1 2 3 4 5 6
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
INPUT TANGGAL PKS => 7/14/2022 7/21/2022 7/28/2022 8/4/2022 8/11/2022 8/18/2022
7/20/2022 7/27/2022 8/3/2022 8/10/2022 8/17/2022 8/24/2022
Kamis Kamis
Rabu Rabu
Masa Kerja Pelaksanaan => 10/22/2022 100
Hari
PROGRAM : SANIMAS SPALD-S
PEKERJAAN : PEMBANGUNAN TOILET INDIVIDU
LOKASI : DESA RONGDURIN
KECAMATAN TANAH MERAH
TAHUN ANGGARAN : 2022
TFL Teknik : R M ALGHAF DIENULLAH, ST.
TFL Pemberdayaan : ABD SALAM, SE.
FASKAB : M MUCTAR ALI, ST.
TIM TEKNIS KAB : ZAIFUL BAHRI, ST
Nip, 1965031320001121003
TIM TEKNIS SATKER : …............
Bangkalan, ………................2022
Diverifikasi Oleh,
TIM PENGELOLA TEKNIS KABUPATEN
DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN KABUPATEN BANGKALN
ZAIFUL BAHRI, ST
Nip, 1965031320001121003
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : SANIMAS SPALD-S
PEKERJAAN : PEMBANGUNAN TOILET INDIVIDU
LOKASI : DESA RONGDURIN
KECAMATAN TANAH MERAH
TAHUN ANGGARAN : 2022
JUMLAH BANGUNAN : 33 UNIT
JUMLAH SEPTICTANK TYPE 1 : 29 UNIT
JUMLAH SEPTICTANK TYPE 2 : 4 UNIT
JUMLAH RESAPAN : 33 UNIT
HARGA SATUAN
NO NAMA BARANG/ALAT/JASA SAT SPESIFIKASI KETERANGAN
( Rp. )
I BAHAN / MATERIAL
1 Batu Gunung/ Kali m³
2 Batu Bata Putih buah
3 Batu Cor m³
4 Pasir Pasang Lokal m³
5 Pasir Hitam ex. Pasuruan m³
6 Besi Polos Ø 6 lonjor
7 Besi Polos Ø 8 lonjor
8 Besi Polos Ø 10 lonjor
9 Kawat Bendrat kg
10 Papan Bekisting m³
11 Semen 40 kg zak
12 Semen Warna kg
13 Keramik 20 x 20 cm (motif) dos
14 Keramik Dinding 20 x 25 cm (motif) dos
15 Minyak Bekisting liter
16 Paku Biasa kg
17 Cat Tembok Dasar galon
18 Cat Tembok Penutup galon
19 Plamir Tembok kg
20 Kloset Jongkok bh
21 Floor drain bh
22 Pintu Kamar Mandi (Alumunium) unit
23 Tee PVC AW Ø 1 1/2" bh
24 Elbow PVC AW Ø 2" bh
25 Tee PVC AW Ø 2" bh
26 Tee PVC AW Ø 3" bh
27 Pipa PVC AW Ø 1 1/2" m'
28 Pipa PVC AW Ø 2" m'
29 Pipa PVC AW Ø 3" m'
30 Bak Mandi Fiber Oval bh
31 Anaerobik Filter uk. 37x1.00x60cm unit
32 Anaerobik Filter uk. 47x1.00x60cm unit
33 Pasang Rangka Atap Galvalum C. 75 - 0,75 + Spande m2
34 Pasang Lisplang L. 20 (Kalsiplank) m'
34 Glassblock 20x20cm bh
35 Roster Batapres 20x20cm bh
36 Pasang Grease Trap Precast unit
37 Fitting Lampu bh
38 Lampu 5 watt bh
39 Kabel NYM 2x1,5mm m
40 Sakelar Tunggal bh
II ALAT
1 Kuas bh
2 Ember bh
1 Jumali Ab Ketua
2 Andri Anggota
MENGETAHUI
TFL TEKNIK KETUA KSM
LANCAR JAYA
UD. ANNUR
H. ROKIB
HARGA SATUAN
NO NAMA BARANG/ALAT/JASA SAT SPESIFIKASI KETERANGAN
( Rp. )
I BAHAN / MATERIAL
1 Batu Gunung/ Kali m³
2 Batu Bata Putih buah
3 Batu Cor m³
4 Pasir Pasang Lokal m³
5 Pasir Hitam ex. Pasuruan m³
6 Besi Polos Ø 6 lonjor
7 Besi Polos Ø 8 lonjor
8 Besi Polos Ø 10 lonjor
9 Kawat Bendrat kg
10 Papan Bekisting m³
11 Semen 40 kg zak
12 Semen Warna kg
13 Keramik 20 x 20 cm (motif) dos
14 Keramik Dinding 20 x 25 cm (motif) dos
15 Minyak Bekisting liter
16 Paku Biasa kg
17 Cat Tembok Dasar galon
18 Cat Tembok Penutup galon
19 Plamir Tembok kg
20 Kloset Jongkok bh
21 Floor drain bh
22 Pintu Kamar Mandi (Alumunium) unit
23 Tee PVC AW Ø 1 1/2" bh
24 Elbow PVC AW Ø 2" bh
25 Tee PVC AW Ø 2" bh
26 Tee PVC AW Ø 3" bh
27 Pipa PVC AW Ø 1 1/2" m'
28 Pipa PVC AW Ø 2" m'
29 Pipa PVC AW Ø 3" m'
30 Bak Mandi Fiber Oval bh
31 Anaerobik Filter uk. 37x1.00x60cm unit
32 Anaerobik Filter uk. 47x1.00x60cm unit
33 Pasang Rangka Atap Galvalum C. 75 - 0,75 + Spande m2
34 Pasang Lisplang L. 20 (Kalsiplank) m'
34 Glassblock 20x20cm bh
35 Roster Batapres 20x20cm bh
36 Pasang Grease Trap Precast unit
37 Fitting Lampu bh
38 Lampu 5 watt bh
39 Kabel NYM 2x1,5mm m
40 Sakelar Tunggal bh
II ALAT
1 Kuas bh
2 Ember bh
1 Jumali Ab Ketua
2 Andri Anggota
MENGETAHUI
TFL TEKNIK KETUA KSM
LANCAR JAYA
H. ROKIB
HARGA SATUAN
NO NAMA BARANG/ALAT/JASA SAT SPESIFIKASI KETERANGAN
( Rp. )
I BAHAN / MATERIAL
1 Batu Gunung/ Kali m³
2 Batu Bata Putih buah
3 Batu Cor m³
4 Pasir Pasang Lokal m³
5 Pasir Hitam ex. Pasuruan m³
6 Besi Polos Ø 6 lonjor
7 Besi Polos Ø 8 lonjor
8 Besi Polos Ø 10 lonjor
9 Kawat Bendrat kg
10 Papan Bekisting m³
11 Semen 40 kg zak
12 Semen Warna kg
13 Keramik 20 x 20 cm (motif) dos
14 Keramik Dinding 20 x 25 cm (motif) dos
15 Minyak Bekisting liter
16 Paku Biasa kg
17 Cat Tembok Dasar galon
18 Cat Tembok Penutup galon
19 Plamir Tembok kg
20 Kloset Jongkok bh
21 Floor drain bh
22 Pintu Kamar Mandi (Alumunium) unit
23 Tee PVC AW Ø 1 1/2" bh
24 Elbow PVC AW Ø 2" bh
25 Tee PVC AW Ø 2" bh
26 Tee PVC AW Ø 3" bh
27 Pipa PVC AW Ø 1 1/2" m'
28 Pipa PVC AW Ø 2" m'
29 Pipa PVC AW Ø 3" m'
30 Bak Mandi Fiber Oval bh
31 Anaerobik Filter uk. 37x1.00x60cm unit
32 Anaerobik Filter uk. 47x1.00x60cm unit
33 Pasang Rangka Atap Galvalum C. 75 - 0,75 + Spande m2
34 Pasang Lisplang L. 20 (Kalsiplank) m'
34 Glassblock 20x20cm bh
35 Roster Batapres 20x20cm bh
36 Pasang Grease Trap Precast unit
37 Fitting Lampu bh
38 Lampu 5 watt bh
39 Kabel NYM 2x1,5mm m
40 Sakelar Tunggal bh
II ALAT
1 Kuas bh
2 Ember bh
1 Jumali Ab Ketua
2 Andri Anggota
MENGETAHUI
TFL TEKNIK KETUA KSM
LANCAR JAYA
H. LUKMAN
DAFTAR HARGA SURVEY
I BAHAN / MATERIAL
1 Batu Gunung/ Kali m³ Rp 200,000.00 Rp 202,000.00 Rp 203,000.00 Rp 200,000.00
2 Batu Bata Putih buah Rp 800.00 Rp 900.00 Rp 1,000.00 Rp 800.00
3 Batu Cor m³ Rp 275,000.00 Rp 277,750.00 Rp 278,000.00 Rp 275,000.00
4 Pasir Pasang Lokal m³ Rp 220,000.00 Rp 222,200.00 Rp 222,400.00 Rp 220,000.00
5 Pasir Hitam ex. Pasuruan m³ Rp 325,000.00 Rp 328,250.00 Rp 328,500.00 Rp 325,000.00
6 Besi Polos Ø 6 lonjor Rp 30,000.00 Rp 30,300.00 Rp 30,500.00 Rp 30,000.00
7 Besi Polos Ø 8 lonjor Rp 42,000.00 Rp 42,400.00 Rp 43,000.00 Rp 42,000.00
8 Besi Polos Ø 10 lonjor Rp 66,100.00 Rp 66,700.00 Rp 67,000.00 Rp 66,100.00
9 Kawat Bendrat kg Rp 21,000.00 Rp 21,200.00 Rp 22,000.00 Rp 21,000.00
10 Papan Bekisting m³ Rp 13,600.00 Rp 13,700.00 Rp 14,000.00 Rp 13,600.00
11 Semen 40 kg zak Rp 54,000.00 Rp 54,550.00 Rp 54,700.00 Rp 54,000.00
12 Semen Warna kg Rp 12,000.00 Rp 12,100.00 Rp 12,200.00 Rp 12,000.00
13 Keramik 20 x 20 cm (motif) dos Rp 60,000.00 Rp 60,600.00 Rp 60,700.00 Rp 60,000.00
14 Keramik Dinding 20 x 25 cm (motif) dos Rp 65,000.00 Rp 65,650.00 Rp 65,700.00 Rp 65,000.00
15 Minyak Bekisting liter Rp 6,500.00 Rp 6,600.00 Rp 6,700.00 Rp 6,500.00
16 Paku Biasa kg Rp 17,000.00 Rp 17,100.00 Rp 17,200.00 Rp 17,000.00
17 Cat Tembok Dasar galon Rp 350,000.00 Rp 353,500.00 Rp 353,850.00 Rp 350,000.00
18 Cat Tembok Penutup galon Rp 105,000.00 Rp 106,050.00 Rp 107,000.00 Rp 105,000.00
19 Plamir Tembok kg Rp 30,000.00 Rp 30,300.00 Rp 30,400.00 Rp 30,000.00
20 Kloset Jongkok bh Rp 175,000.00 Rp 176,750.00 Rp 176,900.00 Rp 175,000.00
21 Floor drain bh Rp 20,000.00 Rp 20,200.00 Rp 20,300.00 Rp 20,000.00
22 Pintu Kamar Mandi (Alumunium) unit Rp 300,000.00 Rp 303,000.00 Rp 303,300.00 Rp 300,000.00
23 Tee PVC AW Ø 1 1/2" bh Rp 105,000.00 Rp 106,000.00 Rp 107,000.00 Rp 105,000.00
24 Elbow PVC AW Ø 2" bh Rp 10,000.00 Rp 10,100.00 Rp 10,200.00 Rp 10,000.00
25 Tee PVC AW Ø 2" bh Rp 12,000.00 Rp 12,100.00 Rp 12,200.00 Rp 12,000.00
26 Tee PVC AW Ø 3" bh Rp 16,000.00 Rp 16,100.00 Rp 16,200.00 Rp 16,000.00
27 Pipa PVC AW Ø 1 1/2" m' Rp 73,900.00 Rp 74,600.00 Rp 74,750.00 Rp 73,900.00
28 Pipa PVC AW Ø 2" m' Rp 37,000.00 Rp 37,300.00 Rp 38,000.00 Rp 37,000.00
29 Pipa PVC AW Ø 3" m' Rp 60,000.00 Rp 60,600.00 Rp 61,000.00 Rp 60,000.00
30 Bak Mandi Fiber Oval bh Rp 340,000.00 Rp 343,400.00 Rp 344,000.00 Rp 340,000.00
31 Anaerobik Filter uk. 37x1.00x60cm unit Rp 350,000.00 Rp 353,500.00 Rp 353,800.00 Rp 350,000.00
32 Anaerobik Filter uk. 47x1.00x60cm unit Rp 550,000.00 Rp 555,500.00 Rp 556,000.00 Rp 550,000.00
33 Pasang Rangka Atap Galvalum C. 75 - 0,75 m2 Rp 192,000.00 Rp 193,000.00 Rp 194,000.00 Rp 192,000.00
34 Pasang Lisplang L. 20 (Kalsiplank) m' Rp 25,000.00 Rp 25,250.00 Rp 25,300.00 Rp 25,000.00
34 Glassblock 20x20cm bh Rp 25,000.00 Rp 25,250.00 Rp 25,300.00 Rp 25,000.00
35 Roster Batapres 20x20cm bh Rp 35,000.00 Rp 35,350.00 Rp 35,400.00 Rp 35,000.00
36 Pasang Grease Trap Precast unit Rp 320,000.00 Rp 323,200.00 Rp 323,500.00 Rp 320,000.00
37 Fitting Lampu bh Rp 9,000.00 Rp 9,500.00 Rp 10,000.00 Rp 9,000.00
38 Lampu 5 watt bh Rp 20,000.00 Rp 20,200.00 Rp 20,300.00 Rp 20,000.00
39 Kabel NYM 2x1,5mm m Rp 8,000.00 Rp 8,100.00 Rp 8,200.00 Rp 8,000.00
40 Sakelar Tunggal bh Rp 15,000.00 Rp 15,200.00 Rp 16,000.00 Rp 15,000.00
II ALAT
1 Kuas bh Rp 22,700.00 Rp 22,900.00 Rp 23,000.00 Rp 22,700.00
2 Ember bh Rp 7,500.00 Rp 7,600.00 Rp 7,700.00 Rp 7,500.00
MINGGU KE
1 2 3 4 5 6 7 8 9 10 11 12 13
PERIODE HARI KALENDER
Bobot
14 Jul 22 21 Jul 22 28 Jul 22 04 Agu 22 11 Agu 22 18 Agu 22 25 Agu 22 01 Sep 22 08 Sep 22 15 Sep 22 22 Sep 22 29 Sep 22 06 Okt 22 BOBOT
NO JENIS PEKERJAAN Cost Duration Pekerjaan
(%)
(%)
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
20 Jul 22 27 Jul 22 03 Agu 22 10 Agu 22 17 Agu 22 24 Agu 22 31 Agu 22 07 Sep 22 14 Sep 22 21 Sep 22 28 Sep 22 05 Okt 22 12 Okt 22
1 2 3 4 5 6 7
Err:509 -
JUMLAH BOBOT Err:509
RENCANA BOBOT MINGGUAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KUMULATIF RENCANA BOBOT MINGGUAN 0 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
REALISASI BOBOT MINGGUAN - - -
KUMULATIF REALISASI BOBOT MINGGUAN 0 0 0
DEVIASI (+/-) %
Bangkalan, ………................2022
Harga
No. Uraian Kegiatan Kebutuhan Unit/ satuan Jumlah
satuan Rp. Rp.
1 2 3 4 5 6
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 37.00 m³ Rp 207,000.00 Rp 7,659,000.00
2 Portland Cement (PC) 31,580.00 kg Rp 1,450.00 Rp 45,791,000.00
3 Pasir Hitam ex. Pasuruan 57.00 m³ Rp 305,000.00 Rp 17,385,000.00
4 Batu Bata Putih 20,895.00 buah Rp 900.00 Rp 18,805,500.00
5 Pasir Pasang Lokal 37.00 m³ Rp 250,000.00 Rp 9,250,000.00
6 Besi Beton 4,486.00 kg Rp 12,000.00 Rp 53,832,000.00
7 Kawat Beton 65.00 kg Rp 23,000.00 Rp 1,495,000.00
8 Batu Cor 45.00 m³ Rp 256,000.00 Rp 11,520,000.00
9 Air 11.00 m³ Rp - Rp -
10 Kayu Bekisting 18.00 m³ Rp 1,500,000.00 Rp 27,000,000.00
11 Paku Biasa 121.00 kg Rp 17,000.00 Rp 2,057,000.00
12 Minyak Bekisting 40.00 liter Rp 6,500.00 Rp 260,000.00
13 Keramik 57.00 dos Rp 70,000.00 Rp 3,990,000.00
14 Semen Warna 76.00 kg Rp 12,000.00 Rp 912,000.00
15 Keramik Dinding 25.00 dos Rp 66,000.00 Rp 1,650,000.00
16 Plamir Tembok 69.00 kg Rp 30,000.00 Rp 2,070,000.00
17 Cat Tembok Dasar 69.00 kg Rp 50,000.00 Rp 3,450,000.00
18 Cat Tembok Penutup 179.00 kg Rp 100,000.00 Rp 17,900,000.00
19 Glassblock 20x20cm 70.00 bh Rp 25,000.00 Rp 1,750,000.00
20 Roster Batapres 20x20cm 140.00 bh Rp 35,000.00 Rp 4,900,000.00
21 Pasang Rangka Atap Galvalum C. 75 - 0,75 273.00 m' Rp 20,000.00 Rp 5,460,000.00
22 Pasang Reng Galvalum 195.00 m' Rp 11,000.00 Rp 2,145,000.00
23 Pasang Spandek 0,3 mm 168.00 m² Rp 85,000.00 Rp 14,280,000.00
24 Pasang Lisplang L. 20 (Kalsiplank) 385.00 m' Rp 25,000.00 Rp 9,625,000.00
25 Fitting Lampu 70.00 bh Rp 9,000.00 Rp 630,000.00
26 Lampu 5 watt 70.00 bh Rp 20,000.00 Rp 1,400,000.00
27 Kabel NYM 2x1,5mm 175.00 m Rp 8,000.00 Rp 1,400,000.00
28 Sakelar Tunggal 35.00 bh Rp 15,000.00 Rp 525,000.00
29 Pintu Kamar Mandi (Alumunium) 35.00 unit Rp 400,000.00 Rp 14,000,000.00
30 Floor Drain 35.00 bh Rp 21,000.00 Rp 735,000.00
31 Bak Mandi Fiber Oval 35.00 bh Rp 390,000.00 Rp 13,650,000.00
32 Anaerobik Filter uk. 37x1.00x60cm 27.00 unit Rp 350,000.00 Rp 9,450,000.00
33 Anaerobik Filter uk. 47x1.00x60cm 8.00 unit Rp 500,000.00 Rp 4,000,000.00
34 Kloset Jongkok 35.00 bh Rp 180,000.00 Rp 6,300,000.00
35 Pasang Buis Beton Ø 50 Cm 35.00 bh Rp 100,000.00 Rp 3,500,000.00
36 Pasang Buis Beton Ø 100 Cm 35.00 bh Rp 200,000.00 Rp 7,000,000.00
37 Tee PVC AW Ø 1 1/2" 35.00 bh Rp 25,000.00 Rp 875,000.00
38 Elbow PVC AW Ø 2" 105.00 bh Rp 10,000.00 Rp 1,050,000.00
39 Tee PVC AW Ø 2" 70.00 bh Rp 10,000.00 Rp 700,000.00
40 Tee PVC AW Ø 3" 70.00 bh Rp 16,000.00 Rp 1,120,000.00
41 Pipa PVC AW Ø 1 1/2" 140.00 m' Rp 73,900.00 Rp 10,346,000.00
42 Pipa PVC AW Ø 2" 140.00 m' Rp 21,500.00 Rp 3,010,000.00
43 Pipa PVC AW Ø 3" 140.00 m' Rp 50,000.00 Rp 7,000,000.00
Sub Jumlah I Rp 349,877,500.00
II UPAH
1 Pekerja 1,006.00 oh Rp 100,000.00 Rp 100,600,000.00
2 Tukang 483.00 oh Rp 125,000.00 Rp 60,375,000.00
Sub Jumlah II Rp 160,975,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 Lbr 2,000.00 Rp 60,000.00
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 Ls 200,000.00 Rp 200,000.00
3 Kerta A4 10.00 Rim 45,000.00 Rp 450,000.00
4 Balpoint 3.00 dos 40,000.00 Rp 120,000.00
5 Buku 1.00 bh 7,000.00 Rp 7,000.00
6 Penggaris 1.00 bh 5,000.00 Rp 5,000.00
7 Isolasi 3.00 bh 14,000.00 Rp 42,000.00
8 Lem Kertas 3.00 bh 5,000.00 Rp 15,000.00
9 Gunting 2.00 bh 9,500.00 Rp 19,000.00
10 Printer 1.00 Unit 1,800,000.00 Rp 1,800,000.00
11 Materai 68.00 Lembar 10,000.00 Rp 680,000.00
Sub Jumlah III Rp 3,398,000.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 5.00 Buku 500,000.00 Rp 2,500,000.00
2 Foto Copy dan Penjilidan LPJ Akhir 5.00 Buku 500,000.00 Rp 2,500,000.00
3 Pembuatan Vidio Dokumentasi 1.00 Ls 500,000.00 Rp 500,000.00
Sub Jumlah IV Rp 5,500,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 10.00 Pcs 50,000.00 Rp 500,000.00
2 Sarung Tangan 10.00 Pasang 30,000.00 Rp 300,000.00
3 Sepatu Boods Panjang 10.00 Pasang 100,000.00 Rp 1,000,000.00
4 Rompi Pekerja 10.00 Pcs 55,000.00 Rp 550,000.00
5 Obat-obatan P3K 1.00 Set 250,000.00 Rp 250,000.00
6 Alat Ukur Suhu Tubuh 1.00 Unit 225,000.00 Rp 225,000.00
7 Masker Kain 15.00 Pcs 16,000.00 Rp 240,000.00
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 Botol 195,000.00 Rp 195,000.00
Sub Jumlah V Rp 3,260,000.00
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 6.00 Org/Kali 75,000.00 Rp 450,000.00
Sub Jumlah VI Rp 450,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 ls 200,000.00 Rp 200,000.00
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat 1.00 ls 200,000.00 Rp 200,000.00
3 Pembuatan Stiker Penerima 35.00 Bh 10,000.00 Rp 350,000.00
4 Pembuatan Prasasti 20 x 30 35.00 Bh 250,000.00 Rp 8,750,000.00
Sub Jumlah VII Rp 9,500,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 ls 200,000.00 Rp 200,000.00
Sub Jumlah VIII Rp 200,000.00
VII TRANSPORT KSM
1 Transport ke Bank 5 kali untuk 3 orang 15.00 Org/Kali 100,000.00 Rp 1,500,000.00
Sub Jumlah IX Rp 1,500,000.00
Volume Harga
No. Uraian Kegiatan Kebutuhan Realisasi Pengajuan Komulatif s/d Unit/ satuan Jumlah
Tahap Lalu Saat ini Saat ini satuan Rp. Rp.
