NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I PEKERJAAN PENDAHULUAN 8,011,872.00


II PEKERJAAN TANAH 39,450,163.50
III PEKERJAAN PONDASI 167,842,036.98
IV PEKERJAAN STRUKTUR KONSTRUKSI BETON 415,530,387.97
V PEKERJAAN KUDA-KUDA, ATAP dan LISTPLANG 172,963,487.14
VI PEKERJAAN DINDING PAS. BATA, PLESTERAN & ORNAMEN 619,015,199.26
VII PEKERJAAN LANTAI, PLAFOND 631,442,663.11
VIII PEKERJAAN KUSEN, DAUN PINTU JENDELA DAN KACA 134,536,265.40
IX PEKERJAAN PENGECATAN, BATU ALAM & ORNAMEN PAGAR BESI 144,200,952.71
X PEKERJAAN SANITASI & SEPTICTANK 114,931,808.35
XI PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 148,446,450.00
JUMLAH 2,596,371,286.41
JUMLAH PEMBULATAN 2,596,371,000.00
Terbilang : (Tiga Milyar Empat Ratus Lima Puluh Dua Juta Lima Ratus Empat Puluh Sembilan Ribu Rupiah)
Samarinda, Oktober 2014
:Dibuat Oleh

P E M I L I K
P E M I L I K
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Bangunan M2 A1 300.00
2 Pemasangan Bowplank M1 A2 102.00
JUMLAH I
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi Poor Plate dan Pondasi Menerus M3 B1 132.72
2 Urugan Tanah Kembali M3 B3 33.18
3 Urugan Tanah dan Pemadatan Peninggian Lantai Bangunan M3 B4 + B5 195.00
4 Urugan Pasir Bawah Pondasi M3 B6 22.46
JUMLAH II
III. PEKERJAAN PONDASI
1 Pek. Cerucuk Kayu Ulin 10/10 - 2 m' Ttk B7 138.00
2 Kalang Ulin 5/10 dan Kalang Ulin 5/10 Setempat M3 B7A 2.39
3 Pek. Pancang Kayu Ulin 10/10 - 12 m' Poor Plate Ttk Bc 120.00
4 Pas Aanstamping Batu Gunung M3 B9 12.24
5 Pas Batu Gunung 1 : 4 M3 B10 44.88
JUMLAH III

RAB RUMAH 7
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
IV. PEKERJAAN STRUKTUR KONSTRUKSI BETON
PEKERJAAN COR BETON BERTULANG K.250
1 Beton Lantai Kerja Bawah Foot Plat dan Bawah Lantai M3 C15 16.88
2 Beton Foot Plat 1.20x1.20 M3 C16 10.37
3 Beton Sloof 20 x 30 M3 C17 7.56
4 Beton Sloof 15 x 20 M3 C18 2.07
5 Beton Kolom 30 x 30 utama Elevasi -1.00 ke +3.60 M3 C22 7.15
6 Beton Kolom 13 x 13 praktis Elevasi +0.00 - ke +3.60 M3 C23 0.73
7 Beton Balok Elevasi +3.60 (25 x 35) M3 C19 9.23
8 Beton Balok Elevasi +3.60 (20 x 30) M4 C20 2.64
9 Beton Untuk Plat Lantai tebal 12 cm Elevasi +3.60 M3 C24 13.08
10 Beton Kolom 25 x 25 utama Elevasi +3.60 ke +7.20 M3 C22 5.40
11 Beton Kolom 13 x 13 praktis Elevasi +3.60 - ke +7.20 M3 C23 0.85
12 Beton Balok Elevasi +7.20 (20 x 30) M3 C20 2.22
13 Beton Balok Elevasi +7.20 (15 x 20) Ring Balk M3 C20 8.40
14 Beton Untuk Plat Duck tebal 10 cm Elevasi + 7.20 M3 C25 2.10
15 Beton Untuk Tangga M3 3.24
JUMLAH IV

RAB RUMAH 8
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
V. PEKERJAAN KUDA-KUDA, ATAP dan LISTPLANG
1 Kuda-Kuda Baja Ringan & rangka Atap M2 I1 375.00
2 Pasang Atap Genteng Metal M2 I3 375.00
3 Pasang Nok Metal M1 I4 15.00
4 Listplang Papan GRC Finishing Cat M1 I2 108.00

JUMLAH V
VI. PEKERJAAN DINDING PAS. BATA, PLESTERAN & ORNAMEN
LANTAI 1
1 Pasangan Dinding 1/2 bata 1:4 M2 E2 679.24
2 Pasangan Dinding 1/2 bata 1:2 Saluran Keliling M2 E1 87.75
3 Plesteran Dinding 1 : 4 M2 E4 1,358.48
4 Plesteran Dinding 1 : 2 M2 E3 175.50
5 Plesteran Ornamen Ls 1.00
LANTAI 2
1 Pasangan Dinding 1/2 bata 1:4 M2 E2 884.76
2 Plesteran Dinding 1 : 4 M2 E4 1,769.52
3 Plesteran Ornamen Ls 1.00
LANTAI 3
1 Pasangan Dinding 1/2 bata 1:4 M2 E2 650.21
2 Plesteran Dinding 1 : 4 M2 E4 1,300.42
RAB RUMAH 9
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
3 Plesteran Ornamen Ls 1.00
JUMLAH VI

RAB RUMAH 10
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
VII. PEKERJAAN LANTAI, PLAFOND
PEKERJAAN LANTAI KERAMIK UNTUK LANTAI 1
1 Cor Rabat Parkir Area M3 C1 8.50
2 Lantai Keramik 40/40 M2 D2 434.65
3 Keramik tangga 30/30 M2 72.20
4 Lantai Keramik 20/20 U KM/WC M2 D2 17.85
5 Dinding Keramik 20/25 u km/wc M2 D3 107.80
PEKERJAAN LANTAI KERAMIK UNTUK LANTAI 2
1 Lantai Keramik 40/40 M2 D2 426.50
2 Keramik tangga 30/30 M2 D2 72.20
3 Lantai Keramik 20/20 U KM/WC M2 D2 26.00
4 Dinding Keramik 20/25 u km/wc M2 D3 97.60
PEKERJAAN LANTAI KERAMIK UNTUK LANTAI 3
1 Lantai Keramik 40/40 M2 D2 294.75
2 Lantai Keramik 20/20 U KM/WC M2 D2 26.00
3 Dinding Keramik 20/25 u km/wc M2 D3 97.60

PEKERJAAN PLAFOND UNTUK LANTAI 1


1 Pasang Rangka plafond Hollow M2 E.001 434.65
2 Pasang bahan plafond gipsum M2 G2 434.65
3 Pasang list plafon M1 G4 905.00
RAB RUMAH 11
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
PEKERJAAN PLAFOND UNTUK LANTAI 2
1 Pasang Rangka plafond Hollow M2 E.001 426.50
2 Pasang bahan plafond gipsum M2 G2 426.50
3 Pasang list plafon M1 G4 905.00
PEKERJAAN PLAFOND UNTUK LANTAI 3
1 Pasang Rangka plafond Hollow M2 E.001 294.75
2 Pasang bahan plafond gipsum M2 G2 294.75
3 Pasang list plafon M1 G4 589.50
JUMLAH VII

RAB RUMAH 12
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
VIII.PEKERJAAN KUSEN, DAUN PINTU JENDELA DAN KACA
PEKERJAAN KUSEN, DAUN PINTU, JENDELA & KACA UNTUK LANTAI 1
1 Pasang Folding Gate Ruko M2 22.50
2 Pasang Kusen, pintu, jendela Kayu M' F.001 104.20
3 Pasang Pintu Panel Rangka Kayu bengkirai/kapur M2 F.002 22.47
4 Pasang Daun Jendela kaca Rangka Kayu M2 F.003 3.25
5 Pasang kaca Bening 5 mm M2 K10 4.88
6 Pasang Kunci Pintu 2x putar setara SES Bh K4 14.00
7 Pasang Engsel Pintu BH K5 42.00
8 Pasang Engsel Jendela BH K6 10.00
9 Pasang Grendel Jendela BH 10.00
10 Pasang Hak angin BH K9 10.00
PEKERJAAN KUSEN, DAUN PINTU, JENDELA & KACA UNTUK LANTAI 2
1 Pasang Kusen, pintu, jendela Kayu M' F.001 170.80
2 Pasang Pintu Panel Rangka Kayu bengkirai/kapur M2 F.002 35.70
3 Pasang Daun Jendela kaca Rangka Kayu M2 F.003 3.90
4 Pasang kaca Bening 5 mm M2 K10 5.85
5 Pasang Kunci Pintu 2x putar setara SES Bh K4 22.00
6 Pasang Engsel Pintu BH K5 66.00
7 Pasang Engsel Jendela BH K6 12.00
8 Pasang Grendel Jendela BH 12.00
RAB RUMAH 13
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
9 Pasang Hak angin BH K9 12.00
PEKERJAAN KUSEN, DAUN PINTU, JENDELA & KACA UNTUK LANTAI 3
1 Pasang Kusen, pintu, jendela Kayu M' F.001 104.20
2 Pasang Pintu Panel Rangka Kayu bengkirai/kapur M2 F.002 22.47
3 Pasang Daun Jendela kaca Rangka Kayu M2 F.003 3.25
4 Pasang kaca Bening 5 mm M2 K10 4.88
5 Pasang Kunci Pintu 2x putar setara SES Bh K4 14.00
6 Pasang Engsel Pintu BH K5 42.00
7 Pasang Engsel Jendela BH K6 10.00
8 Pasang Grendel Jendela BH 10.00
9 Pasang Hak angin BH K9 10.00
JUMLAH VIII

RAB RUMAH 14
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
IX. PEKERJAAN PENGECATAN, BATU ALAM & ORNAMEN PAGAR BESI
1 Cat Dinding Tembok dan Plafond M2 F1 4,428.42
2 Cat Minyak Kusen, Pintu, Jendela, Lisplank M2 F3 654.18
3 Batu Alam atau Finishing Dinding dengan cat motif M2 32.00
4 Pagar Besi Hollow Galvanis Finishing Cat (Tangga + Balkon) M1 134.00
JUMLAH IX
X. PEKERJAAN SANITASI & SEPTICTANK
1 Kloset Dudukk + Acsesoris Lengkap (Ex. Toto) Bh M1 16.00
2 Bak Mandi fiber Lapis Keramik Bh 4.00
3 Septicktang Beton dan Pasangan Bata
1. Pengukuran dan Bowplang M1 A2 24.00
2. Galian Tanah biasa M3 B1 24.26
3. Urugan Tanah Kembali M3 B3 7.28
4. Urugan Pasir M3 B6 1.00
5. Cor Beton Bertulang Konstruksi M3 C18 1.82
6. Cor Beton Bertulang Plat Lantai Penutup (Bawah & Atas) M3 C25 2.11
7. Pemasangan Peresapan Buis Beton diameter 50 cm + Acsesoris Bh 4.00
8. Pasangan Bata Dinding 1 : 2 M2 41.60
9. Plesteran Dinding 1 : 2 M2 83.20
10. Pemasangan Pipa PVC 4" M1 48.00
11. Pemasangan Pipa Udara PVC 2" + Acsesorisnya M1 16.00
RAB RUMAH 15
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4

