RENCANA ANGGARAN BIAYA RUMAH KOS

REKAPITULASI
RENCANA ANGGARAN BIAYA ( R A B )
KEGIATAN : PERENCANAAN
PEKERJAAN : PEMBANGUNAN KOS-KOSAN 2 LANTAI
LOKASI : MAKASSAR

NO URAIAN PEKERJAAN JUMLAH HARGA KET


a b c d
I PEKERJAAN PERSIAPAN Rp 5,653,600.00
II PEKERJAAN STRUKTUR Rp 742,056,536.83
III PEKERJAAN FINISHING ARSITEKTUR Rp 479,441,724.10
IV PEKERJAAN MEKANIKAL ELEKTRIKAL Rp 14,810,229.00
V PEKERJAAN FIXTURE, FURNISHING & EQUIPMENT Rp 21,063,276.00

Rp 1,263,025,365.93
R E A L C O S T ………………………………………………………………………………………………………………………………………………………..
Rp 138,932,790.25
PPN 11% ………………………………………………………………………………………………………………………………………………………..
Rp 1,401,958,156.18
J U M L A H ………………………………………………………………………………………………………………………………………………………..
Rp 1,401,900,000.00
DIBULATKAN ………………………………………………………………………………………………………………………………………………………..
Terbilang : Satu Milyar Empat Ratus Seratus Juta Sembilang Ratus Ribu Rupiah, ......
DAFTAR
RENCANA ANGGARAN BIAYA ( R A B )
KEGIATAN : PERENCANAAN
PEKERJAAN : PEMBANGUNAN KOS-KOSAN 2 LANTAI
LOKASI : MAKASSAR

NO URAIAN PEKERJAAN SPESIFIKASI BAHAN UKURAN SATUAN HARGA SATUAN JUMLAH HARGA
a b c d e f h
I PEKERJAAN PERSIAPAN Rp 5,653,600.00
1.1 PEKERJAAN MOBILISASI DAN DEMOBILISASI
1 Pembersihan, Penimbungan dan Pematangan Lokasi 1 LS Rp 1,000,000.00 Rp 1,000,000.00
2 Pengukuran dan Pemasangan Bowplank 60 M1 Rp 77,560.00 Rp 4,653,600.00

II PEKERJAAN STRUKTUR Rp 742,056,536.83


2.1 ELEV. '-1.50 s/d ±0.00
I PEKERJAAN PONDASI PASANGAN BATU KALI Camp. 1 : 5 Rp 61,674,180.41
1 Galian Tanah Pondasi 16.16 M3 Rp 110,917.50 Rp 1,792,426.80
2 Urugan Pasir Bawah Pondasi Pasir Urugan 4.04 M3 Rp 287,247.00 Rp 1,160,477.88
3 Pasangan Batu Kosong Batu Kali 6.06 M3 Rp 592,785.90 Rp 3,592,282.55
4 Pasangan Batu Kali Camp. 1 : 5 Batu Kali 51.38 M3 Rp 1,066,567.50 Rp 54,804,237.78
5 Urugan Tanah Kembali 4.04 M3 Rp 80,385.00 Rp 324,755.40

II PEKERJAAN POER PLAT BETON Rp 29,151,092.58


A Pekerjaan Poer Plat Type 80x80
1 Pekerjaan Galian Tanah 14.58 M3 Rp 110,917.50 Rp 1,617,177.15
2 Pekerjaan Lantai Kerja 9.72 M3 Rp 1,339,178.83 Rp 13,016,818.27
3 Pekerjaan Bekisting Poer Plat 10.44 M2 Rp 123,815.33 Rp 1,292,631.99
4 Pekerjaan Pembesian Poer Plat 397.15 KG Rp 17,602.33 Rp 6,990,801.06
5 Pekerjaan Cor Beton Poer Plat Mutu K.275 3.89 M3 Rp 1,603,308.67 Rp 6,233,664.11

III PEKERJAAN PEDESTAL KOLOM BETON Rp 45,704,568.30


A Pekerjaan Pedestal Kolom Beton Type PK.1 15 / 35
1 Pekerjaan Bekisting Pedestal Kolom 18.08 M2 Rp 221,057.60 Rp 3,996,721.41
2 Pekerjaan Pembesian Pedestal Kolom 522.25 KG Rp 17,602.33 Rp 9,192,747.09
3 Pekerjaan Cor Pedestal Kolom Mutu K.275 20.28 M3 Rp 1,603,308.67 Rp 32,515,099.81

IV PEKERJAAN SLOEF BETON / TIE BEAM 35x40 22.5 Rp 35,012,537.49


1 Pekerjaan Bekisting Sloef 47.70 M2 Rp 134,953.50 Rp 6,437,281.95
2 Pekerjaan Pembesian Sloef 954.82 KG Rp 17,602.33 Rp 16,806,969.91
3 Pekerjaan Cor Beton Sloef Mutu K.275 7.34 M3 Rp 1,603,308.67 Rp 11,768,285.63

2.2 LANTAI 1 (ELEV. ' ±0.00 s/d + 4.00)


I PEKERJAAN KOLOM BETON UTAMA 35X35 Rp 44,421,515.36
A Pekerjaan Kolom Beton Type K.1 25X25
1 Pekerjaan Bekisting Kolom 2 X pakai 44.10 M2 Rp 221,057.60 Rp 9,748,640.16
2 Pekerjaan Pembesian Kolom 1158.38 KG Rp 17,325.08 Rp 20,069,098.37
3 Pekerjaan Cor Beton Kolom Mutu K.225 5.88 M3 Rp 1,437,713.19 Rp 8,453,753.53

B Pekerjaan Kolom Praktis Type KP 15X15


1 Pekerjaan Bekisting Kolom 2 X pakai 8.88 M2 Rp 213,697.18 Rp 1,897,630.99
2 Pekerjaan Pembesian Kolom 202.43 KG Rp 17,325.08 Rp 3,507,081.80
3 Pekerjaan Cor Beton Kolom Mutu K.225 0.52 M3 Rp 1,437,713.19 Rp 745,310.52

II PEKERJAAN BALOK ( BALOK INDUK DAN BALOK ANAK) Rp 101,618,753.94


A Pekerjaan Balok / Beam Beton Type B.1 25 x 40
1 Pekerjaan Bekisting Balok 88.55 M2 Rp 221,057.60 Rp 19,574,650.48
2 Pekerjaan Pembesian Balok 1321.22 KG Rp 17,602.33 Rp 23,256,552.09
3 Pekerjaan Cor Beton Balok Mutu K.275 25.99 M3 Rp 1,603,308.67 Rp 41,665,984.04

B Pekerjaan Anak Balok / Beam Beton Type B.2 20x30


1 Pekerjaan Bekisting Balok 28.8 M2 Rp 221,057.60 Rp 6,366,458.88
2 Pekerjaan Pembesian Balok 488.04 KG Rp 17,602.33 Rp 8,590,641.74
3 Pekerjaan Cor Beton Balok Mutu K.275 1.35 M3 Rp 1,603,308.67 Rp 2,164,466.70

III PEKERJAAN PLAT BETON / LANTAI 2 Rp 238,780,389.06


A Pekerjaan Plat Beton TOC E. ± 3.00 M
1 Pekerjaan Plat Bondex 0,35 124.35 M2 Rp 221,057.60 Rp 27,488,512.56
2 Pekerjaan Pembesian Wiremesh M8 124.35 KG Rp 17,602.33 Rp 2,188,849.89
3 Pekerjaan Cor Beton Plat Mutu K.275 124.35 M3 Rp 1,603,308.67 Rp 199,371,433.01

B Pekerjaan Meja Beton T. 10 CM


1 Pekerjaan Bekisting Plat 12 M2 Rp 221,057.60 Rp 2,652,691.20
2 Pekerjaan Pembesian Plat 289.14 KG Rp 17,602.33 Rp 5,089,538.06
3 Pekerjaan Cor Beton Plat Mutu K.175 1.35 M3 Rp 1,473,603.21 Rp 1,989,364.34

IV PEKERJAAN TANGGA Rp 22,304,726.27


A Pekerjaan Tangga Beton
1 Pekerjaan Bekisting Tangga 12 M2 Rp 221,057.60 Rp 2,652,691.20
2 Pekerjaan Pembesian Plat 289.14 KG Rp 17,602.33 Rp 5,089,538.06
3 Pekerjaan Cor Beton Plat Mutu K.175 1.35 M3 Rp 1,603,308.67 Rp 2,164,466.70
4 Pekerjaan Lantai Keramik Tangga 15 M2 Rp 339,820.69 Rp 5,097,310.31
5 Pekerjaan Railing Tangga Besi Hollow 4x4 56 M1 Rp 130,370.00 Rp 7,300,720.00
2.3 LANTAI 2 (ELEV. ' ± 4.00 s/d + 8.00)
I PEKERJAAN KOLOM BETON Rp 30,406,094.15
A Pekerjaan Kolom Utma Type K.1 35x35
1 Pekerjaan Bekisting Kolom 2 X pakai 31.28 M2 Rp 42,494.43 Rp 1,329,013.30
2 Pekerjaan Pembesian Kolom 816.62 KG Rp 27,806.63 Rp 22,707,494.77
3 Pekerjaan Cor Beton Kolom Mutu K.225 4.13 M3 Rp 78,103.08 Rp 322,907.42

B Pekerjaan Kolom Praktis Type KP 15X15


1 Pekerjaan Bekisting Kolom 2 X pakai 8.88 M2 Rp 42,494.43 Rp 377,350.54
2 Pekerjaan Pembesian Kolom 202.43 KG Rp 27,806.63 Rp 5,628,839.49
3 Pekerjaan Cor Beton Kolom Mutu K.225 0.52 M3 Rp 78,103.08 Rp 40,488.64

II PEKERJAAN RINGBALK BETON TYPE RB. 15X25 Rp 20,517,127.57


1 Pekerjaan Bekisting Ringbalk 2 X pakai 56.7 M2 Rp 213,697.18 Rp 12,116,630.30
2 Pekerjaan Pembesian Ringbalk 350.44 KG Rp 17,325.08 Rp 6,071,401.91
3 Pekerjaan Cor Beton Ringbalk Mutu K.225 1.62 M3 Rp 1,437,713.19 Rp 2,329,095.36

III PEKERJAAN PLAT BETON / LANTAI 2 Rp 54,051,067.40


A Pekerjaan Plat Beton TOC E. ± 3.00 M
1 Pekerjaan Plat Bondex 0,35 33 M2 Rp 221,057.60 Rp 7,294,900.80
2 Pekerjaan Pembesian Wiremesh M8 33 KG Rp 17,602.33 Rp 580,876.93
3 Pekerjaan Cor Beton Plat Mutu K.275 28.8 M3 Rp 1,603,308.67 Rp 46,175,289.67

IV PEKERJAAN ATAP Rp 58,414,484.29


A Pekerjaan Pasangan Rangka Atap ( Baja Ringan )
1 Rangka Atap Baja Zincalum 206.75 M2 Rp 144,210.00 Rp 29,814,707.79
B Pekerjaan Pasangan Atap Spandek
1 Pekerjaan Atap Spandek 208.00 M2 Rp 131,210.00 Rp 27,291,680.00
2 Pekerjaan Nok Atap 10 M1 Rp 18,350.00 Rp 183,500.00
3 Pekerjaan Talang Atap 15 M1 Rp 74,973.10 Rp 1,124,596.50

III PEKERJAAN FINISHING ARSITEKTUR Rp 479,441,724.10


3.1 ELEV. ' - 0.00 - 8.00
I PEKERJAAN LANTAI SATU Rp 55,238,093.08
A PEKERJAAN KERAMIK LANTAI 1
1 Pekerjaan Penimbunan Tanah Bawah Lantai T. 0.5 cm 24 M3 Rp 70,260.00 Rp 1,686,240.00
2 Pekerjaan Penimbunan Pasir Bawah Lantai T. 15 cm 36 M3 Rp 167,840.00 Rp 6,042,240.00
3 Pekerjaan Rabat Beton T. 5 cm 6 M3 Rp 1,283,295.51 Rp 7,699,773.08
4 Pekerjaan Pas. Lantai Type. A ( u/ Lantai Utama ) 40x40 Warna 125.75 M2 Rp 298,740.00 Rp 37,566,555.00
5 Pekerjaan Pas. Lantai Toilet 20x20 Warna 2.25 M2 Rp 298,740.00 Rp 672,165.00
6 Pekerjaan Pas. Lantai Teras 40x40 Warna 8 M2 Rp 196,390.00 Rp 1,571,120.00
B PEKERJAAN DINDING Rp 102,086,203.89
1 Pekerjaan Pas. Batu Merah 1/2 Batu ( Camp 1 : 4 ) Campuran 1 PC : 4 PS 91.06 M2 Rp 159,000.88 Rp 14,478,619.68
2 Pekerjaan Plesteran Campuran 1 PC : 4 PS 244.06 M2 Rp 78,103.08 Rp 19,061,837.70
3 Pekerjaan Acian Dinding 244.06 M2 Rp 27,806.63 Rp 6,786,484.90
4 Pekerjaan Pas. Dinding Keramik (u/ Kamar Mandi) Keramik 25 x 40 Corak 4.5 M2 Rp 241,851.94 Rp 1,088,333.73
5 Pekerjaan Pas. Dinding Kaca T. 12 mm 21.6 M2 Rp 2,309,247.15 Rp 49,879,738.44
6 Pekerjaan Pas. Dinding Partisi Gypsun 30.11 M2 Rp 358,392.21 Rp 10,791,189.44

C PEKERJAAN PINTU UTAMA unit Rp 11,594,469.23


1 Kusen Aluminium Allumunium 4" Putih 5.7 M1 Rp 221,057.60 Rp 1,260,028.32
2 Bingkai Pintu Aluminium Allumunium 4" Putih 11.4 M1 Rp 227,698.85 Rp 2,595,766.89
3 Daun Pintu Kaca 12 mm 2.1 M2 Rp 2,309,247.15 Rp 4,849,419.02
4 Handle Stainless steel 4 Psg Rp 397,387.10 Rp 1,589,548.40
5 Door Closer 2 Bh Rp 499,737.10 Rp 999,474.20
6 Kunci 1 Bh Rp 125,000.00 Rp 125,000.00
7 Engsel 4 Bh Rp 43,808.10 Rp 175,232.40

D PEKERJAAN PINTU 1 unit Rp 3,986,100.51


1 Kusen Aluminium Allumunium 4" Putih 5.1 M1 Rp 189,206.28 Rp 964,952.03
2 Daun Pintu 1.89 M2 Rp 801,069.30 Rp 1,514,020.98
3 Handle Stainless steel 2 Psg Rp 397,387.10 Rp 794,774.20
4 Door Closer 1 Bh Rp 499,737.10 Rp 499,737.10
5 Kunci 1 Bh Rp 125,000.00 Rp 125,000.00
6 Engsel 2 Bh Rp 43,808.10 Rp 87,616.20

E PEKERJAAN PINTU WC/KM unit Rp 1,350,000.00


1 Kusen Aluminium 1 Set Rp 1,350,000.00 Rp 1,350,000.00

I PEKERJAAN PLAFOND PVC unit Rp 12,049,211.25


1 Rangka Besi Hollow 40 x 40 x 20 mm Modul 60 x 60 Cm 112.5 M2 Rp 64,561.00 Rp 7,263,112.50
2 Plafond Gypsung Tebal 8 mm x 20 Cm 112.5 M2 Rp 42,543.10 Rp 4,786,098.75

J PEKERJAAN PENGECATAN unit Rp 8,970,743.60


1 Pekerjaan Pengecatan Dinding Dalam Exterior Ex. Dulux 242.06 M2 Rp 37,060.00 Rp 8,970,743.60
2 Pekerjaan Pengecatan Dinding Luar Interior Ex. Dulux 458.06 M2 Rp 43,880.00 Rp 20,099,672.80
3 Pekerjaan Pengecatan Plafond 112.5 M2 Rp 66,260.00 Rp 7,454,250.00
4 Pekerjaan Pengecatan Besi Hollow 20 M2 Rp 83,550.00 Rp 1,671,000.00

II PEKERJAAN LANTAI DUA Rp 48,583,750.00


A PEKERJAAN KERAMIK LANTAI 2
1 Pekerjaan Pas. Lantai Type. A ( u/ Lantai Utama ) 40x40 Warna 120 M2 Rp 298,740.00 Rp 35,848,800.00
2 Pekerjaan Pas. Lantai Type. B ( u/ Dapur ) 20x20 Warna 58 M2 Rp 196,390.00 Rp 11,390,620.00
4 Pekerjaan Pas. Lantai Balkom 40x40 Warna 4.5 M2 Rp 298,740.00 Rp 1,344,330.00
B PEKERJAAN DINDING Rp 126,714,758.46
1 Pekerjaan Pas. Batu Merah 1/2 Batu ( Camp 1 : 4 ) Campuran 1 PC : 4 PS 329.975 M2 Rp 159,000.88 Rp 52,466,313.73
2 Pekerjaan Plesteran Campuran 1 PC : 4 PS 659.95 M2 Rp 78,103.08 Rp 51,544,127.65
3 Pekerjaan Acian Dinding 659.95 M2 Rp 27,806.63 Rp 18,350,982.17
4 Pekerjaan Pas. Dinding Keramik (u/ Kamar Mandi) Keramik 25 x 40 Corak 18 M2 Rp 241,851.94 Rp 4,353,334.92

C PEKERJAAN PINTU UTAMA unit Rp 6,104,885.76


1 Kusen Aluminium Allumunium 4" Putih 6.3 M1 Rp 189,206.28 Rp 1,191,999.56
2 Daun Pintu 3.15 M2 Rp 801,069.30 Rp 2,523,368.30
3 Handle Stainless steel 4 Psg Rp 397,387.10 Rp 1,589,548.40
4 Door Closer 1 Bh Rp 499,737.10 Rp 499,737.10
5 Kunci 1 Bh Rp 125,000.00 Rp 125,000.00
6 Engsel 4 Bh Rp 43,808.10 Rp 175,232.40

D PEKERJAAN PINTU 1 unit Rp 19,461,362.17


1 Kusen Aluminium Allumunium 4" Putih 40.8 M1 Rp 189,206.28 Rp 7,719,616.22
2 Daun Pintu 3.575 M2 Rp 801,069.30 Rp 2,863,822.75
3 Handle Stainless steel 8 Psg Rp 397,387.10 Rp 3,179,096.80
4 Door Closer 8 Bh Rp 499,737.10 Rp 3,997,896.80
5 Kunci 8 Bh Rp 125,000.00 Rp 1,000,000.00
6 Engsel 16 Bh Rp 43,808.10 Rp 700,929.60

E PEKERJAAN PINTU WC/KM unit Rp 2,700,000.00


1 Kusen Aluminium Allumunium 4" Putih 2 Set Rp 1,350,000.00 Rp 2,700,000.00

F PEKERJAAN JENDELA 1 unit Rp 5,097,855.14


1 Kusen Aluminium Allumunium 4" Putih 12.4 M1 Rp 284,796.81 Rp 3,531,480.44
2 Bingkai Aluminium Allumunium 4" Putih 2.4 M1 Rp 43,808.10 Rp 105,139.44
3 Kaca 5 mm 2.4 M2 Rp 220,099.65 Rp 528,239.16
4 Kait Angin 6 Psg Rp 49,191.25 Rp 295,147.50
5 Kunci 3 Bh Rp 125,000.00 Rp 375,000.00
6 Engsel 6 Bh Rp 43,808.10 Rp 262,848.60

F PEKERJAAN JENDELA 2 unit Rp 8,115,007.07


1 Kusen Aluminium Allumunium 4" Putih 17.6 M1 Rp 284,796.81 Rp 5,012,423.86
2 Bingkai Aluminium Allumunium 4" Putih 3.84 M1 Rp 43,808.10 Rp 168,223.10
3 Kaca 5 mm 7.68 M2 Rp 220,099.65 Rp 1,690,365.31
4 Kait Angin 8 Psg Rp 49,191.25 Rp 393,530.00
5 Kunci 4 Bh Rp 125,000.00 Rp 500,000.00
6 Engsel 8 Bh Rp 43,808.10 Rp 350,464.80

F PEKERJAAN JENDELA 3 unit Rp 20,744,835.06


1 Kusen Aluminium Allumunium 4" Putih 46.2 M1 Rp 284,796.81 Rp 13,157,612.62
2 Bingkai Aluminium Allumunium 4" Putih 10.5 M1 Rp 43,808.10 Rp 459,985.05
3 Kaca 5 mm 12.6 M2 Rp 220,099.65 Rp 2,773,255.59
4 Kait Angin 28 Psg Rp 49,191.25 Rp 1,377,355.00
5 Kunci 14 Bh Rp 125,000.00 Rp 1,750,000.00
6 Engsel 28 Bh Rp 43,808.10 Rp 1,226,626.80

H PEKERJAAN VENTILASI unit Rp 1,199,267.58


1 Kusen Aluminium Allumunium 4" Putih 3.84 M1 Rp 284,796.81 Rp 1,093,619.75
2 Kaca 5 mm 0.48 M2 Rp 220,099.65 Rp 105,647.83

I PEKERJAAN PLAFOND Gypsum unit Rp 10,121,337.45


1 Rangka Besi Hollow 40 x 40 x 20 mm Modul 60 x 60 Cm 94.5 M2 Rp 64,561.00 Rp 6,101,014.50
2 Plafond GypsumTebal 8 mm x 20 Cm 94.5 M2 Rp 42,543.10 Rp 4,020,322.95

J PEKERJAAN PENGECATAN unit Rp 35,323,843.84


1 Pekerjaan Pengecatan Dinding Dalam Exterior Ex. Dulux 242.06 M2 Rp 49,053.71 Rp 11,873,941.04
2 Pekerjaan Pengecatan Dinding Luar Interior Ex. Dulux 458.06 M2 Rp 40,083.71 Rp 18,360,744.20
3 Pekerjaan Pengecatan Plafond 94.5 M2 Rp 40,083.71 Rp 3,787,910.60
4 Pekerjaan Pengecatan Besi Hollow 20 M2 Rp 65,062.40 Rp 1,301,248.00

IV PEKERJAAN MEP Rp 30,777,943.95


I PEKERJAAN INSTALASI AIR BERSIH Rp 3,000,000.00
B Reservoar Air / Tandon Air 2 Bh Rp 1,500,000.00 Rp 3,000,000.00
1 Kapasitas : 1200 Lt
2 Bentuk : Bulat
3 Material : Fiber

C SANITARY, PIPE & SUPPORTING MATERIAL (CLEAN WATER) Rp 1,519,197.40


1 LANTAI 1
- Pipa Air Bersih Pipa PVC (3/4") 12 M1 Rp 28,844.30 Rp 346,131.60
2 Fitting - fitting , Assesories dan Material Bantu 1 LS Rp 500,000.00 Rp 500,000.00

3 LANTAI 2
- Pipa Air Bersih Pipa PVC (3/4") 6 M1 Rp 28,844.30 Rp 173,065.80
- Gate Valve 3/4" 1 BH Rp 500,000.00

4 Fitting - fitting , Assesories dan Material Bantu 1 LS Rp 500,000.00 Rp 500,000.00

II PEKERJAAN INSTALASI AIR BUANG/BEKAS Rp 7,738,264.00


A LANTAI SATU
1 Pekerjaan Pas. Pipa aIR PVC Dia. 4 " (Padat) 7 M1 Rp 181,111.20 Rp 1,267,778.40
2 Pekerjaan Pas. Pipa PVC Dia. 3 " (Cair) 7 Rp 122,288.70 Rp 856,020.90
3 Fitting - fitting , Assesories dan Material Bantu 1 LS Rp 500,000.00 Rp 500,000.00

B LANTAI DUA
1 Pekerjaan Pas. Pipa aIR PVC Dia. 4 " (Padat) 14 M1 Rp 181,111.20 Rp 2,535,556.80
2 Pekerjaan Pas. Pipa PVC Dia. 3 " (Cair) 17 M1 Rp 122,288.70 Rp 2,078,907.90
3 Fitting - fitting , Assesories dan Material Bantu 1 LS Rp 500,000.00 Rp 500,000.00

III PEKERJAAN PASANGAN SANITARY Rp 9,168,254.25


A LANTAI SATU
1 Kloset Jonkok 1 SET Rp 802,964.50 Rp 802,964.50
3 Pekerjaan Pas. Bak Cuci Piring 2 BH Rp 1,576,753.50 Rp 3,153,507.00
4 Kerang Air 2 SET Rp 167,063.38 Rp 334,126.75
5 Pekerjaan Pas. Kran Air San Ei 6 BH Rp 224,563.38 Rp 1,347,380.25
6 Floor Drain Stainless 6 BH Rp 198,777.50 Rp 1,192,665.00

B LANTAI DUA
1 Kloset Jonkok 2 SET Rp 802,964.50 Rp 1,605,929.00
2 Kerang Air 2 SET Rp 167,063.38 Rp 334,126.75
3 Floor Drain Stainless 2 BH Rp 198,777.50 Rp 397,555.00

IV PEKERJAAN BIO TANK Rp 8,251,630.00


1 Seprik Tank Bio Biotech 7m3 1 LS Rp 8,251,630.00 Rp 8,251,630.00

V PEKERJAAN INSTALASI AIR HUJAN Rp 1,100,598.30


A PVC-AW CLASS
1 PVC pipe dia. 75mm (3") (Vertical Pipe) 9 M1 Rp 122,288.70 Rp 1,100,598.30

V PEKERJAAN MEKANIKAL ELEKTRIKAL Rp 14,810,229.00


4.1 INSTALASI LISTRIK
I PENYAMBUNGAN DAYA DARI MDP KE EXISTING 1 LS Rp 1,500,000.00 Rp 1,500,000.00

II PEKERJAAN PANEL LISTRIK Rp 510,000.00


1 Pekerjaan Box Panel 1 UNIT Rp 350,000.00 Rp 350,000.00
2 Pekerjaan Panel MCB Distribusi Utama ( MDP ) 1 UNIT Rp 80,000.00 Rp 80,000.00
3 Pekerjaan Panel MCB Penerangan 1 UNIT Rp 80,000.00 Rp 80,000.00

III PEKERJAAN KABEL FEEDER DISTRIBUSI UTAMA Rp 4,200,000.00


1 Pekerjaan Kabel NYY 4 x 6 mm2 100 M1 Rp 33,000.00 Rp 3,300,000.00
2 Pekerjaan Kabel NYM 3 x 4 mm2 50 M1 Rp 18,000.00 Rp 900,000.00

IV PEKERJAAN INSTALASI PENERANGAN LENGKAP Rp 3,720,000.00


1 Pekerjaan Titik Lampu 50 TTK Rp 60,000.00 Rp 3,000,000.00
2 Pekerjaan Instalasi KKB 12 TTK Rp 60,000.00 Rp 720,000.00
V INSTALASI JARINGAN AC + EXHAUST Rp 1,800,000.00
A INSTALASI AC 6 TTK Rp 300,000.00 Rp 1,800,000.00

V INSTALASI SPEAKER Rp 3,080,229.00


A Pasangan Speaker 6 TTK Rp 513,371.50 Rp 3,080,229.00

V PEKERJAAN FIXTURE, FURNISHING & EQUIPMENT Rp 21,063,276.00


5.1 PEKERJAAN FIXTURE
I ARMATURE Rp 16,063,276.00
1 Pekerjaan Pas. Lampu RC091v Led 36s 20 BH Rp 675,523.80 Rp 13,510,476.00
2 Pekerjaan Pas. Lampu Down Light 4 " + Assesories 30 BH Rp 80,000.00 Rp 2,400,000.00
3 Pekerjaan Pas. Saklar Tunggal 4 BH Rp 9,800.00 Rp 39,200.00
4 Pekerjaan Pas. Saklar Ganda 3 BH Rp 14,200.00 Rp 42,600.00
5 Pekerjaan Pas. Stop Kontak 5 BH Rp 14,200.00 Rp 71,000.00

II AIR CONDITION (AC) Rp 5,000,000.00


1 Pekerjaan Pas. AC Split Wall Mounted 0.75 PK + Assesories 2 BH Rp 2,500,000.00 Rp 5,000,000.00

REAL COST Rp 1,263,025,365.93


`
RENCANA PERKIRAAN BIAYA K3

HARGA SAT. JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT.
(Rp.) (Rp.)

