Anda di halaman 1dari 9

RENCANA JADWAL PELAKSANAAN

Pekerjaan : Optimalisasi SPAM Rangkasbitung dan SPAM KAWACI Kab. Lebak (NUWSP)
No. Kontrak : HK.02.03/AM/SPK/PK-NUWSP LEBAK/315/V/2023
Tgl. Kontrak : 02 Mei 2023
Lokasi : Kab. Lebak
Waktu Pelaksanaan : 180 Hari Kalender
Tahun Anggaran : 2023

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp) BOBOT M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25
(%)
08/05/23 14/05/23 20/05/23 26/05/23 01/06/23 07/06/23 13/06/23 19/06/23 25/06/23 01/07/23 07/07/23 13/07/23 19/07/23 25/07/23 31/07/23 06/08/23 12/08/23 18/08/23 24/08/23 30/08/23 05/09/23 11/09/23 17/09/23 23/09/23 29/09/23

I PEKERJAAN PERSIAPAN Rp 41,186,797.98 0.1974 0.0536 0.0479 0.0479 0.0479

II SMK3 Rp 238,890,949.25 1.1448 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458

III SPAM RASKASBITUNG

A PENGADAAN, PEMASANGAN, POMPA INTAKE, METER INDUK DAN PERPIPAAN

1 PENGADAAN DAN PEMASANGAN POMPA INTAKE DAN PERPIPAAN Rp 397,515,126.32 1.9049 0.2330 0.2330 0.2330 0.2330 0.2330 0.2330 0.2330 0.2330 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068

2 PENGADAAN DAN PEMASANGAN METER INDUK Rp 838,223,455.76 4.0169 0.3560 0.3560 0.3560 0.3560 0.3560 0.3832 0.4327 0.5009 0.2781 0.3539 0.1680 0.0522 0.0340 0.0340

B PENGADAAN DAN PEMASANGAN PIPA DAN AKSESORIS TRANMISI DAN DISTRIBUSI

1 SEWA LAHAN GUDANG PIPA Rp 96,000,000.00 0.4600 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184

2 PIPA TRANMISI PABUARAN Rp 457,663,336.46 2.1932 0.1937 0.1937 0.1937 0.1937 0.1937 0.1937 0.2227 0.2240 0.0312 0.0312 0.0312 0.0312 0.0312 0.0312 0.0514 0.0502 0.0492 0.0492 0.0492 0.0492 0.0492 0.0492

3 PIPA DISTRIBUSI JL. JENDRAL SUDIRMAN Rp 4,522,447,136.79 21.6721 0.5245 0.5245 0.5245 0.5245 0.5245 0.5245 1.6871 1.6896 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653

4 PIPA DISTRIBUSI JL. SILIWANGI - JL. GUNUNG SAMARI - JL. IR JUANDA Rp 1,026,901,938.14 4.9210 0.2236 0.2236 0.2236 0.2236 0.3818 0.4025 0.4041 0.4276 0.2041 0.2276 0.2041 0.2433 0.2198 0.2198 0.1963 0.1963 0.1963 0.2198 0.2198 0.0616 0.0018

5 PIPA DISTRIBUSI JL. OTTO ISKANDARDINATA - JL. SUNAN KALIJAGA Rp 5,875,211,306.90 28.1547 0.9912 0.8518 0.8518 2.6010 2.6116 2.6116 2.6116 2.6116 1.7598 1.7598 2.2293 1.6267 1.1506 0.9694 0.9694 0.4895 0.4685 0.4694 0.4694 0.0415 0.0095

6 PIPA DISTRIBUSI JL. TIRTAYASA Rp 307,935,988.42 1.4757 0.0479 0.0479 0.0479 0.1830 0.1843 0.1845 0.1845 0.1845 0.1366 0.1366 0.1366 0.0015 0.0001

7 PIPA DISTRIBUSI JL. RT. HADIWINANGUN Rp 1,531,812,271.48 7.3406 0.2013 0.2013 0.8339 0.8377 0.8380 0.8380 0.8380 0.8380 0.6367 0.6367 0.6367 0.0041 0.0003

IV SPAM KARAWACI

A PENGADAAN , PEMASANGAN PIPA DAN AKSESORIS DISTRIBUSI

1 SEWA LAHAN GUDANG PIPA Rp 96,000,000.00 0.4600 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184

2 PIPA DISTRIBUSI JL. PASIR MUNDING - JL. LEBAK MANDANG Rp 1,769,023,315.29 8.4774 0.4231 0.4231 0.4231 0.4231 0.7154 0.7612 0.7623 0.7626 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.0472 0.0015

3 PIPA DISTRIBUSI JL. RANGKASBITUNG - PANDEGLANG Rp 3,668,825,085.84 17.5814 0.3790 0.3790 0.3790 0.3790 0.3790 0.3790 0.3790 1.4965 1.1192 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194

JUMLAH Rp 20,867,636,708.64 100.0000

BOBOT RENCANA PROGRESS MINGGUAN 0.1362 0.1305 0.3242 2.4387 2.6782 2.6782 4.4275 4.8886 5.2170 6.4314 6.6209 5.9172 5.6986 6.7786 6.2191 5.7470 5.4025 5.4049 4.7013 4.5548 4.2581 4.1410 2.6116 2.4634 0.1305

KOMULATIF BOBOT RENCANA MINGGUAN 0.1362 0.2667 0.5909 3.0296 5.7078 8.3860 12.8135 17.7021 22.9191 29.3505 35.9714 41.8887 47.5873 54.3658 60.5849 66.3319 71.7344 77.1393 81.8406 86.3954 90.6535 94.7945 97.4060 99.8695 100.0000
DETAIL JADWAL PELAKSANAAN
Pekerjaan : Optimalisasi SPAM Rangkasbitung dan SPAM KAWACI Kab. Lebak (NUWSP)
No. Kontrak : HK.02.03/AM/SPK/PK-NUWSP LEBAK/315/V/2023
Tgl. Kontrak : 02 Mei 2023
Lokasi : Kab. Lebak
Waktu Pelaksanaan : 180 Hari Kalender
Tahun Anggaran : 2023

JUMLAH HARGA BOBOT M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.)
(Rp.) (%)
08/05/23 14/05/23 20/05/23 26/05/23 01/06/23 07/06/23 13/06/23 19/06/23 25/06/23 01/07/23 07/07/23 13/07/23 19/07/23 25/07/23 31/07/23 06/08/23 12/08/23 18/08/23 24/08/23 30/08/23 05/09/23 11/09/23 17/09/23 23/09/23 29/09/23
A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Buah 1.00 Rp 1,186,797.98 Rp 1,186,797.98 0.0057 0.0057
2 Mobilisasi dan Demobilisasi Peralatan Ls 1.00 Rp 40,000,000.00 Rp 40,000,000.00 0.1917 0.0479 0.0479 0.0479 0.0479
SUB TOTAL Rp 41,186,797.98 0.1974 0.0536 0.0479 0.0479 - - - - - - - - - - - - - - - - - - - - - 0.0479

B SMK3
1 Penyiapan RK3K Ls 1.00 Rp 20,000,000.00 Rp 20,000,000.00 0.0958 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038
2 Induksi K3 (Safety Induction ) khusus untuk pekerja baru Org 20.00 Rp 125,000.00 Rp 2,500,000.00 0.0120 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
3 Pengarahan K3 (safety briefing) Pertemuan Keselamatan (Safety Talk dan\/atau Tool Box Meeting) setiap hari Org 20.00 Rp 225,000.00 Rp 4,500,000.00 0.0216 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
4 Pelatihan K3 Org 20.00 Rp 100,000.00 Rp 2,000,000.00 0.0096 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
5 Simulasi K3 Org 20.00 Rp 150,000.00 Rp 3,000,000.00 0.0144 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
6 Spanduk (banner) Lb 5.00 Rp 500,000.00 Rp 2,500,000.00 0.0120 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
7 Poster Lb 5.00 Rp 300,000.00 Rp 1,500,000.00 0.0072 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
8 Papan Informasi K3. Bh 1.00 Rp 300,000.00 Rp 300,000.00 0.0014 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
9 Alat Pelindung Kerja terdiri atas Ls 1.00
Topi Pelindung (Safety Helmet) Bh 25.00 Rp 85,000.00 Rp 2,125,000.00 0.0102 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Pelindung Mata (Goggles, Spectacles) Psg 20.00 Rp 125,000.00 Rp 2,500,000.00 0.0120 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
Tameng Muka (Face Shield) Bh 2.00 Rp 165,000.00 Rp 330,000.00 0.0016 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pelindung Telinga (Ear Plug, Ear Muff) Psg 20.00 Rp 75,000.00 Rp 1,500,000.00 0.0072 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Pelindung Pernafasan Dan Mulut (Masker) Bh 100.00 Rp 10,000.00 Rp 1,000,000.00 0.0048 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Sarung Tangan (Safety Gloves) Psg 20.00 Rp 25,000.00 Rp 500,000.00 0.0024 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Sepatu Keselamatan (Safety Shoes) untuk Staf Psg 20.00 Rp 575,000.00 Rp 11,500,000.00 0.0551 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022
Sepatu Keselamatan (Rubber Safety Shoes and toe cap) Psg 10.00 Rp 125,000.00 Rp 1,250,000.00 0.0060 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Penunjang Seluruh Tubuh (Full Body Harness) Bh 10.00 Rp 250,000.00 Rp 2,500,000.00 0.0120 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
Rompi Keselamatan (Safety Vest) Bh 20.00 Rp 80,000.00 Rp 1,600,000.00 0.0077 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Celemek (Apron/Coveralls) Bh 2.00 Rp 90,000.00 Rp 180,000.00 0.0009 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pelindung Jatuh (Fall Arrester) Bh 10.00 Rp 300,000.00 Rp 3,000,000.00 0.0144 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
10 Rambu- Rambu Ls 1.00 Rp 2,780,949.25 Rp 2,780,949.25 0.0133 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
11 Alat Pemadam Api Ringan (APAR) 10Kg Bh 4.00 Rp 1,800,000.00 Rp 7,200,000.00 0.0345 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
12 Sirine Bh 1.00 Rp 300,000.00 Rp 300,000.00 0.0014 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
13 Bendera K3 Ls 1.00 Rp 200,000.00 Rp 200,000.00 0.0010 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
14 Lampu Darurat (Emergency Lamp ) Bh 1.00 Rp 500,000.00 Rp 500,000.00 0.0024 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
15 Program Inspeksi Dan Audit Internal Org 1.00 Rp 2,000,000.00 Rp 2,000,000.00 0.0096 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
16 Pelaporan dan Penyelidikan Insiden. Ls 1.00 Rp 3,000,000.00 Rp 3,000,000.00 0.0144 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
17 Petugas pengatur jalan 3 orang OB 24.00 Rp 2,000,000.00 Rp 48,000,000.00 0.2300 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092
18 Asuransi (Construction All Risk/ CAR) Ls 1.00 Rp 18,000,000.00 Rp 18,000,000.00 0.0863 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
19 Asuransi pengiriman peralatan Unit 1.00 Rp 16,000,000.00 Rp 16,000,000.00 0.0767 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
20 BPJS Ketenagakerjaan dan Kesehatan Kerja (Iuran JKK 0,09% dan JKM 0,01% ) Ls 1.00 Rp 48,000,000.00 Rp 48,000,000.00 0.2300 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092 0.0092
21 Petugas Kesehatan Bekerjasama dengan Klinik/Puskesmas setempat OH 2.00 Rp 3,500,000.00 Rp 7,000,000.00 0.0335 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
22 Bed Periksa lengkap dgn Sprei, alas perlak, selimut privacy Unit 1.00 Rp 2,000,000.00 Rp 2,000,000.00 0.0096 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
23 disposible inj 5ml Bh 40.00 Rp 15,000.00 Rp 600,000.00 0.0029 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
24 Infus set Set 30.00 Rp 25,000.00 Rp 750,000.00 0.0036 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
25 Standart Infus portable kaki 5 Unit 2.00 Rp 300,000.00 Rp 600,000.00 0.0029 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
26 Tabung Oxsigen Kecil + Troli Unit 2.00 Rp 1,200,000.00 Rp 2,400,000.00 0.0115 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
27 Stetoskop Bh 1.00 Rp 200,000.00 Rp 200,000.00 0.0010 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
28 Tensimeter Digital Bh 1.00 Rp 750,000.00 Rp 750,000.00 0.0036 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
29 Termometer Scaner Bh 1.00 Rp 400,000.00 Rp 400,000.00 0.0019 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
30 Timbangan BB Bh 1.00 Rp 250,000.00 Rp 250,000.00 0.0012 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
31 Head Lamp Dokter Bh 1.00 Rp 300,000.00 Rp 300,000.00 0.0014 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
32 Lampu Senter Kecil Bh 1.00 Rp 150,000.00 Rp 150,000.00 0.0007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
33 Stensilator/ autoclaf Kecil ( 18 Ltr ) Bh 1.00 Rp 2,500,000.00 Rp 2,500,000.00 0.0120 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
34 Masker Bedah Box 2.00 Rp 50,000.00 Rp 100,000.00 0.0005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
35 Hanscoon disposible Box 2.00 Rp 75,000.00 Rp 150,000.00 0.0007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
36 Hanscoon sampai dg siku Bh 15.00 Rp 120,000.00 Rp 1,800,000.00 0.0086 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
37 Apron/ Celemek Bh 10.00 Rp 90,000.00 Rp 900,000.00 0.0043 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
38 Kaca mata google Bh 20.00 Rp 120,000.00 Rp 2,400,000.00 0.0115 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
39 Sepatu Boot Bh 15.00 Rp 125,000.00 Rp 1,875,000.00 0.0090 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
40 Penyediaan fasilitas pencegahan tambahan Covid-19 Ls 1.00 Rp 2,000,000.00 Rp 2,000,000.00 0.0096 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
41 Penyediaan Obat-obatan dan vaksin Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00 0.0072 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
SUB TOTAL Rp 238,890,949.25 1.1448 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458 0.0458

