Anda di halaman 1dari 43

TUGAS

COMPUTER AIDED DESIGN (CAD)

DIKERJAKAN OLEH:

NAMA : MISBAKHUL MILLAH


NIM : I0119106

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET
SURAKARTA
2020
DAFTAR ISI
TUGAS DENAH SITUASI..................................................................................... 1
DENAH LANTAI 1.................................................................................. 2
COMPUTER AIDED DESIGN (CAD) DENAH LANTAI 2.................................................................................. 3
RENCANA ATAP LANTAI 1................................................................. 4
RENCANA ATAP LANTAI 2................................................................. 5
RENCANA KUDA-KUDA...................................................................... 6
DETAIL KUDA-KUDA........................................................................... 10
DENAH PONDASI................................................................................... 11
DETAIL PONDASI................................................................................... 12
DETAIL PINTU DAN JENDELA............................................................ 17
DIKERJAKAN OLEH:
RENCANA BALOK ANAK DAN INDUK............................................. 25
NAMA : MISBAKHUL MILLAH DETAIL BALOK INDUK DAN KOLOM............................................... 26
NIM : I0119106 RENCANA TANGGA.............................................................................. 28
DETAIL TANGGA................................................................................... 29
DENAH SANITASI LANTAI 1............................................................... 30
DISETUJUI DIPERIKSA
DOSEN ASISTEN DENAH SANITASI LANTAI 2............................................................... 31
RENCANA PLAFOND DAN INSTALASI LISTRIK LANTAI 1.......... 32
RENCANA PLAFOND DAN INSTALASI LISTRIK LANTAI 2.......... 33
DETAIL SEPTICTANK........................................................................... 34
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119 DETAIL RESAPAN................................................................................. 35
TAMPAK DEPAN................................................................................... 36
TAMPAK SAMPING KANAN............................................................... 37

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK TAMPAK SAMPING KIRI..................................................................... 38


TAMPAK BELAKANG.......................................................................... 39
UNIVERSITAS SEBELAS MARET
POTONGAN A-A.................................................................................... 40
SURAKARTA POTONGAN B-B.................................................................................... 41
2020
10m 10m U
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH
J
D COMPUTER AIDED DESIGN (CAD)
L

JL. BERKAH
GAMBAR SKALA

A JL. PAMUNGKAS DENAH SITUASI 1 : 500

10m
I
A DIGAMBAR
K A A
F MISBAKHUL MILLAH
I0119106
JL. DOREMI A B DISETUJUI DIPERIKSA

5m
JL. LURUS AJA DOSEN ASISTEN
H E B
A A A

JL. SENANG
G C M E EDY PURWANTO, S.T., M.T.
NIP. 196809121997021001
PUPUNG BORSALINO
NIM. I0118119

REVISI

10m 10m

KETERANGAN :
A : PEMUKIMAN B : MASJID
JALAN RAYA
C : SWALAYAN D : SDN TEGAK 1
E : MINI MARKET F : KANTOR DESA BATASAN TANAH
DENAH SITUASI G
I
: KANTOR RT
: PERSIL
H
J
: KANTOR RW
: TAMAN MAJU
SELOKAN
GANG
SKALA 1:500 K : FUTSAL COURT L : ARENA BASKET
M : RM. MBOK JUM

HALAMAN JML HALAMAN

1 41
I H G F E D C B A
200 300 200 200 400 300 150 150 200 200

B
PRODI TEKNIK SIPIL FAKULTAS TEKNIK

200
UNIVERSITAS SEBELAS MARET
SURAKARTA
J2 BV2 J1 BV1

1 MATA KULIAH
K. MANDI P3 TANGGA
-0.05 P2

200
GUDANG
TAMAN BV1 ±0.00 K. MANDI COMPUTER AIDED DESIGN (CAD)
KAMAR UTAMA 1 -0.05
-0.40 ±0.00
DAPUR P2
±0.00 2 GAMBAR SKALA
P3

200
A J2
RUANG MAKAN
±0.00
DENAH LANTAI 1 1 : 100
3
NAIK
J1 J1
1500

RUANG KELUARGA
DIGAMBAR

400
TERAS ±0.00 TERAS
-0.10 PU P1 -0.10
MISBAKHUL MILLAH
I0119106
J1 J1
RUANG TAMU
±0.00 A DISETUJUI DIPERIKSA
P2
4
P2
J2 J2 DOSEN ASISTEN

KAMAR TAMU KAMAR ANAK

300
±0.00 ±0.00

CARPOT
-0.20

TAMAN
5
-0.40 J2 J2
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

200
REVISI

JALAN
2300 B
-0.60

KETERANGAN:
DENAH LANTAI 1
SKALA 1:100 P1 (2 x 0.8 x 2.1) meter J1 (0.6 x 1.5) meter
P2 (0.8 x 2.1) meter J2 (2 x 0.6 x 1.5 ) meter
P3 (0.6 x 2.1) meter BV1 (0.5 x 0.4) meter
PU (2 x 0.8 x 2.1) meter BV2 (2 x 0.5 x 0.4) meter
HALAMAN JML HALAMAN

2 41
I H G F E D C B A
300 200 200 400 300 150 150 200
U
PRODI TEKNIK SIPIL FAKULTAS TEKNIK

B
UNIVERSITAS SEBELAS MARET
SURAKARTA
J2 BV2 J1 BV1

1 MATA KULIAH
K. MANDI P3 TANGGA
-0.05

200
T.CUCI
BV1 RUANG OLAHRAGA +3.55 K. MANDI COMPUTER AIDED DESIGN (CAD)
KAMAR UTAMA 2 +3.60 +3.55
+3.60
P3
2 GAMBAR SKALA

200
A J2

P2 P2 DENAH LANTAI 2 1 : 100


3
TURUN
J1 J1
1100

T. JEMUR DIGAMBAR
+3.55

400
BALKON
+3.55 P1 P1
RUANG BACA
+3.60
MISBAKHUL MILLAH
I0119106
J1 J1
A DISETUJUI DIPERIKSA
P2
4
P2
J2 J2 RUANG MEDITASI DOSEN ASISTEN
+3.60

