Anda di halaman 1dari 11

Data Pekerjaan T 238 -T 254

BIAYA YG DI BUTUHKAN

JARAK PONDASI ERECTION


No.Tower Jenis Tower Pabrikan JENIS PONDASI BIAYA PONDASI
LANGSIR FINISH FINISH

T.238 BB + 6 DHJ BB TIPE 2 20 Btg -6 m 580 1


T.239 BB + 6 BUKAKA Bb class 3 A 510 1 Rp181,871,310
T.240 AA + 6 BSB AA Class 3 A 739 1 Err:507
T.241 AA + 9 DHJ AA Class Boepile 16 Btg -5 m 460 1 Err:507
T.242 AA + 6 DHJ AA TIPE 2 16 Btg -5 m 341 1
T.243 AA + 6 BSB AA Class 1 B 293 1 Err:507
T.244 BB + 6 BUKAKA BB TIPE 2 28 Btg -9 m 237 1
T.245 AA + 6 DHJ AA TIPE 2 16 Btg -6 m 346 1
T.246 AA + 6 DHJ AA TIPE 2 16 Btg -6 m 321 1
T.247 AA + 9 DHJ AA Class 4 A 67 1 Err:507
T.248 AA + 3 DCP AA Class 1 B 400 1 Err:507
T.249 AA + 9 DHJ AA TIPE 2 16 Btg - 7 m 374 1
T.250 AA + 3 DCP AA TIPE 1 59 1
T.251 AA + 6 DHJ AA TIPE 2 16 Btg -6 m 91 1
T.252 AA + 9 BUKAKA AA TIPE 2 16 Btg -10 m 606 1
T.253 AA + 12 DHJ AA TIPE 2 16 Btg - 7 m 384 1
T.254 BB + 6 BUKAKA BB TIPE 2 20 Btg - 7 m 140 1
Err:508

Biaya Stringing

Kmr 6096.45

Biaya Jasa Rp95,000,000 Rp579,162,496.83


Biaya Alat Rp75,000,000 Rp37,500,000
Transport Tenaga Rp1,500,000 Rp60,000,000
Operasional Pekerjaan
Sewa Truck Rp15,000,000 Rp7,500,000.00
Sewa Pick Up Rp3,500,000 Rp1,750,000.00
Mess Pekerja Rp4,000,000 Rp2,000,000
BBM Operasional Rp700,000 Rp10,500,000
Bambu Stager Rp15,000 Rp1,500,000
Tambang ikat Rp500,000
Batang Kelapa Rp200,000
Sewa Lokasi Rp1,500,000 Rp3,000,000
Seling Skur Rp40,000 Rp4,000,000

Rp707,612,496.83
Kebutuhan Roll Triple

Tower Rol triple rol Single


18 108 36
3 2
Total 111 38

Kebutuhan material :

Material Konductor 39 Drum


Material GSW 4 Drum Sisa 1519
MateriAL OPGW 2 Drum Sampai T 258
Joint Box 2 Set
IAYA YG DI BUTUHKAN

BIAYA
ERECTION

Rp30,728,400
Rp30,728,400
Rp17,952,450
Rp18,097,400
Rp16,920,700
Rp16,920,700
Rp21,721,800
Rp16,920,700
Rp16,920,700
Rp18,097,400
Rp15,153,600
Rp18,097,400
Rp15,153,600
Rp16,920,700
Rp19,200,900
Rp20,083,850
Rp21,721,800
Err:508
M
PT. PLN PERSERO
UIP KALIMANTAN BAGIAN TENGAH

DAFTAR MATERIAL SCHEDULE


PEKERJAAN PEMBANGUNAN SUTT 150 kV
KASONGAN - KUALA KURUN SECTION 4 (T.302-T.376)
DI KALIMANTAN TENGAH
0038.PJ/DAN.02.02/UIP.KALTENG/2018.TANGGAL 20 DESEMBER 2018

U- Bolt shackle Jumlah Insulator String Set 2 x ACSR 240/40 mm2 GSW 55 sqmm
L
TYPE Pabrikan SUDUT
NO NOMOR TOWER SPAN (M) Conductor KETERANGAN LOKASI ISOLATOR
TOWER Tower BELOK suspension Spacer Spacer Armour Suspension Armour
(M) 80mm M16 60mm M16 85mm M16 120 KN 210 KN Mid Span Mid Span Vib. Damper Tension Set
SS DS ST DT JMP Damper Jumper Rods Set Rods