III SPAM RANGKASBITUNG


A PENGADAAN, PEMASANGAN, POMPA INTAKE, METER INDUK DAN PERPIPAAN
1 PENGADAAN DAN PEMASANGAN POMPA INTAKE DAN PERPIPAAN
a Pengadaan Pompa Intake Submersible Q=50 lps, H = 30 m, wlc, Panel dan pengkabelan, Motor pompa 35 Unit
kW \/ 3 x 3801.00
V \/ 50 HzRp
, Putaran296,500,000.00
3500 rpm Rp 296,500,000.00 1.4209 0.1776 0.1776 0.1776 0.1776 0.1776 0.1776 0.1776 0.1776
b Pemasangan Pompa Intake Submersible Q=50 lps, H = 30 m, wlc, Panel dan pengkabelan, Motor pompa 35 kW \/ 3 x 380
Unit V \/ 50 Hz
1.00 Rp, Putaran 8,895,000.00
3500 rpm Rp 8,895,000.00 0.0426 0.0053 0.0053 0.0053 0.0053 0.0053 0.0053 0.0053 0.0053
c Pengadaan Manometer Unit 2.00 Rp 2,455,000.00 Rp 4,910,000.00 0.0235 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029
d Pemasangan Manometer Unit 2.00 Rp 245,500.00 Rp 491,000.00 0.0024 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
e Pengadaan dan Pemasangan Grounding Unit 1.00 Rp 4,500,000.00 Rp 4,500,000.00 0.0216 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027
f Pengadaan Pipa GIP Medium SII dan Aksesoris
1 Pengadaan Pipa GIP 6" (Discharge) M 13.00 Rp 583,333.33 Rp 7,583,333.33 0.0363 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
2 Pengadaan Pipa GIP 16" (Header) M 6.00 Rp 2,183,333.33 Rp 13,100,000.00 0.0628 0.0078 0.0078 0.0078 0.0078 0.0078 0.0078 0.0078 0.0078
3 Pengadaan Pipa GIP 12" (Tambahan) M 4.00 Rp 1,766,666.67 Rp 7,066,666.67 0.0339 0.0042 0.0042 0.0042 0.0042 0.0042 0.0042 0.0042 0.0042
g Pengadaan Aksesoris Pipa Discharge
1 Pengadaan Bend All Flange 6" x 90° Bh 1.00 Rp 3,424,000.00 Rp 3,424,000.00 0.0164 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021
2 Pengadaan Bend All Flange 6" x 45° Bh 2.00 Rp 3,283,200.00 Rp 6,566,400.00 0.0315 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039
3 Pengadaan Loose Flange 6" Bh 6.00 Rp 718,400.00 Rp 4,310,400.00 0.0207 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026
h Pengadaan Aksesoris Pipa Header
1 Pengadaan Bend All Flange 16" x 45° Bh 4.00 Rp 3,100,000.00 Rp 12,400,000.00 0.0594 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074
2 Pengadaan Loose Flange 16" Bh 4.00 Rp 1,174,400.00 Rp 4,697,600.00 0.0225 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028
3 Pengadaan Reducer All Flange 16" x 12" Bh 2.00 Rp 4,136,000.00 Rp 8,272,000.00 0.0396 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050
4 Pengadaan Stube Flange 12" Bh 2.00 Rp 3,139,200.00 Rp 6,278,400.00 0.0301 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038
i Pemasangan Pipa GIP Medium SII dan Aksesoris
1 Pemasangan Pipa GIP 6" (Discharge) M 13.00 Rp 87,500.00 Rp 1,137,500.00 0.0055 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
2 Pemasangan Pipa GIP 16" (Header) M 6.00 Rp 327,500.00 Rp 1,965,000.00 0.0094 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016
3 Pemasangan Pipa GIP 12" (Tambahan) M 4.00 Rp 265,000.00 Rp 1,060,000.00 0.0051 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
j Pemasangan Aksesoris Pipa Discharge
1 Pemasangan Bend All Flange 6" x 90° Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2 Pemasangan Bend All Flange 6" x 45° Bh 2.00 Rp 39,774.90 Rp 79,549.80 0.0004 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
3 Pemasangan Loose Flange 6" Bh 6.00 Rp 39,774.90 Rp 238,649.40 0.0011 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
k Pemasangan Aksesoris Pipa Header
1 Pemasangan Bend All Flange 16" x 45° Bh 4.00 Rp 39,774.90 Rp 159,099.60 0.0008 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
2 Pemasangan Loose Flange 16" Bh 4.00 Rp 39,774.90 Rp 159,099.60 0.0008 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
3 Pemasangan Reducer All Flange 16" x 12" Bh 2.00 Rp 39,774.90 Rp 79,549.80 0.0004 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
4 Pemasangan Stube Flange 12" Bh 2.00 Rp 39,774.90 Rp 79,549.80 0.0004 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
l Pekerjaan Tanah pada pipa 16
JUMLAH HARGA BOBOT M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.)
(Rp.) (%)
08/05/23 14/05/23 20/05/23 26/05/23 01/06/23 07/06/23 13/06/23 19/06/23 25/06/23 01/07/23 07/07/23 13/07/23 19/07/23 25/07/23 31/07/23 06/08/23 12/08/23 18/08/23 24/08/23 30/08/23 05/09/23 11/09/23 17/09/23 23/09/23 29/09/23
1 Galian Tanah M3 6.84 Rp 68,866.16 Rp 471,044.53 0.0023 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
2 Urugan Tanah Baru di padatkan M3 6.08 Rp 195,316.00 Rp 1,187,521.28 0.0057 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
3 Buangan Sisa Galian M3 0.75 Rp 26,926.24 Rp 20,194.68 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
m Pekerjaan Tanah pada pipa 12
1 Galian Tanah M3 4.32 Rp 68,866.16 Rp 297,501.81 0.0014 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
2 Urugan Tanah Baru di padatkan M3 4.03 Rp 195,316.00 Rp 787,123.48 0.0038 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
3 Buangan Sisa Galian M3 0.28 Rp 26,926.24 Rp 7,539.35 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
n Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225
1 Thrust Block Bend All Flange 16" x 45° M3 0.55 Rp 1,366,596.89 Rp 751,628.29 0.0036 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
SUB TOTAL Rp 397,515,126.32 1.9049 - - - - - - - - 0.2330 0.2330 0.2330 0.2330 0.2330 0.2330 0.2330 0.2330 - 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 - -

2 PENGADAAN DAN PEMASANGAN METER INDUK


a Pekerjaan Chamber Meter Induk
1 Galian tanah biasa M3 133.98 Rp 68,866.16 Rp 9,226,688.12 0.0442 0.0147 0.0147 0.0147
2 Urugan Tanah dipadatkan M3 11.48 Rp 63,940.00 Rp 734,031.20 0.0035 0.0012 0.0012 0.0012
3 Buangan Sisa Galian M3 122.50 Rp 26,926.24 Rp 3,298,464.40 0.0158 0.0053 0.0053 0.0053
4 Urugan Pasir t= 10 cm M3 4.76 Rp 244,420.00 Rp 1,163,439.20 0.0056 0.0019 0.0019 0.0019
5 Lantai Kerja t= 5 cm M3 2.38 Rp 1,116,132.35 Rp 2,656,394.99 0.0127 0.0042 0.0042 0.0042
6 Pelat Lantai (t=25 cm)
- Beton K-225 M3 11.90 Rp 1,366,596.89 Rp 16,262,503.00 0.0779 0.0779
- Pekerjaan besi tulangan Kg 1,584.12 Rp 17,990.50 Rp 28,499,110.86 0.1366 0.0455 0.0455 0.0455
- Pekerjaan bekisting M2 10.30 Rp 236,524.15 Rp 2,436,198.69 0.0117 0.0039 0.0039 0.0039
7 Dinding (t=20 cm)
- Beton K-225 M3 30.82 Rp 1,366,596.89 Rp 42,118,516.16 0.2018 0.2018
- Pekerjaan besi tulangan 13-150 Kg 231.62 Rp 18,568.00 Rp 4,300,720.16 0.0206 0.0069 0.0069 0.0069
- Pekerjaan besi tulangan 10-150 Kg 137.40 Rp 17,990.50 Rp 2,471,894.70 0.0118 0.0039 0.0039 0.0039
- Pekerjaan bekisting dinding beton M2 27.84 Rp 526,053.13 Rp 14,645,319.19 0.0702 0.0234 0.0234 0.0234
8 Pelat Atap (t= 20 cm)
- Beton K-225 M3 7.18 Rp 1,366,596.89 Rp 9,812,165.67 0.0470 0.0470
- Pekerjaan besi tulangan 13-150 Kg 578.62 Rp 18,568.00 Rp 10,743,816.16 0.0515 0.0172 0.0172 0.0172
- Pekerjaan besi tulangan 10-150 Kg 335.24 Rp 17,990.50 Rp 6,031,135.22 0.0289 0.0096 0.0096 0.0096
- Pekerjaan bekisting M2 71.92 Rp 485,512.63 Rp 34,918,068.49 0.1673 0.0558 0.0558 0.0558
9 Manhole (t= 10 cm)
- Beton K-225 M3 2.00 Rp 1,366,596.89 Rp 2,733,193.78 0.0131 0.0131
- Pekerjaan besi tulangan 10-150 Kg 19.74 Rp 17,990.50 Rp 355,132.47 0.0017 0.0006 0.0006 0.0006
- Pekerjaan bekisting M2 2.00 Rp 236,524.15 Rp 473,048.29 0.0023 0.0008 0.0008 0.0008
10 Thrust Block
- Thrust Block Gate Valve 12" M3 0.70 Rp 1,366,596.89 Rp 956,617.82 0.0046 0.0023 0.0023
- Thrust Block Meter induk 12 " M3 0.24 Rp 1,366,596.89 Rp 327,983.25 0.0016 0.0008 0.0008
11 Pekerjaan Anak Tangga Besi Kg 7.44 Rp 18,568.00 Rp 138,145.92 0.0007 0.0007
b Pekerjaan Meter Induk, Perpipaan dan Aksesoris
1 Pengadaan Pipa GIP 12" M 14.28 Rp 1,583,333.33 Rp 22,610,000.00 0.1083 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135 0.0135
2 Pengadaan Tee All Flange 12" x 12" Bh 4.00 Rp 3,470,000.00 Rp 13,880,000.00 0.0665 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083
3 Pengadaan Gate Valve Resilient 12" Bh 6.00 Rp 19,299,750.00 Rp 115,798,500.00 0.5549 0.0694 0.0694 0.0694 0.0694 0.0694 0.0694 0.0694 0.0694
4 Pengadaan Bend All Flange 12" x 90° Bh 4.00 Rp 3,948,400.00 Rp 15,793,600.00 0.0757 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095
5 Pengadaan Loose Flange 12" Bh 28.00 Rp 1,014,400.00 Rp 28,403,200.00 0.1361 0.0170 0.0170 0.0170 0.0170 0.0170 0.0170 0.0170 0.0170
6 Pengadaan Stube Flange 12" Bh 2.00 Rp 1,982,400.00 Rp 3,964,800.00 0.0190 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024 0.0024
7 Pemasangan Pipa GIP 12" M 14.28 Rp 237,500.00 Rp 3,391,500.00 0.0163 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023
8 Pemasangan Tee All Flange 12" x 12" Bh 4.00 Rp 121,506.00 Rp 486,024.00 0.0023 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
9 Pemasangan Gate Valve Resilient 12" Bh 6.00 Rp 780,340.00 Rp 4,682,040.00 0.0224 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032
10 Pemasangan Bend All Flange 12" x 90° Bh 4.00 Rp 121,506.00 Rp 486,024.00 0.0023 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
11 Pemasangan Loose Flange 12" Bh 28.00 Rp 121,506.00 Rp 3,402,168.00 0.0163 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023
12 Pemasangan Stube Flange 12" Bh 2.00 Rp 121,506.00 Rp 243,012.00 0.0012 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
13 Pengadaan Meter Induk Electromagnetic 12" lengkap dengan sensor, rated pressure (tekanan kerja) = 0.25Mpa/2.5
Unit bar 2.00 Rp 164,900,000.00 Rp 329,800,000.00 1.5804 0.1976 0.1976 0.1976 0.1976 0.1976 0.1976 0.1976 0.1976
14 Pemasangan Meter Induk Electromagnetic 12" lengkap dengan sensor, rated pressure (tekanan kerja) = 0.25Mpa/2.5
Unit bar 2.00 Rp 16,490,000.00 Rp 32,980,000.00 0.1580 0.0226 0.0226 0.0226 0.0226 0.0226 0.0226 0.0226
15 Pengadaan Data Logger lengkap dengan Panel Unit 2.00 Rp 32,000,000.00 Rp 64,000,000.00 0.3067 0.0383 0.0383 0.0383 0.0383 0.0383 0.0383 0.0383 0.0383
16 Pemasangan Data Logger lengkap dengan Panel Unit 2.00 Rp 2,000,000.00 Rp 4,000,000.00 0.0192 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027
SUB TOTAL Rp 838,223,455.76 4.0169 - - - - - - - - - - 0.3560 0.3560 0.3560 0.3560 0.3560 0.3832 0.4327 0.5009 0.2781 0.3539 0.1680 0.0522 0.0340 0.0340 -