1 2 3 4 5 6 7 8 9
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 37.00 19.00 18.00 37.00 m³ Rp 207,000.00 Rp 3,726,000.00
2 Portland Cement (PC) 31,580.00 19,400.00 12,180.00 31,580.00 kg Rp 1,450.00 Rp 17,661,000.00
3 Pasir Hitam ex. Pasuruan 57.00 22.00 35.00 57.00 m³ Rp 305,000.00 Rp 10,675,000.00
4 Batu Bata Putih 20,895.00 0.48 20,894.52 20,895.00 buah Rp 900.00 Rp 18,805,069.67
5 Pasir Pasang Lokal 37.00 13,650.00 (13,613.00) 37.00 m³ Rp 250,000.00 Rp (3,403,250,000.00)
6 Besi Beton 4,486.00 26.00 4,460.00 4,486.00 kg Rp 12,000.00 Rp 53,520,000.00
7 Kawat Beton 65.00 2,901.50 (2,836.50) 65.00 kg Rp 23,000.00 Rp (65,239,500.00)
8 Batu Cor 45.00 42.00 3.00 45.00 m³ Rp 256,000.00 Rp 768,000.00
9 Air 11.00 24.00 (13.00) 11.00 m³ Rp - Rp -
10 Kayu Bekisting 18.00 Err:509 Err:509 Err:509 m³ Rp 1,500,000.00 Err:509
11 Paku Biasa 121.00 3.00 118.00 121.00 kg Rp 17,000.00 Rp 2,006,000.00
12 Minyak Bekisting 40.00 78.00 (38.00) 40.00 liter Rp 6,500.00 Rp (247,000.00)
13 Keramik 57.00 26.00 31.00 57.00 dos Rp 70,000.00 Rp 2,170,000.00
14 Semen Warna 76.00 37.00 39.00 76.00 kg Rp 12,000.00 Rp 468,000.00
15 Keramik Dinding 25.00 46.00 (21.00) 25.00 dos Rp 66,000.00 Rp (1,386,000.00)
16 Plamir Tembok 69.00 495.00 (426.00) 69.00 kg Rp 30,000.00 Rp (12,780,000.00)
17 Cat Tembok Dasar 69.00 45.00 24.00 69.00 kg Rp 50,000.00 Rp 1,200,000.00
18 Cat Tembok Penutup 179.00 45.00 134.00 179.00 kg Rp 100,000.00 Rp 13,400,000.00
19 Glassblock 20x20cm 70.00 118.00 (48.00) 70.00 bh Rp 25,000.00 Rp (1,200,000.00)
20 Roster Batapres 20x20cm 140.00 46.00 94.00 140.00 bh Rp 35,000.00 Rp 3,290,000.00
21 Pasang Rangka Atap Galvalum C. 75 - 0,75 273.00 92.00 181.00 273.00 m' Rp 65,000.00 Rp 11,765,000.00
22 Pasang Reng Galvalum 195.00 180.00 15.00 195.00 m' Rp 41,000.00 Rp 615,000.00
23 Pasang Spandek 0,3 mm 168.00 128.00 40.00 168.00 m² Rp 60,000.00 Rp 2,400,000.00
24 Pasang Lisplang L. 20 (Kalsiplank) 385.00 111.00 274.00 385.00 m' Rp 25,000.00 Rp 6,850,000.00
25 Fitting Lampu 70.00 253.00 (183.00) 70.00 bh Rp 9,000.00 Rp (1,647,000.00)
26 Lampu 5 watt 70.00 46.00 24.00 70.00 bh Rp 20,000.00 Rp 480,000.00
27 Kabel NYM 2x1,5mm 175.00 46.00 129.00 175.00 m Rp 8,000.00 Rp 1,032,000.00
28 Sakelar Tunggal 35.00 115.00 (80.00) 35.00 bh Rp 15,000.00 Rp (1,200,000.00)
29 Pintu Kamar Mandi (Alumunium) 35.00 23.00 12.00 35.00 unit Rp 300,000.00 Rp 3,600,000.00
30 Floor Drain 35.00 23.00 12.00 35.00 bh Rp 20,000.00 Rp 240,000.00
31 Bak Mandi Fiber Oval 35.00 23.00 12.00 35.00 bh Rp 340,000.00 Rp 4,080,000.00
32 Anaerobik Filter uk. 37x1.00x60cm 27.00 23.00 4.00 27.00 unit Rp 350,000.00 Rp 1,400,000.00
33 Anaerobik Filter uk. 47x1.00x60cm 8.00 20.00 (12.00) 8.00 unit Rp 550,000.00 Rp (6,600,000.00)
34 Kloset Jongkok 35.00 2.00 33.00 35.00 bh Rp 175,000.00 Rp 5,775,000.00
35 Pasang Buis Beton Ø 50 Cm 35.00 23.00 12.00 35.00 bh Rp 100,000.00 Rp 1,200,000.00
36 Tee PVC AW Ø 1 1/2" 35.00 23.00 12.00 35.00 bh Rp 105,000.00 Rp 1,260,000.00
37 Elbow PVC AW Ø 2" 105.00 46.00 59.00 105.00 bh Rp 10,000.00 Rp 590,000.00
38 Tee PVC AW Ø 2" 70.00 46.00 24.00 70.00 bh Rp 12,000.00 Rp 288,000.00
39 Tee PVC AW Ø 3" 70.00 23.00 47.00 70.00 bh Rp 16,000.00 Rp 752,000.00
40 Pipa PVC AW Ø 1 1/2" 140.00 23.00 117.00 140.00 m' Rp 73,900.00 Rp 8,646,300.00
41 Pipa PVC AW Ø 2" 140.00 92.00 48.00 140.00 m' Rp 37,000.00 Rp 1,776,000.00
42 Pipa PVC AW Ø 3" 140.00 Err:509 Err:509 Err:509 m' Rp 60,000.00 Err:509
Sub Jumlah I Err:509
II UPAH
1 Pekerja 990.00 693.00 297.00 990.00 oh Rp 100,000.00 Rp 29,700,000.00
2 Tukang 416.00 290.00 126.00 416.00 oh Rp 125,000.00 Rp 15,750,000.00
Sub Jumlah II Rp 45,450,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 30.00 - 30.00 Lbr 2,000.00 Rp -
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 - 1.00 Ls 200,000.00 Rp -
3 Kerta A4 10.00 10.00 - 10.00 Rim 45,000.00 Rp -
4 Balpoint 3.00 2.00 1.00 3.00 dos 40,000.00 Rp 40,000.00
5 Buku 1.00 1.00 - 1.00 bh 7,000.00 Rp -
6 Penggaris 1.00 1.00 - 1.00 bh 5,000.00 Rp -
7 Isolasi 3.00 2.00 1.00 3.00 bh 14,000.00 Rp 14,000.00
8 Lem Kertas 3.00 2.00 1.00 3.00 bh 5,000.00 Rp 5,000.00
9 Gunting 2.00 1.00 1.00 2.00 bh 9,500.00 Rp 9,500.00
10 Printer 1.00 1.00 - 1.00 Unit 1,800,000.00 Rp -
11 Materai 68.00 78.00 (10.00) 68.00 Lembar 10,000.00 Rp (100,000.00)
Sub Jumlah III Rp (31,500.00)
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 5.00 5.00 - 5.00 Buku 500,000.00 Rp -
2 Foto Copy dan Penjilidan LPJ Akhir 5.00 - 5.00 5.00 Buku 500,000.00 Rp 2,500,000.00
3 Pembuatan Vidio Dokumentasi 1.00 - 1.00 1.00 Ls 500,000.00 Rp 500,000.00
Sub Jumlah IV Rp 3,000,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 10.00 15.00 (5.00) 10.00 Pcs 50,000.00 Rp (250,000.00)
2 Sarung Tangan 10.00 15.00 (5.00) 10.00 Pasang 30,000.00 Rp (150,000.00)
3 Sepatu Boods Panjang 10.00 15.00 (5.00) 10.00 Pasang 100,000.00 Rp (500,000.00)
4 Rompi Pekerja 10.00 15.00 (5.00) 10.00 Pcs 55,000.00 Rp (275,000.00)
5 Obat-obatan P3K 1.00 1.00 - 1.00 Set 250,000.00 Rp -
6 Alat Ukur Suhu Tubuh 1.00 1.00 - 1.00 Unit 225,000.00 Rp -
7 Masker Kain 15.00 2.00 13.00 15.00 Pcs 16,000.00 Rp 208,000.00
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 1.00 - 1.00 Botol 195,000.00 Rp -
Sub Jumlah V Rp (967,000.00)
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 6.00 4.00 2.00 6.00 Org/Kali 75,000.00 Rp 150,000.00
Sub Jumlah VI Rp 150,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 1.00 - 1.00 ls 200,000.00 Rp -
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 - 1.00 ls 200,000.00 Rp -
3 Pembuatan Stiker Penerima 35.00 29.00 6.00 35.00 Bh 10,000.00 Rp 60,000.00
4 Pembuatan Prasasti 20 x 30 35.00 29.00 6.00 35.00 Bh 250,000.00 Rp 1,500,000.00
Sub Jumlah VII Rp 1,560,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 1.00 - 1.00 ls 200,000.00 Rp -
Sub Jumlah VIII Rp -
VII TRANSPORT KSM
1 Transport ke Bank 5 kali untuk 3 orang 15.00 10.00 5.00 15.00 Org/Kali 100,000.00 Rp 500,000.00
Sub Jumlah IX Rp 500,000.00
FENTY ARINIYANTI MAMIK, ST., MT. MOHAMMAD SALIM, ST Ali Usman. Ilham Julianto Putro Syarif
NIP. 19860209 201012 2 002 Faskab Tfl. Teknik Tfl. Pemberdayaan Ksm
RENCANA PENGGUNAAN DANA BANK TAHAP - I (RPD 60 % )
Volume Harga
No. Uraian Kegiatan Kebutuhan Realisasi Pengajuan Komulatif s/d Unit/ satuan Jumlah
Tahap Lalu Saat ini Saat ini satuan Rp. Rp.
1 2 3 4 5 6 7 8 9
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 9.00 6.00 6.00 m³ Rp 207,000.00 Rp 1,242,000.00
2 Portland Cement (PC) 12,180.00 5,620.00 5,620.00 kg Rp 1,450.00 Rp 8,149,000.00
3 Pasir Hitam ex. Pasuruan 35.00 9.00 9.00 m³ Rp 305,000.00 Rp 2,745,000.00
4 Batu Bata Putih 20,894.52 3,740.00 3,740.00 buah Rp 900.00 Rp 3,366,000.00
5 Pasir Pasang Lokal (13,613.00) 6.00 6.00 m³ Rp 250,000.00 Rp 1,500,000.00
6 Besi Beton 4,460.00 800.00 800.00 kg Rp 12,000.00 Rp 9,600,000.00
7 Kawat Beton (2,836.50) 10.00 10.00 kg Rp 23,000.00 Rp 230,000.00
8 Batu Cor 3.00 8.00 8.00 m³ Rp 256,000.00 Rp 2,048,000.00
9 Air (13.00) 2.00 2.00 m³ Rp - Rp -
10 Kayu Bekisting Err:509 Err:509 Err:509 m³ Rp 1,500,000.00 Err:509
11 Paku Biasa 118.00 20.00 20.00 kg Rp 17,000.00 Rp 340,000.00
12 Minyak Bekisting (38.00) 10.00 10.00 liter Rp 6,500.00 Rp 65,000.00
13 Keramik 31.00 10.00 10.00 dos Rp 70,000.00 Rp 700,000.00
14 Semen Warna 39.00 14.00 14.00 kg Rp 12,000.00 Rp 168,000.00
15 Keramik Dinding (21.00) 4.00 4.00 dos Rp 66,000.00 Rp 264,000.00
16 Plamir Tembok (426.00) 13.00 13.00 kg Rp 30,000.00 Rp 390,000.00
17 Cat Tembok Dasar 24.00 13.00 13.00 kg Rp 50,000.00 Rp 650,000.00
18 Cat Tembok Penutup 134.00 32.00 32.00 kg Rp 100,000.00 Rp 3,200,000.00
19 Glassblock 20x20cm (48.00) 13.00 13.00 bh Rp 25,000.00 Rp 325,000.00
20 Roster Batapres 20x20cm 94.00 25.00 25.00 bh Rp 35,000.00 Rp 875,000.00
21 Pasang Rangka Atap Galvalum C. 75 - 0,75 181.00 49.00 49.00 m' Rp 65,000.00 Rp 3,185,000.00
22 Pasang Reng Galvalum 15.00 35.00 35.00 m' Rp 41,000.00 Rp 1,435,000.00
23 Pasang Spandek 0,3 mm 40.00 24.00 24.00 m² Rp 60,000.00 Rp 1,440,000.00
24 Pasang Lisplang L. 20 (Kalsiplank) 274.00 164.40 164.40 m' Rp 25,000.00 Rp 4,110,000.00
25 Fitting Lampu (183.00) 13.00 13.00 bh Rp 9,000.00 Rp 117,000.00
26 Lampu 5 watt 24.00 13.00 13.00 bh Rp 20,000.00 Rp 260,000.00
27 Kabel NYM 2x1,5mm 129.00 31.00 31.00 m Rp 8,000.00 Rp 248,000.00
28 Sakelar Tunggal (80.00) 7.00 7.00 bh Rp 15,000.00 Rp 105,000.00
29 Pintu Kamar Mandi (Alumunium) 12.00 7.00 7.00 unit Rp 300,000.00 Rp 2,100,000.00
30 Floor Drain 12.00 7.00 7.00 bh Rp 20,000.00 Rp 140,000.00
31 Bak Mandi Fiber Oval 12.00 7.00 7.00 bh Rp 340,000.00 Rp 2,380,000.00
32 Anaerobik Filter uk. 37x1.00x60cm 4.00 5.00 5.00 unit Rp 350,000.00 Rp 1,750,000.00
33 Anaerobik Filter uk. 47x1.00x60cm (12.00) 1.00 1.00 unit Rp 550,000.00 Rp 550,000.00
34 Kloset Jongkok 33.00 7.00 7.00 bh Rp 175,000.00 Rp 1,225,000.00
35 Pasang Buis Beton Ø 50 Cm 12.00 7.00 7.00 bh Rp 100,000.00 Rp 700,000.00
36 Tee PVC AW Ø 1 1/2" 12.00 7.00 7.00 bh Rp 105,000.00 Rp 735,000.00
37 Elbow PVC AW Ø 2" 59.00 19.00 19.00 bh Rp 10,000.00 Rp 190,000.00
38 Tee PVC AW Ø 2" 24.00 13.00 13.00 bh Rp 12,000.00 Rp 156,000.00
39 Tee PVC AW Ø 3" 47.00 13.00 13.00 bh Rp 16,000.00 Rp 208,000.00
40 Pipa PVC AW Ø 1 1/2" 117.00 25.00 25.00 m' Rp 73,900.00 Rp 1,847,500.00
41 Pipa PVC AW Ø 2" 48.00 25.00 25.00 m' Rp 37,000.00 Rp 925,000.00
42 Pipa PVC AW Ø 3" Err:509 25.00 25.00 m' Rp 60,000.00 Rp 1,500,000.00
Sub Jumlah I Err:509
II UPAH
1 Pekerja 297.00 181.00 181.00 oh Rp 100,000.00 Rp 18,100,000.00
2 Tukang 126.00 75.60 75.60 oh Rp 125,000.00 Rp 9,450,000.00
Sub Jumlah II Rp 27,550,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 - - - Lbr 2,000.00 Rp -
2 Banner Promosi Perilaku Hidup Bersih dan Sehat - - - Ls 200,000.00 Rp -
3 Kerta A4 - 2.00 2.00 Rim 45,000.00 Rp 90,000.00
4 Balpoint 1.00 1.00 1.00 dos 40,000.00 Rp 40,000.00
5 Buku - - - bh 7,000.00 Rp -
6 Penggaris - - - bh 5,000.00 Rp -
7 Isolasi 1.00 1.00 1.00 bh 14,000.00 Rp 14,000.00
8 Lem Kertas 1.00 1.00 1.00 bh 5,000.00 Rp 5,000.00
9 Gunting 1.00 1.00 1.00 bh 9,500.00 Rp 9,500.00
10 Printer - - - Unit 1,800,000.00 Rp -
11 Materai (10.00) 13.00 13.00 Lembar 10,000.00 Rp 130,000.00
Sub Jumlah III Rp 288,500.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I - 1.00 1.00 Buku 500,000.00 Rp 500,000.00
2 Foto Copy dan Penjilidan LPJ Akhir 5.00 3.00 3.00 Buku 500,000.00 Rp 1,500,000.00
3 Pembuatan Vidio Dokumentasi 1.00 1.00 1.00 Ls 500,000.00 Rp 500,000.00
Sub Jumlah IV Rp 2,500,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja (5.00) - - Pcs 50,000.00 Rp -
2 Sarung Tangan (5.00) - - Pasang 30,000.00 Rp -
3 Sepatu Boods Panjang (5.00) - - Pasang 100,000.00 Rp -
4 Rompi Pekerja (5.00) - - Pcs 55,000.00 Rp -
5 Obat-obatan P3K - - - Set 250,000.00 Rp -
6 Alat Ukur Suhu Tubuh - - - Unit 225,000.00 Rp -
7 Masker Kain 13.00 - - Pcs 16,000.00 Rp -
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) - - - Botol 195,000.00 Rp -
Sub Jumlah V Rp -
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 2.00 - - Org/Kali 75,000.00 Rp -
Sub Jumlah VI Rp -
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga - - - ls 200,000.00 Rp -
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat - - - ls 200,000.00 Rp -
3 Pembuatan Stiker Penerima 6.00 7.00 7.00 Bh 10,000.00 Rp 70,000.00
4 Pembuatan Prasasti 20 x 30 6.00 7.00 7.00 Bh 250,000.00 Rp 1,750,000.00
Sub Jumlah VII Rp 1,820,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan - - - ls 200,000.00 Rp -
Sub Jumlah VIII Rp -
VII TRANSPORT KSM
1 Transport ke Bank 5 kali untuk 3 orang 5.00 3.00 3.00 Org/Kali 100,000.00 Rp 300,000.00
Sub Jumlah IX Rp 300,000.00
Volume Harga
No. Uraian Kegiatan Kebutuhan Realisasi Pengajuan Komulatif s/d Unit/ satuan Jumlah
Tahap Lalu Saat ini Saat ini satuan Rp. Rp.
1 2 3 4 5 6 7 8 9
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 31.00 19.00 19.00 m³ Rp 207,000.00 Rp 3,933,000.00
2 Portland Cement (PC) 27,602.00 19,400.00 19,400.00 buah Rp 1,450.00 Rp 28,130,000.00
3 Pasir Hitam ex. Pasuruan 31.00 22.00 22.00 m³ Rp 305,000.00 Rp 6,710,000.00
4 Pasir Urug 0.50 0.48 0.48 m³ Rp 245,000.00 Rp 117,144.55
5 Batu Bata Putih 19,500.00 13,650.00 13,650.00 m³ Rp 900.00 Rp 12,285,000.00
6 Pasir Pasang Lokal 38.00 26.00 26.00 m³ Rp 250,000.00 Rp 6,500,000.00
7 Besi Beton 4,145.00 2,901.50 2,901.50 kg Rp 12,000.00 Rp 34,818,000.00
8 Kawat Beton 59.00 42.00 42.00 kg Rp 23,000.00 Rp 966,000.00
9 Batu Cor 35.00 24.00 24.00 m³ Rp 256,000.00 Rp 6,144,000.00
10 Kayu Bekisting 5.00 3.00 3.00 kg Rp 1,500,000.00 Rp 4,500,000.00
11 Paku Biasa 112.00 78.00 78.00 kg Rp 17,000.00 Rp 1,326,000.00
12 Minyak Bekisting 37.00 26.00 26.00 dos Rp 6,500.00 Rp 169,000.00
13 Keramik 54.00 37.00 37.00 dos Rp 70,000.00 Rp 2,590,000.00
14 Semen Warna 67.00 46.00 46.00 liter Rp 12,000.00 Rp 552,000.00
15 Keramik Dinding 708.00 495.00 495.00 kg Rp 66,000.00 Rp 32,670,000.00
16 Plamir Tembok 65.00 45.00 45.00 kg Rp 30,000.00 Rp 1,350,000.00
17 Cat Tembok Dasar 65.00 45.00 45.00 kg Rp 50,000.00 Rp 2,250,000.00
18 Cat Tembok Penutup 169.00 118.00 118.00 kg Rp 100,000.00 Rp 11,800,000.00
19 Glassblock 20x20cm 66.00 46.00 46.00 kg Rp 25,000.00 Rp 1,150,000.00
20 Roster Batapres 20x20cm 132.00 92.00 92.00 bh Rp 35,000.00 Rp 3,220,000.00
21 Pasang Rangka Atap Galvalum C. 75 - 0,75 257.00 180.00 180.00 bh Rp 20,000.00 Rp 3,600,000.00
22 Pasang Reng Galvalum 183.00 128.00 128.00 bh Rp 11,000.00 Rp 1,408,000.00
23 Pasang Spandek 0,3 mm 158.00 111.00 111.00 unit Rp 85,000.00 Rp 9,435,000.00
24 Pasang Lisplang L. 20 (Kalsiplank) 363.00 253.00 253.00 bh Rp 25,000.00 Rp 6,325,000.00
25 Fitting Lampu 66.00 46.00 46.00 m' Rp 9,000.00 Rp 414,000.00
26 Lampu 5 watt 66.00 46.00 46.00 bh Rp 20,000.00 Rp 920,000.00
27 Kabel NYM 2x1,5mm 165.00 115.00 115.00 bh Rp 8,000.00 Rp 920,000.00
28 Sakelar Tunggal 33.00 23.00 23.00 bh Rp 15,000.00 Rp 345,000.00
29 Pintu Kamar Mandi (Alumunium)+kusen 33.00 23.00 23.00 bh Rp 400,000.00 Rp 9,200,000.00
30 Floor Drain 33.00 23.00 23.00 bh Rp 21,000.00 Rp 483,000.00
31 Bak Mandi Fiber Oval 33.00 23.00 23.00 m' Rp 390,000.00 Rp 8,970,000.00
32 Anaerobik Filter uk. 37x1.00x60cm 29.00 20.00 20.00 m' Rp 350,000.00 Rp 7,000,000.00
33 Anaerobik Filter uk. 47x1.00x60cm 4.00 2.00 2.00 m' Rp 500,000.00 Rp 1,000,000.00
34 Kloset Jongkok 33.00 23.00 23.00 bh Rp 180,000.00 Rp 4,140,000.00
35 Pasang Buis Beton Ø 50 Cm 33.00 23.00 23.00 unit Rp 100,000.00 Rp 2,300,000.00
36 Tee GI Ø 1 66.00 46.00 46.00 unit Rp 81,000.00 Rp 3,726,000.00
37 Elbow PVC AW Ø 2" 66.00 46.00 46.00 m1 Rp 10,000.00 Rp 460,000.00
38 Elbow PVC AW Ø 3" 33.00 23.00 23.00 m1 Rp 10,000.00 Rp 230,000.00
39 Tee PVC AW Ø 2" 33.00 23.00 23.00 m2 Rp 10,000.00 Rp 230,000.00
40 Tee PVC AW Ø 3" 66.00 46.00 46.00 Bh Rp 16,000.00 Rp 736,000.00
41 Pipa GI Ø 1 '' 66.00 46.00 46.00 Bh Rp 81,000.00 Rp 3,726,000.00
42 Keni PCV AW 3/4 66.00 46.00 46.00 m' Rp 5,000.00 Rp 230,000.00
43 Pipa PVC AW Ø 2" 132.00 92.00 92.00 lbr Rp 21,500.00 Rp 1,978,000.00
44 Pipa PCV AW 3/4 132.00 92.00 92.00 bh Rp 9,500.00 Rp 874,000.00
45 Kran PCV AW 3/4 33.00 23.00 23.00 bh Rp 20,000.00 Rp 460,000.00
46 Pipa PVC AW Ø 3" 132.00 92.00 92.00 bh Rp 50,000.00 Rp 4,600,000.00
Sub Jumlah I Rp 234,890,144.55
II UPAH
1 Pekerja 990.00 693.00 693.00 oh Rp 100,000.00 Rp 69,300,000.00
2 Tukang 416.00 290.00 290.00 oh Rp 125,000.00 Rp 36,250,000.00
Sub Jumlah II Rp 105,550,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 30.00 30.00 Lbr 12,000.00 Rp 360,000.00
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 1.00 Ls 125,000.00 Rp 125,000.00
3 Kerta A4 10.00 10.00 10.00 Rim 45,000.00 Rp 450,000.00
4 Balpoint 3.00 2.00 2.00 dos 40,000.00 Rp 80,000.00
5 Buku 1.00 1.00 1.00 bh 7,000.00 Rp 7,000.00
6 Penggaris 1.00 1.00 1.00 bh 6,000.00 Rp 6,000.00
7 Isolasi 3.00 2.00 2.00 bh 14,000.00 Rp 28,000.00
8 Lem Kertas 3.00 2.00 2.00 bh 5,000.00 Rp 10,000.00
9 Gunting 2.00 1.00 1.00 bh 12,000.00 Rp 12,000.00
10 Printer 5.00 1.00 1.00 Unit 200,000.00 Rp 200,000.00
11 Materai 88.00 78.00 78.00 Lembar 10,000.00 Rp 780,000.00
Sub Jumlah III Rp 2,058,000.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 5.00 5.00 5.00 Buku 500,000.00 Rp 2,500,000.00
2 Foto Copy dan Penjilidan LPJ Akhir 5.00 - - Buku 500,000.00 Rp -
3 Pembuatan Vidio Dokumentasi 1.00 - - Ls 500,000.00 Rp -
Sub Jumlah IV Rp 2,500,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 15.00 15.00 15.00 Pcs 50,000.00 Rp 750,000.00
2 Sarung Tangan 15.00 15.00 15.00 Pasang 30,000.00 Rp 450,000.00
3 Sepatu Boods Panjang 15.00 15.00 15.00 Pasang 100,000.00 Rp 1,500,000.00
4 Rompi Pekerja 15.00 15.00 15.00 Pcs 55,000.00 Rp 825,000.00
5 Obat-obatan P3K 1.00 1.00 1.00 Set 250,000.00 Rp 250,000.00
6 Alat Ukur Suhu Tubuh 1.00 1.00 1.00 Unit 225,000.00 Rp 225,000.00
7 Masker Kain 2.00 2.00 2.00 Pcs 80,000.00 Rp 160,000.00
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 1.00 1.00 Botol 195,000.00 Rp 195,000.00
Sub Jumlah V Rp 4,355,000.00
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 6.00 4.00 Org/Kali 75,000.00 Rp 300,000.00
Sub Jumlah VI Rp 300,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 1.00 1.00 ls 150,000.00 Rp 150,000.00
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 1.00 ls 225,000.00 Rp 225,000.00
3 Pembuatan Stiker Penerima 33.00 29.00 29.00 Bh 10,000.00 Rp 290,000.00
4 Pembuatan Prasasti 20 x 30 33.00 29.00 29.00 Bh 250,000.00 Rp 7,250,000.00
Sub Jumlah VII Rp 7,915,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 1.00 1.00 ls 200,000.00 Rp 200,000.00
Sub Jumlah VIII Rp 200,000.00
VII TRANSPORT KSM
1 Transport ke Bank 6 kali untuk 3 orang 18.00 10.00 10.00 Org/Kali 125,000.00 Rp 1,250,000.00
Sub Jumlah IX Rp 1,250,000.00
ZAIFUL BAHRI, ST M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST.ABD SALAM, SE. ISROK
Nip, 1965031320001121003 Faskab Tfl. Teknik Tfl. Pemberdayaan Ketua KSM
RENCANA PENGGUNAAN DANA BANK TAHAP - I (RPDB 30 % )
Volume Harga
No. Uraian Kegiatan Kebutuhan Realisasi Pengajuan Komulatif s/d Unit/ satuan Jumlah
Tahap Lalu Saat ini Saat ini satuan Rp. Rp.
