Anda di halaman 1dari 1

NO URAIAN PEKERJAAN

I MATA PEMBAYARAN UMUM


PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN
II
KONSTRUKSI (RK3K)
III MATA PEMBAYARAN UTAMA
TOTAL PEKERJAAN BJS. 17 (KM 15+482) - BJS. 18 (KM16+300)
TOTAL PEKERJAAN BJS. 18 (KM 16+300) - BJS. 19 (KM 16+919)
TOTAL PEKERJAAN BJS. 19 (KM 16+919) - BJS. 20 (KM 17+905)
TOTAL PEKERJAAN BJS. 20 (KM 17+905) - BJS. 21 (KM 18+710)
TOTAL PEKERJAAN BJS. 21 (KM 18+710) - BJS. 22 (KM 19+655)
TOTAL PEKERJAAN BJS. 22 (KM 19+655) - BJS. 23 (KM 19+785)
TOTAL PEKERJAAN BJS. 23 (KM 19+785) - BJS. 24 (KM 20+480)
RUAS JURANG BATU BJB. 19 - BJB. 27 (3700 M)
INSTRUMENTASI HYDRO-MECHANICAL DAN FASILITAS PENDUKUNG MODERNISASI
IV
IRIGASI

Anda mungkin juga menyukai