Anda di halaman 1dari 28

MATA PEMBAYARAN UTAMA

HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN VOLUME VOLUME JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 4 5 6
1 Pekerjaan Galian Tanah M3 0.69 0.69 61,600 42,504.00
1 Pekerjaan Galian Tanah M3 0.69 0.69 61,600.00 42,504.00
1 Pekerjaan Galian Tanah M3 0.69 0.69 61,600.00 42,504.00
1 Pekerjaan Galian Tanah M3 0.69 0.69 61,600.00 42,504.00
1 Pekerjaan Galian Tanah M3 0.69 0.69 61,600.00 42,504.00
1 Pekerjaan Galian Tanah M3 0.69 0.69 61,600.00 42,504.00
1 Pekerjaan Galian Tanah M3 0.69 0.69 61,600.00 42,504.00
1 Pekerjaan Galian Tanah M3 0.62 0.62 78,375.00 48,592.50
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 2.00 2.00 26,711.30 53,422.60
1 Pekerjaan Galian Tanah M3 0.69 0.69 78,375.00 54,078.75
4 Pekerjaan Lantai Beton K-175 T=10cm M3 0.06 0.06 1,368,181.18 82,090.87
2 Pekerjaan Urugan Pasir M3 0.60 0.60 139,920.00 83,952.00
2 Pekerjaan Urugan Pasir M3 0.60 0.60 139,920.00 83,952.00
4 Pas. Kuku Keramik Setara Mulia M 1.68 1.68 52,155.40 87,621.07
4 Pas. Kuku Keramik Setara Mulia M 1.70 1.70 52,155.40 88,664.18
2 Pekerjaan Urugan Pasir M3 0.60 0.60 148,775.00 89,265.00
2 Pekerjaan Urugan Pasir M3 0.60 0.60 148,775.00 89,265.00
2 Pekerjaan Urugan Pasir M3 0.60 0.60 148,775.00 89,265.00
5 Pemasangan Floor Drain Bh 2.00 2.00 46,997.50 93,995.00
5 Pekerjaan Pasir Urug Bawah Pondasi Telapak T=10 cm M3 0.50 0.50 192,720.00 96,360.00
5 Pekerjaan Pasir Urug Bawah Pondasi Telapak T=10 cm M3 0.50 0.50 192,720.00 96,360.00
4 Pas. Kuku Keramik Setara Mulia M 1.68 1.68 57,581.04 96,736.15
4 Pas. Kuku Keramik Setara Mulia M 1.68 1.68 57,581.04 96,736.15
4 Pas. Kuku Keramik Setara Mulia M 1.68 1.68 57,581.04 96,736.15
4 Pas. Kuku Keramik Setara Mulia M 1.68 1.68 57,581.04 96,736.15
4 Pas. Kuku Keramik M 1.60 1.60 61,336.00 98,137.60
1 Pekerjaan Galian Tanah Kanstin M3 1.17 1.17 85,800 100,386.00
1 Pekerjaan Galian Tanah Kanstin M3 1.17 1.17 85,800.00 100,386.00
4 Pas. Kuku Keramik M 1.68 1.68 61,336.00 103,044.48
4 Pas. Kuku Keramik M 1.68 1.68 61,336.00 103,044.48
4 Pekerjaan Lantai Beton K-175 T=10cm M3 0.11 0.11 950,680.76 104,574.88
4 Pekerjaan Lantai Beton K-175 T=10cm M3 0.11 0.11 971,484 106,863.29
2 Pekerjaan Urugan Tanah Kembali M3 1.79 1.79 61,600.00 110,264.00
4 Pekerjaan Lantai Beton K-175 T=10cm M3 0.11 0.11 1,007,250.36 110,797.54
4 Pekerjaan Lantai Beton K-175 T=10cm M3 0.11 0.11 1,007,250.36 110,797.54
4 Pekerjaan Lantai Beton K-175 T=10cm M3 0.11 0.11 1,007,250.36 110,797.54
4 Pekerjaan Lantai Beton K-175 T=10cm M3 0.11 0.11 1,021,594.36 112,375.38
4 Pekerjaan Lantai Beton K-175 T=10cm M3 0.11 0.11 1,021,594.36 112,375.38
4 Pas. Kuku Keramik Setara Mulia M 1.70 1.70 67,494 114,739.65
4 Pas. Kuku Keramik Setara Mulia M 1.70 1.70 67,494 114,739.65
4 Pas. Kuku Keramik Setara Mulia M 1.70 1.70 67,494 114,739.65
4 Pas. Kuku Keramik Setara Mulia M 1.70 1.70 67,494 114,739.65
4 Pas. Kuku Keramik Setara Mulia M 1.70 1.70 67,494 114,739.65
2 Pekerjaan Urugan Pasir M3 0.60 0.60 192,720.00 115,632.00
2 Pekerjaan Urugan Pasir M3 0.60 0.60 192,720.00 115,632.00
2 Pekerjaan Urugan Pasir M3 0.60 0.60 192,720.00 115,632.00
3 Pemasangan Lampu Downlight 6 Watt (Toilet) Setara Philips Bh 1.00 1.00 117,837.50 117,837.50
4 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,909 118,908.90
5 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,909 118,908.90
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,909 118,908.90
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,909 118,908.90
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,909 118,908.90
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,909 118,908.90
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
3 Pemasangan Lampu Downlight 6 Watt (Toilet) Setara Philips Bh 1.00 1.00 118,908.90 118,908.90
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
3 Pemasangan Lampu Downlight 6 Watt (Toilet) Setara Philips Bh 1.00 1.00 118,908.90 118,908.90
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 118,908.90 118,908.90
2 Pemasangan Lampu Downlight 12 Watt Setara Philips Bh 1.00 1.00 121,429.00 121,429.00
3 Pekerjaan Timbunan Pilihan M3 0.70 0.70 174,487.50 122,141.25
1 Pekerjaan Galian Tanah Kanstin M3 1.50 1.50 85,800.00 128,700.00
2 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 0.77 0.77 167,444 128,932.03
2 Pemasangan Lampu Downlight 12 Watt Setara Philips Bh 1.00 1.00 131,008.90 131,008.90
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 1.00 1.00 131,008.90 131,008.90
2 Pemasangan Lampu Downlight 12 Watt Setara Philips Bh 1.00 1.00 131,008.90 131,008.90
3 Pekerjaan Timbunan Pilihan M3 0.79 0.79 166,100 131,219.00
3 Pekerjaan Timbunan Pilihan M3 0.79 0.79 166,100.00 131,219.00
3 Pekerjaan Timbunan Pilihan M3 0.79 0.79 166,100.00 131,219.00
3 Pekerjaan Timbunan Pilihan M3 0.79 0.79 166,100.00 131,219.00
3 Pekerjaan Timbunan Pilihan M3 0.79 0.79 166,100.00 131,219.00
3 Pekerjaan Timbunan Pilihan M3 0.79 0.79 166,100.00 131,219.00
3 Pekerjaan Timbunan Pilihan M3 0.79 0.79 166,100.00 131,219.00
2 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 0.77 0.77 175,467.60 135,110.05
2 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 0.77 0.77 175,467.60 135,110.05
2 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 0.77 0.77 175,467.60 135,110.05
3 Pekerjaan Timbunan Pilihan M3 0.79 0.79 174,487.50 137,845.13
4 Pekerjaan Urugan Pasir M3 0.60 0.60 231,000 138,600.00
2 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 0.77 0.77 186,032.00 143,244.64
- Pekerjaan Beton M3 0.14 0.14 1,030,577.25 144,280.82
2 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 0.77 0.77 188,216.60 144,926.78
2 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 0.77 0.77 188,216.60 144,926.78
4 Pekerjaan Lantai Beton K-175 T=10cm M3 0.11 0.11 1,368,181.18 150,499.93
3 Pekerjaan Tanah Urug Pilihan M3 1.00 1.00 166,100.00 166,100.00
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 1.12 1.12 148,775.00 166,628.00
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 0.88 0.88 192,720.00 169,593.60
- Pekerjaan Beton M3 0.18 0.18 950,680.76 171,122.54
- Pekerjaan Beton M3 0.18 0.18 950,680.76 171,122.54
6 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 0.22 0.22 794,116.40 174,705.61
- Pekerjaan Beton M3 0.18 0.18 971,484 174,867.20
- Pekerjaan Beton M3 0.18 0.18 1,007,250.36 181,305.06
- Pekerjaan Beton M3 0.18 0.18 1,021,594.36 183,886.98
- Pekerjaan Beton M3 0.18 0.18 1,021,594.36 183,886.98
- Pekerjaan Beton M3 0.18 0.18 1,021,594.36 183,886.98
- Pekerjaan Beton M3 0.18 0.18 1,030,577.25 185,503.91
2 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 0.77 0.77 244,887.50 188,563.38
2 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 0.77 0.77 244,887.50 188,563.38
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 2.00 2.00 94,490.00 188,980.00
2 Pekerjaan Urugan Tanah Kembali M3 3.08 3.08 61,600.00 189,728.00
- Pekerjaan Beton M3 0.18 0.18 1,054,912 189,884.22
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 1.00 1.00 192,720.00 192,720.00
- Pekerjaan Beton M3 0.18 0.18 1,100,825.79 198,148.64
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 1.44 1.44 139,920.00 201,484.80
- Pekerjaan Beton M3 0.14 0.14 1,467,827.93 205,495.91
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 1.44 1.44 148,775.00 214,236.00
1 Pekerjaan Lantai Kerja Pondasi Telapak T=5 cm (Mutu f'= 7,4 Mpa / K-100) M3 0.25 0.25 866,909.21 216,727.30
- Pekerjaan Beton M3 0.23 0.23 950,680.76 218,656.58
- Pekerjaan Beton M3 0.23 0.23 950,680.76 218,656.58
- Pekerjaan Beton M3 0.23 0.23 971,484 223,441.42
4 Pas. Kuku Keramik Setara Mulia M 3.40 3.40 67,494 229,479.29
4 Pas. Kuku Keramik Setara Mulia M 3.40 3.40 67,494 229,479.29
5 Pekerjaan Pasir Urug Bawah Pondasi Telapak T=10 cm M3 1.20 1.20 192,720.00 231,264.00
- Pekerjaan Beton M3 0.23 0.23 1,007,250.36 231,667.58
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 2.00 2.00 116,490.00 232,980.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 2.00 2.00 116,490.00 232,980.00
- Pekerjaan Beton M3 0.23 0.23 1,021,594.36 234,966.70
- Pekerjaan Beton M3 0.23 0.23 1,021,594.36 234,966.70
1 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 2.00 2.00 118,909 237,817.80
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 2.00 2.00 118,908.90 237,817.80
6 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 0.32 0.32 758,289.40 242,652.61
- Pekerjaan Beton M3 0.18 0.18 1,368,181.18 246,272.61
- Pekerjaan Beton M3 0.18 0.18 1,368,181.18 246,272.61
8 Pemasangan Maintenance Hole Bh 1.00 1.00 250,000.00 250,000.00
8 Pemasangan Maintenance Hole Bh 1.00 1.00 250,000.00 250,000.00
8 Pemasangan Maintenance Hole Bh 1.00 1.00 250,000.00 250,000.00
8 Pemasangan Maintenance Hole Bh 1.00 1.00 250,000.00 250,000.00
8 Pemasangan Maintenance Hole Bh 1.00 1.00 250,000.00 250,000.00
8 Pemasangan Maintenance Hole Bh 1.00 1.00 250,000.00 250,000.00
3 Pekerjaan Pasir Urug Bawah Kanstin T=10 cm M3 1.82 1.82 139,920.00 254,654.40
4 Pas. Kuku Keramik Setara Mulia M 5.04 5.04 52,155.40 262,863.22
- Pekerjaan Beton M3 0.18 0.18 1,467,827.93 264,209.03
- Pekerjaan Beton M3 0.18 0.18 1,467,827.93 264,209.03
- Pekerjaan Beton M3 0.18 0.18 1,467,827.93 264,209.03
3 Pekerjaan Pasir Urug Bawah Kanstin T=10 cm M3 1.43 1.43 192,720.00 275,589.60
- Pekerjaan Beton M3 0.27 0.27 1,021,594.36 275,830.48
- Pekerjaan Beton M3 0.27 0.27 1,030,577.25 278,255.86
6 Pemasangan Floor Drain Bh 6.00 6.00 46,997.50 281,985.00
- Pekerjaan Beton M3 0.27 0.27 1,054,912 284,826.33
4 Pas. Kuku Keramik Setara Mulia M 5.04 5.04 57,581.04 290,208.44
4 Pas. Kuku Keramik Setara Mulia M 5.04 5.04 57,581.04 290,208.44
4 Pas. Kuku Keramik Setara Mulia M 5.04 5.04 57,581.04 290,208.44
6 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 0.32 0.32 907,308.38 290,338.68
4 Pas. Kuku Keramik M 4.80 4.80 61,336.00 294,412.80
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 11.00 11.00 26,766 294,422.04
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 11.00 11.00 26,765.64 294,422.04
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 11.00 11.00 26,765.64 294,422.04
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 11.00 11.00 26,765.64 294,422.04
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 7.00 7.00 42,441.30 297,089.10
- Pekerjaan Beton M3 0.27 0.27 1,100,825.79 297,222.96
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 2.00 2.00 148,775.00 297,550.00
4 Pekerjaan Pasangan Stop Kontak (Ruangan) Bh 1.00 1.00 301,482.50 301,482.50
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 2.16 2.16 139,920.00 302,227.20
2 Pekerjaan Urugan Tanah Kembali M3 3.92 3.92 78,375.00 307,230.00
1 Pekerjaan Galian Tanah Pondasi M3 3.59 3.59 85,800.00 308,022.00
4 Pas. Kuku Keramik M 5.04 5.04 61,336.00 309,133.44
4 Pas. Kuku Keramik Setara Mulia M 5.04 5.04 61,336.00 309,133.44
2 Pekerjaan Urugan Tanah Kembali M3 5.04 5.04 61,600 310,464.00
- Pekerjaan Beton M3 0.23 0.23 1,368,181.18 314,681.67
- Pekerjaan Beton M3 0.23 0.23 1,368,181.18 314,681.67
- Pekerjaan Bekisting M2 2.48 2.48 126,934.50 314,797.56
1 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 319,055 319,055.00
2 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 319,055 319,055.00
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 319,055 319,055.00
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 319,055.00 319,055.00
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 319,055.00 319,055.00
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 319,055.00 319,055.00
4 Pekerjaan Pengecatan Pintu & Jendela M2 2.00 2.00 160,525.75 321,051.50
4 Pekerjaan Pengecatan Pintu & Jendela M2 2.00 2.00 160,525.75 321,051.50
4 Pekerjaan Pengecatan Pintu & Jendela M2 2.00 2.00 160,525.75 321,051.50
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 2.16 2.16 148,775.00 321,354.00
1 Pekerjaan Pengecatan Pondasi Eksterior M2 6.50 6.50 50,402.00 327,613.00
6 Pemasangan Floor Drain Bh 7.00 7.00 46,997.50 328,982.50
- Pekerjaan Beton M3 0.23 0.23 1,467,827.93 337,600.42
- Pekerjaan Beton M3 0.36 0.36 950,680.76 342,245.07
- Pekerjaan Beton M3 0.36 0.36 950,680.76 342,245.07
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 1.79 1.79 192,720.00 344,968.80
6 Pekerjaan Acian Pondasi M2 6.50 6.50 53,652.50 348,741.25
- Pekerjaan Bekisting M2 2.48 2.48 142,557.80 353,543.34
4 Pas. Kuku Keramik Setara Mulia M 6.80 6.80 52,155.40 354,656.72
4 Pas. Kuku Keramik Setara Mulia M 5.80 5.80 61,336.00 355,748.80
5 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 3.00 3.00 118,909 356,726.70
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 3.00 3.00 118,908.90 356,726.70
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 3.00 3.00 118,908.90 356,726.70
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 3.00 3.00 118,908.90 356,726.70
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 3.00 3.00 118,908.90 356,726.70
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 3.00 3.00 118,908.90 356,726.70
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 3.00 3.00 118,908.90 356,726.70
2 Pekerjaan Pipa PVC AW 1" (Air bersih) M 10.00 10.00 35,947 359,467.49
2 Pekerjaan Pipa PVC AW 1" (Air bersih) M 10.00 10.00 35,946.75 359,467.49
2 Pekerjaan Pipa PVC AW 1" (Air bersih) M 10.00 10.00 35,946.75 359,467.49
2 Pekerjaan Pipa PVC AW 1" (Air bersih) M 10.00 10.00 35,946.75 359,467.49
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 121,429.00 364,287.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 121,429.00 364,287.00
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 42,592.00 367,994.88
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 42,592.00 367,994.88
- Pekerjaan Beton M3 0.33 0.33 1,117,721.79 368,848.19
- Pekerjaan Beton M3 0.33 0.33 1,117,721.79 368,848.19
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 42,828 370,033.49
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 43,307.00 374,172.48
3 Pemasangan Pipa PVC 3/4" M 14.00 14.00 26,765.64 374,718.96
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 43,450.00 375,408.00
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 2.70 2.70 139,920.00 377,784.00
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 2.56 2.56 148,775.00 380,864.00
2 Pemasangan Lampu Downlight 24 Watt (Ruangan) Bh 2.00 2.00 193,490.00 386,980.00
6 Pekerjaan Acian Pondasi M2 9.00 9.00 43,450.00 391,050.00
4 Pas. Kuku Keramik Setara Mulia M 6.80 6.80 57,653.64 392,044.75
4 Pas. Kuku Keramik Setara Mulia M 6.80 6.80 57,653.64 392,044.75
4 Pas. Kuku Keramik Setara Mulia M 6.80 6.80 57,653.64 392,044.75
4 Pas. Kuku Keramik Setara Mulia M 6.80 6.80 57,653.64 392,044.75
5 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,009 393,026.70
6 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,009 393,026.70
7 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,009 393,026.70
8 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,009 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 3.00 3.00 131,008.90 393,026.70
2 Pekerjaan Urugan Tanah Kembali M3 5.04 5.04 78,375.00 395,010.00
- Pekerjaan Beton M3 0.27 0.27 1,467,827.93 396,313.54
- Pekerjaan Beton M3 0.27 0.27 1,467,827.93 396,313.54
- Pekerjaan Bekisting M2 4.40 4.40 91,212.00 401,332.80
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 2.70 2.70 148,775.00 401,692.50
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 405,762.50 405,762.50
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 405,762.50 405,762.50
3 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 405,762.50 405,762.50
4 Pekerjaan Pasangan Saklar Tunggal (Toilet) Bh 1.00 1.00 405,762.50 405,762.50
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 1.00 1.00 405,762.50 405,762.50
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 2.16 2.16 192,720.00 416,275.20
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 2.16 2.16 192,720.00 416,275.20
1 Pekerjaan Galian Tanah Kanstin M3 4.91 4.91 85,800.00 421,278.00
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.00 8.00 53,652.50 429,220.00
5 Pemasangan Floor Drain Bh 2.00 2.00 214,720.00 429,440.00
- Pekerjaan Beton M3 0.32 0.32 1,368,181.18 437,817.98
2 Pekerjaan Urugan Tanah Kembali M3 7.12 7.12 61,600.00 438,592.00
- Pekerjaan Beton M3 0.43 0.43 1,030,577.25 443,148.22
- Pekerjaan Beton M3 0.43 0.43 1,030,577.25 443,148.22
3 Pekerjaan Tanah Urug Pilihan M3 2.70 2.70 166,100.00 448,470.00
- Pekerjaan Beton M3 0.43 0.43 1,054,912 453,612.31
3 Pas. Kuku Keramik (Pintu & Teras) M 7.40 7.40 61,336.00 453,886.40
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 53,652.50 463,557.60
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 53,652.50 463,557.60
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 53,652.50 463,557.60
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 53,652.50 463,557.60
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 8.64 8.64 53,652.50 463,557.60
2 Pekerjaan Urugan Tanah Kembali M3 7.56 7.56 61,600 465,696.00
2 Pekerjaan Urugan Tanah Kembali M3 7.56 7.56 61,600.00 465,696.00
2 Pekerjaan Urugan Tanah Kembali M3 7.56 7.56 61,600.00 465,696.00
2 Pekerjaan Urugan Tanah Kembali M3 7.56 7.56 61,600.00 465,696.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 4.00 4.00 116,490.00 465,960.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 4.00 4.00 116,490.00 465,960.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 4.00 4.00 116,490.00 465,960.00
3 Pekerjaan Tanah Urug Pilihan M3 2.70 2.70 174,487.50 471,116.25
2 Pemasangan Lampu Downlight 6 Watt (Toilet) Setara Philips Bh 4.00 4.00 117,837.50 471,350.00
- Pekerjaan Beton M3 0.43 0.43 1,100,825.79 473,355.09
- Pekerjaan Beton M3 0.47 0.47 1,007,250.36 473,407.67
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 4.00 4.00 118,908.90 475,635.60
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 4.00 4.00 118,908.90 475,635.60
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 4.00 4.00 118,908.90 475,635.60
- Pekerjaan Bekisting M2 3.60 3.60 132,480.33 476,929.20
- Pekerjaan Bekisting M2 3.60 3.60 132,480.33 476,929.20
- Pekerjaan Beton M3 0.47 0.47 1,021,594.36 480,149.35
- Pekerjaan Beton M3 0.43 0.43 1,117,721.79 480,620.37
- Pekerjaan Bekisting M2 5.60 5.60 86,269.33 483,108.27
4 Pas. Kuku Keramik Setara Mulia M 8.40 8.40 57,653.64 484,290.58
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 3.28 3.28 148,775.00 487,982.00
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 3.28 3.28 148,775.00 487,982.00
- Pekerjaan Beton M3 0.36 0.36 1,368,181.18 492,545.22
- Pekerjaan Beton M3 0.36 0.36 1,368,181.18 492,545.22
3 Pemasangan Pipa PVC 3/4" M 18.47 18.47 26,765.64 494,361.37
8 Pekerjaan Rabat Beton Keliling Bangunan M3 0.65 0.65 764,903 497,186.69
3 Pas. Kuku Keramik Setara Mulia M 9.55 9.55 52,155.40 498,084.07
3 Pas. Kuku Keramik Setara Mulia M 9.55 9.55 52,155.40 498,084.07
- Pekerjaan Pembesian Ulir 13 Kg 26.30 26.30 18,971.70 498,955.71
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 2.16 2.16 231,000 498,960.00
8 Pemasangan Maintenance Hole Bh 2.00 2.00 250,000 500,000.00
8 Pemasangan Maintenance Hole Bh 2.00 2.00 250,000.00 500,000.00
8 Pemasangan Maintenance Hole Bh 2.00 2.00 250,000.00 500,000.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 12.00 12.00 42,441.30 509,295.60
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 0.65 0.65 785,316.40 510,455.66
- Pekerjaan Pembesian Ulir 13 Kg 26.30 26.30 19,428.75 510,976.13
6 Pekerjaan Acian Pondasi M2 12.00 12.00 42,592.00 511,104.00
4 Pekerjaan Pengecatan Pintu dan Jendela Setara Jotun M2 19.25 19.25 26,711.30 514,192.53
4 Pekerjaan Pengecatan Pintu dan Jendela Setara Jotun M2 19.25 19.25 26,711.30 514,192.53
4 Pekerjaan Pengecatan Pintu dan Jendela Setara Jotun M2 19.25 19.25 26,711.30 514,192.53
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 19.25 19.25 26,711.30 514,192.53
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 19.25 19.25 26,711.30 514,192.53
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 3.68 3.68 139,920.00 514,905.60
4 Pas. Kuku Keramik M 8.40 8.40 61,336.00 515,222.40
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 0.65 0.65 794,116.40 516,175.66
2 Pekerjaan Urugan Tanah Kembali M3 8.40 8.40 61,600 517,440.00
1 Pekerjaan Lantai Kerja Pondasi Telapak T=5 cm (Mutu f'= 7,4 Mpa / K-100) M3 0.60 0.60 866,909.21 520,145.53
- Pekerjaan Beton M3 0.36 0.36 1,467,827.93 528,418.05
4 Pas. Kuku Keramik Setara Mulia M 10.20 10.20 52,155.40 531,985.08
4 Pas. Kuku Keramik Setara Mulia M 10.20 10.20 52,155.40 531,985.08
- Pekerjaan Bekisting M2 3.60 3.60 148,855.67 535,880.40
- Pekerjaan Beton M3 0.54 0.54 1,007,250.36 543,915.19
- Pekerjaan Bekisting M2 6.40 6.40 85,290.33 545,858.13
2 Pekerjaan Urugan Tanah Kembali M3 7.00 7.00 78,375.00 548,625.00
3 Pas. Kuku Keramik Setara Mulia M 9.55 9.55 57,581.04 549,898.93
3 Pas. Kuku Keramik Setara Mulia M 9.55 9.55 57,653.64 550,592.26
3 Pas. Kuku Keramik Setara Mulia M 9.55 9.55 57,653.64 550,592.26
- Pekerjaan Beton M3 0.54 0.54 1,021,594.36 551,660.95
8 Pekerjaan Acian Kolom 20/20 M2 12.96 12.96 42,592.00 551,992.32
- Pekerjaan Bekisting M2 6.40 6.40 86,269.33 552,123.73
- Pekerjaan Beton M3 0.54 0.54 1,030,577.25 556,511.72
- Pekerjaan Beton M3 0.54 0.54 1,030,577.25 556,511.72
- Pekerjaan Bekisting M2 3.60 3.60 155,091 558,327.00
8 Pekerjaan Acian Kolom 20/20 M2 12.96 12.96 43,450.00 563,112.00
- Pekerjaan Bekisting M2 7.20 7.20 79,167.00 570,002.40
3 Pekerjaan Pasangan Saklar Ganda (Ruangan) Bh 1.00 1.00 570,762.50 570,762.50
5 Pekerjaan Pasangan Saklar Ganda (Ruangan) Bh 1.00 1.00 570,762.50 570,762.50
5 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 1.00 1.00 570,762.50 570,762.50
5 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 1.00 1.00 570,762.50 570,762.50
5 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 1.00 1.00 570,762.50 570,762.50
5 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 1.00 1.00 570,762.50 570,762.50
5 Pekerjaan Pasangan Saklar Ganda (Toilet) Bh 1.00 1.00 570,762.50 570,762.50
4 Pekerjaan Pasangan Saklar Ganda Bh 1.00 1.00 570,762.50 570,762.50
3 Pembuatan Papan Proyek Bh 1.00 1.00 570,827 570,827.05
- Pekerjaan Bekisting M2 4.50 4.50 126,934.50 571,205.25
4 Pas. Kuku Keramik Setara Mulia M 8.50 8.50 67,494 573,698.24
- Pekerjaan Bekisting M2 3.60 3.60 159,562.33 574,424.40
- Pekerjaan Bekisting M2 3.60 3.60 159,562.33 574,424.40
4 Pekerjaan Acian Kolom K1 20/25 M2 10.80 10.80 53,652.50 579,447.00
4 Pekerjaan Acian Dinding M2 10.80 10.80 53,652.50 579,447.00
1 Pekerjaan Pembongkaran Atap M2 85.13 85.13 6,820 580,586.60
3 Pas. Kuku Keramik M 9.55 9.55 61,336.00 585,758.80
3 Pas. Kuku Keramik M 9.55 9.55 61,336.00 585,758.80
3 Pas. Kuku Keramik Setara Mulia M 9.55 9.55 61,336.00 585,758.80
- Pekerjaan Beton M3 0.43 0.43 1,368,181.18 588,317.91
- Pekerjaan Beton M3 0.72 0.72 818,264.86 589,150.70
- Pekerjaan Beton M3 0.72 0.72 818,264.86 589,150.70
8 Pekerjaan Rabat Beton Keliling Bangunan M3 0.65 0.65 907,308.38 589,750.45
3 Pembuatan Papan Proyek Bh 1.00 1.00 590,462.05 590,462.05
3 Pembuatan Papan Proyek Bh 1.00 1.00 592,112.05 592,112.05
3 Pembuatan Papan Proyek Bh 1.00 1.00 592,112.05 592,112.05
2 Pekerjaan Urugan Tanah Kembali M3 7.56 7.56 78,375.00 592,515.00
3 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 5.00 5.00 118,909 594,544.50
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 5.00 5.00 118,908.90 594,544.50
9 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,402 594,803.00
10 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,402 594,803.00
11 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,402 594,803.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,402 594,803.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,401.50 594,803.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,401.50 594,803.00
5 Pekerjaan Pasangan Stop Kontak (Ruangan) Bh 2.00 2.00 297,401.50 594,803.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,401.50 594,803.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,401.50 594,803.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,401.50 594,803.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,401.50 594,803.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,401.50 594,803.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 297,401.50 594,803.00
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 4.00 4.00 148,775.00 595,100.00
- Pekerjaan Beton M3 0.72 0.72 834,550 600,876.14
1 Pekerjaan Pembongkaran Atap M2 68.38 68.38 8,800.00 601,744.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 301,482.50 602,965.00
5 Pekerjaan Pasangan Stop Kontak (Ruangan) Bh 2.00 2.00 301,482.50 602,965.00
6 Pekerjaan Pasangan Stop Kontak (Toilet) Bh 2.00 2.00 301,482.50 602,965.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 301,482.50 602,965.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 2.00 2.00 301,482.50 602,965.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 12.00 12.00 50,402.00 604,824.00
2 Pekerjaan Pipa PVC AW 1" (Kotor) M 17.00 17.00 35,946.75 611,094.73
3 Pekerjaan Pasir Urug Bawah Kanstin T=10 cm M3 1.43 1.43 430,320 615,357.60
3 Pembuatan Papan Proyek Bh 1.00 1.00 615,960.00 615,960.00
- Pekerjaan Beton M3 0.72 0.72 856,041.21 616,349.67
- Pekerjaan Beton M3 0.42 0.42 1,467,827.93 616,487.73
- Pekerjaan Beton M3 0.42 0.42 1,467,827.93 616,487.73
3 Pembuatan Papan Proyek Bh 1.00 1.00 618,572.55 618,572.55
- Pekerjaan Bekisting M2 7.20 7.20 86,269.33 621,139.20
- Pekerjaan Beton M3 0.72 0.72 866,909.21 624,174.63
- Pekerjaan Beton M3 0.72 0.72 866,909.21 624,174.63
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 4.20 4.20 148,775.00 624,855.00
2 Pekerjaan Urugan Tanah Kembali M3 8.00 8.00 78,375.00 627,000.00
- Pekerjaan Beton M3 0.43 0.43 1,467,827.93 631,166.01
- Pekerjaan Beton M3 0.43 0.43 1,467,827.93 631,166.01
- Pekerjaan Beton M3 0.43 0.43 1,467,827.93 631,166.01
- Pekerjaan Beton M3 0.43 0.43 1,467,827.93 631,166.01
- Pekerjaan Beton M3 0.43 0.43 1,467,827.93 631,166.01
- Pekerjaan Beton M3 0.43 0.43 1,467,827.93 631,166.01
- Pekerjaan Bekisting M2 4.80 4.80 132,480.33 635,905.60
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 15.00 15.00 42,441 636,619.50
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 15.00 15.00 42,441.30 636,619.50
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 15.00 15.00 42,441.30 636,619.50
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 15.00 15.00 42,441.30 636,619.50
2 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 2.00 2.00 319,055 638,110.00
6 Pekerjaan Acian Pondasi M2 15.00 15.00 42,592.00 638,880.00
6 Pekerjaan Acian Pondasi M2 15.00 15.00 42,828 642,419.25
1 Pekerjaan Galian Pondasi Telapak M3 7.50 7.50 85,800.00 643,500.00
1 Pekerjaan Galian Pondasi Telapak M3 7.50 7.50 85,800.00 643,500.00
6 Pekerjaan Acian Pondasi M2 12.00 12.00 53,652.50 643,830.00
5 Pemasangan Floor Drain Bh 3.00 3.00 214,720.00 644,160.00
3 Pas. Kuku Keramik Setara Mulia M 9.55 9.55 67,494 644,566.84
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 15.20 15.20 42,441 645,107.76
2 Pekerjaan Pipa PVC AW 1" (Air Kotor) M 18.00 18.00 35,946.75 647,041.48
6 Pekerjaan Acian Pondasi M2 15.00 15.00 43,307.00 649,605.00
6 Pekerjaan Acian Pondasi M2 15.00 15.00 43,450.00 651,750.00
4 Pekerjaan Nok Atap Metal Berpasir M 6.00 6.00 109,010.00 654,060.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 15.60 15.60 42,441.30 662,084.28
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 25.00 25.00 26,765.64 669,141.00
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 25.00 25.00 26,765.64 669,141.00
- Pekerjaan Beton M3 0.65 0.65 1,030,577.25 669,875.22
- Pekerjaan Bekisting M2 5.40 5.40 126,934.50 685,446.30
- Pekerjaan Bekisting M2 5.40 5.40 126,934.50 685,446.30
4 Pas. Kuku Keramik Setara Mulia M 10.20 10.20 67,494 688,437.88
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 12.96 12.96 53,652.50 695,336.40
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 12.96 12.96 53,652.50 695,336.40