T.237 ( Tower 6 12 1
ST
existing )
375.67 385.06 376.64 36 4
Hutan -
1 T.238 BB + 6 DHJ 03° 20' L ST/DT 12 6 6 12 2
392 401.40 392.69 Hutan/Semak 36 4
-
2 T.239 BB + 6 BUKAKA 05° 41' R DT/ST 12 6 6 12 2
350.00 358.75 350.83 Hutan/Semak 30 2
-
3 T.240 AA + 6 BSB 0O SS 6 6 12 1 1
398.24 408.19 399.36 Hutan/Semak 36 4
-
4 T.241 AA + 9 DHJ 0O SS 6 6 12 1 1
356.66 365.57 357.52 Hutan/Semak 36 2
-
5 T.242 AA + 6 DHJ 0O SS 6 6 12 1 1
347.53 356.21 348.34 Hutan/Semak 12 30 1 2

6 T.243 AA + 6 WIKA 0O SS 6 6 12 1 1
377.42 386.86 378.41 Hutan/Semak 36 4
-
7 T.244 BB + 6 BUKAKA 09° 42' R ST/ST 12 12 12 2
347.16 355.83 347.97 Hutan/Semak 30 2
-
8 T.245 AA + 6 DHJ 0O SS 6 6 12 1 1
349.11 357.84 349.93 Hutan/Semak 30 2
-
9 T.246 AA + 6 DHJ 0O SS 6 6 12 1 1
374.04 383.39 375.00 Hutan/Semak 36 4
-
10 T.247 AA + 9 DHJ 0O DS 6 6 12 1 1
297.36 304.79 298.01 TM 20 kV Jalan Raya 12 30 1 2

11 T.248 AA + 3 DCP 0O DS 6 6 12 1 1
374.05 383.40 375.01 Sawah 36 4
-
12 T.249 AA + 9 DHJ 0O SS 6 6 12 1 1
355.39 364.27 356.25 Sawah 36 2
-
13 T.250 AA + 3 DCP 0O SS 6 6 12 1 1
346.54 355.20 347.35 Hutan/Semak 30 2
-
14 T.251 AA + 6 DHJ 0O SS 6 6 12 1 1
357.39 366.32 358.26 Kebun Karet semak 36 2
-
15 T.252 AA + 9 BUKAKA 0O SS 6 6 12 1 1
344.84 353.46 345.64 Kebun Karet semak 30 2
-
16 T.253 AA + 12 DHJ 0O SS 6 6 12 1 1
353.45 362.29 354.29 Kebun Karet semak 12 30 1 2

17 T.254 BB + 6 BUKAKA 0° 02' R ST/ST 12 6 12 1


Hutan -
TOTAL 6,096 6,249 6,112 24 0 0 54 48 66 12 30 12 0 36 564 60 156 3 46 13 8 13
FTAR MATERIAL SCHEDULE
RJAAN PEMBANGUNAN SUTT 150 kV
- KUALA KURUN SECTION 4 (T.302-T.376)
DI KALIMANTAN TENGAH
UIP.KALTENG/2018.TANGGAL 20 DESEMBER 2018

OPGW 70 sqmm

Join Box Vib. Damper Suspension Tension Set Armour


Set Rods

1 1
4

2
4

2
2

1 1
4

1 1
2

1 1
2

1 1
4

2
2

1 1
2

1 1
4

1 2
2

1 1
4

1 1
2

1 1
2

1 1
2

1 1
2

1 1
2

1
0
2 46 12 10 12
PT. PLN (PERSERO)

UNIT INDUK PEMBANGUNAN PEMBANGKIT DAN JARINGAN KALIMANTAN BAGIAN BARAT

PEKERJAAN : PEMBANGUNAN SUTT 150 KV GI KASONGAN - GI KUALAKURUN SECTION 3


Kontrak No. : 0038.PJ/DAN 02.02/UIP.KALTENG/2018.TANGGAL 20 DESEMBER 2018

DRUM SCHEDULE CONDUCTOR


DARI TOWER 254 KE TOWER 237

Spaser Dumper 36 36 30 36 36 30 36 30 30 36 30 36 36 30 36 30 30
ST ST/DT DT/ST SS SS SS SS ST/ST SS SS DS DS SS SS SS SS SS ST/ST