300
RUANG KERJA
+3.60

5
J2 J2
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

B
REVISI

1900

KETERANGAN:
DENAH LANTAI 2
SKALA 1:100 P1 (2 x 0.8 x 2.1) meter J1 (0.6 x 1.5) meter
P2 (0.8 x 2.1) meter J2 (2 x 0.6 x 1.5 ) meter
P3 (0.6 x 2.1) meter BV1 (0.5 x 0.4) meter
PU (2 x 0.8 x 2.1) meter BV2 (2 x 0.5 x 0.4) meter
HALAMAN JML HALAMAN

3 41
300 1400 200
U
PRODI TEKNIK SIPIL FAKULTAS TEKNIK

B
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

VOID
COMPUTER AIDED DESIGN (CAD)

400
GAMBAR SKALA

A
RENCANA ATAP
1 : 100
DENAH

DIGAMBAR

400
DAK BETON
MISBAKHUL MILLAH
I0119106

A DISETUJUI DIPERIKSA

DOSEN ASISTEN

300
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

B
REVISI

1100 600 200

RENCANA ATAP LANTAI 1


SKALA 1:100

HALAMAN JML HALAMAN

4 41
U

B
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA
K
MATA KULIAH
BP GD BP
COMPUTER AIDED DESIGN (CAD)
JL
JL
GAMBAR SKALA

306,5
GD

200
KK1
A

66,4
GD RENCANA ATAP
1 : 100
SK1 N LANTAI 2
JL JD JD JL

K GD
BP DIGAMBAR
SK3 N N SK3
MISBAKHUL MILLAH
KK3 JD N KK3
I0119106

606,5
GD
BP A DISETUJUI DIPERIKSA
KK2
GD DOSEN ASISTEN
K GD K

JL SK2

BP

EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO


K NIP. 196809121997021001 NIM. I0118119

R U REVISI

B
KETERANGAN

KK1 KUDA-KUDA 1 (12 M)


KK2 KUDA-KUDA 2 (4 M)
SK1 SETENGAH KUDA-KUDA 1 (6 M)
SK2 SETENGAH KUDA-KUDA 2 (2 M)
JL JURAI LUAR
JD JURAI DALAM
RENCANA ATAP LANTAI 2 GD GORDING 8 12
N NOK 8 12
SKALA 1:100 R RENG 3 4
U USUK 5 7
BP BALOK PENERUS 8 12
K KONSUL 8 12

JARAK USUK = ± 0.35 meter HALAMAN JML HALAMAN


JARAK RENG = ± 0.25 mete
5 41
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH
GENTENG KERPUS
SPESI 1:3
PAPAN RUITTER COMPUTER AIDED DESIGN (CAD)
BAUT Ø 0,5"
RENG 2/3
MAKELAR 8/12
GAMBAR SKALA
USUK 5/7

30°
BALOK GAPIT 6/12
BEGEL PLAT 4X40
BALOK TARIK 8/12 RENCANA
1 : 50
KUDA-KUDA
MOORPLAT 8/12
LISPLANG

KONSUL
DIGAMBAR

MISBAKHUL MILLAH
I0119106
400
KUDA-KUDA 3 (4M) DISETUJUI DIPERIKSA

1:50 DOSEN ASISTEN

GENTENG KERPUS
SPESI 1:3
PAPAN RUITTER
BAUT Ø 0,5"
RENG 2/3
MAKELAR 8/12 EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119
USUK 5/7
BALOK GAPIT 6/12

30°
REVISI
BEGEL PLAT 4X40
BALOK TARIK 8/12
MOORPLAT 8/12
LISPLANG

KONSUL

200

SETENGAH KUDA-KUDA 3 (2M)


1:50
RENCANA KUDA-KUDA
SKALA 1:50 HALAMAN JML HALAMAN

6 41
GENTENG KERPUS
SPESI 1:3
PAPAN RUITTER
BAUT Ø 0,5"
RENG 2/3
MAKELAR 8/12
USUK 5/7
BALOK GAPIT 6/12
BEGEL PLAT 4X40
BALOK KUNCI 8/12 PRODI TEKNIK SIPIL FAKULTAS TEKNIK

30°
UNIVERSITAS SEBELAS MARET
BALOK TARIK 8/12
SURAKARTA
MOORPLAT 8/12
MATA KULIAH
LISPLANG
COMPUTER AIDED DESIGN (CAD)
KONSUL

GAMBAR SKALA

600
RENCANA
1 : 50
KUDA-KUDA
KUDA-KUDA 2 (6M)
1:50 DIGAMBAR

MISBAKHUL MILLAH
I0119106

GENTENG KERPUS DISETUJUI DIPERIKSA


SPESI 1:3
PAPAN RUITTER DOSEN ASISTEN
BAUT Ø 0,5"
RENG 2/3
MAKELAR 8/12
USUK 5/7
BALOK GAPIT 6/12
BEGEL PLAT 4X40
BALOK KUNCI 8/12

30°
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
BALOK TARIK 8/12 NIP. 196809121997021001 NIM. I0118119

MOORPLAT 8/12
REVISI

LISPLANG

KONSUL

300

SETENGAH KUDA-KUDA 2 (3M)


1:50

RENCANA KUDA-KUDA
SKALA 1:50
HALAMAN JML HALAMAN

7 41
POTONGAN A

GENTENG KERPUS
SPESI 1:3
PAPAN RUITTER
BAUT Ø 0,5"
RENG 2/3
MAKELAR 8/12
POTONGAN D POTONGAN B USUK 5/7
BALOK GAPIT 6/12
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
BEGEL PLAT 4 X 40
UNIVERSITAS SEBELAS MARET
BALOK KUNCI 8/12 SURAKARTA
POTONGAN E
BALOK TARIK 8/12
MATA KULIAH

30°
MOORPLAT 8/12

COMPUTER AIDED DESIGN (CAD)