1 2 3 4 5 6 7 8 9
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 19.00 5.00 5.00 m³ Rp 207,000.00 Rp 1,035,000.00
2 Portland Cement (PC) 19,400.00 5,810.00 5,810.00 buah Rp 1,450.00 Rp 8,424,500.00
3 Pasir Hitam ex. Pasuruan 22.00 6.00 6.00 m³ Rp 305,000.00 Rp 1,830,000.00
4 Pasir Urug 0.48 0.48 0.48 m³ Rp 245,000.00 Rp 117,144.55
5 Batu Bata Putih 13,650.00 4,096.00 4,096.00 m³ Rp 900.00 Rp 3,686,400.00
6 Pasir Pasang Lokal 26.00 7.00 7.00 m³ Rp 250,000.00 Rp 1,750,000.00
7 Besi Beton 2,901.50 895.00 895.00 kg Rp 12,000.00 Rp 10,740,000.00
8 Kawat Beton 42.00 12.00 12.00 kg Rp 23,000.00 Rp 276,000.00
9 Batu Cor 24.00 7.00 7.00 m³ Rp 256,000.00 Rp 1,792,000.00
10 Kayu Bekisting 3.00 0.90 0.90 kg Rp 1,500,000.00 Rp 1,350,000.00
11 Paku Biasa 78.00 23.00 23.00 kg Rp 17,000.00 Rp 391,000.00
12 Minyak Bekisting 26.00 7.00 7.00 dos Rp 6,500.00 Rp 45,500.00
13 Keramik 37.00 11.00 11.00 dos Rp 70,000.00 Rp 770,000.00
14 Semen Warna 46.00 13.00 13.00 liter Rp 12,000.00 Rp 156,000.00
15 Keramik Dinding 495.00 148.00 148.00 kg Rp 66,000.00 Rp 9,768,000.00
16 Plamir Tembok 45.00 13.00 13.00 kg Rp 30,000.00 Rp 390,000.00
17 Cat Tembok Dasar 45.00 13.00 13.00 kg Rp 50,000.00 Rp 650,000.00
18 Cat Tembok Penutup 118.00 35.00 35.00 kg Rp 100,000.00 Rp 3,500,000.00
19 Glassblock 20x20cm 46.00 14.00 14.00 kg Rp 25,000.00 Rp 350,000.00
20 Roster Batapres 20x20cm 92.00 28.00 28.00 bh Rp 35,000.00 Rp 980,000.00
21 Pasang Rangka Atap Galvalum C. 75 - 0,75 180.00 54.00 54.00 bh Rp 20,000.00 Rp 1,080,000.00
22 Pasang Reng Galvalum 128.00 38.00 38.00 bh Rp 11,000.00 Rp 418,000.00
23 Pasang Spandek 0,3 mm 111.00 33.00 33.00 unit Rp 85,000.00 Rp 2,805,000.00
24 Pasang Lisplang L. 20 (Kalsiplank) 253.00 76.00 76.00 bh Rp 25,000.00 Rp 1,900,000.00
25 Fitting Lampu 46.00 14.00 14.00 m' Rp 9,000.00 Rp 126,000.00
26 Lampu 5 watt 46.00 14.00 14.00 bh Rp 20,000.00 Rp 280,000.00
27 Kabel NYM 2x1,5mm 115.00 34.00 34.00 bh Rp 8,000.00 Rp 272,000.00
28 Sakelar Tunggal 23.00 7.00 7.00 bh Rp 15,000.00 Rp 105,000.00
29 Pintu Kamar Mandi (Alumunium)+kusen 23.00 7.00 7.00 bh Rp 400,000.00 Rp 2,800,000.00
30 Floor Drain 23.00 7.00 7.00 bh Rp 21,000.00 Rp 147,000.00
31 Bak Mandi Fiber Oval 23.00 7.00 7.00 m' Rp 390,000.00 Rp 2,730,000.00
32 Anaerobik Filter uk. 37x1.00x60cm 20.00 6.00 6.00 m' Rp 350,000.00 Rp 2,100,000.00
33 Anaerobik Filter uk. 47x1.00x60cm 2.00 1.00 1.00 m' Rp 500,000.00 Rp 500,000.00
34 Kloset Jongkok 23.00 7.00 7.00 bh Rp 180,000.00 Rp 1,260,000.00
35 Pasang Buis Beton Ø 50 Cm 23.00 7.00 7.00 unit Rp 100,000.00 Rp 700,000.00
36 Tee GI Ø 1 46.00 14.00 14.00 unit Rp 81,000.00 Rp 1,134,000.00
37 Elbow PVC AW Ø 2" 46.00 14.00 14.00 m1 Rp 10,000.00 Rp 140,000.00
38 Elbow PVC AW Ø 3" 23.00 7.00 7.00 m1 Rp 10,000.00 Rp 70,000.00
39 Tee PVC AW Ø 2" 23.00 7.00 7.00 m2 Rp 10,000.00 Rp 70,000.00
40 Tee PVC AW Ø 3" 46.00 14.00 14.00 Bh Rp 16,000.00 Rp 224,000.00
41 Pipa GI Ø 1 '' 46.00 14.00 14.00 Bh Rp 81,000.00 Rp 1,134,000.00
42 Keni PCV AW 3/4 46.00 14.00 14.00 m' Rp 5,000.00 Rp 70,000.00
43 Pipa PVC AW Ø 2" 92.00 28.00 28.00 lbr Rp 21,500.00 Rp 602,000.00
44 Pipa PCV AW 3/4 92.00 28.00 28.00 bh Rp 9,500.00 Rp 266,000.00
45 Kran PCV AW 3/4 23.00 7.00 7.00 bh Rp 20,000.00 Rp 140,000.00
46 Pipa PVC AW Ø 3" 92.00 28.00 28.00 bh Rp 50,000.00 Rp 1,400,000.00
Sub Jumlah I Rp 70,474,544.55
II UPAH
1 Pekerja 693.00 202.00 202.00 oh Rp 100,000.00 Rp 20,200,000.00
2 Tukang 290.00 83.00 83.00 oh Rp 125,000.00 Rp 10,375,000.00
Sub Jumlah II Rp 30,575,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 9.00 9.00 Lbr 12,000.00 Rp 108,000.00
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 1.00 Ls 125,000.00 Rp 125,000.00
3 Kerta A4 10.00 3.00 3.00 Rim 45,000.00 Rp 135,000.00
4 Balpoint 2.00 1.00 1.00 dos 40,000.00 Rp 40,000.00
5 Buku 1.00 1.00 1.00 bh 7,000.00 Rp 7,000.00
6 Penggaris 1.00 1.00 1.00 bh 6,000.00 Rp 6,000.00
7 Isolasi 2.00 1.00 1.00 bh 14,000.00 Rp 14,000.00
8 Lem Kertas 2.00 1.00 1.00 bh 5,000.00 Rp 5,000.00
9 Gunting 1.00 1.00 1.00 bh 12,000.00 Rp 12,000.00
10 Printer 1.00 1.00 1.00 Unit 200,000.00 Rp 200,000.00
11 Materai 78.00 23.00 23.00 Lembar 10,000.00 Rp 230,000.00
Sub Jumlah III Rp 882,000.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 5.00 3.00 3.00 Buku 500,000.00 Rp 1,500,000.00
2 Foto Copy dan Penjilidan LPJ Akhir 0.00 - - Buku 500,000.00 Rp -
3 Pembuatan Vidio Dokumentasi 0.00 - - Ls 500,000.00 Rp -
Sub Jumlah IV Rp 1,500,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 10.00 3.00 3.00 Pcs 50,000.00 Rp 150,000.00
2 Sarung Tangan 10.00 3.00 3.00 Pasang 30,000.00 Rp 90,000.00
3 Sepatu Boods Panjang 10.00 3.00 3.00 Pasang 100,000.00 Rp 300,000.00
4 Rompi Pekerja 10.00 3.00 3.00 Pcs 55,000.00 Rp 165,000.00
5 Obat-obatan P3K 1.00 1.00 1.00 Set 250,000.00 Rp 250,000.00
6 Alat Ukur Suhu Tubuh 1.00 1.00 1.00 Unit 225,000.00 Rp 225,000.00
7 Masker Kain 10.00 7.00 7.00 Pcs 80,000.00 Rp 560,000.00
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 1.00 1.00 Botol 195,000.00 Rp 195,000.00
Sub Jumlah V Rp 1,935,000.00
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 4.00 1.00 Org/Kali 75,000.00 Rp 75,000.00
Sub Jumlah VI Rp 75,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 1.00 1.00 ls 150,000.00 Rp 150,000.00
2 Konsumsi Promosi Perilaku Hidup Bersih dan Seha 1.00 1.00 1.00 ls 225,000.00 Rp 225,000.00
3 Pembuatan Stiker Penerima 29.00 - - Bh 10,000.00 Rp -
4 Pembuatan Prasasti 20 x 30 29.00 - - Bh 250,000.00 Rp -
Sub Jumlah VII Rp 375,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 1.00 1.00 ls 200,000.00 Rp 200,000.00
Sub Jumlah VIII Rp 200,000.00
VII TRANSPORT KSM
1 Transport ke Bank 6 kali untuk 3 orang 10.00 3.00 3.00 Org/Kali 125,000.00 Rp 375,000.00
Sub Jumlah IX Rp 375,000.00
ZAIFUL BAHRI, ST M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST.ABD SALAM, SE. ISROK
Nip, 1965031320001121003 Faskab Tfl. Teknik Tfl. Pemberdayaan Ketua KSM
RENCANA PENGGUNAAN DANA TAHAP - I (RPD 70 % )
Volume Harga
No. Uraian Kegiatan Kebutuhan Realisasi Pengajuan Komulatif s/d Unit/ satuan Jumlah
Tahap Lalu Saat ini Saat ini satuan Rp. Rp.
1 2 3 4 5 6 7 8 9
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 31.00 19.00 12.00 31.00 m³ Rp 207,000.00 Rp 2,484,000.00
2 Portland Cement (PC) 27,602.00 19,400.00 8,202.00 27,602.00 buah Rp 1,450.00 Rp 11,892,900.00
3 Pasir Hitam ex. Pasuruan 31.00 22.00 9.00 31.00 m³ Rp 305,000.00 Rp 2,745,000.00
4 Pasir Urug 0.50 0.48 0.02 0.50 m³ Rp 245,000.00 Rp 4,438.75
5 Batu Bata Putih 19,500.00 13,650.00 5,850.00 19,500.00 m³ Rp 900.00 Rp 5,265,000.00
6 Pasir Pasang Lokal 38.00 26.00 12.00 38.00 m³ Rp 250,000.00 Rp 3,000,000.00
7 Besi Beton 4,145.00 2,901.50 1,243.50 4,145.00 kg Rp 12,000.00 Rp 14,922,000.00
8 Kawat Beton 59.00 42.00 17.00 59.00 kg Rp 23,000.00 Rp 391,000.00
9 Batu Cor 35.00 24.00 11.00 35.00 m³ Rp 256,000.00 Rp 2,816,000.00
10 Kayu Bekisting 5.00 3.00 2.00 5.00 kg Rp 1,500,000.00 Rp 3,000,000.00
11 Paku Biasa 112.00 78.00 34.00 112.00 kg Rp 17,000.00 Rp 578,000.00
12 Minyak Bekisting 37.00 26.00 11.00 37.00 dos Rp 6,500.00 Rp 71,500.00
13 Keramik 54.00 37.00 17.00 54.00 dos Rp 70,000.00 Rp 1,190,000.00
14 Semen Warna 67.00 46.00 21.00 67.00 liter Rp 12,000.00 Rp 252,000.00
15 Keramik Dinding 708.00 495.00 213.00 708.00 kg Rp 66,000.00 Rp 14,058,000.00
16 Plamir Tembok 65.00 45.00 20.00 65.00 kg Rp 30,000.00 Rp 600,000.00
17 Cat Tembok Dasar 65.00 45.00 20.00 65.00 kg Rp 50,000.00 Rp 1,000,000.00
18 Cat Tembok Penutup 169.00 118.00 51.00 169.00 kg Rp 100,000.00 Rp 5,100,000.00
19 Glassblock 20x20cm 66.00 46.00 20.00 66.00 kg Rp 25,000.00 Rp 500,000.00
20 Roster Batapres 20x20cm 132.00 92.00 40.00 132.00 bh Rp 35,000.00 Rp 1,400,000.00
21 Pasang Rangka Atap Galvalum C. 75 - 0,75 257.00 180.00 77.00 257.00 bh Rp 20,000.00 Rp 1,540,000.00
22 Pasang Reng Galvalum 183.00 128.00 55.00 183.00 bh Rp 11,000.00 Rp 605,000.00
23 Pasang Spandek 0,3 mm 158.00 111.00 47.00 158.00 unit Rp 85,000.00 Rp 3,995,000.00
24 Pasang Lisplang L. 20 (Kalsiplank) 363.00 253.00 110.00 363.00 bh Rp 25,000.00 Rp 2,750,000.00
25 Fitting Lampu 66.00 46.00 20.00 66.00 m' Rp 9,000.00 Rp 180,000.00
26 Lampu 5 watt 66.00 46.00 20.00 66.00 bh Rp 20,000.00 Rp 400,000.00
27 Kabel NYM 2x1,5mm 165.00 115.00 50.00 165.00 bh Rp 8,000.00 Rp 400,000.00
28 Sakelar Tunggal 33.00 23.00 10.00 33.00 bh Rp 15,000.00 Rp 150,000.00
29 Pintu Kamar Mandi (Alumunium)+kusen 33.00 23.00 10.00 33.00 bh Rp 400,000.00 Rp 4,000,000.00
30 Floor Drain 33.00 23.00 10.00 33.00 bh Rp 21,000.00 Rp 210,000.00
31 Bak Mandi Fiber Oval 33.00 23.00 10.00 33.00 m' Rp 390,000.00 Rp 3,900,000.00
32 Anaerobik Filter uk. 37x1.00x60cm 29.00 20.00 9.00 29.00 m' Rp 350,000.00 Rp 3,150,000.00
33 Anaerobik Filter uk. 47x1.00x60cm 4.00 2.00 2.00 4.00 m' Rp 500,000.00 Rp 1,000,000.00
34 Kloset Jongkok 33.00 23.00 10.00 33.00 bh Rp 180,000.00 Rp 1,800,000.00
35 Pasang Buis Beton Ø 50 Cm 33.00 23.00 10.00 33.00 unit Rp 100,000.00 Rp 1,000,000.00
36 Tee GI Ø 1 66.00 46.00 20.00 66.00 unit Rp 81,000.00 Rp 1,620,000.00
37 Elbow PVC AW Ø 2" 66.00 46.00 20.00 66.00 m1 Rp 10,000.00 Rp 200,000.00
38 Elbow PVC AW Ø 3" 33.00 23.00 10.00 33.00 m1 Rp 10,000.00 Rp 100,000.00
39 Tee PVC AW Ø 2" 33.00 23.00 10.00 33.00 m2 Rp 10,000.00 Rp 100,000.00
40 Tee PVC AW Ø 3" 66.00 46.00 20.00 66.00 Bh Rp 16,000.00 Rp 320,000.00
41 Pipa GI Ø 1 '' 66.00 46.00 20.00 66.00 Bh Rp 81,000.00 Rp 1,620,000.00
42 Keni PCV AW 3/4 66.00 46.00 20.00 66.00 m' Rp 5,000.00 Rp 100,000.00
43 Pipa PVC AW Ø 2" 132.00 92.00 40.00 132.00 lbr Rp 21,500.00 Rp 860,000.00
44 Pipa PCV AW 3/4 132.00 92.00 40.00 132.00 bh Rp 9,500.00 Rp 380,000.00
45 Kran PCV AW 3/4 33.00 23.00 10.00 33.00 bh Rp 20,000.00 Rp 200,000.00
46 Pipa PVC AW Ø 3" 132.00 92.00 40.00 132.00 bh Rp 50,000.00 Rp 2,000,000.00
Sub Jumlah I Rp 103,849,838.75
II UPAH
1 Pekerja 990.00 693.00 297.00 990.00 oh Rp 100,000.00 Rp 29,700,000.00
2 Tukang 416.00 290.00 126.00 416.00 oh Rp 125,000.00 Rp 15,750,000.00
Sub Jumlah II Rp 45,450,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 30.00 - 30.00 Lbr 12,000.00 Rp -
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 - 1.00 Ls 125,000.00 Rp -
3 Kerta A4 10.00 10.00 - 10.00 Rim 45,000.00 Rp -
4 Balpoint 3.00 2.00 1.00 3.00 dos 40,000.00 Rp 40,000.00
5 Buku 1.00 1.00 - 1.00 bh 7,000.00 Rp -
6 Penggaris 1.00 1.00 - 1.00 bh 6,000.00 Rp -
7 Isolasi 3.00 2.00 1.00 3.00 bh 14,000.00 Rp 14,000.00
8 Lem Kertas 3.00 2.00 1.00 3.00 bh 5,000.00 Rp 5,000.00
9 Gunting 2.00 1.00 1.00 2.00 bh 12,000.00 Rp 12,000.00
10 Printer 5.00 1.00 4.00 5.00 Unit 200,000.00 Rp 800,000.00
11 Materai 88.00 78.00 10.00 88.00 Lembar 10,000.00 Rp 100,000.00
Sub Jumlah III Rp 971,000.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 5.00 5.00 - 5.00 Buku 500,000.00 Rp -
2 Foto Copy dan Penjilidan LPJ Akhir 5.00 0.00 5.00 5.00 Buku 500,000.00 Rp 2,500,000.00
3 Pembuatan Vidio Dokumentasi 1.00 0.00 1.00 1.00 Ls 500,000.00 Rp 500,000.00
Sub Jumlah IV Rp 3,000,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 15.00 10.00 5.00 15.00 Pcs 50,000.00 Rp 250,000.00
2 Sarung Tangan 15.00 10.00 5.00 15.00 Pasang 30,000.00 Rp 150,000.00
3 Sepatu Boods Panjang 15.00 10.00 5.00 15.00 Pasang 100,000.00 Rp 500,000.00
4 Rompi Pekerja 15.00 10.00 5.00 15.00 Pcs 55,000.00 Rp 275,000.00
5 Obat-obatan P3K 1.00 1.00 - 1.00 Set 250,000.00 Rp -
6 Alat Ukur Suhu Tubuh 1.00 1.00 - 1.00 Unit 225,000.00 Rp -
7 Masker Kain 2.00 10.00 (8.00) 2.00 Pcs 80,000.00 Rp (640,000.00)
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 1.00 - 1.00 Botol 195,000.00 Rp -
Sub Jumlah V Rp 535,000.00
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 6.00 4.00 2.00 Org/Kali 75,000.00 Rp 150,000.00
Sub Jumlah VI Rp 150,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 1.00 - 1.00 ls 150,000.00 Rp -
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 - 1.00 ls 225,000.00 Rp -
3 Pembuatan Stiker Penerima 33.00 29.00 4.00 33.00 Bh 10,000.00 Rp 40,000.00
4 Pembuatan Prasasti 20 x 30 33.00 29.00 4.00 33.00 Bh 250,000.00 Rp 1,000,000.00
Sub Jumlah VII Rp 1,040,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 1.00 - 1.00 ls 200,000.00 Rp -
Sub Jumlah VIII Rp -
VII TRANSPORT KSM
1 Transport ke Bank 6 kali untuk 3 orang 18.00 10.00 8.00 18.00 Org/Kali 125,000.00 Rp 1,000,000.00
Sub Jumlah IX Rp 1,000,000.00
ZAIFUL BAHRI, ST M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST.ABD SALAM, SE. ISROK
Nip, 1965031320001121003 Faskab Tfl. Teknik Tfl. Pemberdayaan Ketua KSM
RENCANA PENGGUNAAN DANA (RPD 100 % )
Harga
No. Uraian Kegiatan Kebutuhan Unit/ satuan Jumlah
satuan Rp. Rp.
1 2 3 4 5 6
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 31.00 m³ Rp 207,000.00 Rp 6,417,000.00
2 Portland Cement (PC) 27,602.00 kg Rp 1,450.00 Rp 40,022,900.00
3 Pasir Hitam ex. Pasuruan 31.00 m³ Rp 305,000.00 Rp 9,455,000.00
4 Pasir Urug 0.50 m³ Rp 245,000.00 Rp 121,583.30
5 Batu Bata Putih 19,500.00 buah Rp 900.00 Rp 17,550,000.00
6 Pasir Pasang Lokal 38.00 m³ Rp 250,000.00 Rp 9,500,000.00
7 Besi Beton 4,145.00 kg Rp 12,000.00 Rp 49,740,000.00
8 Kawat Beton 59.00 kg Rp 23,000.00 Rp 1,357,000.00
9 Batu Cor 35.00 m³ Rp 256,000.00 Rp 8,960,000.00
11 Kayu Bekisting 5.00 m³ Rp 1,500,000.00 Rp 7,500,000.00
12 Paku Biasa 112.00 kg Rp 17,000.00 Rp 1,904,000.00
13 Minyak Bekisting 37.00 liter Rp 6,500.00 Rp 240,500.00
14 Keramik 54.00 dos Rp 70,000.00 Rp 3,780,000.00
15 Semen Warna 67.00 kg Rp 12,000.00 Rp 804,000.00
16 Keramik Dinding 708.00 dos Rp 66,000.00 Rp 46,728,000.00
17 Plamir Tembok 65.00 kg Rp 30,000.00 Rp 1,950,000.00
18 Cat Tembok Dasar 65.00 kg Rp 50,000.00 Rp 3,250,000.00
19 Cat Tembok Penutup 169.00 kg Rp 100,000.00 Rp 16,900,000.00
20 Glassblock 20x20cm 66.00 bh Rp 25,000.00 Rp 1,650,000.00
21 Roster Batapres 20x20cm 132.00 bh Rp 35,000.00 Rp 4,620,000.00
22 Pasang Rangka Atap Galvalum C. 75 - 0,75 257.00 m' Rp 20,000.00 Rp 5,140,000.00
23 Pasang Reng Galvalum 183.00 m' Rp 11,000.00 Rp 2,013,000.00
24 Pasang Spandek 0,3 mm 158.00 m² Rp 85,000.00 Rp 13,430,000.00
25 Pasang Lisplang L. 20 (Kalsiplank) 363.00 m' Rp 25,000.00 Rp 9,075,000.00
26 Fitting Lampu 66.00 bh Rp 9,000.00 Rp 594,000.00
27 Lampu 5 watt 66.00 bh Rp 20,000.00 Rp 1,320,000.00
28 Kabel NYM 2x1,5mm 165.00 m Rp 8,000.00 Rp 1,320,000.00
29 Sakelar Tunggal 33.00 bh Rp 15,000.00 Rp 495,000.00
30 Pintu Kamar Mandi (Alumunium)+kusen 33.00 unit Rp 400,000.00 Rp 13,200,000.00
31 Floor Drain 33.00 bh Rp 21,000.00 Rp 693,000.00
32 Bak Mandi Fiber Oval 33.00 bh Rp 390,000.00 Rp 12,870,000.00
33 Anaerobik Filter uk. 37x1.00x60cm 29.00 unit Rp 350,000.00 Rp 10,150,000.00
34 Anaerobik Filter uk. 47x1.00x60cm 4.00 unit Rp 500,000.00 Rp 2,000,000.00
35 Kloset Jongkok 33.00 bh Rp 180,000.00 Rp 5,940,000.00
36 Pasang Buis Beton Ø 50 Cm 33.00 bh Rp 100,000.00 Rp 3,300,000.00
37 Tee GI Ø 1 66.00 bh Rp 81,000.00 Rp 5,346,000.00
38 Elbow PVC AW Ø 2" 66.00 bh Rp 10,000.00 Rp 660,000.00
39 Elbow PVC AW Ø 3" 33.00 bh Rp 10,000.00 Rp 330,000.00
40 Tee PVC AW Ø 2" 33.00 bh Rp 10,000.00 Rp 330,000.00
41 Tee PVC AW Ø 3" 66.00 bh Rp 16,000.00 Rp 1,056,000.00
42 Pipa GI Ø 1 '' 66.00 bh Rp 81,000.00 Rp 5,346,000.00
43 Keni PCV AW 3/4 66.00 bh Rp 5,000.00 Rp 330,000.00
44 Pipa PVC AW Ø 2" 132.00 bh Rp 21,500.00 Rp 2,838,000.00
45 Pipa PCV AW 3/4 132.00 bh Rp 9,500.00 Rp 1,254,000.00
46 Kran PCV AW 3/4 33.00 bh Rp 20,000.00 Rp 660,000.00
47 Pipa PVC AW Ø 3" 132.00 bh Rp 50,000.00 Rp 6,600,000.00
Sub Jumlah I Rp 338,739,983.30
II UPAH
1 Pekerja 990.00 oh Rp 100,000.00 Rp 99,000,000.00
2 Tukang 416.00 oh Rp 125,000.00 Rp 52,000,000.00
Sub Jumlah II Rp 151,000,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 Lbr 12,000.00 Rp 360,000.00
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 Ls 125,000.00 Rp 125,000.00
3 Kerta A4 10.00 Rim 45,000.00 Rp 450,000.00
4 Balpoint 3.00 dos 40,000.00 Rp 120,000.00
5 Buku 1.00 bh 7,000.00 Rp 7,000.00
6 Penggaris 1.00 bh 6,000.00 Rp 6,000.00
7 Isolasi 3.00 bh 14,000.00 Rp 42,000.00
8 Lem Kertas 3.00 bh 5,000.00 Rp 15,000.00
9 Gunting 2.00 bh 12,000.00 Rp 24,000.00
10 Printer 5.00 Unit 200,000.00 Rp 1,000,000.00
11 Materai 88.00 Lembar 10,000.00 Rp 880,000.00
Sub Jumlah III Rp 3,029,000.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 5.00 Buku 500,000.00 Rp 2,500,000.00
2 Foto Copy dan Penjilidan LPJ Akhir 5.00 Buku 500,000.00 Rp 2,500,000.00
3 Pembuatan Vidio Dokumentasi 1.00 Ls 500,000.00 Rp 500,000.00
Sub Jumlah IV Rp 5,500,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 15.00 Pcs 50,000.00 Rp 750,000.00
2 Sarung Tangan 15.00 Pasang 30,000.00 Rp 450,000.00
3 Sepatu Boods Panjang 15.00 Pasang 100,000.00 Rp 1,500,000.00
4 Rompi Pekerja 15.00 Pcs 55,000.00 Rp 825,000.00
5 Obat-obatan P3K 1.00 Set 250,000.00 Rp 250,000.00
6 Alat Ukur Suhu Tubuh 1.00 Unit 225,000.00 Rp 225,000.00
7 Masker Kain 2.00 Pcs 80,000.00 Rp 160,000.00
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 Botol 195,000.00 Rp 195,000.00
Sub Jumlah V Rp 4,355,000.00
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 6.00 Org/Kali 75,000.00 Rp 450,000.00
Sub Jumlah VI Rp 450,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 ls 150,000.00 Rp 150,000.00
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat 1.00 ls 225,000.00 Rp 225,000.00
3 Pembuatan Stiker Penerima 33.00 Bh 10,000.00 Rp 330,000.00
4 Pembuatan Prasasti 20 x 30 33.00 Bh 250,000.00 Rp 8,250,000.00
Sub Jumlah VII Rp 8,955,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 ls 200,000.00 Rp 200,000.00
Sub Jumlah VIII Rp 200,000.00
VII TRANSPORT KSM
1 Transport ke Bank 5 kali untuk 3 orang 18.00 Org/Kali 125,000.00 Rp 2,250,000.00
Sub Jumlah IX Rp 2,250,000.00
Jumlah
NO. URAIAN PEKERJAAN. SAT Panjang Lebar Tinggi Jumlah Bang. : 33 Total Volume
Unit
A. PEKERJAAN BANGUNAN BILIK TOILET 33.00
I PEKERJAAN PONDASI DAN BETON
1 Galian Tanah Biasa Sedalam 1 m m3 5.80 0.40 0.20 33.00 15.31
2 Pasangan Pondasi Batu Gunung 1 Pc : 8 Ps m3 5.80 0.33 0.40 33.00 24.88
Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Tenaga
Pekerja 0.0200 OH 100,000.00 2,000.00
Tukang Cat 0.0630 OH 125,000.00 7,875.00
Kepala Tukang 0.0063 OH - -
Mandor 0.0030 OH - -
Jumlah (1) 9,875.00
Bahan
Plamir Tembok 0.1000 kg 30,000.00 3,000.00
Cat Tembok Dasar 0.1000 kg 50,000.00 5,000.00
Cat Tembok Penutup 0.2600 kg 100,000.00 26,000.00
Jumlah (2) 34,000.00
Jumlah (1) + (2) 43,875.00
2,1,1,e,(a) Pasangan Unit Pondasi Sumuran Diameter
Tenaga
HARGA SAT JUMLAH
NO. PEKERJAAN KOEF. SAT.