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 12.96 12.96 53,652.50 695,336.40
8 Pekerjaan Acian Kolom 20/20 M2 12.96 12.96 53,652.50 695,336.40
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 6.00 6.00 116,490.00 698,940.00
- Pekerjaan Beton M3 0.48 0.48 1,467,827.93 704,557.40
- Pekerjaan Beton M3 0.48 0.48 1,467,827.93 704,557.40
1 Pekerjaan Pengecatan Pondasi Eksterior M2 14.00 14.00 50,402.00 705,628.00
2 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 6.00 6.00 118,909 713,453.40
- Pekerjaan Beton M3 0.72 0.72 996,477.51 717,463.81
- Pekerjaan Beton M3 0.72 0.72 996,477.51 717,463.81
4 Pas. Kuku Keramik M 11.76 11.76 61,336.00 721,311.36
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 17.00 17.00 42,441 721,502.10
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 17.00 17.00 42,441 721,502.10
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 17.00 17.00 42,441.30 721,502.10
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 17.00 17.00 42,441.30 721,502.10
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 17.00 17.00 42,441.30 721,502.10
- Pekerjaan Beton M3 0.65 0.65 1,117,721.79 726,519.16
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 6.00 6.00 121,429.00 728,574.00
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 4.90 4.90 148,775.00 728,997.50
3 Pekerjaan Tanah Urug Pilihan M3 4.20 4.20 174,487.50 732,847.50
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 367,317.50 734,635.00
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 367,317.50 734,635.00
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 367,317.50 734,635.00
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 367,317.50 734,635.00
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 367,317.50 734,635.00
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 367,317.50 734,635.00
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 367,317.50 734,635.00
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 367,317.50 734,635.00
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 367,317.50 734,635.00
4 Pekerjaan Pasangan Saklar Ganda Bh 1.00 1.00 744,425.00 744,425.00
5 Pekerjaan Pasangan Saklar Ganda (Ruangan) Bh 1.00 1.00 744,425.00 744,425.00
4 Pekerjaan Pasangan Saklar Ganda Bh 1.00 1.00 744,425.00 744,425.00
5 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 1.00 1.00 744,425.00 744,425.00
4 Pekerjaan Pasangan Saklar Tunggal Bh 1.00 1.00 744,425.00 744,425.00
5 Pekerjaan Pasangan Saklar Ganda (Ruangan) Bh 1.00 1.00 744,425.00 744,425.00
6 Pekerjaan Acian Pondasi M2 14.00 14.00 53,652.50 751,135.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 17.78 17.78 42,441 754,606.31
- Pekerjaan Pembesian Polos 12 Kg 39.80 39.80 18,971.70 755,073.66
- Pekerjaan Pembesian Polos 12 Kg 39.80 39.80 18,971.70 755,073.66
- Pekerjaan Pembesian Polos 12 Kg 39.80 39.80 18,971.70 755,073.66
- Pekerjaan Pembesian Polos 12 Kg 39.80 39.80 18,971.70 755,073.66
- Pekerjaan Pembesian Polos 12 Kg 39.80 39.80 18,971.70 755,073.66
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 5.40 5.40 139,920.00 755,568.00
1 Pekerjaan Pengecatan Pondasi Eksterior M2 15.00 15.00 50,402.00 756,030.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 6.50 6.50 116,373.40 756,427.10
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 380,706.95 761,413.91
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 380,706.95 761,413.91
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 380,706.95 761,413.91
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 381,182.85 762,365.69
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 381,436.15 762,872.30
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 381,436.15 762,872.30
1 Splitzen Tembaga Ø 1" Lengkap dengan Connecting Sleeve dan Tiang Dudukan Pipa Galvanis 3/4" Unit 2.00 2.00 381,436.15 762,872.30
4 Pekerjaan Nok Atap Metal Berpasir M 7.00 7.00 109,010.00 763,070.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 18.00 18.00 42,441.30 763,943.40
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 18.00 18.00 42,441.30 763,943.40
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 18.00 18.00 42,441.30 763,943.40
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 18.00 18.00 42,441.30 763,943.40
- Pekerjaan Bekisting M2 5.40 5.40 142,557.80 769,812.12
8 Pekerjaan Acian Kolom K1 20/25 M2 14.40 14.40 53,652.50 772,596.00
- Pekerjaan Pembesian Polos 12 Kg 39.80 39.80 19,428.75 773,264.25
- Pekerjaan Pembesian Polos 12 Kg 39.80 39.80 19,428.75 773,264.25
- Pekerjaan Pembesian Polos 12 Kg 39.80 39.80 19,428.75 773,264.25
- Pekerjaan Bekisting (3x pakai) M2 4.50 4.50 172,107.83 774,485.25
- Pekerjaan Bekisting M2 4.50 4.50 172,107.83 774,485.25
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 18.50 18.50 42,441.30 785,164.05
1 Pekerjaan Pondasi Batu Kosong M3 1.76 1.76 446,391.00 785,648.16
2 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 6.00 6.00 131,009 786,053.40
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 6.00 6.00 131,009 786,053.40
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 6.00 6.00 131,009 786,053.40
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 6.00 6.00 131,008.90 786,053.40
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 6.00 6.00 131,008.90 786,053.40
3 Pemasangan Lampu Downlight 12 Watt Setara Philips Bh 6.00 6.00 131,008.90 786,053.40
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 6.00 6.00 131,008.90 786,053.40
3 Pekerjaan Pasir Urug Bawah Kanstin T=10 cm M3 4.10 4.10 192,720.00 790,152.00
- Pekerjaan Beton M3 0.54 0.54 1,467,827.93 792,627.08
- Pekerjaan Beton M3 0.54 0.54 1,467,827.93 792,627.08
- Pekerjaan Beton M3 0.54 0.54 1,467,827.93 792,627.08
1 Pekerjaan Galian Pondasi Batu Belah M3 9.24 9.24 85,800.00 792,792.00
2 Pekerjaan Urugan Tanah Kembali M3 12.88 12.88 61,600.00 793,408.00
- Pekerjaan Bekisting M2 6.30 6.30 126,934.50 799,687.35
- Pekerjaan Pembesian Polos 12 Kg 39.80 39.80 20,094 799,729.26
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 5.40 5.40 148,775.00 803,385.00
4 Pekerjaan Nok Atap Metal Berpasir M 8.35 8.35 96,250 803,687.50
6 Pekerjaan Acian Pondasi M2 15.00 15.00 53,652.50 804,787.50
- Pekerjaan Bekisting M2 5.40 5.40 149,142 805,365.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 19.00 19.00 42,441.30 806,384.70
1 Pekerjaan Pengecatan Pondasi Eksterior M2 16.00 16.00 50,402.00 806,432.00
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 93,450.72 807,414.22
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 93,450.72 807,414.22
6 Pekerjaan Acian Pondasi M2 19.00 19.00 42,592.00 809,248.00
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 5.44 5.44 148,775.00 809,336.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 7.00 7.00 116,490.00 815,430.00
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 94,442 815,978.47
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 94,647.52 817,754.57
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 95,013.60 820,917.50
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 95,390.90 824,177.38
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 95,390.90 824,177.38
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 95,390.90 824,177.38
2 Pemasangan Lampu Downlight 6 Watt (Toilet) Setara Philips Bh 7.00 7.00 117,837.50 824,862.50
- Pekerjaan Bekisting (3x pakai) M2 4.80 4.80 172,107.83 826,117.60
- Pekerjaan Bekisting M2 4.80 4.80 172,107.83 826,117.60
- Pekerjaan Bekisting M2 5.40 5.40 153,264.47 827,628.12
- Pekerjaan Bekisting M2 5.40 5.40 153,264.47 827,628.12
4 Pekerjaan Nok Atap Metal Berpasir M 8.80 8.80 94,050.00 827,640.00
2 Pemasangan Kabel BC 25 mm M 14.00 14.00 59,152.50 828,135.00
2 Pemasangan Lampu Downlight 6 Watt (Toilet) Setara Philips Bh 7.00 7.00 118,909 832,362.30
2 Pemasangan Lampu Downlight 6 Watt (Toilet) Setara Philips Bh 7.00 7.00 118,908.90 832,362.30
2 Pemasangan Lampu Downlight 6 Watt (Toilet) Setara Philips Bh 7.00 7.00 118,908.90 832,362.30
2 Pemasangan Lampu Downlight 6 Watt (Toilet) Setara Philips Bh 7.00 7.00 118,908.90 832,362.30
- Pekerjaan Beton M3 0.81 0.81 1,030,577.25 834,767.58
- Pekerjaan Beton M3 0.81 0.81 1,030,577.25 834,767.58
- Pekerjaan Bekisting M2 6.60 6.60 126,934.50 837,767.70
4 Pekerjaan Nok Atap Metal Berpasir M 8.80 8.80 96,250 847,000.00
4 Pekerjaan Nok Atap Metal Berpasir M 8.80 8.80 96,250.00 847,000.00
4 Pekerjaan Nok Atap Metal Berpasir M 8.80 8.80 96,250.00 847,000.00
- Pekerjaan Pembesian Ulir 12 Kg 44.66 44.66 18,971.70 847,276.12
- Pekerjaan Pembesian Ulir 12 Kg 44.66 44.66 18,971.70 847,276.12
- Pekerjaan Pembesian Ulir 12 Kg 44.66 44.66 18,971.70 847,276.12
- Pekerjaan Beton M3 0.77 0.77 1,100,825.79 847,635.86
- Pekerjaan Beton M3 0.81 0.81 1,054,912 854,479.00
- Pekerjaan Beton M3 0.81 0.81 1,054,912 854,479.00
3 Pekerjaan Tanah Urug Pilihan M3 4.90 4.90 174,487.50 854,988.75
- Pekerjaan Bekisting M2 10.80 10.80 79,167.00 855,003.60
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 9.00 9.00 95,013.60 855,122.40
1 Pekerjaan Pengecatan Pondasi Eksterior M2 17.00 17.00 50,402.00 856,834.00
1 Pekerjaan Pengecatan Pondasi Eksterior M2 17.00 17.00 50,402.00 856,834.00
- Pekerjaan Bekisting M2 10.00 10.00 86,269.33 862,693.33
- Pekerjaan Bekisting M2 10.00 10.00 86,269.33 862,693.33
- Pekerjaan Pembesian Ulir 13 Kg 44.66 44.66 19,428.75 867,687.98
- Pekerjaan Pembesian Polos 12 Kg 44.66 44.66 19,428.75 867,687.98
1 Pekerjaan Pembongkaran Atap M2 127.58 127.58 6,820.00 870,095.60
1 Pekerjaan Pembongkaran Atap M2 127.58 127.58 6,820.00 870,095.60
1 Pekerjaan Pembongkaran Atap M2 127.58 127.58 6,820.00 870,095.60
- Pekerjaan Bekisting M2 4.50 4.50 193,699.00 871,645.50
- Pekerjaan Bekisting M2 4.50 4.50 193,699.00 871,645.50
5 Pekerjaan Railing Pipa Stainless D 2" M 5.00 5.00 175,450.00 877,250.00
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 887,270.77 887,270.77
2 Pekerjaan Urugan Tanah Kembali M3 11.33 11.33 78,375.00 887,988.75
- Pekerjaan Beton M3 0.81 0.81 1,100,825.79 891,668.89
- Pekerjaan Beton M3 0.81 0.81 1,100,825.79 891,668.89
6 Pekerjaan Pasangan Stop Kontak Bh 3.00 3.00 297,401.50 892,204.50
6 Pekerjaan Pasangan Stop Kontak (Ruangan & Rg. Alat) Bh 3.00 3.00 297,401.50 892,204.50
6 Pekerjaan Pasangan Stop Kontak (Ruangan & Rg. Alat) Bh 3.00 3.00 297,401.50 892,204.50
3 Pekerjaan Tanah Urug Pilihan M3 5.40 5.40 166,100 896,940.00
3 Pekerjaan Tanah Urug Pilihan M3 5.40 5.40 166,100.00 896,940.00
3 Pekerjaan Tanah Urug Pilihan M3 5.40 5.40 166,100.00 896,940.00
3 Pekerjaan Tanah Urug Pilihan M3 5.40 5.40 166,100.00 896,940.00
- Pekerjaan Pembesian Ulir 12 Kg 44.66 44.66 20,094 897,384.64
2 Pekerjaan Urugan Tanah Kembali M3 11.48 11.48 78,375.00 899,745.00
2 Pekerjaan Urugan Tanah Kembali M3 11.48 11.48 78,375.00 899,745.00
2 Pekerjaan Urugan Tanah Kembali M3 11.48 11.48 78,375.00 899,745.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 21.20 21.20 42,441.30 899,755.56
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 21.20 21.20 42,441.30 899,755.56
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 13.00 13.00 69,217.50 899,827.50
- Pekerjaan Bekisting M2 4.50 4.50 200,897 904,035.00
6 Pekerjaan Pasangan Stop Kontak (Ruangan) Bh 3.00 3.00 301,482.50 904,447.50
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 3.00 3.00 301,482.50 904,447.50
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 6.08 6.08 148,775.00 904,552.00
- Pekerjaan Beton M3 0.81 0.81 1,117,721.79 905,354.65
- Pekerjaan Beton M3 0.81 0.81 1,117,721.79 905,354.65
4 Pas. Kuku Keramik M 14.80 14.80 61,336.00 907,772.80
4 Pas. Kuku Keramik M 14.80 14.80 61,336.00 907,772.80
6 Pekerjaan Acian Pondasi M2 17.00 17.00 53,652.50 912,092.50
6 Pekerjaan Acian Pondasi M2 17.00 17.00 53,652.50 912,092.50
2 Pekerjaan Pipa PVC AW 1" (Kotor) M 25.50 25.50 35,946.75 916,642.09
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 7.00 7.00 131,009 917,062.30
4 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 7.00 7.00 131,009 917,062.30
6 Pekerjaan Acian Pondasi M2 21.20 21.20 43,307.00 918,108.40
- Pekerjaan Bekisting M2 4.50 4.50 204,405.67 919,825.50
- Pekerjaan Bekisting M2 4.50 4.50 204,405.67 919,825.50
- Pekerjaan Bekisting M2 4.50 4.50 204,405.67 919,825.50
6 Pemasangan Kloset Jongkok + Aksesoris Bh 1.00 1.00 920,436.00 920,436.00
6 Pekerjaan Acian Pondasi M2 21.20 21.20 43,450.00 921,140.00
6 Pemasangan Kloset Jongkok + Aksesoris Bh 1.00 1.00 921,822.00 921,822.00
1 Pekerjaan Pembongkaran Atap M2 135.44 135.44 6,820.00 923,700.80
- Pekerjaan Beton M3 0.63 0.63 1,467,827.93 924,731.59
- Pekerjaan Bekisting M2 6.05 6.05 153,264.47 927,250.02
6 Pemasangan Kloset Jongkok + Aksesoris Bh 1.00 1.00 927,300.00 927,300.00
- Pekerjaan Bekisting M2 4.80 4.80 193,699.00 929,755.20
- Pekerjaan Bekisting M2 4.80 4.80 193,699.00 929,755.20
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.00 8.00 116,373.40 930,987.20
- Pekerjaan Bekisting M2 10.80 10.80 86,269.33 931,708.80
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 931,921.93 931,921.93
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 931,921.93 931,921.93
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 931,921.93 931,921.93
- Pekerjaan Bekisting M2 10.26 10.26 91,212.00 935,835.12
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 6.30 6.30 148,775.00 937,282.50
3 Pekerjaan Tanah Urug Pilihan M3 5.40 5.40 174,487.50 942,232.50
- Pekerjaan Pembesian Polos 12 Kg 49.75 49.75 18,971.70 943,842.08
- Pekerjaan Pembesian Polos 12 Kg 49.75 49.75 18,971.70 943,842.08
- Pekerjaan Pembesian Polos 12 Kg 49.75 49.75 18,971.70 943,842.08
- Pekerjaan Pembesian Polos 12 Kg 49.75 49.75 18,971.70 943,842.08
- Pekerjaan Pembesian Polos 12 Kg 49.75 49.75 18,971.70 943,842.08
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 5.00 5.00 189,409.00 947,045.00
- Pekerjaan Beton M3 0.65 0.65 1,467,827.93 954,088.15
- Pekerjaan Beton M3 0.65 0.65 1,467,827.93 954,088.15
- Pekerjaan Beton M3 0.65 0.65 1,467,827.93 954,088.15
- Pekerjaan Beton M3 0.65 0.65 1,467,827.93 954,088.15
4 Pekerjaan Pasangan Saklar Tunggal Bh 3.00 3.00 319,055.00 957,165.00
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 957,349.34 957,349.34
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 957,349.34 957,349.34
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 957,349.34 957,349.34
4 Pekerjaan Nok Atap Metal Berpasir M 8.80 8.80 109,010.00 959,288.00
4 Pekerjaan Nok Atap Metal Berpasir M 10.20 10.20 94,050.00 959,310.00
2 Pekerjaan Urugan Tanah Kembali M3 15.59 15.59 61,600.00 960,344.00
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 10.00 10.00 96,217.00 962,170.00
- Pekerjaan Bekisting M2 4.80 4.80 200,897 964,304.00
8 Pekerjaan Acian Kolom K1 20/25 M2 18.00 18.00 53,652.50 965,745.00
- Pekerjaan Pembesian Polos 12 Kg 49.75 49.75 19,428.75 966,580.31
- Pekerjaan Pembesian Polos 12 Kg 49.75 49.75 19,428.75 966,580.31
- Pekerjaan Pembesian Polos 12 Kg 49.75 49.75 19,428.75 966,580.31
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 14.00 14.00 69,217.50 969,045.00
- Pekerjaan Bekisting M2 7.70 7.70 126,934.50 977,395.65
- Pekerjaan Bekisting M2 10.80 10.80 90,717 979,743.60
4 Pekerjaan Nok Atap Metal Berpasir M 9.00 9.00 109,010.00 981,090.00
- Pekerjaan Bekisting M2 4.80 4.80 204,405.67 981,147.20
- Pekerjaan Bekisting M2 4.80 4.80 204,405.67 981,147.20
- Pekerjaan Bekisting M2 4.80 4.80 204,405.67 981,147.20
- Pekerjaan Bekisting M2 10.80 10.80 91,212.00 985,089.60
- Pekerjaan Bekisting M2 10.80 10.80 91,212.00 985,089.60
- Pekerjaan Beton M3 0.72 0.72 1,368,181.18 985,090.45
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 6.64 6.64 148,775.00 987,866.00
1 Pekerjaan Pembongkaran Atap M2 146.15 146.15 6,820.00 996,743.00
- Pekerjaan Pembesian Polos 12 Kg 49.75 49.75 20,094 999,661.58
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 116,373.40 1,005,466.18
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 8.64 8.64 116,373.40 1,005,466.18
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 24.00 24.00 42,441.30 1,018,591.20
4 Pekerjaan Nok Atap Metal Berpasir M 10.90 10.90 94,050.00 1,025,145.00
- Pekerjaan Bekisting M2 7.20 7.20 142,557.80 1,026,416.16
- Pekerjaan Beton M3 1.08 1.08 950,680.76 1,026,735.22
- Pekerjaan Beton M3 1.08 1.08 950,680.76 1,026,735.22
1 Pekerjaan Galian Tanah M3 12.00 12.00 85,800 1,029,600.00
1 Pekerjaan Galian Tanah M3 12.00 12.00 85,800.00 1,029,600.00
1 Pekerjaan Galian Tanah M3 12.00 12.00 85,800.00 1,029,600.00
1 Pekerjaan Galian Tanah M3 12.00 12.00 85,800.00 1,029,600.00
1 Pekerjaan Galian Tanah M3 12.00 12.00 85,800.00 1,029,600.00
1 Pekerjaan Galian Tanah M3 12.00 12.00 85,800.00 1,029,600.00
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 4.90 4.90 210,347.50 1,030,702.75
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 4.90 4.90 210,347.50 1,030,702.75
3 Pekerjaan Pembongkaran Plafond M2 69.72 69.72 14,784 1,030,740.48
4 Pekerjaan Nok Atap Metal Berpasir M 10.80 10.80 96,250.00 1,039,500.00
4 Pekerjaan Nok Atap Metal Berpasir M 10.80 10.80 96,250.00 1,039,500.00
4 Pekerjaan Nok Atap Metal Berpasir M 10.80 10.80 96,250.00 1,039,500.00
4 Pekerjaan Nok Atap Metal Berpasir M 10.80 10.80 96,250.00 1,039,500.00
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 5.40 5.40 192,720.00 1,040,688.00
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 5.40 5.40 192,720.00 1,040,688.00
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 7.00 7.00 148,775.00 1,041,425.00
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 7.00 7.00 148,775.00 1,041,425.00
1 Pekerjaan Pembongkaran Atap M2 153.80 153.80 6,820 1,048,916.00
1 Pekerjaan Pembongkaran Atap M2 153.80 153.80 6,820 1,048,916.00
1 Pekerjaan Pembongkaran Atap M2 153.80 153.80 6,820.00 1,048,916.00
1 Pekerjaan Pembongkaran Atap M2 153.80 153.80 6,820.00 1,048,916.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 56.76 56.76 18,480 1,048,924.80
3 Pekerjaan Pembongkaran Plafond M2 56.00 56.00 18,810.00 1,053,360.00
2 Pekerjaan Pipa PVC AW 2" (Air Kotor) M 12.00 12.00 87,865.75 1,054,388.94
2 Pekerjaan Pipa PVC AW 2" (Air Kotor) M 12.00 12.00 87,865.75 1,054,388.94
1 Pekerjaan Pondasi Batu Kosong M3 2.24 2.24 471,058.50 1,055,171.04
- Pekerjaan Beton M3 0.72 0.72 1,467,827.93 1,056,836.11
- Pekerjaan Beton M3 0.72 0.72 1,467,827.93 1,056,836.11
- Pekerjaan Beton M3 0.72 0.72 1,467,827.93 1,056,836.11
- Pekerjaan Beton M3 0.72 0.72 1,467,827.93 1,056,836.11
- Pekerjaan Beton M3 0.72 0.72 1,467,827.93 1,056,836.11
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 11.00 11.00 96,217.00 1,058,387.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 25.00 25.00 42,441 1,061,032.50
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 25.00 25.00 42,441 1,061,032.50
8 Pekerjaan Rabat Beton Keliling Bangunan M3 1.40 1.40 758,289.40 1,061,605.16
5 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 1.00 1.00 1,062,930.00 1,062,930.00
4 Pas. Kuku Keramik Setara Mulia M 20.40 20.40 52,155.40 1,063,970.16
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 1,065,744.83 1,065,744.83
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 1,065,744.83 1,065,744.83
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 1,065,744.83 1,065,744.83
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 1,065,744.83 1,065,744.83
4 Pembuatan Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 1,065,744.83 1,065,744.83
4 Pekerjaan Nok Atap Metal Berpasir M 9.80 9.80 109,010.00 1,068,298.00
4 Pekerjaan Nok Atap Metal Berpasir M 9.80 9.80 109,010.00 1,068,298.00
4 Pekerjaan Nok Atap Metal Berpasir M 11.40 11.40 94,050.00 1,072,170.00
4 Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 1,081,614.48 1,081,614.48
4 Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 1,081,614.48 1,081,614.48
4 Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 1,081,614.48 1,081,614.48
4 Bak grounding, uk. 700 x 700 x 650 mm Unit 1.00 1.00 1,081,614.48 1,081,614.48
8 Pekerjaan Acian Kolom K1 20/25 M2 25.20 25.20 43,307.00 1,091,336.40
2 Pemasangan Kabel BC 25 mm M 18.47 18.47 59,152.50 1,092,546.68
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 9.00 9.00 121,429.00 1,092,861.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 9.00 9.00 121,429.00 1,092,861.00
8 Pekerjaan Acian Kolom K1 20/25 M2 25.20 25.20 43,450.00 1,094,940.00
3 Pekerjaan Tanah Urug Pilihan M3 6.30 6.30 174,487.50 1,099,271.25
- Pekerjaan Beton M3 0.75 0.75 1,467,827.93 1,100,870.94
- Pekerjaan Beton M3 0.75 0.75 1,467,827.93 1,100,870.94
- Pekerjaan Beton M3 0.75 0.75 1,467,827.93 1,100,870.94
- Pekerjaan Beton M3 0.75 0.75 1,467,827.93 1,100,870.94
- Pekerjaan Beton M3 1.08 1.08 1,021,594.36 1,103,321.91
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 25.92 25.92 42,592.00 1,103,984.64
4 Pekerjaan Nok Atap Metal Berpasir M 11.80 11.80 94,050.00 1,109,790.00
- Pekerjaan Bekisting M2 8.80 8.80 126,934.50 1,117,023.60
- Pekerjaan Beton M3 1.00 1.00 1,117,721.79 1,117,721.79
- Pekerjaan Beton M3 1.00 1.00 1,117,721.79 1,117,721.79
1 Pekerjaan Pembongkaran Atap M2 163.97 163.97 6,820 1,118,275.40
1 Pekerjaan Pembongkaran Atap M2 127.29 127.29 8,800.00 1,120,152.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 12.00 12.00 93,450.72 1,121,408.64
1 Pekerjaan Pembongkaran Atap M2 166.36 166.36 6,820.00 1,134,575.20
4 Pekerjaan Nok Atap Metal Berpasir M 11.80 11.80 96,250 1,135,750.00
4 Pekerjaan Nok Atap Metal Berpasir M 11.80 11.80 96,250 1,135,750.00
4 Pekerjaan Nok Atap Metal Berpasir M 11.80 11.80 96,250 1,135,750.00
4 Pekerjaan Nok Atap Metal Berpasir M 11.80 11.80 96,250 1,135,750.00
4 Pekerjaan Nok Atap Metal Berpasir M 11.80 11.80 96,250 1,135,750.00
4 Pekerjaan Nok Atap Metal Berpasir M 11.80 11.80 96,250.00 1,135,750.00
4 Pekerjaan Nok Atap Metal Berpasir M 11.80 11.80 96,250.00 1,135,750.00
5 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409 1,136,454.00
6 Pemasangan Lampu Downlight 24 Watt (Ruangan) Setara Philips Bh 6.00 6.00 189,409 1,136,454.00
7 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409 1,136,454.00
8 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruangan) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 189,409.00 1,136,454.00
3 Pemasangan Pipa PVC 3/4" M 42.47 42.47 26,765.64 1,136,736.73
5 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 2.00 2.00 570,762.50 1,141,525.00
4 Pekerjaan Pasangan Saklar Ganda (Ruangan) Bh 2.00 2.00 570,762.50 1,141,525.00
4 Pekerjaan Pasangan Saklar Ganda Bh 2.00 2.00 570,762.50 1,141,525.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 2.00 2.00 570,762.50 1,141,525.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 2.00 2.00 570,762.50 1,141,525.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 2.00 2.00 570,762.50 1,141,525.00
2 Pekerjaan Pipa PVC AW 2" (Air Kotor) M 12.00 12.00 95,384.25 1,144,610.94
- Pekerjaan Bekisting M2 8.64 8.64 132,480.33 1,144,630.08
- Pekerjaan Bekisting M2 8.64 8.64 132,480.33 1,144,630.08
- Pekerjaan Bekisting M2 8.64 8.64 132,480.33 1,144,630.08
- Pekerjaan Bekisting M2 8.64 8.64 132,480.33 1,144,630.08
- Pekerjaan Bekisting M2 8.64 8.64 132,480.33 1,144,630.08
- Pekerjaan Bekisting M2 8.64 8.64 132,480.33 1,144,630.08
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 12.00 12.00 95,390.90 1,144,690.80
1 Pekerjaan Pembongkaran Atap M2 168.21 168.21 6,820.00 1,147,192.20
8 Pekerjaan Acian Kolom K1 20/25 M2 21.60 21.60 53,652.50 1,158,894.00
8 Pekerjaan Acian Kolom K1 20/25 M2 21.60 21.60 53,652.50 1,158,894.00
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 21.60 21.60 53,652.50 1,158,894.00
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 21.60 21.60 53,652.50 1,158,894.00
2 Pemasangan Lampu Downlight 24 Watt (Ruangan) Bh 6.00 6.00 193,490.00 1,160,940.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 6.00 6.00 193,490.00 1,160,940.00
2 Pemasangan Lampu Downlight 24 Watt (Ruangan) Bh 6.00 6.00 193,490.00 1,160,940.00
- Pekerjaan Bekisting M2 13.60 13.60 86,269.33 1,173,262.93
- Pekerjaan Beton M3 0.80 0.80 1,467,827.93 1,174,262.34
4 Pas. Kuku Keramik Setara Mulia M 20.40 20.40 57,653.64 1,176,134.26
4 Pemasangan Mata Kran Air Bh 5.00 5.00 235,400.00 1,177,000.00
4 Pemasangan Mata Kran Air Bh 5.00 5.00 235,400.00 1,177,000.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 9.00 9.00 131,009 1,179,080.10
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 9.00 9.00 131,008.90 1,179,080.10
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 9.00 9.00 131,008.90 1,179,080.10
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 9.00 9.00 131,008.90 1,179,080.10
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 9.00 9.00 131,008.90 1,179,080.10
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 9.00 9.00 131,008.90 1,179,080.10
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 9.00 9.00 131,008.90 1,179,080.10
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 9.00 9.00 131,008.90 1,179,080.10
6 Pekerjaan Acian Pondasi M2 22.00 22.00 53,652.50 1,180,355.00
8 Pemasangan Kloset Duduk + Aksesoris Bh 1.00 1.00 1,181,654.63 1,181,654.63
2 Pekerjaan Pipa PVC AW 1" (Air bersih) M 8.00 8.00 147,851.00 1,182,808.00
- Pekerjaan Beton M3 0.81 0.81 1,467,827.93 1,188,940.62
- Pekerjaan Beton M3 0.81 0.81 1,467,827.93 1,188,940.62
1 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 4.00 4.00 297,402 1,189,606.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 4.00 4.00 297,401.50 1,189,606.00
2 Pekerjaan Urugan Tanah Kembali M3 19.32 19.32 61,600.00 1,190,112.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 4.00 4.00 301,482.50 1,205,930.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 4.00 4.00 301,482.50 1,205,930.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 4.00 4.00 301,482.50 1,205,930.00
4 Pekerjaan Nok Atap Metal Berpasir M 12.58 12.58 96,250 1,210,825.00
5 Pekerjaan Plesteran Kolom Utama 20/20 SP 1 : 4 M2 12.96 12.96 93,450.72 1,211,121.33
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 3.00 3.00 405,762.50 1,217,287.50
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 3.00 3.00 405,762.50 1,217,287.50
- Pekerjaan Pembesian Ulir 13 Kg 64.30 64.30 18,971.70 1,219,880.31
- Pekerjaan Pembesian Ulir 13 Kg 64.30 64.30 18,971.70 1,219,880.31
3 Pekerjaan Tanah Urug Pilihan M3 7.00 7.00 174,487.50 1,221,412.50
3 Pekerjaan Tanah Urug Pilihan M3 7.00 7.00 174,487.50 1,221,412.50
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 8.24 8.24 148,775.00 1,225,906.00
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 42,592.00 1,226,649.60
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 42,592.00 1,226,649.60
1 Pekerjaan Pondasi Batu Kosong M3 2.88 2.88 427,383.00 1,230,863.04
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 8.80 8.80 139,920.00 1,231,296.00
5 Pekerjaan Plesteran Kolom Utama 20/20 SP 1 : 4 M2 12.96 12.96 95,013.60 1,231,376.26
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 42,828 1,233,444.96
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 4.90 4.90 251,762.50 1,233,636.25
5 Pekerjaan Plesteran Kolom Utama 20/20 SP 1 : 4 M2 12.96 12.96 95,390.90 1,236,266.06
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 43,307.00 1,247,241.60
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 5.40 5.40 231,000 1,247,400.00
4 Pekerjaan Pemasangan Logo Gerbang Ls 1.00 1.00 1,250,000 1,250,000.00
4 Pekerjaan Pemasangan Logo Gerbang Ls 1.00 1.00 1,250,000.00 1,250,000.00
4 Pekerjaan Pemasangan Logo Gerbang Ls 1.00 1.00 1,250,000.00 1,250,000.00
4 Pekerjaan Pemasangan Logo Gerbang Ls 1.00 1.00 1,250,000.00 1,250,000.00
4 Pemasangan Logo Gerbang Ls 1.00 1.00 1,250,000.00 1,250,000.00
4 Pekerjaan Pemasangan Logo Gerbang Ls 1.00 1.00 1,250,000.00 1,250,000.00
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 43,450.00 1,251,360.00
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 18,971.70 1,251,563.05
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 18,971.70 1,251,563.05
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 18,971.70 1,251,563.05
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 18,971.70 1,251,563.05