LISPLANG
POTONGAN C KONSUL
GAMBAR SKALA

800 RENCANA
1 : 50
KUDA-KUDA
KUDA-KUDA 1 (8M)
1:50 DIGAMBAR

MISBAKHUL MILLAH
I0119106

DISETUJUI DIPERIKSA

DOSEN ASISTEN
GENTENG KERPUS
SPESI 1:3
PAPAN RUITTER
BAUT Ø 0,5"
RENG 2/3
MAKELAR 8/12
USUK 5/7
BALOK GAPIT 6/12 EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119
BEGEL PLAT 4 X 40
BALOK KUNCI 8/12
REVISI
BALOK TARIK 8/12

30°
MOORPLAT 8/12

LISPLANG
KONSUL

400

SETENGAH KUDA-KUDA 1 (4M)


RENCANA KUDA-KUDA 1:50
SKALA 1:50
HALAMAN JML HALAMAN

8 41
12
GENTENG KERPUS 8

SPESI 1:3
GENTENG MAKELAR 8/12 PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
RENG 2/3 SURAKARTA

5 5 USUK 5/7 6 8 6
BAUT Ø 0,5" MATA KULIAH
7 7 12 12
8 8 BAUT Ø 0,5" COMPUTER AIDED DESIGN (CAD)
12 6 BALOK GAPIT 6/12
12
12 GAMBAR SKALA
8 BEGEL PLAT 4X40
12

DETAIL
1 : 20
KUDA-KUDA
POTONGAN A POTONGAN B
1:20 1:20 DIGAMBAR

MISBAKHUL MILLAH
12
8 MAKELAR 8/12 I0119106

6 6 DISETUJUI DIPERIKSA
12 12 BALOK PENYOKONG 8/12 DOSEN ASISTEN
BALOK GAPIT 6/12 BAUT Ø 0,5"
10
BEGEL PLAT 4X40
2
10
17,5 17,5
BALOK KUNCI 8/12 EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
25 NIP. 196809121997021001 NIM. I0118119

BALOK TARIK 8/12


REVISI

POTONGAN C
1:20

DETAIL KUDA-KUDA
SKALA 1:20
HALAMAN JML HALAMAN

9 41
GENTENG
RENG 2/3 BAUT Ø 0,5"
6 8 6

USUK 5/7 12 12 PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET
SURAKARTA

KAKI KUDA-KUDA 8/12 8 BALOK SOKONG 8/12 MATA KULIAH


12
COMPUTER AIDED DESIGN (CAD)

POTONGAN D GAMBAR SKALA

1:20 DETAIL
1 : 20
KUDA-KUDA

DIGAMBAR

MISBAKHUL MILLAH
I0119106

DISETUJUI DIPERIKSA

GENTENG 5 7 DOSEN ASISTEN

RENG 2/3 8
12

USUK 5/7 8
12
KAKI KUDA-KUDA 8/12 EDY PURWANTO, S.T., M.T.
NIP. 196809121997021001
PUPUNG BORSALINO
NIM. I0118119

ANGKUR BAUT Ø 0,5" REVISI


RING BALOK 15/20
LISPLANG PLESTERAN
PAS. BATU KALI

KONSUL

POTONGAN E
1:20
DETAIL KUDA-KUDA
SKALA 1:20
HALAMAN JML HALAMAN

10 41
U
200 300 200 200 400 300 150 150 200 200

B
PRODI TEKNIK SIPIL FAKULTAS TEKNIK

200
UNIVERSITAS SEBELAS MARET
C SURAKARTA
B B
MATA KULIAH

200
C D COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

200
D
A
DENAH PONDASI 1 : 100

G G E E
1500

DIGAMBAR

400
MISBAKHUL MILLAH
a I0119106
H bc
A A
A DISETUJUI DIPERIKSA

DOSEN ASISTEN
H bc
a

300
F F

EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO


NIP. 196809121997021001 NIM. I0118119
d

200
J
REVISI

B
J d

KETERANGAN
a-a 15 cm
DENAH PONDASI b-b 30 cm
SKALA 1:100
c-c 85 cm
d-d 42.5 cm
e-e 100 cm HALAMAN JML HALAMAN

11 41
POTONGAN B-B
+360 POTONGAN A-A SKALA 1 : 20 +360
SKALA 1 : 20 RING BALK 15/20
+340 +340

PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET
SURAKARTA

PASANGAN BATU BATA MATA KULIAH


1 PC : 8 PS

PLESTERAN COMPUTER AIDED DESIGN (CAD)


1 PC : 8 PS
GAMBAR SKALA
MARMER 40X40
2 CM

DETAIL PONDASI 1 : 20

SPESI 1 PC : 3 PS
3 CM
DIGAMBAR
TRASRAM +45
1 PC : 3 PS MISBAKHUL MILLAH
SIRTU I0119106
10 CM
DISETUJUI DIPERIKSA
±0.00 ±0.00 DOSEN ASISTEN
±0.00 ±0.00
-15

-40
-40 -40
-50 -50
-60
-60 -60 EDY PURWANTO, S.T., M.T.
NIP. 196809121997021001
PUPUNG BORSALINO
NIM. I0118119

REVISI

MUKA TANAH ASLI

SLOOF 15/20

TANAH URUG
-145
PASANGA BATU KALI
-168 1 PC : 5 PS -165
-175
-188 ASTAMPENG 15
-195 LANTAI KERJA 20 CM
-200 30
PASIR URUG PASIR URUG 50
5 CM 100 10 CM
DETAIL PONDASI HALAMAN JML HALAMAN
PASIR URUG SKALA 1:20
5 CM 12 41
+360 POTONGAN D-D +360
POTONGAN C-C RING BALK 15/20 SKALA 1 : 20
+340 SKALA 1 : 20 +340

PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH
PASANGAN BATU BATA
1 PC : 8 PS COMPUTER AIDED DESIGN (CAD)