Rp.- Rp.-
1 2 3 4 5 6=(3x5)
Pekerja 1.2000 OH - -
Tukang Batu 0.4000 OH - -
Kepala Tukang 0.0400 OH - -
Mandor 0.0595 OH - -
Jumlah (1) -
Bahan
Buis Beton Diameter 50 cm 1.0000 Unit 100,000.00 100,000.00
Bangkalan, ………................2022
Bangkalan, ………................2022
Mengetahui
TIM PENGELOLA TEKNIS KABUPATEN
DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN KABUPATEN BANGKALAN
ZAIFUL BAHRI, ST
Nip, 1965031320001121003
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : SANIMAS SPALD-S
PEKERJAAN : PEMBANGUNAN TOILET INDIVIDU
LOKASI : DESA RONGDURIN
KECAMATAN TANAH MERAH
TAHUN ANGGARAN : 2022
JUMLAH BANGUNAN : 33 UNIT
JUMLAH SEPTICTANK TYPE 1 : 29 UNIT
JUMLAH SEPTICTANK TYPE 2 : 4 UNIT
JUMLAH RESAPAN : 33 UNIT
NO NAMA BAHAN DAN UPAH TENAGA KERJA SATUAN HARGA SATUAN (Rp)
1 2 3 4
B BIAYA BAHAN
1 Air m³ -
2 Batu Gunung/ Kali m³ 207,000.00
3 Batu Bata Putih buah 900.00
4 Batu Cor m³ 256,000.00
5 Pasir Pasang Lokal m³ 250,000.00
6 Pasir Hitam ex. Pasuruan m³ 305,000.00
7 Pasir Urug m³ 245,000.00
8 Besi Beton kg 12,000.00
9 Kawat Beton kg 23,000.00
10 Kayu Bekisting m³ 1,500,000.00
11 Balok Kayu Lokal setara Meranti m³ 2,500,000.00
12 Portland Cement (PC) kg 1,450.00
13 Semen Warna kg 12,000.00
14 Keramik 30x30 dos 70,000.00
15 Keramik Dinding 10 x 30 cm (motif) dos 66,000.00
16 Minyak Bekisting liter 6,500.00
17 Paku Sekrup kg 25,500.00
18 Paku Biasa kg 17,000.00
19 Cat Tembok Dasar kg 50,000.00
20 Cat Tembok Penutup kg 100,000.00
21 Plamir Tembok kg 30,000.00
22 Kloset Jongkok bh 180,000.00
23 Floor drain bh 21,000.00
24 Sealtape bh 2,000.00
25 Pintu Kamar Mandi Galvalum unit 400,000.00
26 Keni PCV AW 3/4 bh 5,000.00
27 Pipa PCV AW 3/4 m' 9,500.00
28 Kran PCV AW 3/4 bh 20,000.00
29 Tee GI Ø 1" bh 25,000.00
30 Elbow PVC AW Ø 2" bh 10,000.00
31 Tee PVC AW Ø 2" bh 10,000.00
32 Tee PVC AW Ø 3" bh 16,000.00
33 Pipa GI Ø 1'' m' 81,000.00
34 Pipa PVC Ø 2" AW m' 21,500.00
35 Pipa PVC Ø 3" AW m' 50,000.00
36 Elbow PVC AW Ø 3" bh 20,000.00
NO NAMA BAHAN DAN UPAH TENAGA KERJA SATUAN HARGA SATUAN (Rp)
1 2 3 4
37 Bak Mandi Fiber Oval bh 390,000.00
38 Anaerobik Filter uk. 37x1.00x60cm unit 350,000.00
39 Anaerobik Filter uk. 47x1.00x60cm unit 500,000.00
40 Pasang Rangka Atap Galvalum C. 75 - 0,75 m1 20,000.00
41 Pasang Reng Galvalum m1 11,000.00
42 Pasang Spandek 0,3 mm m2 85,000.00
43 Buis Beton Ø 50 cm x 0,5 m Bh 100,000.00
44 Buis Beton Ø 100 cm x 0,5 m Bh 200,000.00
45 Kalsiplang L . 20 Cm m' 25,000.00
46 Triplek tbl. 9 mm lbr 98,500.00
47 Glassblock 20x20cm bh 25,000.00
48 Roster Batapres 20x20cm bh 35,000.00
49 Fitting Lampu bh 9,000.00
50 Lampu 5 watt bh 20,000.00
51 Kabel NYM 2x1,5mm m 8,000.00
52 Sakelar Tunggal bh 15,000.00
53 Kuas Cat 4" bh 16,500.00
Bangkalan, ………................2022
NO NAMA BAHAN DAN UPAH TENAGA KERJA SATUAN HARGA SATUAN (Rp)
1 2 3 4
B BIAYA BAHAN
1 Air m³ -
2 Batu Gunung/ Kali m³ 207,000.00
3 Batu Bata Putih buah 900.00
4 Batu Cor m³ 256,000.00
5 Pasir Pasang Lokal m³ 250,000.00
6 Pasir Hitam ex. Pasuruan m³ 305,000.00
7 Pasir Urug m³ 245,000.00
8 Besi Beton kg 12,000.00
9 Kawat Beton kg 23,000.00
10 Kayu Bekisting m³ 1,500,000.00
11 Balok Kayu Lokal setara Akasia m³ 2,500,000.00
12 Portland Cement (PC) kg 1,450.00
13 Semen Warna kg 12,000.00
14 Keramik dos 70,000.00
15 Keramik Dinding dos 66,000.00
16 Minyak Bekisting liter 6,500.00
17 Paku Sekrup kg 25,500.00
18 Paku Biasa kg 17,000.00
19 Cat Tembok Dasar kg 50,000.00
20 Cat Tembok Penutup kg 100,000.00
21 Plamir Tembok kg 30,000.00
22 Kloset Jongkok bh 180,000.00
23 Floor drain bh 21,000.00
24 Sealtape bh 2,000.00
25 Pintu Kamar Mandi Galvalum unit 400,000.00
26 Keni PCV AW 3/4 bh 5,000.00
27 Pipa PCV AW 3/4 m' 9,500.00
28 Kran PCV AW 3/4 bh 20,000.00
29 Tee GI Ø 1 bh 25,000.00
30 Elbow PVC AW Ø 2" bh 10,000.00
31 Tee PVC AW Ø 2" bh 10,000.00
32 Tee PVC AW Ø 3" bh 16,000.00
33 Pipa GI Ø 1 '' m' 81,000.00
34 Pipa PVC AW Ø 2" m' 21,500.00
35 Pipa PVC AW Ø 3" m' 50,000.00
NO NAMA BAHAN DAN UPAH TENAGA KERJA SATUAN HARGA SATUAN (Rp)
1 2 3 4
36 Bak Mandi Fiber Oval bh 390,000.00
37 Anaerobik Filter uk. 37x1.00x60cm unit 350,000.00
38 Anaerobik Filter uk. 47x1.00x60cm unit 500,000.00
39 Pasang Rangka Atap Galvalum C. 75 - 0,75 m1 20,000.00
40 Pasang Reng Galvalum m1 11,000.00
41 Pasang Spandek 0,3 mm m2 85,000.00
42 Pasang Buis Beton Ø 50 Cm Bh 100,000.00
43 Buis Beton Ø 100 cm x 0,5 m Bh 200,000.00
44 Pasang Lisplang L. 20 (Kalsiplank) m' 25,000.00
45 Triplek tbl. 9 mm lbr 98,500.00
46 Glassblock 20x20cm bh 25,000.00
47 Roster Batapres 20x20cm bh 35,000.00
48 Fitting Lampu bh 9,000.00
49 Lampu 5 watt bh 20,000.00
50 Kabel NYM 2x1,5mm m 8,000.00
51 Sakelar Tunggal bh 15,000.00
52 Kuas Cat 4" bh 16,500.00
54 Elbow PVC AW Ø 3" bh 20,000.00
Bangkalan, ………................2022
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. ABD SALAM, SE. ISROK
Faskab TFL Teknik TFL Pemberdayaan Ketua
RENCANA PENGGUNAAN DANA ( RPD 70 % )
Harga
No. Uraian Kegiatan Kebutuhan Unit/ satuan Jumlah
satuan Rp. Rp.
1 2 3 4 5 6
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 22.00 m³ Rp 207,000.00 Rp 4,554,000.00
2 Batu Bata Putih 14,000.00 buah Rp 900.00 Rp 12,600,000.00
3 Batu Cor 28.00 m³ Rp 256,000.00 Rp 7,168,000.00
4 Pasir Pasang Lokal 28.00 m³ Rp 250,000.00 Rp 7,000,000.00
5 Pasir Hitam ex. Pasuruan 35.00 m³ Rp 305,000.00 Rp 10,675,000.00
6 Pasir Urug 1.00 m³ Rp 245,000.00 Rp 245,000.00
7 Tulangan Ø 10 295.00 lonjor Rp 88,800.00 Rp 26,196,000.00
8 Tulangan Ø 6 265.00 lonjor Rp 31,900.00 Rp 8,453,500.00
9 Kawat Beton 41.00 kg Rp 23,000.00 Rp 943,000.00
10 Kayu Bekisting 2/20 392.00 lembar Rp 24,000.00 Rp 9,408,000.00
11 Kayu Lokal 5/7 150.00 batang Rp 35,000.00 Rp 5,250,000.00
12 Portland Cement (PC) 536.00 sak Rp 58,000.00 Rp 31,088,000.00
13 Semen Warna 47.00 kg Rp 12,000.00 Rp 564,000.00
14 Keramik 37.00 dos Rp 70,000.00 Rp 2,590,000.00
15 Keramik Dinding 10 x 30 cm 15.00 dos Rp 66,000.00 Rp 990,000.00
16 Minyak Bekisting 25.00 liter Rp 6,500.00 Rp 162,500.00
17 Paku Biasa 66.00 kg Rp 17,000.00 Rp 1,122,000.00
18 Cat Tembok Dasar 45.00 kg Rp 50,000.00 Rp 2,250,000.00
19 Cat Tembok Penutup 117.00 kg Rp 100,000.00 Rp 11,700,000.00
20 Kuas Cat 4" 7.00 bh Rp 16,500.00 Rp 115,500.00
21 Plamir Tembok 45.00 kg Rp 30,000.00 Rp 1,350,000.00
22 Kloset Jongkok 23.00 bh Rp 180,000.00 Rp 4,140,000.00
23 Floor drain 23.00 bh Rp 21,000.00 Rp 483,000.00
24 Sealtape 23.00 bh Rp 2,000.00 Rp 46,000.00
25 Pintu Kamar Mandi Galvalum 23.00 unit Rp 400,000.00 Rp 9,200,000.00
26 Keni PCV AW 3/4 46.00 bh Rp 5,000.00 Rp 230,000.00
27 Pipa PCV AW 3/4 15.00 lonjor Rp 57,000.00 Rp 855,000.00
28 Kran PCV AW 3/4 23.00 bh Rp 20,000.00 Rp 460,000.00
29 Tee GI Ø 1 46.00 bh Rp 25,000.00 Rp 1,150,000.00
30 Elbow PVC AW Ø 2" 46.00 bh Rp 10,000.00 Rp 460,000.00
31 Tee PVC AW Ø 2" 23.00 bh Rp 10,000.00 Rp 230,000.00
32 Tee PVC AW Ø 3" 46.00 bh Rp 16,000.00 Rp 736,000.00
33 Pipa GI Ø 1 '' 46.00 m' Rp 81,000.00 Rp 3,726,000.00
34 Pipa PVC AW Ø 2" 23.00 lonjor Rp 86,000.00 Rp 1,978,000.00
35 Pipa PVC AW Ø 3" 23.00 lonjor Rp 200,000.00 Rp 4,600,000.00
36 Elbow PVC AW Ø 3" 23.00 bh Rp 20,000.00 Rp 460,000.00
37 Bak Mandi Fiber Oval 23.00 bh Rp 390,000.00 Rp 8,970,000.00
38 Anaerobik Filter uk. 37x1.00x60cm 19.00 unit Rp 350,000.00 Rp 6,650,000.00
39 Anaerobik Filter uk. 47x1.00x60cm 4.00 unit Rp 500,000.00 Rp 2,000,000.00
40 Rangka Atap Galvalum C. 75 - 0,75 30.00 batang Rp 120,000.00 Rp 3,600,000.00
41 Reng Galvalum 21.00 batang Rp 66,000.00 Rp 1,386,000.00
42 Spandek 0,3 mm 110.00 m2 Rp 85,000.00 Rp 9,350,000.00
43 Pasang Buis Beton Ø 50 Cm 23.00 Bh Rp 100,000.00 Rp 2,300,000.00
44 Buis Beton Ø 100 cm x 0,5 m 23.00 Bh Rp 200,000.00 Rp 4,600,000.00
45 Lisplang L. 20 (Kalsiplank) 83.00 m' Rp 75,000.00 Rp 6,225,000.00
46 Triplek tbl. 9 mm 19.00 lbr Rp 98,500.00 Rp 1,871,500.00
47 Glassblock 20x20cm 46.00 bh Rp 25,000.00 Rp 1,150,000.00
48 Roster Batapres 20x20cm 92.00 bh Rp 35,000.00 Rp 3,220,000.00
49 Fitting Lampu 46.00 bh Rp 9,000.00 Rp 414,000.00
50 Lampu 5 watt 46.00 bh Rp 20,000.00 Rp 920,000.00
51 Kabel NYM 2x1,5mm 115.00 m Rp 8,000.00 Rp 920,000.00
52 Sakelar Tunggal 23.00 bh Rp 15,000.00 Rp 345,000.00
Sub Jumlah I Rp 227,100,000.00
II UPAH
1 Pekerja 690.00 oh Rp 100,000.00 Rp 69,000,000.00
2 Tukang 281.00 oh Rp 125,000.00 Rp 35,125,000.00
Sub Jumlah II Rp 104,125,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 Lbr 12,000.00 Rp 360,000.00
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 Ls 125,000.00 Rp 125,000.00
3 Kerta A4 7.00 Rim 45,000.00 Rp 315,000.00
4 Balpoint 2.00 dos 40,000.00 Rp 80,000.00
5 Buku 1.00 bh 7,000.00 Rp 7,000.00
6 Penggaris 1.00 bh 6,000.00 Rp 6,000.00
7 Isolasi 2.00 bh 14,000.00 Rp 28,000.00
8 Lem Kertas 2.00 bh 5,000.00 Rp 10,000.00
9 Gunting 2.00 bh 12,000.00 Rp 24,000.00
10 Sewa Printer 5.00 Bln 200,000.00 Rp 1,000,000.00
11 Materai 61.00 Lembar 10,000.00 Rp 610,000.00
Sub Jumlah III Rp 2,565,000.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 3.00 Buku 500,000.00 Rp 1,500,000.00
2 Foto Copy dan Penjilidan LPJ Akhir 3.00 Buku 500,000.00 Rp 1,500,000.00
3 Pembuatan Vidio Dokumentasi 1.00 Ls 500,000.00 Rp 500,000.00
Sub Jumlah IV Rp 3,500,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 15.00 Pcs 50,000.00 Rp 750,000.00
2 Sarung Tangan 15.00 Pasang 30,000.00 Rp 450,000.00
3 Sepatu Boods Panjang 15.00 Pasang 100,000.00 Rp 1,500,000.00
4 Rompi Pekerja 15.00 Pcs 55,000.00 Rp 825,000.00
5 Obat-obatan P3K 1.00 Set 250,000.00 Rp 250,000.00
6 Alat Ukur Suhu Tubuh 1.00 Unit 225,000.00 Rp 225,000.00
7 Masker Kain 2.00 Pcs 80,000.00 Rp 160,000.00
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 Botol 195,000.00 Rp 195,000.00
Sub Jumlah V Rp 4,355,000.00
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 4.00 Org/Kali 75,000.00 Rp 300,000.00
Sub Jumlah VI Rp 300,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 ls 150,000.00 Rp 150,000.00
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat 1.00 ls 225,000.00 Rp 225,000.00
3 Pembuatan Stiker Penerima 23.00 Bh 10,000.00 Rp 230,000.00
4 Pembuatan Prasasti 20 x 30 23.00 Bh 250,000.00 Rp 5,750,000.00
Sub Jumlah VII Rp 6,355,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 ls 200,000.00 Rp 200,000.00
Sub Jumlah VIII Rp 200,000.00
VII TRANSPORT KSM
1 Transport ke Bank 6 kali untuk 3 orang 12.00 Org/Kali 125,000.00 Rp 1,500,000.00
Sub Jumlah IX Rp 1,500,000.00
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. ABD SALAM, SE. ISROK
Faskab TFL Teknik TFL Pemberdayaan Ketua
RENCANA PENGGUNAAN DANA BANK 1 ( RPDB 30 % )
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. ABD SALAM, SE. ISROK
Faskab TFL Teknik TFL Pemberdayaan Ketua
RENCANA PENGGUNAAN DANA BANK 2 ( RPDB 30 % )
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. ABD SALAM, SE. ISROK
Faskab TFL Teknik TFL Pemberdayaan Ketua
RENCANA PENGGUNAAN DANA 3 ( RPDB 30 % )
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. ABD SALAM, SE. ISROK
Faskab TFL Teknik TFL Pemberdayaan Ketua
RENCANA PENGGUNAAN DANA 4 ( RPDB 10 % )
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. ABD SALAM, SE. ISROK
Faskab TFL Teknik TFL Pemberdayaan Ketua
RENCANA PENGGUNAAN DANA (RPD 30 % )
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. ABD SALAM, SE. ISROK
Faskab TFL Teknik TFL Pemberdayaan Ketua
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : SANIMAS SPALD-S
PEKERJAAN : PEMBANGUNAN TOILET INDIVIDU
LOKASI : DESA RONGDURIN
KECAMATAN TANAH MERAH
TAHUN ANGGARAN : 2022
JUMLAH BANGUNAN : 33 UNIT
JUMLAH SEPTICTANK TYPE 1 : 29 UNIT
JUMLAH SEPTICTANK TYPE 2 : 4 UNIT
JUMLAH RESAPAN : 33 UNIT
JUMLAH TOTAL
(Rp)
14
4,350,000.00
5,500,000.00
3,175,000.00
630,900.00
8,450,000.00
200,000.00
1,500,000.00
23,805,900.00
1,148,400.00
20,724,342.21
3,590,017.20
12,000,062.05
6,288,052.52
8,487,848.77
4,447,646.90
8,487,848.77
JUMLAH TOTAL
(Rp)
4,447,646.90
6,403,072.50
9,058,005.00
9,058,005.00
94,140,947.83
8,826,200.63
24,886,642.77
11,467,853.10
32,035,107.85
24,216,406.50
1,650,000.00
4,620,000.00
107,702,210.85
Err:509
9,075,000.00
11,274,120.00
5,394,188.09
2,231,026.70
594,000.00
1,320,000.00
1,320,000.00
495,000.00
28,552,095.00
Err:509
13,200,000.00
693,000.00
12,870,000.00
10,150,000.00
2,000,000.00
5,940,000.00
Err:509
825,000.00
660,000.00
330,000.00
1,056,000.00
JUMLAH TOTAL
(Rp)
5,346,000.00
2,838,000.00
6,600,000.00
Err:509
6,681,600.00
2,842,055.04
4,312,869.73
4,483,255.00
18,795,048.88
26,362,416.20
20,095,729.61
83,572,974.45
1,305,600.00
556,143.76
842,744.66
899,175.00
3,255,768.42
4,528,513.21
5,596,970.00
16,984,915.05
3,885,750.00
8,134,170.00
3,495,525.00
2,410,481.46
2,675,404.46
3,453,153.77
24,054,484.69
Err:509
Err:509
RENCANA PENGGUNAAN DANA BANK TAHAP - I (RPD 40 % )
Volume Harga
No. Uraian Kegiatan Kebutuhan Realisasi Pengajuan Komulatif s/d Unit/ satuan Jumlah
Tahap Lalu Saat ini Saat ini satuan Rp. Rp.
