Pembersihan lokasi
26.000
47.000
1.000
1,222.000 1,222.000
Pasang bouwplank
59.000
2.000
1.000
118.000 118.000
52.380 112.980
53.408
-
166.388 166.388
Bangunan 651.300
1.000
1.000
651.300 651.300
Jalan/hal 311.300
180.000
491.300 491.300
1.000 74.164
1.000
1.000
74.164 74.164
1.000 4.800
3.468
11.683
19.951 19.951
PEKERJAAN PASANGAN
Plesteran 1 : 2 = 179.880
Plesteran 1 : 4 = 3,430.402
357.020 0.475
1.050
1.000
178.064 178.064
Pasang aanstamping
357.020 0.700
0.200
1.000
49.983 49.983
Saluran Air/Got
1.000 12.000
1.000
1.000
12.000 12.000
Pj. Dinding Lt. 1
82.000 28.400
37.000 60.000
24.000 32.000
19.400 6.400
15.400 6.000
18.000
195.800 132.800 328.600
82.000 28.400
37.000 66.000
24.000 20.500
12.900 6.000
10.000 6.400
19.200
185.100 127.300 312.400
5.000
10.000
8.220
80.000
28.400
72.000
72.000
17.000
11.000
18.000
20.000
18.000
9.120
6.150 15.270
374.890
PEKERJAAN LANTAI DAN BETON
2.000 0.150
0.300
3.150
0.284 0.284
372.290
0.200
0.250
18.615 18.615
Plate 26 1.026
1.000
1.000
26.666 26.666
Plate 24 0.853
1.000
1.000
20.471 20.471
24.000 0.175
4.000
1.000
16.800 16.800
2.000 0.580
4.000
1.000
4.640 4.640
Kolom 35/35
24.000 0.123
4.000
1.000
11.760 11.760
1.96
Balok Utama 30/60
22.000 0.180
6.000
1.000
23.760 23.760
2.000 0.180
2.500
1.000
0.900 0.900
11.000 0.120
2.200
1.000
2.904 2.904
32.000 0.096
4.000
1.000
12.288 12.288
6.000 0.096
2.500
1.000
1.440 1.440
115.500 0.060
1.000
1.000
6.930 6.930
16.000 0.138
1.000
1.000
2.200 2.200
Beton Konsol
29.900 0.080
1.000
-
2.392 2.392
Kolom Praktis
97.000 0.014
3.600
1.000
5.028 5.028
102.000 0.014
4.000
1.000
5.875 5.875
24.000 0.080
1.000
1.000
1.920 1.920
18.200 0.138
1.000
1.000
2.503 2.503
82.000 0.060
1.000
1.000
4.920 4.920
212.100 0.030
1.000
1.000
6.363 6.363
Cor Lantai t = 12 cm
0.120 557.200
8.100
7.500
PEKERJAAN KAYU, ATAP DAN PLAFON
14.600 71.100
20.400
0.050
0.100
0.150
- 0.509 0.509
10 Buah 10.000 5.085
12.700 71.000
13.800
0.050
0.100
0.150
0.459 0.459
4 Buah 4.000 1.834
Gording
5.097
929.316
Atap Metal Roof
1.000 56.400
1.000
1.000
56.400 56.400
1.000 -
1.000
1.000
- -
56.400
Bubungan
1.000 6.000
1.000
1.000
6.000 6.000
Listplank
1.000 12.000
1.000
1.000
12.000 12.000
Plafon
1.000 49.200
1.000
1.000
49.200 49.200
List plafon
1.000 209.160
1.000
1.000
209.160 209.160
Kusen
76.820
0.060
0.120
0.553 0.553
Jalusi
-
1.000
0.100
- -
2.000 0.800
2.100
1.000
3.360 3.360
2.000 0.800
2.100
1.000
3.360 3.360
1.470
1.000
1.000
1.470 1.470
Jendela panil
4.320
1.000
1.000
4.320 4.320
kaca mati
0.275
1.000
1.000
0.275 0.275
Has nyamuk
-
1.000
1.000
- -
A. BAHAN MATERIAL
HARGA HARGA
NO. JENIS BAHAN / MATERIAL SATUAN NO. JENIS BAHAN / MATERIAL SATUAN
(Rp.) (Rp.)
