BACK UP DATA QUANTITY

PEKERJAAN : KONTRAKTOR PELAKSANA CV. SINAR BAHAGIA


KONSULTAN PENGAWAS CV. R'LIMA KONSULTAN
ITEM PEKERJAAN VOL. KONTRAK VOL. CCO SELISIH
Pembukaan Jalan Penghubung Lengke - Galung
Galian Untuk Selokan Drainase Dan Saluran
Air
313.125 627.000 313.875

Periode :
URAIAN
Dimensi
NO SKETSA KIRI KANAN
Station Luas Luas Volume Ket.
Pjg
LA LB H LUAS Rata2 LA LB H LUAS Rata2

(m) (m) (m) (m) (m²) (m²) (m) (m) (m²) (m²) (m²)
a b c d e f g h i j k l m n o = d*(i+m) p

0+000 0.000 1.10 0.80 0.80 0.760


50.00 0.000 0.760 38.000 m³
0+050 0.000 1.10 0.80 0.80 0.760
50.00 0.000 0.760 38.000 m³
0+100 0.000 1.10 0.80 0.80 0.760
50.00 0.380 0.380 38.000 m³
0+150 1.10 0.80 0.80 0.760 0.000
50.00 0.760 0.000 38.000 m³
0+200 1.10 0.80 0.80 0.760 0.000
LA 50.00 0.760 0.000 38.000 m³
0+250 1.10 0.80 0.80 0.760 0.000
50.00 0.760 0.000 38.000 m³
0+300 1.10 0.80 0.80 0.760 0.000
H

50.00 0.760 0.000 38.000 m³


0+350 1.10 0.80 0.80 0.760 0.000
50.00 0.760 0.000 38.000 m³
0+400 1.10 0.80 0.80 0.760 0.000
LB 50.00 0.760 0.000 38.000 m³
0+450 1.10 0.80 0.80 0.760 0.000
50.00 0.380 0.000 19.000 m³
0+500 0.000 0.000
50.00 0.000 0.000 0.000 m³
0+550 0.000 0.000
50.00 0.000 0.000 0.000 m³
0+600 0.000 0.000
50.00 0.380 0.000 19.000 m³
0+650 1.10 0.80 0.80 0.760 0.000
50.00 0.760 0.000 38.000 m³
0+700 1.10 0.80 0.80 0.760 0.000
50.00 0.760 0.000 38.000 m³
0+750 1.10 0.80 0.80 0.760 0.000
50.00 0.760 0.000 38.000 m³
0+800 1.10 0.80 0.80 0.760 0.000
50.00 0.760 0.380 57.000 m³
0+850 1.10 0.80 0.80 0.760 1.10 0.80 0.80 0.760
50.00 0.760 0.760 76.000 m³
0+900 1.10 0.80 0.80 0.760 1.10 0.80 0.80 0.760

Jumlah Volume Galian Untuk Selokan Drainase Dan Saluran Air 627.000 m³

Diperiksa dan Disetujui Oleh; Diperiksa Oleh; Dibuat :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN CV. SINAR BAHAGIA
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi ILMAN HIDAYAT, ST SIDDIK


Nip. 196001017 201001 1016 Team Leader Direktur
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA CV. SINAR BAHAGIA
KONSULTAN PENGAWAS CV. R'LIMA KONSULTAN
ITEM PEKERJAAN VOL. KONTRAK VOL. CCO SELISIH
Pembukaan Jalan Penghubung Lengke - Galung
Galian Biasa 4638.92 1440.43 -3198.49

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas Volume Ket.
Pjg
LUAS AREA Rata2

(m) (m) (m) (m) (m²) (m²)


a b c d e f g h i j k l m n o = d*i p

0+000
50.00 0.00 0.00 m³
0+050
50.00 0.00 0.00 m³
Area Galian
0+100
50.00 0.00 0.00 m³
0+150
50.00 0.00 0.00 m³
0+200
50.00 0.00 0.00 m³
0+250
50.00 0.00 0.00 m³
Area Timbunan
0+300
50.00 0.00 0.00 m³
0+350
Area Galian Drainase 50.00 0.00 0.00 m³
0+400
50.00 0.00 0.00 m³
0+450
50.00 0.00 0.00 m³
0+500
50.00 0.00 0.00 m³
0+550 7.50
50.00 4.24 212.19 m³
0+600 0.98
50.00 0.00 0.00 m³
0+650
50.00 0.00 0.00 m³
0+700
50.00 0.00 0.00 m³
0+750
50.00 0.00 0.00 m³
0+800 9.22
50.00 13.14 657.18 m³
0+850 17.07
50.00 11.42 571.06 m³
0+900 5.77

