DINAS PEKERJAAN UMUM

1 Harga Satuan Dasar Upah


- Pekerja Hari (7 jam) Rp 85,000
Jam Rp 12,143
- Tukang Bongkar Hari (7 jam) Rp 130,000
Jam Rp 18,571
- Tukang Kayu Hari (7 jam) Rp 130,000
Jam Rp 18,571
- Tukang Batu Hari (7 jam) Rp 130,000
Jam Rp 18,571
- Tukang Besi Hari (7 jam) Rp 130,000
Jam Rp 18,571
- Tukang Khusus alluminium Hari (7 jam) Rp 130,000
Jam Rp 18,571
- Tukang Las Hari (7 jam) Rp 130,000
Jam Rp 18,571
- Tukang Cat Hari (7 jam) Rp 130,000
Jam Rp 18,571
- Tukang Pipa Hari (7 jam) Rp 130,000
Jam Rp 18,571
- Kepala Tukang Hari (7 jam) Rp 150,000
Jam Rp 21,429
- Mandor Hari (7 jam) Rp 110,000
Jam Rp 15,714
- Operator Org/Jam Rp 21,429
- Pembantu Operator Org/Jam Rp 17,143
- Sopir/driver Org/Jam Rp 21,429
- Pembantu Sopir Org/Jam Rp 17,143
- Mekanik Org/Jam Rp 21,429
- Pembantu Mekanik Org/Jam Rp 17,143
2 Harga Satuan K3
1 Topi Pelindung (Safety Helmet) Buah Rp 35,000
2 Pelindung Mata (Goggles, Spectacles); Buah Rp 18,000
3 Sarung Tangan (Safety Gloves); Buah Rp 15,000
4 Sepatu Keselamatan (Safety Shoes); Buah Rp 150,000
5 Rompi Keselamatan (Safety Vest); Buah Rp 72,000
6 Bendera K3; Buah Rp 50,000
7 Tali Keselamatan Set Rp 2,500,000
8 Pelindung Jatuh (Fall Arrester) Set Rp 2,000,000

3 Harga Satuan Dasar Bahan Bangunan


a. Bahan Pasangan
- Pasir Pasang/Beton M3 Rp 235,000
Kg Rp 168
- Pasir Urug M3 Rp 159,000
- Portland Cement Kg Rp 1,560
- Portland Cement 50 Kg Zak Rp 78,000
- Semen Warna (Nak untuk tegel) Kg Rp 15,000
Mortar Siap Pakai Kg Rp 180,000
- Urugan Tanah Pilihan M3 Rp 88,200
- Urugan Tanah Biasa M3 Rp 60,000
- Batu Gunung M3 Rp 235,000
- Batu Bata Buah Rp 788
- Hebel / bata Ringan M3 Rp 15,581
Buah Rp 188
- Batu Pecah 1-2 cm M3 Rp 350,000
- Batu Pecah 2-3 cm M3 Rp 449,263
Kg Rp 333
- Kerikil M3 Rp 305,282
- Sirtu Gunung M3 Rp 191,625
- Sirtu Kali M3 Rp 191,625
- Kapur M3 Rp 506,930
- Paving Blok K.300 (ukuran 10 cm x 20 cm, tebal 8 cm) M2 Rp 100,268
- Paving Blok K.250 (ukuran 10 cm x 20 cm, tebal 8 cm) Bh Rp 3,250
Pancang Beton 25x25 Cm, K-450 m1 Rp 450,000
- Topi Uskup (pengancing paving blok) Bh Rp 7,000
- Cansteen (ukuran 20 cm x 60 cm) Bh Rp 75,000
- Cansteen (ukuran 30 cm x 60 cm) Bh Rp 100,000
- Agregat Kasar M3 Rp 421,667
- Agregat Halus M3 Rp 498,333
- Air Bersih M3 Rp 79
- Minyak Begisting Liter Rp 12,500

b Bahan Penggantung
- Kunci Tanam 2 x Putar Buah Rp 203,500
- Kunci Tanam Antik Buah Rp 422,625
Kunci Pintu Aluminium dan Accesories Buah Rp 250,000
- Grendel Jendela Buah Rp 38,000
- Grendel Pintu Tanam Buah Rp 50,000
- Engsel Pintu Buah Rp 34,500
- Door Closer Buah Rp 190,181
Rel pintu sorong Set Rp 750,000
c Bahan Lantai
- Lantai Granito ukuran 60 x 60 cm Buah Rp 93,333
- Tegel Plint Keramik ukuran 10 x 60 cm Buah Rp 18,667
- Tegel Dinding Keramik ukuran 30 x 60 cm Buah Rp 46,667
d Bahan Dinding
- Dinding terawang 20x20x11 (rooster) Buah Rp 16,000

e Bahan Penutup Langit - Langit


- Tripleks Tebal 3 mm Lembar Rp 72,700
- List profil Gypsum Mtr Rp 20,000
- List PVC Mtr Rp 23,000
- Plywood 9 mm Lbr Rp 120,000
- Multipleks 9 Mm Ex. Palem Lbr Rp 135,000
- Multipleks 12 Mm Ex. Palem Lbr Rp 178,000
- Multipleks 15 Mm Ex. Palem Lbr Rp 240,000
- Taco HPL Lbr Rp 185,000
- Lem Fox/ Karet 168 Kg Rp 54,000
- Paku skrup kg Rp 90,000
- Gipsumboard 240 x 120 x 0,9 cm Lbr Rp 85,575
- Plafond PVC 20 Cm T. 8 Mm Lbr Rp 95,000
- Kalsiplank 2x20 Cm Mtr Rp 18,750
f Bahan penutup Atap
- Seng Gelombang BJL.S 10 Lembar Rp 52,500
- Spandek 0,3 Mm M Rp 68,000
g Bahan Kayu
- Kayu Balok Klas II M3 Rp 4,200,000
- Kayu Balok Klas III M3 Rp 3,360,000
- Kayu Balok Begisting Klas IV M3 Rp 1,800,000
- Papan Kayu Kelas II M3 Rp 2,400,000
- Papan Kayu Kelas III M3 Rp 2,400,000
- Papan Kayu Kelas III untuk papan begisting/mall M3 Rp 1,800,000
- Dolken Btg Rp 7,000

h Bahan Besi dan Aluminium


- Baja Tulangan U24 Polos Kg Rp 24,000
- Besi IWF Kg Rp 20,000
- Besi Profil Kg Rp 20,000
- Besi Struktur/Polos Kg Rp 17,000
- Kawat beton Kg Rp 19,800
- Paku Biasa/Campur Kg Rp 17,500
- Paku Gypsumboard 120x240x9 Cm Kg Rp 90,000
- Sekrup Atap Kg Rp 150,000
- Rangka Metal Hollow 40.40.2 (Rangka Plafond) M1 Rp 5,250
Pintu Kaca 12 Mm Frameless floor hinge dorma BTS 84 Buah Rp 6,000,000
- Daun Pintu Plat Aluminium Spandrell Unit Rp 1,500,000
- Profil Batang Kesmen Aluminium M' Rp 61,417
- Kusen Aluminium Profil M 4" Ex. Alu Prima M' Rp 71,917
- Tutup Kaca Mati 4" M' Rp 35,533
- Ambang Bawah M' Rp 96,417
- Ambang Atas / Tegak M' Rp 75,367
- Penutup Lurus Polos M' Rp 25,167
- Kaca tempered 12 mm M2 Rp 1,210,000
- Floor hinges Ex. Dekson Set Rp 1,100,000
- Overpanel Set Rp 495,000
- Top patch fitting Set Rp 495,000
- Bottom patch fitting Set Rp 495,000
- Bottom patch lock + cylinder Set Rp 1,045,000
- Pull handle Set Rp 148,500
- List aluminium U M1 Rp 16,500
- Kaca tempered 10 mm M2 Rp 1,100,000
- Sealant Ex. Dow Corning/Col. Clear Bh Rp 55,000
- High Pressure Laminate (HPL) Lbr Rp 198,000
- Frame Aluminium 4" Kesmen M1 Rp 81,583
- Sanblast Putih Buram M2 Rp 132,000
- Engsel Pintu Buah Rp 44,000
- Engsel Jendela Buah Rp 33,000
- Kunci Pintu Ex. Dekson Set Rp 385,000
- Sekrup Kg Rp 165,000
- Aluminium Kotak 1 Cm M1 Rp 22,000
- Rell 2 ,4 Meter Set Rp 660,000
- Plat Spandrell Aluminium 0,6 Mm Lmbr Rp 220,000
- Rangka Pintu M' Rp 36,667
- Balangkoak M' Rp 24,750
- Tangga" M' Rp 82,500
- Hollow 1/2 x 3/4 M' Rp 20,833
- Spycoat M' Rp 10,787
- Skrup Aluminium Bh Rp 600
- Baut Fixer Bh Rp 2,140
Baut (Srew driver) Bh Rp 700
- Paku Rivet Bh Rp 250
- Sealant Tube Rp 40,000
- Profil kaca M Rp 20,000
- Karet C M1 Rp 6,462
- Galvalume HI100 CI 75.75 M' Rp 52,710
- Dynabol dia 12 x 120 mm Bh Rp 2,359
- Reng Canal Baja Ringan M1 Rp 20,000
- Baja Ringan Canal C 75.0,75 M' Rp 18,333
- Talang / Jurai Canai Dingin M1 Rp 30,000
- Perforated Metal Panel m2 Rp 656,250
- Paku Skrup Kg Rp 32,225
- Pipa Stainless steel 2,5 " M1 Rp 75,000
- Baja Profil Siku Kg Rp 20,500
- Baja Profil UNP Kg Rp 20,500
- Besi Pengaku Kg Rp 19,367
- Kawat Las Listrik Kg Rp 24,750
- Tandon Stainless Air Bersih 1500 Liter Buah Rp 5,400,000
- Baut HTB M16 Buah Rp 21,000
- Aluminium Composite Panel M2 Rp 408,800
- Hollow Besi Galvanis 20.40.2mm M' Rp 22,183
- Hollow Besi Galvanis 40.40.2mm M' Rp 33,183
- Braket Siku / spigot / stiffener Btg Rp 40,000
- Paku Sekrup Beton kg Rp 405,000
- Paku Sekrup kg Rp 21,000
- Sealant Bh Rp 40,000
- Plat Bondek 0,75 mm m2 Rp 183,333
- Stiffener Aluminium Bh Rp 37,000

