5,500,000 33,000,000
13,500,000 13,500,000
2,260,000 2,260,000
6,000,000 6,000,000
2,400,000 2,400,000
57,160,000
450,000 16,200,000
550,000 145,200,000
450,000 118,800,000
450,000 118,800,000
20,000 6,000,000
150,000 36,000,000
160,000 9,600,000
2,000,000 6,000,000
80,000 2,400,000
1,200,000 3,600,000
50,000 7,200,000
4,500,000 13,500,000
483,300,000
325,000 78,000,000
925,000 55,500,000
200,000 600,000
100,000 3,000,000
134,000 28,140,000
2,000,000 6,000,000
350,000 10,500,000
1,600,000 4,800,000
57,000,000 171,000,000
55,000 16,500,000
25,000 7,500,000
25,000 6,000,000
8,000,000 24,000,000
411,540,000
952,000,000
104,720,000.00
1,056,720,000.00
TIME SCHEDULE RENCANA DAN REALISASI PELAKSANAAN PEKERJAAN
PEKERJAAN : PENGEBORAN 100 METER
LOKASI : PT. KAMU KONTRAKTOR CV. KURNIA DRILLING
NO.KONTRAK : 122100028 Tanggal 18 Agustus 2022 BULAN KE 1
ADDENDUM : 1002103789-Rev 1 Tanggal 22 Desember 2022 PERIODE KERJA 22 Desember 2022 S/D 18 Januari 2023
28 Desember 2022 04 Januari 2023 11 Januari 2023 18 Januari 2023 25 Januari 2023 01 Februari 2023 08 Februari 2023 15 Februari 2023 22 Februari 2023 01 Maret 2023 08 Maret 2023 15 Maret 2023
A PEKERJAAN PERSIAPAN
1 Surfe GEOLISTRIKPLUS PQWT M200 3.466 3.466
2 Mobilisasi dan Demobilisasi 1.418 0.709 0.709
3 Pembuatan Spul Bak/Bak Sirkulasi 0.237 0.178 0.059 100
JUMLAH 100.000
MINGGUAN 4.364 0.178 10.798 14.678 8.836 5.685 8.647 18.093 18.128 8.615 1.268 0.709
RENCANA
KOMULATIF 4.364 4.543 15.340 30.019 38.855 44.539 53.186 71.279 89.407 98.023 99.291 100.000
MINGGUAN 8.808 25.734 2.056 13.128
REALISASI
KOMULATIF 8.808 34.543 36.599 49.726
Deviasi ( +/- ) 4.444 30.000 21.258 19.708
NO.KONTRAK : 122100028 Tanggal 18 Agustus 2022 PERIODE KERJA : 22 Desember 2022 s/d
1 Surfe GEOLISTRIKPLUS PQWT M200 6.00 Titik 3.466 - - 4.50 2.600 4.50 2.600 75%
2 Mobilisasi dan Demobilisasi 1.00 Ls 1.418 - - 0.25 0.355 0.25 0.355 25%
3 Pembuatan Spul Bak/Bak Sirkulasi 1.00 Ls 0.237 - - 0.50 0.119 0.50 0.119 50%
4 Pek. Pemasangan dan Pembongkaran Rigg 1.00 Ls 0.630 - - 0.25 0.158 0.25 0.158 25%
5 Pembersihan dan Persiapan Lokasi 1.00 Ls 0.252 - - 0.25 0.063 0.25 0.063 25%
1 Pengeboran 14 Inchi dan Pemasangan, pengadaan Cassing 12 Inchi 36.00 M' 1.702 - - 36.00 1.702 36.00 1.702 100%
2 Pengeboran segala formasi 6 inchi 264.00 M' 15.252 - - 66.00 3.813 66.00 3.813 25%
7 Pemasangan Screen low carbon dia 150 mm open area 255 60.00 M' 1.008 - - - - - - 0%
b. Pipa Screen low carbon dia 150 mm open area 255 60.00 M' 5.830 - - - - - - 0%
MINGGUAN - 4.364
RENCANA
KOMULATIF - 4.364
MINGGUAN - 8.808
REALISASI
KOMULATIF - 8.808
ADDENDUM : 1002103789-Rev 1 Tanggal 22 Desember 2022 PERIODE KERJA : 29 Desember 2022 s/d
04 Januari 2023