Jumlah Volume Galian Biasa 1440.43 m³

Diperiksa dan Disetujui Oleh; Diperiksa Oleh; Dibuat :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN CV. SINAR BAHAGIA
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi ILMAN HIDAYAT, ST SIDDIK


Nip. 196001017 201001 1016 Team Leader Direktur
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA CV. SINAR BAHAGIA
KONSULTAN PENGAWAS CV. R'LIMA KONSULTAN
ITEM PEKERJAAN VOL. KONTRAK VOL. CCO SELISIH
Pembukaan Jalan Penghubung Lengke - Galung
Galian Batu Lunak 441.377 490.028 48.651

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas Volume Ket.
Pjg
LUAS AREA Rata2

(m) (m) (m) (m) (m²) (m²)


a b c d e f g h i j k l m n o = d*i p

0+000
50.00 0.000 0.000 m³
0+050
50.00 0.000 0.000 m³
Area Galian
0+100
50.00 0.000 0.000 m³
0+150
50.00 0.000 0.000 m³
0+200
50.00 0.000 0.000 m³
0+250
50.00 0.000 0.000 m³
Area Timbunan
0+300 2.359
50.00 1.775 88.733 m³
0+350 1.191
Area Galian Drainase 50.00 2.854 142.690 m³
0+400 4.517
50.00 5.172 258.605 m³
0+450 5.827
50.00 0.000 0.000 m³
0+500
50.00 0.000 0.000 m³
0+550
50.00 0.000 0.000 m³
0+600
50.00 0.000 0.000 m³
0+650
50.00 0.000 0.000 m³
0+700
50.00 0.000 0.000 m³
0+750
50.00 0.000 0.000 m³
0+800
50.00 0.000 0.000 m³
0+850
50.00 0.000 0.000 m³
0+900

Jumlah Volume Galian Batu Lunak 490.028 m³

Diperiksa dan Disetujui Oleh; Diperiksa Oleh; Dibuat :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN CV. SINAR BAHAGIA
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi ILMAN HIDAYAT, ST SIDDIK


Nip. 196001017 201001 1016 Team Leader Direktur
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA CV. SINAR BAHAGIA
KONSULTAN PENGAWAS CV. R'LIMA KONSULTAN
ITEM PEKERJAAN VOL. KONTRAK VOL. CCO SELISIH
Pembukaan Jalan Penghubung Lengke - Galung
Timbunan Pilihan dari sumber galian 0.000 875.593 875.593

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas Volume Ket.
Pjg
LUAS AREA Rata2

(m) (m) (m) (m) (m²) (m²)


a b c d e f g h i j k l m n o = d*i p

0+000 0.816
50.00 1.254 62.703 m³
0+050 1.692
50.00 1.594 79.720 m³
Area Galian
0+100 1.497
50.00 1.365 68.260 m³
0+150 1.234
50.00 1.429 71.445 m³
0+200 1.624
50.00 1.476 73.823 m³
0+250 1.329
50.00 0.000 0.000 m³
Area Timbunan
0+300 0.000
50.00 0.000 0.000 m³
0+350 0.000
Area Galian Drainase 50.00 0.000 0.000 m³
0+400 0.000
50.00 0.000 0.000 m³
0+450 0.000
50.00 3.932 196.580 m³
0+500 7.863
50.00 3.932 196.580 m³
0+550 0.000
50.00 0.000 0.000 m³
0+600 0.000
50.00 0.000 0.000 m³
0+650 1.165
50.00 1.234 61.710 m³
0+700 1.304
50.00 1.295 64.773 m³
0+750 1.287
50.00 0.000 0.000 m³
0+800 0.000
50.00 0.000 0.000 m³
0+850 0.000
50.00 0.000 0.000 m³
0+900 0.000

Jumlah Volume Timbunan Pilihan dari sumber galian 875.593 m³

Diperiksa dan Disetujui Oleh; Diperiksa Oleh; Dibuat :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN CV. SINAR BAHAGIA
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi ILMAN HIDAYAT, ST SIDDIK


Nip. 196001017 201001 1016 Team Leader Direktur
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA CV. SINAR BAHAGIA
KONSULTAN PENGAWAS CV. R'LIMA KONSULTAN
ITEM PEKERJAAN VOL. KONTRAK VOL. CCO SELISIH
Pembukaan Jalan Penghubung Lengke - Galung
Penyiapan Badan Jalan 1346.667 4500.000 3153.333