i Bahan Cat
- Cat besi Kg Rp 13,000
- Plamur Tembok Kg Rp 19,320
- Cat Tembok Lenkote Sunguard Eksterior Kg Rp 114,000
- Cat Tembok Lenkote Sunguard Interior Kg Rp 102,795
- Cat Minyak Kg Rp 18,113
- Meni Besi Kg Rp 19,320
- Cat No Drop/Anti Lumut Kg Rp 120,000

j Bahan Sanitair / Saluran Air


- Pipa PVC dia 1/2 Inci Meter Rp 25,750
- Pipa PVC dia 3/4 Inci Meter Rp 28,750
- Pipa PVC dia 1 Inci Meter Rp 35,700
- Pipa PVC dia 1½ Inci Meter Rp 74,750
- Pipa PVC dia 3 Inci Meter Rp 100,000
- Pipa PVC dia 4 Inci (RR z-join) Meter Rp 287,500
- Pipa PGalvanis dia 2,5 Inci Meter Rp 220,000
- Seal Tape/Isolasi Pipa Buah Rp 9,600
- Kloset Duduk Toto Buah Rp 3,700,000
- Kloset Duduk KIA Buah Rp 1,700,000
- Wastafel M3 Rp 500,000
- Kran Air 1/2 " - 1 " Buah Rp 205,000
- Floor Drain Buah Rp 150,000
- Urinoir Buah Rp 1,677,225
- Jetshower Buah Rp 200,000

k Bahan Lain - Lain


- Kaca. Bening 5 mm M2 135,000
- Kaca Rasa (Cermin) Lembar 5 Mm M2 Rp 300,000
- Sunglass Pintu Kaca M2 Rp 150,000
- Glass Block Buah Rp 23,000

Kendari, Januari 2022

Dibuat Oleh :
Konsultan Perencana
CV. DIGITAL ENGINEERING CONSULTANT
Pusat Kendari

LA NGKURI.,ST.,M.Sc
Direktur
ANALISA HARGA SATUAN PEKERJAAN
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.2 (K3) Pembuatan 1 m1 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 85,000 17,000.00
Tukang Kayu L.02.04 OH 0.4000 130,000 52,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0200 110,000 2,200.00
JUMLAH TENAGA KERJA 74,200.00
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 7,000 8,750.00
Semen portland Kg 2.5000 1,560 3,900.00
Seng gelombang Lembar 1.2000 52,500 63,000.00
Pasir beton m3 0.0050 235,000 1,175.00
Koral beton m3 0.0090 305,282 2,747.54
Kayu Balok 5/7 Kelas III m3 0.0720 3,360,000 241,920.00
Paku biasa/Campur Kg 0.0600 17,500 1,050.00
Meni besi Liter 0.4500 19,320 8,694.00
JUMLAH HARGA BAHAN 331,236.54
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 405,436.54
E Overhead & Profit 15% 15% 60,815.48
F Harga Satuan Pekerjaan (D+E) - 466,252.00

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.1000 85,000 8,500.00
Tukang Kayu L.02.04 OH 0.1000 130,000 13,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0050 110,000 550.00
JUMLAH TENAGA KERJA 23,550.00
B BAHAN
Kayu balok 5/7 Kelas III m3 0.0120 3,360,000 40,320.00
Kayu papan 3/20 Kelas III m3 0.0070 1,800,000 12,600.00
Paku biasa/Campur Kg 0.0200 17,500 350.00
JUMLAH HARGA BAHAN 53,270.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 76,820.00
E Overhead & Profit 15% 15% 11,523.00
F Harga Satuan Pekerjaan (D+E) - 88,343.00

A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1.0000 85,000 85,000.00
Tukang Kayu L.02.04 OH 2.0000 130,000 260,000.00
Kepala Tukang L.03.01 OH 0.2000 150,000 30,000.00
Mandor L.04.01 OH 0.0500 110,000 5,500.00
JUMLAH TENAGA KERJA 380,500.00
B BAHAN
Dolken kayu diameter 8-10/400 cm Batang 1.2500 7,000 8,750.00
Kayu papan 3/20 Kelas III m3 1.8600 1,800,000 3,348,000.00
Paku biasa/Campur Kg 0.3000 17,500 5,250.00
Semen Portland Kg 18.0000 1,560 28,080.00
Pasir Beton Kg 0.0300 168 5.04
Koral Beton Kg 0.0500 333 16.64
Seng Gelombang Lembar 1.5000 52,500 78,750.00
Plywood 4 mm Lembar 1.3500 72,700 98,145.00
JUMLAH HARGA BAHAN 3,362,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,844,998.34
E Overhead & Profit 15% 15% 576,749.75
F Harga Satuan Pekerjaan (D+E) - 4,421,748.00
A. 2.2.1.9 (K3) Pembersihan 1 m2 lapangan dan perataan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.1000 85,000 8,500.00
Mandor L.04.01 OH 0.0050 110,000 550.00
JUMLAH TENAGA KERJA 9,050.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,050.00
E Overhead & Profit 15% 15% 1,357.50
F Harga Satuan Pekerjaan (D+E) - 10,407.00

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.7500 85,000 63,750.00
Mandor L.04.01 OH 0.0250 110,000 2,750.00
JUMLAH TENAGA KERJA 66,500.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 66,500.00
E Overhead & Profit 15% 15% 9,975.00
F Harga Satuan Pekerjaan (D+E) - 76,475.00

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.9000 85,000 76,500.00
Mandor L.04.01 OH 0.0450 110,000 4,950.00
JUMLAH TENAGA KERJA 81,450.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 81,450.00
E Overhead & Profit 15% 15% 12,217.50
F Harga Satuan Pekerjaan (D+E) - 93,667.00

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah Tanah Biasa Sedalam 1 Meter


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2500 85,000 21,250.00
Mandor L.04.01 OH 0.0250 110,000 2,750.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 24,000.00
E Overhead & Profit 15% 15% 3,600.00
F Harga Satuan Pekerjaan (D+E) - 27,600.00
A.2.3.1.14. Pengurugan 1 m3 tanah Tanah Timbunan Biasa Didatangkan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2500 85,000 21,250.00
Mandor L.04.01 OH 0.0250 110,000 2,750.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN - -
Tanah Timbunan Didatangkan M3 1.2000 60,000 72,000.00
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 96,000.00
E Overhead & Profit 15% 15% 14,400.00
F Harga Satuan Pekerjaan (D+E) - 110,400.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.3000 85,000 25,500.00
Mandor L.04.01 OH 0.0100 110,000 1,100.00
JUMLAH TENAGA KERJA 26,600.00
B BAHAN - -
Pasir urug M3 1.2000 159,000 190,800.00
JUMLAH HARGA BAHAN 190,800.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 217,400.00
E Overhead & Profit 15% 15% 32,610.00
F Harga Satuan Pekerjaan (D+E) - 250,010.00

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7800 85,000 66,300.00
Tukang Batu L.02.03 OH 0.3900 130,000 50,700.00
Kepala Tukang L.03.01 OH 0.0390 150,000 5,850.00
Mandor L.04.01 OH 0.0390 110,000 4,290.00
JUMLAH TENAGA KERJA 127,140.00
B BAHAN
Batu belah m3 1.2000 235,000 282,000.00
Pasir urug m3 0.4320 159,000 68,688.00
JUMLAH HARGA BAHAN 350,688.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 477,828.00
E Overhead & Profit 15% 15% 71,674.20
F Harga Satuan Pekerjaan (D+E) - 549,502.00

A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.5000 85,000 127,500.00
Tukang Batu L.02.03 OH 0.7500 130,000 97,500.00
Kepala Tukang L.03.01 OH 0.0750 150,000 11,250.00
Mandor L.04.01 OH 0.0750 110,000 8,250.00
JUMLAH TENAGA KERJA 244,500.00
B BAHAN
Batu belah m3 1.2000 235,000 282,000.00
Semen portland Kg 163.0000 1,560 254,280.00
Pasir Pasang m3 0.5230 235,000 122,905.00
JUMLAH HARGA BAHAN 659,185.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 903,685.00
E Overhead & Profit 15% 15% 135,552.75
F Harga Satuan Pekerjaan (D+E) - 1,039,237.00
A.3.2.1.11. Analisa 1 M1 Pemancangan Tiang Pancang Beton K 25 x 25 Cm K-450
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Kerja + Peralatan L.01.01 M1 1.0000 450,000 450,000.00
JUMLAH TENAGA KERJA 450,000.00
B BAHAN
Pancang Beton M1 1.0000 450,000 450,000.00
JUMLAH HARGA BAHAN 450,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 900,000.00
E Overhead & Profit 15% 15% 135,000.00
F Harga Satuan Pekerjaan (D+E) - 1,035,000.00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.3 Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 85,000 140,250.00
Tukang Batu L.02.03 OH 0.2750 130,000 35,750.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 110,000 9,130.00
JUMLAH TENAGA KERJA 189,330.00
B BAHAN
Semen portland kg 299.0000 1,560 466,440.00
Pasir Beton kg 799.0000 168 134,117.86
Kerikil (Maks 30 mm) kg 1017.0000 333 338,444.79
Air Liter 215.0000 79 16,931.25
JUMLAH HARGA BAHAN 955,933.90
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,145,263.90
E Overhead & Profit 15% 15% 171,789.59
F Harga Satuan Pekerjaan (D+E) - 1,317,053.00
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