JUMLAH X

RAB RUMAH 16
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
XI. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A PEKERJAN ELEKTRIKAL
1 Pek Sekring Listrik
1). Sekring 2 Group unit 8.00
S
2 Pek Lampu Penerangan
1). Lampu RMI 20 Watt bh 8.00
2). Lampu Down Light,1 x 18 Watt bh 100.00
3). Lampu XL 18 Watt bh 50.00
4). Stop kontak, 10 A bh 112.00
5). Saklar tunggal bh 50.00
6). Saklar seri bh 50.00
Su
3 Pek Instalasi
1). Instalasi penerangan Ttk 258.00
2). Instalasi stop kontak Ttk 112.00
Su

RAB RUMAH 17
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
B PEKERJAAN MEKANIKAL
a Pek,Instalasi Air Bersih
B.a,1 Pek Air Bersih Lantai I
2). Pipa PVC 1/2" AW m 150.00
3). Kran 1/2 " Bh 17.00
5). Fitting - Fitting ( Elbow, Tee, Reduser,etc ) Ls 1.00
S
b Pek,Instalasi Air Kotor & Bekas
B.b,1 Pek Air Kotor & Bekas Lantai I
1). Pipa PVC 4" AW m 60.00
2). Pipa PVC 2" AW m 60.00
4). Floor Drain Bh 17.00
6). Fitting - Fitting ( Elbow, Tee, Reduser,etc ) Ls 1.00
S
B.c Pek Air Hujan
1). Pipa PVC 2 1/2 " m 88.00
2). Roof Drain Bh 8.00
3). Fitting - Fitting ( Elbow, Tee, Reduser,etc ) Ls 1.00

JUMLAH
RAB RUMAH 18
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :PEMBANGUNAN RUMAH TEMPAT TINGGAL


LOKASI :Jl. ......................................, Samarinda
TAHUN :2015

KODE
URAIAN KEGIATAN SATUAN VOLUME
ANALISA

1 2 3 4
JUMLAH PEMBANGUNAN

RAB RUMAH 19
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

15,950.00 4,785,000.00
31,636.00 3,226,872.00
8,011,872.00

69,575.00 9,233,994.00
19,613.00 650,759.34
135,410.00 26,404,950.00
140,690.00 3,160,460.16
39,450,163.50

176,451.00 24,350,238.00
7,189,600.00 17,147,196.00
671,451.00 80,574,120.00
477,906.00 5,849,569.44
889,503.42 39,920,913.54
167,842,036.98

RAB RUMAH 20
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

1,180,461.33 19,927,367.77
4,069,955.90 42,197,302.82
5,159,904.33 39,008,876.76
5,571,009.33 11,531,989.32
5,784,209.33 41,357,096.73
6,403,416.00 4,675,005.95
6,081,244.72 56,099,482.56
4,917,591.25 12,982,440.90
4,796,882.21 62,743,219.29
5,784,209.33 31,234,730.40
6,403,416.00 5,454,173.61
4,917,591.25 10,917,052.58
5,784,209.33 48,587,358.40
4,796,882.21 10,073,452.64
5,784,209.33 18,740,838.24
415,530,387.97

RAB RUMAH 21
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

317,340.00 119,002,500.00
120,450.79 45,169,044.64
157,063.50 2,355,952.50
59,592.50 6,435,990.00

172,963,487.14

127,128.16 86,350,529.97
138,407.50 12,145,258.13
67,103.18 91,158,333.69
75,330.03 13,220,419.62
5,000,000.00 5,000,000.00

127,128.16 112,477,908.98
67,103.18 118,740,426.52
5,000,000.00 5,000,000.00

127,128.16 82,659,999.54
67,103.18 87,262,322.81
RAB RUMAH 22
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6
5,000,000.00 5,000,000.00
619,015,199.26

RAB RUMAH 23
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

1,025,706.00 8,718,501.00
211,592.53 91,968,691.56
211,592.53 15,276,980.40
211,592.53 3,776,926.59
216,629.37 23,352,645.92

211,592.53 90,244,212.47
211,592.53 15,276,980.40
211,592.53 5,501,405.68
216,629.37 21,143,026.36

211,592.53 62,366,897.13
211,592.53 5,501,405.68
216,629.37 21,143,026.36

95,575.00 41,541,673.75
50,127.00 21,787,700.55
41,156.50 37,246,632.50
RAB RUMAH 24
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

95,575.00 40,762,737.50
50,127.00 21,379,165.50
41,156.50 37,246,632.50

95,575.00 28,170,731.25
50,127.00 14,774,933.25
41,156.50 24,261,756.75
631,442,663.11

RAB RUMAH 25
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

750,000.00 16,875,000.00
83,859.58 8,738,168.17
654,335.00 14,702,907.45
481,591.00 1,565,170.75
117,917.25 574,846.59
325,580.75 4,558,130.50
51,092.25 2,145,874.50
37,361.50 373,615.00
15,000.00 150,000.00
19,676.25 196,762.50

83,859.58 14,323,216.16
654,335.00 23,359,759.50
481,591.00 1,878,204.90
117,917.25 689,815.91
325,580.75 7,162,776.50
51,092.25 3,372,088.50
37,361.50 448,338.00
15,000.00 180,000.00
RAB RUMAH 26
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6
19,676.25 236,115.00

83,859.58 8,738,168.17
654,335.00 14,702,907.45
481,591.00 1,565,170.75
117,917.25 574,846.59
325,580.75 4,558,130.50
51,092.25 2,145,874.50
37,361.50 373,615.00
15,000.00 150,000.00
19,676.25 196,762.50
134,536,265.40

RAB RUMAH 27
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

15,661.25 69,354,592.73
20,248.80 13,246,359.98
250,000.00 8,000,000.00
400,000.00 53,600,000.00
144,200,952.71

4,586,056.32 73,376,901.05
500,000.00 2,000,000.00

31,636.00 759,264.00
69,575.00 1,687,889.50
19,613.00 142,743.41
140,690.00 140,690.00
5,571,009.33 10,128,094.97
4,796,882.21 10,131,015.22
250,000.00 1,000,000.00
138,407.50 5,757,752.00
75,330.03 6,267,458.19
63,250.00 3,036,000.00
31,500.00 504,000.00
RAB RUMAH 28
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

114,931,808.35

RAB RUMAH 29
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

1,000,000.00 8,000,000.00
Sub Total, A,a, I 8,000,000.00

750,000.00 6,000,000.00
150,000.00 15,000,000.00
150,000.00 7,500,000.00
50,750.00 5,684,000.00
43,350.00 2,167,500.00
50,750.00 2,537,500.00
Sub Total,A, a, III 38,889,000.00

225,000.00 58,050,000.00
225,000.00 25,200,000.00
Sub Total,A, a, IV 83,250,000.00
TOTAL, A 130,139,000.00

RAB RUMAH 30
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6

14,600.00 2,190,000.00
78,500.00 1,334,500.00
750,000.00 750,000.00
Sub Total, B,a, I 4,274,500.00

63,250.00 3,795,000.00
31,500.00 1,890,000.00
103,950.00 1,767,150.00
750,000.00 750,000.00
Sub Total, B.b, I 8,202,150.00

34,600.00 3,044,800.00
254,500.00 2,036,000.00
750,000.00 750,000.00
5,830,800.00
18,307,450.00
JUMLAH TOTAL, A , B. 148,446,450.00
RAB RUMAH 31
NGGARAN BIAYA (RAB)

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6
2,596,371,286.41

RAB RUMAH 32
ANALISA PEKERJAAN

NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH


1 2 3 4 5 6=(3X5) 7=(3X5)

A. ANALISA PEKERJAAN PERSIAPAN / PENDAHULUAN


A1 1 M2 Pembersihan Lahan
SNI
6.8 Pekerja 0.1000 org 88,000.00 8,800.00
03-2835-2002 Mandor 0.0500 org 143,000.00 7,150.00
Jumlah 0.00 15,950.00

A2 1 M' Pengukuran dan Pemasangan Bouwplank


SNI kayu meranti bouwplank 5/7 0.0120 M 2,200,000.00 26,400.00
6.4 Paku Biasa 0.0200 kg 14,850.00 297.00
03-2835-2002 Kayu Papan Meranti Bouwplank 3/20 0.0070 M 2,200,000.00 15,400.00
Pekerja 0.100 org 88,000.00 8,800.00
Tukang 0.100 org 104,500.00 10,450.00
Kepala tukang 0.010 org 121,000.00 1,210.00
Mandor 0.0050 org 143,000.00 715.00
Jumlah 42,097.00 21,175.00

A3 1 M2 PEMBUATAN DIREKSI KEET


Kayu Dolken D 8-10 cm - 4 m 1.700 Btg 14,850.00 25,245.00
Kayu Meranti 0.210 M3 2,200,000.00 462,000.00
Paku 0.300 Kg 14,850.00 4,455.00
Semen Portland 10.500 Kg 1,650.00 17,325.00
Pasir Pasang 0.030 m3 202,631.58 6,078.95
Koral Beton 0.050 m3 407,000.00 20,350.00
Seng Gelombang BJLS 30 1.500 Lbr 39,996.00 59,994.00
Pekerja 1.0000 org 88,000.00 88,000.00
tukang kayu 2.0000 org 104,500.00 209,000.00
Kepala tukang 0.2000 org 121,000.00 24,200.00
Mandor 0.0500 org 143,000.00 7,150.00
Jumlah 595,447.95 328,350.00

33
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
B. ANALISA PEKERJAAN PONDASI / TANAH
SNI 2835:2008
B1 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 1 M'
SNI 2835:2008 Pekerja 0.7500 org 88,000.00 66,000.00
Mandor 0.0250 org 143,000.00 3,575.00
Jumlah 0.00 69,575.00

B2 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 2 M'


Pekerja 0.9000 org 88,000.00 79,200.00
Mandor 0.0450 org 143,000.00 6,435.00
Jumlah 85,635.00