1 Surfe GEOLISTRIKPLUS PQWT M200 6.00 Titik 3.466 4.50 2.600 1.50 0.867 6.00 3.466 100%
2 Mobilisasi dan Demobilisasi 1.00 Ls 1.418 0.25 0.355 0.25 0.355 0.50 0.709 50%
3 Pembuatan Spul Bak/Bak Sirkulasi 1.00 Ls 0.237 0.50 0.119 0.25 0.059 0.75 0.178 75%
4 Pek. Pemasangan dan Pembongkaran Rigg 1.00 Ls 0.630 0.25 0.158 0.25 0.158 0.50 0.315 50%
5 Pembersihan dan Persiapan Lokasi 1.00 Ls 0.252 0.25 0.063 0.25 0.063 0.50 0.126 50%
1 Pengeboran 14 Inchi dan Pemasangan, pengadaan Cassing 12 Inchi 36.00 M' 1.702 36.00 1.702 - - 36.00 1.702 100%
2 Pengeboran segala formasi 6 inchi 264.00 M' 15.252 66.00 3.813 198.00 11.439 264.00 15.252 100%
3 Pelebaran lubang Bor (Reaming) 6-8.5 inchi 264.00 M' 12.479 - - 132.00 6.239 132.00 6.239 50%
4 Pelebaran lubang Bor (Reaming) 8.5-12 inchi 264.00 M' 12.479 - - 132.00 6.239 132.00 6.239 50%
5 Pengambilan contoh Catting 300.00 M' 0.630 - - 150.00 0.315 150.00 0.315 50%
7 Pemasangan Screen low carbon dia 150 mm open area 255 60.00 M' 1.008 - - - - - - 0%
b. Pipa Screen low carbon dia 150 mm open area 255 60.00 M' 5.830 - - - - - - 0%
MINGGUAN - 0.178
RENCANA
KOMULATIF - 4.543
MINGGUAN - 25.734
REALISASI
KOMULATIF - 34.543
NO.KONTRAK : 122100028 Tanggal 18 Agustus 2022 PERIODE KERJA : 05 Januari 2023 s/d
1 Surfe GEOLISTRIKPLUS PQWT M200 6.00 Titik 3.466 6.00 3.466 - - 6.00 3.466 100%
2 Mobilisasi dan Demobilisasi 1.00 Ls 1.418 0.50 0.709 - - 0.50 0.709 50%
3 Pembuatan Spul Bak/Bak Sirkulasi 1.00 Ls 0.237 0.75 0.178 - - 0.75 0.178 75%
4 Pek. Pemasangan dan Pembongkaran Rigg 1.00 Ls 0.630 0.50 0.315 - - 0.50 0.315 50%
5 Pembersihan dan Persiapan Lokasi 1.00 Ls 0.252 0.50 0.126 - - 0.50 0.126 50%
1 Pengeboran 14 Inchi dan Pemasangan, pengadaan Cassing 12 Inchi 36.00 M' 1.702 36.00 1.702 - - 36.00 1.702 100%
2 Pengeboran segala formasi 6 inchi 264.00 M' 15.252 264.00 15.252 - - 264.00 15.252 100%
3 Pelebaran lubang Bor (Reaming) 6-8.5 inchi 264.00 M' 12.479 132.00 6.239 - - 132.00 6.239 50%
4 Pelebaran lubang Bor (Reaming) 8.5-12 inchi 264.00 M' 12.479 132.00 6.239 - - 132.00 6.239 50%
5 Pengambilan contoh Catting 300.00 M' 0.630 150.00 0.315 - - 150.00 0.315 50%
6 Pemasangan Cassing Pipa GIV dia 150 mm 240.00 M' 3.782 - - 60.00 0.945 60.00 0.945 25%
7 Pemasangan Screen low carbon dia 150 mm open area 255 60.00 M' 1.008 - - 15.00 0.252 15.00 0.252 25%
8 Development/pencucian Sumur sebelum pemompaan uji 3.00 Ls 0.630 - - 0.75 0.158 0.75 0.158 25%
9 Pengisian Gravel Pack 30.00 M3 0.252 - - 7.50 0.063 7.50 0.063 25%
11 Pumping Tes 144.00 Jam 0.756 - - 36.00 0.189 36.00 0.189 25%
12 Setting Pompa Submersible 3.00 Ls 1.418 - - 0.75 0.355 0.75 0.355 25%
b. Pipa Screen low carbon dia 150 mm open area 255 60.00 M' 5.830 - - - - - - 0%