MARMER 40X40
2 CM PLESTERAN GAMBAR SKALA
1 PC : 8 PS
±0.90
TRASRAM
1 PC : 3 PS DETAIL PONDASI 1 : 20
SPESI 1 PC : 3 PS
3 CM MARMER 40X40
2 CM
SIRTU DIGAMBAR
SPESI 1 PC : 3 PS
10 CM 3 CM
MISBAKHUL MILLAH
SIRTU I0119106
+30
10 CM
DISETUJUI DIPERIKSA
±0.00 ±0.00
±0.00 -5 ±0.00 DOSEN ASISTEN

-15 -15
-20
-40
-40 -40
-50 -50
-60 -60 EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIM. I0118119
NIP. 196809121997021001

MUKA TANAH ASLI REVISI

SLOOF 15/20

TANAH URUG
-145 -145
PASANGA BATU KALI
-165 1 PC : 5PS -165
-175 -175
ASTAMPENG 15
15 20 CM
30
30
PASIR URUG 100
100
10 CM
DETAIL PONDASI
HALAMAN JML HALAMAN
SKALA 1:20
13 41
+360 +360
POTONGAN E-E RING BALK 15/20
POTONGAN F-F
SKALA 1 : 20 SKALA 1 : 20
+340 +340

PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET
SURAKARTA

PASANGAN BATU BATA MATA KULIAH


1 PC : 8 PS
COMPUTER AIDED DESIGN (CAD)
PLESTERAN
1 PC : 8 PS
GAMBAR SKALA
TRASRAM
1 PC : 3 PS
MARMER 40X40 PAVING DETAIL PONDASI 1 : 20
2 CM
SPESI 1 PC : 3 PS
3 CM DIGAMBAR
SIRTU
10 CM
+30 SIRTU MISBAKHUL MILLAH
10 CM I0119106
TRASRAM
±0.00 1 PC : 3 PS
DISETUJUI DIPERIKSA
±0.00 -10 ±0.00
-20 DOSEN ASISTEN
-15
-40 -25
-25
-35
-40 -40
-50 -50
-60 -60
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119
MUKA TANAH ASLI
REVISI

SLOOF 15/20

TANAH URUG
-145 -145
PASANGA BATU KALI
-165 1 PC : 5 PS -165
-175 -175
ASTAMPENG
15 20 CM 15
PONDASI BATU BATA
30 30
PASIR URUG
100 100
10 CM

DETAIL PONDASI
HALAMAN JML HALAMAN
SKALA 1:20
14 41
+360 +360
POTONGAN H-H
+340
POTONGAN G-G SKALA 1 : 20 +340
SKALA 1 : 20

PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

MARMER 40X40 MARMER 40X40


2 CM 2 CM GAMBAR SKALA
TRASRAM
1 PC : 3 PS
TRASRAM
1 PC : 3 PS DETAIL PONDASI 1 : 20
PAVING
SPESI 1 PC : 3 PS SPESI 1 PC : 3 PS
3 CM 3 CM
DIGAMBAR
SIRTU
10 CM MISBAKHUL MILLAH
SIRTU SIRTU I0119106
10 CM 10 CM
DISETUJUI DIPERIKSA
±0.00 -10 ±0.00
-10 DOSEN ASISTEN
-15 -20
-25 -25
-40 -35
-40 -40
-50 -50
-60 -60
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

MUKA TANAH ASLI


REVISI

SLOOF 15/20

TANAH URUG

-165 -165
-175 PONDASI BATU BATA -175
15
15
30
30
100 PASIR URUG
100
10 CM

DETAIL PONDASI HALAMAN JML HALAMAN


SKALA 1:20
15 41
+360 POTONGAN J-J +360
SKALA 1 : 20
+340 POTONGAN I-I +340
SKALA 1 : 20
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

DETAIL PONDASI 1 : 20

PAVING
DIGAMBAR

MISBAKHUL MILLAH
SIRTU I0119106
10 CM
DISETUJUI DIPERIKSA

DOSEN ASISTEN
±0.00 ±0.00
-20
-25
-40 -40
-40 -40
-50 -60 -50 EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119
-60 -60
REVISI
MUKA TANAH ASLI

SLOOF 15/20

TANAH URUG
-145 -145
PASANGAN BATU KALI
-165 1 PC : 5 PS -165
-175 -175
ASTAMPENG
15 15 20 CM
30 30
PASIR URUG 100
100
10 CM HALAMAN JML HALAMAN
DETAIL PONDASI
SKALA 1:20 16 41
298

PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET

A A SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

DETAIL PINTU 1 : 20
194

DIGAMBAR

249
B B MISBAKHUL MILLAH
I0119106

DISETUJUI DIPERIKSA

DOSEN ASISTEN

A
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

REVISI

A
TAMPAK LUAR

DETAIL PINTU UTAMA (PU) 1 BUAH


SKALA 1:20

HALAMAN JML HALAMAN

17 41
298

PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET
SURAKARTA

A A MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

DETAIL PINTU 1 : 20
194

DIGAMBAR

MISBAKHUL MILLAH

249
I0119106
B B
DISETUJUI DIPERIKSA

DOSEN ASISTEN

A
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

REVISI

160
A
TAMPAK DALAM

DETAIL PINTU UTAMA (PU) 1 BUAH


SKALA 1:20

HALAMAN JML HALAMAN

18 41
170 180

PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET

A A SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

DETAIL PINTU 1 : 20

DIGAMBAR

249

249
B B B B MISBAKHUL MILLAH
I0119106

DISETUJUI DIPERIKSA

DOSEN ASISTEN

EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO


NIP. 196809121997021001 NIM. I0118119

REVISI

A A
TAMPAK LUAR TAMPAK DALAM

DETAIL PINTU 1 (P1) 3 BUAH


SKALA 1:20

HALAMAN JML HALAMAN

19 41
90
90

A A
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

DETAIL PINTU 1 : 20

249

249
DIGAMBAR

B B B B MISBAKHUL MILLAH
I0119106

DISETUJUI DIPERIKSA

DOSEN ASISTEN

EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO


NIP. 196809121997021001 NIM. I0118119

A A REVISI

TAMPAK LUAR TAMPAK DALAM

DETAIL PINTU 2 (P2) 8 BUAH


SKALA 1:20

HALAMAN JML HALAMAN

20 41
70
70

A A PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

DETAIL PINTU 1 : 20

215

215
DIGAMBAR
B B B B MISBAKHUL MILLAH
I0119106

DISETUJUI DIPERIKSA

DOSEN ASISTEN

A A EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO


NIP. 196809121997021001 NIM. I0118119

TAMPAK LUAR TAMPAK DALAM REVISI

DETAIL PINTU 3 (P3) 4 BUAH


SKALA 1:20

HALAMAN JML HALAMAN

21 41
70 70

PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET

A A SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

DETAIL JENDELA 1 : 20

194

194
DIGAMBAR

MISBAKHUL MILLAH

B B B B I0119106

DISETUJUI DIPERIKSA

DOSEN ASISTEN

A A
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

REVISI

TAMPAK LUAR TAMPAK DALAM

DETAIL JENDELA 1 (J1) 10 BUAH


SKALA 1:20

HALAMAN JML HALAMAN

22 41
134
134

PRODI TEKNIK SIPIL FAKULTAS TEKNIK

A UNIVERSITAS SEBELAS MARET

A SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

DETAIL JENDELA 1 : 20

194

194
DIGAMBAR

MISBAKHUL MILLAH
B B B B
I0119106

DISETUJUI DIPERIKSA

DOSEN ASISTEN

A A
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

REVISI

TAMPAK LUAR TAMPAK DALAM

DETAIL JENDELA 2 (J2) 12 BUAH


SKALA 1:20

HALAMAN JML HALAMAN

23 24
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

DETAIL BOUVEN 1 : 20

62 DIGAMBAR
118
MISBAKHUL MILLAH
I0119106

A A DISETUJUI DIPERIKSA

DOSEN ASISTEN
42

42
B B B
B
A A EDY PURWANTO, S.T., M.T.
NIP. 196809121997021001
PUPUNG BORSALINO
NIM. I0118119

REVISI

TAMPAK LUAR DAN DALAM TAMPAK LUAR DAN DALAM

DETAIL BOUVEN 1 (BV1) 4 BUAH DETAIL BOUVEN 2 (BV2) 1 BUAH


SKALA 1:20 SKALA 1:20

HALAMAN JML HALAMAN

24 41
U
I H G F E D C B A
300 200 200 400 300 150 150 200
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

1 MATA KULIAH
BI BI BI BI BI
BI

200
BI BA BI BA BI COMPUTER AIDED DESIGN (CAD)

BA
BI BI
BA BA
2 GAMBAR SKALA

200
BI
BI BI
RENCANA BALOK
BI 1 : 100
3 INDUK DAN ANAK
BI BI BI BI BI
1100

DIGAMBAR

400
D10-400
D10-400
MISBAKHUL MILLAH
BI BI BI BI BI BI BI I0119106

BI BI BI BI DISETUJUI DIPERIKSA
BI
4
BI DOSEN ASISTEN

D10-400
D10-400

300
BI BI BI
BI

BI BI
5
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

REVISI

1900

KETERANGAN
BI BALOK INDUK 25
50
RENCANA BALOK INDUK DAN ANAK BA BALOK ANAK 20
20

SKALA 1:100

HALAMAN JML HALAMAN

25 41
TYPE BALOK INDUK 25x50

POSISI TUMPUAN LAPANGAN PRODI TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

POTONGAN
GAMBAR SKALA

50 50 DETAIL BALOK
INDUK DAN 1 : 10
KOLOM

DIGAMBAR
25 25

DISETUJUI DIPERIKSA

TULANGAN 6 D22 4 D22


DOSEN ASISTEN

ATAS
TULANGAN 2 D22 2 D22
PINGGANG EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

TULANGAN 4 D22 6 D22 REVISI


BAWAH
SENGKANG Ø10 - 120 Ø10 - 120

DETAIL BALOK INDUK DAN KOLOM


SKALA 1:10
HALAMAN JML HALAMAN

26 41
TYPE KOLOM 30x30 KOLOM 15x15 PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

POTONGAN
GAMBAR SKALA

30 15 DETAIL BALOK
INDUK DAN 1 : 10
KOLOM

DIGAMBAR
15
MISBAKHUL MILLAH
I0119106
30
DISETUJUI DIPERIKSA
TULANGAN 4 D22 4 Ø10 DOSEN ASISTEN

POKOK
TULANGAN 2 D22 -
EKSTRA EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

SENGKANG Ø10 - 150 Ø6 - 150 REVISI

DETAIL BALOK INDUK DAN KOLOM


SKALA 1:10

HALAMAN JML HALAMAN

27 41
300

B
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH
PERHITUNGAN
+1.80 JARAK LANTAI 1 DAN 2
LUAS RUANGAN
: 360 CM
: 400 CM X 300 CM COMPUTER AIDED DESIGN (CAD)
OPTREDE (O) : 18 CM
ANTREDE (A) : 29 CM
GAMBAR SKALA
SYARAT IDEAL TANGGA
2 X O + A = 60 - 65
2 X 18 + 29 = 65 (MEMENUHI SYARAT) RENCANA TANGGA 1 : 25
+1.62 +1.98 JUMLAH OPTREDE
360 CM/18 CM = 20 BUAH
+1.44 +2.16 DIGAMBAR
JUMLAH ANTREDE

400
O-1= A
+1.26 +2.34 20 BUAH-1BUAH= 19 BUAH
MISBAKHUL MILLAH
I0119106
PANJANG BORDES = 400-(29 X 9)
+1.08 +2.52 = 400-261 DISETUJUI DIPERIKSA
= 139 CM DOSEN ASISTEN
UKURAN BORDES : 139 CM X 300 CM
+0.90 +2.70 TANGEN @ = O/A
= 18 / 29
+0.72 +2.88 @ = ARC TANGEN (18 / 29)
= 31,8274º
+0.54 +3.06 ≈ 32º
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

