PT.

ARTHA BANGUN DIMENSI PROPERTI


PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT ISLAM " ASSHOBIRIN "
JLN. RAYA SERPONG KM. 11 TANGERANG SELATAN
BANGUNAN RUANG GENSET
HARGA TOTAL
NO JENIS PEKERJAAN STN VOLUME SATUAN HARGA KET
Rp. Rp.

1 PEKERJAAN PERSIAPAN
1.1 Pembersihan lokasi m2 153.00
1.2 Pasang bouwplank m1 60.00

2 PEKERJAAN TANAH DAN PASIR


2.1 Galian Tanah dan Tie Beam
2.1.1 - Pondasi tapak type PT.1 1.000 x 1000 mm ( 3 bh ) m3 6.75
2.1.2 - Pondasi tapak type PT.2 6.00 x 6.00 mm ( 14 bh ) m3 16.94
2.1.3 - Tie Beam m3 21.80

2.2 Urugan pasir dibawah Pondasi tapak tebal 10 cm


2.2.1 - Pondasi tapak type PT.1 m3 0.68
2.2.2 - Pondasi tapak type PT.2 m3 1.69
2.2.3 - Tie Beam m3 4.36
2.2.4 - Dibawah lantai m3 13.30

2.3 Lantai kerja tebal 5 cm


2.3.1 - Pondasi tapak type PT.1 m3 0.34
2.3.2 - Pondasi tapak type PT.2 m3 0.85
2.3.3 - Tie Beam m3 2.18
2.3.4 - Dibawah lantai m3 6.65

2.4 Urugan tanah kembali dipadatkan m3 9.10


2.5 Pemadatan tanah dasar Pondasi & Tie beam m2 8.04

3 PEKERJAAN BETON
3.1 PONDASI SETEMPAT
3.1.1 PONDASI SETEMPAT PT.1 ( 1000 x 1000 x 300 )
- Bekesting bataco m2 3.60
- Pembesian D. 13 mm - 150 kg 135.00
- Beton Readymix K. 350 m3 0.90

3.1.2 BETON PONDASI SETEMPAT PT.2 ( 600 x 600 x 300 )


- Bekesting bataco m2 10.08
- Pembesian D. 13 mm - 150 kg 226.80
- Beton Readymix K. 350 m3 1.51

3.2 TIE BEAM


3.2.1 BETON TIE BEAM TB.1 ( 200 x 450 ) 30
- Bekesting bataco m2 27.00
- Pembesian 4 D.16 mm kg 298.29
- Pembesian 2 D.13 mm kg 65.64
- Beugel Ø 10 mm - 150 kg 133.16
- Beton Readymix K. 350 m3 2.70
HARGA TOTAL
NO JENIS PEKERJAAN STN VOLUME SATUAN HARGA KET
Rp. Rp.

3.2.2 BETON TIE BEAM TB.2 ( 200 x 400 ) 70


- Bekesting bataco m2 56.00
- Pembesian 4 D.16 mm kg 696.00
- Pembesian 2 D.13 mm kg 153.16
- Beugel Ø 10 mm - 150 kg 310.72
- Beton Readymix K. 350 m3 5.60

3.2.3 BETON TIE BEAM TB.3 ( 200 X 350 ) 9.4


- Bekesting bataco m2 6.58
- Pembesian 4 D.16 mm kg 62.31
- Pembesian 2 D.13 mm kg 20.57
- Beugel Ø 10 mm - 150 kg 41.72
- Beton Readymix K. 350 m3 0.66

3.3 PLAT LANTAI TEBAL 12 CM 144


- Bekesting m2 6.24
- Pembesian Ø. 10 mm - 150 ( double ) kg 2,379.20
- Beton Readymix K. 350 m3 17.28
- Floor hardener Non methalic 5kg/ m2 m2 144.00

3.4 KOLOM
3.4.1 BETON KOLOM K.1 ( 40 X 40 ) 13
- Bekesting m2 104.00
- Pembesian 6 D 16 mm kg 615.51
- Beugel Ø 10 mm - 150 kg 264.48
- Beton Readymix K. 350 m3 10.40

3.4.2 BETON KOLOM K.2 ( 30 X 30 ) 9


- Bekesting m2 54.00
- Pembesian 4 D 16 mm kg 284.08
- Beugel Ø 10 mm - 150 kg 183.10
- Beton Readymix K. 350 m3 4.05

3.5 BALOK
3.5.1 BALOK INDUK B.1 ( 200 X 450 ) 51
- Bekesting m2 56.10
- Pembesian 6 D 16 mm kg 507.09
- Beugel Ø 10 mm - 150 kg 226.38
- Beton Readymix K. 350 m3 4.59

