PEMERINTAH KABUPATEN NGADA

DINAS PENDIDIKAN
KABUPATEN NGADA
Jln.Soekarno – Hatta, Telp (0384) 21423 – Bajawa

ENGINEER ESTIMATE
(EE)

PROGRAM :
WAJIB BELAJAR PENDIDIKAN DASAR 9 (SEMBILAN) TAHUN

KEGIATAN :
PEMBANGUNAN RUANG KELAS BARU (RKB) SD

PEKERJAAN :
PEMBANGUNAN 6 (ENAM) RUANG KELAS BARU BESERTA PERABOTNYA
SDN NGGOLOLOE

TAHUN ANGGARAN 2020

LOKASI KEGIATAN :
KECAMATAN : RIUNG
KABUPATEN : NGADA
PEMERINTAH KABUPATEN NGADA
DINAS PENDIDIKAN
KABUPATEN NGADA
Jln.Soekarno – Hatta, Telp (0384) 21423 – Bajawa

SPESIFIKASI TEKNIS/
RENCANA KERJA DAN SYARAT-SYARAT
(RKS)

PROGRAM :
WAJIB BELAJAR PENDIDIKAN DASAR 9 (SEMBILAN) TAHUN

KEGIATAN :
PEMBANGUNAN RUANG KELAS BARU (RKB) SD

PEKERJAAN :
PEMBANGUNAN 6 (ENAM) RUANG KELAS BARU BESERTA PERABOTNYA
SDN NGGOLOLOE

TAHUN ANGGARAN 2020

LOKASI KEGIATAN :
KECAMATAN : RIUNG
KABUPATEN : NGADA

PERENCANA
PEMERINTAH KABUPATEN NGADA
DINAS PENDIDIKAN
Jln. Soekarno-Hatta Telp. (0384)21423-Bajawa

PROGRAM:
PENGELOLAAN PENDIDIKAN

KEGIATAN:
PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA
TAHUN ANGGARAN 2023

PEKERJAAN:
PEMBANGUNAN RUANG TATA USAHA SMPS ST. AGUSTINUS LANGA

LOKASI:
JLN. JEREBUU-BAJAWA, DESA BOMARI-KEO, KEC. BAJAWA, KAB. NGADA

TAHUN ANGGARAN:
2023
REKAPITULASI RENCANA ANGGARAN BIAYA

PROGRAM : PENGELOLAAN PENDIDIKAN


KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA TAHUN ANGGARAN 2023
PEKERJAAN : PEMBANGUNAN RUANG DESA
JLN. JEREBUU-BAJAWA, TATA USAHA-SMPS
BOMARI-KEO, ST.
KEC.AGUSTINUS LANGA
BAJAWA, KAB. NGADA
LOKASI :
T.A. : 2023

NO
JUMLAH HARGA
MATA URAIAN PEKERJAAN
(Rp)
ANGAARAN
1 2 3
PEMBANGUNAN TATA USAHA
1 PEKERJAAN PERSIAPAN 21,119,508.33
2 PEKERJAAN TANAH 6,678,244.20
3 PEKERJAAN PONDASI BANGUNAN GEDUNG 19,079,829.17
4 PEKERJAAN BETON 52,266,910.19
5 PEKERJAAN LANTAI, DINDING DAN SELASAR 98,532,679.97
6 PEKERJAAN PLESTERAN DAN ACIAN 30,568,197.09
7 PEKERJAAN KAYU 63,810,046.38
8 PEKERJAAN PENUTUP ATAP 41,023,452.76
9 PEKERJAAN LANGIT - LANGIT 31,619,812.60
10 PEKERJAAN KUNCI DAN PENGGANTUNG 11,109,406.00
11 PEKERJAAN PENGECATAN 25,767,750.60
12 PEKERJAAN INSTALASI LISTRIK 17,872,360.57
13 PEKERJAAN SALURAN KELILING BANGUNAN 5,904,426.65
14 PEKERJAAN SANITASI & SANITAIR 7,842,784.45
15 PEKERJAAN MEUBELER 10,500,000.00

A JUMLAH 443,695,408.98
B PPN (11 % X A) 48,806,494.99
C JUMLAH (A + B) 492,501,903.96
D DIBULATKAN 492,501,900.00

TERBILANG :
DAFTAR RENCANA ANGGARAN BI

PROGRAM : PENGELOLAAN PENDIDIKAN


KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA TAHUN ANG
PEKERJAAN : PEMBANGUNAN RUANG TATA USAHA-SMPS ST. AGUSTINUS LANGA
LOKASI : JLN. JEREBUU-BAJAWA, DESA BOMARI-KEO, KEC. BAJAWA, KAB. NGADA
T.A. : 2023

NO.
MATA URAIAN PEKERJAAN
ANGG.
1 2
BAB I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Sebelum dan Sesudah Selesai Pekerjaan
2 Pengukuran dan Pemasangan Bouplank
3 Penyediaan Air Kerja
4 Kesehatan dan Keselamatan Kerja (K3)
5 Pembuatan Direksikeet / Barak / Los Kerja
6 Administrasi Dan Dokumentasi
7 Papan Nama Proyek dan Pemasangan

BAB II PEKERJAAN TANAH


1 Galian Tanah Pondasi Gedung
2 Urugan Kembali Tanah Pada Galian Pondasi
3 Urugan Tanah Biasa dan Pemadatan Pada Lantai
4 Urugan Pasir bawah Lantai

BAB III PEKERJAAN PONDASI BANGUNAN GEDUNG


1 Urugan Pasir di bawah Pondasi
2 Pek.Batu Kosong
3 Pek.Pasangan Batu Sungai/Gunung 1 Pc : 5 Psr

BAB IV PEKERJAAN BETON


1 Sloof Beton Bertulang 15/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
2 Sloof Beton Bertulang 15/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
3 Kolom Beton 15/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
4 Kolom Beton 20/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
5 Beton Balok Latei 12/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
6 Beton Balok Teras & Balok Gantung 15/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
7 Beton Ringbalk 15/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
8 Beton Balok Gewel 15/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
9 Pemasangan Pillar Tiang teras
10 Pekerjaan Quality Contorol/Pengujian Kubus Beton (Benda Uji 15 x 15 x15)

BAB V PEKERJAAN LANTAI, DINDING DAN SELASAR


1 Pekerjaan Rabat Lantai 1pc:3psr:5krl
2 Pekerjaan Rabat Lantai taman tebal 12 1pc:3psr:5krl
3 Pekerjaan Pasangan Batako Dinding Tembok1pc:5psr
4 Pekerjaan Pemasangan Lantai (60x60)cm Untuk Ruang & Selasar
5 Pekerjaan Pemasangan Uk.(40x40)cm T. 1,2 m'
6 Pemasangan Ornamen Tiang/Sepatu Tiang Teras

BAB VI PEKERJAAN PLESTERAN DAN ACIAN


1 Plesteran 1Pc : 5Psr (dinding Pondasi)
2 Plesteran 1Pc : 5Psr (dinding Tembok)
3 Pleteran List Tiang Timbul Spesi (1pc:5Psr)
4 Acian Dinding Pondasi
5 Acian Dinding Tembok
6 Acian Dinding List Tiang Timbul

BAB VII PEKERJAAN KAYU


1 Memasang Konstruksi Kuda - Kuda Konvensional 6/12, Kayu Kelas II
2 Memasang Konstruksi Gording 6/8, Kayu Kelas II
3 Kusen Pintu Kayu Kls II (Type P1 ) + Pemasangan
4 Kusen Pintu Kayu Kls II (Type P2 ) + Pemasangan
5 Kusen Pintu Kayu Kls II (Type P3 ) + Pemasangan
6 Kusen Jendela Kayu Kls II (Type J1) + Pemasangan
7 Kusen Jendela Kayu Kls II (Type J2) + Pemasangan
8 Kusen Buven Kayu Kls II (Type BV) + Pemasangan
9 Daun Pintu Panil Kayu Kls II (Type P1 uk. 2.17 x 1) + Pemasangan
10 Daun Pintu Panil Kayu Kls II (Type P2 uk. 1.45 x 3) + Pemasangan
11 Daun Pintu Panil Kayu Kls II (Type P3 uk. 1.30 x 1) + Pemasangan
12 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J1 Uk. 0.37 X 0.77 ) + Pemasangan
13 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J2 Uk. 0.67 X 0.37) + Pemasangan
14 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVP1 Uk. 0.57 x 0.37) + Pemasangan
15 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ1 Uk. 0.65 x 0.37) + Pemasangan
16 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
17 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BV Uk. 0.77 x 0.37) + Pemasangan
18 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
19 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ3 Uk. 0.77 x 0.37) + Pemasangan
20 Memasang Woodplank (L=30cm)

BAB VIII PEKERJAAN PENUTUP ATAP


1 Pek Atap Seng Galvalum P 6 m, t 0.3
2 Pas. Atap Seng Bubungan BJLS 0,30 mm
3 Beugle U Plat
4 Plat Strip P. 30 cm
5 Pas. Baut (D12 P.12 cm)
6 Pas. Baut (D12 P.30 cm)
7 Pas. Baut ( D 16 P: 40 cm )

BAB IX PEKERJAAN LANGIT - LANGIT


1 Memasang Rangka Langit-langit (60 x 60 cm) Kayu Kelas 2
2 Memasang Langit-langit Plafond Kalsiboard 4 mm
3 Memasang List gipsun Profil 10 cm

BAB X PEKERJAAN KUNCI DAN PENGGANTUNG


1 Pek. Kunci pintu uk. Besar 2 x putar mutu baik
2 Pek. Engsel pintu (1 pintu 3 buah engsel)
3 Pek. Engsel Jendela + Boven
4 Pek. Grendel Pintu Panjang
5 Pek. Grendel Spring Knip (Jendela+Boven jendela dan Boven Pintu)
6 Pek. Pasang Kait angin
BAB XI PEKERJAAN PENGECATAN
1 Pek. Cat Pondasi Dengan Cat Tembok
2 Pek. Cat Dinding Tembok Dengan Cat Tembok
3 Pek. Cat Penutup Plafond + List plafond Dengan Cat Tembok
4 Pek. Cat Tiang Pilar Dengan Cat Tembok
5 Pek. Cat Kusen Dengan Cat Mengkilat
6 Pek. Vernis/Milamin Daun Pintu,Jendela dan Buven
7 Pek. Menie Seng
8 Pemasangan Plakat ukuran 10 x 25 cm (Batu marmer hitam)

BAB XII PEKERJAAN INSTALASI LISTRIK


1 Instalasi Listrik
2 Penangkal Petir
3 Panel SDP
4 Kabel NYY 4 x 2,5 mm
5 Kabel NYY 3 x 2,5 mm
6 Kabel NYM 2,5 mm
7 Downlights Inbow 5 Inch DL 500 Lampu 23 Watt
8 Downlights Inbow 5 Inch DL 500 Lampu 15 Watt
9 Saklar Tunggal setara broco
10 Saklar ganda setara broco
11 Stop kontak setara broco
12 Arde (1 Fase)

BAB XIII PEKERJAAN SALURAN KELILING BANGUNAN


1 Galian Tanah
2 Urugan Pasir di bawah Lantai Saluran
3 Pasangan Dinding Batako Saluran (1 Pc : 5 Psr)
4 Beton Tumbuk Lantai Saluran (1 Pc : 3 Psr : 5 Krl)
5 Plesteran Dinding Saluran (1 Pc : 4 Psr)
6 Acian Dinding Saluran

BAB XIIIIPEKERJAAN SANITASI & SANITAIR


1 Kloset Jongkok
2 Wastafel Keramik
3 Pipa PVC AW dia 4" + assesories
4 Pipa PVC AW dia 2" assesories
5 Pipa PVC AW dia 1/2 + assesories
6 Pipa Hawa Gip dia 2" assesories
7 Floor Drain Stenlis
8 Kran Air Stenlis dia 1/2"
9 Stop Kran Gip dia 1/2"
BAB XV PEKERJAAN MEUBELER
1 Meja Kerja (1/2 Biro)
2 Lemari 2 Pintu
3 Kursi Guru
CANA ANGGARAN BIAYA

GAH PERTAMA TAHUN ANGGARAN 2023


. AGUSTINUS LANGA
. BAJAWA, KAB. NGADA

HARGA SATUAN SUB TOTAL


SAT. VOL. PEKERJAAN
(RP.) (RP.)
3 4 5 6

M2 300 8,790.00 2,637,000.00


M' 43.50 74,503.33 3,240,895.00
Ls 1.00 2,500,000.00 2,500,000.00
Ls 1.00 2,500,000.00 2,500,000.00
Unit 1.00 5,741,613.33 5,741,613.33
Ls 1.00 4,000,000.00 4,000,000.00
Ls 1.00 500,000.00 500,000.00
JUMLAH BAB I 21,119,508.33

M3 28.21 64,700.00 1,825,187.00


M3 7.05 9,280.00 65,447.20
M3 93.75 9,280.00 870,000.00
M3 21.38 183,280.00 3,917,610.00
JUMLAH BAB II 6,678,244.20

M3 3.58 183,280.00 655,226.00


M3 5.01 319,149.00 1,597,340.74
M 3
25.07 671,345.00 16,827,262.43
JUMLAH BAB III 19,079,829.17

M3 1.34 902,203.09 1,209,313.03


M2 5.59 171,889.33 960,001.93
Kg 223.58 18,341.85 4,100,941.78
M3 0.45 902,203.09 404,570.42
M 2
1.49 171,889.33 256,931.58
Kg 94.48 18,341.85 1,732,992.33
M3 1.71 902,203.09 1,542,767.29
M2 5.70 328,064.67 1,869,968.60
Kg 394.07 18,341.85 7,228,047.56
M3 0.71 902,203.09 638,759.79
M 2
0.35 328,064.67 116,134.89
Kg 98.31 18,341.85 1,803,135.19
M 3
1.25 902,203.09 1,128,656.07
M 2
10.42 171,889.33 1,791,946.30
Kg 314.84 18,341.85 5,774,708.80
M 3
0.47 902,203.09 423,855.01
M2 2.94 336,964.67 991,628.79
Kg 123.73 15,300.25 1,893,150.93
M 3
2.09 902,203.09 1,881,093.45
M2 6.95 171,889.33 1,194,630.87
Kg 347.79 18,341.85 6,379,038.80
M 3
0.21 902,203.09 188,786.00
M2 0.70 171,889.33 119,892.81
Kg 45.51 18,341.85 834,757.97
Unit 6.00 800,200.00 4,801,200.00
Bh 10.00 300,000.00 3,000,000.00
JUMLAH BAB IV 52,266,910.19

M3 7.13 902,203.09 6,428,197.05


M3 1.35 902,203.09 1,217,974.18
M2 197.30 275,257.35 54,308,880.72
M 2
142.50 149,828.67 21,350,585.00
M2 92.45 138,683.83 12,821,043.02
Unit 6.00 401,000.00 2,406,000.00
JUMLAH BAB V 98,532,679.97

M2 56.92 31,474.80 1,791,702.99


M2 394.60 31,474.80 12,420,094.57
M 2
29.88 31,474.80 940,467.02
M2 56.92 32,022.50 1,822,880.81
M 2
394.60 32,022.50 12,636,219.40
M2 29.88 32,022.50 956,832.30
JUMLAH BAB VI 30,568,197.09

M3 1.81 6,150,800.00 11,156,468.66


M3 1.65 5,432,020.00 8,952,403.52
Unit 1.00 500,000.00 500,000.00
Unit 1.00 500,000.00 500,000.00
Unit 2.00 500,000.00 1,000,000.00
Unit 7.00 1,400,000.00 9,800,000.00
Unit 1.00 850,000.00 850,000.00
Unit 3.00 300,000.00 900,000.00
Unit 1.00 1,750,000.00 1,750,000.00
Unit 1.00 1,750,000.00 1,750,000.00
Unit 2.00 1,750,000.00 3,500,000.00
Unit 21.00 500,000.00 10,500,000.00
Unit 2.00 500,000.00 1,000,000.00
Unit 2.00 300,000.00 600,000.00
Unit 21.00 300,000.00 6,300,000.00
Unit 2.00 300,000.00 600,000.00
Unit 3.00 300,000.00 900,000.00
Unit 4.00 300,000.00 1,200,000.00
Unit 2.00 300,000.00 600,000.00
M1 46.82 30,994.75 1,451,174.20
JUMLAH BAB VII 63,810,046.38

M2 230.86 159,646.00 36,856,194.85


M¹ 16.35 43,449.00 710,391.15
Bh 20.00 32,709.78 654,195.60
Bh 30.00 26,259.78 787,793.40
Bh 120.00 7,634.78 916,173.60
Bh 60.00 15,009.78 900,586.80
Bh 12.00 16,509.78 198,117.36
JUMLAH BAB VIII 41,023,452.76

M2 229.52 46,770.00 10,734,650.40


M 2
229.52 50,645.00 11,624,040.40
M1 176.52 52,465.00 9,261,121.80
JUMLAH BAB IX 31,619,812.60

Bh 4.00 298,720.00 1,194,880.00


Bh 15.00 48,418.40 726,276.00 bon
Bh 98.00 34,359.00 3,367,182.00
Bh 2.00 33,734.00 67,468.00
Bh 52.00 41,624.00 2,164,448.00
Bh 98.00 36,624.00 3,589,152.00
JUMLAH BAB X 11,109,406.00
M2 56.92 24,138.07 1,374,059.44
M2 394.60 24,138.07 9,524,987.31
M2 229.32 28,471.40 6,529,061.45
M2 15.36 24,138.07 370,760.70
M2 12.44 69,430.33 863,713.35
M2 28.38 69,430.33 1,970,713.36
M2 227.59 20,801.50 4,734,254.99
Bh 1.00 400,200.00 400,200.00
JUMLAH BAB XI 25,767,750.60

Titik 10.00 157,721.00 1,577,210.00


Unit 1.00 6,427,250.50 6,427,250.50
Unit 1.00 1,280,700.80 1,280,700.80
m' 25.00 36,405.69 910,142.26
m' 100.00 30,381.67 3,038,167.24
m' 150.00 12,077.93 1,811,688.81
Bh 8.00 212,111.00 1,696,888.00
Bh 2.00 142,111.00 284,222.00
Bh 5.00 30,030.62 150,153.11
Bh 1.00 38,806.87 38,806.87
Bh 8.00 33,541.12 268,328.98
Fase 2.00 194,401.00 388,802.00
JUMLAH BAB XII 17,872,360.57

M3 8.82 64,700.00 570,654.00


M3 4.41 9,280.00 40,924.80
M 2
12.60 275,257.35 3,468,242.61
M3 0.84 902,203.09 757,850.60
M 2
16.80 31,474.80 528,776.64
M2 16.80 32,022.50 537,978.00
JUMLAH BAB XIII 5,904,426.65

Bh 2.00 522,250.06 1,044,500.12


Bh 2.00 1,017,030.00 2,034,060.00
M' 20.00 65,490.50 1,309,810.00
M' 25.00 65,490.50 1,637,262.50
m' 25.00 34,740.50 868,512.50
Bh 2.00 140,490.50 280,981.00
Bh 2.00 39,383.33 78,766.67
Bh 4.00 112,112.92 448,451.67
Bh 1.00 140,440.00 140,440.00
JUMLAH BAB XIIII 7,842,784.45

Bh 3.00 2,000,000.00 6,000,000.00


Unit 1.00 3,000,000.00 3,000,000.00
Bh 3.00 500,000.00 1,500,000.00
JUMLAH BAB XV 10,500,000.00
JUMLAH (BAB I S/D BAB XIV) 443,695,408.98
2350000
Analisis Harga Satuan Pekerjaan 2022 (Peraturan Menteri Pekerjaa
Perumahan Rakyat No. 1 Tahun 2022)
Pembersihann 1m2 Lapangan dan peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 83,000.00
Mandor L.04 OH 0.005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pembuatan direksikeet (Kantor), los kerja dan gudang


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.200 83,000.00
Tukang tembok/batu L.02 OH 0.400 88,000.00
Kepala tukang L.03 OH 0.040 93,000.00
Mandor L.04 OH 0.120 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Balok Kayu Kelas II 5/7 M.33.d M3 0.5 2,966,666.67
2 Dinding triplek 4mm M.42.b Lembar 15.00 75,500.00
3 Paku M.72.g Kg 3.00 23,500.00
4 Asbes Gelombang M.122.a Lembar 40.00 70,000.00
5 Paku Asbes M.54.f Kg 3.00 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)


Pengukuran dan pemasangan 1 m’ Bouwplank
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.10 83,000.00
Tukang Kayu L.02 OH 0.10 88,000.00
Kepala Tukang L.03 OH 0.01 93,000.00
Mandor L.04 OH 0.005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok 5/7 Kls. II Lokal m3 0.012 2,966,666.67
Paku 2”-3” kg 0.020 27,500.00
papan 3/20 m3 0.007 2,833,333.33
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Menggali 1 m3 tanah keras sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.750 83,000.00
Mandor L.04 OH 0.025 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pengurungan kembali 1 m3 galian tanah pada pondasi


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 83,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
F Harga Satuan Pekerjaan (C+D)

Pengurungan kembali 1 m3 galian tanah pada lantai


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 83,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pengurungan 1 m3 dengan pasir urug bawah lantai


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 83,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug M3 1.200 145,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pengurungan 1 m3 dengan pasir urug bawah pondasi


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 83,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug M3 1.200 145,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m3 pondasi batu kosong (anstamping)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.780 83,000.00
Tukang Batu L.02 OH 0.390 88,000.00
Kepala Tukang L.03 OH 0.039 93,000.00
Mandor L.04 OH 0.039 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 125,000.00
Pasir urug m3 0.432 145,000.00
JUMLAH HARGA BAHAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m3 pondasi batu sungai / gunung campuran 1pc : 5 pp


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.500 83,000.00
Tukang Batu L.02 OH 0.750 88,000.00
Kepala Tukang L.03 OH 0.075 93,000.00
Mandor L.04 OH 0.075 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Gunung/batu Quary m3 1.200 165,500.00
Semen Porland Kg 136.000 1,450.00
Pasir Pasang m3 0.544 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)


Membuat Beton sloof ukuran 15/20 K125 = Fc 9,8 mpa
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton m3 0.591 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 bekisting untuk sloof ukuran 15/20 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 83,000.00
Tukang Kayu L.02 OH 0.260 88,000.00
Kepala Tukang L.03 OH 0.026 93,000.00
Mandor L.04 OH 0.026 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan tipis 2,5 cm Kls. m3
2,000,000.00
III Lokal 0.045
Paku 5 - 10 cm kg 0.300 23,500.00
Minyak bekisting Liter 0.100 38,333.33
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pembesian sloof 15/20 cm dengan besi polos atau besi ulir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.600 83,000.00
Tukang besi L.02 OH 1.600 88,000.00
Kepala Tukang L.03 OH 0.160 93,000.00
Mandor L.04 OH 0.160 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 105.00 13,875.00
(polos/ulir)
Kawat beton kg 2.8 26,125.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)


Harga Satuan Pekerjaan (C+D)

Membuat Beton sloof ukuran 15/15 K125 = Fc 9,8 mpa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.591 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 bekisting untuk sloof ukuran 15/15 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 83,000.00
Tukang Kayu L.02 OH 0.260 88,000.00
Kepala Tukang L.03 OH 0.026 93,000.00
Mandor L.04 OH 0.026 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan tipis 2,5 cm Kls. m3
2,000,000.00
III Lokal 0.045
Paku 5 - 10 cm kg 0.300 23,500.00
Minyak bekisting Liter 0.100 38,333.33
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pembesian sloof 15/15 cm dengan besi polos atau besi ulir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.600 83,000.00
Tukang besi L.02 OH 1.600 88,000.00
Kepala Tukang L.03 OH 0.160 93,000.00
Mandor L.04 OH 0.160 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 105 13,875.00
(polos/ulir)
Kawat beton kg 2.8 26,125.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)


Harga Satuan Pekerjaan (C+D)

Membuat Beton kolom ukuran 15/15 K125 = Fc 9,8 mpa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.591 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 bekisting untuk kolom ukuran 15/15


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 83,000.00
Tukang Kayu L.02 OH 0.330 88,000.00
Kepala Tukang L.03 OH 0.033 93,000.00
Mandor L.04 OH 0.033 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan tipis 2,5 cm Kls. m3
2,000,000.00
III Lokal 0.040
Paku 5 - 12 cm kg 0.400 23,500.00
Minyak bekisting Liter 0.200 38,333.33
Balok kayu kelas II m3 0.015 2,966,666.67
plywood tebal 9 mm Lbr 0.350 132,500.00
Dolken kayu Ø8- Batang 2.000 25,000.00
10cm - panjang 4 m
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pembesian kolom 15/15 cm dengan besi polos atau besi ulir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.600 83,000.00
Tukang besi L.02 OH 1.600 88,000.00
Kepala Tukang L.03 OH 0.160 93,000.00
Mandor L.04 OH 0.160 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 105 13,875.00
(polos/ulir)
Kawat beton kg 2.8 26,125.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)


Harga Satuan Pekerjaan (C+D)

Membuat Beton kolom ukuran 20/20 K125 = Fc 9,8 mpa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.591 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 bekisting untuk kolom ukuran 20/20


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 83,000.00
Tukang Kayu L.02 OH 0.330 88,000.00
Kepala Tukang L.03 OH 0.033 93,000.00
Mandor L.04 OH 0.033 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan tipis 2,5 cm Kls. m3
2,000,000.00
III Lokal 0.040
Paku 5 - 12 cm kg 0.400 23,500.00
Minyak bekisting Liter 0.200 38,333.33
Balok kayu kelas II m3 0.015 2,966,666.67
plywood tebal 9 mm Lbr 0.350 132,500.00
Dolken kayu Ø8- Batang 2.000 25,000.00
10cm - panjang 4 m
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pembesian kolom 20/20 cm dengan besi polos atau besi ulir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.600 83,000.00
Tukang besi L.02 OH 1.600 88,000.00
Kepala Tukang L.03 OH 0.160 93,000.00
Mandor L.04 OH 0.160 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 105 13,875.00
(polos/ulir)
Kawat beton kg 2.8 26,125.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
Jumlah (A+B+C)

Membuat Beton balok latei ukuran 12/15 K125 = Fc 9,8 mpa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.591 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 bekisting untuk balok latai ukuran 12/15 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 83,000.00
Tukang Kayu L.02 OH 0.260 88,000.00
Kepala Tukang L.03 OH 0.026 93,000.00
Mandor L.04 OH 0.026 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan tipis 2,5 cm Kls. m3
2,000,000.00
III Lokal 0.045
Paku 5 - 10 cm kg 0.300 23,500.00
Minyak bekisting Liter 0.100 38,333.33
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pembesian balok latai 12/15 cm dengan besi polos atau besi ulir
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.600 83,000.00
Tukang besi L.02 OH 1.600 88,000.00
Kepala Tukang L.03 OH 0.160 93,000.00
Mandor L.04 OH 0.160 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 105 13,875.00
(polos/ulir)
Kawat beton kg 2.8 26,125.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
Jumlah (A+B+C)

Membuat Beton balok teras dan balok gantung ukuran 15/20 K125 = Fc 9,8 mpa
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.5914 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 bekisting untuk Balok teras dan balok gantung ukuran 15/20 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 83,000.00
Tukang Kayu L.02 OH 0.330 88,000.00
Kepala Tukang L.03 OH 0.033 93,000.00
Mandor L.04 OH 0.033 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan tipis 2,5 cm Kls. m3
2,000,000.00
III Lokal 0.040
Paku 5 - 12 cm kg 0.400 23,500.00
Minyak bekisting Liter 0.200 38,333.33
Balok kayu kelas II m3 0.018 2,966,666.67
plywood tebal 9 mm Lbr 0.350 132,500.00
Dolken kayu Ø8- Batang 2.000 25,000.00
10cm - panjang 4 m
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pembesian Balok teras dan balok gantung ukuran 15/20 cm dengan besi polos atau besi ulir
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.600 83,000.00
Tukang besi L.02 OH 1.600 88,000.00
Kepala Tukang L.03 OH 0.160 93,000.00
Mandor L.04 OH 0.160 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 105 13,875.00
(polos/ulir)
Kawat beton kg 2.8 26,125.00
Jumlah (A+B+C)
Jumlah (A+B+C)

Membuat Beton ringbalk ukuran 15/20 K125 = Fc 9,8 mpa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.5914 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 bekisting untuk Ringbalk ukuran 15/20 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 83,000.00
Tukang Kayu L.02 OH 0.260 88,000.00
Kepala Tukang L.03 OH 0.026 93,000.00
Mandor L.04 OH 0.026 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan tipis 2,5 cm Kls. m3
2,000,000.00
III Lokal 0.045
Paku 5 - 10 cm kg 0.300 23,500.00
Minyak bekisting Liter 0.100 38,333.33
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pembesian Ringbalk 15/20 cm dengan besi polos atau besi ulir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.600 83,000.00
Tukang besi L.02 OH 1.600 88,000.00
Kepala Tukang L.03 OH 0.160 93,000.00
Mandor L.04 OH 0.160 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 105 13,875.00
(polos/ulir)
Kawat beton kg 2.8 26,125.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)


Harga Satuan Pekerjaan (C+D)

Membuat Beton gewel ukuran 15/15 K125 = Fc 9,8 mpa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.5914 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 bekisting untuk gewel ukuran 15/15 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 83,000.00
Tukang Kayu L.02 OH 0.260 88,000.00
Kepala Tukang L.03 OH 0.026 93,000.00
Mandor L.04 OH 0.026 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan tipis 2,5 cm Kls. m3
2,000,000.00
III Lokal 0.045
Paku 5 - 10 cm kg 0.300 23,500.00
Minyak bekisting Liter 0.100 38,333.33
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pembesian gewel 15/15 cm dengan besi polos atau besi ulir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.600 83,000.00
Tukang besi L.02 OH 1.600 88,000.00
Kepala Tukang L.03 OH 0.160 93,000.00
Mandor L.04 OH 0.160 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 105 13,875.00
(polos/ulir)
Kawat beton kg 2.8 26,125.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)


Harga Satuan Pekerjaan (C+D)

Membuat Pekerjaan Rabat Lantai 1pc:3psr:5krl K125 = Fc 9,8 mpa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.5914 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Membuat Pekerjaan Rabat Lantai taman tebal 12 1pc:3psr:5krl K125 = Fc 9,8 mpa
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.5914 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m2 dinding batako campuran 1pc : 5Psr


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.600 83,000.00
Tukang batu L.02 OH 0.200 88,000.00
Kepala Tukang L.03 OH 0.020 93,000.00
Mandor L.04 OH 0.030 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batako buah 12.50 5,850.00
Semen Portland kg 22.20 1,450.00
Pasir Pasang m3 0.043 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 Lantai Ubin Ukuran 60 cm x 60 cm


Harga Satuan
Uraian Kode Satuan Koefisien
(Rp)
No TENAGA
A Pekerja L.01 OH 0.24 83,000.00
Tukang batu L.02 OH 0.12 88,000.00
Kepala Tukang L.03 OH 0.012 93,000.00
Mandor L.04 OH 0.012 98,000.00
JUMLAH TENAGA KERJA
BAHAN
B Keramik Bh 3.10 31,041.67
Semen portland Kg 9.60 1,450.00
Pasir pasang m3 0.045 130,000.00
Semen Warna Kg 0.045 23,500.00
JUMLAH HARGA BAHAN
PERALATAN
C JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 Lantai Ubin Ukuran 40 cm x 40 cm 1.2 m


Harga Satuan
Uraian Kode Satuan Koefisien
(Rp)
No TENAGA
A Pekerja L.01 OH 0.250 83,000.00
Tukang batu L.02 OH 0.125 88,000.00
Kepala Tukang L.03 OH 0.013 93,000.00
Mandor L.04 OH 0.013 98,000.00
JUMLAH TENAGA KERJA
BAHAN
B Keramik Bh 6.63 12,569.13
Semen portland Kg 9.80 1,450.00
Pasir pasang m3 0.05 130,000.00
Semen Warna Kg 0.045 23,500.00
JUMLAH HARGA BAHAN
PERALATAN
C JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 plesteran 1pc : 5Psr tebal 15mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 83,000.00
Tukang batu L.02 OH 0.150 88,000.00
Kepala Tukang L.03 OH 0.015 93,000.00
Mandor L.04 OH 0.015 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement kg 5.184 1,450.00
Pasir Pasang m3 0.026 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 plesteran dinding pondasi 1pc : 5Psr tebal 15mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.150 83,000.00
Tukang batu L.02 OH 0.075 88,000.00
Kepala Tukang L.03 OH 0.008 93,000.00
Mandor L.04 OH 0.008 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement kg 5.184 1,450.00
Pasir Pasang m3 0.026 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 plesteran dinding tembok 1pc : 5Psr tebal 15mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.150 83,000.00
Tukang batu L.02 OH 0.075 88,000.00
Kepala Tukang L.03 OH 0.008 93,000.00
Mandor L.04 OH 0.008 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement kg 5.184 1,450.00
Pasir Pasang m3 0.026 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 plesteran List Tiang Timbul Spesi (1pc:5Psr) 1pc : 5Psr tebal 15mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.150 83,000.00
Tukang batu L.02 OH 0.075 88,000.00
Kepala Tukang L.03 OH 0.008 93,000.00
Mandor L.04 OH 0.008 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement kg 5.184 1,450.00
Pasir Pasang m3 0.026 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 acian dinding pondasi


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 83,000.00
Tukang batu L.02 OH 0.100 88,000.00
Kepala Tukang L.03 OH 0.010 93,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250 1,450.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 acian dinding tembok


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 83,000.00
Tukang batu L.02 OH 0.100 88,000.00
Kepala Tukang L.03 OH 0.010 93,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250 1,450.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 acian dinding List Tiang Timbul


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 83,000.00
Tukang batu L.02 OH 0.100 88,000.00
Kepala Tukang L.03 OH 0.010 93,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250 1,450.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m3 Konstruksi Kuda-kuda Konvensional, 6/12 Kayu Kelas II Bentang Sampai Dengan 6
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 4.000 83,000.00
Tukang L.02 OH 12.000 88,000.00
Kepala Tukang L.03 OH 1.200 93,000.00
Mandor L.04 OH 0.200 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu M³ 1.500 3,000,000.00
Paku 12 cm Kg 5.600 23,500.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E Harga Satuan Pekerjaan (C+D)

Memasang Konstruksi Gording 6/8 Kayu Kelas II


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 2.400 83,000.00
Tukang L.02 OH 7.200 88,000.00
Kepala Tukang L.03 OH 0.720 93,000.00
Mandor L.04 OH 0.120 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu M³ 1.500 2,966,666.67
Paku 12 cm Kg 3.000 23,500.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Memasang Woodplank (L=30cm)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 83,000.00
Tukang L.02 OH 0.200 88,000.00
Kepala Tukang L.03 OH 0.020 93,000.00
Mandor L.04 OH 0.005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Woodplank (L=30cm) M³ 0.011 84,750.00
Paku woodplank Kg 0.050 36,250.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)


Pemasangan 1m2 atap seng Galvalum tbl 4 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.120 83,000.00
Tukang L.02 OH 0.06 88,000.00
Kepala Tukang L.03 OH 0.006 93,000.00
Mandor L.04 OH 0.006 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng Galvalum panjang 6 mm Lbr 0.44 324,000.00
Paku Seng Kg 0.02 35,000.00
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m atap Nok Bubungan BJLS 0,30 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.150 83,000.00
Tukang L.02 OH 0.070 88,000.00
Kepala Tukang L.03 OH 0.007 93,000.00
Mandor L.04 OH 0.006 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng Pelat Bjls Lbr 1.20 18,500.00
Paku Seng Kg 0.04 35,000.00
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 Rangka Plafond 60 x 60 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 83,000.00
Tukang L.02 OH 0.300 88,000.00
Kepala Tukang L.03 OH 0.030 93,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
paku 7/10 cm kg 0.250 23,500.00
Balok 5/7 Kls. II Lokal m3 0.0163 2,966,666.67
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 Penutup Plafond Calsiboard Board 4 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 83,000.00
Tukang L.02 OH 0.050 88,000.00
Kepala Tukang L.03 OH 0.005 93,000.00
Mandor L.04 OH 0.005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Calsiboard Lembar 0.364 85,000.00
Paku sekrup Kg 0.110 55,000.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 Penutup Plafond Gypsum Board Profil 10 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 83,000.00
Tukang L.02 OH 0.050 88,000.00
Kepala Tukang L.03 OH 0.005 93,000.00
Mandor L.04 OH 0.005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Gipsum
120x240 cm Lembar 0.364 90,000.00
Paku sekrup Kg 0.110 55,000.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Cat Pondasi Dengan Cat Tembok


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.020 83,000.00
Tukang cat L.02 OH 0.063 88,000.00
Kepala Tukang L.03 OH 0.0063 93,000.00
Mandor L.04 OH 0.003 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur kg 0.10 19,375.00
cat dasar kg 0.10 23,300.00
cat penutup kg 0.26 45,333.33

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Cat Dinding Tembok Dengan Cat Tembok