B3 1 M3 PEK. URUGAN TANAH KEMBALI


Pekerja 0.1920 org 88,000.00 16,896.00
Mandor 0.0190 org 143,000.00 2,717.00
Alat bantu 0.0000 lot 25,000.00 0.00
Jumlah 0.00 19,613.00

B4 1 M3 URUGAN TANAH
Tanah urug 1.2000 m3 47,025.00 56,430.00
Pekerja / buruh tak terlatih 0.300 org 88,000.00 26,400.00
Mandor 0.010 org 143,000.00 1,430.00
Jumlah 56,430.00 27,830.00

B5 PEMADATAN TANAH
Pekerja / buruh tak terlatih 0.500 org 88,000.00 44,000.00
Mandor 0.050 org 143,000.00 7,150.00
Jumlah 0.00 51,150.00

B6 1 M3 URUGAN PASIR
Pasir urug 1.2000 m3 94,050.00 112,860.00
Pekerja 0.3000 org 88,000.00 26,400.00
Mandor 0.0100 org 143,000.00 1,430.00
Jumlah 112,860.00 27,830.00

B7 1 Titik Cerucuk Kayu Ulin


Kayu Ulin 10/10 - 2 m' 0.0200 m3 4,950,000.00 99,000.00

34
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Pekerja 0.2070 org 88,000.00 18,216.00
Tukang Kayu 0.2700 org 104,500.00 28,215.00
Ka. Tukang Kayu 0.1500 org 121,000.00 18,150.00
Mandor 0.0900 org 143,000.00 12,870.00
Jumlah 99,000.00 77,451.00

B7A 1 M3 PAPAN KALANG ULIN MENERUS DAN SUNDUK ULIN


Balok Ulin Uk. 5/10 + Papan Ulin Uk. 2/20 1.0000 m3 4,950,000.00 4,950,000.00
Paku Ulin 1.0000 Kg 14,850.00 14,850.00
Pekerja 5.0000 org 88,000.00 440,000.00
Tukang Kayu 15.0000 org 104,500.00 1,567,500.00
Ka. Tukang Kayu 1.5000 org 121,000.00 181,500.00
Mandor 0.2500 org 143,000.00 35,750.00
Jumlah 4,964,850.00 2,224,750.00

35
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
B8 1 M3 Sloop dan Gelagar Ulin
Balok Ulin Uk. 10/10 1.1000 m3 4,950,000.00 5,445,000.00
Paku Ulin 1.0000 Kg 22,500.00 22,500.00
Pekerja 5.0000 org 88,000.00 440,000.00
Tukang Kayu 15.0000 org 104,500.00 1,567,500.00
Ka. Tukang Kayu 1.5000 org 121,000.00 181,500.00
Mandor 0.2500 org 143,000.00 35,750.00
Jumlah 5,467,500.00 2,224,750.00

B8A 1 M3 LANTAI PAPAN ULIN 5/20


Papan Ulin Uk. 5/20 1.1000 m3 4,950,000.00 5,445,000.00
Paku Ulin 2.0000 Kg 22,500.00 45,000.00
Pekerja 5.0000 org 88,000.00 440,000.00
Tukang Kayu 15.0000 org 104,500.00 1,567,500.00
Ka. Tukang Kayu 1.5000 org 121,000.00 181,500.00
Mandor 0.2500 org 143,000.00 35,750.00
Jumlah 5,490,000.00 2,224,750.00

Bc 1 Titik Cerucuk Kayu Ulin


Kayu Ulin 10/10 - 12 m' 0.1200 m3 4,950,000.00 594,000.00
Pekerja 0.2070 org 88,000.00 18,216.00
Tukang Kayu 0.2700 org 104,500.00 28,215.00
Ka. Tukang Kayu 0.1500 org 121,000.00 18,150.00
Mandor 0.0900 org 143,000.00 12,870.00
Jumlah 594,000.00 77,451.00

B9 1 M3 PASANGAN ANSTAMPING BATU GUNUNG


SNI Batu gunung 1.2000 m3 275,000.00 330,000.00
6.14 Pasir urug 0.3000 m3 94,050.00 28,215.00
03-2836-2002 Pekerja 0.7800 org 88,000.00 68,640.00
Tukang batu 0.3900 org 104,500.00 40,755.00
Kepala tukang batu 0.0390 org 121,000.00 4,719.00
Mandor 0.0390 org 143,000.00 5,577.00
Jumlah 358,215.00 119,691.00

B10 1 M3 PASANGAN BATU GUNUNG 1 : 4


SNI Batu gunung 1.1000 m3 275,000.00 302,500.00

36
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
6.9 PC ( 50 kg ) 163.0000 kg 1,650.00 268,950.00
03-2836-2002 Pasir pasang 0.5200 m3 202,631.58 105,368.42
Pekerja 1.5000 org 88,000.00 132,000.00
Tukang batu 0.6000 org 104,500.00 62,700.00
Kepala tukang batu 0.0600 org 121,000.00 7,260.00
Mandor 0.0750 org 143,000.00 10,725.00
Jumlah 676,818.42 212,685.00

37
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
C. ANALISA PEKERJAAN BETON
C1 1 M3 LANTAI KERJA/ BETON TUMBUK 1 PC : 3 PS : 5 KRL
SNI PC ( 50 kg ) 218.0000 kg 1,650.00 359,700.00
6.1 Pasir beton 0.5200 m3 242,550.00 126,126.00
03-2837-2002 Koral Beton 0.8700 m3 407,000.00 354,090.00
Pekerja 1.6500 org 88,000.00 145,200.00
Tukang batu 0.2500 org 104,500.00 26,125.00
Kepala tukang batu 0.0250 org 121,000.00 3,025.00
Mandor 0.0800 org 143,000.00 11,440.00
Jumlah 839,916.00 185,790.00

C6 1 Kg. Besi beton polos/Ulir


SNI besi beton (polos/ulir) 1.0500 kg 17,050.00 17,902.50
7394:2008 kawat beton 0.0150 kg 15,840.00 237.60
Pekerja 0.0070 org 88,000.00 616.00
Tukang besi 0.0070 org 104,500.00 731.50
Kepala tukang batu 0.0007 org 121,000.00 84.70
Mandor 0.0003 org 143,000.00 42.90
Jumlah 18,140.10 1,475.10
SNI 7394:2008
C8 1 M2 BEKESTING DENGAN PAPAN UNTUK PONDASI/POOR PLAT
SNI Kayu Kelas III papan meranti begesting 0.0400 M 1,800,000.00 72,000.00
6.20 paku 5 cm-10 cm 0.3000 kg 15,000.00 4,500.00
7394:2008 minyak begesting 0.1000 Ltr 15,750.00 1,575.00
Pekerja 0.5200 org 88,000.00 45,760.00
Tukang kayu 0.2600 org 104,500.00 27,170.00
Kepala tukang kayu 0.0260 org 121,000.00 3,146.00
Mandor 0.0260 org 143,000.00 3,718.00
Jumlah 78,075.00 79,794.00
BAHAN 2X PAKAI
C9 1 M2 BEKESTING DENGAN PAPAN UNTUK SLOOF
SNI Kayu Kelas III papan meranti begesting 0.0450 M 1,800,000.00 81,000.00
6.21 paku 5 cm-10 cm 0.3000 kg 15,000.00 4,500.00
7394:2008 minyak begesting 0.1000 Ltr 15,750.00 1,575.00
Pekerja 0.5200 org 88,000.00 45,760.00
Tukang kayu 0.2600 org 104,500.00 27,170.00
Kepala tukang kayu 0.0260 org 121,000.00 3,146.00

38
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Mandor 0.0260 org 143,000.00 3,718.00
Jumlah 87,075.00 79,794.00
BAHAN 2X PAKAI

39
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
C10 1 M2 BEKESTING UNTUK KOLOM
SNI Kayu Kelas III papan meranti begesting 0.0400 M 1,800,000.00 72,000.00
6.22 paku 5 cm-10 cm 0.4000 kg 15,000.00 6,000.00
7394:2008 minyak begesting 0.2000 Ltr 15,750.00 3,150.00
Balok Kayu Meranti kayu kelas II 0.0150 M 88,000.00 1,320.00
Plywood tebal 9 mm 0.3500 Lbr 150,000.00 52,500.00
Dolken kayu galam d8-10 / 4 m 2.0000 Btg 17,000.00 34,000.00
Pekerja 0.6600 org 88,000.00 58,080.00
Tukang kayu 0.3300 org 104,500.00 34,485.00
Kepala tukang kayu 0.0330 org 121,000.00 3,993.00
Mandor 0.0330 org 143,000.00 4,719.00
Jumlah 168,970.00 101,277.00
BAHAN 2X PAKAI
C11 1 M2 BEKESTING DENGAN PAPAN UNTUK RING BALK
papan begesting 0.0450 M 1,800,000.00 81,000.00
paku 0.3000 kg 15,000.00 4,500.00
minyak begesting 0.1000 Ltr 15,750.00 1,575.00
Pekerja 0.3000 org 88,000.00 26,400.00
Tukang kayu 0.2600 org 104,500.00 27,170.00
Kepala tukang kayu 0.0260 org 121,000.00 3,146.00
Mandor 0.0050 org 143,000.00 715.00
Jumlah 87,075.00 57,431.00
BAHAN 2X PAKAI
C12 1 M2 BEKESTING UNTUK LANTAI
papan begesting 0.0400 M 0.00
paku 0.4000 kg 15,000.00 6,000.00
minyak begesting 0.2000 Ltr 15,750.00 3,150.00
Balok Kayu Meranti 0.0140 M 2,200,000.00 30,800.00
Dolken ( kayu perancah ) 6.0000 Btg 14,850.00 89,100.00
Plywood Tebal 12 mm 0.3500 Lbr 111,375.00 38,981.25
Pekerja 0.3200 org 88,000.00 28,160.00
Tukang kayu 0.3300 org 104,500.00 34,485.00
Kepala tukang kayu 0.0330 org 121,000.00 3,993.00
Mandor 0.0060 org 143,000.00 858.00
Jumlah 168,031.25 67,496.00
BAHAN 2X PAKAI