1 2 3 4 5 6 7 8 9
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 19.00 11.00 11.00 m³ Rp 207,000.00 Rp 2,277,000.00
2 Portland Cement (PC) 19,400.00 8,850.00 8,850.00 kg Rp 1,450.00 Rp 12,832,500.00
3 Pasir Hitam ex. Pasuruan 22.00 16.00 16.00 m³ Rp 305,000.00 Rp 4,880,000.00
4 Batu Bata Putih 0.48 5,958.00 5,958.00 buah Rp 900.00 Rp 5,362,200.00
5 Pasir Pasang Lokal 13,650.00 10.00 10.00 m³ Rp 250,000.00 Rp 2,500,000.00
6 Besi Beton 26.00 1,260.00 1,260.00 kg Rp 12,000.00 Rp 15,120,000.00
7 Kawat Beton 2,901.50 20.00 20.00 kg Rp 23,000.00 Rp 460,000.00
8 Batu Cor 42.00 12.00 12.00 m³ Rp 256,000.00 Rp 3,072,000.00
9 Air 24.00 3.00 3.00 m³ Rp - Rp -
10 Kayu Bekisting Err:509 5.00 5.00 m³ Rp 1,500,000.00 Rp 7,500,000.00
11 Paku Biasa 3.00 34.00 34.00 kg Rp 17,000.00 Rp 578,000.00
12 Minyak Bekisting 78.00 11.00 11.00 liter Rp 6,500.00 Rp 71,500.00
13 Keramik 26.00 16.00 16.00 dos Rp 70,000.00 Rp 1,120,000.00
14 Semen Warna 37.00 21.00 21.00 kg Rp 12,000.00 Rp 252,000.00
15 Keramik Dinding 46.00 7.00 7.00 dos Rp 66,000.00 Rp 462,000.00
16 Plamir Tembok 495.00 19.00 19.00 kg Rp 30,000.00 Rp 570,000.00
17 Cat Tembok Dasar 45.00 19.00 19.00 kg Rp 50,000.00 Rp 950,000.00
18 Cat Tembok Penutup 45.00 50.00 50.00 kg Rp 100,000.00 Rp 5,000,000.00
19 Glassblock 20x20cm 118.00 19.00 19.00 bh Rp 25,000.00 Rp 475,000.00
20 Roster Batapres 20x20cm 46.00 39.00 39.00 bh Rp 35,000.00 Rp 1,365,000.00
21 Pasang Rangka Atap Galvalum C. 75 - 0,75 92.00 76.00 76.00 m' Rp 65,000.00 Rp 4,940,000.00
22 Pasang Reng Galvalum 180.00 54.00 54.00 m' Rp 41,000.00 Rp 2,214,000.00
23 Pasang Spandek 0,3 mm 128.00 47.00 47.00 m² Rp 60,000.00 Rp 2,820,000.00
24 Pasang Lisplang L. 20 (Kalsiplank) 111.00 108.00 108.00 m' Rp 25,000.00 Rp 2,700,000.00
25 Fitting Lampu 253.00 19.00 19.00 bh Rp 9,000.00 Rp 171,000.00
26 Lampu 5 watt 46.00 19.00 19.00 bh Rp 20,000.00 Rp 380,000.00
27 Kabel NYM 2x1,5mm 46.00 49.00 49.00 m Rp 8,000.00 Rp 392,000.00
28 Sakelar Tunggal 115.00 9.00 9.00 bh Rp 15,000.00 Rp 135,000.00
29 Pintu Kamar Mandi (Alumunium) 23.00 9.00 9.00 unit Rp 300,000.00 Rp 2,700,000.00
30 Floor Drain 23.00 9.00 9.00 bh Rp 20,000.00 Rp 180,000.00
31 Bak Mandi Fiber Oval 23.00 9.00 9.00 bh Rp 340,000.00 Rp 3,060,000.00
32 Anaerobik Filter uk. 37x1.00x60cm 23.00 7.00 7.00 unit Rp 350,000.00 Rp 2,450,000.00
33 Anaerobik Filter uk. 47x1.00x60cm 20.00 2.00 2.00 unit Rp 550,000.00 Rp 1,100,000.00
34 Kloset Jongkok 2.00 9.00 9.00 bh Rp 175,000.00 Rp 1,575,000.00
35 Pasang Buis Beton Ø 50 Cm 23.00 9.00 9.00 bh Rp 100,000.00 Rp 900,000.00
36 Tee PVC AW Ø 1 1/2" 23.00 9.00 9.00 bh Rp 105,000.00 Rp 945,000.00
37 Elbow PVC AW Ø 2" 46.00 29.00 29.00 bh Rp 10,000.00 Rp 290,000.00
38 Tee PVC AW Ø 2" 46.00 19.00 19.00 bh Rp 12,000.00 Rp 228,000.00
39 Tee PVC AW Ø 3" 23.00 19.00 19.00 bh Rp 16,000.00 Rp 304,000.00
40 Pipa PVC AW Ø 1 1/2" 23.00 39.00 39.00 m' Rp 73,900.00 Rp 2,882,100.00
41 Pipa PVC AW Ø 2" 92.00 39.00 39.00 m' Rp 37,000.00 Rp 1,443,000.00
42 Pipa PVC AW Ø 3" Err:509 39.00 39.00 m' Rp 60,000.00 Rp 2,340,000.00
Sub Jumlah I Rp 98,996,300.00
II UPAH
1 Pekerja 693.00 281.00 281.00 oh Rp 100,000.00 Rp 28,100,000.00
2 Tukang 290.00 135.00 135.00 oh Rp 125,000.00 Rp 16,875,000.00
Sub Jumlah II Rp 44,975,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 12.00 12.00 Lbr 2,000.00 Rp 24,000.00
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 1.00 Ls 200,000.00 Rp 200,000.00
3 Kerta A4 10.00 2.00 2.00 Rim 45,000.00 Rp 90,000.00
4 Balpoint 2.00 1.00 1.00 dos 40,000.00 Rp 40,000.00
5 Buku 1.00 1.00 1.00 bh 7,000.00 Rp 7,000.00
6 Penggaris 1.00 1.00 1.00 bh 5,000.00 Rp 5,000.00
7 Isolasi 2.00 2.00 2.00 bh 14,000.00 Rp 28,000.00
8 Lem Kertas 2.00 2.00 2.00 bh 5,000.00 Rp 10,000.00
9 Gunting 1.00 1.00 1.00 bh 9,500.00 Rp 9,500.00
10 Printer 1.00 1.00 1.00 Unit 1,800,000.00 Rp 1,800,000.00
11 Materai 78.00 18.00 18.00 Lembar 10,000.00 Rp 180,000.00
Sub Jumlah III Rp 2,393,500.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 5.00 1.00 1.00 Buku 500,000.00 Rp 500,000.00
2 Foto Copy dan Penjilidan LPJ Akhir - - - Buku 500,000.00 Rp -
3 Pembuatan Vidio Dokumentasi - - - Ls 500,000.00 Rp -
Sub Jumlah IV Rp 500,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 15.00 6.00 6.00 Pcs 50,000.00 Rp 300,000.00
2 Sarung Tangan 15.00 6.00 6.00 Pasang 30,000.00 Rp 180,000.00
3 Sepatu Boods Panjang 15.00 6.00 6.00 Pasang 100,000.00 Rp 600,000.00
4 Rompi Pekerja 15.00 6.00 6.00 Pcs 55,000.00 Rp 330,000.00
5 Obat-obatan P3K 1.00 1.00 1.00 Set 250,000.00 Rp 250,000.00
6 Alat Ukur Suhu Tubuh 1.00 1.00 1.00 Unit 225,000.00 Rp 225,000.00
7 Masker Kain 2.00 0.80 0.80 Pcs 16,000.00 Rp 12,800.00
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 1.00 1.00 Botol 195,000.00 Rp 195,000.00
Sub Jumlah V Rp 2,092,800.00
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 4.00 2.00 2.00 Org/Kali 75,000.00 Rp 150,000.00
Sub Jumlah VI Rp 150,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 1.00 1.00 ls 200,000.00 Rp 200,000.00
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 1.00 ls 200,000.00 Rp 200,000.00
3 Pembuatan Stiker Penerima 29.00 9.00 9.00 Bh 10,000.00 Rp 90,000.00
4 Pembuatan Prasasti 20 x 30 29.00 9.00 9.00 Bh 250,000.00 Rp 2,250,000.00
Sub Jumlah VII Rp 2,740,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 1.00 1.00 ls 200,000.00 Rp 200,000.00
Sub Jumlah VIII Rp 200,000.00
VII TRANSPORT KSM
1 Transport ke Bank 5 kali untuk 3 orang 10.00 4.00 4.00 Org/Kali 100,000.00 Rp 400,000.00
Sub Jumlah IX Rp 400,000.00
Volume Harga
No. Uraian Kegiatan Kebutuhan Real. S/d Pengajuan Jumlah Unit/ satuan Jumlah
tahap lalu sekarang komulatif satuan Rp. Rp.
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 31.00 25.00 25.00 m³ 207,000.00 5,175,000.00
2 Batu Bata Putih 27,602.00 15,823.00 15,823.00 buah 900.00 14,240,700.00
3 Batu Cor 31.00 35.00 35.00 m³ 256,000.00 8,960,000.00
4 Pasir Pasang Lokal 19,500.00 27.00 27.00 m³ 250,000.00 6,750,000.00
5 Pasir Hitam ex. Pasuruan 38.00 40.00 40.00 m³ 305,000.00 12,200,000.00
6 Besi Polos Ø 6 4,145.00 290.00 290.00 lonjor 30,000.00 8,700,000.00
7 Besi Polos Ø 8 59.00 20.00 20.00 lonjor 42,000.00 840,000.00
8 Besi Polos Ø 10 35.00 330.00 330.00 lonjor 66,100.00 21,813,000.00
9 Kawat Bendrat Err:509 45.00 45.00 kg 23,000.00 1,035,000.00
10 Papan Bekisting 5.00 3.50 3.50 m³ 24,000.00 84,000.00
11 Semen 40 kg 112.00 542.00 542.00 zak 58,000.00 31,436,000.00
12 Semen Warna 37.00 54.00 54.00 kg 12,000.00 648,000.00
13 Keramik 20 x 20 cm (motif) 54.00 45.00 45.00 dos #N/A #N/A
14 Keramik Dinding 20 x 25 cm (motif) 67.00 - - dos #N/A #N/A
15 Minyak Bekisting 708.00 18.00 18.00 liter 6,500.00 117,000.00
16 Paku Biasa 65.00 85.00 85.00 kg 17,000.00 1,445,000.00
17 Cat Tembok Dasar 65.00 10.00 10.00 galon 250,000.00 2,500,000.00
18 Cat Tembok Penutup 169.00 25.00 25.00 galon 500,000.00 12,500,000.00
19 Plamir Tembok 66.00 46.20 46.20 kg 30,000.00 1,386,000.00
20 Kloset Jongkok 132.00 25.00 25.00 bh 180,000.00 4,500,000.00
21 Floor drain 257.00 25.00 25.00 bh 21,000.00 525,000.00
22 Pintu Kamar Mandi (Alumunium) 183.00 25.00 25.00 unit #N/A #N/A
23 Tee PVC AW Ø 1 1/2" 158.00 25.00 25.00 bh #N/A #N/A
24 Elbow PVC AW Ø 2" 363.00 74.00 74.00 bh 10,000.00 740,000.00
25 Tee PVC AW Ø 2" 66.00 50.00 50.00 bh 10,000.00 500,000.00
26 Tee PVC AW Ø 3" 66.00 50.00 50.00 bh 16,000.00 800,000.00
27 Pipa PVC AW Ø 1 1/2" 165.00 50.00 50.00 m' #N/A #N/A
28 Pipa PVC AW Ø 2" 33.00 100.00 100.00 m' 21,500.00 2,150,000.00
29 Pipa PVC AW Ø 3" 33.00 100.00 100.00 m' 50,000.00 5,000,000.00
30 Bak Mandi Fiber Oval 33.00 30.00 30.00 bh 390,000.00 11,700,000.00
31 Anaerobik Filter uk. 37x1.00x60cm 33.00 19.00 19.00 unit 350,000.00 6,650,000.00
32 Anaerobik Filter uk. 47x1.00x60cm 29.00 6.00 6.00 unit 500,000.00 3,000,000.00
33 Pasang Rangka Atap Galvalum C. 75 - 0,75 + Spandek 0,3 4.00 118.00 118.00 m2 #N/A #N/A
34 Pasang Lisplang L. 20 (Kalsiplank) 33.00 270.00 270.00 m' 25,000.00 6,750,000.00
34 Glassblock 20x20cm 33.00 23.10 23.10 bh 25,000.00 577,500.00
35 Roster Batapres 20x20cm 66.00 46.20 46.20 bh 35,000.00 1,617,000.00
36 Pasang Grease Trap Precast 66.00 - - unit #N/A #N/A
37 Fitting Lampu 33.00 23.10 23.10 bh 9,000.00 207,900.00
38 Lampu 5 watt 33.00 23.10 23.10 bh 20,000.00 462,000.00
39 Kabel NYM 2x1,5mm Err:509 122.00 122.00 m 8,000.00 976,000.00
### Alat Pelindung Diri Dan Keselamatan Kerja (Apd K3) 1.00 Ls 2,553,900.00 2,553,900.00
### Kampanye Phbs 1.00 Ls 630,900.00 630,900.00
### Kegiatan Rembuk Warga 1.00 Ls 5,915,000.00 5,915,000.00
### Papan Informasi Pelaksanaan Kegiatan 1.00 Ls - -
### Transport Ksm 1.00 Ls 1,050,000.00 1,050,000.00
Sub Total IV 10,149,800.00
Jumlah Sub Total I+II+III+IV #REF!
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. / ABD SALAM, SE. ISROK
Diverifikasi,
Tim Teknis Satker Tim Teknis Satker Kabupaten
Dinas Perumahan dan Kawasan Permukiman
Pelaksanaan Prasarana Permukiman Wilayah II Provinsi Jawa Timur
Kabupaten Bangkalan
Nip, 1965031320001121003
Mengetahui,
Permukiman Wilayah II
Desa : RONGDURIN
Nama KSM : DURIN JAYA
Volume
No. Uraian Kegiatan Kebutuhan Real. S/d Pengajuan Jumlah
tahap lalu sekarang komulatif
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 30.00 25.00 5.00 30.00
2 Batu Bata Putih 20,053.00 15,823.00 4,230.00 20,053.00
3 Batu Cor 41.00 35.00 6.00 41.00
4 Pasir Pasang Lokal 38.00 27.00 11.00 38.00
5 Pasir Hitam ex. Pasuruan 51.00 40.00 11.00 51.00
6 Besi Polos Ø 6 342.00 290.00 52.00 342.00
7 Besi Polos Ø 8 22.00 20.00 2.00 22.00
8 Besi Polos Ø 10 400.00 330.00 70.00 400.00
9 Kawat Bendrat 60.00 45.00 15.00 60.00
10 Papan Bekisting 595.00 3.50 591.50 595.00
11 Semen 40 kg 772.00 542.00 230.00 772.00
12 Semen Warna 67.00 54.00 13.00 67.00
13 Keramik 20 x 20 cm (motif) - 45.00 (45.00) -
14 Keramik Dinding 20 x 25 cm (motif) - - - -
15 Minyak Bekisting 38.00 18.00 20.00 38.00
16 Paku Biasa 97.00 85.00 12.00 97.00
17 Cat Tembok Dasar 14.00 10.00 4.00 14.00
18 Cat Tembok Penutup 34.00 25.00 9.00 34.00
19 Plamir Tembok 66.00 46.20 19.80 66.00
20 Kloset Jongkok 33.00 25.00 8.00 33.00
21 Floor drain 33.00 25.00 8.00 33.00
22 Pintu Kamar Mandi (Alumunium) - 25.00 (25.00) -
23 Tee PVC AW Ø 1 1/2" - 25.00 (25.00) -
24 Elbow PVC AW Ø 2" 66.00 74.00 (8.00) 66.00
25 Tee PVC AW Ø 2" 33.00 50.00 (17.00) 33.00
Diverifikasi,
Tim Teknis Satker
Pelaksanaan Prasarana Permukiman Wilayah II Provinsi Jawa Timur
…............
Mengetahui,
Pejabat Pembuat Komitmen Pengembangan PLP
Satuan Kerja Pelaksanaan Prasarana
Permukiman Wilayah II
Provinsi Jawa Timur
Harga
Unit/ satuan Jumlah
satuan Rp. Rp.
m³ 207,000.00 1,035,000.00
buah 900.00 3,807,000.00
m³ 256,000.00 1,536,000.00
m³ 250,000.00 2,750,000.00
m³ 305,000.00 3,355,000.00
lonjor 30,000.00 1,560,000.00
lonjor 42,000.00 84,000.00
lonjor 66,100.00 4,627,000.00
kg 23,000.00 345,000.00
m³ 24,000.00 14,196,000.00
zak 58,000.00 13,340,000.00
kg 12,000.00 156,000.00
dos #N/A #N/A
dos #N/A #N/A
liter 6,500.00 130,000.00
kg 17,000.00 204,000.00
galon 250,000.00 1,000,000.00
galon 500,000.00 4,500,000.00
kg 30,000.00 594,000.00
bh 180,000.00 1,440,000.00
bh 21,000.00 168,000.00
unit #N/A #N/A
bh #N/A #N/A
bh 10,000.00 (80,000.00)
bh 10,000.00 (170,000.00)
bh 16,000.00 256,000.00
OH 100,000.00 Err:509
OH 125,000.00 Err:509
Ls Err:509 Err:509
Ls Err:509 Err:509
Ls 621,100.00 621,100.00
Ls - -
Ls 2,535,000.00 2,535,000.00
Ls 200,000.00 200,000.00
Ls 450,000.00 450,000.00
Disusun oleh,
KSM DURIN JAYA
ZAIFUL BAHRI, ST
Nip, 1965031320001121003
Volume Harga
No. Uraian Kegiatan Kebutuhan Realisasi Pengajuan Komulatif s/d Unit/ satuan Jumlah
Tahap Lalu Saat ini Saat ini satuan Rp. Rp.
1 2 3 4 5 6 7 8 9
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 19.00 11.00 10.00 21.00 m³ Rp 207,000.00 Rp 2,070,000.00
2 Portland Cement (PC) 19,400.00 8,850.00 6,650.00 15,500.00 kg Rp 1,450.00 Rp 9,642,500.00
3 Pasir Hitam ex. Pasuruan 22.00 16.00 12.00 28.00 m³ Rp 305,000.00 Rp 3,660,000.00
4 Batu Bata Putih 0.48 5,958.00 4,508.00 10,466.00 buah Rp 900.00 Rp 4,057,200.00
5 Pasir Pasang Lokal 13,650.00 10.00 8.00 18.00 m³ Rp 250,000.00 Rp 2,000,000.00
6 Besi Beton 26.00 1,260.00 937.00 2,197.00 kg Rp 12,000.00 Rp 11,244,000.00
7 Kawat Beton 2,901.50 20.00 17.00 37.00 kg Rp 23,000.00 Rp 391,000.00
8 Batu Cor 42.00 12.00 11.00 23.00 m³ Rp 256,000.00 Rp 2,816,000.00
9 Air 24.00 3.00 3.00 6.00 m³ Rp - Rp -
10 Kayu Bekisting Err:509 5.00 4.00 9.00 m³ Rp 1,500,000.00 Rp 6,000,000.00
11 Paku Biasa 3.00 34.00 28.00 62.00 kg Rp 17,000.00 Rp 476,000.00
12 Minyak Bekisting 78.00 11.00 12.00 23.00 liter Rp 6,500.00 Rp 78,000.00
13 Keramik 26.00 16.00 12.00 28.00 dos Rp 70,000.00 Rp 840,000.00
14 Semen Warna 37.00 21.00 16.00 37.00 kg Rp 12,000.00 Rp 192,000.00
15 Keramik Dinding 46.00 7.00 6.00 13.00 dos Rp 66,000.00 Rp 396,000.00
16 Plamir Tembok 495.00 19.00 15.00 34.00 kg Rp 30,000.00 Rp 450,000.00
17 Cat Tembok Dasar 45.00 19.00 15.00 34.00 kg Rp 50,000.00 Rp 750,000.00
18 Cat Tembok Penutup 45.00 50.00 38.00 88.00 kg Rp 100,000.00 Rp 3,800,000.00
19 Glassblock 20x20cm 118.00 19.00 15.00 34.00 bh Rp 25,000.00 Rp 375,000.00
20 Roster Batapres 20x20cm 46.00 39.00 30.00 69.00 bh Rp 35,000.00 Rp 1,050,000.00
21 Pasang Rangka Atap Galvalum C. 75 - 0,75 92.00 76.00 57.00 133.00 m' Rp 65,000.00 Rp 3,705,000.00
22 Pasang Reng Galvalum 180.00 54.00 41.00 95.00 m' Rp 41,000.00 Rp 1,681,000.00
23 Pasang Spandek 0,3 mm 128.00 47.00 35.00 82.00 m² Rp 60,000.00 Rp 2,100,000.00
24 Pasang Lisplang L. 20 (Kalsiplank) 111.00 108.00 81.00 189.00 m' Rp 25,000.00 Rp 2,025,000.00
25 Fitting Lampu 253.00 19.00 14.00 33.00 bh Rp 9,000.00 Rp 126,000.00
26 Lampu 5 watt 46.00 19.00 14.00 33.00 bh Rp 20,000.00 Rp 280,000.00
27 Kabel NYM 2x1,5mm 46.00 49.00 37.00 86.00 m Rp 8,000.00 Rp 296,000.00
28 Sakelar Tunggal 115.00 9.00 7.00 16.00 bh Rp 15,000.00 Rp 105,000.00
29 Pintu Kamar Mandi (Alumunium) 23.00 9.00 7.00 16.00 unit Rp 300,000.00 Rp 2,100,000.00
30 Floor Drain 23.00 9.00 7.00 16.00 bh Rp 20,000.00 Rp 140,000.00
31 Bak Mandi Fiber Oval 23.00 9.00 7.00 16.00 bh Rp 340,000.00 Rp 2,380,000.00
32 Anaerobik Filter uk. 37x1.00x60cm 23.00 7.00 6.00 13.00 unit Rp 350,000.00 Rp 2,100,000.00
33 Anaerobik Filter uk. 47x1.00x60cm 20.00 2.00 2.00 4.00 unit Rp 550,000.00 Rp 1,100,000.00
34 Kloset Jongkok 2.00 9.00 7.00 16.00 bh Rp 175,000.00 Rp 1,225,000.00
35 Pasang Buis Beton Ø 50 Cm 23.00 9.00 7.00 16.00 bh Rp 100,000.00 Rp 700,000.00
36 Tee PVC AW Ø 1 1/2" 23.00 9.00 7.00 16.00 bh Rp 105,000.00 Rp 735,000.00
37 Elbow PVC AW Ø 2" 46.00 29.00 22.00 51.00 bh Rp 10,000.00 Rp 220,000.00
38 Tee PVC AW Ø 2" 46.00 19.00 15.00 34.00 bh Rp 12,000.00 Rp 180,000.00
39 Tee PVC AW Ø 3" 23.00 19.00 15.00 34.00 bh Rp 16,000.00 Rp 240,000.00
40 Pipa PVC AW Ø 1 1/2" 23.00 39.00 29.00 68.00 m' Rp 73,900.00 Rp 2,143,100.00
41 Pipa PVC AW Ø 2" 92.00 39.00 29.00 68.00 m' Rp 37,000.00 Rp 1,073,000.00
42 Pipa PVC AW Ø 3" Err:509 39.00 29.00 68.00 m' Rp 60,000.00 Rp 1,740,000.00
Sub Jumlah I Rp 76,681,800.00
II UPAH
1 Pekerja 693.00 281.00 211.00 492.00 oh Rp 100,000.00 Rp 21,100,000.00
2 Tukang 290.00 135.00 101.00 236.00 oh Rp 125,000.00 Rp 12,625,000.00
Sub Jumlah II Rp 33,725,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 12.00 7.00 19.00 Lbr 2,000.00 Rp 14,000.00
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 - 1.00 Ls 200,000.00 Rp -
3 Kerta A4 10.00 2.00 2.00 4.00 Rim 45,000.00 Rp 90,000.00
4 Balpoint 2.00 1.00 - 1.00 dos 40,000.00 Rp -
5 Buku 1.00 1.00 - 1.00 bh 7,000.00 Rp -
6 Penggaris 1.00 1.00 - 1.00 bh 5,000.00 Rp -
7 Isolasi 2.00 2.00 - 2.00 bh 14,000.00 Rp -
8 Lem Kertas 2.00 2.00 - 2.00 bh 5,000.00 Rp -
9 Gunting 1.00 1.00 - 1.00 bh 9,500.00 Rp -
10 Printer 1.00 1.00 - 1.00 Unit 1,800,000.00 Rp -
11 Materai 78.00 18.00 14.00 32.00 Lembar 10,000.00 Rp 140,000.00
Sub Jumlah III Rp 244,000.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 5.00 1.00 1.00 2.00 Buku 500,000.00 Rp 500,000.00
2 Foto Copy dan Penjilidan LPJ Akhir - - - - Buku 500,000.00 Rp -
3 Pembuatan Vidio Dokumentasi - - - - Ls 500,000.00 Rp -
Sub Jumlah IV Rp 500,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 15.00 6.00 4.50 10.50 Pcs 50,000.00 Rp 225,000.00
2 Sarung Tangan 15.00 6.00 4.50 10.50 Pasang 30,000.00 Rp 135,000.00
3 Sepatu Boods Panjang 15.00 6.00 4.50 10.50 Pasang 100,000.00 Rp 450,000.00
4 Rompi Pekerja 15.00 6.00 4.50 10.50 Pcs 55,000.00 Rp 247,500.00
5 Obat-obatan P3K 1.00 1.00 - 1.00 Set 250,000.00 Rp -
6 Alat Ukur Suhu Tubuh 1.00 1.00 - 1.00 Unit 225,000.00 Rp -
7 Masker Kain 2.00 0.80 4.00 4.80 Pcs 16,000.00 Rp 64,000.00
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 1.00 - 1.00 Botol 195,000.00 Rp -
Sub Jumlah V Rp 1,121,500.00
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 4.00 2.00 2.00 4.00 Org/Kali 75,000.00 Rp 150,000.00
Sub Jumlah VI Rp 150,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 1.00 - 1.00 ls 200,000.00 Rp -
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 - 1.00 ls 200,000.00 Rp -
3 Pembuatan Stiker Penerima 29.00 9.00 7.00 16.00 Bh 10,000.00 Rp 70,000.00
4 Pembuatan Prasasti 20 x 30 29.00 9.00 7.00 16.00 Bh 250,000.00 Rp 1,750,000.00
Sub Jumlah VII Rp 1,820,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 1.00 - 1.00 ls 200,000.00 Rp -
Sub Jumlah VIII Rp -
VII TRANSPORT KSM
1 Transport ke Bank 5 kali untuk 3 orang 10.00 4.00 3.00 7.00 Org/Kali 100,000.00 Rp 300,000.00
Sub Jumlah IX Rp 300,000.00
Bangkalan, …............................2021
Volume
No. Uraian Kegiatan Kebutuhan Real. S/d Pengajuan Jumlah Unit/
tahap lalu sekarang komulatif satuan
I
1 25.00 10.00 10.00 m³
2 15,823.00 8,352.00 8,352.00 buah
3 35.00 14.00 14.00 m³
4 27.00 10.80 10.80 m³
5 40.00 16.00 16.00 m³
III
1 Err:509 Err:509 Err:509 OH
2 Err:509 Err:509 Err:509 OH
IV
1 1.00 1.00 Ls
2 1.00 1.00 Ls
3 1.00 1.00 Ls
4 1.00 1.00 Ls
5 1.00 1.00 Ls
6 1.00 1.00 Ls
7 1.00 1.00 Ls
Bangkalan, …… ….............
: TANAH MERAH
: BANGKALAN
Harga
satuan Jumlah
Rp. Rp.
Rp 207,000 Rp 2,070,000
Rp 900 Rp 7,516,800
Rp 256,000 Rp 3,584,000
Rp 250,000 Rp 2,700,000
Rp 305,000 Rp 4,880,000
Rp 30,000 Rp 3,480,000
Rp 42,000 Rp 336,000
Rp 66,100 Rp 8,725,200
Rp 23,000 Rp 414,000
Rp 24,000 Rp 33,600
Rp 58,000 Rp 12,574,400
Rp 12,000 Rp 259,200
#N/A #N/A
#N/A #N/A
Rp 6,500 Rp 46,800
Rp 17,000 Rp 578,000
Rp 250,000 Rp 1,000,000
Rp 500,000 Rp 5,000,000
Rp 30,000 Rp 554,400
Rp 180,000 Rp 1,800,000
Rp 21,000 Rp 210,000
#N/A #N/A
#N/A #N/A
Rp 10,000 Rp 296,000
Rp 10,000 Rp 200,000
Rp 16,000 Rp 320,000
#N/A #N/A
Rp 21,500 Rp 860,000
Rp 50,000 Rp 2,000,000
Rp 390,000 Rp 4,680,000
Rp 350,000 Rp 2,660,000
Rp 500,000 Rp 1,200,000
#N/A #N/A
Rp 25,000 Rp 2,700,000
Rp 25,000 Rp 231,000
Rp 35,000 Rp 646,800
#N/A #N/A
Rp 9,000 Rp 83,160
Rp 20,000 Rp 184,800
Rp 8,000 Rp 390,400
Rp 15,000 Err:509
Rp 100,000 Err:509
Rp 125,000 Err:509
Err:509 Err:509
Err:509 Err:509
Rp 1,270,000 Rp 1,270,000
Rp 252,360 Rp 252,360
Rp 3,380,000 Rp 3,380,000
Rp 80,000 Rp 80,000
Rp 600,000 Rp 600,000
Disusun oleh,
KSM DURIN JAYA
ISROK
RENCANA PENARIKAN DANA BANK TAHAP II ( RPDB II. 30% )
Volume Harga
No. Uraian Kegiatan Kebutuhan Real. S/d Pengajuan Jumlah Unit/ satuan Jumlah
tahap lalu sekarang komulatif satuan Rp. Rp.
