Anda di halaman 1dari 8

GAMBAR RENCANA KERJA

PEKERJAAN :
PEMBANGUNAN LANJUTAN BALAI DRAS TPA SIJNUL MUKMININ GP. BABAH LHUENG
KECAMATAN BLANGPIDIE
LOKASI :
GAMPONG BABAH LHUENG KECAMATAN BLANGPIDIE
KABUPATEN ACEH BARAT DAYA
PERENCANA :
CV. AJU Consultant

J
(ABDYA JAYA UTAMA Consultant)

l
.
R
a
w
a
-
S
a
n
g
k
a
l
a
n
D
e
s
a
T
a
n
g
a
h
K
e
c
.
S
u
s
o
h
T
e
l
p
.
0
8
5
2
7
6
5
4
0
7
1
3
K
o
d
e
P
o
s
2
3
7
6
5
CV. AJU Consultant
KAB. ACEH BARAT DAYA
Design - Supervisi - Surveyor - Project Management
Lokasi Proyek
MESJID

SUNGAI
MESJID
SAWAH
SITE PLANT SITE PLANT NSC
NSC
01
TAMPAK DEPAN
SKALA 1 : 100
TAMPAK SAMPING TAMPAK 1 : 100
SKALA 1 : 100
02
B
2.50 2.50 0.72
TANGGA
- 0.20
3.00 RUANGAN DRAS
± 0.00
A
TANGGA
- 0.40
2.50 2.50 0.72
5.00
DENAH RENCANA DENAH RENCANA 1 : 100
SKALA 1 : 100
03
2.50 2.50 0.72
3.00
2.50 2.50 0.72
5.00
DENAH PONDASI DENAH PONDASI 1 : 100
SKALA 1 : 100
04
Existing Existing
1.73
2.20
Pas. Keramik 40x40 cm Existing
Cor Beton Lantai 5 cm 2.20
Urugan Pasir
Tanah urugan
Pasangan Bata 1 : 4
Keramik Dinding 20 x 25
0.60 I
0.55 0.60
Aanstamping0.30 Pasangan Bata 1 : 4
Pasangan Batu Kali
2.50 2.50 0.66
POTONGAN A - A POTONGAN 1 : 50
SKALA 1 : 50
05
Existing
Existing
2.20
2.80
Pas. Keramik 40x40 cm
Cor Beton Lantai 5 cm
Urugan Pasir Existing
Tanah urugan
Pasangan Bata 1 : 4
0.60 Keramik Dinding 20 x 25
II
0.55 0.55
0.30 0.30
3.00
POTONGAN B - B POTONGAN 1 : 50
SKALA 1 : 50
06
Pas. Keramik 40x40 cm
Cor Beton Lantai 5 cm
Urugan Pasir
Tanah urugan
I
5
10 20
II
20
45 70 70
20
30
15 15
Pas. Batu Kali
Aanstamping
Pas. Batu Kali 20
20 Aanstamping
40 40
50 50
DETAIL I - I DETAIL II - II
SKALA 1 : 20 SKALA 1 : 20
DETAIL 1 : 20
07

Anda mungkin juga menyukai