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.020 83,000.00
Tukang cat L.02 OH 0.063 88,000.00
Kepala Tukang L.03 OH 0.0063 93,000.00
Mandor L.04 OH 0.003 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur kg 0.10 19,375.00
cat dasar kg 0.10 23,300.00
cat penutup kg 0.26 45,333.33

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Cat Penutup Plafond + List plafond Dengan Cat Tembok


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.020 83,000.00
Tukang cat L.02 OH 0.063 88,000.00
Kepala Tukang L.03 OH 0.0063 93,000.00
Mandor L.04 OH 0.003 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur kg 0.10 19,375.00
cat dasar kg 0.10 23,300.00
cat penutup kg 0.26 62,000.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Cat Tiang Pilar Dengan Cat Tembok


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.020 83,000.00
Tukang cat L.02 OH 0.063 88,000.00
Kepala Tukang L.03 OH 0.0063 93,000.00
Mandor L.04 OH 0.003 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur kg 0.10 19,375.00
cat dasar kg 0.10 23,300.00
cat penutup kg 0.26 45,333.33

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Cat Kusen Dengan Cat Mengkilat


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.160 83,000.00
Tukang cat L.02 OH 0.16 88,000.00
Kepala Tukang L.03 OH 0.016 93,000.00
Mandor L.04 OH 0.003 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
vernis L 0.15 86,666.67
dempul kg 0.05 61,666.67
ampelas Lbr 0.10 7,500.00
cat dasar kg 0.10 23,300.00
cat penutup kg 0.26 81,250.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Vernis/Milamin Daun Pintu,Jendela dan Buven


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.160 83,000.00
Tukang cat L.02 OH 0.16 88,000.00
Kepala Tukang L.03 OH 0.016 93,000.00
Mandor L.04 OH 0.003 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
vernis L 0.15 86,666.67
dempul kg 0.05 61,666.67
ampelas Lbr 0.10 7,500.00
cat dasar kg 0.10 23,300.00
cat penutup kg 0.26 81,250.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pek. 1 M2 Meni Seng


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.040 83,000.00
Tukang cat L.02 OH 0.005 88,000.00
Kepala Tukang L.03 OH 0.0005 93,000.00
Mandor L.04 OH 0.0025 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Meni Seng L 0.10 167,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Menggali saluran 1 m3 tanah keras sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.750 83,000.00
Mandor L.04 OH 0.025 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)


Pengurungan 1 m3 dengan pasir urug bawah lantai saluran
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 83,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug M3 1.200 145,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m2 dinding batako saluran campuran 1pc : 5Psr


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.600 83,000.00
Tukang batu L.02 OH 0.200 88,000.00
Kepala Tukang L.03 OH 0.020 93,000.00
Mandor L.04 OH 0.030 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batako buah 0.14 5,850.00
Semen Portland kg 22.20 1,450.00
Pasir Pasang m3 0.102 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Membuat Pekerjaan Beton Tumbuk Lantai Saluran 1pc:3psr:5krl K125 = Fc 9,8 mpa
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 83,000.00
Tukang batu L.02 OH 0.275 88,000.00
Kepala Tukang L.03 OH 0.028 93,000.00
Mandor L.04 OH 0.083 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 1,450.00
Pasir Beton Kg 0.5914 245,000.00
Kerikil (maks 30mm) Kg 1,012 183.02
Air Liter 215 -
JUMLAH HARGA BAHAN

C PERALATAN
D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Plesteran Dinding Saluran (1 Pc : 4 Psr)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 83,000.00
Tukang batu L.02 OH 0.150 88,000.00
Kepala Tukang L.03 OH 0.015 93,000.00
Mandor L.04 OH 0.015 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement kg 5.184 1,450.00
Pasir Pasang m3 0.026 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1m2 acian dinding saluran


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 83,000.00
Tukang batu L.02 OH 0.100 88,000.00
Kepala Tukang L.03 OH 0.010 93,000.00
Mandor L.04 OH 0.010 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250 1,450.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)

F Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah kunci tanam biasa


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.010 83,000.00
Tukang Kayu L.02 OH 0.500 88,000.00
Kepala Tukang L.03 OH 0.050 93,000.00
Mandor L.04 OH 0.005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci Tanam Biasa bh 1.000 248,750.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah engsel pintu


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 83,000.00
Tukang Kayu L.02 OH 0.15 88,000.00
Kepala Tukang L.03 OH 0.015 93,000.00
Mandor L.04 OH 0.0008 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel Pintu Bh 1.00 32,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah engsel jendela


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.01 83,000.00
Tukang Kayu L.02 OH 0.10 88,000.00
Kepala Tukang L.03 OH 0.010 93,000.00
Mandor L.04 OH 0.0005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel Jendela + Jendela Bh 1.00 23,750.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah grendel


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.01 83,000.00
Tukang Kayu L.02 OH 0.10 88,000.00
Kepala Tukang L.03 OH 0.01 93,000.00
Mandor L.04 OH 0.001 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Grendel Bh 1.00 23,125.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah kait angin jendela dan boven


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 83,000.00
Tukang Kayu L.02 OH 0.15 88,000.00
Kepala Tukang L.03 OH 0.015 93,000.00
Mandor L.04 OH 0.008 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
kait angin Bh 1.00 20,000.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah spring knip jendela dan boven


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.015 83,000.00
Tukang Kayu L.02 OH 0.15 88,000.00
Kepala Tukang L.03 OH 0.015 93,000.00
Mandor L.04 OH 0.008 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
spring knip Bh 1.00 25,000.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah closet jongkok type toto


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.50 83,000.00
Tukang L.02 OH 1.50 88,000.00
Kepala Tukang L.03 OH 0.15 93,000.00
Mandor L.04 OH 0.16 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
pasangan bata bh 7.8 1,650.00
Closet Jongkok Unit 1.00 306,250.00
Perlengkapan Ls 0.06 1.00
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah Wastafel


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.20 83,000.00
Tukang L.02 OH 1.45 88,000.00
Kepala Tukang L.03 OH 0.15 93,000.00
Mandor L.04 OH 0.06 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.20 633,333.33
Semen Portland Kg 6.00 1,450.00
Pasir pasang M3 0.01 130,000.00

JUMLAH HARGA BAHAN


PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2 ”


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.054 83,000.00
Tukang L.02 OH 0.09 88,000.00
Kepala Tukang L.03 OH 0.006 93,000.00
Mandor L.04 OH 0.002 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2 M 1.20 32,500.00
perlengkapan Ls 35% pipa 1.00
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah Floor drain


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.01 83,000.00
Tukang L.02 OH 0.10 88,000.00
Kepala Tukang L.03 OH 0.01 93,000.00
Mandor L.04 OH 0.005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Florr Drain Unit 1.00 28,333.33
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah kran air diameter 1/2


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.01 83,000.00
Tukang L.02 OH 0.4 88,000.00
Kepala Tukang L.03 OH 0.04 93,000.00
Mandor L.04 OH 0.005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kran Air Bh 1.00 71,666.67
Sealtape Bh 0.025 8,250.00
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m’ pipa PVC diameter 4”


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 83,000.00
Tukang L.02 OH 0.135 88,000.00
Kepala Tukang L.03 OH 0.0135 93,000.00
Mandor L.04 OH 0.004 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 4 M 1.20 133,750.00
perlengkapan Ls 35% pipa
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m’ pipa PVC diameter 2"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 83,000.00
Tukang L.02 OH 0.135 88,000.00
Kepala Tukang L.03 OH 0.0135 93,000.00
Mandor L.04 OH 0.004 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 2 M 1.20 60,000.00
perlengkapan Ls 35% pipa
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 m’ pipa hawa gip diameter 2"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 83,000.00
Tukang L.02 OH 0.135 88,000.00
Kepala Tukang L.03 OH 0.0135 93,000.00
Mandor L.04 OH 0.004 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Hawa Gip M 1.20 125,000.00
0 0
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

Pemasangan 1 buah stop kran gip diameter 1/2"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.01 83,000.00
Tukang L.02 OH 0.4 88,000.00
Kepala Tukang L.03 OH 0.04 93,000.00
Mandor L.04 OH 0.005 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Stop Kran Bh 1.00 96,250.00
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)


Pemasangan 1 m’ pipa PVC diameter 1/2"
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.081 83,000.00
Tukang L.02 OH 0.135 88,000.00
Kepala Tukang L.03 OH 0.0135 93,000.00
Mandor L.04 OH 0.004 98,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC diameter 1/2 M 1.20 32,500.00
perlengkapan Ls 35% pipa
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
C Jumlah (A+B+C)

E Harga Satuan Pekerjaan (C+D)

1 Unit Pemasangan Instalasi Penangkal Petir

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0810
Tukang Listrik L.02 OH 0.1350
Kepala Tukang Listrik L.03 OH 0.0135
Mandor L.04 OH 0.0040
g
JUMLAH TENAGA KERJA
B BAHAN
Stik penerima / blacksem 2m' Bh 3.00
Reduser galvanis 3/4" - 1" Bh 3.00
Pipa Galvanis 1" m' 3.00
Kabel BC 70 mm2 m' 60.00
Pipa Conduit 3/4" m' 60.00
sock/klem conduit 20mm bh 5.00
Grounding BC 70 mm2 m' 6.60
Pipa galvanis 1" m' 6.60
Material bantu Ls 3.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
n Menteri Pekerjaan Umum
un 2022)

Jumlah Harga
Keterangan
(Rp)

8,300.00 Bagian
490.00 Umum
8,790.00 Halaman

151

8,790.00

8,790.00

Jumlah Harga
Keterangan
(Rp)

99,600.00 Bagian
35,200.00 Umum
3,720.00 Halaman
11,760.00
150,280.00 153

1,483,333
1,132,500
70,500
2,800,000
105,000
5,591,333

5,741,613.33

5,741,613.33
Jumlah Harga
(Rp)
Keterangan
8,300.00
8,800.00 Bagian
930.00 Umum
490.00 Halaman
18,520.00
149
35,600.00
550.00
19,833.33
55,983.33

74,503.33

74,503.33

Jumlah Harga
(Rp)
Keterangan
62,250.00
2,450.00 Bagian
64,700.00 Umum
Halaman

64,700.00 183

64,700.00

Jumlah Harga
(Rp)
Keterangan
8,300.00
980.00 Bagian
9,280.00 Umum
Halaman

204
9,280.00
9,280.00

Jumlah Harga
(Rp)
Keterangan
8,300.00
980.00 Bagian
9,280.00 Umum
Halaman

204
9,280.00

9,280.00

Jumlah Harga
(Rp)
Keterangan
8,300.00
980.00 Bagian
9,280.00 Umum
Halaman
174,000.00
174,000.00 217

183,280.00

183,280.00

Jumlah Harga
(Rp)
Keterangan
8,300.00
980.00 Bagian
9,280.00 Umum
Halaman
174,000.00
174,000.00 217
183,280.00

183,280.00

Jumlah Harga
(Rp)
Keterangan
64,740.00
34,320.00 Bagian
3,627.00 Cipta Karya
3,822.00 Halaman
106,509.00
1066
150,000.00
62,640.00
212,640.00
319,149.00

319,149.00

Jumlah Harga
(Rp)
Keterangan
124,500.00
66,000.00 Bagian
6,975.00 Umum
7,350.00 Halaman
204,825.00
250
198,600.00
197,200.00
70,720.00
466,520.00

671,345.00

671,345.00
Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
43,160.00
22,880.00 Bagian
2,418.00 Cipta Karya
2,548.00 Halaman
71,006.00
1072
90,000.00

7,050.00
3,833.33
100,883.33
-

171,889.33

171,889.33
Jumlah Harga
Keterangan
(Rp)

132,800.00 Bagian
140,800.00 Umum
14,880.00 Halaman
15,680.00
304,160.00 280

1,456,875.00

73,150.00
1,530,025.00

1,834,185.00

1,834,185.00
18,341.85

Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
43,160.00
22,880.00 Bagian
2,418.00 Cipta Karya
2,548.00 Halaman
71,006.00
1072
90,000.00

7,050.00
3,833.33
100,883.33
-

171,889.33

171,889.33

Jumlah Harga
Keterangan
(Rp)

132,800.00 Bagian
140,800.00 Umum
14,880.00 Halaman
15,680.00
304,160.00 280

1,456,875.00

73,150.00
1,530,025.00

1,834,185.00

1,834,185.00
18,341.85

Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
54,780.00
29,040.00 Bagian
3,069.00 Cipta Karya
3,234.00 Halaman
90,123.00
1073
80,000.00

9,400.00
7,666.67
44,500.00
46,375.00
50,000.00

237,941.67
-

328,064.67

328,064.67
Jumlah Harga
Keterangan
(Rp)

132,800.00 Bagian
140,800.00 Umum
14,880.00 Halaman
15,680.00
304,160.00 280

1,456,875.00

73,150.00
1,530,025.00

1,834,185.00

1,834,185.00
18,341.85

Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
54,780.00
29,040.00 Bagian
3,069.00 Cipta Karya
3,234.00 Halaman
90,123.00
1073
80,000.00

9,400.00
7,666.67
44,500.00
46,375.00
50,000.00

237,941.67
-

328,064.67

328,064.67

Jumlah Harga
Keterangan
(Rp)

132,800.00 Bagian
140,800.00 Umum
14,880.00 Halaman
15,680.00
304,160.00 280

1,456,875.00

73,150.00
1,530,025.00

1,834,185.00
18,341.85
Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
43,160.00
22,880.00 Bagian
2,418.00 Cipta Karya
2,548.00 Halaman
71,006.00
1072
90,000.00

7,050.00
3,833.33
100,883.33
-

171,889.33

171,889.33
Jumlah Harga
Keterangan
(Rp)

132,800.00 Bagian
140,800.00 Umum
14,880.00 Halaman
15,680.00
304,160.00 280

1,456,875.00

73,150.00
1,530,025.00

1,834,185.00
18,341.85

Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
54,780.00
29,040.00 Bagian
3,069.00 Cipta Karya
3,234.00 Halaman
90,123.00
1073
80,000.00

9,400.00
7,666.67
53,400.00
46,375.00
50,000.00

246,841.67
-

336,964.67

336,964.67

olos atau besi ulir


Jumlah Harga
Keterangan
(Rp)

132,800.00 Bagian
140,800.00 Umum
14,880.00 Halaman
15,680.00
304,160.00 280

1,456,875.00

73,150.00
1,530,025.00
15,300.25

Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
43,160.00
22,880.00 Bagian
2,418.00 Cipta Karya
2,548.00 Halaman
71,006.00
1072
90,000.00

7,050.00
3,833.33
100,883.33
-

171,889.33

171,889.33

Jumlah Harga
Keterangan
(Rp)

132,800.00 Bagian
140,800.00 Umum
14,880.00 Halaman
15,680.00
304,160.00 280

1,456,875.00

73,150.00
1,530,025.00

1,834,185.00

1,834,185.00
18,341.85

Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
43,160.00
22,880.00 Bagian
2,418.00 Cipta Karya
2,548.00 Halaman
71,006.00
1072
90,000.00

7,050.00
3,833.33
100,883.33
-

171,889.33

171,889.33

Jumlah Harga
Keterangan
(Rp)

132,800.00 Bagian
140,800.00 Umum
14,880.00 Halaman
15,680.00
304,160.00 280

1,456,875.00

73,150.00
1,530,025.00

1,834,185.00

1,834,185.00
18,341.85

Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
49,800.00
17,600.00 Bagian
1,860.00 Cipta Karya
2,940.00 Halaman
72,200.00
1096
73,125.00
129,870.00
62.35
203,057.35

275,257.35

275,257.35

Jumlah Harga
(Rp)
Keterangan
19,920.00
10,560.00 Bagian
1,116.00 Cipta Karya
1,176.00 Halaman
32,772.00
1114
96,229.17
13,920.00
5,850.00
1,057.50
117,056.67

149,828.67

149,828.67

Jumlah Harga
(Rp)
Keterangan
20,750.00
11,000.00 Bagian
1,209.00 Cipta Karya
1,274.00 Halaman
34,233.00
1113
83,333.33
14,210.00
5,850.00
1,057.50
104,450.83

138,683.83

138,683.83

Jumlah Harga
(Rp)
Keterangan
24,900.00
13,200.00 Bagian
1,395.00 Cipta Karya
1,470.00 Halaman
40,965.00
1113
7,516.80
3,380.00
10,896.80

51,861.80

51,861.80

Jumlah Harga
(Rp)
Keterangan
12,450.00
6,600.00 Bagian
744.00 Cipta Karya
784.00 Halaman
20,578.00
1105
7,516.80
3,380.00
10,896.80
31,474.80

31,474.80

Jumlah Harga
(Rp)
Keterangan
12,450.00
6,600.00 Bagian
744.00 Cipta Karya
784.00 Halaman
20,578.00
1105
7,516.80
3,380.00
10,896.80

31,474.80

31,474.80

tebal 15mm
Jumlah Harga
(Rp)
Keterangan
12,450.00
6,600.00 Bagian
744.00 Cipta Karya
784.00 Halaman
20,578.00
1105
7,516.80
3,380.00
10,896.80
31,474.80

31,474.80

Jumlah Harga
(Rp)
Keterangan
16,600.00
8,800.00 Bagian
930.00 Umum
980.00 Halaman
27,310.00
318
4,712.50
4,712.50

-
-
-
32,022.50

32,022.50

Jumlah Harga
(Rp)
Keterangan
16,600.00
8,800.00 Bagian
930.00 Umum
980.00 Halaman
27,310.00
318
4,712.50
4,712.50

-
-
-
32,022.50

32,022.50

Jumlah Harga
(Rp)
Keterangan
16,600.00
8,800.00 Bagian
930.00 Umum
980.00 Halaman
27,310.00
318
4,712.50
4,712.50

-
-
-
32,022.50

32,022.50

II Bentang Sampai Dengan 6 Meter


Jumlah Harga
(Rp)
Keterangan
332,000.00
1,056,000.00 Bagian
111,600.00 Cipta Karya
19,600.00 Halaman
1,519,200.00
1171
4,500,000.00
131,600.00
-
4,631,600.00

6,150,800.00
6,150,800.00

Jumlah Harga
(Rp)
Keterangan
199,200.00
633,600.00 Bagian
66,960.00 Umum
11,760.00 Halaman
911,520.00
1172
4,450,000.00
70,500.00
-
4,520,500.00

5,432,020.00

5,432,020.00

Jumlah Harga
(Rp)
Keterangan
8,300.00
17,600.00 Bagian
1,860.00 Cipta Karya
490.00 Halaman
28,250.00
1176
932.25
1,812.50
-
2,744.75

30,994.75

30,994.75
Jumlah Harga
(Rp)
Keterangan
9,960.00
5,280.00 Bagian
558.00 Cipta Karya
588.00 Halaman
16,386.00
1162
142,560.00
700.00
143,260.00

159,646.00

159,646.00

Jumlah Harga
(Rp)
Keterangan
12,450.00
6,160.00 Bagian
651.00 Cipta Karya
588.00 Halaman
19,849.00
1162
22,200.00
1,400.00
23,600.00

43,449.00

43,449.00

Jumlah Harga
(Rp)
Keterangan
16,600.00
26,400.00 Bagian
2,790.00 Cipta Karya
980.00 Halaman
46,770.00
1175
5,875.00
48,356.67

46,770.00

46,770.00

Jumlah Harga
(Rp)
Keterangan
8,300.00
4,400.00 Bagian
465.00 Cipta Karya
490.00 Halaman
13,655.00
1142
30,940.00
6,050.00

36,990.00

50,645.00

50,645.00

Jumlah Harga
(Rp)
Keterangan
8,300.00
4,400.00 Bagian
465.00 Cipta Karya
490.00 Halaman
13,655.00
1143
32,760.00
6,050.00

38,810.00

52,465.00

52,465.00

Jumlah Harga
(Rp)
Keterangan
1,660.00
5,544.00 Bagian
585.90 Umum
294.00 Halaman
8,083.90
323
1,937.50
2,330.00
11,786.67

16,054.17

24,138.07

24,138.07

Jumlah Harga
(Rp)
Keterangan
1,660.00
5,544.00 Bagian
585.90 Umum
294.00 Halaman
8,083.90
323
1,937.50
2,330.00
11,786.67

16,054.17

24,138.07

24,138.07

Jumlah Harga
(Rp)
Keterangan
1,660.00
5,544.00 Bagian
585.90 Umum
294.00 Halaman
8,083.90
323
1,937.50
2,330.00
16,120.00

20,387.50

28,471.40

28,471.40

Jumlah Harga
(Rp)
Keterangan
1,660.00
5,544.00 Bagian
585.90 Umum
294.00 Halaman
8,083.90
323
1,937.50
2,330.00
11,786.67

16,054.17

24,138.07

24,138.07

Jumlah Harga
(Rp)
Keterangan
13,280.00
14,080.00 Bagian
1,488.00 Umum
294.00 Halaman
29,142.00
323
13,000.00
3,083.33
750.00
2,330.00
21,125.00
40,288.33

69,430.33

69,430.33

Jumlah Harga
(Rp)
Keterangan
13,280.00
14,080.00 Bagian
1,488.00 Umum
294.00 Halaman
29,142.00
323
13,000.00
3,083.33
750.00
2,330.00
21,125.00
40,288.33

69,430.33

69,430.33

Jumlah Harga
(Rp)
Keterangan
3,320.00
440.00 Bagian
46.50 Umum
245.00 Halaman
4,051.50
325
16,750.00
16,750.00

20,801.50

20,801.50

Jumlah Harga
(Rp)
Keterangan
62,250.00
2,450.00 Bagian
64,700.00 Umum
Halaman

64,700.00 183

64,700.00
Jumlah Harga
(Rp)
Keterangan
8,300.00
980.00 Bagian
9,280.00 Umum
Halaman
174,000.00
174,000.00 217

183,280.00

183,280.00

Jumlah Harga
(Rp)
Keterangan
49,800.00
17,600.00 Bagian
1,860.00 Cipta Karya
2,940.00 Halaman
72,200.00
1096
819.00
129,870.00
147.90
130,836.90

203,036.90

203,036.90

= Fc 9,8 mpa
Jumlah Harga
(Rp)
Keterangan
136,950.00
24,200.00 Bagian
2,604.00 Cipta Karya
8,134.00 Halaman
171,888.00
1067
400,200.00
144,900.00
185,215.09
-
730,315.09

902,203.09

902,203.09

Jumlah Harga
(Rp)
Keterangan
24,900.00
13,200.00 Bagian
1,395.00 Cipta Karya
1,470.00 Halaman
40,965.00
1113
7,516.80
3,380.00
10,896.80

51,861.80

51,861.80

Jumlah Harga
(Rp)
Keterangan
16,600.00
8,800.00 Bagian
930.00 Umum
980.00 Halaman
27,310.00
318
4,712.50
4,712.50

-
-
-
32,022.50

32,022.50

Jumlah Harga
(Rp)
Keterangan
830.00
44,000.00 Bagian
4,650.00 Halaman
490.00 Halaman
49,970.00
1113
248,750.00
248,750.00

298,720.00

298,720.00

Jumlah Harga
(Rp)
Keterangan
1,245.00
13,200.00 Bagian
1,395.00 Cipta Karya
78.40 Halaman
15,918.40
1181
32,500.00
-
32,500.00

48,418.40

48,418.40

Jumlah Harga
(Rp)
Keterangan
830.00
8,800.00 Bagian
930.00 Cipta Karya
49.00 Halaman
10,609.00
1181
23,750.00
-
23,750.00

34,359.00

34,359.00

Jumlah Harga
(Rp)
Keterangan
830.00
8,800.00 Bagian
930.00 Cipta Karya
49.00 Halaman
10,609.00
1179
23,125.00
-
23,125.00

33,734.00
33,734.00

Jumlah Harga
(Rp)
Keterangan
1,245.00
13,200.00 Bagian
1,395.00 Cipta Karya
784.00 Halaman
16,624.00
1183
20,000.00
-
20,000.00

36,624.00

36,624.00

Jumlah Harga
(Rp)
Keterangan
1,245.00
13,200.00 Bagian
1,395.00 Cipta Karya
784.00 Halaman
16,624.00
1182
25,000.00
-
25,000.00

41,624.00

41,624.00
Jumlah Harga
(Rp)
Keterangan
41,500.00
132,000.00 Bagian
13,950.00 Cipta Karya
15,680.00 Halaman
203,130.00
1191
12,870.00
306,250.00
0.06
319,120.06

522,250.06

522,250.06

Jumlah Harga
(Rp)
Keterangan
99,600.00
127,600.00 Bagian
13,950.00 Cipta Karya
5,880.00 Halaman
247,030.00
1193
760,000.00
8,700.00
1,300.00
-
770,000.00

1,017,030.00

1,017,030.00

Jumlah Harga
(Rp)
Keterangan
4,482.00
7,920.00 Bagian
558.00 Cipta Karya
196.00 Halaman
13,156.00
1201
39,000.00
1.00

13,156.00

13,156.00

Jumlah Harga
(Rp)
Keterangan
830.00
8,800.00 Bagian
930.00 Cipta Karya
490.00 Halaman
11,050.00
1206
28,333.33
28,333.33

39,383.33

39,383.33

Jumlah Harga
(Rp)
Keterangan
830.00
35,200.00 Bagian
3,720.00 Cipta Karya
490.00 Halaman
40,240.00
1206
71,666.67
206.25
71,872.92

112,112.92

112,112.92

Jumlah Harga
(Rp)
Keterangan
6,723.00
11,880.00 Bagian
1,255.50 Cipta Karya
392.00 Halaman
20,250.50
1204
45,240.00

20,250.50

65,490.50

Jumlah Harga
(Rp)
Keterangan
6,723.00
11,880.00 Bagian
1,255.50 Cipta Karya
392.00 Halaman
20,250.50
1204
45,240.00
20,250.50

65,490.50

Jumlah Harga
(Rp)
Keterangan
6,723.00
11,880.00 Bagian
1,255.50 Halaman
392.00 Halaman
20,250.50
1204
120,240.00

140,490.50

140,490.50

Jumlah Harga
(Rp)
Keterangan
830.00
35,200.00 Bagian
3,720.00 Halaman
490.00 Halaman
40,240.00
1206
100,200.00
100,200.00

140,440.00

140,440.00
Jumlah Harga
(Rp)
Keterangan
6,723.00
11,880.00 Bagian
1,255.50 Halaman
392.00 Halaman
20,250.50
1204
14,490.00

20,250.50

34,740.50

Harga Jumlah
Satuan Harga
(Rp) (Rp)

83,000.00 6,723.0
88,000.00 11,880.0
93,000.00 1,255.5
98,000.00 392.0

H TENAGA KERJA 20,250.50

60,000.00 180,000.00
8,000.00 24,000.00
20,000.00 60,000.00
85,000.00 5,100,000.00
5,000.00 300,000.00
4,000.00 20,000.00
85,000.00 561,000.00
20,000.00 132,000.00
10,000.00 30,000.00

H HARGA BAHAN 6,407,000.00

AH HARGA ALAT

6,427,250.50
DAFTAR ANALISA SATUAN PEKERJAAN ME

Memasang Panel PP-SDP


Bahan An. SNI 6.36.1
1.000 bh MCB 1 Pha 10 A @ Rp. 61,666.67 = Rp 61,666.67
1.000 bh Box Panel 30 x 40 x 20 cm @ Rp. 600,200.00 = Rp 600,200.00
1.000 bh Busbar, Wirring @ Rp. 160,200.00 = Rp 160,200.00
1.000 bh Ampere Meter + CT @ Rp. 110,200.00 = Rp 110,200.00
1.000 bh Volt Meter + SS @ Rp. 110,200.00 = Rp 110,200.00
1.000 bh Pilot Lamp + Fuse @ Rp. 60,200.00 = Rp 60,200.00
1.000 bh Grounding Panel @ Rp. 110,200.00 = Rp 110,200.00
5.000 % Accesories & Termination = Rp 60,643.33
Sub total : = Rp 1,273,510.00

Upah An. SNI ( Revisi ) 6.36.2


0.025 Oh Pekerja @ Rp. 83,000.00 = Rp 2,075.00
0.025 Oh Tukang listrik @ Rp. 88,000.00 = Rp 2,200.00
0.017 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 1,543.80
0.014 Oh Mandor @ Rp. 98,000.00 = Rp 1,372.00
Sub total : = Rp 7,190.80
Total upah+bahan : = Rp 1,280,700.80
Memasang 1 M Kabel NYY 3 x 2,5 mm
Bahan An. SNI 6.13.1
1.100 m Kabel NYM 3 x 2,5 mm @ Rp. 20,000.00 = Rp 22,000.00
5.000 % Accesories & Termination = Rp 1,100.00
Sub total : = Rp 23,100.00

Upah An. SNI ( Revisi ) 6.13.2


0.025 Oh Pekerja @ Rp. 83,000.00 = Rp 2,075.00
0.025 Oh Tukang Listrik @ Rp. 88,000.00 = Rp 2,200.00
0.017 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 1,543.80
0.014 Oh Mandor @ Rp. 98,000.00 = Rp 1,372.00
Sub total : = Rp 7,190.80

Lain-lain K3 + CAR = Rp 90.87

Total upah+bahan : = Rp 30,381.67

Memasang 1 M Kabel NYY 4 x 2,5 mm


Bahan An. SNI 6.13.1
1.100 m Kabel NYY 4 x 2,5 mm @ Rp. 25,200.00 = Rp 27,720.00
5.000 % Accesories & Termination = Rp 1,386.00
Sub total : = Rp 29,106.00

Upah An. SNI ( Revisi ) 6.13.2


0.025 Oh Pekerja @ Rp. 83,000.00 = Rp 2,075.00
0.025 Oh Tukang Listrik @ Rp. 88,000.00 = Rp 2,200.00
0.017 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 1,543.80
0.014 Oh Mandor @ Rp. 98,000.00 = Rp 1,372.00
Sub total : = Rp 7,190.80

Lain-lain K3 + CAR = Rp 108.89

Total upah+bahan : = Rp 36,405.69

Memasang 1 M Kabel NYM 2,5 mm


Bahan An. SNI 6.13.1
1.100 m Kabel NYM 2,5 mm @ Rp. 4,200.00 = Rp 4,620.00
5.000 % Accesories & Termination = Rp 231.00
Sub total : = Rp 4,851.00

Upah An. SNI ( Revisi ) 6.13.2


0.025 Oh Pekerja @ Rp. 83,000.00 = Rp 2,075.00
0.025 Oh Tukang Listrik @ Rp. 88,000.00 = Rp 2,200.00
0.017 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 1,543.80
0.014 Oh Mandor @ Rp. 98,000.00 = Rp 1,372.00
Sub total : = Rp 7,190.80

Lain-lain K3 + CAR = Rp 36.13

Total upah+bahan : = Rp 12,077.93


Instalasi listrik Satu Titik Lampu
Bahan An. SNI 6.35.1

1.000 Btg Pipa listrik @ Rp. 21,666.67 = Rp 21,666.67

1.000 Buah T Dus @ Rp. 8,333.33 = Rp 8,333.33

1.000 Buah L Bow @ Rp. 4,166.67 = Rp 4,166.67

1.000 Buah Las Dop @ Rp. 3,400.00 = Rp 3,400.00

1.000 Buah Klem @ Rp. 31,666.67 = Rp 31,666.67

1.000 Buah Mongkok @ Rp. 60,000.00 = Rp 60,000.00

1.000 Buah Fitting @ Rp. 19,166.67 = Rp 19,166.67


5.000 % Accesories & Termination = Rp 7,420.00
Sub total : = Rp 155,820.00

Upah An. SNI ( Revisi ) 6.35.2


0.010 Oh Pekerja @ Rp. 83,000.00 = Rp 830.00
0.010 Oh Tukang Listrik @ Rp. 88,000.00 = Rp 880.00
0.001 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 93.00
0.001 Oh Mandor @ Rp. 98,000.00 = Rp 98.00
Sub total : = Rp 1,901.00
Total upah+bahan : = Rp 157,721.00

Memasang Satu buah Lampu 23 Watt


Bahan An. SNI 6.35.1
1.000 bh Box Downlights Inbow 5 Inch DL 500 + Lampu 23 Watt @ Rp. 200,200.00 = Rp 200,200.00
5.000 % Accesories & Termination = Rp 10,010.00
Sub total : = Rp 210,210.00

Upah An. SNI ( Revisi ) 6.35.2


0.010 Oh Pekerja @ Rp. 83,000.00 = Rp 830.00
0.010 Oh Tukang Listrik @ Rp. 88,000.00 = Rp 880.00
0.001 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 93.00
0.001 Oh Mandor @ Rp. 98,000.00 = Rp 98.00
Sub total : = Rp 1,901.00
Total upah+bahan : = Rp 212,111.00

Memasang Satu buah Lampu 15 Watt


Bahan An. SNI 6.35.1
1 bh Box Downlights Inbow 5 Inch DL 500 + Lampu 15 Watt @ Rp. 130200 = Rp 130,200.00

5 % Accesories & Termination = Rp 10,010.00


Sub total : = Rp 140,210.00

Upah An. SNI ( Revisi ) 6.35.2


0.010 Oh Pekerja @ Rp. 83000 = Rp 830.00

0.010 Oh Tukang Listrik @ Rp. 88000 = Rp 880.00

0.001 Oh Kepala Tukang Listrik @ Rp. 93000 = Rp 93.00

0.001 Oh Mandor @ Rp. 98000 = Rp 98.00


Sub total : = Rp 1,901.00
Total upah+bahan : = Rp 142,111.00

Memasang Arde
Bahan An. SNI 6.35.1
1.000 bh Arde 1 Fase @ Rp. 183,333.33 = Rp 183,333.33
5.000 % Accesories & Termination = Rp 9,166.67
Sub total : = Rp 192,500.00

Upah An. SNI ( Revisi ) 6.35.2


0.010 Oh Pekerja @ Rp. 83,000.00 = Rp 830.00
0.010 Oh Tukang Listrik @ Rp. 88,000.00 = Rp 880.00
0.001 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 93.00
0.001 Oh Mandor @ Rp. 98,000.00 = Rp 98.00
Sub total : = Rp 1,901.00
Total upah+bahan : = Rp 194,401.00
Memasang Saklar Tunggal
Bahan An. SNI 6.22.1
1.000 bh Saklar Tunggal (Setara Broco) @ Rp. 21,666.67 = Rp 21,666.67
5.000 % Perlengkapan instalasi = Rp 1,083.33
Sub total : = Rp 22,750.00

Upah An. SNI ( Revisi ) 6.22.2


0.025 Oh Pekerja @ Rp. 83,000.00 = Rp 2,075.00
0.025 Oh Tukang Listrik @ Rp. 88,000.00 = Rp 2,200.00
0.017 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 1,543.80
0.014 Oh Mandor @ Rp. 98,000.00 = Rp 1,372.00
Sub total : = Rp 7,190.80

Lain-lain K3 + CAR = Rp 89.82

Total upah+bahan : = Rp 30,030.62

Memasang Saklar Ganda


Bahan An. SNI 6.22.1
1.000 bh Saklar Ganda (Setara Broco) @ Rp. 30,000.00 = Rp 30,000.00
5.000 % Perlengkapan instalasi = Rp 1,500.00
Sub total : = Rp 31,500.00

Upah An. SNI ( Revisi ) 6.22.2


0.025 Oh Pekerja @ Rp. 83,000.00 = Rp 2,075.00
0.025 Oh Tukang Listrik @ Rp. 88,000.00 = Rp 2,200.00
0.017 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 1,543.80
0.014 Oh Mandor @ Rp. 98,000.00 = Rp 1,372.00
Sub total : = Rp 7,190.80

Lain-lain K3 + CAR = Rp 116.07

Total upah+bahan : = Rp 38,806.87

Memasang Stop Kontak


Bahan An. SNI 6.22.1
1.000 bh Stop Kontak (Setara Broco) @ Rp. 25,000.00 = Rp 25,000.00
5.000 % Perlengkapan instalasi = Rp 1,250.00
Sub total : = Rp 26,250.00

Upah An. SNI ( Revisi ) 6.22.2


0.025 Oh Pekerja @ Rp. 83,000.00 = Rp 2,075.00
0.025 Oh Tukang Listrik @ Rp. 88,000.00 = Rp 2,200.00
0.017 Oh Kepala Tukang Listrik @ Rp. 93,000.00 = Rp 1,543.80
0.014 Oh Mandor @ Rp. 98,000.00 = Rp 1,372.00
Sub total : = Rp 7,190.80

Lain-lain K3 + CAR = Rp 100.32

Total upah+bahan : = Rp 33,541.12

Memasang Lampu TL 2 x 20 W
Bahan An. SNI 6.30.1
1.000 bh Lampu TL 2 x 20 W @ Rp. 101,300.00 = Rp 101,300.00

5.000 % Perlengkapan instalasi = Rp 5,065.00


Sub total : = Rp 106,365.00

Upah An. SNI ( Revisi ) 6.30.2


0.166 Oh Pekerja @ Rp. 64,000.00 = Rp 10,624.00
0.166 Oh Tukang Listrik @ Rp. 72,000.00 = Rp 11,952.00
0.033 Oh Kepala Tukang Listrik @ Rp. 81,000.00 = Rp 2,673.00
0.017 Oh Mandor @ Rp. 72,000.00 = Rp 1,195.20
Sub total : = Rp 26,444.20