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 21.00 10.00 6.00 16.00 m³ Rp 207,000 Rp 1,242,000
2 Batu Bata Putih 14,000.00 8,352.00 4,200.00 12,552.00 buah Rp 900 Rp 3,780,000
3 Batu Cor 31.00 14.00 9.00 23.00 m³ Rp 256,000 Rp 2,304,000
4 Pasir Pasang Lokal 25.20 10.80 7.00 17.80 m³ Rp 250,000 Rp 1,750,000
5 Pasir Hitam ex. Pasuruan 38.00 16.00 11.00 27.00 m³ Rp 305,000 Rp 3,355,000
6 Besi Polos Ø 6 258.00 116.00 77.00 193.00 lonjor Rp 30,000 Rp 2,310,000
7 Besi Polos Ø 8 16.80 8.00 5.00 13.00 lonjor Rp 42,000 Rp 210,000
8 Besi Polos Ø 10 301.00 132.00 90.00 222.00 lonjor Rp 66,100 Rp 5,949,000
9 Kawat Bendrat 45.00 18.00 14.00 32.00 kg Rp 23,000 Rp 322,000
10 Papan Bekisting 798.00 1.40 239.00 240.40 m³ Rp 24,000 Rp 5,736,000
11 Semen 40 kg 542.00 216.80 163.00 379.80 zak Rp 58,000 Rp 9,454,000
12 Semen Warna 54.00 21.60 16.00 37.60 kg Rp 12,000 Rp 192,000
13 Keramik 20 x 20 cm (motif) 41.00 18.00 12.00 30.00 dos #N/A #N/A
14 Keramik Dinding 20 x 25 cm (motif) 18.00 - 5.00 5.00 dos #N/A #N/A
15 Minyak Bekisting 18.00 7.20 4.00 11.20 liter Rp 6,500 Rp 26,000
16 Paku Biasa 85.00 34.00 26.00 60.00 kg Rp 17,000 Rp 442,000
17 Cat Tembok Dasar 10.00 4.00 3.00 7.00 galon Rp 250,000 Rp 750,000
18 Cat Tembok Penutup 25.00 10.00 8.00 18.00 galon Rp 500,000 Rp 4,000,000
19 Plamir Tembok 49.00 18.48 15.00 33.48 kg Rp 30,000 Rp 450,000
20 Kloset Jongkok 25.00 10.00 8.00 18.00 bh Rp 180,000 Rp 1,440,000
21 Floor drain 25.00 10.00 8.00 18.00 bh Rp 21,000 Rp 168,000
22 Pintu Kamar Mandi (Alumunium) 25.00 10.00 7.00 17.00 unit #N/A #N/A
23 Tee PVC AW Ø 1 1/2" 25.00 10.00 7.00 17.00 bh #N/A #N/A
24 Elbow PVC AW Ø 2" 74.00 29.60 22.00 51.60 bh Rp 10,000 Rp 220,000
25 Tee PVC AW Ø 2" 49.00 20.00 15.00 35.00 bh Rp 10,000 Rp 150,000
26 Tee PVC AW Ø 3" 49.00 20.00 15.00 35.00 bh Rp 16,000 Rp 240,000
27 Pipa PVC AW Ø 1 1/2" 98.00 20.00 29.00 49.00 m' #N/A #N/A
28 Pipa PVC AW Ø 2" 98.00 40.00 29.00 69.00 m' Rp 21,500 Rp 623,500
29 Pipa PVC AW Ø 3" 98.00 40.00 29.00 69.00 m' Rp 50,000 Rp 1,450,000
30 Bak Mandi Fiber Oval 25.00 12.00 8.00 20.00 bh Rp 390,000 Rp 3,120,000
31 Anaerobik Filter uk. 37x1.00x60cm 19.00 7.60 6.00 13.60 unit Rp 350,000 Rp 2,100,000
32 Anaerobik Filter uk. 47x1.00x60cm 6.00 2.40 2.00 4.40 unit Rp 500,000 Rp 1,000,000
33 Pasang Rangka Atap Galvalum C. 75 - 0,75 + 118.00 47.20 35.00 82.20 m2 #N/A #N/A
34 Pasang Lisplang L. 20 (Kalsiplank) 270.00 108.00 81.00 189.00 m' Rp 25,000 Rp 2,025,000
34 Glassblock 20x20cm 49.00 9.24 15.00 24.24 bh Rp 25,000 Rp 375,000
35 Roster Batapres 20x20cm 98.00 18.48 29.00 47.48 bh Rp 35,000 Rp 1,015,000
36 Pasang Grease Trap Precast 24.00 - 7.00 7.00 unit #N/A #N/A
37 Fitting Lampu 49.00 9.24 15.00 24.24 bh Rp 9,000 Rp 135,000
38 Lampu 5 watt 49.00 9.24 15.00 24.24 bh Rp 20,000 Rp 300,000
39 Kabel NYM 2x1,5mm 122.00 48.80 37.00 85.80 m Rp 8,000 Rp 296,000
40 Sakelar Tunggal 24.00 Err:509 7.00 Err:509 bh Rp 15,000 Rp 105,000
II UPAH
1 Pekerja Err:509 Err:509 Err:509 500.00 OH Rp 100,000 Err:509
2 Tukang Err:509 Err:509 100.00 Err:509 OH Rp 125,000 Rp 12,500,000
III OPERASIONAL
1 Alat Tulis Kantor (Atk) Termasuk Materai : 1.00 1.00 1.00 Ls Rp 1,305,000 Rp 1,305,000
Pembuatan Dokumen Lpj Ksm (Cetak, Foto
2 1.00 1.00 1.00 Ls Rp 1,000,000 Rp 1,000,000
Copy, Jilid)
Alat Pelindung Diri Dan Keselamatan Kerja
3 1.00 1.00 1.00 Ls Rp 879,800 Rp 879,800
(Apd K3)
4 Kampanye Phbs 1.00 1.00 1.00 Ls Rp 135,000 Rp 135,000
5 Kegiatan Rembuk Warga 1.00 1.00 1.00 Ls Rp 1,500,000 Rp 1,500,000
6 Papan Informasi Pelaksanaan Kegiatan 1.00 1.00 1.00 Ls Rp 60,000 Rp 60,000
7 Transport Ksm 1.00 1.00 1.00 Ls Rp 450,000 Rp 450,000
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. / ABD SALAM, SE. ISROK
RENCANA PENARIKAN DANA BANK TAHAP III ( RPDB III. 30% )
Volume Harga
No. Uraian Kegiatan Kebutuhan Real. S/d Pengajuan Jumlah Unit/ satuan Jumlah
tahap lalu sekarang komulatif satuan Rp. Rp.
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 21.00 16.00 5.00 21.00 m³ Rp 207,000 Rp 1,035,000
2 Batu Bata Putih 14,000.00 12,552.00 1,448.00 14,000.00 buah Rp 900 Rp 1,303,200
3 Batu Cor 31.00 23.00 8.00 31.00 m³ Rp 256,000 Rp 2,048,000
4 Pasir Pasang Lokal 25.20 17.80 7.40 25.20 m³ Rp 250,000 Rp 1,850,000
5 Pasir Hitam ex. Pasuruan 38.00 27.00 11.00 38.00 m³ Rp 305,000 Rp 3,355,000
6 Besi Polos Ø 6 258.00 193.00 65.00 258.00 lonjor Rp 30,000 Rp 1,950,000
7 Besi Polos Ø 8 16.80 13.00 3.80 16.80 lonjor Rp 42,000 Rp 159,600
8 Besi Polos Ø 10 301.00 222.00 79.00 301.00 lonjor Rp 66,100 Rp 5,221,900
9 Kawat Bendrat 45.00 32.00 13.00 45.00 kg Rp 23,000 Rp 299,000
10 Papan Bekisting 798.00 240.40 557.60 798.00 m³ Rp 24,000 Rp 13,382,400
11 Semen 40 kg 542.00 379.80 162.20 542.00 zak Rp 58,000 Rp 9,407,600
12 Semen Warna 54.00 37.60 16.40 54.00 kg Rp 12,000 Rp 196,800
13 Keramik 20 x 20 cm (motif) 41.00 30.00 11.00 41.00 dos #N/A #N/A
14 Keramik Dinding 20 x 25 cm (motif) 18.00 5.00 13.00 18.00 dos #N/A #N/A
15 Minyak Bekisting 18.00 11.20 6.80 18.00 liter Rp 6,500 Rp 44,200
16 Paku Biasa 85.00 60.00 25.00 85.00 kg Rp 17,000 Rp 425,000
17 Cat Tembok Dasar 10.00 7.00 3.00 10.00 galon Rp 250,000 Rp 750,000
18 Cat Tembok Penutup 25.00 18.00 7.00 25.00 galon Rp 500,000 Rp 3,500,000
19 Plamir Tembok 49.00 33.48 15.52 49.00 kg Rp 30,000 Rp 465,600
20 Kloset Jongkok 25.00 18.00 7.00 25.00 bh Rp 180,000 Rp 1,260,000
21 Floor drain 25.00 18.00 7.00 25.00 bh Rp 21,000 Rp 147,000
22 Pintu Kamar Mandi (Alumunium) 25.00 17.00 8.00 25.00 unit #N/A #N/A
23 Tee PVC AW Ø 1 1/2" 25.00 17.00 8.00 25.00 bh #N/A #N/A
24 Elbow PVC AW Ø 2" 74.00 51.60 22.40 74.00 bh Rp 10,000 Rp 224,000
25 Tee PVC AW Ø 2" 49.00 35.00 14.00 49.00 bh Rp 10,000 Rp 140,000
26 Tee PVC AW Ø 3" 49.00 35.00 14.00 49.00 bh Rp 16,000 Rp 224,000
27 Pipa PVC AW Ø 1 1/2" 98.00 49.00 49.00 98.00 m' #N/A #N/A
28 Pipa PVC AW Ø 2" 98.00 69.00 29.00 98.00 m' Rp 21,500 Rp 623,500
29 Pipa PVC AW Ø 3" 98.00 69.00 29.00 98.00 m' Rp 50,000 Rp 1,450,000
30 Bak Mandi Fiber Oval 25.00 20.00 5.00 25.00 bh Rp 390,000 Rp 1,950,000
31 Anaerobik Filter uk. 37x1.00x60cm 19.00 13.60 5.40 19.00 unit Rp 350,000 Rp 1,890,000
32 Anaerobik Filter uk. 47x1.00x60cm 6.00 4.40 1.60 6.00 unit Rp 500,000 Rp 800,000
33 Pasang Rangka Atap Galvalum C. 75 - 0,75 + 118.00 82.20 35.80 118.00 m2 #N/A #N/A
34 Pasang Lisplang L. 20 (Kalsiplank) 270.00 189.00 81.00 270.00 m' Rp 25,000 Rp 2,025,000
34 Glassblock 20x20cm 49.00 24.24 24.76 49.00 bh Rp 25,000 Rp 619,000
35 Roster Batapres 20x20cm 98.00 47.48 50.52 98.00 bh Rp 35,000 Rp 1,768,200
36 Pasang Grease Trap Precast 24.00 7.00 17.00 24.00 unit #N/A #N/A
37 Fitting Lampu 49.00 24.24 24.76 49.00 bh Rp 9,000 Rp 222,840
38 Lampu 5 watt 49.00 24.24 24.76 49.00 bh Rp 20,000 Rp 495,200
39 Kabel NYM 2x1,5mm 122.00 85.80 36.20 122.00 m Rp 8,000 Rp 289,600
40 Sakelar Tunggal 24.00 Err:509 Err:509 Err:509 bh Rp 15,000 Err:509
II ALAT
1 Err:509 3.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Err:509 7.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
III UPAH
1 Pekerja 700.00 Err:509 Err:509 Err:509 OH Rp 100,000 Err:509
2 Tukang 335.00 Err:509 Err:509 Err:509 OH Rp 125,000 Err:509
IV OPERASIONAL
1 Alat Tulis Kantor (Atk) Termasuk Materai : 1.00 1.00 1.00 Ls Err:509 Err:509
Pembuatan Dokumen Lpj Ksm (Cetak, Foto
2 1.00 1.00 1.00 Ls Err:509 Err:509
Copy, Jilid)
Alat Pelindung Diri Dan Keselamatan Kerja
3 1.00 1.00 1.00 Ls Rp 404,100 Rp 404,100
(Apd K3)
4 Kampanye Phbs 1.00 1.00 1.00 Ls Rp 243,540 Rp 243,540
5 Kegiatan Rembuk Warga 1.00 1.00 1.00 Ls Rp 1,035,000 Rp 1,035,000
6 Papan Informasi Pelaksanaan Kegiatan 1.00 1.00 1.00 Ls Rp (140,000) Rp (140,000)
7 Transport Ksm 1.00 1.00 1.00 Ls Rp - Rp -
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. / ABD SALAM, SE. ISROK
RENCANA PENGGUNAAN DANA BANK TAHAP - III (RPD 30 % )
Volume Harga
No. Uraian Kegiatan Kebutuhan Realisasi Pengajuan Komulatif s/d Unit/ satuan Jumlah
Tahap Lalu Saat ini Saat ini satuan Rp. Rp.
1 2 3 4 5 6 7 8 9
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 19.00 21.00 (2.00) 19.00 m³ Rp 207,000.00 Rp (414,000.00)
2 Portland Cement (PC) 19,400.00 15,500.00 3,900.00 19,400.00 kg Rp 1,450.00 Rp 5,655,000.00
3 Pasir Hitam ex. Pasuruan 22.00 28.00 (6.00) 22.00 m³ Rp 305,000.00 Rp (1,830,000.00)
4 Batu Bata Putih 0.48 10,466.00 (10,465.52) 0.48 buah Rp 900.00 Rp (9,418,969.67)
5 Pasir Pasang Lokal 13,650.00 18.00 13,632.00 13,650.00 m³ Rp 250,000.00 Rp 3,408,000,000.00
6 Besi Beton 26.00 2,197.00 (2,171.00) 26.00 kg Rp 12,000.00 Rp (26,052,000.00)
7 Kawat Beton 2,901.50 37.00 2,864.50 2,901.50 kg Rp 23,000.00 Rp 65,883,500.00
8 Batu Cor 42.00 23.00 19.00 42.00 m³ Rp 256,000.00 Rp 4,864,000.00
9 Air 24.00 6.00 18.00 24.00 m³ Rp - Rp -
10 Kayu Bekisting Err:509 9.00 Err:509 Err:509 m³ Rp 1,500,000.00 Err:509
11 Paku Biasa 3.00 62.00 (59.00) 3.00 kg Rp 17,000.00 Rp (1,003,000.00)
12 Minyak Bekisting 78.00 23.00 55.00 78.00 liter Rp 6,500.00 Rp 357,500.00
13 Keramik 26.00 28.00 (2.00) 26.00 dos Rp 70,000.00 Rp (140,000.00)
14 Semen Warna 37.00 37.00 - 37.00 kg Rp 12,000.00 Rp -
15 Keramik Dinding 46.00 13.00 33.00 46.00 dos Rp 66,000.00 Rp 2,178,000.00
16 Plamir Tembok 495.00 34.00 461.00 495.00 kg Rp 30,000.00 Rp 13,830,000.00
17 Cat Tembok Dasar 45.00 34.00 11.00 45.00 kg Rp 50,000.00 Rp 550,000.00
18 Cat Tembok Penutup 45.00 88.00 (43.00) 45.00 kg Rp 100,000.00 Rp (4,300,000.00)
19 Glassblock 20x20cm 118.00 34.00 84.00 118.00 bh Rp 25,000.00 Rp 2,100,000.00
20 Roster Batapres 20x20cm 46.00 69.00 (23.00) 46.00 bh Rp 35,000.00 Rp (805,000.00)
21 Pasang Rangka Atap Galvalum C. 75 - 0,75 92.00 133.00 (41.00) 92.00 m' Rp 65,000.00 Rp (2,665,000.00)
22 Pasang Reng Galvalum 180.00 95.00 85.00 180.00 m' Rp 41,000.00 Rp 3,485,000.00
23 Pasang Spandek 0,3 mm 128.00 82.00 46.00 128.00 m² Rp 60,000.00 Rp 2,760,000.00
24 Pasang Lisplang L. 20 (Kalsiplank) 111.00 189.00 (78.00) 111.00 m' Rp 25,000.00 Rp (1,950,000.00)
25 Fitting Lampu 253.00 33.00 220.00 253.00 bh Rp 9,000.00 Rp 1,980,000.00
26 Lampu 5 watt 46.00 33.00 13.00 46.00 bh Rp 20,000.00 Rp 260,000.00
27 Kabel NYM 2x1,5mm 46.00 86.00 (40.00) 46.00 m Rp 8,000.00 Rp (320,000.00)
28 Sakelar Tunggal 115.00 16.00 99.00 115.00 bh Rp 15,000.00 Rp 1,485,000.00
29 Pintu Kamar Mandi (Alumunium) 23.00 16.00 7.00 23.00 unit Rp 300,000.00 Rp 2,100,000.00
30 Floor Drain 23.00 16.00 7.00 23.00 bh Rp 20,000.00 Rp 140,000.00
31 Bak Mandi Fiber Oval 23.00 16.00 7.00 23.00 bh Rp 340,000.00 Rp 2,380,000.00
32 Anaerobik Filter uk. 37x1.00x60cm 23.00 13.00 10.00 23.00 unit Rp 350,000.00 Rp 3,500,000.00
33 Anaerobik Filter uk. 47x1.00x60cm 20.00 4.00 16.00 20.00 unit Rp 550,000.00 Rp 8,800,000.00
34 Kloset Jongkok 2.00 16.00 (14.00) 2.00 bh Rp 175,000.00 Rp (2,450,000.00)
35 Pasang Buis Beton Ø 50 Cm 23.00 16.00 7.00 23.00 bh Rp 100,000.00 Rp 700,000.00
36 Tee PVC AW Ø 1 1/2" 23.00 16.00 7.00 23.00 bh Rp 105,000.00 Rp 735,000.00
37 Elbow PVC AW Ø 2" 46.00 51.00 (5.00) 46.00 bh Rp 10,000.00 Rp (50,000.00)
38 Tee PVC AW Ø 2" 46.00 34.00 12.00 46.00 bh Rp 12,000.00 Rp 144,000.00
39 Tee PVC AW Ø 3" 23.00 34.00 (11.00) 23.00 bh Rp 16,000.00 Rp (176,000.00)
40 Pipa PVC AW Ø 1 1/2" 23.00 68.00 (45.00) 23.00 m' Rp 73,900.00 Rp (3,325,500.00)
41 Pipa PVC AW Ø 2" 92.00 68.00 24.00 92.00 m' Rp 37,000.00 Rp 888,000.00
42 Pipa PVC AW Ø 3" Err:509 68.00 Err:509 Err:509 m' Rp 60,000.00 Err:509
Sub Jumlah I Err:509
II UPAH
1 Pekerja 693.00 492.00 201.00 693.00 oh Rp 100,000.00 Rp 20,100,000.00
2 Tukang 290.00 236.00 54.00 290.00 oh Rp 125,000.00 Rp 6,750,000.00
Sub Jumlah II Rp 26,850,000.00
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I ALAT TULIS KANTOR (ATK) TERMASUK MATERAI :
1 Foto Copy A3 30.00 19.00 11.00 30.00 Lbr 2,000.00 Rp 22,000.00
2 Banner Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 - 1.00 Ls 200,000.00 Rp -
3 Kerta A4 10.00 4.00 6.00 10.00 Rim 45,000.00 Rp 270,000.00
4 Balpoint 2.00 1.00 1.00 2.00 dos 40,000.00 Rp 40,000.00
5 Buku 1.00 1.00 - 1.00 bh 7,000.00 Rp -
6 Penggaris 1.00 1.00 - 1.00 bh 5,000.00 Rp -
7 Isolasi 2.00 2.00 - 2.00 bh 14,000.00 Rp -
8 Lem Kertas 2.00 2.00 - 2.00 bh 5,000.00 Rp -
9 Gunting 1.00 1.00 - 1.00 bh 9,500.00 Rp -
10 Printer 1.00 1.00 - 1.00 Unit 1,800,000.00 Rp -
11 Materai 78.00 32.00 46.00 78.00 Lembar 10,000.00 Rp 460,000.00
Sub Jumlah III Rp 792,000.00
II PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)
1 Foto Copy dan Penjilidan LPJ Tahap I 5.00 2.00 3.00 5.00 Buku 500,000.00 Rp 1,500,000.00
2 Foto Copy dan Penjilidan LPJ Akhir - - - - Buku 500,000.00 Rp -
3 Pembuatan Vidio Dokumentasi - - - - Ls 500,000.00 Rp -
Sub Jumlah IV Rp 1,500,000.00
III ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3)
1 Helm Pengaman Kerja 15.00 10.50 4.50 15.00 Pcs 50,000.00 Rp 225,000.00
2 Sarung Tangan 15.00 10.50 4.50 15.00 Pasang 30,000.00 Rp 135,000.00
3 Sepatu Boods Panjang 15.00 10.50 4.50 15.00 Pasang 100,000.00 Rp 450,000.00
4 Rompi Pekerja 15.00 10.50 4.50 15.00 Pcs 55,000.00 Rp 247,500.00
5 Obat-obatan P3K 1.00 1.00 - 1.00 Set 250,000.00 Rp -
6 Alat Ukur Suhu Tubuh 1.00 1.00 - 1.00 Unit 225,000.00 Rp -
7 Masker Kain 2.00 4.80 (2.80) 2.00 Pcs 16,000.00 Rp (44,800.00)
8 Hand Sanitazer (@ 1 Liter / 1.000 ml) 1.00 1.00 - 1.00 Botol 195,000.00 Rp -
Sub Jumlah V Rp 1,012,700.00
IV KAMPANYE PHBS
1 Transport Sanitarian 3 kali untuk 2 orang 4.00 4.00 2.00 6.00 Org/Kali 75,000.00 Rp 150,000.00
Sub Jumlah VI Rp 150,000.00
V KEGIATAN REMBUK WARGA
1 Konsumsi Rembuk Warga 1.00 1.00 - 1.00 ls 200,000.00 Rp -
2 Konsumsi Promosi Perilaku Hidup Bersih dan Sehat 1.00 1.00 - 1.00 ls 200,000.00 Rp -
3 Pembuatan Stiker Penerima 29.00 16.00 13.00 29.00 Bh 10,000.00 Rp 130,000.00
4 Pembuatan Prasasti 20 x 30 29.00 16.00 13.00 29.00 Bh 250,000.00 Rp 3,250,000.00
Sub Jumlah VII Rp 3,380,000.00
VI PAPAN INFORMASI PELAKSANAAN KEGIATAN
1 Papan Informasi Pelaksanaan Kegiatan 1.00 1.00 - 1.00 ls 200,000.00 Rp -
Sub Jumlah VIII Rp -
VII TRANSPORT KSM
1 Transport ke Bank 5 kali untuk 3 orang 10.00 7.00 3.00 10.00 Org/Kali 100,000.00 Rp 300,000.00
Sub Jumlah IX Rp 300,000.00
I BAHAN / MATERIAL
1 Pasir Pasang Lokal 21.00 m³ Rp 200,000.00 Rp 4,200,000.00 15.00 m³ Rp 200,000.00 Rp 3,000,000.00 5.00 m³ Rp 200,000.00 Rp 1,000,000.00
2 Pasir Hitam ex. Pasuruan 14,000.00 buah Rp 800.00 Rp 11,200,000.00 9,678.00 buah Rp 800.00 Rp 7,742,400.00 1,448.00 buah Rp 800.00 Rp 1,158,400.00
3 Pasir Urug 31.00 m³ Rp 275,000.00 Rp 8,525,000.00 21.00 m³ Rp 275,000.00 Rp 5,775,000.00 8.00 m³ Rp 275,000.00 Rp 2,200,000.00
4 Besi Beton 25.20 m³ Rp 220,000.00 Rp 5,544,000.00 17.00 m³ Rp 220,000.00 Rp 3,740,000.00 7.40 m³ Rp 220,000.00 Rp 1,628,000.00
5 Besi Polos Ø 6 38.00 m³ Rp 325,000.00 Rp 12,350,000.00 26.00 m³ Rp 325,000.00 Rp 8,450,000.00 11.00 m³ Rp 325,000.00 Rp 3,575,000.00
6 Kawat Bendrat 258.00 lonjor Rp 30,000.00 Rp 7,740,000.00 180.00 lonjor Rp 30,000.00 Rp 5,400,000.00 65.00 lonjor Rp 30,000.00 Rp 1,950,000.00
7 Papan Bekisting 16.80 lonjor Rp 42,000.00 Rp 705,600.00 12.00 lonjor Rp 42,000.00 Rp 504,000.00 3.80 lonjor Rp 42,000.00 Rp 159,600.00
8 Kayu Lokal setara Akasia 4/6 301.00 lonjor Rp 66,100.00 Rp 19,896,100.00 210.00 lonjor Rp 66,100.00 Rp 13,881,000.00 79.00 lonjor Rp 66,100.00 Rp 5,221,900.00
9 Semen 40 kg 45.00 kg Rp 21,000.00 Rp 945,000.00 32.00 kg Rp 21,000.00 Rp 672,000.00 13.00 kg Rp 21,000.00 Rp 273,000.00
10 Semen Warna 798.00 m³ Rp 13,600.00 Rp 10,852,800.00 558.00 m³ Rp 13,600.00 Rp 7,588,800.00 557.60 m³ Rp 13,600.00 Rp 7,583,360.00
11 Keramik Dinding 20 x 25 cm (motif) 542.00 zak Rp 54,000.00 Rp 29,268,000.00 380.00 zak Rp 54,000.00 Rp 20,520,000.00 162.20 zak Rp 54,000.00 Rp 8,758,800.00
12 Minyak Bekisting 54.00 kg Rp 12,000.00 Rp 648,000.00 38.00 kg Rp 12,000.00 Rp 456,000.00 16.40 kg Rp 12,000.00 Rp 196,800.00
13 Paku Biasa 41.00 dos Rp 60,000.00 Rp 2,460,000.00 28.00 dos Rp 60,000.00 Rp 1,680,000.00 11.00 dos Rp 60,000.00 Rp 660,000.00
14 Cat Tembok Dasar 18.00 dos Rp 65,000.00 Rp 1,170,000.00 12.00 dos Rp 65,000.00 Rp 780,000.00 13.00 dos Rp 65,000.00 Rp 845,000.00
15 Cat Tembok Penutup 18.00 liter Rp 6,500.00 Rp 117,000.00 11.00 liter Rp 6,500.00 Rp 71,500.00 6.80 liter Rp 6,500.00 Rp 44,200.00
16 Plamir Tembok 85.00 kg Rp 17,000.00 Rp 1,445,000.00 60.00 kg Rp 17,000.00 Rp 1,020,000.00 25.00 kg Rp 17,000.00 Rp 425,000.00
17 Kloset Jongkok 10.00 galon Rp 350,000.00 Rp 3,500,000.00 7.00 galon Rp 350,000.00 Rp 2,450,000.00 3.00 galon Rp 350,000.00 Rp 1,050,000.00
18 Floor drain 25.00 galon Rp 105,000.00 Rp 2,625,000.00 18.00 galon Rp 105,000.00 Rp 1,890,000.00 7.00 galon Rp 105,000.00 Rp 735,000.00
19 Pintu Kamar Mandi (Alumunium) 49.00 kg Rp 30,000.00 Rp 1,470,000.00 35.00 kg Rp 30,000.00 Rp 1,050,000.00 15.52 kg Rp 30,000.00 Rp 465,600.00
20 Tee PVC AW Ø 1 1/2" 25.00 bh Rp 175,000.00 Rp 4,375,000.00 18.00 bh Rp 175,000.00 Rp 3,150,000.00 7.00 bh Rp 175,000.00 Rp 1,225,000.00
21 Elbow PVC AW Ø 2" 25.00 bh Rp 20,000.00 Rp 500,000.00 18.00 bh Rp 20,000.00 Rp 360,000.00 7.00 bh Rp 20,000.00 Rp 140,000.00
22 Tee PVC AW Ø 2" 25.00 unit Rp 300,000.00 Rp 7,500,000.00 17.00 unit Rp 300,000.00 Rp 5,100,000.00 8.00 unit Rp 300,000.00 Rp 2,400,000.00
23 Tee PVC AW Ø 3" 25.00 bh Rp 105,000.00 Rp 2,625,000.00 17.00 bh Rp 105,000.00 Rp 1,785,000.00 8.00 bh Rp 105,000.00 Rp 840,000.00
24 Pipa PVC AW Ø 1 1/2" 74.00 bh Rp 10,000.00 Rp 740,000.00 52.00 bh Rp 10,000.00 Rp 520,000.00 22.40 bh Rp 10,000.00 Rp 224,000.00
25 Pipa PVC AW Ø 2" 49.00 bh Rp 12,000.00 Rp 588,000.00 35.00 bh Rp 12,000.00 Rp 420,000.00 14.00 bh Rp 12,000.00 Rp 168,000.00
26 Pipa PVC AW Ø 3" 49.00 bh Rp 16,000.00 Rp 784,000.00 35.00 bh Rp 16,000.00 Rp 560,000.00 14.00 bh Rp 16,000.00 Rp 224,000.00
27 Bak Mandi Fiber Oval 98.00 m' Rp 73,900.00 Rp 7,242,200.00 68.00 m' Rp 73,900.00 Rp 5,025,200.00 49.00 m' Rp 73,900.00 Rp 3,621,100.00
