TUTORIAL SURPAC 6

PIT & DUMP DESIGN v2

Oleh : Adrianto Setiadi

MINETECH INDONESIA
MEI 2020
Tutorial Surpac 6 – Pit & Dump Design 2020

DAFTAR ISI

1. PENGANTAR ....................................................................................................................................... 1
2. PERSIAPAN.......................................................................................................................................... 1
3. PEMBUATAN KONTUR STRIPPING RATIO.......................................................................................... 2
3.1. Membedakan Ore dan Waste ....................................................................................................... 2
3.2. Menghitung Ketebalan Ore dan Waste ........................................................................................ 7
3.3. Membuat Contour Stripping Ratio ............................................................................................. 26
4. MEMBUAT PIT DESIGN .................................................................................................................... 38
4.1. Membatasi Area Blok Model ...................................................................................................... 40
4.2. Membuat Ultimate Pit ................................................................................................................. 44
4.3. Clip Pit dan Topo .......................................................................................................................... 69
4.4. Membuat Waste Dump ............................................................................................................... 87

Minetech Indonesia Page i


Tutorial Surpac 6 – Pit & Dump Design 2020

TUTORIAL SURPAC – PIT DESIGN

1. PENGANTAR
Pit design merupakan rencana bukaan lahan tambang yang akan digunakan untuk mengambil mineral
ekonomis yang berada dibawah tanah. Design dari pit ini harus mempertimbangkan beberapa factor penting
yaitu kualitas dan jumlah cadangan mineral, stripping ratio yang ekonomis untuk ditambang serta aspek
geoteknik dan keamanan tambang.

2. PERSIAPAN
Sebelum mulai, siapkan menu dan toolbar Block Model dan Surface Design

Menu dan toolbar Block Model

Menu dan toolbar Surface Design

Minetech Indonesia Page 1


Tutorial Surpac 6 – Pit & Dump Design 2020

Siapkan juga toolbar Edit dan Display and hide

Serta toolbar Classic slicing dan Hide and Transparency

3. PEMBUATAN KONTUR STRIPPING RATIO


3.1. Membedakan Ore dan Waste
Dari menu Block Model > Coloumn processing > Ore/Waste discrimination

Muncul window Block model ore/waste discrimination

Minetech Indonesia Page 2


Tutorial Surpac 6 – Pit & Dump Design 2020

Minetech Indonesia Page 3


Tutorial Surpac 6 – Pit & Dump Design 2020

Pilih atau ketikan pada Block model ore/waste discrimination


Digging zone : none ; Maximise : Ore Grade ; Minimum thickness : Ore = 4; Waste = 2
Attribute : ni_id ; Composite : ni_id_comp
Cut off = 1.5 ; Ore attribute : ore_attribute ; Ore value = 1 ; Waste value = 0 ; Direction of columns
: -Z ; Constraint discrimination : v
Report file name : rep_ore_waste_disc ; Format : .not

Muncul window Enter constraints

Minetech Indonesia Page 4


Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah muncul CONS_TOPO_BEDROCK.CON pada kolom Constraint file, ceklist Inside, klik Add, maka akan
muncul kalimat pada kolom Constraint values : a. Constraint File : inside CONS_TOPO_BEDROCK.CON >
Apply

Minetech Indonesia Page 5


Tutorial Surpac 6 – Pit & Dump Design 2020

Lalu muncul window report : rep_ore_waste_disc.not

Cek hasil ore_attrribute nya pada salah satu kotak blok model ore

Minetech Indonesia Page 6


Tutorial Surpac 6 – Pit & Dump Design 2020

Dan cek juga hasil ore_attrribute nya pada salah satu kotak blok model waste

3.2. Menghitung Ketebalan Ore dan Waste


Setelah blok model terisi oleh attribute ore atau waste, langkah selanjutnya adalah menghitung
berapa ketebalan ore atau waste pada satu kumpulan blok model vertical, sehinggan nantinya bisa
diketahui berapa Stripping Rationya
Pada menu Block model > Column processing > Thickness

Muncul window Block model thickness

Minetech Indonesia Page 7


Tutorial Surpac 6 – Pit & Dump Design 2020

Pilih atau ketikan pada Block model thickness


Class attribute : ore_attribute ; Class value = 1
Attribute to composite : ni_id ; Attribute to aggregate : ni_id
Location : bm_thick_ore ; Direction of column : -z ; Constraint extraction : v
Report file name : rep_bm_thick_ore ; Format : .not

Minetech Indonesia Page 8


Tutorial Surpac 6 – Pit & Dump Design 2020

Muncul window Enter constraints

Minetech Indonesia Page 9


Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah muncul CONS_TOPO_BEDROCK.CON pada kolom Constraint file, ceklist Inside, klik Add, maka akan
muncul kalimat pada kolom Constraint values : a. Constraint File : inside CONS_TOPO_BEDROCK.CON >
Apply

Lalu muncul window report : rep_ore_waste_disc.not

Minetech Indonesia Page 10


Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah selesai, cek hasil file string bm_thick_ore.str yang ada pada view Surpac.

