DRAINASE DIBEDAKAN :
BERASAL DARI :
1. HUJAN
2. RUMAH TANGGA DAN RUMAH MAKAN
3. PABRIK
4. RUMAH SAKIT
5. TEMPAT HIBURAN
6. LAPANGAN OLAH RAGA
7. KEBUN BINATANG
8. TEMPAT PEMOTONGAN HEWAN
BADAN AIR ( RECEIVING WATER )
-INFILTRASI
MENGURANGI CURAH HUJAN YANG MENJADI LIMPASAN , KARENA
SEBAGIAN DARI VOLUME AIR AKAN MASUK KEDALAM TANAH.
-INTERSEPSI
MENGURANGI CURAH HUJAN YANG MENJADI LIMPASAN DAN
MEMPERLAMBAT TERJADINYA PUNCAK BANJIR, KARENA MEMBERI
KESEMPATAN AIR MASUK KEDALAM TANAH DAN MENAHAN SEBAGIAN
VOLUME AIR UNTUK TIDAK LANGSUNG MENGALIR KE BAWAH.
-RETENSI
MENGURANGI CURAH HUJAN YANG MENJADI LIMPASAN KARENA
MENGISI CEKUNGAN PADA PERMUKAAN TANAH.
-LIMPASAN
MENGALIR DI ALUR TERUS KE LAUT.
NOMENKLATUR
TUJUAN
◦ UNTUK MENYAMAKAN SUATU OBYEK YANG
DIBICARAKAN ATAU UNTUK MENSERAGAMKAN
PENAMAAN TERHADAP OBYEK DRAINASE.
CARA :
◦ MEMBERI NAMA SISTEM SAMA DENGAN NAMA SALURAN PRIMER
TERBESAR DALAM SISTEM.
◦ MEMBERI NAMA SALURAN PRIMER TERBESAR SAMA DENGAN NAMA
KAWASAN TERKENAL TERDEKAT ATAU YANG DILALUI.
◦ MEMBERI NAMA SALURAN SEKUNDER DAN TERSIER SESUAI DENGAN NAMA
KAWASAN YANG DILEWATI.
SALURAN DRAINASE
SISTEM TERCAMPUR
◦ SALURAN UNTUK AIR BUANGAN (SANITASI ) JADI SATU
DENGAN SALURAN UNTUK HUJAN.
◦ SALURAN LIMBAH TIDAK DIPROSES
SISTEM TERPISAH
◦ SALURAN UNTUK HUJAN TERPISAH DENGAN SALURAN
UNTUK AIR BUANGAN ( SANITASI )
◦ SALURAN BUANGAN DIPROSES LEBIH DULU DI IPAL.
PERENCANAAN
DIMENSI :
◦ DIDASARKAN ATAS KEBUTUHAN YANG BERKAITAN DENGAN CURAH HUJAN
YANG AKAN DITAMPUNG DAN DILEWATKAN.
◦ DIDASARKAN ATAS JUMLAH PENDUDUK YANG DILAYANI DARI SUATU
KAWASAN.
◦ RENTANG WAKTU YANG DIRENCANAKAN UNTUK SELESAINYA PEMBANGUNAN
HUJAN RENCANA
Basin Drainage 10 - 50
RUMUS STRICKLER V = k .R 2 / 3 .S 1 / 2
R = jari-jari Hidrolis
S = kemiringan dasar saluran.