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas Volume Ket.
Pjg
Lebar Rata2

(m) (m) (m) (m) (m²) (m²)


a b c d e f g h i j k l m n o = d*i p

0+000 5.000
50.00 5.000 250.000 m³
0+050 5.000
50.00 5.000 250.000 m³
0+100 5.000
50.00 5.000 250.000 m³
0+150 5.000
50.00 5.000 250.000 m³
0+200 5.000
50.00 5.000 250.000 m³
0+250 5.000
50.00 5.000 250.000 m³
0+300 5.000
50.00 5.000 250.000 m³
0+350 5.000
50.00 5.000 250.000 m³
0+400 5.000
50.00 5.000 250.000 m³
0+450 5.000
50.00 5.000 250.000 m³
0+500 5.000
50.00 5.000 250.000 m³
0+550 5.000
50.00 5.000 250.000 m³
0+600 5.000
50.00 5.000 250.000 m³
0+650 5.000
50.00 5.000 250.000 m³
0+700 5.000
50.00 5.000 250.000 m³
0+750 5.000
50.00 5.000 250.000 m³
0+800 5.000
50.00 5.000 250.000 m³
0+850 5.000
50.00 5.000 250.000 m³
0+900 5.000

Jumlah Volume Penyiapan Badan Jalan 4500.000 m³

Diperiksa dan Disetujui Oleh; Diperiksa Oleh; Dibuat :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN CV. SINAR BAHAGIA
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi ILMAN HIDAYAT, ST SIDDIK


Nip. 196001017 201001 1016 Team Leader Direktur
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA CV. SINAR BAHAGIA
KONSULTAN PENGAWAS CV. R'LIMA KONSULTAN
ITEM PEKERJAAN VOL. KONTRAK VOL. CCO SELISIH
Pembukaan Jalan Penghubung Lengke - Galung
Lapis Permukaan Agregat Tanpa Penutup
Aspal (Agregat Kelas C)
606.000 338.700 -267.300

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas Volume Ket.
Pjg
L T Luas Rata2

(m) (m) (m) (m) (m²) (m²)


a b c d e f g h=e*f i j k l m n o = d*i p

0+448 5.000 0.150 0.750


1.60 0.750 1.200 m³
0+450 5.000 0.150 0.750
50.00 0.750 37.500 m³
0+500 5.000 0.150 0.750
50.00 0.750 37.500 m³
0+550 5.000 0.150 0.750
50.00 0.750 37.500 m³
0+600 5.000 0.150 0.750
50.00 0.750 37.500 m³
0+650 5.000 0.150 0.750
50.00 0.750 37.500 m³
0+700 5.000 0.150 0.750
50.00 0.750 37.500 m³
0+750 5.000 0.150 0.750
50.00 0.750 37.500 m³
0+800 5.000 0.150 0.750
50.00 0.750 37.500 m³
0+850 5.000 0.150 0.750
50.00 0.750 37.500 m³
0+900 5.000 0.150 0.750

Jumlah Volume Lapis Permukaan Agregat Tanpa Penutup Aspal (Agregat Kelas C) 338.700 m³

Diperiksa dan Disetujui Oleh; Diperiksa Oleh; Dibuat :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN CV. SINAR BAHAGIA
KAB. MAMUJU
MUH, SALADIN AYYUBI HARUN S,Pi ILMAN HIDAYAT, ST SIDDIK
Nip. 196001017 201001 1016 Team Leader Direktur
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA CV. SINAR BAHAGIA
KONSULTAN PENGAWAS CV. R'LIMA KONSULTAN
ITEM PEKERJAAN VOL. KONTRAK VOL. CCO SELISIH
Pembukaan Jalan Penghubung Lengke - Galung
PEKERJAAN STRUKTUR DUIKER 1 0.000 0.000

Periode :
URAIAN
Dimensi
NO SKETSA
Volume Ket.
Beton mutu sedang fc’20Mpa Panjang Bntang Tebal
(m) (m) (m) (m) (m²) (m²)
a b c d e f g h=e*f i j k l m n o = e*f*g p

8.000 2.000 0.200 3.200 m3

URAIAN
Dimensi
NO SKETSA
Volume Ket.
Beton mutu rendah fc’15 MPa Panjang Lebar Tebal
(m) (m) (m) (m) (m²) (m²)
a b c d e f g h=e*f i j k l m n o = e*f*g p