I PEKERJAAN k3
- Penyiapan RK3K
- Pembuatan Manual, Prosedur, Instruksi Kerja, Izin Kerja 1.000 set 820,000.00 820,000.00
- Pembuatan Kartu Identitas Pekerja (KIP) 60.000 org 5,000.00 300,000.00
- Sosialisasi dan Promosi K3
- Instruksi K3 (Safety Induction) 60.000 org 7,500.00 450,000.00
- Pengarahan K3 (Safety Briefing) : Pertemuan Keselamatan 60.000 org 7,500.00 450,000.00
(Safety Talk atau Tool Box Meeting) : Setiap Hari
- Pelatihan K3 Bekerja di Ketinggian - org 7,500.00 -
- K3 Peralatan Konstruksi & Penggunaan bahan kimia (MSDS) - org 7,500.00 -
- Analisis Keselamatan Pekerjaan - org 7,500.00 -
- Perilaku Berbasis Keselamatan (Budaya K3) 60.000 org 5,000.00 300,000.00
- P3K 1.000 org 850,000.00 850,000.00
- Simulasi K3 - Set 7,500.00 -
- Spanduk (Banner) 4.000 lb 150,000.00 600,000.00
- Poster 4.000 lb 50,000.00 200,000.00
- Papan Informasi K3 2.000 bh 350,000.00 700,000.00
- Alat Pelindung Kerja
- Jaring Pengaman (Safety Net) - bh 5,000,000.00 -
- Tali Keselamatan (Life Line) - psg 1,000,000.00 -
- Penahan Jatuh (Safety Deck) - bh 5,000,000.00 -
- Pagar Pengaman (Guard Railing) - psg 3,000,000.00 -
- Pembatas Area (Restricted Area) - psg 850,000.00 -
- Alat Pelindung Diri
- Topi Pelindung / Safety Helmet 60.000 bh 50,000.000 3,000,000.00
- Pelindung Mata (Goggles, Spectades) 10.000 psg 20,000.000 200,000.00
- Tameng Muka (Face Shield) 5.000 bh 75,000.000 375,000.00
- Pelindung Telinga (Ear Plug, Ear Muff) 10.000 psg 50,000.000 500,000.00
- Pelindung Pernapasan dan Mulut 60.000 bh 5,000.000 300,000.00
- Sarung Tangan (Safety Gloves) 60.000 psg 5,000.000 300,000.00
- Sepatu Keselamatan (Safety Shoes) 2.000 psg 250,000.000 500,000.00
- Sepatu Keselamatan (Rubber Safety Shoes and Toe Cap) 60.000 psg 70,000.000 4,200,000.00
- Penunjang Seluruh Tubuh (Full Body Harness) - bh 700,000.000 -
- Rompi Keselamatan (Safety Vest) 60.000 bh 25,000.000 1,500,000.00
- Celemek (Apron/Coveralls) - bh 40,000.000 -
- Pelindung Jatuh (Fall Arrester) - bh 150,000.000 -
- Asuransi dan Perizinan
- BPJS Ketenagakerjaan dan Kesehatan Kerja 1.000 Ls 1,500,000.00 1,500,000.00
- Surat Izin Kelaikan Alat - Alat 7,000,000.00 -
- Surat Izin Operator - Lb/Alat 5,000,000.00 -
- Surat Izin Pengesahan Panitia Pembina Keselamatan dan Kesehatan
- KerjaLs(P2K3) 250,000.00 -
- Personil K3
- Ahli K3 - OB 5,000,000.00 -
- Petugas K3 1.000 OB 4,000,000.00 4,000,000.00
- Petugas Tanggap Darurat - OB 3,000,000.00 -
- Petugas P3K - OB 3,000,000.00 -
- Ass Petugas K3 / Safety Man / Pengatur Lalu Lintas (Flagman) - OB 3,000,000.00 -
- Petugas Medis - OB 3,000,000.00 -
- Fasilitas Sarana Kesehatan
- Peralatan P3K, Tandu, Tabung oksigen, Obat Luka, Perban dll1.000 set 3,610,000.00 3,610,000.00
- Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan,
- '-set 3,000,000.00 -
Tensi Meter dll)
- Peralatan Pengasapan (Fogging) - Bh 1,500,000.00 -
- Obat Pengasapan - Kali 40,000.00 -
- Rambu Rambu
- Rambu Petunjuk 5.000 Bh 75,000.00 375,000.00
- Rambu Larangan 5.000 Bh 75,000.00 375,000.00
- Rambu Peringatan 5.000 Bh 75,000.00 375,000.00
- Rambu Informasi - Bh 75,000.00 -
- Rambu Pekerjaan Sementara - Bh 75,000.00 -
- Tongkat Pengatur Lalu Lintas (Warning Light Stick) - Bh 50,000.00 -
- Kerucut Lalu Lintas (Traffic Cone) - Bh 100,000.00 -
- Lampu Putar (Rotary Lamp) - Bh 100,000.00 -
- Lain-Lain Terkait Pengendalian Resiko K3
- Alat Pemadam Api Ringan 10 Kg 1.000 Bh 750,000.00 750,000.00
- Sirine - Bh 100,000.00 -
- Bendera K3 1.000 Bh 50,000.00 50,000.00
- Jalur Evakuasi (Escape Route) - Ls 350,000.00 -
- Lampu darurat (Emergency Lamp) - Bh 70,000.00 -
- Program Inspeksi dan Audit Internal - Org 2,000,000.00 -
- Pelaporan dan Penyelidikan Insiden - Ls 500,000.00 -
- Thermogun 1.000 Bh 800,000.00 800,000.00
- Wastafel + Sabun 1.000 Ls 1,000,000.00 1,000,000.00

SUB TOTAL I ………………………………………….………………


28,380,000.00
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
BIDANG CIPTA KARYA
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

A.2.2.1.2 Pembuatan 1 M2 Pagar Sementara dari Seng Gelombang Tinggi 2 Meter


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 123,000.00 24,600.00
Tukang Kayu L.02 OH 0.400 143,000.00 57,200.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.020 168,000.00 3,360.00

Jumlah Harga Tenaga .................................................................. 88,120.00


B. BAHAN
Dolken kayu dia. 8 - 10/400 cm Batang 1.250 22,000.00 27,500.00
Semen Portland Kg 2.500 1,575.00 3,937.50
Seng Gelombang Lbr 1.200 50,000.00 60,000.00
Pasir beton M3 0.005 225,000.00 1,125.00
Koral beton M3 0.009 449,263.00 4,043.37
Kayu 5/7 - Kelas II M3 0.072 3,850,000.00 277,200.00
Paku biasa 2" - 5" Kg 0.060 20,000.00 1,200.00
Residu Liter 0.450 7,500.00 3,375.00

Jumlah Harga Bahan ..................................................................378,380.87


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 466,500.87
E. Overhead & Profit 15% X D 69,975.13
F. Harga Satuan Pekerjaan (D+E) 536,476.00

A.2.2.1.4 Pengukuran dan Pemasangan 1 M' Bouwplank


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 28,920.00


B. BAHAN
Kayu 5/7 - Kelas II M3 0.012 3,850,000.00 46,200.00
Paku biasa 2" - 3" Kg 0.020 20,000.00 400.00
Kayu papan 3/20 - Kelas II M3 0.007 4,125,000.00 28,875.00

Jumlah Harga Bahan .................................................................. 75,475.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 104,395.00
E. Overhead & Profit 15% X D 15,659.25
F. Harga Satuan Pekerjaan (D+E) 120,054.25

A.2.2.1.5 Pembuatan 1 m2 Kantor Sementara Lantai Plesteran


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 2.000 123,000.00 246,000.00
Tukang Kayu L.02 OH 2.000 143,000.00 286,000.00
Tukang Batu L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang L.03 OH 0.300 148,000.00 44,400.00
Mandor L.04 OH 0.050 168,000.00 8,400.00

Jumlah Harga Tenaga ..................................................................727,800.00


B. BAHAN
Dolken kayu dia. 8 - 10/400 cm Batang 1.250 22,000.00 27,500.00
Kayu - Kelas II M3 0.180 3,850,000.00 693,000.00
Paku biasa Kg 0.080 20,000.00 1,600.00
Besi strip Kg 1.100 18,000.00 19,800.00
Semen Portland Kg 35.000 1,575.00 55,125.00
Pasir pasang M3 0.150 225,000.00 33,750.00
Pasir beton M3 0.100 225,000.00 22,500.00
Koral beton M3 0.150 449,263.00 67,389.45
Bata merah Bh 30.000 1,000.00 30,000.00
Seng plat Lbr 0.250 55,000.00 13,750.00
Jendela nako Bh 0.200 150,000.00 30,000.00
Kaca polos 3 mm M2 0.080 148,500.00 11,880.00
Kunci tanam Bh 0.150 671,000.00 100,650.00
Plywood 4 mm Lbr 0.060 66,000.00 3,960.00

Jumlah Harga Bahan ..................................................................


1,110,904.45
C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,838,704.45
E. Overhead & Profit 15% X D 275,805.67
F. Harga Satuan Pekerjaan (D+E) 2,114,510.12

A.2.2.1.6 Pembuatan 1 M2 Rumah Jaga (Konstruksi Kayu)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 150,000.00 150,000.00
Tukang Kayu L.02 OH 1.500 180,000.00 270,000.00
Kepala Tukang L.03 OH 0.150 200,000.00 30,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00

Jumlah Harga Tenaga ..................................................................460,000.00


B. BAHAN
Dolken kayu dia. 8 - 10/400 cm Batang 3.000 22,000.00 66,000.00
Kayu - Kelas II M3 0.276 3,500,000.00 966,000.00
Paku biasa Kg 0.700 20,000.00 14,000.00
Seng gelombang Lbr 1.500 50,000.00 75,000.00

Jumlah Harga Bahan ..................................................................


1,121,000.00
C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,581,000.00
E. Overhead & Profit 15% X D 237,150.00
F. Harga Satuan Pekerjaan (D+E) 1,818,150.00

A.2.2.1.7 Pembuatan 1 m2 gudang semen dan peralatan


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 150,000.00 150,000.00
Tukang Kayu L.02 OH 2.000 180,000.00 360,000.00
Kepala Tukang L.03 OH 0.200 200,000.00 40,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00

Jumlah Harga Tenaga ..................................................................560,000.00


B. BAHAN
Dolken kayu dia. 8 - 10/400 cm Batang 1.700 22,000.00 37,400.00
Kayu - Kelas II M3 0.210 3,850,000.00 808,500.00
Paku biasa Kg 0.300 20,000.00 6,000.00
Semen Portland Kg 10.500 1,575.00 16,537.50
Pasir beton M3 0.030 225,000.00 6,750.00
Koral beton M3 0.050 449,263.00 22,463.15
Seng gelombang Lbr 1.500 50,000.00 75,000.00
Seng plat Lbr 0.250 55,000.00 13,750.00

Jumlah Harga Bahan ..................................................................986,400.65


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,546,400.65
E. Overhead & Profit 15% X D 231,960.10
F. Harga Satuan Pekerjaan (D+E) 1,778,360.75

A.2.2.1.13 Pembongkaran 1 M3 Beton Bertulang


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 13.334 123,000.00 1,640,082.00
Mandor L.04 OH 0.666 168,000.00 111,888.00

Jumlah Harga Tenaga ..................................................................


1,751,970.00
B. BAHAN
Jumlah Harga Bahan .................................................................. -
C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,751,970.00
E. Overhead & Profit 15% X D 262,795.50
F. Harga Satuan Pekerjaan (D+E) 2,014,765.50

A.2.2.1.14 Pembongkaran 1 M3 dinding tembok bata


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.667 123,000.00 82,041.00
Mandor L.04 OH 0.333 168,000.00 55,944.00

Jumlah Harga Tenaga ..................................................................137,985.00


B. BAHAN

Jumlah Harga Bahan .................................................................. -


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 137,985.00
E. Overhead & Profit 15% X D 20,697.75
F. Harga Satuan Pekerjaan (D+E) 158,682.75
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1 Penggalian 1 M3 Tanah Biasa Sedalam 1 M


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.750 123,000.00 92,250.00
Mandor L.04 OH 0.025 168,000.00 4,200.00

Jumlah Harga Tenaga .................................................................. 96,450.00


B. BAHAN

Jumlah Harga Bahan .................................................................. -


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 96,450.00
E. Overhead & Profit 15% X D 14,467.50
F. Harga Satuan Pekerjaan (D+E) 110,917.50

A.2.3.1.2 Penggalian 1 M3 Tanah Biasa Sedalam 2 M


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 123,000.00 110,700.00
Mandor L.04 OH 0.045 168,000.00 7,560.00

Jumlah Harga Tenaga .................................................................. 118,260.00


B. BAHAN

Jumlah Harga Bahan .................................................................. -


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 118,260.00
E. Overhead & Profit 15% X D 17,739.00
F. Harga Satuan Pekerjaan (D+E) 135,999.00

A.2.3.1.9 Pengurugan Kembali 1 M3 Galian Tanah


Pengurugan kembali 1 M3 dihitung dari 1/3 kali dari koefisien pekerjaan galian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.500 123,000.00 61,500.00
Mandor L.04 OH 0.050 168,000.00 8,400.00

Jumlah Harga Tenaga .................................................................. 69,900.00


B. BAHAN

Jumlah Harga Bahan .................................................................. -


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 69,900.00
E. Overhead & Profit 15% X D 10,485.00
F. Harga Satuan Pekerjaan (D+E) 80,385.00

A.2.3.1.11 Pengurugan 1 M3 dengan Pasir Urug


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Mandor L.04 OH 0.010 168,000.00 1,680.00

Jumlah Harga Tenaga .................................................................. 38,580.00


B. BAHAN
Pasir urug M3 1.200 176,000.00 211,200.00

Jumlah Harga Bahan .................................................................. 211,200.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 249,780.00
E. Overhead & Profit 15% X D 37,467.00
F. Harga Satuan Pekerjaan (D+E) 287,247.00

A.2.3.1.15 Pengurugan 1 M3 dengan Tanah Urug


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 123,000.00 30,750.00
Mandor L.04 OH 0.025 168,000.00 4,200.00

Jumlah Harga Tenaga .................................................................. 34,950.00


B. BAHAN
Tanah urug M3 1.200 220,000.00 264,000.00

Jumlah Harga Bahan .................................................................. 264,000.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 298,950.00
E. Overhead & Profit 15% X D 44,842.50
F. Harga Satuan Pekerjaan (D+E) 343,792.50

A.2.3.1.14 Pengurugan 1 M3 dengan Sirtu Padat


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 123,000.00 30,750.00
Mandor L.04 OH 0.025 168,000.00 4,200.00

Jumlah Harga Tenaga .................................................................. 34,950.00


B. BAHAN
Sirtu M3 1.200 225,000.00 270,000.00

Jumlah Harga Bahan .................................................................. 270,000.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 304,950.00
E. Overhead & Profit 15% X D 45,742.50
F. Harga Satuan Pekerjaan (D+E) 350,692.50

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.2 Pemasangan 1 M3 Pondasi Batu Belah Campuran 1 SP : 4 PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 123,000.00 184,500.00
Tukang Batu L.02 OH 0.750 143,000.00 107,250.00
Kepala Tukang L.03 OH 0.075 148,000.00 11,100.00
Mandor L.04 OH 0.075 168,000.00 12,600.00

Jumlah Harga Tenaga .................................................................. 315,450.00


B. BAHAN
Batu belah M3 1.200 229,500.00 275,400.00
Semen Portland Kg 163.000 1,575.00 256,725.00
Pasir pasang M3 0.520 225,000.00 117,000.00

Jumlah Harga Bahan .................................................................. 649,125.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 964,575.00
E. Overhead & Profit 15% X D 144,686.25
F. Harga Satuan Pekerjaan (D+E) 1,109,261.25

A.3.2.1.3 Pemasangan 1 M3 Pondasi Batu Belah Campuran 1 SP : 5 PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 123,000.00 184,500.00
Tukang Batu L.02 OH 0.750 143,000.00 107,250.00
Kepala Tukang L.03 OH 0.075 148,000.00 11,100.00
Mandor L.04 OH 0.075 168,000.00 12,600.00

Jumlah Harga Tenaga .................................................................. 315,450.00


B. BAHAN
Batu belah M3 1.200 229,500.00 275,400.00
Semen Portland Kg 136.000 1,575.00 214,200.00
Pasir pasang M3 0.544 225,000.00 122,400.00

Jumlah Harga Bahan .................................................................. 612,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 927,450.00
E. Overhead & Profit 15% X D 139,117.50
F. Harga Satuan Pekerjaan (D+E) 1,066,567.50

A.3.2.1.9 Pemasangan 1 M3 Batu Kosong (Aanstamping)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.780 123,000.00 95,940.00
Tukang Batu L.02 OH 0.390 143,000.00 55,770.00
Kepala Tukang L.03 OH 0.039 148,000.00 5,772.00
Mandor L.04 OH 0.039 168,000.00 6,552.00

Jumlah Harga Tenaga .................................................................. 164,034.00


B. BAHAN
Batu belah M3 1.200 229,500.00 275,400.00
Pasir urug M3 0.432 176,000.00 76,032.00

Jumlah Harga Bahan .................................................................. 351,432.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 515,466.00
E. Overhead & Profit 15% X D 77,319.90
F. Harga Satuan Pekerjaan (D+E) 592,785.90

A.3.2.1.10 Pemasangan 1 M3 Pondasi Siklop, 60% beton camp. 1 SP : 2 PB : 3 Kr dan 40% Batu Belah
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 3.400 123,000.00 418,200.00
Tukang Batu L.02 OH 0.850 143,000.00 121,550.00
Kepala Tukang L.03 OH 0.085 148,000.00 12,580.00
Mandor L.04 OH 0.170 168,000.00 28,560.00

Jumlah Harga Tenaga .................................................................. 580,890.00


B. BAHAN
Batu belah M3 0.480 229,500.00 110,160.00
Semen Portland Kg 194.000 1,575.00 305,550.00
Pasir beton M3 0.312 225,000.00 70,200.00
Kerikil M3 0.468 449,263.00 210,255.08

Jumlah Harga Bahan .................................................................. 696,165.08


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,277,055.08
E. Overhead & Profit 15% X D 191,558.26
F. Harga Satuan Pekerjaan (D+E) 1,468,613.35

A.3.2.1.11 Pemasangan 1 M3 Pondasi Sumuran, diameter dalam 70 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 2.400 123,000.00 295,200.00
Tukang Batu L.02 OH 0.800 143,000.00 114,400.00
Kepala Tukang L.03 OH 0.080 148,000.00 11,840.00
Mandor L.04 OH 0.119 168,000.00 19,992.00

Jumlah Harga Tenaga .................................................................. 441,432.00


B. BAHAN
Batu belah M3 0.450 229,500.00 103,275.00
Semen Portland Kg 194.000 1,575.00 305,550.00
Pasir beton M3 0.312 225,000.00 70,200.00
Kerikil M3 0.468 449,263.00 210,255.08

Jumlah Harga Bahan .................................................................. 689,280.08


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,130,712.08
E. Overhead & Profit 15% X D 169,606.81
F. Harga Satuan Pekerjaan (D+E) 1,300,318.90

A.3.2.1.11a Pemasangan 1 M' Gorong2 Pondasi Sumuran, diameter dalam 70 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 123,000.00 184,500.00
Tukang Batu L.02 OH 0.500 143,000.00 71,500.00
Kepala Tukang L.03 OH 0.050 148,000.00 7,400.00
Mandor L.04 OH 0.075 168,000.00 12,600.00

Jumlah Harga Tenaga .................................................................. 276,000.00


B. BAHAN
Gorong2 dia. 70 cm (dalam) bh 2.000 192,500.00 385,000.00

Jumlah Harga Bahan .................................................................. 385,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 661,000.00
E. Overhead & Profit 15% X D 99,150.00
F. Harga Satuan Pekerjaan (D+E) 760,150.00

Pemancangan Tiang 1 m'


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pilling Crew OH 0.050 143,000.00 7,150.00
Pilling Master OH 0.200 148,000.00 29,600.00
Surveyor OH 0.050 143,000.00 7,150.00
Ass. Surveyor OH 0.050 123,000.00 6,150.00
Recorder OH 0.050 123,000.00 6,150.00
Jumlah Harga Tenaga .................................................................. 56,200.00
B. BAHAN

Jumlah Harga Bahan .................................................................. -


C. PERALATAN
Handling/Penyetelan Tiang Ls 1.000 80,000.00 80,000.00
Alat Pancang Hidrolic Ls 1.000 200,000.00 200,000.00
Operasional Alat Pancang Ls 1.000 15,000.00 15,000.00
Jumlah Harga Peralatan ..................................................................
295,000.00
D. Jumlah (A+B+C) 351,200.00
E. Overhead & Profit 15% X D 52,680.00
F. Harga Satuan Pekerjaan (D+E) 403,880.00

Pengupasan Kepala Tiang Pancang


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 123,000.00 110,700.00
Mandor L.04 OH 0.300 168,000.00 50,400.00

Jumlah Harga Tenaga .................................................................. 161,100.00


B. BAHAN

Jumlah Harga Bahan .................................................................. -


C. PERALATAN
Alat Bantu ls 1.000 20,000.00 20,000.00
-

Jumlah Harga Peralatan ..................................................................20,000.00


D. Jumlah (A+B+C) 181,100.00
E. Overhead & Profit 15% X D 27,165.00
F. Harga Satuan Pekerjaan (D+E) 208,265.00

Penyambungan Tiang Pancang


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.800 123,000.00 98,400.00
Tukang Las L.02 OH 0.400 143,000.00 57,200.00
Mandor L.04 OH 0.400 168,000.00 67,200.00

Jumlah Harga Tenaga .................................................................. 222,800.00


B. BAHAN

Jumlah Harga Bahan .................................................................. -


C. PERALATAN
Alat Bantu ls 1.000 20,000.00 20,000.00
-

Jumlah Harga Peralatan ..................................................................20,000.00


D. Jumlah (A+B+C) 242,800.00
E. Overhead & Profit 15% X D 36,420.00
F. Harga Satuan Pekerjaan (D+E) 279,220.00
A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.4.1.1.1 Membuat 1 M3 Beton Mutu f'c = 7,4 Mpa (K.100), Slump (12 ± 2) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 123,000.00 202,950.00
Tukang Batu L.02 OH 0.275 143,000.00 39,325.00
Kepala Tukang L.03 OH 0.028 148,000.00 4,144.00
Mandor L.04 OH 0.083 168,000.00 13,944.00

Jumlah Harga Tenaga .................................................................. 260,363.00


B. BAHAN
Semen Portland Kg 247.000 1,575.00 389,025.00
Pasir beton Kg 869.000 160.71 139,660.71
Kerikil (maks 30 mm) Kg 999.000 332.79 332,454.62
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan .................................................................. 904,140.33


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,164,503.33
E. Overhead & Profit 15% X D 174,675.50
F. Harga Satuan Pekerjaan (D+E) 1,339,178.83

A.4.1.1.2 Membuat 1 M3 Beton Mutu f'c = 9,8 Mpa (K.125), Slump (12 ± 2) cm, w/c = 0,78
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 123,000.00 202,950.00
Tukang Batu L.02 OH 0.275 143,000.00 39,325.00
Kepala Tukang L.03 OH 0.028 148,000.00 4,144.00
Mandor L.04 OH 0.083 168,000.00 13,944.00

Jumlah Harga Tenaga .................................................................. 260,363.00


B. BAHAN
Semen Portland Kg 276.000 1,575.00 434,700.00
Pasir beton Kg 828.000 160.71 133,071.43
Kerikil (maks 30 mm) Kg 1,012.000 332.79 336,780.86
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan .................................................................. 947,552.28


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,207,915.28
E. Overhead & Profit 15% X D 181,187.29
F. Harga Satuan Pekerjaan (D+E) 1,389,102.58
A.4.1.1.5 Membuat 1 M3 Beton Mutu f'c = 14,5 Mpa (K.175), Slump (12 ± 2) cm, w/c = 0,66
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 123,000.00 202,950.00
Tukang Batu L.02 OH 0.275 143,000.00 39,325.00
Kepala Tukang L.03 OH 0.028 148,000.00 4,144.00
Mandor L.04 OH 0.083 168,000.00 13,944.00

Jumlah Harga Tenaga .................................................................. 260,363.00


B. BAHAN
Semen Portland Kg 326.000 1,575.00 513,450.00
Pasir beton Kg 760.000 160.71 122,142.86
Kerikil (maks 30 mm) Kg 1,029.000 332.79 342,438.24
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan ..................................................................1,021,031.10


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,281,394.10
E. Overhead & Profit 15% X D 192,209.11
F. Harga Satuan Pekerjaan (D+E) 1,473,603.21
A.4.1.1.3 Membuat 1 M3 Beton Mutu f'c = 16,9 Mpa (K.200), Slump (12 ± 2) cm, w/c = 0,61
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 123,000.00 202,950.00
Tukang Batu L.02 OH 0.275 143,000.00 39,325.00
Kepala Tukang L.03 OH 0.028 148,000.00 4,144.00
Mandor L.04 OH 0.083 168,000.00 13,944.00

Jumlah Harga Tenaga .................................................................. 260,363.00


B. BAHAN
Semen Portland Kg 352.000 1,575.00 554,400.00
Pasir beton Kg 731.000 160.71 117,482.14
Kerikil (maks 30 mm) Kg 1,031.000 332.79 343,103.82
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan ..................................................................1,057,985.96


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,318,348.96
E. Overhead & Profit 15% X D 197,752.34
F. Harga Satuan Pekerjaan (D+E) 1,516,101.30

A.4.1.1.7 Membuat 1 M3 Beton Mutu f'c = 19,3 Mpa (K.225), Slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 123,000.00 202,950.00
Tukang Batu L.02 OH 0.275 143,000.00 39,325.00
Kepala Tukang L.03 OH 0.028 148,000.00 4,144.00
Mandor L.04 OH 0.083 168,000.00 13,944.00

Jumlah Harga Tenaga .................................................................. 260,363.00


B. BAHAN
Semen Portland Kg 371.000 1,575.00 584,325.00
Pasir beton Kg 698.000 160.71 112,178.57
Kerikil (maks 30 mm) Kg 1,047.000 332.79 348,428.42
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan ..................................................................1,087,931.99


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,348,294.99
E. Overhead & Profit 15% X D 202,244.25
F. Harga Satuan Pekerjaan (D+E) 1,550,539.24

A.4.1.1.4 Membuat 1 M3 Beton Mutu f'c = 21,7 Mpa (K.250), Slump (12 ± 2) cm, w/c = 0,56
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 123,000.00 202,950.00
Tukang Batu L.02 OH 0.275 143,000.00 39,325.00
Kepala Tukang L.03 OH 0.028 148,000.00 4,144.00
Mandor L.04 OH 0.083 168,000.00 13,944.00

Jumlah Harga Tenaga .................................................................. 260,363.00


B. BAHAN
Semen Portland Kg 384.000 1,575.00 604,800.00
Pasir beton Kg 692.000 160.71 111,214.29
Kerikil (maks 30 mm) Kg 1,039.000 332.79 345,766.12
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan ..................................................................1,104,780.40


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,365,143.40
E. Overhead & Profit 15% X D 204,771.51
F. Harga Satuan Pekerjaan (D+E) 1,569,914.91
A.4.1.1.5 Membuat 1 M3 Beton Mutu f'c = 24,0 Mpa (K.275), Slump (12 ± 2) cm, w/c = 0,53
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 123,000.00 202,950.00
Tukang Batu L.02 OH 0.275 143,000.00 39,325.00
Kepala Tukang L.03 OH 0.028 148,000.00 4,144.00
Mandor L.04 OH 0.083 168,000.00 13,944.00

Jumlah Harga Tenaga .................................................................. 260,363.00


B. BAHAN
Semen Portland Kg 406.000 1,575.00 639,450.00
Pasir beton Kg 684.000 160.71 109,928.57
Kerikil (maks 30 mm) Kg 1,026.000 332.79 341,439.88
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan ..................................................................1,133,818.45


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,394,181.45
E. Overhead & Profit 15% X D 209,127.22
F. Harga Satuan Pekerjaan (D+E) 1,603,308.67