28 Anaerobik Filter uk. 37x1.00x60cm 98.00 m' Rp 37,000.00 Rp 3,626,000.00 68.00 m' Rp 37,000.00 Rp 2,516,000.00 29.00 m' Rp 37,000.00 Rp 1,073,000.00
29 Anaerobik Filter uk. 47x1.00x60cm 98.00 m' Rp 60,000.00 Rp 5,880,000.00 68.00 m' Rp 60,000.00 Rp 4,080,000.00 29.00 m' Rp 60,000.00 Rp 1,740,000.00
30 Pasang Rangka Atap Galvalum C. 75 - 0,75 + Spandek 0,3 mm 25.00 bh Rp 340,000.00 Rp 8,500,000.00 18.00 bh Rp 340,000.00 Rp 6,120,000.00 5.00 bh Rp 340,000.00 Rp 1,700,000.00
31 Pasang Lisplang L. 20 (Kalsiplank) 19.00 unit Rp 350,000.00 Rp 6,650,000.00 14.00 unit Rp 350,000.00 Rp 4,900,000.00 5.40 unit Rp 350,000.00 Rp 1,890,000.00
32 Triplek tbl. 9 mm 6.00 unit Rp 550,000.00 Rp 3,300,000.00 4.00 unit Rp 550,000.00 Rp 2,200,000.00 1.60 unit Rp 550,000.00 Rp 880,000.00
33 Glassblock 20x20cm 118.00 m2 Rp 192,000.00 Rp 22,656,000.00 82.00 m2 Rp 192,000.00 Rp 15,744,000.00 35.80 m2 Rp 192,000.00 Rp 6,873,600.00
34 Roster Batapres 20x20cm 270.00 m' Rp 25,000.00 Rp 6,750,000.00 189.00 m' Rp 25,000.00 Rp 4,725,000.00 81.00 m' Rp 25,000.00 Rp 2,025,000.00
34 Fitting Lampu 49.00 bh Rp 25,000.00 Rp 1,225,000.00 35.00 bh Rp 25,000.00 Rp 875,000.00 24.76 bh Rp 25,000.00 Rp 619,000.00
35 Lampu 5 watt 98.00 bh Rp 35,000.00 Rp 3,430,000.00 68.00 bh Rp 35,000.00 Rp 2,380,000.00 50.52 bh Rp 35,000.00 Rp 1,768,200.00
36 Kabel NYM 2x1,5mm 24.00 unit Rp 320,000.00 Rp 7,680,000.00 17.00 unit Rp 320,000.00 Rp 5,440,000.00 17.00 unit Rp 320,000.00 Rp 5,440,000.00
37 Sakelar Tunggal 49.00 bh Rp 9,000.00 Rp 441,000.00 25.00 bh Rp 9,000.00 Rp 225,000.00 24.76 bh Rp 9,000.00 Rp 222,840.00
38 Err:509 49.00 bh Rp 20,000.00 Rp 980,000.00 25.00 bh Rp 20,000.00 Rp 500,000.00 24.76 bh Rp 20,000.00 Rp 495,200.00
39 Err:509 122.00 m Rp 8,000.00 Rp 976,000.00 86.00 m Rp 8,000.00 Rp 688,000.00 36.20 m Rp 8,000.00 Rp 289,600.00
40 Pekerja 24.00 bh Rp 15,000.00 Rp 360,000.00 17.00 bh Rp 15,000.00 Rp 255,000.00 Err:509 bh Rp 15,000.00 Err:509
II ALAT
1 Kuas 3.00 bh Rp 22,700.00 Rp 68,100.00 #NAME? bh Rp 22,700.00 #NAME? Err:509 bh Rp 22,700.00 Err:509
2 Ember 7.00 bh Rp 7,500.00 Rp 52,500.00 #NAME? bh Rp 7,500.00 #NAME? Err:509 bh Rp 7,500.00 Err:509
III UPAH
1 Pekerja 700.00 OH Rp 100,000.00 Rp 70,000,000.00 Err:509 OH Rp 100,000.00 Err:509 216.00 OH Rp 100,000.00 Rp 21,600,000.00
2 Tukang 335.00 OH Rp 125,000.00 Rp 41,875,000.00 224.00 OH Rp 125,000.00 Rp 28,000,000.00 111.00 OH Rp 125,000.00 Rp 13,875,000.00
IV OPERASIONAL
1 Alat Tulis Kantor (Atk) Termasuk Materai : 1.00 Ls Rp 3,042,200.00 Rp 3,042,200.00 1.00 Ls Rp 2,521,000.00 Rp 2,521,000.00 1.00 Ls Rp 521,200.00 Rp 521,200.00
2 Pembuatan Dokumen Lpj Ksm (Cetak, Foto Copy, Jilid) 1.00 Ls Rp 3,850,000.00 Rp 3,850,000.00 1.00 Ls Rp 3,200,000.00 Rp 3,200,000.00 1.00 Ls Rp 650,000.00 Rp 650,000.00
3 Alat Pelindung Diri Dan Keselamatan Kerja (Apd K3) 1.00 Ls Rp 2,222,500.00 Rp 2,222,500.00 1.00 Ls Rp 2,149,800.00 Rp 2,149,800.00 1.00 Ls Rp 72,700.00 Rp 72,700.00
4 Kampanye Phbs 1.00 Ls Rp 315,000.00 Rp 315,000.00 1.00 Ls Rp 315,000.00 Rp 315,000.00 1.00 Ls Rp - Rp -
5 Kegiatan Rembuk Warga 1.00 Ls Rp 5,915,000.00 Rp 5,915,000.00 1.00 Ls Rp 4,879,700.00 Rp 4,879,700.00 1.00 Ls Rp 1,035,300.00 Rp 1,035,300.00
6 Papan Informasi Pelaksanaan Kegiatan 1.00 Ls Rp 140,000.00 Rp 140,000.00 1.00 Ls Rp 140,000.00 Rp 140,000.00 1.00 Ls Rp - Rp -
7 Transport Ksm 1.00 Ls Rp 1,050,000.00 Rp 1,050,000.00 1.00 Ls Rp 1,050,000.00 Rp 1,050,000.00 1.00 Ls Rp - Rp -
Diperiksa oleh
Faskab Sandes Pen Kab. Bangkalan Tenaga Fasilitator Lapangan
MOH. SALIM, ST ALI USMAN ILHAM JOLIANTO PUTRA
PENGGUNAAN DANA
D TERMIN 1-1
Err:509 Err:509
Bangkalan……………2021
Disusun oleh :
ator Lapangan KSM
LANCAR JAYA
SYARIF
Format 1.13
KABUPATEN : BANGKALAN
10
11
12
13
14
15
16
17
18
19
20
21
22
TOTAL
Syarif …..........
Format 1.13
Format 1.13
KABUPATEN : BANGKALAN
JENIS KEGIATAN : SANITASI PERDESAAN PADAT KARYA Upah Harian Pekerja : Rp 100,000.00
10
11
12
13
14
15
16
17
18
19
20
21
22
TOTAL
Syarif …..........
Format 1.13
DAFTAR HADIR PEKERJA HARIAN DAN PENERIMAAN UPAH
KABUPATEN : BANGKALAN
JENIS KEGIATAN : SANITASI PERDESAAN PADAT KARYA Upah Harian Pekerja : Rp 100,000.00
10
11
12
13
14
15
16
17
18
19
20
21
TOTAL
Syarif …..........
Format 1.13
KABUPATEN : BANGKALAN
JENIS KEGIATAN : SANITASI PERDESAAN PADAT KARYA Upah Harian Pekerja : Rp 100,000.00
10
11
12
13
14
15
TOTAL
Syarif …..........
Format 1.13
KABUPATEN : BANGKALAN
JENIS KEGIATAN : SANITASI PERDESAAN PADAT KARYA Upah Harian Pekerja : Rp 100,000.00
10
11
12
13
14
15
TOTAL
Syarif …..........
Format 1.13
KABUPATEN : BANGKALAN
JENIS KEGIATAN : SANITASI PERDESAAN PADAT KARYA Upah Harian Pekerja : Rp 100,000.00
10
11
12
13
14
15
16
TOTAL
Syarif …..........
Format 1.13
KABUPATEN : BANGKALAN
JENIS KEGIATAN : SANITASI PERDESAAN PADAT KARYA Upah Harian Pekerja : Rp 100,000.00
10
11
12
13
14
15
TOTAL
Syarif …..........
Format 1.13
KABUPATEN : BANGKALAN
JENIS KEGIATAN : SANITASI PERDESAAN PADAT KARYA Upah Harian Pekerja : Rp 100,000.00
10
11
12
13
14
15
16
17
TOTAL
Syarif …..........
Format 1.13
JENIS KEGIATAN : SANITASI PERDESAAN PADAT KARYA Upah Harian Pekerja : Rp 100,000.00
10
11
12
13
14
15
TOTAL
Syarif …..........
DAFTAR HADIR PEKERJA HARIAN
Periode : I 9/13/2021 s/d 9/19/2021
Bulan September 2021
Jumlah 19 6 13 123
Jumlah 15 5 10 105
Jumlah 15 5 10 105
Jumlah 15 5 10 97
Jumlah 15 5 10 103
Jumlah 17 6 11 98
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN MINGGUAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN MINGGUAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN MINGGUAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
Pekerjaan
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Prosentase Kemajuan
Tiap Pekerjaan Seluruh
NO. URAIAN PEKERJAAN. SAT VOL. (Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa Kemajuan Terhadap
Pekerjaan
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN MINGGUAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN MINGGUAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN MINGGUAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN MINGGUAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN MINGGUAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
PERALATAN KONDISI
NO
Jenis Jumlah Satuan Baik Rusak
1 Helm Pengaman Kerja 2.00 Pcs Baik
2 Sarung Tangan 2.00 Pasang Baik
3 Sepatu Boods Panjang 2.00 Pasang Baik
4 Rompi Pekerja 2.00 Pcs Baik
5 Alat Ukur Suhu Tubuh 1.00 Unit Baik
6 Masker Kain 3.00 Dus Baik
Dibuat oleh:
'' LANCAR JAYA ''
SYARIF
Diperiksa Oleh :
TFL Teknis
ALI USMAN
CATATAN PERALATAN
PERALATAN KONDISI
NO
Jenis Jumlah Satuan Baik Rusak
1 Helm Pengaman Kerja 1.00 Pcs Baik
2 Sarung Tangan 1.00 Pasang Baik
3 Sepatu Boods Panjang 1.00 Pasang Baik
4 Rompi Pekerja 1.00 Pcs Baik
5 Masker Kain 2.00 Pcs Baik
Dibuat oleh:
'' LANCAR JAYA ''
SYARIF
Diperiksa Oleh :
TFL Teknis
ALI USMAN
CATATAN PERALATAN
PERALATAN KONDISI
NO
Jenis Jumlah Satuan Baik Rusak
1 Helm Pengaman Kerja 1.00 Pcs Baik
2 Sarung Tangan 1.00 Pasang Baik
3 Sepatu Boods Panjang 1.00 Pasang Baik
4 Rompi Pekerja 1.00 Pcs Baik
5 Masker Kain 1.00 Pcs Baik
Dibuat oleh:
'' LANCAR JAYA ''
SYARIF
Diperiksa Oleh :
TFL Teknis
ALI USMAN
CATATAN PERALATAN
PERALATAN KONDISI
NO
Jenis Jumlah Satuan Baik Rusak
1 Helm Pengaman Kerja 1.00 Pcs Baik
2 Sarung Tangan 1.00 Pasang Baik
3 Sepatu Boods Panjang 1.00 Pasang Baik
4 Rompi Pekerja 1.00 Pcs Baik
5 Masker Kain 1.00 Pcs Baik
Dibuat oleh:
'' LANCAR JAYA ''
SYARIF
Diperiksa Oleh :
TFL Teknis
ALI USMAN
CATATAN PERALATAN
PERALATAN KONDISI
NO
Jenis Jumlah Satuan Baik Rusak
1 Helm Pengaman Kerja 1.00 Pcs Baik
2 Sarung Tangan 1.00 Pasang Baik
3 Sepatu Boods Panjang 1.00 Pasang Baik
4 Rompi Pekerja 1.00 Pcs Baik
5 Masker Kain 1.00 Pcs Baik
Dibuat oleh:
'' LANCAR JAYA ''
SYARIF
Diperiksa Oleh :
TFL Teknis
ALI USMAN
CATATAN PERALATAN
PERALATAN KONDISI
NO
Jenis Jumlah Satuan Baik Rusak
1 Helm Pengaman Kerja 1.00 Pcs Baik
2 Sarung Tangan 1.00 Pasang Baik
3 Sepatu Boods Panjang 1.00 Pasang Baik
4 Rompi Pekerja 1.00 Pcs Baik
5 Masker Kain 1.00 Pcs Baik
Dibuat oleh:
'' LANCAR JAYA ''
SYARIF
Diperiksa Oleh :
TFL Teknis
ALI USMAN
CATATAN PERALATAN
PERALATAN KONDISI
NO
Jenis Jumlah Satuan Baik Rusak
1 Helm Pengaman Kerja 1.00 Pcs Baik
2 Sarung Tangan 1.00 Pasang Baik
3 Sepatu Boods Panjang 1.00 Pasang Baik
4 Rompi Pekerja 1.00 Pcs Baik
5 Masker Kain 1.00 Pcs Baik
Dibuat oleh:
'' LANCAR JAYA ''
SYARIF
Diperiksa Oleh :
TFL Teknis
ALI USMAN
CATATAN PERALATAN
PERALATAN KONDISI
NO
Jenis Jumlah Satuan Baik Rusak
1 Helm Pengaman Kerja 1.00 Pcs Baik
2 Sarung Tangan 1.00 Pasang Baik
3 Sepatu Boods Panjang 1.00 Pasang Baik
4 Rompi Pekerja 1.00 Pcs Baik
5 Masker Kain 3.00 Pcs Baik
Dibuat oleh:
'' LANCAR JAYA ''
SYARIF
Diperiksa Oleh :
TFL Teknis
ALI USMAN
CATATAN PERALATAN
PERALATAN KONDISI
NO
Jenis Jumlah Satuan Baik Rusak
1 Helm Pengaman Kerja 1.00 Pcs Baik
2 Sarung Tangan 1.00 Pasang Baik
3 Sepatu Boods Panjang 1.00 Pasang Baik
4 Rompi Pekerja 1.00 Pcs Baik
5 Masker Kain 2.00 Pcs Baik
Dibuat oleh:
'' LANCAR JAYA ''
SYARIF
Diperiksa Oleh :
TFL Teknis
ALI USMAN
LAPORAN BULANAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Bulan Lalu Bulan ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN BULANAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Bulan Lalu Bulan ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
LAPORAN BULANAN
Prosentase
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Kemajuan
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Terhadap
Tiap Pekerjaan Seluruh
(Rp) (Rp) (%) Bulan Lalu Bulan ini jumlah Sisa
Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12 13
MINGGU
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
NO
JENIS PEKERJAAN Cost Duration Bobot BOBOT KETERANGAN
Pekerjaan (%) (%)
1-7 8 - 14 15 - 21 22 - 28 29 Agustus 5 - 11 12 - 18 19 - 25 26 3-9 10 - 16 17 - 23 24 - 30 31 Oktober 7 - 13
11 - 17 Juli 18 - 24 Juli 25 - 31 Juli -4 September -6 30 s/d 5 6 s/d 12 13 s/d 19 20 s/d 26 27 s/d 3 4 s/d 10 11 s/d 17 18 s/d 24 25 s/d 31 1 s/d 7 8 s/d 14 15 s/d 21 22 s/d 28 29 s/d 5 6 s/d 12 13 s/d 19
Agustus Agustus Agustus Agustus September September September September - 2 Oktober Oktober Oktober Oktober Oktober November November s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
500,000,009.39 - 100.00
JUMLAH BOBOT
RENCANA BOBOT MINGGUAN 0.71 0.38 1.28 1.90 1.40 2.32 4.08 2.90 5.80 7.03 8.14 8.36 14.72 13.06 12.47 9.27 3.45 2.71
RENCANA
KUMULATIF RENCANA BOBOT MINGGUAN 0 0.71 1.09 2.37 4.28 5.68 8.00 12.08 14.98 20.78 27.81 35.95 44.32 59.03 72.09 84.56 93.83 97.29 100.00
REALISASI BOBOT MINGGUAN - - - - - - 0.38 1.54 2.23 2.64 6.20 12.79 7.41 14.07 10.58 10.38 7.38 - - - -
REALISASI
KUMULATIF REALISASI BOBOT MINGGUAN 0 0 - - - - 0.38 1.92 4.15 6.79 12.99 25.77 33.18 47.25 57.83 68.21 75.59
DEVIASI (+/-) % (0.71) (1.09) (2.37) (3.90) (3.76) (3.85) (5.29) (2.00) 4.99 5.37 11.29 13.51 9.18 3.50 (84.56) (93.83) (97.29) (100.00)
Bangkalan, ………................2022
Dibuat oleh,
Disetujui Oleh, Diperiksa oleh, KSM DURIN JAYA
TENAGA FASILITATOR LAPANGAN (TFL) DESA RONGDURIN
M MUCTAR ALI, ST. R M ALGHAF DIENULLAH, ST. ABD SALAM, SE. ISROK
Faskab TFL Teknik TFL Pemberdayaan Ketua
T I M E S C H E D U L E
KEGIATAN : SANIMAS SPALD-S
PEKERJAAN : PEMBANGUNAN TOILET INDIVIDU
LOKASI : DESA RONGDURIN `
: KECAMATAN TANAH MERAH
TAHUN ANGGARAN : 2022
MINGGU
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Bobot BULAN
NO JENIS PEKERJAAN Cost Duration Pekerjaan BOBOT (%)
(%)
Juli Agustus OKTOBER NOVEMBER DESEMBER
14 s/d 17 30 s/d 5 6 s/d 12 13 s/d 19 20 s/d 26 27 s/d 3 4 s/d 10 11 s/d 17 18 s/d 24 25 s/d 31 1 s/d 7 8 s/d 14 15 s/d 21 22 s/d 28 29 s/d 5 6 s/d 12 13 s/d 19
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
500,000,009.39 -
JUMLAH BOBOT 100.00
RENCANA BOBOT MINGGUAN 0.68 0.36 1.82 1.51 2.57 4.51 5.56 7.02 8.07 8.73 15.32 13.55 13.00 9.97 3.91 2.75 0.68
KUMULATIF RENCANA BOBOT MINGGUAN 0 0.68 1.04 2.85 4.37 6.94 11.45 17.01 24.03 32.10 40.83 56.15 69.70 82.70 92.67 96.57 99.32 100.00
REALISASI BOBOT MINGGUAN - - - - - - 9.56 9.49 10.28 4.42 7.91 7.91 7.05 7.91 3.16
KUMULATIF REALISASI BOBOT MINGGUAN 0 0 0 - - - 9.56 19.05 29.33 33.75 41.66 49.56 56.61 64.52 67.68
DEVIASI (+/-) % (0.68) (1.04) (2.85) 5.20 12.11 17.89 16.74 17.63 17.46 15.78 8.37 (2.02)
Bangkalan, ………................2022
22 Matsurah
23 H. Rofii
24 Jaelani Sadli
25 Zeinal
26 Fatmah
27 Moh. Heriyanto
28 Bahrun Anwar
29 Hasan
30 Abd. Aziz
31 Achmad Efendi
32 Jaminten
33 Umar
34 Nasihah
35 Tiara
TOTAL 7 14 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 7 14 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 7 14 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 7 14 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 7 14 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 7 14 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 7 14 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 13 26 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 10 26 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 10 26 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 10 26 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 10 26 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 10 26 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 42 100 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 19 38 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 19 38 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 19 38 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 19 38 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 19 38 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 19 38 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 43 89 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 24 48 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 24 48 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 24 48 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 24 48 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 24 48 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 24 48 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 35 70 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 29 58 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 29 58 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 29 58 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 29 58 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 29 58 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 29 58 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 35 70 -
1 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
2 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
3 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
4 √ √ √ √ √ √ √ √ √ 5 Rp 500,000.00
5 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
6 √ √ √ √ √ √ √ √ 7 Rp 700,000.00
7 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
8 √ √ √ √ √ √ √ √ √ 5 Rp 500,000.00
9 √ √ √ √ √ √ √ 7 Rp 700,000.00
10 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
11 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
12 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
13 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
14 5 Rp 500,000.00
15 √ √ √ √ √ √ √ 7 Rp 875,000.00
16 √ √ √ √ √ √ √ 5 Rp 625,000.00
17 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
18 √ √ √ √ √ √ √ √ √ 6 Rp 750,000.00
19 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
20 √ √ √ √ √ √ √ √ √ 6 Rp 750,000.00
21 5 Rp 625,000.00
22 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
TOTAL 50 92 Rp 15,450,000.00
Syarif …..........
Format 1.13
1 √ √ √ √ √ √ √ 7 Rp 700,000.00
2 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
3 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
4 √ √ √ √ √ √ √ 6 Rp 600,000.00
5 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
6 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
7 √ √ √ √ √ √ √ √ √ 5 Rp 500,000.00
8 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
9 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
10 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
11 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
12 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
13 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
14 √ √ √ √ √ √ √ 7 Rp 700,000.00
15 5 Rp 500,000.00
16 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
17 √ √ √ √ √ √ √ √ √ 6 Rp 750,000.00
18 √ √ √ √ √ √ √ 7 Rp 875,000.00
19 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
20 √ √ √ √ √ √ √ √ √ 6 Rp 750,000.00
21 3 Rp 375,000.00
22 √ √ √ √ 6 Rp 750,000.00
Syarif …..........
Format 1.13
Format 1.13
1 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
2 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
3 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
4 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
5 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
6 √ √ √ √ √ √ √ √ √ 4 Rp 400,000.00
7 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
8 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
9 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
10 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
11 √ √ √ √ √ √ √ √ √ 3 Rp 300,000.00
12 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
13 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
14 5 Rp 500,000.00
15 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
16 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
17 √ √ √ √ √ √ √ √ √ 6 Rp 750,000.00
18 √ √ √ √ √ √ √ √ √ 6 Rp 750,000.00
19 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
20 4 Rp 500,000.00
21 √ √ √ √ √ √ √ √ √ 6 Rp 750,000.00
TOTAL 43 89 Rp 14,275,000.00
Syarif …..........