A.4.1.1.1 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 85,000 140,250.00
Tukang Batu L.02.03 OH 0.2750 130,000 35,750.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 110,000 9,130.00
JUMLAH TENAGA KERJA 189,330.00
B BAHAN
Semen portland kg 247.0000 1,560 385,320.00
Pasir Beton kg 869.0000 168 145,867.86
Kerikil (Maks 30 mm) kg 999.0000 333 332,454.62
Air Liter 215.0000 79 16,931.25
JUMLAH HARGA BAHAN 880,573.73
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,069,903.73
E Overhead & Profit 15% 15% 160,485.56
F Harga Satuan Pekerjaan (D+E) - 1,230,389.00
A.4.1.1.8. Membuat 1 m3 beton mutu f'c= 21,7 MPa (K 250)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 85,000 140,250.00
Tukang Batu L.02.03 OH 0.2750 130,000 35,750.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 110,000 9,130.00
JUMLAH TENAGA KERJA 189,330.00
B BAHAN
Semen portland kg 384.0000 1,560 599,040.00
Pasir Beton kg 692.0000 168 116,157.14
Kerikil (Maks 30 mm) kg 1039.0000 333 345,766.12
Air Liter 215.0000 79 16,931.25
JUMLAH HARGA BAHAN 1,077,894.51
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,267,224.51
E Overhead & Profit 15% 15% 190,083.68
F Harga Satuan Pekerjaan (D+E) - 1,457,308.00

A.4.1.1.17 Pembesian 10 kg dengan besi ulir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0700 85,000 5,950.00
Tukang Besi L.02.05 OH 0.0700 130,000 9,100.00
Kepala Tukang L.03.01 OH 0.0070 150,000 1,050.00
Mandor L.04.01 OH 0.0040 110,000 440.00
JUMLAH TENAGA KERJA 16,540.00
B BAHAN
Besi beton (polos/ulir) kg 10.5000 17,000 178,500.00
Kawat beton kg 0.1500 19,800 2,970.00
JUMLAH HARGA BAHAN 181,470.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 198,010.00
E Overhead & Profit 15% 15% 29,701.50
F Harga Satuan Pekerjaan (D+E) - 22,771.10

A.4.1.1.18 Pemasangan 1 m2 bekisting untuk pondasi telapak beton bangunan gedung


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5200 85,000 44,200.00
Tukang Kayu L.02.04 OH 0.2600 130,000 33,800.00
Kepala Tukang L.03.01 OH 0.0260 150,000 3,900.00
Mandor L.04.01 OH 0.0260 110,000 2,860.00
JUMLAH TENAGA KERJA 84,760.00
B BAHAN
Kayu kelas III m3 0.0400 1,800,000 72,000.00
Paku 5 - 10 cm kg 0.3000 17,500 5,250.00
Minyak bekisting Liter 0.1000 12,500 1,250.00
JUMLAH HARGA BAHAN 78,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 163,260.00
E Overhead & Profit 15% 15% 24,489.00
F Harga Satuan Pekerjaan (D+E) - 187,749.00
A.4.1.1.19 Pemasangan 1 m2 bekisting untuk sloof beton bangunan gedung
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5200 85,000 44,200.00
Tukang Kayu L.02.04 OH 0.2600 130,000 33,800.00
Kepala Tukang L.03.01 OH 0.0260 150,000 3,900.00
Mandor L.04.01 OH 0.0260 110,000 2,860.00
JUMLAH TENAGA KERJA 84,760.00
B BAHAN
Kayu kelas III m3 0.0450 1,800,000 81,000.00
Paku 5 - 10 cm kg 0.3000 17,500 5,250.00
Minyak bekisting Liter 0.1000 12,500 1,250.00
JUMLAH HARGA BAHAN 87,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 172,260.00
E Overhead & Profit 15% 15% 25,839.00
F Harga Satuan Pekerjaan (D+E) - 198,099.00

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk kolom beton bangunan gedung


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 85,000 56,100.00
Tukang Kayu L.02.04 OH 0.3300 130,000 42,900.00
Kepala Tukang L.03.01 OH 0.0330 150,000 4,950.00
Mandor L.04.01 OH 0.0330 110,000 3,630.00
JUMLAH TENAGA KERJA 107,580.00
B BAHAN
Kayu kelas III m3 0.0400 1,800,000 72,000.00
Paku 5 - 12 cm kg 0.4000 17,500 7,000.00
Minyak bekisting Liter 0.2000 12,500 2,500.00
Balok kayu kelas II m3 0.0150 4,200,000 63,000.00
Plywood 9 mm Lbr 0.3500 120,000 42,000.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 7,000 14,000.00
JUMLAH HARGA BAHAN 200,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 308,080.00
E Overhead & Profit 15% 15% 46,212.00
F Harga Satuan Pekerjaan (D+E) - 354,292.00

A.4.1.1.21 Pemasangan 1 m2 bekisting untuk balok bangunan gedung


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 85,000 56,100.00
Tukang Kayu L.02.04 OH 0.3300 130,000 42,900.00
Kepala Tukang L.03.01 OH 0.0330 150,000 4,950.00
Mandor L.04.01 OH 0.0330 110,000 3,630.00
JUMLAH TENAGA KERJA 107,580.00
B BAHAN
Kayu kelas III m3 0.0400 1,800,000 72,000.00
Paku 5 - 12 cm kg 0.4000 17,500 7,000.00
Minyak bekisting Liter 0.2000 12,500 2,500.00
Balok kayu kelas II m3 0.0180 4,200,000 75,600.00
Plywood 9 mm Lbr 0.3500 120,000 42,000.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 7,000 14,000.00
JUMLAH HARGA BAHAN 213,100.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 320,680.00
E Overhead & Profit 15% 15% 48,102.00
F Harga Satuan Pekerjaan (D+E) - 368,782.00
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 85,000 56,100.00
Tukang Kayu L.02.04 OH 0.3300 130,000 42,900.00
Kepala Tukang L.03.01 OH 0.0330 150,000 4,950.00
Mandor L.04.01 OH 0.0330 110,000 3,630.00
JUMLAH TENAGA KERJA 107,580.00
B BAHAN
Kayu kelas III m3 0.0400 2,400,000 96,000.00
Paku 5 - 12 cm kg 0.4000 17,500 7,000.00
Minyak bekisting Liter 0.2000 18,113 3,622.60
Balok kayu kelas III m3 0.0150 3,360,000 50,400.00
Bondek 0,75 mm m2 1.0000 183,333 183,333.00
Dolken kayu Ø 8-10/400 cm Batang 6.0000 7,000 42,000.00
JUMLAH HARGA BAHAN 382,355.60
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 489,935.60
E Overhead & Profit 15% 15% 73,490.34
F Harga Satuan Pekerjaan (D+E) - 563,425.00

A.4.1.1.25 Pemasangan 1 m2 bekisting untuk tangga beton bangunan gedung


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 85,000 56,100.00
Tukang Kayu L.02.04 OH 0.3300 130,000 42,900.00
Kepala Tukang L.03.01 OH 0.0330 150,000 4,950.00
Mandor L.04.01 OH 0.0330 110,000 3,630.00
JUMLAH TENAGA KERJA 107,580.00
B BAHAN
Kayu kelas III m3 0.0300 2,400,000 72,000.00
Paku 5 - 12 cm kg 0.4000 17,500 7,000.00
Minyak bekisting Liter 0.1500 18,113 2,716.95
Balok kayu kelas II m3 0.0150 3,360,000 50,400.00
Plywood 9 mm Lbr 0.3500 183,333 64,166.55
Dolken kayu Ø 8-10/400 cm Batang 2.0000 7,000 14,000.00
JUMLAH HARGA BAHAN 210,283.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 317,863.50
E Overhead & Profit 15% 15% 47,679.53
F Harga Satuan Pekerjaan (D+E) - 365,543.00