B PENGADAAN DAN PEMASANGAN PIPA DAN AKSESORIS TRANMISI DAN DISTRIBUSI


1 SEWA LAHAN
a Sewa Lahan Untuk Gudang Pipa Bln 8.00 Rp 12,000,000.00 Rp 96,000,000.00 0.4600 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184
SUB TOTAL Rp 96,000,000.00 0.4600 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184

2 PIPA TRANMISI PABUARAN


a Pekerjaan Pengadaan Pipa dan Aksesoris
1 Pengadaan Pipa 12" HDPE SDR17/PN 10-STA 0 + 000 S.D STA 0 + 102 M 133.50 Rp 709,582.50 Rp 94,729,263.75 0.4540 0.0567 0.0567 0.0567 0.0567 0.0567 0.0567 0.0567 0.0567
2 Pengadaan Pipa 12" HDPE SDR17\/PN 10-STA 0 + 000 S.D STA 0 + 175 M 206.00 Rp 709,582.50 Rp 146,173,995.00 0.7005 0.0876 0.0876 0.0876 0.0876 0.0876 0.0876 0.0876 0.0876
3 Pengadaan Tee All Socket 12" x 12" PVC Bh 1.00 Rp 919,120.00 Rp 919,120.00 0.0044 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
4 Pengadaan Gate Valve 12" Resilient Bh 1.00 Rp 19,299,750.00 Rp 19,299,750.00 0.0925 0.0116 0.0116 0.0116 0.0116 0.0116 0.0116 0.0116 0.0116
5 Pengadaan Stube Flange 12" HDPE Bh 2.00 Rp 2,506,500.00 Rp 5,013,000.00 0.0240 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030
6 Pengadaan Flange Socket 12" PVC Bh 3.00 Rp 1,645,000.00 Rp 4,935,000.00 0.0236 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030
7 Pengadaan Segmented Bend 12" x 90° HDPE Bh 2.00 Rp 2,588,000.00 Rp 5,176,000.00 0.0248 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
8 Pengadaan Segmented Bend 12" x 45° HDPE Bh 1.00 Rp 1,788,000.00 Rp 1,788,000.00 0.0086 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
9 Pengadaan Segmented Bend 12" x 22.5° HDPE Bh 1.00 Rp 1,572,000.00 Rp 1,572,000.00 0.0075 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
10 Pengadaan Box Street Bh 1.00 Rp 1,235,000.00 Rp 1,235,000.00 0.0059 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
11 Pengadaan Tee All Socket 12" x12" PVC Bh 1.00 Rp 919,120.00 Rp 919,120.00 0.0044 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
12 Pengadaan Gate Valve 12" Resilient Bh 1.00 Rp 19,299,750.00 Rp 19,299,750.00 0.0925 0.0116 0.0116 0.0116 0.0116 0.0116 0.0116 0.0116 0.0116
13 Pengadaan Stube Flange 12" HDPE Bh 2.00 Rp 2,506,500.00 Rp 5,013,000.00 0.0240 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030
14 Pengadaan Flange Socket 12" PVC Bh 3.00 Rp 1,645,000.00 Rp 4,935,000.00 0.0236 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030
15 Pengadaan Segmented Bend 12" x 90° HDPE Bh 3.00 Rp 2,588,000.00 Rp 7,764,000.00 0.0372 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047 0.0047
16 Pengadaan Segmented Bend 12" x 45° HDPE Bh 1.00 Rp 1,788,000.00 Rp 1,788,000.00 0.0086 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
17 Pengadaan Segmented Bend 12" x 22.5° HDPE Bh 1.00 Rp 1,572,000.00 Rp 1,572,000.00 0.0075 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
18 Pengadaan Box Street Bh 1.00 Rp 1,235,000.00 Rp 1,235,000.00 0.0059 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
b Pekerjaan Pemasangan Pipa dan Aksesoris
1 Pekerjaan Pemasangan Pipa Transmisi Jalur 1-12 HDPE
Pemasangan Pipa 12" HDPE M 133.50 Rp 106,437.38 Rp 14,209,389.56 0.0681 0.0085 0.0085 0.0085 0.0085 0.0085 0.0085 0.0085 0.0085
Penyambungan Pipa 12" HDPE Cm 1,695.60 Rp 3,102.80 Rp 5,261,105.73 0.0252 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032
Galian Tanah M3 110.16 Rp 68,866.16 Rp 7,586,296.19 0.0364 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045 0.0045
Urugan Tanah baru dipadatkan M3 109.33 Rp 195,316.00 Rp 21,353,898.28 0.1023 0.0128 0.0128 0.0128 0.0128 0.0128 0.0128 0.0128 0.0128
Buangan Sisa Galian M3 0.83 Rp 26,926.24 Rp 22,348.78 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2 Pekerjaan Pemasangan Pipa Transmisi Jalur 2-12 HDPE
Pemasangan Pipa 12" HDPE M 206.00 Rp 106,437.38 Rp 21,926,099.25 0.1051 0.0131 0.0131 0.0131 0.0131 0.0131 0.0131 0.0131 0.0131
Penyambungan Pipa 12" HDPE Cm 2,841.70 Rp 3,102.80 Rp 8,817,223.49 0.0423 0.0053 0.0053 0.0053 0.0053 0.0053 0.0053 0.0053 0.0053
Galian Tanah M3 189.89 Rp 68,866.16 Rp 13,076,995.12 0.0627 0.0078 0.0078 0.0078 0.0078 0.0078 0.0078 0.0078 0.0078
Urugan Tanah baru dipadatkan M3 176.63 Rp 195,316.00 Rp 34,498,665.08 0.1653 0.0207 0.0207 0.0207 0.0207 0.0207 0.0207 0.0207 0.0207
Buangan Sisa Galian M3 12.38 Rp 26,926.24 Rp 333,346.85 0.0016 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
3 Pemasangan Aksesoris Pipa Transmisi Jalur 1
Pemasangan Tee All Socket 12" x 12" PVC Bh 1.00 Rp 91,912.00 Rp 91,912.00 0.0004 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Gate Valve 12" Resilient Bh 1.00 Rp 780,340.00 Rp 780,340.00 0.0037 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
Pemasangan Stube Flange 12" HDPE Bh 2.00 Rp 121,506.00 Rp 243,012.00 0.0012 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Flange Socket 12" PVC Bh 3.00 Rp 121,506.00 Rp 364,518.00 0.0017 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Segmented Bend 12" x 90° HDPE Bh 2.00 Rp 121,506.00 Rp 243,012.00 0.0012 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Segmented Bend 12" x 45° HDPE Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Segmented Bend 12" x 22.5° HDPE Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Box Street Bh 1.00 Rp 123,500.00 Rp 123,500.00 0.0006 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
JUMLAH HARGA BOBOT M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.)
(Rp.) (%)
08/05/23 14/05/23 20/05/23 26/05/23 01/06/23 07/06/23 13/06/23 19/06/23 25/06/23 01/07/23 07/07/23 13/07/23 19/07/23 25/07/23 31/07/23 06/08/23 12/08/23 18/08/23 24/08/23 30/08/23 05/09/23 11/09/23 17/09/23 23/09/23 29/09/23
4 Pemasangan Aksesoris Pipa Transmisi Jalur 2
Pemasangan Tee All Socket 12" x 12" PVC Bh 1.00 Rp 91,912.00 Rp 91,912.00 0.0004 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Gate Valve 12" Resilient Bh 1.00 Rp 780,340.00 Rp 780,340.00 0.0037 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
Pemasangan Stube Flange 12" HDPE Bh 2.00 Rp 121,506.00 Rp 243,012.00 0.0012 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Flange Socket 12" PVC Bh 3.00 Rp 121,506.00 Rp 364,518.00 0.0017 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Segmented Bend 12" x 90° HDPE Bh 3.00 Rp 121,506.00 Rp 364,518.00 0.0017 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Segmented Bend 12" x 45° HDPE Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Segmented Bend 12" x 22.5° HDPE Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Box Street Bh 1.00 Rp 123,500.00 Rp 123,500.00 0.0006 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
5 Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225 Transmisi Jalur 1
Thrust Block Tee All Socket 12" x12" M3 0.12 Rp 1,366,596.89 Rp 163,991.63 0.0008 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Gate Valve 12" Resilient M3 0.12 Rp 1,366,596.89 Rp 163,991.63 0.0008 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Segmented Bend 12" x 90° M3 0.30 Rp 1,366,596.89 Rp 409,979.07 0.0020 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Thrust Block Segmented Bend 12" x 45° M3 0.45 Rp 1,366,596.89 Rp 614,968.60 0.0029 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Thrust Block Segmented Bend 12" x 22.5° M3 0.15 Rp 1,366,596.89 Rp 204,989.53 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
6 Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225 Transmisi Jalur 2
Thrust Block Tee All Socket 12" x12" M3 0.12 Rp 1,366,596.89 Rp 163,991.63 0.0008 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Gate Valve 12" Resilient M3 0.12 Rp 1,366,596.89 Rp 163,991.63 0.0008 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Segmented Bend 12" x 90° M3 0.45 Rp 1,366,596.89 Rp 614,968.60 0.0029 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Thrust Block Segmented Bend 12" x 45° M3 0.15 Rp 1,366,596.89 Rp 204,989.53 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Segmented Bend 12" x 22.5° M3 0.15 Rp 1,366,596.89 Rp 204,989.53 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
SUB TOTAL Rp 457,663,336.46 2.1932 - - 0.1937 0.1937 0.1937 0.1937 0.1937 0.1937 0.2227 0.2240 0.0312 0.0312 0.0312 0.0312 0.0312 0.0312 0.0514 0.0502 0.0492 0.0492 0.0492 0.0492 0.0492 0.0492 -

3 PIPA DISTRIBUSI JL. JENDRAL SUDIRMAN


a Pekerjaan Pengadaan Pipa dan Aksesoris
1 Pengadaan Pipa HDPE 8" - STA 0 + 000 S.D STA 2 + 420 M 2,456.00 Rp 300,533.75 Rp 738,110,890.00 3.5371 0.4421 0.4421 0.4421 0.4421 0.4421 0.4421 0.4421 0.4421
2 Pengadaan Tee HDPE 8" x 8" Bh 1.00 Rp 1,788,000.00 Rp 1,788,000.00 0.0086 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
3 Pengadaan Tee All Socket 8" x 8" Bh 1.00 Rp 676,800.00 Rp 676,800.00 0.0032 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
4 Pengadaan Tee HDPE 8" x 6" Bh 1.00 Rp 1,852,000.00 Rp 1,852,000.00 0.0089 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
5 Pengadaan Tee HDPE 8" x 2" Bh 1.00 Rp 892,000.00 Rp 892,000.00 0.0043 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
6 Pengadaan Gate Vave CI 8" Resilient Bh 5.00 Rp 8,757,750.00 Rp 43,788,750.00 0.2098 0.0262 0.0262 0.0262 0.0262 0.0262 0.0262 0.0262 0.0262
7 Pengadaan Gate Vave CI 6" Resilient Bh 1.00 Rp 5,720,250.00 Rp 5,720,250.00 0.0274 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034
8 Pengadaan Gate Vave CI 2" Resilient Bh 1.00 Rp 2,209,500.00 Rp 2,209,500.00 0.0106 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
9 Pengadaan Stub Flange 8" Bh 34.00 Rp 1,780,200.00 Rp 60,526,800.00 0.2901 0.0363 0.0363 0.0363 0.0363 0.0363 0.0363 0.0363 0.0363
10 Pengadaan Stub Flange 6" Bh 1.00 Rp 1,606,500.00 Rp 1,606,500.00 0.0077 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
11 Pengadaan Stub Flange 2" Bh 2.00 Rp 1,236,600.00 Rp 2,473,200.00 0.0119 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
12 Pengadaan Flange Socket 8" Bh 3.00 Rp 1,236,000.00 Rp 3,708,000.00 0.0178 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022
13 Pengadaan Flange Socket 6" Bh 3.00 Rp 746,000.00 Rp 2,238,000.00 0.0107 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
14 Pengadaan Segmented Bend 8" x 90° HDPE Bh 2.00 Rp 820,000.00 Rp 1,640,000.00 0.0079 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
15 Pengadaan Box Street Bh 7.00 Rp 1,196,000.00 Rp 8,372,000.00 0.0401 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050
b Pekerjaan Pemasangan Pipa dan Aksesoris
1 Pemasangan Pipa HDPE 8" M 2,456.00 Rp 45,080.06 Rp 110,716,633.50 0.5306 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354
2 Penyambungan Pipa HDPE 8" Cm 25,392.13 Rp 2,401.58 Rp 60,981,270.95 0.2922 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195 0.0195
3 Pekerjaan PIT di Tanah
Galian Tanah M3 71.40 Rp 68,866.16 Rp 4,917,043.82 0.0236 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016
Urugan Sirtu dipadatkan M3 55.82 Rp 195,316.00 Rp 10,902,539.12 0.0522 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
Buangan Sisa Galian M3 15.58 Rp 26,926.24 Rp 419,510.82 0.0020 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Lapis Agregat Kelas B t=20 cm M3 8.40 Rp 491,437.85 Rp 4,128,077.97 0.0198 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
Lapis Agregat Kelas S t=15 cm M3 6.30 Rp 407,677.41 Rp 2,568,367.66 0.0123 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
Kayu Dolken 10 cm (1 btg 4 m) M 24.00 Rp 20,500.00 Rp 492,000.00 0.0024 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Multiplek, t= 18 mm M2 42.00 Rp 131,820.00 Rp 5,536,440.00 0.0265 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018
4 Pekerjaan HDD
Pekerjaan HDD Pipa HDPE 8" M 2,456.00 Rp 1,400,000.00 Rp 3,438,400,000.00 16.4772 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985 1.0985
Pemasangan Tee HDPE 8" x 8" Bh 1.00 Rp 62,893.60 Rp 62,893.60 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee All Socket 8" x 8" Bh 1.00 Rp 62,893.60 Rp 62,893.60 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 8" x 6" Bh 1.00 Rp 62,893.60 Rp 62,893.60 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 8" x 2" Bh 1.00 Rp 62,893.60 Rp 62,893.60 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Gate Vave CI 8" Resilient Bh 5.00 Rp 562,672.00 Rp 2,813,360.00 0.0135 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
Pemasangan Gate Vave CI 6" Resilient Bh 1.00 Rp 345,400.00 Rp 345,400.00 0.0017 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Gate Vave CI 2" Resilient Bh 1.00 Rp 304,150.00 Rp 304,150.00 0.0015 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Stub Flange 8" Bh 34.00 Rp 62,893.60 Rp 2,138,382.40 0.0102 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
Pemasangan Stub Flange 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Stub Flange 2" Bh 2.00 Rp 36,144.90 Rp 72,289.80 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Socket 8" Bh 3.00 Rp 62,893.60 Rp 188,680.80 0.0009 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Flange Socket 6" Bh 3.00 Rp 39,774.90 Rp 119,324.70 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 8" x 90° HDPE Bh 2.00 Rp 62,893.60 Rp 125,787.20 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Box Street Bh 7.00 Rp 119,600.00 Rp 837,200.00 0.0040 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
5 Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225
Thrust Block Tee HDPE 8" x 8" M3 0.03 Rp 1,366,596.89 Rp 40,997.91 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee All Socket 8" x 8" M3 0.03 Rp 1,366,596.89 Rp 40,997.91 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 8" x 6" M3 0.03 Rp 1,366,596.89 Rp 40,997.91 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 8" x 2" M3 0.03 Rp 1,366,596.89 Rp 40,997.91 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Valve 8" Resilient M3 0.17 Rp 1,366,596.89 Rp 232,321.47 0.0011 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Gate Valve 6" Resilient M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Valve 2" Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Segmented Bend 8" x 90° M3 0.08 Rp 1,366,596.89 Rp 109,327.75 0.0005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
SUB TOTAL Rp 4,522,447,136.79 21.6721 - - - 0.5245 0.5245 0.5245 0.5245 0.5245 0.5245 1.6871 1.6896 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 1.1653 -