40
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
C12a 1 M2 BEKESTING UNTUK LANTAI PLAT DECKER
papan begesting 0.0400 M 0.00
paku 0.4000 kg 15,000.00 6,000.00
minyak begesting 0.2000 Ltr 15,750.00 3,150.00
Balok Kayu Meranti 0.0140 M 2,200,000.00 30,800.00
Dolken ( kayu perancah ) Btg 14,850.00 0.00
Plywood Tebal 12 mm 0.3500 Lbr 111,375.00 38,981.25
Pekerja 0.3200 org 88,000.00 28,160.00
Tukang kayu 0.3300 org 104,500.00 34,485.00
Kepala tukang kayu 0.0330 org 121,000.00 3,993.00
Mandor 0.0060 org 143,000.00 858.00
Jumlah 78,931.25 67,496.00
BAHAN 2X PAKAI
C13 1 M2 BEKESTING UNTUK BALOK
papan begesting 0.0400 M 1,800,000.00 72,000.00
paku 0.4000 kg 15,000.00 6,000.00
minyak begesting 0.2000 Ltr 15,750.00 3,150.00
Balok Kayu Meranti 0.0180 M 1,800,000.00 32,400.00
Dolken ( kayu perancah ) 2.0000 Btg 14,850.00 29,700.00
Plywood Tebal 12 mm 0.3500 Lbr 111,375.00 38,981.25
Pekerja 0.3200 org 88,000.00 28,160.00
Tukang kayu 0.3300 org 104,500.00 34,485.00
Kepala tukang kayu 0.0330 org 121,000.00 3,993.00
Mandor 0.0060 org 143,000.00 858.00
Jumlah 182,231.25 67,496.00
BAHAN 2X PAKAI
C15 1 M3 BETON K-250
SNI 7394:2008 PC ( 50 kg ) 384.000 kg 1,650.00 633,600.00
Pasir beton 0.499 m3 242,550.00 120,928.50
Split pecah mesin 2/3 0.582 m3 407,000.00 236,738.33
Pekerja 1.650 org 88,000.00 145,200.00
Tukang batu 0.275 org 104,500.00 28,737.50
Kepala tukang batu 0.028 org 121,000.00 3,388.00
Mandor 0.083 org 143,000.00 11,869.00
Jumlah 991,266.83 189,194.50
SNI 7394:2008
C16 1 M3 BETON BERTULANG PONDASI

41
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Begesting untuk pondasi 42.0000 m2 118,831.50 4,990,923.00
Besi beton polos/Ulir 1,911.0000 Kg 19,615.20 37,484,647.20
Cor Beton K-250 14.7000 m3 1,180,461.33 17,352,781.60
jumlah 59,828,351.80
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
C17 1 M3 BETON BERTULANG SLOOP 20/30
Begesting untuk Sloof 114.6000 m2 123,331.50 14,133,789.90
Besi beton polos/Ulir 1,604.4000 Kg 19,615.20 31,470,626.88
Cor Beton K-250 11.4600 m3 1,180,461.33 13,528,086.88
jumlah 59,132,503.66
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton

42
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
C18 1 M3 BETON BERTULANG SLOOP 15/20
Begesting untuk Sloof 44.0000 m2 123,331.50 5,426,586.00
Besi beton polos/Ulir 462.0000 Kg 19,615.20 9,062,222.40
Cor Beton K-250 3.3000 m3 1,180,461.33 3,895,522.40
jumlah 18,384,330.80
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
C19 1 M3 BETON BERTULANG BALOK EL. 3.40 25/45
Begesting untuk Balok 305.1625 m2 158,611.63 48,402,320.01
Besi beton polos/Ulir 4,394.3400 Kg 19,615.20 86,195,857.97
Cor Beton K-250 27.4646 m3 1,180,461.33 32,420,927.85
jumlah 167,019,105.83
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
C19.A 1 M3 BETON BERTULANG BALOK EL. 3.40 20/30
Begesting untuk Balok 152.4125 m2 28,737.50 4,379,954.22
Besi beton polos/Ulir 1,170.5280 Kg 19,615.20 22,960,140.83
Cor Beton K-250 7.3158 m3 1,180,461.33 8,636,019.02
jumlah 35,976,114.07
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
C20 1 M3 BETON BERTULANG BALOK EL. 6.00 15/20
Begesting untuk Balok 45.1000 m2 158,611.63 7,153,384.29
Besi beton polos/Ulir 480.2057 Kg 19,615.20 9,419,330.19
Cor Beton K-250 2.4600 m3 1,180,461.33 2,903,934.88
jumlah 19,476,649.36
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
C21 1 M3 BETON BERTULANG BALOK GEWEL15/20
Begesting untuk Balok 19.3600 m2 158,611.63 3,070,721.06
Besi beton polos/Ulir 206.1371 Kg 19,615.20 4,043,419.79
Cor Beton K-250 1.0560 m3 1,180,461.33 1,246,567.17
jumlah 8,360,708.02
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
C22 1 M3 BETON BERTULANG KOLOM UTAMA 40/40
Begesting untuk Balok 176.0000 m2 185,762.00 32,694,112.00
Besi beton polos/Ulir 2,464.0000 Kg 19,615.20 48,331,852.80

43
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Cor Beton K-250 17.6000 m3 1,180,461.33 20,776,119.47
jumlah 101,802,084.27
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
C23 1 M3 BETON BERTULANG KOLOM PRAKTIS 15/15
Begesting untuk Balok 51.0000 m2 185,762.00 9,473,862.00
Besi beton polos/Ulir 535.5000 Kg 19,615.20 10,503,939.60
Cor Beton K-250 3.8250 m3 1,180,461.33 4,515,264.60
jumlah 24,493,066.20
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
C24 1 M3 BETON BERTULANG PLAT DECK 10CM
Begesting untuk Plat Lantai 123.0000 m2 151,511.63 18,635,929.88
Besi beton polos/Ulir 1,771.2000 Kg 19,615.20 34,742,442.24
Cor Beton K-250 14.7600 m3 1,180,461.33 17,423,609.28
jumlah 70,801,981.40
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton

44
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
D. ANALISA PEKERJAAN KERAMIK DAN PENUTUP DINDING
D2 1 M2 LANTAI KERAMIK 40/40
Keramik 1.0000 m2 71,280.00 71,280.00
PC ( 50 kg ) 11.3800 kg 1,650.00 18,777.00
Pasir pasang 0.0420 m3 202,631.58 8,510.53
Semen warna 1.5000 kg 8,910.00 13,365.00
Pekerja 0.6200 org 88,000.00 54,560.00
Tukang batu 0.3500 org 104,500.00 36,575.00
Kepala tukang batu 0.0350 org 121,000.00 4,235.00
Mandor 0.0300 org 143,000.00 4,290.00
Jumlah 111,932.53 99,660.00

D3 1 M2 DINDING KERAMIK 20/20


Keramik 1.0000 m2 71,280.00 71,280.00
PC ( 50 kg ) 11.3800 kg 1,650.00 18,777.00
Pasir pasang 0.0180 m3 202,631.58 3,647.37
Semen warna 1.5000 kg 8,910.00 13,365.00
Pekerja 0.6000 org 88,000.00 52,800.00
Tukang batu 0.4500 org 104,500.00 47,025.00
Kepala tukang batu 0.0450 org 121,000.00 5,445.00
Mandor 0.0300 org 143,000.00 4,290.00
Jumlah 107,069.37 109,560.00

D5 1 M2 DINDING BATU ALAM


Keramik 1.0500 m2 150,000.00 157,500.00
PC ( 50 kg ) 11.7500 kg 1,650.00 19,387.50
Pasir pasang 0.0350 m3 202,631.58 7,092.11
Semen warna kg 8,910.00 0.00
Pekerja 0.6200 org 88,000.00 54,560.00
Tukang batu 0.3500 org 104,500.00 36,575.00
Kepala tukang batu 0.0350 org 121,000.00 4,235.00
Mandor 0.0300 org 143,000.00 4,290.00
Jumlah 183,979.61 99,660.00

45
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
E. ANALISA PEKERJAAN DINDING
E1 1 M2 PASANGAN BATA MERAH 1/2 BATA 1 : 2
Bata merah 55.0000 bh 1,045.00 57,475.00
PC ( 50 kg ) 18.9500 kg 1,650.00 31,267.50
Pasir pasang 0.0380 m3 202,631.58 7,700.00
Pekerja 0.3200 org 88,000.00 28,160.00
Tukang batu 0.1000 org 104,500.00 10,450.00
Kepala tukang batu 0.0100 org 121,000.00 1,210.00
Mandor 0.0150 org 143,000.00 2,145.00
Jumlah 96,442.50 41,965.00

E2 1 M2 PASANGAN BATA MERAH 1/2 BATA 1 : 4


Bata merah 55.0000 bh 1,045.00 57,475.00
PC ( 50 kg ) 11.5000 kg 1,650.00 18,975.00
Pasir pasang 0.0430 m3 202,631.58 8,713.16
Pekerja 0.3200 org 88,000.00 28,160.00
Tukang batu 0.1000 org 104,500.00 10,450.00
Kepala tukang batu 0.0100 org 121,000.00 1,210.00
Mandor 0.0150 org 143,000.00 2,145.00
Jumlah 85,163.16 41,965.00

E2.a 1 M2 PASANGAN BATA MERAH 1 BATA 1 : 4


SNI Bata merah 101.7500 bh 1,045.00 106,328.75
6.4 PC ( 50 kg ) 21.2750 kg 1,650.00 35,103.75
03-2837-2002 Pasir pasang 0.0796 m3 202,631.58 16,119.34
Pekerja 0.5920 org 88,000.00 52,096.00
Tukang batu 0.1850 org 104,500.00 19,332.50
Kepala tukang batu 0.0185 org 121,000.00 2,238.50
Mandor 0.0278 org 143,000.00 3,968.25
Jumlah 157,551.84 77,635.25

E3 1 M2 PLESTERAN DINDING / SIAR 1 : 2 + ACIAN tebal 20 mm


PC ( 50 kg ) 14.2800 kg 1,650.00 23,562.00
Pasir pasang 0.0230 m3 202,631.58 4,660.53
Pekerja 0.2500 org 88,000.00 22,000.00
Tukang batu 0.2000 org 104,500.00 20,900.00
Kepala tukang batu 0.0200 org 121,000.00 2,420.00
46
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Mandor 0.0125 org 143,000.00 1,787.50
Jumlah 28,222.53 47,107.50

47
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
E4 1 M2 PLESTERAN DINDING / SIAR 1 : 4 + ACIAN tebal 20 cm
PC ( 50 kg ) 8.6800 kg 1,650.00 14,322.00
Pasir pasang 0.0280 m3 202,631.58 5,673.68
Pekerja 0.2500 org 88,000.00 22,000.00
Tukang batu 0.2000 org 104,500.00 20,900.00
Kepala tukang batu 0.0200 org 121,000.00 2,420.00
Mandor 0.0125 org 143,000.00 1,787.50
Jumlah 19,995.68 47,107.50