A = luas penampang basah
P= keliling basah
PENYELESAIAN PERSAMAAN
Q = V .A
A = (b + z.h ).h
(
P = b + 2.h. 1 + z 2 )
2/3
1 æ (b + zh) h ö
Q = çç ÷
÷ S 0.5 (b + zh )h
n è b + 2 zh 1 + z 2 ø
æ nQ ö
3
=
((b + z.h ).h ) 5
ç 0.5 ÷
( ( ))
2
èS ø b + 2.h. 1 + z 2
( )(
n g = nb .b + 2n s .h 1 + z 2 / b + 2.h 1 + z 2 )
CONTOH SOAL :
3
Q= 0.829 m /dt
b= 2.00 m
z= 0
S= 0.0005
nb = 0.025
ns = 0.016
h ng A P A5/P2 (nQ/S0.5)3 = V(m/dt) Delta
m
0.700 0.021294 1.400 3.400 0.465 0.492 0.592 -0.026
0.702 0.021288 1.404 3.404 0.471 0.491 0.590 -0.020
0.704 0.021282 1.408 3.408 0.476 0.491 0.589 -0.014
0.706 0.021275 1.412 3.412 0.482 0.490 0.587 -0.008
0.708 0.021269 1.416 3.416 0.488 0.490 0.585 -0.002
0.710 0.021263 1.420 3.420 0.494 0.489 0.584 0.004
0.712 0.021257 1.424 3.424 0.499 0.489 0.582 0.010
0.714 0.021251 1.428 3.428 0.505 0.489 0.580 0.017
0.716 0.021245 1.432 3.432 0.511 0.488 0.579 0.023
0.718 0.021239 1.436 3.436 0.517 0.488 0.577 0.029
0.720 0.021233 1.440 3.440 0.523 0.487 0.576 0.036
0.722 0.021226 1.444 3.444 0.529 0.487 0.574 0.042
0.724 0.021220 1.448 3.448 0.535 0.487 0.572 0.049
0.726 0.021214 1.452 3.452 0.542 0.486 0.571 0.056
0.728 0.021208 1.456 3.456 0.548 0.486 0.569 0.062
0.730 0.021202 1.460 3.460 0.554 0.485 0.568 0.069
0.732 0.021196 1.464 3.464 0.560 0.485 0.566 0.076
0.734 0.021190 1.468 3.468 0.567 0.484 0.565 0.082
0.736 0.021184 1.472 3.472 0.573 0.484 0.563 0.089
0.738 0.021178 1.476 3.476 0.580 0.484 0.561 0.096
0.740 0.021172 1.480 3.480 0.586 0.483 0.560 0.103
PENENTUAN KEDALAMAN AIR
TRIAL & ERROR
Manning
3
Q= 0.829 m /dt
b= 2.00 m
z= 1
S= 0.0005
nb = 0.025
ns = 0.016
h ng A P A5/P2 (nQ/S0.5)3 = V(m/dt) Delta
m
0.550 0.021062 1.403 3.556 0.429 0.476 0.591 -0.047
0.552 0.021054 1.409 3.561 0.437 0.475 0.588 -0.038
0.554 0.021046 1.415 3.567 0.446 0.475 0.586 -0.029
0.556 0.021038 1.421 3.573 0.454 0.474 0.583 -0.020
0.558 0.021030 1.427 3.578 0.463 0.474 0.581 -0.011
0.560 0.021022 1.434 3.584 0.471 0.473 0.578 -0.002
0.562 0.021015 1.440 3.590 0.480 0.472 0.576 0.008
0.564 0.021007 1.446 3.595 0.489 0.472 0.573 0.017
0.566 0.020999 1.452 3.601 0.498 0.471 0.571 0.027
0.568 0.020991 1.459 3.607 0.508 0.471 0.568 0.037
0.570 0.020983 1.465 3.612 0.517 0.470 0.566 0.047
0.572 0.020975 1.471 3.618 0.527 0.470 0.563 0.057
0.574 0.020968 1.477 3.624 0.536 0.469 0.561 0.067
