Anda di halaman 1dari 1

KERTAS KERJA IDENTIFIKASI POTENSI PAP

DEPOT ALSIN
KAPASITAS KAPASITAS RATA-RATA ANGKUTAN JUMLAH TOTAL
NO NAMA NILAI AIR HARGA AIR JUMLAH (Rp) PAP 10% (Rp)
ARMADA ARMADA PER HARI HARI KERJA (M3)
LITER m³ RET

1 TRUCK TANGKI AIR 1 8000 8 6 30 1440 1.2 700 1,209,600 120,960

2 TRUCK TANGKI AIR 2 8000 8 6 30 1440 1.2 700 1,209,600 120,960

3 TRUCK TANGKI AIR 3 8000 8 6 30 1440 1.2 700 1,209,600 120,960

4 TRUCK TANGKI AIR 4 8000 8 6 30 1440 1.2 700 1,209,600 120,960

TOTAL 32000 8 6 30 5760 1.2 700 4,838,400 483,840

Anda mungkin juga menyukai