Anda di halaman 1dari 2

DAFTAR IRIGASI KEWENANGAN KABUPATEN BELU

Luas Daerah Irigasi (Ha) KONDISI PADA TAHUN ANGGARAN 2021


TOTAL
NO KECAMATAN DESA NAMA DAERAH IRIGASI JENIS SALURAN PANJANG Keterangan
Rusak Rusak SALURAN
Fungsional Potensial Baku Baik Sedang
Ringan Berat
1 Raimanuk Teun DI. Teun 24.92 24.92 48.32 - 1,719.36 1,685.32 479.32 3,884.00
- Panjang Sal. Primer (M) 124.50 1,082.50 - 1,207.00
Rehabilitasi Saluran + Intake + Broncapterin
9° 21' 58.2" LS -124° 52' 51.2" BT - Panjang Sal. Sekunder (M) - 1,594.86 602.82 379.32 2,577.00
- Panjang Sal. Tersier (M) - - - 100.00 100.00
2 Leuntolu DI. Seopasar 3.28 3.28 11.78 - 511.00 65.00 - 576.00
- Panjang Sal. Primer (M) - 196.00 65.00 - 261.00 Rehab Saluran Irigasi + Rehab Intake (Alternatif
9° 17' 19,50" LS -124° 52' 13,60" BT - Panjang Sal. Sekunder (M) - 315.00 - - 315.00 Suplesi Sumur Bor)

- Panjang Sal. Tersier (M) - - - - -


3 Tasifeto Barat Naitimu DI. Halilulik 64.61 64.61 71.77 462.13 420.50 787.10 261.27 1,931.00
- Panjang Sal. Primer (M) - - 151.00 - 151.00
Rehab Saluran Irigas (Alternatif Supelsi Sumur Bor)
9° 16' 35,40" LS -124° 52' 34,30" BT - Panjang Sal. Sekunder (M) 462.13 420.50 636.10 41.27 1,560.00
- Panjang Sal. Tersier (M) - - - 220.00 220.00
4 Lawalutolus DI. Buburlaran 36.04 36.04 56.60 - 124.00 174.89 1,850.11 2,149.00
- Panjang Sal. Primer (M) - 124.00 110.00 50.00 284.00
(Banguna Embung Irigasi / Sumur Bor)
9° 16' 52.88" LS -124° 54' 13.73" BT - Panjang Sal. Sekunder (M) - - 64.89 973.11 1,038.00
- Panjang Sal. Tersier (M) - - - 827.00 827.00
5 Lookeu DI. Lookeu 9.76 9.76 41.43 128.00 414.00 1,244.00 - 1,786.00
- Panjang Sal. Primer (M) 128.00 102.00 - - 230.00 Rehab Saluran Irigas (Alternatif Supelsi Embung
9° 12' 33.70" LS -124° 56' 53.70" BT - Panjang Sal. Sekunder (M) - 312.00 1,244.00 - 1,556.00 Irigasi)

- Panjang Sal. Tersier (M) - - - - -


6 Derokfaturene DI. Lelowai 10.76 10.76 26.69 - 512.24 670.26 - 1,182.50
- Panjang Sal. Primer (M) - - 187.00 - 187.00
(Alternatif Supelsi Embung Irigasi / Sumur Bor)
9° 12' 26.03" LS -124° 55' 36.84" BT - Panjang Sal. Sekunder (M) - 512.24 483.26 - 995.50
- Panjang Sal. Tersier (M) - - - - -
7 DI. Tulatudik 34.51 34.51 34.51 - 806.23 1,226.42 120.00 2,152.65
- Panjang Sal. Primer (M) - 384.00 51.00 - 435.00
Rehab Saluran Irigasi + Rehab Intake
9° 13' 7.12" LS -124° 56' 56.17" BT - Panjang Sal. Sekunder (M) - 422.23 1,175.42 120.00 1,717.66
- Panjang Sal. Tersier (M) - - - - -
8 Bakustulama DI. Buitasik 58.22 58.22 83.09 - 1,225.52 285.10 313.38 1,824.00
- Panjang Sal. Primer (M) - 115.00 20.00 83.00 218.00 Rehabilitasi Saluran + Broncapterin (Alternatif Supelsi
9°14'40.60" LS -124°53'11.40" BT - Panjang Sal. Sekunder (M) - 1,110.52 265.10 230.38 1,606.00 Embung Irigasi / Sumur Bor)