Hasil file string bm_thick_ore.str

Minetech Indonesia Page 11


Tutorial Surpac 6 – Pit & Dump Design 2020

Kolom 1 = String number; Kolom 2 = Northing; Kolom 3 = Easting; Kolom 4 = Elevation; Kolom 5 atau Kolom
Deskripsi 1 = Ketebalan; Kolom 6 atau Kolom Deskripsi 2 = Nilai kadar Ni (%); Kolom 7 atau Kolom Deskripsi
3 = Aggregate Ni

Minetech Indonesia Page 12


Tutorial Surpac 6 – Pit & Dump Design 2020

Pilih keseluruhan tulisan > Copy

Buku Microsoft Excel > Paste

Plih Data > Text to Column

Minetech Indonesia Page 13


Tutorial Surpac 6 – Pit & Dump Design 2020

Muncul window Convert Text to Column Wizard (Step 1) > Delimited > Next

Muncul window Convert Text to Column Wizard (Step 2) > Comma > Next

Minetech Indonesia Page 14


Tutorial Surpac 6 – Pit & Dump Design 2020

Muncul window Convert Text to Column Wizard (Step 3) > General > Finish

Hasil pemisahan text to column

Minetech Indonesia Page 15


Tutorial Surpac 6 – Pit & Dump Design 2020

Pilihlah setengah data terakhir dimana string numbernya angka 2 (kolom A)

Pilih semua data tersebut sampai kebawah atau data terakhir > Cut

Pilihlah kolom H3 > Paste

Minetech Indonesia Page 16


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil pemindahan setengah data terakhir yang berawalan string number 2.


Terlihat bahwa kedua data tersebut serupa Y, X, Z nya namun berbeda ketebalannya, kadar Ni, dan
aggregate Ni nya.

Tambahkan judul kolom : Y, X, Z, Ore_Thick, Ore_Grade, Waste_Thick, Waste_Grade dan SR

Hapus kolom yang tidak diperlukan : A, G, H, I, J, K dan N

Minetech Indonesia Page 17


Tutorial Surpac 6 – Pit & Dump Design 2020

Hapus baris yang tidak diperlukan : 1, 11750 dan 11751

Minetech Indonesia Page 18


Tutorial Surpac 6 – Pit & Dump Design 2020

Pada kolom SR buatlah rumus menghitung Stripping Ratio = F2/D2

Copy kan sampai kepada baris terakhir

Melalui menu Filter, ceklah berapa nilai SR paling tinggi, dalam hal ini = 8

Ganti nilai #DIV/0! dengan angka 10 (dianggap sebagai SR maksimal)

Minetech Indonesia Page 19


Tutorial Surpac 6 – Pit & Dump Design 2020

Simpan file tersebut : bm_thick_ore_sr.csv

Minetech Indonesia Page 20


Tutorial Surpac 6 – Pit & Dump Design 2020

Import file .csv tersebut kedalam bentuk .str , File > Import > Data from one file

Muncul window Import from text file


Text file name : bm_thick_ore_sr.csv ; Location : bm_thick_sr ; String no : 1
Number of header lines = 1 ; Number of description fields = 5
Delimited : v ; Delimiter : ,

Minetech Indonesia Page 21


Tutorial Surpac 6 – Pit & Dump Design 2020

Y coordinate = 1; X coordinate = 2; Z coordinate = 3; D1 = 4; D2 = 5; D3 = 6; D4 =7; D5 = 8 > Apply

Cek file string hasil import dari .csv

Minetech Indonesia Page 22


Tutorial Surpac 6 – Pit & Dump Design 2020

File string bm_thick_sr.str dalam bentuk notepad

Drag file bm_thick_sr.str kedalam window Surpac

Minetech Indonesia Page 23


Tutorial Surpac 6 – Pit & Dump Design 2020

Ubahlah format string polyline menjadi point, dengan men drag file strings_ka_pts.tcl

Muncul window Breaks strings into points > String > Apply

Pilih stringnya

Minetech Indonesia Page 24


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil break strings into points

Format file string bm_thick_sr.str yang telah di break to points dalam bentuk notepad

Minetech Indonesia Page 25


Tutorial Surpac 6 – Pit & Dump Design 2020

3.3. Membuat Contour Stripping Ratio


Dalam pembuatan blok model suatu endapan mineral, seringkali kita membutuhkan suatu pembatas.
Pembatas ini diperlukan bila dalam 1 lokasi endapan mineral memiliki beberapa karakteristik, atau untuk
memisahkan antar bagian dari 1 blok model.
Dari menu Surface > Contouring > Begin contouring

Muncul window Load grid defaults file > Apply

Minetech Indonesia Page 26


Tutorial Surpac 6 – Pit & Dump Design 2020

Muncul window Graphical display data > Continue

Kemudian kita tentukan batas area kontur, menu Surface > Contouring > Contouring area > Define extents