4 Pemasangan Mata Kran Air Bh 5.00 5.00 250,937.50 1,254,687.50
- Pekerjaan Bekisting M2 9.90 9.90 126,934.50 1,256,651.55
2 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 10.80 10.80 116,373.40 1,256,832.72
2 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 10.80 10.80 116,373.40 1,256,832.72
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 209,990.00 1,259,940.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 6.00 6.00 209,990.00 1,259,940.00
1 Pekerjaan Pengecatan Pondasi Eksterior M2 25.00 25.00 50,402.00 1,260,050.00
1 Pekerjaan Galian Pondasi Batu Belah M3 11.76 11.76 107,937.50 1,269,345.00
8 Pekerjaan Rabat Beton Keliling Bangunan M3 1.40 1.40 907,308.38 1,270,231.73
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 1.40 1.40 907,308.38 1,270,231.73
- Pekerjaan Pembesian Ulir 12 Kg 66.98 66.98 18,971.70 1,270,724.47
- Pekerjaan Pembesian Ulir 12 Kg 66.98 66.98 18,971.70 1,270,724.47
- Pekerjaan Pembesian Ulir 12 Kg 66.98 66.98 18,971.70 1,270,724.47
- Pekerjaan Bekisting M2 9.60 9.60 132,480.33 1,271,811.20
- Pekerjaan Bekisting M2 9.60 9.60 132,480.33 1,271,811.20
1 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 4.00 4.00 319,055 1,276,220.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 30.15 30.15 42,441 1,279,605.20
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 19,428.75 1,281,714.64
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 19,428.75 1,281,714.64
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 19,428.75 1,281,714.64
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 19,428.75 1,281,714.64
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 19,428.75 1,281,714.64
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 19,428.75 1,281,714.64
- Pekerjaan Bekisting M2 8.64 8.64 148,855.67 1,286,112.96
- Pekerjaan Bekisting M2 8.64 8.64 148,855.67 1,286,112.96
1 Pekerjaan Galian Tanah M3 12.00 12.00 107,937.50 1,295,250.00
1 Pekerjaan Galian Tanah M3 12.00 12.00 107,937.50 1,295,250.00
1 Pekerjaan Galian Tanah M3 12.00 12.00 107,937.50 1,295,250.00
1 Pekerjaan Galian Pondasi Batu Belah M3 15.12 15.12 85,800.00 1,297,296.00
- Pekerjaan Beton M3 0.95 0.95 1,368,181.18 1,299,772.12
- Pekerjaan Beton M3 0.95 0.95 1,368,181.18 1,299,772.12
- Pekerjaan Pembesian Ulir 13 Kg 66.98 66.98 19,428.75 1,301,337.68
- Pekerjaan Pembesian Polos 12 Kg 66.98 66.98 19,428.75 1,301,337.68
2 Pekerjaan Urugan Tanah Kembali M3 16.67 16.67 78,375.00 1,306,511.25
4 Pekerjaan Pembongkaran Lantai Keramik M2 70.94 70.94 18,480.00 1,310,971.20
- Pekerjaan Beton M3 0.90 0.90 1,467,827.93 1,321,045.13
- Pekerjaan Pembesian Ulir 13 Kg 65.97 65.97 20,094 1,325,581.39
1 Pekerjaan Pembongkaran Atap M2 150.77 150.77 8,800.00 1,326,776.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 72.00 72.00 18,480 1,330,560.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 72.00 72.00 18,480 1,330,560.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 72.00 72.00 18,480.00 1,330,560.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 72.00 72.00 18,480.00 1,330,560.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 72.00 72.00 18,480.00 1,330,560.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 72.00 72.00 18,480.00 1,330,560.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 72.00 72.00 18,480.00 1,330,560.00
- Pekerjaan Beton M3 1.30 1.30 1,030,577.25 1,339,750.43
- Pekerjaan Bekisting M2 8.64 8.64 155,091 1,339,984.80
- Pekerjaan Pembesian Ulir 12 Kg 66.98 66.98 20,094 1,345,876.03
3 Pemasangan Pipa PVC 3/4" M 50.47 50.47 26,765.64 1,350,861.85
3 Pemasangan Pipa PVC 3/4" M 50.47 50.47 26,765.64 1,350,861.85
3 Pemasangan Pipa PVC 3/4" M 50.47 50.47 26,765.64 1,350,861.85
3 Pemasangan Pipa PVC 3/4" M 50.47 50.47 26,765.64 1,350,861.85
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding Rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding Rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
5 Grounding Rod Ø 5/8 lengkap dengan driving stud, clamp, coupler dan drill head Set 2.00 2.00 676,071.00 1,352,142.00
- Pekerjaan Pembesian Polos 12 Kg 69.65 69.65 19,428.75 1,353,212.44
6 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 7.03 7.03 192,720.00 1,354,821.60
6 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 7.03 7.03 192,720.00 1,354,821.60
1 Pekerjaan Pondasi Batu Kosong M3 2.88 2.88 471,058.50 1,356,648.48
- Pekerjaan Pembesian Ulir 13 Kg 70.14 70.14 19,428.75 1,362,732.53
4 Pekerjaan Nok Atap Metal Berpasir M 12.60 12.60 109,010.00 1,373,526.00
- Pekerjaan Bekisting M2 8.64 8.64 159,562.33 1,378,618.56
- Pekerjaan Bekisting M2 8.64 8.64 159,562.33 1,378,618.56
2 Pekerjaan Rabat Beton 5 cm M2 1.76 1.76 794,116.40 1,397,644.86
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 12.00 12.00 116,490.00 1,397,880.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 15.00 15.00 93,450.72 1,401,760.80
2 Pekerjaan Pengecatan Kanstin Eksterior Setara Jotun M2 33.25 33.25 42,441.30 1,411,173.23
- Pekerjaan Bekisting M2 9.90 9.90 142,557.80 1,411,322.22
5 Pemasangan Mata Kran Air Bh 6.00 6.00 235,400 1,412,400.00
5 Pemasangan Mata Kran Air Bh 6.00 6.00 235,400.00 1,412,400.00
- Pekerjaan Bekisting M2 16.40 16.40 86,269.33 1,414,817.07
- Pekerjaan Bekisting M2 16.40 16.40 86,269.33 1,414,817.07
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 15.00 15.00 94,442 1,416,629.28
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 15.00 15.00 94,647.52 1,419,712.80
- Pekerjaan Beton M3 1.38 1.38 1,030,577.25 1,422,196.61
- Pekerjaan Beton M3 1.38 1.38 1,030,577.25 1,422,196.61
4 Pekerjaan Nok Atap Metal Berpasir M 14.80 14.80 96,250.00 1,424,500.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 15.00 15.00 95,013.60 1,425,204.00
- Pekerjaan Bekisting M2 9.60 9.60 148,855.67 1,429,014.40
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 15.00 15.00 95,390.90 1,430,863.50
4 Pekerjaan Nok Atap Metal Berpasir M 14.95 14.95 96,250 1,438,937.50
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 34.00 34.00 42,441.30 1,443,004.20
4 Pekerjaan Pembongkaran Lantai Keramik M2 78.24 78.24 18,480 1,445,875.20
- Pekerjaan Bekisting M2 9.45 9.45 153,264.47 1,448,349.21
- Pekerjaan Bekisting M2 9.45 9.45 153,264.47 1,448,349.21
9 Pekerjaan Acian Kolom K2 20/20 M2 27.00 27.00 53,652.50 1,448,617.50
- Pekerjaan Beton M3 1.30 1.30 1,117,721.79 1,453,038.32
- Pekerjaan Bekisting M2 18.40 18.40 79,167.00 1,456,672.80
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 34.40 34.40 42,441.30 1,459,980.72
3 Pekerjaan Tanah Urug Pilihan M3 8.80 8.80 166,100.00 1,461,680.00
2 Pekerjaan Pipa PVC AW 1" (Air bersih) M 10.00 10.00 147,851.00 1,478,510.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 21.40 21.40 69,217.50 1,481,254.50
8 Pekerjaan Pasangan Stop Kontak (Ruangan) Bh 5.00 5.00 297,402 1,487,007.50
5 Pekerjaan Pasangan Saklar Ganda Bh 5.00 5.00 297,401.50 1,487,007.50
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 743,847.50 1,487,695.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 743,847.50 1,487,695.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 743,847.50 1,487,695.00
3 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 10.00 10.00 148,775.00 1,487,750.00
5 Pekerjaan Pasangan Saklar Ganda Bh 2.00 2.00 744,425.00 1,488,850.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 2.00 2.00 744,425.00 1,488,850.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 2.00 2.00 744,425.00 1,488,850.00
4 Pekerjaan Pasangan Saklar Ganda (Ruangan) Bh 2.00 2.00 744,425.00 1,488,850.00
5 Pekerjaan Pasangan Saklar Ganda Bh 2.00 2.00 744,425.00 1,488,850.00
4 Pekerjaan Pasangan Saklar Ganda Bh 2.00 2.00 744,425.00 1,488,850.00
4 Pekerjaan Pasangan Saklar Ganda Bh 2.00 2.00 744,425.00 1,488,850.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 2.00 2.00 744,425.00 1,488,850.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 2.00 2.00 744,425.00 1,488,850.00
5 Pekerjaan Pasangan Saklar Ganda (Selasar & Ruang Kelas) Bh 2.00 2.00 744,425.00 1,488,850.00
2 Pekerjaan Urugan Tanah Kembali M3 19.04 19.04 78,375.00 1,492,260.00
2 Pekerjaan Urugan Tanah Kembali M3 19.04 19.04 78,375.00 1,492,260.00
1 Pekerjaan Galian Tanah Kanstin M3 13.84 13.84 107,937.50 1,493,855.00
3 Pekerjaan Pasir Urug Bawah Saluran T=10 cm M3 10.68 10.68 139,920.00 1,494,345.60
4 Pekerjaan Pembongkaran Lantai Keramik M2 81.00 81.00 18,480.00 1,496,880.00
- Pekerjaan Beton M3 1.02 1.02 1,467,827.93 1,497,184.48
- Pekerjaan Beton M3 1.02 1.02 1,467,827.93 1,497,184.48
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 34.56 34.56 43,450.00 1,501,632.00
6 Pemasangan Floor Drain Bh 7.00 7.00 214,720 1,503,040.00
6 Pemasangan Floor Drain Bh 7.00 7.00 214,720.00 1,503,040.00
6 Pemasangan Floor Drain Bh 7.00 7.00 214,720.00 1,503,040.00
5 Pemasangan Mata Kran Air Bh 6.00 6.00 250,937.50 1,505,625.00
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 12.96 12.96 116,373.40 1,508,199.26
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 12.96 12.96 116,373.40 1,508,199.26
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 12.96 12.96 116,373.40 1,508,199.26
- Pekerjaan Pembesian Polos 12 Kg 79.61 79.61 18,971.70 1,510,337.04
- Pekerjaan Pembesian Polos 12 Kg 79.61 79.61 18,971.70 1,510,337.04
4 Pekerjaan Pipa PVC AW 4" (Air bersih) M 12.00 12.00 126,153.53 1,513,842.33
4 Pekerjaan Nok Atap Metal Berpasir M 13.90 13.90 109,010.00 1,515,239.00
3 Pekerjaan Urugan Tanah Kembali M3 24.61 24.61 61,600.00 1,515,976.00
3 Pekerjaan Urugan Tanah Kembali M3 24.61 24.61 61,600.00 1,515,976.00
4 Pekerjaan Pembongkaran Lantai Keramik Unit 82.26 82.26 18,480.00 1,520,164.80
3 Pekerjaan Pipa PVC AW 3" (Air bersih) M 16.00 16.00 95,384.25 1,526,147.92
- Pekerjaan Bekisting M2 11.52 11.52 132,480.33 1,526,173.44
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 36.00 36.00 42,441.30 1,527,886.80
- Pekerjaan Beton M3 1.40 1.40 1,100,825.79 1,541,156.10
4 Pekerjaan Pengecatan Pintu dan Jendela Setara Jotun M2 57.75 57.75 26,711.30 1,542,577.58
1 Pekerjaan Galian Pondasi Telapak M3 18.00 18.00 85,800.00 1,544,400.00
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 11.04 11.04 139,920.00 1,544,716.80
3 Pekerjaan Pembongkaran Plafond M2 104.49 104.49 14,784.00 1,544,780.16
3 Pekerjaan Pembongkaran Plafond M2 104.49 104.49 14,784.00 1,544,780.16
3 Pekerjaan Pembongkaran Plafond M2 104.49 104.49 14,784.00 1,544,780.16
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 53,652.50 1,545,192.00
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 53,652.50 1,545,192.00
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 53,652.50 1,545,192.00
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 53,652.50 1,545,192.00
8 Pekerjaan Acian Kolom K1 20/25 M2 28.80 28.80 53,652.50 1,545,192.00
- Pekerjaan Pembesian Polos 12 Kg 79.61 79.61 19,428.75 1,546,722.79
- Pekerjaan Pembesian Polos 12 Kg 79.61 79.61 19,428.75 1,546,722.79
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 22.40 22.40 69,217.50 1,550,472.00
1 Pekerjaan Pengecatan Pondasi Eksterior M2 31.00 31.00 50,402.00 1,562,462.00
1 Pekerjaan Pengecatan Pondasi Eksterior M2 31.00 31.00 50,402.00 1,562,462.00
- Pekerjaan Beton M3 1.40 1.40 1,117,721.79 1,564,810.50
4 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
5 Pekerjaan Lubang Angin uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 785,262.50 1,570,525.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 85.00 85.00 18,480.00 1,570,800.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 12.00 12.00 131,008.90 1,572,106.80
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 12.00 12.00 131,008.90 1,572,106.80
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 12.00 12.00 131,008.90 1,572,106.80
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 37.07 37.07 42,441.30 1,573,298.99
- Pekerjaan Beton M3 1.08 1.08 1,467,827.93 1,585,254.16
- Pekerjaan Beton M3 1.08 1.08 1,467,827.93 1,585,254.16
- Pekerjaan Pembesian Ulir 13 Kg 81.83 81.83 19,428.75 1,589,854.61
- Pekerjaan Pembesian Ulir 13 Kg 81.83 81.83 19,428.75 1,589,854.61
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 36.72 36.72 43,307.00 1,590,233.04
4 Pekerjaan Pasangan Saklar Tunggal (Selasar & Rg. Alat) Bh 5.00 5.00 319,055.00 1,595,275.00
4 Pekerjaan Pasangan Saklar Tunggal (Selasar & Rg. Alat) Bh 5.00 5.00 319,055.00 1,595,275.00
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 36.72 36.72 43,450.00 1,595,484.00
4 Pas. Kuku Keramik Setara Mulia M 30.60 30.60 52,155.40 1,595,955.24
- Pekerjaan Bekisting M2 12.60 12.60 126,934.50 1,599,374.70
1 Pekerjaan Pondasi Batu Kosong M3 3.59 3.59 446,391.00 1,602,543.69
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 31.64 31.64 50,968.66 1,612,648.39
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 32.00 32.00 50,402.00 1,612,864.00
1 Pekerjaan Urugan Tanah Pilihan M3 9.72 9.72 166,100.00 1,614,492.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 17.00 17.00 95,390.90 1,621,645.30
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 17.00 17.00 95,390.90 1,621,645.30
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 4.00 4.00 405,762.50 1,623,050.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 14.00 14.00 116,373.40 1,629,227.60
1 Pekerjaan Galian Pondasi Batu Belah M3 15.12 15.12 107,937.50 1,632,015.00
6 Pekerjaan Acian Wastafel M2 37.80 37.80 43,307.00 1,637,004.60
- Pekerjaan Bekisting M2 19.20 19.20 85,290.33 1,637,574.40
3 Pekerjaan Pembongkaran Plafond M2 110.93 110.93 14,784.00 1,639,989.12
1 Pemasangan Instalasi Penerangan Titik 2.00 2.00 820,050.00 1,640,100.00
1 Pemasangan Instalasi Penerangan Titik 2.00 2.00 820,050.00 1,640,100.00
- Pekerjaan Beton M3 1.60 1.60 1,030,577.25 1,648,923.61
- Pekerjaan Beton M3 1.60 1.60 1,030,577.25 1,648,923.61
- Pekerjaan Beton M3 1.13 1.13 1,467,827.93 1,658,645.56
4 Pekerjaan Pipa PVC AW 4" (Air bersih) M 14.00 14.00 118,635 1,660,890.39
4 Pekerjaan Pipa PVC AW 4" (Air bersih) M 14.00 14.00 118,635.03 1,660,890.39
3 Pekerjaan Pipa PVC AW 4" (Air Kotor) M 14.00 14.00 118,635.03 1,660,890.39
4 Pekerjaan Pipa PVC AW 4" (Air bersih) M 14.00 14.00 118,635.03 1,660,890.39
3 Pekerjaan Pipa PVC AW 4" (Air Kotor) M 14.00 14.00 118,635.03 1,660,890.39
4 Pekerjaan Pipa PVC AW 4" (Air bersih) M 14.00 14.00 118,635.03 1,660,890.39
6 Pekerjaan Acian Pondasi M2 31.00 31.00 53,652.50 1,663,227.50
6 Pekerjaan Acian Pondasi M2 31.00 31.00 53,652.50 1,663,227.50
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 62.40 62.40 26,711.30 1,666,785.12
2 Pekerjaan Urugan Tanah Kembali M3 21.28 21.28 78,375.00 1,667,820.00
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 14.40 14.40 116,373.40 1,675,776.96
2 Pekerjaan Pasangan Dinding Wastafel 1/2 Bata SP 1 : 4 M2 18.00 18.00 93,450.72 1,682,112.96
- Pekerjaan Beton M3 1.23 1.23 1,368,181.18 1,682,862.85
- Pekerjaan Beton M3 1.60 1.60 1,054,912 1,687,859.75
- Pekerjaan Bekisting M2 12.80 12.80 132,480.33 1,695,748.27
2 Pekerjaan Pasangan Dinding Wastafel 1/2 Bata SP 1 : 4 M2 18.00 18.00 94,647.52 1,703,655.36
2 Pemasangan Lampu Downlight 24 Watt (Ruangan) Setara Philips Bh 9.00 9.00 189,409.00 1,704,681.00
2 Pemasangan Lampu Downlight 24 Watt (Ruangan) Setara Philips Bh 9.00 9.00 189,409.00 1,704,681.00
9 Pemasangan Wastafel + Aksesoris Bh 1.00 1.00 1,711,288 1,711,287.60
9 Pemasangan Wastafel + Aksesoris Bh 1.00 1.00 1,711,853.00 1,711,853.00
3 Pekerjaan Pasir Urug Bawah Kanstin T=10 cm M3 11.53 11.53 148,775.00 1,715,375.75
- Pekerjaan Bekisting M2 12.96 12.96 132,480.33 1,716,945.12
- Pekerjaan Bekisting M2 12.96 12.96 132,480.33 1,716,945.12
- Pekerjaan Bekisting M2 12.96 12.96 132,480.33 1,716,945.12
- Pekerjaan Bekisting M2 12.96 12.96 132,480.33 1,716,945.12
- Pekerjaan Bekisting M2 13.75 13.75 126,934.50 1,745,349.38
- Pekerjaan Bekisting M2 13.75 13.75 126,934.50 1,745,349.38
- Pekerjaan Pembesian Ulir 12 Kg 92.12 92.12 18,971.70 1,747,673.00
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 34.44 34.44 50,968.66 1,755,360.63
3 Pekerjaan Pipa PVC AW 3" (Air bersih) M 20.00 20.00 87,866 1,757,314.90
3 Pekerjaan Pipa PVC AW 3" (Air bersih) M 20.00 20.00 87,865.75 1,757,314.90
3 Pekerjaan Pipa PVC AW 3" (Air bersih) M 20.00 20.00 87,865.75 1,757,314.90
3 Pekerjaan Pipa PVC AW 3" (Air bersih) M 20.00 20.00 87,865.75 1,757,314.90
- Pekerjaan Beton M3 1.60 1.60 1,100,825.79 1,761,321.26
4 Pekerjaan Pipa PVC AW 4" (Air bersih) M 14.00 14.00 126,153.53 1,766,149.39
3 Pekerjaan Pipa PVC AW 4" (Air Kotor) M 14.00 14.00 126,153.53 1,766,149.39
3 Pekerjaan Pembongkaran Plafond M2 119.70 119.70 14,784.00 1,769,644.80
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 19.00 19.00 93,450.72 1,775,563.68
3 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 297,402 1,784,409.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 297,401.50 1,784,409.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 297,401.50 1,784,409.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 297,401.50 1,784,409.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 297,401.50 1,784,409.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 297,401.50 1,784,409.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 297,401.50 1,784,409.00
3 Pekerjaan Pasir Urug Bawah Saluran T=10 cm M3 12.00 12.00 148,775.00 1,785,300.00
- Pekerjaan Beton M3 1.60 1.60 1,117,721.79 1,788,354.86
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 33.00 33.00 54,527 1,799,397.44
11 Pemasangan Tanki Air 1100 L Bh 1.00 1.00 1,800,000.00 1,800,000.00
11 Pemasangan Tanki Air 1100 L Bh 1.00 1.00 1,800,000.00 1,800,000.00
11 Pemasangan Tanki Air 1100 L Bh 1.00 1.00 1,800,000.00 1,800,000.00
11 Pemasangan Tanki Air 1100 L Bh 1.00 1.00 1,800,000.00 1,800,000.00
1 Pemasangan Instalasi Penerangan Titik 2.00 2.00 901,560.00 1,803,120.00
1 Pemasangan Instalasi Penerangan Titik 2.00 2.00 901,560.00 1,803,120.00
- Pekerjaan Beton M3 1.23 1.23 1,467,827.93 1,805,428.35
- Pekerjaan Beton M3 1.23 1.23 1,467,827.93 1,805,428.35
- Pekerjaan Beton M3 1.23 1.23 1,467,827.93 1,805,428.35
2 Pekerjaan Pengecatan Kanstin Eksterior Setara Jotun M2 42.56 42.56 42,441.30 1,806,301.73
1 Pekerjaan Pembongkaran Atap M2 265.19 265.19 6,820.00 1,808,595.80
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 301,482.50 1,808,895.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 301,482.50 1,808,895.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 6.00 6.00 301,482.50 1,808,895.00
1 Pekerjaan Pengecatan Pondasi Eksterior M2 36.00 36.00 50,402.00 1,814,472.00
- Pekerjaan Pembesian Ulir 13 Kg 93.53 93.53 19,428.75 1,817,170.99
- Pekerjaan Pembesian Ulir 13 Kg 93.53 93.53 19,428.75 1,817,170.99
2 Pekerjaan Urugan Tanah Kembali M3 23.24 23.24 78,375.00 1,821,435.00
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 15.00 15.00 121,429.00 1,821,435.00
- Pekerjaan Bekisting M2 14.40 14.40 126,934.50 1,827,856.80
1 Pekerjaan Galian Tanah Saluran M3 21.36 21.36 85,800.00 1,832,688.00
1 Pekerjaan Pembongkaran Atap M2 269.07 269.07 6,820 1,835,057.40
1 Pekerjaan Pembongkaran Atap M2 269.07 269.07 6,820 1,835,057.40
- Pekerjaan Beton M3 1.80 1.80 1,021,594.36 1,838,869.84
1 Pekerjaan Pondasi Batu Kosong M3 4.32 4.32 427,383.00 1,846,294.56
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 31.40 31.40 59,073.44 1,854,905.94
- Pekerjaan Pembesian Polos 12 Kg 95.53 95.53 19,428.75 1,856,028.49
3 Pekerjaan Pembongkaran Plafond M2 125.97 125.97 14,784 1,862,340.48
3 Pekerjaan Pembongkaran Plafond M2 125.97 125.97 14,784 1,862,340.48
3 Pekerjaan Pembongkaran Plafond M2 125.97 125.97 14,784.00 1,862,340.48
3 Pekerjaan Pembongkaran Plafond M2 125.97 125.97 14,784.00 1,862,340.48
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 12.60 12.60 148,775.00 1,874,565.00
- Pekerjaan Pembesian Ulir 13 Kg 98.96 98.96 18,971.70 1,877,439.43
- Pekerjaan Pembesian Ulir 13 Kg 98.96 98.96 18,971.70 1,877,439.43
1 Pekerjaan Pondasi Batu Kosong M3 4.00 4.00 471,058.50 1,884,234.00
- Pekerjaan Bekisting M2 14.85 14.85 126,934.50 1,884,977.33
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 2.50 2.50 758,289.40 1,895,723.50
3 Pekerjaan Pipa PVC AW 3" (Air bersih) M 20.00 20.00 95,384.25 1,907,684.90
- Pekerjaan Bekisting M2 14.40 14.40 132,480.33 1,907,716.80
1 Pekerjaan Pembongkaran Atap M2 217.92 217.92 8,800.00 1,917,696.00
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 37.64 37.64 50,968.66 1,918,460.34
1 Pekerjaan Pondasi Batu Kosong M3 4.32 4.32 444,992 1,922,364.58
- Pekerjaan Pembesian Ulir 13 Kg 98.96 98.96 19,428.75 1,922,669.10
- Pekerjaan Pembesian Ulir 13 Kg 98.96 98.96 19,428.75 1,922,669.10
- Pekerjaan Pembesian Ulir 13 Kg 98.96 98.96 19,428.75 1,922,669.10
- Pekerjaan Pembesian Ulir 13 Kg 98.96 98.96 19,428.75 1,922,669.10
1 Pekerjaan Pondasi Batu Kosong M3 4.32 4.32 446,391.00 1,928,409.12
1 Pekerjaan Pondasi Batu Kosong M3 4.32 4.32 446,391.00 1,928,409.12
- Pekerjaan Bekisting M2 12.96 12.96 148,855.67 1,929,169.44
6 Pemasangan Floor Drain Bh 9.00 9.00 214,720.00 1,932,480.00
- Pekerjaan Beton M3 1.73 1.73 1,117,721.79 1,933,658.69
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 10.00 10.00 193,490.00 1,934,900.00
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 72.49 72.49 26,711.30 1,936,302.14
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 72.49 72.49 26,711.30 1,936,302.14
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 38.14 38.14 50,968.66 1,943,944.67
1 Pekerjaan Galian Pondasi Batu Belah M3 22.68 22.68 85,800 1,945,944.00
1 Pekerjaan Galian Pondasi Batu Belah M3 22.68 22.68 85,800.00 1,945,944.00
1 Pekerjaan Galian Pondasi Batu Belah M3 22.68 22.68 85,800.00 1,945,944.00
1 Pekerjaan Galian Pondasi Batu Belah M3 22.68 22.68 85,800.00 1,945,944.00
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 38.00 38.00 51,233.66 1,946,879.20
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 38.00 38.00 51,233.66 1,946,879.20
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 38.00 38.00 51,233.66 1,946,879.20
3 Pekerjaan Pembongkaran Plafond M2 104.25 104.25 18,810.00 1,960,942.50
4 Pekerjaan Nok Atap Metal Berpasir M 18.00 18.00 109,010.00 1,962,180.00
5 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 15.00 15.00 131,009 1,965,133.50
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Setara Philips Bh 15.00 15.00 131,008.90 1,965,133.50
- Pekerjaan Pembesian Ulir 12 Kg 104.48 104.48 18,971.70 1,982,163.22
- Pekerjaan Pembesian Ulir 12 Kg 104.48 104.48 18,971.70 1,982,163.22
3 Pekerjaan Pembongkaran Plafond M2 134.29 134.29 14,784 1,985,343.36
3 Pekerjaan Plint Keramik 10x40 M 33.64 33.64 59,073.44 1,987,230.44
3 Pekerjaan Plint Keramik 10x40 M 33.64 33.64 59,073.44 1,987,230.44
- Pekerjaan Pembesian Ulir 13 Kg 105.22 105.22 18,971.70 1,996,202.27
- Pekerjaan Pembesian Ulir 13 Kg 105.22 105.22 18,971.70 1,996,202.27
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 38.00 38.00 52,748.67 2,004,449.51
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 38.00 38.00 52,748.67 2,004,449.51
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 21.20 21.20 94,647.52 2,006,527.42
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 21.20 21.20 95,013.60 2,014,288.32
3 Pekerjaan Pembongkaran Plafond M2 136.25 136.25 14,784.00 2,014,320.00
- Pekerjaan Beton M3 1.84 1.84 1,100,825.79 2,025,519.45
6 Pekerjaan Acian Wastafel M2 37.80 37.80 53,652.50 2,028,064.50
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 5.00 5.00 405,762.50 2,028,812.50
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 5.00 5.00 405,762.50 2,028,812.50
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 5.00 5.00 405,762.50 2,028,812.50
1 Pekerjaan Pondasi Batu Kosong M3 4.32 4.32 471,058.50 2,034,972.72
3 Pekerjaan Pembongkaran Plafond M2 137.77 137.77 14,784.00 2,036,791.68
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 38.64 38.64 52,748.67 2,038,208.66
- Pekerjaan Pembesian Ulir 13 Kg 105.22 105.22 19,428.75 2,044,293.08
- Pekerjaan Pembesian Ulir 13 Kg 105.22 105.22 19,428.75 2,044,293.08
- Pekerjaan Beton M3 1.84 1.84 1,117,721.79 2,056,608.09
4 Pekerjaan Pengecatan Pintu dan Jendela Setara Jotun M2 77.00 77.00 26,711.30 2,056,770.10
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 21.60 21.60 95,390.90 2,060,443.44
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 21.60 21.60 95,390.90 2,060,443.44
2 Pekerjaan Plint Keramik 10x40 M 35.00 35.00 59,073.44 2,067,570.31
- Pekerjaan Bekisting M2 12.96 12.96 159,562.33 2,067,927.84
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 38.00 38.00 54,527 2,072,033.42
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 38.00 38.00 54,527 2,072,033.42
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 2,072,571.50 2,072,571.50
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 2,072,571.50 2,072,571.50
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 30.00 30.00 69,217.50 2,076,525.00
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 2.29 2.29 907,308.38 2,077,736.19
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 2.29 2.29 907,308.38 2,077,736.19
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 49.00 49.00 42,441.30 2,079,623.70
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 18.00 18.00 116,373.40 2,094,721.20
2 Pekerjaan Pasangan Dinding Wastafel 1/2 Bata SP 1 : 4 M2 18.00 18.00 116,373.40 2,094,721.20
3 Pemasangan Lampu Downlight 12 Watt (Selasar) Bh 18.00 18.00 116,490.00 2,096,820.00
1 Pekerjaan Pembongkaran Atap M2 307.61 307.61 6,820.00 2,097,900.20
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 2.38 2.38 887,579.00 2,112,438.02
4 Pekerjaan Nok Atap Metal Berpasir M 19.40 19.40 109,010.00 2,114,794.00
- Pekerjaan Bekisting M2 14.85 14.85 142,557.80 2,116,983.33
7 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 2.00 2.00 1,062,930.00 2,125,860.00
4 Pas. Kuku Keramik Setara Mulia M 40.80 40.80 52,155.40 2,127,940.32
6 Pekerjaan Acian Pondasi M2 49.00 49.00 43,450.00 2,129,050.00
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 50.48 50.48 42,441.30 2,142,436.82
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 50.48 50.48 42,441.30 2,142,436.82
6 Pekerjaan Acian Pondasi M2 40.00 40.00 53,652.50 2,146,100.00
6 Pekerjaan Acian Pondasi M2 40.00 40.00 53,652.50 2,146,100.00
6 Pekerjaan Acian Pondasi M2 40.00 40.00 53,652.50 2,146,100.00
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 39.56 39.56 54,527 2,157,095.84
- Pekerjaan Beton M3 1.58 1.58 1,368,181.18 2,161,726.26
1 Pekerjaan Galian Tanah Saluran M3 25.20 25.20 85,800 2,162,160.00
1 Pemasangan Tiang Bendera Stainless (D 3 Inch = 5 M, 2 Inch = 3 M & 1 Inch = 2 M) P = 10 m Unit 1.00 1.00 2,163,019.84 2,163,019.84
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 51.00 51.00 42,441.30 2,164,506.30
4 Pekerjaan Nok Atap Metal Berpasir M 20.00 20.00 109,010.00 2,180,200.00
3 Pekerjaan Tanah Urug Pilihan M3 12.60 12.60 174,487.50 2,198,542.50
- Pekerjaan Bekisting M2 14.85 14.85 149,142 2,214,753.75
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 32.00 32.00 69,217.50 2,214,960.00
8 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 3.00 3.00 744,425 2,233,275.00
9 Pekerjaan Pasangan Saklar Ganda (Ruangan) Bh 3.00 3.00 744,425 2,233,275.00
10 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 3.00 3.00 744,425 2,233,275.00
11 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 3.00 3.00 744,425 2,233,275.00
3 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 16.10 16.10 139,920.00 2,252,712.00
2 Pekerjaan Urugan Tanah Kembali M3 28.84 28.84 78,375.00 2,260,335.00
- Pekerjaan Pembesian Ulir 12 Kg 119.41 119.41 18,971.70 2,265,410.70
- Pekerjaan Pembesian Ulir 12 Kg 119.41 119.41 18,971.70 2,265,410.70
1 Pekerjaan Galian Pondasi Batu Belah M3 21.00 21.00 107,937.50 2,266,687.50
4 Pekerjaan Nok Atap Metal Berpasir M 23.60 23.60 96,250.00 2,271,500.00
5 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 12.00 12.00 189,409 2,272,908.00
6 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 12.00 12.00 189,409 2,272,908.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 12.00 12.00 189,409.00 2,272,908.00