Lain-lain K3 + CAR = Rp 398.43


Total upah+bahan : = Rp 133,207.63
Memasang Lampu TL 2 x 36 W
Bahan An. SNI 6.30.1
1.000 bh Lampu TL 2 x 36 W @ Rp. 126,300.00 = Rp 126,300.00

5.000 % Perlengkapan instalasi = Rp 6,315.00


Sub total : = Rp 132,615.00

Upah An. SNI ( Revisi ) 6.30.2


0.166 Oh Pekerja @ Rp. 64,000.00 = Rp 10,624.00
0.166 Oh Tukang Listrik @ Rp. 72,000.00 = Rp 11,952.00
0.033 Oh Kepala Tukang Listrik @ Rp. 81,000.00 = Rp 2,673.00
0.017 Oh Mandor @ Rp. 72,000.00 = Rp 1,195.20
Sub total : = Rp 26,444.20

Lain-lain K3 + CAR = Rp 477.18

Total upah+bahan : = Rp 159,536.38

Over Head & Profit 10% x Total U + B = Rp 15,953.64


Total Harga Satuan Pek. = Rp 175,490.02
ANALISA HARGA SATUAN
Memasang 1 Baut (dia 12 mm, panjang 12 cm)
Bahan
Baut dia 12 mm, panjang 12 cm 1.00000 Bh 7,625.00 7,625.00
Tenaga Kerja
Tukang Kayu 0.00010 OH 88,000.00 8.80
Mandor 0.00001 OH 98,000.00 0.98
JUMLAH HARGA PER SATUAN PEKERJAAN 7,634.78
JUMLAH 7,634.78
Memasang 1 Baut (dia 12 mm, panjang 30 cm)
Bahan
Pemasangan 1 Baut dia 12 mm, panjang 30 cm 1.00000 Bh 15,000.00 15,000.00
Tenaga Kerja
Tukang Kayu 0.00010 OH 88,000.00 8.80
Mandor 0.00001 OH 98,000.00 0.98
JUMLAH HARGA PER SATUAN PEKERJAAN 15,009.78
JUMLAH 15,009.78
Memasang 1 Baut (dia 16 mm, panjang 40 cm)
Bahan
Pemasangan 1 Baut dia 16 mm, panjang 40 cm 1.00000 Bh 15,000.00 16,500.00
Tenaga Kerja
Tukang Kayu 0.00010 OH 88,000.00 8.80
Mandor 0.00001 OH 98,000.00 0.98
JUMLAH HARGA PER SATUAN PEKERJAAN 16,509.78
JUMLAH 16,509.78
Memasang 1 Bh Beugel U Pelat
Bahan
Beugel U Pelat 1.00000 Bh 33,125.00 32,700.00
Tenaga Kerja
Tukang Kayu 0.00010 OH 88,000.00 8.80
Mandor 0.00001 OH 98,000.00 0.98
JUMLAH HARGA PER SATUAN PEKERJAAN 32,709.78
JUMLAH 32,709.78
Memasang 1 Bh Pelat strip 30 cm
Bahan
Pelat strip 30 cm 1.00000 Bh 26,250.00 26,250.00
Tenaga Kerja
Tukang Kayu 0.00010 OH 88,000.00 8.80
Mandor 0.00001 OH 98,000.00 0.98
JUMLAH HARGA PER SATUAN PEKERJAAN 26,259.78
JUMLAH 26,259.78
SURVEY HARGA BAHAN BANGUNAN

NAMA TOKO
NO BAHAN/MATERIAL SAT.
HARGA (Tanpa Pa

TOKO SENTRAL
A B C D
Bahan Bangunan
1 Semen (40 Kg) Tonasa Zak 58,000.00
2 Semen Putih Zak 135,000.00
2 Semen Warna Kg 15,000.00
3 Besi Tulangan Beton Kg 15,000.00
3 Kawat Beton Kg 25,000.00
4 Tiang Pilar (20x20) + List Tiang Unit
4 Papan 3/20 M3
5 Beugel U Besi Pelat Bh 37,500.00
5 Beugel U Besi Bulat Bh 37,500.00
6 Beugel Plat Bh 20,000.00
6 Angker dia 12mm (panjang 40cm) Bh 25,000.00
7 Baut/Mur 19mm (30 cm) Psg 15,000.00
7 Baut/Mur 12mm (12cm) Psg 7,500.00
8 Seng Gelombang BJLS 0.20 Lbr 70,000.00
8 Seng Gelombang BJLS 0.3 Lbr 135,000.00
9 Seng Plat BJLS lebar 40cm M1 18,000.00
9 Papan Bunga Wood Plank Lbr 75,000.00
10 Paku Biasa 5 - 12 cm Kg 20,000.00
10 Paku Biasa 2 - 4 cm Kg 25,000.00
11 Paku Woodplank (Paku Putih) Kg 35,000.00
11 Paku Skrup Hitam 3cm Kg 60,000.00
12 Paku Skrup Hitam 5cm Kg 60,000.00
12 Paku Seng Kg 35,000.00
13 Plamir Tembok Kg 15,000.00
13 Plamir Kayu Kg 55,000.00
14 Dumpul Kayu Kg 55,000.00
14 Lem Aibon Kg 75,000.00
15 Kertas Gosok/Amplas Lbr 6,500.00
15 Mateks Tembok Kg 26,000.00
16 Mateks Plafon Kg 26,000.00
16 Cat pro Healty Kg
17 Vernis Kg 90,000.00
17 Politur Kg 90,000.00
18 Menie Besi Kg 55,000.00
18 Cat Seng Kg 32,500.00
19 Meni Kayu Kg 55,000.00
19 Cat Kayu Kg 85,000.00
20 Cat Kilap Kg 85,000.00
20 Minyak Cat Kg 50,000.00
21 Minyak Begesting Ltr 50,000.00
21 Kwas Sedang 2,5 cm Bh 5,000.00
22 Kwas Besar 12 cm Bh 25,000.00
22 Kwas Roll Bh 30,000.00
23 Teak wood 3 mm Lbr 95,000.00
23 Tripleks 3 mm Lbr 60,000.00
24 Tripleks 4 mm Lbr 75,000.00
24 Tripleks 5 mm Lbr 95,000.00
25 Tripleks 9 mm Lbr 135,000.00
25 Tripleks 12 mm Lbr 200,000.00
26 Gibsum Board Lbr
26 Calsiboard 4,5 mm Lbr 85,000.00
27 Kasa Plafon Rol 12,500.00
27 List Kayu Profil 5 cm M' 49,000.00
28 List Kayu Profil 4 cm M' 35,000.00
28 List Gipsum (List Sudut) dan pemasangan M'
29 List Gipsum (List Datar) dan pemasangan M'
29 List kayu untuk kaca jendela,boven M'
30 Granit 60 x 60 Dos 200,000.00
30 Tegel Keramik 20 x 40 Polos M2
31 Tegel Keramik 40 x 40 Polos M2 65,000.00
31 Tegel Keramik 40 x 40 Profil M2
32 Tegel Keramik 20 x 40 Motif Batu Alam M2 90,000.00
32 Plint Keramik 10 x 40 Polos M2 20,000.00
33 Plint Keramik 10 x 40 Profil M2 25,000.00
33 Plint Keramik 10 x 20 Polos M2 15,000.00
34 Keramik 60 x 60 cm M2 150,000.00
34 Kunci Tanam 2 slaag Bh 250,000.00
35 Kunci Tanam 2 slaag (kuningan) Bh 250,000.00
35 Hengsel Pintu Kuningan Bh 40,000.00
36 Hengsel Pintu Kuningan Bh 40,000.00
36 Hengsel Jendela Kuningan Bh 25,000.00
37 Haak Angin Bh 15,000.00
37 Spring knip Bh 25,000.00
38 Grendel Pintu Bh 17,500.00
38 Grendel Jendela Bh 15,000.00
39 Kaca Polos 3 mm m2 175,000.00
39 Kaca Polos 5 mm m2 200,000.00
40 Kaca Reben 5 mm M2 250,000.00
40 Kaca Blok (20x20)cm Bh 35,000.00
41 Instalasi Listrik titik
41 Panel SDP Unit
42 Pipa 20 mm btg 25,000.00
42 Meteran Listrik 1300 KVA Dan Pemasangan Komplit Unit
43 Meteran Listrik 10600 KVA Dan Pemasangan Komplit Unit
43 MCB 10 Amper Jalur 65,000.00
44 Box / Rumah MCB bh 25,000.00
44 Lampu TL LED 2 x 40 Watt Komplit Setara Philips bh 135,000.00
45 Lampu TL LED 2 x 18 Watt Komplit Setara Philips bh 70,000.00
45 Lampu LED 10,5 Watt Setara Philis bh 65,000.00
46 Lampu LED 23 Watt Setara Philis bh
46 Lampu Listrik 18 watt Setara Philips bh 65,000.00
47 Lampu Listrik 23watt Setara Philips bh 75,000.00
47 Fhisher dos 25,000.00
48 Saklar Tunggal bh 25,000.00
48 Saklar Ganda bh 30,000.00
49 Triple Saklar bh 35,000.00
49 Stop Kontak bh 25,000.00
50 T Dos bh 5,000.00
50 Arde Fase 150,000.00
51 L Bow bh 2,500.00
51 Las Dop bh
52 Fiting Tempel / Tanam bh 17,500.00
52 Klem Pipa / Kabel bh 35,000.00
53 Mangkok Listrik bh
53 Kabel Listrik 3x2.5mm M' 20,000.00
54 Kabel Listrik 2x1.5mm M' 12,500.00
54 Kabel Listrik 4x6mm M'
55 Pipa Hawa Unit 150,000.00
55 Pipa Gip diameter 1/2" M' 230,000.00
56 Pipa Gip diameter 1" M' 450,000.00
56 Pipa PVC 5/8" (Pipa Kabel Listrik) Btg 15,000.00
57 Pipa PVC 1" M1 75,000.00
57 Pipa PVC 1" Tebal M1 75,000.00
58 Pipa PVC 1 1/4" M1 78,000.00
58 Pipa PVC 2" M1 90,000.00
59 Pipa PVC 2" Tebal M1 185,000.00
59 Pipa PVC 3" M1 200,000.00
60 Pipa PVC 4" M1 280,000.00
60 Pipa PVC 4" Tebal M1 430,000.00
61 Pipa Saringan Tembok Penyokong PVC 2" Bh 185,000.00
61 Boq PVC diameter 4" Bh 90,000.00
62 Boq PVC diameter 3" Bh 50,000.00
62 Tee PVC diameter 4" Bh 60,000.00
63 Tee PVC diameter 3" Bh 35,000.00
63 Kloset Jongkok Setara INA Bh 310,000.00
64 Wastafel Kramik Unit 600,000.00
64 Wastafel Sainless 2 Lubang Unit 500,000.00
65 Wastafel Sainless 1 Lubang Unit 250,000.00
65 Kran Air 1/2" pipa gip Bh 85,000.00
66 Kran Air 1/2" Wastafel Keramik Bh 75,000.00
66 Setop Kran 1/2" Gip Bh 110,000.00
67 Sealtape Bh 8,000.00
67 Kloset duduk Biasa + Tutupan unit 1,100,000.00
68 Kloset duduk Komplite Shower unit 1,300,000.00
68 Kloset Jongkok Setara INA Bh 310,000.00
69 Bokor Ember 60Liter + Penggayung Bh 300,000.00
69 Saringan Lantai Bh 25,000.00
70 Penutup Lubang Penguras Bak bh 10,000.00
70 Bak Fiber reservoir 1100 liter bh 1,950,000.00
71 Bak Fiber reservoir 2200 liter bh 3,000,000.00
72 Seng Galvalum P 6 m, t 0.3 Lbr 282,000.00

NO BAHAN/MATERIAL LOKAL SAT. HARGA (TANPA PAJAK)

TOKO
KURNIAWAN
A B C D
I Material Bangunan
1 Batu Quari/Batu Gunung M3 164,000.00
2 Batu Belah 2 - 3 cm M3 125,000.00
2 Batu Belah 7 - 10 cm M3 125,000.00
3 Kerikil/Kerikil Hasil Saringan 2 - 3 cm M3 240,000.00
3 Kerikil/Kerikil Hasil Saringan 5 - 7 cm M3 240,000.00
4 Pasir ayak utk beton M3 250,000.00
4 Pasir Pasangan M3 140,000.00
5 Pasir Pelester M3 320,000.00
5 Sirtu Tak diayak (Pasir Urug) M3 150,000.00
6 Tanah Timbunan pilihan M3 75,000.00
6 Tanah Timbunan biasa M3 70,000.00
7 Batako Bh 6,000.00
8 Batu Bata Bh 1,600.00
9 Pavingblock Bh

SURVEY HARGA BALOK DAN PAPAN

NO BAHAN/MATERIAL SAT.
HARGA BALOK DAN PAPAN (TANPA P
CV.
PAULYEFRAN
A B C D
I Material Lokal ( Balok + Papan )
1 Balok 8/12 Kls. I Lokal M3 3,200,000.00
1 Balok 8/12 Kls. II Lokal M3 3,000,000.00
2 Balok 7/15 KLS I Lokal M3 3,200,000.00
3 Balok 6/12 Kls. II Lokal M3 3,000,000.00
4 Balok 6/8 Kls. II Lokal M3 3,000,000.00
5 Balok 5/7 Kls. II Lokal M3 3,000,000.00
6 Balok 6/10 Kls II Lokal M3 3,000,000.00
7 Papan t = 4 cm Kls. I Lokal M3 3,500,000.00
8 Papan t = 4 cm Kls. II Lokal M3 3,000,000.00
9 Papan tipis 2,5 cm Kls. I Lokal M3 3,500,000.00
10 Papan tipis 2,5 cm Kls. II Lokal M3 3,000,000.00
11 Papan tipis 2,5 cm Kls. III Lokal M3 2,000,000.00
12 Balok 5/7 Kls. III Lokal M3 2,000,000.00
13 Papan 3/20 M3 3,000,000.00

SURVEY HARGA BAHAN MEUBELER

NO BAHAN/MATERIAL SAT.
HARGA MEUBELER (TANPA PAJA
NO BAHAN/MATERIAL SAT.
HARGA MEUBELER (TANPA PAJA
MEUBELER
RANDY
A B C D
I Material Meubeler
1 Meja Kerja ( 1/2 Biro ) Bh 1,200,000.00
2 Kursi Guru Bh 450,000.00
3 Papan Tulis Gantung Putih/White Board (120x240cm) Bh 1,000,000.00
4 Kusen Pintu, Kayu Kelas I Meranti ( Type P1 ) Unit 500,000.00
5 Kusen Pintu, Kayu Kelas I Meranti (Type Type P2) Unit 500,000.00
Kusen Jalusi Boven Pintu, Kayu Kelas I Meranti (Type
6 Unit 300,000.00
P1)
7 Kusen Jandela , Kayu Kelas I Meranti (Type J1) Unit 1,400,000.00
Kusen Jalusi Boven Jandela, Kayu Kelas I Meranti (Type
8 Unit
j1)
Kusen Jalusi Boven Tembok Gewel, Kayu Kelas I
9 Unit
Meranti (Type1BV)
Pemasangan Unit Daun Pintu Panil, Kayu Kelas II Jati
10 (Type P1 Unit 1,500,000.00
Pemasangan 1 Unit Daun Pintu Panil, Kayu Kelas II Jati
11 (Type P2) Unit 1,500,000.00
Daun Jendela Kaca 5 mm, Rangka Kayu Kelas II Jati
12 Type J1 Unit
13 Kursi dan meja Siswa 1 Pasang Unit 800,000.00

SURVEY HARGA BAHAN LOKAL

NO BAHAN/MATERIAL SAT.
HARGA LOKAL (TANPA PAJAK )

A B C D
I Material Lokal
Bh
1 Pelupuh (Naja) Lbr
2 Bambu (Bambu) Btg
3 Ijuk

Bajawa, Maret 2023


Toko/UD,…...............

…...............................................
RGA BAHAN BANGUNAN

NAMA TOKO
HARGA RATA-
HARGA (Tanpa Pajak)
RATA
TOKO TOKO SINAR TOKO
KURNIAWAN BERLIAN SENANDUNG
E F G H

58,000.00 58,000.00 58,000.00 58,000.00


145,000.00 145,000.00 140,000.00 141,250.00
30,000.00 24,000.00 25,000.00 23,500.00
13,500.00 13,500.00 Besi13,500.00
Tulangan Beton (Polos)
13,875.00
27,000.00 27,500.00 Besi25,000.00
Tulangan Beton SNI
26,125.00
8 mm (Polos)
600,000.00 650,000.00 600,000.00 615,000.00
3,000,000.00 2,800,000.00 2,750,000.00 2,850,000.00
35,000.00 30,000.00 30,000.00 33,125.00
35,000.00 35,000.00 35,000.00 35,625.00
30,000.00 25,000.00 30,000.00 26,250.00
20,000.00 20,000.00 ### 17,000.00 20,500.00
15,000.00 15,000.00 ### 15,000.00 15,000.00
8,000.00 7,000.00 8,000.00 7,625.00
70,000.00 70,000.00 70,000.00 70,000.00
130,000.00 132,000.00 130,000.00 131,750.00
18,000.00 20,000.00 18,000.00 18,500.00
85,000.00 89,000.00 90,000.00 84,750.00
25,000.00 24,000.00 25,000.00 23,500.00
30,000.00 30,000.00 25,000.00 27,500.00
35,000.00 40,000.00 35,000.00 36,250.00
50,000.00 60,000.00 50,000.00 55,000.00
50,000.00 60,000.00 50,000.00 55,000.00
35,000.00 35,000.00 35,000.00 35,000.00
17,500.00 25,000.00 20,000.00 19,375.00
75,000.00 75,000.00 68,333.33
65,000.00 65,000.00 61,666.67
90,000.00 80,000.00 81,666.67
7,500.00 10,000.00 6,000.00 7,500.00
40,000.00 70,000.00 45,333.33
80,000.00 80,000.00 62,000.00
23,300.00
85,000.00 85,000.00 86,666.67
75,000.00 75,000.00 80,000.00
60,000.00 60,000.00 58,333.33
235,000.00 235,000.00 167,500.00
60,000.00 80,000.00 60,000.00 63,750.00
80,000.00 80,000.00 80,000.00 81,250.00
75,000.00 90,000.00 75,000.00 81,250.00
75,000.00 80,000.00 75,000.00 70,000.00
35,000.00 30,000.00 38,333.33
8,000.00 15,000.00 10,000.00 9,500.00
15,000.00 20,000.00 15,000.00 18,750.00
30,000.00 30,000.00 25,000.00 28,750.00
115,000.00 128,000.00 115,000.00 113,250.00
65,000.00 65,000.00 65,000.00 63,750.00
78,000.00 74,000.00 75,000.00 75,500.00
90,000.00 94,000.00 95,000.00 93,500.00
135,000.00 130,000.00 130,000.00 132,500.00
185,000.00 185,000.00 180,000.00 187,500.00
90,000.00 90,000.00 90,000.00
85,000.00 85,000.00 85,000.00
25,000.00 25,000.00 20,833.33
55,000.00 60,000.00 54,666.67
45,000.00 45,000.00 41,666.67
70,000.00 65,000.00 67,500.00
80,000.00 75,000.00 77,500.00
20,000.00 20,000.00 20,000.00
275,000.00 270,000.00 245,000.00 247,500.00
85,000.00 85,000.00 80,000.00 83,333.33
75,000.00 70,000.00 75,000.00 71,250.00
85,000.00 80,000.00 85,000.00 83,333.33
90,000.00 90,000.00 85,000.00 88,750.00
40,000.00 40,000.00 38,000.00 34,500.00
45,000.00 45,000.00 45,000.00 40,000.00
40,000.00 35,000.00 40,000.00 32,500.00
215,000.00 195,000.00 185,000.00 186,250.00
250,000.00 245,000.00 250,000.00 248,750.00
250,000.00 275,000.00 250,000.00 256,250.00
30,000.00 30,000.00 30,000.00 32,500.00
25,000.00 25,000.00 25,000.00 28,750.00
25,000.00 20,000.00 25,000.00 23,750.00
15,000.00 30,000.00 20,000.00 20,000.00
25,000.00 25,000.00 25,000.00 25,000.00
25,000.00 25,000.00 25,000.00 23,125.00
15,000.00 15,000.00 15,000.00 15,000.00
60,000.00 60,000.00 60,000.00
330,000.00 325,000.00 327,000.00
350,000.00 350,000.00 350,000.00
35,000.00 40,000.00 36,666.67
250,000.00 250,000.00
10,500,000.00 10,500,000.00
20,000.00 20,000.00 21,666.67
3,900,000.00 3,900,000.00
0.00
60,000.00 60,000.00 61,666.67
25,000.00 25,000.00 25,000.00
150,000.00 150,000.00 145,000.00
150,000.00 150,000.00 150,000.00 150,000.00
75,000.00 75,000.00 75,000.00 72,500.00
0.00
60,000.00 60,000.00 60,000.00
75,000.00 75,000.00 75,000.00
35,000.00 35,000.00 31,666.67
20,000.00 20,000.00 21,666.67
30,000.00 30,000.00 30,000.00
30,000.00 30,000.00 31,666.67
25,000.00 25,000.00 25,000.00
10,000.00 10,000.00 8,333.33
200,000.00 200,000.00 183,333.33
5,000.00 5,000.00 4,166.67
0.00
20,000.00 20,000.00 19,166.67
30,000.00 30,000.00 31,666.67
60,000.00 60,000.00 60,000.00
20,000.00 20,000.00 20,000.00
12,500.00 12,500.00 12,500.00
120,000.00 120,000.00
115,000.00 115,000.00 120,000.00 125,000.00
45,000.00 46,000.00 45,000.00 91,500.00
68,000.00 69,000.00 68,000.00 163,750.00
15,000.00 14,000.00 15,000.00 14,750.00
15,000.00 25,000.00 15,000.00 32,500.00
20,000.00 75,000.00 20,000.00 47,500.00
40,000.00 65,000.00 40,000.00 55,750.00
40,000.00 70,000.00 40,000.00 60,000.00
50,000.00 85,000.00 50,000.00 92,500.00
50,000.00 90,000.00 50,000.00 97,500.00
60,000.00 135,000.00 60,000.00 133,750.00
125,000.00 185,000.00 125,000.00 216,250.00
185,000.00
45,000.00 35,000.00 45,000.00 41,666.67
30,000.00 30,000.00 30,000.00 35,000.00
65,000.00 65,000.00 63,333.33
40,000.00 40,000.00 38,333.33
295,000.00 320,000.00 300,000.00 306,250.00
650,000.00 650,000.00 633,333.33
450,000.00 450,000.00 466,666.67
250,000.00 250,000.00 250,000.00
40,000.00 40,000.00 55,000.00
70,000.00 70,000.00 71,666.67
90,000.00 95,000.00 90,000.00 96,250.00
10,000.00 7,000.00 8,000.00 8,250.00
750,000.00 850,000.00 800,000.00 875,000.00
2,000,000.00 2,000,000.00 2,000,000.00 1,825,000.00
295,000.00 320,000.00 300,000.00 306,250.00
300,000.00
30,000.00 30,000.00 28,333.33
30,000.00 45,000.00 28,333.33
2,500,000.00 1,600,000.00 1,500,000.00 1,887,500.00
3,700,000.00 2,700,000.00 2,500,000.00 2,975,000.00
420,000.00 270,000.00 324,000.00

HARGA RATA-
HARGA (TANPA PAJAK)
RATA
CV. SINAR
CV. SENANDUNG
HARGA RATA-RATA
BERLIAN
E F G G

167,000.00 165,000.00### 165,500.00


125,000.00 125,000.00### 125,000.00
125,000.00 125,000.00### 125,000.00
245,000.00### 242,500.00
240,000.00### 240,000.00
240,000.00### 245,000.00
125,000.00 125,000.00### 130,000.00
350,000.00 300,000.00### 323,500.00
140,000.00### 145,000.00
75,000.00### 75,000.00
75,000.00### 72,500.00
6,000.00 5,500.00### 5,850.00
1,700.00 1,600.00### 1,650.00
4,000.00### 4,000.00

APAN

RGA BALOK DAN PAPAN (TANPA PAJAK)


HARGA RATA-
HARGARATA
RATA- RATA
CV. SEPAKAT TOKO HOGA
KARYA MEKU
E F G G

3,150,000.00 3,000,000.00### 3,116,666.67


3,000,000.00 2,900,000.00### 2,966,666.67
3,200,000.00 3,000,000.00### 3,133,333.33
3,000,000.00 3,000,000.00### 3,000,000.00
3,000,000.00 2,900,000.00### 2,966,666.67
3,000,000.00 2,900,000.00### 2,966,666.67
3,000,000.00 2,900,000.00### 2,966,666.67
3,500,000.00 3,000,000.00### 3,333,333.33
3,000,000.00 2,900,000.00### 2,966,666.67
3,500,000.00 3,000,000.00### 3,333,333.33
3,000,000.00 2,900,000.00### 2,966,666.67
2,000,000.00 2,000,000.00### 2,000,000.00
2,000,000.00 2,000,000.00### 2,000,000.00
3,000,000.00 2,500,000.00### 2,833,333.33

BELER

HARGA RATA -
HARGA RATA - RATA
HARGA MEUBELER (TANPA PAJAK ) RATA
HARGA RATA -
HARGA RATA - RATA
HARGA MEUBELER (TANPA PAJAK ) RATA
MEUBELER MEUBELER
MAIWALI ANALOKA
E F G G

2,000,000.00 ### 2,000,000.00


450,000.00 ### 500,000.00
800,000.00 ### 800,000.00
### 500,000.00
### 500,000.00
### 300,000.00
### 1,400,000.00

1,500,000.00 ### 1,750,000.00


1,500,000.00 ### 150,000.00
500,000.00 ### 500,000.00
800,000.00 ### 800,000.00

KAL

HARGA RATA
HARGA- RATA
RATA - RATA
HARGA LOKAL (TANPA PAJAK )

E F G G

###
###
### 25,000.00
###
###

........................
UPAH TENAGA KERJA DAN HARGA SATUAN

Lokasi : SMPS ST AGUSTINUS LANGA


Kecamatan : Bajawa

Pekerjaan PEMBANGUNAN RUANG UKS-SMPS


JLN. JEREBUU-BAJAWA, ST. AGUSTINUS
DESA BOMARI-KEO, LANGA KAB. NGADA
KEC. BAJAWA,
Lokasi
T.A : 2023

NO TENAGA KERJA KODE

1 Mandor Lapangan L. 061


2 Kepala Tukang L. 073
3 Tukang L. 072
4 Pekerja L. 101
5 Mekanik L. 071
6 Pembantu Mekanik L. 072
7 Operator L. 081
8 Pembantu Operator L. 082

NO BAHAN/MATERIAL SAT.

A B C
I Material Bangunan
1 Batu Quari/Batu Gunung M3
2 Batu Belah 2 - 3 cm M3
3 Batu Belah 7 - 10 cm M3
4 Kerakal/Kerikil Hasil Saringan 2 - 3 cm M3
5 Kerakal/Kerikil Hasil Saringan 5 - 7 cm M3
6 Pasir ayak utk beton M3
7 Pasir Pasangan M3
8 Pasir Pelester M3
9 Sirtu Tak diayak (Pasir Urug) M3
10 Tanah Timbunan pilihan M3
11 Tanah Timbunan biasa M3
II Bahan Bangunan
1 Semen (40 Kg) Zak
2 Semen Putih Zak
3 Semen Warna Kg
4 Besi Tulangan Beton Kg
5 Air Liter
5 Kawat Beton Kg
6 Batako Bh
7 Batu Bata Bh
8 Pavingblock Bh
9 Pelupuh (Naja) Lbr
10 Pelupuh (Bambu) Btg
11 Ijuk M3
11 Tiang Pilar (20x20) + List Tiang Unit
12 Balok 8/12 Kls. I Lokal M3
13 Balok 8/12 Kls. II Lokal M3
14 Balok 7/15 KLS I Lokal M3
15 Balok 6/12 Kls. II Lokal M3
16 Balok 6/8 Kls. II Lokal M3
17 Balok 5/7 Kls. II Lokal M3
18 Balok 6/10 Kls II Lokal M3
19 Papan t = 4 cm Kls. I Lokal M3
20 Papan t = 4 cm Kls. II Lokal M3
21 Papan tipis 2,5 cm Kls. I Lokal M3
22 Papan tipis 2,5 cm Kls. II Lokal M3
23 Papan tipis 2,5 cm Kls. III Lokal M3
24 Balok 5/7 Kls. III Lokal M3
24 Papan 3/20 M3
25 Beugle U Plat Bh
26 Plat Strip P. 30 cm Bh
27 Pas. Baut (D12 P.12 cm) Bh
28 Pas. Baut (D12 P.30 cm) Bh
29 #NAME? lbr
29 Pas. Baut ( D 16 P: 40 cm ) Bh
31 Seng Gelombang BJLS 0.20 Lbr
32 Seng Galvalum 4 m Lbr
33 Seng Plat BJLS lebar 40cm M1
34 Papan Bunga Wood Plank Lbr
35 Paku Biasa 5 - 12 cm Kg
36 Paku Biasa 2 - 4 cm Kg
37 Paku Woodplank (Paku Putih) Kg
38 Paku Skrup Hitam 3cm Kg
39 Paku Skrup Hitam 5cm Kg
40 Paku Seng Kg
41 Plamir Tembok Kg
42 Plamir Kayu Kg
43 Dumpul Kayu Kg
44 Plakat Bh
44 Lem Aibon Kg
45 Kertas Gosok/Amplas Lbr
46 Mateks Tembok Kg
47 Mateks Plafon Kg
48 Cat pro Healty Kg
49 Vernis Kg
50 Politur Kg
51 Menie Seng Kg
52 Cat Seng Kg
53 Meni Kayu Kg
54 Cat Kayu Kg
55 Cat Kilap Kg
56 Minyak Cat Kg
57 Minyak Begesting Ltr
58 Kwas Sedang 2,5 cm Bh
59 Kwas Besar 12 cm Bh
60 Kwas Roll Bh
61 Teak wood 3 mm Lbr
62 Tripleks 3 mm Lbr
63 Tripleks 4 mm Lbr
64 Tripleks 5 mm Lbr
65 Tripleks 9 mm Lbr
66 Tripleks 12 mm Lbr
67 Calsiboard lbr
68 Gipsum Board tbl 10 cm lbr
69 List Kayu Profil 5 cm M'
70 List Kayu Profil 4 cm M'
71 List Gipsum (List Sudut) dan pemasangan M'
72 List Gipsum (List Datar) dan pemasangan M'
73 List kayu untuk kaca jendela,boven M'
74 Pemasangan Pilar Tiang Teras unit
74 Granit 60 x 60 Dos
74 ornamen tiang / sepatu tiang unit
75 Tegel Keramik 20 x 40 Polos M2
76 Tegel Keramik 40 x 40 Polos M2
77 Tegel Keramik 40 x 40 Profil M2
78 Tegel Keramik 20 x 40 Motif Batu Alam M2
79 Plint Keramik 10 x 40 Polos M2
80 Plint Keramik 10 x 40 Profil M2
81 Plint Keramik 10 x 20 Polos M2
82 Kunci Tanam 2 slaag Bh
83 Kunci Tanam 2 slaag (kuningan) Bh
84 Hengsel Pintu Kuningan Bh
85 Hengsel Pintu Kuningan Bh
86 Hengsel Jendela Kuningan Bh
87 Haak Angin Bh
88 Spring knip Bh
89 Grendel Pintu Bh
90 Grendel Jendela Bh
91 Kaca Polos 3 mm m2
92 Kaca Polos 5 mm m2
93 Kaca Reben 5 mm M2
94 Kaca Blok (20x20)cm Bh
95 Meteran Listrik 3500 KVA Unit
96 Instalasi Listrik titik
97 MCCB 3 Pha 500 A Bh
98 MCCB 3 Pha 400 A Bh
99 MCCB 3 Pha 200 A Bh
100 MCCB 3 Pha 100 A Bh
101 MCB 1 Pha 10 A Bh
102 MCB 1 Pha 20 A Bh
103 MCB 1 Pha 25 A Bh
104 Kabel NYFGBY 4 x 120 mm m'
105 Kabel NYFGBY 4 x 35 mm m'
106 Kabel NYFGBY 4 x 25 mm m'
107 Kabel NYFGBY 4 x 16 mm m'
108 NYFGBY 4 x 16 mm m'
109 Kabel NYM 2 x 2,5 mm m'
110 Kabel NYY 3 x 2,5 mm m'
111 Kabel NYM 3 x 2,5 mm m'
112 Kabel NYY 4 x 2,5 mm m'
113 Kabel NYM 2,5 mm m'
114 Lampu TL 40 Watt Bh
115 Lampu XL 18 Watt Bh
116 Lampu XL 23 Watt Bh
117 Lampu TL 2 x 20 W Bh
118 Lampu TL 2 x 36 W Bh
119 Downlights Tipis autbow Putih Bulat LED 18 Watt Bh
120 Downlights Tipis autbow Putih Bulat LED 12 Watt Bh
121 Box Downlights Inbow 5 Inch DL 500 + Lampu 15 Watt Bh
122 Box Downlights Inbow 5 Inch DL 500 + Lampu 23 Watt Bh
123 Saklar Tunggal (Setara Broco) Bh
124 Saklar Ganda (Setara Broco) Bh
125 Triple Saklar (Setara Broco) Bh
126 Stop Kontak (Setara Broco) Bh
127 Stop Kontak AC / Stop Kontak 3 Pin Bh
128 Handel Bh
129 Box Panel 30 x 40 x 20 cm Bh
130 Box Panel 40 x 60 x 20 cm Bh
131 Box Panel 180 x 80 x 60 cm Bh
132 Busbar, Wirring Bh
133 Pilot Lamp + Fuse Bh
134 Ampere Meter + CT Bh
135 Volt Meter + SS Bh
136 Grounding Panel Btg
137 Kabel BC 25 mm m'
138 Batang Grounding Btg
139 Pipa Listrik Btg
140 T Dos 20 mm Bh
141 L bow bh
142 Las Dop bh
143 Klem Kabel Dos
144 Fitting Bh
145 Mongkok bh
146 Sealtape Listrik Bh
147 Arde 1 Fase Bh
148 Pipa Hawa Unit
149 Pipa Gip diameter 1/2" M'
150 Pipa Gip diameter 1" M'
151 Pipa PVC 5/8" (Pipa Kabel Listrik) Btg
152 Pipa PVC 1/2" M1
153 Pipa PVC 1" Tebal M1
154 Pipa PVC 1 1/4" M1
155 Pipa PVC 2" M1
156 Pipa PVC 2" Tebal M1
157 Pipa PVC 3" M1
158 Pipa PVC 4" M1
159 Pipa PVC 4" Tebal M1
160 Pipa Saringan Tembok Penyokong PVC 2" Bh
161 Boq PVC diameter 4" Bh
162 Boq PVC diameter 3" Bh
163 Tee PVC diameter 4" Bh
164 Tee PVC diameter 3" Bh
165 Kloset Jongkok Setara INA Bh
166 Wastafel Kramik Unit
167 Wastafel Sainless 2 Lubang Unit
168 Wastafel Sainless 1 Lubang Unit
169 Kran Air 1/2" pipa gip Bh
170 Kran Air 1/2" Wastafel Keramik Bh
171 Setop Kran 1/2" Gip Bh
172 Sealtape Bh
173 Floor Drain unit
174 Kloset duduk Biasa + Tutupan unit
175 Kloset duduk Komplite Shower unit
176 Kloset Jongkok Setara INA Bh
177 Bokor Ember 60Liter + Penggayung Bh
178 Saringan Lantai Bh
179 Penutup Lubang Penguras Bak bh
180 Bak Fiber reservoir 1100 liter bh
181 Bak Fiber reservoir 2200 liter bh
182 Septitank Unit
183 Papan Nama Proyek Dan Pemasangan Unit
184 Meja Kerja (1/2 Biro) Bh
185 Kursi Guru Bh
186 Papan Tulis Gantung Putih/White Board (120x240cm) Bh
187 Kusen Pintu Kayu Kls II (Type P1 ) + Pemasangan Unit
188 Kusen Pintu Kayu Kls II (Type P2 ) + Pemasangan Unit
189 Kusen Pintu Kayu Kls II (Type P3 ) + Pemasangan Unit
190 Kusen Jendela Kayu Kls II (Type J1) + Pemasangan Unit
191 Kusen Jendela Kayu Kls II (Type J2) + Pemasangan Unit
192 Kusen Buven Kayu Kls II (Type BV) + Pemasangan Unit
193 Daun Pintu Panil Kayu Kls II (Type P1 uk. 2.17 x 1) + Pemasangan Unit
194 Daun Pintu Panil Kayu Kls II (Type P2 uk. 1.45 x 3) + Pemasangan Unit
195 Daun Pintu Panil Kayu Kls II (Type P3 uk. 1.30 x 1) + Pemasangan Unit
196 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J1 Uk. 0.37 X 0.77 ) + Pemasangan Unit
197 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J2 Uk. 0.67 X 0.37) + Pemasangan Unit
198 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVP1 Uk. 0.57 x 0.37) + Pemasangan Unit
199 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ1 Uk. 0.65 x 0.37) + Pemasangan Unit
200 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan Unit
201 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BV Uk. 0.77 x 0.37) + Pemasangan Unit
202 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan Unit
203 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ3 Uk. 0.77 x 0.37) + Pemasangan Unit
204 Penangkal Petir
Stik penerima / blacksem 2m' Bh
Reduser galvanis 3/4" - 1" Bh
Pipa Galvanis 1" m'
Kabel BC 70 mm2 m'
Pipa Conduit 3/4" m'
sock/klem conduit 20mm bh
Grounding BC 70 mm2 m'
Pipa galvanis 1" m'
Material bantu Ls
AGA KERJA DAN HARGA SATUAN 2022

