Boq Bpjs Tenaga Kerja Final
Boq Bpjs Tenaga Kerja Final
JUMLAH HARGA
NO ITEM PEKERJAAN
(Rp)
1 PEKERJAAN PERSIAPAN -
2 PEKERJAAN PONDASI -
3 PEKERJAAN LANTAI -
4 PEKERJAAN DINDING -
5 PEKERJAAN BETON -
6 PEKERJAAN ATAP DAN PLAFON -
7 PEKERJAAN KUSEN, PINTU, JENDELA, BOVEN DAN PARTISI -
8 PEKERJAAN PENGECATAN -
9 PEKERJAAN SANITAIR -
10 PEKERJAAN MEKANIKAL ELEKTRIKAL -
11 PEKERJAAN LAIN-LAIN -
A JUMLAH -
B PPN 10 % X A -
C PENYAMBUNGAN LISTRIK DAYA BARU DARI PLN
D JUMLAH TOTAL (A+B+C) -
E JUMLAH TOTAL DIBULATKAN -
Terbilang
RUPIAH
1 OF 173
KOP SURAT PERUSAHAAN
JUMLAH HARGA
NO ITEM PEKERJAAN
(Rp)
1 PEKERJAAN PERSIAPAN -
A PEKERJAAN GEDUNG UTAMA
1 PEKERJAAN PONDASI -
2 PEKERJAAN LANTAI -
3 PEKERJAAN DINDING -
4 PEKERJAAN BETON -
5 PEKERJAAN ATAP DAN PLAFON -
6 PEKERJAAN KUSEN, PINTU, JENDELA, BOVEN DAN PARTISI -
7 PEKERJAAN PENGECATAN -
8 PEKERJAAN SANITAIR -
9 PEKERJAAN MEKANIKAL ELEKTRIKAL -
10 PEKERJAAN LAIN-LAIN -
A JUMLAH -
B PEKERJAAN SELASAR PENGHUBUNG
1 PEKERJAAN PONDASI -
2 PEKERJAAN BETON -
2 PEKERJAAN LANTAI -
3 PEKERJAAN ATAP -
3 PEKERJAAN KUSEN, PINTU, JENDELA, BOVEN DAN PARTISI -
4 PEKERJAAN PENGECATAN -
4 PEKERJAAN MEKANIKAL ELEKTRIKAL -
B JUMLAH -
TOTAL A + B -
B PPN 10 % X A -
C JUMLAH TOTAL (A+B+C) -
D JUMLAH TOTAL DIBULATKAN -
Terbilang
Rupiah
Kupang,………………………… 2020
PT/CV ,…………………………..
………………………………………….
2 OF 173
RENCANA ANGGARAN BIAYA
Proyek
Lokasi : Jl. W.J. Lalamentik No. 88 Oebufu, Kupang, Nusa Tenggara Timur
Tahun Anggaran : 2020
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 80,000.00 96,000.00
Tukang Batu L.02.03 OH 0.2000 95,000.00 19,000.00
Kepala Tukang L.03.01 OH 0.0200 110,000.00 2,200.00
Mandor L.04.01 OH 0.0600 130,000.00 7,800.00
JUMLAH TENAGA KERJA 125,000.00
B BAHAN
Semen portland kg 230.00 1,250.00 287,500.00
Pasir Beton kg 893.00 178.57 159,464.29
Kerikil (Maks 30 mm) kg 1,027.00 244.44 251,044.44
Air Liter 200.00 20.00 4,000.00
JUMLAH HARGA BAHAN 702,008.73
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 827,008.73
E Overhead & Profit 10 % 0.1000 82,700.87
F Harga Satuan Pekerjaan (D+E) 909,709.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02.03 OH 0.2750 95,000.00 26,125.00
Kepala Tukang L.03.01 OH 0.0280 110,000.00 3,080.00
Mandor L.04.01 OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 171,995.00
B BAHAN
Semen portland kg 326.00 1,250.00 407,500.00
Pasir Beton kg 760.00 178.57 135,714.29
Kerikil (Maks 30 mm) kg 1,029.00 244.44 251,533.33
Air Liter 215.00 20.00 4,300.00
JUMLAH HARGA BAHAN 799,047.62
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 971,042.62
E Overhead & Profit 10 % 0.1000 97,104.26
F Harga Satuan Pekerjaan (D+E) 1,068,146.00
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02.03 OH 0.2750 95,000.00 26,125.00
Kepala Tukang L.03.01 OH 0.0280 110,000.00 3,080.00
Mandor L.04.01 OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 171,995.00
B BAHAN
Semen portland kg 352.0000 1,250.00 440,000.00
Pasir Beton kg 731.0000 178.57 130,535.71
Kerikil (Maks 30 mm) kg 1,031.0000 244.44 252,022.22
Air Liter 215.0000 20.00 4,300.00
JUMLAH HARGA BAHAN 826,857.94
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 998,852.94
E Overhead & Profit 10 % 0.1000 99,885.29
F Harga Satuan Pekerjaan (D+E) 1,098,738.00
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02.03 OH 0.2750 95,000.00 26,125.00
Kepala Tukang L.03.01 OH 0.0280 110,000.00 3,080.00
Mandor L.04.01 OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 171,995.00
B BAHAN
Semen portland kg 371.0000 1,250.00 463,750.00
Pasir Beton kg 698.0000 178.57 124,642.86
Kerikil (Maks 30 mm) kg 1,047.0000 244.44 255,933.33
Air Liter 215.0000 20.00 4,300.00
JUMLAH HARGA BAHAN 848,626.19
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,020,621.19
E Overhead & Profit 10 % 0.1000 102,062.12
F Harga Satuan Pekerjaan (D+E) 1,122,683.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02.03 OH 0.2750 95,000.00 26,125.00
Kepala Tukang L.03.01 OH 0.0280 110,000.00 3,080.00
Mandor L.04.01 OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 171,995.00
B BAHAN
Semen portland kg 384.00 1,250.00 480,000.00
Pasir Beton kg 692.00 178.57 123,571.43
Kerikil (Maks 30 mm) kg 1,039.00 244.44 253,977.78
Air Liter 215.00 20.00 4,300.00
JUMLAH HARGA BAHAN 861,849.21
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,033,844.21
E Overhead & Profit 10 % 0.1000 103,384.42
F Harga Satuan Pekerjaan (D+E) 1,137,228.00
