URAIAN PEKERJAAN VOLUME

Dana Masuk Pencairan Tahap 3


Tarik Tunai
Pengawasan 1.00
PEKERJAAN BETON BERTULANG
6 Jalan Ramp Beton
- Besi 10 10.00 Btg
- Semen 10.00 Sak
- Pasir Beton 0.50 m3
- Kerikil 0.50 m3
- Kepala Tukang 3 Hari 3.00 HOK
- Tukang Batu 3 Hari 3.00 HOK
- Pembelian Kayu 4m 8.00 Bh
- Kasau 2m 10.00 Bh
- Pembelian Paku 2.00 Kg
PEKERJAAN RANGKA/ATAP/PLAFON
3 Listplank lebar 20 cm (50%)
- Kalsiboard 3.00 Bh
- Upah Tukang 1 Hari 4.00 HOK
4 Plafond kalsiboard tbl. 3,5 mm + rangka holow (bag. dalam) (50%)
- Kalsiboard 9.00 Bh
- Baja Ringan Taso 13.00 Bh
- Paku Baja 2.00 Kg
- Kepala Tukang 4 Hari 4.00 HOK
- Tukang Plafon 4 Hari 4.00 HOK
- Upah Tukang 4 Hari 16.00 HOK
5 Plafond kalsiboard tbl. 3,5 mm + rangka holow (bag. luar) (50%)
- Kalsiboard 9.00 Bh
- Baja Ringan Taso 13.00 Bh
- Paku Baja 2.00 Kg
- Kepala Tukang 4 Hari 4.00 HOK
- Tukang Plafon 4 Hari 4.00 HOK
- Upah Tukang 4 Hari 16.00 HOK
PEKERJAAN KUSEN/PINTU/JENDELA
2 Paketan Pintu dan Jendela (Aluminium dan HPL) (40%)
- Paketan Jendela dan Pintu 1.00 Bh
PEKERJAAN INSTALASI LISTRIK
1 Titik lampu 6.00 Bh
2 Lampu SL 12 watt 6.00 Bh
3 Stop kontak 6.00 Bh
4 Saklar ganda 1.00 Bh
5 Saklar tunggal 1.00 Bh
6 Panil MCB 1.00 Bh
7 Penyambungan instalasi Listrik baru ke bangunan yg ada 1.00 Bh
PEKERJAAN CAT - CATAN
1 Cat tembok : dinding 2.00 Bh
Kepala Tukang 4 Hari 4.00 HOK
Tukang Cat 4 Hari 4.00 HOK
2 Cat tembok : plafond 2.00 Bh
Kepala Tukang 4 Hari 4.00 HOK
Tukang Cat 4 Hari 4.00 HOK

PEKERJAAN LAIN - LAIN


1 Jalur Disabilitas 29.00 Bh
2 Pegangan Difabel 3.40 m
PEKERJAAN PENGADAAN MEBELER
Kursi Kantor Guru 14 Bh
Lemari Kantor Guru 7 Bh
Papan Statistik 1 Bh
Papan Pengumuman 1 Bh
210000000

HARGA SATUAN DANA MASUK DANA KELUAR

Rp. 75,000,000.00
Rp. 75,000,000.00
4,200,000.00 4,200,000.00
JUMLAH III Rp. 4,200,000.000

Rp. 97,500.00 Rp. 975,000.00


Rp. 83,000.00 Rp. 830,000.00
Rp. 220,000.00 Rp. 110,000.00
Rp. 280,000.00 Rp. 140,000.00
Rp. 170,000.00 Rp. 510,000.00
Rp. 150,000.00 Rp. 450,000.00
Rp. 35,000.00 Rp. 280,000.00
Rp. 25,000.00 Rp. 250,000.00
Rp. 26,000.00 Rp. 52,000.00
JUMLAH III Rp. 3,597,000.000

Rp. 68,000.00 Rp. 204,000.00


Rp. 110,000.00 Rp. 440,000.00

Rp. 68,000.00 Rp. 612,000.00


Rp. 67,000.00 Rp. 871,000.00
Rp. 27,000.00 Rp. 54,000.00
Rp. 170,000.00 Rp. 680,000.00
Rp. 150,000.00 Rp. 600,000.00
Rp. 110,000.00 Rp. 1,760,000.00

Rp. 68,000.00 Rp. 612,000.00


Rp. 67,000.00 Rp. 871,000.00
Rp. 27,000.00 Rp. 54,000.00
Rp. 170,000.00 Rp. 680,000.00
Rp. 150,000.00 Rp. 600,000.00
Rp. 110,000.00 Rp. 1,760,000.00
JUMLAH V Rp. 9,798,000.000

Rp. 10,360,000.00 Rp. 10,360,000.00


JUMLAH VI Rp. 10,360,000.000
Rp. 170,000.00 Rp. 1,020,000.00
Rp. 81,333.00 Rp. 488,000.00
Rp. 55,000.00 Rp. 330,000.00
Rp. 55,000.00 Rp. 55,000.00
Rp. 55,000.00 Rp. 55,000.00
Rp. 120,000.00 Rp. 120,000.00
Rp. 400,000.00 Rp. 400,000.00
JUMLAH VIII Rp. 2,468,000.000
Rp. 1,800,000.00 Rp. 3,600,000.00
Rp. 170,000.00 Rp. 680,000.00
Rp. 150,000.00 Rp. 600,000.00
Rp. 1,500,000.00 Rp. 3,000,000.00
Rp. 170,000.00 Rp. 680,000.00
Rp. 150,000.00 Rp. 600,000.00

JUMLAH IX Rp. 9,160,000.000


Rp. 85,000.00 Rp. 2,465,000.00
Rp. 280,000.00 Rp. 952,000.00
JUMLAH X Rp. 3,417,000.000
Rp. 393,571.43 5,510,000
Rp. 3,500,000.00 24,500,000
Rp. 1,000,000.00 1,000,000
Rp. 990,000.00 990,000
JUMLAH I Rp. 32,000,000

JUMLAH TAHAP III Rp. 75,000,000

SALDO DUIT TAHAP II Rp. (0.00)

SALDO Rp. - 0