Propinsi : Nusa Tenggara Timur Kode : (53)


Kabupaten : Ngada Kode : (11)

UPAH TENAGA
KODE NO TENAGA KERJA KODE
KERJA (RP/HARI)
L. 061 98,000.00 9 Buruh Lapangan Tak Terampil/terlatih
L. 073 93,000.00 10 Buruh Lapangan Agak Terlatih
L. 072 88,000.00 11 Buruh Lapangan Terampil
L. 101 83,000.00 12 Supir Truck L. 091
L. 071 88,000.00 13 Pembantu Sopir L. 099
L. 072 83,000.00 14 Sopir Personil
L. 081 93,000.00 15 Operator Kurang Terlatih
L. 082 66,000.00
HARGA JARAK HARGA ONGKOS JML HRG PAJAK
DI QUARY ANGKUT ANGKUT ANGKUT TANPA &
KODE
(TNP.PAJAK) RATA2 RATA2/KM /UNIT PAJAK KEUNTU-
(Rp.) (KM) (Rp.) (Rp/JAM) (Rp) NGAN (Rp)
D E F G H = FxG M=E+H N

107,500.00 20.00 3,000.00 60,000.00 167,500.00 0.00


77,500.00 20.00 3,000.00 60,000.00 137,500.00 0.00
88,333.33 20.00 3,000.00 60,000.00 148,333.33 0.00
80,483.57 20.00 3,000.00 60,000.00 140,483.57 0.00
80,483.57 20.00 3,000.00 60,000.00 140,483.57 0.00
82,500.00 20.00 3,000.00 60,000.00 142,500.00 0.00
75,000.00 20.00 3,000.00 60,000.00 135,000.00 0.00
187,500.00 20.00 3,000.00 60,000.00 247,500.00 0.00
75,000.00 20.00 3,000.00 60,000.00 135,000.00 0.00
50,000.00 10.00 2,000.00 20,000.00 70,000.00 0.00
40,000.00 10.00 2,000.00 20,000.00 60,000.00 0.00

65,000.00 20.00 75.00 1,500.00 66,500.00 0.00


155,000.00 20.00 10.00 200.00 155,200.00 0.00
28,000.00 20.00 10.00 200.00 28,200.00 0.00
12,637.00 20.00 10.00 200.00 12,837.00 0.00
70,000.00 20.00 10.00 200.00 70,200.00 0.00
30,000.00 20.00 10.00 200.00 30,200.00 0.00
4,700.00 10.00 200.00 2,000.00 6,700.00 0.00
1,500.00 10.00 50.00 500.00 2,000.00 0.00
3,500.00 20.00 200.00 4,000.00 7,500.00 0.00
10,000.00 10.00 10.00 100.00 10,100.00 0.00
25,000.00 10.00 10.00 100.00 25,100.00 0.00
500,000.00 10.00 25.00 250.00 500,250.00 0.00
801,300.00 10.00 25.00 250.00 801,550.00 0.00
6,240,000.00 10.00 40,000.00 400,000.00 6,640,000.00 0.00
3,120,000.00 10.00 40,000.00 400,000.00 3,520,000.00 0.00
6,240,000.00 10.00 40,000.00 400,000.00 6,640,000.00 0.00
3,120,000.00 10.00 40,000.00 400,000.00 3,520,000.00 0.00
3,120,000.00 10.00 40,000.00 400,000.00 3,520,000.00 0.00
3,120,000.00 10.00 40,000.00 400,000.00 3,520,000.00 0.00
3,120,000.00 10.00 40,000.00 400,000.00 3,520,000.00 0.00
6,240,000.00 10.00 40,000.00 400,000.00 6,640,000.00 0.00
3,120,000.00 10.00 40,000.00 400,000.00 3,520,000.00 0.00
6,240,000.00 10.00 40,000.00 400,000.00 6,640,000.00 0.00
3,120,000.00 10.00 40,000.00 400,000.00 3,520,000.00 0.00
2,000,000.00 10.00 40,000.00 400,000.00 2,400,000.00 0.00
2,000,000.00 10.00 40,000.00 400,000.00 2,400,000.00 0.00
2,500,000.00 10.00 40,000.00 400,000.00 2,900,000.00 0.00
32,700.00 20.00 10.00 200.00 32,900.00 0.00
37,200.00 20.00 10.00 200.00 37,400.00 0.00
11,300.00 20.00 10.00 200.00 11,500.00 0.00
16,300.00 20.00 10.00 200.00 16,500.00 0.00
63,000.00 20.00 10.00 200.00 63,200.00 0.00
16,300.00 20.00 10.00 200.00 16,500.00 0.00
67,000.00 20.00 25.00 500.00 67,500.00 0.00
100,000.00 20.00 25.00 500.00 100,500.00 0.00
18,000.00 20.00 25.00 500.00 18,500.00 0.00
85,000.00 20.00 100.00 2,000.00 87,000.00 0.00
28,000.00 20.00 10.00 200.00 28,200.00 0.00
30,000.00 20.00 10.00 200.00 30,200.00 0.00
28,000.00 20.00 10.00 200.00 28,200.00 0.00
55,000.00 20.00 10.00 200.00 55,200.00 0.00
55,000.00 20.00 10.00 200.00 55,200.00 0.00
50,000.00 20.00 10.00 200.00 50,200.00 0.00
60,000.00 20.00 10.00 200.00 60,200.00 0.00
48,000.00 20.00 10.00 200.00 48,200.00 0.00
50,000.00 20.00 10.00 200.00 50,200.00 0.00
400,000.00 20.00 10.00 200.00 400,200.00 0.00
75,000.00 20.00 10.00 200.00 75,200.00 0.00
5,000.00 20.00 10.00 200.00 5,200.00 0.00
22,750.00 20.00 10.00 200.00 22,950.00 0.00
22,750.00 20.00 10.00 200.00 22,950.00 0.00
23,000.00 20.00 10.00 200.00 23,200.00 0.00
75,000.00 20.00 10.00 200.00 75,200.00 0.00
60,000.00 20.00 10.00 200.00 60,200.00 0.00
45,000.00 20.00 10.00 200.00 45,200.00 0.00
22,000.00 20.00 10.00 200.00 22,200.00 0.00
50,000.00 20.00 10.00 200.00 50,200.00 0.00
65,000.00 20.00 10.00 200.00 65,200.00 0.00
65,000.00 20.00 10.00 200.00 65,200.00 0.00
35,000.00 20.00 10.00 200.00 35,200.00 0.00
M.003 3,000.00 20.00 10.00 200.00 3,200.00 0.00
15,000.00 20.00 10.00 200.00 15,200.00 0.00
25,000.00 20.00 10.00 200.00 25,200.00 0.00
35,000.00 20.00 10.00 200.00 35,200.00 0.00
135,000.00 20.00 25.00 500.00 135,500.00 0.00
55,000.00 20.00 25.00 500.00 55,500.00 0.00
80,000.00 20.00 25.00 500.00 80,500.00 0.00
95,000.00 20.00 25.00 500.00 95,500.00 0.00
125,000.00 20.00 25.00 500.00 125,500.00 0.00
200,000.00 20.00 25.00 500.00 200,500.00 0.00
81,000.00 20.00 300.00 6,000.00 87,000.00 0.00
106,000.00 20.00 10.00 200.00 106,200.00 0.00
13,750.00 20.00 10.00 200.00 13,950.00 0.00
11,250.00 20.00 10.00 200.00 11,450.00 0.00
25,000.00 20.00 10.00 200.00 25,200.00 0.00
28,333.33 20.00 10.00 200.00 28,533.33 0.00
1,000.00 20.00 10.00 200.00 1,200.00 0.00
800,000.00 20.00 10.00 200.00 800,200.00 0.00
300,000.00 20.00 50.00 1,000.00 301,000.00 0.00
400,000.00 20.00 50.00 1,000.00 401,000.00 0.00
75,000.00 20.00 50.00 1,000.00 76,000.00 0.00
98,000.00 20.00 50.00 1,000.00 99,000.00 0.00
100,000.00 20.00 50.00 1,000.00 101,000.00 0.00
85,000.00 20.00 50.00 1,000.00 86,000.00 0.00
103,000.00 20.00 50.00 1,000.00 104,000.00 0.00
105,000.00 20.00 50.00 1,000.00 106,000.00 0.00
75,000.00 20.00 50.00 1,000.00 76,000.00 0.00
250,000.00 20.00 10.00 200.00 250,200.00 0.00
365,000.00 20.00 10.00 200.00 365,200.00 0.00
12,500.00 20.00 10.00 200.00 12,700.00 0.00
20,800.00 20.00 10.00 200.00 21,000.00 0.00
10,000.00 20.00 10.00 200.00 10,200.00 0.00
10,000.00 20.00 10.00 200.00 10,200.00 0.00
21,000.00 20.00 10.00 200.00 21,200.00 0.00
15,000.00 20.00 10.00 200.00 15,200.00 0.00
10,000.00 20.00 10.00 200.00 10,200.00 0.00
75,500.00 20.00 100.00 2,000.00 77,500.00 0.00
113,300.00 20.00 100.00 2,000.00 115,300.00 0.00
113,600.00 20.00 100.00 2,000.00 115,600.00 0.00
32,000.0 20.00 10.00 200.00 32,200.00 0.00
4,000,000.0 20.00 10.00 200.00 4,000,200.00 0.00
150,000.00 20.00 10.00 200.00 150,200.00 0.00
250,000.00 20.00 10.00 200.00 250,200.00 0.00
250,000.00 20.00 10.00 200.00 250,200.00 0.00
250,000.00 20.00 10.00 200.00 250,200.0 0.00
250,000.00 20.00 20.00 400.00 250,400.00 0.00
75,000.00 20.00 20.00 400.00 75,400.00 0.00
80,000.00 20.00 20.00 400.00 80,400.00 0.00
85,000.00 20.00 20.00 400.00 85,400.00 0.00
1,200,000.00 20.00 20.00 400.00 1,200,400.00 0.00
260,000.00 20.00 20.00 400.00 260,400.00 0.00
200,000.00 20.00 20.00 400.00 200,400.00 0.00
130,000.00 20.00 20.00 400.00 130,400.00 0.00
130,000.00 20.00 20.00 400.00 130,400.00 0.00
9,000.00 20.00 10.00 200.00 9,200.00 0.00
12,000.00 20.00 10.00 200.00 12,200.00 0.00
16,000.00 20.00 10.00 200.00 16,200.00 0.00
25,000.00 20.00 10.00 200.00 25,200.00 0.00
4,000.00 20.00 10.00 200.00 4,200.00 0.00
150,000.00 20.00 10.00 200.00 150,200.00 0.00
75,000.00 20.00 10.00 200.00 75,200.00 0.00
100,000.00 20.00 10.00 200.00 100,200.00 0.00
100,000.00 20.00 10.00 200.00 100,200.00 0.00
125,000.00 20.00 10.00 200.00 125,200.00 0.00
200,000.00 20.00 10.00 200.00 200,200.00 0.00
175,000.00 20.00 10.00 200.00 175,200.00 0.00
130,000.00 20.00 10.00 200.00 130,200.00 0.00
200,000.00 20.00 10.00 200.00 200,200.00 0.00
20,000.00 20.00 10.00 200.00 20,200.00 0.00
20,000.00 20.00 10.00 200.00 20,200.00 0.00
20,000.00 20.00 10.00 200.00 20,200.00 0.00
20,000.00 20.00 10.00 200.00 20,200.00 0.00
100,000.00 20.00 10.00 200.00 100,200.00 0.00
100,000.00 20.00 10.00 200.00 100,200.00 0.00
600,000.00 20.00 10.00 200.00 600,200.00 0.00
900,000.00 20.00 10.00 200.00 900,200.00 0.00
7,000,000.00 20.00 10.00 200.00 7,000,200.00 0.00
160,000.00 20.00 10.00 200.00 160,200.00 0.00
60,000.00 20.00 10.00 200.00 60,200.00 0.00
110,000.00 20.00 10.00 200.00 110,200.00 0.00
110,000.00 20.00 10.00 200.00 110,200.00 0.00
110,000.00 20.00 10.00 200.00 110,200.00 0.00
60,000.00 20.00 10.00 200.00 60,200.00 0.00
120,000.00 20.00 10.00 200.00 120,200.00 0.00
11,000.00 20.00 10.00 200.00 11,200.00 0.00
3,000.00 20.00 10.00 200.00 3,200.00 0.00
3,200.00 20.00 10.00 200.00 3,400.00 0.00
3,200.00 20.00 10.00 200.00 3,400.00 0.00
37,000.00 20.00 10.00 200.00 37,200.00 0.00
20,000.00 20.00 10.00 200.00 20,200.00 0.00
1,200.00 20.00 10.00 200.00 1,400.00 0.00
15,000.00 20.00 10.00 200.00 15,200.00 0.00
160,000.00 20.00 10.00 200.00 160,200.00 0.00
100,000.00 20.00 10.00 200.00 100,200.00 0.00
35,000.00 20.00 25.00 500.00 35,500.00 0.00
66,666.67 20.00 25.00 500.00 67,166.67 0.00
15,000.00 20.00 25.00 500.00 15,500.00 0.00
11,875.00 20.00 10.00 200.00 12,075.00 0.00
16,875.00 20.00 10.00 200.00 17,075.00 0.00
23,750.00 20.00 10.00 200.00 23,950.00 0.00
37,500.00 20.00 10.00 200.00 37,700.00 0.00
46,500.00 20.00 10.00 200.00 46,700.00 0.00
23,750.00 20.00 10.00 200.00 23,950.00 0.00
37,500.00 20.00 10.00 200.00 37,700.00 0.00
118,750.00 20.00 10.00 200.00 118,950.00 0.00
28,000.00 20.00 10.00 200.00 28,200.00 0.00
20,000.00 20.00 25.00 500.00 20,500.00 0.00
12,500.00 20.00 25.00 500.00 13,000.00 0.00
18,500.00 20.00 25.00 500.00 19,000.00 0.00
12,500.00 20.00 25.00 500.00 13,000.00 0.00
275,000.00 20.00 200.00 4,000.00 279,000.00 0.00
1,000,000.00 20.00 200.00 4,000.00 1,004,000.00 0.00
450,000.00 20.00 200.00 4,000.00 454,000.00 0.00
250,000.00 20.00 200.00 4,000.00 254,000.00 0.00
30,000.0 20.00 10.00 200.00 30,200.00 0.00
100,000.0 20.00 10.00 200.00 100,200.00 0.00
100,000.0 20.00 10.00 200.00 100,200.00 0.00
5,000.0 20.00 10.00 200.00 5,200.00 0.00
10,000.0 20.00 10.00 200.00 10,200.00 0.00
750,000.00 20.00 10.00 5,000.00 755,000.00 0.00
2,700,000.00 20.00 10.00 5,000.00 2,705,000.00 0.00
260,000.00 20.00 10.00 5,000.00 265,000.00 0.00
95,000.00 20.00 10.00 5,000.00 100,000.00 0.00
35,000.0 20.00 10.00 200.00 35,200.00 0.00
35,000.00 20.00 25.00 500.00 35,500.00 0.00
1,500,000.00 20.00 2,000.00 40,000.00 1,540,000.00 0.00
3,000,000.00 20.00 2,000.00 40,000.00 3,040,000.00 0.00
10,000,000.00 20.00 2,000.00 40,000.00 10,040,000.00 0.00
10,400,000.00 - - - 10,400,000.00 -
1,000,000.00 1,000,000.00
400,000.00 400,000.00
900,000.00 900,000.00
450,000.00 450,000.00
225,000.00 225,000.00
225,000.00 225,000.00
850,000.00 850,000.00
850,000.00 850,000.00
300,000.00 300,000.00
1,400,000.00 1,400,000.00
1,400,000.00 1,400,000.00
1,400,000.00 1,400,000.00
400,000.00 400,000.00
400,000.00 400,000.00
300,000.00 300,000.00
300,000.00 300,000.00
300,000.00 300,000.00
300,000.00 300,000.00
300,000.00 300,000.00
300,000.00 300,000.00
60,000
8,000
20,000
85,000
5,000
4,000
85,000
20,000
10,000
K9

UPAH TENAGA
KERJA (RP/HARI
66,000.00
66,000.00
66,000.00
66,000.00
59,000.00
59,000.00
66,000.00

JUMLAH
HARGA
TOTAL
(Rp)
O=M+N

167,500.00
137,500.00
148,333.33
140,483.57
140,483.57
142,500.00
135,000.00
247,500.00
135,000.00
70,000.00
60,000.00

66,500.00
155,200.00
28,200.00
12,837.00
14.04
30,200.00
6,700.00
2,000.00
7,500.00
10,100.00
25,100.00
500,250.00
801,550.00
6,640,000.00
3,520,000.00
6,640,000.00
3,520,000.00
3,520,000.00
3,520,000.00
3,520,000.00
6,640,000.00
3,520,000.00
6,640,000.00
3,520,000.00
2,400,000.00
2,400,000.00
2,900,000.00
32,900.00
37,400.00
11,500.00
16,500.00
63,200.00
16,500.00
67,500.00
100,500.00
18,500.00
87,000.00
28,200.00
30,200.00
28,200.00
55,200.00
55,200.00
50,200.00
60,200.00
48,200.00
50,200.00
400,200.00
75,200.00
5,200.00
22,950.00
22,950.00
23,200.00
75,200.00
60,200.00
45,200.00
22,200.00
50,200.00
65,200.00
65,200.00
35,200.00
3,200.00
15,200.00
25,200.00
35,200.00
135,500.00
55,500.00
80,500.00
95,500.00
125,500.00
200,500.00
87,000.00
106,200.00
13,950.00
11,450.00
25,200.00
28,533.33
1,200.00
800,200.00
301,000.00
401,000.00
76,000.00
99,000.00
101,000.00
86,000.00
104,000.00
106,000.00
76,000.00
250,200.00
365,200.00
12,700.00
21,000.00
10,200.00
10,200.00
21,200.00
15,200.00
10,200.00
77,500.00
115,300.00
115,600.00
32,200.00
4,000,200.00
150,200.00
250,200.00
250,000.00
250,000.00
250,400.00
75,400.00
80,400.00
85,400.00
1,200,400.00
260,400.00
200,400.00
130,400.00
130,400.00
9,200.00
12,200.00
16,200.00
25,200.00
4,200.00
150,200.00
75,200.00
100,200.00
100,200.00
125,200.00
200,200.00
175,200.00
130,200.00
200,200.00
20,200.00
20,200.00
20,200.00
20,200.00
100,200.00
100,200.00
600,200.00
900,200.00
7,000,200.00
160,200.00
60,200.00
110,200.00
110,200.00
110,200.00
60,200.00
120,200.00
11,200.00
3,200.00
3,400.00
3,400.00
37,200.00
20,200.00
1,400.00
15,200.00
160,200.00
100,200.00
35,500.00
67,166.67
15,500.00
12,075.00
17,075.00
23,950.00
37,700.00
46,700.00
23,950.00
37,700.00
118,950.00
28,200.00
20,500.00
13,000.00
19,000.00
13,000.00
279,000.00
1,004,000.00
454,000.00
254,000.00
30,200.00
100,200.00
100,200.00
5,200.00
10,200.00
755,000.00
2,705,000.00
265,000.00
100,000.00
35,200.00
35,500.00
1,540,000.00
3,040,000.00
10,040,000.00
10,400,000.00
1,000,000.00
400,000.00
900,000.00
450,000.00
225,000.00
225,000.00
850,000.00
850,000.00
300,000.00
1,400,000.00
1,400,000.00
1,400,000.00
400,000.00
400,000.00
300,000.00
300,000.00
300,000.00
300,000.00
300,000.00
300,000.00
60,000
8,000
20,000
85,000
5,000
4,000
85,000
20,000
10,000
DAFTAR RENCANA ANGGARAN BIAYA
PROGRAM : PENGELOLAAN PENDIDIKAN
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA TAHUN ANG
PEMBANGUNAN RUANG TATA USAHA-SMPS ST.
PEKERJAAN :
AGUSTINUS LANGA
LOKASI : JLN. JEREBUU-BAJAWA, DESA BOMARI-KEO, KEC. BAJAWA, KAB. NGADA
T.A. : 2023

NO.
MATA URAIAN PEKERJAAN
ANGG.
1 2
BAB I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Sebelum dan Sesudah Selesai Pekerjaan
2 Pengukuran dan Pemasangan Bouplank
3 Penyediaan Air Kerja
4 Kesehatan dan Keselamatan Kerja (K3)
5 Pembuatan Direksikeet / Barak / Los Kerja
6 Administrasi Dan Dokumentasi
7 Papan Nama Proyek dan Pemasangan
BAB II PEKERJAAN TANAH
1 Galian Tanah Pondasi Gedung
2 Urugan Kembali Tanah Pada Galian Pondasi
3 Urugan Tanah Biasa dan Pemadatan Pada Lantai
4 Urugan Pasir bawah Lantai
BAB III PEKERJAAN PONDASI BANGUNAN GEDUNG
1 Urugan Pasir di bawah Pondasi
2 Pek.Batu Kosong
3 Pek.Pasangan Batu Sungai/Gunung 1 Pc : 5 Psr
BAB IV PEKERJAAN BETON
1 Sloof Beton Bertulang 15/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
2 Sloof Beton Bertulang 15/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
3 Kolom Beton 15/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
4 Kolom Beton 20/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
5 Beton Balok Latei 12/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
6 Beton Balok Teras & Balok Gantung 15/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
7 Beton Ringbalk 15/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
8 Beton Balok Gewel 15/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
9 Pemasangan Pillar Tiang teras
10 Pekerjaan Quality Contorol/Pengujian Kubus Beton (Benda Uji 15 x 15 x15)
BAB V PEKERJAAN LANTAI, DINDING DAN SELASAR
1 Pekerjaan Rabat Lantai 1pc:3psr:5krl
2 Pekerjaan Rabat Lantai taman tebal 12 1pc:3psr:5krl
3 Pekerjaan Pasangan Batako Dinding Tembok1pc:5psr
4 Pekerjaan Pemasangan Lantai (60x60)cm Untuk Ruang & Selasar
5 Pekerjaan Pemasangan Uk.(40x40)cm T. 1,2 m'
6 Pemasangan Ornamen Tiang/Sepatu Tiang Teras
BAB VI PEKERJAAN PLESTERAN DAN ACIAN
1 Plesteran 1Pc : 5Psr (dinding Pondasi)
2 Plesteran 1Pc : 5Psr (dinding Tembok)
3 Pleteran List Tiang Timbul Spesi (1pc:5Psr)
4 Acian Dinding Pondasi
5 Acian Dinding Tembok
6 Acian Dinding List Tiang Timbul
BAB VII PEKERJAAN KAYU
1 Memasang Konstruksi Kuda - Kuda Konvensional 6/12, Kayu Kelas II
2 Memasang Konstruksi Gording 6/8, Kayu Kelas II
3 Kusen Pintu Kayu Kls II (Type P1 ) + Pemasangan
4 Kusen Pintu Kayu Kls II (Type P2 ) + Pemasangan
5 Kusen Pintu Kayu Kls II (Type P3 ) + Pemasangan
6 Kusen Jendela Kayu Kls II (Type J1) + Pemasangan
7 Kusen Jendela Kayu Kls II (Type J2) + Pemasangan
8 Kusen Buven Kayu Kls II (Type BV) + Pemasangan
9 Daun Pintu Panil Kayu Kls II (Type P1 uk. 2.17 x 1) + Pemasangan
10 Daun Pintu Panil Kayu Kls II (Type P2 uk. 1.45 x 3) + Pemasangan
11 Daun Pintu Panil Kayu Kls II (Type P3 uk. 1.30 x 1) + Pemasangan
12 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J1 Uk. 0.37 X 0.77 ) + Pemasangan
13 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J2 Uk. 0.67 X 0.37) + Pemasangan
14 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVP1 Uk. 0.57 x 0.37) + Pemasangan
15 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ1 Uk. 0.65 x 0.37) + Pemasangan
16 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
17 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BV Uk. 0.77 x 0.37) + Pemasangan
18 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
19 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ3 Uk. 0.77 x 0.37) + Pemasangan
20 Memasang Woodplank (L=30cm)
BAB VIII PEKERJAAN PENUTUP ATAP
1 Pas. Atap Galvalum tbl 4 mm
2 Pas. Atap Seng Bubungan BJLS 0,30 mm
3 Beugle U Plat
4 Plat Strip P. 30 cm
5 Pas. Baut (D12 P.12 cm)
6 Pas. Baut (D12 P.30 cm)
7 Pas. Baut ( D 16 P: 40 cm )
BAB IX PEKERJAAN LANGIT - LANGIT
1 Memasang Rangka Langit-langit (60 x 60 cm) Kayu Kelas 2
2 Memasang Langit-langit Plafond Kalsiboard 4 mm
3 Memasang List gipsun Profil 10 cm
BAB X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pek. Kunci pintu uk. Besar 2 x putar mutu baik
2 Pek. Engsel pintu (1 pintu 3 buah engsel)
3 Pek. Engsel Jendela + Boven
4 Pek. Grendel Pintu Panjang
5 Pek. Grendel Spring Knip (Jendela+Boven jendela dan Boven Pintu)
6 Pek. Pasang Kait angin
BAB XI PEKERJAAN PENGECATAN
1 Pek. Cat Pondasi Dengan Cat Tembok
2 Pek. Cat Dinding Tembok Dengan Cat Tembok
3 Pek. Cat Penutup Plafond + List plafond Dengan Cat Tembok
4 Pek. Cat Tiang Pilar Dengan Cat Tembok
5 Pek. Cat Kusen Dengan Cat Mengkilat
6 Pek. Vernis/Milamin Daun Pintu,Jendela dan Buven
7 Pek. Menie Seng
8 Pemasangan Plakat ukuran 10 x 25 cm (Batu marmer hitam)
BAB XII PEKERJAAN INSTALASI LISTRIK
1 Instalasi Listrik
2 Penangkal Petir
3 Panel SDP
4 Kabel NYY 4 x 2,5 mm
5 Kabel NYY 3 x 2,5 mm
6 Kabel NYM 2,5 mm
7 Downlights Inbow 5 Inch DL 500 Lampu 23 Watt
8 Downlights Inbow 5 Inch DL 500 Lampu 15 Watt
9 Saklar Tunggal setara broco
10 Saklar ganda setara broco
11 Stop kontak setara broco
12 Arde (1 Fase)
BAB XIII PEKERJAAN SALURAN KELILING BANGUNAN
1 Galian Tanah
2 Urugan Pasir di bawah Lantai Saluran
3 Pasangan Dinding Batako Saluran (1 Pc : 5 Psr)
4 Beton Tumbuk Lantai Saluran (1 Pc : 3 Psr : 5 Krl)
5 Plesteran Dinding Saluran (1 Pc : 4 Psr)
6 Acian Dinding Saluran
BAB XIIIIPEKERJAAN SANITASI & SANITAIR
1 Kloset Jongkok
2 Wastafel Keramik
3 Pipa PVC AW dia 4" + assesories
4 Pipa PVC AW dia 2" assesories
5 Pipa PVC AW dia 1/2 + assesories
6 Pipa Hawa Gip dia 2" assesories
7 Floor Drain Stenlis
8 Kran Air Stenlis dia 1/2"
9 Stop Kran Gip dia 1/2"
BAB XV PEKERJAAN MEUBELER
1 Meja Kerja (1/2 Biro)
2 Lemari 2 Pintu
3 Kursi Guru
GAH PERTAMA TAHUN ANGGARAN 2023

. BAJAWA, KAB. NGADA

HARGA SATUAN SUB TOTAL


SAT. VOL. PEKERJAAN
(RP.) (RP.)
3 4 5 6

M2 300 8,790.00 2,637,000.00


M' 43.50 74,503.33 3,240,895.00
Ls 1.00 2,500,000.00 2,500,000.00
Ls 1.00 2,500,000.00 2,500,000.00
Unit 1.00 5,741,613.33 5,741,613.33
Ls 1.00 4,000,000.00 4,000,000.00
Ls 1.00 500,000.00 500,000.00

M3 28.21 64,700.00 1,825,187.00


M 3
7.05 9,280.00 65,447.20
M3 93.75 9,280.00 870,000.00
M 3
21.38 183,280.00 3,917,610.00

M3 3.58 183,280.00 655,226.00


M 3
5.01 319,149.00 1,597,340.74
M3 25.07 671,345.00 16,827,262.43

M3 1.34 902,203.09 1,209,313.03


M2 5.59 171,889.33 960,001.93
Kg 223.58 18,341.85 4,100,941.78
M 3
0.45 902,203.09 404,570.42
M2 1.49 171,889.33 256,931.58
Kg 94.48 18,341.85 1,732,992.33
M3 1.71 902,203.09 1,542,767.29
M 2
5.70 328,064.67 1,869,968.60
Kg 394.07 18,341.85 7,228,047.56
M3 0.71 902,203.09 638,759.79
M 2
0.35 328,064.67 116,134.89
Kg 98.31 18,341.85 1,803,135.19
M 3
1.25 902,203.09 1,128,656.07
M2 10.42 171,889.33 1,791,946.30
Kg 314.84 18,341.85 5,774,708.80
M 3
0.47 902,203.09 423,855.01
M2 2.94 336,964.67 991,628.79
Kg 123.73 15,300.25 1,893,150.93
M3 2.09 902,203.09 1,881,093.45
M 2
6.95 171,889.33 1,194,630.87
Kg 347.79 18,341.85 6,379,038.80
M3 0.21 902,203.09 188,786.00
M 2
0.70 171,889.33 119,892.81
Kg 45.51 18,341.85 834,757.97
Unit 6.00 800,200.00 4,801,200.00
Bh 10.00 300,000.00 3,000,000.00

M3 7.13 902,203.09 6,428,197.05


M 3
1.35 902,203.09 1,217,974.18
M 2
197.30 275,257.35 54,308,880.72
M2 142.50 149,828.67 21,350,585.00
M 2
92.45 138,683.83 12,821,043.02
Unit 6.00 401,000.00 2,406,000.00

M2 56.92 31,474.80 1,791,702.99


M 2
394.60 31,474.80 12,420,094.57
M2 29.88 31,474.80 940,467.02
M 2
56.92 32,022.50 1,822,880.81
M2 394.60 32,022.50 12,636,219.40
M2 29.88 32,022.50 956,832.30

M3 1.81 6,150,800.00 11,156,468.66


M3 1.65 5,432,020.00 8,952,403.52
Unit 1.00 450,000.00 450,000.00
Unit 1.00 225,000.00 225,000.00
Unit 2.00 225,000.00 450,000.00
Unit 7.00 850,000.00 5,950,000.00
Unit 1.00 850,000.00 850,000.00
Unit 3.00 300,000.00 900,000.00
Unit 1.00 1,400,000.00 1,400,000.00
Unit 1.00 1,400,000.00 1,400,000.00
Unit 2.00 1,400,000.00 2,800,000.00
Unit 21.00 400,000.00 8,400,000.00
Unit 2.00 400,000.00 800,000.00
Unit 2.00 300,000.00 600,000.00
Unit 21.00 300,000.00 6,300,000.00
Unit 2.00 300,000.00 600,000.00
Unit 3.00 300,000.00 900,000.00
Unit 4.00 300,000.00 1,200,000.00
Unit 2.00 300,000.00 600,000.00
M1 46.82 30,994.75 1,451,174.20

M2 230.86 159,646.00 36,856,194.85


M¹ 16.35 43,449.00 710,391.15
Bh 20.00 32,709.78 654,195.60
Bh 30.00 26,259.78 787,793.40
Bh 120.00 7,634.78 916,173.60
Bh 60.00 15,009.78 900,586.80
Bh 12.00 16,509.78 198,117.36

M2 229.52 46,770.00 10,734,650.40


M 2
229.52 50,645.00 11,624,040.40
M1 176.52 52,465.00 9,261,121.80

Bh 4.00 298,720.00 1,194,880.00


Bh 15.00 48,418.40 726,276.00
Bh 98.00 34,359.00 3,367,182.00
Bh 2.00 33,734.00 67,468.00
Bh 52.00 41,624.00 2,164,448.00
Bh 98.00 36,624.00 3,589,152.00

M2 56.92 24,138.07 1,374,059.44


M2 394.60 24,138.07 9,524,987.31
M2 229.32 28,471.40 6,529,061.45
M2 15.36 24,138.07 370,760.70
M2 12.44 69,430.33 863,713.35
M2 28.38 69,430.33 1,970,713.36
M2 227.59 20,801.50 4,734,254.99
Bh 1.00 400,200.00 400,200.00

Titik 10.00 157,721.00 1,577,210.00


Unit 1.00 6,427,250.50 6,427,250.50
Unit 1.00 1,280,700.80 1,280,700.80
m' 25.00 36,405.69 910,142.26
m' 100.00 30,381.67 3,038,167.24
m' 150.00 12,077.93 1,811,688.81
Bh 8.00 212,111.00 1,696,888.00
Bh 2.00 142,111.00 284,222.00
Bh 5.00 30,030.62 150,153.11
Bh 1.00 38,806.87 38,806.87
Bh 8.00 33,541.12 268,328.98
Fase 2.00 194,401.00 388,802.00

M3 8.82 64,700.00 570,654.00


M 3
4.41 9,280.00 40,924.80
M2 12.60 275,257.35 3,468,242.61
M 3
0.84 902,203.09 757,850.60
M2 16.80 31,474.80 528,776.64
M 2
16.80 32,022.50 537,978.00

Bh 2.00 522,250.06 1,044,500.12


Bh 2.00 1,017,030.00 2,034,060.00
M' 20.00 65,490.50 1,309,810.00
M' 25.00 65,490.50 1,637,262.50
m' 25.00 34,740.50 868,512.50
Bh 2.00 140,490.50 280,981.00
Bh 2.00 39,383.33 78,766.67
Bh 4.00 112,112.92 448,451.67
Bh 1.00 140,440.00 140,440.00

Bh 6.00 1,500,000.00 9,000,000.00


Unit 1.00 3,000,000.00 3,000,000.00
Bh 6.00 500,000.00 3,000,000.00
JUMLAH (BAB I S/D BAB XIV) 439,770,408.98
BOBOT (%)

0.599631067977605
0.736951585154828
0.568478448973839
0.568478448973839
1.30559337693634
0.909565518358142
0.113695689794768

0.415031789938886
0.0148821290982723
0.197830500242896
0.89083074259376
0
0.148992744082933
0.363221515680127
3.8263744175359

0.274987357713575
0.218296162513345
0.932518807836416
0.091995826531416
0.0584240266637105
0.394067517696881
0.350811982759037
0.425214739743112
1.64359570539655
0.145248470054619
0.0264080733103617
0.410017398827947
0.256646661071085
0.407473141307364
1.31311900165817
0.0963809763159039
0.225487837804205
0.430486202501884
0.427744435118475
0.271648760871576
1.45053843206426
0.0429283084165664
0.0272625914687661
0.189816767179631
1.09175149168528
0.682174138768607 2350000

1.46171659482932
0.276956828493977
12.3493713111504
4.85493897819365
2.91539466100415
0.547103659292423

0.407417814710796
2.82422243870469
0.213854094045825
0.414507382781669
2.87336736193466
0.217575416732828

2.5368847997629
2.03569938741884
0.102326120815291
0.0511630604076455
0.102326120815291
1.35297870855774
0.193282672651105
0.204652241630582
0.31834793142535
0.31834793142535
0.6366958628507
1.9100875885521
0.181913103671628
0.136434827753721
1.43256569141407
0.136434827753721
0.204652241630582
0.272869655507443
0.136434827753721
0.329984502225784

8.38078099381702
0.161536823646697
0.148758440005404
0.179137428057531
0.208329978847511
0.204785674892125
0.0450501798110367

2.44096696386736
2.6432065829605
2.10589926264872
0
0.271705411643944
0.16514890160277
0.765668160309052
0.0153416415981468
0.492176816769811
0.816142224836541

0.312449272836581
2.16590000593967
1.48465229008557
0.0843077879801475
0.196400969468428
0.448123229375454
1.07652877304996
0.0910020301117321
0
0.358643957802411
1.46150135816253
0.291220321753422
0.206958504124138
0.690853040127332
0.411962417892824
0.385857703328928
0.064629632689697
0.0341435232873421
0.00882434825259107
0.0610156967641398
0.0884102231671706
0
0.129761800328287
0.00930594673142583
0.788648471839112
0.172328693285141
0.120239249664319
0.122331559608819
0
0.237510323268235
0.462527709567891
0.29783950290017
0.372299378625212
0.197492255565757
0.0638926572284473
0.0179108609990024
0.10197404316256
0.0319348453495544
0
2.04652241630582
0.682174138768607
0.682174138768607
100
DAFTAR RENCANA ANGGARAN BIAYA