Minetech Indonesia Page 27


Tutorial Surpac 6 – Pit & Dump Design 2020

Muncul window Enter data/mesh option

Pada Layer containing data pilih bm_thick_sr.str > Calculated grid mesh size

Muncul otomatis angka 30 pada grid Y dan X

Kemudian rubahlah angka grid Y dan X menjadi 10 agar lebih detil > Apply

Minetech Indonesia Page 28


Tutorial Surpac 6 – Pit & Dump Design 2020

Muncul window Enter grid mesh parameters > Apply

Akan muncul batas kotak warna biru sebagai pembatas area kontur SR

Minetech Indonesia Page 29


Tutorial Surpac 6 – Pit & Dump Design 2020

Selanjutnya kita estimasin nilai SR pada masing – masing titik grid tersebut, menu Surface > Estimate grid
value > By triangulation

Muncul window Select string file sources

Minetech Indonesia Page 30


Tutorial Surpac 6 – Pit & Dump Design 2020

Pilihlah Location : bm_thick_sr ; Z or D field? : D ; D field = 5 > Apply

Muncul window Triangulation parameters, Constraint interpolation tidak perlu di ceklist > Apply

Minetech Indonesia Page 31


Tutorial Surpac 6 – Pit & Dump Design 2020

Kemudian kita buat kontur SR nya, menu Surface > Contouring > Contour grid

Muncul window Define layer to display contour

Contour display layer : bm_sr_contour > Apply

Minetech Indonesia Page 32


Tutorial Surpac 6 – Pit & Dump Design 2020

Masukkan Contour Definition : Interval ; Minimum contour = 0 ; Maximum contour = 10 ; Contour interval
= 0.5 > Apply

Muncul contour drawing styles

Minetech Indonesia Page 33


Tutorial Surpac 6 – Pit & Dump Design 2020

Ganti Colur : light grey ; Index Contour Properties Interval 2.5 ; Colour : red ; Draw contour value? V ;
Frequency 100 ; Size : 2 > Apply

Window verify creation of file > Yes

Minetech Indonesia Page 34


Tutorial Surpac 6 – Pit & Dump Design 2020

Matikan layer lainnya kecuali bm_sr_contour

Hasil contour SR

Save file bm_sr_contour tersebut.

Minetech Indonesia Page 35


Tutorial Surpac 6 – Pit & Dump Design 2020

Selanjutnya bukalah file topo_ex3.dtm

Miringkanlah view nya sehingga terlihat antara SR Contour dan DTM Topo

Minetech Indonesia Page 36


Tutorial Surpac 6 – Pit & Dump Design 2020

Kembalikan view ke Plan view, lalu buatlah DTM topo_ex3 lebih transparan 50%

Dengan transparan 50%, kita bisa melihat contour SR dan juga DTM topo_ex3, sehingga kita bisa memberi
Batasan rencana pit yang akan kita buat

Minetech Indonesia Page 37


Tutorial Surpac 6 – Pit & Dump Design 2020

Berilah batasan berdasarkan beberapa parameter yaitu :


- Maksimum Stripping Ratio yang diinginkan,
- Area paling favorable atau banyak ore yang terkumpul hampir tidak terpisah
- Batas dari morfologi berupa punggungan bukit atau lembah sungai

Contoh Batasan dibawah ini yang akan kita gunakan sebagai batasan rencana ultimate pit yang akan kita buat

4. MEMBUAT PIT DESIGN


Setelah kita dapat membuat peta kontur Stripping Ratio dan mengetahui Batasan dari rencana
ultimate pit yang akan kita buat, maka kita buat batas tersebut sebagai panduan.
Tampilkan blok model dengan nilai ni_id > 1.5 untuk di overlay dengan bm_sr_contour

Constraint > New graphical constraint

Minetech Indonesia Page 38


Tutorial Surpac 6 – Pit & Dump Design 2020

Muncul window Enter constraints

Ganti constraint type : Block, setelah itu pilih ni_id > 1.5 >, maka akan muncul kalimat pada kolom Constraint
values : a. Block Constraint : ni_id . 1.5 > Apply

Minetech Indonesia Page 39


Tutorial Surpac 6 – Pit & Dump Design 2020

4.1. Membatasi Area Blok Model


Dari menu Layers > New

Name : bound_pit_plan > Apply

Klik icon Enter/Change digitiser point attributes

Ganti angka 1 pada kolom String # menjadi angka 2 > Apply

Minetech Indonesia Page 40


Tutorial Surpac 6 – Pit & Dump Design 2020

Klik icon Start new segment for digitizing (1) lalu klik icon Create new points using the mouse (2)
2 1

Mulailah digitasi batas rencana pit

Minetech Indonesia Page 41


Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah mau menutup polygon, klik icon Close the current segment being digitised

