Geotechnical Consultant
Jl. Mahkota Raya Blok H1 No. 12A
Telp. (021) 70218911, (021) 5529233
Fax. (021) 5529233
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Disiapkan untuk:
25 November 2022
PT. GEO PRIMA
Geotechnical Consultant
Jl. Mahkota Raya Blok H1 No. 12A
Modernland, Tangerang 15117
Telp. (021) 5529233
25 November 2022
Perihal: Hasil Pile Integrity Tester (PIT) pada (8) Tiang Bor pada Proyek STS
Martadinata, Tangerang Selatan.
Dengan hormat,
Bersama ini kami sampaikan (2) copy laporan hasil Pile Integrity Tester (PIT)
pada (8) Tiang Bor pada Proyek STS Martadinata, Tangerang Selatan.
Hormat kami,
PT. GEO PRIMA
1 PENDAHULUAN ............................................................................. 1
3 KESIMPULAN……………………………………………………. . 1
1. PENDAHULUAN
Laporan ini menyajikan hasil Pile Integrity Tester (PIT) yang telah dikerjakan
pada (8) Tiang Bor pada Proyek STS Martadinata, Tangerang Selatan.
Ruang lingkup pekerjaan kami adalah melakukan test PIT pada (8) tiang bor,
dimana tiang bor dikerjakan oleh PT. PP (Persero), Tbk. Tujuan dari PIT adalah untuk
membuktikan integritas tiang (seperti crack atau reduksi diameter) dibawah kepala
tiang.
2. HASIL TEST
Hasil dari PIT dan analisa pile profile menggunakan program Profile 2009
yang dibuat oleh Pile Dynamic (USA) menghasilkan pile profile dan nilai BTA yang
kami rangkum sebagai berikut:
Panjang
Diameter
No. No Tiang. Tanggal Tes Tiang BTA (%) Keterangan
Tiang (m)
(m)
1. A2-1 24.0 98 AB
2. A2-2 24.0 97 AB
3. A2-3 24.0 85 AB
4. A2-4 24 November 24.0 98 AB
1.0
5. A2-5 2022 24.0 88 AB
6. A2-6 24.0 85 AB
7. A2-7 24.0 90 AB
8. A2-8 24.0 89 AB
(1)
Panjang tiang didapat dari record yang disiapkan oleh PT. PP (Persero), Tbk.
(2)
BTA adalah rasio antara hasil impedansi (penampang) dengan aktual top diameter tiang, dengan
menganggap modulus beton (E) dan cepat rambat (c) konstant sepanjang tiang.
3. KESIMPULAN
Berdasarkan data di atas, (8) PIT menunjukkan hasil yang baik dan tiang dapat
digunakan.
1
PT. GEO PRIMA
Geotechnical Consultant
Jl. Mahkota Raya Blok H1 No. 12A
Modernland, Tangerang 15117
Telp. (021) 5529233
2
GAMBAR
DENAH LOKASI TES PIT
LAMPIRAN A
HASIL PIT TEST
Ge o - Op t ima In c 11 / 2 5 / 20 2 2
STS MA RTA DINA TA
C: \ .. . \File PIT\ A v e r a ge . PIT PIT- W 2 0 0 9- 1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.25
0.00
-0.25
24.00 m (3800 m/s) V 0.322 cm/s (0.395)
Reference
x 24.00
Magn
0.98
6.3 m
0 5 10 15 20 25 30 diam
0 5 10 15 20 25 30 35 m
Geo-Optima Inc 11/25/2022
STS MARTADINATA; Pile: A2-2 Collected: 11/24/2022
Profile 2009
0.15
0.00
-0.15
24.00 m (3800 m/s) V 0.159 cm/s (0.200)
Reference
x 24.00
Magn
0.97
6.7 m
0 5 10 15 20 25 30 diam
0 5 10 15 20 25 30 35 m
Geo-Optima Inc 11/25/2022
STS MARTADINATA; Pile: A2-3 Collected: 11/24/2022
Profile 2009
0.10
0.00
-0.10
24.00 m (3800 m/s) V 0.157 cm/s (0.188)
Reference
x 24.00
Magn
0.85
23.1 m
0 5 10 15 20 25 30 diam
0 5 10 15 20 25 30 35 m
Geo-Optima Inc 11/25/2022
STS MARTADINATA; Pile: A2-4 Collected: 11/24/2022
Profile 2009
0.15
0.00
-0.15
24.00 m (3800 m/s) V 0.167 cm/s (0.206)
Reference
x 24.00
Magn
0.98
6.4 m
0 5 10 15 20 25 30 diam
0 5 10 15 20 25 30 35 m
Geo-Optima Inc 11/25/2022
STS MARTADINATA; Pile: A2-5 Collected: 11/24/2022
Profile 2009
0.10
0.00
-0.10
24.00 m (3800 m/s) V 0.179 cm/s (0.282)
Reference
x 24.00
Magn
0.88
22.3 m
0 5 10 15 20 25 30 diam
0 5 10 15 20 25 30 35 m
Geo-Optima Inc 11/25/2022
STS MARTADINATA; Pile: A2-6 Collected: 11/24/2022
Profile 2009
0.10
0.00
-0.10
24.00 m (3800 m/s) V 0.184 cm/s (0.249)
Reference
x 24.00
Magn
0.85
21.4 m
0 5 10 15 20 25 30 diam
0 5 10 15 20 25 30 35 m
Geo-Optima Inc 11/25/2022
STS MARTADINATA; Pile: A2-7 Collected: 11/24/2022
Profile 2009
0.20
0.00
-0.20
24.00 m (3800 m/s) V 0.262 cm/s (0.341)
Reference
x 24.00
Magn
0.90
22.9 m
0 5 10 15 20 25 30 diam
0 5 10 15 20 25 30 35 m
Geo-Optima Inc 11/25/2022
STS MARTADINATA; Pile: A2-8 Collected: 11/24/2022
Profile 2009
0.15
0.00
-0.15
24.00 m (3800 m/s) V 0.192 cm/s (0.265)
Reference
x 24.00
Magn
0.89
22.8 m
0 5 10 15 20 25 30 diam
0 5 10 15 20 25 30 35 m
LAMPIRAN B
DOKUMENTASI