E5 1 M' Plesteran Sponing 1 : 2


PC ( 50 kg ) 0.0250 kg 1,650.00 41.25
Pasir pasang 0.0001 m3 202,631.58 20.26
Pekerja 0.0029 org 88,000.00 250.80
Tukang batu 0.0019 org 104,500.00 198.55
Kepala tukang batu 0.0019 org 121,000.00 229.90
Mandor 0.0001 org 143,000.00 14.30
Jumlah 61.51 693.55

E6 1 M2 Plesteran Sponing 1 : 2 Type Kotak


PC ( 50 kg ) 4.3200 kg 1,650.00 7,128.00
Pasir pasang 0.0160 m3 202,631.58 3,242.11
Pekerja 0.2500 org 88,000.00 22,000.00
Tukang batu 0.1000 org 104,500.00 10,450.00
Kepala tukang batu 0.0100 org 121,000.00 1,210.00
Mandor 0.0150 org 143,000.00 2,145.00
Jumlah 10,370.11 35,805.00

48
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
F. ANALISA PEKERJAAN CAT
F1 1 M2 PENGECATAN TEMBOK BARU BAGIAN DALAM ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
Plamir Tembok 0.1000 kg 47,520.00 4,752.00
Cat Dasar morilex 0.1000 kg 47,520.00 4,752.00
Cat Penutup dalam morilex 2x 0.2600 kg 47,520.00 12,355.20
Pekerja 0.0200 org 88,000.00 1,760.00
Tukang cat 0.0630 org 104,500.00 6,583.50
Kepala tukang cat 0.0063 org 121,000.00 762.30
Mandor 0.0025 org 143,000.00 357.50
Jumlah 21,859.20 9,463.30

F2 1 M2 PENGECATAN TEMBOK BARU BAGIAN LUAR ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
Alkali 0.1000 kg 47,520.00 4,752.00
Cat Dasar morilex 0.1000 kg 47,520.00 4,752.00
Cat Penutup Luar morilex 2x 0.2600 kg 64,350.00 16,731.00
Pekerja 0.0200 org 88,000.00 1,760.00
Tukang cat 0.0630 org 104,500.00 6,583.50
Kepala tukang cat 0.0063 org 121,000.00 762.30
Mandor 0.0025 org 143,000.00 357.50
Jumlah 26,235.00 9,463.30

F3 1 M2 PENGECATAN KAYU, 1 LAPIS PLAMIR, 1 LAPIS MENI, 2 LAPIS CAT


Meni kayu 0.2000 kg 23,760.00 4,752.00
Plamir kayu 0.1500 kg 47,520.00 7,128.00
Cat kayu dasar morilex 0.1700 kg 47,520.00 8,078.40
Cat kayu penutup morilex 0.2600 kg 47,520.00 12,355.20
Pekerja 0.0700 org 88,000.00 6,160.00
Tukang cat 0.0090 org 104,500.00 940.50
Kepala tukang cat 0.0060 org 121,000.00 726.00
Mandor 0.0025 org 143,000.00 357.50
Jumlah 32,313.60 8,184.00

49
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
F4 1 M2 MENDEMPUL DAN MENGGOSOK KAYU
Dempul 0.0800 kg 9,108.00 728.64
Minyak cat 0.0200 Ltr 24,750.00 495.00
Amplas 2.0000 Lbr 3,960.00 7,920.00
Pekerja 0.0400 org 88,000.00 3,520.00
Tukang cat 0.0400 org 104,500.00 4,180.00
Kepala tukang cat 0.0040 org 121,000.00 484.00
Mandor 0.0025 org 143,000.00 357.50
Jumlah 9,143.64 8,541.50

F5 1 M2 MELAMIN / DECO
Clear Doof 0.6667 Ltr 99,000.00 66,003.30
Wood Filler 0.4000 kg 34,650.00 13,860.00
Wood Fstain (Pewarna) 0.4000 kg 37,125.00 14,850.00
Ampelas 0.8000 Lbr 3,960.00 3,168.00
Sanding Sailer 0.6667 Kg 34,650.00 23,101.16
Tinner A 1.4000 Ltr 24,750.00 34,650.00
Pekerja 0.1600 org 88,000.00 14,080.00
Tukang cat 0.1600 org 104,500.00 16,720.00
Kepala tukang cat 0.0160 org 121,000.00 1,936.00
Mandor 0.0025 org 143,000.00 357.50
Jumlah 155,632.46 33,093.50

50
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
G. ANALISA PEKERJAAN PLAFON
E.001 1 M2 PAS. RANGKA PLAFOND HOLLOW ( HANYA RANGKA UKURAN 1 X 1 M' )
Hollow 0,40 mm + Asesoris 4.0000 M1 8,750.00 35,000.00
Sekrup + Asesoris 1.0000 Ls 7,500.00 7,500.00
Pekerja 0.1500 org 88,000.00 13,200.00
Tukang 0.2500 org 104,500.00 26,125.00
Kepala tukang 0.0250 org 121,000.00 3,025.00
Mandor 0.0750 org 143,000.00 10,725.00
Jumlah 42,500.00 53,075.00
G2 1 M2 PAS. BAHAN PLAFOND GYPSUM BOARD TEBAL 9 MM PENUTUP PADA RANGKA
Gypsum Board 9 mm 0.3040 Lbr 99,000.00 30,096.00
Paku Sekrup 0.1100 kg 24,750.00 2,722.50
Pekerja 0.1000 org 88,000.00 8,800.00
Tukang kayu 0.0650 org 104,500.00 6,792.50
Kepala tukang kayu 0.0065 org 121,000.00 786.50
Mandor 0.0065 org 143,000.00 929.50
Jumlah 32,818.50 17,308.50

G4 1 M' List Plafon gypsum


List gypsum 1.1000 Lbr 27,500.00 30,250.00
Paku 0.0100 kg 24,750.00 247.50
Pekerja 0.0500 org 88,000.00 4,400.00
Tukang kayu 0.0500 org 104,500.00 5,225.00
Kepala tukang kayu 0.0050 org 121,000.00 605.00
Mandor 0.0030 org 143,000.00 429.00
Jumlah 30,497.50 10,659.00

51
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
F. ANALISA KUSEN & DAUN PINTU
F.001 Membuat dan Memasang 1 m3 kusen pintu dan kusen jendela
Balok Kayu 1.1000 M3 4,950,000.00 5,445,000.00
Paku 10 cm 1.2500 Kg 14,850.00 18,562.50
Lem Kayu 1.0000 Kg 22,770.00 22,770.00
Pekerja 7.0000 OH 88,000.00 616,000.00
Tukang kayu 21.0000 OH 104,500.00 2,194,500.00
Kepala tukang 2.1000 OH 121,000.00 254,100.00
Mandor 0.3500 OH 143,000.00 50,050.00
Jumlah 5,486,332.50 3,114,650.00
untuk 1 m1 kusen kayu 102.56 0.01
F.002 Membuat dan Memasang 1 m2 pintu daun pintu panel
Papan Kayu 0.0400 M3 4,950,000.00 198,000.00
Lem Kayu 0.5000 kg 22,770.00 11,385.00
Pekerja 1.0000 OH 88,000.00 88,000.00
Tukang besi konstruksi 3.0000 OH 104,500.00 313,500.00
Kepala tukang 0.3000 OH 121,000.00 36,300.00
Mandor 0.0500 OH 143,000.00 7,150.00
Jumlah 209,385.00 444,950.00
F.003 Membuat dan Memasang 1 m2 pintu dan jendela kaca
Papan Kayu 0.0240 M3 4,950,000.00 118,800.00
Lem Kayu 0.3000 kg 22,770.00 6,831.00
Pekerja 0.8000 OH 88,000.00 70,400.00
Tukang besi konstruksi 2.4000 OH 104,500.00 250,800.00
Kepala tukang 0.2400 OH 121,000.00 29,040.00
Mandor 0.0400 OH 143,000.00 5,720.00
Jumlah 125,631.00 355,960.00
H5 1 M2 JALUSI PAPAN BANGKIRAI
Papan Bangkirai 0.0600 m3 66,000.00 3,960.00
Paku Biasa 0.1500 Kg 24,750.00
Pekerja 0.5000 org 88,000.00 44,000.00
Tukang kayu 2.0000 org 104,500.00 209,000.00
52
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Kepala tukang kayu 0.2000 org 121,000.00 24,200.00
Mandor 0.0250 org 143,000.00 3,575.00
Jumlah 3,960.00 280,775.00

53
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
I. ANALISA PEKERJAAN ATAP
I1 1 M2 KUDA-KUDA & RANGKA ATAP BAJA RINGAN
Besi baja Ringan C 75 5 0,5 6.5000 m1 12,500.00 81,250.00
Reng tipe R-35 9.0000 m1 9,500.00 85,500.00
Sekrup + Asesoris 30% 1.0000 ls 6,600.00 6,600.00
Pekerja 0.680 kg 88,000.00 59,840.00
Tukang Besi 0.680 org 104,500.00 71,060.00
Kepala tukang 0.068 org 121,000.00 8,228.00
Mandor 0.034 org 143,000.00 4,862.00
Jumlah 233,190.00 84,150.00

I2 1 M' PEKERJAAN LISTPLANK PAPAN GRC BOARD


Papan GRC 0.3850 M2 66,000.00 25,410.00
Paku 0.0500 kg 14,850.00 742.50
Pekerja 0.1000 org 88,000.00 8,800.00
Tukang kayu 0.2000 org 104,500.00 20,900.00
Kepala tukang kayu 0.0250 org 121,000.00 3,025.00
Mandor 0.0050 org 143,000.00 715.00
Jumlah 26,152.50 33,440.00

I3 1 M2 PENUTUP ATAP Genteng Metal


Genteng Metal Multi Roof 1.7857 Bh 55,000.00 98,214.29
Paku Genteng Metal 0.0500 Kg 24,750.00 1,237.50
Pekerja 0.1315 org 88,000.00 11,572.00
Tukang kayu 0.0700 org 104,500.00 7,315.00
Kepala tukang kayu 0.0080 org 121,000.00 968.00
Mandor 0.0080 org 143,000.00 1,144.00
Jumlah 99,451.79 20,999.00

I4 1 M' PASANG NOK Genteng Metal


Nok Genteng Metal Multi Roof 3.0000 Bh 32,670.00 98,010.00
Paku Genteng 0.0100 kg 24,750.00 247.50
Pekerja 0.4000 org 88,000.00 35,200.00
Tukang kayu 0.2000 org 104,500.00 20,900.00
Kepala tukang kayu 0.0200 org 121,000.00 2,420.00
Mandor 0.0020 org 143,000.00 286.00
54
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Jumlah 98,257.50 58,806.00