+0.36 +3.24 REVISI

+0.18 +3.42
±0.00 +3.60

NAIK RENCANA TANGGA


SKALA 1:25
B

HALAMAN JML HALAMAN

28 41
KETERANGAN GAMBAR :
ANTREDE 29 CM
OPTREDE 18 CM
BORDES 139 CM
KEMIRINGAN 32 °
JUMLAH ANTREDE 19
JUMLAH OPTREDE 20
RING BALOK 25/50 +3.60
+ 360
+3.42
+3.24
+3.06
+2.88
+2.70
+2.52
+2.34
+2.16
+1.98
RING BALOK 15/20
+ 180
+1.80 29
+1.62
18

+1.44
+1.26
+1.08
+0.90
+0.72
+0.54
KERAMIK MARMER 40 X 40 +0.36
2 CM
+0.18
32°

±0.00
±0.00

- 40
-0.40
- 60
SPESI

SIRTU
SLOOF 15 20
TANAH URUG

- 145
ANSTAMPENG
- 165 20 CM
- 175
- 190

- 210 PASIR URUG


10 CM
FOOTPLAT
400

DETAIL TANGGA
SKALA 1 : 25
29
DOSEN

HALAMAN
DISETUJUI
GAMBAR

NIP. 196809121997021001
EDY PURWANTO, S.T., M.T.
DETAIL TANGGA

REVISI
I0119106
SURAKARTA

DIGAMBAR
MATA KULIAH

41
MISBAKHUL MILLAH
UNIVERSITAS SEBELAS MARET

1 : 25

NIM. I0118119
ASISTEN
SKALA

DIPERIKSA

PUPUNG BORSALINO
PRODI TEKNIK SIPIL FAKULTAS TEKNIK

JML HALAMAN
COMPUTER AIDED DESIGN (CAD)
U
I H G F E D C B A
200 300 200 200 400 300 150 150 200 200

PRODI TEKNIK SIPIL FAKULTAS TEKNIK

200
B
P S UNIVERSITAS SEBELAS MARET
KETERANGAN SURAKARTA
BV2 A' A'
J2 J1 BV1
B' B'
1 SALURAN AIR BERSIH MATA KULIAH
K. MANDI P3
A' TANGGA
-0.05 P2

200
GUDANG
TAMAN BV1 ±0.00 K. MANDI C' SALURAN AIR KOTOR
COMPUTER AIDED DESIGN (CAD)
KAMAR UTAMA 1 -0.05
-0.05 ±0.00
DAPUR P2 SALURAN TINJA
±0.00 2
C'
GAMBAR SKALA
P3 KRAN AIR

200
A J2
RUANG MAKAN
±0.00 POMPA

3 DENAH LANTAI 1 1 : 100


METERAN PDAM
NAIK
J1 J1
GROUND WATER
1500

RUANG KELUARGA DIGAMBAR

400
TERAS ±0.00 TERAS
-0.10 PU P1 -0.10 S SEPTICTANK
MISBAKHUL MILLAH
P PERESAPAN I0119106
J1 J1
RUANG TAMU
±0.00 A BAK KONTROL
DISETUJUI DIPERIKSA
P2
4
J2 J2 P2 SALURAN AIR KOTOR
A'
DARI LANTAI 2 DOSEN ASISTEN

KAMAR TAMU KAMAR ANAK B'


SALURAN TINJA DARI

300
±0.00 ±0.00 LANTAI 2

C'
SALURAN AIR BERSIH
CARPOT
-0.20
KE LANTAI 2

TAMAN KETERANGAN UKURAN PIPA


5
-0.40 J2 J2 SALURAN AIR BERSIH AW 3 4" = 26 MM EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO

200
NIP. 196809121997021001 NIM. I0118119
B SALURAN AIR KOTOR
> D 4" = 114 MM
> D 2 1 2" = 76 MM
REVISI
SALURAN TINJA D 3" = 89 MM

JALAN
-0.60
2300

DENAH SANITASI LANTAI 1


SKALA 1:100

HALAMAN JML HALAMAN

30 41
U
I H G F E D C B A
300 200 200 400 300 150 150 200

B
J2 BV2
A J1 A BV1
B PRODI TEKNIK SIPIL FAKULTAS TEKNIK
B
1 UNIVERSITAS SEBELAS MARET
K. MANDI P3 TANGGA KETERANGAN SURAKARTA
-0.05

200
T.CUCI
RUANG OLAHRAGA C
BV1
KAMAR UTAMA 2 +3.60
+3.55 K. MANDI
+3.55
MATA KULIAH
SALURAN AIR BERSIH
+3.60
P3
C 2 SALURAN AIR KOTOR COMPUTER AIDED DESIGN (CAD)

200
A J2 SALURAN TINJA
GAMBAR SKALA
P2 P2 KRAN AIR
3
TURUN POMPA
J1 J1
DENAH LANTAI 1 1 : 100
1100

T. JEMUR
METERAN PDAM
+3.55

400
BALKON
+3.55 P1 P1
RUANG BACA
+3.60
GROUND WATER
DIGAMBAR
J1 J1 S SEPTICTANK
A MISBAKHUL MILLAH
4 P PERESAPAN I0119106
J2 J2 P2 P2 RUANG MEDITASI
+3.60
BAK KONTROL DISETUJUI DIPERIKSA

300
A
SALURAN AIR KOTOR DOSEN ASISTEN
DARI LANTAI 2

RUANG KERJA B
SALURAN TINJA DARI
+3.60 LANTAI 2
5 C SALURAN AIR BERSIH
J2 J2 KE LANTAI 2

B
KETERANGAN UKURAN PIPA
SALURAN AIR BERSIH AW 3 4" = 26 MM EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119
> D 4" = 114 MM
1900 SALURAN AIR KOTOR
> D 2 1 2"= 76 MM
REVISI
SALURAN TINJA D 3" = 89 MM