A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.3000 85,000 450,500.00
Tukang batu L.02.03 OH 0.2750 130,000 35,750.00
Tukang kayu L.02.04 OH 1.3000 130,000 169,000.00
Tukang besi L.02.05 OH 1.0500 130,000 136,500.00
Kepala tukang L.03.01 OH 0.2620 150,000 39,300.00
Mandor L.04.01 OH 0.2650 110,000 29,150.00
JUMLAH TENAGA KERJA 860,200.00
B BAHAN
Kayu kelas III m3 0.2000 1,800,000 360,000.00
Paku Biasa kg 1.5000 17,500 26,250.00
Minyak bekisting Liter 0.4000 18,113 7,245.20
Besi beton (polos/ulir) kg 157.5000 17,000 2,677,500.00
Kawat beton kg 2.2500 19,800 44,550.00
Semen portland kg 336.0000 1,560 524,160.00
Pasir Beton m3 0.5400 235,000 126,900.00
Kerikil m3 0.8100 305,282 247,278.42
JUMLAH HARGA BAHAN 4,013,883.62
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 4,874,083.62
E Overhead & Profit 15% 15% 731,112.54
F Harga Satuan Pekerjaan (D+E) - 5,605,196.00
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1800 85,000 15,300.00
Tukang batu L.02.03 OH 0.0200 130,000 2,600.00
Tukang kayu L.02.04 OH 0.0200 130,000 2,600.00
Tukang besi L.02.05 OH 0.0200 130,000 2,600.00
Kepala tukang L.03.01 OH 0.0060 150,000 900.00
Mandor L.04.01 OH 0.0090 110,000 990.00
JUMLAH TENAGA KERJA 24,990.00
B BAHAN
Kayu kelas III m3 0.0020 2,400,000 4,800.00
Paku Biasa kg 0.0100 17,500 175.00
Minyak bekisting Liter 1.2000 18,113 21,735.60
Besi beton (polos/ulir) kg 3.0000 17,000 51,000.00
Kawat beton kg 0.4500 19,800 8,910.00
Semen portland kg 4.0000 1,560 6,240.00
Pasir Beton m3 0.0060 235,000 1,410.00
Kerikil m3 0.0090 305,282 2,747.54
JUMLAH HARGA BAHAN 97,018.14
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 122,008.14
E Overhead & Profit 15% 15% 18,301.22
F Harga Satuan Pekerjaan (D+E) - 140,309.00

A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2970 85,000 25,245.00
Tukang batu L.02.03 OH 0.0330 130,000 4,290.00
Tukang kayu L.02.04 OH 0.0330 130,000 4,290.00
Tukang besi L.02.05 OH 0.0330 130,000 4,290.00
Kepala tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 110,000 1,650.00
JUMLAH TENAGA KERJA 41,265.00
B BAHAN
Kayu kelas III m3 0.0030 2,400,000 7,200.00
Paku Biasa kg 0.0200 17,500 350.00
Minyak bekisting Liter 1.2000 18,113 21,735.60
Besi beton (polos/ulir) kg 3.6000 17,000 61,200.00
Kawat beton kg 0.0500 19,800 990.00
Semen portland kg 5.5000 1,560 8,580.00
Pasir Beton m3 0.0090 235,000 2,115.00
Kerikil m3 0.0150 305,282 4,579.23
JUMLAH HARGA BAHAN 106,749.83
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 148,014.83
E Overhead & Profit 15% 15% 22,202.22
F Harga Satuan Pekerjaan (D+E) - 170,217.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. Pemasangan 1 kg besi profil
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0600 85,000 5,100.00
Tukang Las Konstruksi L.02.10 OH 0.0600 130,000 7,800.00
Kepala tukang L.03.01 OH 0.0060 150,000 900.00
Mandor L.04.01 OH 0.0030 110,000 330.00
JUMLAH TENAGA KERJA 14,130.00
B BAHAN
Besi Profil Kg 1.1500 20,000 23,000.00
JUMLAH HARGA BAHAN 23,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 37,130.00
E Overhead & Profit 15% 15% 5,569.50
F Harga Satuan Pekerjaan (D+E) - 42,699.00

A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0600 85,000 5,100.00
Tukang Las Konstruksi L.02.10 OH 0.0600 130,000 7,800.00
Kepala tukang L.03.01 OH 0.0060 150,000 900.00
Mandor L.04.01 OH 0.0030 110,000 330.00
JUMLAH TENAGA KERJA 14,130.00
B BAHAN
Besi IWF Kg 1.1500 20,000 23,000.00
JUMLAH HARGA BAHAN 23,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 37,130.00
E Overhead & Profit 15% 15% 5,569.50
F Harga Satuan Pekerjaan (D+E) - 42,699.00

A.4.2.1.20. Pemasangan 1 m2 rangka Besi Hollow 1x40,40,2 Mm, modul 60 x 60 cm, Rangka Plafond
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 85,000 29,750.00
Tukang Besi L.02.05 OH 0.3500 130,000 45,500.00
Kepala Tukang L.03.01 OH 0.0350 150,000 5,250.00
Mandor L.04.01 OH 0.0180 110,000 1,980.00
JUMLAH TENAGA KERJA 82,480.00
B BAHAN
Rangka Metal Hollow 40.40.2 M1 4.0000 5,250 21,000.00
Accesories Ls 1.0000 21,000 21,000.00
JUMLAH HARGA BAHAN 42,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 124,480.00
E Overhead & Profit 15% 15% 18,672.00
F Harga Satuan Pekerjaan (D+E) - 143,152.00
A.4.2.1.24. Pemasangan 1 M2 Pasang Kuda-kuda Baja Ringan + Reng untuk Atap Genteng Biasa/Metal
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 85,000 17,000.00
Tukang Besi L.02.05 OH 0.4500 130,000 58,500.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0500 110,000 5,500.00
JUMLAH TENAGA KERJA 82,500.00
B BAHAN
Baja ringan canal C75.0,75 M' 3.7200 18,333 68,200.00
Baut (Srew driver) bh 28.0000 700 19,600.00
Dynabol dia 12 x 120 mm bh 2.0000 2,359 4,718.00
Reng Canal 0,7 M' 5.4000 20,000 108,000.00
Talang / Jurai Canai Dingin M' 0.1240 30,000 3,720.00
JUMLAH HARGA BAHAN 204,238.00
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 286,738.00
E Overhead & Profit 15% 15% 43,010.70
F Harga Satuan Pekerjaan (D+E) - 329,748.00

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu dengan mortar type N,fc'5,2 Mpa (setara campuran 1SP :4PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 85,000 25,500.00
Tukang Batu L.02.03 OH 0.1000 130,000 13,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 110,000 1,650.00
JUMLAH TENAGA KERJA 41,650.00
B BAHAN
Bata merah m2 70.0000 788 55,160.00
Semen portland Kg 11.5000 1,560 17,940.00
Pasir Pasang m3 0.0430 235,000 10,105.00
JUMLAH HARGA BAHAN 83,205.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 124,855.00
E Overhead & Profit 15% 15% 18,728.25
F Harga Satuan Pekerjaan (D+E) - 143,583.00

A.4.4.1.11 Pemasangan 1m2 dinding bata Ringan (Hebel) (10x20x60)cm tebal ½ batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 85,000 25,500.00
Tukang Batu L.02.03 OH 0.1000 130,000 13,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 110,000 1,650.00
JUMLAH TENAGA KERJA 41,650.00
B BAHAN
Bata merah m3 70.0000 788 55,160.00
Semen portland Kg 8.3200 1,560 12,979.20
JUMLAH HARGA BAHAN 68,139.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 109,789.20
E Overhead & Profit 15% 15% 16,468.38
F Harga Satuan Pekerjaan (D+E) - 126,257.00
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.671 85,000 57,035.00
Tukang Batu L.02.03 OH 0.130 130,000 16,900.00
Kepala Tukang L.03.01 OH 0.013 150,000 1,950.00
Mandor L.04.01 OH 0.003 110,000 330.00
JUMLAH TENAGA KERJA 76,215.00
B BAHAN
Bata ringan tebal 10cm Bh 8.400 15,581 130,883.72
Mortar siap pakai Kg 0.063 180,000 11,340.00
JUMLAH HARGA BAHAN 142,223.72
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 142,224 14,222.37
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 225,549.91
E Overhead & Profit 15% 15% 33,832.49
F Harga Satuan Pekerjaan (D+E) - 259,382.00

A. 4.4.1.23 Pemasangan 1 M2 dinding Terawang (rooster) 11x20x20 dengan mortar tipe N,fc' 5,2 Mpa (setara campuran 1SP : 4PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.300 85,000 25,500.00
Tukang Batu L.02.03 OH 0.100 130,000 13,000.00
Kepala Tukang L.03.01 OH 0.010 150,000 1,500.00
Mandor L.04.01 OH 0.015 110,000 1,650.00
JUMLAH TENAGA KERJA 41,650.00
B BAHAN
Dinding terawang 20x20x11 (rooster) Bh 25.000 16,000 400,000.00
Semen Portland Kg 11.000 1,560 17,160.00
Pasir Pasang M3 0.035 235,000 8,225.00
JUMLAH HARGA BAHAN 425,385.00
C PERALATAN
Peralatan Pasang Dinding Bata Ringan - - - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 467,035.00
E Overhead & Profit 15% 15% 70,055.25
F Harga Satuan Pekerjaan (D+E) - 537,090.00

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah Gypsum rangkap, rangka Kanal C 75,0.65


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.15 85,000 12,750.00
Tukang kayu L.02 OH 0.45 130,000 58,500.00
Kepala tukang L.03 OH 0.045 150,000 6,750.00
Mandor L.04 OH 0.008 110,000 880.00
JUMLAH TENAGA KERJA 78,880.00
B BAHAN
Kanal C 75.0,65 M1 3.900 18,333 71,500.00
Sekrup Gypsum kg 0.150 32,225 4,833.75
Gypsum Board 120x240x0,9 lembar 0.860 85,575 73,594.50
Cornice kg 0.560 19,320 10,819.20
JUMLAH HARGA BAHAN 76,333.75
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 197,420.60
E Overhead & Profit 15% 15% 29,613.09
F Harga Satuan Pekerjaan (D+E) - 227,033.00
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 85,000 25,500.00
Tukang Batu L.02.03 OH 0.1500 130,000 19,500.00
Kepala Tukang L.03.01 OH 0.0150 150,000 2,250.00
Mandor L.04.01 OH 0.0150 110,000 1,650.00
JUMLAH TENAGA KERJA 48,900.00
B BAHAN
Semen portland Kg 7.7760 1,560 12,130.56
Pasir Pasang m3 0.0230 235,000 5,405.00
JUMLAH HARGA BAHAN 17,535.56
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 66,435.56
E Overhead & Profit 15% 15% 9,965.33
F Harga Satuan Pekerjaan (D+E) - 76,400.00