24 1 M3 BETON MUTU Fic= 19,3 Mpa (K-225), Slump (12±2), w/c = 0,58 (SNI 7394 - 2008)
37 1 M3 PLAT LANTAI T = 10 CM
1.0000 M3 Beton Cor 2,299,637.78 2,299,637.78
132.5921 kg Besi beton 88,365.63 11,716,583.79
6.0000 M2 Bekisting 2,965,425.00 17,792,550.00
31,808,771.56
5 1 M2 ACIAN
11 1 BH PASANG GRENDEL
32 1 KG PEKERJAAN BESI
1.1000 Kg Baja Profil 81,000.00 89,100.00
0.0800 Kg Menie 43,750.00 3,500.00
0.0750 Dos Kawat Las 150,000.00 11,250.00
0.0600 Bh Gurinda 95,000.00 5,700.00
0.0650 ho Pekerja 150,000.00 9,750.00
0.0650 ho Tukang Las 200,000.00 13,000.00
0.0070 ho Kepala Tukang 250,000.00 1,750.00
0.0003 ho Mandor 250,000.00 75.00
0.0075 Jam Sewa Alat Bantu 175,000.00 1,312.50
JUMLAH 135,437.50
CATATAN :
Bobot Isi Pasir = 1400 Kg / m3
Bobot Isi Batu Pecah = 1350 Kg / m3
Buckling Factor Pasir = 20%
HARGA PERKIRAAN SENDIRI (HPS)
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM FISIKA
SMA PERSIAPAN KEMTU GRESI
LOKASI : KELURAHAN KEMTUK GRESI, DISTRIK KEMTUK GRESI
PROVINSI : PAPUA
TAHUN : 2023
HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)
A B C D E
I. PEKERJAAN PERSIAPAN
1 Prasarana Kerja 1.00 Ls 8,250,000.00 8,250,000.00
2 Papan Nama Proyek + Dokumentasi/Laporan 1.00 Ls 1,000,000.00 1,000,000.00
3 Pembersihan Lokasi 120.75 M2 27,500.00 3,320,625.00
4 Pengukuran dan Pas. Bouwbplank 45.00 M' 105,750.00 4,758,750.00
17,329,375.00
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi 16.42 M2 118,750.00 1,949,400.00
2 Urugan Kembali Bekas Galian Pondasi 12.31 M2 39,583.33 487,350.00
3 Urugan Pasir Bawah Pondasi 10 cm 3.19 M3 523,750.00 1,671,810.00
4 Urugan Peninggian Lantai 25 cm 29.00 M3 232,150.00 6,732,350.00
5 Urugan Pasir Bawah Lantai 10 cm 11.60 M3 523,750.00 6,075,500.00
16,916,410.00
III. PEK. PASANGAN, LANTAI DAN PLESTERAN
1 Pas. Anstamping /Batu Kosong 10.26 M3 897,300.00 9,206,298.00
2 Pas. Pondasi Batu Kali/Gunung 1:4 21.89 M3 1,510,250.00 33,056,352.00
3 Cor Sloof 15/20 Campuran 1:2:3 1.37 M3 13,800,356.53 18,878,887.73
4 Cor Kolom Praktis 11/11 Campuran 1:2:3 0.59 M3 14,982,695.81 8,883,240.35
5 Cor Ring Balok 15/20 Campuran 1:2:3 0.98 M3 16,675,406.53 16,308,547.58
6 Cor Plat Beton T.12 Campuran 1:2:3 (Meja Praktek) 2.40 M3 16,675,406.53 40,020,975.67
7 Pas. Batu Tela 1:4 102.04 M2 169,750.00 17,321,969.00
8 Plesteran 1 :4 204.09 M2 106,740.00 21,784,353.12
9 Acian 204.09 M2 66,812.50 13,635,629.50
10 Pas. Lantai keramik 40x40 + Meja Beton 87.00 M2 308,125.00 26,806,875.00
11 Pas. Lantai Keramik 40x40 Anti Slip 22.00 M2 304,850.00 6,706,700.00
12 Cor Rabat Samping & Belakang T.5cm dihaluskan 2.93 M3 1,524,190.00 4,458,255.75
13 Pek, pasangan Got Air Keliling 49.26 M' 333,891.05 16,447,473.12
233,515,556.82
IV. PEKERJAAN KAYU
1 Pas. Kosen Kayu Besi 5/10 0.92 M3 13,043,750.00 12,058,946.88