8.000 0.750 0.100 0.600 m3


URAIAN
Dimensi
NO SKETSA
Panjang Berat 2 Volume Ket.
Baja Tulangan U 24 Polos Ø Jumlah / Batang Tot. Pjg
besi Lapis
Batang (m) (m) (Kg)
a b c d e f g h i j k l m n o = g*h*i p

y=2m 12.00 54.00 2.30 124.20 0.89 2.00 220.421 Kg


x=7m 16.00 14.00 8.30 116.20 1.58 2.00 366.619 Kg
Angkur 12.00 8.00 0.55 4.40 0.89 3.904 Kg
Total 590.945 Kg

URAIAN
Dimensi
NO SKETSA A Luas B Luas
Panjang Lebar Lebar Rata- Rata- 2 sisi Volume Ket.
Pasangan Batu Atas
Tinggi Luas Rata Lebar Tinggi Luas Rata
Bawah
(m) (m) (m) (m) (m²) (m²) (m) (m) (m²) (m²)
a b c d e f g h i j k l m n o = d*(i+m)*2 p

0.40 0.65 1.25 0.66 0.500 0.950 0.48


11.00 0.66 0.48 2.00 24.888
0.40 0.65 1.25 0.66 0.500 0.950 0.48
URAIAN
Dimensi
NO SKETSA A Luas
Panjang Rata- Volume Ket.
Pasangan Batu Kosong Lebar Tinggi Luas Rata
(m) (m) (m) (m²) (m²) (m²) (m) (m²) (m²)
a b c d e f g h i j k l m n o = d*i*2 p

0.20 0.95 0.19


11.00 0.19 2.00 4.180
0.20 0.95 0.19

Diperiksa dan Disetujui Oleh; Diperiksa Oleh; Dibuat :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN CV. SINAR BAHAGIA
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi ILMAN HIDAYAT, ST SIDDIK


Nip. 196001017 201001 1016 Team Leader Direktur
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA 0
KONSULTAN PENGAWAS 0
ITEM PEKERJAAN VOL. KONTRAK VOL. CCO SELISIH
0
PEKERJAAN STRUKTUR 0.000

Periode :
URAIAN
Dimensi

NO SKETSA PORTAL BANDUL


Jumlah Tinggi/D Vol. Tinggi/D Vol. Volume Ket.
Galian Struktur Panjang Lebar Panjang Lebar
alam alam
(m) (m) (m) (m) (m3) (m) (m) (m) (m) (m3)
a b c d e f g h i=exfxgxd j k l m n=jxkxlxd o=i+n p

2.000 3.500 3.000 2.650 55.650 3.200 2.000 2.500 32.000 87.650 m3

Jumlah Volume Galian Struktur 87.65 m3

URAIAN
Dimensi
NO SKETSA
Volume Ket.
Urugan Tanah Bekas Galian

a b c d e f g h i=exfxgxd j k l m n=jxkxlxd o=i+n p

50 % Dari Galian 43.825 m3

Jumlah Volume Urugan Tanah Bekas Galian 43.83 m3


URAIAN
Dimensi
SKETSA PORTAL BANDUL
NO Panjang/ Lebar/L Volume Ket.
Jumlah Tinggi/T Vol. Tinggi/T Vol.
Beton Mutu Sedang dengan fc'=20Mpa Panjang Lebar Lbr ebar
ebal Bawah ebal
Atas
(Titik) (m) (m) (m) (m) (m3) (m) (m) (m) (m) (m3)
a b c d e f g h i=exfxgxd j k l m n=jxkxl o=m+h p

Tapak 2.000 3.500 3.000 0.400 8.400 8.400 M3

Kolom 8.000 0.500 0.500 2.600 5.200 5.200 M3

Balok
- Type 1 4.000 1.500 0.300 0.400 0.720 0.720 M3
- Type 2 4.000 0.930 0.300 0.400 0.446 0.446 M3

Plat 2.000 3.000 2.130 0.500 6.390 6.390 M3

Bandul
- Type 1 2.000 3.200 2.000 2.500 32.000 32.000 M3
- Type 2 4.000 2.000 1.300 1.000 0.800 5.280 5.280 M3

Jumlah Volume 58.44 M3

URAIAN
Dimensi
NO SKETSA PORTAL BANDUL
Jumlah Tinggi/T Vol. Tinggi/T Vol. Volume Ket.
Beton Mutu Rendah dengan fc'=15 Mpa Panjang Lebar Panjang Lebar
ebal ebal
(m) (m) (m) (m) (m²) (m3) (m) (m) (m) (m²) (m3)
a b c d e f g h i=exfxgxd j k l m n=jxkxl o=i+n p