PROGRAM : PENGELOLAAN PENDIDIKAN


KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA TAHUN ANG
PEMBANGUNAN RUANG TATA USAHA-SMPS ST.
PEKERJAAN :
AGUSTINUS LANGA
LOKASI : JLN. JEREBUU-BAJAWA, DESA BOMARI-KEO, KEC. BAJAWA, KAB. NGADA
T.A. : 2023

NO.
MATA URAIAN PEKERJAAN
ANGG.
1 2
BAB I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Sebelum dan Sesudah Selesai Pekerjaan
2 Pengukuran dan Pemasangan Bouplank
3 Penyediaan Air Kerja
4 Kesehatan dan Keselamatan Kerja (K3)
5 Pembuatan Direksikeet / Barak / Los Kerja
6 Administrasi Dan Dokumentasi
7 Papan Nama Proyek dan Pemasangan

BAB II PEKERJAAN TANAH


1 Galian Tanah Pondasi Gedung
2 Urugan Kembali Tanah Pada Galian Pondasi
3 Urugan Tanah Biasa dan Pemadatan Pada Lantai
4 Urugan Pasir bawah Lantai

BAB III PEKERJAAN PONDASI BANGUNAN GEDUNG


1 Urugan Pasir di bawah Pondasi
2 Pek.Batu Kosong
3 Pek.Pasangan Batu Sungai/Gunung 1 Pc : 5 Psr

BAB IV PEKERJAAN BETON


1 Sloof Beton Bertulang 15/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
2 Sloof Beton Bertulang 15/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
3 Kolom Beton 15/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
4 Kolom Beton 20/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
5 Beton Balok Latei 12/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
6 Beton Balok Teras & Balok Gantung 15/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
7 Beton Ringbalk 15/20 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
8 Beton Balok Gewel 15/15 cm (1 Pc : 2 Psr : 3 Krl)
Bekisting
Pembesian
9 Pemasangan Pillar Tiang teras
10 Pekerjaan Quality Contorol/Pengujian Kubus Beton (Benda Uji 15 x 15 x15)

BAB V PEKERJAAN LANTAI, DINDING DAN SELASAR


1 Pekerjaan Rabat Lantai 1pc:3psr:5krl
2 Pekerjaan Rabat Lantai taman tebal 12 1pc:3psr:5krl
3 Pekerjaan Pasangan Batako Dinding Tembok1pc:5psr
4 Pekerjaan Pemasangan Lantai (60x60)cm Untuk Ruang & Selasar
5 Pekerjaan Pemasangan Uk.(40x40)cm T. 1,2 m'
6 Pemasangan Ornamen Tiang/Sepatu Tiang Teras

BAB VI PEKERJAAN PLESTERAN DAN ACIAN


1 Plesteran 1Pc : 5Psr (dinding Pondasi)
2 Plesteran 1Pc : 5Psr (dinding Tembok)
3 Pleteran List Tiang Timbul Spesi (1pc:5Psr)
4 Acian Dinding Pondasi
5 Acian Dinding Tembok
6 Acian Dinding List Tiang Timbul

BAB VII PEKERJAAN KAYU


1 Memasang Konstruksi Kuda - Kuda Konvensional 6/12, Kayu Kelas II
2 Memasang Konstruksi Gording 6/8, Kayu Kelas II
3 Kusen Pintu Kayu Kls II (Type P1 ) + Pemasangan
4 Kusen Pintu Kayu Kls II (Type P2 ) + Pemasangan
5 Kusen Pintu Kayu Kls II (Type P3 ) + Pemasangan
6 Kusen Jendela Kayu Kls II (Type J1) + Pemasangan
7 Kusen Jendela Kayu Kls II (Type J2) + Pemasangan
8 Kusen Buven Kayu Kls II (Type BV) + Pemasangan
9 Daun Pintu Panil Kayu Kls II (Type P1 uk. 2.17 x 1) + Pemasangan
10 Daun Pintu Panil Kayu Kls II (Type P2 uk. 1.45 x 3) + Pemasangan
11 Daun Pintu Panil Kayu Kls II (Type P3 uk. 1.30 x 1) + Pemasangan
12 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J1 Uk. 0.37 X 0.77 ) + Pemasangan
13 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J2 Uk. 0.67 X 0.37) + Pemasangan
14 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVP1 Uk. 0.57 x 0.37) + Pemasangan
15 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ1 Uk. 0.65 x 0.37) + Pemasangan
16 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
17 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BV Uk. 0.77 x 0.37) + Pemasangan
18 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
19 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ3 Uk. 0.77 x 0.37) + Pemasangan
20 Memasang Woodplank (L=30cm)

BAB VIII PEKERJAAN PENUTUP ATAP


1 Pas. Atap Galvalum tbl 4 mm
2 Pas. Atap Seng Bubungan BJLS 0,30 mm
3 Beugle U Plat
4 Plat Strip P. 30 cm
5 Pas. Baut (D12 P.12 cm)
6 Pas. Baut (D12 P.30 cm)
7 Pas. Baut ( D 16 P: 40 cm )

BAB IX PEKERJAAN LANGIT - LANGIT


1 Memasang Rangka Langit-langit (60 x 60 cm) Kayu Kelas 2
2 Memasang Langit-langit Plafond Kalsiboard 4 mm
3 Memasang List gipsun Profil 10 cm

BAB X PEKERJAAN KUNCI DAN PENGGANTUNG


1 Pek. Kunci pintu uk. Besar 2 x putar mutu baik
2 Pek. Engsel pintu (1 pintu 3 buah engsel)
3 Pek. Engsel Jendela + Boven
4 Pek. Grendel Pintu Panjang
5 Pek. Grendel Spring Knip (Jendela+Boven jendela dan Boven Pintu)
6 Pek. Pasang Kait angin

BAB XI PEKERJAAN PENGECATAN


1 Pek. Cat Pondasi Dengan Cat Tembok
2 Pek. Cat Dinding Tembok Dengan Cat Tembok
3 Pek. Cat Penutup Plafond + List plafond Dengan Cat Tembok
4 Pek. Cat Tiang Pilar Dengan Cat Tembok
5 Pek. Cat Kusen Dengan Cat Mengkilat
6 Pek. Vernis/Milamin Daun Pintu,Jendela dan Buven
7 Pek. Menie Seng
8 Pemasangan Plakat ukuran 10 x 25 cm (Batu marmer hitam)

BAB XII PEKERJAAN INSTALASI LISTRIK


1 Instalasi Listrik
2 Penangkal Petir
3 Panel SDP
4 Kabel NYY 4 x 2,5 mm
5 Kabel NYY 3 x 2,5 mm
6 Kabel NYM 2,5 mm
7 Downlights Inbow 5 Inch DL 500 Lampu 23 Watt
8 Downlights Inbow 5 Inch DL 500 Lampu 15 Watt
9 Saklar Tunggal setara broco
10 Saklar ganda setara broco
11 Stop kontak setara broco
12 Arde (1 Fase)

BAB XIII PEKERJAAN SALURAN KELILING BANGUNAN


1 Galian Tanah
2 Urugan Pasir di bawah Lantai Saluran
3 Pasangan Dinding Batako Saluran (1 Pc : 5 Psr)
4 Beton Tumbuk Lantai Saluran (1 Pc : 3 Psr : 5 Krl)
5 Plesteran Dinding Saluran (1 Pc : 4 Psr)
6 Acian Dinding Saluran

BAB XIIIIPEKERJAAN SANITASI & SANITAIR


1 Kloset Jongkok
2 Wastafel Keramik
3 Pipa PVC AW dia 4" + assesories
4 Pipa PVC AW dia 2" assesories
5 Pipa PVC AW dia 1/2 + assesories
6 Pipa Hawa Gip dia 2" assesories
7 Floor Drain Stenlis
8 Kran Air Stenlis dia 1/2"
9 Stop Kran Gip dia 1/2"

BAB XV PEKERJAAN MEUBELER


1 Meja Kerja (1/2 Biro)
2 Lemari 2 Pintu
3 Kursi Guru

JUMLAH (BAB I
GAH PERTAMA TAHUN ANGGARAN 2023

. BAJAWA, KAB. NGADA

SAT. VOL. BOBOT (%) BULAN APRIL


Minggu 1 Minggu 2
3 4 7

M2 300 0.600 0.600


M' 43.50 0.813 0.813
Ls 1.00 0.572
Ls 1.00 0.572 0.036 0.036
Unit 1.00 1.530 1.530
Ls 1.00 0.915 0.915
Ls 1.00 0.114 0.114

M3 28.21 0.418 0.209 0.209


M 3
7.05 0.015 0.015
M3 93.75 0.199 0.199
M3 21.38 0.838 0.838

M3 3.58 0.140
M 3
5.01 0.393
M 3
25.07 4.046

M3 1.34 0.253
M2 5.59 0.240
Kg 223.58 0.888
M 3
0.45 0.085
M 2
1.49 0.064
Kg 94.48 0.375
M 3
1.71 0.323
M 2
5.70 0.450
Kg 394.07 1.566
M 3
0.71 0.134
M 2
0.35 0.028
Kg 98.31 0.391
M 3
1.25 0.236
M2 10.42 0.448
Kg 314.84 1.251
M 3
0.47 0.089
M 2
2.94 0.239
Kg 123.73 0.406
M3 2.09 0.394
M 2
6.95 0.299
Kg 347.79 1.382
M3 0.21 0.040
M2 0.70 0.030
Kg 45.51 0.181
Unit 6.00 1.099
Bh 10.00 0.686

M3 7.13 1.346
M 3
1.35 0.255
M 2
197.30 13.759
M2 142.50 6.899
M 2
92.45 3.318
Unit 6.00 0.551

M2 56.92 0.426
M2 394.60 2.953
M 2
29.88 0.224
M 2
56.92 0.426
M 2
394.60 2.954
M 2
29.88 0.224

M3 1.81 2.888
M3 1.65 2.367
Unit 1.00 0.103
Unit 1.00 0.051
Unit 2.00 0.103
Unit 7.00 1.361
Unit 1.00 0.194
Unit 3.00 0.206
Unit 1.00 0.320
Unit 1.00 0.320
Unit 2.00 0.641
Unit 21.00 1.922
Unit 2.00 0.183
Unit 2.00 0.137
Unit 21.00 1.442
Unit 2.00 0.137
Unit 3.00 0.206
Unit 4.00 0.275
Unit 2.00 0.137
M1 46.82 0.328

M2 230.86 4.635
M¹ 16.35 0.165
Bh 20.00 0.150
Bh 30.00 0.257
Bh 120.00 0.316
Bh 60.00 0.227
Bh 12.00 0.045

M2 229.52 2.456
M2 229.52 2.699
M 1
176.52 2.358

Bh 4.00 0.380
Bh 15.00 0.127
Bh 98.00 0.467
Bh 2.00 0.012
Bh 52.00 0.450
Bh 98.00 0.602

M2 56.92 0.292
M2 394.60 2.022
M2 229.32 1.175
M2 15.36 0.079
M2 12.44 0.179
M2 28.38 0.407
M2 227.59 0.446
Bh 1.00 0.092

Titik 10.00 0.197


Unit 1.00 1.471
Unit 1.00 0.296
m' 25.00 0.208
m' 100.00 0.488
m' 150.00 0.415
Bh 8.00 0.388
Bh 2.00 0.065
Bh 5.00 0.033
Bh 1.00 0.007
Bh 8.00 0.052
Fase 2.00 0.078

M3 8.82 0.131 0.065 0.065


M3 4.41 0.009 0.009
M 2
12.60 0.879 0.879
M 3
0.84 0.159 0.159
M 2
16.80 0.126 0.126
M 2
16.80 0.126 0.126

Bh 2.00 0.228
Bh 2.00 0.670
M' 20.00 0.300
M' 25.00 0.375
m' 25.00 0.199
Bh 2.00 0.064
Bh 2.00 0.010
Bh 4.00 0.129
Bh 1.00 0.032
Bh 6.00 2.059
Unit 1.00 0.686
Bh 6.00 0.686

JUMLAH (BAB I S/D BAB XIV) 100.000

4.282 2.660
RENCANA 4.282 6.942
WAKTU PELAKSANAAN PEKERJAAN 120 (SERATUS DUA PULUH) HARI KALE
BULAN APRIL BULAN MEI BULAN JUNI
Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8 Minngu 9
0.064 0.064 0.064 0.064 0.064 0.064 0.064
0.036 0.036 0.036 0.036 0.036 0.036 0.036

0.140
0.393
4.046

0.253
0.240
0.888
0.085
0.064
0.375
0.323
0.450
1.566
0.134
0.028
0.391
0.236
0.448
1.251
0.089
0.239
0.406
0.394
0.299
1.382
0.040
0.030
0.181
1.099
0.137 0.137 0.137 0.137 0.137

1.346
0.255
4.586 4.586 4.586
3.450

0.551

0.051 0.051
0.026 0.026
0.051 0.051
0.681 0.681
0.097 0.097
0.103 0.103
0.114 0.114
0.670
0.300
0.375
0.199
0.064
0.010
0.129
0.032
4.815 2.143 8.724 8.616 10.688 1.700 3.549
11.757 13.899 22.623 31.238 41.927 43.627 47.176
ERATUS DUA PULUH) HARI KALENDER
BULAN JUNI BULAN JULI
Minggu 10 Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15 Minggu 16
0.064 0.064
0.036 0.036 0.036 0.036 0.036 0.036 0.036
3.450
3.318

0.426
2.953
0.224
0.426
2.954
0.224

1.444 1.444
2.367

0.320
0.320
0.641
1.922
0.183
0.137
1.442
0.137
0.206
0.275
0.137
0.328

4.635
0.165
0.075 0.075
0.128 0.128
0.158 0.158
0.113 0.113
0.023 0.023

2.456
2.699
2.358

0.380
0.127
0.467
0.012
0.450
0.602

0.292
2.022
1.175
0.079
0.179
0.407
0.446
0.092

0.197
1.471
0.296
0.208
0.488
0.415
0.388
0.065
0.033
0.007
0.052
0.078
2.059
0.686
0.686

6.867 7.306 1.977 9.471 11.247 7.793 8.159


54.043 61.349 63.326 72.797 84.044 91.837 100
PERESENTASE

100%
0%
DAFTAR KEBUTUHAN SUMBER D

PROGRAM : PENGELOLAAN PENDIDIKAN


KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA TAHUN ANG
PEKERJAAN : PEMBANGUNAN RUANG TATA USAHA-SMPS ST. AGUSTINUS LANGA
LOKASI : JLN. JEREBUU-BAJAWA, DESA BOMARI-KEO, KEC. BAJAWA, KAB. NGADA
T.A. : 2023

NO.
MATA URAIAN PEKERJAAN
ANGG.
1 2
BAB I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Sebelum dan Sesudah Selesai Pekerjaan

2 Pengukuran dan Pemasangan Bouplank

3 Penyediaan Air Kerja


4 Kesehatan dan Keselamatan Kerja (K3)
5 Pembuatan Direksikeet / Barak / Los Kerja

6 Administrasi Dan Dokumentasi


7 Papan Nama Proyek dan Pemasangan
BAB II PEKERJAAN TANAH
1 Galian Tanah Pondasi Gedung
2 Urugan Kembali Tanah Pada Galian Pondasi
3 Urugan Tanah Biasa dan Pemadatan Pada Lantai
4 Urugan Pasir bawah Lantai
BAB III PEKERJAAN PONDASI BANGUNAN GEDUNG
1 Urugan Pasir di bawah Pondasi

2 Pek.Batu Kosong

3 Pek.Pasangan Batu Sungai/Gunung 1 Pc : 5 Psr

BAB IV PEKERJAAN BETON


Sloof Beton Bertulang 15/20 cm (1 Pc : 2 Psr : 3 Krl)

1
Bekisting

Pembesian

Sloof Beton Bertulang 15/15 cm (1 Pc : 2 Psr : 3 Krl)

2
Bekisting

Pembesian

Kolom Beton 15/15 cm (1 Pc : 2 Psr : 3 Krl)

3
Bekisting

Pembesian

Kolom Beton 20/20 cm (1 Pc : 2 Psr : 3 Krl)

4
Bekisting
Bekisting

Pembesian

Beton Balok Latei 12/15 cm (1 Pc : 2 Psr : 3 Krl)

5
Bekisting

Pembesian

Beton Balok Teras & Balok Gantung 15/20 cm (1 Pc : 2 Psr : 3 Krl)

6
Bekisting

Pembesian

Beton Ringbalk 15/20 cm (1 Pc : 2 Psr : 3 Krl)

7
Bekisting

Pembesian

Beton Balok Gewel 15/15 cm (1 Pc : 2 Psr : 3 Krl)

8
Bekisting
8
Bekisting

Pembesian

9 Pemasangan Pillar Tiang teras


BAB V PEKERJAAN LANTAI, DINDING DAN SELASAR

1 Pekerjaan Rabat Lantai 1pc:3psr:5krl

2 Pekerjaan Rabat Lantai taman tebal 12 1pc:3psr:5krl

3 Pekerjaan Pasangan Batako Dinding Tembok1pc:5psr

4 Pekerjaan Pemasangan Lantai (60x60)cm Untuk Ruang & Selasar

5 Pekerjaan Pemasangan Uk.(40x40)cm T. 1,2 m'

6 Pemasangan Ornamen Tiang/Sepatu Tiang Teras


BAB VI PEKERJAAN PLESTERAN DAN ACIAN

1 Plesteran 1Pc : 5Psr (dinding Pondasi)

2 Plesteran 1Pc : 5Psr (dinding Tembok)

3 Pleteran List Tiang Timbul Spesi (1pc:5Psr)

4 Acian Dinding Pondasi


5 Acian Dinding Tembok
6 Acian Dinding List Tiang Timbul
BAB VII PEKERJAAN KAYU

1 Memasang Konstruksi Kuda - Kuda Konvensional 6/12, Kayu Kelas II

2 Memasang Konstruksi Gording 6/8, Kayu Kelas II


3 Kusen Pintu Kayu Kls II (Type P1 ) + Pemasangan
4 Kusen Pintu Kayu Kls II (Type P2 ) + Pemasangan
5 Kusen Pintu Kayu Kls II (Type P3 ) + Pemasangan
6 Kusen Jendela Kayu Kls II (Type J1) + Pemasangan
7 Kusen Jendela Kayu Kls II (Type J2) + Pemasangan
8 Kusen Buven Kayu Kls II (Type BV) + Pemasangan
9 Daun Pintu Panil Kayu Kls II (Type P1 uk. 2.17 x 1) + Pemasangan
10 Daun Pintu Panil Kayu Kls II (Type P2 uk. 1.45 x 3) + Pemasangan
11 Daun Pintu Panil Kayu Kls II (Type P3 uk. 1.30 x 1) + Pemasangan
12 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J1 Uk. 0.37 X 0.77 ) + Pemasangan
13 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J2 Uk. 0.67 X 0.37) + Pemasangan
14 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVP1 Uk. 0.57 x 0.37) + Pemasangan
15 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ1 Uk. 0.65 x 0.37) + Pemasangan
16 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
17 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BV Uk. 0.77 x 0.37) + Pemasangan
18 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
19 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ3 Uk. 0.77 x 0.37) + Pemasangan

20 Memasang Woodplank (L=30cm)

BAB VIII PEKERJAAN PENUTUP ATAP

1 Pas. Atap Galvalum tbl 4 mm

2 Pas. Atap Seng Bubungan BJLS 0,30 mm

3 Beugle U Plat
4 Plat Strip P. 30 cm
5 Pas. Baut (D12 P.12 cm)
6 Pas. Baut (D12 P.30 cm)
7 Pas. Baut ( D 16 P: 40 cm )
BAB IX PEKERJAAN LANGIT - LANGIT

1 Memasang Rangka Langit-langit (60 x 60 cm) Kayu Kelas 2

2 Memasang Langit-langit Plafond Kalsiboard 4 mm

3 Memasang List gipsun Profil 10 cm

BAB X PEKERJAAN KUNCI DAN PENGGANTUNG


1 Pek. Kunci pintu uk. Besar 2 x putar mutu baik
2 Pek. Engsel pintu (1 pintu 3 buah engsel)
3 Pek. Engsel Jendela + Boven
4 Pek. Grendel Pintu Panjang
5 Pek. Grendel Spring Knip (Jendela+Boven jendela dan Boven Pintu)
6 Pek. Pasang Kait angin
BAB XI PEKERJAAN PENGECATAN

1 Pek. Cat Pondasi Dengan Cat Tembok

2 Pek. Cat Dinding Tembok Dengan Cat Tembok

3 Pek. Cat Penutup Plafond + List plafond Dengan Cat Tembok

4 Pek. Cat Tiang Pilar Dengan Cat Tembok

5 Pek. Cat Kusen Dengan Cat Mengkilat

6 Pek. Vernis/Milamin Daun Pintu,Jendela dan Buven

7 Pek. Menie Seng


8 Pemasangan Plakat ukuran 10 x 25 cm (Batu marmer hitam)
BAB XII PEKERJAAN INSTALASI LISTRIK

1 Instalasi Listrik

2 Penangkal Petir
2 Penangkal Petir

3 Panel SDP

4 Kabel NYY 4 x 2,5 mm

5 Kabel NYY 3 x 2,5 mm

6 Kabel NYM 2,5 mm

7 Downlights Inbow 5 Inch DL 500 Lampu 23 Watt

8 Downlights Inbow 5 Inch DL 500 Lampu 15 Watt

9 Saklar Tunggal setara broco

10 Saklar ganda setara broco

11 Stop kontak setara broco

12 Arde (1 Fase)

BAB XIII PEKERJAAN SALURAN KELILING BANGUNAN


1 Galian Tanah
2 Urugan Pasir di bawah Lantai Saluran

3 Pasangan Dinding Batako Saluran (1 Pc : 5 Psr)

4 Beton Tumbuk Lantai Saluran (1 Pc : 3 Psr : 5 Krl)

5 Plesteran Dinding Saluran (1 Pc : 4 Psr)


5 Plesteran Dinding Saluran (1 Pc : 4 Psr)

6 Acian Dinding Saluran


BAB XIIIIPEKERJAAN SANITASI & SANITAIR

1 Kloset Jongkok

2 Wastafel Keramik

3 Pipa PVC AW dia 4" + assesories


4 Pipa PVC AW dia 2" assesories
5 Pipa PVC AW dia 1/2 + assesories
6 Pipa Hawa Gip dia 2" assesories
7 Floor Drain Stenlis

8 Kran Air Stenlis dia 1/2"

9 Stop Kran Gip dia 1/2"


BAB XV PEKERJAAN MEUBELER
1 Meja Kerja (1/2 Biro)
2 Lemari 2 Pintu
3 Kursi Guru
TUHAN SUMBER DAYA MATERIAL

PERTAMA TAHUN ANGGARAN 2023


USTINUS LANGA
AWA, KAB. NGADA

KOEF.
MATERIAL SAT. ANALISA
(a)
3 4 5

- - -
Balok 5/7 Kls. II Lokal m3 0.012
Paku 2”-3” kg 0.020
Papan 3/20 m3 0.007
- - -
- - -
Balok Kayu Kelas II 5/7 M3 0.5
Dinding triplek 4mm Lembar 15.00
GRC pelat, t=4mm, uk 122x244 cm Lembar 10.00
Paku Kg 3.00
Asbes Gelombang Lembar 40.00
Paku Asbes Kg 3.00
- - -
- -

- - -
- - -
- -
Pasir urug m3 1.200

Pasir urug m3 1.200


Batu belah m3 1.200
Pasir urug m3 0.432
Batu Gunung/batu Quary m3 1.200
Semen Portland kg 136.000
Pasir Pasang m3 0.544
Semen Portland kg 276.000
Pasir Beton m3 0.5914
Kerikil (maks 30mm) kg 1,012.000
Air Liter 215.000
Papan tipis 2,5 cm Kls. III Lokal m3 0.045
Paku 5 - 10 cm kg 0.300
Minyak bekisting Liter 0.100
Besi beton (polos/ulir) kg 105.00
Kawat beton kg 2.8
Semen Portland kg 276.000
Pasir Beton m3 0.5914
Kerikil (maks 30mm) kg 1,012.000
Air Liter 215.000
Papan tipis 2,5 cm Kls. III Lokal m3 0.045
Paku 5 - 10 cm kg 0.300
Minyak bekisting Liter 0.100
Besi beton (polos/ulir) kg 105.00
Kawat beton kg 2.8
Semen Portland Kg 276
Pasir Beton m3 0.5914
Kerikil (maks 30mm) Kg 1012
Air Liter 215
Papan tipis 2,5 cm Kls. III Lokal m3 0.04
Paku 5 - 12 cm kg 0.4
Minyak bekisting Liter 0.2
Balok kayu kelas II m3 0.015
plywood tebal 9 mm Lbr 0.35
Dolken kayu Ø8-
Batang 2.000
10cm - panjang 4 m
Besi beton (polos/ulir) kg 12,837
Kawat beton kg 30,200
Semen Portland Kg 276
Pasir Beton m3 0.201
Kerikil (maks 30mm) Kg 1,012
Air Liter 215
Papan tipis 2,5 cm Kls. III Lokal m3 0.040
Paku 5 - 12 cm kg 0.400
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015
plywood tebal 9 mm Lbr 0.350
Dolken kayu Ø8-
Batang 2.000
Batang 2.000
10cm - panjang 4 m
Besi beton (polos/ulir) kg 105
Kawat beton kg 2.8
Semen Portland Kg 276
Pasir Beton m3 0.5914
Kerikil (maks 30mm) Kg 1012
Air Liter 215
Papan tipis 2,5 cm Kls. III Lokal m3 0.045
Paku 5 - 10 cm kg 0.300
Minyak bekisting Liter 0.100
Besi beton (polos/ulir) kg 105
Kawat beton kg 2.8
Semen Portland Kg 276
Pasir Beton m3 0.5914
Kerikil (maks 30mm) Kg 1012
Air Liter 215
Papan tipis 2,5 cm Kls. III Lokal m3 0.040
Paku 5 - 12 cm kg 0.400
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.018
plywood tebal 9 mm Lbr 0.350
Dolken kayu Ø8-
Batang 2.000
10cm - panjang 4 m
Besi beton (polos/ulir) kg 12837
Kawat beton kg 30200
Semen Portland Kg 276
Pasir Beton m3 0.5914
Kerikil (maks 30mm) Kg 1012
Air Liter 215
Papan tipis 2,5 cm Kls. III Lokal m3 0.045
Paku 5 - 10 cm kg 0.300
Minyak bekisting Liter 0.100
Besi beton (polos/ulir) kg 105
Kawat beton kg 2.8
Semen Portland Kg 276
Pasir Beton m3 0.5914
Kerikil (maks 30mm) Kg 1012
Air Liter 215
Papan tipis 2,5 cm Kls. III Lokal m3 0.045
Paku 5 - 10 cm kg 0.300
Minyak bekisting Liter 0.100
Besi beton (polos/ulir) kg 105
Kawat beton kg 2.8
Pilar Tiang Teras - -

Semen Portland Kg 276


Pasir Beton m3 0.5914
Kerikil (maks 30mm) Kg 1012
Air Liter 215
Semen Portland Kg 276
Pasir Beton m3 0.5914
Kerikil (maks 30mm) Kg 1012
Air Liter 215
Batako buah 12.50
Semen Portland kg 22.20
Pasir Pasang m3 0.043
Keramik Bh 3.10
Semen portland Kg 9.60
Pasir pasang m3 0.045
Semen Warna Kg 0.05
Keramik Bh 6.63
Semen portland Kg 9.8
Pasir pasang m3 0.045
Semen Warna Kg 0.045
Ornamen Tiang/Sepatu Tiang Teras - -

Portland Cement kg 5.184


Pasir Pasang m3 0.026
Portland Cement kg 5.184
Pasir Pasang m3 0.026
Portland Cement kg 5.184
Pasir Pasang m3 0.026
Semen PC Kg 3.25
Semen PC Kg 3.25
Semen PC Kg 3.25

Balok Kayu 6/12 Kelas II M³ 1.500


Paku 12 cm Kg 5.600
Balok Kayu 6/8 Kelas II M³ 1.500
Paku 12 cm Kg 3.000
Kusen Pintu Kayu Kls II (Type P1 ) - -
Kusen Pintu Kayu Kls II (Type P2 ) - -
Kusen Pintu Kayu Kls II (Type P3 ) - -
Kusen Jendela Kayu Kls II (Type J1) - -
Kusen Jendela Kayu Kls II (Type J2) - -
Kusen Buven Kayu Kls II (Type BV) - -
Daun Pintu Panil Kayu Kls II (Type P1 uk. 2.17 x 1) - -
Daun Pintu Panil Kayu Kls II (Type P2 uk. 1.45 x 3) - -
Daun Pintu Panil Kayu Kls II (Type P3 uk. 1.30 x 1) - -
Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J1 Uk. 0.37 X 0.77 ) - -
Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J2 Uk. 0.67 X 0.37) - -
Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVP1 Uk. 0.57 x 0.37) - -
Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ1 Uk. 0.65 x 0.37) - -
Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) - -
Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BV Uk. 0.77 x 0.37) - -
Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) - -
Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ3 Uk. 0.77 x 0.37) - -
Woodplank (L=30cm) M³ 0.011
Paku 5 dan paku 7 cm Kg 0.05

Seng Galvalum tbl 4 mm Lbr 0.70


Paku Biasa 1/2"-1 Kg 0.02
Seng Pelat Bjls 0.30 Lbr 1.20
Paku Biasa 1/2"-1 Kg 0.04
Beugel U Pelat Bh 1
Pelat strip 30 cm Bh 1
Baut dia 12 mm, panjang 12 cm Bh 1
1 Baut dia 12 mm, p 30 cm Bh 1
Pem 1 Baut dia 16 mm, 40 cm Bh 1

paku 7/10 cm kg 0.25


Balok 5/7 Kls. II Lokal m3 0.0163
Calsiboard Lembar 0.364
Paku sekrup Kg 0.11
Papan Gipsum
Lembar 0.364
120x240 cm
Paku sekrup Kg 0.11

kunci tanam biasa Bh 1.00


Engsel pintu Bh 1.00
Engsel jendela + boven Bh 1.00
Grendel pintu panjang Bh 1.00
Grendel spring knip Bh 1.00
Kait angin Bh 1.00

Plamuur kg 0.10
cat dasar kg 0.10
cat penutup kg 0.26
Plamuur kg 0.10
cat dasar kg 0.10
cat penutup kg 0.26
Plamuur kg 0.10
cat dasar kg 0.10
cat penutup kg 0.26
Plamuur kg 0.10
cat dasar kg 0.10
cat penutup kg 0.26
vernis L 0.15
dempul kg 0.05
ampelas Lbr 0.10
cat dasar kg 0.10
cat penutup kg 0.26
vernis L 0.15
dempul kg 0.05
ampelas Lbr 0.10
cat dasar kg 0.10
cat penutup kg 0.26
Meni Seng L 0.10
Plakat ukuran 10 x 25 cm (Batu marmer hitam) - -

Pipa listrik Btg 1.000


T Dus Buah 1.000
L Bow Buah 1.000
Las Dop Buah 1.000
Klem Buah 1.000
Mongkok Buah 1.000
Fitting Buah 1.000
Accesories & Termination % 5.000
Stik penerima / blacksem 2m' Bh 3.000
Reduser galvanis 3/4" - 1" Bh 3.000
Pipa Galvanis 1" m' 3.000
Kabel BC 70 mm2 m' 60.000
Pipa Conduit 3/4" m' 60.000
sock/klem conduit 20mm bh 5.000
Grounding BC 70 mm2 m' 6.600
Pipa galvanis 1" m' 6.600
Material bantu Ls 3.000
MCB 1 Pha 10 A bh 1.000
Box Panel 30 x 40 x 20 cm bh 1.000
Busbar, Wirring bh 1.000
Ampere Meter + CT bh 1.000
Volt Meter + SS bh 1.000
Pilot Lamp + Fuse bh 1.000
Grounding Panel bh 1.000
Accesories & Termination % 5.000
Kabel NYY 4 x 2,5 mm m 1.100
Accesories & Termination % 5.000
Kabel NYM 3 x 2,5 mm m 1.100
Accesories & Termination % 5.000
Kabel NYM 2,5 mm m 1.100
Accesories & Termination % 5.000
Box Downlight + Lampu 23 Watt bh 1.000
Accesories & Termination % 5.000
Box Downlights + Lampu 15 Watt bh 1.000
Accesories & Termination % 5.000
Saklar Tunggal (Setara Broco) bh 1.000
Perlengkapan instalasi % 5.000
Saklar Ganda (Setara Broco) bh 1.000
Perlengkapan instalasi % 5.000
Stop Kontak (Setara Broco) bh 1.000
Perlengkapan instalasi % 5.000
Arde 1 Fase bh 1.000
Accesories & Termination % 5.000

- - -
Pasir urug M3 1.200
Batako buah 0.14
Semen Portland kg 22.20
Pasir Pasang m3 0.102
Semen Portland Kg 276.000
Pasir Beton m3 0.5914
Kerikil (maks 30mm) Kg 1012
Air Liter 215
Portland Cement kg 5.184
Pasir Pasang m3 0.026
Semen PC Kg 3.250

pasangan bata bh 7.8


Closet Jongkok Unit 1.00
Perlengkapan Ls 0.06
Wastafel Unit 1.20
Semen Portland Kg 6.00
Pasir pasang M3 0.01
Pipa PVC diameter 4 M 1.20
Pipa PVC diameter 2 M 1.20
Pipa PVC 1/2 M 1.20
Pipa Hawa Gip M 1.20
Florr Drain Unit 1.00
Kran Air Bh 1.00
Sealtape Bh 0.025
Stop Kran Bh 1.00
VOL. TOTAL JUMLAH
SAT.
PEK. MATERIAL
(b) (c) (d) = a*b
6 7 8

300.00 M2 -
0.52
43.50 M' 0.87
0.30
1.00 Ls -
1.00 Ls -
0.5
15
10
1.00 Unit
3
40
3
1.00 Ls -
1.00 Ls -

28.21 m3 -
7.05 m3 -
93.75 m3 -
21.38 M 3
25.65

3.58 M3 4.29
6.01
5.01 M3
2.16
30.08
25.07 M3 3,408.84
13.64
369.950
0.793
1.34 M3
1356.485
288.19
0.25
5.59 M2 1.68
0.56
23,476
223.58 Kg
9.39
123.77
0.27
0.45 M3
453.81
96.41
0.07
1.49 M3 0.45
0.149
9920.711
94.48 Kg
3.98
471.96
1.01
1.71 M3
1,730.52
367.65
0.23
2.28
1.14
5.70 M 2
0.09
1.99
11.400
11.400

5058728.88888889
394.07 Kg
9.00
195.408
0.142611428571429
0.71 M3
716.496
152.22
0.01
0.14
0.07
0.35 M2 0.01
0.12
0.71
0.71
0.35 M2

0.71

10,322.25
98.31 Kg
4.13
345.28
0.74
1.25 M3
1,266.01
268.97
0.47
10.42 M2 3.127
1.043
33,057.98
314.84 Kg
5.00
129.66
0.28
0.47 M3
475.44
101.01
0.118
1.177
0.589
2.94 M 2
0.053
1.030
5.886
5.886

1588364.8
123.73 Kg
6.00
575.46
1.23312857142857
2.09 M3
2110.02
448.275
0.31275
6.95 M 2
2.085
0.695
36517.5308641975
347.79 Kg
15.00
57.753
0.123756428571429
0.21 M3
211.761
44.98875
0.031
0.70 M2 0.209
0.70 M2
0.070
4,778.67
45.51 Kg
2.00
6.00 Unit 6.00

1966.5
4.21
7.13 M3
7210.5
1531.875
372.60
0.80
1.35 M3
1,366.20
290.25
2,466.28
197.30 M2 4,380.11
8.484
441.75
1,368.00
142.50 M2
6.41
6.41
612.93
905.99
92.45 M2
4.16
4.16
6.00 Unit 6.00

295.10
56.92 M2
1.48
2,045.63
394.60 M2
10.26
154.90
29.88 M2
0.78
56.92 M 2
185.01
394.60 M2 1,282.46
29.88 M 2
97.11

3
1.81 M3
10.157
3
1.65 M3
4.944
1.00 Unit 1.00
1.00 Unit 1.00
2.00 Unit 2.00
7.00 Unit 7.00
1.00 Unit 1.00
3.00 Unit 3.00
1.00 Unit 1.00
1.00 Unit 1.00
2.00 Unit 2.00
21.00 Unit 21.00
2.00 Unit 2.00
2.00 Unit 2.00
21.00 Unit 21.00
2.00 Unit 2.00
3.00 Unit 3.00
4.00 Unit 4.00
2.00 Unit 2.00
0.52
46.82 M1
2.34

161.60
230.86 M2
4.62
16.00
16.35 M¹
0.65
20.00 Bh 20.00
30.00 Bh 30.00
120.00 Bh 120.00
60.00 Bh 60.00
12.00 Bh 12.00