A.4.1.1.6 Membuat 1 M3 Beton Mutu f'c = 26,4 Mpa (K.300), Slump (12 ± 2) cm, w/c = 0,52
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 123,000.00 202,950.00
Tukang Batu L.02 OH 0.275 143,000.00 39,325.00
Kepala Tukang L.03 OH 0.028 148,000.00 4,144.00
Mandor L.04 OH 0.083 168,000.00 13,944.00

Jumlah Harga Tenaga .................................................................. 260,363.00


B. BAHAN
Semen Portland Kg 413.000 1,575.00 650,475.00
Pasir beton Kg 681.000 160.71 109,446.43
Kerikil (maks 30 mm) Kg 1,021.000 332.79 339,775.94
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan ..................................................................1,142,697.37


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,403,060.37
E. Overhead & Profit 15% X D 210,459.06
F. Harga Satuan Pekerjaan (D+E) 1,613,519.43
A.4.1.1.7 Membuat 1 M3 Beton Mutu f'c = 28,8 Mpa (K.325), Slump (12 ± 2) cm, w/c = 0,49
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 2.100 123,000.00 258,300.00
Tukang Batu L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.105 168,000.00 17,640.00

Jumlah Harga Tenaga .................................................................. 331,170.00


B. BAHAN
Semen Portland Kg 439.000 1,575.00 691,425.00
Pasir beton Kg 670.000 160.71 107,678.57
Kerikil (maks 30 mm) Kg 1,006.000 332.79 334,784.13
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan ..................................................................1,176,887.70


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,508,057.70
E. Overhead & Profit 15% X D 226,208.66
F. Harga Satuan Pekerjaan (D+E) 1,734,266.36

A.4.1.1.8 Membuat 1 M3 Beton Mutu f'c = 31,2 Mpa (K.350), Slump (12 ± 2) cm, w/c = 0,48
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 2.100 123,000.00 258,300.00
Tukang Batu L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.105 168,000.00 17,640.00

Jumlah Harga Tenaga .................................................................. 331,170.00


B. BAHAN
Semen Portland Kg 448.000 1,575.00 705,600.00
Pasir beton Kg 667.000 160.71 107,196.43
Kerikil (maks 30 mm) Kg 1,000.000 332.79 332,787.41
Air Liter 215.000 200.00 43,000.00

Jumlah Harga Bahan ..................................................................1,188,583.84


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,519,753.84
E. Overhead & Profit 15% X D 227,963.08
F. Harga Satuan Pekerjaan (D+E) 1,747,716.91
A.4.1.1.9 Pembesian 1 Kg dengan besi polos (dihitung per 10 kg)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.070 123,000.00 8,610.00
Tukang Besi L.02 OH 0.070 143,000.00 10,010.00
Kepala Tukang L.03 OH 0.007 148,000.00 1,036.00
Mandor L.04 OH 0.004 168,000.00 672.00

Jumlah Harga Tenaga .................................................................. 20,328.00


B. BAHAN
Besi beton - polos Kg 10.500 12,250.00 128,625.00
Kawat beton Kg 0.150 27,405.00 4,110.75

Jumlah Harga Bahan .................................................................. 132,735.75


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 153,063.75
E. Overhead & Profit 15% X D 22,959.56
F. Harga Satuan Pekerjaan (D+E) 176,023.31
Untuk 1 Kg pekerjaan besi polos 17,602.33

A.4.1.1.18 Pembesian 1 Kg dengan besi ulir (dihitung per 10 kg)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.070 123,000.00 8,610.00
Tukang Besi L.02 OH 0.070 143,000.00 10,010.00
Kepala Tukang L.03 OH 0.007 148,000.00 1,036.00
Mandor L.04 OH 0.004 168,000.00 672.00

Jumlah Harga Tenaga .................................................................. 20,328.00


B. BAHAN
Besi beton - ulir Kg 10.500 12,750.00 133,875.00
Kawat beton Kg 0.150 27,405.00 4,110.75

Jumlah Harga Bahan .................................................................. 137,985.75


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 158,313.75
E. Overhead & Profit 15% X D 23,747.06
F. Harga Satuan Pekerjaan (D+E) 182,060.81
Untuk 1 Kg pekerjaan besi ulir 18,206.08

A.4.1.1.19 Pemasangan 1 M2 Besi Ulir Wiremesh


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Besi L.02 OH 0.070 143,000.00 10,010.00
Kepala Tukang L.03 OH 0.070 148,000.00 10,360.00
Mandor L.04 OH 0.040 168,000.00 6,720.00

Jumlah Harga Tenaga .................................................................. 39,390.00


B. BAHAN
Bondek 0.70 M2 1.100 100,000.00 110,000.00
Kawat beton Kg 0.150 27,405.00 4,110.75

Jumlah Harga Bahan .................................................................. 114,110.75


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 153,500.75
E. Overhead & Profit 15% X D 23,025.11
F. Harga Satuan Pekerjaan (D+E) 176,525.86
A.4.1.1.20 1 M2 Pemasangan Wiremesh M8
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.175 123,000.00 21,525.00
Tukang Besi L.02 OH 0.070 143,000.00 10,010.00
Kepala Tukang L.03 OH 0.007 148,000.00 1,036.00
Mandor L.04 OH 0.004 168,000.00 672.00

Jumlah Harga Tenaga .................................................................. 33,243.00


B. BAHAN
Wiremesh M8 m2 1.100 95,000.00 104,500.00
Kawat Beton Kg 0.015 27,405.00 411.08

Jumlah Harga Bahan .................................................................. 104,911.08


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 138,154.08
E. Overhead & Profit 15% X D 20,723.11
F. Harga Satuan Pekerjaan (D+E) 158,877.19

A.4.1.1.21 Pemasangan 1 M2 Bekisting untuk Pondasi


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.520 123,000.00 63,960.00
Tukang Kayu L.02 OH 0.260 143,000.00 37,180.00
Kepala Tukang L.03 OH 0.026 148,000.00 3,848.00
Mandor L.04 OH 0.026 168,000.00 4,368.00

Jumlah Harga Tenaga .................................................................. 109,356.00


B. BAHAN
Kayu kelas III (papan) M3 0.040 2,205,000.00 88,200.00
Paku 5 - 12 cm Kg 0.300 20,000.00 6,000.00
Minyak bekisting Liter 0.100 7,500.00 750.00

Jumlah Harga Bahan .................................................................. 94,950.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 204,306.00
E. Overhead & Profit 15% X D 30,645.90
F. Harga Satuan Pekerjaan (D+E) 234,951.90
Untuk 2x pakai .................................................................. 117,475.95
A.4.1.1.22 Pemasangan 1 M2 Bekisting untuk Sloof
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.520 123,000.00 63,960.00
Tukang Kayu L.02 OH 0.260 143,000.00 37,180.00
Kepala Tukang L.03 OH 0.026 148,000.00 3,848.00
Mandor L.04 OH 0.026 168,000.00 4,368.00

Jumlah Harga Tenaga .................................................................. 109,356.00


B. BAHAN
Kayu kelas III (papan) M3 0.045 2,205,000.00 99,225.00
Paku 5 - 12 cm Kg 0.300 20,000.00 6,000.00
Minyak bekisting Liter 0.100 7,500.00 750.00

Jumlah Harga Bahan .................................................................. 105,975.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 215,331.00
E. Overhead & Profit 15% X D 32,299.65
F. Harga Satuan Pekerjaan (D+E) 247,630.65
Untuk 2x pakai .................................................................. 123,815.33

A.4.1.1.22 Pemasangan 1 M2 Bekisting untuk Kolom


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 123,000.00 81,180.00
Tukang Kayu L.02 OH 0.330 143,000.00 47,190.00
Kepala Tukang L.03 OH 0.033 148,000.00 4,884.00
Mandor L.04 OH 0.033 168,000.00 5,544.00

Jumlah Harga Tenaga .................................................................. 138,798.00


B. BAHAN
Kayu kelas III (papan) M3 0.040 2,205,000.00 88,200.00
Paku 5 - 12 cm Kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.200 7,500.00 1,500.00
Balok kayu kelas II M3 0.015 3,850,000.00 57,750.00
Multipleks tebal 9 mm Lbr 0.350 132,000.00 46,200.00
Dolken kayu dia. 8 - 10/400 cm Batang 2.000 22,000.00 44,000.00

Jumlah Harga Bahan .................................................................. 245,650.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 384,448.00
E. Overhead & Profit 15% X D 57,667.20
F. Harga Satuan Pekerjaan (D+E) 442,115.20
Untuk 2x pakai .................................................................. 221,057.60
A.4.1.1.23 Pemasangan 1 M2 Bekisting untuk Balok
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 123,000.00 81,180.00
Tukang Kayu L.02 OH 0.330 143,000.00 47,190.00
Kepala Tukang L.03 OH 0.033 148,000.00 4,884.00
Mandor L.04 OH 0.033 168,000.00 5,544.00

Jumlah Harga Tenaga .................................................................. 138,798.00


B. BAHAN
Kayu kelas III (papan) M3 0.040 2,205,000.00 88,200.00
Paku 5 - 12 cm Kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.200 7,500.00 1,500.00
Balok kayu kelas II M3 0.018 3,850,000.00 69,300.00
Multipleks tebal 9 mm Lbr 0.350 132,000.00 46,200.00
Dolken kayu dia. 8 - 10/400 cm Batang 2.000 22,000.00 44,000.00

Jumlah Harga Bahan .................................................................. 257,200.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 395,998.00
E. Overhead & Profit 15% X D 59,399.70
F. Harga Satuan Pekerjaan (D+E) 455,397.70
Untuk 2x pakai .................................................................. 227,698.85

A.4.1.1.24 Pemasangan 1 M2 Bekisting untuk Lantai


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 123,000.00 81,180.00
Tukang Kayu L.02 OH 0.330 143,000.00 47,190.00
Kepala Tukang L.03 OH 0.033 148,000.00 4,884.00
Mandor L.04 OH 0.033 168,000.00 5,544.00

Jumlah Harga Tenaga .................................................................. 138,798.00


B. BAHAN
Kayu kelas III (papan) M3 0.040 2,205,000.00 88,200.00
Paku 5 - 12 cm Kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.200 7,500.00 1,500.00
Balok kayu kelas II M3 0.015 3,850,000.00 57,750.00
Multipleks tebal 9 mm Lbr 0.350 132,000.00 46,200.00
Dolken kayu dia. 8 - 10/400 cm Batang 6.000 22,000.00 132,000.00

Jumlah Harga Bahan .................................................................. 333,650.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 472,448.00
E. Overhead & Profit 15% X D 70,867.20
F. Harga Satuan Pekerjaan (D+E) 543,315.20
Untuk 2x pakai .................................................................. 271,657.60
A.4.1.1.25 Pemasangan 1 M2 Bekisting untuk Dinding
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.990 123,000.00 121,770.00
Tukang Kayu L.02 OH 0.495 143,000.00 70,785.00
Kepala Tukang L.03 OH 0.050 148,000.00 7,400.00
Mandor L.04 OH 0.050 168,000.00 8,400.00

Jumlah Harga Tenaga .................................................................. 208,355.00


B. BAHAN
Kayu kelas III (papan) M3 0.045 2,205,000.00 99,225.00
Paku 5 - 12 cm Kg 0.600 20,000.00 12,000.00
Minyak bekisting Liter 0.300 7,500.00 2,250.00
Balok kayu kelas II M3 0.030 3,850,000.00 115,500.00
Multipleks tebal 9 mm Lbr 0.525 132,000.00 69,300.00
Dolken kayu dia. 8 - 10/400 cm Batang 4.500 22,000.00 99,000.00

Jumlah Harga Bahan .................................................................. 397,275.00


Untuk 2x pakai .................................................................. 198,637.50
C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 605,630.00
E. Overhead & Profit 15% X D 90,844.50
F. Harga Satuan Pekerjaan (D+E) 696,474.50
Untuk 2x pakai .................................................................. 348,237.25

A.4.1.1.26 Pemasangan 1 M2 Bekisting untuk Tangga


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 123,000.00 81,180.00
Tukang Kayu L.02 OH 0.330 143,000.00 47,190.00
Kepala Tukang L.03 OH 0.033 148,000.00 4,884.00
Mandor L.04 OH 0.033 168,000.00 5,544.00

Jumlah Harga Tenaga .................................................................. 138,798.00


B. BAHAN
Kayu kelas III (papan) M3 0.030 2,205,000.00 66,150.00
Paku 5 - 12 cm Kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.150 7,500.00 1,125.00
Balok kayu kelas II M3 0.015 3,850,000.00 57,750.00
Multipleks tebal 9 mm Lbr 0.350 132,000.00 46,200.00
Dolken kayu dia. 8 - 10/400 cm Batang 2.000 22,000.00 44,000.00

Jumlah Harga Bahan .................................................................. 223,225.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 362,023.00
E. Overhead & Profit 15% X D 54,303.45
F. Harga Satuan Pekerjaan (D+E) 416,326.45
Untuk 2x pakai .................................................................. 208,163.23
A.4.1.1.27 Pemasangan 1 M2 Bekisting Bondek 0,7mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.330 123,000.00 40,590.00
Tukang Kayu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.033 148,000.00 4,884.00
Mandor L.04 OH 0.003 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 74,578.00


B. BAHAN
Bambu Btg 2.000 22,000.00 44,000.00
Paku 5 - 12 cm Kg 0.400 20,000.00 8,000.00
Balok kayu kelas II M3 0.010 3,850,000.00 38,500.00
Boundeck 0,7mm M2 1.100 129,100.00 142,010.00

Jumlah Harga Bahan .................................................................. 232,510.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 307,088.00
E. Overhead & Profit 15% X D 46,063.20
F. Harga Satuan Pekerjaan (D+E) 353,151.20

Pemasangan 1 M1 Bekisting Kolom Praktis


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.180 123,000.00 22,140.00
Tukang Batu L.02 OH 0.020 143,000.00 2,860.00
Tukang Kayu L.02 OH 0.020 143,000.00 2,860.00
Tukang Besi L.02 OH 0.020 143,000.00 2,860.00
Kepala Tukang L.03 OH 0.006 148,000.00 888.00
Mandor L.04 OH 0.009 168,000.00 1,512.00

Jumlah Harga Tenaga .................................................................. 33,120.00


B. BAHAN
Kayu kelas III (papan) M3 0.002 2,205,000.00 4,410.00
Paku 5 - 12 cm Kg 0.010 20,000.00 200.00
Minyak bekisting Liter - 7,500.00 -
Besi beton Kg 3.000 12,250.00 36,750.00
kawat beton Kg 0.450 27,405.00 12,332.25
semen Kg 4.000 1,575.00 6,300.00
pasir beton m3 0.006 225,000.00 1,350.00
kerikil m3 0.009 449,263.00 4,043.37

Jumlah Harga Bahan .................................................................. 65,385.62


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 98,505.62
E. Overhead & Profit 15% X D 14,775.84
F. Harga Satuan Pekerjaan (D+E) 113,281.46
Pemasangan 1 M1 Bekisting Ringbalok Beton Bertulang
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.297 123,000.00 36,531.00
Tukang Batu L.02 OH 0.033 143,000.00 4,719.00
Tukang Kayu L.02 OH 0.033 143,000.00 4,719.00
Tukang Besi L.02 OH 0.033 143,000.00 4,719.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 54,688.00


B. BAHAN
Kayu kelas III (papan) M3 0.003 2,205,000.00 6,615.00
Paku 5 - 12 cm Kg 0.020 20,000.00 400.00
Minyak bekisting Liter - 7,500.00 -
Besi beton Kg 3.600 12,250.00 44,100.00
kawat beton Kg 0.050 27,405.00 1,370.25
semen Kg 5.500 1,575.00 8,662.50
pasir beton m3 0.009 225,000.00 2,025.00
kerikil m3 0.015 449,263.00 6,738.95

Jumlah Harga Bahan .................................................................. 69,911.70


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 124,599.70
E. Overhead & Profit 15% X D 18,689.95
F. Harga Satuan Pekerjaan (D+E) 143,289.65
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

A.4.2.1.1 Pemasangan 1 Kg Besi Profil


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 123,000.00 7,380.00
Tukang Las L.02 OH 0.060 143,000.00 8,580.00
Kepala Tukang L.03 OH 0.006 148,000.00 888.00
Mandor L.04 OH 0.003 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 17,352.00


B. BAHAN
Besi Profil Kg 1.150 18,000.00 20,700.00

Jumlah Harga Bahan .................................................................. 20,700.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 38,052.00
E. Overhead & Profit 10% X D 3,805.20
F. Harga Satuan Pekerjaan (D+E) 41,857.20

A.4.2.1.4 Pembuatan 1 M2 Pintu Besi Plat Tebal 2 mm Rangkap, Rangka Besi Hollow
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.050 123,000.00 129,150.00
Tukang Las L.02 OH 1.050 143,000.00 150,150.00
Kepala Tukang L.03 OH 0.105 148,000.00 15,540.00
Mandor L.04 OH 0.052 168,000.00 8,736.00

Jumlah Harga Tenaga .................................................................. 303,576.00


B. BAHAN
Besi Hollow 4/6 M1 4.000 70,000.00 280,000.00
Plat Baja 2 mm kg 32.800 18,000.00 590,400.00
Kawat Las Kg 0.050 160,000.00 8,000.00

Jumlah Harga Bahan .................................................................. 878,400.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,181,976.00
E. Overhead & Profit 15% X D 177,296.40
F. Harga Satuan Pekerjaan (D+E) 1,359,272.40
A.4.2.1.4 Pembuatan 1 BH Pintu Besi Ulir dia. 19 , Rangka Besi Hollow Uk. 210 x 80
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.050 123,000.00 129,150.00
Tukang Las L.02 OH 1.050 143,000.00 150,150.00
Kepala Tukang L.03 OH 0.105 148,000.00 15,540.00
Mandor L.04 OH 0.052 168,000.00 8,736.00

Jumlah Harga Tenaga .................................................................. 303,576.00


B. BAHAN
Besi Hollow 4/6 M1 6.920 70,000.00 484,400.00
Besi Ulir dia. 19 kg 31.692 18,206.08 576,987.96
Kawat Las Kg 0.084 160,000.00 13,440.00

Jumlah Harga Bahan .................................................................. 1,074,827.96


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,378,403.96
E. Overhead & Profit 15% X D 206,760.59
F. Harga Satuan Pekerjaan (D+E) 1,585,164.55

A.4.2.1.19 Pemasangan 1 M' Talang 1/2 Lingkaran diameter 15 cm, Seng Plat BJLS 30 Lebar 45 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 123,000.00 18,450.00
Tukang Kayu L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang L.03 OH 0.030 148,000.00 4,440.00
Mandor L.04 OH 0.008 168,000.00 1,344.00

Jumlah Harga Tenaga .................................................................. 67,134.00


B. BAHAN
Seng plat M' 1.050 55,000.00 57,750.00
Paku sekrup Kg 0.015 45,000.00 675.00
Besi Strip Kg 0.500 18,000.00 9,000.00

Jumlah Harga Bahan .................................................................. 67,425.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 134,559.00
E. Overhead & Profit 15% X D 20,183.85
F. Harga Satuan Pekerjaan (D+E) 154,742.85
A.4.2.1.22 1 M2 Pemasangan Rangka Besi Hollow 1x (20.40.2 + 40.40.2) mm, Modul 60 x 60 cm, Plafond
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 123,000.00 43,050.00
Tukang Besi L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.0175 168,000.00 2,940.00

Jumlah Harga Tenaga .................................................................. 101,220.00


B. BAHAN
Rangka metal hollow 20.40.2 mm M' 2.000 7,950.00 15,900.00
Rangka metal hollow 40.40.2 mm M' 2.000 9,600.00 19,200.00
Assesories (perkuatan, las, dll.) Ls 1.000 15,900.00 15,900.00
(100% X rangka)

Jumlah Harga Bahan .................................................................. 51,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 152,220.00
E. Overhead & Profit 15% X D 22,833.00
F. Harga Satuan Pekerjaan (D+E) 175,053.00

A.4.2.1.20 1 M2 Pemasangan Partisi Dobel Gypsum Rangka Metal Stud


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.450 123,000.00 55,350.00
Tukang Besi L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.0230 168,000.00 3,864.00

Jumlah Harga Tenaga .................................................................. 114,444.00


B. BAHAN
DH Track btg 0.080 59,400 4,752.00
Wall Track btg 0.250 75,800 18,950.00
Wall Stud btg 0.750 65,600 49,200.00
Jayaboard Sheetrock 9 mm lbr 0.830 75,000 62,250.00
Jayacompound UB 20 zak 0.040 82,500 3,300.00
UB Tape rol 0.030 35,000 1,050.00
Drywall Screw 25 mm bh 25.000 495 12,375.00

Jumlah Harga Bahan .................................................................. 151,877.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 266,321.00
E. Overhead & Profit 15% X D 39,948.15
F. Harga Satuan Pekerjaan (D+E) 306,269.15
A.4.2.1.SPL-2 1 M2 Pekerjaan Besi Kotak 4x6 cm, tebal 3 mm (Rangka Atap)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 123,000.00 18,450.00
Tukang Besi L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 44,640.00


B. BAHAN
Besi Kotak 4x6 cm, tebal 3 mm M' 4.050 71,250.00 288,562.50
Kawat las Kg 0.180 160,000.00 28,800.00

Jumlah Harga Bahan .................................................................. 317,362.50


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 362,002.50
E. Overhead & Profit 15% X D 54,300.38
F. Harga Satuan Pekerjaan (D+E) 416,302.88

A.4.2.1.SPL-7 1 M' Pekerjaan Kusen Aluminium Putih 4 Inchi Powder Coating


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.043 123,000.00 5,289.00
Tukang Besi L.02 OH 0.043 143,000.00 6,149.00
Kepala Tukang L.03 OH 0.0043 148,000.00 636.40
Mandor L.04 OH 0.0021 168,000.00 352.80

Jumlah Harga Tenaga .................................................................. 12,427.20


B. BAHAN
Aluminium 4" - Putih M' 1.100 135,000.00 148,500.00
Sealant kaca & dinding kg 0.060 48,000.00 2,880.00
Skrup aluminium bh 2.000 360.00 720.00

Jumlah Harga Bahan .................................................................. 152,100.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 164,527.20
E. Overhead & Profit 15% X D 24,679.08
F. Harga Satuan Pekerjaan (D+E) 189,206.28
A.4.2.1.SPL-6 1 M2 Pintu Kaca Rangka Alumunium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.085 123,000.00 10,455.00
Tukang Besi L.02 OH 0.085 143,000.00 12,155.00
Kepala Tukang L.03 OH 0.009 148,000.00 1,332.00
Mandor L.04 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 24,782.00


B. BAHAN
Pintu Alumunium M' 4.400 140,000.00 616,000.00
Profil Kaca M' 4.500 6,000.00 27,000.00
Sealant kaca & dinding kg 0.600 48,000.00 28,800.00

Jumlah Harga Bahan .................................................................. 671,800.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 696,582.00
E. Overhead & Profit 15% X D 104,487.30
F. Harga Satuan Pekerjaan (D+E) 801,069.30

A.4.2.1.SPL-6 1 M2 Pintu ACP + Kaca Rangka Alumunium


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.085 123,000.00 10,455.00
Tukang Besi L.02 OH 0.085 143,000.00 12,155.00
Kepala Tukang L.03 OH 0.009 148,000.00 1,332.00
Mandor L.04 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 24,782.00


B. BAHAN
Pintu Alumunium M' 4.400 140,000.00 616,000.00
ACP Polister M2 0.960 350,000.00 336,000.00
Kaca 5 mm M2 0.180 148,500.00 26,730.00
Sealant kaca & dinding kg 0.600 3,300.00 1,980.00

Jumlah Harga Bahan .................................................................. 980,710.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,005,492.00
E. Overhead & Profit 15% X D 150,823.80
F. Harga Satuan Pekerjaan (D+E) 1,156,315.80
1 M2 Pekerjaan Floor Deck 0,70 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.320 123,000.00 39,360.00
Tukang Besi L.02 OH 0.330 143,000.00 47,190.00
Kepala Tukang L.03 OH 0.033 148,000.00 4,884.00
Mandor L.04 OH 0.033 168,000.00 5,544.00

Jumlah Harga Tenaga .................................................................. 96,978.00


B. BAHAN
Floordeck 0,70 mm m2 1.000 129,100.00 129,100.00
Besi Beton Pengikat kg 1.500 12,250.00 18,375.00
Balok Kayu Kls. III m3 0.040 2,200,000.00 88,000.00
Paku kg 0.100 20,000.00 2,000.00

Jumlah Harga Bahan .................................................................. 237,475.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 334,453.00
E. Overhead & Profit 15% X D 50,167.95
F. Harga Satuan Pekerjaan (D+E) 384,620.95

1 M2 Pemasangan Wiremesh M8
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.175 123,000.00 21,525.00
Tukang Besi L.02 OH 0.070 143,000.00 10,010.00
Mandor L.04 OH 0.035 168,000.00 5,880.00

Jumlah Harga Tenaga .................................................................. 37,415.00


B. BAHAN
Wiremesh M8 lbr 0.097 95,000.00 9,215.00

Jumlah Harga Bahan .................................................................. 9,215.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 46,630.00
E. Overhead & Profit 15% X D 6,994.50
F. Harga Satuan Pekerjaan (D+E) 53,624.50

1 M2 Pemasangan Alumunium Composite Panel PVDF


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 123,000.00 49,200.00
Tukang Besi L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang L.03 OH 0.300 148,000.00 44,400.00
Mandor L.04 OH 0.030 168,000.00 5,040.00

Jumlah Harga Tenaga .................................................................. 141,540.00


B. BAHAN

Alucopan PVDF m2 1.150 325,500.00 374,325.00


Besi Kotak 4 x 4 m1 8.000 35,000.00 280,000.00
Bracket besi siku 70.70.7 kg 2.100 18,000.00 37,800.00
Dynabolt M 10 x 120 bh 3.000 12,000.00 36,000.00
Mur + baut M 10 x 70 bh 2.000 3,000.00 6,000.00
Zincromate kg 0.067 40,000.00 2,668.00
Sealant tube 0.250 48,000.00 12,000.00
Ramsel Nails bh 12.000 350.00 4,200.00

Jumlah Harga Bahan .................................................................. 752,993.00


C. PERALATAN
Alat bantu Ls 1.000 2,500.00 2,500.00
-

Jumlah Harga Peralatan .................................................................. 2,500.00


D. Jumlah (A+B+C) 897,033.00
E. Overhead & Profit 15% X D 134,554.95
F. Harga Satuan Pekerjaan (D+E) 1,031,587.95

1 M2 Pemasangan Alumunium Composite Panel PVDF Cutting


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 123,000.00 49,200.00
Tukang Besi L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang L.03 OH 0.300 148,000.00 44,400.00
Mandor L.04 OH 0.030 168,000.00 5,040.00

Jumlah Harga Tenaga .................................................................. 141,540.00


B. BAHAN

Alucopan PVDF Cutting m2 1.100 460,500.00 506,550.00


Besi Kotak 4 x 4 m1 8.000 35,000.00 280,000.00
Bracket besi siku 70.70.7 kg 2.100 18,000.00 37,800.00
Dynabolt M 10 x 120 bh 3.000 12,000.00 36,000.00
Mur + baut M 10 x 70 bh 2.000 3,000.00 6,000.00
Zincromate kg 0.067 40,000.00 2,668.00
Sealant tube 0.250 48,000.00 12,000.00
Ramsel Nails bh 12.000 350.00 4,200.00

Jumlah Harga Bahan .................................................................. 885,218.00


C. PERALATAN
Alat bantu Ls 1.000 2,500.00 2,500.00
-

Jumlah Harga Peralatan .................................................................. 2,500.00


D. Jumlah (A+B+C) 1,029,258.00
E. Overhead & Profit 15% X D 154,388.70
F. Harga Satuan Pekerjaan (D+E) 1,183,646.70

1 M2 Pemasangan Dinding Kaca + Rangka


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

Pemasangan Jendela Curtain Wall m2 1.000 1,350,000.00 1,350,000.00


- Tiang Vertikal (mullion). Uk. 40 x 100 tebal 2 mm
- Cover mullion (omega) tebal 1 mm
- Ambang Transome tebal 1,2 mm
- Bracket
- Kaca Stopsol 8 mm
- List Karet
- Sealent
- Paku Skrup
- Pisher
- Dinabold