2.000 3.500 3.000 0.100 2.100 3.200 2.000 0.100 1.280 3.380 M3

Jumlah Volume Beton Mutu Rendah dengan fc'=15 Mpa 3.38 M3


URAIAN
Dimensi
NO SKETSA
Jumlah Panjang Berat 2 Volume Ket.
Baja Tulangan U 24 Polos Ø Jumlah / Batang Tot. Pjg
besi Lapis
(Bh) Batang (m) (m) (Kg)
a b c d d e f g h i k l m n o = g*h*i*d p

PORTAL
Poer
Plat 16.00 24.00 3.50 84.00 1.58 2.00 530.052 Kg
2.000
16.00 21.00 4.00 84.00 1.58 2.00 530.052 Kg

Kolom
Pokok 20.00 12.00 3.000 36.000 2.465 709.891 Kg
8.000
Beugel 10.00 31.00 2.100 65.10 0.616 320.930 Kg

Balok
Pokok 19.00 10.00 3.500 35.000 2.225 311.440 Kg
1 4.000
Beugel 10.00 36.00 1.500 54.000 0.616 133.105 Kg

Balok
Pokok 19.00 10.00 0.930 9.300 2.225 82.754 Kg
2 4.000
Beugel 10.00 10.00 1.500 15.000 0.616 36.974 Kg

Plat 20.00 31.00 3.10 96.10 2.465 473.754 Kg


2.000
20.00 26.00 3.60 93.60 2.465 461.429 Kg
BANDUL

Alas 19.00 33.00 2.10 69.30 2.225 1.00 308.326 Kg


2.000
19.00 21.00 3.30 69.30 2.225 1.00 308.326 Kg

Sisi Kanan 19.00 36.00 2.10 75.60 2.225 2.00 672.711 Kg


2.000
19.00 21.00 3.60 75.60 2.225 2.00 672.711 Kg

Sisi Kiri 19.00 36.00 2.10 75.60 2.225 2.00 672.711 Kg


2.000
19.00 21.00 3.60 75.60 2.225 2.00 672.711 Kg

Depan 19.00 33.00 2.60 85.80 1.578 1.00 270.705 Kg


2.000
19.00 26.00 3.30 85.80 1.578 1.00 270.705 Kg

Belakang 19.00 33.00 2.60 85.80 2.225 1.00 381.737 Kg


2.000
19.00 26.00 3.30 85.80 2.225 1.00 381.737 Kg

Jumlah Volume Baja Tulangan U 24 Polos 8202.76 Kg


BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
ITEM PEKERJAAN
Pembukaan Jalan Penghubung Lengke - Galung
Timbunan Biasa Dari Galian

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas
Pjg
LUAS Rata2
(m) (m) (m) (m) (m²) (m²)
a b c d e f g h i j

0+000 0.000
50.00 0.000
0+050 0.000
Area Galian 50.00 0.000
0+100 0.000
50.00 0.000
0+150 0.000
50.00 0.000
0+200 0.000
50.00 0.000
0+250 0.000
50.00 0.000
Area Timbunan
0+300 0.000
50.00 0.000
0+350 0.000
Area Galian Drainase 50.00 0.000
0+400 0.000
50.00 0.000
0+450 0.000
50.00 0.000
0+500 0.000
50.00 0.000
0+550 0.000
50.00 0.000
0+600 0.000
50.00 0.000
0+650 0.000
50.00 0.000
0+700 0.000
50.00 0.000
0+750 0.000
50.00 0.000
0+800 0.000
50.00 0.000
0+850 0.000
50.00 0.000
0+900 0.000
Err:509 0.000
Err:509 0.000
Err:509 0.000
Err:509 0.000
Err:509 0.000
Err:509 0.000

Jumlah Volume Timbunan Biasa Dari Galian

Diperiksa dan Disetujui Oleh; Diperiksa Oleh;


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN
KAB. MAMUJU
MUH, SALADIN AYYUBI HARUN S,Pi ILMAN HIDAYAT, ST
Nip. 196001017 201001 1016 Team Leader
ATA QUANTITY
CV. SINAR BAHAGIA
CV. R'LIMA KONSULTAN
VOL. KONTRAK REALISASI SELISIH

0.000 Err:509 Err:509

URAIAN
Dimensi

Volume Ket.

k l m n o = d*i p

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³
0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