57.38
229.52 M2
3.74
83.55
229.52 M2
25.25
64.25
176.52 M1
19.42

4.00 Bh 4.00
15.00 Bh 15.00
98.00 Bh 98.00
2.00 Bh 2.00
52.00 Bh 52.00
98.00 Bh 98.00

5.69
56.92 M2 5.69
14.80
39.46
394.60 M2 39.46
102.60
22.93
229.32 M2 22.93
59.62
1.54
15.36 M2 1.54
3.99
1.87
0.62
12.44 M2 1.24
1.24
3.23
4.26
1.42
28.38 M2 2.84
2.84
7.38
227.59 M2 22.76
1.00 Bh 1.00

10.00
10.00
10.00
10.00
10.00 Unit
10.00
10.00
10.00
50.00
3.00
3.00
3.00
60.00
1.00 Unit 60.00
1.00 Unit
5.00
6.60
6.60
3.00
1.000
1.000
1.000
1.000
1.00 Unit
1.000
1.000
1.000
5.000
27.500
25.00 m'
125.000
110.000
100.00 m'
500.000
165.000
150.00 m'
750.000
8.000
8.00 Bh
40.000
2.000
2.00 Bh
10.000
5.000
5.00 Bh
25.000
1.000
1.00 Bh
5.000
8.000
8.00 Bh
40.000
2.000
2.00 Fase
10.000

8.82 M3 -
4.41 M3 5.292
1.76
12.60 M 2
279.72
1.285
231.840
0.50
0.84 M3
850.08
180.60
87.09
16.80 M2
16.80 M2
0.44
16.80 M 2
54.600

15.60
2.00 Bh 2.00
0.12
2.40
2.00 Bh 12.00
0.02
20.00 M' 24.00
25.00 M' 30.00
25.00 m' 30.00
2.00 Bh 2.40
2.00 Bh 2.00
4.00
4.00 Bh
0.10
1.00 Bh 1.00

3.00 Bh 6.00
1.00 Unit 1.00
3.00 Bh 6.00
DAFTAR KEBUTUHAN SUMBER DAYA MATERIAL

PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
T.A. :

REKAPITULASI DATA KEBUTUHAN SUMBER DAYA MATERIAL

NO JENIS MATERIAL
a b
1 Balok 5/7 Kls. II Lokal
2 Paku 2”-3”
3 Papan 3/20
4 Pasir urug
5 Batu belah
6 Batu Gunung/batu Quary
7 Semen Portland
8 Pasir Pasang
9 Pasir Beton
10 Kerikil (maks 30mm)
11 Air
12 Papan tipis 2,5 cm Kls. III Lokal
13 Paku 5-12 cm
14 Minyak bekisting
15 Besi Dia. 12
16 Besi Dia. 8
17 Kawat beton
17 Pilar Tiang Teras
18 Ornamen Tiang/Sepatu Tiang Teras
18 Balok kayu kelas II
19 plywood tebal 9 mm
20 Dolken kayu Ø8-10cm - panjang 4 m
21 Batako
22 Keramik 60 x 60
23 Keramik 40 x 40
24 Dinding triplek 4mm
26 Asbes Gelombang
27 Paku Asbes
28 Semen Warna
29 Balok Kayu 6/12 Kelas II
30 Balok Kayu 6/8 Kelas II
31 Kusen Pintu Kayu Kls II (Type P1 )
32 Kusen Pintu Kayu Kls II (Type P2 )
33 Kusen Pintu Kayu Kls II (Type P3 )
34 Kusen Jendela Kayu Kls II (Type J1)
35 Kusen Jendela Kayu Kls II (Type J2)
36 Kusen Buven Kayu Kls II (Type BV)
37 Daun Pintu Panil Kayu Kls II (Type P1 uk. 2.17 x 1)
38 Daun Pintu Panil Kayu Kls II (Type P2 uk. 1.45 x 3)
39 Daun Pintu Panil Kayu Kls II (Type P3 uk. 1.30 x 1)
40 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J1 Uk. 0.37 X 0.77 )
41 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J2 Uk. 0.67 X 0.37)
42 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVP1 Uk. 0.57 x 0.37)
43 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ1 Uk. 0.65 x 0.37)
44 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37)
45 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BV Uk. 0.77 x 0.37)
46 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37)
47 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ3 Uk. 0.77 x 0.37)
48 Woodplank (L=30cm)
49 Seng Galvalum tbl 4 mm
50 Paku Biasa 1/2"-1
51 Seng Pelat Bjls 0.30
52 Beugel U Pelat
53 Pelat strip 30 cm
54 Baut dia 12 mm, panjang 12 cm
55 1 Baut dia 12 mm, p 30 cm
56 Pem 1 Baut dia 16 mm, 40 cm
57 Calsiboard
58 Paku sekrup
Papan Gipsum
59
120x240 cm
60 kunci tanam biasa
61 Engsel pintu
62 Engsel jendela + boven
63 Grendel pintu panjang
64 Grendel spring knip
65 Kait angin
66 Plamur Tembok
67 Cat Dasar (Cat Pro Healty)
68 Cat Penutup Tembok
69 Cat Penutup Plafon
70 Cat Penutup (Cat kayu)
71 Vernis
72 Dempul
73 Ampelas
74 Menie Seng
75 Plakat ukuran 10 x 25 cm (Batu marmer hitam)
76 Wastafel
77 Pipa PVC diameter 4
78 Pipa PVC diameter 2
79 Pipa PVC 1/2
80 Pipa Hawa Gip
81 Florr Drain
82 Kran Air
83 Sealtape
84 Stop Kran
85 Meja Kerja (1/2 Biro)
85 Lemari 2 Pintu
86 Kursi Guru
87 Kloset Jongkok
88 pasangan bata
89 Closet Jongkok
90 Perlengkapan
91 Insatalasi Listrik
92 Pipa listrik
93 T Dus
94 L Bow
95 Las Dop
96 Klem
97 Mongkok
98 Fitting
99 Accesories & Termination
100 Penangkal Petir
101 Stik penerima / blacksem 2m'
102 Reduser galvanis 3/4" - 1"
103 Pipa Galvanis 1"
104 Kabel BC 70 mm2
105 Pipa Conduit 3/4"
106 sock/klem conduit 20mm
107 Grounding BC 70 mm2
108 Pipa galvanis 1"
109 Material bantu
110 Panel SDP
111 MCB 1 Pha 10 A
112 Box Panel 30 x 40 x 20 cm
113 Busbar, Wirring
114 Ampere Meter + CT
115 Volt Meter + SS
116 Pilot Lamp + Fuse
117 Grounding Panel
118 Accesories & Termination
119 Kabel NYY 4 x 2,5 mm
120 Kabel NYY 4 x 2,5 mm
121 Accesories & Termination
122 Kabel NYY 3 x 2,5 mm
123 Kabel NYM 3 x 2,5 mm
124 Accesories & Termination
125 Kabel NYM 2,5 mm
126 Kabel NYM 2,5 mm
127 Accesories & Termination
128 Downlights Inbow 5 Inch DL 500 Lampu 23 Watt
129 Box Downlight + Lampu 23 Watt
130 Accesories & Termination
131 Downlights Inbow 5 Inch DL 500 Lampu 15 Watt
132 Box Downlights + Lampu 15 Watt
133 Accesories & Termination
134 Saklar Tunggal setara broco
135 Saklar Tunggal (Setara Broco)
136 Perlengkapan instalasi
137 Saklar ganda setara broco
138 Saklar Ganda (Setara Broco)
139 Perlengkapan instalasi
140 Stop kontak setara broco
141 Stop Kontak (Setara Broco)
142 Perlengkapan instalasi
143 Arde (1 Fase)
144 Arde 1 Fase
145 Accesories & Termination
PENGELOLAAN PENDIDIKAN
PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA TAHUN ANGGARAN 2023
PEMBANGUNAN RUANG TATA USAHA-SMPS ST. AGUSTINUS LANGA
JLN. JEREBUU-BAJAWA, DESA BOMARI-KEO, KEC. BAJAWA, KAB. NGADA
2023

AYA MATERIAL

VOLUME SATUAN
c d
5 M3
1 Kg 19,396.73 19,396.73
1 M3 21.25
37 m3 12
6 m3 46.95
30 m3 7.50 9.25
485 zak 12.12
47 m3 41.25 11.5
12 m3 41.25
14 m3 10.10 0.01
3770 Liter 17,747.32
2 m3
89 kg 6765167.131
5 Liter
106 Btg - 10.6666667
81 Btg - 4.74074074
50 Kg 15.4074074
6 Unit
6 Unit
1 m3
4 Lbr
18 Btg
2468 Bh
442 Bh
613 Bh
15 lbr
40 lbr
3 kg
11 kg
3 m3
3 m3
1 Unit
1 Unit
2 Unit
7 Unit
1 Unit
3 Unit
1 Unit
1 Unit
2 Unit
21 Unit
2 Unit
2 Unit
21 Unit
2 Unit
3 Unit
4 Unit
2 Unit
1 m3
160 Lbr
6 Kg
16 m'
20 Bh
30 Bh
120 Bh
60 Bh
12 Bh
84 Lbr
45 Kg
65 Lbr
4 Bh
15 Bh
98 Bh
2 Bh
52 Bh
98 Bh
70 Kg
74 Kg
117 Kg
60 Kg
11 Kg
6 Liter
2 Kg
5 Lembar
23 Liter
1 Bh
2 Bh
24 M
30 M
30 M
2 M
2 Unit
4 Bh
1 Bh
1 Bh
3 Bh
1 Unit
3 Bh

16 bh
2 Unit
1 Ls

10 Btg
10 Buah
10 Buah
10 Buah
10 Buah
10 Buah
10 Buah
50 %

3 Bh
3 Bh
3 m'
60 m'
60 m'
5 bh
7 m'
7 m'
3 Ls

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
5 %

28 m
125 %

110 m
500 %

165 m
750 %

8 bh
40 %

2 bh
10 %

5 bh
25 %

1 bh
5 %

8 bh
40 %

2 bh
10 %
15,640.93
DAFTAR KEBUTUHAN SUMBER DAYA TENAGA KERJA

PROGRAM : PENGELOLAAN PENDIDIKAN


KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA TAHUN ANG
PEKERJAAN : PEMBANGUNAN RUANG TATA USAHA-SMPS ST. AGUSTINUS LANGA
LOKASI : JLN. JEREBUU-BAJAWA, DESA BOMARI-KEO, KEC. BAJAWA, KAB. NGADA
T.A. : 2023

NO.
MATA URAIAN PEKERJAAN
ANGG.
1 2
BAB I PEKERJAAN PERSIAPAN
1
Pembersihan Lokasi Sebelum dan Sesudah Selesai Pekerjaan

2 Pengukuran dan Pemasangan Bouplank

3 Penyediaan Air Kerja


4 Kesehatan dan Keselamatan Kerja (K3)

5 Pembuatan Direksikeet / Barak / Los Kerja

6 Administrasi Dan Dokumentasi


7 Papan Nama Proyek dan Pemasangan
BAB II PEKERJAAN TANAH

1 Galian Tanah Pondasi Gedung

2 Urugan Kembali Tanah Pada Galian Pondasi

3 Urugan Tanah Biasa dan Pemadatan Pada Lantai

4 Urugan Pasir bawah Lantai

BAB III PEKERJAAN PONDASI BANGUNAN GEDUNG

1 Urugan Pasir di bawah Pondasi

2 Pek.Batu Kosong
2 Pek.Batu Kosong

3 Pek.Pasangan Batu Sungai/Gunung 1 Pc : 5 Psr

BAB IV PEKERJAAN BETON

Sloof Beton Bertulang 15/20 cm (1 Pc : 2 Psr : 3 Krl)

1 Bekisting

Pembesian

Sloof Beton Bertulang 15/15 cm (1 Pc : 2 Psr : 3 Krl)

2 Bekisting

Pembesian

Kolom Beton 15/15 cm (1 Pc : 2 Psr : 3 Krl)

3 Bekisting

Pembesian
3

Pembesian

Kolom Beton 20/20 cm (1 Pc : 2 Psr : 3 Krl)

4 Bekisting

Pembesian

Beton Balok Latei 12/15 cm (1 Pc : 2 Psr : 3 Krl)

5 Bekisting

Pembesian

Beton Balok Teras & Balok Gantung 15/20 cm (1 Pc : 2 Psr : 3 Krl)

6 Bekisting

Pembesian

Beton Ringbalk 15/20 cm (1 Pc : 2 Psr : 3 Krl)


Beton Ringbalk 15/20 cm (1 Pc : 2 Psr : 3 Krl)

7 Bekisting

Pembesian

Beton Balok Gewel 15/15 cm (1 Pc : 2 Psr : 3 Krl)

8 Bekisting

Pembesian

9 Pemasangan Pillar Tiang teras


BAB V PEKERJAAN LANTAI, DINDING DAN SELASAR

1 Pekerjaan Rabat Lantai 1pc:3psr:5krl

2 Pekerjaan Rabat Lantai taman tebal 12 1pc:3psr:5krl

3 Pekerjaan Pasangan Batako Dinding Tembok1pc:5psr

4 Pekerjaan Pemasangan Lantai (60x60)cm Untuk Ruang & Selasar


4 Pekerjaan Pemasangan Lantai (60x60)cm Untuk Ruang & Selasar

5 Pekerjaan Pemasangan Uk.(40x40)cm T. 1,2 m'

6 Pemasangan Ornamen Tiang/Sepatu Tiang Teras


BAB VI PEKERJAAN PLESTERAN DAN ACIAN

1 Plesteran 1Pc : 5Psr (dinding Pondasi)

2 Plesteran 1Pc : 5Psr (dinding Tembok)

3 Pleteran List Tiang Timbul Spesi (1pc:5Psr)

4 Acian Dinding Pondasi

5 Acian Dinding Tembok

6 Acian Dinding List Tiang Timbul

BAB VII PEKERJAAN KAYU

1 Memasang Konstruksi Kuda - Kuda Konvensional 6/12, Kayu Kelas II

2 Memasang Konstruksi Gording 6/8, Kayu Kelas II


3 Kusen Pintu Kayu Kls II (Type P1 ) + Pemasangan
4 Kusen Pintu Kayu Kls II (Type P2 ) + Pemasangan
5 Kusen Pintu Kayu Kls II (Type P3 ) + Pemasangan
6 Kusen Jendela Kayu Kls II (Type J1) + Pemasangan
7 Kusen Jendela Kayu Kls II (Type J2) + Pemasangan
8 Kusen Buven Kayu Kls II (Type BV) + Pemasangan
9 Daun Pintu Panil Kayu Kls II (Type P1 uk. 2.17 x 1) + Pemasangan
10 Daun Pintu Panil Kayu Kls II (Type P2 uk. 1.45 x 3) + Pemasangan
11 Daun Pintu Panil Kayu Kls II (Type P3 uk. 1.30 x 1) + Pemasangan
12 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J1 Uk. 0.37 X 0.77 ) + Pemasangan
13 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J2 Uk. 0.67 X 0.37) + Pemasangan
14 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVP1 Uk. 0.57 x 0.37) + Pemasangan
15 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ1 Uk. 0.65 x 0.37) + Pemasangan
16 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
17 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BV Uk. 0.77 x 0.37) + Pemasangan
18 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan
19 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ3 Uk. 0.77 x 0.37) + Pemasangan

20 Memasang Woodplank (L=30cm)

BAB VIII PEKERJAAN PENUTUP ATAP

1 Pas. Atap Galvalum tbl 4 mm

2 Pas. Atap Seng Bubungan BJLS 0,30 mm

3 Beugle U Plat

4 Plat Strip P. 30 cm

5 Pas. Baut (D12 P.12 cm)

6 Pas. Baut (D12 P.30 cm)

7 Pas. Baut ( D 16 P: 40 cm )

BAB IX PEKERJAAN LANGIT - LANGIT


1 Memasang Rangka Langit-langit (60 x 60 cm) Kayu Kelas 2

2 Memasang Langit-langit Plafond Kalsiboard 4 mm

3 Memasang List gipsun Profil 10 cm

BAB X PEKERJAAN KUNCI DAN PENGGANTUNG

1 Pek. Kunci pintu uk. Besar 2 x putar mutu baik

2 Pek. Engsel pintu (1 pintu 3 buah engsel)

3 Pek. Engsel Jendela + Boven

4 Pek. Grendel Pintu Panjang

5 Pek. Grendel Spring Knip (Jendela+Boven jendela dan Boven Pintu)

6 Pek. Pasang Kait angin

BAB XI PEKERJAAN PENGECATAN

1 Pek. Cat Pondasi Dengan Cat Tembok


1 Pek. Cat Pondasi Dengan Cat Tembok

2 Pek. Cat Dinding Tembok Dengan Cat Tembok

3 Pek. Cat Penutup Plafond + List plafond Dengan Cat Tembok

4 Pek. Cat Tiang Pilar Dengan Cat Tembok

5 Pek. Cat Kusen Dengan Cat Mengkilat

6 Pek. Vernis/Milamin Daun Pintu,Jendela dan Buven

7 Pek. Menie Seng

8 Pemasangan Plakat ukuran 10 x 25 cm (Batu marmer hitam)


BAB XII PEKERJAAN INSTALASI LISTRIK

1 Instalasi Listrik

2 Penangkal Petir

3 Panel SDP

4 Kabel NYY 4 x 2,5 mm


4 Kabel NYY 4 x 2,5 mm

5 Kabel NYY 3 x 2,5 mm

6 Kabel NYM 2,5 mm

7 Downlights Inbow 5 Inch DL 500 Lampu 23 Watt

8 Downlights Inbow 5 Inch DL 500 Lampu 15 Watt

9 Saklar Tunggal setara broco

10 Saklar ganda setara broco

11 Stop kontak setara broco

12 Arde (1 Fase)

BAB XIII PEKERJAAN SALURAN KELILING BANGUNAN

1 Galian Tanah

2 Urugan Pasir di bawah Lantai Saluran

3 Pasangan Dinding Batako Saluran (1 Pc : 5 Psr)


3 Pasangan Dinding Batako Saluran (1 Pc : 5 Psr)

4 Beton Tumbuk Lantai Saluran (1 Pc : 3 Psr : 5 Krl)

5 Plesteran Dinding Saluran (1 Pc : 4 Psr)

6 Acian Dinding Saluran

BAB XIIIIPEKERJAAN SANITASI & SANITAIR

1 Kloset Jongkok

2 Wastafel Keramik

3 Pipa PVC AW dia 4" + assesories

4 Pipa PVC AW dia 2" assesories

5 Pipa PVC AW dia 1/2 + assesories

6 Pipa Hawa Gip dia 2" assesories


7 Floor Drain Stenlis

8 Kran Air Stenlis dia 1/2"

9 Stop Kran Gip dia 1/2"

BAB XV PEKERJAAN MEUBELER


1 Meja Kerja (1/2 Biro)
2 Kursi Guru
DAYA TENAGA KERJA

GAH PERTAMA TAHUN ANGGARAN 2023


. AGUSTINUS LANGA
. BAJAWA, KAB. NGADA

KOEF. VOL. TOTAL JUMLAH


SAT.
TENAGA KERJA SAT. ANALISA PEK. TENAGA KERJA
(a) (b) (c) (d) = a*b (e)
3 4 5 6 7 8 9.00

Pekerja OH 0.100 30.000 30


300.00 M2
Mandor OH 0.005 1.500 1
Pekerja OH 0.10 4.35 4
Tukang Kayu OH 0.10 4.35 4
43.50 M'
Kepala Tukang OH 0.010 0.44 1
Mandor OH 0.005 0.22 1
- - - 1.00 Ls - -
- - - 1.00 Ls - -
Pekerja OH 1.500 1.500 2
Tukang tembok/batu OH 0.400 0.400 1
1.00 Unit
Kepala tukang OH 0.040 0.040 1
Mandor OH 0.120 0.120 1
- - - 1.00 Ls - -
- - 1.00 Ls - -

Pekerja OH 0.750 21.158 21


28.21 m3
Mandor OH 0.025 0.705 1
Pekerja OH 0.100 0.705 1
7.05 m3
Mandor OH 0.010 0.071 1
Pekerja OH 0.100 9.375 9
93.75 m3
Mandor OH 0.010 0.938 1
Pekerja OH 0.100 2.14 3
21.38 M3
Mandor OH 0.010 0.21 1

Pekerja OH 0.100 0.36 4


3.58 M3
Mandor OH 0.010 0.04 1
Pekerja OH 0.780 3.90 4

5.01 M3
Tukang Batu OH 0.390 1.95 2
5.01 M3
Kepala Tukang OH 0.039 0.20 1
Mandor OH 0.039 0.20 1
Pekerja OH 1.500 10.00 10
Tukang Batu OH 0.750 5.00 5
25.07 M3
Kepala Tukang OH 0.075 1.88 1
Mandor OH 0.075 1.88 1

Pekerja OH 1.650 2.212 2


Tukang batu OH 0.275 0.369 1
1.34 M3
Kepala Tukang OH 0.028 0.038 1
Mandor OH 0.083 0.11 1
Pekerja OH 0.520 2.90 3
Tukang Kayu OH 0.260 1.45 2
5.59 M2
Kepala Tukang OH 0.026 0.15 1
Mandor OH 0.026 0.15 1
Pekerja OH 1.600 12.78 13
Tukang Besi OH 1.600 12.78 13
223.58 Kg
Kepala Tukang OH 0.160 1.28 1
Mandor OH 0.160 1.28 1
Pekerja OH 1.650 0.74 1
Tukang batu OH 0.275 0.12 1
0.45 M3
Kepala Tukang OH 0.028 0.01 1
Mandor OH 0.083 0.04 1
Pekerja OH 0.520 0.78 1
Tukang Kayu OH 0.260 0.39 1
1.49 M3
Kepala Tukang OH 0.026 0.04 1
Mandor OH 0.026 0.039 1
Pekerja OH 1.600 5.399 5
Tukang besi OH 1.600 5.399 5
Kg
Kepala Tukang OH 0.160 94.48 0.540 1
Mandor OH 0.160 0.54 1
Pekerja OH 1.650 2.82 3
Tukang batu OH 0.275 0.47 1
1.71 M3
Kepala Tukang OH 0.028 0.05 1
Mandor OH 0.083 0.14 1
Pekerja OH 0.660 3.76 4
Tukang Kayu OH 0.330 1.88 2
5.70 M2
Kepala Tukang OH 0.033 0.19 1
Mandor OH 0.033 0.19 1
Pekerja OH 1.600 22.52 23

394.07 Kg
Tukang besi OH 1.600 22.52 23
394.07 Kg
Kepala Tukang OH 0.160 2.25 2
Mandor OH 0.160 2.25 2
Pekerja OH 1.650 1.1682 1
Tukang batu OH 0.275 0.1947 1
0.71 M3
Kepala Tukang OH 0.028 0.019824 1
Mandor OH 0.083 0.06 1
Pekerja OH 0.660 0.23 1
Tukang Kayu OH 0.330 0.12 1
0.35 M2
Kepala Tukang OH 0.033 0.01 1
Mandor OH 0.033 0.01 1
Pekerja OH 1.600 5.62 7
Tukang besi OH 1.600 5.62 7
98.31 Kg
Kepala Tukang OH 0.160 0.56 1
Mandor OH 0.160 0.56 1
Pekerja OH 1.650 2.06 2
Tukang batu OH 0.275 0.34 1
1.25 M3
Kepala Tukang OH 0.028 0.04 1
Mandor OH 0.083 0.10 1
Pekerja OH 0.520 5.42 5
Tukang Kayu OH 0.260 2.71 3
10.42 M2
Kepala Tukang OH 0.026 0.271 1
Mandor OH 0.026 0.271 1
Pekerja OH 1.600 17.99 18
Tukang besi OH 1.600 17.99 18
314.84 Kg
Kepala Tukang OH 0.160 1.80 1
Mandor OH 0.160 1.80 1
Pekerja OH 1.650 0.78 1
Tukang batu OH 0.275 0.13 1
0.47 M3
Kepala Tukang OH 0.028 0.01 1
Mandor OH 0.083 0.04 1
Pekerja OH 0.660 1.942 2
Tukang Kayu OH 0.330 0.971 1
2.94 M2
Kepala Tukang OH 0.033 0.097 1
Mandor OH 0.033 0.097 1
Pekerja OH 1.600 7.070 7
Tukang besi OH 1.600 7.070 7
123.73 Kg
Kepala Tukang OH 0.160 0.707 1
Mandor OH 0.160 0.707 1
Pekerja OH 1.650 3.440 3

2.09 M3
Tukang batu OH 0.275 0.57 1
2.09 M3
Kepala Tukang OH 0.028 0.06 1
Mandor OH 0.083 0.17 1
Pekerja OH 0.520 3.614 4
Tukang Kayu OH 0.260 1.807 2
6.95 M2
Kepala Tukang OH 0.026 0.181 1
Mandor OH 0.026 0.181 1
Pekerja OH 1.600 19.873 19
Tukang besi OH 1.600 19.873 19
347.79 Kg
Kepala Tukang OH 0.160 1.987 1
Mandor OH 0.160 1.987 1
Pekerja OH 1.650 0.345 1
Tukang batu OH 0.275 0.06 1
0.21 M3
Kepala Tukang OH 0.028 0.01 1
Mandor OH 0.083 0.02 1
Pekerja OH 0.520 0.363 1
Tukang Kayu OH 0.260 0.181 1
0.70 M2
Kepala Tukang OH 0.026 0.018 1
Mandor OH 0.026 0.018 1
Pekerja OH 1.600 2.60 3
Tukang besi OH 1.600 2.60 3
45.51 Kg
Kepala Tukang OH 0.160 0.26 1
Mandor OH 0.160 0.26 1
- - - 6.00 Unit - -

Pekerja OH 1.650 11.756 12


Tukang batu OH 0.275 1.959 2
7.13 M3
Kepala Tukang OH 0.028 0.200 1
Mandor OH 0.083 0.591 1
Pekerja OH 1.650 2.23 2
Tukang batu OH 0.275 0.37 1
1.35 M3
Kepala Tukang OH 0.028 0.04 1
Mandor OH 0.083 0.11 1
Pekerja OH 0.600 5.92 6
Tukang batu OH 0.200 1.97 2
197.30 M2
Kepala Tukang OH 0.020 0.20 1
Mandor OH 0.030 0.296 1
Pekerja OH 0.24 34.20 34
Tukang batu OH 0.12 17.10 17
142.50 M2
Kepala Tukang OH 0.012 1.43 2
142.50 M2

Mandor OH 0.012 1.71 2


Pekerja OH 0.25 23.11 23
Tukang batu OH 0.125 11.56 12
92.45 M2
Kepala Tukang OH 0.013 1.20 1
Mandor OH 0.013 1.20 1
- - - 6.00 Unit - -

Pekerja OH 0.300 17.08 17


Tukang batu OH 0.150 8.54 9
56.92 M2
Kepala Tukang OH 0.015 0.85 1
Mandor OH 0.015 0.85 1
Pekerja OH 0.150 59.19 59
Tukang batu OH 0.075 29.60 30
394.60 M2
Kepala Tukang OH 0.008 3.16 3
Mandor OH 0.008 3.16 3
Pekerja OH 0.150 4.48 4
Tukang batu OH 0.075 2.24 2
29.88 M2
Kepala Tukang OH 0.008 0.24 1
Mandor OH 0.008 0.24 1
Pekerja OH 0.200 11.38 11
Tukang batu OH 0.100 5.69 6
56.92 M2
Kepala Tukang OH 0.010 0.57 1
Mandor OH 0.010 0.57 1
Pekerja OH 0.200 78.92 79
Tukang batu OH 0.100 39.46 39
394.60 M2
Kepala Tukang OH 0.010 3.95 4
Mandor OH 0.010 3.95 4
Pekerja OH 0.200 5.98 6
Tukang batu OH 0.100 2.99 3
29.88 M2
Kepala Tukang OH 0.010 0.30 1
Mandor OH 0.010 0.30 1

Pekerja OH 4.000 7.255 7


Tukang OH 12.000 21.766 20
1.81 M3
Kepala Tukang OH 1.200 2.177 2
Mandor OH 0.200 0.363 1
Pekerja OH 2.400 3.955 4
Tukang OH 7.200 11.866 12
1.65 M3
Kepala Tukang OH 0.720 1.187 1
Mandor OH 0.120 0.198 1
- - - 1.00 Unit - -
- - - 1.00 Unit - -
- - - 2.00 Unit - -
- - - 7.00 Unit - -
- - - 1.00 Unit - -
- - - 3.00 Unit - -
- - - 1.00 Unit - -
- - - 1.00 Unit - -
- - - 2.00 Unit - -
- - - 21.00 Unit - -
- - - 2.00 Unit - -
- - - 2.00 Unit - -
- - - 21.00 Unit - -
- - - 2.00 Unit - -
- - - 3.00 Unit - -
- - - 4.00 Unit - -
- - - 2.00 Unit - -
Pekerja OH 0.100 4.68 5
Tukang OH 0.200 9.36 9
46.82 M1
Kepala Tukang OH 0.020 0.94 1
Mandor OH 0.005 0.23 1

Pekerja OH 0.120 27.70 27


Tukang OH 0.060 13.85 14
230.86 M2
Kepala Tukang OH 0.006 1.39 1
Mandor OH 0.006 1.39 1
Pekerja OH 0.150 2.45 2
Tukang OH 0.070 1.14 1
16.35 M¹
Kepala Tukang OH 0.007 0.11 1
Mandor OH 0.006 0.10 1
Tukang Kayu OH 0.0001 0.002 1
20.00 Bh
Mandor OH 0.00001 0.0002 1
Tukang Kayu OH 0.0001 0.0030 1
30.00 Bh
Mandor OH 0.00001 0.0003 1
Tukang Kayu OH 0.0001 0.0120 1
120.00 Bh
Mandor OH 0.00001 0.0012 1
Tukang Kayu OH 0.0001 0.006 1
60.00 Bh
Mandor OH 0.00001 0.001 1
Tukang Kayu OH 0.0001 0.0012 1
12.00 Bh
Mandor OH 0.00001 0.0001 1
Pekerja OH 0.200 45.90 46
Tukang OH 0.300 68.86 69
229.52 M2
Kepala Tukang OH 0.030 6.89 7
Mandor OH 0.010 2.30 2
Pekerja OH 0.100 22.95 23
Tukang OH 0.050 11.48 11
229.52 M2
Kepala Tukang OH 0.005 1.15 1
Mandor OH 0.005 1.15 1
Pekerja OH 0.100 17.65 18
Tukang OH 0.050 8.83 9
176.52 M1
Kepala Tukang OH 0.005 0.88 1
Mandor OH 0.005 0.88 1

Pekerja OH 0.010 0.04 1


Tukang Kayu OH 0.500 2.00 2
4.00 Bh
Kepala Tukang OH 0.050 0.20 1
Mandor OH 0.005 0.02 1
Pekerja OH 0.0150 0.22 1
Tukang Kayu OH 0.1500 2.25 2
15.00 Bh
Kepala Tukang OH 0.0150 0.22 1
Mandor OH 0.0008 0.01 1
Pekerja OH 0.0100 0.98 1
Tukang Kayu OH 0.1000 9.80 10
98.00 Bh
Kepala Tukang OH 0.0100 0.98 1
Mandor OH 0.0005 0.05 1
Pekerja OH 0.0100 0.02 1
Tukang Kayu OH 0.1000 0.20 1
2.00 Bh
Kepala Tukang OH 0.0100 0.02 1
Mandor OH 0.0005 0.001 1
Pekerja OH 0.015 0.78 1
Tukang Kayu OH 0.150 7.80 8
52.00 Bh
Kepala Tukang OH 0.015 0.78 1
Mandor OH 0.008 0.42 1
Pekerja OH 0.015 1.47 1
Tukang Kayu OH 0.150 14.70 15
98.00 Bh
Kepala Tukang OH 0.015 1.47 1
Mandor OH 0.008 0.78 1

Pekerja OH 0.0200 1.14 1


Tukang cat OH 0.0630 3.59 4
56.92 M2
56.92 M2
Kepala Tukang OH 0.0063 0.36 1
Mandor OH 0.0030 0.17 1
Pekerja OH 0.0200 7.89 8
Tukang cat OH 0.0630 24.86 25
394.60 M2
Kepala Tukang OH 0.0063 2.49 2
Mandor OH 0.0030 1.18 1
Pekerja OH 0.0200 4.59 5
Tukang cat OH 0.0630 14.45 14
229.32 M2
Kepala Tukang OH 0.0063 1.44 1
Mandor OH 0.0030 0.69 1
Pekerja OH 0.0200 0.31 1
Tukang cat OH 0.0630 0.97 1
15.36 M2
Kepala Tukang OH 0.0063 0.10 1
Mandor OH 0.0030 0.05 1
Pekerja OH 0.160 1.99 2
Tukang cat OH 0.160 1.99 2
12.44 M2
Kepala Tukang OH 0.016 0.20 1
Mandor OH 0.003 0.04 1
Pekerja OH 0.160 4.54 5
Tukang cat OH 0.160 4.54 5
28.38 M2
Kepala Tukang OH 0.016 0.45 1
Mandor OH 0.003 0.09 1
Pekerja OH 0.0400 9.10 9
Tukang cat OH 0.0050 1.14 1
227.59 M2
Kepala Tukang OH 0.0005 0.11 1
Mandor OH 0.0025 0.57 1
- - - 1.00 Bh - -

Pekerja OH 0.010 0.10 1


Tukang Listrik OH 0.010 0.10 1
10.00 Unit
Kepala Tukang Listrik OH 0.001 0.01 1
Mandor OH 0.001 0.01 1
Pekerja OH 0.081 0.081 1
Tukang Listrik OH 0.135 0.135 1
1.00 Unit
Kepala Tukang Listrik OH 0.0135 0.0135 1
Mandor OH 0.004 0.004 1
Pekerja OH 0.025 0.025 1
Tukang listrik OH 0.025 0.025 1
1.00 Unit
Kepala Tukang Listrik OH 0.017 0.017 1
Mandor OH 0.014 0.014 1
Pekerja OH 0.025 0.625 1

25.00 m'
Tukang Listrik OH 0.025 0.625 1
25.00 m'
Kepala Tukang Listrik OH 0.017 0.415 1
Mandor OH 0.014 0.350 1
Pekerja OH 0.025 2.500 3
Tukang Listrik OH 0.025 2.500 3
100.00 m'
Kepala Tukang Listrik OH 0.017 1.660 2
Mandor OH 0.014 1.400 1
Pekerja OH 0.025 3.750 4
Tukang Listrik OH 0.025 3.750 4
150.00 m'
Kepala Tukang Listrik OH 0.017 2.490 2
Mandor OH 0.014 2.100 2
Pekerja OH 0.010 0.080 1
Tukang Listrik OH 0.010 0.080 1
8.00 Bh
Kepala Tukang Listrik OH 0.001 0.008 1
Mandor OH 0.001 0.008 1
Pekerja OH 0.010 0.020 1
Tukang Listrik OH 0.010 0.020 1
2.00 Bh
Kepala Tukang Listrik OH 0.001 0.002 1
Mandor OH 0.001 0.002 1
Pekerja OH 0.025 0.125 1
Tukang Listrik OH 0.025 0.125 1
5.00 Bh
Kepala Tukang Listrik OH 0.017 0.083 1
Mandor OH 0.014 0.070 1
Pekerja OH 0.025 0.025 1
Tukang Listrik OH 0.025 0.025 1
1.00 Bh
Kepala Tukang Listrik OH 0.017 0.017 1
Mandor OH 0.014 0.014 1
Pekerja OH 0.025 0.200 1
Tukang Listrik OH 0.025 0.200 1
8.00 Bh
Kepala Tukang Listrik OH 0.017 0.133 1
Mandor OH 0.014 0.112 1
Pekerja OH 0.010 0.020 1
Tukang Listrik OH 0.010 0.020 1
2.00 Fase
Kepala Tukang Listrik OH 0.001 0.002 1
Mandor OH 0.001 0.002 1

Pekerja OH 0.750 6.615 7


8.82 M3
Mandor OH 0.025 0.220 1
Pekerja OH 0.100 0.441 1
4.41 M3
Mandor OH 0.010 0.044 1
Pekerja OH 0.60 7.56 8

12.60 M2
Tukang batu OH 0.20 2.52 3
12.60 M2
Kepala Tukang OH 0.02 0.25 1
Mandor OH 0.03 0.378 1
Pekerja OH 1.650 1.386 1
Tukang batu OH 0.275 0.23 1
0.84 M3
Kepala Tukang OH 0.028 0.02 1
Mandor OH 0.083 0.07 1
Pekerja OH 0.300 5.04 5
Tukang batu OH 0.150 2.52 3
16.80 M2
Kepala Tukang OH 0.015 0.25 1
Mandor OH 0.015 0.25 1
Pekerja OH 0.200 3.360 3
Tukang batu OH 0.100 1.680 2
16.80 M2
Kepala Tukang OH 0.010 0.168 1
Mandor OH 0.010 0.168 1

