NO. URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA PPN TOTAL HARGA TOTAL HARGA KETERANGAN
VOLUME VOLUME
SATUAN (Rp) (Rp) 10% (Rp) (Rp) TAMBAH KURANG
I PEKERJAAN PERSIAPAN
1 Pemasangan bouwplank M' 90.00 32,649.31 2,938,437.90 - 2,938,437.90 82.00 2,677,243.42 - 8.00 8.00 VOL. BERKURANG
2 Pembersihan Lokasi Ls 1.00 200,000.00 200,000.00 - 200,000.00 1.00 200,000.00 - - TETAP