Polygon hasil digitasi bound_pit_plan.str

Hapuskan temporary marker pada polygon tersebut icon Hide temporary marker

Minetech Indonesia Page 42


Tutorial Surpac 6 – Pit & Dump Design 2020

Layers > bound_pit_plan > Save layer

Window Save file > Apply

Minetech Indonesia Page 43


Tutorial Surpac 6 – Pit & Dump Design 2020

4.2. Membuat Ultimate Pit


Kita batasi dulu blok model yang termasuk ore dan didalam area polygon bound_pit_plan, menu
Constraint > New graphical constraint

Pada window Enter constraints, ganti Constraint type : String ; String file : bound_pit_plan.str >
Open

Minetech Indonesia Page 44


Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah string file Bound_Pit_Plan muncul, ceklist Inside, Extent : Z > Add, maka akan muncul kalimat pada
kolom Constraint values : a. String Constraint : inside Bound_Pit_Plan.str in direction Z > Apply

Hasil dari Constraint bound_pit_plan

Matikan semua layer, sehingga hanya terlihat blok model, lalu kita rubah view menjadi Section View

Minetech Indonesia Page 45


Tutorial Surpac 6 – Pit & Dump Design 2020

Cek lah elevasi terendah dari blok model yang masih masuk kedalam kumpulan yang banyak, contoh
dibawah ini adalah elevasi 126 m

Lalu kita batasi blok model yang akan ditampilkan hanya dari elevasi 126 – 132 m, dengan asumsi
dalam hal ini tinggi bench yang akan kita buat adalah 6 m.

Minetech Indonesia Page 46


Tutorial Surpac 6 – Pit & Dump Design 2020

Ganti Constraint type : Z Plane ; Z = 126 ; Above (√) > Add lalu Z = 132 ; Above ( ) > Add, sehingga
pada kolom Constraint values : a. Z Value Constraint : above Z = 126 ; b. Z Value Constraint : Not
above Z = 132 > Apply

Hasil constraint Z Plane 126 – 132 m

Kembalikan view ke Plan view

Minetech Indonesia Page 47


Tutorial Surpac 6 – Pit & Dump Design 2020

Buatlah layer baru, Layers > New

Window Create a new layer : pit_ex3_v1 > Apply

Klik icon Enter/Change digitiser point attributes

Minetech Indonesia Page 48


Tutorial Surpac 6 – Pit & Dump Design 2020

Display Digitiser string attributes, String # : 11 ; Z = 126 > Apply

Klik icon Start new segment for digitizing (1) lalu klik icon Create new points using the mouse (2)
2 1

Mulailah digitasi batas pit level 126 m

Minetech Indonesia Page 49


Tutorial Surpac 6 – Pit & Dump Design 2020

Tentukan pit slope gradient, menu Design > Pit design > Set slope gradient

Muncul window Set the design gradient, Ganti unit : angle ; Gradient = 60 > Apply

Expand segment by bench height

Minetech Indonesia Page 50


Tutorial Surpac 6 – Pit & Dump Design 2020

Pada window Expand segment by bench height, Bench Height = 6 ; Limiting elevation = 9999 ; Z
direction : up ; Horizontal direction : expand > Apply

Hasil dari expand segment by bench height

Minetech Indonesia Page 51


Tutorial Surpac 6 – Pit & Dump Design 2020

Tampilkan lah elevasi dari masing – masing segment tersebut

Pada window drawing pilih layer name : pit_ex3_v1 > Apply

Kemudian expand segment by berm width

Minetech Indonesia Page 52


Tutorial Surpac 6 – Pit & Dump Design 2020

Dalam contoh ini kita asumsikan berm width 2 m, pada window Expand Segment by Berm Width
Default berm width = 2 ; Berm gradient (%) = 0 ; Horizontal direction : expand > Apply

Hasil expand segment by berm width

Minetech Indonesia Page 53


Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah selesai pembuatan bench level 126 – 132, kita kembalikan blok model seperti sebelumnya,
icon Remove last graphical constraint

Lalu kita constraint lagi berdasarkan Z Plane

Minetech Indonesia Page 54


Tutorial Surpac 6 – Pit & Dump Design 2020

Ganti Constraint type : Z Plane ; Z = 132 ; Above (√) > Add lalu Z = 138 ; Above ( ) > Add, sehingga
pada kolom Constraint values : a. Z Value Constraint : above Z = 132 ; b. Z Value Constraint : Not
above Z = 138 > Apply

Hasil constraint Z Plane 132 – 138 m

Selanjutnya kita geser polygon berm atau toe level 132 m, agar blok model level 132 – 138 m bisa
tertambang