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02.03 OH 0.2750 95,000.00 26,125.00
Kepala Tukang L.03.01 OH 0.0280 110,000.00 3,080.00
Mandor L.04.01 OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 171,995.00
B BAHAN
Semen portland kg 406.0000 1,250.00 507,500.00
Pasir Beton kg 684.0000 178.57 122,142.86
Kerikil (Maks 30 mm) kg 1,026.0000 244.44 250,800.00
Air Liter 215.0000 20.00 4,300.00
JUMLAH HARGA BAHAN 884,742.86
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,056,737.86
E Overhead & Profit 10 % 0.1000 105,673.79
F Harga Satuan Pekerjaan (D+E) 1,162,411.00
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 80,000.00 20,000.00
Tukang Besi L.02.05 OH 0.2500 95,000.00 23,750.00
Kepala Tukang L.03.01 OH 0.0250 110,000.00 2,750.00
Mandor L.04.01 OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 48,190.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 17,500.00 61,250.00
Assesoris (perkuatan, las dll) Ls 1.0000 -
JUMLAH HARGA BAHAN 61,250.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 109,440.00
E Overhead & Profit 10 % 0.1000 10,944.00
F Harga Satuan Pekerjaan (D+E) 120,384.00
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2400 80,000.00 19,200.00
Tukang Batu L.02.03 OH 0.1200 95,000.00 11,400.00
Kepala tukang L.03.01 OH 0.0120 110,000.00 1,320.00
Mandor L.04.01 OH 0.0120 130,000.00 1,560.00
JUMLAH TENAGA KERJA 33,480.00
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh 3.1000 - -
Semen portland kg 9.6000 1,250.00 12,000.00
Semen Warna Kg 1.5000 9,750.00 14,625.00
Pasir Pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 35,625.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,105.00
E Overhead & Profit 10 % 0.1000 6,910.50
F Harga Satuan Pekerjaan (D+E) 76,015.00
A.4.4.3.38. Pemasangan 1m2 lantai keramik Vinson Bianco- Gol B ukuran 30cm x 60cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02.03 OH 0.3500 95,000.00 33,250.00
Kepala tukang L.03.01 OH 0.0350 110,000.00 3,850.00
Mandor L.04.01 OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 97,650.00
B BAHAN
Keramik Vinson Bianco- Gol B ukuran 30cm x 60cm Bh 11.8700 6,000.00 71,220.00
Semen portland Kg 14.1500 1,250.00 17,687.50
Pasir Pasang M3 0.0390 200,000.00 7,800.00
Semen Warna Kg 2.0000 9,750.00 19,500.00
JUMLAH HARGA BAHAN 116,207.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 213,857.50
E Overhead & Profit 10 % 0.1000 21,385.75
F Harga Satuan Pekerjaan (D+E) 235,243.00
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.02.04 OH 0.2000 95,000.00 19,000.00
Kepala tukang L.03.01 OH 0.0200 110,000.00 2,200.00
Mandor L.04.01 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 29,850.00
B BAHAN
Kayu Papan m1 0.0110 32,500.00 357.50
Paku Skrup kg 0.0500 19,800.00 990.00
JUMLAH HARGA BAHAN 1,347.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,197.50
E Overhead & Profit 10 % 0.1000 3,119.75
F Harga Satuan Pekerjaan (D+E) 34,317.00
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.0000 80,000.00 480,000.00
Tukang batu L.02.03 OH 3.0000 95,000.00 285,000.00
Kepala tukang L.03.01 OH 0.3000 110,000.00 33,000.00
Mandor L.04.01 OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 801,900.00
B BAHAN
Bata merah bh 150.0000 500.00 75,000.00
Semen portland Kg 120.0000 1,250.00 150,000.00
Pasir pasang M3 0.3000 200,000.00 60,000.00
Keramik 20x20 bh 180.0000 23,833.33 4,290,000.00
Semen warna Kg 6.0000 9,750.00 58,500.00
JUMLAH HARGA BAHAN 4,633,500.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,435,400.00
E Overhead & Profit 10 % 0.1000 543,540.00
F Harga Satuan Pekerjaan (D+E) 5,978,940.00
A.8.4.6.2 Memasang 1 bh Lampu LED Plafond (ex. Philips) Downlight 2 x18 watt
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
Lampu LED Plafond (ex. Philips) Downlight 2x 18 watt BH 1.0000 280,000.00 280,000.00
Material Bantu LS 1.0000 15,000.00 15,000.00
Upah Kerja % 1.0000 295,000.00 2,950.00
A Jumlah (A+B+C) 297,950.00
B Overhead & Profit 10 % 0.1000 29,795.00
C Harga Satuan Pekerjaan (D+E) 327,745.00
A.8.4.6.2 Memasang 1 bh Lampu LED Plafond (ex. Philips) Downlight Bulat 8 watt
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
Lampu LED Plafond (ex. Philips) Downlight Bulat 8 watt BH 1.0000 120,000.00 120,000.00
Material Bantu LS 1.0000 15,000.00 15,000.00
Upah Kerja % 1.0000 135,000.00 1,350.00
A Jumlah (A+B+C) 136,350.00
B Overhead & Profit 10 % 0.1000 13,635.00
C Harga Satuan Pekerjaan (D+E) 149,985.00
Harga Satuan
No Uraian Satuan
(Rp.)