0.576 0.020960 1.484 3.629 0.546 0.469 0.559 0.077
0.578 0.020952 1.490 3.635 0.556 0.468 0.556 0.088
0.580 0.020944 1.496 3.640 0.566 0.468 0.554 0.098
0.582 0.020937 1.503 3.646 0.576 0.467 0.552 0.109
0.584 0.020929 1.509 3.652 0.587 0.467 0.549 0.120
0.586 0.020921 1.515 3.657 0.597 0.466 0.547 0.131
0.588 0.020914 1.522 3.663 0.608 0.466 0.545 0.142
0.590 0.020906 1.528 3.669 0.619 0.465 0.542 0.154
PENENTUAN KEDALAMAN AIR
TRIAL & ERROR
Manning
3
Q= 0.829 m /dt
b= 2.00 m
z= 1.5
S= 0.0005
nb = 0.025
ns = 0.016
h ng A P A5/P2 (nQ/S0.5)3 = V(m/dt) Delta
m
0.520 0.020645 1.446 3.875 0.420 0.448 0.573 -0.028
0.522 0.020637 1.453 3.882 0.429 0.447 0.570 -0.018
0.524 0.020628 1.460 3.889 0.438 0.447 0.568 -0.009
0.526 0.020620 1.467 3.897 0.448 0.446 0.565 0.001
0.528 0.020611 1.474 3.904 0.457 0.446 0.562 0.011
0.530 0.020602 1.481 3.911 0.466 0.445 0.559 0.021
0.532 0.020594 1.489 3.918 0.476 0.445 0.557 0.031
0.534 0.020586 1.496 3.925 0.486 0.444 0.554 0.042
0.536 0.020577 1.503 3.933 0.496 0.444 0.551 0.052
0.538 0.020569 1.510 3.940 0.506 0.443 0.549 0.063
0.540 0.020560 1.517 3.947 0.516 0.443 0.546 0.074
0.542 0.020552 1.525 3.954 0.527 0.442 0.544 0.085
0.544 0.020544 1.532 3.961 0.538 0.441 0.541 0.096
0.546 0.020536 1.539 3.969 0.548 0.441 0.538 0.108
0.548 0.020527 1.546 3.976 0.560 0.440 0.536 0.119
0.550 0.020519 1.554 3.983 0.571 0.440 0.533 0.131
0.552 0.020511 1.561 3.990 0.582 0.439 0.531 0.143
0.554 0.020503 1.568 3.997 0.594 0.439 0.528 0.155
0.556 0.020495 1.576 4.005 0.606 0.438 0.526 0.167
0.558 0.020487 1.583 4.012 0.618 0.438 0.524 0.180
0.560 0.020479 1.590 4.019 0.630 0.437 0.521 0.193
DEBIT LIMPASAN
to = 60.6 MENIT
ALUR PENYELESAIAN PERHITUNGAN
CONTOH SKEMA SISTEM
R2= 94 mm
SALURAN A Lo So C nd Ls tf to tc Cs I Q b S V h(m)
3
ha m mnt mnt mnt mm/jam m /dt m m/dt
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
421-4.2 0.071 11 0.01 0.8 0.4 44 1.6 8.43 10.04 0.93 310 0.045 0.5 0.001 0.456 0.199
43-42 0.089 11 0.01 0.8 0.4 90 3.2 8.43 11.66 0.88 280 0.049 0.5 0.001 0.465 0.210
42-41 0.178 13 0.01 0.8 0.4 16 0.5 11.66 12.13 0.98 273 0.106 0.6 0.001 0.565 0.312
1.2.2-1.2.1 0.045 11 0.01 0.8 0.4 29 1.2 8.43 9.60 0.94 319 0.030 0.4 0.001 0.413 0.182
1.2.3-1.2.1 0.142 16 0.01 0.8 0.4 98 3.2 10.04 13.29 0.89 257 0.072 0.4 0.001 0.503 0.359
1.2.1-1.2 0.206 10 0.01 0.8 0.4 18 0.5 13.29 13.81 0.98 250 0.113 0.6 0.001 0.574 0.327