Klik dekat point, dan tahan, lalu drag kearah blok model yang akan ditambang

Minetech Indonesia Page 55


Tutorial Surpac 6 – Pit & Dump Design 2020

Muncul window Enter/edit a point > Apply

Hasil copy point

Minetech Indonesia Page 56


Tutorial Surpac 6 – Pit & Dump Design 2020

Kalau masih kurang pas, kita bisa geser lagi, Move point

Hasil move point

Lanjutkan Add atau Move point sesuai kebutuhan hingga selesai

Minetech Indonesia Page 57


Tutorial Surpac 6 – Pit & Dump Design 2020

Lanjutkan dengan, Expand segment by bench height

Pada window Expand segment by bench height, Bench Height = 6 ; Limiting elevation = 9999 ; Z
direction : up ; Horizontal direction : expand > Apply

Kemudian expand segment by berm width

Minetech Indonesia Page 58


Tutorial Surpac 6 – Pit & Dump Design 2020

Pada window Expand Segment by Berm Width

Default berm width = 2 ; Berm gradient (%) = 0 ; Horizontal direction : expand > Apply

Minetech Indonesia Page 59


Tutorial Surpac 6 – Pit & Dump Design 2020

Ulangi langkah – langkah tersebut sampai level blok model tertinggi dan melewati topografi tertinggi
di area pit tersebut.

Cek bench dari pit sudah melebihi dari topografi sekitar pit

Minetech Indonesia Page 60


Tutorial Surpac 6 – Pit & Dump Design 2020

Save file pit_ex3_v1, Layers > Save layer

Buatlah DTM dari file pit_ex3_v1.str, Surface > DTM File functions > Create DTM from string file

Minetech Indonesia Page 61


Tutorial Surpac 6 – Pit & Dump Design 2020

Minetech Indonesia Page 62


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil report DTM file pit_ex3_v1

Bukalah file DTM nya, pit_ex3_v1 > Open

Minetech Indonesia Page 63


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil DTM file pit_ex3_v1.dtm

Matikan file stringnya pit_ex3_v1.str, overlay dengan file DTM topo_ex3.dtm

Minetech Indonesia Page 64


Tutorial Surpac 6 – Pit & Dump Design 2020

Untuk memotong kelebihan dari DTM pit_ex3_v1, kita gunakan menu Surfaces > Clip or intersect
DTMs > Line of intersection between DTMs

Muncul window Intersect DTMs for line of contact,


First DTM layer : topo_ex3.dtm ; Object ID : 1 ; Trisolation ID : 1
Second DTM layer : pit_ex3_v1.dtm ; Object ID : 5 ; Trisolation ID : 1
Output layer : intersect_topo_pit_v1 ; String number : 108

Minetech Indonesia Page 65


Tutorial Surpac 6 – Pit & Dump Design 2020

Garis polygon merah hasil intersect antara DTM topo_ex3 dan DTM pit_ex3_v1

Matikan layer DTM topo_ex3 dan DTM pit_ex3_v1, lalu cek lah polygon hasil intersect nya, jika ada
segment yang berada didalam atau diluar dari polygon utama, maka kita hapus saja segment
tersebut, icon Delete segment.

Pilih segment yang terpisah dari polygon utama hasil intersect topo_ex3 dan pit_ex3_vq, klik pada
segment tersebut.

Minetech Indonesia Page 66


Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah kita delete semua segment yang berada diluar atau didalam polygon utama, lalu kita save
file intersect_topo_pit_v1.str

Minetech Indonesia Page 67


Tutorial Surpac 6 – Pit & Dump Design 2020

Overlay kan file string pit_ex3_v1.str dan file intersect_topo_pit_v1.str

Minetech Indonesia Page 68


Tutorial Surpac 6 – Pit & Dump Design 2020

4.3. Clip Pit dan Topo


Selanjutnya kita clip batas topo dan pit nya, menu Edit > Trim > Clip by selected segment

Pada window Select and clip data > Outside the boundary > Apply

Minetech Indonesia Page 69


Tutorial Surpac 6 – Pit & Dump Design 2020

Pilihlah polygon string intersect_topo_pit_v1.str

Setelah dipilih polygonnya, maka segment dari pit_ex3_v1.str yang berada diluar batas polygon
intersect_topo_pit_v1.str akan terpotong.

Minetech Indonesia Page 70


Tutorial Surpac 6 – Pit & Dump Design 2020

Save lah file string pit_ex3_v1 yang telah di clip tadi dengan nama file lain,

Contohnya kita namakan dengan pit_ex3_v1_clip.str, untuk membedakan dengan file pit_ex3_v1.str
yang belum di clip.

Bersihkan layer monitor Surpac dengan icon Reset graphics

Minetech Indonesia Page 71


Tutorial Surpac 6 – Pit & Dump Design 2020

Untuk membentuk DTM pit yang sudah di clip, kita harus membuat lagi DTMnya, namun sebelum
itu kita siapkan string gabungan / merge antara file pit_ex3_v1_clip.str dengan file
intersect_topo_pit_v1.str, dengan cara memilih kedua file tersebut sambal menekan tombol Ctr, lalu
drag kedua file tersebut kedalam monitor Surpac.