4 PIPA DISTRIBUSI JL. SILIWANGI - JL. GUNUNG SAMARI - JL. IR JUANDA


a Pekerjaan Pengadaan Pipa dan Aksesoris
1 Pengadaan Pipa HDPE 6" -STA 0 + 000 S.D STA 1 + 470 M 1,485.00 Rp 195,593.75 Rp 290,456,718.75 1.3919 0.1740 0.1740 0.1740 0.1740 0.1740 0.1740 0.1740 0.1740
2 Pengadaan Tee HDPE 8" x 6" Bh 1.00 Rp 1,852,000.00 Rp 1,852,000.00 0.0089 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
3 Pengadaan Tee HDPE 6" x 1 1/2" Bh 1.00 Rp 579,200.00 Rp 579,200.00 0.0028 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
4 Pengadaan Tee HDPE 6" x 3" Bh 1.00 Rp 618,400.00 Rp 618,400.00 0.0030 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
5 Pengadaan Tee All Socket 3" x 3" Bh 1.00 Rp 214,400.00 Rp 214,400.00 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
6 Pengadaan Gate Vave CI 1 1/2" Resilient Bh 1.00 Rp 2,209,500.00 Rp 2,209,500.00 0.0106 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
7 Pengadaan Gate Vave CI 3" Resilient Bh 2.00 Rp 2,998,500.00 Rp 5,997,000.00 0.0287 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036
8 Pengadaan Gate Vave CI 6" Resilient Bh 3.00 Rp 5,720,250.00 Rp 17,160,750.00 0.0822 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103
9 Pengadaan Gate Vave CI 8" Resilient Bh 1.00 Rp 8,757,750.00 Rp 8,757,750.00 0.0420 0.0052 0.0052 0.0052 0.0052 0.0052 0.0052 0.0052 0.0052
10 Pengadaan Stube Flange 1 1/2" Bh 2.00 Rp 1,236,600.00 Rp 2,473,200.00 0.0119 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
11 Pengadaan Stube Flange 3" Bh 2.00 Rp 1,333,800.00 Rp 2,667,600.00 0.0128 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016
12 Pengadaan Stube Flange 6" Bh 7.00 Rp 1,606,500.00 Rp 11,245,500.00 0.0539 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067 0.0067
13 Pengadaan Stube Flange 8" Bh 2.00 Rp 1,780,200.00 Rp 3,560,400.00 0.0171 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021
14 Pengadaan Flange Socket 3" Bh 1.00 Rp 296,000.00 Rp 296,000.00 0.0014 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
15 Pengadaan Reducer HDPE 6" x 3" Bh 1.00 Rp 995,200.00 Rp 995,200.00 0.0048 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
16 Pengadaan Segmented Bend 6" x 90° Bh 4.00 Rp 782,400.00 Rp 3,129,600.00 0.0150 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019
17 Pengadaan Segmented Bend 6" x 45° Bh 3.00 Rp 570,400.00 Rp 1,711,200.00 0.0082 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
18 Pengadaan Segmented Bend 6" x 22.5° Bh 2.00 Rp 354,400.00 Rp 708,800.00 0.0034 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
19 Pengadaan Box Street Bh 6.00 Rp 1,143,000.00 Rp 6,858,000.00 0.0329 0.0041 0.0041 0.0041 0.0041 0.0041 0.0041 0.0041 0.0041
20 Pengadaan Air Valve Bh 2.00 Rp 5,914,100.00 Rp 11,828,200.00 0.0567 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071
b Pekerjaan Pemasangan Pipa dan Aksesoris
1 Pemasangan Pipa HDPE 6" M 1,485.00 Rp 29,339.06 Rp 43,568,507.81 0.2088 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139 0.0139
2 Penyambungan Pipa HDPE 6" Cm 11,586.60 Rp 1,826.07 Rp 21,157,917.74 0.1014 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068
3 Pekerjaan Open Cut di Aspal
Galian Aspal M2 390.00 Rp 39,589.00 Rp 15,439,710.00 0.0740 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049
Cuting Aspal M 1,301.20 Rp 2,234.00 Rp 2,906,880.80 0.0139 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
JUMLAH HARGA BOBOT M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.)
(Rp.) (%)
08/05/23 14/05/23 20/05/23 26/05/23 01/06/23 07/06/23 13/06/23 19/06/23 25/06/23 01/07/23 07/07/23 13/07/23 19/07/23 25/07/23 31/07/23 06/08/23 12/08/23 18/08/23 24/08/23 30/08/23 05/09/23 11/09/23 17/09/23 23/09/23 29/09/23
Galian Tanah M3 604.50 Rp 68,866.16 Rp 41,629,593.72 0.1995 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133 0.0133
Urugan Sirtu dipadatkan M3 437.01 Rp 195,316.00 Rp 85,355,045.16 0.4090 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273 0.0273
Buangan Sisa Galian M3 167.49 Rp 26,926.24 Rp 4,509,875.94 0.0216 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
Lapis Agregat Kelas B t=20 cm M3 78.00 Rp 491,437.85 Rp 38,332,152.55 0.1837 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122 0.0122
Lapis Agregat Kelas A t=20 cm M3 78.00 Rp 574,344.03 Rp 44,798,834.08 0.2147 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143 0.0143
Laston Lapis Antara (AC-BC) t=6 cm Ton 8.26 Rp 1,353,579.51 Rp 11,180,566.78 0.0536 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036
Laston Lapis Aus (AC-WC) t=4 cm Ton 5.51 Rp 1,490,717.05 Rp 8,213,850.95 0.0394 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026
4 Pekerjaan Open Cut di beton
Galian Beton M3 17.22 Rp 39,589.00 Rp 681,722.58 0.0033 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Cuting Beton M 1,003.20 Rp 2,234.00 Rp 2,241,148.80 0.0107 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
Galian Tanah M3 266.91 Rp 68,866.16 Rp 18,381,066.77 0.0881 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059
Urugan Sirtu dipadatkan M3 196.40 Rp 195,316.00 Rp 38,360,062.40 0.1838 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123 0.0123
Buangan Sisa Galian M3 87.73 Rp 26,926.24 Rp 2,362,239.04 0.0113 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
Lapis Agregat Kelas B t=20 cm M3 34.44 Rp 491,437.85 Rp 16,925,119.66 0.0811 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054 0.0054
Lapis Agregat Kelas S t=15 cm M3 25.83 Rp 407,677.41 Rp 10,530,307.40 0.0505 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034
Urugan pasir t= 5 cm M3 8.61 Rp 244,420.00 Rp 2,104,456.20 0.0101 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
Rabat beton kembali K-250 t=8 cm M3 13.78 Rp 1,384,249.67 Rp 19,074,960.49 0.0914 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061 0.0061
Wiremesh M8 Kg 82.74 Rp 32,000.00 Rp 2,647,680.00 0.0127 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
5 Pekerjaan Open Cut di Tanah
Galian Tanah M3 495.99 Rp 68,866.16 Rp 34,156,926.70 0.1637 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109 0.0109
Urugan Tanah Baru dipadatkan M3 487.13 Rp 195,316.00 Rp 95,144,283.08 0.4559 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304 0.0304
Buangan Sisa Galian M3 8.86 Rp 26,926.24 Rp 238,566.49 0.0011 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
6 Crossing Pipa
Crossing Pipa diatas Tanah STA 0+113, STA 0+886, P= 3 m Unit 2.00 Rp 7,350,000.00 Rp 14,700,000.00 0.0704 0.0235 0.0235 0.0235
Crossing Pipa diatas Aspal STA 0+911, P= 4 m Unit 1.00 Rp 9,800,000.00 Rp 9,800,000.00 0.0470 0.0157 0.0157 0.0157
Crossing Pipa diatas Tanah STA 0+579, P= 6 m Unit 1.00 Rp 14,700,000.00 Rp 14,700,000.00 0.0704 0.0235 0.0235 0.0235
Crossing Pipa diatas Aspal STA 0+872, P= 6 m Unit 1.00 Rp 14,700,000.00 Rp 14,700,000.00 0.0704 0.0235 0.0235 0.0235
Crossing Pipa diatas Aspal STA 1+130, P= 10 m Unit 1.00 Rp 24,500,000.00 Rp 24,500,000.00 0.1174 0.0391 0.0391 0.0391
Crossing Sungai STA 0+793, P= 4 m Unit 1.00 Rp 9,800,000.00 Rp 9,800,000.00 0.0470 0.0157 0.0157 0.0157
7 Pemasangan Aksesoris Pipa
Pemasangan Tee HDPE 8" x 6" Bh 1.00 Rp 62,893.60 Rp 62,893.60 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 11/2" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 3" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee All Socket 3" x 3" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasnagan Gate Vave CI 1 1/2" Resilient Bh 1.00 Rp 304,150.00 Rp 304,150.00 0.0015 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Gate Vave CI 3" Resilient Bh 2.00 Rp 304,150.00 Rp 608,300.00 0.0029 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Gate Vave CI 6" Resilient Bh 3.00 Rp 345,400.00 Rp 1,036,200.00 0.0050 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Pemasangan Gate Vave CI 8" Resilient Bh 1.00 Rp 562,672.00 Rp 562,672.00 0.0027 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Stube Flange 1 1/2" Bh 2.00 Rp 36,144.90 Rp 72,289.80 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Stube Flange 6" Bh 7.00 Rp 39,774.90 Rp 278,424.30 0.0013 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Stube Flange 8" Bh 2.00 Rp 62,893.60 Rp 125,787.20 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Socket 3" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Reducer HDPE 6" x 3" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 6" x 90° Bh 4.00 Rp 39,774.90 Rp 159,099.60 0.0008 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Segmented Bend 6" x 45° Bh 3.00 Rp 39,774.90 Rp 119,324.70 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 6" x 22.5" Bh 2.00 Rp 39,774.90 Rp 79,549.80 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Box Street Bh 6.00 Rp 114,300.00 Rp 685,800.00 0.0033 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Air Valve Bh 2.00 Rp 304,150.00 Rp 608,300.00 0.0029 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
8 Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225
Thrust Block Tee HDPE 8x6 M3 0.03 Rp 1,366,596.89 Rp 40,997.91 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6x1 1\/2 M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6x3 M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee All Socket 3x3 M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 1 1\/2 Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 3 Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 6 Resilient M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 8 Resilient M3 0.03 Rp 1,366,596.89 Rp 40,997.91 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Segmented Bend 6 x 90 M3 0.10 Rp 1,366,596.89 Rp 136,659.69 0.0007 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Segmented Bend 6 x 45 M3 0.08 Rp 1,366,596.89 Rp 109,327.75 0.0005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Segmented Bend 6 x 22.5 M3 0.05 Rp 1,366,596.89 Rp 68,329.84 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Air valve M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
SUB TOTAL Rp 1,026,901,938.14 4.9210 - - - 0.2236 0.2236 0.2236 0.2236 0.3818 0.4025 0.4041 0.4276 0.2041 0.2276 0.2041 0.2433 0.2198 0.2198 0.1963 0.1963 0.1963 0.2198 0.2198 0.0616 0.0018 -