Jumlah (A+B+C) 1,350,000.00


Overhead & Profit 15% X D 202,500.00
Harga Satuan Pekerjaan (D+E) 1,552,500.00

1 M2 Dinding Partisi Double Gypsum Rangka Metal Stud


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.450 123,000.00 55,350.00
Tukang Besi L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.0230 168,000.00 3,864.00

Jumlah Harga Tenaga .................................................................. 114,444.00


B. BAHAN
DH Track Btg 0.080 113,520.00 9,081.60
Wall Track Btg 0.250 94,600.00 23,650.00
Wall Stud Btg 0.750 102,740.00 77,055.00
Jayaboard Sheetrock 9 mm lbr 0.830 84,810.00 70,392.30
Jayacompound UB 20 zak 0.040 77,000.00 3,080.00
UB Tape rol 0.030 52,250.00 1,567.50
Drywall Screw 25 bh 25.000 495.00 12,375.00

Jumlah Harga Bahan .................................................................. 197,201.40


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 311,645.40
E. Overhead & Profit 15% X D 46,746.81
F. Harga Satuan Pekerjaan (D+E) 358,392.21
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A.4.4.1.3 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) cm, tebal 1 batu Campuran 1 SP : 4 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 123,000.00 73,800.00
Tukang Batu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.030 168,000.00 5,040.00

Jumlah Harga Tenaga .................................................................. 110,400.00


B. BAHAN
Bata merah Bh 140.000 1,000.00 140,000.00
Semen Portland Kg 26.550 1,575.00 41,816.25
Pasir pasang M3 0.093 225,000.00 20,925.00

Jumlah Harga Bahan .................................................................. 202,741.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 313,141.25
E. Overhead & Profit 15% X D 46,971.19
F. Harga Satuan Pekerjaan (D+E) 360,112.44

A.4.4.1.7 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) cm, tebal 1/2 batu Campuran 1 SP : 2 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Batu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 55,200.00


B. BAHAN
Bata merah Bh 70.000 1,000.00 70,000.00
Semen Portland Kg 18.950 1,575.00 29,846.25
Pasir pasang M3 0.038 225,000.00 8,550.00

Jumlah Harga Bahan .................................................................. 108,396.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 163,596.25
E. Overhead & Profit 15% X D 24,539.44
F. Harga Satuan Pekerjaan (D+E) 188,135.69
A.4.4.1.10 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) cm, tebal 1/2 batu Campuran 1 SP : 5 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Batu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 55,200.00


B. BAHAN
Bata merah Bh 70.000 1,000.00 70,000.00
Semen Portland Kg 9.680 1,575.00 15,246.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 95,371.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 150,571.00
E. Overhead & Profit 15% X D 22,585.65
F. Harga Satuan Pekerjaan (D+E) 173,156.65

A.4.4.1.10 Pemasangan 1 M2 Dinding Roster, Campuran 1 SP : 4 PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Batu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 55,200.00


B. BAHAN
Roster Bh 25.000 12,000.00 300,000.00
Semen Portland Kg 11.000 1,575.00 17,325.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 327,450.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 382,650.00
E. Overhead & Profit 15% X D 57,397.50
F. Harga Satuan Pekerjaan (D+E) 440,047.50
A.4.4.1.11 Pemasangan 1 M2 Dinding Bata Ringan 0,2 x 0,6 x 0,1 Spacie 3 MM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Batu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 55,200.00


B. BAHAN
Bata Ringan 0,2 x 0,6 x 0,1 M3 0.105 824,400.00 86,562.00
Prime mortar mu - 380 Zak 0.066 90,000.00 5,940.00

Jumlah Harga Bahan .................................................................. 92,502.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 147,702.00
E. Overhead & Profit 15% X D 22,155.30
F. Harga Satuan Pekerjaan (D+E) 169,857.30

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.2 Pemasangan 1 M2 Plesteran Campuran 1 SP : 2 PP, Tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Batu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 63,090.00


B. BAHAN
Semen Portland Kg 10.224 1,575.00 16,102.80
Pasir pasang M3 0.020 225,000.00 4,500.00

Jumlah Harga Bahan .................................................................. 20,602.80


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 83,692.80
E. Overhead & Profit 15% X D 12,553.92
F. Harga Satuan Pekerjaan (D+E) 96,246.72
A.4.4.2.2a Pemasangan 1 M2 Plesteran Screed Campuran 1 SP : 2 PP, Tebal 15 mm + Waterproofing
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 123,000.00 49,200.00
Tukang Batu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.020 168,000.00 3,360.00

Jumlah Harga Tenaga .................................................................. 84,120.00


B. BAHAN
Semen Portland Kg 10.224 1,575.00 16,102.80
Pasir pasang M3 0.020 225,000.00 4,500.00
Kawat ram halus m2 1.050 16,000.00 16,800.00
Pelapis anti bocor Silasec Super kg 0.500 127,000.00 63,500.00

Jumlah Harga Bahan .................................................................. 100,902.80


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 185,022.80
E. Overhead & Profit 15% X D 27,753.42
F. Harga Satuan Pekerjaan (D+E) 212,776.22

A.4.4.2.3 Pemasangan 1 M2 Plesteran Campuran 1 SP : 3 PP, Tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Batu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 63,090.00


B. BAHAN
Semen Portland Kg 7.776 1,575.00 12,247.20
Pasir pasang M3 0.023 225,000.00 5,175.00

Jumlah Harga Bahan .................................................................. 17,422.20


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 80,512.20
E. Overhead & Profit 15% X D 12,076.83
F. Harga Satuan Pekerjaan (D+E) 92,589.03
A.4.4.2.4 Pemasangan 1 M2 Plesteran Campuran 1 SP : 4 PP, Tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Batu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 63,090.00


B. BAHAN
Semen Portland Kg 6.240 1,575.00 9,828.00
Pasir pasang M3 0.024 225,000.00 5,400.00

Jumlah Harga Bahan .................................................................. 15,228.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 78,318.00
E. Overhead & Profit 15% X D 11,747.70
F. Harga Satuan Pekerjaan (D+E) 90,065.70

A.4.4.2.5 Pemasangan 1 M2 Plesteran Campuran 1 SP : 5 PP, Tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Batu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 63,090.00


B. BAHAN
Semen Portland Kg 5.184 1,575.00 8,164.80
Pasir pasang M3 0.026 225,000.00 5,850.00

Jumlah Harga Bahan .................................................................. 14,014.80


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 77,104.80
E. Overhead & Profit 15% X D 11,565.72
F. Harga Satuan Pekerjaan (D+E) 88,670.52
A.4.4.2.5 Pemasangan 1 M2 Plesteran Campuran 1 SP : 5 PP, Tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Batu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 63,090.00


B. BAHAN
Semen Portland Kg 5.184 1,575.00 8,164.80
Pasir pasang M3 0.026 225,000.00 5,850.00

Jumlah Harga Bahan .................................................................. 14,014.80


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 77,104.80
E. Overhead & Profit 15% X D 11,565.72
F. Harga Satuan Pekerjaan (D+E) 88,670.52

Pemasangan 1 M2 Plesteran Dengan Mortar T. 10 MM


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 123,000.00 24,600.00
Tukang Batu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.010 168,000.00 1,680.00

Jumlah Harga Tenaga .................................................................. 49,950.00


B. BAHAN
Semen Instan Plesteran Zak 0.479 79,500.00 38,080.50

Jumlah Harga Bahan .................................................................. 38,080.50


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 88,030.50
E. Overhead & Profit 15% X D 13,204.58
F. Harga Satuan Pekerjaan (D+E) 101,235.08
A.4.4.2.27 Pemasangan 1 M2 Acian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 123,000.00 24,600.00
Tukang Batu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.010 168,000.00 1,680.00

Jumlah Harga Tenaga .................................................................. 42,060.00


B. BAHAN
Semen Portland Kg 3.250 1,575.00 5,118.75

Jumlah Harga Bahan .................................................................. 5,118.75


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 47,178.75
E. Overhead & Profit 15% X D 7,076.81
F. Harga Satuan Pekerjaan (D+E) 54,255.56

Pemasangan 1 M2 Acian Dengan Mortar T. 1,5 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 123,000.00 24,600.00
Tukang Batu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.010 168,000.00 1,680.00

Jumlah Harga Tenaga .................................................................. 49,950.00


B. BAHAN
Semen Instan Acian Zak 0.058 133,650.00 7,751.70

Jumlah Harga Bahan .................................................................. 7,751.70


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 57,701.70
E. Overhead & Profit 15% X D 8,655.26
F. Harga Satuan Pekerjaan (D+E) 66,356.96
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI, PENUTUP DINDING DAN PAVING BLOK

A.4.4.3.33 Pemasangan 1 M2 Lantai Keramik Granit Ukuran 60 cm x 60 cm polished


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.240 123,000.00 29,520.00
Tukang Batu L.02 OH 0.120 143,000.00 17,160.00
Kepala Tukang L.03 OH 0.012 148,000.00 1,776.00
Mandor L.04 OH 0.012 168,000.00 2,016.00

Jumlah Harga Tenaga .................................................................. 50,472.00


B. BAHAN
Granit 60 cm x 60 cm m2 1.050 171,500.00 180,075.00
Semen Portland Kg 8.190 1,575.00 12,899.25
Semen warna Kg 1.500 22,000.00 33,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 236,099.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 286,571.25
E. Overhead & Profit 15% X D 42,985.69
F. Harga Satuan Pekerjaan (D+E) 329,556.94

A.4.4.3.33a Pemasangan 1 M2 Lantai Keramik Granit Ukuran 60 cm x 60 cm Unpolished


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.240 123,000.00 29,520.00
Tukang Batu L.02 OH 0.120 143,000.00 17,160.00
Kepala Tukang L.03 OH 0.012 148,000.00 1,776.00
Mandor L.04 OH 0.012 168,000.00 2,016.00

Jumlah Harga Tenaga .................................................................. 50,472.00


B. BAHAN
Granit 60 cm x 60 cm m2 1.050 180,000.00 189,000.00
Semen Portland Kg 8.190 1,575.00 12,899.25
Semen warna Kg 1.500 22,000.00 33,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 245,024.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 295,496.25
E. Overhead & Profit 15% X D 44,324.44
F. Harga Satuan Pekerjaan (D+E) 339,820.69
A.4.4.3.33a Pemasangan 1 M2 Lantai Keramik Granit Ukuran 60 cm x 60 cm (hitam)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.240 123,000.00 29,520.00
Tukang Batu L.02 OH 0.120 143,000.00 17,160.00
Kepala Tukang L.03 OH 0.012 148,000.00 1,776.00
Mandor L.04 OH 0.012 168,000.00 2,016.00

Jumlah Harga Tenaga .................................................................. 50,472.00


B. BAHAN
Keramik 60 cm x 60 cm, hitam m2 1.000 227,600.00 227,600.00
Semen Portland Kg 8.190 1,575.00 12,899.25
Semen warna Kg 1.620 22,000.00 35,640.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 286,264.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 336,736.25
E. Overhead & Profit 15% X D 50,510.44
F. Harga Satuan Pekerjaan (D+E) 387,246.69

Pemasangan 1 M2 Lantai Keramik Granit Ukuran 80 cm x 80 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.240 123,000.00 29,520.00
Tukang Batu L.02 OH 0.120 143,000.00 17,160.00
Kepala Tukang L.03 OH 0.012 148,000.00 1,776.00
Mandor L.04 OH 0.012 168,000.00 2,016.00

Jumlah Harga Tenaga .................................................................. 50,472.00


B. BAHAN
Granit 80 cm x 80 cm m2 1.000 75,000.00 75,000.00
Semen Portland Kg 8.190 1,575.00 12,899.25
Semen warna Kg 1.500 22,000.00 33,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 131,024.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 181,496.25
E. Overhead & Profit 15% X D 27,224.44
F. Harga Satuan Pekerjaan (D+E) 208,720.69
Pemasangan 1 M2 Lantai Keramik 40 cm x 40 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.240 123,000.00 29,520.00
Tukang Batu L.02 OH 0.120 143,000.00 17,160.00
Kepala Tukang L.03 OH 0.012 148,000.00 1,776.00
Mandor L.04 OH 0.012 168,000.00 2,016.00

Jumlah Harga Tenaga .................................................................. 50,472.00


B. BAHAN
Keramik 40 x 40 cm m2 2.050 75,000.00 153,750.00
Semen Portland Kg 8.190 1,575.00 12,899.25
Semen warna Kg 1.500 22,000.00 33,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 209,774.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 260,246.25
E. Overhead & Profit 15% X D 39,036.94
F. Harga Satuan Pekerjaan (D+E) 299,283.19

Pemasangan 1 M2 Lantai Andesit Ukuran 30 cm x 30 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 123,000.00 86,100.00
Tukang Batu L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.035 168,000.00 5,880.00

Jumlah Harga Tenaga .................................................................. 147,210.00


B. BAHAN
Andesit Bakar 30 x 30 cm m2 1.000 170,000.00 170,000.00
Semen Portland Kg 8.190 1,575.00 12,899.25
Semen warna Kg 1.500 22,000.00 33,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 226,024.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 373,234.25
E. Overhead & Profit 15% X D 55,985.14
F. Harga Satuan Pekerjaan (D+E) 429,219.39

Pemasangan 1 M2 Lantai Granit Ukuran 30 cm x 60 cm Stepnozing


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.240 123,000.00 29,520.00
Tukang Batu L.02 OH 0.120 143,000.00 17,160.00
Kepala Tukang L.03 OH 0.012 148,000.00 1,776.00
Mandor L.04 OH 0.012 168,000.00 2,016.00
Jumlah Harga Tenaga .................................................................. 50,472.00
B. BAHAN
Granit 30 cm x 60 cm, stepnozing M2 1.050 186,500.00 195,825.00
Semen Portland Kg 8.190 1,575.00 12,899.25
Semen warna Kg 1.500 22,000.00 33,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 251,849.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 302,321.25
E. Overhead & Profit 15% X D 45,348.19
F. Harga Satuan Pekerjaan (D+E) 347,669.44
A.4.4.3.35 Pemasangan 1 M2 Lantai Keramik Ukuran 20 cm x 20 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 123,000.00 86,100.00
Tukang Batu L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.035 168,000.00 5,880.00

Jumlah Harga Tenaga .................................................................. 147,210.00


B. BAHAN
Keramik 20 cm x 20 cm m2 1.050 55,000.00 57,750.00
Semen Portland Kg 10.000 1,575.00 15,750.00
Semen warna Kg 1.500 22,000.00 33,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 116,625.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 263,835.00
E. Overhead & Profit 15% X D 39,575.25
F. Harga Satuan Pekerjaan (D+E) 303,410.25

Pemasangan 1 M2 Lantai Vynil


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 123,000.00 86,100.00
Tukang Batu L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.035 168,000.00 5,880.00

Jumlah Harga Tenaga .................................................................. 147,210.00


B. BAHAN
Lantai Vynil m2 1.050 500,000.00 525,000.00
Lem Kg 0.600 60,000.00 36,000.00

Jumlah Harga Bahan .................................................................. 561,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 708,210.00
E. Overhead & Profit 15% X D 106,231.50
F. Harga Satuan Pekerjaan (D+E) 814,441.50
A.4.4.3.54a Pemasangan 1 M2 Dinding Homegeneus Tile 30 cm x 60 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 123,000.00 86,100.00
Tukang Batu L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.035 168,000.00 5,880.00

Jumlah Harga Tenaga .................................................................. 147,210.00


B. BAHAN
Homogeneus Tile 30 x 60 cm m2 1.050 150,000.00 157,500.00
Semen Portland Kg 9.300 1,575.00 14,647.50
Semen warna Kg 1.940 22,000.00 42,680.00
Pasir pasang M3 0.018 225,000.00 4,050.00

Jumlah Harga Bahan .................................................................. 218,877.50


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 366,087.50
E. Overhead & Profit 15% X D 54,913.13
F. Harga Satuan Pekerjaan (D+E) 421,000.63

Pemasangan 1 M2 Dinding Keramik 40 cm x 40 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 123,000.00 86,100.00
Tukang Batu L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.035 168,000.00 5,880.00

Jumlah Harga Tenaga .................................................................. 147,210.00


B. BAHAN
Keramik 40 x 40 cm m2 1.050 75,000.00 78,750.00
Semen Portland Kg 9.300 1,575.00 14,647.50
Semen warna Kg 1.940 22,000.00 42,680.00
Pasir pasang M3 0.018 225,000.00 4,050.00

Jumlah Harga Bahan .................................................................. 140,127.50


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 287,337.50
E. Overhead & Profit 15% X D 43,100.63
F. Harga Satuan Pekerjaan (D+E) 330,438.13

Pemasangan 1 M2 Dinding Marmer Polish


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 123,000.00 86,100.00
Tukang Batu L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.035 168,000.00 5,880.00
Jumlah Harga Tenaga .................................................................. 147,210.00
B. BAHAN
Marmer Polish m2 1.000 800,000.00 800,000.00
Semen Portland Kg 9.300 1,575.00 14,647.50
Semen warna Kg 1.940 22,000.00 42,680.00
Pasir pasang M3 0.018 225,000.00 4,050.00

Jumlah Harga Bahan .................................................................. 861,377.50


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,008,587.50
E. Overhead & Profit 15% X D 151,288.13
F. Harga Satuan Pekerjaan (D+E) 1,159,875.63
Pemasangan 1 M1 Plint Granite 10 x 60 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 123,000.00 11,070.00
Tukang Batu L.02 OH 0.090 143,000.00 12,870.00
Kepala Tukang L.03 OH 0.009 148,000.00 1,332.00
Mandor L.04 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 26,112.00


B. BAHAN
Granite 10 x 60 cm Bh 1.667 28,000.00 46,666.67
Semen Portland Kg 1.140 1,575.00 1,795.50
Semen warna Kg 0.003 22,000.00 66.00
Pasir pasang M3 0.100 225,000.00 22,500.00

Jumlah Harga Bahan .................................................................. 71,028.17


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 97,140.17
E. Overhead & Profit 15% X D 14,571.03
F. Harga Satuan Pekerjaan (D+E) 111,711.19

Pemasangan 1 M2 Dinding Batu Alam Andesit


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 123,000.00 86,100.00
Tukang Batu L.02 OH 0.350 143,000.00 50,050.00
Kepala Tukang L.03 OH 0.035 148,000.00 5,180.00
Mandor L.04 OH 0.035 168,000.00 5,880.00

Jumlah Harga Tenaga .................................................................. 147,210.00


B. BAHAN
Batu Alam Andesit m2 1.050 180,000.00 189,000.00
Semen Portland Kg 9.300 1,575.00 14,647.50
Semen warna Kg 1.940 22,000.00 42,680.00
Pasir pasang M3 0.018 225,000.00 4,050.00

Jumlah Harga Bahan .................................................................. 250,377.50


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 397,587.50
E. Overhead & Profit 15% X D 59,638.13
F. Harga Satuan Pekerjaan (D+E) 457,225.63
A.4.4.3.55 Pemasangan 1 M2 Floor Hardener
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.120 123,000.00 14,760.00
Tukang Batu L.02 OH 0.120 143,000.00 17,160.00
Kepala Tukang L.03 OH 0.012 148,000.00 1,776.00
Mandor L.04 OH 0.006 168,000.00 1,008.00

Jumlah Harga Tenaga .................................................................. 34,704.00


B. BAHAN
Floor Hardener (MU 700) Kg 5.000 7,100.00 35,500.00

Jumlah Harga Bahan .................................................................. 35,500.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 70,204.00
E. Overhead & Profit 15% X D 10,530.60
F. Harga Satuan Pekerjaan (D+E) 80,734.60

Pemasangan 1 m2 Paving Blok Kotak


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 123,000.00 24,600.00
Tukang Batu L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang L.03 OH 0.030 148,000.00 4,440.00
Mandor L.04 OH 0.025 168,000.00 4,200.00

Jumlah Harga Tenaga .................................................................. 76,140.00


B. BAHAN

Paving Blok T. 8 cm K. 300 m2 1.000 130,000.00 130,000.00


Pasir pasang M3 0.100 225,000.00 22,500.00

Jumlah Harga Bahan .................................................................. 152,500.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 228,640.00
E. Overhead & Profit 15% X D 34,296.00
F. Harga Satuan Pekerjaan (D+E) 262,936.00

Pemasangan 1 m1 Cansting Beton


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 123,000.00 6,150.00
Tukang Batu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.050 148,000.00 7,400.00
Mandor L.04 OH 0.025 168,000.00 4,200.00
Jumlah Harga Tenaga .................................................................. 32,050.00
B. BAHAN

Cansting Beton 15/30/50 bh 2.000 55,000.00 110,000.00


Pasir pasang M3 0.001 225,000.00 225.00

Jumlah Harga Bahan .................................................................. 110,225.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 142,275.00
E. Overhead & Profit 15% X D 21,341.25
F. Harga Satuan Pekerjaan (D+E) 163,616.25

A.4.4.3.33 Pemasangan 1 M2 Lantai Keramik Ukuran 60 cm x 60 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.240 123,000.00 29,520.00
Tukang Batu L.02 OH 0.120 143,000.00 17,160.00
Kepala Tukang L.03 OH 0.012 148,000.00 1,776.00
Mandor L.04 OH 0.012 168,000.00 2,016.00

Jumlah Harga Tenaga .................................................................. 50,472.00


B. BAHAN
Granit 60 cm x 60 cm m2 1.050 - -
Semen Portland Kg 8.190 1,575.00 12,899.25
Semen warna Kg 1.500 22,000.00 33,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00

Jumlah Harga Bahan .................................................................. 56,024.25


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 106,496.25
E. Overhead & Profit 15% X D 15,974.44
F. Harga Satuan Pekerjaan (D+E) 122,470.69

A.4.4.3.33a Pemasangan 1 M2 Lantai Keramik Granit Ukuran 60 cm x 60 cm Unpolished


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.240 123,000.00 29,520.00
Tukang Batu L.02 OH 0.120 143,000.00 17,160.00
Kepala Tukang L.03 OH 0.012 148,000.00 1,776.00
Mandor L.04 OH 0.012 168,000.00 2,016.00

Jumlah Harga Tenaga .................................................................. 50,472.00


B. BAHAN
Granit 60 cm x 60 cm m2 1.050 180,000.00 189,000.00
Semen Portland Kg 8.190 1,575.00 12,899.25
Semen warna Kg 1.500 22,000.00 33,000.00
Pasir pasang M3 0.045 225,000.00 10,125.00
Jumlah Harga Bahan .................................................................. 245,024.25
C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 295,496.25
E. Overhead & Profit 15% X D 44,324.44
F. Harga Satuan Pekerjaan (D+E) 339,820.69
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.4.5.7 Pemasangan 1 m2 Langit-langit Gypsum Board Ukuran (120x240x9) mm, Tebal 9 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.02 OH 0.070 143,000.00 10,010.00
Kepala Tukang L.03 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 23,890.00


B. BAHAN
Gypsum Board tebal 9 mm Lbr 0.364 75,000.00 27,300.00
Paku Sekrup Kg 0.110 45,000.00 4,950.00

Jumlah Harga Bahan .................................................................. 32,250.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 56,140.00
E. Overhead & Profit 15% X D 8,421.00
F. Harga Satuan Pekerjaan (D+E) 64,561.00

A.4.4.5.7a Pemasangan 1 m2 Langit-langit kalsiboard, Tebal 3,5 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.02 OH 0.050 143,000.00 7,150.00
Kepala Tukang L.03 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 21,030.00


B. BAHAN
Kalsiboard t. 3,5 mm Lbr 0.364 70,000.00 25,480.00
Paku Sekrup Kg 0.110 45,000.00 4,950.00

Jumlah Harga Bahan .................................................................. 30,430.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 51,460.00
E. Overhead & Profit 15% X D 7,719.00
F. Harga Satuan Pekerjaan (D+E) 59,179.00
A.4.4.5.7b Pemasangan 1 m2 Langit-langit PVC "Shunda"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.02 OH 0.050 143,000.00 7,150.00
Kepala Tukang L.03 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 21,030.00


B. BAHAN
Plafon PVC Shunda Lbr 1.300 113,520.00 147,576.00
Paku Sekrup Kg 0.110 45,000.00 4,950.00

Jumlah Harga Bahan .................................................................. 152,526.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 173,556.00
E. Overhead & Profit 15% X D 26,033.40
F. Harga Satuan Pekerjaan (D+E) 199,589.40

A.4.4.5.7c Pemasangan 1 m' List Plafond Gypsum


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 123,000.00 6,150.00
Tukang Kayu L.02 OH 0.050 143,000.00 7,150.00
Kepala Tukang L.03 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.003 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 14,544.00


B. BAHAN
List Plafon Gypsum m' 1.100 20,000.00 22,000.00
Paku Sekrup Kg 0.010 45,000.00 450.00

Jumlah Harga Bahan .................................................................. 22,450.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 36,994.00
E. Overhead & Profit 15% X D 5,549.10
F. Harga Satuan Pekerjaan (D+E) 42,543.10

A.4.4.5.7d Pemasangan 1 m' List Plafond PVC Shunda


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 123,000.00 6,150.00
Tukang Kayu L.02 OH 0.050 143,000.00 7,150.00
Kepala Tukang L.03 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.003 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 14,544.00


B. BAHAN
List Plafon PVC Shunda m' 1.100 26,620.00 29,282.00
Paku Sekrup Kg 0.010 45,000.00 450.00

Jumlah Harga Bahan .................................................................. 29,732.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 44,276.00
E. Overhead & Profit 15% X D 6,641.40
F. Harga Satuan Pekerjaan (D+E) 50,917.40
A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.41 Pemasangan 1 m1 nok Spandek


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 123,000.00 30,750.00
Tukang Kayu L.03 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.11 OH 0.015 148,000.00 2,220.00
Mandor L.15 OH 0.013 168,000.00 2,184.00

Jumlah Harga Tenaga .................................................................. 56,604.00


B. BAHAN
Nok Spandek M1 1.100 80,000.00 88,000.00
Paku/sekrup genteng Kg 0.050 38,000.00 1,900.00

Jumlah Harga Bahan .................................................................. 89,900.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 146,504.00
E. Overhead & Profit 15% X D 21,975.60
F. Harga Satuan Pekerjaan (D+E) 168,479.60

A.4.5.2.42 Pemasangan 1 m2 Atap Spandek Warna 0,35 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 123,000.00 24,600.00
Tukang Kayu L.03 OH 0.750 143,000.00 107,250.00
Kepala Tukang L.11 OH 0.010 148,000.00 1,480.00
Mandor L.15 OH 0.001 168,000.00 168.00

Jumlah Harga Tenaga .................................................................. 133,498.00


B. BAHAN
Atap Spandek Warna 0,35 mm m1 1.280 55,000.00 70,400.00
Paku/sekrup genteng bh 9.097 1,200.00 10,916.40

Jumlah Harga Bahan .................................................................. 81,316.40


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 214,814.40
E. Overhead & Profit 15% X D 32,222.16
F. Harga Satuan Pekerjaan (D+E) 247,036.56

A.4.5.2.42 Pemasangan 1 m2 Atap Spandek (Model Melengkung)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 123,000.00 18,450.00
Tukang Kayu L.03 OH 0.750 143,000.00 107,250.00
Kepala Tukang L.11 OH 0.035 148,000.00 5,180.00
Mandor L.15 OH 0.001 168,000.00 168.00

Jumlah Harga Tenaga .................................................................. 131,048.00


B. BAHAN
Atap Spandek Warna 0,35 mm m2 1.280 110,000.00 140,800.00
Paku/sekrup genteng bh 9.097 1,200.00 10,916.40

Jumlah Harga Bahan .................................................................. 151,716.40


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 282,764.40
E. Overhead & Profit 15% X D 42,414.66
F. Harga Satuan Pekerjaan (D+E) 325,179.06

A.4.5.2.43 Pemasangan 1 m1 nok Atap Bitumen Onduline


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.084 123,000.00 10,332.00
Tukang Kayu L.03 OH 0.125 143,000.00 17,875.00
Kepala Tukang L.11 OH 0.013 148,000.00 1,924.00
Mandor L.15 OH 0.004 168,000.00 672.00