I UPAH
1 Pekerja OH 80,000.00
2 Pembantu operator crane OH 90,000.00
3 Tukang OH 95,000.00
4 Tukang Alumunium OH 95,000.00
5 Tukang Batu OH 95,000.00
6 Tukang Besi OH 95,000.00
7 Tukang Besi Konstruksi OH 95,000.00
8 Tukang cat OH 95,000.00
9 Tukang ereksi OH 95,000.00
10 Tukang Kayu OH 95,000.00
11 Tukang Las OH 95,000.00
12 Tukang Las Konstruksi OH 95,000.00
13 Tukang Pipa OH 95,000.00
14 Tukang vibrator OH 95,000.00
15 Kepala Tukang OH 110,000.00
16 Mandor OH 130,000.00
II BAHAN
1 Air Liter 20.00
2 Aluminium strip m 8,000.00
3 Alumunium foil M2 8,333.33
8 Assesoris (perkuatan, las dll) Ls 10,000.00
11 Kaso R 75.65(Tinggi 75 mm, T=0.65 mm) ex taso m' 17,000.00
17 Balok kayu kelas II m3 4,000,000.00
20 Bata ringan (ex. Hebel) uk. 10x20x60 cm bh 13,000.00
22 Bata merah Bh 500.00
26 Batu belah m3 200,000.00
31 Baut (Srew driver) bh 500.00
32 Besi angker dia 8 Kg 11,500.00
33 Besi beton (polos) kg 11,500.00
34 Besi beton (ulir) kg 12,000.00
35 Besi hollow 40x40 m' 17,000.00
36 Besi IWF Kg 19,000.00
37 Besi Baja Hollow 40/60 kuang tebal btg 180,000.00
38 Besi Baja Hollow 40/60 tebal btg 250,000.00
39 Besi Baja Hollow 40/40 btg 180,000.00
40 Besi Baja Hollow 20/40 btg 125,000.00
40 Besi Plat 0,9 mm lbr 290,000.00
41 Besi Plat 1,2 mm lbr 350,000.00
42 Besi Plat 2 mm lbr 525,000.00
38 Besi plat baja Berlubang 0.8mm x 1 m x 2 m Lmr 380,000.00
47 Cat Besi Kg 60,000.00
50 Cat dasar Tembok Kg 42,000.00
Harga Satuan
No Uraian Satuan
(Rp.)
53 Cat Penutup Tembok Kg 45,000.00
55 Closet jongkok Unit 285,000.00
Harga Satuan
No Uraian Satuan
(Rp.)
58 Dolken kayu Ø 8-10/400 cm Batang 3,000.00
64 Engsel kupu-kupu Bh 15,000.00
65 Engsel pintu Bh 20,000.00
68 Floor drain Unit 507,000.00
69 Jet Washer Set 565,000.00
70 Shower Set Set 210,000.00
76 Galvalum 0.30 mm Lbr 65,000.00
77 Nok Galvalum 0.30 mm m1 15,000.00
81 Gypsum board 9 mm (1200 x 2400 mm) Lembar 70,000.00
89 Kabel NYM 3x2,5 mm2 m 12,500.00
91 Kaca Tempered 12 mm m2 660,000.00
94 Kaca Clear Glass 10 mm m2 270,000.00
98 Kaca tebal 5 mm m2 170,000.00
100 Kait angin Bh 20,000.00
105 Kawat beton Kg 22,000.00
4 Kayu balok 5/7 m3 2,500,000.00
11 Kayu kelas III m3 1,500,000.00
14 Kayu papan 3/20 m3 2,500,000.00
18 Woodplank 30 cm m1 32,500.00
22 keramik Dinding 30cm x 60cm Bh 23,833.33
23 keramik Vinson Bianco- Gol B 30cm x 60cm Bh 6,000.00
27 Keramik ukuran 20cm x 20cm Bh 8,000.00
28 keramik ukuran 30cm x 30cm Bh 5,454.55
30 Keramik HOMOGENEUS TILE 60 X 60 (ivory white) ex sierra Bh 35,750.00
31 Keramik Indogress Bianco Travertino TILE 60 X 60 Bh 80,837.50
33 Kerikil (Maks 30 mm) m3 330,000.00
34 Kerikil (Maks 30 mm) kg 244.44
36 Klem Pipa Listrik bh 500.00
39 Koral beton m3 250,000.00
40 Kran air bh 45,000.00
47 Engsel pintu tanam/floor hinge Bh 1,500,000.00
49 L.Bow bh 5,000.00
51 Lampu LED Plafond (ex. Philips) Downlight Bulat 8 watt bh 120,000.00
53 Lampu LED Plafond (ex. Philips) Downlight Bulat 24 watt bh 247,500.00
54 Exhaust Fan 8" ex KDK/Panasonic 410,000.00
55 Exit lamp 1 MK + Battery 480,000.00
56 Las Dop bh 5,000.00
59 List Gybsum m1 4,000.00
64 Meni besi Liter 45,000.00
68 Minyak bekisting Liter 15,000.00
69 Minyak pelumas Liter 25,000.00
78 Paku 2”-3” Kg 19,000.00
79 Paku 5 - 10 cm kg 19,000.00
80 Paku 5 - 12 cm kg 19,000.00
81 Paku biasa Kg 19,000.00
86 Paku skrup buah 500.00
87 Paku skrup kg 19,800.00
88 Paku tripleks kg 22,000.00
92 Pasir beton m3 250,000.00
Harga Satuan
No Uraian Satuan
(Rp.)