5 PIPA DISTRIBUSI JL. OTTO ISKANDARDINATA - JL. SUNAN KALIJAGA


a Pekerjaan Pengadaan Pipa dan Aksesoris
Pengadaan Pipa HDPE 12" - Jalur 1 (STA 0 + 000 S.D STA 0 + 920) M 934.00 Rp 709,582.50 Rp 662,750,055.00 3.1760 0.3970 0.3970 0.3970 0.3970 0.3970 0.3970 0.3970 0.3970
Pengadaan Pipa HDPE 10" -Jalur 1 (STA 0 + 920 S.D STA 1 + 370) M 463.00 Rp 468,360.75 Rp 216,851,027.25 1.0392 0.1299 0.1299 0.1299 0.1299 0.1299 0.1299 0.1299 0.1299
Pengadaan Pipa HDPE 6" - Jalur 1 (STA 1 + 370 S.D STA 1 + 790) M 337.00 Rp 195,593.75 Rp 65,915,093.75 0.3159 0.0395 0.0395 0.0395 0.0395 0.0395 0.0395 0.0395 0.0395
Pengadaan Pipa HDPE 6" - Jalur 2 (STA 0 + 000 S.D STA 0 + 920) M 917.00 Rp 195,593.75 Rp 179,359,468.75 0.8595 0.1074 0.1074 0.1074 0.1074 0.1074 0.1074 0.1074 0.1074
b Pekerjaan Pengadaan Aksesoris - Jalur 1
Pengadaan Tee All Socket 12" x 12" Bh 1.00 Rp 919,120.00 Rp 919,120.00 0.0044 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
Pengadaan Tee HDPE 12" x 3" Bh 1.00 Rp 2,300,000.00 Rp 2,300,000.00 0.0110 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
Pengadaan Tee HDPE 10" x 3" Bh 1.00 Rp 2,113,600.00 Rp 2,113,600.00 0.0101 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
Pengadaan Tee HDPE 6" x 2" Bh 1.00 Rp 579,200.00 Rp 579,200.00 0.0028 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Pengadaan Tee All Flange 6" x 6" Bh 1.00 Rp 733,120.00 Rp 733,120.00 0.0035 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Pengadaan Gate Valve 12" Resilient Bh 3.00 Rp 19,299,750.00 Rp 57,899,250.00 0.2775 0.0347 0.0347 0.0347 0.0347 0.0347 0.0347 0.0347 0.0347
Pengadaan Gate Valve 10" Resilient Bh 1.00 Rp 14,363,250.00 Rp 14,363,250.00 0.0688 0.0086 0.0086 0.0086 0.0086 0.0086 0.0086 0.0086 0.0086
Pengadaan Gate Valve 6" Resilient Bh 1.00 Rp 5,720,250.00 Rp 5,720,250.00 0.0274 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034
Pengadaan Gate Valve 3" Resilient Bh 2.00 Rp 2,998,500.00 Rp 5,997,000.00 0.0287 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036
Pengadaan Gate Valve 2" Resilient Bh 1.00 Rp 2,209,500.00 Rp 2,209,500.00 0.0106 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
Pengadaan Stube Flange 12" Bh 19.00 Rp 1,982,400.00 Rp 37,665,600.00 0.1805 0.0226 0.0226 0.0226 0.0226 0.0226 0.0226 0.0226 0.0226
Pengadaan Stube Flange 10" Bh 10.00 Rp 468,360.75 Rp 4,683,607.50 0.0224 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028
Pengadaan Stube Flange 6" Bh 8.00 Rp 1,606,500.00 Rp 12,852,000.00 0.0616 0.0077 0.0077 0.0077 0.0077 0.0077 0.0077 0.0077 0.0077
Pengadaan Stube Flange 3" Bh 2.00 Rp 1,333,800.00 Rp 2,667,600.00 0.0128 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016
Pengadaan Stube Flange 2" Bh 1.00 Rp 1,236,600.00 Rp 1,236,600.00 0.0059 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
Pengadaan Flange Adaftor 12" Bh 1.00 Rp 4,696,000.00 Rp 4,696,000.00 0.0225 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028
Pengadaan Flange Adaftor 6" Bh 2.00 Rp 1,560,000.00 Rp 3,120,000.00 0.0150 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019
Pengadaan Flange Socket 12" Bh 1.00 Rp 1,645,000.00 Rp 1,645,000.00 0.0079 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
Pengadaan Flange Socket 3" Bh 2.00 Rp 296,000.00 Rp 592,000.00 0.0028 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Pengadaan Flange Socket 2" Bh 1.00 Rp 242,000.00 Rp 242,000.00 0.0012 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pengadaan Segmented Bend 6" x 90° Bh 1.00 Rp 782,400.00 Rp 782,400.00 0.0037 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
Pengadaan Segmented Bend 12" x 90° Bh 1.00 Rp 2,588,000.00 Rp 2,588,000.00 0.0124 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016
Pengadaan Segmented Bend 12" x 45° Bh 1.00 Rp 1,788,000.00 Rp 1,788,000.00 0.0086 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
Pengadaan Reducer HDPE 12" x 10" Bh 1.00 Rp 2,864,000.00 Rp 2,864,000.00 0.0137 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
Pengadaan Reducer HDPE 10" x 6" Bh 1.00 Rp 1,692,000.00 Rp 1,692,000.00 0.0081 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
Pengadaan Box Street Bh 8.00 Rp 1,235,000.00 Rp 9,880,000.00 0.0473 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059 0.0059
Pengadaan Air Valve Bh 2.00 Rp 5,914,100.00 Rp 11,828,200.00 0.0567 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071
c Pekerjaan Pengadaan Aksesoris - Jalur 2
Pengadaan Tee All Flange 6" x 6" Bh 1.00 Rp 733,120.00 Rp 733,120.00 0.0035 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Pengadaan Tee All Socket 6" x 6" Bh 1.00 Rp 580,800.00 Rp 580,800.00 0.0028 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Pengadaan Tee HDPE 6" x 3" Bh 1.00 Rp 618,400.00 Rp 618,400.00 0.0030 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Pengadaan Gate Valve 6" Resilient Bh 5.00 Rp 5,720,250.00 Rp 28,601,250.00 0.1371 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171
Pengadaan Gate Valve 3" Resilient Bh 1.00 Rp 2,998,500.00 Rp 2,998,500.00 0.0144 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018
Pengadaan Stube Flange 6" Bh 26.00 Rp 1,606,500.00 Rp 41,769,000.00 0.2002 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250
Pengadaan Stube Flange 3" Bh 1.00 Rp 1,333,800.00 Rp 1,333,800.00 0.0064 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
Pengadaan Flange Socket 3" Bh 1.00 Rp 296,000.00 Rp 296,000.00 0.0014 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
JUMLAH HARGA BOBOT M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.)
(Rp.) (%)
08/05/23 14/05/23 20/05/23 26/05/23 01/06/23 07/06/23 13/06/23 19/06/23 25/06/23 01/07/23 07/07/23 13/07/23 19/07/23 25/07/23 31/07/23 06/08/23 12/08/23 18/08/23 24/08/23 30/08/23 05/09/23 11/09/23 17/09/23 23/09/23 29/09/23
Pengadaan Flange Socket 6" Bh 1.00 Rp 746,000.00 Rp 746,000.00 0.0036 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Pengadaan Flange Adaftor 6" Bh 3.00 Rp 1,560,000.00 Rp 4,680,000.00 0.0224 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028
Pengadaan Segmented Bend 6" x 90° Bh 3.00 Rp 782,400.00 Rp 2,347,200.00 0.0112 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
Pengadaan Box Street Bh 6.00 Rp 1,143,000.00 Rp 6,858,000.00 0.0329 0.0041 0.0041 0.0041 0.0041 0.0041 0.0041 0.0041 0.0041
Pengadaan Air Valve Bh 2.00 Rp 5,914,100.00 Rp 11,828,200.00 0.0567 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071
d Pekerjaan Pemasangan Pipa dan Aksesoris
Pemasangan Pipa HDPE 12" - Jalur 1 M 934.00 Rp 106,437.38 Rp 99,412,508.25 0.4764 0.0595 0.0595 0.0595 0.0595 0.0595 0.0595 0.0595 0.0595
Pemasangan Pipa HDPE 10" - Jalur 1 M 463.00 Rp 70,254.11 Rp 32,527,654.09 0.1559 0.0312 0.0312 0.0312 0.0312 0.0312
Pemasangan Pipa HDPE 6" - Jalur 1 M 337.00 Rp 29,339.06 Rp 9,887,264.06 0.0474 0.0118 0.0118 0.0118 0.0118
Pemasangan Pipa HDPE 6" - Jalur 2 M 917.00 Rp 29,339.06 Rp 26,903,920.31 0.1289 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161
Penyambungan Pipa HDPE 12" - Jalur 1 Cm 14,538.20 Rp 3,102.80 Rp 45,109,110.25 0.2162 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270 0.0270
Penyambungan Pipa HDPE 10" - Jalur 1 Cm 7,159.20 Rp 2,498.17 Rp 17,884,931.03 0.0857 0.0171 0.0171 0.0171 0.0171 0.0171
Penyambungan Pipa HDPE 6" - Jalur 1 Cm 6,688.20 Rp 1,826.07 Rp 12,213,106.99 0.0585 0.0146 0.0146 0.0146 0.0146
Penyambungan Pipa HDPE 6" - Jalur 2 Cm 14,538.20 Rp 1,826.07 Rp 26,547,739.60 0.1272 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159
e Pekerjaan PIT di Aspal Pipa 12 - Jalur 1
Galian Aspal M2 24.00 Rp 39,589.00 Rp 950,136.00 0.0046 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
Cutting Aspal M 56.00 Rp 2,234.00 Rp 125,104.00 0.0006 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Galian Tanah M3 40.80 Rp 68,866.16 Rp 2,809,739.33 0.0135 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
Urugan Sirtu dipadatkan M3 30.07 Rp 195,316.00 Rp 5,873,152.12 0.0281 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
Buangan Sisa Galian M3 10.73 Rp 26,926.24 Rp 288,918.56 0.0014 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Lapis Agregat Kelas B t=20 cm M3 4.80 Rp 491,437.85 Rp 2,358,901.70 0.0113 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
Lapis Agregat Kelas A t=20 cm M3 4.80 Rp 574,344.03 Rp 2,756,851.33 0.0132 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
Laston Lapis Antara (AC-BC) t=6 cm Ton 0.51 Rp 1,353,579.51 Rp 690,325.55 0.0033 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Laston Lapis Aus (AC-WC) t=4 cm Ton 0.34 Rp 1,490,717.05 Rp 506,843.80 0.0024 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Kayu Dolken 10 cm (1 btg 4 m) M 24.00 Rp 20,500.00 Rp 492,000.00 0.0024 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Multiplek, t= 18 mm M2 3.00 Rp 131,820.00 Rp 395,460.00 0.0019 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
f Pekerjaan PIT di Aspal Pipa 10 Jalur 1
Galian Aspal M2 12.00 Rp 39,589.00 Rp 475,068.00 0.0023 0.0005 0.0005 0.0005 0.0005 0.0005
Cutting Aspal M 28.00 Rp 2,234.00 Rp 62,552.00 0.0003 0.0001 0.0001 0.0001 0.0001 0.0001
Galian Tanah M3 19.80 Rp 68,866.16 Rp 1,363,549.97 0.0065 0.0013 0.0013 0.0013 0.0013 0.0013
Urugan Sirtu dipadatkan M3 14.61 Rp 195,316.00 Rp 2,853,566.76 0.0137 0.0027 0.0027 0.0027 0.0027 0.0027
Buangan Sisa Galian M3 5.19 Rp 26,926.24 Rp 139,747.19 0.0007 0.0001 0.0001 0.0001 0.0001 0.0001
Lapis Agregat Kelas B t=20 cm M3 2.40 Rp 491,437.85 Rp 1,179,450.85 0.0057 0.0011 0.0011 0.0011 0.0011 0.0011
Lapis Agregat Kelas A t=20 cm M3 2.40 Rp 574,344.03 Rp 1,378,425.66 0.0066 0.0013 0.0013 0.0013 0.0013 0.0013
Laston Lapis Antara (AC-BC) t=6 cm Ton 0.25 Rp 1,353,579.51 Rp 338,394.88 0.0016 0.0003 0.0003 0.0003 0.0003 0.0003
Laston Lapis Aus (AC-WC) t=4 cm Ton 0.17 Rp 1,490,717.05 Rp 253,421.90 0.0012 0.0002 0.0002 0.0002 0.0002 0.0002
Kayu Dolken 10 cm (1 btg 4 m) M 24.00 Rp 20,500.00 Rp 492,000.00 0.0024 0.0005 0.0005 0.0005 0.0005 0.0005
Multiplek, t= 18 mm M2 3.00 Rp 131,820.00 Rp 395,460.00 0.0019 0.0004 0.0004 0.0004 0.0004 0.0004
g Pekerjaan PIT di Aspal Pipa 6 Jalur 1
Galian Aspal M2 12.00 Rp 39,589.00 Rp 475,068.00 0.0023 0.0006 0.0006 0.0006 0.0006
Cutting Aspal M 7.00 Rp 2,234.00 Rp 15,638.00 0.0001 0.0000 0.0000 0.0000 0.0000
Galian Tanah M3 18.60 Rp 68,866.16 Rp 1,280,910.58 0.0061 0.0015 0.0015 0.0015 0.0015
Urugan Sirtu dipadatkan M3 13.66 Rp 195,316.00 Rp 2,668,016.56 0.0128 0.0032 0.0032 0.0032 0.0032
Buangan Sisa Galian M3 4.94 Rp 26,926.24 Rp 133,015.63 0.0006 0.0002 0.0002 0.0002 0.0002
Lapis Agregat Kelas B t=20 cm M3 2.40 Rp 491,437.85 Rp 1,179,450.85 0.0057 0.0014 0.0014 0.0014 0.0014
Lapis Agregat Kelas A t=20 cm M3 2.40 Rp 574,344.03 Rp 1,378,425.66 0.0066 0.0017 0.0017 0.0017 0.0017
Laston Lapis Antara (AC-BC) t=6 cm Ton 0.25 Rp 1,353,579.51 Rp 338,394.88 0.0016 0.0004 0.0004 0.0004 0.0004
Laston Lapis Aus (AC-WC) t=4 cm Ton 0.17 Rp 1,490,717.05 Rp 253,421.90 0.0012 0.0003 0.0003 0.0003 0.0003
Kayu Dolken 10 cm (1 btg 4 m) M 24.00 Rp 20,500.00 Rp 492,000.00 0.0024 0.0006 0.0006 0.0006 0.0006
Multiplek, t= 18 mm M2 3.00 Rp 131,820.00 Rp 395,460.00 0.0019 0.0005 0.0005 0.0005 0.0005
h Pekerjaan PIT di Aspal Pipa 6 Jalur 2
Galian Aspal M2 36.00 Rp 39,589.00 Rp 1,425,204.00 0.0068 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
Cutting Aspal M 7.00 Rp 2,234.00 Rp 15,638.00 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Galian Tanah M3 55.80 Rp 68,866.16 Rp 3,842,731.73 0.0184 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023
Urugan Sirtu dipadatkan M3 40.98 Rp 195,316.00 Rp 8,004,049.68 0.0384 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048
Buangan Sisa Galian M3 14.82 Rp 26,926.24 Rp 399,046.88 0.0019 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Lapis Agregat Kelas B t=20 cm M3 7.20 Rp 491,437.85 Rp 3,538,352.54 0.0170 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021
Lapis Agregat Kelas A t=20 cm M3 7.20 Rp 574,344.03 Rp 4,135,276.99 0.0198 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
Laston Lapis Antara (AC-BC) t=6 cm Ton 0.76 Rp 1,353,579.51 Rp 1,028,720.43 0.0049 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
Laston Lapis Aus (AC-WC) t=4 cm Ton 0.51 Rp 1,490,717.05 Rp 760,265.70 0.0036 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
Kayu Dolken 10 cm (1 btg 4 m) M 24.00 Rp 20,500.00 Rp 492,000.00 0.0024 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Multiplek, t= 18 mm M2 3.00 Rp 131,820.00 Rp 395,460.00 0.0019 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
i Pekerjaan HDD Pipa
Pekerjaan HDD Pipa HDPE 12" - Jalur 1 (STA 0 + 000 S.D STA 0 + 920) M 871.00 Rp 2,050,000.00 Rp 1,785,550,000.00 8.5566 1.0696 1.0696 1.0696 1.0696 1.0696 1.0696 1.0696 1.0696
Pekerjaan HDD Pipa HDPE 10" -Jalur 1 (STA 0 + 920 S.D STA 1 + 370) M 421.00 Rp 1,800,000.00 Rp 757,800,000.00 3.6315 0.9079 0.9079 0.9079 0.9079
Pekerjaan HDD Pipa HDPE 6" - Jalur 1 (STA 1 + 370 S.D STA 1 + 790) M 337.00 Rp 1,060,000.00 Rp 357,220,000.00 1.7118 0.4280 0.4280 0.4280 0.4280
Pekerjaan HDD Pipa HDPE 6" - Jalur 2 (STA 0 + 000 S.D STA 0 + 920) M 854.00 Rp 1,060,000.00 Rp 905,240,000.00 4.3380 0.5423 0.5423 0.5423 0.5423 0.5423 0.5423 0.5423 0.5423
j Pekerjaan HDD Cross Sungai
Pekerjaan HDD Cross Sungai Pipa HDPE 12" Jalur 1 (STA 0 + 200 S.D STA 0 +263) M 63.00 Rp 2,050,000.00 Rp 129,150,000.00 0.6189 0.3095 0.3095
Pekerjaan HDD Cross Sungai Pipa HDPE 10" Jalur 1 (STA 1 + 190 S.D STA 1 +232) M 42.00 Rp 1,800,000.00 Rp 75,600,000.00 0.3623 0.1811 0.1811
Pekerjaan HDD Cross Sungai Pipa HDPE 6" Jalur 2 (STA 0 + 190 S.D STA 0 +253) M 63.00 Rp 1,060,000.00 Rp 66,780,000.00 0.3200 0.1600 0.1600
k Pekerjaan Pemasangan Aksesoris - Jalur 1
Pemasangan Tee All Socket 12" x 12" Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 12" x 3" Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 10" x 3" Bh 1.00 Rp 92,199.80 Rp 92,199.80 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 2" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee All Flange 6" x 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Gate Valve 12" Resilient Bh 3.00 Rp 780,340.00 Rp 2,341,020.00 0.0112 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
Pemasangan Gate Valve 10" Resilient Bh 1.00 Rp 645,172.00 Rp 645,172.00 0.0031 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Gate Valve 6" Resilient Bh 1.00 Rp 345,400.00 Rp 345,400.00 0.0017 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Gate Valve 3" Resilient Bh 2.00 Rp 304,150.00 Rp 608,300.00 0.0029 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Gate Valve 2" Resilient Bh 1.00 Rp 304,150.00 Rp 304,150.00 0.0015 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Stube Flange 12" Bh 19.00 Rp 121,506.00 Rp 2,308,614.00 0.0111 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
Pemasangan Stube Flange 10" Bh 10.00 Rp 92,199.80 Rp 921,998.00 0.0044 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Stube Flange 6" Bh 8.00 Rp 39,774.90 Rp 318,199.20 0.0015 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Stube Flange 3" Bh 2.00 Rp 36,144.90 Rp 72,289.80 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Stube Flange 2" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Adaftor 12" Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Adaftor 6" Bh 2.00 Rp 39,774.90 Rp 79,549.80 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Socket 12" Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Socket 3" Bh 2.00 Rp 36,144.90 Rp 72,289.80 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Socket 2" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 6" x 90° Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 12" x 90° Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 12" x 45° Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Reducer 12" x 10" Bh 1.00 Rp 121,506.00 Rp 121,506.00 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Reducer 10" x 6" Bh 1.00 Rp 92,199.80 Rp 92,199.80 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Box Street Bh 8.00 Rp 114,300.00 Rp 914,400.00 0.0044 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Air Valve Bh 2.00 Rp 304,150.00 Rp 608,300.00 0.0029 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
l Pekerjaan Pemasangan Aksesoris - Jalur 2
Pemasangan Tee All Flange 6" x 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee All Socket 6" x 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 3" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Gate Valve 6" Resilient Bh 5.00 Rp 345,400.00 Rp 1,727,000.00 0.0083 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
Pemasangan Gate Valve 3" Resilient Bh 1.00 Rp 304,150.00 Rp 304,150.00 0.0015 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Stube Flange 6" Bh 26.00 Rp 39,774.90 Rp 1,034,147.40 0.0050 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
JUMLAH HARGA BOBOT M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.)
(Rp.) (%)
08/05/23 14/05/23 20/05/23 26/05/23 01/06/23 07/06/23 13/06/23 19/06/23 25/06/23 01/07/23 07/07/23 13/07/23 19/07/23 25/07/23 31/07/23 06/08/23 12/08/23 18/08/23 24/08/23 30/08/23 05/09/23 11/09/23 17/09/23 23/09/23 29/09/23
Pemasangan Stube Flange 3" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Socket 3" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Socket 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Adaftor 6" Bh 3.00 Rp 39,774.90 Rp 119,324.70 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 6" x 90° Bh 3.00 Rp 39,774.90 Rp 119,324.70 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Box Street Bh 6.00 Rp 114,300.00 Rp 685,800.00 0.0033 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Air Valve Bh 2.00 Rp 304,150.00 Rp 608,300.00 0.0029 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
m Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225 Jalur 1
Thrust Block Tee All Socket 12" x 12" M3 0.12 Rp 1,366,596.89 Rp 163,991.63 0.0008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 12" x 3" M3 0.12 Rp 1,366,596.89 Rp 163,991.63 0.0008 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 10" x 3" M3 0.06 Rp 1,366,596.89 Rp 81,995.81 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6" x 2" M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee All Flange 6" x 6" M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 12" Resilient M3 0.35 Rp 1,366,596.89 Rp 478,308.91 0.0023 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Gate Vave CI 10" Resilient M3 0.06 Rp 1,366,596.89 Rp 81,995.81 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 6" Resilient M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 3" Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 2" Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Segmented Bend 6" x 90° M3 0.03 Rp 1,366,596.89 Rp 40,997.91 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Segmented Bend 12" x 90° M3 0.15 Rp 1,366,596.89 Rp 204,989.53 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Segmented Bend 12" x 45° M3 0.15 Rp 1,366,596.89 Rp 204,989.53 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Air valve M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
n Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225 Jalur 2
Thrust Block Tee All Flange 6" x 6" M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee All Socket 6" x 6" M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6" x 6" M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 6" Resilient M3 0.11 Rp 1,366,596.89 Rp 150,325.66 0.0007 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 3" Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Segmented Bend 6" x 90° M3 0.08 Rp 1,366,596.89 Rp 109,327.75 0.0005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Air valve M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
m Pekerjaan Tes Sondir Lokasi Crossing Anak Sungai Dan Drainase Jl. Sunan Kalijaga
Tes Sondir di 2 Lokasi Anak Sungai dan Drainase Titik 6.00 Rp 4,850,000.00 Rp 29,100,000.00 0.1395 0.1395
SUB TOTAL Rp 5,875,211,306.90 28.1547 - - - 0.9912 0.8518 0.8518 2.6010 2.6116 2.6116 2.6116 2.6116 1.7598 1.7598 2.2293 1.6267 1.1506 0.9694 0.9694 0.4895 0.4685 0.4694 0.4694 0.0415 0.0095 -