3.5.2 BALOK INDUK B.2 ( 200 X 350 ) 54


- Bekesting m2 48.60
- Pembesian 6 D 16 mm kg 536.92
- Beugel Ø 10 mm - 150 kg 199.75
- Beton Readymix K. 350 m3 3.57

3.5.3 BETON BALOK B.3 ( 150 X 300 ) 24


HARGA TOTAL
NO JENIS PEKERJAAN STN VOLUME SATUAN HARGA KET
Rp. Rp.
- Bekesting m2 18.00
- Pembesian 4 D 16 mm kg 159.09
- Beugel Ø 10 mm - 150 kg 71.02
- Beton Readymix K. 350 m3 1.08

3.6 PLAT DAK ATAP EL + 4.000


3.6.1 PLAT ATAP TEBAL 10 CM
- Bekesting m2 160.00
- Besi Ø 10 mm - 150 kg 2,230.50
- Beton Readymix K. 350 m3 16.20
- Water proofing coating m2 176.00

PLAT DAK ATAP EL + 5.500


3.6.2 PLAT ATAP TEBAL 10 CM
- Bekesting m2 25.00
- Besi Ø 10 mm - 150 kg 413.06
- Beton Readymix K. 350 m3 3.00
- Water proofing coating m2 27.50

3.7 LISPLANK
3.7.1 BETON BALOK LISPLANK ( 150 X 200 ) 28
- Bekesting m2 21.00
- Tulangan pokok 4 D 13 mm kg 122.53
- Beugel Ø 8 mm - 150 kg 39.77
- Beton Readymix K. 350 m3 0.84

3.7.2 BETON LISPLANK ( 100 x 400 )


- Bekesting m2 16.80
- Pembesian Ø 10 mm - 200 ( H ) kg 45.31
- Pembesian Ø 8 mm - 200 ( V ) kg 46.40
- Beton Readymix K. 350 m3 1.12

3.8 PLAT BETON DIATAS PINTU & JENDELA ( TEBAL 10 CM ) 8


- Bekesting m2 4.80
- Pembesian Ø 10 mm - 200 ( H ) kg 41.43
- Beton Readymix K. 350 m3 0.48

4 PEKERJAAN TRENCH CABLE ( 45 M1 )


4.1 CABLE TRENCH 400 X 400 MM
- Bekesting m2 72.00
- Pembesian Ø 10 mm - 200 ( H ) kg 486.00
- Pembesian Ø 8 mm - 200 ( V ) kg 270.00
- Beton Readymix K. 350 m3 5.40

4.2 DUDUKAN DAN TUTUP CABLE TRENCH


4.2.1 - Besi L. 50 x 50 x 5 + Angkur kg 340.20
4.2.2 - Checker plate tebal 5 mm + rangka siku 40 x 40 x 4 m2 27.00

5 PEKERJAAN PONDASI GENSET ( 2 UNIT )


5.1 - Galian tanah m3 16.13
5.2 - Pemadatan tanah dasar m2 18.00
5.3 - Urugan pasir tebal 10 cm m3 1.80
HARGA TOTAL
NO JENIS PEKERJAAN STN VOLUME SATUAN HARGA KET
Rp. Rp.
5.4 - Lantai kerja tebal 5 cm m3 0.90
5.5 - Beton Readymix K. 350 m3 7.20
5.6 - Pembesian D. 13 mm - 150 kg 720.00
5.7 - Sthyropoam tebal 1 cm m2 10.40
5.8 - Sealent m1 26.00

6 PEKERJAAN ARSITEKTUR
6.1 PEKERJAAN PASANGAN 78
6.1.1 - Pasang dinding bata ringan tebal 10 cm m2 312.00
6.1.2 - Plesteran dinding m2 624.00
6.1.3 - Acian dinding m2 624.00
6.1.4 - Kolom praktis 15 x 15 cm m1 40.00
6.1.5 - Balok praktis 15 x 20 cm m1 52.00
6.1.6 - Pasang Pipa air hujan PVC Ø 4" Klas AW m1 24.00
6.1.7 - Pasang Roof drain Ø 4" PVC bh 4.00

6.2 PEKERJAAN PENGECATAN


6.2.1 - Pengecatan kolom dan dinding Exterior m2 312.00
6.2.2 - Pengecatan kolom dan dinding Interior m2 312.00
6.2.3 - Pengecatan dak beton m2 180.00
6.2.4 - Pengecatan Lisplank m2 21.60

6.3 PEKERJAAN PINTU DAN JENDELA


6.3.1 - Pintu besi double Type PB. 2 (1000 x 2100) mm x 2 ( swin Unit 3.00
6.3.2 - Pintu besi Type PB. 1 ( 900 x 2100 ) mm x1 ( swing ) Unit 1.00
6.3.3 - Pasang jendela louver besi + Kawat burung Unit 4.00

SUB. TOTAL PEKERJAAN RUMAH GENSET