JOIN CONDUCTOR
JOIN CONDUCTOR

TENSIONER 351 7
195 190
ENGGINE
385 Meter 1864 Meter 2000 METER 2000 METER

Jumlah Span 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Tower No. T. 237 T. 238 T. 239 T. 240 T. 241 T. 242 T. 243 T. 244 T. 245 T. 246 T. 247 T. 248 T. 249 T. 250 T. 251 T. 252 T. 253 T. 254
TOTAL
Tower Type BB + 6 BB + 6 AA + 6 AA + 9 AA + 6 AA + 6 BB + 6 AA + 6 AA + 6 AA + 9 AA + 3 AA + 9 AA +3 AA + 6 AA + 9 AA + 12 BB +6
Jarak/Span (Mtr) 6,096.46 375.67 391.61 350.00 398.24 356.66 347.53 377.42 347.16 349.11 374.04 297.36 374.05 355.39 346.54 357.39 344.84 353.45
Faktor Sag 3% 6,279.35 0.000 386.94 403.36 360.50 410.19 367.36 357.96 388.74 357.57 359.58 385.26 306.28 385.27 366.05 356.94 368.11 355.19 364.05
Join Conductor 386.9 1863.8 2351.0 2195.6
Jln Raya
TM 20 Kv

CATATAN : Penggunaan Kabel Konductor Acsr 250 mm


2,000 24 Haspel Sisa Konductor : 0 Meter
2,000 12 Haspel Sisa Konductor : 137 Meter x 12 Gulung
2,000 3 Haspel 1 haspel = 2000 meter : 385 meter : 5 Sisa Konductor : 1200 Meter x 1 Gulung

KEBUTUHAN MATERIAL : STRING SET


CONDUCTOR ACSR 250 mm² = 2,000.00 Meter = 39.00 Drum 1. SINGLE SUSPENSION SS = 66 set 5. JUMPER SUPPORT SET = -
2. DOUBLE SUSPENSION DS = 12 set 6. SPASER DUMPER FOR ACSR = 594 Set
3. SINGLE TENSION ST = 36 set 7. SPASER JUMPER = 60 Set
4. DOUBLE TENSION DT = 12 set 8. ARMOUR FOR ACSR = 156 pcs
JUMLAH TOWER = 18 Tower 9. MiSPAND JOINT = 24 pcs

PT. PLN (Persero)


UPP 3 KALBAGBAR PT. PRIMA POWER NUSANTARA

( .................................................. ) Abdol Ariska Choir


Project Manager
PT. PLN (PERSERO)

UNIT INDUK PEMBANGUNAN PEMBANGKIT DAN JARINGAN KALIMANTAN BAGIAN TENGAH

PEKERJAAN : PEMBANGUNAN SUTT 150 KV GI KASONGAN - GI KUALAKURUN SECTION 3


Kontrak No. : 0038.PJ/DAN 02.02/UIP.KALTENG/2018.TANGGAL 20 DESEMBER 2018

OPGW SCHEDULE
DARI TOWER 258 KE TOWER 237

T T/T T/T S S S S T/T S S T/T S S S S S S T/T S S S T/T

TENSIONER

ENGGINE

Jumlah Span 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Tower No. T. 237 T. 238 T. 239 T. 240 T. 241 T. 242 T. 243 T. 244 T. 245 T. 246 T. 247 T. 248 T. 249 T. 250 T. 251 T. 252 T. 253 T. 254 T. 255 T. 256 T. 257 T. 258
TOTAL
Tower Type BB + 6 BB + 6 AA + 6 AA + 9 AA + 6 AA + 6 BB + 6 AA + 6 AA + 6 AA + 9 AA + 3 AA + 9 AA +3 AA + 6 AA + 9 AA + 12 BB +6 AA + 6 AA + 0 AA + 0 AA + 0

Jarak/Span (Mtr) 7,394.90 375.67 391.61 350.00 398.24 356.66 347.53 377.42 347.16 349.11 374.04 297.36 374.05 355.39 346.54 357.39 344.84 353.45 352.10 297.79 349.07 299.48
Faktor Sag 1,5% 7,505.82 381.31 397.48 355.25 404.21 362.01 352.74 383.08 352.37 354.35 379.65 301.82 379.66 360.72 351.74 362.75 350.01 358.75 357.38 302.26 354.31 303.97
3762.45 3823.37

CATATAN :