Minetech Indonesia Page 72


Tutorial Surpac 6 – Pit & Dump Design 2020

Lalu save string tersebut pit_ex3_v1_clip.str > Apply

Pada window Verify creation of file > Yes

Minetech Indonesia Page 73


Tutorial Surpac 6 – Pit & Dump Design 2020

Buatlah file DTM dari string pit_ex3_v1_clip.str , Surface > DTM File functions > Create DTM from
string file

Minetech Indonesia Page 74


Tutorial Surpac 6 – Pit & Dump Design 2020

Pada window Create a DTM from a string file, ketikan atau pilih
Location : pit_ex3_v1_clip ; Object ID : 5
Strings to act as break lines (√) ; Would you like to clip the DTM to boundary after creation? (√) ;
Location : intersect_topo_pit_v1 ; String : 108 > Apply

Minetech Indonesia Page 75


Tutorial Surpac 6 – Pit & Dump Design 2020

File report pit_ex3_v1_clip

Bukalah file DTM nya pit_ex3_v1_clip.dtm

Minetech Indonesia Page 76


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil DTM file pit_ex3_v1_clip.dtm

Hapus tampilan di layer window Surpac, icon Reset graphics

Selanjutnya kita akan meng clip string topo_ex3.str yang berada didalam string boundary
intersect_topo_pit_v1.str.
Tampilkan dalam layer file string topo_ex3.str dan intersect_topo_pit_v1

Minetech Indonesia Page 77


Tutorial Surpac 6 – Pit & Dump Design 2020

Dari menu Edit > Trim > Clip by selected segment

Pada window Select and clip data : inside the boundary > Apply

Pilihlah polygon string intersect_topo_pit_v1.str

Minetech Indonesia Page 78


Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah dipilih polygonnya, maka segment dari topo_ex3.str yang berada didalam batas polygon
intersect_topo_pit_v1.str akan terpotong.

Save lah file string topo_ex3 yang telah di clip tadi dengan nama file lain,

Minetech Indonesia Page 79


Tutorial Surpac 6 – Pit & Dump Design 2020

Contohnya kita namakan dengan topo_ex3_clip_pit_v1.str, untuk membedakan dengan file


topo_ex3.str yang belum di clip.

Hapus tampilan di layer window Surpac, icon Reset graphics

Untuk membuat file DTM topo_ex yang sudah di clip, maka kita siapkan string gabungan / merge
antara file topo_ex3_clip_pit_v1.str dengan file intersect_topo_pit_v1.str, dengan cara memilih
kedua file tersebut sambal menekan tombol Ctr, lalu drag kedua file tersebut kedalam monitor
Surpac.

Minetech Indonesia Page 80


Tutorial Surpac 6 – Pit & Dump Design 2020

Minetech Indonesia Page 81


Tutorial Surpac 6 – Pit & Dump Design 2020

Lalu save string tersebut topo_ex3_clip_pit_v1.str > Apply

Minetech Indonesia Page 82


Tutorial Surpac 6 – Pit & Dump Design 2020

Buatlah file DTM dari string topo_ex3_clip_pit_v1.str , Surface > DTM File functions > Create DTM
from string file

Pada window Create a DTM from a string file, ketikan atau pilih
Location : topo_ex3_clip_pit_v1 ; Object ID : 1
Strings to act as break lines (√) ; Would you like to clip the DTM to boundary after creation? (√) ;
Location : intersect_topo_pit_v1 ; String : 108 > Apply

Minetech Indonesia Page 83


Tutorial Surpac 6 – Pit & Dump Design 2020

Minetech Indonesia Page 84


Tutorial Surpac 6 – Pit & Dump Design 2020

File report topo_ex3_clip_pit_v1

Bukalah file DTM nya topo_ex3_clip_pit_v1.dtm

Minetech Indonesia Page 85


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil DTM file topo_ex3_clip_pit_v1.dtm

Tampilkan file DTM pit_ex3_v1_Cclip.dtm dan file string intersect_topo_pit_v1.str

Tampilan bersama dengan blok model ore nya.

Minetech Indonesia Page 86


Tutorial Surpac 6 – Pit & Dump Design 2020

4.4. Membuat Waste Dump


Sebelum membuat wastedump sebaiknya kita membuat dulu contur dari data DTM topo_ex3.dtm,
menu Surface > Contouring > Contour DTM file

Minetech Indonesia Page 87


Tutorial Surpac 6 – Pit & Dump Design 2020

Kemudian muncul window Extract contours from a DTM, isikan atau pilih
DTM from which contours will be extracted > Location : topo_ex3; Field to contour : z; Object ID :
1; Trisolation ID : 1
Define contours by > (√) Interval ; Minimum contour = 70 ; Maximum contour = 336 ; Contour
interval = 2
Define the contour string file > Location : topo_ex3_cont ; Define plot enhancement requirements
> (√) Create index contour file ; Location : topo_ex3_cont10 ; Index value = 10

Hasil kontur DTM topo_ex3_cont

Minetech Indonesia Page 88


Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah selesai membuat contour, maka kita lanjutkan untuk membuat waste dump. Dimana waste dump ini
akan digunakan untuk menimbun material overburden atau waste yang tidak bisa digunakan atau dijual.