DENAH SANITASI LANTAI 2


SKALA 1:100

HALAMAN JML HALAMAN

31 41
200 300 200 200 400 300 150 150 200 200 U

200
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
VOID SURAKARTA

200
KETERANGAN
MATA KULIAH

= KABEL PRIMER
COMPUTER AIDED DESIGN (CAD)

200
= KABEL SEKUNDER
A
GAMBAR SKALA

RENCANA
KETERANGAN PLAFOND DAN
1500

1 : 100
INSTALASI

400
= LAMPU TAMAN 15 WATT LISTRIK LANTAI 1
= LAMPU TL 18 WATT
1A2

DIGAMBAR
A = LAMPU TL 23 WATT
MISBAKHUL MILLAH
= LAMPU HIAS 50 WATT I0119106

STOP KONTAK 75 WATT


DISETUJUI DIPERIKSA

300
SAKLAR GANDA
DOSEN ASISTEN
SAKLAR TUNGGAL
METERAN LISTRIK
A
SEKRING UTAMA (8 A)
1
SEKRING 1 (4 A)

200
2
SEKRING 2 (4 A)
3
SEKRING 3 (4 A)
PUPUNG BORSALINO
4 EDY PURWANTO, S.T., M.T.

B SEKRING 4 (2 A) NIP. 196809121997021001 NIM. I0118119

SALURAN KABEL KE LT. 2


2300 REVISI
SEKRING 1 SEKRING 2
KETERANGAN
JML DAYA
JML
DAYA JML DAYA
JML
DAYA
SEKRING DAYA
SEKRING 1 470 WATT
LAMPU TAMAN 15 WATT 2 15 30 2 15 30 SEKRING 2 240 WATT
LAMPU TL 18 WATT 2 5 10 2 5 10 SEKRING 3 405 WATT
LAMPU TL 23 WATT 3 10 30 5 10 50
SEKRING 4 210 WATT
JUMLAH 1325 WATT
LAMPU HIAS 50 WATT 2 50 100 - 50 -

STOP KONTAK 75 WATT 4 75 300 2 75 150 DAYA YANG DIPASANG 1760 WATT
JUMLAH 470 WATT 240 WATT
JADI ARUS SEKRING UTAMA 8 A
ARUS SEKRING 4A 2A

RENCANA PLAFOND DAN INSTALASI LISTRIK LANTAI 1 HALAMAN JML HALAMAN


SKALA 1:100
32 41
U
100 300 200 200 400 300 150 150 200 100

100
200
KETERANGAN PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA
= KABEL PRIMER
MATA KULIAH
= KABEL SEKUNDER

200
A
COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA
KETERANGAN
1300

400
= LAMPU TAMAN 15 WATT RENCANA
PLAFOND DAN
= LAMPU TL 18 WATT
1 : 100
INSTALASI
3

LISTRIK LANTAI 2
A
4

= LAMPU TL 23 WATT

= LAMPU HIAS 50 WATT


DIGAMBAR

STOP KONTAK 75 WATT MISBAKHUL MILLAH


I0119106

300
SAKLAR GANDA

SAKLAR TUNGGAL
DISETUJUI DIPERIKSA
METERAN LISTRIK
A DOSEN ASISTEN
SEKRING UTAMA (8 A)

100
1
SEKRING 1 (4 A)
2
SEKRING 2 (2 A)

B
3
SEKRING 3 (4 A)
4
SEKRING 4 (4 A)
2100
SALURAN KABEL KE LT. 2
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119

SEKRING 3 SEKRING 4
KETERANGAN JML JML SEKRING DAYA REVISI
JML DAYA DAYA JML DAYA DAYA
SEKRING 1 470 WATT
LAMPU TAMAN 15 WATT - 15 - - 15 - SEKRING 2 240 WATT
LAMPU TL 18 WATT 3 5 15 2 5 10 SEKRING 3 405 WATT
LAMPU TL 23 WATT 4 10 40 5 10 50
SEKRING 4 210 WATT
JUMLAH 1325 WATT
LAMPU HIAS 50 WATT 1 50 50 - 50 -

STOP KONTAK 75 WATT 4 75 300 2 75 150 DAYA YANG DIPASANG 1760 WATT
JUMLAH 405 WATT 210 WATT
JADI ARUS SEKRING UTAMA 8 A
ARUS SEKRING 4A 2A

RENCANA PLAFOND DAN INSTALASI LISTRIK LANTAI 2


SKALA 1:100 HALAMAN JML HALAMAN

33 41
PERHITUNGAN RECANA SEPTICTANK:

30 100 30
UNTUK 15 ORANG
B TIAP ORANG BUTUH 25 LITER PER HARI
LAMA PEMBUSUKAN 3 HARI

PERHITUNGAN :
VOLUME = BANYAK AIR YANG MASUK X LAMA PEMBUSUKAN

30
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
= 15 X 25 X 3 UNIVERSITAS SEBELAS MARET
SURAKARTA
= 1125 LITER
A A MATA KULIAH
= 1.125 M³

75
# SYARAT MINIMUM TINGGI AIR 1.5 M COMPUTER AIDED DESIGN (CAD)
LUAS PENAMPANG ( A ) = V/H

= 1.125 / 1.5
GAMBAR SKALA
= 0.75 M²

30
# JADI UKURAN SEPTICTANK :
P =1M DETAIL
1 : 25
SEPTICTANK
L = 0.75 M
B
H = 1.5 M
TAMPAK ATAS DIGAMBAR

MISBAKHUL MILLAH
30 100 30 120 300 120 I0119106
PIPA UDARA
DISETUJUI DIPERIKSA

DOSEN ASISTEN
10

10
BESI PENGANGKAT
IN

50
50

OUT PLAT BETON

LUBANG EDY PURWANTO, S.T., M.T.