93 Pasir beton kg 178.57
94 Pasir pasang m3 200,000.00
95 Pasir urug M3 150,000.00
100 Pemasangan 1 kg rangka kuda-kuda baja WF Kg 36,740.00
101 Penangkal Petir Tipe Konvensional (Splitzen) lengkap dengan tian unit 2,000,000.00
102 Pengencer Kg 20,000.00
104 Pengerjaan 1 kg pekerjaan perakitan Kg 31,086.00
108 Frame Alluminium Pintu, Jendela, Boven m' 50,000.00
144 Pipa galvanis ½” M 75,000.00
145 Pipa galvanis 1” M 150,000.00
149 Pipa Medium 2” M 666,000.00
181 Pipa listrik 5/8” btg 15,000.00
197 Pipa PVC 2” M 59,000.00
201 Pipa PVC 4” M 166,000.00
202 Dop Pipa PVC 4” M 50,000.00
220 Plamuur Kg 26,000.00
227 Plint ukuran 10cm x 60cm Bh 3,500.00
244 Plywood 9 mm Lbr 150,000.00
252 Profil alluminium m 80,000.00
253 Profil kaca m 8,500.00
255 Rangka metal hollow 40.40.2 mm M1 17,500.00
256 Baja Ringan C85068 setara gigasteel m 20,000.00
257 Baja Ringan B41045 setara gigasteel m 11,000.00
258 Ramset/dinabolt bh 1,500.00
259 Reng Canai Dingin M' 7,500.00
265 Saklar Ganda setara Broco bh 18,000.00
266 Saklar Tunggal setara Broco bh 13,000.00
268 Sealant Tube 33,000.00
274 Semen portland Kg 1,250.00
275 Semen Warna Kg 9,750.00
276 Semen instan MU - 380 (perekat bata ringan) @ 40 Kg/Zak Zak 158,000.00
277 Semen instan MU - 301 (plester bata ringan) @ 40 Kg/Zak Zak 65,000.00
278 Semen instan MU - 201 (acian bata ringan) @ 40 Kg/Zak Zak 162,000.00
279 Seng gelombang Lbr 50,000.00
283 Sirtu m3 123,000.00
284 Skrup fixer buah 700.00
287 Solar Liter 7,500.00
288 Spring knip Bh 35,000.00
290 Stop Kontak Dinding 1 Phasa setara Broco bh 35,000.00
291 Stop Kontak Dinding 1 Phasa setara Broco bh 45,000.00
291 Aluminium Composite Panel (ACP) m2 420,500.00
292 Tripleks 3 mm Lembar 44,000.00
401 Tripleks 18 mm Lembar 205,000.00
402 Tee Doos bh 5,000.00
403 Wastafel LW 649 CJ Unit 1,720,000.00
PERHITUNGAN VOLUME PEKERJAAN LANTAI 1 (SATU)
PROGRAM :
PEKRJAAAN :
LOKASI :
TAHUN ANGARAN :
3 Pemasangan Bowplank
= Keliling bangunan K = 49.00 m1
b. Teras
A (m2) h (m) b (m) L (m) V = (A - (bxL)) x h
7.00 0.55 0.25 7.50 = 2.819
b. Bangunan Teras
A (m2) h (m) b (m) L (m) V = (A - (bxL)) x h
7.00 0.10 0.25 0.00 = 0.70
E. PEKERJAAN BETON
5 Cor Rabat Lantai Elv + -0.05 m
A (m2) h (m) Apondasi (m2) V = (A-Avoid-Abalok) x h
139.00 0.05 27.60 = 5.57
c. Pintu/ Jendelaa
Type b (m) h (m) n (jlh) A = bxhxn
Pintu (P1) 1.48 2.12 1.00 = 3.138
Pintu Jendela (PJ 2.95 2.95 1.00 = 8.703
Pintu (P2) 0.92 2.10 3.00 = 5.796
Jendela (J1) 2.55 5.80 3.00 = 44.370
Jendela (J2) 2.00 2.95 2.00 = 11.800
Boven (BV1) 2.25 0.55 3.00 = 3.713
Boven (BV2) 1.70 0.55 2.00 = 1.870
Boven (BV3) 0.70 0.55 2.00 = 0.770
Vtot = 80.159 m2
At1a = 0.000 m2
b. Bangunan km/wc
Abw S A = Abw x S
0.00 2.00 = 0.00
7 Acian
Aptt Aptb App A = Aptt + Aptb + App-Apk
0.00 201.93 23.40 = 225.33
7 Acian
Aptt Aptb A = Aptt + Aptb
288.77 = 288.77
G. PEKRJAAN LANTAI 1
1 Granit B. Induk 60x60 cm
Type Abw (m2) Akol (m2) A = Ab - Akol
Lantai 1 139.42 = 139.42
2 Pintu Type P2
a. Kusen Aluminium Coating Putih 4"
Type b (m) h (m) L = b+h
Pintu (P2) 3.18 5.38 = 8.56 m1
b. Stiker
Type b (m) h (m) n (jlh) A = bxhxn
Pintu (P2) 0.59 0.83 2.00 = 0.98 m2
3 Pintu Type P3
a. Kusen Aluminium Coating Putih 4"
Type b (m) h (m) L = b+h
Pintu (P3) 2.78 5.38 = 8.16 m1
b. Stiker
Type b (m) h (m) n (jlh) A = bxhxn
Pintu (P3) 0.49 0.83 2.00 = 0.81 m2
NO. SKETSA GAMBAR URAIAN PEKRJAAN DAN PERHITUNGAN VOLUME SAT.
A. PEKRJAAN PESIAPAN 1 Pembersihan Lahan
c. Kaca Frame Aluminium
Type b (m) h (m) n (jlh) A = bxhxn
Bawah 0.65 1.01 2.00 = 1.31
Atas 0.65 1.09 2.00 = 1.42
Boven 0.63 0.50 2.00 = 0.63
Luasan Total Kaca Polos 5 mm A = 3.36 m2
12 Pintu Type PJ 1
a. Kusen Aluminium Coating Putih 4"
Type b (m) h (m) L = b+h
Pintu (PJ1 7.80 14.75 = 22.55 m1
b. Stiker
Type b (m) h (m) n (jlh) A = bxhxn
Pintu (PJ1 0.64 0.83 1.00 = 0.53 m2
14 Jendela Type J1
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 2.55 6 = 15.30 m1
Arah Y 5.80 5 = 29.00 m1
Tot = 44.30
b. Stiker
Type b (m) h (m) n (jlh) A = bxhxn
Arah Y 0.58 0.70 4.00 = 1.62 m2
b. Kaca Mati
Type b (m) h (m) n (jlh) A = bxhxn
NO. SKETSA GAMBAR URAIAN PEKRJAAN DAN PERHITUNGAN VOLUME SAT.