Buatlah layer baru, Layers > New , pada window Create a new layer Name : bound_wd_plan

Enter / Change digitizer point attributes, String # = 108 ; Z = 0

Minetech Indonesia Page 89


Tutorial Surpac 6 – Pit & Dump Design 2020

Buatlah layer baru, Layers > New , pada window Create a new layer Name : wd_ex3_v1

Kita mulai digitasi dari level yang agak bawah dulu, yaitu level 150
Enter / Change digitizer point attributes, String # = 11 ; Z = 150

Minetech Indonesia Page 90


Tutorial Surpac 6 – Pit & Dump Design 2020

Kita mulai digitasi pada level 170 m, bagian bawah dari waste dump.

Minetech Indonesia Page 91


Tutorial Surpac 6 – Pit & Dump Design 2020

Set waste dump slope gradient

Pada window Set the design gradient Unit : angle ; Gradient = 40 ; Angel units : decimal degrees >
Apply

Lanjutkan dengan, Expand segment by bench height

Minetech Indonesia Page 92


Tutorial Surpac 6 – Pit & Dump Design 2020

Dalam hal ini kita buat kearah bawah dulu, atau kearah toe waste dump
Pada window Expand segment by bench height, Bench Height = 5 ; Limiting elevation = -9999 ; Z
direction : down ; Horizontal direction : expand > Apply

Tampilkan nilai Z pada vertex atau point segment wd_ex3_v1.str

Minetech Indonesia Page 93


Tutorial Surpac 6 – Pit & Dump Design 2020

Kemudian expand segment by berm width

Pada window Expand Segment by Berm Width, Default berm width = 10 ; Berm gradient (%) = 0 ;
Horizontal direction : expand

Minetech Indonesia Page 94


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil expand segment

Selanjutnya kita buat kaki toe paling bawah dari waste dump ini, sampai toe nya dibawah permukaan
tanah, icon Expand segment by bench height

Untuk itu kita coba expand sampai 15 m kearah bawah, Bench height = 15 ; Limiting elevation -9999
; Z direction : down ; Horizontal direction : expand

Hasil dari expand segment down sejauh 15 m

Minetech Indonesia Page 95


Tutorial Surpac 6 – Pit & Dump Design 2020

Pastikan level toe 130 m wastedump tidak muncul ke permukaan

Setelah toe waste dump paling bawah selesai, kita lanjutkan kearah atas.

Minetech Indonesia Page 96


Tutorial Surpac 6 – Pit & Dump Design 2020

Lanjutkan naikkan bench 5 m

Untuk itu kita coba expand by bench height kearah atas, Bench height = 5 ; Limiting elevation 9999
; Z direction : up ; Horizontal direction : contract > Apply
Minetech Indonesia Page 97
Tutorial Surpac 6 – Pit & Dump Design 2020

Setelah naik bench, lanjutkan berm, dengan expand segment by berm width

Pada window Expand Segment by Berm Width, Default berm width = 25 ; Berm gradient (%) = 0 ;
Horizontal direction : contract

Minetech Indonesia Page 98


Tutorial Surpac 6 – Pit & Dump Design 2020

Dan seterusnya dilanjutkan sampai level 190 m

Setelah selesai, save Layer wd_ex3_v1.str

Minetech Indonesia Page 99


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil file string wd_ex3_v1.str

Selanjutnya sambungkanlah garis – garis tersebut sehingga membentuk polygon

Minetech Indonesia Page 100


Tutorial Surpac 6 – Pit & Dump Design 2020

Selanjutnya kita buatkan file DTM nya, menu Surface > DTM file function > Create DTM from string
file

Minetech Indonesia Page 101


Tutorial Surpac 6 – Pit & Dump Design 2020

Window Create a DTM from a string file


Location : wd_ex3_v1_clip ; Object ID : 5
Strings to act as break lines (√) ; Would you like to clip the DTM to boundary after creation? ( )

Minetech Indonesia Page 102


Tutorial Surpac 6 – Pit & Dump Design 2020

Report DTM wd_ex3_v1

Hasil DTM file wd_ex3_v1.dtm

Minetech Indonesia Page 103


Tutorial Surpac 6 – Pit & Dump Design 2020

Selanjutnya kita potong pertemuan antara DTM wd_ex3_v1.dtm dengan DTM topo_ex3.dtm

Pada window Intersect DTMs for line of contact :


First DTM layer : topo_ex3.dtm ; Object ID : 1 ; Trisolation ID :1
Second DTM layer : wd_ex3_v1.dtm ; Object ID : 5 ; Trisolation ID :1
Output layer : intersect_topo_wd_ex3_v1 ; String Number : 109