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 85,000 25,500.00
Tukang Batu L.02.03 OH 0.1500 130,000 19,500.00
Kepala Tukang L.03.01 OH 0.0150 150,000 2,250.00
Mandor L.04.01 OH 0.0150 110,000 1,650.00
JUMLAH TENAGA KERJA 48,900.00
B BAHAN
Semen portland Kg 5.1840 1,560 8,087.04
Pasir Pasang m3 0.0260 235,000 6,110.00
JUMLAH HARGA BAHAN 14,197.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,097.04
E Overhead & Profit 15% 15% 9,464.56
F Harga Satuan Pekerjaan (D+E) - 72,561.00

A.4.4.2.27. Pemasangan 1 m2 acian.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 85,000 17,000.00
Tukang Batu L.02.03 OH 0.1000 130,000 13,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0100 110,000 1,100.00
JUMLAH TENAGA KERJA 32,600.00
B BAHAN
Semen portland Kg 3.2500 1,560 5,070.00
JUMLAH HARGA BAHAN 5,070.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 37,670.00
E Overhead & Profit 15% 15% 5,650.50
F Harga Satuan Pekerjaan (D+E) - 43,320.00
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.13. Pemasangan 1m2 lantai Granito ukuran 60cm x60cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2400 85,000 20,400.00
Tukang Batu L.02.03 OH 0.1200 130,000 15,600.00
Kepala tukang L.03.01 OH 0.0120 150,000 1,800.00
Mandor L.04.01 OH 0.0120 110,000 1,320.00
JUMLAH TENAGA KERJA 39,120.00
B BAHAN
Granito Tile ukuran 60cm x60cm Bh 3.1000 93,333 289,333.33
Semen portland kg 9.6000 1,560 14,976.00
Semen Warna Kg 1.5000 15,000 22,500.00
Pasir Pasang M3 0.0450 235,000 10,575.00
JUMLAH HARGA BAHAN 337,384.33
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 376,504.33
E Overhead & Profit 15% 15% 56,475.65
F Harga Satuan Pekerjaan (D+E) - 432,979.00

A.4.4.3.28. Pemasangan 1 m’ plint Granite Tile ukuran 10cm x 60cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0900 85,000 7,650.00
Tukang Batu L.02.03 OH 0.0900 130,000 11,700.00
Kepala tukang L.03.01 OH 0.0350 150,000 5,250.00
Mandor L.04.01 OH 0.0050 110,000 550.00
JUMLAH TENAGA KERJA 25,150.00
B BAHAN
Plint Granito Tile ukuran 10cm x 60cm Bh 1.7000 18,667 31,733.33
Semen portland kg 1.1400 1,560 1,778.40
Semen Warna Kg 0.0030 15,000 45.00
Pasir Pasang M3 0.0500 235,000 11,750.00
JUMLAH HARGA BAHAN 45,306.73
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 70,456.73
E Overhead & Profit 15% 15% 10,568.51
F Harga Satuan Pekerjaan (D+E) - 81,025.00

A.4.4.3.36 Pemasangan 1 m2 dinding keramik 30 cm x 60cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 85,000 59,500.00
Tukang Batu L.02.03 OH 0.3500 130,000 45,500.00
Kepala tukang L.03.01 OH 0.0350 150,000 5,250.00
Mandor L.04.01 OH 0.0350 110,000 3,850.00
JUMLAH TENAGA KERJA 114,100.00
B BAHAN
keramik Dinding 30cm x 60cm Bh 6.2000 46,667 289,333.33
Semen portland Kg 10.0000 1,560 15,600.00
Pasir Pasang M3 0.0450 235,000 10,575.00
Semen Warna Kg 0.5000 15,000 7,500.00
JUMLAH HARGA BAHAN 323,008.33
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 437,108.33
E Overhead & Profit 15% 15% 65,566.25
F Harga Satuan Pekerjaan (D+E) - 502,674.00
A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 85,000 29,750.00
Tukang L.02.03 OH 0.1750 130,000 22,750.00
Kepala tukang L.03.01 OH 0.0170 150,000 2,550.00
Mandor L.04.01 OH 0.0020 110,000 220.00
JUMLAH TENAGA KERJA 55,270.00
B BAHAN
wallpaper lebar 50 cm m 2.2000 21,333 46,933.33
Lem Putih Kg 0.2500 6,000 1,500.00
JUMLAH HARGA BAHAN 48,433.33
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 103,703.33
E Overhead & Profit 15% 15% 15,555.50
F Harga Satuan Pekerjaan (D+E) - 119,258.00

A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1200 85,000 10,200.00
Tukang Batu L.02.03 OH 0.1200 130,000 15,600.00
Kepala tukang L.03.01 OH 0.0120 150,000 1,800.00
Mandor L.04.01 OH 0.0060 110,000 660.00
JUMLAH TENAGA KERJA 28,260.00
B BAHAN
Kayu Papan kelas I M3 0.0030 4,200,000 12,600.00
Paku skrup Kg 0.0500 17,500 875.00
JUMLAH HARGA BAHAN 13,475.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 41,735.00
E Overhead & Profit 15% 15% 6,260.25
F Harga Satuan Pekerjaan (D+E) - 47,995.00

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 85,000 8,500.00
Tukang kayu L.02.04 OH 0.0500 130,000 6,500.00
Kepala tukang L.03.01 OH 0.0050 150,000 750.00
Mandor L.04.01 OH 0.0050 110,000 550.00
JUMLAH TENAGA KERJA 16,300.00
B BAHAN
Gypsum board 9 mm (1200 x 2400 mm) Lembar 0.3640 85,575 31,149.30
Paku skrup kg 0.1100 90,000 9,900.00
JUMLAH HARGA BAHAN 41,049.30
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 57,349.30
E Overhead & Profit 15% 15% 8,602.40
F Harga Satuan Pekerjaan (D+E) - 65,951.00
A.4.5.1.7. Pemasangan 1 m2 langit-langit PVC 20 cm T. 8 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 85,000 12,750.00
Tukang kayu L.02.04 OH 0.4000 130,000 52,000.00
Kepala tukang L.03.01 OH 0.0050 150,000 750.00
Mandor L.04.01 OH 0.0050 110,000 550.00
JUMLAH TENAGA KERJA 66,050.00
B BAHAN
PVC 20 cm T. 8 mm Lembar 1.2600 95,000 119,700.00
Paku Skrup Kg 0.1200 90,000 10,800.00
JUMLAH HARGA BAHAN 130,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 196,550.00
E Overhead & Profit 15% 15% 29,482.50
F Harga Satuan Pekerjaan (D+E) - 226,032.00

A.4.5.1.9. Pemasangan 1 m’ List Langit-Langit PVC


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0500 85,000 4,250.00
Tukang Kayu L.02.04 OH 0.0500 130,000 6,500.00
Kepala tukang L.03.01 OH 0.0050 150,000 750.00
Mandor L.04.01 OH 0.0030 110,000 330.00
JUMLAH TENAGA KERJA 11,830.00
B BAHAN
List Profil PVC M' 1.0500 23,000 24,150.00
Paku Skrup Kg 0.1200 90,000 10,800.00
JUMLAH HARGA BAHAN 34,950.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 46,780.00
E Overhead & Profit 15% 15% 7,017.00
F Harga Satuan Pekerjaan (D+E) - 53,797.00

A.4.5.1.9. Pemasangan 1 m’ list langit-langit


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0500 85,000 4,250.00
Tukang Kayu L.02.04 OH 0.0500 130,000 6,500.00
Kepala tukang L.03.01 OH 0.0050 150,000 750.00
Mandor L.04.01 OH 0.0030 110,000 330.00
JUMLAH TENAGA KERJA 11,830.00
B BAHAN
List profil Gypsum m 1.0500 20,000 21,000.00
Cornice kg 0.0100 19,320 193.20
JUMLAH HARGA BAHAN 21,193.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 33,023.20
E Overhead & Profit 15% 15% 4,953.48
F Harga Satuan Pekerjaan (D+E) - 37,976.00
A.4.5.1.10 Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40
Lihat pada kelompok Pekerjaan Besi dan Alumunium ( A.9.21)
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.39. Pemasangan 1 m2 atap Spandek
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1200 85,000 10,200.00
Tukang Kayu L.02.04 OH 0.0600 130,000 7,800.00
Kepala tukang L.03.01 OH 0.0060 150,000 900.00
Mandor L.04.01 OH 0.0060 110,000 660.00
JUMLAH TENAGA KERJA 19,560.00
B BAHAN
Spandek 0,3 M1 1.1000 68,000 74,800.00
Sekrup Atap Kg 0.0200 150,000 3,000.00
JUMLAH HARGA BAHAN 77,800.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 97,360.00
E Overhead & Profit 15% 15% 14,604.00
F Harga Satuan Pekerjaan (D+E) - 111,964.00

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (1 x 20) cm, Kalsiplank Jadi


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 85,000 8,500.00
Tukang kayu L.02.04 OH 0.2 130,000 26,000.00
Kepala tukang L.03.01 OH 0.02 150,000 3,000.00
Mandor L.04.01 OH 0.005 110,000 550.00
JUMLAH TENAGA KERJA 38,050.00
B BAHAN
Kalsiplank 2x20 Cm M1 1.1 18,750 20,625.00
Sekrup kg 0.1 90,000 9,000.00
JUMLAH HARGA BAHAN 29,625.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 67,675.00
E Overhead & Profit 15% 15% 10,151.25
F Harga Satuan Pekerjaan (D+E) - 77,826.00