Jumlah Harga Tenaga .................................................................. 30,803.00


B. BAHAN
Nok Bitumen M1 1.100 90,000.00 99,000.00
Paku/sekrup genteng Kg 0.050 1,200.00 60.00

Jumlah Harga Bahan .................................................................. 99,060.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 129,863.00
E. Overhead & Profit 15% X D 19,479.45
F. Harga Satuan Pekerjaan (D+E) 149,342.45
A.4.5.2.Spl-1 Pemasangan 1 M2 Rangka Atap Baja Ringan
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.247 123,000.00 30,381.00
Tukang Baja Ringan L.03 OH 0.176 143,000.00 25,168.00
Kepala Tukang L.11 OH 0.117 148,000.00 17,316.00
Mandor L.15 OH - 168,000.00 -

Jumlah Harga Tenaga .................................................................. 72,865.00


B. BAHAN
Main Truss 75 . 75 M1 2.800 13,333.33 37,333.33
Reng R. 33 M1 5.100 6,666.67 34,000.00
Truss Screw Bh 25.000 850.00 21,250.00
Reng Screw Bh 35.000 750.00 26,250.00
Dinabolt 12 x 120 mm Bh 1.000 5,000.00 5,000.00

Jumlah Harga Bahan .................................................................. 123,833.33


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 196,698.33
E. Overhead & Profit 15% X D 29,504.75
F. Harga Satuan Pekerjaan (D+E) 226,203.08

A.4.5.3.Spl-1 Pemasangan 1 M1 Lisplang Ukuran (2x20)cm PVC/KALSIPLANG/GRC


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.247 123,000.00 30,381.00
Tukang Baja Ringan L.03 OH 0.176 143,000.00 25,168.00
Kepala Tukang L.11 OH 0.117 148,000.00 17,316.00
Mandor L.15 OH - 168,000.00 -

Jumlah Harga Tenaga .................................................................. 72,865.00


B. BAHAN
Kalsiplank L.30cm P. 3M M1 2.800 13,333.33 37,333.33
Paku kg 0.060 6,666.67 400.00

Jumlah Harga Bahan .................................................................. 37,733.33


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 110,598.33
E. Overhead & Profit 15% X D 16,589.75
F. Harga Satuan Pekerjaan (D+E) 127,188.08

Pemasangan 1 m2 alumunium foil/isalation


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 123,000.00 18,450.00
Tukang Baja Ringan L.03 OH 0.050 143,000.00 7,150.00
Kepala Tukang L.11 OH 0.005 148,000.00 740.00
Mandor L.15 OH 0.008 168,000.00 1,344.00

Jumlah Harga Tenaga .................................................................. 27,684.00


B. BAHAN
Alumunium Voil buble doble M2 1.050 65,000.00 68,250.00
side premium 8 mm

Jumlah Harga Bahan .................................................................. 68,250.00


C. PERALATAN
Alat bantu Ls 1.000 5,000.00 5,000.00
-

Jumlah Harga Peralatan .................................................................. 5,000.00


D. Jumlah (A+B+C) 100,934.00
E. Overhead & Profit 15% X D 15,140.10
F. Harga Satuan Pekerjaan (D+E) 116,074.10

Pemasangan 1 m1 Talang Air PVC 4


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 123,000.00 18,450.00
Tukang Baja Ringan L.03 OH 0.050 143,000.00 7,150.00
Kepala Tukang L.11 OH 0.005 148,000.00 740.00
Mandor L.15 OH 0.008 168,000.00 1,344.00

Jumlah Harga Tenaga .................................................................. 27,684.00


B. BAHAN
Alumunium Voil buble doble M1 1.100 29,500.00 32,450.00
Paku/sekrup genteng Kg 0.050 1,200.00 60.00

Jumlah Harga Bahan .................................................................. 32,510.00


C. PERALATAN
Alat bantu Ls 1.000 5,000.00 5,000.00
-

Jumlah Harga Peralatan .................................................................. 5,000.00


D. Jumlah (A+B+C) 65,194.00
E. Overhead & Profit 15% X D 9,779.10
F. Harga Satuan Pekerjaan (D+E) 74,973.10
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1 Pembuatan dan Pemasangan 1 M3 Kusen Pintu dan Jendela, Kayu Kelas I
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 7.000 123,000.00 861,000.00
Tukang Kayu L.03 OH 21.000 143,000.00 3,003,000.00
Kepala Tukang L.11 OH 2.100 148,000.00 310,800.00
Mandor L.15 OH 0.350 168,000.00 58,800.00

Jumlah Harga Tenaga ..................................................................


4,233,600.00
B. BAHAN
Balok kayu kelas I M3 1.100 16,500,000.00 18,150,000.00
Paku 10 cm Kg 1.250 20,000.00 25,000.00
Lem kayu Kg 1.000 45,000.00 45,000.00

Jumlah Harga Bahan ..................................................................


18,220,000.00
C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 22,453,600.00
E. Overhead & Profit 15% X D 3,368,040.00
F. Harga Satuan Pekerjaan (D+E) 25,821,640.00

A.4.6.1.5 Pembuatan dan Pemasangan 1 M2 Daun Pintu Panel, Kayu Kelas I (atau kelas II)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 123,000.00 123,000.00
Tukang Kayu L.03 OH 3.000 143,000.00 429,000.00
Kepala Tukang L.11 OH 0.300 148,000.00 44,400.00
Mandor L.15 OH 0.050 168,000.00 8,400.00

Jumlah Harga Tenaga .................................................................. 604,800.00


B. BAHAN
Papan kayu kelas II M3 0.040 4,125,000.00 165,000.00
Lem kayu Kg 0.500 45,000.00 22,500.00

Jumlah Harga Bahan .................................................................. 187,500.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 792,300.00
E. Overhead & Profit 15% X D 118,845.00
F. Harga Satuan Pekerjaan (D+E) 911,145.00
A.4.6.1.8 Pembuatan 1 M2 Daun Pintu Multipleks Rangkap, Rangka Kayu Kelas II (Lapis HPL + Almn. plat)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.800 123,000.00 98,400.00
Tukang Kayu L.03 OH 2.400 143,000.00 343,200.00
Kepala Tukang L.11 OH 0.240 148,000.00 35,520.00
Mandor L.15 OH 0.040 168,000.00 6,720.00
Jumlah Harga Tenaga .................................................................. 483,840.00
B. BAHAN
Papan kayu kelas II M3 0.025 4,125,000.00 103,125.00
Paku 1 cm - 2,5 cm Kg 0.030 20,000.00 600.00
Lem kayu fox Kg 0.500 60,000.00 30,000.00
Plywood t. 4 mm uk. (90 x 220) cm Lbr 1.000 66,000.00 66,000.00
HPL Lbr 0.365 165,000.00 60,225.00
Aluminium plat m2 1.050 10,000.00 10,500.00
Jumlah Harga Bahan .................................................................. 270,450.00
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 754,290.00
E. Overhead & Profit 15% X D 113,143.50
F. Harga Satuan Pekerjaan (D+E) 867,433.50

A.4.6.1.21a Pemasangan 1 M' Lisplank Ukuran (30 x 300) cm, Woodplank/Kalsiplank/PVS/GRC


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.03 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.11 OH 0.010 148,000.00 1,480.00
Mandor L.15 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 43,220.00


B. BAHAN
Woodplank uk. 1.8 x 20 cm M' 1.0500 35,000.00 36,750.00
Paku genteng Kg 0.050 45,000.00 2,250.00

Jumlah Harga Bahan .................................................................. 39,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 82,220.00
E. Overhead & Profit 15% X D 12,333.00
F. Harga Satuan Pekerjaan (D+E) 94,553.00
A.4.6.1.21b Pemasangan 1 M' Plint Conwood Clasic
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.03 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.11 OH 0.010 148,000.00 1,480.00
Mandor L.15 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 43,220.00


B. BAHAN
Conwood Clasic M' 1.0500 23,333.33 24,500.00
Sekrup Kg 0.050 45,000.00 2,250.00

Jumlah Harga Bahan .................................................................. 26,750.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 69,970.00
E. Overhead & Profit 15% X D 10,495.50
F. Harga Satuan Pekerjaan (D+E) 80,465.50

A.4.6.1.21a Pemasangan 1 M2 Daun Pintu Woodplank/Kalsiplank


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.03 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.11 OH 0.010 148,000.00 1,480.00
Mandor L.15 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 43,220.00


B. BAHAN
Woodplank uk. 1.8 x 20 cm M' 1.0500 35,000.00 36,750.00
Paku genteng Kg 0.050 45,000.00 2,250.00

Jumlah Harga Bahan .................................................................. 39,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 82,220.00
E. Overhead & Profit 15% X D 12,333.00
F. Harga Satuan Pekerjaan (D+E) 94,553.00

A.4.6.2.17 Pemasangan 1 M2 Jendela Kayu Kelas II, Kaca Tebal 5 mm (polos)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 123,000.00 1,845.00
Tukang Kayu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.00075 168,000.00 126.00

Jumlah Harga Tenaga .................................................................. 25,641.00


B. BAHAN
Kaca t. 5 mm M2 1.100 148,500.00 163,350.00
Sealant Kg 0.050 48,000.00 2,400.00
Papan kayu kelas II M3 0.025 4,125,000.00 103,125.00
Paku 1 cm - 2,5 cm Kg 0.030 20,000.00 600.00
Lem kayu fox Kg 0.500 60,000.00 30,000.00
Plywood t. 4 mm uk. (90 x 220) cm Lbr 1.000 66,000.00 66,000.00

Jumlah Harga Bahan .................................................................. 365,475.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 391,116.00
E. Overhead & Profit 15% X D 58,667.40
F. Harga Satuan Pekerjaan (D+E) 449,783.40
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.2 Pemasangan 1 Buah Kunci Tanam Biasa


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Kayu L.02 OH 0.500 143,000.00 71,500.00
Kepala Tukang L.03 OH 0.050 148,000.00 7,400.00
Mandor L.04 OH 0.005 168,000.00 840.00
Jumlah Harga Tenaga .................................................................. 80,970.00
B. BAHAN
Kunci tanam biasa Bh 1.000 1,133,000.00 1,133,000.00

Jumlah Harga Bahan ..................................................................1,133,000.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,213,970.00
E. Overhead & Profit 15% X D 182,095.50
F. Harga Satuan Pekerjaan (D+E) 1,396,065.50

A.4.6.2.3 Pemasangan 1 Buah Kunci Kamar Mandi


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.005 123,000.00 615.00
Tukang Kayu L.02 OH 0.500 143,000.00 71,500.00
Kepala Tukang L.03 OH 0.050 148,000.00 7,400.00
Mandor L.04 OH 0.003 168,000.00 504.00
Jumlah Harga Tenaga .................................................................. 80,019.00
B. BAHAN
Kunci tanam KM/WC Bh 1.000 880,000.00 880,000.00

Jumlah Harga Bahan .................................................................. 880,000.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 960,019.00
E. Overhead & Profit 15% X D 144,002.85
F. Harga Satuan Pekerjaan (D+E) 1,104,021.85

A.4.6.2.5 Pemasangan 1 Buah Engsel Pintu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 123,000.00 1,845.00
Tukang Kayu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.0008 168,000.00 134.40

Jumlah Harga Tenaga .................................................................. 25,649.40


B. BAHAN
Engsel pintu Bh 1.000 70,000.00 70,000.00

Jumlah Harga Bahan .................................................................. 70,000.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 95,649.40
E. Overhead & Profit 15% X D 14,347.41
F. Harga Satuan Pekerjaan (D+E) 109,996.81

A.4.6.2.5' Pemasangan 1 Buah Engsel Pintu Koboi


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 123,000.00 1,845.00
Tukang Kayu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.0008 168,000.00 134.40

Jumlah Harga Tenaga .................................................................. 25,649.40


B. BAHAN
Engsel pintu koboi Bh 1.000 222,000.00 222,000.00

Jumlah Harga Bahan .................................................................. 222,000.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 247,649.40
E. Overhead & Profit 15% X D 37,147.41
F. Harga Satuan Pekerjaan (D+E) 284,796.81

A.4.6.2.6 Pemasangan 1 Buah Engsel Jendela Kupu-kupu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Kayu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.0005 168,000.00 84.00

Jumlah Harga Tenaga .................................................................. 17,094.00


B. BAHAN
Engsel jendela kupu-kupu Bh 1.000 21,000.00 21,000.00

Jumlah Harga Bahan .................................................................. 21,000.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 38,094.00
E. Overhead & Profit 15% X D 5,714.10
F. Harga Satuan Pekerjaan (D+E) 43,808.10

A.4.6.2.7 Pemasangan 1 Buah Engsel Angin (Casement, 8")


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.0005 168,000.00 84.00
Jumlah Harga Tenaga .................................................................. 43,944.00
B. BAHAN
Engsel angin / casement Bh 1.000 37,500.00 37,500.00

Jumlah Harga Bahan .................................................................. 37,500.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 81,444.00
E. Overhead & Profit 15% X D 12,216.60
F. Harga Satuan Pekerjaan (D+E) 93,660.60

A.4.6.2.7a Pemasangan 1 Buah Engsel Angin (Casement, 16")


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.0005 168,000.00 84.00
Jumlah Harga Tenaga .................................................................. 43,944.00
B. BAHAN
Engsel angin / casement Bh 1.000 58,000.00 58,000.00

Jumlah Harga Bahan .................................................................. 58,000.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 101,944.00
E. Overhead & Profit 15% X D 15,291.60
F. Harga Satuan Pekerjaan (D+E) 117,235.60

A.4.6.2.7b Pemasangan 1 Buah Engsel Angin (Casement, 24")


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Kayu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.0005 168,000.00 84.00
Jumlah Harga Tenaga .................................................................. 43,944.00
B. BAHAN
Engsel angin / casement Bh 1.000 125,000.00 125,000.00

Jumlah Harga Bahan .................................................................. 125,000.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 168,944.00
E. Overhead & Profit 15% X D 25,341.60
F. Harga Satuan Pekerjaan (D+E) 194,285.60

A.4.6.2.9 Pemasangan 1 Buah Kait Angin


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 123,000.00 1,845.00
Tukang Kayu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.0075 168,000.00 1,260.00
Jumlah Harga Tenaga .................................................................. 26,775.00
B. BAHAN
Kait angin Bh 1.000 16,000.00 16,000.00

Jumlah Harga Bahan .................................................................. 16,000.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 42,775.00
E. Overhead & Profit 15% X D 6,416.25
F. Harga Satuan Pekerjaan (D+E) 49,191.25

A.4.6.2.17 Pemasangan 1 M2 Kaca Tebal 5 mm (polos)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 123,000.00 1,845.00
Tukang Kayu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.00075 168,000.00 126.00

Jumlah Harga Tenaga .................................................................. 25,641.00


B. BAHAN
Kaca t. 5 mm M2 1.100 148,500.00 163,350.00
Sealant Kg 0.050 48,000.00 2,400.00

Jumlah Harga Bahan .................................................................. 165,750.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 191,391.00
E. Overhead & Profit 15% X D 28,708.65
F. Harga Satuan Pekerjaan (D+E) 220,099.65

Pemasangan 1 M2 Kaca Tempered Tebal 12 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 123,000.00 1,845.00
Tukang Kayu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.00075 168,000.00 126.00

Jumlah Harga Tenaga .................................................................. 25,641.00


B. BAHAN
Kaca Tempered t. 12 mm M2 1.100 1,800,000.00 1,980,000.00
Sealant Kg 0.050 48,000.00 2,400.00

Jumlah Harga Bahan ..................................................................1,982,400.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 2,008,041.00
E. Overhead & Profit 15% X D 301,206.15
F. Harga Satuan Pekerjaan (D+E) 2,309,247.15
Pemasangan 1 M2 Kaca Stopsol Tebal 5 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 123,000.00 1,845.00
Tukang Kayu L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.00075 168,000.00 126.00

Jumlah Harga Tenaga .................................................................. 25,641.00


B. BAHAN
Kaca Stopsol t. 5 mm M2 1.100 148,500.00 163,350.00
Sealant Kg 0.050 48,000.00 2,400.00

Jumlah Harga Bahan .................................................................. 165,750.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 191,391.00
E. Overhead & Profit 15% X D 28,708.65
F. Harga Satuan Pekerjaan (D+E) 220,099.65

A.4.6.2.11 Pemasangan 1 Buah Door Closer


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 123,000.00 6,150.00
Tukang Kayu L.02 OH 0.500 143,000.00 71,500.00
Kepala Tukang L.03 OH 0.050 148,000.00 7,400.00
Mandor L.04 OH 0.00300 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 85,554.00


B. BAHAN
Door Closer bh 1.000 349,000.00 349,000.00

Jumlah Harga Bahan .................................................................. 349,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 434,554.00
E. Overhead & Profit 15% X D 65,183.10
F. Harga Satuan Pekerjaan (D+E) 499,737.10

Pemasangan 1 Buah Grendel Jendela (camlock)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Kayu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.00050 168,000.00 84.00

Jumlah Harga Tenaga .................................................................. 32,874.00


B. BAHAN
Grendel Jendela bh 1.000 36,000.00 36,000.00

Jumlah Harga Bahan .................................................................. 36,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 68,874.00
E. Overhead & Profit 15% X D 10,331.10
F. Harga Satuan Pekerjaan (D+E) 79,205.10

A.4.6.2.10 Pemasangan 1 Buah Grendel Pintu Tanam


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 123,000.00 1,845.00
Tukang Kayu L.02 OH 0.015 143,000.00 2,145.00
Kepala Tukang L.03 OH 0.015 148,000.00 2,220.00
Mandor L.04 OH 0.00100 168,000.00 168.00

Jumlah Harga Tenaga .................................................................. 6,378.00


B. BAHAN
Grendel Pintu Tanam Alumunium bh 1.000 120,000.00 120,000.00

Jumlah Harga Bahan .................................................................. 120,000.00

-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 126,378.00
E. Overhead & Profit 15% X D 18,956.70
F. Harga Satuan Pekerjaan (D+E) 145,334.70

Pemasangan 1 Bh Handle Pintu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 123,000.00 6,150.00
Tukang Kayu L.02 OH 0.500 143,000.00 71,500.00
Kepala Tukang L.03 OH 0.050 148,000.00 7,400.00
Mandor L.04 OH 0.00300 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 85,554.00


B. BAHAN
Handle Pintu set 1.000 1,316,800.00 1,316,800.00

Jumlah Harga Bahan ..................................................................1,316,800.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,402,354.00
E. Overhead & Profit 15% X D 210,353.10
F. Harga Satuan Pekerjaan (D+E) 1,612,707.10
Pemasangan 1 Bh Handle Pintu T. 35 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 123,000.00 6,150.00
Tukang Kayu L.02 OH 0.500 143,000.00 71,500.00
Kepala Tukang L.03 OH 0.050 148,000.00 7,400.00
Mandor L.04 OH 0.00300 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 85,554.00


B. BAHAN
Handle Pintu 35 cm set 1.000 260,000.00 260,000.00

Jumlah Harga Bahan .................................................................. 260,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 345,554.00
E. Overhead & Profit 15% X D 51,833.10
F. Harga Satuan Pekerjaan (D+E) 397,387.10

Pemasangan 1 Bh Patch Fitting


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 123,000.00 6,150.00
Tukang Kayu L.02 OH 0.500 143,000.00 71,500.00
Kepala Tukang L.03 OH 0.050 148,000.00 7,400.00
Mandor L.04 OH 0.00300 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 85,554.00


B. BAHAN
Patch Fitting bh 1.000 326,000.00 326,000.00

Jumlah Harga Bahan .................................................................. 326,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 411,554.00
E. Overhead & Profit 15% X D 61,733.10
F. Harga Satuan Pekerjaan (D+E) 473,287.10

Pemasangan 1 Buah Casement Handle


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Kayu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.00050 168,000.00 84.00

Jumlah Harga Tenaga .................................................................. 32,874.00


B. BAHAN
Casement Handle bh 1.000 60,000.00 60,000.00

Jumlah Harga Bahan .................................................................. 60,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 92,874.00
E. Overhead & Profit 15% X D 13,931.10
F. Harga Satuan Pekerjaan (D+E) 106,805.10
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.10 1 M2 Pengecatan Dinding & Plafon (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 123,000.00 2,460.00
Tukang Cat L.02 OH 0.063 143,000.00 9,009.00
Kepala Tukang L.03 OH 0.0063 148,000.00 932.40
Mandor L.04 OH 0.003 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 12,905.40


B. BAHAN
Plamur (skim coat) Kg 0.100 3,500.00 350.00
Cat dasar Kg 0.100 60,000.00 6,000.00
Cat penutup (warna), dalam Kg 0.260 60,000.00 15,600.00

Jumlah Harga Bahan .................................................................. 21,950.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 34,855.40
E. Overhead & Profit 15% X D 5,228.31
F. Harga Satuan Pekerjaan (D+E) 40,083.71

A.4.7.1.10a 1 M2 Pengecatan Tembok Baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat weathershield)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 123,000.00 2,460.00
Tukang Cat L.02 OH 0.063 143,000.00 9,009.00
Kepala Tukang L.03 OH 0.0063 148,000.00 932.40
Mandor L.04 OH 0.003 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 12,905.40


B. BAHAN
Plamur (skim coat) Kg 0.100 3,500.00 350.00
Cat dasar Kg 0.100 60,000.00 6,000.00
Cat Wheathershield Kg 0.260 90,000.00 23,400.00

Jumlah Harga Bahan .................................................................. 29,750.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 42,655.40
E. Overhead & Profit 15% X D 6,398.31
F. Harga Satuan Pekerjaan (D+E) 49,053.71
A.4.7.1.11 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.070 123,000.00 8,610.00
Tukang Cat L.02 OH 0.090 143,000.00 12,870.00
Kepala Tukang L.03 OH 0.0060 148,000.00 888.00
Mandor L.04 OH 0.003 168,000.00 420.00

Jumlah Harga Tenaga .................................................................. 22,788.00


B. BAHAN
Cat Menie Kg 0.200 20,500.00 4,100.00
Plamir Kg 0.150 30,000.00 4,500.00
Cat Dasar Kg 0.170 55,000.00 9,350.00
Cat Penutup Kg 0.260 55,000.00 14,300.00
Kuas Bh 0.010 8,800.00 88.00
Pengencer Kg 0.030 30,000.00 900.00
Amplas Bh 0.200 2,750.00 550.00

Jumlah Harga Bahan .................................................................. 33,788.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 56,576.00
E. Overhead & Profit 15% X D 8,486.40
F. Harga Satuan Pekerjaan (D+E) 65,062.40

A.4.7.1.22 10 M2 Pengecatan Dengan Melamik


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 2.000 123,000.00 246,000.00
Tukang Cat L.02 OH 12.000 143,000.00 1,716,000.00
Kepala Tukang L.03 OH 1.200 148,000.00 177,600.00
Mandor L.04 OH 0.1000 168,000.00 16,800.00

Jumlah Harga Tenaga ..................................................................


2,156,400.00
B. BAHAN
Cat epoxy Kg 0.200 65,000.00 13,000.00
Kuas 3" Bh 0.010 8,800.00 88.00

Jumlah Harga Bahan .................................................................. 13,088.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 2,169,488.00
E. Overhead & Profit 15% X D 325,423.20
F. Harga Satuan Pekerjaan (D+E) 2,494,911.20
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1 Pemasangan 1 Buah Closet Duduk / Monoblock


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 3.300 123,000.00 405,900.00
Tukang Batu L.02 OH 1.100 143,000.00 157,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.160 168,000.00 26,880.00

Jumlah Harga Tenaga .................................................................. 591,560.00


B. BAHAN
Closet duduk Unit 1.000 2,650,000.00 2,650,000.00
Perlengkapan Ls 6% x closet 159,000.00 159,000.00

Jumlah Harga Bahan .................................................................. 2,809,000.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 3,400,560.00
E. Overhead & Profit 15% X D 510,084.00
F. Harga Satuan Pekerjaan (D+E) 3,910,644.00

A.5.1.1.5 Pemasangan 1 Buah Closet Jongkok Porselin


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 123,000.00 123,000.00
Tukang Batu L.02 OH 1.150 143,000.00 164,450.00
Kepala Tukang L.03 OH 0.150 148,000.00 22,200.00
Mandor L.04 OH 0.160 168,000.00 26,880.00

Jumlah Harga Tenaga .................................................................. 336,530.00


B. BAHAN
Closet Jongkok Unit 1.000 350,000.00 350,000.00
Semen Portland Kg 6.000 1,575.00 9,450.00
Pasir pasang M3 0.010 225,000.00 2,250.00

Jumlah Harga Bahan .................................................................. 361,700.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 698,230.00
E. Overhead & Profit 15% X D 104,734.50
F. Harga Satuan Pekerjaan (D+E) 802,964.50
A.5.1.1.5 Pemasangan 1 Buah Wastafel
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.200 123,000.00 147,600.00
Tukang Batu L.02 OH 1.450 143,000.00 207,350.00
Kepala Tukang L.03 OH 0.150 148,000.00 22,200.00
Mandor L.04 OH 0.060 168,000.00 10,080.00

Jumlah Harga Tenaga .................................................................. 387,230.00


B. BAHAN
Wastafel Unit 1.000 850,000.00 850,000.00
Semen Portland Kg 6.000 1,575.00 9,450.00
Pasir pasang M3 0.010 225,000.00 2,250.00
Perlengkapan Ls 12% 850,000.00 102,000.00

Jumlah Harga Bahan .................................................................. 963,700.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,350,930.00
E. Overhead & Profit 15% X D 202,639.50
F. Harga Satuan Pekerjaan (D+E) 1,553,569.50

A.5.1.1.5a Pemasangan 1 Buah Wastafel Meja


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1.200 123,000.00 147,600.00
Tukang Batu L.02 OH 1.450 143,000.00 207,350.00
Kepala Tukang L.03 OH 0.150 148,000.00 22,200.00
Mandor L.04 OH 0.060 168,000.00 10,080.00

Jumlah Harga Tenaga .................................................................. 387,230.00


B. BAHAN
Wastafel Meja Unit 1.000 868,000.00 868,000.00
Semen Portland Kg 6.000 1,575.00 9,450.00
Pasir pasang M3 0.010 225,000.00 2,250.00
Perlengkapan Ls 12% 868,000.00 104,160.00

Jumlah Harga Bahan .................................................................. 983,860.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,371,090.00
E. Overhead & Profit 15% X D 205,663.50
F. Harga Satuan Pekerjaan (D+E) 1,576,753.50
A.5.1.1.6 Pemasangan 1 Buah Urinoir Toto
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.030 123,000.00 3,690.00
Tukang Batu L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang L.03 OH 0.030 148,000.00 4,440.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 53,550.00


B. BAHAN
Urinoir Unit 1.000 1,800,000.00 1,800,000.00
Perlengkapan Ls 6% x urinoir 108,000.00 108,000.00
Jumlah Harga Bahan .................................................................. 1,908,000.00
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,961,550.00
E. Overhead & Profit 15% X D 294,232.50
F. Harga Satuan Pekerjaan (D+E) 2,255,782.50

Pemasangan 1 Buah Urinoir Partision


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.030 123,000.00 3,690.00
Tukang Batu L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang L.03 OH 0.030 148,000.00 4,440.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 53,550.00


B. BAHAN
Urinoir Partision Unit 1.000 1,350,000.00 1,350,000.00
Perlengkapan Ls 6% x urinoir 81,000.00 81,000.00
Jumlah Harga Bahan .................................................................. 1,431,000.00
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,484,550.00
E. Overhead & Profit 15% X D 222,682.50
F. Harga Satuan Pekerjaan (D+E) 1,707,232.50

A.5.1.1.12 Pemasangan 1 Buah Bak Cuci Piring Stainless Steel


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.030 123,000.00 3,690.00
Tukang Batu L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang L.03 OH 0.030 148,000.00 4,440.00
Mandor L.04 OH 0.015 168,000.00 2,520.00

Jumlah Harga Tenaga .................................................................. 53,550.00