MINGGUAN - 10.798
RENCANA
KOMULATIF - 15.340
MINGGUAN - 2.056
REALISASI
KOMULATIF - 36.599
NO.KONTRAK : 122100028 Tanggal 18 Agustus 2022 PERIODE KERJA : 12 Januari 2023 s/d
1 Surfe GEOLISTRIKPLUS PQWT M200 6.00 Titik 3.466 6.00 3.466 - - 6.00 3.466 100%
2 Mobilisasi dan Demobilisasi 1.00 Ls 1.418 0.50 0.709 - - 0.50 0.709 50%
3 Pembuatan Spul Bak/Bak Sirkulasi 1.00 Ls 0.237 0.75 0.178 - - 0.75 0.178 75%
4 Pek. Pemasangan dan Pembongkaran Rigg 1.00 Ls 0.630 0.50 0.315 - - 0.50 0.315 50%
5 Pembersihan dan Persiapan Lokasi 1.00 Ls 0.252 0.50 0.126 - - 0.50 0.126 50%
1 Pengeboran 14 Inchi dan Pemasangan, pengadaan Cassing 12 Inchi 36.00 M' 1.702 36.00 1.702 - - 36.00 1.702 100%
2 Pengeboran segala formasi 6 inchi 264.00 M' 15.252 264.00 15.252 - - 264.00 15.252 100%
3 Pelebaran lubang Bor (Reaming) 6-8.5 inchi 264.00 M' 12.479 132.00 6.239 26.40 1.248 158.40 7.487 60%
4 Pelebaran lubang Bor (Reaming) 8.5-12 inchi 264.00 M' 12.479 132.00 6.239 26.40 1.248 158.40 7.487 60%
5 Pengambilan contoh Catting 300.00 M' 0.630 150.00 0.315 30.00 0.063 180.00 0.378 60%
6 Pemasangan Cassing Pipa GIV dia 150 mm 240.00 M' 3.782 60.00 0.945 48.00 0.756 108.00 1.702 45%
7 Pemasangan Screen low carbon dia 150 mm open area 255 60.00 M' 1.008 15.00 0.252 12.00 0.202 27.00 0.454 45%
8 Development/pencucian Sumur sebelum pemompaan uji 3.00 Ls 0.630 0.75 0.158 0.60 0.126 1.35 0.284 45%
9 Pengisian Gravel Pack 30.00 M3 0.252 7.50 0.063 6.00 0.050 13.50 0.113 45%
10 Grouting 3.00 Ls 0.378 0.75 0.095 0.60 0.076 1.35 0.170 45%
11 Pumping Tes 144.00 Jam 0.756 36.00 0.189 28.80 0.151 64.80 0.340 45%
12 Setting Pompa Submersible 3.00 Ls 1.418 0.75 0.355 0.60 0.284 1.35 0.638 45%
a. Pipa Cassing GIV dia 150 mm 240.00 M' 8.193 - - 36.00 1.229 36.00 1.229 15%
b. Pipa Screen low carbon dia 150 mm open area 255 60.00 M' 5.830 - - 6.00 0.583 6.00 0.583 10%
d. Socket SDL dan SDD 3 inchi GIV 30.00 Bh 0.315 - - 3.00 0.032 3.00 0.032 10%
e. Pipa GIV 3 inchi untuk pompa Submersible 210.00 M' 2.956 - - 21.00 0.296 21.00 0.296 10%
3 Gravel Pack terayak 5-10 mm 30.00 M3 1.103 - - 3.00 0.110 3.00 0.110 10%
4 Pengadaan Tutup sumur Cor Beton K175 3.00 Bh 0.504 - - 0.30 0.050 0.30 0.050 10%
5 Pengadaan Pompa Submersible 5,5 HP 3 Phase grundfos 3.00 Unit 17.962 - - 1.00 5.987 1.00 5.987 33%
6 Kabel NYY-HY 4x4,4 mm 300.00 M' 1.733 - - 30.00 0.173 30.00 0.173 10%
7 Kabel NYY-HY 3x2,5 mm 300.00 M' 0.788 - - 30.00 0.079 30.00 0.079 10%
8 Pek. Pengadaan Sling Pompa 240.00 M' 0.630 - - 24.00 0.063 24.00 0.063 10%
9 Panel Pompa Submersible Automatis Elektroda 3.00 Unit 2.521 - - 0.30 0.252 0.30 0.252 10%
MINGGUAN - 14.678
RENCANA
KOMULATIF - 30.019
MINGGUAN - 13.128
REALISASI
KOMULATIF - 49.726