Err:509 m³

Err:509 m³

Err:509 m³

Jumlah Volume Timbunan Biasa Dari Galian Err:509 m³

Dibuat :
Kontraktor Pelaksana
CV. SINAR BAHAGIA
SIDDIK
Direktur
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
ITEM PEKERJAAN
Pembukaan Jalan Desa Botteng Kelapa 7 (Lanjutan)
Galian Untuk Selokan Drainase Dan Saluran
SEGMEN 2
Air
Periode :
URAIAN
Dimensi
KIRI
NO SKETSA Station Luas
Pjg
LA LB H LUAS Rata2 LA
(m) (m) (m) (m) (m²) (m²) (m)
a b c d e f g h i j

0+000 0.000 1.10


50.00 0.200
0+050 1.20 0.80 0.40 0.400
50.00 0.400
0+100 1.20 0.80 0.40 0.400
50.00 0.400
0+150 1.20 0.80 0.40 0.400
50.00 0.400
0+200 1.20 0.80 0.40 0.400
LA 12.00 0.400
0+212 1.20 0.80 0.40 0.400
H

LB
LB

Jumlah Volume Galian Untuk Selokan Drainase Dan Saluran Air SEGM

Diperiksa dan Disetujui Oleh; Diperiksa Oleh;


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi HARMOKO


Nip. 196001017 201001 1016 Inspector
ATA QUANTITY
CV. TAHTA PERDANA KARSA
CV. R'LIMA KONSULTAN
VOL. KONTRAK REALISASI SELISIH

0.000 83.800 83.800

URAIAN
Dimensi
KANAN
Luas Volume Ket.
LB H LUAS Rata2
(m) (m²) (m²) (m²)
k l m n o = d*(i+m) p

0.70 0.40 0.360


0.180 19.000 m³
0.000
0.000 20.000 m³
0.000
0.000 20.000 m³
0.000
0.000 20.000 m³
0.000
0.000 4.800 m³
0.000
ume Galian Untuk Selokan Drainase Dan Saluran Air SEGMEN 2 83.800 m³

Dibuat :
Kontraktor Pelaksana
CV. TAHTA PERDANA KARSA

ASRAFIL
Pelaksana Lapangan
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
ITEM PEKERJAAN
Pembukaan Jalan Desa Botteng Kelapa 7 (Lanjutan)
Galian Biasa SEGMEN 2

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas
Pjg
LUAS Rata2
(m) (m) (m) (m) (m²) (m²)
a b c d e f g h i j

0+000 3.559
50.00 3.622
0+050 3.684
50.00 5.267
Area Galian
0+100 6.850
50.00 8.036
0+150 9.222
50.00 7.718
0+200 6.215
12.00 6.545
0+212 6.875

Area Timbunan

Area Galian Drainase


Jumlah Volume Galian Biasa SEGMEN 2

Diperiksa dan Disetujui Oleh; Diperiksa Oleh;


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi HARMOKO


Nip. 196001017 201001 1016 Inspector
ATA QUANTITY
CV. TAHTA PERDANA KARSA
CV. R'LIMA KONSULTAN
VOL. KONTRAK REALISASI SELISIH

0.000 1310.681 1310.681

URAIAN
Dimensi

Volume Ket.

k l m n o = d*i p

181.075 m³

263.345 m³

401.800 m³

385.923 m³

78.539 m³
Jumlah Volume Galian Biasa SEGMEN 2 1310.681 m³

Dibuat :
Kontraktor Pelaksana
CV. TAHTA PERDANA KARSA

ASRAFIL
Pelaksana Lapangan
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
ITEM PEKERJAAN
Pembukaan Jalan Desa Botteng Kelapa 7 (Lanjutan)
Galian Batu Lunak SEGMEN 2

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas
Pjg
LUAS Rata2
(m) (m) (m) (m) (m²) (m²)
a b c d e f g h i j

0+000 0.000
50.00 0.000
0+050 0.000
50.00 0.000
Area Galian
0+100 0.000
50.00 0.000
0+150 0.000
50.00 0.000
0+200 0.000
12.00 0.000
0+212 0.000

Area Timbunan

Area Galian Drainase


Jumlah Volume Galian Batu Lunak SEGMEN 2

Diperiksa dan Disetujui Oleh; Diperiksa Oleh;


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi HARMOKO


Nip. 196001017 201001 1016 Inspector
ATA QUANTITY
CV. TAHTA PERDANA KARSA
CV. R'LIMA KONSULTAN
VOL. KONTRAK REALISASI SELISIH