2 Pas. Kuda - kuda Kayu Besi 5/10 1.12 M2 10,640,000.00 11,868,920.00
3 Pas. Gording Kayu Matoa 5/10 1.16 M2 5,935,000.00 6,884,600.00
4 Pek. Pasangan Daun Pintu Panil 2.00 Bh 1,497,500.00 2,995,000.00
5 Pek . Pasangna Daun Jendela Panil Kaca 5 mm 13.64 M2 630,190.00 8,595,791.60
6 Pek . Pasangna Daun Jendela Panil Papan (Laci Meja Beton) 14.00 M2 630,190.00 8,822,660.00
7 Pas. Lisplank Kayu Besi 2/20 35.80 M' 134,000.00 4,797,200.00
8 Pas. Jalusi Papan Ky Klas I 5.70 M2 1,028,000.00 5,855,488.00
9 Pas. Rangka Atap Kaso+Reng 227.27 M2 117,850.00 26,783,769.50
88,662,375.98
V. PEKERJAAN ATAP DAN PLAFON
1 Pas. Atap Multy Roof 227.27 M2 158,412.50 36,002,408.88
2 Pas. Nok Multy Roof 23.80 M1 111,312.50 2,649,237.50
3 Pas. Rangka Plafon 125.40 M2 163,300.00 20,477,820.00
4 Pas. Penutup Plafon Triplek 4mm luar dalam 125.40 M2 85,587.50 10,732,672.50
5 Pas. Lisp Plafond Profil 102.00 M1 28,150.00 2,871,300.00
72,733,438.88
VI. PEKERJAAN ALAT GANTUNG
1 Pas. Kunci tanam 2 slaag 1.00 Bh 237,625.00 237,625.00
2 Pas. Engsel Pintu 2.00 Zet 103,781.50 207,563.00
3 Pas. Engsel Jendela 60.00 Zet 59,500.00 3,570,000.00
4 Pas. Grendel Jendela 60.00 Bh 59,500.00 3,570,000.00
5 Pas. Engsel Daun Pintu Meja 24.00 Bh 59,500.00 1,428,000.00
6 Pas. Grendel Daun Pintu Meja 24.00 Bh 59,500.00 1,428,000.00
7 Pas. Handel Jendela 60.00 Bh 39,000.00 2,340,000.00
8 Grenel Pintu 2.00 Zet 41,500.00 83,000.00
7 Pas. Tralist Besi Jendela 30.00 Zet 750,000.00 22,500,000.00
8 Pas. Tralist Besi Ventelasi 32.00 Zet 550,000.00 17,600,000.00
9 Pas. Handel Pintu 1.00 Zet 181,500.00 181,500.00
53,145,688.00
A B C D E
VII. PEKERJAAN PENGECATAN
1 Cat Tembok luar dalam 2x 408.18 M2 43,320.00 17,682,184.32
2 Pengecatan Warna Kolom 8.40 M2 43,320.00 363,888.00
3 Cat Plafond 125.40 M2 55,194.00 6,921,327.60
4 Cat Kosen Pintu /Jendela 66.84 M2 96,317.76 6,437,879.08
5 Cat Daun Pintu / Jendela 31.78 M2 96,317.76 3,060,978.41
34,466,257.41
JUMLAH TOTAL
NO URAIAN PEKERJAAN ( Rp )
A B C
Terbilang : Enam Ratus Empat Puluh Satu Juta Sembilan Ratus Tiga Puluh Delapan Ribu Rupiah,-
Dalam
Grouting /kerok kasar Acian permukaan Lantai 47.61
A B C D
VIII. PEKERJAAN INST LISTRIK
1 Lampu SL 18 Watt 7.00 Ttk -
2 Stop kontak 1.00 Ttk 46,640.00
3 Saklar ganda 1.00 Ttk 31,500.00
4 Saklar Tunggal 1.00 Ttk 28,437.00
5 Pas. Sekring Box 1.00 Ttk 85,000.00
X. PEKERJAAN AKHIR
1 Pembersihan Lokasi 1.000 Ls 2,000,000.00
VOLUME
5,000,000.00
1,500,000.00
9.00 37.00
-
-
6,500,009.00
L
9.40 94.43 106.24
Samp.
11.04 79.29
15.00 34.25
1.25 1.88
493,480.67
8,998,348.73
59,598.00
-
-
-
-
160,950.00
541,200.00
-
132,121.72
###
14.37
1,500.00
750.00
38,250.00
-
40,500.00
-
210,000.00
9,130.80
-
420,300.00
639,430.80
-
46,640.00
31,500.00
28,437.00
85,000.00
191,577.00
3,504,375.00
3,504,375.00
2,000,000.00
2,000,000.00