6 PIPA DISTRIBUSI JL. TIRTAYASA


a Pekerjaan Pengadaan Pipa dan Aksesoris
1 Pipa HDPE 6" - STA 0 + 000 S.D STA 0 +198 M 200.00 Rp 195,593.75 Rp 39,118,750.00 0.1875 0.0234 0.0234 0.0234 0.0234 0.0234 0.0234 0.0234 0.0234
2 Pengadaan Tee 6" x 6" Bh 1.00 Rp 691,200.00 Rp 691,200.00 0.0033 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
3 Pengadaan Tee All Flange 6" x 6" Bh 1.00 Rp 733,120.00 Rp 733,120.00 0.0035 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
4 Pengadaan Gate Valve 6" Resilient Bh 4.00 Rp 5,720,250.00 Rp 22,881,000.00 0.1096 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137 0.0137
5 Pengadaan Stube Flange 6" Bh 5.00 Rp 1,606,500.00 Rp 8,032,500.00 0.0385 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048 0.0048
6 Pengadaan Flange Adaftor 6" Bh 2.00 Rp 1,560,000.00 Rp 3,120,000.00 0.0150 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019
7 Pengadaan Segmented Bend 6" x 90° Bh 1.00 Rp 782,400.00 Rp 782,400.00 0.0037 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
8 Pengadaan Box Street Bh 4.00 Rp 1,143,000.00 Rp 4,572,000.00 0.0219 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027
b Pekerjaan Pemasangan Pipa dan Aksesoris
1 Pemasangan Pipa HDPE 6 M 200.00 Rp 29,339.06 Rp 5,867,812.50 0.0281 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
2 Penyambungan Pipa HDPE 6 Cm 1,601.40 Rp 1,826.07 Rp 2,924,265.05 0.0140 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018
3 Pekerjaan PIT di Aspal Pipa 6
Galian Aspal M2 6.00 Rp 39,589.00 Rp 237,534.00 0.0011 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Cutting Aspal M 14.00 Rp 2,234.00 Rp 31,276.00 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Galian Tanah M3 9.30 Rp 68,866.16 Rp 640,455.29 0.0031 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Urugan Sirtu dipadatkan M3 6.83 Rp 195,316.00 Rp 1,334,008.28 0.0064 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
Buangan Sisa Galian M3 2.47 Rp 26,926.24 Rp 66,507.81 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Lapis Agregat Kelas B t=20 cm M3 1.20 Rp 491,437.85 Rp 589,725.42 0.0028 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Lapis Agregat Kelas A t=20 cm M3 1.20 Rp 574,344.03 Rp 689,212.83 0.0033 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Laston Lapis Antara (AC-BC) t=6 cm Ton 0.13 Rp 1,353,579.51 Rp 175,965.34 0.0008 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Laston Lapis Aus (AC-WC) t=4 cm Ton 0.08 Rp 1,490,717.05 Rp 119,257.36 0.0006 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Kayu Dolken 10 cm (1 btg 4 m) M 24.00 Rp 20,500.00 Rp 492,000.00 0.0024 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Multiplek, t= 18 mm M2 3.00 Rp 131,820.00 Rp 395,460.00 0.0019 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
4 Pekerjaan HDD
Pekerjaan HDD Pipa HDPE 6" -STA 0 + 000 S.D STA 0 +198 M 200.00 Rp 1,060,000.00 Rp 212,000,000.00 1.0159 0.1270 0.1270 0.1270 0.1270 0.1270 0.1270 0.1270 0.1270
5 Pemasangan Aksesoris Pipa
Pemasangan Tee 6" x 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee All Flange 6" x 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Gate Valve 6" Resilient Bh 4.00 Rp 345,400.00 Rp 1,381,600.00 0.0066 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
Pemasangan Stube Flange 6" Bh 5.00 Rp 39,774.90 Rp 198,874.50 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Flange Adaftor 6" Bh 2.00 Rp 39,774.90 Rp 79,549.80 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 6" x 90° Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Box Street Bh 4.00 Rp 114,300.00 Rp 457,200.00 0.0022 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
c Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225
Thrust Block Tee HDPE 6" x 6" M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee All Flange 6" x 6" M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 6" Resilient M3 0.08 Rp 1,366,596.89 Rp 109,327.75 0.0005 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Segmented Bend 6" x 90° M3 0.03 Rp 1,366,596.89 Rp 40,997.91 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
SUB TOTAL Rp 307,935,988.42 1.4757 - - - - - - - - - 0.0479 0.0479 0.0479 0.1830 0.1843 0.1845 0.1845 0.1845 0.1366 0.1366 0.1366 0.0015 0.0001 - - -