B. BAHAN
Bak cuci piring Unit 1.000 990,000.00 990,000.00
Jumlah Harga Bahan .................................................................. 990,000.00
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,043,550.00
E. Overhead & Profit 15% X D 156,532.50
F. Harga Satuan Pekerjaan (D+E) 1,200,082.50
A.5.1.1.14 Pemasangan 1 Buah Floor Drain
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Batu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 17,850.00


B. BAHAN
Floor drain Unit 1.000 155,000.00 155,000.00

Jumlah Harga Bahan .................................................................. 155,000.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 172,850.00
E. Overhead & Profit 15% X D 25,927.50
F. Harga Satuan Pekerjaan (D+E) 198,777.50

Pemasangan 1 Buah Clean Out


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Batu L.02 OH 0.100 143,000.00 14,300.00
Kepala Tukang L.03 OH 0.010 148,000.00 1,480.00
Mandor L.04 OH 0.005 168,000.00 840.00

Jumlah Harga Tenaga .................................................................. 17,850.00


B. BAHAN
Clean Out Unit 1.000 165,900.00 165,900.00

Jumlah Harga Bahan .................................................................. 165,900.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 183,750.00
E. Overhead & Profit 15% X D 27,562.50
F. Harga Satuan Pekerjaan (D+E) 211,312.50

A.5.1.1.14a Pemasangan 1 Buah Roof Drain dia. 3"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 123,000.00 2,460.00
Tukang Batu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.010 168,000.00 1,680.00
Jumlah Harga Tenaga .................................................................. 35,700.00
B. BAHAN
Roof drain, dia. 3" Unit 1.000 160,000.00 160,000.00

Jumlah Harga Bahan .................................................................. 160,000.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 195,700.00
E. Overhead & Profit 15% X D 29,355.00
F. Harga Satuan Pekerjaan (D+E) 225,055.00

A.5.1.1.14b Pemasangan 1 Buah Roof Drain dia. 6"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 123,000.00 2,460.00
Tukang Batu L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang L.03 OH 0.020 148,000.00 2,960.00
Mandor L.04 OH 0.010 168,000.00 1,680.00
Jumlah Harga Tenaga .................................................................. 35,700.00
B. BAHAN
Roof drain, dia. 6" Unit 1.000 365,000.00 365,000.00

Jumlah Harga Bahan .................................................................. 365,000.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 400,700.00
E. Overhead & Profit 15% X D 60,105.00
F. Harga Satuan Pekerjaan (D+E) 460,805.00

A.5.1.1.18 Pemasangan 1 Buah Kran Air diameter 1/2" atau 3/4"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Batu L.02 OH 0.400 143,000.00 57,200.00
Kepala Tukang L.03 OH 0.040 148,000.00 5,920.00
Mandor L.04 OH 0.005 168,000.00 840.00
Jumlah Harga Tenaga .................................................................. 65,190.00
B. BAHAN
Kran air Bh 1.000 80,000.00 80,000.00
Seal tape Bh 0.025 3,300.00 82.50
Jumlah Harga Bahan .................................................................. 80,082.50
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 145,272.50
E. Overhead & Profit 15% X D 21,790.88
F. Harga Satuan Pekerjaan (D+E) 167,063.38

Pemasangan 1 Buah Kran Air Leher Angsa


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Batu L.02 OH 0.400 143,000.00 57,200.00
Kepala Tukang L.03 OH 0.040 148,000.00 5,920.00
Mandor L.04 OH 0.005 168,000.00 840.00
Jumlah Harga Tenaga .................................................................. 65,190.00
B. BAHAN
Kran air Leher Angsa Bh 1.000 130,000.00 130,000.00
Seal tape Bh 0.025 3,300.00 82.50
Jumlah Harga Bahan .................................................................. 130,082.50
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 195,272.50
E. Overhead & Profit 15% X D 29,290.88
F. Harga Satuan Pekerjaan (D+E) 224,563.38

Pemasangan 1 Buah Shower cebok


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Batu L.02 OH 0.400 143,000.00 57,200.00
Kepala Tukang L.03 OH 0.040 148,000.00 5,920.00
Mandor L.04 OH 0.005 168,000.00 840.00
Jumlah Harga Tenaga .................................................................. 65,190.00
B. BAHAN
Shower cebok Bh 1.000 261,000.00 261,000.00
Seal tape Bh 0.025 3,300.00 82.50
Jumlah Harga Bahan .................................................................. 261,082.50
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 326,272.50
E. Overhead & Profit 15% X D 48,940.88
F. Harga Satuan Pekerjaan (D+E) 375,213.38

Pemasangan 1 Buah Kran Air diameter 1/2" Onda


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 123,000.00 1,230.00
Tukang Batu L.02 OH 0.400 143,000.00 57,200.00
Kepala Tukang L.03 OH 0.040 148,000.00 5,920.00
Mandor L.04 OH 0.005 168,000.00 840.00
Jumlah Harga Tenaga .................................................................. 65,190.00
B. BAHAN
Kran air Onda Bh 1.000 50,000.00 50,000.00
Seal tape Bh 0.025 3,300.00 82.50
Jumlah Harga Bahan .................................................................. 50,082.50
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 115,272.50
E. Overhead & Profit 15% X D 17,290.88
F. Harga Satuan Pekerjaan (D+E) 132,563.38

A.5.1.1.26 Pemasangan 1 M' Pipa PVC tipe AW 1/2"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.036 123,000.00 4,428.00
Tukang Batu L.02 OH 0.060 143,000.00 8,580.00
Kepala Tukang L.03 OH 0.006 148,000.00 888.00
Mandor L.04 OH 0.002 168,000.00 336.00
Jumlah Harga Tenaga .................................................................. 14,232.00
B. BAHAN
Pipa PVC dia. 3/4" M' 1.200 7,000.00 8,400.00
Perlengkapan Ls 35% 7,000.00 2,450.00

Jumlah Harga Bahan .................................................................. 10,850.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 25,082.00
E. Overhead & Profit 15% X D 3,762.30
F. Harga Satuan Pekerjaan (D+E) 28,844.30

A.5.1.1.26 Pemasangan 1 M' Pipa PVC tipe AW 3/4"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.036 123,000.00 4,428.00
Tukang Batu L.02 OH 0.060 143,000.00 8,580.00
Kepala Tukang L.03 OH 0.006 148,000.00 888.00
Mandor L.04 OH 0.002 168,000.00 336.00
Jumlah Harga Tenaga .................................................................. 14,232.00
B. BAHAN
Pipa PVC dia. 3/4" M' 1.200 8,500.00 10,200.00
Perlengkapan Ls 35% 8,500.00 2,975.00

Jumlah Harga Bahan .................................................................. 13,175.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 27,407.00
E. Overhead & Profit 15% X D 4,111.05
F. Harga Satuan Pekerjaan (D+E) 31,518.05

A.5.1.1.29 Pemasangan 1 M' Pipa PVC tipe AW 1"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.054 123,000.00 6,642.00
Tukang Batu L.02 OH 0.090 143,000.00 12,870.00
Kepala Tukang L.03 OH 0.009 148,000.00 1,332.00
Mandor L.04 OH 0.003 168,000.00 504.00
Jumlah Harga Tenaga .................................................................. 21,348.00
B. BAHAN
Pipa PVC dia. 1" M' 1.200 16,500.00 19,800.00
Perlengkapan Ls 35% 16,500.00 5,775.00
Jumlah Harga Bahan .................................................................. 25,575.00
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 46,923.00
E. Overhead & Profit 15% X D 7,038.45
F. Harga Satuan Pekerjaan (D+E) 53,961.45

A.5.1.1.29 Pemasangan 1 M' Pipa PVC tipe AW 2"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.054 123,000.00 6,642.00
Tukang Batu L.02 OH 0.090 143,000.00 12,870.00
Kepala Tukang L.03 OH 0.009 148,000.00 1,332.00
Mandor L.04 OH 0.003 168,000.00 504.00
Jumlah Harga Tenaga .................................................................. 21,348.00
B. BAHAN
Pipa PVC dia. 2" M' 1.200 30,000.00 36,000.00
Perlengkapan Ls 35% 30,000.00 10,500.00
Jumlah Harga Bahan .................................................................. 46,500.00
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 67,848.00
E. Overhead & Profit 15% X D 10,177.20
F. Harga Satuan Pekerjaan (D+E) 78,025.20

A.5.1.1.31 Pemasangan 1 M' Pipa PVC tipe AW 3"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 123,000.00 9,963.00
Tukang Batu L.02 OH 0.135 143,000.00 19,305.00
Kepala Tukang L.03 OH 0.0135 148,000.00 1,998.00
Mandor L.04 OH 0.004 168,000.00 672.00
Jumlah Harga Tenaga .................................................................. 31,938.00
B. BAHAN
Pipa PVC dia. 3" M' 1.200 48,000.00 57,600.00
Perlengkapan Ls 35% 48,000.00 16,800.00
Jumlah Harga Bahan .................................................................. 74,400.00
C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 106,338.00
E. Overhead & Profit 15% X D 15,950.70
F. Harga Satuan Pekerjaan (D+E) 122,288.70

A.5.1.1.32 Pemasangan 1 M' Pipa PVC tipe AW 4"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 123,000.00 9,963.00
Tukang Batu L.02 OH 0.135 143,000.00 19,305.00
Kepala Tukang L.03 OH 0.0135 148,000.00 1,998.00
Mandor L.04 OH 0.004 168,000.00 672.00
Jumlah Harga Tenaga .................................................................. 31,938.00
B. BAHAN
Pipa PVC dia. 4" M' 1.200 81,000.00 97,200.00
Perlengkapan Ls 35% 81,000.00 28,350.00

Jumlah Harga Bahan .................................................................. 125,550.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 157,488.00
E. Overhead & Profit 15% X D 23,623.20
F. Harga Satuan Pekerjaan (D+E) 181,111.20

Pemasangan 1 M' Pipa PVC tipe AW 6"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 123,000.00 9,963.00
Tukang Batu L.02 OH 0.135 143,000.00 19,305.00
Kepala Tukang L.03 OH 0.0135 148,000.00 1,998.00
Mandor L.04 OH 0.004 168,000.00 672.00
Jumlah Harga Tenaga .................................................................. 31,938.00
B. BAHAN
Pipa PVC dia. 6" M' 1.200 180,000.00 216,000.00
Perlengkapan Ls 35% 180,000.00 63,000.00

Jumlah Harga Bahan .................................................................. 279,000.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 310,938.00
E. Overhead & Profit 15% X D 46,640.70
F. Harga Satuan Pekerjaan (D+E) 357,578.70

Pemasangan 1 M' Pipa Polypropelyne PN. 10 3/4"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.036 123,000.00 4,428.00
Tukang Batu L.02 OH 0.060 143,000.00 8,580.00
Kepala Tukang L.03 OH 0.006 148,000.00 888.00
Mandor L.04 OH 0.002 168,000.00 336.00
Jumlah Harga Tenaga .................................................................. 14,232.00
B. BAHAN
Pipa Polypropelyne dia. 3/4" M' 1.100 20,750.00 22,825.00
Perlengkapan Ls 35% 20,750.00 7,262.50

Jumlah Harga Bahan .................................................................. 30,087.50


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 44,319.50
E. Overhead & Profit 15% X D 6,647.93
F. Harga Satuan Pekerjaan (D+E) 50,967.43

Pemasangan 1 M' Pipa Polypropelyne PN. 10 1"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.036 123,000.00 4,428.00
Tukang Batu L.02 OH 0.060 143,000.00 8,580.00
Kepala Tukang L.03 OH 0.006 148,000.00 888.00
Mandor L.04 OH 0.002 168,000.00 336.00
Jumlah Harga Tenaga .................................................................. 14,232.00
B. BAHAN
Pipa Polypropelyne dia. 1" M' 1.100 33,500.00 36,850.00
Perlengkapan Ls 35% 33,500.00 11,725.00

Jumlah Harga Bahan .................................................................. 48,575.00


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 62,807.00
E. Overhead & Profit 15% X D 9,421.05
F. Harga Satuan Pekerjaan (D+E) 72,228.05
Pemasangan 1 M' Pipa Polypropelyne PN. 10 2"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.036 123,000.00 4,428.00
Tukang Batu L.02 OH 0.060 143,000.00 8,580.00
Kepala Tukang L.03 OH 0.006 148,000.00 888.00
Mandor L.04 OH 0.002 168,000.00 336.00
Jumlah Harga Tenaga .................................................................. 14,232.00
B. BAHAN
Pipa Polypropelyne dia. 2" M' 1.100 128,750.00 141,625.00
Perlengkapan Ls 35% 128,750.00 45,062.50

Jumlah Harga Bahan .................................................................. 186,687.50


C. PERALATAN

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 200,919.50
E. Overhead & Profit 15% X D 30,137.93
F. Harga Satuan Pekerjaan (D+E) 231,057.43

Pemasangan 1 M' Pipa GIP 2"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 123,000.00 9,963.00
Tukang Batu L.02 OH 0.135 143,000.00 19,305.00
Kepala Tukang L.03 OH 0.0135 148,000.00 1,998.00
Mandor L.04 OH 0.004 168,000.00 672.00
Jumlah Harga Tenaga .................................................................. 31,938.00
B. BAHAN
Pipa GIP dia. 2" M' 1.200 65,000.00 78,000.00
Perlengkapan Ls 35% 65,000.00 22,750.00

Jumlah Harga Bahan .................................................................. 100,750.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 132,688.00
E. Overhead & Profit 15% X D 19,903.20
F. Harga Satuan Pekerjaan (D+E) 152,591.20

Pemasangan 1 M' Pipa GIP 3"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 123,000.00 9,963.00
Tukang Batu L.02 OH 0.135 143,000.00 19,305.00
Kepala Tukang L.03 OH 0.0135 148,000.00 1,998.00
Mandor L.04 OH 0.004 168,000.00 672.00
Jumlah Harga Tenaga .................................................................. 31,938.00
B. BAHAN
Pipa GIP dia. 3" M' 1.200 185,000.00 222,000.00
Perlengkapan Ls 35% 185,000.00 64,750.00

Jumlah Harga Bahan .................................................................. 286,750.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 318,688.00
E. Overhead & Profit 15% X D 47,803.20
F. Harga Satuan Pekerjaan (D+E) 366,491.20

Pemasangan 1 M' Pipa GIP 4"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 123,000.00 9,963.00
Tukang Batu L.02 OH 0.135 143,000.00 19,305.00
Kepala Tukang L.03 OH 0.0135 148,000.00 1,998.00
Mandor L.04 OH 0.004 168,000.00 672.00
Jumlah Harga Tenaga .................................................................. 31,938.00
B. BAHAN
Pipa GIP dia. 4" M' 1.200 285,000.00 342,000.00
Perlengkapan Ls 35% 285,000.00 99,750.00

Jumlah Harga Bahan .................................................................. 441,750.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 473,688.00
E. Overhead & Profit 15% X D 71,053.20
F. Harga Satuan Pekerjaan (D+E) 544,741.20

Pemasangan 1 BH Gate Valve dia. 1" 10 K


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Tukang Pipa L.02 OH 0.170 143,000.00 24,310.00
Kepala Tukang L.03 OH 0.170 148,000.00 25,160.00
Mandor L.04 OH 0.080 168,000.00 13,440.00
Jumlah Harga Tenaga .................................................................. 62,910.00
B. BAHAN
Gate Valve dia. 1" 10 K Bh 1.000 455,000.00 455,000.00
Perlengkapan Ls 35% 455,000.00 159,250.00

Jumlah Harga Bahan .................................................................. 614,250.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 677,160.00
E. Overhead & Profit 15% X D 101,574.00
F. Harga Satuan Pekerjaan (D+E) 778,734.00

Pemasangan 1 BH Gate Valve dia. 2" 10 K


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Tukang Pipa L.02 OH 0.170 143,000.00 24,310.00
Kepala Tukang L.03 OH 0.170 148,000.00 25,160.00
Mandor L.04 OH 0.080 168,000.00 13,440.00
Jumlah Harga Tenaga .................................................................. 62,910.00
B. BAHAN
Gate Valve dia. 2" 10 K Bh 1.000 1,650,000.00 1,650,000.00
Perlengkapan Ls 35% 1,650,000.00 577,500.00

Jumlah Harga Bahan .................................................................. 2,227,500.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 2,290,410.00
E. Overhead & Profit 15% X D 343,561.50
F. Harga Satuan Pekerjaan (D+E) 2,633,971.50

Pemasangan 1 BH Water Level Control ( WLC )


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Tukang Pipa L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang L.03 OH 1.000 148,000.00 148,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00
Jumlah Harga Tenaga .................................................................. 459,000.00
B. BAHAN
Water Level Control ( WLC ) Bh 1.000 696,000.00 696,000.00
Perlengkapan Ls 2% 696,000.00 13,920.00

Jumlah Harga Bahan .................................................................. 709,920.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 1,168,920.00
E. Overhead & Profit 15% X D 175,338.00
F. Harga Satuan Pekerjaan (D+E) 1,344,258.00

Pemasangan 1 BH Ventilator Out


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Tukang Pipa L.02 OH 0.830 143,000.00 118,690.00
Kepala Tukang L.03 OH 0.660 148,000.00 97,680.00
Mandor L.04 OH 0.320 168,000.00 53,760.00
Jumlah Harga Tenaga .................................................................. 270,130.00
B. BAHAN
Ventilator Out Bh 1.000 252,000.00 252,000.00
Perlengkapan Ls 2% 252,000.00 5,040.00

Jumlah Harga Bahan .................................................................. 257,040.00


C. PERALATAN
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 527,170.00
E. Overhead & Profit 15% X D 79,075.50
F. Harga Satuan Pekerjaan (D+E) 606,245.50

1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
BAHAN :
Galian tanah m³ 2.2500 135,999.00 305,997.75
Pasir urug m³ 0.1071 287,247.00 30,764.15
Lantai kerja m³ 1.1250 1,613,519.43 1,815,209.36
Pas. bata 1 PC : 4 PS + Plesteran m² 7.5000 188,135.69 1,411,017.66
Plat beton penutup & balok m³ 0.1500 1,634,540.00 245,181.00
Pipa PVC 4" jenis AW + sambungan m1 9.0000 138,385.13 1,245,466.13
Pipa GIP1/2" btg 0.6000 20,680.00 12,408.00
Galian tanah untuk rembesan m³ 1.6875 135,999.00 229,498.31
Pas. injuk kg 2.7000 150,000.00 405,000.00
Urugan kerikil 3,5 cm m³ 0.5250 350,692.50 184,113.56
Pipa PVC 4" berlobang jenis AW m1 9.0000 138,385.13 1,245,466.13
Urugan kembali perataan tanah m³ 0.5625 80,385.00 45,216.56
Jumlah 7,175,338.60
Overhead & Profit Max. 15 % 1,076,300.79
Jumlah 8,251,639.39
Dibulatkan 8,251,630.00
A.4.7.1 ANALISA PEKERJAAN PELATARAN / PAVING

A.4.7.1.10 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 123,000.00 30,750.00
Tukang Cat L.02 OH 0.500 143,000.00 71,500.00
Kepala Tukang L.03 OH 0.0250 148,000.00 3,700.00
Mandor L.04 OH 0.003 168,000.00 504.00

Jumlah Harga Tenaga .................................................................. 106,454.00


B. BAHAN
Paving Block Natural 8 cm bh 50.000 1,500.00 75,000.00
Pasir Pasang m³ 0.100 105,000.00 10,500.00

Jumlah Harga Bahan .................................................................. 85,500.00


C. PERALATAN
-
-

Jumlah Harga Peralatan .................................................................. -


D. Jumlah (A+B+C) 191,954.00
E. Overhead & Profit 15% X D 28,793.10
F. Harga Satuan Pekerjaan (D+E) 220,747.10

A.4.7.1.10a 1 M1 PASANGAN CANSTEEN BETON K. 300 ( 40/30/15 )


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 123,000.00 12,300.00
Tukang Cat L.02 OH 0.250 143,000.00 35,750.00
Kepala Tukang L.03 OH 0.0100 148,000.00 1,480.00
Mandor L.04 OH 0.001 168,000.00 168.00

Jumlah Harga Tenaga .................................................................. 49,698.00


B. BAHAN
Cansteen Beton K. 300 ( 40/30/15 ) m' 1.100 120,000.00 132,000.00
Semen Portland kg 5.000 1,180.00 5,900.00
Pasir Pasang m³ 0.042 105,000.00 4,410.00

Jumlah Harga Bahan .................................................................. 142,310.00


C. PERALATAN
-
-
Jumlah Harga Peralatan .................................................................. -
D. Jumlah (A+B+C) 192,008.00
E. Overhead & Profit 15% X D 28,801.20
F. Harga Satuan Pekerjaan (D+E) 220,809.20
HARGA SATUAN PEKERJAAN ELEKTRIKAL

Membuat 1 Unit Panel LVMDP


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 20.000 143,000.00 2,860,000.00
Kepala Tukang Listrik L.03 OH 10.000 148,000.00 1,480,000.00
Mandor L.04 OH 5.000 168,000.00 840,000.00

JUMLAH TENAGA KERJA 5,180,000.00


B BAHAN
ACB 300 A + Micrologic 2.3 (motor mechanism module) Bh 2.00 31,632,618.00 63,265,236.00
MCCB 60 A/3 Phasa 36 KA Bh 1.00 1,079,733.00 1,079,733.00
MCCB 50 A/3 Phasa 36 KA Bh 1.00 982,355.00 982,355.00
MCCB 40 A/3 Phasa 36 KA Bh 2.00 982,355.00 1,964,710.00
MCCB 16 A/3 Phasa 36 KA Bh 1.00 982,355.00 982,355.00
MCB 32 A/3 Phasa Bh 2.00 420,000.00 840,000.00
MCB 25 A/3 Phasa Bh 1.00 383,243.00 383,243.00
MCB 40 A/3 Phasa Bh 1.00 475,200.00 475,200.00
Capasitor Bank 100 A Bh 1.00 - -
Powermeter Bh 1.00 8,250,000.00 8,250,000.00
Pilot Lamp Bh 6.00 20,000.00 120,000.00
Fuse Bh 6.00 15,000.00 90,000.00
Box Panel & Accessories Unit 1.00 7,150,000.00 7,150,000.00
Busbar ls 1.00 1,283,742.48 1,283,742.48
Wiring Acc. ls 1.00 427,914.16 427,914.16

JUMLAH HARGA BAHAN 87,294,488.64


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 92,474,488.64


E Overhead & Profit 15% x D 13,871,173.30
F Harga Satuan Pekerjaaan (D+E) 106,345,661.94

Membuat 1 Unit Panel PP - Transfer Pump / Deep Well


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 1.000 148,000.00 148,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00

JUMLAH TENAGA KERJA 459,000.00


B BAHAN
MCB 20 A/3 Phasa 4,5 KA Bh 2.00 362,045.00 724,090.00
MCB 6 A/1 Phasa Bh 1.00 76,373.00 76,373.00
Pilot Lamp Bh 3.00 20,000.00 60,000.00
Fuse Bh 3.00 15,000.00 45,000.00
Box Panel (60x40x20) cm Bh 1.00 965,250.00 965,250.00
Material Bantu (Busbar, dll) Ls 1.00 140,303.48 140,303.48

JUMLAH HARGA BAHAN 2,011,016.48


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,470,016.48


E Overhead & Profit 15% x D 370,502.47
F Harga Satuan Pekerjaaan (D+E) 2,840,518.95
Membuat 1 Unit Panel PP - STP
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 1.000 148,000.00 148,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00

JUMLAH TENAGA KERJA 459,000.00


B BAHAN
MCB 10 A/1 Phasa Bh 1.00 76,373.00 76,373.00
MCB 6 A/1 Phasa Bh 4.00 76,373.00 305,492.00
Pilot Lamp Bh 3.00 20,000.00 60,000.00
Fuse Bh 3.00 15,000.00 45,000.00
Box Panel (60x40x20) cm Bh 1.00 965,250.00 965,250.00
Material Bantu (Busbar, dll) Ls 1.00 108,908.63 108,908.63

JUMLAH HARGA BAHAN 1,561,023.63


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,020,023.63


E Overhead & Profit 15% x D 303,003.54
F Harga Satuan Pekerjaaan (D+E) 2,323,027.17

Membuat 1 Unit Panel PLP - Site Area


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 1.000 148,000.00 148,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00

JUMLAH TENAGA KERJA 459,000.00


B BAHAN
MCB 16 A/3 Phasa 4,5 KA Bh 1.00 362,043.00 362,043.00
MCB 6 A/1 Phasa Bh 12.00 76,373.00 916,476.00
Pilot Lamp Bh 3.00 20,000.00 60,000.00
Fuse Bh 3.00 15,000.00 45,000.00
Box Panel (60x40x20) cm Bh 1.00 965,250.00 965,250.00
Material Bantu (Busbar, dll) Ls 1.00 176,157.68 176,157.68

JUMLAH HARGA BAHAN 2,524,926.68


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,983,926.68


E Overhead & Profit 15% x D 447,589.00
F Harga Satuan Pekerjaaan (D+E) 3,431,515.68

Membuat 1 Unit Panel PLP - LT. 01


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 1.000 148,000.00 148,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00

JUMLAH TENAGA KERJA 459,000.00


B BAHAN
MCCB 40 A/3 Phasa 16 KA Bh 1.00 982,355.00 982,355.00
MCB 10 A/1 Phasa 4,5 KA Bh 5.00 76,373.00 381,865.00
MCB 6 A/1 Phasa 4,5 KA Bh 20.00 76,373.00 1,527,460.00
Pilot Lamp Bh 3.00 20,000.00 60,000.00
Fuse Bh 3.00 15,000.00 45,000.00
Box Panel (80x60x25) cm Bh 1.00 1,500,000.00 1,500,000.00
Material Bantu (Busbar, dll) Ls 1.00 337,251.00 337,251.00

JUMLAH HARGA BAHAN 4,833,931.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 5,292,931.00


E Overhead & Profit 15% x D 793,939.65
F Harga Satuan Pekerjaaan (D+E) 6,086,870.65

Membuat 1 Unit Panel PLP - LT. 02


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 1.000 148,000.00 148,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00

JUMLAH TENAGA KERJA 459,000.00


B BAHAN
MCCB 50 A/3 Phasa 16 KA Bh 1.00 982,355.00 982,355.00
MCB 10 A/1 Phasa 4,5 KA Bh 10.00 76,373.00 763,730.00
MCB 6 A/1 Phasa 4,5 KA Bh 17.00 76,373.00 1,298,341.00
Pilot Lamp Bh 3.00 20,000.00 60,000.00
Fuse Bh 3.00 15,000.00 45,000.00
Box Panel (80x60x25) cm Bh 1.00 1,500,000.00 1,500,000.00
Material Bantu (Busbar, dll) Ls 1.00 348,706.95 348,706.95

JUMLAH HARGA BAHAN 4,998,132.95


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 5,457,132.95


E Overhead & Profit 15% x D 818,569.94
F Harga Satuan Pekerjaaan (D+E) 6,275,702.89

Membuat 1 Unit Panel PP AC - LT. 01


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 1.000 148,000.00 148,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00

JUMLAH TENAGA KERJA 459,000.00


B BAHAN
MCCB 40 A/3 Phasa 16 KA Bh 1.00 982,355.00 982,355.00
MCB 16 A/3 Phasa 4,5 KA Bh 2.00 362,043.00 724,086.00
MCB 6 A/1 Phasa 4,5 KA Bh 3.00 76,373.00 229,119.00
MCB 4 A/1 Phasa 4,5 KA Bh 11.00 76,373.00 840,103.00
Pilot Lamp Bh 3.00 20,000.00 60,000.00
Fuse Bh 3.00 15,000.00 45,000.00
Box Panel (80x60x25) cm Bh 1.00 1,500,000.00 1,500,000.00
Material Bantu (Busbar, dll) Ls 1.00 328,549.73 328,549.73

JUMLAH HARGA BAHAN 4,709,212.73


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 5,168,212.73


E Overhead & Profit 15% x D 775,231.91
F Harga Satuan Pekerjaaan (D+E) 5,943,444.63

Membuat 1 Unit Panel PP AC - LT. 02


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 1.000 148,000.00 148,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00