3 Pekerjaan Plint Keramik 10x40 M 38.50 38.50 59,073.44 2,274,327.34
- Pekerjaan Bekisting M2 14.85 14.85 153,264.47 2,275,977.33
- Pekerjaan Bekisting M2 14.85 14.85 153,264.47 2,275,977.33
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 54.00 54.00 42,441.30 2,291,830.20
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 54.00 54.00 42,441.30 2,291,830.20
- Pekerjaan Bekisting M2 14.40 14.40 159,562.33 2,297,697.60
- Pekerjaan Bekisting M2 14.40 14.40 159,562.33 2,297,697.60
9 Pekerjaan Acian Kolom K2 20/20 (selasar) M2 43.20 43.20 53,652.50 2,317,788.00
- Pekerjaan Pembesian Ulir 13 Kg 119.41 119.41 19,428.75 2,319,987.04
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 12.00 12.00 193,490.00 2,321,880.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 12.00 12.00 193,490.00 2,321,880.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 12.00 12.00 193,490.00 2,321,880.00
3 Pekerjaan Pembongkaran Plafond M2 123.48 123.48 18,810.00 2,322,658.80
6 Pekerjaan Acian Wastafel M2 53.55 53.55 43,450.00 2,326,747.50
6 Pekerjaan Acian Wastafel M2 53.55 53.55 43,808 2,345,891.63
7 Pekerjaan Acian Dinding M2 54.00 54.00 43,450.00 2,346,300.00
- Pekerjaan Beton M3 1.60 1.60 1,467,827.93 2,348,524.68
- Pekerjaan Beton M3 1.60 1.60 1,467,827.93 2,348,524.68
- Pekerjaan Beton M3 1.60 1.60 1,467,827.93 2,348,524.68
- Pekerjaan Beton M3 1.60 1.60 1,467,827.93 2,348,524.68
- Pekerjaan Beton M3 1.60 1.60 1,467,827.93 2,348,524.68
- Pekerjaan Beton M3 1.60 1.60 1,467,827.93 2,348,524.68
- Pekerjaan Beton M3 1.60 1.60 1,467,827.93 2,348,524.68
- Pekerjaan Beton M3 1.60 1.60 1,467,827.93 2,348,524.68
8 Pemasangan Kloset Duduk + Aksesoris Bh 2.00 2.00 1,181,654.63 2,363,309.26
2 Penanaman Pohon Ketapang Kencana Pohon 10.00 10.00 237,039.66 2,370,396.60
- Pekerjaan Bekisting M2 18.70 18.70 126,934.50 2,373,675.15
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 56.00 56.00 42,441 2,376,712.80
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 8.00 8.00 297,401.50 2,379,212.00
5 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 8.00 8.00 297,401.50 2,379,212.00
6 Pekerjaan Pasangan Stop Kontak (Ruangan) Bh 8.00 8.00 297,401.50 2,379,212.00
2 Pekerjaan Urugan Tanah Kembali M3 38.64 38.64 61,600.00 2,380,224.00
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 25.20 25.20 94,647.52 2,385,117.50
4 Pekerjaan Plesteran SP 1 : 4 M2 25.20 25.20 95,013.60 2,394,342.72
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 25.20 25.20 95,013.60 2,394,342.72
- Pekerjaan Bekisting M2 18.90 18.90 126,934.50 2,399,062.05
- Pekerjaan Bekisting M2 18.90 18.90 126,934.50 2,399,062.05
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 25.00 25.00 96,217.00 2,405,425.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 8.00 8.00 301,482.50 2,411,860.00
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 57.00 57.00 42,441.30 2,419,154.10
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 25.92 25.92 93,450.72 2,422,242.66
6 Pekerjaan Acian Pondasi M2 57.00 57.00 42,592.00 2,427,744.00
4 Pekerjaan Pasangan Saklar Tunggal (Selasar) Bh 6.00 6.00 405,762.50 2,434,575.00
4 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 16.40 16.40 148,775.00 2,439,910.00
1 Pekerjaan Galian Pondasi Batu Belah M3 22.68 22.68 107,937.50 2,448,022.50
2 Pekerjaan Urugan Tanah Humus M3 5.63 5.63 435,187.50 2,450,105.63
- Pekerjaan Beton M3 1.80 1.80 1,368,181.18 2,462,726.12
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 92.40 92.40 26,711 2,468,124.12
4 Pekerjaan Pemasangan Logo Kementerian PUPR Bh 19.25 19.25 128,337.00 2,470,487.25
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 19.25 19.25 128,337.00 2,470,487.25
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 19.25 19.25 128,689 2,477,263.25
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 19.25 19.25 128,689 2,477,263.25
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 19.25 19.25 128,689 2,477,263.25
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 19.25 19.25 128,689.00 2,477,263.25
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 19.25 19.25 128,689.00 2,477,263.25
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 19.25 19.25 128,689.00 2,477,263.25
- Pekerjaan Beton M3 1.71 1.71 1,467,827.93 2,509,985.75
2 Pemasangan Kabel BC 25 mm M 42.47 42.47 59,152.50 2,512,206.68
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 21.60 21.60 116,373.40 2,513,665.44
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 21.60 21.60 116,373.40 2,513,665.44
3 Pekerjaan Pasir Urug Bawah Saluran T=10 cm M3 17.00 17.00 148,775.00 2,529,175.00
2 Penanaman Pohon Ketapang Kencana Tinggi 1,5 M Pohon 10.00 10.00 253,589.71 2,535,897.10
1 Penanaman Rumput Jepang M2 34.50 34.50 73,590.00 2,538,855.00
- Pekerjaan Bekisting M2 19.20 19.20 132,480.33 2,543,622.40
- Pekerjaan Bekisting M2 19.20 19.20 132,480.33 2,543,622.40
- Pekerjaan Bekisting M2 19.20 19.20 132,480.33 2,543,622.40
- Pekerjaan Bekisting M2 19.20 19.20 132,480.33 2,543,622.40
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 50.48 50.48 50,402.00 2,544,292.96
2 Pekerjaan Pengecatan Kanstin Eksterior Setara Jotun M2 33.25 33.25 76,695 2,550,118.73
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 22.00 22.00 116,373.40 2,560,214.80
1 Pekerjaan Pembongkaran Atap M2 377.40 377.40 6,820 2,573,868.00
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 96.63 96.63 26,711.30 2,581,112.92
3 Pekerjaan Pengecatan Dinding Interior M2 74.63 74.63 34,672.00 2,587,571.36
5 Pemasangan Mata Kran Air Bh 11.00 11.00 235,400.00 2,589,400.00
5 Pemasangan Mata Kran Air Bh 11.00 11.00 235,400.00 2,589,400.00
1 Pekerjaan Galian Tanah Saluran M3 24.00 24.00 107,937.50 2,590,500.00
4 Pekerjaan Nok Atap Metal Berpasir M 23.80 23.80 109,010.00 2,594,438.00
4 Pekerjaan Nok Atap Metal Berpasir M 23.80 23.80 109,010.00 2,594,438.00
2 Pekerjaan Pasangan Dinding Wastafel 1/2 Bata SP 1 : 4 M2 25.50 25.50 101,842 2,596,981.20
3 Pekerjaan Pengecatan Kolom Pagar Eksterior M2 61.33 61.33 42,441.30 2,602,924.93
8 Pemasangan Kloset Duduk + Aksesoris Bh 1.00 1.00 2,608,207 2,608,207.36
8 Pemasangan Kloset Duduk + Aksesoris Bh 1.00 1.00 2,608,207.36 2,608,207.36
8 Pemasangan Kloset Duduk + Aksesoris Bh 1.00 1.00 2,608,207.36 2,608,207.36
8 Pemasangan Kloset Duduk + Aksesoris Bh 1.00 1.00 2,608,207.36 2,608,207.36
1 Pekerjaan Pembongkaran Atap M2 382.75 382.75 6,820.00 2,610,355.00
8 Pekerjaan Acian Kolom M2 61.33 61.33 42,592.00 2,612,167.36
- Pekerjaan Bekisting M2 30.40 30.40 86,269.33 2,622,587.73
4 Pekerjaan Nok Atap Metal Berpasir M 27.90 27.90 94,050.00 2,623,995.00
- Pekerjaan Pembesian Ulir 13 Kg 135.23 135.23 19,428.75 2,627,349.86
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 2,638,268.50 2,638,268.50
1 Pekerjaan Pembongkaran Atap M2 388.35 388.35 6,820.00 2,648,547.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 14.00 14.00 189,409 2,651,726.00
3 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 14.00 14.00 189,409 2,651,726.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 144.00 144.00 18,480 2,661,120.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 144.00 144.00 18,480 2,661,120.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 144.00 144.00 18,480.00 2,661,120.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 144.00 144.00 18,480.00 2,661,120.00
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 100.13 100.13 26,711.30 2,674,602.47
6 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 13.92 13.92 192,720.00 2,682,662.40
3 Pas. Kuku Keramik (Pintu & Teras) Setara Mulia M 46.60 46.60 57,581.04 2,683,276.46
3 Pas. Kuku Keramik (Pintu & Teras) Setara Mulia M 46.60 46.60 57,653.64 2,686,659.62
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 28.80 28.80 93,450.72 2,691,380.74
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 28.80 28.80 94,442 2,719,928.22
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 28.80 28.80 94,647.52 2,725,848.58
2 Pekerjaan Pipa PVC AW 1" (Kotor) M 25.50 25.50 106,986 2,728,143.00
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 28.80 28.80 95,013.60 2,736,391.68
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 28.80 28.80 95,390.90 2,747,257.92
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 28.80 28.80 95,390.90 2,747,257.92
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 28.80 28.80 95,390.90 2,747,257.92
1 Penanaman Rumput Jepang M2 37.50 37.50 73,590 2,759,625.00
1 Penanaman Rumput Jepang M2 37.50 37.50 73,590.00 2,759,625.00
5 Pemasangan Mata Kran Air Bh 11.00 11.00 250,937.50 2,760,312.50
4 Pekerjaan Nok Atap Metal Berpasir M 29.40 29.40 94,050.00 2,765,070.00
- Pekerjaan Beton M3 2.70 2.70 1,030,577.25 2,782,558.59
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 66.00 66.00 42,441.30 2,801,125.80
1 Pekerjaan Pembongkaran Atap M2 411.10 411.10 6,820.00 2,803,702.00
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 2,804,458.06 2,804,458.06
- Pekerjaan Bekisting M2 18.33 18.33 153,264.47 2,809,337.67
1 Pekerjaan Pembongkaran Atap M2 412.82 412.82 6,820.00 2,815,432.40
4 Pemasangan Kran Wastafel 3/4" BH 12.00 12.00 235,400.00 2,824,800.00
4 Pemasangan Kran Wastafel 3/4" BH 12.00 12.00 235,400.00 2,824,800.00
- Pekerjaan Pembesian Ulir 13 Kg 146.13 146.13 19,428.75 2,839,123.24
- Pekerjaan Pembesian Ulir 13 Kg 146.13 146.13 19,428.75 2,839,123.24
- Pekerjaan Pembesian Ulir 13 Kg 146.13 146.13 19,428.75 2,839,123.24
- Pekerjaan Pembesian Ulir 13 Kg 146.13 146.13 19,428.75 2,839,123.24
- Pekerjaan Pembesian Ulir 13 Kg 149.87 149.87 18,971.70 2,843,288.68
2 Penanaman Pohon Ketapang Kencana Pohon 12.00 12.00 237,040 2,844,475.92
5 Pekerjaan Pasangan Saklar Ganda (Toilet) Bh 5.00 5.00 570,762.50 2,853,812.50
- Pekerjaan Bekisting M2 22.50 22.50 126,934.50 2,856,026.25
4 Pekerjaan Nok Atap Metal Berpasir M 30.40 30.40 94,050.00 2,859,120.00
- Pekerjaan Bekisting M2 21.60 21.60 132,480.33 2,861,575.20
- Pekerjaan Bekisting M2 21.60 21.60 132,480.33 2,861,575.20
- Pekerjaan Bekisting M2 22.55 22.55 126,934.50 2,862,372.98
- Pekerjaan Bekisting M2 33.20 33.20 86,269.33 2,864,141.87
1 Pekerjaan Galian Tanah Kanstin M3 26.62 26.62 107,937.50 2,873,296.25
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 68.00 68.00 42,441.30 2,886,008.40
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 68.00 68.00 42,441.30 2,886,008.40
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 15.00 15.00 193,490.00 2,902,350.00
- Pekerjaan Beton M3 2.64 2.64 1,100,825.79 2,906,180.07
- Pekerjaan Beton M3 2.64 2.64 1,100,825.79 2,906,180.07
3 Pekerjaan Pasir Urug Bawah Saluran T=10 cm M3 12.60 12.60 231,000 2,910,600.00
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 109.20 109.20 26,711.30 2,916,873.96
4 Pekerjaan Nok Atap Metal Berpasir M 30.40 30.40 96,250.00 2,926,000.00
- Pekerjaan Beton M3 2.64 2.64 1,117,721.79 2,950,785.51
- Pekerjaan Beton M3 2.64 2.64 1,117,721.79 2,950,785.51
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 56.00 56.00 52,748.67 2,953,925.59
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 31.00 31.00 95,390.90 2,957,117.90
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 31.00 31.00 95,390.90 2,957,117.90
1 Pekerjaan Pengecatan Pondasi Eksterior M2 59.00 59.00 50,402.00 2,973,718.00
2 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 10.00 10.00 297,402 2,974,015.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 10.00 10.00 297,401.50 2,974,015.00
1 Pemasangan Tiang Bendera Stainless (D 3 Inch = 5 M, 2 Inch = 5 M) Tinggi = 10 m Unit 1.00 1.00 2,975,517.76 2,975,517.76
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 4.00 4.00 744,425.00 2,977,700.00
2 Pemasangan Kabel BC 25 mm M 50.47 50.47 59,152.50 2,985,426.68
2 Pemasangan Kabel BC 25 mm M 50.47 50.47 59,152.50 2,985,426.68
2 Pemasangan Kabel BC 25 mm M 50.47 50.47 59,152.50 2,985,426.68
2 Pemasangan Kabel BC 25 mm M 50.47 50.47 59,152.50 2,985,426.68
2 Pemasangan Kabel BC 25 mm M 50.47 50.47 59,152.50 2,985,426.68
2 Pemasangan Kabel BC 25 mm M 50.47 50.47 59,152.50 2,985,426.68
2 Pemasangan Kabel BC 25 mm M 50.47 50.47 59,152.50 2,985,426.68
2 Pemasangan Kabel BC 25 mm M 50.47 50.47 59,152.50 2,985,426.68
2 Pemasangan Kabel BC 25 mm M 50.47 50.47 59,152.50 2,985,426.68
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 112.00 112.00 26,711.30 2,991,665.60
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 112.00 112.00 26,711.30 2,991,665.60
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 112.00 112.00 26,711.30 2,991,665.60
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 112.00 112.00 26,711.30 2,991,665.60
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 18,971.70 2,994,113.69
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 18,971.70 2,994,113.69
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 18,971.70 2,994,113.69
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 18,971.70 2,994,113.69
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 18,971.70 2,994,113.69
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 18,971.70 2,994,113.69
3 Pekerjaan Urugan Tanah Kembali M3 48.72 48.72 61,600.00 3,001,152.00
4 Pemasangan Kran Wastafel 3/4" BH 12.00 12.00 250,937.50 3,011,250.00
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 10.00 10.00 301,482.50 3,014,825.00
6 Pekerjaan Acian Wastafel M2 37.80 37.80 79,761.53 3,014,985.76
2 Kabel BC 25 mm M 50.47 50.47 59,812.50 3,018,736.88
2 Kabel BC 25 mm M 50.47 50.47 59,812.50 3,018,736.88
2 Kabel BC 25 mm M 50.47 50.47 59,812.50 3,018,736.88
2 Kabel BC 25 mm M 50.47 50.47 59,812.50 3,018,736.88
- Pekerjaan Pembesian Ulir 13 Kg 156.30 156.30 19,428.75 3,036,713.63
1 Pemasangan Tiang Bendera Stainless (D 3 Inch = 5 M, 2 Inch = 5M) Tinggi = 10 m Unit 1.00 1.00 3,042,495.44 3,042,495.44
4 Pekerjaan Nok Atap Metal Berpasir M 28.00 28.00 109,010.00 3,052,280.00
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 19,428.75 3,066,245.33
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 19,428.75 3,066,245.33
- Pekerjaan Bekisting M2 21.60 21.60 142,557.80 3,079,248.48
1 Pekerjaan Pondasi Batu Kosong M3 6.56 6.56 471,058.50 3,090,143.76
1 Pekerjaan Pondasi Batu Kosong M3 6.56 6.56 471,058.50 3,090,143.76
1 Pekerjaan Pondasi Batu Kosong M3 6.56 6.56 471,058.50 3,090,143.76
- Pekerjaan Pembesian Ulir 13 Kg 159.21 159.21 19,428.75 3,093,251.29
- Pekerjaan Pembesian Ulir 13 Kg 159.21 159.21 19,428.75 3,093,251.29
- Pekerjaan Pembesian Ulir 13 Kg 159.21 159.21 19,428.75 3,093,251.29
- Pekerjaan Pembesian Polos 12 Kg 159.21 159.21 19,428.75 3,093,251.29
1 Pemasangan 1 Unit Tiang Bendera (Diameter 3 Inch = 5 M, Diameter 2 Inch + 5 M), Tinggi = 10 M Unit 1.00 1.00 3,116,458.85 3,116,458.85
4 Pekerjaan Nok Atap Metal Berpasir M 32.40 32.40 96,250.00 3,118,500.00
4 Pekerjaan Nok Atap Metal Berpasir M 32.40 32.40 96,250.00 3,118,500.00
2 Pekerjaan Urugan Tanah Humus M3 7.31 7.31 426,800 3,119,908.00
2 Pekerjaan Urugan Tanah Humus M3 7.31 7.31 426,800.00 3,119,908.00
- Pekerjaan Bekisting M2 24.60 24.60 126,934.50 3,122,588.70
3 Pekerjaan Pengecatan Kolom Pagar Eksterior M2 73.60 73.60 42,441 3,123,679.68
3 Pekerjaan Pengecatan Kolom Pagar Eksterior M2 73.60 73.60 42,441.30 3,123,679.68
3 Pekerjaan Pengecatan Kolom Pagar Eksterior M2 73.60 73.60 42,441.30 3,123,679.68
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 21.00 21.00 148,775.00 3,124,275.00
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 21.00 21.00 148,775.00 3,124,275.00
2 Pekerjaan Pengecatan Dinding Interior & Eksterior Setara Jotun M2 74.00 74.00 42,441.30 3,140,656.20
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 M2 27.00 27.00 116,373.40 3,142,081.80
1 Pekerjaan Pondasi Batu Kosong M3 7.36 7.36 427,383.00 3,145,538.88
1 Pekerjaan Pembongkaran Atap M2 461.41 461.41 6,820.00 3,146,816.20
8 Pekerjaan Acian Kolom M2 73.60 73.60 42,828 3,152,137.12
3 Pekerjaan Pengecatan Dinding Interior M2 91.00 91.00 34,672.00 3,155,152.00
1 Pemasangan 1 Unit Tiang Bendera (Diameter 3 Inch = 5 M, Diameter 2 Inch + 5 M), Tinggi = 10 M Unit 1.00 1.00 3,161,558.85 3,161,558.85
- Pekerjaan Beton M3 2.16 2.16 1,467,827.93 3,170,508.32
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 20,094 3,171,187.73
- Pekerjaan Pembesian Ulir 13 Kg 157.82 157.82 20,094 3,171,187.73
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 119.00 119.00 26,711 3,178,644.70
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 119.00 119.00 26,711 3,178,644.70
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 119.00 119.00 26,711.30 3,178,644.70
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 119.00 119.00 26,711.30 3,178,644.70
- Pekerjaan Bekisting M2 24.00 24.00 132,480.33 3,179,528.00
2 Pekerjaan Urugan Tanah Humus M3 7.31 7.31 435,187.50 3,181,220.63
8 Pekerjaan Acian Kolom M2 73.60 73.60 43,307.00 3,187,395.20
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 3.00 3.00 1,062,930.00 3,188,790.00
6 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 3.00 3.00 1,062,930.00 3,188,790.00
7 Pekerjaan Plesteran Dinding SP 1 : 3 M2 40.00 40.00 79,761.53 3,190,461.12
7 Pekerjaan Plesteran Dinding SP 1 : 3 M2 40.00 40.00 79,761.53 3,190,461.12
3 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 21.49 21.49 148,775.00 3,197,174.75
8 Pekerjaan Acian Kolom M2 73.60 73.60 43,450.00 3,197,920.00
- Pekerjaan Pembesian Ulir 13 Kg 164.93 164.93 19,428.75 3,204,383.74
- Pekerjaan Pembesian Ulir 13 Kg 164.93 164.93 19,428.75 3,204,383.74
- Pekerjaan Bekisting M2 35.16 35.16 91,212.00 3,207,013.92
- Pekerjaan Bekisting M2 35.16 35.16 91,212.00 3,207,013.92
3 Pekerjaan Pembongkaran Plafond M2 217.19 217.19 14,784.00 3,210,936.96
4 Pekerjaan Nok Atap Metal Berpasir M 34.20 34.20 94,050.00 3,216,510.00
7 Pekerjaan Plesteran Dinding SP 1 : 3 M2 40.00 40.00 80,889 3,235,573.79
1 Pekerjaan Pembongkaran Atap M2 368.33 368.33 8,800.00 3,241,304.00
4 Pekerjaan Pemasangan Logo Kementerian PUPR Bh 1.00 1.00 3,250,000.00 3,250,000.00
4 Pekerjaan Pemasangan Logo Kementerian PUPR Bh 1.00 1.00 3,250,000.00 3,250,000.00
4 Pekerjaan Pemasangan Logo Kementerian PUPR Bh 1.00 1.00 3,250,000.00 3,250,000.00
7 Pekerjaan Plesteran Dinding SP 1 : 3 M2 40.00 40.00 81,428.69 3,257,147.52
3 Pekerjaan Pembongkaran Plafond M2 220.37 220.37 14,784 3,257,950.08
3 Pekerjaan Pembongkaran Plafond M2 220.37 220.37 14,784 3,257,950.08
5 Pekerjaan Acian Kanstin M2 75.05 75.05 43,450.00 3,260,922.50
2 Pekerjaan Plint Keramik 10x40 Setara Mulia M 64.00 64.00 50,968.66 3,261,994.21
1 Pekerjaan Pembongkaran Atap M2 480.22 480.22 6,820.00 3,275,100.40
7 Pekerjaan Plesteran Dinding SP 1 : 3 M2 40.00 40.00 81,884.88 3,275,395.20
7 Pekerjaan Plesteran Dinding SP 1 : 3 M2 40.00 40.00 81,884.88 3,275,395.20
- Pekerjaan Beton M3 3.78 3.78 866,909.21 3,276,916.83
2 Pekerjaan Plint Keramik 10x40 Setara Mulia M 64.00 64.00 51,233.66 3,278,954.45
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 34.56 34.56 95,013.60 3,283,670.02
5 Pekerjaan Acian Kanstin M2 75.05 75.05 43,808 3,287,752.88
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 77.49 77.49 42,441 3,288,776.34
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 77.49 77.49 42,441.30 3,288,776.34
3 Pekerjaan Pasir Urug Bawah Kanstin T=10 cm M3 22.19 22.19 148,775.00 3,301,317.25
2 Pekerjaan Urugan Tanah Kembali M3 53.67 53.67 61,600.00 3,306,072.00
1 Pekerjaan Galian Pondasi Batu Belah M3 38.64 38.64 85,800.00 3,315,312.00
7 Pekerjaan Acian Dinding M2 78.00 78.00 42,592.00 3,322,176.00
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 124.46 124.46 26,711 3,324,488.40
- Pekerjaan Beton M3 2.28 2.28 1,467,827.93 3,346,647.67
- Pekerjaan Beton M3 2.28 2.28 1,467,827.93 3,346,647.67
4 Pekerjaan Nok Atap Metal Berpasir M 34.80 34.80 96,250.00 3,349,500.00
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 28.80 28.80 116,373.40 3,351,553.92
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 28.80 28.80 116,373.40 3,351,553.92
4 Pekerjaan Pembongkaran Plafond M2 178.48 178.48 18,810.00 3,357,208.80
4 Pekerjaan Nok Atap Metal Berpasir M 31.00 31.00 109,010.00 3,379,310.00
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 62.00 62.00 54,527 3,380,686.11
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 62.00 62.00 54,527 3,380,686.11
- Pekerjaan Bekisting M2 25.60 25.60 132,480.33 3,391,496.53
- Pekerjaan Bekisting M2 25.60 25.60 132,480.33 3,391,496.53
- Pekerjaan Bekisting M2 25.60 25.60 132,480.33 3,391,496.53
- Pekerjaan Bekisting M2 25.60 25.60 132,480.33 3,391,496.53
- Pekerjaan Bekisting M2 25.60 25.60 132,480.33 3,391,496.53
- Pekerjaan Bekisting M2 25.60 25.60 132,480.33 3,391,496.53
- Pekerjaan Bekisting M2 25.60 25.60 132,480.33 3,391,496.53
- Pekerjaan Bekisting M2 25.60 25.60 132,480.33 3,391,496.53
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 80.00 80.00 42,441.30 3,395,304.00
4 Pekerjaan Nok Atap Metal Berpasir M 35.40 35.40 96,250.00 3,407,250.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 18.00 18.00 189,409.00 3,409,362.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 18.00 18.00 189,409.00 3,409,362.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 18.00 18.00 189,409.00 3,409,362.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 18.00 18.00 189,409.00 3,409,362.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 18.00 18.00 189,409.00 3,409,362.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 18.00 18.00 189,409.00 3,409,362.00
5 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 6.00 6.00 570,762.50 3,424,575.00
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 3.79 3.79 907,308.38 3,438,698.76
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 3.79 3.79 907,308.38 3,438,698.76
3 Pekerjaan Plint Keramik 10x40 M 58.40 58.40 59,073.44 3,449,888.75
1 Pekerjaan Dinding Keramik Polos 20x40 cm (Polished) Setara Mulia M2 10.00 10.00 345,145.90 3,451,459.00
- Pekerjaan Pembesian Ulir 13 Kg 182.21 182.21 18,971.70 3,456,833.46
- Pekerjaan Pembesian Ulir 13 Kg 178.62 178.62 19,428.75 3,470,363.33
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 36.72 36.72 94,647.52 3,475,456.93
- Pekerjaan Beton M3 3.12 3.12 1,117,721.79 3,487,291.97
7 Pekerjaan Acian Dinding M2 65.00 65.00 53,652.50 3,487,412.50
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 4.08 4.08 854,843.00 3,487,759.44
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 36.72 36.72 95,013.60 3,488,899.39
1 Pemasangan Tiang Bendera Stainless (D 3 Inch = 5 M, 2 Inch = 3 M & 1 Inch = 2 M) P = 10 m Unit 1.00 1.00 3,500,000 3,500,000.00
1 Penanaman Rumput Jepang M2 48.00 48.00 73,590.00 3,532,320.00
4 Pekerjaan Plesteran Wastafel SP 1 : 4 M2 37.80 37.80 93,450.72 3,532,437.22
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Unpolished) Setara Mulia M2 10.00 10.00 353,808.40 3,538,084.00
- Pekerjaan Bekisting M2 41.20 41.20 86,269.33 3,554,296.53
2 Penanaman Pohon Ketapang Kencana Pohon 15.00 15.00 237,039.66 3,555,594.90
2 Penanaman Pohon Ketapang Kencana Pohon 15.00 15.00 237,039.66 3,555,594.90
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 10.26 10.26 347,673.04 3,567,125.39
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 10.26 10.26 347,673.04 3,567,125.39
3 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 12.00 12.00 297,402 3,568,818.00
- Pekerjaan Bekisting M2 22.40 22.40 159,562.33 3,574,196.27
- Pekerjaan Bekisting M2 22.40 22.40 159,562.33 3,574,196.27
4 Pekerjaan Plesteran Wastafel SP 1 : 4 M2 37.80 37.80 94,647.52 3,577,676.26
11 Pemasangan Tanki Air 1100 L Bh 2.00 2.00 1,800,000 3,600,000.00
11 Pemasangan Tanki Air 1100 L Bh 2.00 2.00 1,800,000.00 3,600,000.00
4 Pekerjaan Plesteran Wastafel SP 1 : 4 M2 37.80 37.80 95,390.90 3,605,776.02
- Pekerjaan Bekisting M2 25.30 25.30 142,557.80 3,606,712.34
6 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 3 M2 20.00 20.00 180,784.91 3,615,698.24
6 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 12.00 12.00 301,482.50 3,617,790.00
1 Pekerjaan Pembongkaran Atap M2 413.13 413.13 8,800.00 3,635,544.00
3 Pekerjaan Pengecatan Dinding Interior M2 105.00 105.00 34,672.00 3,640,560.00
4 Pekerjaan Nok Atap Metal Berpasir M 33.50 33.50 109,010.00 3,651,835.00
- Pekerjaan Beton M3 2.49 2.49 1,467,827.93 3,654,891.54
- Pekerjaan Beton M3 2.49 2.49 1,467,827.93 3,654,891.54
3 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 19.44 19.44 188,216.60 3,658,930.70
3 Pekerjaan Tanah Urug Pilihan M3 21.00 21.00 174,487.50 3,664,237.50
3 Pekerjaan Tanah Urug Pilihan M3 21.00 21.00 174,487.50 3,664,237.50
1 Pekerjaan Galian Tanah Saluran M3 34.00 34.00 107,937.50 3,669,875.00
8 Pekerjaan Acian Kolom K1 20/25 M2 86.40 86.40 42,592.00 3,679,948.80
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 26.40 26.40 139,920.00 3,693,888.00
2 Pekerjaan Pipa PVC AW 1" (Kotor) M 25.00 25.00 147,851.00 3,696,275.00
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 3,706,205.06 3,706,205.06
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 3,706,205.06 3,706,205.06
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 3,706,205.06 3,706,205.06
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 3,706,205.06 3,706,205.06
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 3,706,205.06 3,706,205.06
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 1.00 1.00 3,706,205.06 3,706,205.06
7 Pemasangan Kloset Jongkok + Aksesoris Bh 4.00 4.00 927,300.00 3,709,200.00
3 Pekerjaan Pengecatan Kolom Pagar Eksterior M2 73.60 73.60 50,402.00 3,709,587.20
3 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 19.25 19.25 192,720.00 3,709,860.00
8 Pekerjaan Rabat Beton Keliling Bangunan M3 4.09 4.09 907,308.38 3,710,891.27
1 Pekerjaan Galian Pondasi Batu Belah M3 34.44 34.44 107,937.50 3,717,367.50
1 Pekerjaan Galian Pondasi Batu Belah M3 34.44 34.44 107,937.50 3,717,367.50
1 Pekerjaan Galian Pondasi Batu Belah M3 34.44 34.44 107,937.50 3,717,367.50
2 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 5.00 5.00 744,425 3,722,125.00
5 Pekerjaan Pasangan Saklar Ganda (Toilet) Bh 5.00 5.00 744,425 3,722,125.00
5 Pekerjaan Pasangan Saklar Ganda (Toilet) Bh 5.00 5.00 744,425.00 3,722,125.00
5 Pekerjaan Pasangan Saklar Ganda Bh 5.00 5.00 744,425.00 3,722,125.00
3 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 19.32 19.32 192,720.00 3,723,350.40
3 Pekerjaan Pembongkaran Plafond M2 251.93 251.93 14,784.00 3,724,533.12
6 Pekerjaan Acian Wastafel M2 37.80 37.80 99,055.66 3,744,303.95
5 Pekerjaan Railing Pipa Stainless D 2" M 23.10 23.10 162,250 3,747,975.00
5 Pekerjaan Railing Pipa Stainless D 2" M 23.10 23.10 162,250.00 3,747,975.00
5 Pekerjaan Railing Pipa Stainless D 2" M 23.10 23.10 162,250.00 3,747,975.00
5 Pekerjaan Railing Pipa Stainless D 2" M 23.10 23.10 162,250.00 3,747,975.00
5 Pekerjaan Railing Pipa Stainless D 2" M 23.10 23.10 162,250.00 3,747,975.00
5 Pekerjaan Railing Pipa Stainless D 2" M 23.10 23.10 162,250.00 3,747,975.00
5 Pekerjaan Railing Pipa Stainless D 2" M 23.10 23.10 162,250.00 3,747,975.00
- Pekerjaan Pembesian Ulir 13 Kg 197.92 197.92 18,971.70 3,754,878.86
2 Pekerjaan Pengecatan Dinding Eksterior M2 74.50 74.50 50,402.00 3,754,949.00
2 Pekerjaan Pipa PVC AW 1" (Kotor) M 25.50 25.50 147,851.00 3,770,200.50
1 Pekerjaan Pengecatan Pondasi Eksterior Setara Jotun M2 88.90 88.90 42,441 3,773,031.57
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 18.00 18.00 209,990.00 3,779,820.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 18.00 18.00 209,990.00 3,779,820.00
- Pekerjaan Bekisting M2 25.60 25.60 148,855.67 3,810,705.07
- Pekerjaan Bekisting M2 25.60 25.60 148,855.67 3,810,705.07
3 Pas. Kuku Keramik M 62.40 62.40 61,336.00 3,827,366.40
- Pekerjaan Bekisting M2 25.92 25.92 148,855.67 3,858,338.88
- Pekerjaan Pembesian Ulir 13 Kg 198.74 198.74 19,428.75 3,861,269.78
- Pekerjaan Pembesian Ulir 13 Kg 198.74 198.74 19,428.75 3,861,269.78
8 Pekerjaan Acian Kolom K1 20/25 M2 72.00 72.00 53,652.50 3,862,980.00
8 Pekerjaan Acian Kolom K1 20/25 M2 72.00 72.00 53,652.50 3,862,980.00
- Pekerjaan Pembesian Ulir 13 Kg 199.01 199.01 19,428.75 3,866,515.54