KEBUTUHAN MATERIAL : STRING SET


Gantry Box = - Set 1. VIBRATION DUMPER = 56 set
Joint Box = 3 Pcs 2. SUSPENSION SET OPGW = 15 set
3. TENSION SET OPGW = 13 set
One earth wire OPGW 70 mm2 12 Pair = 4000 Meter = 2.00 Drum 4. ARMOUR ROD OPGW = 15 set

PT. PLN (Persero)


UPP KALBAGBAR PT. PRIMA POWER NUSANTARA

( .................................................. ) Abdol Ariska Choir


Project Manager
PT. PLN (PERSERO)

UNIT INDUK PEMBANGUNAN PEMBANGKIT DAN JARINGAN KALIMANTAN BAGIAN TENGAH

PEKERJAAN : PEMBANGUNAN SUTT 150 KV GI KASONGAN - GI KUALAKURUN SECTION 3


Kontrak No. : 0038.PJ/DAN 02.02/UIP.KALTENG/2018.TANGGAL 20 DESEMBER 2018

DRUM SCHEDULE GSW


DARI TOWER 254 KE TOWER 237

Vibration Dumper 2 2 2 2 1 1 2 2 1 1 1 1 2 2 1 1 1 1 2 2 1 1 2 2 1 1 1 1 1 1 1 1 1 1
Tension /Suspension T T/T T/T S S S S T/T S S S S S S S S S T/T

JOIN GSW JOIN GSW


2

TENSIONER 288 65 164 216

381,3 ENGGINE
1806,6 2000 METER 2000 METER

Jumlah Span 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Tower No. T. 237 T. 238 T. 239 T. 240 T. 241 T. 242 T. 243 T. 244 T. 245 T. 246 T. 247 T. 248 T. 249 T. 250 T. 251 T. 252 T. 253 T. 254
TOTAL
Tower Type BB + 6 BB + 6 AA + 6 AA + 9 AA + 6 AA + 6 BB + 6 AA + 6 AA + 6 AA + 9 AA + 3 AA + 9 AA +3 AA + 6 AA + 9 AA + 12 BB +6
Jarak/Span (Mtr) 6,096.46 375.67 391.61 350.00 398.24 356.66 347.53 377.42 347.16 349.11 374.04 297.36 374.05 355.39 346.54 357.39 344.84 353.45
Faktor Sag 1,5% 6,187.91 381.31 397.48 355.25 404.21 362.01 352.74 383.08 352.37 354.35 379.65 301.82 379.66 360.72 351.74 362.75 350.01 358.75
Join Conductor 381.3 1806.6 2287.6 2163.6

CATATAN : Penggunaan Kabel GSW 55 mm


2,000 2 Haspel Sisa Gsw : 0 Meter
2,000 1 Haspel Sisa Gsw : 194 Meter
2,000 1 Haspel Sisa Gsw : 1,519 Meter

KEBUTUHAN MATERIAL : STRING SET


GSW 55 mm² = 2,000 Meter = 4.00 Drum 1. VIBRATION DUMPER GSW = 46 PC
2. SUSPENSION SET GSW = 13 PC
3. TENSION SET GSW = 9 PC
4. ARMOUR FOR GSW = 13 PC
5. Mispand FOR GSW = 2 PC

PT. PLN (Persero)


UPP KALBAGBAR PT. PRIMA POWER NUSANTARA

( .................................................. ) Abdol Ariska Choir


Project Manager
PT. PLN PERSERO
UIP KALIMANTAN BAGIAN TENGAH

DAFTAR MATERIAL SCHEDULE


PEKERJAAN PEMBANGUNAN SUTT 150 kV
KASONGAN - KUALA KURUN SECTION 4 (T.302-T.376)
DI KALIMANTAN TENGAH
0038.PJ/DAN.02.02/UIP.KALTENG/2018.TANGGAL 20 DESEMBER 2018

Jumlah Insulator String Set 2 x ACSR 240/40 mm2 GSW 55 sqmm OPGW 70 sqmm
TYPE SUDUT TOTAL JARAK
NO NOMOR TOWER SPAN (M) KETERANGAN LOKASI ISOLATOR
TOWER BELOK (M) suspension Spacer Spacer Armour Armour Armour
Mid Span Mid Span Vib. Damper Suspension Set Tension Set Join Box Vib. Damper Suspension Set Tension Set
SS DS ST DT JMP Damper Jumper Rods Rods Rods