7 PIPA DISTRIBUSI JL. RT. HADIWINANGUN


a Pekerjaan Pengadaan Pipa dan Aksesoris
1 Pengadaan Pipa HDPE 6" -STA 0 + 000 S.D STA 1 + 095 M 1,061.00 Rp 195,593.75 Rp 207,524,968.75 0.9945 0.1243 0.1243 0.1243 0.1243 0.1243 0.1243 0.1243 0.1243
2 Pengadaan Tee All Socket 4" x 4" Bh 1.00 Rp 524,000.00 Rp 524,000.00 0.0025 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
3 Pengadaan Tee HDPE 6" x 6" Bh 1.00 Rp 691,200.00 Rp 691,200.00 0.0033 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
4 Pengadaan Tee HDPE 6" x 4" Bh 1.00 Rp 650,400.00 Rp 650,400.00 0.0031 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
5 Pengadaan Tee HDPE 6" x 3" Bh 1.00 Rp 618,400.00 Rp 618,400.00 0.0030 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
6 Pengadaan Tee HDPE 6" x 2" Bh 2.00 Rp 579,200.00 Rp 1,158,400.00 0.0056 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
7 Pengadaan Tee All Flange 6"x 6" Bh 1.00 Rp 733,120.00 Rp 733,120.00 0.0035 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
8 Pengadaan Gate Valve 2" Resilient Bh 2.00 Rp 2,209,500.00 Rp 4,419,000.00 0.0212 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026
9 Pengadaan Gate Valve 3" Resilient Bh 1.00 Rp 2,998,500.00 Rp 2,998,500.00 0.0144 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018
10 Pengadaan Gate Valve 4" Resilient Bh 2.00 Rp 3,658,840.00 Rp 7,317,680.00 0.0351 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044
11 Pengadaan Gate Valve 6" Resilient Bh 7.00 Rp 5,720,250.00 Rp 40,041,750.00 0.1919 0.0240 0.0240 0.0240 0.0240 0.0240 0.0240 0.0240 0.0240
12 Pengadaan Stube Flange 2" Bh 2.00 Rp 1,236,600.00 Rp 2,473,200.00 0.0119 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
13 Pengadaan Stube Flange 3" Bh 1.00 Rp 1,333,800.00 Rp 1,333,800.00 0.0064 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
14 Pengadaan Stube Flange 4" Bh 1.00 Rp 1,400,400.00 Rp 1,400,400.00 0.0067 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
15 Pengadaan Stube Flange 6" Bh 25.00 Rp 1,606,500.00 Rp 40,162,500.00 0.1925 0.0241 0.0241 0.0241 0.0241 0.0241 0.0241 0.0241 0.0241
16 Pengadaan Flange Socket 2" Bh 2.00 Rp 242,000.00 Rp 484,000.00 0.0023 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
17 Pengadaan Flange Socket 3" Bh 1.00 Rp 296,000.00 Rp 296,000.00 0.0014 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
18 Pengadaan Flange Socket 4" Bh 4.00 Rp 436,000.00 Rp 1,744,000.00 0.0084 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
19 Pengadaan Flange Socket 6" Bh 1.00 Rp 746,000.00 Rp 746,000.00 0.0036 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
20 Pengadaan Flange Adaftor 6" Bh 2.00 Rp 1,560,000.00 Rp 3,120,000.00 0.0150 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019
21 Pengadaan Segmented Bend 6" x 90° Bh 2.00 Rp 782,400.00 Rp 1,564,800.00 0.0075 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
22 Pengadaan Reducer All Socket 6" x 4" Bh 1.00 Rp 2,389,600.00 Rp 2,389,600.00 0.0115 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
23 Pengadaan Box Street Bh 12.00 Rp 1,143,000.00 Rp 13,716,000.00 0.0657 0.0082 0.0082 0.0082 0.0082 0.0082 0.0082 0.0082 0.0082
b Pekerjaan Pemasangan Pipa dan Aksesoris
1 Pemasangan Pipa HDPE 6" M 1,061.00 Rp 29,339.06 Rp 31,128,745.31 0.1492 0.0166 0.0166 0.0166 0.0166 0.0166 0.0166 0.0166 0.0166 0.0166
2 Penyambungan Pipa HDPE 6" Cm 8,642.85 Rp 1,826.07 Rp 15,782,430.51 0.0756 0.0084 0.0084 0.0084 0.0084 0.0084 0.0084 0.0084 0.0084 0.0084
3 Pekerjaan PIT di Aspal Pipa 6"
Galian Aspal M2 24.00 Rp 39,589.00 Rp 950,136.00 0.0046 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
JUMLAH HARGA BOBOT M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.)
(Rp.) (%)
08/05/23 14/05/23 20/05/23 26/05/23 01/06/23 07/06/23 13/06/23 19/06/23 25/06/23 01/07/23 07/07/23 13/07/23 19/07/23 25/07/23 31/07/23 06/08/23 12/08/23 18/08/23 24/08/23 30/08/23 05/09/23 11/09/23 17/09/23 23/09/23 29/09/23
Cutting Aspal M 56.00 Rp 2,234.00 Rp 125,104.00 0.0006 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Galian Tanah M3 37.20 Rp 68,866.16 Rp 2,561,821.15 0.0123 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
Urugan Sirtu dipadatkan M3 27.32 Rp 195,316.00 Rp 5,336,033.12 0.0256 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028
Buangan Sisa Galian M3 9.88 Rp 26,926.24 Rp 266,031.25 0.0013 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Lapis Agregat Kelas B t=20 cm M3 4.80 Rp 491,437.85 Rp 2,358,901.70 0.0113 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
Lapis Agregat Kelas A t=20 cm M3 4.80 Rp 574,344.03 Rp 2,756,851.33 0.0132 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
Laston Lapis Antara (AC-BC) t=6 cm Ton 0.51 Rp 1,353,579.51 Rp 690,325.55 0.0033 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Laston Lapis Aus (AC-WC) t=4 cm Ton 0.34 Rp 1,490,717.05 Rp 506,843.80 0.0024 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Kayu Dolken 10 cm (1 btg 4 m) M 24.00 Rp 20,500.00 Rp 492,000.00 0.0024 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Multiplek, t= 18 mm M2 3.00 Rp 131,820.00 Rp 395,460.00 0.0019 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
4 Pekerjaan HDD
Pekerjaan HDD Pipa HDPE 6" - STA 0 + 000 S.D STA 1 + 095 M 1,061.00 Rp 1,060,000.00 Rp 1,124,660,000.00 5.3895 0.5988 0.5988 0.5988 0.5988 0.5988 0.5988 0.5988 0.5988 0.5988
5 Pemasangan Aksesoris Pipa
Pemasangan Tee All Socket 4" x 4" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 4" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 3" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 2" Bh 2.00 Rp 39,774.90 Rp 79,549.80 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee All Flange 6" x 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Gate Valve 2" Resilient Bh 2.00 Rp 304,150.00 Rp 608,300.00 0.0029 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Pemasangan Gate Valve 3" Resilient Bh 1.00 Rp 304,150.00 Rp 304,150.00 0.0015 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Gate Valve 4" Resilient Bh 2.00 Rp 304,150.00 Rp 608,300.00 0.0029 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Pemasangan Gate Valve 6" Resilient Bh 7.00 Rp 345,400.00 Rp 2,417,800.00 0.0116 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
Pemasangan Stube Flange 2" Bh 2.00 Rp 36,144.90 Rp 72,289.80 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Stube Flange 3" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Stube Flange 4" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Stube Flange 6" Bh 25.00 Rp 39,774.90 Rp 994,372.50 0.0048 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
Pemasangan Flange Socket 2" Bh 2.00 Rp 36,144.90 Rp 72,289.80 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Socket 3" Bh 1.00 Rp 36,144.90 Rp 36,144.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Socket 4" Bh 4.00 Rp 36,144.90 Rp 144,579.60 0.0007 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Flange Socket 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Flange Adaftor 6" Bh 2.00 Rp 39,774.90 Rp 79,549.80 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 6" x 90° Bh 2.00 Rp 39,774.90 Rp 79,549.80 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Reducer All Socket 6" x 4" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Box Street Bh 12.00 Rp 114,300.00 Rp 1,371,600.00 0.0066 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
6 Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225
Thrust Block Tee All Socket 4x4 M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6x6 M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6x4 M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6x3 M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6x2 M3 0.04 Rp 1,366,596.89 Rp 54,663.88 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 2 Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 3 Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 4 Resilient M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Vave CI 6 Resilient M3 0.15 Rp 1,366,596.89 Rp 204,989.53 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Segmented Bend 6 x 90 M3 0.05 Rp 1,366,596.89 Rp 68,329.84 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
SUB TOTAL Rp 1,531,812,271.48 7.3406 - - - - - - - - - - - 0.2013 0.2013 0.8339 0.8377 0.8380 0.8380 0.8380 0.8380 0.6367 0.6367 0.6367 0.0041 0.0003 -

IV SPAM KAWACI
A PENGADAAN , PEMASANGAN PIPA DAN AKSESORIS DISTRIBUSI
1 SEWA LAHAN GUDANG PIPA
a Sewa Lahan Untuk Gudang Pipa Bln 8.00 Rp 12,000,000.00 Rp 96,000,000.00 0.4600 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184
SUB TOTAL Rp 96,000,000.00 0.4600 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184 0.0184