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.015 85,000 1,275.00
Tukang kayu L.02.04 OH 0.150 130,000 19,500.00
Kepala tukang L.03.01 OH 0.015 150,000 2,250.00
Mandor L.04.01 OH 0.001 110,000 88.00
JUMLAH TENAGA KERJA 23,113.00
B BAHAN
Kaca tebal 5 mm m2 1.100 135,000 148,500.00
SEalant Kg 0.050 40,000 2,000.00
JUMLAH HARGA BAHAN 150,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 173,613.00
E Overhead & Profit 15% 15% 26,041.95
F Harga Satuan Pekerjaan (D+E) - 199,654.00
A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.015 85,000 1,275.00
Tukang kayu L.02.04 OH 0.150 130,000 19,500.00
Kepala tukang L.03.01 OH 0.015 150,000 2,250.00
Mandor L.04.01 OH 0.008 110,000 880.00
JUMLAH TENAGA KERJA 23,905.00
B BAHAN
Kaca cermin 5 mm m2 1.100 300,000 330,000.00
JUMLAH HARGA BAHAN 330,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 353,905.00
E Overhead & Profit 15% 15% 53,085.75
F Harga Satuan Pekerjaan (D+E) - 406,990.00

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.10. Pengecatan 1 m2 tembok baru Eksterior ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.020 85,000 1,700.00
Tukang cat L.02.08 OH 0.063 130,000 8,190.00
Kepala tukang L.03.01 OH 0.006 150,000 945.00
Mandor L.04.01 OH 0.003 110,000 330.00
JUMLAH TENAGA KERJA 11,165.00
B BAHAN
Plamuur Kg 0.100 19,320 1,932.00
Cat dasar Sunguard Kg 0.100 114,000 11,400.00
Cat Penutup Sunguard Kg 0.260 114,000 29,640.00
JUMLAH HARGA BAHAN 42,972.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 54,137.00
E Overhead & Profit 15% 15% 8,120.55
F Harga Satuan Pekerjaan (D+E) - 62,257.00

A.4.7.1.10.1 Pengecatan 1 m2 tembok baru Interior ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.020 85,000 1,700.00
Tukang cat L.02.08 OH 0.063 130,000 8,190.00
Kepala tukang L.03.01 OH 0.006 150,000 945.00
Mandor L.04.01 OH 0.003 110,000 330.00
JUMLAH TENAGA KERJA 11,165.00
B BAHAN
Plamuur Kg 0.100 19,320 1,932.00
Cat Dasar ICI Nippon Paint Kg 0.100 102,795 10,279.50
Cat Penutup ICI Nippon Paint Kg 0.260 102,795 26,726.70
JUMLAH HARGA BAHAN 38,938.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 50,103.20
E Overhead & Profit 15% 15% 7,515.48
F Harga Satuan Pekerjaan (D+E) - 57,618.00
A.4.7.1.10.2 Pengecatan 1 m2 Cat Anti Lumut ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.028 85,000 2,380.00
Tukang cat L.02.08 OH 0.042 130,000 5,460.00
Kepala tukang L.03.01 OH 0.004 150,000 630.00
Mandor L.04.01 OH 0.003 110,000 330.00
JUMLAH TENAGA KERJA 8,800.00
B BAHAN
Cat Dasar Kg 0.120 120,000 14,400.00
Cat Anti Lumut Kg 0.180 120,000 21,600.00
JUMLAH HARGA BAHAN 36,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 44,800.00
E Overhead & Profit 15% 15% 6,720.00
F Harga Satuan Pekerjaan (D+E) - 51,520.00

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.500 85,000 42,500.00
Tukang batu L.02.03 OH 1.100 130,000 143,000.00
Kepala tukang L.03.01 OH 0.010 150,000 1,500.00
Mandor L.04.01 OH 0.160 110,000 17,600.00
JUMLAH TENAGA KERJA 204,600.00
B BAHAN
Closet duduk Unit 1.000 1,700,000 1,700,000.00
Perlengkapan % 0.060 1,700,000 102,000.00
JUMLAH HARGA BAHAN 1,802,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) - 2,006,600.00
E Overhead & Profit 15% 15% 300,990.00
F Harga Satuan Pekerjaan (D+E) - 2,307,590.00

A.5.1.1 4. (K3) Pemasangan 1 buah Urinoir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.000 85,000 85,000.00
Tukang batu L.02.03 OH 1.000 130,000 130,000.00
Kepala tukang L.03.01 OH 0.100 150,000 15,000.00
Mandor L.04.01 OH 0.050 110,000 5,500.00
JUMLAH TENAGA KERJA 235,500.00
B BAHAN
Urinoir Muslim Unit 1.000 1,677,225 1,677,225.00
Semen portland Kg 6.000 1,560 9,360.00
Pasir pasang M3 0.010 235,000 2,350.00
JUMLAH HARGA BAHAN 1,688,935.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) - 1,924,435.00
E Overhead & Profit 15% 15% 288,665.25
F Harga Satuan Pekerjaan (D+E) - 2,213,100.00
A.5.1.1 5. (K3) Pemasangan 1 buah wastafel
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.200 85,000 102,000.00
Tukang batu L.02.03 OH 1.450 130,000 188,500.00
Kepala tukang L.03.01 OH 0.150 150,000 22,500.00
Mandor L.04.01 OH 0.060 110,000 6,600.00
JUMLAH TENAGA KERJA 319,600.00
B BAHAN
Wastafel Unit 1.200 500,000 600,000.00
Semen portland Kg 6.000 1,560 9,360.00
Pasir pasang M3 0.010 235,000 2,350.00
JUMLAH HARGA BAHAN 611,710.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) - 931,310.00
E Overhead & Profit 15% 15% 139,696.50
F Harga Satuan Pekerjaan (D+E) - 1,071,006.00

A.5.1.1 14. Pemasangan 1 buah floor drain


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.010 85,000 850.00
Tukang batu L.02.03 OH 0.100 130,000 13,000.00
Kepala tukang L.03.01 OH 0.010 150,000 1,500.00
Mandor L.04.01 OH 0.005 110,000 550.00
JUMLAH TENAGA KERJA 15,900.00
B BAHAN
Floor drain Ex. Wasser Unit 1.000 150,000 150,000.00
JUMLAH HARGA BAHAN 150,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 165,900.00
E Overhead & Profit 15% 15% 24,885.00
F Harga Satuan Pekerjaan (D+E) - 190,785.00

A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 85,000 272,000.00
Tukang batu L.02.03 OH 1.150 130,000 149,500.00
Kepala tukang L.03.01 OH 0.011 150,000 1,650.00
Mandor L.04.01 OH 0.016 110,000 1,760.00
JUMLAH TENAGA KERJA 424,910.00
B BAHAN
Bata merah bh 70.000 788 55,160.00
Semen portland Kg 77.000 1,560 120,120.00
Pasir pasang M3 0.130 235,000 30,550.00
Pasir beton M3 0.090 235,000 21,150.00
Kerikil M3 0.020 305,282 6,105.64
Baja tulangan Kg 2.600 24,000 62,400.00
JUMLAH HARGA BAHAN 295,485.64
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 720,395.64
E Overhead & Profit 15% 15% 108,059.35
F Harga Satuan Pekerjaan (D+E) - 828,454.00
A.5.1.1. 23. Pemasangan 1 m’ pipa galvanis diameter 2½”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.135 85,000 11,475.00
Tukang batu L.02.03 OH 0.225 130,000 29,250.00
Kepala tukang L.03.01 OH 0.023 150,000 3,450.00
Mandor L.04.01 OH 0.007 110,000 770.00
JUMLAH TENAGA KERJA 44,945.00
B BAHAN
Pipa galvanis ½” M 1.200 220,000 264,000.00
Perlengkapan % 35.000 2,640 92,400.00
JUMLAH HARGA BAHAN 356,400.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 401,345.00
E Overhead & Profit 15% 15% 60,201.75
F Harga Satuan Pekerjaan (D+E) - 461,546.00

A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.010 85,000 850.00
Tukang batu L.02.03 OH 0.400 130,000 52,000.00
Kepala tukang L.03.01 OH 0.040 150,000 6,000.00
Mandor L.04.01 OH 0.005 110,000 550.00
JUMLAH TENAGA KERJA 59,400.00
B BAHAN
Kran air M 1.000 205,000 205,000.00
Sealtape Buah 0.025 9,600 240.00
JUMLAH HARGA BAHAN 205,240.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 264,640.00
E Overhead & Profit 15% 15% 39,696.00
F Harga Satuan Pekerjaan (D+E) - 304,336.00

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.036 85,000 3,060.00
Tukang batu L.02.03 OH 0.060 130,000 7,800.00
Kepala tukang L.03.01 OH 0.006 150,000 900.00
Mandor L.04.01 OH 0.002 110,000 220.00
JUMLAH TENAGA KERJA 11,980.00
B BAHAN
Pipa PVC 1/2” M 1.200 25,750 30,900.00
Perlengkapan % 35.000 309 10,815.00
JUMLAH HARGA BAHAN 41,715.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 53,695.00
E Overhead & Profit 15% 15% 8,054.25
F Harga Satuan Pekerjaan (D+E) - 61,749.00
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.036 85,000 3,060.00
Tukang batu L.02.03 OH 0.060 130,000 7,800.00
Kepala tukang L.03.01 OH 0.006 150,000 900.00
Mandor L.04.01 OH 0.002 110,000 220.00
JUMLAH TENAGA KERJA 11,980.00
B BAHAN
Pipa PVC 3/4” M 1.200 28,750 34,500.00
Perlengkapan % 35.000 345 12,075.00
JUMLAH HARGA BAHAN 46,575.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 58,555.00
E Overhead & Profit 15% 15% 8,783.25
F Harga Satuan Pekerjaan (D+E) - 67,338.00