NIP. 196809121997021001
PUPUNG BORSALINO
NIM. I0118119

REVISI
PIPA PVC Ø 10 CM

150
150

PIPA PVC Ø 15 CM

PASANGAN BATA
40

40
POTONGAN A - A DETAIL SEPTICTANK POTONGAN B - B HALAMAN JML HALAMAN
SKALA 1 : 25
34 41
7 10 300 10 7

40 7
A A PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

100
MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

7 10
GAMBAR SKALA

B
DETAIL RESAPAN 1:25
TAMPAK ATAS

DIGAMBAR
7 10 100 10 7
7 10 300 10 7 MISBAKHUL MILLAH
MUKA TANAH ASLI I0119106

30
DISETUJUI DIPERIKSA
TANAH URUG
DOSEN ASISTEN

10
PLAT BETON
PASANGAN BATU BATA
PIPA PVC Ø 10 CM

80
BATU KALI
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
IJUK NIP. 196809121997021001 NIM. I0118119

REVISI

40
40
POTONGAN A - A POTONGAN B - B

DETAIL RESAPAN
SKALA 1 : 25 HALAMAN JML HALAMAN

35 41
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

TAMPAK DEPAN 1 : 100


+987,04

+928,79

+870,29
DIGAMBAR

MISBAKHUL MILLAH
I0119106
+697,85

DISETUJUI DIPERIKSA

DOSEN ASISTEN

+400

+350

EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO


NIP. 196809121997021001 NIM. I0118119

+180
REVISI

±0.00
-10
-40

TAMPAK DEPAN
SKALA 1:100

HALAMAN JML HALAMAN

36 41
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

TAMPAK SAMPING
1 : 100
+987,04 KANAN
+928,79

+870,29
DIGAMBAR

MISBAKHUL MILLAH
I0119106
+697,85

DISETUJUI DIPERIKSA

DOSEN ASISTEN

+400

+350

EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO


NIP. 196809121997021001 NIM. I0118119

+180
REVISI

±0.00
-10
-40

TAMPAK SAMPING KANAN


SKALA 1:100

HALAMAN JML HALAMAN

37 41
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

TAMPAK SAMPING
1 : 100
+987,04 KIRI
+928,79

+870,29
DIGAMBAR

MISBAKHUL MILLAH
I0119106
+697,85

DISETUJUI DIPERIKSA

DOSEN ASISTEN

+400

+350

EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO


NIP. 196809121997021001 NIM. I0118119

+180
REVISI

±0.00
-10
-40

TAMPAK SAMPING KIRI


SKALA 1:100

HALAMAN JML HALAMAN

38 41
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

TAMPAK
1 : 100
+987,04 BELAKANG
+928,79

+870,29
DIGAMBAR

MISBAKHUL MILLAH
I0119106
+697,85

DISETUJUI DIPERIKSA

DOSEN ASISTEN

+400

+350

EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO


NIP. 196809121997021001 NIM. I0118119

+180
REVISI

±0.00
-10
-40

TAMPAK BELAKANG
SKALA 1:100

HALAMAN JML HALAMAN

39 41
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

PAPAN RUITER 2/20


USUK 3/4 POTONGAN A-A 1 : 100
+987,04
RENG 2/3
SETENGAH KUDA - KUDA 4 M
+928,79
BALOK PENYOKONG 8/12
BALOK TARIK 8/12
SETENGAH KUDA -KUDA 2M +870,29
DIGAMBAR
GORDING 8/12
MISBAKHUL MILLAH
GENTENG (22 x 28 ) CM
I0119106
+697,85

LISPLANG 3/30 DISETUJUI DIPERIKSA


BAUT
KONSUL DOSEN ASISTEN
PASANGAN BATU BATA
PLESTERAN

DAK BETON

+3.55 +3.60 +3.60 +3.55 +400


RING BALOK 25/50

+350

KERAMIK MARMER 40 X 40 X 2
EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
NIP. 196809121997021001 NIM. I0118119
SPESI
SIRTU
+180
REVISI

TRASRAM 15/30 -0.10 ±0.00 ±0.00 -0.05 ±0.00


-10
SLOOF 15/20 -0.40 -0.40 -40
-60
TANAH URUG
PASANGAN BATU KALI
ANSTAMPENG 20 CM -145
PASIR URUG 10 CM -165
-175
-190
FOOTPLATE -210

POTONGAN A-A
SKALA 1:100

HALAMAN JML HALAMAN

40 41
PRODI TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA

MATA KULIAH

COMPUTER AIDED DESIGN (CAD)

GAMBAR SKALA

PAPAN RUITER 2/20


USUK 3/4
RENG 2/3 +987,04
POTONGAN B-B 1 : 100
SETENGAH KUDA - KUDA 3 M
+928,79
BALOK PENYOKONG 8/12
BALOK TARIK 8/12
KUDA KUDA 8M

DIGAMBAR
GORDING 8/12

GENTENG (22 x 28 ) CM
MISBAKHUL MILLAH
+697,85
I0119106
LISPLANG 3/30
BAUT DISETUJUI DIPERIKSA
KONSUL

PASANGAN BATU BATA DOSEN ASISTEN


PLESTERAN

DAK BETON

+3.60 +400
RING BALOK 25/50 +3.42
+3.24
+3.06
+2.88 +350
+2.70
+2.52
+2.34
+2.16
RING BALOK 15/20 +1.98 EDY PURWANTO, S.T., M.T. PUPUNG BORSALINO
+1.80 NIP. 196809121997021001 NIM. I0118119
+1.62
KERAMIK MARMER 40 X 40 X 2 +1.44
+1.26 +180

SPESI
+1.08
+0.90
REVISI
+0.72
SIRTU +0.54
+0.36
+0.18 ±0.00
32°

TRASRAM15/30 ±0.00
-10
SLOOF 15/20 -0.40 -0.40 -40
-60
TANAH URUG
PASANGAN BATU KALI
ANSTAMPENG 20 CM -145
PASIR URUG 10 CM -165
-175
-190
FOOTPLATE -210

POTONGAN B-B
SKALA 1:100

HALAMAN JML HALAMAN

41 41

Anda mungkin juga menyukai