2 PIPA DISTRIBUSI JL. PASIR MUNDING - JL. LEBAK MANDANG


a Pekerjaan Pengadaan Pipa dan Aksesoris
1 Pengadaan Pipa HDPE 6" -STA 0 + 000 S.D STA 3 + 240 M 3,293.00 Rp 195,593.75 Rp 644,090,218.75 3.0866 0.3858 0.3858 0.3858 0.3858 0.3858 0.3858 0.3858 0.3858
2 Pengadaan Tee HDPE 6" x 6" Bh 1.00 Rp 691,200.00 Rp 691,200.00 0.0033 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
3 Pengadaan Tee HDPE 6" x 4" Bh 1.00 Rp 650,400.00 Rp 650,400.00 0.0031 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
4 Pengadaan Gate Valve 4" Resilient Bh 1.00 Rp 3,658,840.00 Rp 3,658,840.00 0.0175 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022
5 Pengadaan Gate Valve 6" Resilient Bh 3.00 Rp 5,720,250.00 Rp 17,160,750.00 0.0822 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103
6 Pengadaan Stube Flange 4" Bh 2.00 Rp 1,400,400.00 Rp 2,800,800.00 0.0134 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
7 Pengadaan Stube Flange 6" Bh 6.00 Rp 1,606,500.00 Rp 9,639,000.00 0.0462 0.0058 0.0058 0.0058 0.0058 0.0058 0.0058 0.0058 0.0058
8 Pengadaan Segemented Bend 6" x 90° Bh 5.00 Rp 782,400.00 Rp 3,912,000.00 0.0187 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023
9 Pengadaan Segemented Bend 6" x 45° Bh 9.00 Rp 570,400.00 Rp 5,133,600.00 0.0246 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
10 Pengadaan Segemented Bend 6" x 22.5° Bh 6.00 Rp 354,400.00 Rp 2,126,400.00 0.0102 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
11 Pengadaan Box Street Bh 4.00 Rp 1,143,000.00 Rp 4,572,000.00 0.0219 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027
Pengadaan Air Valve Bh 2.00 Rp 5,914,100.00 Rp 11,828,200.00 0.0567 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071
b Pekerjaan Pemasangan Pipa dan Aksesoris
1 Pemasangan Pipa HDPE 6" M 3,293.00 Rp 29,339.06 Rp 96,613,532.81 0.4630 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309 0.0309
2 Penyambungan Pipa HDPE 6" Cm 25,481.10 Rp 1,826.07 Rp 46,530,217.47 0.2230 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149 0.0149
3 Pekerjaan Open Cut di Aspal
Galian Aspal M2 80.40 Rp 39,589.00 Rp 3,182,955.60 0.0153 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
Cutting Aspal M 269.20 Rp 2,234.00 Rp 601,392.80 0.0029 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Galian Tanah M3 124.62 Rp 68,866.16 Rp 8,582,100.86 0.0411 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027
Urugan Sirtu dipadatkan M3 90.09 Rp 195,316.00 Rp 17,596,018.44 0.0843 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056 0.0056
Buangan Sisa Galian M3 34.53 Rp 26,926.24 Rp 929,763.07 0.0045 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Lapis Agregat Kelas B t=20 cm M3 16.08 Rp 491,437.85 Rp 7,902,320.68 0.0379 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
Lapis Agregat Kelas A t=20 cm M3 16.08 Rp 574,344.03 Rp 9,235,451.95 0.0443 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030
Laston Lapis Antara (AC-BC) t=6 cm Ton 1.70 Rp 1,353,579.51 Rp 2,301,085.17 0.0110 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
Laston Lapis Aus (AC-WC) t=4 cm Ton 1.14 Rp 1,490,717.05 Rp 1,699,417.44 0.0081 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
4 Pekerjaan Open Cut di Beton
Galian Beton M3 0.96 Rp 39,589.00 Rp 38,005.44 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Cutting Beton M 33.20 Rp 2,234.00 Rp 74,168.80 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Galian Tanah M3 14.88 Rp 68,866.16 Rp 1,024,728.46 0.0049 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Urugan Sirtu dipadatkan M3 10.95 Rp 195,316.00 Rp 2,138,710.20 0.0102 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
Buangan Sisa Galian M3 4.89 Rp 26,926.24 Rp 131,669.31 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Lapis Agregat Kelas B t=20 cm M3 1.92 Rp 491,437.85 Rp 943,560.68 0.0045 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Lapis Agregat Kelas S t=15 cm M3 1.44 Rp 407,677.41 Rp 587,055.46 0.0028 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Urugan pasir t= 5 cm M3 0.48 Rp 244,420.00 Rp 117,321.60 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Rabat beton kembali K-250 t=8 cm M3 0.77 Rp 1,384,249.67 Rp 1,065,872.25 0.0051 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Wiremesh M8 Kg 52.31 Rp 32,000.00 Rp 1,673,920.00 0.0080 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
5 Pekerjaan Open Cut di Tanah
Galian Tanah M3 3,059.10 Rp 68,866.16 Rp 210,668,470.06 1.0095 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673 0.0673
Urugan Tanah Baru dipadatkan M3 3,004.47 Rp 195,316.00 Rp 586,821,062.52 2.8121 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875 0.1875
Buangan Sisa Galian M3 54.63 Rp 26,926.24 Rp 1,470,980.49 0.0070 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
6 Crossing Jalan dan Gorong - Gorong
Crossing Jalan diatas Tanah STA 0+790, P= 3 m Unit 1.00 Rp 7,350,000.00 Rp 7,350,000.00 0.0352 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023
Crossing Jalan diatas Tanah STA 1+122 P= 4 m Unit 1.00 Rp 9,800,000.00 Rp 9,800,000.00 0.0470 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031 0.0031
Crossing Jalan diatas Tanah STA 1+122 P= 7 m Unit 1.00 Rp 17,150,000.00 Rp 17,150,000.00 0.0822 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055
Crossing Gorong-gorong diatas Tanah STA 0+730 P= 2 m Unit 1.00 Rp 4,900,000.00 Rp 4,900,000.00 0.0235 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016
Crossing Gorong-gorong diatas Tanah STA 1+979 P= 1.5 m Unit 1.00 Rp 3,675,000.00 Rp 3,675,000.00 0.0176 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012
Crossing Gorong-gorong diatas Tanah STA 2+244 P= 1 m Unit 1.00 Rp 2,450,000.00 Rp 2,450,000.00 0.0117 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
Crossing Gorong-gorong diatas Tanah STA 2+640 P= 2 m Unit 1.00 Rp 4,900,000.00 Rp 4,900,000.00 0.0235 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016
Crossing Gorong-gorong diatas Tanah STA 2+889 P= 1 m Unit 1.00 Rp 2,450,000.00 Rp 2,450,000.00 0.0117 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008
Crossing Gorong-gorong diatas Tanah STA 3+231 P= 1.5 m Unit 1.00 Rp 3,675,000.00 Rp 3,675,000.00 0.0176 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012
JUMLAH HARGA BOBOT M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp.)
(Rp.) (%)
08/05/23 14/05/23 20/05/23 26/05/23 01/06/23 07/06/23 13/06/23 19/06/23 25/06/23 01/07/23 07/07/23 13/07/23 19/07/23 25/07/23 31/07/23 06/08/23 12/08/23 18/08/23 24/08/23 30/08/23 05/09/23 11/09/23 17/09/23 23/09/23 29/09/23
7 Pekerjaan Pemasangan Aksesoris Pipa
Pemasangan Tee HDPE 6" x 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 4" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Gate Valve 4" Resilient Bh 1.00 Rp 304,150.00 Rp 304,150.00 0.0015 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Gate Valve 6" Resilient Bh 3.00 Rp 345,400.00 Rp 1,036,200.00 0.0050 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Pemasangan Stube Flange 4" Bh 2.00 Rp 36,144.90 Rp 72,289.80 0.0003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Stube Flange 6" Bh 6.00 Rp 39,774.90 Rp 238,649.40 0.0011 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Segmented Bend 6" x 90° Bh 5.00 Rp 39,774.90 Rp 198,874.50 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Segmented Bend 6" x 45° Bh 9.00 Rp 39,774.90 Rp 357,974.10 0.0017 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Segmented Bend 6" x 22.5° Bh 6.00 Rp 39,774.90 Rp 238,649.40 0.0011 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Box Street Bh 4.00 Rp 114,300.00 Rp 457,200.00 0.0022 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Air Valve Bh 2.00 Rp 304,150.00 Rp 608,300.00 0.0029 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
8 Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225
Thrust Block Tee HDPE 6x6 M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6x4 M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Valve 4 Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Valve 6 Resilient M3 0.06 Rp 1,366,596.89 Rp 81,995.81 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Segmented Bend 6 x 90 M3 0.13 Rp 1,366,596.89 Rp 177,657.60 0.0009 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Segmented Bend 6 x 45 M3 0.23 Rp 1,366,596.89 Rp 314,317.28 0.0015 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Segmented Bend 6 x 22.5 M3 0.16 Rp 1,366,596.89 Rp 218,655.50 0.0010 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Thrust Block Air valve M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
SUB TOTAL Rp 1,769,023,315.29 8.4774 - - - 0.4231 0.4231 0.4231 0.4231 0.7154 0.7612 0.7623 0.7626 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.3395 0.0472 0.0015 -

3 PIPA DISTRIBUSI JL. RANGKASBITUNG - PANDEGLANG


a Pekerjaan Pengadaan Pipa dan Aksesoris
1 Pengadaan Pipa HDPE 6" - STA 3 +240 S.D STA 5 + 950 M 2,720.00 Rp 195,593.75 Rp 532,015,000.00 2.5495 0.3187 0.3187 0.3187 0.3187 0.3187 0.3187 0.3187 0.3187
2 Pengadaan Tee All Socket 6" x 6" Bh 1.00 Rp 580,800.00 Rp 580,800.00 0.0028 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
3 Pengadaan Tee HDPE 6" x 2" Bh 1.00 Rp 579,200.00 Rp 579,200.00 0.0028 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
4 Pengadaan Gate Valve 2" Resilient Bh 2.00 Rp 2,209,500.00 Rp 4,419,000.00 0.0212 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026
5 Pengadaan Gate Valve 6" Resilient Bh 3.00 Rp 5,720,250.00 Rp 17,160,750.00 0.0822 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103 0.0103
6 Pengadaan Stube Flange 2" Bh 4.00 Rp 1,236,600.00 Rp 4,946,400.00 0.0237 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030
7 Pengadaan Stube Flange 6" Bh 39.00 Rp 1,606,500.00 Rp 62,653,500.00 0.3002 0.0375 0.0375 0.0375 0.0375 0.0375 0.0375 0.0375 0.0375
8 Pengadaan Flange Socket 6" Bh 3.00 Rp 746,000.00 Rp 2,238,000.00 0.0107 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
9 Pengadaan Segmented Bend 6" x 90° Bh 3.00 Rp 782,400.00 Rp 2,347,200.00 0.0112 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
10 Pengadaan Box Street Bh 5.00 Rp 1,143,000.00 Rp 5,715,000.00 0.0274 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034
b Pekerjaan Pemasangan Pipa dan Aksesoris
1 Pemasangan Pipa HDPE 6" M 2,720.00 Rp 29,339.06 Rp 79,802,250.00 0.3824 0.0294 0.0294 0.0294 0.0294 0.0294 0.0294 0.0294 0.0294 0.0294 0.0294 0.0294 0.0294 0.0294
2 Penyambungan Pipa HDPE 6" Cm 21,320.60 Rp 1,826.07 Rp 38,932,862.18 0.1866 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144
3 Pekerjaan PIT di Tanah Pipa 6"
Galian Tanah M3 89.10 Rp 68,866.16 Rp 6,135,974.86 0.0294 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023
Urugan Sirtu dipadatkan M3 69.56 Rp 195,316.00 Rp 13,586,180.96 0.0651 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050
Buangan Sisa Galian M3 19.54 Rp 26,926.24 Rp 526,138.73 0.0025 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Lapis Agregat Kelas B t=20 cm M3 10.80 Rp 491,437.85 Rp 5,307,528.81 0.0254 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020
Lapis Agregat Kelas S t=15 cm M3 8.10 Rp 407,677.41 Rp 3,302,186.99 0.0158 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012
Kayu Dolken 10 cm (1 btg 4 m) M 24.00 Rp 20,500.00 Rp 492,000.00 0.0024 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Multiplek, t= 18 mm M2 3.00 Rp 131,820.00 Rp 395,460.00 0.0019 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
4 Pekerjaan HDD
Pekerjaan HDD Pipa HDPE 6" -STA 3 +240 S.D STA 5 + 950 M 2,720.00 Rp 1,060,000.00 Rp 2,883,200,000.00 13.8166 1.0628 1.0628 1.0628 1.0628 1.0628 1.0628 1.0628 1.0628 1.0628 1.0628 1.0628 1.0628 1.0628
5 Pekerjaan Pemasangan Aksesoris Pipa
Pemasangan Tee All Socket 6" x 6" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Tee HDPE 6" x 2" Bh 1.00 Rp 39,774.90 Rp 39,774.90 0.0002 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Gate Valve 2" Resilient Bh 2.00 Rp 304,150.00 Rp 608,300.00 0.0029 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Pemasangan Gate Valve 6" Resilient Bh 3.00 Rp 345,400.00 Rp 1,036,200.00 0.0050 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
Pemasangan Stube Flange 2" Bh 4.00 Rp 36,144.90 Rp 144,579.60 0.0007 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
Pemasangan Stube Flange 6" Bh 39.00 Rp 39,774.90 Rp 1,551,221.10 0.0074 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
Pemasangan Flange Socket 6" Bh 3.00 Rp 39,774.90 Rp 119,324.70 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Segmented Bend 6" x 90° Bh 3.00 Rp 39,774.90 Rp 119,324.70 0.0006 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Pemasangan Box Street Bh 5.00 Rp 114,300.00 Rp 571,500.00 0.0027 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
6 Pekerjaan Thrust Block Aksesoris Pipa -Beton K-225
Thrust Block Tee All Socket 6x6 M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Tee HDPE 6x2 M3 0.02 Rp 1,366,596.89 Rp 27,331.94 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Valve 2 Resilient M3 0.01 Rp 1,366,596.89 Rp 13,665.97 0.0001 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Gate Valve 6 Resilient M3 0.06 Rp 1,366,596.89 Rp 81,995.81 0.0004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Thrust Block Segmented Bend 6 x 90 M3 0.08 Rp 1,366,596.89 Rp 109,327.75 0.0005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
SUB TOTAL Rp 3,668,825,085.84 17.5814 - - - - 0.3790 0.3790 0.3790 0.3790 0.3790 0.3790 0.3790 1.4965 1.1192 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 1.1194 -

JUMLAH TOTAL Rp 20,867,636,708.64 100.0000


BOBOT RENCANA PROGRESS MINGGUAN 0.1362 0.1305 0.3242 2.4387 2.6782 2.6782 4.4275 4.8886 5.2170 6.4314 6.6209 5.9172 5.6986 6.7786 6.2191 5.7470 5.4025 5.4049 4.7013 4.5548 4.2581 4.1410 2.6116 2.4634 0.1305
KOMULATIF BOBOT RENCANA MINGGUAN 0.1362 0.2667 0.5909 3.0296 5.7078 8.3860 12.8135 17.7021 22.9191 29.3505 35.9714 41.8887 47.5873 54.3658 60.5849 66.3319 71.7344 77.1393 81.8406 86.3954 90.6535 94.7945 97.4060 99.8695 100.0000

Anda mungkin juga menyukai