- Pekerjaan Pembesian Ulir 13 Kg 203.90 203.90 18,971.70 3,868,329.63
- Pekerjaan Pembesian Ulir 13 Kg 203.90 203.90 18,971.70 3,868,329.63
- Pekerjaan Pembesian Ulir 13 Kg 203.90 203.90 18,971.70 3,868,329.63
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 26.10 26.10 148,775.00 3,883,027.50
3 Pekerjaan Pengecatan Dinding Interior M2 112.00 112.00 34,672.00 3,883,264.00
- Pekerjaan Beton M3 3.78 3.78 1,030,577.25 3,895,582.02
1 Pekerjaan Pengecatan Pondasi Eksterior M2 92.00 92.00 42,441.30 3,904,599.60
6 Pekerjaan Acian Pondasi M2 92.00 92.00 42,592.00 3,918,464.00
3 Pekerjaan Pintu Panel P2 uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 1,968,712.17 3,937,424.33
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 92.99 92.99 42,441.30 3,946,616.49
8 Pekerjaan Acian Kolom M2 73.60 73.60 53,652.50 3,948,824.00
2 Pekerjaan Urugan Tanah Kembali M3 64.17 64.17 61,600.00 3,952,872.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 57.20 57.20 69,217.50 3,959,241.00
- Pekerjaan Pembesian Ulir 13 Kg 203.90 203.90 19,428.75 3,961,522.13
- Pekerjaan Pembesian Ulir 13 Kg 203.90 203.90 19,428.75 3,961,522.13
7 Pekerjaan Plesteran Dinding SP 1 : 3 M2 40.00 40.00 99,055.66 3,962,226.40
7 Pekerjaan Plesteran Dinding SP 1 : 3 M2 40.00 40.00 99,055.66 3,962,226.40
7 Pekerjaan Plesteran Dinding SP 1 : 3 M2 40.00 40.00 99,055.66 3,962,226.40
- Pekerjaan Beton M3 2.70 2.70 1,467,827.93 3,963,135.40
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 61.65 61.65 64,295 3,963,786.75
2 Pekerjaan Urugan Tanah Kembali M3 64.40 64.40 61,600.00 3,967,040.00
- Pekerjaan Bekisting M2 25.60 25.60 155,091 3,970,325.33
- Pekerjaan Beton M3 3.78 3.78 1,054,912 3,987,568.66
3 Pekerjaan Pengecatan Dinding Interior M2 115.04 115.04 34,672.00 3,988,666.88
4 Pekerjaan Pembongkaran Lantai Keramik M2 216.00 216.00 18,480 3,991,680.00
2 Pekerjaan Urugan Tanah Humus M3 9.36 9.36 426,800.00 3,994,848.00
- Pekerjaan Bekisting M2 31.50 31.50 126,934.50 3,998,436.75
4 Pemasangan Kran Wastafel 3/4" Bh 17.00 17.00 235,400 4,001,800.00
4 Pemasangan Kran Wastafel 3/4" BH 17.00 17.00 235,400.00 4,001,800.00
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 76.00 76.00 52,748.67 4,008,899.02
1 Pekerjaan Galian Tanah Saluran M3 46.77 46.77 85,800.00 4,012,866.00
1 Pekerjaan Pengecatan Pondasi Eksterior M2 80.00 80.00 50,402.00 4,032,160.00
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 80.00 80.00 50,402.00 4,032,160.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 218.70 218.70 18,480 4,041,576.00
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 74.30 74.30 54,527 4,051,370.61
5 Pekerjaan Railing Pipa Stainless D 2" M 23.10 23.10 175,450.00 4,052,895.00
2 Pekerjaan Pengecatan Kanstin Eksterior Setara Jotun M2 95.55 95.55 42,441.30 4,055,266.22
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 4.08 4.08 994,922.50 4,059,283.80
- Pekerjaan Pembesian Polos 12 Kg 208.96 208.96 19,428.75 4,059,831.60
- Pekerjaan Pembesian Polos 12 Kg 208.96 208.96 19,428.75 4,059,831.60
8 Pekerjaan Rabat Beton Keliling Bangunan M3 4.50 4.50 907,308.38 4,082,887.71
- Pekerjaan Bekisting M2 25.60 25.60 159,562.33 4,084,795.73
- Pekerjaan Bekisting M2 25.60 25.60 159,562.33 4,084,795.73
- Pekerjaan Pembesian Ulir 13 Kg 203.90 203.90 20,094 4,097,105.43
4 Pekerjaan Nok Atap Metal Berpasir M 42.80 42.80 96,250.00 4,119,500.00
5 Pekerjaan Plesteran Kolom Utama K2 20/20 SP 1 : 4 (selasar) M2 43.20 43.20 95,390.90 4,120,886.88
3 Pekerjaan Pengecatan Kolom Pagar Eksterior M2 81.87 81.87 50,402.00 4,126,411.74
2 Pekerjaan Pengecatan Dinding & Kolom Eksterior Setara Jotun M2 98.04 98.04 42,441.30 4,160,945.05
- Pekerjaan Beton M3 3.78 3.78 1,100,825.79 4,161,121.47
1 Pekerjaan Pasangan Stop Kontak (Ruang Kelas) Bh 14.00 14.00 297,402 4,163,621.00
7 Pekerjaan Acian Dinding M2 78.00 78.00 53,652.50 4,184,895.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 226.95 226.95 18,480.00 4,194,036.00
1 Pekerjaan Pembongkaran Atap M2 615.21 615.21 6,820.00 4,195,732.20
1 Pekerjaan Pembongkaran Atap M2 615.21 615.21 6,820.00 4,195,732.20
1 Pekerjaan Pembersihan Lokasi M2 240.00 240.00 17,600.00 4,224,000.00
1 Pekerjaan Dinding Keramik Polos 20x40 cm (Toilet) (Polished) M2 12.00 12.00 352,877.80 4,234,533.60
4 Pemasangan Kran Wastafel 3/4" BH 17.00 17.00 250,937.50 4,265,937.50
- Pekerjaan Beton M3 4.14 4.14 1,030,577.25 4,266,589.83
- Pekerjaan Beton M3 4.14 4.14 1,030,577.25 4,266,589.83
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 51.28 51.28 83,325.00 4,272,906.00
3 Pekerjaan Plint Keramik 10x40 M 72.40 72.40 59,073.44 4,276,916.88
1 Pekerjaan Pengecatan Pondasi Eksterior M2 85.00 85.00 50,402.00 4,284,170.00
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 28.80 28.80 148,775.00 4,284,720.00
- Pekerjaan Bekisting M2 28.80 28.80 148,855.67 4,287,043.20
6 Pekerjaan Acian Pondasi M2 80.00 80.00 53,652.50 4,292,200.00
- Pekerjaan Beton M3 2.94 2.94 1,467,827.93 4,315,414.10
- Pekerjaan Bekisting M2 34.20 34.20 126,934.50 4,341,159.90
1 Pembersihan Akhir Ls 1.00 1.00 4,342,981.78 4,342,981.78
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 5.10 5.10 854,843.00 4,359,699.30
- Pekerjaan Bekisting M2 55.20 55.20 79,167.00 4,370,018.40
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 5.10 5.10 857,789 4,374,722.88
3 Pekerjaan Tanah Urug Pilihan M3 26.40 26.40 166,100.00 4,385,040.00
2 Pekerjaan Lantai Beton Selasar Penghubung (Mutu f'= 7,4 Mpa / K-100) M3 5.13 5.13 856,041.21 4,391,491.43
8 Pekerjaan Acian Kolom M2 81.87 81.87 53,652.50 4,392,530.18
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 4.42 4.42 994,922.50 4,397,557.45
4 Pekerjaan Plesteran Wastafel SP 1 : 4 M2 37.80 37.80 116,373.40 4,398,914.52
1 Pekerjaan Pembersihan Lokasi M2 250.00 250.00 17,600.00 4,400,000.00
1 Pekerjaan Pipa PVC AW 3/4" (Air Bersih) M 165.00 165.00 26,765.64 4,416,330.60
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 64.00 64.00 69,217.50 4,429,920.00
8 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 6.00 6.00 744,425 4,466,550.00
9 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 6.00 6.00 744,425 4,466,550.00
5 Pekerjaan Pasangan Saklar Ganda Bh 6.00 6.00 744,425.00 4,466,550.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 6.00 6.00 744,425.00 4,466,550.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 6.00 6.00 744,425.00 4,466,550.00
5 Pekerjaan Pasangan Saklar Ganda (Selasar & Ruang Kelas) Bh 6.00 6.00 744,425.00 4,466,550.00
5 Pekerjaan Pasangan Saklar Ganda (Selasar & Ruang Kelas) Bh 6.00 6.00 744,425.00 4,466,550.00
5 Pekerjaan Pasangan Saklar Ganda (Selasar & Ruang Kelas) Bh 6.00 6.00 744,425.00 4,466,550.00
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 168.00 168.00 26,711.30 4,487,498.40
- Pekerjaan Pembesian Ulir 13 Kg 236.66 236.66 18,971.70 4,489,842.52
- Pekerjaan Pembesian Ulir 13 Kg 236.66 236.66 18,971.70 4,489,842.52
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 5.10 5.10 880,407.00 4,490,075.70
4 Pekerjaan Pembongkaran Lantai Keramik M2 243.00 243.00 18,480.00 4,490,640.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 243.00 243.00 18,480.00 4,490,640.00
2 Pekerjaan Urugan Tanah Kembali M3 57.40 57.40 78,375.00 4,498,725.00
3 Pekerjaan Pasir Urug Bawah Saluran T=10 cm M3 23.38 23.38 192,720.00 4,505,793.60
5 Pekerjaan Listplank GRC tebal 9 mm M 26.00 26.00 173,690.00 4,515,940.00
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 5.10 5.10 887,579.00 4,526,652.90
- Pekerjaan Pembesian Polos 12 Kg 238.82 238.82 18,971.70 4,530,821.39
- Pekerjaan Pembesian Polos 12 Kg 238.82 238.82 18,971.70 4,530,821.39
- Pekerjaan Pembesian Polos 12 Kg 238.82 238.82 18,971.70 4,530,821.39
- Pekerjaan Beton M3 3.09 3.09 1,467,827.93 4,535,588.29
- Pekerjaan Beton M3 3.09 3.09 1,467,827.93 4,535,588.29
4 Pekerjaan Nok Atap Metal Berpasir M 47.20 47.20 96,250.00 4,543,000.00
4 Pekerjaan Nok Atap Metal Berpasir M 47.20 47.20 96,250.00 4,543,000.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 24.00 24.00 189,409.00 4,545,816.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 24.00 24.00 189,409.00 4,545,816.00
2 Pemasangan Lampu Downlight 24 Watt (Ruangan) Setara Philips Bh 24.00 24.00 189,409.00 4,545,816.00
10 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 5.73 5.73 794,116.40 4,550,286.97
3 Pekerjaan Tanah Urug Pilihan M3 26.10 26.10 174,487.50 4,554,123.75
6 Pekerjaan Acian Pondasi M2 85.00 85.00 53,652.50 4,560,462.50
5 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 8.00 8.00 570,762.50 4,566,100.00
3 Pekerjaan Pembongkaran Plafond M2 309.09 309.09 14,784 4,569,586.56
- Pekerjaan Bekisting M2 28.80 28.80 159,562.33 4,595,395.20
3 Pekerjaan Pembongkaran Plafond M2 313.47 313.47 14,784.00 4,634,340.48
9 Pemasangan Wastafel + Aksesoris Bh 4.00 4.00 1,159,488.00 4,637,952.00
10 Pemasangan Urinoir + Aksesoris Bh 2.00 2.00 2,321,495.00 4,642,990.00
10 Pemasangan Urinoir + Aksesoris Bh 2.00 2.00 2,321,495.00 4,642,990.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 24.00 24.00 193,490.00 4,643,760.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 40.00 40.00 116,373.40 4,654,936.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 40.00 40.00 116,373.40 4,654,936.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 40.00 40.00 116,373.40 4,654,936.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 49.00 49.00 95,013.60 4,655,666.40
- Pekerjaan Pembesian Ulir 13 Kg 239.66 239.66 19,428.75 4,656,294.23
- Pekerjaan Pembesian Ulir 13 Kg 239.66 239.66 19,428.75 4,656,294.23
- Pekerjaan Pembesian Ulir 13 Kg 239.66 239.66 19,428.75 4,656,294.23
2 Pekerjaan Pengecatan Dinding Interior M2 134.40 134.40 34,672.00 4,659,916.80
1 Pekerjaan Pengecatan Pondasi Eksterior M2 110.00 110.00 42,441.30 4,668,543.00
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 175.00 175.00 26,711 4,674,477.50
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 175.00 175.00 26,711 4,674,477.50
1 Pekerjaan Pengecatan Pondasi Eksterior M2 110.40 110.40 42,441.30 4,685,519.52
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 72.95 72.95 64,295.00 4,690,320.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 72.95 72.95 64,295.00 4,690,320.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 72.95 72.95 64,295.00 4,690,320.25
6 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 3 M2 20.00 20.00 234,685 4,693,698.24
6 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 3 M2 20.00 20.00 234,684.91 4,693,698.24
6 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 3 M2 20.00 20.00 234,684.91 4,693,698.24
6 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 3 M2 20.00 20.00 234,684.91 4,693,698.24
6 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 3 M2 20.00 20.00 234,684.91 4,693,698.24
3 Pekerjaan Pembongkaran Plafond M2 318.06 318.06 14,784.00 4,702,199.04
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 4.76 4.76 994,922.50 4,735,831.10
3 Pekerjaan Pintu Panel P2 uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 2,379,694.17 4,759,388.33
6 Pekerjaan Acian Pondasi M2 110.00 110.00 43,307.00 4,763,770.00
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 37.25 37.25 128,689 4,793,665.25
6 Pekerjaan Acian Pondasi M2 110.40 110.40 43,450.00 4,796,880.00
2 Pekerjaan Pasangan Dinding Wastafel 1/2 Bata SP 1 : 4 M2 25.50 25.50 188,216.60 4,799,523.30
3 Pipa PVC 3/4" M 50.47 50.47 96,217.00 4,856,071.99
3 Pipa PVC 3/4" M 50.47 50.47 96,217.00 4,856,071.99
3 Pipa PVC 3/4" M 50.47 50.47 96,217.00 4,856,071.99
3 Pipa PVC 3/4" M 50.47 50.47 96,217.00 4,856,071.99
3 Pemasangan Pipa PVC 3/4" M 50.47 50.47 96,217.00 4,856,071.99
3 Pemasangan Pipa PVC 3/4" M 50.47 50.47 96,217.00 4,856,071.99
3 Pemasangan Pipa PVC 3/4" M 50.47 50.47 96,217.00 4,856,071.99
3 Pemasangan Pipa PVC 3/4" M 50.47 50.47 96,217.00 4,856,071.99
3 Pemasangan Pipa PVC 3/4" M 50.47 50.47 96,217.00 4,856,071.99
5 Pekerjaan Listplank GRC tebal 9 mm M 28.00 28.00 173,690.00 4,863,320.00
1 Pekerjaan Pembongkaran Atap M2 715.71 715.71 6,820 4,881,142.20
- Pekerjaan Beton M3 4.90 4.90 996,477.51 4,882,739.79
- Pekerjaan Beton M3 4.90 4.90 996,477.51 4,882,739.79
1 Pemasangan Instalasi Penerangan Titik 6.00 6.00 820,050.00 4,920,300.00
1 Pemasangan Instalasi Penerangan Titik 6.00 6.00 820,050.00 4,920,300.00
1 Pembersihan Akhir Ls 1.00 1.00 4,932,628.49 4,932,628.49
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 2,469,032.50 4,938,065.00
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 2,469,032.50 4,938,065.00
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 2,469,032.50 4,938,065.00
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 2,469,032.50 4,938,065.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) M2 14.00 14.00 352,877.80 4,940,289.20
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) M2 14.00 14.00 352,877.80 4,940,289.20
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 2,471,617.50 4,943,235.00
- Pekerjaan Beton M3 4.80 4.80 1,030,577.25 4,946,770.82
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 38.50 38.50 128,689 4,954,526.50
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 38.50 38.50 128,689 4,954,526.50
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 38.50 38.50 128,689 4,954,526.50
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 38.50 38.50 128,689.00 4,954,526.50
1 Pembersihan Akhir LS 1.00 1.00 4,969,885.79 4,969,885.79
1 Pekerjaan Galian Tanah Saluran M3 57.96 57.96 85,800.00 4,972,968.00
3 Pekerjaan Pembongkaran Plafond M2 336.69 336.69 14,784.00 4,977,624.96
1 Penanaman Rumput Jepang M2 60.00 60.00 83,050.00 4,983,000.00
2 Pekerjaan Pengecatan Dinding Eksterior M2 99.05 99.05 50,402.00 4,992,318.10
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 6.36 6.36 785,316.40 4,994,612.30
6 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 3 M2 20.00 20.00 249,759.40 4,995,188.00
6 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 3 M2 20.00 20.00 249,759.40 4,995,188.00
6 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 3 M2 20.00 20.00 249,759.40 4,995,188.00
3 Pekerjaan Pembongkaran Plafond M2 338.10 338.10 14,784.00 4,998,470.40
6 Pekerjaan Pembuatan Barak Kerja Ls 1.00 1.00 5,000,000 5,000,000.00
4 Pekerjaan Pembuatan Barak Kerja Ls 1.00 1.00 5,000,000.00 5,000,000.00
4 Pekerjaan Pembuatan Barak Kerja Ls 1.00 1.00 5,000,000.00 5,000,000.00
4 Mobilisasi dan Demobilisasi Ls 1.00 1.00 5,000,000.00 5,000,000.00
5 Pekerjaan Pembuatan Barak Kerja Ls 1.00 1.00 5,000,000.00 5,000,000.00
8 Pekerjaan Acian Kolom K1 20/25 M2 115.20 115.20 43,450.00 5,005,440.00
- Pekerjaan Pembesian Ulir 13 Kg 263.89 263.89 18,971.70 5,006,441.91
3 Pekerjaan Tanah Urug Pilihan M3 28.80 28.80 174,487.50 5,025,240.00
- Pekerjaan Beton M3 6.16 6.16 818,264.86 5,040,511.52
10 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 6.36 6.36 794,116.40 5,050,580.30
2 Pekerjaan Pengecatan Dinding & Kolom Eksterior Setara Jotun M2 119.04 119.04 42,441.30 5,052,212.35
4 Pekerjaan Plesteran Wastafel SP 1 : 4 M2 53.55 53.55 94,442 5,057,366.53
- Pekerjaan Beton M3 4.91 4.91 1,030,577.25 5,060,134.32
2 Penanaman Pohon Ketapang Kencana (Tinggi 1,5 M) Pohon 20.00 20.00 253,589.71 5,071,794.20
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 5.10 5.10 994,922.50 5,074,104.75
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 78.95 78.95 64,295 5,076,090.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 78.95 78.95 64,295.00 5,076,090.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 78.95 78.95 64,295.00 5,076,090.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 78.95 78.95 64,295.00 5,076,090.25
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 27.00 27.00 188,216.60 5,081,848.20
2 Pekerjaan Pengecatan Dinding & Kolom Eksterior Setara Jotun M2 119.84 119.84 42,441.30 5,086,165.39
4 Pekerjaan Plesteran Wastafel SP 1 : 4 M2 53.55 53.55 95,013.60 5,087,978.28
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 120.00 120.00 42,441 5,092,956.00
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 120.00 120.00 42,441.30 5,092,956.00
3 Pekerjaan Pengecatan Dinding Interior M2 146.92 146.92 34,672.00 5,094,010.24
- Pekerjaan Pembesian Ulir 13 Kg 268.89 268.89 18,971.70 5,101,300.41
- Pekerjaan Pembesian Ulir 13 Kg 268.89 268.89 18,971.70 5,101,300.41
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 120.20 120.20 42,441 5,101,444.26
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 39.75 39.75 128,689 5,115,387.75
1 Pekerjaan Pondasi Batu Kosong M3 10.88 10.88 471,058.50 5,125,116.48
1 Pekerjaan Pondasi Batu Kosong M3 10.88 10.88 471,058.50 5,125,116.48
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 54.00 54.00 95,013.60 5,130,734.40
- Pekerjaan Pembesian Ulir 13 Kg 270.46 270.46 18,971.70 5,131,085.98
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 61.60 61.60 83,325.00 5,132,820.00
3 Pekerjaan Pengecatan Dinding Interior M2 150.00 150.00 34,672.00 5,200,800.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 80.95 80.95 64,295 5,204,680.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 80.95 80.95 64,295 5,204,680.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 80.95 80.95 64,295.00 5,204,680.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 80.95 80.95 64,295.00 5,204,680.25
5 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 35.00 35.00 148,775.00 5,207,125.00
5 Pekerjaan Listplank GRC tebal 9 mm M 30.00 30.00 173,690.00 5,210,700.00
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 63.00 63.00 83,325.00 5,249,475.00
- Pekerjaan Pembesian Ulir 13 Kg 270.46 270.46 19,428.75 5,254,699.73
- Pekerjaan Pembesian Ulir 13 Kg 270.46 270.46 19,428.75 5,254,699.73
- Pekerjaan Pembesian Ulir 13 Kg 270.46 270.46 19,428.75 5,254,699.73
- Pekerjaan Pembesian Ulir 13 Kg 270.46 270.46 19,428.75 5,254,699.73
- Pekerjaan Pembesian Ulir 13 Kg 270.46 270.46 19,428.75 5,254,699.73
- Pekerjaan Pembesian Ulir 13 Kg 270.46 270.46 19,428.75 5,254,699.73
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 16.00 16.00 329,217.24 5,267,475.84
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 16.00 16.00 329,217.24 5,267,475.84
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 16.00 16.00 329,217.24 5,267,475.84
- Pekerjaan Pembesian Polos 12 Kg 271.98 271.98 19,428.75 5,284,231.43
- Pekerjaan Bekisting M2 41.80 41.80 126,934.50 5,305,862.10
8 Pekerjaan Pasangan MCB 10 A dengan Sekring Box Bh 5.00 5.00 1,062,930.00 5,314,650.00
- Pekerjaan Pembesian Ulir 13 Kg 280.39 280.39 18,971.70 5,319,474.96
- Pekerjaan Pembesian Ulir 13 Kg 280.39 280.39 18,971.70 5,319,474.96
4 Pekerjaan Pembongkaran Lantai Keramik M2 288.00 288.00 18,480.00 5,322,240.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 288.00 288.00 18,480.00 5,322,240.00
4 Pekerjaan Pembongkaran Lantai Keramik M2 288.00 288.00 18,480.00 5,322,240.00
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 57.00 57.00 93,450.72 5,326,691.04
2 Pekerjaan Pengecatan Dinding & Kolom Eksterior Setara Jotun M2 125.54 125.54 42,441.30 5,328,080.80
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 13.20 13.20 403,946 5,332,091.61
- Pekerjaan Beton M3 5.18 5.18 1,030,577.25 5,338,390.18
4 Pekerjaan Nok Atap Metal Berpasir M 49.00 49.00 109,010.00 5,341,490.00
1 Pekerjaan Galian Pondasi Batu Belah M3 50.00 50.00 107,937.50 5,396,875.00
1 Pemasangan Instalasi Penerangan Titik 6.00 6.00 901,560.00 5,409,360.00
- Pekerjaan Pembesian Ulir 13 Kg 279.10 279.10 19,428.75 5,422,564.13
7 Pekerjaan Acian Dinding M2 124.99 124.99 43,450.00 5,430,815.50
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 78.95 78.95 69,217.50 5,464,721.63
2 Pekerjaan Pengecatan Dinding & Kolom Eksterior Setara Jotun M2 129.04 129.04 42,441.30 5,476,625.35
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 129.47 129.47 42,441.30 5,494,875.11
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 107.82 107.82 50,968.66 5,495,440.87
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 85.63 85.63 64,295 5,505,580.85
- Pekerjaan Bekisting M2 34.56 34.56 159,562.33 5,514,474.24
- Pekerjaan Bekisting M2 36.00 36.00 153,264.47 5,517,520.80
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 6.46 6.46 854,843.00 5,522,285.78
7 Pemasangan Kloset Jongkok + Aksesoris Bh 6.00 6.00 920,436.00 5,522,616.00
7 Pemasangan Kloset Jongkok + Aksesoris Bh 6.00 6.00 920,993 5,525,955.60
7 Pemasangan Kloset Jongkok + Aksesoris Bh 6.00 6.00 921,558.00 5,529,348.00
7 Pemasangan Kloset Jongkok + Aksesoris Bh 6.00 6.00 921,822.00 5,530,932.00
- Pekerjaan Beton M3 3.78 3.78 1,467,827.93 5,548,389.56
5 Pekerjaan Listplank GRC tebal 9 mm M 32.00 32.00 173,690.00 5,558,080.00
7 Pemasangan Kloset Jongkok + Aksesoris Bh 6.00 6.00 927,300.00 5,563,800.00
2 Pekerjaan Pembongkaran Konstruksi Atap M2 69.72 69.72 80,080 5,583,177.60
3 Pekerjaan Pasir Urug Bawah Saluran T=10 cm M3 28.98 28.98 192,720.00 5,585,025.60
3 Pekerjaan Pembongkaran Plafond M2 377.90 377.90 14,784.00 5,586,873.60
1 Pekerjaan Pembongkaran Atap M2 819.85 819.85 6,820 5,591,377.00
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 132.04 132.04 42,441.30 5,603,949.25
1 Pembersihan Akhir Ls 1.00 1.00 5,605,088 5,605,087.95
1 Pekerjaan Pembersihan Lokasi M2 240.00 240.00 23,375.00 5,610,000.00
2 Pekerjaan Urugan Tanah Kembali M3 71.63 71.63 78,375.00 5,614,001.25
7 Pekerjaan Acian Dinding M2 130.04 130.04 43,307.00 5,631,642.28
1 Pekerjaan Pembersihan Lokasi M2 320.00 320.00 17,600 5,632,000.00
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 110.00 110.00 51,233.66 5,635,702.96
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 211.05 211.05 26,711 5,637,419.87
4 Pekerjaan Nok Atap Metal Berpasir M 51.80 51.80 109,010.00 5,646,718.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 16.00 16.00 353,808.40 5,660,934.40
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 16.00 16.00 353,808.40 5,660,934.40
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 16.00 16.00 353,808.40 5,660,934.40
1 Pekerjaan Rabat Beton Lantai Drainase M3 7.48 7.48 758,289.40 5,672,004.71
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 82.00 82.00 69,217.50 5,675,835.00
8 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 30.00 30.00 189,409 5,682,270.00
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Setara Philips Bh 30.00 30.00 189,409.00 5,682,270.00
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 7.51 7.51 758,289.40 5,694,753.39
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 68.38 68.38 83,325.00 5,697,763.50
2 Pekerjaan Pengecatan Dinding Eksterior M2 113.05 113.05 50,402.00 5,697,946.10
5 Pekerjaan Listplank GRC tebal 9 mm M 35.25 35.25 161,810 5,703,802.50
2 Pekerjaan Pembongkaran Konstruksi Atap M2 56.00 56.00 101,887.50 5,705,700.00
5 Pekerjaan Pasangan Saklar Ganda Bh 10.00 10.00 570,762.50 5,707,625.00
2 Pekerjaan Urugan Tanah Kembali M3 92.87 92.87 61,600 5,720,792.00
1 Pekerjaan Pasangan Dinding Kanstin 1/2 Bata SP 1 : 4 M2 30.40 30.40 188,216.60 5,721,784.64
- Pekerjaan Bekisting M2 43.20 43.20 132,480.33 5,723,150.40
1 Pekerjaan Pondasi Batu Kosong M3 12.16 12.16 471,058.50 5,728,071.36
5 Pekerjaan Plesteran Kolom 20/20 SP 1 : 4 M2 61.33 61.33 93,450.72 5,731,332.66
1 Pekerjaan Pipa PVC AW 3/4" (Bersih) M 214.49 214.49 26,765.64 5,740,962.12
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 214.49 214.49 26,765.64 5,740,962.12
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 5.78 5.78 994,922.50 5,750,652.05
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 5.78 5.78 994,922.50 5,750,652.05
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 112.92 112.92 50,968.66 5,755,381.03
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 112.92 112.92 50,968.66 5,755,381.03
8 Pekerjaan Rabat Beton Keliling Bangunan M3 6.36 6.36 907,308.38 5,770,481.30
- Pekerjaan Bekisting M2 45.65 45.65 126,934.50 5,794,559.93
9 Pemasangan Wastafel + Aksesoris Bh 5.00 5.00 1,159,488.00 5,797,440.00
2 Pekerjaan Pengecatan Dinding Eksterior M2 115.04 115.04 50,402.00 5,798,246.08
2 Pekerjaan Pengecatan Dinding Eksterior M2 115.04 115.04 50,402.00 5,798,246.08
3 Pekerjaan Pembongkaran Plafond M2 393.30 393.30 14,784.00 5,814,547.20
- Pekerjaan Beton M3 5.22 5.22 1,117,721.79 5,834,507.72
- Pekerjaan Beton M3 5.22 5.22 1,117,721.79 5,834,507.72
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 114.00 114.00 51,233.66 5,840,637.61
- Pekerjaan Bekisting M2 36.72 36.72 159,562.33 5,859,128.88
- Pekerjaan Bekisting M2 36.72 36.72 159,562.33 5,859,128.88
- Pekerjaan Beton M3 4.00 4.00 1,467,827.93 5,871,311.70
- Pekerjaan Beton M3 4.00 4.00 1,467,827.93 5,871,311.70
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 17.00 17.00 347,673.04 5,910,441.68
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 8.00 8.00 744,425.00 5,955,400.00
4 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 8.00 8.00 744,425.00 5,955,400.00
5 Pekerjaan Pasangan Saklar Ganda (Ruangan) Bh 8.00 8.00 744,425.00 5,955,400.00
3 Pekerjaan Plint Keramik 10x40 M 100.92 100.92 59,073.44 5,961,691.31
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 100.92 100.92 59,073.44 5,961,691.31
3 Pekerjaan Plint Keramik 10x40 M 101.00 101.00 59,073.44 5,966,417.19
4 Pekerjaan Tanah Urug Pilihan M3 36.00 36.00 166,100.00 5,979,600.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 85.13 85.13 70,455 5,997,834.15
2 Pekerjaan Pengecatan Dinding Interior M2 173.40 173.40 34,672.00 6,012,124.80
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 114.00 114.00 52,748.67 6,013,348.52
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 87.20 87.20 69,217.50 6,035,766.00
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 120.00 120.00 50,402.00 6,048,240.00
4 Pekerjaan Nok Atap Metal Berpasir M 62.90 62.90 96,250 6,054,125.00
3 Pekerjaan Tanah Urug Pilihan M3 35.00 35.00 174,487.50 6,107,062.50
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 144.00 144.00 42,441.30 6,111,547.20
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 144.00 144.00 42,441.30 6,111,547.20
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 144.00 144.00 42,441.30 6,111,547.20
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 115.92 115.92 52,748.67 6,114,625.97
1 Pekerjaan Galian Pondasi Batu Belah M3 57.12 57.12 107,937.50 6,165,390.00
1 Pekerjaan Galian Pondasi Batu Belah M3 57.12 57.12 107,937.50 6,165,390.00
1 Pekerjaan Pengecatan Pondasi Eksterior M2 122.80 122.80 50,402.00 6,189,365.60
2 Pekerjaan Pintu Panel P1 uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 2,072,572 6,217,714.50
2 Pekerjaan Pintu Panel P1 uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 2,072,571.50 6,217,714.50
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 96.95 96.95 64,295 6,233,400.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 96.95 96.95 64,295 6,233,400.25
- Pekerjaan Beton M3 6.19 6.19 1,007,250.36 6,234,879.71
1 Pekerjaan Pondasi Batu Kosong M3 13.28 13.28 471,058.50 6,255,656.88
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 18.00 18.00 347,673.04 6,258,114.72
- Pekerjaan Beton M3 4.27 4.27 1,467,827.93 6,267,625.24
1 Pekerjaan Pondasi Batu Kosong M3 14.06 14.06 446,391.00 6,276,257.46
1 Pekerjaan Pondasi Batu Kosong M3 14.06 14.06 446,391.00 6,276,257.46
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 148.00 148.00 42,441 6,281,312.40
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 148.00 148.00 42,441 6,281,312.40
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 148.00 148.00 42,441.30 6,281,312.40
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 148.00 148.00 42,441.30 6,281,312.40
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 30.00 30.00 209,990.00 6,299,700.00
2 Pekerjaan Galian Pondasi Batu Belah M3 73.84 73.84 85,800.00 6,335,472.00
2 Pekerjaan Galian Pondasi Batu Belah M3 73.84 73.84 85,800.00 6,335,472.00
- Pekerjaan Bekisting M2 69.60 69.60 91,212.00 6,348,355.20
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) M2 18.00 18.00 352,877.80 6,351,800.40
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 238.00 238.00 26,711.30 6,357,289.40