Format 1.13
DAFTAR HADIR PEKERJA HARIAN DAN PENERIMAAN UPAH
Pembayaran Upah : Priode IV Tanggal 4 s/d 10 Oktober 2021
1 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
2 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
3 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
4 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
5 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
6 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
7 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
8 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
9 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
10 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
11 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
12 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
13 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
14 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
15 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
TOTAL 35 70 Rp 11,375,000.00
Syarif …..........
Format 1.13
1 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
2 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
3 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
4 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
5 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
6 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
7 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
8 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
9 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
10 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
11 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
12 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
13 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
14 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
15 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
TOTAL 35 70 Rp 11,375,000.00
Syarif …..........
Format 1.13
1 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
2 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
3 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
4 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
5 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
6 √ √ √ √ √ √ √ √ √ 6 Rp 600,000.00
7 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
8 √ √ √ √ √ √ √ √ √ 4 Rp 400,000.00
9 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
10 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
11 5 Rp 500,000.00
12 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
13 √ √ √ √ √ √ √ 5 Rp 625,000.00
14 √ √ √ √ √ √ 6 Rp 750,000.00
15 √ √ √ √ √ √ √ √ √ 6 Rp 750,000.00
16 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
TOTAL 31 71 Rp 10,975,000.00
Syarif …..........
Format 1.13
1 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
2 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
3 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
4 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
5 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
6 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
7 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
8 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
9 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
10 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
11 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
12 √ √ √ √ √ √ √ √ √ 5 Rp 625,000.00
13 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
14 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
15 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
TOTAL 33 70 Rp 11,125,000.00
Syarif …..........
Format 1.13
1 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
2 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
3 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
4 √ √ √ √ √ √ √ √ √ 5 Rp 500,000.00
5 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
6 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
7 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
8 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
9 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
10 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
11 7 Rp 700,000.00
12 √ √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
13 √ √ √ √ √ √ √ √ √ 5 Rp 625,000.00
14 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
15 √ √ √ √ √ √ √ √ √ 5 Rp 625,000.00
16 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
17 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
TOTAL 38 75 Rp 12,250,000.00
Syarif …..........
Format 1.13
1 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
2 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
3 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
4 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
5 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
6 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
7 √ √ √ √ √ √ √ √ √ 5 Rp 500,000.00
8 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
9 √ √ √ √ √ √ √ √ √ 7 Rp 700,000.00
10 √ √ √ √ √ √ √ √ 6 Rp 600,000.00
11 √ √ √ √ √ √ √ √ √ 5 Rp 625,000.00
12 √ √ √ √ √ √ √ √ 7 Rp 875,000.00
13 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
14 √ √ √ √ √ √ √ √ √ 5 Rp 625,000.00
15 √ √ √ √ √ √ √ √ √ 7 Rp 875,000.00
TOTAL 31 67 Rp 10,575,000.00
Syarif …..........
CATATAN HARIAN KEGIATAN
DESA/KELURAHAN : DESA AENG TABER TANGGAL KERJA Monday, October 18, 2021
KECAMATAN/KAB/KOTA : TANJUNG BUMI PELAKSANA ABDUL ROFIK
JENIS KEGIATAN : SANITASI PERDESAAN PADAT KARYA PENDAMPING ALI USMAN + ILHAM JULIANTO PUTRO
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 31 71 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 70 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Tidak
23 H. Rofii Tidak
24 Jaelani Sadli Tidak
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 68 -
22 Matsurah Ya
PEKERJAAN PONDASI DAN BETON - 0 0
PEKERJAAN PASANGAN DINDING -
PEKERJAAN ATAP, LISTRIK, LANTAI DAN PENGECATAN -
PEKERJAAN PIPA DAN ACCESORIS -
PEKERJAAN SEPTICTANK TYPE 1 (1-5 Jiwa) -
PEKERJAAN SEPTICTANK TYPE 2 (6-10 Jiwa) -
PEKERJAAN RESAPAN -
23 H. Rofii Ya
PEKERJAAN PONDASI DAN BETON
PEKERJAAN PASANGAN DINDING
PEKERJAAN ATAP, LISTRIK, LANTAI DAN PENGECATAN
PEKERJAAN PIPA DAN ACCESORIS
PEKERJAAN SEPTICTANK TYPE 1 (1-5 Jiwa)
PEKERJAAN SEPTICTANK TYPE 2 (6-10 Jiwa)
PEKERJAAN RESAPAN
24 Jaelani Sadli Ya
PEKERJAAN PONDASI DAN BETON
PEKERJAAN PASANGAN DINDING
PEKERJAAN ATAP, LISTRIK, LANTAI DAN PENGECATAN
PEKERJAAN PIPA DAN ACCESORIS
PEKERJAAN SEPTICTANK TYPE 1 (1-5 Jiwa)
PEKERJAAN SEPTICTANK TYPE 2 (6-10 Jiwa)
PEKERJAAN RESAPAN
25 Zeinal Tidak
26 Fatmah Tidak
27 Moh. Heriyanto Tidak
28 Bahrun Anwar Tidak
29 Hasan Tidak
30 Abd. Aziz Tidak
31 Achmad Efendi Tidak
32 Jaminten Tidak
33 Umar Tidak
34 Nasihah Tidak
35 Tiara Tidak
TOTAL 33 70 -
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Tiap Kemajuan Terhadap
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa Pekerjaan Seluruh Pekerjaan
1 2 4 5 6 7 8 9 10 11 12 13 14
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Tiap Kemajuan Terhadap
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa Pekerjaan Seluruh Pekerjaan
1 2 4 5 6 7 8 9 10 11 12 13 14
LAPORAN MINGGUAN
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Tiap Kemajuan Terhadap
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa Pekerjaan Seluruh Pekerjaan
1 2 4 5 6 7 8 9 10 11 12 13 14
LAPORAN MINGGUAN
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Tiap Kemajuan Terhadap
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa Pekerjaan Seluruh Pekerjaan
1 2 4 5 6 7 8 9 10 11 12 13 14
LAPORAN MINGGUAN
LAPORAN MINGGUAN
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Tiap Kemajuan Terhadap
Pekerjaan Seluruh Pekerjaan
Prosentase Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Tiap Kemajuan Terhadap
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa Pekerjaan Seluruh Pekerjaan
1 2 4 5 6 7 8 9 10 11 12 13 14
270
LAPORAN MINGGUAN
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Tiap Kemajuan Terhadap
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa Pekerjaan Seluruh Pekerjaan
1 2 4 5 6 7 8 9 10 11 12 13 14
A BIAYA OPERASIONAL PEKERJAAN (BOP)
I RINCIAN BIAYA OPERASIONAL PEKERJAAN (BOP)
1 Alat Tulis Kantor (Atk) Termasuk Materai : ls 1.00 Rp 4,350,000.00 Rp 4,350,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Pembuatan Dokumen Lpj Ksm (Cetak, Foto Copy, Jilid) ls 1.00 Rp 5,500,000.00 Rp 5,500,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Alat Pelindung Diri Dan Keselamatan Kerja (Apd K3) ls 1.00 Rp 3,175,000.00 Rp 3,175,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Kampanye Phbs ls 1.00 Rp 450,000.00 Rp 450,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Kegiatan Rembuk Warga ls 1.00 Rp 8,450,000.00 Rp 8,450,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
6 Papan Informasi Pelaksanaan Kegiatan ls 1.00 Rp 200,000.00 Rp 200,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
7 Transport Ksm ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Rp 23,625,000.00 Err:509 Err:509 Err:509 Err:509 Err:509
B PEKERJAAN BANGUNAN BILIK TOILET
I PEKERJAAN PONDASI DAN BETON
1 Galian Tanah Biasa Sedalam 1 m m3 16.24 Rp 75,000.00 Rp 1,218,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Pasangan Pondasi Batu Gunung 1 Pc : 8 Ps m3 26.39 Rp 796,400.00 Rp 21,016,996.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Pasangan Pondasi Rollage 1 Pc : 6 Ps m2 17.06 Rp 168,815.00 Rp 2,880,405.94 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Kolom Praktis 15/15 -
a. Pembesian kg 876.54 Rp 11,340.00 Rp 9,939,946.22 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Beton Camp. 1 Pc : 2 Ps : 3 Kr m3 6.46 Rp 1,029,814.68 Rp 6,650,028.31 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Ringbalk 15/15
a. Pembesian kg 619.99 Rp 11,340.00 Rp 7,030,693.66 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Beton Camp. 1 Pc : 2 Ps : 3 Kr m3 4.57 Rp 1,029,814.68 Rp 4,703,678.56 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
6 Sloof 15/15
a. Pembesian kg 619.99 Rp 11,340.00 Rp 7,030,693.66 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Beton Camp. 1 Pc : 2 Ps : 3 Kr m3 4.57 Rp 1,029,814.68 Rp 4,703,678.56 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
7 Bekisting Kolom Praktis 15/15 (2x pakai) m2 43.05 Rp 128,500.00 Rp 5,531,925.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
8 Bekisting Ringbalk 15/15 (2x pakai) m2 60.90 Rp 128,500.00 Rp 7,825,650.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
9 Bekisting Sloof 15/15 (1x pakai) m2 60.90 Rp 128,500.00 Rp 7,825,650.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Rp 86,357,345.92 Err:509 Err:509 Err:509 Err:509 Err:509
II PEKERJAAN PASANGAN DINDING
1 Pasangan Trasram 1/2 Bata 1pc : 4ps m2 88.38 Rp 99,485.00 Rp 8,791,986.88 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Pasangan Batu Putih 1/2 Bata 1pc : 8ps m2 256.73 Rp 94,275.00 Rp 24,202,749.38 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Plesteran Trasram 1pc : 4ps tb. 20 mm m2 176.75 Rp 69,272.00 Rp 12,243,826.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Plesteran Biasa 1pc : 7ps tb. 20 mm m2 513.45 Rp 51,693.60 Rp 26,542,078.92 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Acian m2 690.20 Rp 31,887.50 Rp 22,008,752.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
6 Glassblock 20x20cm bh 70.00 Rp 25,000.00 Rp 1,750,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
7 Roster Batapres 20x20cm bh 140.00 Rp 35,000.00 Rp 4,900,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Rp 100,439,393.67 Err:509 Err:509 Err:509 Err:509 Err:509
III PEKERJAAN ATAP, LISTRIK, LANTAI DAN PENGECATAN
1 Pasang Rangka Atap Galvalum C. 75 - 0,75 + Spandek 0,3 mm m2 168.35 Rp 192,000.00 Rp 32,323,200.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Pasang Lisplang L. 20 (Kalsiplank) m' 385.00 Rp 25,000.00 Rp 9,625,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Lantai Keramik 20 x 20 cm (Motif) m2 54.60 Rp 206,150.00 Rp 11,255,790.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Keramik Dinding 20 x 25 ( Motif ) m2 25.29 Rp 251,045.00 Rp 6,348,300.44 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Rabat Beton Bawah Keramik m3 3.36 Rp 854,300.00 Rp 2,870,448.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Fitting Lampu bh 70.00 Rp 9,000.00 Rp 630,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
6 Lampu 5 watt bh 70.00 Rp 20,000.00 Rp 1,400,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
7 Kabel NYM 2x1,5mm m 175.00 Rp 8,000.00 Rp 1,400,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
8 Sakelar Tunggal bh 35.00 Rp 15,000.00 Rp 525,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
9 Pengecatan Tembok m2 690.20 Rp 25,335.00 Rp 17,486,217.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Rp 83,863,955.44 Err:509 Err:509 Err:509 Err:509 Err:509
C PEKERJAAN SEPTICTANK DAN RESAPAN
I PEKERJAAN PIPA DAN ACCESORIS
1 Pintu Kamar Mandi (Alumunium) unit 35.00 Rp 300,000.00 Rp 10,500,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Floor Drain bh 35.00 Rp 20,000.00 Rp 700,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Bak Mandi Fiber Oval bh 35.00 Rp 340,000.00 Rp 11,900,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Anaerobik Filter uk. 37x1.00x60cm unit 27.00 Rp 350,000.00 Rp 9,450,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Anaerobik Filter uk. 47x1.00x60cm unit 8.00 Rp 550,000.00 Rp 4,400,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
6 Kloset Jongkok bh 35.00 Rp 175,000.00 Rp 6,125,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
7 Pasang Grease Trap Precast unit 35.00 Rp 320,000.00 Rp 11,200,000.00 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509
8 Tee PVC AW Ø 1 1/2" bh 35.00 Rp 105,000.00 Rp 3,675,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
9 Elbow PVC AW Ø 2" bh 105.00 Rp 10,000.00 Rp 1,050,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
10 Tee PVC AW Ø 2" bh 70.00 Rp 12,000.00 Rp 840,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11 Tee PVC AW Ø 3" bh 70.00 Rp 16,000.00 Rp 1,120,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12 Pipa PVC AW Ø 1 1/2" m' 140.00 Rp 73,900.00 Rp 10,346,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
13 Pipa PVC AW Ø 2" m' 140.00 Rp 37,000.00 Rp 5,180,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14 Pipa PVC AW Ø 3" m' 140.00 Rp 60,000.00 Rp 8,400,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Rp 84,886,000.00 Err:509 Err:509 Err:509 Err:509 Err:509
II PEKERJAAN SEPTICTANK TYPE 1 (1-5 Jiwa)
1 Galian Tanah Keras m3 58.32 Rp 100,000.00 Rp 5,832,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Plat Tutup Beton ( tb. 10 cm )
a. Pembesian kg 182.23 Rp 11,340.00 Rp 2,066,544.15 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Beton 1 Pc : 2 Kr : 3 Ps m3 3.89 Rp 1,029,814.68 Rp 4,003,919.49 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Bekisting Plat Tutup Beton ( tb. 10 cm ) (1x pakai) m2 26.46 Rp 128,500.00 Rp 3,400,110.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Tangki Septik Beton ( tb. 10 cm )
a. Pembesian kg 1,240.67 Rp 11,340.00 Rp 14,069,186.61 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Beton Camp. 1 Pc : 2 Ps : 3 Kr m3 22.58 Rp 1,029,814.68 Rp 23,250,538.01 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Bekisting Tangki Septik Beton ( tb. 10 cm ) (1x pakai) m2 112.08 Rp 128,500.00 Rp 14,402,093.66 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Rp 67,024,391.92 Err:509 Err:509 Err:509 Err:509 Err:509
III PEKERJAAN SEPTICTANK TYPE 2 (6-10 Jiwa)
1 Galian Tanah Keras m3 24.48 Rp 100,000.00 Rp 2,448,000.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Plat Tutup Beton ( tb. 10 cm )
a. Pembesian kg 76.60 Rp 11,340.00 Rp 868,687.36 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Beton Camp. 1 Pc : 2 Ps : 3 Kr m3 1.63 Rp 1,029,814.68 Rp 1,680,657.56 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Bekisting Plat Tutup Beton ( tb. 10 cm ) (1x pakai) m2 10.64 Rp 128,500.00 Rp 1,367,240.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Tangki Septik Beton ( tb. 10 cm )
a. Pembesian kg 459.80 Rp 11,340.00 Rp 5,214,182.37 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Beton Camp. 1 Pc : 2 Ps : 3 Kr m3 8.34 Rp 1,029,814.68 Rp 8,586,182.90 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Bekisting Tangki Septik Beton ( tb. 10 cm ) (1x pakai) m2 66.96 Rp 128,500.00 Rp 8,604,360.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Rp 28,769,310.19 Err:509 Err:509 Err:509 Err:509 Err:509
IV PEKERJAAN RESAPAN
1 Galian Tanah Keras m3 40.04 Rp 100,000.00 Rp 4,003,500.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Pas. Batu Bata Putih Kosong m2 106.76 Rp 74,500.00 Rp 7,953,620.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Pas. Batu Putih 1pc : 4ps ( 1/2 bata ) m2 53.38 Rp 99,485.00 Rp 5,310,509.30 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Plat Beton ( tb. 10 cm )
a. Pembesian kg 171.04 Rp 11,340.00 Rp 1,939,613.56 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Beton Camp. 1 Pc : 2 Ps : 3 Kr m3 2.67 Rp 1,029,814.68 Rp 2,748,575.39 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Bekisting Plat m2 24.02 Rp 128,500.00 Rp 3,086,698.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Rp 25,042,516.75 Err:509 Err:509 Err:509 Err:509 Err:509
LAPORAN MINGGUAN
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Tiap Kemajuan Terhadap
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa Pekerjaan Seluruh Pekerjaan
1 2 4 5 6 7 8 9 10 11 12 13 14
LAPORAN MINGGUAN
HARGA SAT. JUMLAH TOTAL BOBOT HASIL PEKERJAAN (%) Prosentase Prosentase
NO. URAIAN PEKERJAAN. SAT VOL. Kemajuan Tiap Kemajuan Terhadap
(Rp) (Rp) (%) Mingg Lalu Ming ini jumlah Sisa Pekerjaan Seluruh Pekerjaan
1 2 4 5 6 7 8 9 10 11 12 13 14
Kampanye PHBS
@ Rp 12,000 x 15.00 Or Rp 180,000.0 Rp 139,820,000.0
Transport KSM
Transport KSM Ke Bank @ Rp 600,000 x 1.00 Ls Rp 600,000.0 Rp 133,435,000.0
Upah
Upah Pekerja Ming I. @ Rp 100,000 x 92.00 Oh Rp 9,200,000.0 Rp 124,235,000.0
Upah TukangMing I. @ Rp 125,000 x 50.00 Oh Rp 6,250,000.0 Rp 117,985,000.0
Upah
Upah Pekerja Ming II. @ Rp 100,000 x 100.00 Oh Rp 10,000,000.0 Rp 107,985,000.0
Upah TukangMing II. @ Rp 125,000 x 42.00 Oh Rp 5,250,000.0 Rp 102,735,000.0
Upah
Upah Pekerja Ming III. @ Rp 100,000 x 89.00 Oh Rp 8,900,000.0 Rp 93,835,000.0
2) Upah TukangMing III @ Rp 125,000 x 43.00 Oh Rp 5,375,000.0 Rp 88,460,000.0
Bahan Material
Batu Gunung/ Kali @ Rp 207,000 x 10.00 m³ Rp 2,070,000.0 Rp 84,139,300.0
Batu Bata Putih @ Rp 900 x 8,352 buah Rp 7,516,800.0 Rp 76,622,500.0
Batu Cor @ Rp 256,000 x 14.00 m³ Rp 3,584,000.0 Rp 73,038,500.0
Pasir Pasang Lokal @ Rp 250,000 x 10.80 m³ Rp 2,700,000.0 Rp 70,338,500.0
Pasir Hitam ex. Pasuruan @ Rp 305,000 x 16.00 m³ Rp 4,880,000.0 Rp 65,458,500.0
Besi Polos Ø 6 @ Rp 30,000 x 116.00 lonjor Rp 3,480,000.0 Rp 61,978,500.0
Besi Polos Ø 8 @ Rp 42,000 x 8.00 lonjor Rp 336,000.0 Rp 61,642,500.0
Besi Polos Ø 10 @ Rp 66,100 x 132.00 lonjor Rp 8,725,200.0 Rp 52,917,300.0
Kawat Bendrat @ Rp 23,000 x 18.00 kg Rp 414,000.0 Rp 52,503,300.0
Papan Bekisting @ Rp 24,000 x 1.40 m³ Rp 33,600.0 Rp 52,469,700.0
Semen 40 kg @ Rp 58,000 x 216.80 zak Rp 12,574,400.0 Rp 39,895,300.0
Semen Warna @ Rp 12,000 x 21.60 kg Rp 259,200.0 Rp 39,636,100.0
Keramik 20 x 20 cm (motif) @ #N/A x 18.00 dos #N/A #N/A
Keramik Dinding 20 x 25 cm (motif) @ #N/A x 0.00 dos #N/A #N/A
Minyak Bekisting @ Rp 6,500 x 7.20 liter Rp 46,800.0 #N/A
Transport KSM
@ Rp 450,000 x 1.00 Ls Rp 450,000.0 Err:509
Rembuk Warga
1 1) Hand Sanitizer (2 Pcs) @ Rp 100,000 x 2.00 pcs Rp 200,000.0 Err:509
2 2) Masker (4 Pack) @ Rp 100,000 x 4.00 pack Rp 400,000.0 Err:509
3 3) Sabun Cuci Tangan (5 Buah) @ Rp 25,000 x 5.00 buah Rp 125,000.0 Err:509
4 4) Konsumsi Warga (35 Orang) @ Rp 25,000 x 31.00 orang Rp 775,000.0 Err:509
6 @
7 Alat Pelindung Diri dan Keselamatan @
8 1) Sarung Tangan @ Rp 79,900 x 2.00 Pack Rp 159,800.0 Err:509
9 2) Sepatu @ Rp 60,000 x 12.00 orang Rp 720,000.0 Err:509
10 @
11 Pembuatan Dokumen LPJ KSM @
12 1) Foto Copy (1000 Lembar) @ Rp 250 x 1600.00 lembar Rp 400,000.0 Err:509
13 2) Penjilidan (4 Buah) @ Rp 75,000 x 8.00 buah Rp 600,000.0 Err:509
14 @
15 Upah Pekerja @
16 Upah Pekerja Ming I. @ Rp 100,000 x 70.00 Oh Rp 7,000,000.0 Err:509
17 Upah TukangMing I. @ Rp 125,000 x 35.00 Oh Rp 4,375,000.0 Err:509
18 Upah Pekerja Ming II. @ Rp 100,000 x 70.00 Oh Rp 7,000,000.0 Err:509
19 Upah TukangMing II. @ Rp 125,000 x 35.00 Oh Rp 4,375,000.0 Err:509
Upah Pekerja Ming III @ Rp 100,000 x 71.00 Oh Rp 7,100,000.0 Err:509
Upah TukangMing III @ Rp 125,000 x 31.00 Oh Rp 3,875,000.0 Err:509
Alat
1) Kuas @ #NAME? x ### bh #NAME? Err:509
2) Ember @ #NAME? x ### bh #NAME? Err:509
@
Papan Informasi @ Rp 60,000 x 1.00 Ls Rp 60,000.0 Err:509
Rembuk Warga
Masker (1 Pack) @ Rp 100,000 x 3.00 pack Rp 300,000.0 Err:509
Sabun Cuci Tangan (2 Buah) @ Rp 25,000 x 2.00 buah Rp 50,000.0 Err:509
Konsumsi Warga @ Rp 30,000 x 30.00 org Rp 900,000.0 Err:509
15 Upah Pekerja
16 Upah Pekerja Ming I. @ Rp 100,000 x 70.00 Oh Rp 7,000,000.0 Err:509
17 Upah TukangMing I. @ Rp 125,000 x 33.00 Oh Rp 4,125,000.0 Err:509
18 Upah Pekerja Ming II. @ Rp 100,000 x 75.00 Oh Rp 7,500,000.0 Err:509
19 Upah TukangMing II. @ Rp 125,000 x 38.00 Oh Rp 4,750,000.0 Err:509
Upah Pekerja Ming III @ Rp 100,000 x 67.00 Oh Rp 6,700,000.0 Err:509
Upah TukangMing III @ Rp 125,000 x 31.00 Oh Rp 3,875,000.0 Err:509
Jumlah 15 5 10 97 Rp 10,475,000.00
Jumlah 17 6 11 98 Rp 10,450,000.00
Harga
No. Uraian Kegiatan Kebutuhan Unit/ satuan Jumlah
satuan Rp. Rp.
I BAHAN / MATERIAL
1 Batu Gunung/ Kali 30.00 m³ 207,000.00 6,210,000.00
2 Batu Bata Putih 20,882.00 buah 900.00 18,793,800.00
3 Batu Cor 45.00 m³ 256,000.00 11,520,000.00
4 Pasir Pasang Lokal 36.00 m³ 250,000.00 9,000,000.00
5 Pasir Hitam ex. Pasuruan 54.00 m³ 305,000.00 16,470,000.00
6 Besi Polos Ø 6 368.00 lonjor 30,000.00 11,040,000.00
7 Besi Polos Ø 8 24.00 lonjor 42,000.00 1,008,000.00
8 Besi Polos Ø 10 430.00 lonjor 66,100.00 28,423,000.00
9 Kawat Bendrat 64.00 kg 23,000.00 1,472,000.00
10 Papan Bekisting 1,125.00 m³ 24,000.00 27,000,000.00
11 Semen 40 kg 774.00 zak 58,000.00 44,892,000.00
12 Semen Warna 77.00 kg 12,000.00 924,000.00
13 Keramik 20 x 20 cm (motif) 58.00 dos #N/A #N/A
14 Keramik Dinding 20 x 25 cm (motif) 26.00 dos #N/A #N/A
15 Minyak Bekisting 41.00 liter 6,500.00 266,500.00
16 Paku Biasa 122.00 kg 17,000.00 2,074,000.00
17 Cat Tembok Dasar 14.00 galon 250,000.00 3,500,000.00
18 Cat Tembok Penutup 36.00 galon 500,000.00 18,000,000.00
19 Plamir Tembok 70.00 kg 30,000.00 2,100,000.00
20 Kloset Jongkok 35.00 bh 180,000.00 6,300,000.00
21 Floor drain 35.00 bh 21,000.00 735,000.00
22 Pintu Kamar Mandi (Alumunium) 35.00 unit #N/A #N/A
23 Tee PVC AW Ø 1 1/2" 35.00 bh #N/A #N/A
24 Elbow PVC AW Ø 2" 105.00 bh 10,000.00 1,050,000.00
II ALAT
1 Err:509 5.00 Err:509 Err:509 Err:509
2 Err:509 10.00 Err:509 Err:509 Err:509
III UPAH
1 Pekerja - OH 100,000.00 -
2 Tukang - OH 125,000.00 -
IV OPERASIONAL