0.000 0.000 0.000

URAIAN
Dimensi

Volume Ket.

k l m n o = d*i p

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³
Jumlah Volume Galian Batu Lunak SEGMEN 2 0.000 m³

Dibuat :
Kontraktor Pelaksana
CV. TAHTA PERDANA KARSA

ASRAFIL
Pelaksana Lapangan
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
ITEM PEKERJAAN
Pembukaan Jalan Desa Botteng Kelapa 7 (Lanjutan)
Timbunan Biasa Dari Galian SEGMEN 2

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas
Pjg
LUAS Rata2
(m) (m) (m) (m) (m²) (m²)
a b c d e f g h i j

0+000 0.000
50.00 0.000
0+050 0.000
Area Galian 50.00 0.000
0+100 0.000
50.00 0.000
0+150 0.000
50.00 0.000
0+200 0.000
12.00 0.000
0+212 0.000

Area Timbunan

Area Galian Drainase


Jumlah Volume Timbunan Biasa Dari Galian SEGMEN 2

Diperiksa dan Disetujui Oleh; Diperiksa Oleh;


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi HARMOKO


Nip. 196001017 201001 1016 Inspector
ATA QUANTITY
CV. TAHTA PERDANA KARSA
CV. R'LIMA KONSULTAN
VOL. KONTRAK REALISASI SELISIH

0.000 0.000 0.000

URAIAN
Dimensi

Volume Ket.

k l m n o = d*i p

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³
umlah Volume Timbunan Biasa Dari Galian SEGMEN 2 0.000 m³

Dibuat :
Kontraktor Pelaksana
CV. TAHTA PERDANA KARSA

ASRAFIL
Pelaksana Lapangan
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
ITEM PEKERJAAN
Pembukaan Jalan Desa Botteng Kelapa 7 (Lanjutan)
Galian Untuk Selokan Drainase Dan Saluran
SEGMEN 3
Air
Periode :
URAIAN
Dimensi
KIRI
NO SKETSA Station Luas
Pjg
LA LB H LUAS Rata2 LA
(m) (m) (m) (m) (m²) (m²) (m)
a b c d e f g h i j

0+000 1.30 1.10 0.50 0.600


50.00 0.470
0+050 1.00 0.70 0.40 0.340
50.00 0.170
0+100 0.000
50.00 0.000
0+150 0.000
50.00 0.000
0+200 0.000
LA 50.00 0.000
0+250 0.000
50.00 0.000
0+300 0.000
50.00 0.000
H

0+350 0.000
50.00 0.158
0+400 1.20 0.90 0.30 0.315
LB 50.00 0.315
LB
0+450 1.20 0.90 0.30 0.315
50.00 0.000
0+500 1.20 0.90 0.30 0.315

Jumlah Volume Galian Untuk Selokan Drainase Dan Saluran Air SEGM

Diperiksa dan Disetujui Oleh; Diperiksa Oleh;


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi HARMOKO


Nip. 196001017 201001 1016 Inspector
ATA QUANTITY
CV. TAHTA PERDANA KARSA
CV. R'LIMA KONSULTAN
VOL. KONTRAK REALISASI SELISIH

0.000 55.625 55.625

URAIAN
Dimensi
KANAN
Luas Volume Ket.
LB H LUAS Rata2
(m) (m²) (m²) (m²)
k l m n o = d*(i+m) p

0.000 23.500 m³

0.000 8.500 m³

0.000 0.000 m³

0.000 0.000 m³

0.000 0.000 m³

0.000 0.000 m³

0.000 0.000 m³

0.000 7.875 m³

0.000 15.750 m³
0.000 0.000 m³

ume Galian Untuk Selokan Drainase Dan Saluran Air SEGMEN 3 55.625 m³

Dibuat :
Kontraktor Pelaksana
CV. TAHTA PERDANA KARSA

ASRAFIL
Pelaksana Lapangan
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
ITEM PEKERJAAN
Pembukaan Jalan Desa Botteng Kelapa 7 (Lanjutan)
Galian Biasa SEGMEN 3

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas
Pjg
LUAS Rata2
(m) (m) (m) (m) (m²) (m²)
a b c d e f g h i j

0+000 11.935
50.00 9.817
0+050 7.699
50.00 5.306
Area Galian
0+100 2.913
50.00 4.229
0+150 5.545
50.00 4.457
0+200 3.369
50.00 2.267
0+250 1.166
50.00 2.336
Area Timbunan 0+300 3.507
50.00 3.076
0+350 2.645
50.00 3.615
Area Galian Drainase
0+400 4.584
50.00 3.387
0+450 2.189
50.00 0.000
0+500 7.820