A. PEKRJAAN PESIAPAN 1 Pembersihan Lahan
A 0.58 1.05 8 = 4.87
B 0.58 0.70 4 = 1.62
0.58 1.35 8 = 6.26
Tot = 7.89
Luasan Total Kaca Polos 5 mm A = 7.89 m2
14 Jendela Type J5
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 0.60 4 = 2.40 m1
Arah Y 2.55 2 = 5.10 m1
Tot = 7.50
b. Kaca Frame Aluminium
Type b (m) h (m) n (jlh) A = bxhxn
A 0.50 0.45 1 = 0.23
A 0.50 1.50 1 = 0.75
Tot = 0.98
b. Kaca Mati
Type b (m) h (m) n (jlh) A = bxhxn
Bawah 0.50 0.45 1 = 0.23
Tot = 0.23
Luasan Total Kaca Polos 5 mm A = 0.23 m2
14 Jendela Type J6
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 0.60 4 = 2.40 m1
Arah Y 2.55 2 = 5.10 m1
Tot = 7.50
b. Kaca Mati
Type b (m) h (m) n (jlh) A = bxhxn
Bawah 0.50 0.45 1 = 0.23
A 0.50 0.45 1 = 0.23
A 0.50 1.50 1 = 0.75
Tot = 1.20
Luasan Total Kaca Polos 5 mm A = 1.20 m2
14 Jendela Type BV1
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 2.55 2 = 5.10 m1
Arah Y 0.55 5 = 2.75 m1
Tot = 7.85
b. Kaca Frame Aluminium
Type b (m) h (m) n (jlh) A = bxhxn
A 0.50 0.45 4 = 0.90
Tot = 0.90
Luasan Total Kaca Polos 5 mm A = 0.90 m2
14 Jendela Type BV2
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 1.70 2 = 3.40 m1
Arah Y 0.55 4 = 2.20 m1
Tot = 5.60
b. Kaca Frame Aluminium
Type b (m) h (m) n (jlh) A = bxhxn
A 0.50 0.45 3 = 0.68
Tot = 0.68
Luasan Total Kaca Polos 5 mm A = 0.68 m2
14 Jendela Type BV3
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 0.70 2 = 1.40 m1
Arah Y 0.55 4 = 2.20 m1
Tot = 3.60
b. Kaca Mati
Type b (m) h (m) n (jlh) A = bxhxn
A 0.60 0.45 3 = 0.81
Tot = 0.81
Luasan Total Kaca Polos 5 mm A = 0.81 m2
14 Jendela Type BV4
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 1.15 2 = 2.30 m1
Arah Y 0.55 3 = 1.65 m1
Tot = 3.95
b. Kaca Frame Aluminium
Type b (m) h (m) n (jlh) A = bxhxn
A 0.50 0.45 2 = 0.45
Tot = 0.45
Luasan Total Kaca Polos 5 mm A = 0.45 m2
14 Partisi 1
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 3.60 2 = 7.20 m1
2.75 2 = 5.50 m1
Arah Y 3.30 6 = 19.80 m1
NO. SKETSA GAMBAR URAIAN PEKRJAAN DAN PERHITUNGAN VOLUME SAT.
A. PEKRJAAN PESIAPAN 1 Pembersihan Lahan
Tot = 32.50
b. Kaca Frame Aluminium
Type b (m) h (m) n (jlh) A = bxhxn
A =
A =
Tot =
b. Gybsum
Type b (m) h (m) n (jlh) A = bxhxn
A 0.60 0.95 3 = 1.71
B 0.70 1.10 1 = 0.77
Tot = 2.48
b. Kaca Mati
Type b (m) h (m) n (jlh) A = bxhxn
Bawah 0.80 1.10 1 = 0.88
Bawah 0.70 0.95 1 = 0.66
Bawah 0.60 0.95 3 = 1.71
Tot = 3.26
Luasan Total Kaca Polos 5 mm A = 3.26 m2
14 PINTU
b. Kaca Frame Aluminium
Type b (m) h (m) n (jlh) A = bxhxn
A 0.80 2.10 1 = 1.68
Tot = 1.68
b. Stiker
Type b (m) h (m) n (jlh) A = bxhxn
A 0.60 0.90 3 = 0.54
Tot = 0.54
Luasan Total Kaca Polos 5 mm A = 0.00 m2
14 Partisi 2
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 3.10 4 = 12.40 m1
Arah Y 3.30 5 = 16.50 m1
Tot = 28.90
b. Calsipart
Type b (m) h (m) n (jlh) A = bxhxn
A 0.70 1.10 4 = 3.08
Tot = 3.08
b. Kaca Mati
Type b (m) h (m) n (jlh) A = bxhxn
A 0.70 1.10 4 = 3.08
Tot = 3.08
Luasan Total Kaca Polos 5 mm A = 3.08 m2
14 PINTU kaca BELAKANG P2
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 0.80 1 = 0.80 m1
Arah Y 2.10 2 = 4.20 m1
Tot = 5.00
b. Kaca Frame Aluminium
Type b (m) h (m) n (jlh) A = bxhxn
A 0.80 2.10 1 = 1.68
Tot = 1.68
Luasan Total Kaca Polos 5 mm A = 0.00 m2
14 PINTU kaca BELAKANG P4 lorong dua daun
a. Kusen Aluminium Coating Putih 4"
Type b (m) n (m) L = b+n
Arah X 1.50 1 = 1.50 m1
Arah Y 2.10 2 = 4.20 m1
Tot = 5.70
b. Kaca Frame Aluminium
Type b (m) h (m) n (jlh) A = bxhxn
A 0.71 2.10 2 = 2.98
Tot = 2.98
Luasan Total Kaca Polos 5 mm A = bxhxn m2
NO. SKETSA GAMBAR URAIAN PEKRJAAN DAN PERHITUNGAN VOLUME SAT.