T.237 ( Tower 6 12 1 1 1
ST
existing )
375.67 36 4 4
Hutan -
1 T.238 BB + 6 03° 20' L 375.67 ST/DT 6 6 12 2 2
392 Hutan/Semak 36 4 4
-
2 T.239 BB + 6 05° 41' R 767.28 DT/ST 6 6 12 2 2
350.00 Hutan/Semak 30 2 2
-
3 T.240 AA + 6 0O 1,117.28 SS 6 12 1 1 1 1
398.24 Hutan/Semak 36 4 4
-
4 T.241 AA + 9 0O 1,515.52 SS 6 12 1 1 1 1
356.66 Hutan/Semak 36 2 2
-
5 T.242 AA + 6 0O 1,872.18 SS 6 12 1 1 1 1
347.53 Hutan/Semak 12 30 1 2 2

6 T.243 AA + 6 0O 2,219.70 SS 6 12 1 1 1 1
377.42 Hutan/Semak 36 4 4
-
7 T.244 BB + 6 09° 42' R 2,597.13 ST/ST 12 12 2 2
347.16 Hutan/Semak 30 2 2
-
8 T.245 AA + 6 0O 2,944.28 SS 6 12 1 1 1 1
349.11 Hutan/Semak 30 2 2
-
9 T.246 AA + 6 0O 3,293.39 SS 6 12 1 1 1 1
374.04 Hutan/Semak 36 4 4
-
10 T.247 AA + 9 0O 3,667.43 DS 6 12 1 1 1 2
297.36 TM 20 kV Jalan Raya 12 30 1 2 2

11 T.248 AA + 3 0O 3,964.79 DS 6 12 1 1 1 1
374.05 Sawah 36 4 4
-
12 T.249 AA + 9 0O 4,338.84 SS 6 12 1 1 1 1
355.39 Sawah 36 2 2
-
13 T.250 AA + 3 0O 4,694.23 SS 6 12 1 1 1 1
346.54 Hutan/Semak 30 2 2
-
14 T.251 AA + 6 0O 5,040.77 SS 6 12 1 1 1 1
357.39 Kebun Karet semak 36 2 2
-
15 T.252 AA + 9 0O 5,398.16 SS 6 12 1 1 1 1
344.84 Kebun Karet semak 30 2 2
-
16 T.253 AA + 12 0O 5,742.99 SS 6 12 1 1 1 1
353.45 Kebun Karet semak 12 30 1 2 2

17 T.254 BB + 6 0° 02' R 6,096.45 ST/ST 12 12 2 2


352.10 Hutan 30 2 2
-
18 T.255 AA + 6 0O 6,448.55 SS 6 12 1 1 1 1
297.79 Hutan 30 2 2
-
19 T.256 AA + 0 0O 6,746.34 SS 6 12 1 1 1 1
349.07 Hutan 30 2 2
-
20 T.257 AA + 0 0O 7,095.42 SS 6 12 1 1 1 1
299.48 Hutan 30 2 2
-
21 T.258 AA + 0 0O 7,394.90 SS 6 12 1 1 1 2
321.89 30 2 2
Hutan -
PT. PLN PERSERO
UIP KALIMANTAN BAGIAN TENGAH

DAFTAR MATERIAL SCHEDULE


PEKERJAAN PEMBANGUNAN SUTT 150 kV
KASONGAN - KUALA KURUN SECTION 4 (T.302-T.376)
DI KALIMANTAN TENGAH
0038.PJ/DAN.02.02/UIP.KALTENG/2018.TANGGAL 20 DESEMBER 2018

Jumlah Insulator String Set 2 x ACSR 240/40 mm2 GSW 55 sqmm OPGW 70 sqmm
TYPE SUDUT TOTAL JARAK
NO NOMOR TOWER SPAN (M) KETERANGAN LOKASI ISOLATOR
TOWER BELOK (M) suspension Spacer Spacer Armour Armour Armour
Mid Span Mid Span Vib. Damper Suspension Set Tension Set Join Box Vib. Damper Suspension Set Tension Set
SS DS ST DT JMP Damper Jumper Rods Rods Rods
TOTAL 7,717 #REF! 90 12 36 12 0 36 714 60 204 3 56 17 9 17 3 56 15 13 15

BOQ 246 96 72 24 6 132 1968 96 684 12 165 57 26 57 6 145 52 26 52


156 84 36 12 6 96 1,254 36 480 9 109 40 17 40 3 89 37 13 37