1.3.1-1.3 0.019 9 0.01 0.8 0.4 16 0.8 7.68 8.48 0.95 346 0.014 0.4 0.001 0.332 0.105
1.4-1.3 0.1276 15 0.01 0.8 0.4 69 2.2 9.74 11.99 0.91 275 0.071 0.5 0.001 0.512 0.279
1.3-1.2 0.1859 13 0.01 0.8 0.4 22 0.7 11.99 12.64 0.97 265 0.107 0.5 0.001 0.561 0.382
1.2-1.1 0.405 11 0.01 0.8 0.4 17 0.4 13.81 14.23 0.99 245 0.218 0.7 0.001 0.674 0.462
3.2-3.1 0.0478 13 0.01 0.8 0.4 37 1.5 9.11 10.61 0.93 298 0.030 0.4 0.001 0.411 0.180
2.2-2.1 0.0732 18 0.01 0.8 0.4 43 1.6 10.61 12.21 0.94 272 0.041 0.4 0.001 0.447 0.232
CONTOH : Q = 8 m3/dtk
W = 0.50 m
W = 0.80 m
Q W Q W Q W
0.050 0.27 0.500 0.36 0.950 0.40
0.075 0.28 0.525 0.36 0.975 0.40
0.100 0.29 0.550 0.36 1.000 0.40
0.125 0.30 0.575 0.37 1.025 0.40
0.150 0.31 0.600 0.37 1.050 0.40
0.175 0.31 0.625 0.37 1.075 0.40
0.200 0.32 0.650 0.37 1.100 0.41
0.225 0.32 0.675 0.38 1.125 0.41
0.250 0.33 0.700 0.38 1.150 0.41
0.275 0.33 0.725 0.38 1.175 0.41
0.300 0.33 0.750 0.38 1.200 0.41
0.325 0.34 0.775 0.38 1.225 0.41
0.350 0.34 0.800 0.39 1.250 0.42
0.375 0.34 0.825 0.39 1.275 0.42
0.400 0.35 0.850 0.39 1.300 0.42
0.425 0.35 0.875 0.39 1.325 0.42
0.450 0.35 0.900 0.39 1.350 0.42
0.475 0.36 0.925 0.39 1.375 0.42
0.500 0.36 0.950 0.40 1.400 0.42
Q W Q W Q W
1.000 0.50 10.000 0.85 19.000 1.00
1.500 0.54 10.500 0.86 19.500 1.01
2.000 0.58 11.000 0.87 20.000 1.01
2.500 0.61 11.500 0.88 20.500 1.02
3.000 0.63 12.000 0.89 21.000 1.03
3.500 0.66 12.500 0.90 21.500 1.03
4.000 0.68 13.000 0.91 22.000 1.04
4.500 0.70 13.500 0.91 22.500 1.05
5.000 0.71 14.000 0.92 23.000 1.05
5.500 0.73 14.500 0.93 23.500 1.06
6.000 0.75 15.000 0.94 24.000 1.07
6.500 0.76 15.500 0.95 24.500 1.07
7.000 0.77 16.000 0.96 25.000 1.08
7.500 0.79 16.500 0.96 25.500 1.08
8.000 0.80 17.000 0.97 26.000 1.09
8.500 0.81 17.500 0.98 26.500 1.09
9.000 0.82 18.000 0.99 27.000 1.10
9.500 0.84 18.500 0.99 27.500 1.11
10.000 0.85 19.000 1.00 28.000 1.11
PENGARUH HILIR
ELEVASI AIR HILIR LEBIH TINGGI DARI KEDALAMAN
NORMAL.
◦ LENGKUNG AIR BALIK
◦ DEBIT SALURAN KECIL MENYEBABKAN AIR DARI SALURAN TIDAK MENGALIR
KE BADAN AIR.
◦ DEBIT SALURAN BESAR AKAN TERJADI AIR PADA SALURAN NAIK SAMPAI
JAUH KE HULU. PA
◦ TERJADI PENGENDAPAN SEDIMEN PADA MUARA.
2 2
V1 2 V2
So.Dx + y1 + a 1 = y2 + a 2 + S f Dx
2g 2g
E 2 - E1 DE
Dx = =
So - S f So - S f
V2
E = y +a E = enengi spesifik
2g
n 2V 2
Sf = kemiringan gesek
R4/3
BUZEM/BUSEM