- Pekerjaan Bekisting M2 48.00 48.00 132,480.33 6,359,056.00
3 Pekerjaan Pembongkaran Plafond M2 338.35 338.35 18,810.00 6,364,363.50
- Pekerjaan Pembesian Ulir 13 Kg 329.87 329.87 19,428.75 6,408,961.76
3 Pekerjaan Pasir Urug Bawah Pondasi T=10 cm M3 27.86 27.86 231,000 6,435,660.00
- Pekerjaan Beton M3 5.87 5.87 1,100,825.79 6,461,847.36
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 16.00 16.00 403,946 6,463,141.34
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 16.00 16.00 403,946 6,463,141.34
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 16.00 16.00 403,946 6,463,141.34
- Pekerjaan Beton M3 4.41 4.41 1,467,827.93 6,473,121.15
- Pekerjaan Beton M3 4.41 4.41 1,467,827.93 6,473,121.15
7 Pekerjaan Acian Dinding M2 152.00 152.00 42,592.00 6,473,984.00
4 Pekerjaan Pemasangan Logo Kementerian PUPR Bh 2.00 2.00 3,250,000.00 6,500,000.00
3 Pekerjaan Pemasangan Logo Kementerian PUPR Bh 2.00 2.00 3,250,000.00 6,500,000.00
4 Pekerjaan Pemasangan Logo Kementerian PUPR Bh 2.00 2.00 3,250,000.00 6,500,000.00
5 Pekerjaan Pemasangan Logo Kementerian PUPR Bh 2.00 2.00 3,250,000.00 6,500,000.00
7 Pekerjaan Acian Dinding M2 152.00 152.00 42,828 6,509,848.40
1 Pemasangan Instalasi Penerangan Titik 8.00 8.00 820,050.00 6,560,400.00
1 Pemasangan Instalasi Penerangan Titik 8.00 8.00 820,050.00 6,560,400.00
- Pekerjaan Beton M3 5.89 5.89 1,117,721.79 6,583,381.32
6 Pekerjaan Acian Pondasi M2 122.80 122.80 53,652.50 6,588,527.00
- Pekerjaan Beton M3 4.50 4.50 1,467,827.93 6,605,225.67
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 155.80 155.80 42,441 6,612,354.54
5 Pekerjaan Listplank GRC tebal 9 mm M 40.95 40.95 161,810 6,626,119.50
5 Pekerjaan Listplank GRC tebal 9 mm M 40.95 40.95 161,810 6,626,119.50
5 Pekerjaan Listplank GRC tebal 9 mm M 40.95 40.95 161,810.00 6,626,119.50
5 Pekerjaan Listplank GRC tebal 9 mm M 40.95 40.95 161,810.00 6,626,119.50
1 Pekerjaan Dinding Keramik Polos 20x40 cm (Polished) Setara Mulia M2 21.00 21.00 318,244.74 6,683,139.54
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 104.55 104.55 64,295.00 6,722,042.25
- Pekerjaan Beton M3 7.87 7.87 856,041.21 6,737,044.36
1 Pekerjaan Rabat Beton Lantai Drainase M3 8.82 8.82 764,903 6,746,440.93
1 Pekerjaan Pengecatan Pondasi Eksterior M2 159.20 159.20 42,441 6,756,654.96
- Pekerjaan Pembesian Polos 12 Kg 348.27 348.27 19,428.75 6,766,450.76
3 Penanaman Pohon Perdu Palm Kuning Plbg 46.00 46.00 147,879.71 6,802,466.66
3 Pekerjaan Tanah Urug Pilihan M3 41.02 41.02 166,100.00 6,813,422.00
6 Pekerjaan Acian Pondasi M2 159.20 159.20 42,828 6,818,209.64
5 Pekerjaan Listplank GRC tebal 9 mm M 42.15 42.15 161,810.00 6,820,291.50
- Pekerjaan Beton M3 7.87 7.87 866,909.21 6,822,575.52
5 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 12.00 12.00 570,762.50 6,849,150.00
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 72.00 72.00 95,390.90 6,868,144.80
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 72.00 72.00 95,390.90 6,868,144.80
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 106.95 106.95 64,295.00 6,876,350.25
1 Pembersihan Akhir Ls 1.00 1.00 6,885,100.14 6,885,100.14
1 Pekerjaan Galian Pondasi Batu Belah M3 63.84 63.84 107,937.50 6,890,730.00
- Pekerjaan Bekisting M2 80.00 80.00 86,269.33 6,901,546.67
7 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 36.00 36.00 192,720.00 6,937,920.00
- Pekerjaan Beton M3 6.21 6.21 1,117,721.79 6,941,052.29
5 Pekerjaan Listplank GRC tebal 9 mm M 42.95 42.95 161,810.00 6,949,739.50
5 Pekerjaan Listplank GRC tebal 9 mm M 42.95 42.95 161,810.00 6,949,739.50
5 Pekerjaan Listplank GRC tebal 9 mm M 42.95 42.95 161,810.00 6,949,739.50
5 Pekerjaan Plesteran Kolom 20/20 SP 1 : 4 M2 73.60 73.60 94,442 6,950,927.67
2 Pemasangan Lampu Downlight 24 Watt (Ruang kelas) Bh 36.00 36.00 193,490.00 6,965,640.00
5 Pekerjaan Plesteran Kolom 20/20 SP 1 : 4 M2 73.60 73.60 94,647.52 6,966,057.47
5 Pekerjaan Plesteran Kolom 20/20 SP 1 : 4 M2 73.60 73.60 95,013.60 6,993,000.96
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 107.36 107.36 65,780.00 7,062,140.80
- Pekerjaan Bekisting M2 82.00 82.00 86,269.33 7,074,085.33
3 Pekerjaan Plesteran Kanstin SP 1 : 4 M2 75.05 75.05 94,442 7,087,868.50
- Pekerjaan Beton M3 6.90 6.90 1,030,577.25 7,110,983.05
5 Pekerjaan Listplank GRC tebal 9 mm M 40.95 40.95 173,690.00 7,112,605.50
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 266.80 266.80 26,711.30 7,126,574.84
3 Pekerjaan Plesteran Kanstin SP 1 : 4 M2 75.05 75.05 95,013.60 7,130,770.68
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 110.95 110.95 64,295.00 7,133,530.25
5 Pekerjaan Listplank GRC tebal 9 mm M 44.15 44.15 161,810.00 7,143,911.50
- Pekerjaan Beton M3 6.40 6.40 1,117,721.79 7,153,419.43
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 38.07 38.07 188,216.60 7,165,405.96
- Pekerjaan Bekisting M2 56.65 56.65 126,934.50 7,190,839.43
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 112.15 112.15 64,295.00 7,210,684.25
4 Pekerjaan Pembongkaran Lantai Keramik M2 391.20 391.20 18,480 7,229,376.00
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 39.00 39.00 186,032.00 7,255,248.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 104.95 104.95 69,217.50 7,264,376.63
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 104.95 104.95 69,217.50 7,264,376.63
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 113.15 113.15 64,295.00 7,274,979.25
- Pekerjaan Bekisting M2 92.00 92.00 79,167.00 7,283,364.00
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 78.00 78.00 93,450.72 7,289,156.16
1 Pembersihan Akhir Ls 1.00 1.00 7,340,893.68 7,340,893.68
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 820,050.00 7,380,450.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 820,050.00 7,380,450.00
1 Pekerjaan Pembersihan Lokasi M2 420.00 420.00 17,600.00 7,392,000.00
3 Penanaman Pohon Perdu Palm Kuning Plbg 50.00 50.00 147,880 7,393,985.50
3 Penanaman Pohon Perdu Palm Kuning Plbg 50.00 50.00 147,879.71 7,393,985.50
- Pekerjaan Bekisting M2 48.35 48.35 153,264.47 7,410,336.96
- Pekerjaan Bekisting M2 48.35 48.35 153,264.47 7,410,336.96
1 Pekerjaan Dinding Keramik Polos 20x40 cm (Polished) Setara Mulia M2 21.00 21.00 352,877.80 7,410,433.80
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 57.75 57.75 128,337.00 7,411,461.75
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 3,706,205.06 7,412,410.12
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 3,706,205.06 7,412,410.12
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 57.75 57.75 128,689.00 7,431,789.75
5 Pekerjaan Listplank GRC tebal 9 mm M 42.80 42.80 173,690.00 7,433,932.00
1 Pekerjaan Pembongkaran Atap M2 844.93 844.93 8,800.00 7,435,384.00
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 78.00 78.00 95,390.90 7,440,490.20
5 Pekerjaan Pasangan Saklar Ganda Bh 10.00 10.00 744,425.00 7,444,250.00
3 Pekerjaan Pembongkaran Plafond M2 503.86 503.86 14,784.00 7,449,066.24
3 Pekerjaan Pembongkaran Plafond M2 503.86 503.86 14,784.00 7,449,066.24
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 279.40 279.40 26,711.30 7,463,137.22
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 279.40 279.40 26,711.30 7,463,137.22
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 116.95 116.95 64,295.00 7,519,300.25
1 Pekerjaan Galian Pondasi Batu Belah M3 69.72 69.72 107,937.50 7,525,402.50
4 Pekerjaan Nok Atap Metal Berpasir M 69.20 69.20 109,010.00 7,543,492.00
- Pekerjaan Pembesian Polos 12 Kg 398.03 398.03 18,971.70 7,551,305.75
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 107.36 107.36 70,455.00 7,564,048.80
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 65.00 65.00 116,373.40 7,564,271.00
5 Pekerjaan Listplank GRC tebal 9 mm M 46.95 46.95 161,810 7,596,979.50
5 Pekerjaan Listplank GRC tebal 9 mm M 46.95 46.95 161,810 7,596,979.50
5 Pekerjaan Listplank GRC tebal 9 mm M 46.95 46.95 161,810 7,596,979.50
5 Pekerjaan Listplank GRC tebal 9 mm M 46.95 46.95 161,810 7,596,979.50
5 Pekerjaan Listplank GRC tebal 9 mm M 46.95 46.95 161,810 7,596,979.50
5 Pekerjaan Listplank GRC tebal 9 mm M 46.95 46.95 161,810.00 7,596,979.50
5 Pekerjaan Listplank GRC tebal 9 mm M 46.95 46.95 161,810.00 7,596,979.50
5 Pekerjaan Listplank GRC tebal 9 mm M 46.95 46.95 161,810.00 7,596,979.50
2 Pekerjaan Pengecatan Dinding Eksterior M2 150.90 150.90 50,402.00 7,605,661.80
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 36.18 36.18 210,347.50 7,610,372.55
1 Pekerjaan Rabat Beton Lantai Drainase M3 8.40 8.40 907,308.38 7,621,390.39
5 Pekerjaan Listplank GRC tebal 9 mm M 47.15 47.15 161,810.00 7,629,341.50
5 Pekerjaan Acian Kanstin M2 96.06 96.06 79,761.53 7,661,892.38
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 119.85 119.85 64,295 7,705,755.75
1 Pekerjaan Pengecatan Dinding Eksterior M2 152.90 152.90 50,402.00 7,706,465.80
8 Pekerjaan Acian Kolom K1 20/25 M2 144.00 144.00 53,652.50 7,725,960.00
- Pekerjaan Pembesian Polos 12 Kg 398.03 398.03 19,428.75 7,733,225.36
7 Pekerjaan Acian Dinding M2 178.07 178.07 43,450.00 7,737,141.50
1 Pekerjaan Pondasi Batu Kosong M3 16.48 16.48 471,058.50 7,763,044.08
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 224.00 224.00 34,672.00 7,766,528.00
5 Pekerjaan Listplank GRC tebal 9 mm M 44.80 44.80 173,690.00 7,781,312.00
5 Pekerjaan Listplank GRC tebal 9 mm M 44.95 44.95 173,690.00 7,807,365.50
5 Pekerjaan Listplank GRC tebal 9 mm M 44.95 44.95 173,690.00 7,807,365.50
5 Pekerjaan Plesteran Kolom 20/20 SP 1 : 4 M2 81.87 81.87 95,390.90 7,809,652.98
4 Pekerjaan Pembongkaran Lantai Keramik M2 423.00 423.00 18,480 7,817,040.00
2 Pekerjaan Pintu Panel P1 uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 2,618,853.50 7,856,560.50
3 Penanaman Pohon Perdu Palm Kuning Plbg 50.00 50.00 157,339.71 7,866,985.50
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 122.80 122.80 64,295.00 7,895,426.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 122.80 122.80 64,295.00 7,895,426.00
5 Pekerjaan Listplank GRC tebal 9 mm M 48.80 48.80 161,810.00 7,896,328.00
5 Pekerjaan Listplank GRC tebal 9 mm M 48.80 48.80 161,810.00 7,896,328.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 24.00 24.00 329,217.24 7,901,213.76
5 Pekerjaan Listplank GRC tebal 9 mm M 48.95 48.95 161,810.00 7,920,599.50
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 32.50 32.50 244,887.50 7,958,843.75
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 2,666,262.50 7,998,787.50
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 2,666,262.50 7,998,787.50
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 2,666,262.50 7,998,787.50
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 2,666,262.50 7,998,787.50
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 2,668,847.50 8,006,542.50
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 152.00 152.00 52,748.67 8,017,798.03
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 152.00 152.00 52,748.67 8,017,798.03
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 300.40 300.40 26,711.30 8,024,074.52
2 Pekerjaan Pengecatan Dinding Interior M2 232.20 232.20 34,672.00 8,050,838.40
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 86.40 86.40 93,450.72 8,074,142.21
5 Pekerjaan Listplank GRC tebal 9 mm M 50.07 50.07 161,810 8,101,826.70
2 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 85.00 85.00 95,390.90 8,108,226.50
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
1 Pemasangan Instalasi Penerangan Titik 9.00 9.00 901,560.00 8,114,040.00
2 Pekerjaan Pintu Double P1 uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 4,071,877.03 8,143,754.07
7 Pekerjaan Acian Dinding M2 152.00 152.00 53,652.50 8,155,180.00
8 Pekerjaan Rabat Beton Keliling Bangunan M3 9.00 9.00 907,308.38 8,165,775.42
- Pekerjaan Pembesian Ulir 13 Kg 424.23 424.23 19,428.75 8,242,258.61
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 125.45 125.45 65,780.00 8,252,101.00
1 Penanaman Rumput Jepang M2 100.00 100.00 83,050.00 8,305,000.00
2 Pekerjaan Pintu Double P1 uPVC lengkap dengan aksesoris (detail DED) Unit 2.00 2.00 4,158,777.03 8,317,554.07
2 Pekerjaan Pembongkaran Konstruksi Atap M2 104.49 104.49 80,080.00 8,367,559.20
2 Pekerjaan Pembongkaran Konstruksi Atap M2 104.49 104.49 80,080.00 8,367,559.20
2 Pekerjaan Pembongkaran Konstruksi Atap M2 104.49 104.49 80,080.00 8,367,559.20
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 2,804,458.06 8,413,374.17
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 155.00 155.00 54,527 8,451,715.26
- Pekerjaan Bekisting M2 64.00 64.00 132,480.33 8,478,741.33
- Pekerjaan Bekisting M2 64.00 64.00 132,480.33 8,478,741.33
2 Pekerjaan Pasangan Dinding Wastafel 1/2 Bata SP 1 : 4 M2 18.00 18.00 471,377.50 8,484,795.00
9 Pemasangan Wastafel + Aksesoris Bh 5.00 5.00 1,710,731.00 8,553,655.00
9 Pemasangan Wastafel + Aksesoris Bh 5.00 5.00 1,712,117.00 8,560,585.00
5 Pekerjaan Plesteran Kolom 20/20 SP 1 : 4 M2 73.60 73.60 116,373.40 8,565,082.24
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 9.74 9.74 880,407.00 8,575,164.18
3 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 92.00 92.00 93,450.72 8,597,466.24
- Pekerjaan Pembesian Ulir 13 Kg 444.25 444.25 19,428.75 8,631,222.19
- Pekerjaan Pembesian Ulir 13 Kg 444.25 444.25 19,428.75 8,631,222.19
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 204.00 204.00 42,441 8,658,025.20
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 204.00 204.00 42,441 8,658,025.20
1 Pekerjaan Pengecatan Dinding Eksterior M2 171.80 171.80 50,402.00 8,659,063.60
3 Pekerjaan Pembongkaran Plafond M2 586.17 586.17 14,784 8,665,937.28
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 206.00 206.00 42,441.30 8,742,907.80
- Pekerjaan Beton M3 6.00 6.00 1,467,827.93 8,806,967.56
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 125.45 125.45 70,455 8,838,579.75
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 125.45 125.45 70,455.00 8,838,579.75
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 125.45 125.45 70,455.00 8,838,579.75
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 173.20 173.20 51,233.66 8,873,670.47
2 Pekerjaan Pembongkaran Konstruksi Atap M2 110.93 110.93 80,080.00 8,883,274.40
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Unpolished) Setara Mulia M2 27.00 27.00 329,217.24 8,888,865.48
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 135.44 135.44 65,780.00 8,909,243.20
3 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 12.00 12.00 744,425 8,933,100.00
- Pekerjaan Beton M3 8.49 8.49 1,054,912 8,956,205.80
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 336.00 336.00 26,711.30 8,974,996.80
3 Pekerjaan Plesteran Kanstin SP 1 : 4 M2 96.06 96.06 93,450.72 8,976,876.16
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 127.58 127.58 70,455.00 8,988,648.90
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 127.58 127.58 70,455.00 8,988,648.90
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 127.58 127.58 70,455.00 8,988,648.90
- Pekerjaan Beton M3 6.15 6.15 1,467,827.93 9,027,141.75
- Pekerjaan Beton M3 6.15 6.15 1,467,827.93 9,027,141.75
- Pekerjaan Beton M3 8.25 8.25 1,100,825.79 9,081,812.73
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 36.18 36.18 251,762.50 9,108,767.25
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 36.18 36.18 251,762.50 9,108,767.25
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 36.18 36.18 251,762.50 9,108,767.25
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 36.18 36.18 251,762.50 9,108,767.25
10 Pemasangan Urinoir + Aksesoris Bh 2.00 2.00 4,599,826.00 9,199,652.00
10 Pemasangan Urinoir + Aksesoris Bh 2.00 2.00 4,601,212.00 9,202,424.00
- Pekerjaan Beton M3 8.28 8.28 1,117,721.79 9,254,736.39
3 Pekerjaan Acian Dinding M2 173.40 173.40 53,652.50 9,303,343.50
3 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 80.00 80.00 116,373.40 9,309,872.00
1 Pekerjaan Galian Pondasi Batu Belah M3 86.52 86.52 107,937.50 9,338,752.50
5 Pekerjaan Acian Kanstin M2 215.67 215.67 43,307.00 9,340,020.69
1 Pekerjaan Pondasi Batu Kosong M3 20.00 20.00 471,058.50 9,421,170.00
- Pekerjaan Pembesian Ulir 13 Kg 485.16 485.16 19,428.75 9,426,052.35
- Pekerjaan Pembesian Ulir 13 Kg 485.16 485.16 19,428.75 9,426,052.35
1 Pekerjaan Pondasi Batu Kosong M3 22.08 22.08 427,383.00 9,436,616.64
3 Penanaman Pohon Perdu Palm Kuning Plbg 60.00 60.00 157,339.71 9,440,382.60
- Pekerjaan Beton M3 8.96 8.96 1,054,912 9,452,014.61
2 Pekerjaan Pengukuran & Pemasangan Bouwplank M 120.00 120.00 78,776.50 9,453,180.00
3 Penanaman Pohon Perdu Palm Kuning Plbg 64.00 64.00 147,879.71 9,464,301.44
2 Pekerjaan Pengukuran & Pemasangan Bouwplank M 120.00 120.00 79,046.00 9,485,520.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Unpolished) Setara Mulia M2 27.00 27.00 352,877.80 9,527,700.60
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 357.00 357.00 26,711.30 9,535,934.10
5 Pekerjaan Listplank GRC tebal 9 mm M 58.95 58.95 161,810.00 9,538,699.50
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 39.00 39.00 244,887.50 9,550,612.50
2 Pekerjaan Pembongkaran Konstruksi Atap M2 119.70 119.70 80,080.00 9,585,576.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 146.15 146.15 65,780.00 9,613,747.00
- Pekerjaan Beton M3 6.55 6.55 1,467,827.93 9,614,272.92
5 Pekerjaan Listplank GRC tebal 9 mm M 59.55 59.55 161,810 9,635,785.50
- Pekerjaan Pembesian Ulir 13 Kg 513.80 513.80 18,971.70 9,747,659.46
- Pekerjaan Pembesian Ulir 13 Kg 513.80 513.80 18,971.70 9,747,659.46
- Pekerjaan Pembesian Ulir 13 Kg 513.80 513.80 18,971.70 9,747,659.46
- Pekerjaan Pembesian Ulir 13 Kg 513.80 513.80 18,971.70 9,747,659.46
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 4.00 4.00 2,469,032.50 9,876,130.00
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 77.00 77.00 128,689.00 9,909,053.00
3 Pekerjaan Pembongkaran Plafond M2 671.46 671.46 14,784 9,926,864.64
5 Pekerjaan Listplank GRC tebal 9 mm M 57.20 57.20 173,690.00 9,935,068.00
3 Pekerjaan Plint Keramik 10x40 M 168.20 168.20 59,073.44 9,936,152.19
1 Pekerjaan Galian Pondasi Batu Belah M3 115.92 115.92 85,800.00 9,945,936.00
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 42.00 42.00 238,645.00 10,023,090.00
- Pekerjaan Bekisting M2 110.00 110.00 91,212.00 10,033,320.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 51.28 51.28 196,086.00 10,055,290.08
- Pekerjaan Bekisting M2 110.40 110.40 91,212.00 10,069,804.80
2 Pekerjaan Urugan Tanah Humus M3 23.63 23.63 426,800.00 10,085,284.00
2 Pekerjaan Pembongkaran Konstruksi Atap M2 125.97 125.97 80,080 10,087,677.60
2 Pekerjaan Pembongkaran Konstruksi Atap M2 125.97 125.97 80,080 10,087,677.60
2 Pekerjaan Pembongkaran Konstruksi Atap M2 125.97 125.97 80,080.00 10,087,677.60
2 Pekerjaan Pembongkaran Konstruksi Atap M2 125.97 125.97 80,080.00 10,087,677.60
- Pekerjaan Beton M3 6.91 6.91 1,467,827.93 10,142,690.97
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 40.50 40.50 251,762.50 10,196,381.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 158.95 158.95 64,295 10,219,690.25
3 Pekerjaan Acian Drainase M2 242.08 242.08 42,592.00 10,310,671.36
- Pekerjaan Pembesian Ulir 13 Kg 546.62 546.62 18,971.70 10,370,310.65
8 Pekerjaan Rabat Beton Keliling Bangunan T=10 cm M3 11.45 11.45 907,308.38 10,388,680.95
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 161.90 161.90 64,295.00 10,409,360.50
3 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 110.00 110.00 94,647.52 10,411,227.20
2 Pekerjaan Pengecatan Dinding & Kolom Eksterior Setara Jotun M2 245.54 245.54 42,441.30 10,421,036.80
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 125.45 125.45 83,325.00 10,453,121.25
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 392.00 392.00 26,711 10,470,829.60
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 10.54 10.54 994,922.50 10,486,483.15
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 10.54 10.54 994,922.50 10,486,483.15
3 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 110.40 110.40 95,013.60 10,489,501.44
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 32.00 32.00 329,217.24 10,534,951.68
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 249.50 249.50 42,441 10,589,104.35
- Pekerjaan Bekisting M2 122.80 122.80 86,269.33 10,593,874.13
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 127.29 127.29 83,325.00 10,606,439.25
2 Pekerjaan Pembongkaran Konstruksi Atap M2 104.25 104.25 101,887.50 10,621,771.88
7 Pekerjaan Acian Dinding M2 250.04 250.04 42,592.00 10,649,703.68
1 Pemasangan Instalasi Penerangan Titik 13.00 13.00 820,050.00 10,660,650.00
2 Pekerjaan Pembongkaran Konstruksi Atap M2 134.29 134.29 80,080 10,753,943.20
2 Pekerjaan Pengukuran & Pemasangan Bouwplank M 115.00 115.00 93,676 10,772,740.00
3 Pekerjaan Plint Keramik 10x40 Setara Mulia M 197.80 197.80 54,527 10,785,479.22
1 Pekerjaan Rabat Beton Lantai Drainase M3 11.90 11.90 907,308.38 10,796,969.72
- Pekerjaan Bekisting M2 75.90 75.90 142,557.80 10,820,137.02
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 153.80 153.80 70,455 10,835,979.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 153.80 153.80 70,455 10,835,979.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 153.80 153.80 70,455.00 10,835,979.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 153.80 153.80 70,455.00 10,835,979.00
2 Pekerjaan Pengecatan Dinding & Kolom Eksterior Setara Jotun M2 257.04 257.04 42,441.30 10,909,111.75
2 Pekerjaan Pembongkaran Konstruksi Atap M2 136.25 136.25 80,080.00 10,910,900.00
3 Pekerjaan Pengecatan Dinding Interior M2 315.00 315.00 34,672.00 10,921,680.00
3 Pekerjaan Pengecatan Dinding Interior M2 315.00 315.00 34,672.00 10,921,680.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 166.36 166.36 65,780.00 10,943,160.80
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 115.20 115.20 95,013.60 10,945,566.72
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 158.40 158.40 69,217.50 10,964,052.00
2 Pekerjaan Pembongkaran Konstruksi Atap M2 137.77 137.77 80,080.00 11,032,621.60
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 168.21 168.21 65,780.00 11,064,853.80
5 Pekerjaan Listplank GRC tebal 9 mm M 64.00 64.00 173,690.00 11,116,160.00
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 3.00 3.00 3,706,205.06 11,118,615.17
3 Pekerjaan Pasangan Saklar Ganda (Ruang Kelas) Bh 15.00 15.00 744,425 11,166,375.00
2 Pekerjaan Pengecatan Kanstin Eksterior Setara Jotun M2 221.91 221.91 50,402.00 11,184,707.82
- Pekerjaan Bekisting M2 85.33 85.33 132,480.33 11,304,546.84
2 Pekerjaan Pengukuran & Pemasangan Bouwplank M 120.00 120.00 94,303.00 11,316,360.00
2 Pekerjaan Pengecatan Dinding Eksterior M2 225.04 225.04 50,402.00 11,342,466.08
2 Pekerjaan Pengecatan Dinding Eksterior M2 225.04 225.04 50,402.00 11,342,466.08
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 225.05 225.05 50,402.00 11,342,970.10
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 426.17 426.17 26,711.30 11,383,554.72
- Pekerjaan Bekisting M2 90.00 90.00 126,934.50 11,424,105.00
- Pekerjaan Bekisting M2 76.80 76.80 148,855.67 11,432,115.20
4 Pekerjaan Pembongkaran Lantai Keramik M2 490.00 490.00 23,512.50 11,521,125.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 163.97 163.97 70,455 11,552,506.35
7 Pekerjaan Acian Dinding M2 216.00 216.00 53,652.50 11,588,940.00
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 49.00 49.00 238,645.00 11,693,605.00
- Pekerjaan Pembesian Ulir 13 Kg 602.07 602.07 19,428.75 11,697,467.51
- Pekerjaan Pembesian Ulir 13 Kg 602.07 602.07 19,428.75 11,697,467.51
7 Pekerjaan Acian Dinding M2 218.04 218.04 53,652.50 11,698,391.10
7 Pekerjaan Acian Dinding M2 218.04 218.04 53,652.50 11,698,391.10
7 Pekerjaan Acian Dinding M2 270.47 270.47 43,307.00 11,713,244.29
3 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 122.80 122.80 95,390.90 11,714,002.52
1 Pemasangan Instalasi Penerangan Titik 13.00 13.00 901,560 11,720,280.00
1 Pemasangan Instalasi Penerangan Titik 13.00 13.00 901,560.00 11,720,280.00
1 Pemasangan Instalasi Penerangan Titik 13.00 13.00 901,560.00 11,720,280.00
1 Pemasangan Instalasi Penerangan Titik 13.00 13.00 901,560.00 11,720,280.00
- Pekerjaan Beton M3 8.00 8.00 1,467,827.93 11,742,623.41
3 Pekerjaan Pintu Panel P2 uPVC lengkap dengan aksesoris (detail DED) Unit 6.00 6.00 1,968,712 11,812,273.00
3 Pekerjaan Pintu Panel P2 uPVC lengkap dengan aksesoris (detail DED) Unit 6.00 6.00 1,968,712.17 11,812,273.00
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 124.99 124.99 95,013.60 11,875,749.86
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 280.07 280.07 42,441.30 11,886,534.89
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 448.00 448.00 26,711.30 11,966,662.40
4 Pekerjaan Pembongkaran Lantai Keramik M2 648.00 648.00 18,480.00 11,975,040.00
7 Pekerjaan Acian Dinding M2 224.00 224.00 53,652.50 12,018,160.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 61.60 61.60 196,086.00 12,078,897.60
3 Pekerjaan Acian Drainase M2 285.60 285.60 42,828 12,231,662.52
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 130.04 130.04 94,647.52 12,307,963.50
3 Pekerjaan Pembongkaran Plafond M2 656.57 656.57 18,810.00 12,350,081.70
3 Pekerjaan Penutup Atap Metal Berpasir M2 63.00 63.00 196,086.00 12,353,418.00
5 Pekerjaan Lantai Keramik Polos 40x40 cm (Unpolished) Setara Mulia M2 35.10 35.10 353,808.40 12,418,674.84
1 Pekerjaan Pondasi Batu Kosong M3 27.84 27.84 446,391.00 12,427,525.44
3 Pekerjaan Acian Pondasi M2 232.20 232.20 53,652.50 12,458,110.50
2 Pekerjaan Galian Pondasi Batu Belah M3 146.16 146.16 85,800.00 12,540,528.00
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 296.00 296.00 42,441.30 12,562,624.80
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 150.77 150.77 83,325.00 12,562,910.25
2 Pekerjaan Pembongkaran Konstruksi Atap M2 123.48 123.48 101,887.50 12,581,068.50
- Pekerjaan Beton M3 11.94 11.94 1,054,912 12,595,653.39
2 Pekerjaan Pengecatan Dinding Pagar Eksterior M2 250.67 250.67 50,402.00 12,634,269.34
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 151.67 151.67 83,325.00 12,637,902.75
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 151.67 151.67 83,325.00 12,637,902.75
- Pekerjaan Pembesian Ulir 13 Kg 651.59 651.59 19,428.75 12,659,579.21
5 Pekerjaan Listplank GRC tebal 9 mm M 72.95 72.95 173,690.00 12,670,685.50
5 Pekerjaan Listplank GRC tebal 9 mm M 72.95 72.95 173,690.00 12,670,685.50
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 36.00 36.00 352,877.80 12,703,600.80
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) M2 36.00 36.00 352,877.80 12,703,600.80
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 180.33 180.33 70,455.00 12,705,150.15
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 476.00 476.00 26,711.30 12,714,578.80
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 476.00 476.00 26,711 12,714,578.80
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 76.00 76.00 167,444 12,725,759.20
5 Pekerjaan Listplank GRC tebal 9 mm M 78.95 78.95 161,810.00 12,774,899.50
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 32.00 32.00 403,946 12,926,282.69
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 32.00 32.00 403,946 12,926,282.69
1 Pekerjaan Pondasi Batu Kosong M3 28.98 28.98 446,391.00 12,936,411.18
- Pekerjaan Beton M3 8.82 8.82 1,467,827.93 12,946,242.31
1 Pekerjaan Rabat Beton Lantai Drainase T=7 cm M3 16.37 16.37 794,116.40 12,999,685.47
3 Pekerjaan Pembongkaran Plafond M2 692.00 692.00 18,810.00 13,016,520.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 188.95 188.95 69,217.50 13,078,646.63
1 Pemasangan Instalasi Penerangan Titik 16.00 16.00 820,050.00 13,120,800.00
1 Pemasangan Instalasi Penerangan Titik 16.00 16.00 820,050.00 13,120,800.00
1 Pemasangan Instalasi Penerangan Titik 16.00 16.00 820,050.00 13,120,800.00
- Pekerjaan Pembesian Ulir 13 Kg 676.16 676.16 19,428.75 13,136,943.60
- Pekerjaan Pembesian Ulir 13 Kg 676.16 676.16 19,428.75 13,136,943.60
2 Pekerjaan Pengukuran & Pemasangan Bouwplank M 140.00 140.00 94,303.00 13,202,420.00
- Pekerjaan Beton M3 9.00 9.00 1,467,827.93 13,210,451.34