A. PEKRJAAN PESIAPAN 1 Pembersihan Lahan
I. PASANGAN PLAFON
1 Pasangan plafond kalsiboard 6 mm + rangka hollow
a. Dalam gedung
Type Abw (m2) Akol (m2) A = Ab - Akol
K.T UTAMA 121.00 = 121.00
At = 121.00 m2
a. Selasar
Type Abw (m2) Akol (m2) A = Ab - Akol
K.T UTAMA = 0.00
At = 0.00 m2
J. PEKERJAAN ATAP
1 Luas Rangka Atap
Aac (m2) Unit A = Aac/Cos 30
37.27 2 Trapesium = 74.54 m2
17.95 2 Segitiga = 35.90 m2
At = 110.45 m2
2 Penutup Atap
Ap (m2) A = Ap
110.45 = 110.45 m2
3 Listplank
Llp (m) A = b x Llp m2
56.00 = 56.00
3 Jurai Luar
Llp (m) A = b x Llp m2
25.76 = 25.76
3 Bububangn
Llp (m) A = b x Llp m2
8.30 = 8.30
2 Penutup Atap
Ap (m2) A = Ap
10.40 = 10.40 m2
2 Penutup Atap
Ap (m2) A = Ap
20.16 = 20.16 m2
J. PEKERJAAN CAT
1 Cat dinding
Aac (m2) A = Aac
Eksterior 268.75 232.55 = Eksterior m2
Interior 245.35 208.70 = Interior m2
2 Cat PLAFOND
Ap (m2) A = Ap
304.57 328.00 = 304.57 m2
K. PEKERJAAN EXTERIOR
A. Tampak Depan
ITEM PEKE: PASANGAN ACP
SKETSA
A
NO. SKETSA GAMBAR URAIAN PEKRJAAN DAN PERHITUNGAN VOLUME SAT.
A. PEKRJAAN PESIAPAN 1 Pembersihan Lahan
A
NO. SKETSA GAMBAR URAIAN PEKRJAAN DAN PERHITUNGAN VOLUME SAT.
A. PEKRJAAN PESIAPAN 1 Pembersihan Lahan
SKETSA
SKETSA
C-F
SKETSA
SKETSA
120.82
2 Batu Alam
Type L (m) h (m) n (jlh) A = Lxhxn
a 0.93 3.19 12.00 = 35.600
b. 0.93 5.96 12.00 = 66.514
c 0.93 1.69 2.00 = 3.143
2 Besi Hollow
Type L (m) n (jlh) A = Lxhxn
hollo 4/4 3.16 11.00 = 34.760
0.80 11.00 = 8.800
0.96 11.00 = 10.560
4.30 4.00 = 17.200
71.320 11.9
hollo 2/4 6.80 9.00 = 61.200 10.2
SELASAR PENGHUBUNG
1 PEKERJAAN PONDASI 1 Galian Tanah Pondasi Menerus
Type b (m) h (m) L (m) V = bxhxL
Luar X 0.80 0.70 4.60 = 2.58
Luar Y 0.80 0.70 3.00 = 1.68
3 PEKERJAAN BETON
A. Pekerjaan Balok 1 K 40X40
A.1 Balok Tipe S(25X40) Type a (m) b (m) h (m) n (jlh) V = axbxhxn
KP 0.40 0.40 3.65 2.00 = 1.17
c. Pintu/ Jendelaa
Type b (m) h (m) n (jlh) A = bxhxn
Jendela (J2) 2.00 2.45 2.00 = 9.800
Vtot = 9.800 m2
7 Acian
Aptt Aptb App A = Aptt + Aptb + App-Apk
54.72 = 54.72
G. PEKRJAAN KERAMIK
1 Granit B. Induk 60x60 cm
Type Abw (m2) Akol (m2) A = Ab - Akol
Lantai 1 33.60 0.04 = 33.56
2 Cat PLAFOND
Ap (m2) A = Ap
17.20 328.00 = 17.20 m2
7 Beton Rinkbalk
Tul Utama
Dimensi Volume
panjang lebar tinggi beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
61.47 0.15 0.2 1.84 2 61.47 0.887364 12
2 61.47 0.887364 12
Tot D
Bakisting (2x pakai) extra 5%
12.294
Sengkang 307.35 0.7 0.394384 8
extra 1%
15 Plat Lantai t = 10 cm
Tul Utama
Dimensi Volume
panjang lebar t beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
16.206 1 0.12 1.94 108.04 1 0.616225 10
6.6666667 16.206 0.616225 10
Tot D
extra 5%
5.83416
Total all P
15 Plat Bordes t = 12 cm
Tul Utama
Dimensi Volume
panjang lebar t beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
Err:509 1 0.12 Err:509 Err:509 1 0.616225 10
6.6666667 Err:509 0.616225 10
Tot D
Luas Plat 2.025 extra 5%
Total all P
7 Beton Rinkbalk
Tul Utama
Dimensi Volume
panjang lebar tinggi beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
Err:509 0.15 0.2 Err:509 2 Err:509 0.887364 12
2 Err:509 0.887364 12
Tot D
Bakisting (2x pakai) extra 5%
Err:509
Sengkang Err:509 0.7 0.394384 8
extra 1%
23 Bordes Belakang
Tul Utama
Dimensi Volume
panjang lebar tinggi beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
9.1666667 0.15 0.3 0.41 2 9.1666667 0.887364 13
2 9.1666667 0.887364 13
6.875 Tot D
Bakisting (2x pakai) extra 5%
3.4375
Sengkang 65.47619 0.9 0.616225 8
extra 1%
14 Kolom 40/40
Tul Utama
Dimensi Volume
panjang lebar tinggi beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