- Panjang Sal. Tersier (M) - - - - -


9 DI. Halisikun 79.54 79.54 127.06 824.99 385.00 346.21 110.00 1,666.20
- Panjang Sal. Primer (M) 618.70 60.00 - - 678.70 Rehab Saluran Irigasi + Rehab Intake (Alternatif
9° 15' 12.02" LS -124° 54' 9.36" BT - Panjang Sal. Sekunder (M) 206.29 325.00 346.21 110.00 987.50 Supelsi Embung Irigasi / Sumur Bor)

- Panjang Sal. Tersier (M) - - - - -


10 Naekasa DI. Webuni 12.30 12.30 13.57 - 126.63 740.00 10.37 877.00
- Panjang Sal. Primer (M) - 68.63 20.00 10.37 99.00
(Alternatif Supelsi Embung Irigasi / Sumur Bor)
9°13'59.20" LS -124°50'51.80" BT - Panjang Sal. Sekunder (M) - 58.00 720.00 - 778.00
- Panjang Sal. Tersier (M) - - - -
11 DI. Wekari 5.82 5.82 10.90 - - - - -
- Panjang Sal. Primer (M) - - - -
LAHAN DAN JARINGAN RUSAK TOTAL
9° 11' 2.98" LS -124° 53' 13.99" BT - Panjang Sal. Sekunder (M) - - - -
- Panjang Sal. Tersier (M) - - - -
12 DI. Kimbana 11.30 11.30 11.92 - - 394.00 - 394.00
- Panjang Sal. Primer (M) - - 74.00 - 74.00
(Alternatif Supelsi Embung Irigasi / Sumur Bor)
9° 14' 26.09" LS -124° 51' 22.88" BT - Panjang Sal. Sekunder (M) - - 320.00 - 320.00
- Panjang Sal. Tersier (M) - - - - -
13 Tasifeto Timur Fatubaa DI. Taeksoruk 132.19 132.19 150.26 3,921.34 1,358.66 - - 5,280.00
- Panjang Sal. Primer (M) 650.00 - - 650.00
Rehab Saluran Irigasi + Rehab Intake
9°10'16.99" LS -124°56'14.71 BT - Panjang Sal. Sekunder (M) 3,271.34 1,358.66 - - 4,630.00
- Panjang Sal. Tersier (M) - - - - -
14 Takirin DI. Hasmetan 23.98 23.98 23.98 752.00 3,321.50 - 599.50 4,673.00
- Panjang Sal. Primer (M) 414.00 430.00 - - 414.00
Rehab Saluran Irigas
9° 9'9.28" LS -125° 0'27.75" BT - Panjang Sal. Sekunder (M) 338.00 2,891.50 - 599.50 3,829.00
- Panjang Sal. Tersier (M) - - - - 48.00
15 Manleten DI. Lalosuk 9.62 9.62 47.81 - 76.00 80.00 247.00 403.00
- Panjang Sal. Primer (M) - 76.00 - - 76.00
BELUM PEMUTAHIRAN DATA
9° 7' 41.38" LS-124° 54' 11.89" BT - Panjang Sal. Sekunder (M) - - 80.00 198.00 278.00
- Panjang Sal. Tersier (M) - - - 49.00 49.00
16 Bauho DI. Nubelu 85.91 85.91 119.51 1,869.20 415.00 685.80 - 2,970.00
- Panjang Sal. Primer (M) 224.00 - - - 244.00
Rencana Rehab Intake T.A 2022
9° 7'5.10" LS -124° 0'1.33" BT - Panjang Sal. Sekunder (M) 1,645.20 415.00 685.80 - 2,746.00
- Panjang Sal. Tersier (M) - - - - -
17 Halimodok DI. Halimodok 29.06 29.06 29.06 - - 1,306.00 963.00 2,269.00
- Panjang Sal. Primer (M) - 226.00 - 226.00
Rehab Saluran Irigas
9° 7'59.80" LS -125° 1'3.00" BT - Panjang Sal. Sekunder (M) - - 700.00 963.00 1,663.00
- Panjang Sal. Tersier (M) - - 380.00 - 380.00
18 Kian Raiikun DI. Raiikun 30.54 30.54 30.54 1,324.00 572.65 - 37.35 1,934.00
- Panjang Sal. Primer (M) 22.00 292.00 - - 314.00
Rehab Saluran Irigasi + Rehab Intake
9° 10' 52.43" LS -124° 54' 12.05" BT - Panjang Sal. Sekunder (M) 1,302.00 280.65 - 37.35 1,620.00
- Panjang Sal. Tersier (M) - - - -
19 Raihat Maumutin DI. Raimetan 115.99 115.99 115.99 413.40 76.60 - - 490.00
- Panjang Sal. Primer (M) 160.00 - - - 160.00
9° 0' 34.39" LS -125° 8' 34.93" BT - Panjang Sal. Sekunder (M) 253.40 76.60 - - 330.00
- Panjang Sal. Tersier (M) - - - - -
20 DI. Derok 57.63 57.63 60.44 - 621.40 817.60 - 1,439.00
- Panjang Sal. Primer (M) - 206.30 425.60 - 631.90
9° 0'42.06" LS -125° 7'27.02" BT - Panjang Sal. Sekunder (M) - 415.10 392.00 - 807.10
- Panjang Sal. Tersier (M) - - - - -
21 Lasiolat Fatulotu DI. Lahurus 13.70 13.70 13.70 - 433.03 1,020.67 - 1,453.70
- Panjang Sal. Primer (M) - - 464.70 - 464.70 Rehab Saluran Irigas + Pengamanan Sumber Mata Air
9° 4'26.00" LS -125° 2'49.60" BT - Panjang Sal. Sekunder (M) - 433.03 555.97 - 989.00 Lahurus