Minetech Indonesia Page 104


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil line intersect antara DTM topo_ex3.dtm dan DTM wd_ex3_v1.dtm

Save lah file string intersect_topo_wd_ex3_v1.str

Minetech Indonesia Page 105


Tutorial Surpac 6 – Pit & Dump Design 2020

Tampilkan file string wd_ex3_v1.str dan intersect_topo_wd_ex3_v1.str

Kita clip file string waste dumpnya, Edit > Trim > Clip by selected segment

Pada window Select and clip data : Outside the boundary > Apply

Minetech Indonesia Page 106


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil string wd_ex3_v1 yang sudah di clip

Save lah file waste dump hasil clip, Layers > Save layer

Minetech Indonesia Page 107


Tutorial Surpac 6 – Pit & Dump Design 2020

Pada window Save File, kita bedakan namanya menjadi File name : wd_ex3_v1_clip.str > Apply

Kita reset graphic window Surpac, drag lah file intersect_topo_wd_ex3_v1.str dan wd_ex3_v1_clip

Minetech Indonesia Page 108


Tutorial Surpac 6 – Pit & Dump Design 2020

Lalu kita save lagi file nya, Layers > Save layer

Pada window Save File, File name : wd_ex3_v1_clip.str > Apply

Minetech Indonesia Page 109


Tutorial Surpac 6 – Pit & Dump Design 2020

Pada window Verify creation of file > Yes

Kemudian buatlah DTM file wd_ex3_v1_clip

Minetech Indonesia Page 110


Tutorial Surpac 6 – Pit & Dump Design 2020

Pada window Create a DTM from a string file, ketikan atau pilih
Location : wd_ex3_ v1_clip ; Object ID : 6
Strings to act as break lines (√) ; Would you like to clip the DTM to boundary after creation? (√) ;
Location : intersect_topo_wd_ex3_v1 ; String : 109 > Apply

Minetech Indonesia Page 111


Tutorial Surpac 6 – Pit & Dump Design 2020

Report file wd_ex3_v1_clip

Hasil DTM file wd_ex3_v1_clip.dtm

Minetech Indonesia Page 112


Tutorial Surpac 6 – Pit & Dump Design 2020

Kita reset graphic window Surpac

Tampilkan file string topo_ex3_clip_pit_v1.str dan intersect_topo_wd_ex3_v1.str

Kita coba clip lagi file DTM topo_ex3.dtm dengan file string wd_ex3_v1_clip.str Dari menu Edit >
Trim > Clip by selected segment

Pada window Select and clip data : inside the boundary > Apply

Minetech Indonesia Page 113


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil clip topo_ex3 dengan pit_ex3_v1_clip dan wd_ex3_v1_clip

Save lah file tersebut

Minetech Indonesia Page 114


Tutorial Surpac 6 – Pit & Dump Design 2020

Pada window Save File : topo_ex3_clip_pit_v1_wd_v1.str

Drag ketiga file string intersect_topo_pit_ex3_v1, intersect_topo_wd_ex3_v1 dan


topo_ex3_clip_pit_v1_wd_v1.str

Minetech Indonesia Page 115


Tutorial Surpac 6 – Pit & Dump Design 2020

Save file tersebut menjadi topo_ex3_clip_pit_v1_wd_v1.str

Window Verify creation of file > Yes

Minetech Indonesia Page 116


Tutorial Surpac 6 – Pit & Dump Design 2020

Drag bersamaan file intersect_topo_pit_v1.str dan intersect_topo_wd_ex3_v1

Gantilah segment number kedua segment tersebut menjadi 109

Minetech Indonesia Page 117


Tutorial Surpac 6 – Pit & Dump Design 2020

Dari menu Edit > Segment > Renumber

Pada window Renumber a segment ganti to string = 109 > Apply

Minetech Indonesia Page 118


Tutorial Surpac 6 – Pit & Dump Design 2020

Save file kedua segment hasil intersect topo tersebut menjadi file baru, window Save File ; File name
: intersect_topo_pit_v1_wd_v1.str > Apply

Minetech Indonesia Page 119


Tutorial Surpac 6 – Pit & Dump Design 2020

Buatlah DTM topo_ex3 yang sudah di clip oleh pit_ex3_v1 dan wd_ex3_v1
Pada window Create a DTM from a string file, ketikan atau pilih
Location : topo_ex3_clip_pit_v1_wd_v1 ; Object ID : 1
Strings to act as break lines (√) ; Would you like to clip the DTM to boundary after creation? (√) ;
Location : intersect_topo_pit_v1_wd_v1 ; String : 109 > Apply

Minetech Indonesia Page 120


Tutorial Surpac 6 – Pit & Dump Design 2020

Hasil DTM file topo_ex3_clip_pit_v1_wd_v1

Hasil DTM topo_ex3, pit_ex3_v1_clip dan wd_ex3_v1_clip

Ditampilkan pula blok model nya

Minetech Indonesia Page 121