1 Pekerjaan Pengecatan Dinding Eksterior M2 263.40 263.40 50,402.00 13,275,886.80
5 Pekerjaan Listplank GRC tebal 9 mm M 82.15 82.15 161,810.00 13,292,691.50
4 Penanaman Perdu Lili Paris Plbg 90.00 90.00 147,879.71 13,309,173.90
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 76.00 76.00 175,467.60 13,335,537.60
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 56.00 56.00 238,645.00 13,364,120.00
1 Pekerjaan Dinding Keramik Polos 20x40 cm (Toilet) (Polished) Setara Mulia M2 42.00 42.00 318,244.74 13,366,279.08
3 Pekerjaan Penutup Atap Metal Berpasir M2 68.38 68.38 196,086.00 13,408,360.68
7 Pekerjaan Acian Dinding M2 250.67 250.67 53,652.50 13,449,072.18
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 42.00 42.00 321,453.00 13,501,026.00
- Pekerjaan Beton M3 9.21 9.21 1,467,827.93 13,518,695.20
1 Pekerjaan Pipa PVC AW 3/4" (Bersih) M 214.49 214.49 63,690 13,660,868.10
4 Pekerjaan Plesteran Kolom Utama K1 20/25 SP 1 : 4 M2 144.00 144.00 95,390.90 13,736,289.60
1 Pekerjaan Pondasi Batu Kosong M3 32.20 32.20 427,383.00 13,761,732.60
1 Pekerjaan Galian Pondasi Batu Belah M3 161.00 161.00 85,800.00 13,813,800.00
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 13.94 13.94 994,922.50 13,869,219.65
5 Pekerjaan Listplank GRC tebal 9 mm M 80.00 80.00 173,690.00 13,895,200.00
3 Pekerjaan Plint Keramik 10x40 M 235.48 235.48 59,073.44 13,910,613.06
3 Pemasangan Wastafel Setara Toto Unit 12.00 12.00 1,159,488.00 13,913,856.00
1 Pemasangan Instalasi Penerangan Titik 17.00 17.00 820,050.00 13,940,850.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 216.95 216.95 64,295.00 13,948,800.25
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 218.85 218.85 64,295.00 14,070,960.75
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 76.00 76.00 186,032.00 14,138,432.00
2 Pekerjaan Pengecatan Dinding Eksterior M2 281.00 281.00 50,402.00 14,162,962.00
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 152.00 152.00 93,450.72 14,204,509.44
- Pekerjaan Pembesian Ulir 13 Kg 749.33 749.33 18,971.70 14,216,063.96
1 Pekerjaan Pipa PVC AW 4" + Penutup Pipa Biopori (Biopori) (Detail DED) M 120.00 120.00 118,635 14,236,203.30
5 Pekerjaan Listplank GRC tebal 9 mm M 82.00 82.00 173,690.00 14,242,580.00
3 Pekerjaan Pintu Panel P2 uPVC lengkap dengan aksesoris (detail DED) Unit 6.00 6.00 2,379,694.17 14,278,165.00
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 76.00 76.00 188,216.60 14,304,461.60
- Pekerjaan Bekisting M2 112.75 112.75 126,934.50 14,311,864.88
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 152.00 152.00 94,442 14,355,176.70
1 Pekerjaan Dinding Keramik Polos 20x40 cm (Toilet) (Polished) Setara Mulia M2 42.00 42.00 341,898.04 14,359,717.68
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 69.72 69.72 206,415 14,391,253.80
- Pekerjaan Bekisting M2 159.20 159.20 90,717 14,442,146.40
1 Pekerjaan Dinding Keramik Polos 20x40 cm (Toilet) (Polished) Setara Mulia M2 42.00 42.00 345,145.90 14,496,127.80
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 152.00 152.00 95,390.90 14,499,416.80
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 36.00 36.00 403,946 14,542,068.02
3 Pekerjaan Acian Drainase M2 272.00 272.00 53,652.50 14,593,480.00
- Pekerjaan Bekisting M2 98.13 98.13 148,855.67 14,607,206.57
- Pekerjaan Beton M3 14.70 14.70 996,477.51 14,648,219.36
- Pekerjaan Beton M3 14.70 14.70 996,477.51 14,648,219.36
- Pekerjaan Bekisting M2 95.70 95.70 153,264.47 14,667,409.46
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 16.66 16.66 887,579.00 14,787,066.14
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 6.00 6.00 2,469,032.50 14,814,195.00
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 6.00 6.00 2,469,032.50 14,814,195.00
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 6.00 6.00 2,469,032.50 14,814,195.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Toilet & Selasar) (Unpolished) M2 42.00 42.00 352,877.80 14,820,867.60
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) M2 42.00 42.00 352,877.80 14,820,867.60
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 42.00 42.00 352,877.80 14,820,867.60
1 Pekerjaan Dinding Keramik Polos 20x40 cm (Toilet) (Polished) M2 42.00 42.00 352,877.80 14,820,867.60
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 4.00 4.00 3,706,205.06 14,824,820.23
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 6.00 6.00 2,471,617.50 14,829,705.00
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 115.50 115.50 128,689 14,863,579.50
3 Pekerjaan Pengecatan Dinding Interior M2 430.67 430.67 34,672.00 14,932,190.24
4 Pembuatan Barak Kerja Ls 1.00 1.00 15,000,000.00 15,000,000.00
4 Pekerjaan Pembuatan Barak Kerja Ls 1.00 1.00 15,000,000.00 15,000,000.00
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 63.00 63.00 238,645.00 15,034,635.00
3 Pekerjaan Plesteran Pondasi SP 1 : 4 M2 159.20 159.20 94,442 15,035,158.76
- Pekerjaan Beton M3 18.48 18.48 818,264.86 15,121,534.56
5 Pekerjaan Listplank GRC tebal 9 mm M 87.20 87.20 173,690.00 15,145,768.00
2 Pekerjaan Pengecatan Dinding & Kolom Eksterior Setara Jotun M2 357.11 357.11 42,441.30 15,156,212.64
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 236.15 236.15 64,295.00 15,183,264.25
5 Pekerjaan Listplank GRC tebal 9 mm M 93.90 93.90 161,810.00 15,193,959.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 220.95 220.95 69,217.50 15,293,606.63
- Pekerjaan Pembesian Ulir 13 Kg 806.66 806.66 18,971.70 15,303,711.52
- Pekerjaan Pembesian Ulir 13 Kg 806.66 806.66 18,971.70 15,303,711.52
1 Pekerjaan Pasangan Dinding Kanstin 1/2 Bata SP 1 : 4 M2 87.36 87.36 175,467.60 15,328,849.54
- Pekerjaan Pembesian Ulir 13 Kg 811.39 811.39 18,972 15,393,447.66
1 Pekerjaan Pondasi Batu Kosong M3 32.80 32.80 471,058.50 15,450,718.80
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 242.85 242.85 64,295.00 15,614,040.75
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 49.00 49.00 321,453.00 15,751,197.00
1 Pembersihan Lokasi M2 718.00 718.00 22,000.00 15,796,000.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 48.00 48.00 329,217.24 15,802,427.52
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 48.00 48.00 329,217.24 15,802,427.52
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 246.15 246.15 64,295.00 15,826,214.25
3 Pekerjaan Penutup Atap Metal Berpasir M2 85.13 85.13 186,527 15,879,043.51
1 Pekerjaan Rabat Beton Lantai Drainase T=7 cm M3 20.29 20.29 785,316.40 15,934,069.76
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 6.00 6.00 2,666,262.50 15,997,575.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 232.00 232.00 69,217.50 16,058,460.00
1 Pemasangan Instalasi Penerangan Titik 18.00 18.00 901,560 16,228,080.00
1 Pemasangan Instalasi Penerangan Titik 18.00 18.00 901,560 16,228,080.00
1 Pemasangan Instalasi Penerangan Titik 18.00 18.00 901,560.00 16,228,080.00
1 Pemasangan Instalasi Penerangan Titik 18.00 18.00 901,560.00 16,228,080.00
1 Pemasangan Instalasi Penerangan Titik 18.00 18.00 901,560.00 16,228,080.00
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 102.74 102.74 158,015.00 16,234,461.10
2 Pekerjaan Pengecatan Kanstin Eksterior Setara Jotun M2 322.86 322.86 50,402.00 16,272,789.72
- Pekerjaan Bekisting M2 102.40 102.40 159,562.33 16,339,182.93
2 Pekerjaan Pipa PVC AW 4" + Penutup Pipa Biopori (Biopori) (Detail DED) M 138.00 138.00 118,635.03 16,371,633.80
1 Pekerjaan Galian Pondasi Batu Belah M3 192.50 192.50 85,800.00 16,516,500.00
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 19.38 19.38 854,843.00 16,566,857.34
1 Pekerjaan Galian Pondasi Batu Belah M3 193.20 193.20 85,800.00 16,576,560.00
1 Pekerjaan Dinding Keramik Polos 20x40 cm (Toilet) (Polished) Setara Mulia M2 42.00 42.00 395,284 16,601,921.03
3 Pekerjaan Pengecatan Dinding Interior Setara Jotun M2 622.30 622.30 26,711 16,622,441.99
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 396.11 396.11 42,441.30 16,811,423.34
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 6.00 6.00 2,804,458.06 16,826,748.35
4 Pekerjaan Pengecatan Pintu & Jendela M2 105.00 105.00 160,525.75 16,855,203.75
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 178.07 178.07 95,013.60 16,919,071.75
- Pekerjaan Bekisting M2 128.00 128.00 132,480.33 16,957,482.67
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 48.00 48.00 353,808.40 16,982,803.20
- Pekerjaan Pembesian Ulir 13 Kg 895.94 895.94 18,971.70 16,997,504.90
- Pekerjaan Pembesian Ulir 13 Kg 899.20 899.20 18,971.70 17,059,352.64
1 Pekerjaan Pondasi Batu Kosong M3 38.50 38.50 446,391.00 17,186,053.50
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 43.56 43.56 395,284 17,218,563.81
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Polished) M2 49.00 49.00 352,877.80 17,291,012.20
- Pekerjaan Bekisting M2 130.99 130.99 132,480.33 17,353,598.86
- Pekerjaan Bekisting M2 113.44 113.44 153,264.47 17,386,321.10
2 Pekerjaan Pembongkaran Konstruksi Atap M2 217.19 217.19 80,080.00 17,392,575.20
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 82.98 82.98 210,348 17,454,635.55
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 82.98 82.98 210,347.50 17,454,635.55
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 82.98 82.98 210,347.50 17,454,635.55
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 82.98 82.98 210,347.50 17,454,635.55
2 Pekerjaan Pasangan Batu Alam M2 38.00 38.00 461,208.00 17,525,904.00
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 110.93 110.93 158,015.00 17,528,603.95
5 Pekerjaan Listplank GRC tebal 9 mm M 108.95 108.95 161,810.00 17,629,199.50
2 Pekerjaan Plesteran Dinding Drainase SP 1 : 4 M2 188.68 188.68 93,450.72 17,632,281.85
2 Pekerjaan Pembongkaran Konstruksi Atap M2 220.37 220.37 80,080 17,647,229.60
2 Pekerjaan Pembongkaran Konstruksi Atap M2 220.37 220.37 80,080 17,647,229.60
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 51.00 51.00 347,673.04 17,731,325.04
4 Penanaman Perdu Lili Paris Plbg 120.00 120.00 147,880 17,745,565.20
2 Pekerjaan Pipa PVC AW 4" + Penutup Pipa Biopori (Biopori) (Detail DED) M 150.00 150.00 118,635.03 17,795,254.13
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 56.00 56.00 318,244.74 17,821,705.44
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 56.00 56.00 318,244.74 17,821,705.44
1 Pekerjaan Pengecatan Lapangan Eksterior Setara Jotun M2 420.75 420.75 42,441.30 17,857,176.98
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 421.00 421.00 42,441 17,867,787.30
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 56.00 56.00 321,453.00 18,001,368.00
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 217.92 217.92 83,325.00 18,158,184.00
2 Pekerjaan Pembongkaran Konstruksi Atap M2 178.48 178.48 101,887.50 18,184,881.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 107.36 107.36 170,027.00 18,254,098.72
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 432.00 432.00 42,441.30 18,334,641.60
2 Pekerjaan Pasangan Batu Alam M2 38.00 38.00 485,760.00 18,458,880.00
2 Pekerjaan Pasangan Batu Alam M2 38.00 38.00 485,760.00 18,458,880.00
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 5.00 5.00 3,706,205.06 18,531,025.29
1 Pekerjaan Galian Pondasi Batu Belah M3 172.20 172.20 107,937.50 18,586,837.50
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 76.00 76.00 244,887.50 18,611,450.00
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 9.00 9.00 2,072,571.50 18,653,143.50
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 265.19 265.19 70,455.00 18,683,961.45
- Pekerjaan Bekisting M2 117.33 117.33 159,562.33 18,721,448.57
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 54.00 54.00 347,673.04 18,774,344.16
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 54.00 54.00 347,673.04 18,774,344.16
- Pekerjaan Bekisting M2 117.76 117.76 159,562.33 18,790,060.37
2 Pekerjaan Pasangan Batu Alam M2 38.00 38.00 495,155 18,815,872.90
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 444.00 444.00 42,441.30 18,843,937.20
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 119.70 119.70 158,015.00 18,914,395.50
1 Pemasangan Instalasi Penerangan Titik 21.00 21.00 901,560 18,932,760.00
1 Pemasangan Instalasi Penerangan Titik 21.00 21.00 901,560 18,932,760.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 269.07 269.07 70,455 18,957,326.85
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 269.07 269.07 70,455 18,957,326.85
- Pekerjaan Bekisting M2 124.20 124.20 153,264.47 19,035,446.76
1 Pemasangan Grill Penutup Drainase (Detail DED) M2 65.60 65.60 293,612.00 19,260,947.20
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 91.73 91.73 210,347.50 19,295,176.18
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 91.73 91.73 210,347.50 19,295,176.18
- Pekerjaan Pembesian Ulir 13 Kg 1,017.09 1017.09 18,971.70 19,295,926.35
- Pekerjaan Pembesian Ulir 13 Kg 1,017.09 1017.09 18,971.70 19,295,926.35
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 56.00 56.00 345,145.90 19,328,170.40
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 56.00 56.00 345,145.90 19,328,170.40
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 56.00 56.00 345,145.90 19,328,170.40
- Pekerjaan Pembesian Ulir 13 Kg 1,000.19 1000.19 19,428.75 19,432,441.46
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 69.72 69.72 280,313 19,543,422.36
4 Penanaman Perdu Lili Paris Plbg 125.00 125.00 157,339.71 19,667,463.75
- Pekerjaan Bekisting M2 138.00 138.00 142,557.80 19,672,976.40
1 Pemasangan Instalasi Penerangan Titik 24.00 24.00 820,050.00 19,681,200.00
3 Pemasangan Wastafel Setara Toto Unit 17.00 17.00 1,159,488.00 19,711,296.00
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 8.00 8.00 2,469,032.50 19,752,260.00
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) M2 56.00 56.00 352,877.80 19,761,156.80
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) M2 56.00 56.00 352,877.80 19,761,156.80
3 Pekerjaan Penutup Atap Metal Berpasir M2 107.36 107.36 186,527.00 20,025,538.72
2 Pekerjaan Pembongkaran Konstruksi Atap M2 251.93 251.93 80,080.00 20,174,554.40
1 Pekerjaan Plesteran Dinding SP 1 : 4 M2 173.40 173.40 116,373.40 20,179,147.56
2 Pekerjaan Plesteran Dinding Drainase SP 1 : 4 M2 212.00 212.00 95,390.90 20,222,870.80
1 Pekerjaan Pondasi Batu Kosong M3 42.98 42.98 471,058.50 20,246,094.33
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 63.00 63.00 321,453.00 20,251,539.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Toilet & Selasar) (Unpolished) Setara Mulia M2 61.60 61.60 329,217.24 20,279,781.98
3 Pekerjaan Plesteran Kanstin SP 1 : 4 M2 215.67 215.67 94,647.52 20,412,630.64
4 Pekerjaan Pengecatan Pintu & Jendela Setara Jotun M2 159.00 159.00 128,689.00 20,461,551.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) M2 58.00 58.00 352,877.80 20,466,912.40
- Pekerjaan Pembesian Ulir 13 Kg 1,081.86 1081.86 18,971.70 20,524,723.36
3 Pemasangan Wastafel Setara Toto Unit 12.00 12.00 1,710,731.00 20,528,772.00
3 Pemasangan Wastafel Setara Toto Unit 12.00 12.00 1,711,853.00 20,542,236.00
1 Pekerjaan Pipa PVC AW 3/4" (Bersih) M 214.49 214.49 96,217.00 20,637,584.33
3 Pekerjaan Acian Drainase M2 385.34 385.34 53,652.50 20,674,454.35
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Laboratorium) (Polished) Setara Mulia M2 60.68 60.68 341,898.04 20,746,373.07
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 218.04 218.04 95,390.90 20,799,031.84
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 218.04 218.04 95,390.90 20,799,031.84
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 323.80 323.80 64,295.00 20,818,721.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 323.80 323.80 64,295.00 20,818,721.00
5 Pekerjaan Listplank GRC tebal 9 mm M 128.85 128.85 161,810.00 20,849,218.50
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 82.98 82.98 251,762.50 20,891,252.25
1 Pemasangan Grill Penutup Drainase (Detail DED) M2 71.20 71.20 293,612.00 20,905,174.40
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 252.00 252.00 83,325.00 20,997,900.00
2 Pekerjaan Plesteran Dinding Drainase SP 1 : 4 M2 222.60 222.60 94,442 21,022,778.52
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 64.00 64.00 329,217.24 21,069,903.36
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 64.00 64.00 329,217.24 21,069,903.36
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 102.74 102.74 206,415 21,207,077.10
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 102.74 102.74 206,415.00 21,207,077.10
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 102.74 102.74 206,415.00 21,207,077.10
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 114.04 114.04 186,032.00 21,215,089.28
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 330.45 330.45 64,295.00 21,246,282.75
3 Pekerjaan Penutup Atap Metal Berpasir M2 125.45 125.45 170,027.00 21,329,887.15
2 Pekerjaan Pengecatan Dinding Pagar Eksterior M2 502.93 502.93 42,441.30 21,345,003.01
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Toilet & Selasar) (Unpolished) Setara Mulia M2 61.60 61.60 347,673.04 21,416,659.26
7 Pekerjaan Acian Dinding M2 502.93 502.93 42,592.00 21,420,794.56
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 136.25 136.25 158,015.00 21,529,543.75
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 63.00 63.00 341,898.04 21,539,576.52
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 104.49 104.49 206,415.00 21,568,303.35
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 104.49 104.49 206,415.00 21,568,303.35
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 104.49 104.49 206,415.00 21,568,303.35
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 307.61 307.61 70,455.00 21,672,662.55
- Pekerjaan Pembesian Ulir 13 Kg 1,116.40 1116.40 19,428.75 21,690,256.50
- Pekerjaan Pembesian Polos 12 Kg 1,144.33 1144.33 18,971.70 21,709,885.46
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Toilet & Selasar) (Unpolished) M2 61.60 61.60 352,877.80 21,737,272.48
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 137.77 137.77 158,015.00 21,769,726.55
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Toilet & Selasar) (Unpolished) Setara Mulia M2 61.60 61.60 353,808.40 21,794,597.44
3 Pekerjaan Pengecatan Dinding Interior M2 629.95 629.95 34,672.00 21,841,626.40
- Pekerjaan Beton M3 25.20 25.20 866,909.21 21,846,112.20
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 56.00 56.00 395,284 22,135,894.70
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 56.00 56.00 395,284 22,135,894.70
1 Pemasangan Instalasi Penerangan Titik 27.00 27.00 820,050.00 22,141,350.00
1 Pemasangan Instalasi Penerangan Titik 27.00 27.00 820,050.00 22,141,350.00
4 Penanaman Perdu Lili Paris Plbg 150.00 150.00 147,879.71 22,181,956.50
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) M2 63.00 63.00 352,877.80 22,231,301.40
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) M2 63.00 63.00 352,877.80 22,231,301.40
5 Pekerjaan Listplank GRC tebal 9 mm M 128.95 128.95 173,690.00 22,397,325.50
5 Pekerjaan Listplank GRC tebal 9 mm M 138.45 138.45 161,810.00 22,402,594.50
2 Pekerjaan Pengecatan Dinding Eksterior M2 445.04 445.04 50,402.00 22,430,906.08
5 Pekerjaan Listplank GRC tebal 9 mm M 138.95 138.95 161,810.00 22,483,499.50
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 350.85 350.85 64,295.00 22,557,900.75
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 64.00 64.00 353,808.40 22,643,737.60
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 352.95 352.95 64,295.00 22,692,920.25
- Pekerjaan Pembesian Ulir 13 Kg 1,169.07 1169.07 19,428.75 22,713,568.76
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 144.00 144.00 158,015.00 22,754,160.00
5 Pekerjaan Listplank GRC tebal 9 mm M 140.85 140.85 161,810.00 22,790,938.50
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 108.54 108.54 210,347.50 22,831,117.65
- Pekerjaan Bekisting M2 180.00 180.00 126,934.50 22,848,210.00
- Pekerjaan Pembesian Polos 12 Kg 1,205.60 1205.60 18,971.70 22,872,281.52
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 130.47 130.47 175,467.60 22,893,257.77
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 72.00 72.00 318,244.74 22,913,621.28
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 10.00 10.00 2,297,817.50 22,978,175.00
10 Pemasangan Urinoir + Aksesoris Bh 5.00 5.00 4,600,383 23,001,913.00
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 23.12 23.12 994,922.50 23,002,608.20
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 23.12 23.12 994,922.50 23,002,608.20
10 Pemasangan Urinoir + Aksesoris Bh 5.00 5.00 4,600,948.00 23,004,740.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 135.44 135.44 170,027.00 23,028,456.88
3 Pekerjaan Acian Drainase M2 530.01 530.01 43,450.00 23,028,934.50
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 91.73 91.73 251,762.50 23,094,174.13
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 91.73 91.73 251,762.50 23,094,174.13
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 91.73 91.73 251,762.50 23,094,174.13
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 91.73 91.73 251,762.50 23,094,174.13
7 Pekerjaan Acian Dinding M2 432.00 432.00 53,652.50 23,177,880.00
1 Pekerjaan Galian Pondasi Batu Belah M3 214.90 214.90 107,937.50 23,195,768.75
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 68.00 68.00 341,898.04 23,249,066.72
- Pekerjaan Pembesian Ulir 13 Kg 1,198.29 1198.29 19,428.75 23,281,276.84
- Pekerjaan Pembesian Ulir 13 Kg 1,198.29 1198.29 19,428.75 23,281,276.84
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 250.04 250.04 93,450.72 23,366,418.03
- Pekerjaan Bekisting M2 184.20 184.20 126,934.50 23,381,334.90
3 Pekerjaan Penutup Atap Metal Berpasir M2 125.45 125.45 186,527 23,399,812.15
3 Pekerjaan Penutup Atap Metal Berpasir M2 125.45 125.45 186,527.00 23,399,812.15
3 Pekerjaan Penutup Atap Metal Berpasir M2 125.45 125.45 186,527.00 23,399,812.15
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 552.00 552.00 42,441.30 23,427,597.60
4 Penanaman Perdu Lili Paris Plbg 150.00 150.00 157,339.71 23,600,956.50
4 Penanaman Perdu Lili Paris Plbg 160.00 160.00 147,879.71 23,660,753.60
7 Pekerjaan Acian Dinding M2 442.04 442.04 53,652.50 23,716,551.10
2 Pekerjaan Pintu Panel uPVC lengkap dengan aksesoris (detail DED) Unit 9.00 9.00 2,638,268.50 23,744,416.50
5 Pekerjaan Listplank GRC tebal 9 mm M 146.85 146.85 161,810.00 23,761,798.50
3 Pekerjaan Penutup Atap Metal Berpasir M2 127.58 127.58 186,527.00 23,797,114.66
3 Pekerjaan Penutup Atap Metal Berpasir M2 127.58 127.58 186,527.00 23,797,114.66
3 Pekerjaan Penutup Atap Metal Berpasir M2 127.58 127.58 186,527.00 23,797,114.66
1 Pemasangan Grill Penutup Drainase (Detail DED) M2 80.00 80.00 298,182.50 23,854,600.00
1 Pekerjaan Galian Pondasi Batu Belah M3 278.60 278.60 85,800 23,903,880.00
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 9.00 9.00 2,666,262.50 23,996,362.50
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 9.00 9.00 2,666,262.50 23,996,362.50
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 9.00 9.00 2,666,262.50 23,996,362.50
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 98.04 98.04 244,887.50 24,008,770.50
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 98.04 98.04 244,887.50 24,008,770.50
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 9.00 9.00 2,668,847.50 24,019,627.50
1 Pekerjaan Pengecatan Lapangan Eksterior Setara Jotun M2 568.17 568.17 42,441.30 24,113,873.42
1 Pekerjaan Pengecatan Lapangan Eksterior Setara Jotun M2 568.17 568.17 42,441.30 24,113,873.42
7 Pekerjaan Acian Dinding M2 451.20 451.20 53,652.50 24,208,008.00
1 Pemasangan Instalasi Penerangan Titik 27.00 27.00 901,560.00 24,342,120.00
1 Pemasangan Instalasi Penerangan Titik 27.00 27.00 901,560.00 24,342,120.00
1 Pemasangan Instalasi Penerangan Titik 27.00 27.00 901,560.00 24,342,120.00
1 Pemasangan Instalasi Penerangan Titik 27.00 27.00 901,560.00 24,342,120.00
1 Pemasangan Instalasi Penerangan Titik 27.00 27.00 901,560.00 24,342,120.00
1 Pemasangan Instalasi Penerangan Titik 27.00 27.00 901,560.00 24,342,120.00
- Pekerjaan Beton M3 24.50 24.50 996,477.51 24,413,698.93
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 102.74 102.74 238,645.00 24,518,387.30
2 Pekerjaan Pengecatan Dinding Pagar Eksterior M2 577.76 577.76 42,441.30 24,520,885.49
3 Pekerjaan Penutup Atap Metal Berpasir M2 125.45 125.45 196,086.00 24,598,988.70
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 62.24 62.24 395,284 24,602,465.83
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 72.00 72.00 341,898.04 24,616,658.88
2 Pekerjaan Lapangan Beton (Mutu f'= 7,4 Mpa / K-100) M2 28.80 28.80 856,041.21 24,653,986.97
4 Pekerjaan Jendela J-2 uPVC lengkap dengan aksesoris (detail DED) Unit 10.00 10.00 2,469,032.50 24,690,325.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) M2 70.00 70.00 352,877.80 24,701,446.00
2 Pekerjaan Pembongkaran Konstruksi Atap M2 309.09 309.09 80,080 24,751,927.20
1 Pekerjaan Pondasi Batu Kosong M3 55.72 55.72 444,992 24,794,943.10
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 102.74 102.74 241,417.00 24,803,182.58
3 Pekerjaan Penutup Atap Metal Berpasir M2 146.15 146.15 170,027.00 24,849,446.05
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 104.25 104.25 238,645.00 24,878,741.25
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Toilet & Selasar) (Unpolished) Setara Mulia M2 61.60 61.60 403,946 24,883,094.17
3 Pekerjaan Penutup Atap Metal Berpasir M2 127.29 127.29 196,086.00 24,959,786.94
2 Pekerjaan Pembongkaran Konstruksi Atap M2 313.47 313.47 80,080.00 25,102,677.60
7 Pekerjaan Acian Dinding M2 577.76 577.76 43,450.00 25,103,672.00
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 592.00 592.00 42,441.30 25,125,249.60
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 592.00 592.00 42,441.30 25,125,249.60
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 216.00 216.00 116,373.40 25,136,654.40
2 Pekerjaan Pembongkaran Konstruksi Atap M2 318.06 318.06 80,080.00 25,470,244.80
- Pekerjaan Pembesian Ulir 13 Kg 1,344.43 1344.43 18,971.70 25,506,122.63
2 Pekerjaan Pengecatan Dinding Pagar Eksterior M2 601.33 601.33 42,441.30 25,521,226.93
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 388.35 388.35 65,780.00 25,545,663.00
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 270.47 270.47 94,647.52 25,599,314.73
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 25.84 25.84 994,922.50 25,708,797.40
1 Pemasangan Grill Penutup Drainase (Detail DED) M2 84.00 84.00 306,702 25,762,968.00
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 125.97 125.97 206,415 26,002,097.55
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 125.97 125.97 206,415 26,002,097.55
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 125.97 125.97 206,415.00 26,002,097.55
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 125.97 125.97 206,415 26,002,097.55
7 Pekerjaan Acian Dinding M2 601.33 601.33 43,307.00 26,041,798.31
- Pekerjaan Pembesian Ulir 13 Kg 1,373.19 1373.19 18,971.70 26,051,748.72
- Pekerjaan Pembesian Ulir 13 Kg 1296.67 1296.67 20,094 26,054,897.98
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 224.00 224.00 116,373.40 26,067,641.60
- Pekerjaan Pembesian Ulir 13 Kg 1,352.32 1352.32 19,428.75 26,273,887.20
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 29.89 29.89 880,407.00 26,315,365.23
- Pekerjaan Bekisting M2 169.81 169.81 155,091 26,335,974.41
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 108.00 108.00 244,887.50 26,447,850.00
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 29.89 29.89 887,579.00 26,529,736.31
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 377.40 377.40 70,455 26,589,717.00
- Pekerjaan Bekisting M2 179.10 179.10 149,142 26,711,272.50
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 110.93 110.93 241,417.00 26,780,387.81
- Pekerjaan Beton M3 18.27 18.27 1,467,827.93 26,817,216.21
2 Pekerjaan Pembongkaran Konstruksi Atap M2 336.69 336.69 80,080.00 26,962,135.20