Jumlah Volume Galian Biasa SEGMEN 3

Diperiksa dan Disetujui Oleh; Diperiksa Oleh;


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi HARMOKO


Nip. 196001017 201001 1016 Inspector
ATA QUANTITY
CV. TAHTA PERDANA KARSA
CV. R'LIMA KONSULTAN
VOL. KONTRAK REALISASI SELISIH

0.000 1924.538 1924.538

URAIAN
Dimensi

Volume Ket.

k l m n o = d*i p

490.858 m³

265.305 m³

211.453 m³

222.855 m³

113.370 m³

116.823 m³

153.805 m³

180.733 m³

169.338 m³
0.000 m³

Jumlah Volume Galian Biasa SEGMEN 3 1924.538 m³

Dibuat :
Kontraktor Pelaksana
CV. TAHTA PERDANA KARSA

ASRAFIL
Pelaksana Lapangan
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
ITEM PEKERJAAN
Pembukaan Jalan Desa Botteng Kelapa 7 (Lanjutan)
Galian Batu Lunak SEGMEN 3

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas
Pjg
LUAS Rata2
(m) (m) (m) (m) (m²) (m²)
a b c d e f g h i j

0+000 0.000
50.00 0.000
0+050 0.000
50.00 0.000
Area Galian
0+100 0.000
50.00 0.000
0+150 0.000
50.00 0.000
0+200 0.000
50.00 0.000
0+250 0.000
50.00 0.000
Area Timbunan 0+300 0.000
50.00 0.000
0+350 0.000
50.00 0.000
Area Galian Drainase
0+400 0.000
50.00 0.000
0+450 0.000
50.00 0.000
0+500 0.000

Jumlah Volume Galian Batu Lunak SEGMEN 3

Diperiksa dan Disetujui Oleh; Diperiksa Oleh;


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi HARMOKO


Nip. 196001017 201001 1016 Inspector
ATA QUANTITY
CV. TAHTA PERDANA KARSA
CV. R'LIMA KONSULTAN
VOL. KONTRAK REALISASI SELISIH

0.000 0.000 0.000

URAIAN
Dimensi

Volume Ket.

k l m n o = d*i p

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³
0.000 m³

Jumlah Volume Galian Batu Lunak SEGMEN 3 0.000 m³

Dibuat :
Kontraktor Pelaksana
CV. TAHTA PERDANA KARSA

ASRAFIL
Pelaksana Lapangan
BACK UP DATA QUANTITY
PEKERJAAN : KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
ITEM PEKERJAAN
Pembukaan Jalan Desa Botteng Kelapa 7 (Lanjutan)
Timbunan Biasa Dari Galian SEGMEN 3

Periode :
URAIAN
Dimensi
NO SKETSA Station Luas
Pjg
LUAS Rata2
(m) (m) (m) (m) (m²) (m²)
a b c d e f g h i j

0+000 0.000
50.00 0.000
0+050 0.000
Area Galian 50.00 0.000
0+100 0.000
50.00 0.000
0+150 0.000
50.00 0.000
0+200 0.000
50.00 0.000
0+250 0.000
50.00 0.000
Area Timbunan
0+300 0.000
50.00 0.000
0+350 0.000
Area Galian Drainase 50.00 0.000
0+400 0.000
50.00 2.346
0+450 4.692
50.00 2.346
0+500 0.000

Jumlah Volume Timbunan Biasa Dari Galian SEGMEN 3

Diperiksa dan Disetujui Oleh; Diperiksa Oleh;


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG CV. R'LIMA KONSULTAN
KAB. MAMUJU

MUH, SALADIN AYYUBI HARUN S,Pi HARMOKO


Nip. 196001017 201001 1016 Inspector
ATA QUANTITY
CV. TAHTA PERDANA KARSA
CV. R'LIMA KONSULTAN
VOL. KONTRAK REALISASI SELISIH

0.000 234.585 234.585

URAIAN
Dimensi

Volume Ket.

k l m n o = d*i p

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

0.000 m³

117.293 m³
117.293 m³

umlah Volume Timbunan Biasa Dari Galian SEGMEN 3 234.585 m³

Dibuat :
Kontraktor Pelaksana
CV. TAHTA PERDANA KARSA

ASRAFIL
Pelaksana Lapangan