JUMLAH TENAGA KERJA 459,000.00


B BAHAN
MCCB 40 A/3 Phasa 16 KA Bh 1.00 982,355.00 982,355.00
MCB 16 A/3 Phasa 4,5 KA Bh 3.00 362,043.00 1,086,129.00
MCB 10 A/3 Phasa 4,5 KA Bh 1.00 362,043.00 362,043.00
MCB 6 A/1 Phasa 4,5 KA Bh 3.00 76,373.00 229,119.00
MCB 4 A/1 Phasa 4,5 KA Bh 22.00 76,373.00 1,680,206.00
Pilot Lamp Bh 3.00 20,000.00 60,000.00
Fuse Bh 3.00 15,000.00 45,000.00
Box Panel (80x60x25) cm Bh 1.00 1,500,000.00 1,500,000.00
Material Bantu (Busbar, dll) Ls 1.00 445,863.90 445,863.90

JUMLAH HARGA BAHAN 6,390,715.90


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,849,715.90


E Overhead & Profit 15% x D 1,027,457.39
F Harga Satuan Pekerjaaan (D+E) 7,877,173.29

Pekerjaan 1 Titik Instalasi Penerangan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 123,000.00 61,500.00
Tukang Listrik L.02 OH 0.500 143,000.00 71,500.00

JUMLAH TENAGA KERJA 133,000.00


B BAHAN
Kabel NYY 2 X 2,5 mm m' 12.00 8,000.00 96,000.00
Klem Kabel no.10 bh 10.00 750.00 7,500.00
Pipa pvc 5/8" btg 1.00 8,500.00 8,500.00
Isolasi roll 4.00 6,000.00 24,000.00
Tee dos 5/8" bh 1.00 4,500.00 4,500.00

JUMLAH HARGA BAHAN 140,500.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 273,500.00


E Overhead & Profit 15% x D 41,025.00
F Harga Satuan Pekerjaaan (D+E) 314,525.00

Pekerjaan Pasang Instalasi Stop Kontak


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 123,000.00 61,500.00
Tukang Listrik L.02 OH 0.500 143,000.00 71,500.00

JUMLAH TENAGA KERJA 133,000.00


B BAHAN
Kabel NYY 2 X 2,5 mm m' 12.00 8,000.00 96,000.00
Klem Kabel no.10 bh 20.00 750.00 15,000.00
Pipa pvc 5/8" btg 2.00 8,500.00 17,000.00
Isolasi roll 1.00 6,000.00 6,000.00
Tee dos 5/8" bh 1.00 4,500.00 4,500.00
JUMLAH HARGA BAHAN 138,500.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 271,500.00


E Overhead & Profit 15% x D 40,725.00
F Harga Satuan Pekerjaaan (D+E) 312,225.00

Pekerjaan 1 Titik Instalasi AC 1 PK, 1,5 PK, 2 PK Indoor & Outdoor Unit
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 123,000.00 98,400.00
Tukang Listrik L.02 OH 0.500 143,000.00 71,500.00
Mandor L.04 OH 0.080 143,000.00 11,440.00

JUMLAH TENAGA KERJA 181,340.00


B BAHAN
Kabel NYY 3 X 2,5 mm m' 15.00 14,000.00 210,000.00
Klem Kabel no.10 bh 10.00 750.00 7,500.00
Pipa pvc 5/8" btg 1.00 8,500.00 8,500.00
Isolasi roll 4.00 6,000.00 24,000.00
Tee dos 5/8" bh 1.00 4,500.00 4,500.00

JUMLAH HARGA BAHAN 254,500.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 435,840.00


E Overhead & Profit 15% x D 65,376.00
F Harga Satuan Pekerjaaan (D+E) 501,216.00

Pekerjaan 1 Titik Instalasi AC 2,5 PK Indoor & Outdoor Unit


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 123,000.00 98,400.00
Tukang Listrik L.02 OH 0.500 143,000.00 71,500.00
Mandor L.04 OH 0.080 143,000.00 11,440.00

JUMLAH TENAGA KERJA 181,340.00


B BAHAN
Kabel NYY 3 X 2,5 mm m' 15.00 14,000.00 210,000.00
Kabel NYY 3 X 4 mm m' 15.00 27,000.00 405,000.00
Klem Kabel no.10 bh 10.00 750.00 7,500.00
Pipa pvc 5/8" btg 1.00 8,500.00 8,500.00
Isolasi roll 4.00 6,000.00 24,000.00
Tee dos 5/8" bh 1.00 4,500.00 4,500.00

JUMLAH HARGA BAHAN 659,500.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 840,840.00


E Overhead & Profit 15% x D 126,126.00
F Harga Satuan Pekerjaaan (D+E) 966,966.00

Pekerjaan 1 Titik Instalasi AC 4 PK, 5 PK Indoor & Outdoor Unit


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 123,000.00 98,400.00
Tukang Listrik L.02 OH 0.500 143,000.00 71,500.00
Mandor L.04 OH 0.080 143,000.00 11,440.00

JUMLAH TENAGA KERJA 181,340.00


B BAHAN
Kabel NYY 3 X 2,5 mm m' 15.00 14,000.00 210,000.00
Kabel NYY 4 X 4 mm m' 15.00 30,880.00 463,200.00
Klem Kabel no.10 bh 10.00 750.00 7,500.00
Pipa pvc 5/8" btg 1.00 8,500.00 8,500.00
Isolasi roll 4.00 6,000.00 24,000.00
Tee dos 5/8" bh 1.00 4,500.00 4,500.00

JUMLAH HARGA BAHAN 717,700.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 899,040.00


E Overhead & Profit 15% x D 134,856.00
F Harga Satuan Pekerjaaan (D+E) 1,033,896.00

1 Bh Lampu RC091V LED36S/865 PSU W30L120 G2 MR PCV


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang Lampu bh 1.000 143,910.00 143,910.00
-
JUMLAH TENAGA KERJA 143,910.00
B BAHAN
RC091V LED36S/865 PSU W30L120 G2 MR PCV bh 1.00 719,550.00 719,550.00

JUMLAH HARGA BAHAN 719,550.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 863,460.00


E Overhead & Profit 15% x D 129,519.00
F Harga Satuan Pekerjaaan (D+E) 992,979.00

1 Bh Lampu TL TKO 2 x 16 Watt LED


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang Lampu bh 1.000 10,640.00 10,640.00
-
JUMLAH TENAGA KERJA 10,640.00
B BAHAN
Lampu TL TKO 2 x 16 Watt LED bh 1.00 532,000.00 532,000.00

JUMLAH HARGA BAHAN 532,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 542,640.00


E Overhead & Profit 15% x D 81,396.00
F Harga Satuan Pekerjaaan (D+E) 624,036.00

Memasang 1 Bh DN027C LED15/WW D200


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang Lampu bh 1.000 40,400.00 40,400.00
-
JUMLAH TENAGA KERJA 40,400.00
B BAHAN
DN027C LED15/WW D200 bh 1.00 202,000.00 202,000.00

JUMLAH HARGA BAHAN 202,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 242,400.00


E Overhead & Profit 15% x D 36,360.00
F Harga Satuan Pekerjaaan (D+E) 278,760.00
Memasang 1 Bh DN027B G2 LED12/CW 14W 220-240V D150 ID
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang Lampu bh 1.000 40,920.00 40,920.00
-
JUMLAH TENAGA KERJA 40,920.00
B BAHAN
DN027B G2 LED12/CW 14W 220-240V D150 ID bh 1.00 204,600.00 204,600.00

JUMLAH HARGA BAHAN 204,600.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 245,520.00


E Overhead & Profit 15% x D 36,828.00
F Harga Satuan Pekerjaaan (D+E) 282,348.00

Memasang 1 Bh DN390B LED6/840 PSU D100 ALU WP GM


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang Lampu bh 1.000 97,902.00 97,902.00
-
JUMLAH TENAGA KERJA 97,902.00
B BAHAN
DN390B LED6/840 PSU D100 ALU WP GM bh 1.00 489,510.00 489,510.00

JUMLAH HARGA BAHAN 489,510.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 587,412.00


E Overhead & Profit 15% x D 88,111.80
F Harga Satuan Pekerjaaan (D+E) 675,523.80

Memasang 1 Bh Lampu Exit 8 Watt C/W Bateray


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang Lampu bh 1.000 28,420.00 28,420.00
-
JUMLAH TENAGA KERJA 28,420.00
B BAHAN
Lampu Exit 8 Watt C/W Bateray bh 1.00 1,421,000.00 1,421,000.00

JUMLAH HARGA BAHAN 1,421,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,449,420.00


E Overhead & Profit 15% x D 217,413.00
F Harga Satuan Pekerjaaan (D+E) 1,666,833.00

Memasang 1 Bh Lampu Sorot LED 50 Watt


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang Lampu bh 1.000 4,100.00 4,100.00
-
JUMLAH TENAGA KERJA 4,100.00
B BAHAN
Lampu Sorot LED 50 Watt bh 1.00 205,000.00 205,000.00

JUMLAH HARGA BAHAN 205,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 209,100.00


E Overhead & Profit 15% x D 31,365.00
F Harga Satuan Pekerjaaan (D+E) 240,465.00
Memasang 1 Bh Lampu Tanam LED 5 Watt
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang Lampu bh 1.000 4,050.00 4,050.00
-
JUMLAH TENAGA KERJA 4,050.00
B BAHAN
Lampu Tanam LED 5 Watt bh 1.00 202,500.00 202,500.00

JUMLAH HARGA BAHAN 202,500.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 206,550.00


E Overhead & Profit 15% x D 30,982.50
F Harga Satuan Pekerjaaan (D+E) 237,532.50

Memasang 1 Bh Exhouse fan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang bh 1.000 100,000.00 100,000.00
-
JUMLAH TENAGA KERJA 100,000.00
B BAHAN
Exhouse fan bh 1.00 500,000.00 500,000.00

JUMLAH HARGA BAHAN 500,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 600,000.00


E Overhead & Profit 15% x D 90,000.00
F Harga Satuan Pekerjaaan (D+E) 690,000.00

1 Bh Saklar Tunggal / Engkel


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang bh 1.000 9,000.00 9,000.00
-
JUMLAH TENAGA KERJA 9,000.00
B BAHAN
Saklar Tunggal / Engkel bh 1.00 45,000.00 45,000.00

JUMLAH HARGA BAHAN 45,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 54,000.00


E Overhead & Profit 15% x D 8,100.00
F Harga Satuan Pekerjaaan (D+E) 62,100.00
1 Bh Saklar Ganda
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang bh 1.000 11,000.00 11,000.00
-
JUMLAH TENAGA KERJA 11,000.00
B BAHAN
Saklar Ganda bh 1.00 55,000.00 55,000.00

JUMLAH HARGA BAHAN 55,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 66,000.00


E Overhead & Profit 15% x D 9,900.00
F Harga Satuan Pekerjaaan (D+E) 75,900.00

1 Bh Stop Kontak 1 phase


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang bh 1.000 10,000.00 10,000.00
-
JUMLAH TENAGA KERJA 10,000.00
B BAHAN
Stop Kontak 1 phase bh 1.00 50,000.00 50,000.00

JUMLAH HARGA BAHAN 50,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 60,000.00


E Overhead & Profit 15% x D 9,000.00
F Harga Satuan Pekerjaaan (D+E) 69,000.00

1 Bh Stop Kontak Khusus


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang bh 1.000 24,000.00 24,000.00
-
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Stop Kontak AC bh 1.00 120,000.00 120,000.00

JUMLAH HARGA BAHAN 120,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 144,000.00


E Overhead & Profit 15% x D 21,600.00
F Harga Satuan Pekerjaaan (D+E) 165,600.00

1 Bh Stop Kontak Lantai


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang bh 1.000 100,000.00 100,000.00
-
JUMLAH TENAGA KERJA 100,000.00
B BAHAN
Stop Kontak Lantai bh 1.00 500,000.00 500,000.00

JUMLAH HARGA BAHAN 500,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 600,000.00


E Overhead & Profit 15% x D 90,000.00
F Harga Satuan Pekerjaaan (D+E) 690,000.00
1 M Kabel Tray Uk. 40 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang Listrik L.02 OH 0.100 148,000.00 14,800.00
Mandor L.04 OH 0.010 168,000.00 1,680.00
-
JUMLAH TENAGA KERJA 45,080.00
B BAHAN
Tray Uk. 40 cm m1 1.00 230,000.00 230,000.00

JUMLAH HARGA BAHAN 230,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 275,080.00


E Overhead & Profit 15% x D 41,262.00
F Harga Satuan Pekerjaaan (D+E) 316,342.00

1 M Kabel Tray Uk. 20 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.200 143,000.00 28,600.00
Kepala Tukang Listrik L.02 OH 0.100 148,000.00 14,800.00
Mandor L.04 OH 0.010 168,000.00 1,680.00
-
JUMLAH TENAGA KERJA 45,080.00
B BAHAN
Tray Uk. 20 cm m1 1.00 145,000.00 145,000.00

JUMLAH HARGA BAHAN 145,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 190,080.00


E Overhead & Profit 15% x D 28,512.00
F Harga Satuan Pekerjaaan (D+E) 218,592.00

1 M Kabel NYFGBY 4 x 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.017 143,000.00 2,431.00
Kepala Tukang Listrik L.02 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00
-
JUMLAH TENAGA KERJA 4,011.00
B BAHAN
Kabel NYFGBY 4 x 150 mm m1 1.00 1,129,000.00 1,129,000.00

JUMLAH HARGA BAHAN 1,129,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,133,011.00


E Overhead & Profit 15% x D 169,951.65
F Harga Satuan Pekerjaaan (D+E) 1,302,962.65

1 M Kabel NYY 4 x 25 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.017 143,000.00 2,431.00
Kepala Tukang Listrik L.02 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00
-
JUMLAH TENAGA KERJA 4,011.00
B BAHAN
Kabel NYY 4 x 25 mm m1 1.00 189,300.00 189,300.00

JUMLAH HARGA BAHAN 189,300.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 193,311.00


E Overhead & Profit 15% x D 28,996.65
F Harga Satuan Pekerjaaan (D+E) 222,307.65

1 M Kabel NYY 4 x 16 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.017 143,000.00 2,431.00
Kepala Tukang Listrik L.02 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00
-
JUMLAH TENAGA KERJA 4,011.00
B BAHAN
Kabel NYY 4 x 16 mm m1 1.00 122,400.00 122,400.00

JUMLAH HARGA BAHAN 122,400.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 126,411.00


E Overhead & Profit 15% x D 18,961.65
F Harga Satuan Pekerjaaan (D+E) 145,372.65

1 M Kabel NYY 4 x 10 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.017 143,000.00 2,431.00
Kepala Tukang Listrik L.02 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00
-
JUMLAH TENAGA KERJA 4,011.00
B BAHAN
Kabel NYY 4 x 10 mm m1 1.00 79,000.00 79,000.00

JUMLAH HARGA BAHAN 79,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 83,011.00


E Overhead & Profit 15% x D 12,451.65
F Harga Satuan Pekerjaaan (D+E) 95,462.65

1 M Kabel NYY 4 x 6 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.017 143,000.00 2,431.00
Kepala Tukang Listrik L.02 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00
-
JUMLAH TENAGA KERJA 4,011.00
B BAHAN
Kabel NYY 4 x 6 mm m1 1.00 50,300.00 50,300.00

JUMLAH HARGA BAHAN 50,300.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 54,311.00


E Overhead & Profit 15% x D 8,146.65
F Harga Satuan Pekerjaaan (D+E) 62,457.65
1 M Kabel NYM 4 x 6 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.017 143,000.00 2,431.00
Kepala Tukang Listrik L.02 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00
-
JUMLAH TENAGA KERJA 4,011.00
B BAHAN
Kabel NYM 4 x 6 mm m1 1.00 43,882.00 43,882.00

JUMLAH HARGA BAHAN 43,882.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 47,893.00


E Overhead & Profit 15% x D 7,183.95
F Harga Satuan Pekerjaaan (D+E) 55,076.95

1 M Kabel NYM 4 x 4 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.017 143,000.00 2,431.00
Kepala Tukang Listrik L.02 OH 0.005 148,000.00 740.00
Mandor L.04 OH 0.005 168,000.00 840.00
-
JUMLAH TENAGA KERJA 4,011.00
B BAHAN
Kabel NYM 4 x 4 mm m1 1.00 30,880.00 30,880.00

JUMLAH HARGA BAHAN 30,880.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 34,891.00


E Overhead & Profit 15% x D 5,233.65
F Harga Satuan Pekerjaaan (D+E) 40,124.65

Pemasangan 1 Buah Terminal Box Sound System


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang Listrik L.03 OH 0.300 148,000.00 44,400.00
Mandor L.04 OH 0.150 168,000.00 25,200.00
JUMLAH TENAGA KERJA 112,500.00
B BAHAN
Terminal Box Sound System bh 1.00 330,000.00 330,000.00

JUMLAH HARGA BAHAN 330,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 442,500.00


E Overhead & Profit 15% x D 66,375.00
F Harga Satuan Pekerjaaan (D+E) 508,875.00

Pemasangan 1 Buah Volume Control


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang Listrik L.03 OH 0.100 148,000.00 14,800.00
Mandor L.04 OH 0.070 168,000.00 11,760.00
JUMLAH TENAGA KERJA 48,010.00
B BAHAN
Volume Control bh 1.00 150,000.00 150,000.00

JUMLAH HARGA BAHAN 150,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 198,010.00


E Overhead & Profit 15% x D 29,701.50
F Harga Satuan Pekerjaaan (D+E) 227,711.50

1 Titik Instalasi Sound System


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang Listrik L.03 OH 0.300 148,000.00 44,400.00
Mandor L.04 OH 0.170 168,000.00 28,560.00
JUMLAH TENAGA KERJA 115,860.00
B BAHAN
Kabel NYMHY 2x1,5 mm2 m 30.00 7,700.00 231,000.00
Pipa Conduit m 10.00 8,500.00 85,000.00
Socket Pipa bh 3.00 600.00 1,800.00
Tee Doos bh 2.00 4,500.00 9,000.00
Klem Pipa bh 3.00 750.00 2,250.00
Fisher + Sekrup bh 6.00 250.00 1,500.00

JUMLAH HARGA BAHAN 330,550.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 446,410.00


E Overhead & Profit 15% x D 66,961.50
F Harga Satuan Pekerjaaan (D+E) 513,371.50

Pemasangan 1 Bh Ceiling Speaker


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang Listrik L.03 OH 0.100 148,000.00 14,800.00
Mandor L.04 OH 0.070 168,000.00 11,760.00
JUMLAH TENAGA KERJA 48,010.00
B BAHAN
Ceiling Speker (Zs-646R) bh 1.00 142,835.00 142,835.00

JUMLAH HARGA BAHAN 142,835.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 190,845.00


E Overhead & Profit 15% x D 28,626.75
F Harga Satuan Pekerjaaan (D+E) 219,471.75

Pemasangan 1 Bh Horn Speaker


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.150 143,000.00 21,450.00
Kepala Tukang Listrik L.03 OH 0.100 148,000.00 14,800.00
Mandor L.04 OH 0.070 168,000.00 11,760.00
JUMLAH TENAGA KERJA 48,010.00
B BAHAN
Horn Speker bh 1.00 710,000.00 710,000.00

JUMLAH HARGA BAHAN 710,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 758,010.00


E Overhead & Profit 15% x D 113,701.50
F Harga Satuan Pekerjaaan (D+E) 871,711.50
MCFA System 10 Zone
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 3.000 143,000.00 429,000.00
Kepala Tukang Listrik L.03 OH 2.000 148,000.00 296,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00
JUMLAH TENAGA KERJA 893,000.00
B BAHAN
MCFA 10 zone + battery HS-25L Unit 1.00 19,500,000.00 19,500,000.00
Dinabolt 10mm Bh 4.00 3,500.00 14,000.00
Material support 5% dari peralatan 0.05 19,514,000.00 975,700.00

JUMLAH HARGA BAHAN 20,489,700.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 21,382,700.00


E Overhead & Profit 15% x D 3,207,405.00
F Harga Satuan Pekerjaaan (D+E) 24,590,105.00

Pemasangan 1 Buah Terminal Box Fire Alarm


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.170 143,000.00 24,310.00
Kepala Tukang Listrik L.03 OH 0.170 148,000.00 25,160.00
Mandor L.04 OH 0.080 168,000.00 13,440.00
JUMLAH TENAGA KERJA 62,910.00
B BAHAN
Terminal Box Fire Alarm bh 1.00 738,750.00 738,750.00

JUMLAH HARGA BAHAN 738,750.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 801,660.00


E Overhead & Profit 15% x D 120,249.00
F Harga Satuan Pekerjaaan (D+E) 921,909.00

1 Bh pekerjaan Heat Detector


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.170 143,000.00 24,310.00
Kepala Tukang Listrik L.03 OH 0.170 148,000.00 25,160.00
Mandor L.04 OH 0.080 168,000.00 13,440.00
JUMLAH TENAGA KERJA 38,600.00
B BAHAN
Rate of Rise (RoR) Heat detector HS-WS19L Unit 1.00 121,000.00 121,000.00

JUMLAH HARGA BAHAN 121,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 159,600.00


E Overhead & Profit 15% x D 23,940.00
F Harga Satuan Pekerjaaan (D+E) 183,540.00

1 Bh pekerjaan Smoke Detector


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.170 143,000.00 24,310.00
Kepala Tukang Listrik L.03 OH 0.170 148,000.00 25,160.00
Mandor L.04 OH 0.080 168,000.00 13,440.00
JUMLAH TENAGA KERJA 38,600.00
B BAHAN
smoke detector HS-202D Unit 1.00 374,000.00 374,000.00

JUMLAH HARGA BAHAN 374,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 412,600.00


E Overhead & Profit 15% x D 61,890.00
F Harga Satuan Pekerjaaan (D+E) 474,490.00

1 Bh End of Line Resistance


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.050 143,000.00 7,150.00
Kepala Tukang Listrik L.03 OH 0.030 148,000.00 4,440.00
Mandor L.04 OH 0.030 168,000.00 5,040.00
JUMLAH TENAGA KERJA 9,480.00
B BAHAN
Resistance Unit 1.00 10,000.00 10,000.00

JUMLAH HARGA BAHAN 10,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 19,480.00


E Overhead & Profit 15% x D 2,922.00
F Harga Satuan Pekerjaaan (D+E) 22,402.00

Pemasangan 1 Titik Instalasi Heat Detector


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 143,000.00 42,900.00
Tukang Listrik L.02 OH 0.300 148,000.00 44,400.00
Mandor L.04 OH 0.1700 168,000.00 28,560.00
JUMLAH TENAGA KERJA 115,860.00
B BAHAN
NYA 2(1x1,5mm) m1 28.00 3,850.00 107,800.00
Pipa Conduit m1 28.00 8,500.00 238,000.00
Socket Pipa m1 28.00 600.00 16,800.00
Tee Doos bh 4.00 4,500.00 18,000.00
Klem Pipa bh 2.00 750.00 1,500.00
Fisher + Sekrup bh 6.00 250.00 1,500.00

JUMLAH HARGA BAHAN 383,600.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 499,460.00


E Overhead & Profit 15% x D 74,919.00
F Harga Satuan Pekerjaaan (D+E) 574,379.00

1 Bh Push Button
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.170 143,000.00 24,310.00
Kepala Tukang Listrik L.03 OH 0.170 148,000.00 25,160.00
Mandor L.04 OH 0.080 168,000.00 13,440.00
JUMLAH TENAGA KERJA 38,600.00
B BAHAN
Push Button Unit 1.00 1,110,000.00 1,110,000.00

JUMLAH HARGA BAHAN 1,110,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,148,600.00


E Overhead & Profit 15% x D 172,290.00
F Harga Satuan Pekerjaaan (D+E) 1,320,890.00

1 Bh Fireman Telephone
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.170 143,000.00 24,310.00
Kepala Tukang Listrik L.03 OH 0.170 148,000.00 25,160.00
Mandor L.04 OH 0.080 168,000.00 13,440.00
JUMLAH TENAGA KERJA 38,600.00
B BAHAN
Fireman Telephone Unit 1.00 611,490.00 611,490.00

JUMLAH HARGA BAHAN 611,490.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 650,090.00


E Overhead & Profit 15% x D 97,513.50
F Harga Satuan Pekerjaaan (D+E) 747,603.50

1 Bh Bell Alarm
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.170 143,000.00 24,310.00
Kepala Tukang Listrik L.03 OH 0.170 148,000.00 25,160.00
Mandor L.04 OH 0.080 168,000.00 13,440.00
JUMLAH TENAGA KERJA 38,600.00
B BAHAN
Bell Alarm Unit 1.00 2,434,000.00 2,434,000.00

JUMLAH HARGA BAHAN 2,434,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,472,600.00


E Overhead & Profit 15% x D 370,890.00
F Harga Satuan Pekerjaaan (D+E) 2,843,490.00

A.8.4.6.7
Pemasangan 1 Bh NVR 16 Channel
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 2.000 143,000.00 286,000.00
Kepala Tukang Listrik L.03 OH 2.000 148,000.00 296,000.00
Mandor L.04 OH 1.0000 168,000.00 168,000.00
JUMLAH TENAGA KERJA 750,000.00
B BAHAN
NVR 16 Channel bh 1.00 15,620,000.00 15,620,000.00

JUMLAH HARGA BAHAN 15,620,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 16,370,000.00


E Overhead & Profit 15% x D 2,455,500.00
F Harga Satuan Pekerjaaan (D+E) 18,825,500.00
Pemasangan 1 Bh CCTV Indoor
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 2.000 143,000.00 286,000.00
Kepala Tukang Listrik L.03 OH 2.000 148,000.00 296,000.00
Mandor L.04 OH 1.0000 168,000.00 168,000.00
JUMLAH TENAGA KERJA 750,000.00
B BAHAN
UNV DOME (Indoor Camera) IPC 322SR3-VSPF28-C bh 1.00 2,475,000.00 2,475,000.00

JUMLAH HARGA BAHAN 2,475,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 3,225,000.00


E Overhead & Profit 15% x D 483,750.00
F Harga Satuan Pekerjaaan (D+E) 3,708,750.00

Pemasangan 1 Bh CCTV Outdoor


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 2.000 143,000.00 286,000.00
Kepala Tukang Listrik L.03 OH 2.000 148,000.00 296,000.00
Mandor L.04 OH 1.0000 168,000.00 168,000.00
JUMLAH TENAGA KERJA 750,000.00
B BAHAN
UNV BULLET (Outdoor Camera) IPC2222ERS-DUPF40-C bh 1.00 3,584,000.00 3,584,000.00

JUMLAH HARGA BAHAN 3,584,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 4,334,000.00


E Overhead & Profit 15% x D 650,100.00
F Harga Satuan Pekerjaaan (D+E) 4,984,100.00

Pemasangan 1 Titik Instalasi Camera


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 150,000.00 105,000.00
Tukang Listrik L.02 OH 0.400 180,000.00 72,000.00
Mandor L.04 OH 0.0400 200,000.00 8,000.00
JUMLAH TENAGA KERJA 185,000.00
B BAHAN
Kabel UTP cat. 6 m1 28.00 7,540.00 211,120.00
Pipa Conduit m1 28.00 8,500.00 238,000.00
Kabel NYMHY 2 x 1,5 mm m1 28.00 7,700.00 215,600.00
Sok Lurus bh 4.00 700.00 2,800.00
Connector RJ 45 bh 2.00 10,000.00 20,000.00
Klem Pipa bh 6.00 750.00 4,500.00
Fisher + Sekrup bh 12.00 250.00 3,000.00
Flexible Conduit m1 1.00 6,000.00 6,000.00

JUMLAH HARGA BAHAN 701,020.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 886,020.00


E Overhead & Profit 15% x D 132,903.00
F Harga Satuan Pekerjaaan (D+E) 1,018,923.00

Pemasangan 1 Bh Antena Parabola 12 feet c/w dual


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 2.000 148,000.00 296,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00
JUMLAH TENAGA KERJA 607,000.00
B BAHAN
Antena Parabola 12 feet c/w dual bh 1.00 12,312,000.00 12,312,000.00

JUMLAH HARGA BAHAN 12,312,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 12,919,000.00


E Overhead & Profit 15% x D 1,937,850.00
F Harga Satuan Pekerjaaan (D+E) 14,856,850.00