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 382.75 382.75 70,455.00 26,966,651.25
1 Pekerjaan Plesteran Dinding SP 1 : 4 M2 232.20 232.20 116,373.40 27,021,903.48
2 Pekerjaan Pembongkaran Konstruksi Atap M2 338.10 338.10 80,080.00 27,075,048.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 412.82 412.82 65,780.00 27,155,299.60
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 112.00 112.00 244,887.50 27,427,400.00
5 Pekerjaan Listplank GRC tebal 9 mm M 158.40 158.40 173,690.00 27,512,496.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm Setara Sunda Plafond M 428.15 428.15 64,295 27,527,904.25
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 134.29 134.29 206,415 27,719,470.35
2 Pekerjaan Pengukuran & Pemasangan Bouwplank M 359.00 359.00 78,776.50 28,280,763.50
3 Pekerjaan Penutup Atap Metal Berpasir M2 166.36 166.36 170,027.00 28,285,691.72
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 80.00 80.00 353,808.40 28,304,672.00
1 Pekerjaan Pengecatan Lapangan Eksterior Setara Jotun M2 561.75 561.75 50,402.00 28,313,323.50
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 340.66 340.66 83,325.00 28,385,494.50
3 Pekerjaan Acian Drainase M2 656.88 656.88 43,307.00 28,447,502.16
3 Pekerjaan Penutup Atap Metal Berpasir M2 168.21 168.21 170,027.00 28,600,241.67
1 Pekerjaan Pengecatan Lapangan Eksterior Setara Jotun M2 568.17 568.17 50,402.00 28,636,904.34
3 Pekerjaan Penutup Atap Metal Berpasir M2 153.80 153.80 186,527 28,687,852.60
3 Pekerjaan Penutup Atap Metal Berpasir M2 153.80 153.80 186,527 28,687,852.60
3 Pekerjaan Penutup Atap Metal Berpasir M2 153.80 153.80 186,527.00 28,687,852.60
3 Pekerjaan Penutup Atap Metal Berpasir M2 153.80 153.80 186,527.00 28,687,852.60
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 28.90 28.90 994,922.50 28,753,260.25
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 102.74 102.74 280,313 28,799,357.62
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 102.74 102.74 280,313.00 28,799,357.62
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 102.74 102.74 280,313.00 28,799,357.62
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 119.70 119.70 241,417.00 28,897,614.90
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 411.10 411.10 70,455.00 28,964,050.50
2 Pekerjaan Pengecatan Dinding Eksterior M2 575.19 575.19 50,402.00 28,990,726.38
3 Pemasangan Wastafel Setara Toto Unit 17.00 17.00 1,712,117.00 29,105,989.00
3 Pemasangan Wastafel Setara Toto Unit 17.00 17.00 1,714,625 29,148,625.00
4 Pekerjaan Plesteran Dinding SP 1 : 4 M2 250.67 250.67 116,373.40 29,171,320.18
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 104.49 104.49 280,313.00 29,289,905.37
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 104.49 104.49 280,313.00 29,289,905.37
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 104.49 104.49 280,313.00 29,289,905.37
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 123.48 123.48 238,645.00 29,467,884.60
1 Pemasangan Instalasi Penerangan Titik 36.00 36.00 820,050.00 29,521,800.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 150.77 150.77 196,086.00 29,563,886.22
- Pekerjaan Beton M3 20.16 20.16 1,467,827.93 29,591,410.99
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 124.22 124.22 238,645.00 29,644,481.90
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 124.22 124.22 238,645.00 29,644,481.90
- Pekerjaan Pembesian Polos 12 Kg 1,527.43 1527.43 19,428.75 29,676,055.61
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 144.00 144.00 206,415.00 29,723,760.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 151.67 151.67 196,086.00 29,740,363.62
3 Pekerjaan Penutup Atap Metal Berpasir M2 151.67 151.67 196,086.00 29,740,363.62
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) M2 84.64 84.64 352,877.80 29,867,576.99
9 Pemasangan Bio Septic Kapasitas 5 M3 Bh 1.00 1.00 30,000,000 30,000,000.00
9 Pemasangan Bio Septic Kapasitas 5 M3 Bh 1.00 1.00 30,000,000.00 30,000,000.00
9 Pemasangan Bio Septic Kapasitas 5 M3 Bh 1.00 1.00 30,000,000.00 30,000,000.00
9 Pemasangan Bio Septic Kapasitas 5 M3 Bh 1.00 1.00 30,000,000.00 30,000,000.00
9 Pemasangan Bio Septic Kapasitas 5 M3 Bh 1.00 1.00 30,000,000.00 30,000,000.00
9 Pemasangan Bio Septic Kapasitas 5 M3 Bh 1.00 1.00 30,000,000.00 30,000,000.00
9 Pemasangan Bio Septic Kapasitas 5 M3 Bh 1.00 1.00 30,000,000.00 30,000,000.00
9 Pemasangan Bio Septic Kapasitas 5 M3 Bh 1.00 1.00 30,000,000.00 30,000,000.00
9 Pemasangan Bio Septic Kapasitas 5 M3 Bh 1.00 1.00 30,000,000.00 30,000,000.00
2 Pekerjaan Pembongkaran Konstruksi Atap M2 377.90 377.90 80,080.00 30,262,232.00
1 Pekerjaan Pipa PVC AW 3/4" (Air bersih) M 315.00 315.00 96,217.00 30,308,355.00
5 Pekerjaan Listplank GRC tebal 9 mm M 187.80 187.80 161,810.00 30,387,918.00
5 Pekerjaan Listplank GRC tebal 9 mm M 187.80 187.80 161,810.00 30,387,918.00
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 147.69 147.69 206,415.00 30,485,431.35
- Pekerjaan Pembesian Ulir 13 Kg 1,607.47 1607.47 18,971.70 30,496,438.60
7 Pekerjaan Acian Dinding M2 570.04 570.04 53,652.50 30,584,071.10
3 Pekerjaan Penutup Atap Metal Berpasir M2 163.97 163.97 186,527 30,584,832.19
- Pekerjaan Pembesian Ulir 13 Kg 1,613.31 1613.31 18,971.70 30,607,233.33
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 368.33 368.33 83,325.00 30,691,097.25
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 368.33 368.33 83,325.00 30,691,097.25
3 Pekerjaan Plesteran Kanstin SP 1 : 4 M2 322.86 322.86 95,390.90 30,797,905.97
7 Pekerjaan Acian Dinding M2 576.00 576.00 53,652.50 30,903,840.00
1 Pekerjaan Pasangan Dinding Kanstin 1/2 Bata SP 1 : 4 M2 30.40 30.40 1,023,385 31,110,904.00
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 452.95 452.95 69,217.50 31,352,066.63
2 Pekerjaan Pembongkaran Konstruksi Atap M2 393.30 393.30 80,080.00 31,495,464.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 480.22 480.22 65,780.00 31,588,871.60
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 32.00 32.00 994,922.50 31,837,520.00
7 Pekerjaan Acian Dinding M2 750.11 750.11 42,592.00 31,948,685.12
5 Pekerjaan Acian Kanstin M2 322.86 322.86 99,055.66 31,981,110.39
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 12.00 12.00 2,666,262.50 31,995,150.00
4 Pekerjaan Tanah Urug Pilihan M3 193.16 193.16 166,100.00 32,083,876.00
4 Pekerjaan Tanah Urug Pilihan M3 193.16 193.16 166,100.00 32,083,876.00
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 80.00 80.00 403,946 32,315,706.72
1 Pemasangan Instalasi Penerangan Titik 36.00 36.00 901,560.00 32,456,160.00
1 Pemasangan Instalasi Penerangan Titik 36.00 36.00 901,560.00 32,456,160.00
1 Pemasangan Instalasi Penerangan Titik 36.00 36.00 901,560.00 32,456,160.00
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 461.41 461.41 70,455.00 32,508,641.55
7 Pekerjaan Acian Dinding M2 608.00 608.00 53,652.50 32,620,720.00
2 Pekerjaan Pipa PVC AW 4" + Penutup Pipa Biopori (Biopori) (Detail DED) M 276.00 276.00 118,635.03 32,743,267.59
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 136.25 136.25 241,417.00 32,893,066.25
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 102.74 102.74 321,453.00 33,026,081.22
2 Pekerjaan Pengecatan Dinding Eksterior Setara Jotun M2 779.00 779.00 42,441 33,061,772.70
1 Pekerjaan Pasangan Dinding Drainase 1/2 Bata SP 1 : 4 M2 178.00 178.00 186,032.00 33,113,696.00
2 Pekerjaan Pasangan Batu Alam M2 71.63 71.63 463,617.00 33,208,885.71
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 137.77 137.77 241,417.00 33,260,020.09
1 Pekerjaan Pasangan Dinding Kanstin 1/2 Bata SP 1 : 4 M2 38.91 38.91 854,843.00 33,261,941.13
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 104.25 104.25 321,453.00 33,511,475.25
3 Pekerjaan Penutup Atap Metal Berpasir M2 180.33 180.33 186,527.00 33,636,413.91
1 Pemasangan Grill Penutup Drainase (Detail DED) M2 113.33 113.33 298,182.50 33,793,022.73
2 Pekerjaan Pengecatan Dinding Pagar Eksterior M2 671.31 671.31 50,402.00 33,835,366.62
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 413.13 413.13 83,325.00 34,424,057.25
2 Pekerjaan Pembongkaran Konstruksi Atap M2 338.35 338.35 101,887.50 34,473,635.63
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) M2 98.00 98.00 352,877.80 34,582,024.40
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 144.00 144.00 241,417.00 34,764,048.00
- Pekerjaan Pembesian Ulir 13 Kg 1,794.52 1794.52 19,428.75 34,865,280.45
2 Pekerjaan Plesteran Dinding Drainase SP 1 : 4 M2 300.34 300.34 116,373.40 34,951,586.96
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 138.90 138.90 251,762.50 34,969,811.25
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 420.00 420.00 83,325.00 34,996,500.00
1 Pekerjaan Pasangan Dinding Drainase 1/2 Bata SP 1 : 4 M2 210.00 210.00 167,444 35,163,282.00
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 125.97 125.97 280,313 35,311,028.61
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 125.97 125.97 280,313 35,311,028.61
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 125.97 125.97 280,313.00 35,311,028.61
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 125.97 125.97 280,313.00 35,311,028.61
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 112.00 112.00 318,244.74 35,643,410.88
7 Pekerjaan Acian Dinding M2 671.31 671.31 53,652.50 36,017,459.78
7 Pekerjaan List Plafond PVC Minimalis lebar 5 cm M 524.75 524.75 69,217.50 36,321,883.13
1 Pemasangan Instalasi Penerangan Titik 45.00 45.00 820,050.00 36,902,250.00
2 Pekerjaan Pengecatan Dinding Pagar Eksterior M2 870.29 870.29 42,441 36,936,238.98
7 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 193.16 193.16 192,720.00 37,225,795.20
7 Pekerjaan Pasir Urug Bawah Lantai T=10 cm M3 193.16 193.16 192,720.00 37,225,795.20
7 Pekerjaan Acian Dinding M2 870.29 870.29 42,828 37,272,736.61
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 15.00 15.00 2,495,047.50 37,425,712.50
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 134.29 134.29 280,313 37,643,232.77
2 Pekerjaan Lantai Keramik Polos 40x40 cm (Selasar) (Unpolished) Setara Mulia M2 94.00 94.00 403,946 37,970,955.40
7 Pekerjaan Acian Dinding M2 874.07 874.07 43,450.00 37,978,341.50
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 180.90 180.90 210,347.50 38,051,862.75
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 540.99 540.99 70,455.00 38,115,450.45
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 120.00 120.00 318,244.74 38,189,368.80
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Polished) Setara Mulia M2 112.36 112.36 341,898.04 38,415,663.77
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Polished) Setara Mulia M2 112.36 112.36 345,145.90 38,780,593.32
5 Pekerjaan Listplank GRC tebal 9 mm M 224.75 224.75 173,690.00 39,036,827.50
2 Pekerjaan Plesteran Dinding Drainase SP 1 : 4 M2 413.09 413.09 95,013.60 39,249,168.02
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 123.48 123.48 321,453.00 39,693,016.44
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 124.22 124.22 321,453.00 39,930,891.66
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 124.22 124.22 321,453.00 39,930,891.66
3 Pekerjaan Jendela J-1 uPVC lengkap dengan aksesoris (detail DED) Unit 15.00 15.00 2,666,262.50 39,993,937.50
2 Pekerjaan Pembongkaran Konstruksi Atap M2 503.86 503.86 80,080.00 40,349,108.80
2 Pekerjaan Pembongkaran Konstruksi Atap M2 503.86 503.86 80,080.00 40,349,108.80
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 144.00 144.00 280,313.00 40,365,072.00
5 Pekerjaan Listplank GRC tebal 9 mm M 250.35 250.35 161,810 40,509,133.50
1 Pemasangan Instalasi Penerangan Titik 45.00 45.00 901,560 40,570,200.00
1 Pemasangan Instalasi Penerangan Titik 45.00 45.00 901,560.00 40,570,200.00
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 147.69 147.69 280,313.00 41,399,426.97
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 442.04 442.04 95,390.90 42,166,593.44
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 178.48 178.48 238,645.00 42,593,359.60
3 Pekerjaan Penutup Atap Metal Berpasir M2 217.92 217.92 196,086.00 42,731,061.12
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 610.12 610.12 70,455.00 42,986,004.60
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 615.21 615.21 70,455.00 43,344,620.55
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 615.21 615.21 70,455.00 43,344,620.55
- Pekerjaan Pembesian Ulir 13 Kg 2,232.80 2232.80 19,428.75 43,380,513.00
1 Pekerjaan Pengecatan Lapangan Eksterior Setara Jotun M2 568.17 568.17 76,695 43,575,968.60
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 112.00 112.00 395,284 44,271,789.41
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 112.00 112.00 395,284 44,271,789.41
1 Pemasangan Instalasi Penerangan Titik 54.00 54.00 820,050.00 44,282,700.00
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) M2 126.00 126.00 352,877.80 44,462,602.80
- Pekerjaan Pembesian Polos 12 Kg 2221.64 2221.64 20,094 44,640,967.67
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 217.19 217.19 206,415.00 44,831,273.85
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 220.37 220.37 206,415 45,487,673.55
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 220.37 220.37 206,415 45,487,673.55
1 Pekerjaan Kusen uPVC lengkap dengan aksesoris M 180.90 180.90 251,762.50 45,543,836.25
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 51.75 51.75 887,579.00 45,932,213.25
- Pekerjaan Pembesian Ulir 13 Kg 2326.44 2326.44 20,094 46,746,787.43
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 251.47 251.47 186,032.00 46,781,467.04
2 Pekerjaan Pembongkaran Konstruksi Atap M2 586.17 586.17 80,080 46,940,493.60
4 Pekerjaan Plesteran Dinding SP 1 : 4 M2 502.93 502.93 93,450.72 46,999,170.61
2 Pekerjaan Lantai Keramik Polos 40 x 40 cm (Toilet & Selasar) (Unpolished) M2 134.40 134.40 352,877.80 47,426,776.32
2 Pekerjaan Plesteran Dinding Drainase SP 1 : 4 M2 511.98 511.98 94,647.52 48,457,637.29
1 Pekerjaan Pasangan Dinding Drainase 1/2 Bata SP 1 : 4 M2 200.00 200.00 244,887.50 48,977,500.00
1 Pekerjaan Lapangan Beton (Mutu f'= 7,4 Mpa / K-100) M3 56.82 56.82 866,909.21 49,257,781.56
3 Pekerjaan Penutup Atap Metal Berpasir M2 252.00 252.00 196,086.00 49,413,672.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 265.19 265.19 186,527.00 49,465,095.13
4 Pekerjaan Jendela uPVC lengkap dengan aksesoris (detail DED) Unit 20.00 20.00 2,495,047.50 49,900,950.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 269.07 269.07 186,527 50,188,819.89
3 Pekerjaan Penutup Atap Metal Berpasir M2 269.07 269.070 186,527 50,188,819.89
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 318.06 318.06 158,015.00 50,258,250.90
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 432.00 432.00 116,373.40 50,273,308.80
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 715.71 715.71 70,455 50,425,348.05
2 Pekerjaan Pasangan Batu Alam M2 110.14 110.14 463,100.00 51,005,834.00
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 210.04 210.04 244,887.50 51,436,170.50
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 251.93 251.93 206,415.00 52,002,130.95
1 Pekerjaan Plesteran Dinding SP 1 : 4 M2 451.20 451.20 116,373.40 52,507,678.08
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 300.67 300.67 175,467.60 52,757,843.29
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 216.00 216.00 244,887.50 52,895,700.00
2 Pekerjaan Lapangan Beton (Mutu f'= 7,4 Mpa / K-100) M2 63.88 63.88 834,550 53,311,066.78
4 Pekerjaan Jendela uPVC lengkap dengan aksesoris (detail DED) Unit 20.00 20.00 2,668,847.50 53,376,950.00
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 338.10 338.10 158,015.00 53,424,871.50
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 168.00 168.00 318,244.74 53,465,116.32
2 Pekerjaan Pembongkaran Konstruksi Atap M2 671.46 671.46 80,080 53,770,516.80
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 288.88 288.88 188,216.60 54,372,011.41
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 570.04 570.04 95,390.90 54,376,628.64
4 Pekerjaan Plesteran Dinding SP 1 : 4 M2 577.76 577.76 95,013.60 54,895,057.54
1 Pemasangan Grill Penutup Drainase (Detail DED) M2 193.20 193.20 293,612.00 56,725,838.40
4 Pekerjaan Plesteran Dinding SP 1 : 4 M2 601.33 601.33 94,647.52 56,914,393.20
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 178.48 178.48 321,453.00 57,372,931.44
3 Pekerjaan Penutup Atap Metal Berpasir M2 307.61 307.61 186,527.00 57,377,570.47
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 819.85 819.85 70,455 57,762,531.75
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 168.00 168.00 345,145.90 57,984,511.20
7 Pekerjaan Acian Dinding M2 1,090.19 1090.19 53,652.50 58,491,418.98
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) M2 168.00 168.00 352,877.80 59,283,470.40
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 168.00 168.00 352,877.80 59,283,470.40
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 252.00 252.00 238,645.00 60,138,540.00
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 175.95 175.95 341,898.04 60,156,960.14
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 217.19 217.19 280,313.00 60,881,180.47
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 220.37 220.37 280,313 61,772,575.81
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 220.37 220.37 280,313 61,772,575.81
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 393.30 393.30 158,015.00 62,147,299.50
5 Pekerjaan Acian Kanstin M2 1,168.72 1168.72 53,652.50 62,704,749.80
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 758.33 758.33 83,325.00 63,187,847.25
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 342.11 342.11 186,032.00 63,643,407.52
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 309.09 309.09 206,415 63,800,812.35
4 Pekerjaan Plesteran Dinding SP 1 : 4 M2 671.31 671.31 95,390.90 64,036,865.08
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 189.00 189.00 341,898.04 64,618,729.56
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 189.00 189.00 341,898.04 64,618,729.56
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 313.47 313.47 206,415.00 64,704,910.05
3 Pekerjaan Penutup Atap Metal Berpasir M2 388.35 388.35 170,027.00 66,029,985.45
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 279.00 279.00 238,645.00 66,581,955.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 340.66 340.66 196,086.00 66,798,656.76
2 Pekerjaan Reng Baja Ringan Tebal 0,45 mm M2 801.67 801.67 83,325.00 66,799,152.75
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 576.00 576.00 116,373.40 67,031,078.40
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 274.04 274.04 244,887.50 67,108,970.50
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 216.00 216.00 318,244.74 68,740,863.84
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 336.69 336.69 206,415.00 69,497,866.35
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 750.11 750.11 93,450.72 70,098,319.58
3 Pekerjaan Penutup Atap Metal Berpasir M2 412.82 412.82 170,027.00 70,190,546.14
3 Pekerjaan Penutup Atap Metal Berpasir M2 377.40 377.40 186,527 70,395,289.80
2 Pekerjaan Reng Baja Ringan tb. 0,45 mm M2 844.93 844.93 83,325.00 70,403,792.25
2 Pekerjaan Pembongkaran Konstruksi Atap M2 692.00 692.00 101,887.50 70,506,150.00
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 288.00 288.00 244,887.50 70,527,600.00
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 251.93 251.93 280,313.00 70,619,254.09
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 608.00 608.00 116,373.40 70,755,027.20
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 224.00 224.00 318,244.74 71,286,821.76
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 224.00 224.00 318,244.74 71,286,821.76
3 Pekerjaan Penutup Atap Metal Berpasir M2 382.75 382.75 186,527.00 71,393,209.25
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) M2 203.00 203.00 352,877.80 71,634,193.40
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 301.67 301.67 238,645.00 71,992,037.15
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 301.67 301.67 238,645.00 71,992,037.15
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 182.70 182.70 395,284 72,218,356.47
3 Pekerjaan Penutup Atap Metal Berpasir M2 368.33 368.33 196,086.00 72,224,356.38
3 Pekerjaan Penutup Atap Metal Berpasir M2 368.33 368.33 196,086.00 72,224,356.38
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 386.07 386.07 188,216.60 72,664,782.76
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 435.15 435.15 167,444 72,863,343.63
1 Pekerjaan Pasangan Dinding Drainase 1/2 Bata SP 1 : 4 M2 389.71 389.71 188,216.60 73,349,891.19
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 304.00 304.00 244,887.50 74,445,800.00
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 87.40 87.40 854,843.00 74,713,278.20
3 Pekerjaan Penutup Atap Metal Berpasir M2 411.10 411.10 186,527.00 76,681,249.70
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 318.06 318.06 241,417.00 76,785,091.02
1 Pekerjaan Lapangan Beton (Mutu f'= 7,4 Mpa) M3 56.18 56.18 1,368,181.18 76,864,418.61
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 224.00 224.00 345,145.90 77,312,681.60
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 377.90 377.90 206,415.00 78,004,228.50
1 Pekerjaan Paving Block T=8 cm M2 603.51 603.51 130,769.29 78,920,573.35
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Guru) (Polished) M2 226.80 226.80 352,877.80 80,032,685.04
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 338.35 338.35 238,645.00 80,745,535.75
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 252.00 252.00 321,453.00 81,006,156.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 413.13 413.13 196,086.00 81,009,009.18
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 338.10 338.10 241,417.00 81,623,087.70
3 Pekerjaan Penutup Atap Metal Berpasir M2 480.22 480.22 170,027.00 81,650,365.94
2 Pekerjaan Pembongkaran Konstruksi Atap M2 801.67 801.67 101,887.50 81,680,152.13
4 Pekerjaan Plesteran Dinding SP 1 : 4 M2 870.29 870.29 94,442 82,191,886.41
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 335.65 335.65 244,887.50 82,196,489.38
3 Pekerjaan Penutup Atap Metal Berpasir M2 420.00 420.00 196,086.00 82,356,120.00
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 874.07 874.07 95,013.60 83,048,537.35
1 Pekerjaan Pasangan Dinding Drainase 1/2 Bata SP 1 : 4 M2 483.00 483.00 175,467.60 84,750,850.80
3 Pekerjaan Penutup Atap Metal Berpasir M2 461.41 461.41 186,527.00 86,065,423.07
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 309.09 309.09 280,313 86,641,945.17
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 313.47 313.47 280,313.00 87,869,716.11
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 252.00 252.00 352,877.80 88,925,205.60
1 Pekerjaan Paving Block T=8 cm M2 1,711.00 1711.00 52,155.40 89,237,889.40
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 279.00 279.00 321,453.00 89,685,387.00
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 443.07 443.07 206,415.00 91,456,294.05
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 104.50 104.50 880,407.00 92,002,531.50
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 336.69 336.69 280,313.00 94,378,583.97
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 393.30 393.30 241,417.00 94,949,306.10
1 Pekerjaan Paving Block T=8 cm M2 731.68 731.68 130,769.29 95,681,273.06
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 280.00 280.00 345,145.90 96,640,852.00
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 301.67 301.67 321,453.00 96,972,726.51
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 301.67 301.67 321,453.00 96,972,726.51
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) M2 280.00 280.00 352,877.80 98,805,784.00
1 Pekerjaan Paving Block T=8 cm M2 750.58 750.58 133,265 100,025,689.86
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 420.00 420.00 238,645.00 100,230,900.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 540.99 540.99 186,527 100,909,241.73
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 499.69 499.69 206,415.00 103,143,511.35
3 Pekerjaan Plesteran Dinding SP 1 : 4 M2 1,090.19 1090.19 95,390.90 103,994,205.27
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 503.86 503.86 206,415.00 104,004,261.90
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 503.86 503.86 206,415.00 104,004,261.90
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 377.90 377.90 280,313.00 105,930,282.70
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 338.35 338.35 321,453.00 108,763,622.55
3 Pekerjaan Penutup Atap Metal Berpasir M2 610.12 610.12 186,527.00 113,803,853.24
3 Pekerjaan Penutup Atap Metal Berpasir M2 615.21 615.21 186,527.00 114,753,275.67
3 Pekerjaan Penutup Atap Metal Berpasir M2 615.21 615.21 186,527.00 114,753,275.67
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 116.66 116.66 994,922.50 116,067,658.85
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 490.19 490.19 244,887.50 120,041,403.63
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 586.17 586.17 206,415 120,994,280.55
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 311.20 311.20 395,284 123,012,329.14
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 443.07 443.07 280,313.00 124,198,280.91
1 Pekerjaan Pasangan Dinding 1/2 Bata SP 1 : 4 M2 125.33 125.33 994,922.50 124,693,636.93
2 Pekerjaan Pondasi Batu Belah SP 1 : 4 M3 151.24 151.24 857,789 129,731,978.11
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) Setara Mulia M2 329.00 329.00 395,284 130,048,381.39
3 Pekerjaan Penutup Atap Metal Berpasir M2 715.71 715.71 186,527 133,499,239.17
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 420.00 420.00 321,453.00 135,010,260.00
1 Pekerjaan Pasangan Dinding Kanstin 1/2 Bata SP 1 : 4 M2 553.47 553.47 244,887.50 135,537,884.63
3 Pekerjaan Plesteran Kanstin SP 1 : 4 M2 1,168.72 1168.72 116,373.40 136,007,920.05
1 Pekerjaan Lantai Keramik Polos 40x40 cm (Rg. Kelas) (Polished) M2 392.00 392.00 352,877.80 138,328,097.60
6 Pekerjaan Plafond PVC Setara Sunda Plafond dengan Rangka Besi Hollow M2 671.46 671.46 206,415 138,599,415.90
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 499.69 499.69 280,313.00 140,069,602.97
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 503.86 503.86 280,313.00 141,238,508.18
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 503.86 503.86 280,313.00 141,238,508.18
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 621.08 621.08 238,645.00 148,217,636.60
3 Pekerjaan Penutup Atap Metal Berpasir M2 758.33 758.33 196,086.00 148,697,896.38
3 Pekerjaan Penutup Atap Metal Berpasir M2 819.85 819.85 186,527 152,924,160.95
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 656.57 656.57 238,645.00 156,687,147.65
3 Pekerjaan Penutup Atap Metal Berpasir M2 801.67 801.67 196,086.00 157,196,263.62
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 586.17 586.17 280,313 164,311,071.21
6 Pekerjaan Plafond PVC dengan Rangka Besi Hollow M2 692.00 692.00 238,645.00 165,142,340.00
3 Pekerjaan Penutup Atap Metal Berpasir M2 844.93 844.93 196,086.00 165,678,943.98
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 671.46 671.46 280,313 188,218,966.98
1 Pekerjaan Dinding Keramik Polos 20 x 40 cm (Toilet) (Polished) M2 537.60 537.60 352,877.80 189,707,105.28
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 621.08 621.08 321,453.00 199,648,029.24
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 656.57 656.57 321,453.00 211,056,396.21
1 Pekerjaan Konstruksi Atap Baja Ringan C.75.75 (detail DED) M2 692.00 692.00 321,453.00 222,445,476.00
1 Pekerjaan Pasangan Dinding Drainase 1/2 Bata SP 1 : 4 M2 283.34 283.34 994,922.50 281,901,341.15
1 Pekerjaan Paving Block T=8 cm M2 2,306.14 2306.14 165,608.42 381,916,193.13
1 Pekerjaan Pasangan Dinding Kanstin 1/2 Bata SP 1 : 4 M2 473.40 473.40 994,922.50 470,996,311.50
1 Pekerjaan Paving Block T=8 cm M2 4,437.00 4437.00 165,608.42 734,804,543.06

Anda mungkin juga menyukai