Pekerja OH 0.500 1.00 1


Tukang OH 1.500 3.00 3
2.00 Bh
Kepala Tukang OH 0.150 0.30 1
Mandor OH 0.160 0.32 1
Pekerja OH 1.200 2.40 3
Tukang OH 1.450 2.90 3
2.00 Bh
Kepala Tukang OH 0.150 0.30 1
Mandor OH 0.060 0.12 1
Pekerja OH 0.0810 1.62 2
Tukang OH 0.1350 2.70 3
20.00 M'
Kepala Tukang OH 0.0135 0.27 1
Mandor OH 0.0040 0.08 1
Pekerja OH 0.0810 2.03 2
Tukang OH 0.1350 3.38 3
25.00 M'
Kepala Tukang OH 0.0135 0.34 1
Mandor OH 0.0040 0.10 1
Pekerja OH 0.0810 2.03 2
Tukang OH 0.1350 3.38 3
25.00 m'
Kepala Tukang OH 0.0135 0.34 1
Mandor OH 0.0040 0.10 1
Pekerja OH 0.0810 0.16 1
Tukang OH 0.1350 0.27 1
2.00 Bh
Kepala Tukang OH 0.0135 0.03 1
Mandor OH 0.0040 0.01 1
Pekerja OH 0.0100 0.02 1
Tukang OH 0.1000 0.20 1
2.00 Bh
Kepala Tukang OH 0.0100 0.02 1
Mandor OH 0.0050 0.01 1
Pekerja OH 0.0100 0.04 1
Tukang OH 0.4000 1.60 2
Kepala Tukang OH 0.04 4.00 Bh
0.16 1
Mandor OH 0.005 0.02 1
Pekerja OH 0.010 0.01 1
Tukang OH 0.400 0.40 1
1.00 Bh
Kepala Tukang OH 0.040 0.04 1
Mandor OH 0.005 0.01 1

- - - - - - -
- - - - - - -
DAFTAR KEBUTUHAN SUMBER DAYA TENAGA KERJA

PROGRAM : PENGELOLAAN PENDIDIKAN


KEGIATAN : PENGELOLAAN
N RUANG TATA PENDIDIKAN SEKOLAH MENENGAH PERTAMA
PEKERJAAN : USAHA-SMPS
LOKASI : ST. AGUSTINUS
JLN. JEREBUU-BAJAWA, DESA BOMARI-KEO, KEC. BAJAWA, KAB
T.A. : 2023

REKAPITULASI DATA KEBUTUHAN SUMBER DAYA


TENAGA KERJA
NO JENIS TENAGA KERJA VOLUME SATUAN
a b c d
1 Pekerja 695 OH
2 Tukang Kayu 59 OH
3 Tukang Batu 145 OH
4 Tukang Besi 95 OH
5 Tukang Listrik 16 OH
6 Tukang cat 52 OH
7 Tukang 166 OH
8 Kepala Tukang Listrik 14 OH
9 Kepala Tukang 89 OH
10 Mandor 106 OH
MENENGAH PERTAMA TAHUN ANGGARAN 2023

EO, KEC. BAJAWA, KAB. NGADA


BACK UP VOLUME RUANGAN UKS

PROGRAM : PENGELOLAAN PENDIDIKAN


KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA TAHUN ANGGARAN 2023
PEKERJAAN : PEMBANGUNAN RUANG UKS-SMPS ST. AGUSTINUS LANGA
JLN. JEREBUU-BAJAWA, DESA BOMARI-KEO, KEC. BAJAWA, KAB. NGADA
LOKASI :
T.A. : 2023

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3
I RUANGAN TATA USAHA Perhitungan :
p = 12.00 M1
l = 8.00 M1
L = pxl
96.00 M2

p = 4.00 M1
l = 3.00 M1
L = pxl
12.00 M2

p = 1.50 M1
l = 1.50 M1
L = pxl
2.25 M2

p = 1.50 M1
l = 1.50 M1
L = pxl
2.25 M2

p = 3.00 M1
l = 2.50 M1
L = pxl
7.50 M2

TOTAL LUAS BANGUNAN = 112.50 M2

II LUAS TERAS
p = 15.00 M1
l = 2.00 M1
L = pxl
30.00 M2

TOTAL LUAS SELASAR = 30.00 M2


SUB TOTAL LUAS BANGUNAN + SELASAR = 142.50 M2

III PANJANG KELILING BANGUNAN Perhitungan :


P.V = 8.00 M1
P.H = 15.00 M1
T.P = 23.00 M1

P.V = 2.00 M1
P.H = 15.00 M1
UP VOLUME RUANGAN UKS

KET

Rg. Tata Usaha


a

Rg. Kepala Tata Usaha


b

Rg. WC 1
c

Rg. WC 2
d

Rg. Pantry
e

TERAS DEPAN
A

Rg uks

Selasar
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3
T.P = 17.00 M1

TOTAL PANJANG BANGUNAN = 40.00 M¹

IV Total Panjang Bowplank


Perhitungan :

Sisi Tegak

Ruangan Tata Usaha = 10.00 m

Rg. Kepala Tata Usaha = 4.00 m

Rg. WC 1 = 1.50 m

Rg. WC 2 = 1.50 m

Rg. Pantry = 2.50 m

TOTAL = 19.50 m'

Sisi Datar

Ruangan Tata Usaha = 15.00 m

Rg. Kepala Tata Usaha = 3.00 m

Rg. WC 1 = 1.50 m

Rg. WC 2 = 1.50 m

Rg. Pantry = 3.00 m

TOTAL = 24.00 m'

TOTAL PANJANG BOWPLANK BANGUNAN = 43.50 M¹

V PEMBERSIHAN LOKASI
Perhitungan :
Volume = PXL
= 25 x 12 m'
= 300 m2
VI PEMBUATAN DIREKSI KET Perhitungan :
Volume = PxL
= 5x6 m'
= 30 m2
KET

4
BACK UP VOLUME PEKERJAAN TANAH

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4
PEK.TANAH DAN PASIR
1 PANJANG GALIAN
PERHITUNGAN :
Pv = 8.00 M1 Panjang
Ph = 15.00 M 1 Pondasi Menerus
Jumlah = 23.00 M1 Keliling

Pv = 16.00 M1 Panjang
Ph = 6.00 M1 Pondasi Menerus
Jumlah = 22.00 M1 Dalam

Pv = 9.50 M1 Panjang pemisah


Ph = - M1 bentangan lantai bagian
Jumlah = 9.50 M1 Dalam

Pv = 2.00 M1 Selasar
Ph = 15.00 M 1

Jumlah = 17.00 M1

VOLUME GALIAN TANAH Bangunan Keliling = 23.00 M1


VOLUME GALIAN TANAH Bangunan Dalam = 22.00 M1
VOLUME GALIAN TANAH Pemisah Bentangan Lantai = 9.50 M1
VOLUME GALIAN TANAH Selasar = 17.00 M1
2 PEK. GALIAN TANAH
PERHITUNGAN :
P = 23.00 M1 Galian Pondasi
L = 0.70 M1 Menerus
T = 0.65 M1 Keliling
F = PxLxT
= 10.47 M3
Jumlah = 1.00 Unit
V = FxJ
= 10.47 M3

P = 22.00 M1 Galian Pondasi


L = 0.70 M 1 Menerus
T = 0.65 M1 Dalam
F = PxLxT
= 10.01 M3
Jumlah = 1.00 Unit
V = FxJ
= 10.01 M3

P = 9.50 M1 Panjang pemisah


L = 0.45 M1 bentangan lantai bagian
T = 0.40 M1 Dalam
F = PxLxT
= 1.71 M3
Jumlah = 1.00 Unit
V = FxJ
= 1.71 M3
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4
P = 17.00 M1 Galian Pondasi
L = 0.70 M1 Menerus
T = 0.65 M 1 Selasar
F = PxLxT
= 7.73 M3
Jumlah = 1.00 Unit
V = FxJ
= 7.73 M3

VOLUME GALIAN TANAH = 28.21 M3


VOLUME PENGURUGAN KEMBALI TANAH 1/4 = 7.05 M3
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

3 PEKERJAAN URUGAN PASIR


BAWAH PONDASI PERHITUNGAN :
p = 71.50 M1 Urugan Pasir
T = 0.05 M 1 Pondasi
F = LxT
= 3.58 M2
Jumlah = 1.00 Unit
V = FxJ
= 3.58 M3

VOLUME URUGAN PASIR BAWAH PONDASI = 3.58 M3

4 PEKERJAAN URUGAN PASIR


BAWAH LANTAI PERHITUNGAN :
Luas = 112.50 M1 Urugan Pasir
T = 0.15 M 1 Bawah Lantai
F = LxT Bangunan
= 16.88 M2
Jumlah = 1.00 Unit
V = FxJ
= 16.88 M3

Luas = 30.00 M1 Urugan Pasir


T = 0.15 M1 Bawah Lantai
F = LxT Selasar
= 4.50 M 2

Jumlah = 1.00 Unit


V = FxJ
= 4.50 M3

VOLUME URUGAN PASIR BAWAH LANTAI = 21.38 M3

4 PEKERJAAN URUGAN TANAH


PENINGGIAN MUKA LANTAI PERHITUNGAN :
Luas Bangunan = 112.50 M2 Urugan Tanah
t = 0.7 M1 Type 1
= LxT Bangunan
= 78.75 M3
Jumlah = 1.00 Unit
V = FxJ
= 78.75 M3

Luas Selasar = 30.00 M1 Urugan Tanah


t = 0.5 M1 Type 2
= LxT Selasar
= 15.00 M3
Jumlah = 1.00 Unit
V = FxJ
= 15.00 M3

VOLUME URUGAN TANAH BAWAH LANTAI = 93.75 M3


BACK UP VOLUME PEKERJAAN PONDASI

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

IV PANJANG KELILING PONDASI MENERUS Perhitungan :


Pv = 8.00 M1 Panjang
Ph = 15.00 M1 Pondasi Menerus
Jumlah = 23.00 M1 Keliling

Pv = 16.00 M1 Panjang
Ph = 6.00 M1 Pondasi Menerus
Jumlah = 22.00 M1 Dalam

Pv = 9.50 M1 Panjang pemisah


Ph = - M1 bentangan lantai bagian
Jumlah = 9.50 M1 Dalam

Pv = 2.00 M1 Selasar
Ph = 15.00 M1
Jumlah = 17.00 M1

Pv = 16.00 M1 Panjang
Ph = 30.00 M1 Pondasi Menerus
Jumlah = 46.00 M1 Keliling Bangunan

VOLUME GALIAN TANAH Bangunan Keliling = 23.00 M1


VOLUME GALIAN TANAH Bangunan Dalam = 22.00 M1
Volume Panjang Pemisah Bentangan Lantai = 9.50 M1
VOLUME GALIAN TANAH Selasar = 17.00 M1
SUB TOTAL PANJANG = 71.50 M1
SUB TOTAL PANJANG LUAR = 46.00 M1
PEK.PONDASI

1 PEK. BATU KOSONG Bangunan


P = 71.50 M1
L = 0.70 M1
T = 0.10 M1
F = PxLxT
= 5.01 M3
Jumlah = 1.00 Unit
V = FxJ
= 5.01 M3

VOLUME BATU KOSONG = 5.01 M3


2 PEK. PONDASI PERHITUNGAN :
a = 0.30 M1 PONDASI
b = 0.60 M1 Menerus
h rata2 = 0.90 M1 Bangunan
Luas = (a+b) x h x 0.5 Keliling
= 0.40 M2
P = 23.00 M1
Jumlah = 1.00 Unit
V = 9.32 M3
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

a = 0.30 M1 PONDASI
b = 0.60 M1 Menerus
h rata2 = 0.80 M1 Bangunan
Luas = (a+b) x h x 0.5 Dalam
= 0.36 M2
P = 22.00 M1
Jumlah = 1.00 Unit
V = 7.92 M3

a = 0.30 M1
b = 0.30 M1 Panjang pemisah
h rata2 = 0.60 M1 bentangan lantai bagian
Luas = (a+b) x h x 0.5 Dalam
= 0.18 M2

P = 9.50 M1
Jumlah = 1.00 Unit
V = 1.71 M3

a = 0.30 M1 PONDASI
b = 0.60 M1 Selasar
h rata2 = 0.80 M1

Luas = (a+b) x h x 0.5


= 0.36 M2
P = 17.00 M1
Jumlah = 1.00 Unit
V = 6.12 M3

VOLUME PONDASI = 25.07 M3

3 PEK. PLESTERAN DAN ACIAN PONDASI PERHITUNGAN :


P = 46.00 M1
T rata2 = 1.24 M1
Luas = Pxt
= 56.92 M2

Jumlah = 1.00 Unit


V = 56.92 M2

VOLUME PLESTERAN PONDASI = 56.92 M2


VOLUME ACIAN PONDASI = 56.92 M2
BACK UP VOLUME PEKERJAAN STRUKTUR

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3

VI Panjang Keliling Sloof Perhitungan :


Type a
P.V = 16.00 M1
P.H = 30.00 M1
T.P = 46.00 M1
Type c
P.V = 17.50 M1
P.H = 6.00 M1
T.P = 23.50 M1

TOTAL PANJANG SLOOF = 44.68 M¹


TOTAL PANJANG SLOOF = 19.93 M¹

VII Panjang Keliling Balok Latei Perhitungan :


Type a
P.V = 16.00 M1
P.H = 30.00 M1
T.P = 46.00 M1

Type c
P.V = 17.50 M1
P.H = 6.00 M1
T.P = 23.50 M1

TOTAL PANJANG LATEI = 69.50 M¹

VIII Panjang Keliling Balok Ring Balk Perhitungan :

P.V = 16.00 M1
P.H = 30.00 M1
T.P = 46.00 M1

P.V = 17.50 M1
P.H = 6.00 M1
T.P = 23.50 M1

TOTAL PANJANG RING BALK = 69.50 M¹


IX Panjang Keliling Balok Gewel Perhitungan :

P1 = 9.30 M1
P2 = - M1
T.P = 9.30 M1

TOTAL PANJANG BALOK GEWEL = 9.30 M¹

X Jumlah Kolom Perhitungan :


K UP VOLUME PEKERJAAN STRUKTUR

KET

15x20 cm

15x15 cm

15x20 cm
15x15 cm

12 X 15 cm

12 X 15 cm

Panjang
B. Ring Balk

Tiang
Balok a
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3
1 Kolom Praktis T.4 = 19.00 Bh
2 Kolom Teras T.2.95 = 6.00 Bh

Panjang Kolom uk.15/15 cm 19 = 76.00 m'

PANJANG KOLOM = 76.00 M'


Panjang Kolom uk.20/20cm 6 = 17.70 m'

PANJANG KOLOM = 17.70 M'

Panjang Keliling Balok Teras Dan Balok Gantung Keliling

Perhitungan :
P.V = 10.80 M1
P.H = 15.00 M1
T.P = 25.80 M1

Total Panjang Keliling Balok Teras Dan Balok Gantung Keliling = 25.80 M1
KET

4
15x15 CM
20/20cm

T. 4 M'

T. 2.95 M'
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3
PEK. STRUKTUR

1 BETON BERTULANG UNTUK KOLOM Perhitungan


p = 0.15 M1
l = 0.15 M1
= pxl
Bekisting F = 0.02 M2
Lebar = 0.15 M1
t.rata2 = 4.00 M1
Tinggi Rata2 = 4.00 M1
Tinggi Rata2 = 4.00 M1
= 0.60 M2
V = Fxt
4 sisi Bekisting = 2.00 Lembar = 0.09 M3
Luas Bekisting = 1.20 M2 Jumlah Kolom = 19.00 Buah
Jumlah Kolom = 19.00 Buah V = 1.71 M3
Total Luas = 22.80 M 2

25% = 5.70 M2

VOL. BETON = 1.71 M3

Perhitungan
Tulangan inti
Jlm. Kolom = 19.00 Unit
Tinggi Besi = 4.50 M1
(Jlm x Tinggi Kolom) = 85.50 M1
Jlm. Besi = 4.00 bh
Panjang Besi = 342 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 304.000 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 507 bh
Panjang beugel = 0.45 M1
(Jlm Beugel x Pjg Beugel) = 228.000 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 90.074 Kg

VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm = 394.07 Kg


VOLUME BETON K 125 = 1.71 M3
VOLUME BESI = 394.07 Kg
VOLUME BEKISTING = 5.70 M2
BESI 12 10.6667 = 28.50 Btg
BESI 8 4.7407 = 19.00 Btg
KET

4
PEK. STRUKTUR

Kolom Praktis
15x15 CM
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3

2 BETON BERTULANG UNTUK KOLOM Perhitungan


p = 0.20 M1
l = 0.20 M1
= pxl
Bekisting F = 0.04 M2
Lebar = 0.20 M1 t.rata2 = 2.95 M1
Tinggi Rata2 = 2.95 M1 Tinggi Rata2 = 2.95 M1
= 0.59 M2 V = Fxt
4 sisi Bekisting = 2.00 Lembar = 0.12 M3
Luas Bekisting = 1.18 M 2
Jumlah Kolom = 6.00 Buah
Jumlah Kolom = 6.00 Buah V = 0.71 M3
Total Luas = 7.08 M2
5% = 0.35 M2

VOL. BETON = 0.71 M3

Perhitungan
Tulangan inti
Jlm. Kolom = 6.00 Unit
Tinggi Besi = 3.45 M1
(Jlm x Tinggi Kolom) = 20.70 M1
Jlm. Besi = 4.00 bh
Panjang Besi = 82.8 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 73.600 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 118 bh
Panjang beugel = 0.53 M1
(Jlm Beugel x Pjg Beugel) = 62.540 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 24.707 Kg

VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm = 98.31 Kg


VOLUME BETON K 125 = 0.71 M3
VOLUME BESI = 98.31 Kg
VOLUME BEKISTING = 0.35 M2
BESI 12 10.6667 = 6.90 Btg
BESI 8 4.7407 = 5.21 Btg
Jumlah Tiang Pilar Selasar = 6.00 Bh
Luas Cat Tiang Pilar Selasar = 15.36 M2
KET

Kolom Selasar
20x20 CM

Selasar
Selasar
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3

4 BETON BERTULANG UNTUK SLOOF Perhitungan


l = 0.15 M1
Bekisting t = 0.20 M1
Lebar = 0.25 M1
= lxt
Panjang = 44.68 M1 F = 0.03 M2
= 11.17 M2 P = 44.68 M1
2 sisi Bekisting = 2.00 bidang V = FxP
Luas Bekisting = 22.34 M2 = 1.34 M3
Jumlah Kolom = 1.00 Buah Jumlah = 1.00 Buah
Total Luas = 22.34 M2 V = 1.34 M3
25% = 5.59 M2

VOL. BETON = 1.34 M3


KET

SLOOF
15 / 20 Cm
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3

Perhitungan
Tulangan inti
Panjang Besi = 44.68 M1
Jlm. Besi = 4.00 bh
(Pjg Besi x Jlm Besi = 178.72 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 158.862 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 298 bh
Panjang beugel = 0.55 M1
(Jlm Beugel x Pjg Beugel) = 163.827 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 64.722 Kg

VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm = 223.58 Kg


VOLUME BETON K 125 = 1.34 M3
VOLUME BESI = 223.58 Kg
VOLUME BEKISTING = 5.59 M2
BESI 12 10.6667 = 14.89 Btg
BESI 8 4.7407 = 13.65 Btg

5 BETON BERTULANG UNTUK SLOOF Perhitungan


l = 0.15 M1
Bekisting t = 0.15 M1
Lebar = 0.15 M1
= lxt
Panjang = 19.93 M1 F = 0.02 M2
= 2.99 M2
P = 19.93 M1
2 sisi Bekisting = 2.00 bidang V = FxP
Luas Bekisting = 5.98 M2 = 0.45 M3
Jumlah Kolom = 1.00 Buah Jumlah = 1.00 Buah
Total Luas = 5.98 M2 V = 0.45 M3
25% = 1.49 M2

VOL. BETON = 0.45 M3


KET

SLOOF
15 / 15 Cm
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3

Perhitungan
Tulangan inti
Panjang Besi = 19.93 M1
Jlm. Besi = 4.00 bh
(Pjg Besi x Jlm Besi = 79.72 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 70.862 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 133 bh
Panjang beugel = 0.45 M1
(Jlm Beugel x Pjg Beugel) = 59.790 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 23.621 Kg

VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm = 94.48 Kg


VOLUME BETON K 125 = 0.45 M3
VOLUME BESI = 94.48 Kg
VOLUME BEKISTING = 1.49 M2
BESI 12 10.6667 = 6.64 Btg
BESI 8 4.7407 = 4.98 Btg

6 BETON BERTULANG UNTUK BALOK LATEI Perhitungan


l = 0.12 M1
Bekisting t = 0.15 M1
Lebar = 0.15 M1
= lxt
Panjang = 69.50 M1 F = 0.02 M2
= 10.42 M2
P = 69.50 M1
2 sisi Bekisting = 2.00 bidang V = FxP
Luas Bekisting = 20.85 M2 = 1.25 M3
Jumlah Kolom = 1.00 Buah Jumlah = 1.00 Buah
Total Luas = 20.85 M2 V = 1.25 M3
50% = 10.42 M2

VOL. BETON = 1.25 M3

Perhitungan
Tulangan inti
Panjang Besi = 69.50 M1
Jlm. Besi = 4.00 bh
(Pjg Besi x Jlm Besi = 278.00 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 247.111 Kg
KET

LATEI
12/15Cm
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 463 bh
Panjang beugel = 0.37 M1
(Jlm Beugel x Pjg Beugel) = 171.433 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 67.727 Kg

VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm = 314.84 Kg


VOLUME BETON K 125 = 1.25 M3
VOLUME BESI = 314.84 Kg
VOLUME BEKISTING = 10.42 M2
BESI 12 10.6667 = 23.17 Btg
BESI 8 4.7407 = 14.29 Btg

8 BETON BERTULANG UNTUK RING BALK Perhitungan


l = 0.15 M1
Bekisting t = 0.20 M1
Lebar = 0.20 M1 = lxt
Panjang = 69.50 M1 F = 0.03 M2
= 13.90 M2
P = 69.50 M1
2 sisi Bekisting = 2.00 bidang V = FxP
Luas Bekisting = 27.80 M2 = 2.09 M3
Jumlah Kolom = 1.00 Buah Jumlah = 1.00 Buah
Total Luas = 27.80 M2 V = 2.09 M3
25% = 6.95 M2

VOL. BETON = 2.09 M3

Perhitungan
Tulangan inti
Panjang Besi = 69.50 M1
Jlm. Besi = 4.00 bh
(Pjg Besi x Jlm Besi = 278.00 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 247.111 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 463 bh
Panjang beugel = 0.55 M1
(Jlm Beugel x Pjg Beugel) = 254.833 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 100.675 Kg

VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm = 347.79 Kg


VOLUME BETON K 125 = 2.09 M3
VOLUME BESI = 347.79 Kg
VOLUME BEKISTING = 6.95 M2
BESI 12 10.6667 = 23.17 Btg
BESI 8 4.7407 = 21.24 Btg
KET

RING BALK
15 / 20 Cm
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3

9 BETON BERTULANG UNTUK BALOK GEWEL Perhitungan


l = 0.15 M1
Bekisting t = 0.15 M1
Lebar = 0.15 M1
= lxt
Panjang = 9.30 M1 F = 0.02 M2
= 1.39 M2 P = 9.30 M1
2 sisi Bekisting = 2.00 bidang V = FxP
Luas Bekisting = 2.79 M2 = 0.21 M3
Jumlah Kolom = 1.00 Buah Jumlah = 1.00 Buah
Total Luas = 2.79 M2 V = 0.21 M3
25% = 0.70 M2

VOL. BETON = 0.21 M3

Perhitungan
Tulangan inti
Panjang Besi = 9.60 M1
Jlm. Besi = 4.00 bh
(Pjg Besi x Jlm Besi = 38.40 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 34.133 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 64 bh
Panjang beugel = 0.45 M1
(Jlm Beugel x Pjg Beugel) = 28.800 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 11.378 Kg

VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm = 45.51 Kg


VOLUME BETON K 125 = 0.21 M3
VOLUME BESI = 45.51 Kg
VOLUME BEKISTING = 0.70 M2
BESI 12 10.6667 = 3.20 Btg
BESI 8 4.7407 = 2.40 Btg

Beton Balok Teras Dan Balok Gantung Keliling Perhitungan


Bekisting l = 0.12 M1
Lebar = 0.12 M1 t = 0.15 M1
Panjang = 26.10 M1 = lxt
= 3.13 M2 F = 0.02 M2
2 sisi Bekisting = 2.00 bidang P = 26.10 M1
Luas Bekisting = 6.26 M2 V = FxP
Jumlah Kolom = 0.47 Buah = 0.47 M3
Total Luas = 2.94 M2 Jumlah = 1.00 Buah
50% = 1.47 M2 V = 0.47 M3

VOL. BETON = 0.47 M3

Perhitungan
Tulangan inti
KET

BALOK GEWEL
15 / 15 Cm

12 / 15 Cm
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3
Panjang Besi = 26.10 M1
Jlm. Besi = 4.00 bh
(Pjg Besi x Jlm Besi = 104.40 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 92.800 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 174 bh
Panjang beugel = 0.45 M1
(Jlm Beugel x Pjg Beugel) = 78.300 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 30.933 Kg
VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm = 123.73 Kg
VOLUME BETON K 125 = 0.47 M3
VOLUME BESI = 123.73 Kg
VOLUME BEKISTING = 2.94 M2
BESI 12 1,252.8000 = 92.80 Btg
BESI 8 939.6000 = 30.93 Btg

11 PLESTERAN LIST TIANG Perhitungan


l = 0.30 M1
t = 4.00 M1
= lxt
F = 1.20 M2
Jumlah = 19.00 Buah
V = 22.80 M2

Perhitungan
l = 0.40 M1
t = 2.95 M1
= lxt
F = 1.18 M2
Jumlah = 6.00 Buah
V = 7.08 M2

LUAS LIST TIANG = 29.88 M2

TOTAL BESI DIA 12 = 106.47 Btg


TOTAL BESI DIA 8 = 80.77 Btg

Catatan :
- Besi Dia 12mm Untuk Kolom,Sloof,Balok Latei,Ring Balk,Balok Teras dan Balok Gewel
- Besi Dia 8mm Untuk Kolom,Sloof,Balok Latei,Ring Balk dan Balok Gewel
KET

Tiang
15 / 15 Cm

Tiang
20 / 20 Cm
BACK UP VOLUME PEKERJAAN LANTAI

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

XIII LUAS BANGUNAN Perhitungan :


Luas bangunan induk = 112.50 m2
Luas teras = 30.00 m2

TOTAL LUAS BANGUNAN = 142.50 M2

XIV Panjang Keliling Tembok Perhitungan :


P.V = 25.50 M1 P.Dinding
P.H = 36.00 M1

T.P = 61.50 M1

Lubang Pintu, Jendela, Boven


P1 = 1.32 M1 Luas Lubang
P2 = 1.00 M1

P3 = 1.54 M1
J1 = 15.33 M1
J2 = 1.48 M1
B1 = 2.31 M1
T.P = 22.98 M1

TOTAL PANJANG TEMBOK KOTOR = 61.50 M¹


TOTAL PANJANG LUBANG = 22.98 M¹
TOTAL PANJANG TEMBOK BERSIH = 38.52 M¹
TOTAL PANJANG dinding = 38.52 M¹

1 PEK. LANTAI UK.60X60 CM Perhitungan

Luas Bangunan = 112.50 M1


Luas Selasar = 30.00 M1

VOL. KERAMIK 60 X 60 CM = 142.50 M2

2 PEK.Dinding Keramik uk. 40 x 40 cm Perhitungan


Panjang bangunan = 38.52 M1
Tinggi Tembok = 1.20 M1
pxt
Jlm = 2.00 Unit
Luas = 92.45 M2

TOTAL PAS. DINDING GERANID = 92.45 M2

3 PEKERJAAN LANTAI RABAT BETON


NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4
PERHITUNGAN :
Luas Bangunan = 142.50 M1 Bangunan
T = 0.05 M1 dan Selasar
F = LxT
= 7.13 M2
Jumlah = 1.00 Unit
V = FxJ
= 7.13 M3

VOLUME LANTAI RABAT = 7.13 M3


BACK UP VOLUME PEKERJAAN DINDING TEMBOK

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

XI Panjang Keliling Tembok Perhitungan :

P.V = 25.50 M1 Bangunan Induk


P.H = 36.00 M1 T.4 m'
T.P = 61.50 M1

TOTAL PANJANG TEMBOK T.365 CM = 61.50 M¹

XII Panjang Keliling Tembok Gewel P = 8.00 M1 Tembok Gewel


t = 2.58 M1 T. 2.58 M'
jumlah = 1.00 BH

PEK. DINDING TEMBOK

1 PAS. DINDING TEMBOK BATAKO Perhitungan

p = 61.50 M1 Bangunan
l = 3.55 M1 Induk
= pxl T.4 m'
Luas = 218.33 M2

(1/2 a) = 4.00 M1 Top Gewel


T = 2.58 M1 T.2.58 M'
= (1/2 a) x t
Luas = 10.32 M2
JUMLAH = 1.00 Unit
Luas = 10.32 M2

TOTAL LUAS TEMBOK KOTOR = 228.64 M2


NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

TYPE PINTU Luas Lubang


P1 = 1 Bh p = 2.06 M1 P1
P2 = 1 Bh l = 1.32 M 1

P3 = 2 Bh = pxl
F = 2.72 M2
JUMLAH 1.00 Unit
Luas = 2.72 M2

p = 2.06 M1 P2
l = 1.00 M1
= pxl
F = 2.06 M2
JUMLAH = 1.00 Unit
Luas = 2.06 M2

p = 2.06 M1 P3
l = 0.77 M1
= pxl
F = 1.59 M2
JUMLAH = 2.00 Unit
Luas = 3.17 M2

TYPE JENDELA p = 2.19 M1 J1


J1 = 7 Bh l = 0.97 M1
J2 = 1 Bh = pxl
F = 2.12 M2
JUMLAH = 7.00 Unit
Luas = 14.87 M2

p = 1.48 M1 J2
l = 0.97 M 1

= pxl
F = 1.44 M2
JUMLAH = 1.00 Unit
Luas = 1.44 M2

BOVEN PINTU p = 1.32 M1 BV P1


BV P1 = 1 Bh l = 0.47 M 1

= pxl
F = 0.62 M2
JUMLAH = 1.00 Unit
Luas = 0.62 M2

BOVEN JENDELA BV J1 = 7 Bh p = 2.19 M1 BV J1


BV J2 = 1 Bh l = 0.47 M1
= pxl
F = 1.03 M2
JUMLAH = 7.00 Unit
Luas = 7.21 M2
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4
p = 1.48 M1 BV J2
l = 0.47 M1
= pxl
F = 0.70 M2
JUMLAH = 1.00 Unit
Luas = 0.70 M2

BOVEN BV = 3 Bh p = 0.77 M1 BV
l = 0.47 M 1

= pxl
F = 0.36 M2
JUMLAH = 3.00 Unit
Luas = 1.09 M2

TOTAL LUAS
TEMBOK = 228.64
KOTOR
M2

TOTAL LUAS
TEMBOK = 197.30
BERSIH
M2

TOTAL LUAS
2 SISI TEMBOK = 394.60
PLESTERAN
M2

TOTAL LUAS
2 SISI TEMBOK = 394.60
ACIAN
M2
TOTAL LUAS
2 SISI TEMBOK = 394.60
CAT
M2
BACK UP VOLUME PEKERJAAN KUSEN DAN DAUN

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

PEK.KUSEN PINTU JENDELA DAN BUVEN

I KUSEN PINTU, JENDELA DAN BUVEN


TYPE PINTU
P1 = 1 Bh
P2 = 1 Bh
P3 = 2 Bh

TYPE JENDELA
J1 = 7 Bh
J2 = 1 Bh

TYPE BOVEN PINTU


BV P1 = 1 Bh

TYPE BOVEN JENDELA


BV J1 = 7 Bh
BV J2 = 1 Bh

TYPE BOVEN
BV = 3 Bh

II DAUN PINTU, JENDELA DAN BUVEN


TYPE PINTU
P1 = 1 Bh
P2 = 1 Bh
P3 = 2 Bh

TYPE JENDELA
J1 = 21 Bh
J2 = 2 Bh

TYPE BOVEN PINTU


BV P1 = 2 Bh

TYPE BOVEN JENDELA


BV J1 = 21 Bh
BV J2 = 2 Bh

TYPE BOVEN
BV = 3 Bh

1 PEK. KUSEN KAYU KLS II LOKAL (MERANTI) Perhitungan

Pintu
t = 4.12 M1 P1
l = 1.32 M1
Total Pjg = 5.44 M1
Jumlah Kusen = 1.00 Unit
Total Panjang Balok = 5.44 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
= Lbr x Tbl
= 0.01 M2
V = F x Jml. Panjang Batang
= 0.04 M3
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

2 PEK. KUSEN KAYU KLS II LOKAL (MERANTI) t = 4.12 M1 P2


l = 1.00 M1
Total Pjg = 5.12 M1
Jumlah Kusen = 1.00 Unit
Total Panjang Balok = 5.12 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
= Lbr x Tbl
= 0.01 M2
V = F x Jml. Panjang Batang
= 0.04 M3

2 PEK. KUSEN KAYU KLS II LOKAL (MERANTI) t = 8.24 M1 P3


l = 0.77 M1
Total Pjg = 9.01 M1
Jumlah Kusen = 2.00 Unit
Total Panjang Balok = 18.02 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
= Lbr x Tbl
= 0.01 M2
V = F x Jml. Panjang Batang
= 0.13 M3
VOL. KUSEN PINTU = 0.21 M3

3 PEK. KUSEN KAYU KLS II LOKAL (MERANTI) Jendela


t = 27.16 M1 J1
l = 30.66 M1
Total Pjg = 57.82 M1
Jumlah Kusen = 7.00 Unit
Total Panjang Balok = 404.74 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
= Lbr x Tbl
= 0.01 M2
V = F x Jml. Panjang Batang
= 2.91 M3

Jendela
t = 2.91 M1 J2
l = 2.96 M1
Total Pjg = 5.87 M1
Jumlah Kusen = 1.00 Unit
Total Panjang Balok = 5.87 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
= Lbr x Tbl
= 0.01 M2
V = F x Jml. Panjang Batang
= 0.04 M3

VOL. KUSEN JENDELA = 2.96 M3


3 PEK. KUSEN KAYU KLS II LOKAL (MERANTI) Buven Pintu 1 BV p1
t = 1.41 M1
l = 2.64 M1
Total Pjg = 4.05 M1
Jumlah Kusen = 1.00 Unit
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4
Total Panjang Balok = 4.05 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
= Lbr x Tbl
= 0.01 M2
V = F x Jml. Panjang Batang
= 0.03 M3

Buven jendela 1 BV j1
t = 13.16 M1
l = 30.66 M1
Total Pjg = 43.82 M1
Jumlah Kusen = 7.00 Unit
Total Panjang Balok = 306.74 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
= Lbr x Tbl
= 0.01 M2
V = F x Jml. Panjang Batang
= 2.21 M3

Buven jendela 2 BV j2
t = 1.41 M1
l = 2.96 M1
Total Pjg = 4.37 M1
Jumlah Kusen = 1.00 Unit
Total Panjang Balok = 4.37 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
= Lbr x Tbl
= 0.01 M2
V = F x Jml. Panjang Batang
= 0.03 M3

Buven BV
t = 2.82 M1
l = 4.62 M1
Total Pjg = 7.44 M1
Jumlah Kusen = 3.00 Unit
Total Panjang Balok = 22.32 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
= Lbr x Tbl
= 0.01 M2
V = F x Jml. Panjang Batang
= 0.16 M3

VOL. KUSEN BOVEN PINTU JENDELA = 2.43 M3

4 PEK. VOLUME DAUN PINTU Daun Pintu P1


p = 1.20 M1
l = 1.81 M1
Luas Pintu = 2.17
Jumlah unit = 1.00
V = 2.17

Daun Pintu P2
p = 0.80 M1
l = 1.81 M1
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4
Luas Pintu = 1.45
Jumlah unit = 1.00
V = 1.45

Daun Pintu P3
p = 2.00 M1
l = 0.65 M1
Luas Pintu = 1.30
Jumlah unit = 2.00
V = 2.60

TOTAL LUAS PINTU PANIL = 6.22 M2


TOTAL VOL. VERNIS PINTU PANIL = 12.44 M2

4 PEK. VOLUME JENDELA Daun Jendela J1


p = 0.77 M1
l = 0.37 M1
Luas Jendela = 0.17
Jumlah unit = 21.00
V = 3.59

Daun Jendela J2
p = 0.67 M1
l = 0.37 M1
Luas Jendela = 0.15
Jumlah unit = 2.00
V = 0.30

TOTAL LUAS JENDELA = 3.89 M2


TOTAL VOL. VERNIS JENDELA = 7.77 M2

4 PEK. VOLUME BOVEN BOVEN P1 BVP1


p = 0.57 M1
l = 0.37 M1
Luas Boven = 0.13
Jumlah unit = 2.00
V = 0.25

BOVEN J1 BVJ1
p = 0.65 M1
l = 0.37 M1
Luas Boven = 0.14
Jumlah unit = 21.00
V = 3.03

BOVEN J2 BVJ2
p = 0.65 M1
l = 0.37 M1
Luas Boven = 0.14
Jumlah unit = 2.00
V = 0.29