55
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
K. ANALISA PEKERJAAN KUNCI DAN KACA
K1 1 BH PASANG GERENDEL
Gerendel 1.0000 bh 24,750.00 24,750.00
Pekerja 0.0150 org 88,000.00 1,320.00
Tukang 0.1500 org 104,500.00 15,675.00
Kepala tukang 0.0150 org 121,000.00 1,815.00
Mandor 0.00075 org 143,000.00 107.25
Jumlah 24,750.00 18,917.25

K2 1 BH PASANG KUNCI SILINDER


Kunci silinder 1.0000 bh 173,250.00 173,250.00
Pekerja 0.0050 org 88,000.00 440.00
Tukang 0.5000 org 104,500.00 52,250.00
Kepala tukang 0.0050 org 121,000.00 605.00
Mandor 0.00025 org 143,000.00 35.75
Jumlah 173,250.00 53,330.75

K3 1 BH PASANG KUNCI TANAM 1 PUTARAN


Kunci Tanam 1 Putaran 1.0000 bh 168,300.00 168,300.00
Pekerja 0.0050 org 88,000.00 440.00
Tukang 0.5000 org 104,500.00 52,250.00
Kepala tukang 0.0050 org 121,000.00 605.00
Mandor 0.00025 org 143,000.00 35.75
Jumlah 168,300.00 53,330.75

K4 1 BH PASANG KUNCI TANAM 2 PUTARAN


Kunci Tanam 2 Putaran 1.0000 bh 272,250.00 272,250.00
Pekerja 0.0050 org 88,000.00 440.00
Tukang 0.5000 org 104,500.00 52,250.00
Kepala tukang 0.0050 org 121,000.00 605.00
Mandor 0.00025 org 143,000.00 35.75
Jumlah 272,250.00 53,330.75

K5 1 BH PASANG ENGSEL PINTU KUPU - KUPU BESAR


Engsel pintu 1.0000 bh 32,175.00 32,175.00
Pekerja 0.0150 org 88,000.00 1,320.00

56
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Tukang 0.1500 org 104,500.00 15,675.00
Kepala tukang 0.0150 org 121,000.00 1,815.00
Mandor 0.00075 org 143,000.00 107.25
Jumlah 32,175.00 18,917.25

57
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
K6 1 BH PASANG ENGSEL JENDELA KUPU - KUPU KECIL
Engsel jendela 1.0000 bh 24,750.00 24,750.00
Pekerja 0.0100 org 88,000.00 880.00
Tukang 0.1000 org 104,500.00 10,450.00
Kepala tukang 0.0100 org 121,000.00 1,210.00
Mandor 0.00050 org 143,000.00 71.50
Jumlah 24,750.00 12,611.50

K7 1 BH PASANG KAIT / HAK ANGIN


kait angin 1.0000 bh 16,500.00 16,500.00
Pekerja 0.0150 org 88,000.00 1,320.00
Tukang 0.0150 org 104,500.00 1,567.50
Kepala tukang 0.0015 org 121,000.00 181.50
Mandor 0.00075 org 143,000.00 107.25
Jumlah 16,500.00 3,176.25

K8 1 BH PASANG PEGANGAN PINTU / DOOR HOLDER


Door holder 1.0000 bh 68,310.00 68,310.00
Pekerja 0.0500 org 88,000.00 4,400.00
Tukang 0.5000 org 104,500.00 52,250.00
Kepala tukang 0.0500 org 121,000.00 6,050.00
Mandor 0.00250 org 143,000.00 357.50
Jumlah 68,310.00 63,057.50

K9 1 BH PASANG HANDLE JENDELA


Handle Jendela 1.0000 bh 24,750.00 24,750.00
Pekerja 0.0150 org 88,000.00 1,320.00
Tukang 0.1500 org 104,500.00 15,675.00
Kepala tukang 0.0150 org 121,000.00 1,815.00
Mandor 0.00075 org 143,000.00 107.25
Jumlah 24,750.00 18,917.25

K10 1 M2 PASANG KACA BENING , TEBAL 5 MM


Kaca bening 5 mm 1.0000 m2 99,000.00 99,000.00
Pekerja 0.0150 org 88,000.00 1,320.00
Tukang kayu 0.1500 org 104,500.00 15,675.00
Kepala tukang kayu 0.0150 org 121,000.00 1,815.00

58
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Mandor 0.0008 org 143,000.00 107.25
Jumlah 99,000.00 18,917.25

59
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
M. ANALISA PEKERJAAN SANITASI
M1 Memasang 1 bh Kloset Duduk Porselin
closet duduk porselin ex toto 1.0000 bh 4,125,000.00 4,125,000.00
semen PC 6.0000 kg 1,650.00 9,900.00
pasir pasang 0.0100 m3 202,631.58 2,026.32
Pekerja 1.0000 org 88,000.00 88,000.00
Tukang 1.5000 org 104,500.00 156,750.00
Kepala tukang 1.5000 org 121,000.00 181,500.00
Mandor 0.1600 org 143,000.00 22,880.00
Jumlah 4,136,926.32 449,130.00

M4 Memasang 1 bh kran 1/2"


Kran 1/2" 1.0000 bh 84,150.00 84,150.00
Seal Tape 0.0250 Bh 1,980.00 49.50
Pekerja 0.0100 org 88,000.00 880.00
Tukang 0.1000 org 104,500.00 10,450.00
Kepala tukang 0.0100 org 121,000.00 1,210.00
Mandor 0.0050 org 143,000.00 715.00
Jumlah 84,199.50 13,255.00

M5 Memasang Bak Mandi Teraso


Bak Mandi Teraso 1.0000 bh 247,500.00 247,500.00
Semen Portland 6.0000 Kg 1,650.00 9,900.00
Pasir Pasang 0.0100 M3 202,631.58 2,026.32
Pekerja 2.1000 org 88,000.00 184,800.00
Tukang 0.7500 org 104,500.00 78,375.00
Kepala tukang 0.0700 org 121,000.00 8,470.00
Mandor 0.1100 org 143,000.00 15,730.00
Jumlah 259,426.32 287,375.00

M7 1 M' Memasang Pipa PVC 1/2"


Pipa PVC 1/2" AW 1.2000 m' 3,960.00 4,752.00
Perlengkapan 35 % x Pipa 1.0000 Bh 1,386.00 1,386.00
Pekerja 0.0360 org 88,000.00 3,168.00
Tukang 0.0600 org 104,500.00 6,270.00
Kepala tukang 0.0060 org 121,000.00 726.00
Mandor 0.0018 org 143,000.00 257.40

60
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
Jumlah 6,138.00 10,421.40

M8 Memasang Stop Kran 1/2"


Stop Kran 1.0000 Bh 84,150.00 84,150.00
Seal Tape 0.0250 Bh 1,980.00 49.50
Pekerja 0.0100 org 88,000.00 880.00
Tukang 0.1000 org 104,500.00 10,450.00
Kepala tukang 0.0100 org 121,000.00 1,210.00
Mandor 0.0050 org 143,000.00 715.00
Jumlah 84,199.50 13,255.00

61
NO URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH
1 2 3 4 5 6=(3X5) 7=(3X5)
M10 Memasang Floor Drain
Foor Drain 1.0000 Bh 103,950.00 103,950.00
Pekerja 0.0100 org 88,000.00 880.00
Tukang 0.1000 org 104,500.00 10,450.00
Kepala tukang 0.0100 org 121,000.00 1,210.00
Mandor 0.0050 org 143,000.00 715.00
Jumlah 103,950.00 13,255.00

M11 Memasang 1 bh kran 1/2"


Kran 1/2" 1.0000 bh 84,150.00 84,150.00
Seal Tape 0.0250 Bh 1,980.00 49.50
Pekerja 0.0100 org 88,000.00 880.00
Tukang 0.1000 org 104,500.00 10,450.00
Kepala tukang 0.0100 org 121,000.00 1,210.00
Mandor 0.0050 org 143,000.00 715.00
Jumlah 84,199.50 13,255.00

M12 Mmasang Pipa PVC 3"


Pipa PVC 1.2000 m' 40,342.50 48,411.00
Perlengkapan 35 % x Pipa 1.0000 Bh 14,119.88 14,119.88
Pekerja 0.0810 org 88,000.00 7,128.00
Tukang 0.1350 org 104,500.00 14,107.50
Kepala tukang 0.0135 org 121,000.00 1,633.50
Mandor 0.0041 org 143,000.00 586.30
Jumlah 62,530.88 23,455.30

M13 Mmasang Pipa PVC 4"


Pipa PVC 1.2000 m' 56,925.00 68,310.00
Perlengkapan 35 % x Pipa 1.0000 Bh 19,923.75 19,923.75
Pekerja 0.0810 org 88,000.00 7,128.00
Tukang 0.1350 org 104,500.00 14,107.50
Kepala tukang 0.0135 org 121,000.00 1,633.50
Mandor 0.0041 org 143,000.00 586.30
Jumlah 88,233.75 23,455.30

62
ANALISA PEKERJAAN

JUMLAH
8=(6+7)

EKERJAAN PERSIAPAN / PENDAHULUAN

8,800.00
7,150.00
15,950.00

26,400.00
297.00
15,400.00
8,800.00
10,450.00
1,210.00
715.00
63,272.00

25,245.00
462,000.00
4,455.00
17,325.00
6,078.95
20,350.00
59,994.00
88,000.00
209,000.00
24,200.00
7,150.00
923,797.95

63
JUMLAH
8=(6+7)
SA PEKERJAAN PONDASI / TANAH

66,000.00
3,575.00
69,575.00

79,200.00
6,435.00
85,635.00

16,896.00
2,717.00
0.00
19,613.00

56,430.00
26,400.00
1,430.00
84,260.00

44,000.00
7,150.00
51,150.00

112,860.00
26,400.00
1,430.00
140,690.00

99,000.00

64
JUMLAH
8=(6+7)
18,216.00
28,215.00
18,150.00
12,870.00
176,451.00

4,950,000.00
14,850.00
440,000.00
1,567,500.00
181,500.00
35,750.00
7,189,600.00

65
JUMLAH
8=(6+7)

5,445,000.00
22,500.00
440,000.00
1,567,500.00
181,500.00
35,750.00
7,692,250.00

5,445,000.00
45,000.00
440,000.00
1,567,500.00
181,500.00
35,750.00
7,714,750.00

594,000.00
18,216.00
28,215.00
18,150.00
12,870.00
671,451.00

330,000.00
28,215.00
68,640.00
40,755.00
4,719.00
5,577.00
477,906.00

302,500.00

66
JUMLAH
8=(6+7)
268,950.00
105,368.42
132,000.00
62,700.00
7,260.00
10,725.00
889,503.42

67
JUMLAH
8=(6+7)
ANALISA PEKERJAAN BETON
359,700.00
126,126.00
354,090.00
145,200.00
26,125.00
3,025.00
11,440.00
1,025,706.00