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1.5”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.054 85,000 4,590.00
Tukang batu L.02.03 OH 0.090 130,000 11,700.00
Kepala tukang L.03.01 OH 0.009 150,000 1,350.00
Mandor L.04.01 OH 0.003 110,000 330.00
JUMLAH TENAGA KERJA 17,970.00
B BAHAN
Pipa PVC 1” M 1.200 74,750 89,700.00
Perlengkapan % 35.000 897 31,395.00
JUMLAH HARGA BAHAN 121,095.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 139,065.00
E Overhead & Profit 15% 15% 20,859.75
F Harga Satuan Pekerjaan (D+E) - 159,924.00

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.081 85,000 6,885.00
Tukang batu L.02.03 OH 0.135 130,000 17,550.00
Kepala tukang L.03.01 OH 0.014 150,000 2,025.00
Mandor L.04.01 OH 0.004 110,000 440.00
JUMLAH TENAGA KERJA 26,900.00
B BAHAN
Pipa PVC 2” M 1.200 100,000 120,000.00
Perlengkapan % 35.000 1,200 42,000.00
JUMLAH HARGA BAHAN 162,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 188,900.00
E Overhead & Profit 15% 15% 28,335.00
F Harga Satuan Pekerjaan (D+E) - 217,235.00
A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.081 85,000 6,885.00
Tukang batu L.02.03 OH 0.135 130,000 17,550.00
Kepala tukang L.03.01 OH 0.014 150,000 2,025.00
Mandor L.04.01 OH 0.004 110,000 440.00
JUMLAH TENAGA KERJA 26,900.00
B BAHAN
Pipa PVC 4” M 1.200 287,500 345,000.00
Perlengkapan % 35.000 3,450 120,750.00
JUMLAH HARGA BAHAN 465,750.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 492,650.00
E Overhead & Profit 15% 15% 73,897.50
F Harga Satuan Pekerjaan (D+E) - 566,547.00

30 Memasang 1 M2 Aluminium Composite Panel dan Rangka


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.400 Rp 85,000 Rp 34,000
Tukang Besi OH 0.300 Rp 130,000 Rp 39,000
Kepala tukang OH 0.300 Rp 150,000 Rp 45,000
Mandor OH 0.0300 Rp 110,000 Rp 3,300
PLAFON Rp 121,300
PLAFON B BAHAN
Aluminium Composite Panel 0,5 Alloy 5005 Seven M2 1.1500 Rp 408,800 Rp 470,120
Hollow Besi Galvanis (20.40.2mm) M1 4.0000 Rp 22,183 Rp 88,730
Hollow Besi Galvanis (40.40.2mm) M1 4.0000 Rp 33,183 Rp 132,730
Braket Besi Siku Ls 1.0000 Rp 40,000 Rp 40,000
Accecoris Perkuatan (las, scrup, dll) Bh 1.0000 Rp 32,000 Rp 32,000
Sealant Marks Non Asama Bh 1.0000 Rp 40,000 Rp 40,000
Stiffener Aluminium Bh 1.0000 Rp 37,000 Rp 37,000
JUMLAH HARGA BAHAN Rp 840,581
C PERALATAN
Alat Bantu Ls 1.0000 Rp 75,000 Rp 75,000
JUMLAH HARGA ALAT 75,000.00
D JUMLAH (A + B + C) Rp 1,036,881
E OVERHEAT & PROFIT 15% Rp 155,532
F HARGA SATUAN PEKERJAAN Rp 1,192,413

31 Memasang 1 M2 Aluminium Composite Panel dan Rangka (Profil)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.400 Rp 85,000 Rp 34,000
Tukang Besi OH 0.300 Rp 130,000 Rp 39,000
Kepala tukang OH 0.300 Rp 150,000 Rp 45,000
Mandor OH 0.0300 Rp 110,000 Rp 3,300
JUMLAH TENAGA KERJA Rp 121,300
B BAHAN
Aluminium Composite Panel 0,5 Alloy 5005 Seven M2 1.1500 Rp 408,800 Rp 470,120
Hollow Besi Galvanis (20.40.2mm) M1 4.0000 Rp 22,183 Rp 88,730
Hollow Besi Galvanis (40.40.2mm) M1 4.0000 Rp 33,183 Rp 132,730
Braket Besi Siku Ls 1.0000 Rp 40,000 Rp 40,000
Accecoris Perkuatan (las, scrup, dll) Bh 1.0000 Rp 32,000 Rp 32,000
Sealant Marks Non Asama Bh 1.0000 Rp 40,000 Rp 40,000
Stiffener Aluminium Bh 1.0000 Rp 37,000 Rp 37,000
JUMLAH HARGA BAHAN Rp 840,581
C PERALATAN
Alat Bantu Ls 1.0000 Rp 75,000 Rp 75,000
Cutting Laser Ls 1.0000 Rp 160,000 Rp 160,000
JUMLAH HARGA ALAT 235,000.00
D JUMLAH (A + B + C) Rp 1,196,881
E OVERHEAT & PROFIT 15% Rp 179,532
F HARGA SATUAN PEKERJAAN Rp 1,376,413
32 Memasang 1 M2 Aluminium Composite Panel dan Rangka Hollow Galvalum
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.500 Rp 85,000 Rp 42,500
Tukang Besi OH 0.750 Rp 130,000 Rp 97,500
Kepala tukang OH 0.075 Rp 150,000 Rp 11,250
Mandor OH 0.0075 Rp 110,000 Rp 825
JUMLAH TENAGA KERJA Rp 152,075
B BAHAN
Aluminium Composite Panel M2 1.1000 Rp 408,800 Rp 449,680
Rangka Metal Hollow 40.40.2 M1 4.0000 Rp 5,250 Rp 21,000
Paku Skrup kg 0.1100 Rp 40,000 Rp 4,400
Sealant Tube 0.2500 Rp 37,000 Rp 9,250
JUMLAH HARGA BAHAN Rp 484,330
C PERALATAN
Steiger Set 1.0000 Rp 10,000 Rp 10,000
Alat Bantu Lainnya Ls 1.0000 Rp 10,000 Rp 10,000
JUMLAH HARGA ALAT 20,000.00
D JUMLAH (A + B + C) Rp 656,405
E OVERHEAT & PROFIT 15% Rp 98,461
F HARGA SATUAN PEKERJAAN Rp 754,866

A.4.5.1.7. Pemasangan 1 m2 Rangka dan Dinding Multipleks Fin. Taco HPL (2 Lapis HPL)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.7500 85,000 148,750.00
Tukang kayu L.02.04 OH 1.3500 130,000 175,500.00
Kepala tukang L.03.01 OH 1.0000 150,000 150,000.00
Mandor L.04.01 OH 0.7500 110,000 82,500.00
JUMLAH TENAGA KERJA 556,750.00
B BAHAN
Multipleks 12 Mm Ex. Palem Lembar 0.6800 178,000 121,040.00
Rangka Kanal C M1 4.0000 18,333 73,333.33
Taco HPL Lembar 0.6800 185,000 125,800.00
Lem Fox Kg 0.6800 54,000 36,720.00
Paku skrup kg 0.1500 90,000 13,500.00
JUMLAH HARGA BAHAN 370,393.33
C PERALATAN + ACCESORIES 1.0000 370,393 370,393.33
JUMLAH HARGA ALAT 370,393.33
D Jumlah (A+B+C) - 1,297,536.67
E Overhead & Profit 15% 15% 194,630.50
F Harga Satuan Pekerjaan (D+E) - 1,492,167.00

A.4.5.1.7. Pemasangan 1 m2 Rangka dan Dinding Multipleks Fin. Taco HPL (1 Lapis HPL)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.3125 85,000 111,562.50
Tukang kayu L.02.04 OH 1.0125 130,000 131,625.00
Kepala tukang L.03.01 OH 0.7500 150,000 112,500.00
Mandor L.04.01 OH 0.5625 110,000 61,875.00
JUMLAH TENAGA KERJA 417,562.50
B BAHAN
Multipleks 12 Mm Ex. Palem Lembar 0.3840 178,000 68,352.00
Multipleks 15 Mm Ex. Palem Lembar 0.3491 240,000 83,781.82
Taco HPL Lembar 0.3640 185,000 67,340.00
Lem Fox Kg 0.3640 54,000 19,656.00
Paku skrup kg 0.1500 90,000 13,500.00
JUMLAH HARGA BAHAN 252,629.82
C PERALATAN + ACCESORIES 1.0000 252,630 252,629.82
JUMLAH HARGA ALAT 252,629.82
D Jumlah (A+B+C) - 922,822.14
E Overhead & Profit 15% 15% 138,423.32
F Harga Satuan Pekerjaan (D+E) - 1,061,245.00
1 Analisa Memasang 1 Unit Pintu Utama Type P1
Bahan Koefisien Satuan Harga Satuan Jumlah Harga