BOVEN BV
p = 0.77 M1
l = 0.37 M1
Luas Boven = 0.17
Jumlah unit = 3.00
V = 0.51

TOTAL LUAS BOVEN PINTU JENDELA = 4.08 M2


TOTAL VOL. VERNIS PINTU JENDELA = 8.17 M2
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4
NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4
1 Kusen Pintu Kayu Kls II (Type P1 ) + Pemasangan = 1.00 Unit
2 Kusen Pintu Kayu Kls II (Type P2 ) + Pemasangan = 1.00 Unit
3 Kusen Pintu Kayu Kls II (Type P3 ) + Pemasangan = 2.00 Unit
4 Kusen Jendela Kayu Kls II (Type J1) + Pemasangan = 7.00 Unit
5 Kusen Jendela Kayu Kls II (Type J2) + Pemasangan = 1.00 Unit
7 Kusen Buven Kayu Kls II (Type BV) + Pemasangan = 3.00 Unit
8 Daun Pintu Panil Kayu Kls II (Type P1 uk. 2.17 x 1) + Pemasangan = 1.00 Unit
9 Daun Pintu Panil Kayu Kls II (Type P2 uk. 1.45 x 3) + Pemasangan = 1.00 Unit
10 Daun Pintu Panil Kayu Kls II (Type P3 uk. 1.30 x 1) + Pemasangan = 2.00 Unit
11 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J1 Uk. 0.37 X 0.77 ) + Pemasangan = 21.00 Unit
12 Daun Jendela Kayu Kls II + Kaca 5mm Polos (Type J2 Uk. 0.67 X 0.37) + Pemasangan = 2.00 Unit
13 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVP1 Uk. 0.57 x 0.37) + Pemasangan = 2.00 Unit
14 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ1 Uk. 0.65 x 0.37) + Pemasangan = 21.00 Unit
15 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BVJ2 Uk. 0.65 x 0.37) + Pemasangan = 2.00 Unit
16 Daun Buven Kayu Kls II + Kaca 5 mm Polos (Type BV Uk. 0.77 x 0.37) + Pemasangan = 3.00 Unit

4 PEK. PENGUNCI DAN PENGANTUNG

1 Pek. Kunci pintu uk. Besar 2 x putar mutu baik = 4.00 Bh


2 Pek. Engsel pintu (1 pintu 3 buah engsel) = 15.00 Bh
3 Pek. Engsel Jendela + Boven = 98.00 Bh
4 Pek. Grendel Pintu Panjang = 2.00 Bh
5 Pek. Grendel Jendela + Boven = 52.00 Bh
6 Pek. Pasang Kait angin Jendela + Boven = 98.00 Bh
BACK UP VOLUME PEKERJAAN ATAP, PLAFOND & FINISING

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN

1 2 3
PEK. KUDA" DAN PENUTUP ATAP

1 PEK. KUDA" UK.6 / 12 CM Perhitungan Panjang Batang

Kaki Kuda" 1 = 7.95 M1


Kaki Kuda" 2 = 6.17 M1
Balok Tarik = 8.3 M1
Balok Apit = 2.92 M1
Balok penopang x 2 = 3.92 M1
Balok Siku x 2 = 8.2 M1
Balok Tiang x 2 = 3.48 M1
Balok Tiang Apit = 3.6 M1
Tiang Nok = 2.56 M1
Balok Pengunci = 2.1 M1
Total Panjang Balok = 49.20 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
F = Lbr x Tbl
= 0.01 M2
= Panjang Batang * Luas Kayu
= 0.354 M3
Jumlah = 4.00 Unit
V = 1.42 M3

TOTAL VOL. KUDA" KAYU KLS II LOKAL UK. 6/12 CM = 1.42 M3


Beugel U Plat = 16.00 Bh
Plat Strip P.30 cm = 24.00 Bh
Baut ø 16 (P. 40 cm) = 8.00 Bh
Baut ø 12 (P. 12 cm) = 96.00 Bh
Baut ø 12 (P. 30 cm) = 48.00 Bh

Perhitungan Panjang Batang

Kaki Kuda" 1 = 7.95 M1


Kaki Kuda" 2 = 6.17 M1
Balok Tarik = 8.3 M1
Balok Apit = 2.92 M1
Balok penopang x 2 = 3.92 M1
Balok Siku x 2 = 0 M1
Balok Tiang x 2 = 3.48 M1
Balok Tiang Apit = 3.6 M1
Tiang Nok = 2.56 M1
Balok Pengunci = 2.1 M1
Total Panjang Balok = 41.00 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
F = Lbr x Tbl
= 0.01 M2
= Panjang Batang * Luas Kayu
E PEKERJAAN ATAP, PLAFOND & FINISING

KET

4
EK. KUDA" DAN PENUTUP ATAP

K1
sambungan
dari
UKS
K2
K3
K4

Panjang Batang * Luas Kayu

K5

Panjang Batang * Luas Kayu


= 0.295 M3
Jumlah = 1.00 Unit
V = 0.30 M3

TOTAL VOL. KUDA" KAYU KLS II LOKAL UK. 6/12 CM = 0.30 M3


Beugel U Plat = 4.00 Bh
Plat Strip P.30 cm = 6.00 Bh
Baut ø 16 (P. 40 cm) = 2.00 Bh
Baut ø 12 (P. 12 cm) = 24.00 Bh
Baut ø 12 (P. 30 cm) = 12.00 Bh

Perhitungan Panjang Batang

Kaki Kuda" 1 = 7.95 M1


Kaki Kuda" 2 = 6.17 M1
Balok Tarik = 0 M1
Balok Apit = 0 M1
Balok penopang x 2 = 0 M1
Balok Siku x 2 = 0 M1
Balok Tiang x 2 = 0 M1
Balok Tiang Apit = 0 M1
Tiang Nok = 0 M1
Balok Pengunci = 0 M1
Total Panjang Balok = 14.12 M1
Ukuran Kayu
Lbr = 0.12 M1
Tbl = 0.06 M1
F = Lbr x Tbl
= 0.01 M2
= Panjang Batang * Luas Kayu
= 0.102 M3
Jumlah = 1.00 Unit
V = 0.10 M3

TOTAL VOL. KUDA" KAYU KLS II LOKAL UK. 6/12 CM = 0.10 M3


Beugel U Plat = - Bh
Plat Strip P.30 cm = - Bh
Baut ø 16 (P. 40 cm) = 2.00 Bh
Baut ø 12 (P. 12 cm) = - Bh
Baut ø 12 (P. 30 cm) = - Bh
K6
TEMBOK
GUNUNG

Panjang Batang * Luas Kayu


2 PEK. GORDING KAYU KLS II UK. 6/8CM Perhitungan
Gording
Pjg Rata2 = 16.35 M1
Jumlah Batang = 21.00 Unit
V = 343.35 M1

TOTAL PANJANG KAYU KLS II UK. 6/8 CM GORDING = 343.35 M'


UKURAN KAYU 6/8 CM
LBR = 0.06 M'
TBL = 0.08 M'
= 0.005 M2
Panjang x Luas Kayu = 1.65 M3

TOTAL VOL.GORDING KLS II UK. 6/8 CM VOL. = 1.65 M3

3 PENUTUP ATAP DENGAN Perhitungan


Seng Galvalum t = 16.35 M1
p rata2 = 7.95 M1
F = txp
= 129.98 M2
JML = 1.00 Unit
F = 129.98 M2

t = 16.35 M1
p rata2 = 6.17 M1
F = txp
= 100.88 M2
JML = 1.00 Unit
F = 100.88 M2

TOTAL LUAS PENUTUP ATAP = 230.86 M2

4 PEK. SENG BUBUNGAN Perhitungan


Panjang 1 = 16.35 M1

Total Panjang Bubungan = 16.35 M1

5 PEK. WOOD PLANK 1/30 cm Perhitungan


Depan + Belakang = 32.70 M1
Samping = 14.12 M1

Total Panjang Wood Plank = 46.82 M1


PEK. RANGKA PLAFOND & PENUTUP PLAFOND

6 PEK.PLAFOND Perhitungan
Luas Total = 96.00 M2
Luas Total = 12.00 M2
Luas Total = 2.25 M2
Luas Total = 2.25 M2
Luas Total = 7.50 M2
Luas Total = 30.00 M2
Luas Total = 14.12 M2
Luas Total = 65.40 M2

LUAS. PENUTUP PLAFOND = 229.52 M2


Type 1.a

Type 1.a
depan

Type 1.a
Belakang

ANGKA PLAFOND & PENUTUP PLAFOND

Rg. Tata Usaha


Rg. Kepala Tata Usaha
Rg. WC 1
Rg. WC 2
Rg. Pantry
Teras depan
tritisan Kanan
tritisan depan + belakang
7 LIST PLAFOND PROFIL KAYU Perhitungan

P.V = 15.70 M1
P.H = 23.70 M1
T.P = 39.40 M1

P.V = 7.70 M1
P.H = 5.70 M1
T.P = 13.40 M1

P.V = 2.70 M1
P.H = 2.70 M1
T.P = 5.40 M1

P.V = 2.70 M1
P.H = 2.70 M1
T.P = 5.40 M1

P.V = 4.70 M1
P.H = 5.70 M1
T.P = 10.40 M1

P.V = 15.00 M1
P.H = 2.00 M1
T.P = 17.00 M1
JML = 1.00 Unit
F = 17.00 M1

P.V = 14.12 M1
P.H = 1.00 M1
T.P = 15.12 M1
JML = 1.00 Unit
F = 15.12 M1

P.V = 32.60 M1
P.H = 2.00 M1
T.P = 34.60 M1
JML = 2.00 Unit
F = 69.20 M1

PANJANG LIST PLAFOND GYPSUM 10 CM = 176.52 M'


AGENDA PEK. INSTALASI LISTRIK

8 PEK. INSTALASI LISTRIK


1 Meteran = 1.00 Unit
2 Box MCB = 1.00 Unit
1 Panel SDP = 1.00 Unit
2 Pipa Conduit = 12.33 Btg
3 Tee Dos = 15.00 Bh
4 Klem Pipa = 3.00 Dos
5 Fhiser = 2.00 dos
6 Sealtape Listrik = 3.00 Bh
7 Kabel NYY 4 x 2,5 mm = 25.00 m'
8 Kabel NYY 3 x 2,5 mm = 150.00 m'
Rg. Tata Usaha

Rg. Kepala Tata Usaha

Rg. WC 1

Rg. WC 2

Rg. Pantry

Teras depan

Teritisan kanan

Teritisan depan + balakang

ENDA PEK. INSTALASI LISTRIK


9 Kabel NYM 2,5 mm = 200.00 m'
10 Downlights Inbow 5 Inch DL 500 Lampu 23 Watt = 8.00 Bh
11 Downlights Inbow 5 Inch DL 500 Lampu 15 Watt = 2.00 Bh
12 Saklar Tunggal setara broco = 5.00 Bh
13 Saklar ganda setara broco = 1.00 Bh
14 Stop kontak setara broco = 8.00 Bh
15 Arde (1 Fase) = 2.00 Fase
16 Penangkal Petir = 3.00 Unit
PEK.PENGECATAN / FINISING

9 PEK. PENGECATAN/ FINISING

1 Pek. Cat Pondasi Dengan Cat Tembok = 56.92 M²


2 Pek. Cat Dinding Tembok Dengan Cat Tembok = 394.60 M²
3 Pek. Cat Penutup Plafond + List Gypsum Dengan Cat Tembok = 229.52 M²
4 Pek. Cat Tiang Pilar Dengan Cat Tembok = 15.36 M²
5 Pek. Cat Kusen Dengan Cat Mengkilat = 12.44 M²
7 Pek. Vernis/Milamin Daun Pintu,Jendela dan Buven = 28.38 M²
8 Pek. Menie Seng = 230.86 M²
9 Pengadaan & Pemasangan Wastafel Portabel Pedal/Injak (60 Ltr) = 2.00 Unit
10 Pemasangan Pipa Gip dia 1/2" = 20.00 m'
11 Pemasangan Kran Gip dia 1/2" = 2.00 Bh
PEK.PENGECATAN / FINISING
BACK UP VOLUME PEKERJAAN SALURAN

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

XV Panjang Keliling Saluran + Rabat Perhitungan :

P.V = 11.00 M1 P. Saluran


P.H = 31.00 M 1

T.P = 42.00 M1

P.V = 11.00 M1 P. Rabat


P.H = 16.00 M1
T.P = 27.00 M1

TOTAL PANJANG SALURAN = 42.00 M¹


TOTAL PANJANG RABAT = 27.00 M¹
PEK. SALURAN AIR HUJAN

1 PEK. GALIAN TANAH

PERHITUNGAN :
P = 42.00 M1 Galian Saluran
L = 0.70 M1
T = 0.30 M1
F = PxLxT
= 8.82 M3
Jumlah = 1.00 Unit
V = FxJ
= 8.82 M3

VOL. GALIAN = 8.82 M3

2 PEK. PASANGAN SALURAN


BATU BATAKO
Perhitungan :
P = 42.00 M1
L = 0.15 M1
Luas = PxL
= 6.30 M2
Jumlah = 2.00 sisi
V = 12.60 M2

VOL. PASANGAN = 12.60 M2


NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

3 PEK. PLESTERAN SALURAN

Perhitungan :
P = 42.00 M1
L = 0.65 M1
Luas = PxL
= 27.30 M2
Jumlah = 2.00 sisi
V = 54.60 M2

VOL. PLESTERAN = 54.60 M2


VOL. ACIAN = 54.60 M2

4 PEK. LANTAI SALURAN

Perhitungan :
L = 0.40 M1
t = 0.05 M1
Luas = lxh
= 0.02 M2
P = 42.00 M1
Jumlah = 1.00 sisi
V = 0.84 M3

VOL. LANTAI RABAT SALURAN = 0.84 M3

5 PEK. LANTAI RABAT KELILING

Perhitungan :
Vol. Rabat
L = 1.00 M1
t = 0.05 M1
Luas = lxh
= 0.05 M2
P = 27.00 M1
Jumlah = 1.00 sisi
V = 1.35 M3

VOL. LANTAI RABAT SALURAN = 1.35 M3


NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

3 PEK. PLESTERAN SALURAN

Perhitungan :
P = 42.00 M1
L = 0.40 M1
Luas = PxL
= 16.80 M2
Jumlah = 1.00 sisi
V = 16.80 M2

VOL. PLESTERAN = 16.80 M2


VOL. ACIAN = 16.80 M2
BACK UP VOLUME PEKERJAAN 4 RUANG KELAS TYPE I

PROGRAM : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TA : #REF!

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4
I LUAS BANGUNAN 8 RUANG KELAS Perhitungan :
p = 7.00 M1 Rg.Kls 1
l = 9.00 M1

L = pxl
63.00 M2

p = 7.00 M1 Rg.Kls 2
l = 9.00 M1

L = pxl
63.00 M2

p = 7.00 M1 Rg.Kls 3
l = 9.00 M1

L = pxl
63.00 M2

p = 7.00 M1 Rg.Kls 4
l = 9.00 M1
L = pxl
63.00 M2

TOTAL LUAS BANGUNAN = 252.00 M2


II LUAS TERAS
p = 9.00 M1 TERAS DEPAN
l = 2.00 M1 A
L = pxl
18.00 M2

p = 9.00 M1 TERAS DEPAN


l = 2.00 M1 B
L = pxl
18.00 M2

p = 9.00 M1 TERAS DEPAN


l = 2.00 M1 C
L = pxl
18.00 M2

p = 9.00 M1 TERAS DEPAN


l = 2.00 M1 D
L = pxl
18.00 M2

TOTAL LUAS SELASAR = 72.00 M2


SUB TOTAL LUAS BANGUNAN + SELASAR = 324.00 M2
III Panjang Keliling Bangunan Perhitungan :
P.V = 35.00 M1 8 Ruang Kls
P.H = 72.00 M1
T.P = 107.00 M1

P.V = 8.00 M1 Selasar


P.H = 36.00 M1

T.P = 44.00 M1

TOTAL PANJANG BANGUNAN = 151.00 M¹


BACK UP VOLUME PEKERJAAN 4 RUANG KELAS TYPE I

PROGRAM : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TA : #REF!

NO SKET / GAMBAR DIMENSI DAN PERHITUNGAN KET

1 2 3 4

IV Panjang Keliling Pondasi Menerus Perhitungan :


Bangunan
P1 = 43.00 M1 A
Selasar
P1 = 38.00 M1 B

Panjang Pondasi Bangunan = 43.00 M1


Panjang Pondasi Selasar = 38.00 M1

3 PEK. PLESTERAN DAN ACIAN PONDASI PERHITUNGAN :


P = 81.00 M1
T rata2 = 0.60 M1
Luas = Pxt
= 48.60 M2

Jumlah = 1.00 Unit


V = 48.60 M2

VOLUME PLESTERAN PONDASI = 48.60 M2


VOLUME ACIAN PONDASI = 48.60 M2
PEK.LANTAI

XIII LUAS BANGUNAN Perhitungan :


Luas bangunan induk = 252.00 m2
Luas teras = 72.00 m2

TOTAL LUAS BANGUNAN = 324.00 M2

XIV Panjang Keliling Tembok Perhitungan :

P.V = 43.00 M1 P.bangunan dan


P.H = 44.00 M1 Selasar
T.P = 87.00 M1

P.V = 56.00 M1 P.Plin Lantai


P.H = 72.00 M1
T.P = 128.00 M1

Lubang Pintu
P1 = 4.40 M1 Luas Lubang
PH = M1
T.P = 4.40 M1

TOTAL PANJANG TEMBOK KOTOR = 87.00 M¹


TOTAL PANJANG LUBANG = 4.40 M¹
TOTAL PANJANG TEMBOK BERSIH = 82.60 M¹
TOTAL PANJANG PLIN LANTAI = 123.60 M¹

1 PEK. LANTAI GERANID UK.60X60 CM Perhitungan


PEK. LANTAI KERAMIK UK.60X60 CM
Luas Bangunan = 252.00 M1 Rg. Kelas
Luas Bangunan = 72.00 M1 Rg. Kelas
VOL. GERANID UK.60 X 60 CM = 252.00 M2
VOL. KERAMIK UK.60 X 60 CM = 72.00 M2

2 PEK.KERAMIK PLIN uk. 10 x 60 cm Perhitungan

Panjang bangunan = 123.60 M1

TOTAL PAS. KERAMIK PLINT = 123.60 M'


PEK.DAUN PINTU
I KUSEN PINTU, JENDELA DAN BUVEN
TYPE PINTU
DP = 4 Bh
DBP = 4 Bh
DJ = 60 Bh
DBJ = 60 Bh

2 LUAS DAUN PINTU PANIL Perhitungan


p = 2.00 M1 TYPE DP
l = 1.02 M1
= pxl
F = 2.04 M2
JUMLAH = 4.00 Unit
Luas = 8.16 M2

TOTAL LUAS PINTU PANIL = 8.16 M2


TOTAL VOL. VERNIS PINTU PANIL = 8.16 M2
TOTAL VOL. CAT PINTU HARMONIKA = 16.32 M2

3 LUAS CAT KUSEN PINTU,JENDELA Perhitungan


DAUN JENDELA + BUVEN PINTU
t = 5 M1 Kusen Pintu
l = 2.1 M1
Total Pjg = 7.1 M1
Jumlah Kusen = 4.00 Unit
Total Panjang Balok = 28.40 M1
Ukuran Kayu

JENDELA
t = 6.8 M1 Kusen Jendela
l = 6.75 M1
Total Pjg = 13.55 M1
Jumlah Kusen = 20.00 Unit
Total Panjang Balok = 271.00 M1
Ukuran Kayu

p = 1.90 M1 TYPE DBP


l = 0.80 M1
F = 2.70 M1
JUMLAH = 4.00 Unit
Luas = 10.80 M2

p = 2.26 M1 TYPE J
l = 1.40 M1
F = 3.66 M1
JUMLAH = 60.00 Unit
Luas = 219.60 M2

p = 0.66 M1 TYPE DBJ


l = 1.40 M1
F = 2.06 M1
JUMLAH = 60.00 Unit
Luas = 123.60 M2
TOTAL LUAS CAT DAUN JENDELA DAN BUVEN 0.14 = 48.05 M2
TOTAL LUAS CAT DAUN JENDELA DAN BUVEN 0.21 = 62.87 M2
SUB TOTAL LUAS CAT KUSEN DAUN JENDELA DAN BUVEN 0.21 = 110.92 M2
TOTAL LUAS VERNIS DAUN PINTU = 10.80 M2
1 Daun Pintu Panil Kayu Kls II (Type DPP uk. 1.02 x 2) + Pemasangan = 4.00 Bh

4 PEK. PENGUNCI DAN PENGANTUNG

1 Pek. Kunci pintu uk. Besar 2 x putar mutu baik = 4.00 Bh


2 Pek. Engsel pintu (1 pintu 3 buah engsel) = 12.00 Bh
3 Pek. Engsel Jendela = 120.00 Bh
4 Pek. Spring Knip = 60.00 Bh
5 Pek. Pasang Kait angin = 120.00 Bh

PEK. GORDING DAN PENUTUP ATAP


2 PEK. GORDING KAYU KLS II UK. 6/8CM Perhitungan
Gording Type 1.a
Pjg Rata2 = 37.65 M1
Jumlah Batang = 17.00 Unit
V = 640.05 M1

TOTAL PANJANG KAYU KLS II UK. 6/8 CM GORDING = 640.05 M'


UURAN KAYU 6/8 CM
LBR = 0.06 M'
TBL = 0.08 M'
= 0.005 M2
Panjang x Luas Kayu = 3.07 M3

TOTAL VOL.GORDING KLS II UK. 6/8 CM VOL. = 3.07 M3


TOTAL VOL.GORDING KLS II UK. 6/8 CM 30% = 0.92 M3

3 PENUTUP ATAP DENGAN Perhitungan


Seng Gelombang BJLS 0.30 mm t = 37.85 M1 Type 1.a
p rata2 = 5.90 M1 depan
F = txp
= 223.32 M2
JML = 1.00 Unit
F = 223.32 M2

t = 37.85 M1 Type 1.a


p rata2 = 5.90 M1 Belakang
F = txp
= 223.32 M2
JML = 1.00 Unit
F = 223.32 M2

TOTAL LUAS PENUTUP ATAP = 446.63 M2

4 PEK. SENG BUBUNGAN Perhitungan


Panjang 1 = 37.85 M1

Total Panjang Bubungan = 37.85 M1

5 PEK. WOOD PLANK 1/30 cm Perhitungan


Depan + Belakang = 75.70 M1
Samping = 23.60 M1

Total Panjang Wood Plank = 99.30 M1


PEK. PENUTUP PLAFOND

6 PEK.PLAFOND Perhitungan
Luas Total = 252.00 M2 Bangunan
Luas Total = 72.00 M2 Selasar
Luas Total = 30.28 M2 Jurai Depan
Luas Total = 30.28 M2 Jurai Belakang
Luas Total = 18.88 M2 Jurai Samping
LUAS. PENUTUP PLAFOND = 403.44 M2

7 LIST PLAFOND GYPSUM 10 CM Perhitungan

P.V = 56.00 M1 Bangunan


P.H = 72.00 M1
T.P = 128.00 M1

P.V = 4.00 M1 Selasar


P.H = 72.00 M1
T.P = 76.00 M1

P.V = 0.60 M1 Tiang Selasar


P.H = 0.40 M1
T.P = 1.00 M1
JML = 13.00 Unit
F = 13.00 M1

P.V = 5.90 M1 Jurai


P.H = 5.90 M1 Samping
T.P = 11.80 M1
JML = 4.00 Unit
F = 47.20 M1

PANJANG LIST PLAFOND GYPSUM 10 CM = 264.20 M'


PEK. DINDING TEMBOK

1 PAS. CAT DINDING TEMBOK Perhitungan

p = 107.00 M1 Bangunan
l = 3.30 M1 Induk
= pxl T.3,5m'
Luas = 353.10 M2

(1/2 a) = 4.50 M1 Top Gewel


T = 2.00 M1 T.2 M'
= (1/2 a) x t
Luas = 9.00 M2
JUMLAH = 2.00 Unit
Luas = 18.00 M2

TOTAL LUAS TEMBOK KOTOR = 371.10 M2

TYPE PINTU Luas Lubang


P1 = 4 Bh p = 2.50 M1 PINTU
l = 1.10 M1
TYPE JENDELA = pxl
J = 20 Bh F = 2.75 M2
JUMLAH = 4.00 Unit
Luas = 11.00 M2

p = 2.25 M1 JENDELA
l = 1.70 M1
= pxl
F = 3.82 M2
JUMLAH = 20.00 Unit
Luas = 76.50 M2

TOTAL LUAS TEMBOK KOTOR = 371.10 M2


TOTAL LUAS TEMBOK BERSIH = 283.60 M2
TOTAL LUAS CAT 2 SISI TEMBOK = 567.20 M2
PEK. INSTALASI LISTRIK
8 PEK. INSTALASI LISTRIK

1 Pek. Instalasi Listrik dari MCB ke Titik Lampu, Stop Kontak,Saklar + Gambar = 64.00 Titik
2 Pipa Conduit = 50.00 Btg
3 Tee Dos = 20.00 Bh
4 Klem Pipa = 2.00 Bh
5 Sealtape Listrik = 2.00 Bh
6 MCB 10 A + Box 1 Group = 5.00 Bh
7 Kabel NYY 3 x 2,5 mm = 50.00 m'
8 Kabel NYM 2,5 mm = 450.00 m'
9 Downlights Inbow 5 Inch DL 500 Lampu 14 Watt = 36.00 Bh
10 Downlights Inbow 5 Inch DL 500 Lampu 8 Watt = 13.00 Bh
11 Saklar ganda setara broco (Tempel) = 8.00 Bh
12 Stop kontak setara broco (Tempel) = 8.00 Bh
13 Handel = 2.00 Bh

PEK.PENGECATAN / FINISING

9 PEK. PENGECATAN/ FINISING

1 Pek. Cat Pondasi Dengan Cat Tembok = 48.60 M²


2 Pek. Cat Dinding Tembok Dengan Cat Tembok = 567.20 M²
3 Pek. Cat Penutup Plafond + List Gypsum Dengan Cat Tembok = 403.44 M²
4 Pek. Cat Tiang Selasar Dengan Cat Tembok = Err:509 M²
5 Pek. Cat Kusen, Daun Jendela dan daun buven Dengan Cat Mengkilat = 110.92 M²
7 Pek. Vernis/Milamin Daun Pintu = 10.80 M²
8 Pek. Menie Seng = 446.63 M²

PEK. SALURAN AIR HUJAN + RABAT KELILING

XV Panjang Keliling Saluran + Rabat Perhitungan :

P.V = 38.00 M1 P. Saluran


P.H = 38.00 M1
T.P = 76.00 M1

P.V = 38.00 M1 P. Rabar


P.H = 38.00 M1
T.P = 76.00 M1

TOTAL PANJANG SALURAN = 76.00 M¹


TOTAL PANJANG RABAT = 76.00 M¹
PEK. SALURAN AIR HUJAN

1 PEK. GALIAN TANAH

PERHITUNGAN :
P = 76.00 M1 Galian Saluran
L = 0.66 M1
T = 0.20 M1
F = PxLxT
= 10.03 M3
Jumlah = 1.00
V = FxJ
= 10.03 M3

VOL. GALIAN = 10.03 M3

2 PEK. PASANGAN SALURAN


BATU BATAKO
Perhitungan :
P = 76.00 M1
L = 0.45 M1
Luas = PxL
= 34.20 M2
Jumlah = 1.00 sisi
V = 35.20 M2

VOL. PASANGAN = 34.20 M2


3 PEK. PLESTERAN SALURAN

Perhitungan :
P = 76.00 M1
L = 0.65 M1
Luas = PxL
= 49.40 M2
Jumlah = 2.00 sisi
V = 51.40 M2

VOL. PLESTERAN = 51.40 M2


VOL. ACIAN = 51.40 M2

4 PEK. LANTAI SALURAN

Perhitungan :
L = 0.40 M1
t = 0.05 M1
Luas = lxh
= 0.02 M2
P = 76.00 M1
Jumlah = 1.00 sisi
V = 1.52 M3

VOL. LANTAI RABAT SALURAN = 1.52 M3

5 PEK. LANTAI RABAT KELILING

Perhitungan :
Vol. Rabat
L = 0.80 M1
t = 0.05 M1
Luas = lxh
= 0.04 M2
P = 76.00 M1
Jumlah = 1.00 sisi
V = 3.04 M3

VOL. LANTAI RABAT SALURAN = 3.04 M3


BACK UP VOLUME PEKERJAAN SANI
NO SKET / GAMBAR DIMENSI DAN P

1 2 3
PEK. SANITASI SEPTICTANK
5 SEPTICTANK DAN RESAPAN
1 Pek.Galian Tanah

2 Pek.Urugan Pasir

3 Pek.Urugan Kerikil

4 Pek.Urugan Ijuk
6 Pek.Pasangan Batako camp.1 pc : 5 Psr

7 Pek.Plesteran camp.1 pc : 5 Psr

8 Pek.Batu Kosong

3 Pek.Lantai Rabat capm 1 pc : 3 Psr : 5 Krl

PEK. STRUKTUR
4 BETON BERTULANG UNTUK KOLOM

Bekisting
Lebar = 0.11 M1
Tinggi Rata2 = 2.50 M1
= 0.28 M2
4 sisi Bekisting = 2.00 Lembar
Luas Bekisting = 0.55 M2
Jumlah Kolom = 6.00 Buah
Total Luas = 3.30 M2
25% = 0.83 M2

VOL. BETON
VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm
VOLUME BETON K 125
VOLUME BESI
VOLUME BEKISTING
BESI 12 10.6667
BESI 8 4.7407

5 BETON BERTULANG UNTUK SLOOF

Bekisting
Lebar = 0.15 M1
Panjang = 15.80 M1
= 2.37 M2
2 sisi Bekisting = 2.00 bidang
Luas Bekisting = 4.74 M2
Jumlah Kolom = 1.00 Buah
Total Luas = 4.74 M2
25% = 1.19 M2

VOL. BETON

VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm


VOLUME BETON K 125
VOLUME BESI
VOLUME BEKISTING
BESI 12 10.6667
BESI 8 4.7407

6 BETON BERTULANG UNTUK BALOK

Bekisting
Lebar = 0.15 M1
Panjang = 14.30 M1
= 2.15 M2
2 sisi Bekisting = 2.00 bidang
Luas Bekisting = 4.29 M2
Jumlah Kolom = 1.00 Buah
Total Luas = 4.29 M2
25% = 1.07 M2

VOL. BETON

VOL. Kg BESI BETON Ø 12 mm + Ø 8 mm


VOLUME BETON K 125
VOLUME BESI
VOLUME BEKISTING
BESI 12 10.6667
BESI 8 4.7407
7 BETON BERTULANG UNTUK PLAT BETON
CAMP 1PC : 2 PSR : 3 KRL

Bekisting
Panjang = 4.30 M1
Lebar = 1.65 M1
Luas Bekisting = 7.10 M2
Jumlah = 1.00 Unit
Total Luas = 7.10 M2
100% = 7.10 M2

VOL. BETON

`
VOLUME BETON K 125
VOLUME BESI
VOLUME BEKISTING
BESI 12 10.6667

8 Pek. Sanitasi
1 Kloset Jongkok
2 Wastafel Keramik
3 Pipa PVC AW dia 4" + assesories
4 Pipa PVC AW dia 2" assesories
5 Pipa Hawa Gip dia 2" assesories
6 Floor Drain Stenlis
UME PEKERJAAN SANITASI
DIMENSI DAN PERHITUNGAN KET

3 4
SANITASI SEPTICTANK

Perhitungan
P = 3.15 M1 Galian Resapan
L = 1.50 M1
T = 2.50 M1
F = PxLxT
= 11.81 M3
JML = 1.00 Unit
F = 11.81 M3

P = 1.15 M1 Galian Septictank


L = 1.65 M1
T = 1.50 M1
F = PxLxT
= 2.85 M3
JML = 1.00 Unit
F = 2.85 M3

Total Volume = 14.66 M3

Perhitungan Resapan
P = 2.20 M1

L = 1.30 M1
T = 0.50 M1
F = PxLxT
= 1.43 M3
Perhitungan
P = 2.20 M1 Resapan
L = 1.30 M1
T = 0.30 M1
F = PxLxT
= 0.86 M3

Perhitungan
P = 2.20 M1 Resapan
L = 1.30 M1
T = 0.10 M1
F = PxLxT
= 0.2860 M3

Luas Dinding
p = 2.70 M1 Septictank
h = 1.20 M1
F = pxh
= 3.24 M2

Luas Dinding Peresapan


p = 9.45 M1

h = 1.20 M1
F = pxh
= 11.34 M2
Total = 14.58 M2

Luas Dinding
p = 3.85 M1 Septictank
h = 1.35 M1
F = pxh
= 5.20 M2

Perhitungan Septictank
P = 1.20 M1

L = 1.65 M1
T = 0.10 M1
F = PxLxT
= 0.20 M3

Perhitungan Septictank
p = 1.35 M 1

h = 1.00 M1
F = pxh
= 1.35 M2
t = 0.05 M1
v = 0.07 M3

PEK. STRUKTUR
Perhitungan
p = 0.11 M1 Kolom Praktis
l = 0.11 M1 15x15 CM
= pxl
F = 0.01 M2
t.rata2 = 2.50 M1
Tinggi Rata2 = 2.50 M1
V = Fxt
= 0.03 M3
Jumlah Kolom = 6.00 Buah
V = 0.18 M3

p = 0.15 M1
l = 0.15 M1
= pxl
F = 0.02 M2
t.rata2 = 1.50 M1
Tinggi Rata2 = 1.50 M1
V = Fxt
= 0.03 M3
Jumlah Kolom = 2.00 Buah
V = 0.07 M3

= 0.25 M3

Perhitungan
Tulangan inti
Jlm. Kolom = 8.00 Unit
Tinggi Besi = 4.50 M1
(Jlm x Tinggi Kolom) = 36.00 M1
Jlm. Besi = 4.00 bh
Panjang Besi = 144 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 128.000 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 133 bh
Panjang beugel = 0.45 M1
(Jlm Beugel x Pjg Beugel) = 60.000 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 23.704 Kg

= 151.70 Kg
= 0.25 M3
= 151.70 Kg
= 0.83 M2
= 12.00 Btg
= 5.00 Btg

Perhitungan
l = 0.11 M1 SLOOF
t = 0.11 M1 15 / 15 Cm
= lxt
F = 0.01 M2
P = 15.80 M1
V = FxP
= 0.19 M3
Jumlah = 1.00 Buah
V = 0.19 M3

= 0.19 M3
Perhitungan
Tulangan inti
Panjang Besi = 15.80 M1
Jlm. Besi = 8.00 bh
(Pjg Besi x Jlm Besi = 126.40 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 112.356 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 105 bh
Panjang beugel = 0.45 M1
(Jlm Beugel x Pjg Beugel) = 47.400 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 18.726 Kg

= 131.08 Kg
= 0.19 M3
= 131.08 Kg
= 1.19 M2
= 10.53 Btg
= 3.95 Btg

Perhitungan
l = 0.11 M1 BALOK
t = 0.11 M1 15 / 15 Cm
= lxt
F = 0.01 M2
P = 14.30 M1
V = FxP
= 0.17 M3
Jumlah = 1.00 Buah
V = 0.17 M3

= 0.17 M3

Perhitungan
Tulangan inti
Panjang Besi = 14.30 M1
Jlm. Besi = 8.00 bh
(Pjg Besi x Jlm Besi = 114.40 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 101.689 Kg

CINCIN/BEUGEL
Jarak Beugel = 0.15 M1
Jlm. Beugel = 95 bh
Panjang beugel = 0.45 M1
(Jlm Beugel x Pjg Beugel) = 42.900 M1
Berat Besi Ø 8/1m¹ = 0.395 Kg
Vol. Besi Ø 8 mm = 16.948 Kg

= 118.64 Kg
= 0.17 M3
= 118.64 Kg
= 1.07 M2
= 9.53 Btg
= 3.58 Btg
Perhitungan
p = 4.30 M1
l.rata2 = 1.65 M1
= pxl
f = 7.10 M2
t = 0.10 M1
V = fxt
= 0.71 M3
Jml. = 1.00 Unit
V = 0.71 M3

= 0.71 M3

Perhitungan
Tulangan Bawah
Jarak Besi = 0.15 M1
Jlm Besi = 28.67 btg
Panjang Besi Bawah = 1.65 M1
(Pjg Besi x Jlm Besi = 47.30 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 42.044 Kg

Tulangan Atas
Jarak Besi = 0.15 M1
Jlm Besi = 11.00 btg
Panjang Besi Atas = 4.30 M1
(Pjg Besi x Jlm Besi = 47.30 M1
Berat Besi Ø12/1m¹ = 0.889 Kg
Vol. Besi Ø12 mm = 42.044 Kg
Jumlah Kg Besi 1 unit = 84.089 Kg
Jumlah Plat lantai = 1.000 Buah
Total Jumlah Kg Besi = 84.089 Kg

= 84.09 Kg
= 0.71 M3
= 84.09 Kg
= 7.10 M2
= 7.88 Btg
= 2.00 Bh
= 2.00 Bh
= 20.00 M'
= 25.00 M'
= 2.00 Bh
= 2.00 Bh
-
-
-
-
-
-
-
-
5