17,902.50
237.60
616.00
731.50
84.70
42.90
19,615.20

72,000.00
4,500.00
1,575.00
45,760.00
27,170.00
3,146.00
3,718.00
157,869.00
118,831.50

81,000.00
4,500.00
1,575.00
45,760.00
27,170.00
3,146.00

68
JUMLAH
8=(6+7)
3,718.00
166,869.00
123,331.50

69
JUMLAH
8=(6+7)

72,000.00
6,000.00
3,150.00
1,320.00
52,500.00
34,000.00
58,080.00
34,485.00
3,993.00
4,719.00
270,247.00
185,762.00

81,000.00
4,500.00
1,575.00
26,400.00
27,170.00
3,146.00
715.00
144,506.00
100,968.50

0.00
6,000.00
3,150.00
30,800.00
89,100.00
38,981.25
28,160.00
34,485.00
3,993.00
858.00
235,527.25
151,511.63

70
JUMLAH
8=(6+7)

0.00
6,000.00
3,150.00
30,800.00
0.00
38,981.25
28,160.00
34,485.00
3,993.00
858.00
146,427.25
106,961.63

72,000.00
6,000.00
3,150.00
32,400.00
29,700.00
38,981.25
28,160.00
34,485.00
3,993.00
858.00
249,727.25
158,611.63

633,600.00
120,928.50
236,738.33
145,200.00
28,737.50
3,388.00
11,869.00
1,180,461.33

71
JUMLAH
8=(6+7)
4,990,923.00
37,484,647.20
17,352,781.60
59,828,351.80
4,069,955.90

14,133,789.90
31,470,626.88
13,528,086.88
59,132,503.66
5,159,904.33

72
JUMLAH
8=(6+7)

5,426,586.00
9,062,222.40
3,895,522.40
18,384,330.80
5,571,009.33

48,402,320.01
86,195,857.97
32,420,927.85
167,019,105.83
6,081,244.72

4,379,954.22
22,960,140.83
8,636,019.02
35,976,114.07
4,917,591.25

7,153,384.29
9,419,330.19
2,903,934.88
19,476,649.36
7,917,337.14

3,070,721.06
4,043,419.79
1,246,567.17
8,360,708.02
7,917,337.14

32,694,112.00
48,331,852.80

73
JUMLAH
8=(6+7)
20,776,119.47
101,802,084.27
5,784,209.33

9,473,862.00
10,503,939.60
4,515,264.60
24,493,066.20
6,403,416.00

18,635,929.88
34,742,442.24
17,423,609.28
70,801,981.40
4,796,882.21

74
JUMLAH
8=(6+7)
ERJAAN KERAMIK DAN PENUTUP DINDING
71,280.00
18,777.00
8,510.53
13,365.00
54,560.00
36,575.00
4,235.00
4,290.00
211,592.53

71,280.00
18,777.00
3,647.37
13,365.00
52,800.00
47,025.00
5,445.00
4,290.00
216,629.37

157,500.00
19,387.50
7,092.11
0.00
54,560.00
36,575.00
4,235.00
4,290.00
283,639.61

75
JUMLAH
8=(6+7)
NALISA PEKERJAAN DINDING
57,475.00
31,267.50
7,700.00
28,160.00
10,450.00
1,210.00
2,145.00
138,407.50

57,475.00
18,975.00
8,713.16
28,160.00
10,450.00
1,210.00
2,145.00
127,128.16

106,328.75
35,103.75
16,119.34
52,096.00
19,332.50
2,238.50
3,968.25
235,187.09

23,562.00
4,660.53
22,000.00
20,900.00
2,420.00
76
JUMLAH
8=(6+7)
1,787.50
75,330.03

77
JUMLAH
8=(6+7)

14,322.00
5,673.68
22,000.00
20,900.00
2,420.00
1,787.50
67,103.18

41.25
20.26
250.80
198.55
229.90
14.30
755.06

7,128.00
3,242.11
22,000.00
10,450.00
1,210.00
2,145.00
46,175.11

78
JUMLAH
8=(6+7)
ANALISA PEKERJAAN CAT
4,752.00
4,752.00
12,355.20
1,760.00
6,583.50
762.30
357.50
31,322.50

4,752.00
4,752.00
16,731.00
1,760.00
6,583.50
762.30
357.50
35,698.30

4,752.00
7,128.00
8,078.40
12,355.20
6,160.00
940.50
726.00
357.50
40,497.60

79
JUMLAH
8=(6+7)

728.64
495.00
7,920.00
3,520.00
4,180.00
484.00
357.50
17,685.14

66,003.30
13,860.00
14,850.00
3,168.00
23,101.16
34,650.00
14,080.00
16,720.00
1,936.00
357.50
188,725.96

80
JUMLAH
8=(6+7)
NALISA PEKERJAAN PLAFON
35,000.00
7,500.00
13,200.00
26,125.00
3,025.00
10,725.00
95,575.00

30,096.00
2,722.50
8,800.00
6,792.50
786.50
929.50
50,127.00

30,250.00
247.50
4,400.00
5,225.00
605.00
429.00
41,156.50

81
JUMLAH
8=(6+7)
NALISA KUSEN & DAUN PINTU

5,445,000.00
18,562.50
22,770.00
616,000.00
2,194,500.00
254,100.00
50,050.00
8,600,982.50
83,859.58

198,000.00
11,385.00
88,000.00
313,500.00
36,300.00
7,150.00
654,335.00

118,800.00
6,831.00
70,400.00
250,800.00
29,040.00
5,720.00
481,591.00

3,960.00

44,000.00
209,000.00
82
JUMLAH
8=(6+7)
24,200.00
3,575.00
284,735.00

83
JUMLAH
8=(6+7)
ANALISA PEKERJAAN ATAP

81,250.00
85,500.00
6,600.00
59,840.00
71,060.00
8,228.00
4,862.00
317,340.00

25,410.00
742.50
8,800.00
20,900.00
3,025.00
715.00
59,592.50

98,214.29
1,237.50
11,572.00
7,315.00
968.00
1,144.00
120,450.79

98,010.00
247.50
35,200.00
20,900.00
2,420.00
286.00
84
JUMLAH
8=(6+7)
157,063.50

85
JUMLAH
8=(6+7)
SA PEKERJAAN KUNCI DAN KACA

24,750.00
1,320.00
15,675.00
1,815.00
107.25
43,667.25

173,250.00
440.00
52,250.00
605.00
35.75
226,580.75

168,300.00
440.00
52,250.00
605.00
35.75
221,630.75

272,250.00
440.00
52,250.00
605.00
35.75
325,580.75

32,175.00
1,320.00

86
JUMLAH
8=(6+7)
15,675.00
1,815.00
107.25
51,092.25

87
JUMLAH
8=(6+7)

24,750.00
880.00
10,450.00
1,210.00
71.50
37,361.50

16,500.00
1,320.00
1,567.50
181.50
107.25
19,676.25

68,310.00
4,400.00
52,250.00
6,050.00
357.50
131,367.50

24,750.00
1,320.00
15,675.00
1,815.00
107.25
43,667.25

99,000.00
1,320.00
15,675.00
1,815.00

88
JUMLAH
8=(6+7)
107.25
117,917.25

89
JUMLAH
8=(6+7)
NALISA PEKERJAAN SANITASI
4,125,000.00
9,900.00
2,026.32
88,000.00
156,750.00
181,500.00
22,880.00
4,586,056.32

84,150.00
49.50
880.00
10,450.00
1,210.00
715.00
97,454.50

247,500.00
9,900.00
2,026.32
184,800.00
78,375.00
8,470.00
15,730.00
546,801.32

4,752.00
1,386.00
3,168.00
6,270.00
726.00
257.40

90
JUMLAH
8=(6+7)
16,559.40

84,150.00
49.50
880.00
10,450.00
1,210.00
715.00
97,454.50

91
JUMLAH
8=(6+7)

103,950.00
880.00
10,450.00
1,210.00
715.00
117,205.00

84,150.00
49.50
880.00
10,450.00
1,210.00
715.00
97,454.50

48,411.00
14,119.88
7,128.00
14,107.50
1,633.50
586.30
85,986.18

68,310.00
19,923.75
7,128.00
14,107.50
1,633.50
586.30
111,689.05

92
DAFTAR HARGA SATUAN UPAH TENAGA, SATUAN BAHAN & PERALATAN

LOKASI : Jl. ......................................, Samarinda


TAHUN : 2013
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
A. MACAM TENAGA
1 Kepala Tukang Kayu Orang Per Hari 121,000.00
2 Kepala Tukang Batu Orang Per Hari 121,000.00
3 Kepala Tukang Besi Orang Per Hari 121,000.00
4 Mandor Orang Per Hari 143,000.00
5 Operator Orang Per Hari 132,000.00
6 Pekerja Batu Orang Per Hari 88,000.00
7 Pekerja Besi Orang Per Hari 88,000.00
8 Pekerja Kayu Orang Per Hari 88,000.00
9 Tukang Batu Orang Per Hari 104,500.00
10 Tukang Besi Orang Per Hari 104,500.00
11 Tukang Kayu Orang Per Hari 104,500.00

B. MACAM ALAT
1 Bar Bender Jam 12,870.00
2 Bar Cutter Jam 12,870.00
3 Concrete Mixer Jam 74,250.00
4 Concrete Pump Jam 247,500.00
5 Concrete Vibrator Jam 50,490.00
6 Curing Beton Jam 39,600.00
7 Alat Pancang Beton Jam 148,500.00