Pemasangan 1 Bh UHF/VHF Antena elemen & Booster


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 2.000 148,000.00 296,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00
JUMLAH TENAGA KERJA 607,000.00
B BAHAN
UHF/VHF Antena elemen & Booster bh 1.00 4,078,000.00 4,078,000.00

JUMLAH HARGA BAHAN 4,078,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 4,685,000.00


E Overhead & Profit 15% x D 702,750.00
F Harga Satuan Pekerjaaan (D+E) 5,387,750.00

Pemasangan 1 Bh Spliter 6 Way


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 1.000 143,000.00 143,000.00
Kepala Tukang Listrik L.03 OH 2.000 148,000.00 296,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00
JUMLAH TENAGA KERJA 607,000.00
B BAHAN
Spliter 6 Way bh 1.00 1,862,972.00 1,862,972.00

JUMLAH HARGA BAHAN 1,862,972.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,469,972.00


E Overhead & Profit 15% x D 370,495.80
F Harga Satuan Pekerjaaan (D+E) 2,840,467.80

Pemasangan 1 Bh Outlet TV
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.250 143,000.00 35,750.00
Mandor L.04 OH 0.100 168,000.00 16,800.00
JUMLAH TENAGA KERJA 52,550.00
B BAHAN
Outlet TV bh 1.00 95,000.00 95,000.00

JUMLAH HARGA BAHAN 95,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 147,550.00


E Overhead & Profit 15% x D 22,132.50
F Harga Satuan Pekerjaaan (D+E) 169,682.50
Pemasangan 1 Bh Terminal Box TV + Boster
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.500 143,000.00 71,500.00
Mandor L.04 OH 0.050 168,000.00 8,400.00
JUMLAH TENAGA KERJA 79,900.00
B BAHAN
Terminal Box TV + Boster bh 1.00 325,000.00 325,000.00

JUMLAH HARGA BAHAN 325,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 404,900.00


E Overhead & Profit 15% x D 60,735.00
F Harga Satuan Pekerjaaan (D+E) 465,635.00

Pemasangan 1 Titik Instalasi MATV


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 143,000.00 114,400.00
Tukang Listrik L.02 OH 0.500 148,000.00 74,000.00
Mandor L.04 OH 0.0800 168,000.00 13,440.00
JUMLAH TENAGA KERJA 201,840.00
B BAHAN
L.Bow Sekrup bh 1.00 2,265.78 2,265.78
Kabel RG 8 m' 10.00 5,538.57 55,385.66
Sadel bh 20.00 855.96 17,119.20
Penggantung bh 10.00 1,158.06 11,580.64
Inbow Dos bh 1.00 6,545.58 6,545.58
T-Dos bh 2.00 4,783.31 9,566.61
Fizzer + Sekrup bh 40.00 352.45 14,098.17
Kabel Teets bh 10.00 352.45 3,524.54
Pipa Spiral Mtr 2.00 1,258.77 2,517.53
L-Bow bh 5.00 2,265.78 11,328.89
Pipa Clipsal btg 4.17 8,559.60 35,665.01
Isolasi bh 0.20 6,000.00 1,200.00

JUMLAH HARGA BAHAN 170,797.60


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 372,637.60


E Overhead & Profit 15% x D 55,895.64
F Harga Satuan Pekerjaaan (D+E) 428,533.24

Pemasangan 1 Titik Instalasi Socket Data


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 123,000.00 36,900.00
Tukang Listrik L.02 OH 0.000 143,000.00 -
Kepala Tukang Listrik L.03 OH 0.300 148,000.00 44,400.00
Mandor L.04 OH 0.170 168,000.00 28,560.00
JUMLAH TENAGA KERJA 109,860.00
B BAHAN
Kabel LAN Cat 6 bh 16.00 7,540.00 120,640.00
Pipa Conduit m' 16.00 8,500.00 136,000.00
Socket Pipa bh 1.00 700.00 700.00
Tee Doos bh 2.00 4,500.00 9,000.00
Klem Pipa bh 3.00 750.00 2,250.00
Fhiser bh 6.00 250.00 1,500.00
Las Doop bh 2.00 4,783.31 9,566.61
Isolasi ban bh 0.25 6,000.00 1,500.00

JUMLAH HARGA BAHAN 281,156.61


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 391,016.61


E Overhead & Profit 15% x D 58,652.49
F Harga Satuan Pekerjaaan (D+E) 449,669.11

1 Bh Socket Data
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang bh 1.000 19,700.00 19,700.00
-
JUMLAH TENAGA KERJA 19,700.00
B BAHAN
Socket Data bh 1.00 98,500.00 98,500.00

JUMLAH HARGA BAHAN 98,500.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 118,200.00


E Overhead & Profit 15% x D 17,730.00
F Harga Satuan Pekerjaaan (D+E) 135,930.00

1 Bh Socket Telepone
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Biaya Pasang bh 1.000 19,700.00 19,700.00
-
JUMLAH TENAGA KERJA 19,700.00
B BAHAN
Socket telepone bh 1.00 98,500.00 98,500.00

JUMLAH HARGA BAHAN 98,500.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 118,200.00


E Overhead & Profit 15% x D 17,730.00
F Harga Satuan Pekerjaaan (D+E) 135,930.00

1 Bh HUB Un Managable Path Panel 1 x 8 port


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 123,000.00 61,500.00
Tukang Listrik L.02 OH 0.000 143,000.00 -
Kepala Tukang Listrik L.03 OH 0.500 148,000.00 74,000.00
Mandor L.04 OH 0.500 168,000.00 84,000.00
-
JUMLAH TENAGA KERJA 219,500.00
B BAHAN
HUB Un Managable Path Panel 1 x 8 port bh 1.00 2,825,000.00 2,825,000.00
Instalasi 2% % 2.00 2,825,000.00 56,500.00
JUMLAH HARGA BAHAN 2,881,500.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 3,101,000.00


E Overhead & Profit 15% x D 465,150.00
F Harga Satuan Pekerjaaan (D+E) 3,566,150.00

1 Bh Path Panel 2 x 16 port


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 123,000.00 61,500.00
Tukang Listrik L.02 OH 0.000 143,000.00 -
Kepala Tukang Listrik L.03 OH 0.500 148,000.00 74,000.00
Mandor L.04 OH 0.500 168,000.00 84,000.00
-
JUMLAH TENAGA KERJA 219,500.00
B BAHAN
Path Panel 2 x 16 port bh 1.00 5,085,000.00 5,085,000.00
Instalasi 2% % 2.00 5,085,000.00 101,700.00
JUMLAH HARGA BAHAN 5,186,700.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 5,406,200.00


E Overhead & Profit 15% x D 810,930.00
F Harga Satuan Pekerjaaan (D+E) 6,217,130.00

Pemasangan PABX
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 3.000 143,000.00 429,000.00
Kepala Tukang Listrik L.03 OH 2.000 148,000.00 296,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00
JUMLAH TENAGA KERJA 464,000.00
B BAHAN
PABX Kap. 8/40 Extention Bh 1.00 20,900,000.00 20,900,000.00
Dinabolt 10mm Bh 4.00 3,500.00 14,000.00
Material support 5% dari peralatan 0.05 20,914,000.00 1,045,700.00

JUMLAH HARGA BAHAN 21,959,700.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 22,423,700.00


E Overhead & Profit 15% x D 3,363,555.00
F Harga Satuan Pekerjaaan (D+E) 25,787,255.00

Pemasangan MDF Telpon 50 Pair


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 6.000 143,000.00 858,000.00
Kepala Tukang Listrik L.03 OH 4.000 148,000.00 592,000.00
Mandor L.04 OH 3.000 168,000.00 504,000.00
JUMLAH TENAGA KERJA 1,954,000.00
B BAHAN
MDF Telpon 50 Pair Bh 1.00 880,000.00 880,000.00
Dinabolt 10mm Bh 4.00 3,500.00 14,000.00
Material support 5% dari peralatan 0.05 894,000.00 44,700.00

JUMLAH HARGA BAHAN 938,700.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,892,700.00


E Overhead & Profit 15% x D 433,905.00
F Harga Satuan Pekerjaaan (D+E) 3,326,605.00

Pemasangan Operator console


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.300 143,000.00 42,900.00
Kepala Tukang Listrik L.03 OH 0.300 148,000.00 44,400.00
Mandor L.04 OH 0.170 168,000.00 28,560.00
JUMLAH TENAGA KERJA 115,860.00
B BAHAN
Operator console Bh 1.00 3,740,000.00 3,740,000.00
Material support 5% dari peralatan 0.05 3,740,000.00 187,000.00

JUMLAH HARGA BAHAN 3,927,000.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 4,042,860.00


E Overhead & Profit 15% x D 606,429.00
F Harga Satuan Pekerjaaan (D+E) 4,649,289.00
Pemasangan 1Bh Pesawat Telepon
Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA
Tukang Listrik L.02 OH 0.400 143,000.00 57,200.00
Kepala Tukang Listrik L.03 OH 0.200 148,000.00 29,600.00
Mandor L.04 OH 0.050 168,000.00 8,400.00
JUMLAH TENAGA KERJA 95,200.00
B BAHAN
Pesawat Telpon m 1.00 195,000.00 195,000.00
Material support 10% dari peralatan 0.10 195,000.00 19,500.00

JUMLAH HARGA BAHAN 214,500.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 309,700.00


E Overhead & Profit 15% x D 46,455.00
F Harga Satuan Pekerjaaan (D+E) 356,155.00

Pemasangan 1Bh Air Terminal Radius 50 M


Kode Satuan Koefisien Harga Satuan Jumlah Harga
No Uraian
(Rp) (Rp)
A TENAGA

Tukang Listrik L.02 OH 3.000 143,000.00 429,000.00


Kepala Tukang Listrik L.03 OH 2.000 148,000.00 296,000.00
Mandor L.04 OH 1.000 168,000.00 168,000.00
JUMLAH TENAGA KERJA 893,000.00
B BAHAN
Air Terminal Radius 50 M bh 1.00 8,500,000.00 8,500,000.00
Down Conductor HVSC 70 mm2 m 80.00 185,000.00 14,800,000.00
Arde Grounding Split dia 1" (Max. Resistance 2 Ohm) unit 1.00 2,850,000.00 2,850,000.00
Material support 5% dari peralatan lot 1.00 1,307,500.00 1,307,500.00

JUMLAH HARGA BAHAN 27,457,500.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 28,350,500.00


E Overhead & Profit 15% x D 4,252,575.00
F Harga Satuan Pekerjaaan (D+E) 32,603,075.00
1. DAFTAR HARGA BAHAN / MATERIAL
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
A. BAHAN DASAR
1 Batu merah bh 1,000.00
2 Bata Ringan 0,2 x 0,6 x 0,1 m3 824,400.00
3 Batu gunung / batu kali (batu pondasi) m3 229,500.00
4 Kerikil/Batu pecah 1-2 m3 449,263.00
kg 332.79
5 Pasir Pasangan m3 225,000.00
6 Pasir Plasteran m3 225,000.00
7 Pasir Beton m3 225,000.00
kg 160.71
8 Pasir timbunan/urug m3 176,000.00
9 Tanah Timbunan m3 220,000.00
10 Sirtu 191,625.00
11 Semen PC zak 78,750.00 Tonasa
kg 1,575.00
12 Semen Instan Perekat Bata Ringan Zak 90,000.00 Mortar Utama
13 Semen Instan Plesteran Zak 79,500.00 Mortar Utama
14 Semen Instan Acian Zak 133,650.00 Mortar Utama
15 Semen Nat Kg 22,000.00
16 Air liter 200.00
B. BAHAN ATAP, BESI & ALUMINIUM
1 Nok Atap Bitumen lbr 90,000.00
2 Seng plat talang BJLS 0.28 meter 55,000.00
3 Seng Gelombang lbr 50,000.00
4 Atap Spandek Warna 0,35 mm m1 110,000.00 55,000.00
5 Flashing Spendek m1 80,000.00
6 Besi Beton (SIGMA)
- Polos (U.24) kg 12,250.00 Diameter < 16
- Ulir (U.32) kg 12,750.00 Diameter ≥ 16
7 Bondek Tebal ),070mm m2 100,000.00
7 Wiremesh M10 kg 12,750.00
8 Kawat Beton kg 27,405.00
9 Kawat ram halus (bahan screed) m2 16,000.00
10 Besi beton kotak 12.12 kg 11,000.00
Besi kotak 40.40.2,8 m' 35,000.00
Besi profil L (siku) kg 18,000.00
Besi profil IWF kg 18,000.00
11 Paku biasa kg 20,000.00
12 Paku biasa 1/2" - 1" (tripleks) kg 20,000.00
13 Paku Biasa 5" - 12" kg 20,000.00
14 Paku sekrup baja ringan (atap) kg 38,000.00
15 Paku sekrup gypsum kg 45,000.00
16 Paku sekrup genteng, woodplank kg 45,000.00
17 Paku hak panjang 15 cm kg 50,000.00
18 Sekrup spandek bh 700.00
19 Paku sekrup onduline bh 1,200.00
20 Ramset bh 350.00
21 Aluminium 4" - Putih m' 135,000.00 Alexindo
22 Bingkai pintu Aluminium 4" - Putih m' 140,000.00 Alexindo
23 Profil kaca aluminium m' 6,000.00
24 Profil aluminium "T" m' 50,000.00 Alexindo
25 Dynabolt M 10 x 120 bh 12,000.00
26 Mur + baut M 10 x 70 bh 9,000.00
27 Floordeck 0,70 mm m2 129,100.00 Lysaght Maxifloor
28 Wiremesh M8 Uk. 210 x 540 cm m2 95,000.00
29 Besi Kotak 4x6 cm, tebal 3 mm m1 71,250.00
30 Kawat Las kg 160,000.00
31 Alucopan PVDF m2 325,500.00
32 Alucopan PVDF Cutting m2 460,500.00
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
C. BAHAN FINISHING CAT
1 Cat Dasar kg 60,000.00
2 Meni kayu kg 20,500.00
3 Cat Kayu kg 55,000.00 Setara Altex
4 Cat besi Epoxy kg 65,000.00 Setara Altex
5 Cat Tembok (Plafon) kg 50,000.00 Toa
6 Cat Tembok Wheathershield kg 90,000.00 Toa
7 Pelapis anti bocor Silasec Super (Acian/plesteran) kg 127,000.00 Produksi Bondall
8 Skim Coat kg 3,500.00
9 Plamir Kayu kg 30,000.00
10 Minyak cat / pengencer kg 30,000.00
11 Minyak bekisting liter 7,500.00
12 Minyak pelumas liter 20,000.00
13 Cornice zak 82,500.00
14 Plaster Gypsum roll 11,000.00
15 Kuas 3" bh 8,800.00
16 Kuas 4" bh 16,500.00
17 Amplas lembar 2,750.00
D. BAHAN PENGGANTUNG & KACA
1 Kunci pintu 2x putar
- Lever Handle + Cylinder Type HRE 75.17 set 671,000.00 Setara Kend
- Mortise Lock Type K 87735-40/60 bh 462,000.00 Setara Kend
2 Kunci pintu KM
- Lever Handle + Cylinder Type HRE 75.17 set 671,000.00 Setara Kend
- Mortise Lock Type K 87700-60 bh 209,000.00 Setara Kend
3 Cylinder Type DC FN 1001-60 bh 234,000.00 Fino
4 Patch Fitting Atas "PT 2230" bh 326,000.00 Setara Kend
5 Patch Fitting Bawah "PT 2210" bh 326,000.00 Setara Kend
6 Patch Lock Fitting "US 2210" bh 498,000.00 Setara Kend
7 Cylinder Key "08610 - 07" bh 242,000.00 Setara Kend
8 Floor Hinge "FH 08323" bh 2,069,500.00 Setara Kend
9 Full Handle "GHD 4503" set 1,316,800.00 Setara Kend
10 Engsel Pintu Type SEL FN08 4X3X3 mm 4 BB bh 70,000.00 Setara Fino
11 Engsel Pintu Koboi bh 222,000.00 Setara Fino
12 Engsel Jendela Type SEL FB07 NRP 2BB bh 21,000.00 Setara Fino
13 Engsel casement kecil Type CMT FB27 08" bh 39,600.00 Setara Fino
14 Engsel casement 8" bh 37,500.00 Setara Fino
15 Engsel casement 16" bh 58,000.00 Setara Fino
16 Engsel casement 24" bh 125,000.00 Setara Fino
17 Grendel Pintu, tanam, bawah Type FB 411 6" X 19 mm psg 130,000.00 Setara Fino
18 Grendel Pintu, tanam, atas Type FB 411 12" X 19 mm psg 200,000.00 Setara Fino
19 Grendel Pintu Type G-FB 511 4" bh 120,000.00 Setara Fino
20 Grendel Jendela, type kodok Type SK-FB 479 bh 36,000.00 Setara Fino
21 Door Closer bh 349,000.00
22 Handle Pintu T. 35 cm bh 260,000.00
23 Casement Handle Type RMB FN090 RH bh 60,000.00 Setara Fino
24 Hak angin/kait angin, 8" bh 16,000.00
25 Sliding Set set 725,000.00 Setara Fino
26 Sealant kaca & dinding kg 48,000.00
27 Isolasi sealant kg 4,800.00
28 Skrup aluminium bh 360.00
29 Butyl sealer bh 11,400.00
30 Terot / track stang bh 22,800.00
31 Kaca tebal 12 mm m2 1,800,000.00
32 Kaca tebal 5 mm m2 148,500.00 Setara Asahimas
33 Lem Kayu kg 45,000.00
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
E. BAHAN SANITAIR DAN PIPA
1 Kloset duduk Toto CW 660 J lengkap dengan aksesoris unit 2,650,000.00 Toto
2 Kloset jongkok, porselin putih unit 350,000.00 Toto
3 Wastafel Meja LW 661 CJ lengkap dengan aksesoris unit 850,000.00 Toto
4 Wastafel Gantung LW 830 J lengkap aksesoris unit 868,000.00 Toto
5 Uniral tipe Muslim U 57 M unit 1,800,000.00 Toto
6 Uniral Partition A 100 unit 1,350,000.00 Toto
7 Kitchen Zink Onan 6045/model balzano + Acc unit 990,000.00
8 Pipa PVC Ø1/2" - AW m' 7,000.00
9 Pipa PVC Ø3/4" - AW m' 8,500.00
10 Pipa PVC Ø1" - AW m' 16,500.00
11 Pipa PVC Ø2" - AW m' 30,000.00
12 Pipa PVC Ø3" - AW m' 48,000.00
13 Pipa PVC Ø4" - AW m' 81,000.00
14 Pipa PVC Ø6" - AW m' 180,000.00
15 Pipa Polypropelyne dia. 3/4" m' 20,750.00
16 Pipa Polypropelyne dia. 1" m' 33,500.00
17 Pipa Polypropelyne dia. 2" m' 128,750.00
18 Floor Drain HN 508 P bh 155,000.00 San Ei
19 Roof Drain, Stainless Steel, 3" bh 160,000.00
20 Kran air (dinding) Staenlist Stell bh 80,000.00 Onda
21 Jet Washer bh 261,000.00
22 Kran Air Leher Angsa set 130,000.00
23 Seal tape bh 3,300.00
F. BAHAN LANGIT - LANGIT & DINDING PARTISI
1 Multipleks 120 x 240 x 4 mm lbr 66,000.00
2 Multipleks 120 x 240 x 6 mm lbr 88,000.00
3 Multipleks 120 x 240 x 9 mm lbr 132,000.00
4 Multipleks 120 x 240 x 12 mm lbr 198,000.00
5 Multipleks 120 x 240 x 18 mm lbr 308,000.00
6 Gypsum 120 x 240 x 9 mm lbr 75,000.00 Jayaboard
7 Kalsiboard t. 4 mm lbr 70,000.00 Kalsiboard
8 Plafon PVC "Shunda" lbr 113,520.00 Shunda
9 List Plafon Gypsum m' 20,000.00
10 Rangka plafond hollow 20.40.2 mm m' 7,950.00
11 Rangka plafond hollow 40.40.2 mm m' 9,600.00
G. BAHAN LANTAI & KERAMIK
1 Keramik 20 x 20 cm, unpolished m2 55,000.00 Setara Asia Tile
2 Keramik 30 x 60 cm, motif bh 16,250.00 Setara Platinum
3 Keramik 40 x 40 cm, motif m2 75,000.00 Setara Asia Tile
4 Keramik 20 x 25 cm, polished m2 58,000.00 Setara Asia Tile
5 Granit 60 x 60 cm polished, gelap m2 227,600.00 Niro Granite, Indogress
6 Granit 60 x 60 cm Polished m2 171,500.00 Niro Granite
7 Granit 60 x 60 cm Unpolished m2 180,000.00 Niro Granite
8 Granit 30 x 60 cm Polished m2 150,000.00 Niro Granite
9 Granit 30 x 60 cm Stepnozing m2 186,500.00 Niro Granite, Indogress
10 Granit 10 x 60 cm cutting size bh 28,000.00 Niro Granite, Indogress
11 Marmer Polish m2 800,000.00 Citatah
12 Andesit Bakar 30 x 30 cm m2 170,000.00
13 Batu Alam Andesit m2 180,000.00
14 Lantai Vynil m2 500,000.00
15 Paving Blok Kotak K. 300 T. 8 cm m2 93,500.00
16 Cansting Beton 15/30/50 bh 55,000.00
H. BAHAN KAYU
1 Kayu Klas I - balok m3 16,500,000.00 Setara Bayam
2 Kayu Klas I - papan m3 22,000,000.00 Setara Bayam
3 Kayu Klas II - balok m3 3,850,000.00 Setara Samarinda
4 Kayu Klas II - papan m3 4,125,000.00 Setara Samarinda
5 Kayu Bekisting (papan) m3 2,205,000.00
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
6 Kayu kelas III - balok m3 2,200,000.00
7 Dolken kayu dia. 8 - 10/400 cm btg 22,000.00 dia. 10 - 15 cm
8 Woodplank 30/300 cm m' 35,000.00 Motif urat kayu
I. BAHAN LISTRIK
1 ACB 300 A + Micrologic 2.3 (motor mechanism module) Bh 31,632,618.00 Schneider
1 MCCB 60 A/3 Phasa 36 KA Bh 1,079,733.00 Schneider
2 MCCB 50 A/3 Phasa 36 KA Bh 982,355.00 Schneider
3 MCCB 40 A/3 Phasa 36 KA Bh 982,355.00 Schneider
4 MCCB 16 A/3 Phasa 36 KA Bh 982,355.00 Schneider
5 MCCB 40 A/3 Phasa 16 KA Bh 982,355.00 Schneider
6 MCB 32 A/3 Phasa Bh 420,000.00 Schneider
7 MCB 25 A/3 Phasa Bh 383,243.00 Schneider
8 MCB 40 A/3 Phasa Bh 475,200.00 Schneider
9 MCB 20 A/3 Phasa 4,5 KA Bh 362,045.00 Schneider
10 MCB 16 A/3 Phasa 4,5 KA Bh 362,043.00 Schneider
11 MCB 10 A/1 Phasa Bh 76,373.00 Schneider
12 MCB 6 A/1 Phasa Bh 76,373.00 Schneider
13 MCB 4 A/1 Phasa 4,5 KA Bh 76,373.00 Schneider
14 Capasitor Bank 100 A Bh -
15 Powermeter Bh 8,250,000.00
16 Pilot Lamp Bh 20,000.00
17 Fuse Bh 15,000.00
18 Box Panel & Accessories Unit 7,150,000.00
19 Kabel NYFGBY 4 x 150 mm m' 1,129,000.00 Supreme
20 Kabel NYY 4 x 25 mm m' 189,300.00 Supreme
21 Kabel NYY 4 x 16 mm m' 122,400.00 Supreme
22 Kabel NYY 4 x 10 mm m' 79,000.00 Supreme
23 Kabel NYY 4 x 6 mm m' 50,300.00 Supreme
24 Kabel NYM 4 x 6 mm m' 43,882.00 Supreme
25 Kabel NYM 4 x 4 mm m' 30,880.00 Supreme
26 Kabel NYY 3 X 2,5 mm m' 14,000.00 Supreme
26 Kabel NYY 2 X 2,5 mm m' 8,000.00 Supreme
27 Klem Kabel no.10 bh 750.00
28 Pipa pvc 5/8" btg 8,500.00
29 Isolasi roll 6,000.00

30 RC091V LED36S/865 PSU W30L120 G2 MR PCV bh 719,550.00 Philips


31 Lampu TL TKO 2 x 16 Watt LED bh 532,000.00 Philips
32 DN027C LED15/WW D200 bh 202,000.00 Philips
33 DN027B G2 LED12/CW 14W 220-240V D150 ID bh 204,600.00 Philips
34 DN390B LED6/840 PSU D100 ALU WP GM bh 489,510.00 Philips
35 Lampu Exit 8 Watt C/W Bateray bh 1,421,000.00 Philips
36 Lampu Sorot LED 50 Watt bh 205,000.00 Philips
37 Lampu Tanam LED 5 Watt bh 202,500.00 Philips
38 Exhouse fan bh 500,000.00 Panasonic
39 Saklar Tunggal / Engkel bh 45,000.00 Panasonic
40 Saklar Ganda bh 55,000.00 Panasonic
41 Stop Kontak 1 phase bh 50,000.00 Panasonic
42 Stop Kontak AC bh 120,000.00 Panasonic
43 Stop Kontak Lantai bh 500,000.00 Panasonic

44 Tray Uk. 40 cm m 230,000.00 Porforated


45 Tray Uk. 20 cm m 145,000.00 Porforated

46 Terminal Box Sound System bh 330,000.00


47 Volume Control bh 150,000.00
48 Kabel NYMHY 2x1,5 mm2 m 7,700.00
49 Ceiling Speker (Zs-646R) bh 142,835.00
50 Horn Speker bh 710,000.00
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
51 Terminal Box Fire Alarm bh 738,750.00
52 Rate of Rise (RoR) Heat detector HS-WS19L bh 121,000.00
53 smoke detector HS-202D bh 374,000.00
54 End of Line Resistance bh 10,000.00
55 NYA 2(1x1,5mm) m 3,850.00

56 Push Button bh 1,110,000.00


57 Fireman Telephone bh 611,490.00
58 Bell Alarm bh 2,434,000.00

59 NVR 16 Channel bh 15,620,000.00


60 UNV DOME (Indoor Camera) IPC 322SR3-VSPF28-C bh 2,475,000.00
61 UNV BULLET (Outdoor Camera) IPC2222ERS-DUPF40-C bh 3,584,000.00
62 Kabel UTP cat. 6 m 7,540.00

63 Antena Parabola 12 feet c/w dual bh 12,312,000.00


64 UHF/VHF Antena elemen & Booster bh 4,078,000.00
65 Spliter 6 Way bh 1,862,972.00
66 Outlet TV bh 95,000.00
67 Terminal Box TV + Boster bh 325,000.00

68 Socket Data bh 98,500.00


69 Socket telepone bh 98,500.00
70 HUB Un Managable Path Panel 1 x 8 port bh 2,825,000.00
71 Path Panel 2 x 16 port bh 5,085,000.00
72 PABX Kap. 8/40 Extention bh 20,900,000.00
73 MDF Telpon 50 Pair bh 880,000.00
74 Operator console bh 3,740,000.00
75 Pesawat Telpon bh 195,000.00
2. DAFTAR UPAH TENAGA KERJA

HARGA SATUAN
NO. URAIAN TENAGA KERJA SATUAN KETERANGAN
(Rp.)
1 Pekerja oh 123,000.00
2 Tukang Batu oh 143,000.00
3 Tukang Kayu oh 143,000.00
4 Tukang Besi oh 143,000.00
5 Tukang Cat oh 143,000.00
6 Tukang Listrik oh 143,000.00
7 Tukang Las oh 143,000.00
8 Tukang Baja Ringan oh 143,000.00
9 Kepala Tukang Batu oh 148,000.00
10 Kepala Tukang Kayu oh 148,000.00
11 Kepala Tukang Besi oh 148,000.00
12 Kepala Tukang Cat oh 148,000.00
13 Kepala Tukang Listrik oh 148,000.00
14 Kepala Tukang Las oh 148,000.00
15 Kepala Tukang Baja Ringan oh 148,000.00
16 Mandor oh 168,000.00