8.875 0.4 0.4 1.42 12 8.875 1.577536 16
Bakisting (2x pakai) extra 1%
3.55
Sengkang 44.375 1.6 0.616225 10
extra 1%
Tot
7 sloor 25/40
Tul Utama
Dimensi Volume
panjang lebar tinggi beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
14.2 0.25 0.4 1.42 3 14.2 1.577536 16
3 14.2 1.577536 16
Tot D
Bakisting (2x pakai) extra 5%
5.68
Sengkang 71 1.3 0.616225 10
extra 1%
7 balok
Tul Utama
Dimensi Volume
panjang lebar tinggi beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
14.2 0.25 0.4 1.42 3 14.2 1.577536 16
3 14.2 1.577536 16
Tot D
Bakisting (2x pakai) extra 5%
5.68
Sengkang 71 1.3 0.616225 10
extra 1%
7 RB
Tul Utama
Dimensi Volume
panjang lebar tinggi beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
14.2 0.2 0.3 0.85 2 14.2 1.577536 16
2 14.2 1.577536 16
Tot D
Bakisting (2x pakai) extra 5%
4.26
Sengkang 71 1 0.616225 10
extra 1%
15 Plat Lantai t = 10 cm
Tul Utama
Dimensi Volume
panjang lebar t beton JUMLAH pjg tul (m) Berat (Kg/m) Diameter
15.333 1 0.12 1.84 102.22 1 0.616225 10
6.6666667 15.333 0.616225 10
Tot D
extra 5%
7.35984
Total all P
DIA LUAS (M2) BERAT (KG/M) BERAT (KG/LJR)
6 0.00002826 0.221841 2.6621
8 0.00005024 0.394384 4.7326
Berat Total 10 0.00007850 0.616225 7.3947
17.75 12 0.00011304 0.887364 10.6484
17.75 13 0.00013267 1.041420 12.4970
35.49 14 0.00015386 1.207801 14.4936
37.269288 16 0.00020096 1.577536 18.9304
19 0.00028339 2.224572 26.6949
17.75 22 0.00037994 2.982529 35.7903
17.75 25 0.00049063 3.851406 46.2169
35.49 30 0.00070650 5.546025 66.5523
37.269288 32 0.00080384 6.310144 75.7217
74.54
Berat Total
103.64
104.68
34.55
34.89
139.57
244.25
Berat Total
109.09
109.09
218.19
229.09
84.85
85.70
303.88
Berat Total
66.58
66.58
133.15
139.81
139.81
139.81
Berat Total
71.21
71.21
142.42
149.54
149.54
149.54
Berat Total
421.69
518.28
939.97
986.97
986.97
986.97
Berat Total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Berat Total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Berat Total
16.27
16.27
32.54
34.16
36.31
36.68
Berat Total
109.80
109.80
219.60
241.56
483.13
87.63
33.28
120.90
122.11
Berat Total
168.01
169.69
43.75
44.19
213.88
383.56
Berat Total
67.20
67.20
134.41
141.13
56.88
57.45
191.85
Berat Total
67.20
67.20
134.41
141.13
56.88
57.45
191.85
Berat Total
44.80
44.80
89.60
94.08
43.75
44.19
133.79
Berat Total
62.99
62.99
125.98
132.28
132.28
132.28
A. PERHITUNGAN LUASAN
97.92 m2
144.67 m2
L2 46.75 m2
97.92 m2
144.67 m2
Selasar L1 16.80 m2
L2 m2 13.68 25000
16.80 m 2
7,233,500.00
B.UTAMA 289.34 m 2
275.66
Selasar 16.80 m2
Jumlah m2
Luas Bangunan :
a. Bangunan Utama = m2
b. Bangunan WC/KM = m2
c. Teras = m2
d. 1/2 x Luasan Teras = m2
TOTAL
1 Acp 176.8795
2 Laser Cutting 13.8347
3 Sun Screen 19.38
0.4268 atas
1.204 0.1 4 0.4816 samping
0.9084
5.284 atas
0.946 4 3.784 samping
9.068
1.5972 atas
1.204 0.1 8 0.9632 samping
2.5604
9.642 atas
0.946 4 3.784 samping
13.426
63.756
10.143
73.899
No ITEM VOL
LANTAI BASEMEN
1 Panel (Penerangan+Tata Udara) 0
2 Box Sekring (MCB) 0
3 Down Light Spot Light LED 8 W 0
4 Down Light Spot Light LED 24 W 0
5 Down Light Spot Light LED 58 W 0
6 Lampu tabung bulat tempel 8
7 Lampu Sorot/Flood Light LED 100 Watt 0
8 Lampu Ultra Biru (Neon) 18 watt 0
9 Saklar Seri setara Broco 1
10 Saklar Tunggal setara Broco 0
11 Stop Kontak Dinding 1 Phasa setara Broco 0
12 Stop Kontak Dinding Double Outlet setara Broco
No ITEM VOL
LANTAI 1
1 Panel (Penerangan+Tata Udara) 1
2 Box Sekring (MCB) 1
3 Down Light Spot Light LED 8 W 0
4 Down Light Spot Light LED 24 W 0