93
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
C. MACAM BAHAN
1 Alkali Per Kg 50,490.00
2 Amplas / ampril / kertas gosok Per Lbr 3,960.00
3 Baja Profil Per Kg 19,250.00
4 Bak Mandi teraso Per bh 247,500.00
5 Bak Cuci Stainliss Per bh 742,500.00
6 Batchup Per bh 1,485,000.00
7 Batu Bata Merah Per bh 1,045.00
8 Batu gunung ( gebal/besar ) Per m3 275,000.00
9 Batu Alam Per M2 148,500.00
10 Batu Apung Per Kg 24,750.00
11 Bendrad Per kg 15,840.00
12 Besi beton polos/Ulir Per kg 17,050.00
13 Besi strip Per kg 20,592.00
14 Besi profil Per kg 18,304.00
15 Besi / Kawat Berduri Per kg 24,750.00
16 Box Meteran Listrik Per Bh 29,700.00
17 Cincin Pipa Besi 4" Tebal 5mm-20cm Per Bh 29,700.00
18 Cat tembok dalam setara mowilex Per kg 47,520.00
19 Cat tembok luar setara mowilex Per kg 64,350.00
20 Cat tembok dasar setara mowilex Per kg 47,520.00
21 Cat kayu besi setara aftelak Per kg 31,680.00
22 Cat kayu besi setara mowilex Per kg 47,520.00
23 Cat M e n y kayu / besi setara nippon Per kg 23,760.00
24 Cat M e n y kayu setara nippon Per kg 8,538.75
25 Cat Clear Doof Per lt 99,000.00
26 Closet jongkok ex toto Per bh 247,500.00
27 Closet duduk ex toto Per bh 4,125,000.00
28 Urinoir Ex toto Per bh 2,722,500.00
29 Wastafel komplit kaca & asesories Ex Toto Per bh 3,217,500.00
30 Dempul Per kg 9,108.00
31 Engsel jendela 3" Per bh 24,750.00
32 Engsel pintu 4" Per bh 32,175.00

94
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
33 Fiber Bergelombang Per Lbr 74,250.00
34 Floor drain Per bh 103,950.00
35 Genteng Keramik Per Bh 16,335.00
36 Genteng Nok Metal Per Bh 32,670.00
37 Genteng Metal 2 susun setara sakura elang Per Lbr 55,000.00
38 Gerendel jendela / bouvenlist Per bh 24,750.00
39 Gypsum Board 9 mm Per Lbr 99,000.00
40 Gypsum List Per M' 27,500.00
41 GRC BOARD Per Lbr 66,000.00
42 Kabel NYY 2,5 mm Per Rol 196,020.00
43 Kaca bening t = 5 mm Per m2 99,000.00
44 Kaca bening Frameless t = 12 mm Per m2 198,000.00
45 Kaca riben t = 5 mm Per m2 123,750.00
46 Kait Angin / Hak Angin Per bh 16,500.00
47 Kasa Per M' 3,465.00
48 Kayu bangkirai Papan 2/10 Per m3 5,280,000.00
49 Kayu Bangkirai Balok 5/7, 6/12, 8/12 Per m3 4,950,000.00
50 Kayu Bangkirai Listpalnk Per m' 38,500.00
51 Kayu Kapur Papan 2/10 Per m3 3,300,000.00
52 Kayu Kapur Balok 5/7, 6/12, 8/12 Per m3 3,190,000.00
53 Kayu Kapur / Bangkirai Lumber Siring Per Lbr 41,250.00
54 Kayu meranti Balok 5/7 Per m3 2,310,000.00
55 Kayu Meranti Papan 3/20, 2/20 Per m3 2,420,000.00
56 Kayu Meranti Bouwplank / Begesting Per m3 2,200,000.00
57 ( Kayu perancah / perancah d 8 cm panjang 4 m ) Per Btg 14,850.00
58 Kayu Ulin Balok 10/10 Per m3 4,950,000.00
59 Kayu Ulin Papan 3/30 Per m3 5,500,000.00
60 Keramik Dinding 20 x 25 cm ex. Roman Per m2 71,280.00
61 Keramik lantai 20 x 20 cm ex. Roman Per m2 71,280.00
62 Keramik lantai 30 x 30 cm ex. Roman Per m2 71,280.00
63 Keramik lantai 40 x 40 cm ex. Roman Per m2 71,280.00
64 Keramik list dinding 10 x 20 cm ex. Roman Per bh 11,385.00
65 Keramik list dinding 10 x 40 cm ex. Roman Per bh 22,770.00
66 Keramik lantai 40 x 40 cm ex. Ezenza Per m2 193,050.00
67 Keramik lantai 30 x 30 cm ex. Ezenza Per m2 193,050.00
95
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
68 Koral Beton Per m3 407,000.00
69 Kran air / stop k1/2" Per bh 84,150.00
70 Kuas 2,5" Per bh 4,950.00
71 Kunci Tanam 1 putaran untuk wc/km Per bh 168,300.00

96
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
72 Kunci Tanam 2 putaran Per bh 272,250.00
73 Kunci Silinder sekualitas ELT Per bh 173,250.00
74 Kusen pintu/jendela aluminium Per m' 209,880.00
75 Lampu TL Philips 2 x 20 Watt Per bh 148,500.00
76 Lampu Gantung TL Philips 2 x 20 Watt Per bh 198,000.00
77 Lampu TL Philips 2 x 40 Watt Per bh 247,500.00
78 Lampu XL Philips 10 Watt Per bh 24,750.00
79 Lampu XL Philips 18 Watt Per bh 34,650.00
80 Lem Kayu (Fox) Per Kg 22,770.00
81 Minyak Begesting Per lt 15,592.50
82 Minyak Cat / Tiner A Per lt 24,750.00
83 Nok/kerpus atap multi roof Per bh 25,740.00
84 Nok/kerpus atap Fiberglass Per bh 34,650.00
85 Paku Biasa Per kg 14,850.00
86 Paku Baut Per Bh 7,425.00
87 Paku Gypsum ( Paku sekrup ) Per kg 24,750.00
88 Paku Genteng Metal Per kg 24,750.00
89 Paku Plywood 1,5 mm Per kg 17,325.00
90 Pasir beton / palu Per m3 242,550.00
91 Pasir pasang Tenggarong Per m3 202,631.58
92 Pasir urug Mahakam Per m3 94,050.00
93 Paving Blok Per Bh 2,970.00
94 Pegangan / Handle Jendela Per bh 24,750.00
95 Pegangan / Door Holder Per bh 68,310.00
96 Penyekat Urinoir Per bh 704,880.00
97 Pipa pralon PVC dia. 4" AW Per m' 56,925.00
98 Pipa pralon PVC dia. 3" AW Per m' 40,342.50
99 Pipa pralon PVC dia. 2" AW Per m' 23,760.00
100 Pipa pralon PVC dia. 3/4" AW Per m' 8,910.00
101 Pipa pralon PVC dia. 1/2" Per m' 3,960.00
102 Pipa pralon untuk listrik Per m' 1,980.00
103 Plamir kayu Per kg 47,520.00
104 Plastik cor Per m2 4,950.00
105 Plywood/ tripleks tb. 4 mm Per lb 49,500.00
106 Plywood/ tripleks tb. 9 mm Per lb 111,375.00
97
MACAM HARGA
NO. SATUAN
BAHAN/ALAT SATUAN Rp.
01 02 03 04
107 Plywood/ tripleks tb. 12 mm Per lb 148,500.00
108 Plywood/ tripleks sungkai Per lb 99,000.00
109 Rangka Atap Baja Ringan Per M2 396,000.00
110 Residu Per ltr 7,920.00
111 Saklar Tunggal Per bh 24,750.00
112 Saklar Double Per bh 29,700.00
113 Saklar Triple Per bh 34,650.00
114 Sambungan Tiang Pancang Kayu / Shock 4" Per bh 44,550.00
115 Sambungan Tiang Pancang Beton / Las Per Titik 141,570.00
116 Sanding Sailer Per Kg 34,650.00
117 Seal Tape Per bh 1,980.00
118 Sekring Lokal Per bh 42,075.00
119 Semen Portland @ 50 Kg Per kg 1,650.00
120 Semen Portland Per Zak 82,500.00
121 Semen warna Per kg 8,910.00
122 Seng gelombang 0,8 x 2,10 BJLS 30 ( Zincalume ) Per lb 72,270.00
123 Seng gelombang 0,8 x 2,10 BJLS 20 Per lb 39,996.00
124 Seng gelombang 0,8 x 2,10 BJLS 18 Per lb 35,640.00
125 Stop Kontak Per bh 29,700.00
126 Talang seng t=0.2 mm, L=60 cm Per m' 24,750.00
127 T Dos Per bh 7,425.00
128 T a n a h Urug Per m3 47,025.00
129 Tiang Pancang 20 x 20 K-450 Per m' 59,400.00
130 Water Proofing Per m2 130,680.00
131 Wood Filler Per kg 34,650.00
132 Wood Stain (pewarna) Per kg 37,125.00

98
BALOK UTAMA 25/45 LT 2 BALOK ANAK 20/30 LT 2
h h
15.625 1 15.625 15.625
30.625 3 91.875 30.625
9.875 0 0 9.875
17.4 0 0 17.4
17.125 0 0 17.125

v v
10 3 30 10
2.5 0 0 2.5
6.5 0 0 6.5
18.75 1 18.75 18.75
18.5 1 18.5 18.5
15 1 15 15
10 0 0 10
18.125 3 54.375 18.125
244.13

DINDING LT 1
h
14.7 2 29.4 V
4 1 4 10
1.5 1 1.5 3.35
19 1 19 3.075
4 1 4 2.23
2.7 1 2.7 6.35
3 1 3 1.425
29 1 29 4.3
5 1 5 2.1
2 1 2 3.3
29 1 29 3.2
6
4
5
12
128.6

DINDING LT 2
h
15.7 1 15.7 V
12 1 12 10
6.5 1 6.5 3.8
2.5 3 7.5 6.35
4 1 4 3.925
29 1 29 7
16 1 16 12
8 1 8 7.8
29 1 29 17
1 0 2.3
1 0 2.2

127.7

DINDING LT 3
h
14 1 14 V
12 1 12 18
6.5 1 6.5 3.8
2.5 3 7.5 6.35
4 1 4 11
14 1 14 8.5
8 1 8 14
2.5 1 2.5
16 1 16
1 0
1 0

84.5
BALOK ANAK 20/30 LT 2

2 31.25
0 0
2 19.75
2 34.8
1 17.125

0 0
1 2.5
1 6.5
0 0
0 0
0 0
1 10
0 0
121.93

PINTU
1 10 8 15.12
1 3.35 7 11.76
2 6.15 26.88
1 2.23
1 6.35 PINTU FG
1 1.425 2 22.5
2 8.6
1 2.1 49.38
1 3.3
1 3.2
1 6
4 16
1 5
1 12
85.705 214.305 M1

PINTU
1 10 16 30.24
6 22.8 5 8.4
1 6.35 38.64
4 15.7
1 7
1 12
1 7.8
1 17
1 2.3
1 2.2

103.15 230.85 M1

PINTU
1 18 11 20.79
5 19 5 8.4
1 6.35 29.19
1 11
2 17
1 14

85.35 169.85 M1