- Panjang Sal. Tersier (M) - - - - -


22 Raiulun DI. Dualasi Raiulun 1.93 1.93 4.66 - 797.50 1,017.00 40.00 1,854.50
- Panjang Sal. Primer (M) - 217.00 773.00 40.00 1,030.00
Rehab Saluran Irigasi + Rehab Intake
9° 5' 27.42" LS -125° 5' 25.45" BT - Panjang Sal. Sekunder (M) - 580.50 244.00 - 824.50
- Panjang Sal. Tersier (M) - - - -
23 Lamaknen Leowalu DI. Leowalu 32.02 32.02 36.77 - 465.47 999.54 - 1,465.00
- Panjang Sal. Primer (M) - 125.00 89.00 - 214.00
Rehab Saluran Irigasi + Rehab Intake
9° 6' 7.91" LS -125° 6' 57.72" BT - Panjang Sal. Sekunder (M) - 340.47 910.54 - 1,251.00
- Panjang Sal. Tersier (M) - - - - -
24 Lamaknen Selatan Ekin DI. Ekin 3.01 3.01 41.43 398.00 50.00 - - 448.00
- Panjang Sal. Primer (M) 50.00 - - - 50.00 Topografi Daerah irigasi curam sulit dilakukan
9° 6' 4,04" LS -125° 6' 52,95" BT - Panjang Sal. Sekunder (M) 348.00 50.00 - - 398.00 pengembangan luasan daerah irigasi

- Panjang Sal. Tersier (M) - - - - -

TOTAL PANJANG SALURAN DALAM KONDISI BAIK


TOTAL LUAS DAERAH IRIGASI KEWENAGAN KAB. BELU 886.95 886.95 1,211.77 85,841.11 96.7823552624161
Rasio Jaringan Irigasi = (Panjang saluran irigasi / Luas lahan budidaya pertanian)

(Keadaan Optimal) Rasio Jaringan Irigasi = (Panjang saluran irigasi / Luas lahan budidaya pertanian) 96.78

Anda mungkin juga menyukai