Kaca tempered 12 mm 4.4 M2 1,210,000.00 5,324,000.00


Floor hinges Ex. Dekson 2 Set 1,100,000.00 2,200,000.00
Overpanel 2 Set 495,000.00 990,000.00
Top patch fitting 2 Set 495,000.00 990,000.00
Bottom patch fitting 2 Set 495,000.00 990,000.00
Bottom patch lock + cylinder 2 Set 1,045,000.00 2,090,000.00
Pull handle 2 Set 148,500.00 297,000.00
Tenaga
Upah pasang pintu + hardware 2 Daun 1,300,000.00 2,600,000.00
Jumlah A+B = 15,481,000.00
Profit 15% = 2,322,150.00
Total Jumlah = 17,803,150.00

2 Analisa Memasang 1 Unit Kaca atas Pintu Utama Type P1


Bahan Koefisien Satuan Harga Satuan Jumlah Harga
List aluminium U 12 M1 16,500.00 198,000.00
Kaca tempered 10 mm 4.5 M2 1,100,000.00 4,950,000.00
Sealant Ex. Dow Corning/Col. Clear 3 Bh 55,000.00 165,000.00
Tenaga
Upah pasang Kaca 3 Lbr 900,000.00 2,700,000.00
Jumlah A+B = 8,013,000.00
Profit 15% = 1,201,950.00
Total Jumlah = 9,214,950.00

3 Memasang Kusen Alumenium 4 "


Bahan Koefisien Satuan Harga Satuan Jumlah Harga
Kusen Aluminium Profil M 4" Ex. Alu Prima 23.935 M1 71,916.67 1,721,325.42
Tutup Polos 6.68 M1 25,166.67 168,113.33
Tutup Kaca Mati 3.934 M1 35,533.33 139,788.13
Sekrup 0.15 Kg 165,000.00 24,750.00

Tenaga
Upah Pasang 1 Daun 3,400,000.00 3,400,000.00
Jumlah A+B = 5,453,976.88
Profit 15% = 818,096.53
Total Jumlah = 6,272,073.42
4 Memasang Frame Swing Door Alumenium 4 "
Bahan Koefisien Satuan Harga Satuan Jumlah Harga
Ambang Bawah 0.9 M1 96,416.67 86,775.00
Ambang Tegak 6.24 M1 75,366.67 470,288.00
Sekrup 0.15 Kg 165,000.00 24,750.00
Floor hinges Ex. Dekson 1 Set 1,100,000.00 1,100,000.00
Kaca Polos T 5 mm 2.196 M2 135,000.00 296,460.00

Tenaga
Upah Pasang 1 Daun 1,800,000.00 1,800,000.00
Jumlah A+B = 3,778,273.00
Profit 15% = 566,740.95
Total Jumlah = 4,345,013.95

4 Memasang 1 m2 Kaca Polos Tebal 5 mm


Bahan Koefisien Satuan Harga Satuan Jumlah Harga
Kaca Polos Tebal 5 mm 1.1 M1 55,000.00 60,500.00
Sealant Ex. Dow Corning/Col. Clear 1.2 M1 55,000.00 66,000.00

Tenaga
Upah Pasang 1 M2 120,000.00 120,000.00
Jumlah A+B = 246,500.00
Profit 15% = 36,975.00
Total Jumlah = 283,475.00
PEKERJAAN : KANTOR BRINS KENDARI
LOKASI : KENDARI
TAHUN ANGGARAN : 2023

NO. URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA


1 2 4 5 6
I PEKERJAAN KUSEN DAN PINTU

1 Pek. Kusen Alumenium 4' 1.00 Unit Rp 6,272,073 Rp 6,272,073.42


2 Pek. Swing Door Alumenium + Kaca 5 mm 2.00 Unit Rp 4,345,014 Rp 8,690,027.90

3 Pek. Kaca Polos 5 mm 13.74 M2 Rp 283,475 Rp 3,894,946.50

Sub Jumlah I = Rp 18,857,047.82


II PEKERJAAN PLAFOND

1 Pek. Pasangan Rangka Plafond Hollow Galvalum 2/4 dan 4/4 Cm Lt 1 78.75 M2 Rp 143,152 Rp 11,273,220.00

2 Pek. Pasangan Plafond Ruangan, Gypsum Board 120x240x0,9 Cm Lt 1 78.75 M2 Rp 65,951 Rp 5,193,641.25

Sub Jumlah II = Rp 16,466,861.25

III PEKERJAAN PENGECATAN

1 Pek. Pengecatan Dinding, Partisi, & Kolom 59.00 M2 Rp 57,618 Rp 3,399,462.00


2 Pek. Pengecetan Dinding, Kolom Fasad Depan 33.75 M2 Rp 62,257 Rp 2,101,173.75

3 Pek. Pengecetan Folding door Fasad Depan 14.85 M2 Rp 62,257 Rp 924,516.45

4 Pek. Pengecatan Plafond LT 1 78.75 M2 Rp 57,618 Rp 4,537,417.50

Sub Jumlah IV = Rp 10,962,569.70

IV PEKERJAAN INTERIOR

1 Pek. Rangka dan Dinding Multipleks Fin. Taco HPL (1 Lapis HPL) + Gypsum mm 13.50 M2 Rp 1,492,167 Rp 20,144,254.50

2 Pek. Pembuatan Huruf Acrilic + Lighting Resepsionist 1.00 Unit Rp 5,400,000 Rp 5,400,000.00

3 Pek. Sunglass Pintu dan Jendela Kaca Mati Fasad Depan 9.16 M2 Rp 150,000 Rp 1,374,000.00

4 Pek. Pembuatan Meja Resepsionist 1.00 Unit Rp 4,500,000 Rp 4,500,000.00

5 Pek. Pembuatan Sofa Puff Resepsionist ( Sofa 2 Seat + 1 Seat + Meja) 1.00 Unit Rp 4,950,000 Rp 4,950,000.00

6 Pek. Pemasangan Karpet Tile Lantai 50 x 50 23.40 M2 Rp 430,000 Rp 10,062,000.00

7 Pek. Pembuatan Meja Kerja Marketing 1.00 Unit Rp 14,750,000 Rp 14,750,000.00

8 Pek. Pengadaan Kursi Kerja Respsionist & Marketing 1.00 Set Rp 1,970,000 Rp 1,970,000.00

9 Pek. Pembuatan Meja Ruang Rapat 1.00 Unit Rp 11,850,000 Rp 11,850,000.00

10 Pek. Pembuatan Papan Tulis Kaca Glass stone 1.00 Unit Rp 925,000 Rp 925,000.00

11 Pek. Pembuatan Meja Pimpinan 1.00 Unit Rp 7,850,000 Rp 7,850,000.00

12 Pek. Pengadaan Kursi Pimpinan 1.00 Set Rp 2,980,000 Rp 2,980,000.00

13 Pek. Pembuatan Sofa Rg Pimpinan ( 2 Seat + 1 Seat + Meja) 1.00 Set Rp 4,550,000 Rp 4,550,000.00

14 Pek. Pembuatan Partisi Gypsum 2 Sisi Rangka Hollow Baja Ringan Rg Server 9.90 M2 Rp 227,033 Rp 2,247,626.70
15 Pek. Pembuatan Partisi Gypsum 1 Sisi Rangka Hollow Baja Ringan Resepsionist 14.85 M2 Rp 192,033 Rp 2,851,690.05

16 Pek. Pemasangan Vertical Blind Rg Pimpinan 15.00 Unit Rp 275,000 Rp 4,125,000.00

17 Pek. Pembersihan 1.00 Ls Rp 1,000,000 Rp 1,000,000.00


Sub Jumlah VI = Rp 101,529,571.25

V PEKERJAAN ELEKTRIKAL

1 Pek. Pemasangan Instalasi Listrik Include Downlight + LED 6 Watt 1.00 Unit Rp 1,950,000 Rp 1,950,000.00
2 Pek. Pemasangan Instalasi LAN + Accesoris 1.00 Unit Rp 7,500,000 Rp 7,500,000.00

3 Pek. Pemasangan CCTV Ex dauha 4 Titik + Monitor 19 ' 1.00 Unit Rp 3,750,000 Rp 3,750,000.00

4 Pek. Perakitan Rak server Ex indorak + MPLS bandwih cat 6 + RG 45 1.00 Set Rp 12,500,000 Rp 12,500,000.00
5 Pek. Perakitan Pabx Panasonic 8 Lan 4 Titik 1.00 Set Rp 8,540,000 Rp 8,540,000.00

6 Pek. Pemindahan AC 3.00 Bh Rp 650,000 Rp 1,950,000.00

7 Pek. Pembuatan Acrilik Ruangan 2.00 Bh Rp 85,000 Rp 170,000.00

8 Pek. Pemasangan Neon Box Brins 1.00 Unit Rp 2,500,000 Rp 2,500,000.00

9 Pek. Pembuatan Ruang Genset + Genset Silent Ex Honda 1.00 Set Rp 21,000,000 Rp 21,000,000.00

Sub Jumlah VI = Rp 59,860,000.00

33
REKAPITULASI BIAYA

PEKERJAAN : KANTOR BRINS KENDARI


LOKASI : KENDARI
TAHUN ANGGARAN : 2023

SUB TOTAL
NO. URAIAN PEKERJAAN TOTAL HARGA
HARGA
1 2 3 4
I PEKERJAAN KUSEN DAN PINTU Rp 18,857,047.82

II PEKERJAAN PLAFOND Rp 16,466,861.25

III PEKERJAAN PENGECATAN Rp 10,962,569.70

IV PEKERJAAN INTERIOR Rp 101,529,571.25

V PEKERJAAN ELEKTRIKAL Rp 59,860,000.00

NILAI PEKERJAAN Rp 207,676,050.02


DIBULATKAN Rp 207,670,000.00

TERBILANG :
DUA RATUS TUJUH JUTA ENAM RATUS TUJUH PULUH RIBU RUPIAH