5 Down Light Spot Light LED 58 W 0
6 Lampu tabung bulat tempel 27
7 Lampu Sorot/Flood Light LED 100 Watt 0
8 Lampu Ultra Biru (Neon) 18 watt 0
9 Saklar Seri setara Broco 4
10 Saklar Tunggal setara Broco 1
11 Stop Kontak Dinding 1 Phasa setara Broco 10
12 Stop Kontak Dinding Double Outlet setara Broco
13 Stop Kontak AC setara setara Broco
14 Instalasi Penerangan 27
15 Instalasi Stop Kontak 10
16 Instalasi Stop Kontak AC 0
17 Pemindahan KWH Meter dan Panel LVMDP
18 PLN ke Meter, NYFGBY 4x50 mm2
Penangkal Petir Tipe Konvensional (Splitzen) lengkap
19 1
dengan tiang dan acesories
20 Kabel NYY 1x70 mm2
21 Kabel BC 1x50 mm2
22 Grounding System + Bak Kontrol 1
No ITEM VOL
LANTAI 2
1 Panel (Penerangan+Tata Udara) 0
2 Box Sekring (MCB) 1
3 Down Light Spot Light LED 8 W 0
4 Down Light Spot Light LED 24 W 0
5 Down Light Spot Light LED 58 W 0
6 Lampu tabung bulat tempel 27
7 Lampu Sorot/Flood Light LED 100 Watt 0
8 Lampu Ultra Biru (Neon) 18 watt 0
9 Saklar Seri setara Broco 4
10 Saklar Tunggal setara Broco 1
11 Stop Kontak Dinding 1 Phasa setara Broco 10
12 Stop Kontak Dinding Double Outlet setara Broco
1
Tipe 5
pas. batu
H t
1 1 1
Tipe 1
Tipe 1
Tipe 2
aastamping
Tipe 1
Tipe 2
1
Tipe 1
urugan pasir
1 1
Tipe 5
t Tipe 1 Tipe 1 Tipe 4
b2
b2
Tipe 1
Tipe 1
Tipe 1
Tipe 1 Tipe 1 Tipe 4
92 dari 173
DATA ITEM PEKERJAAN
H
pas. batu
H 2
Tipe 1
Tipe 1
Tipe 2
Tipe 1
Tipe 2
t
Tipe 1
aastamping
Tipe 5
urugan pasir
Tipe 1 Tipe 1 Tipe 4
t
b2 2
Tipe 1
Tipe 1
Tipe 1
Tipe 1 Tipe 1 Tipe 4
b2
Tipe 5
93 dari 173
DATA ITEM PEKERJAAN
3
Tipe 5
H Tipe 1 Tipe 1 Tipe 4
pas. batu
H t
aastamping
Tipe 1
Tipe 1
Tipe 2
Tipe 1
Tipe 2
Tipe 1
urugan pasir
Tipe 5
t
b2 Tipe 1 Tipe 1 3
Tipe 4
b2
Tipe 1
Tipe 1
Tipe 1
Tipe 1 Tipe 1 Tipe 4
94 dari 173
DATA ITEM PEKERJAAN
pas. batu
H t
aastamping
Tipe 1
Tipe 1
Tipe 2
Tipe 1
Tipe 2
urugan pasir
Tipe 1
t 4
Tipe 5
b2 Tipe 1 Tipe 1 Tipe 4
b2
Tipe 1
Tipe 1
Tipe 1
Tipe 1 Tipe 1 Tipe 4
b2 80 b2 60
H 50 H 60
LUAS PENAMPANG (Opsi input luas penampang)
LUAS
95 dari 173
PERHITUNGAN VOLUME
25
POND1 72.00 POND-1 1.00 1.00 1.10 79.20 1.00 1.00 0.10 7.20 1.00 1.00 0.20 14.40 0.40 0.80 0.80 34.56
POND2 23.90 POND-2 1.20 1.20 1.30 33.41 1.20 1.20 0.10 2.57 1.20 1.20 0.20 5.14 0.50 1.00 3.80 59.62
POND3 22.55 POND-3 1.00 1.00 1.20 27.06 1.00 1.00 0.10 2.25 1.00 1.00 0.20 4.51 0.40 0.80 2.30 31.12
POND4 35.80 POND-4 0.80 0.80 0.50 14.32 0.80 0.80 0.10 2.86 0.80 0.80 0.20 5.73 0.30 0.60 0.60 9.67
DATA ITEM PEKERJAAN
t rabat beton
1
urugan pasir
t 1 1
urugan tanah/sirtu 1
t
1 1 1
URUGAN SIRTU URUGAN PASIR RABAT/BETON WIREMESS
t 32 t 10 t 8 M 0 1
TULANGAN X TULANGAN Y TIPE TUL
POSISI D JARAK POSISI D JARAK 1 LAPIS 0
ATAS 0 0 ATAS 0 0 2 LAPIS 0
BAWAH 0 0 BAWAH 0 0
97 dari 173
TIPE 2 NAMA RBT-2
SKETSA
t rabat beton
urugan pasir
t 2
urugan tanah/sirtu
t 2
98 dari 173
PERHITUNGAN VOLUME
10
1 1 1
NK
2 2 2 2 2
3 3 3
h1 pas. tembok h2
3 RUANG KELAS
±0.00
3 RUANG PRAKTEK
±0.00
3
3
3 3 3
NK
NK
4 4 4 4 4
4
h1 pas. tembok h2
5 5 5
h1 pas. tembok h2
6 6 6
pas. tembok
7 7 7
h1 h2
h1 pas. tembok h2
8 8
h1 pas. tembok h2
8 8
51
1 1 1
h1 plesteran tembok h2 plest. tembok 1
1 RUANG KELAS
±0.00
1 RUANG PRAKTEK
±0.00
1
1
1 1 1
NK
NK
2 2
2 2 2
3 3 3
3
h1 plesteran tembok h2 plest. tembok
3 RUANG KELAS
3 RUANG PRAKTEK
±0.00 ±0.00
3
3
3 3 3 NK
NK
4 4
4 4 4
5 5 5
6 6 6
7 7 7
h1 plesteran tembok h2 plest. tembok
8 8
9 9
98
TRASRAM/ PLESTERAN
LAYER CAD L NAMA
BIASA h1 h2 sisi Vol
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 5.55 PLEST1-LT1 Biasa 3.30 3.30 1 18.32
PLEST1 5.55 PLEST1-LT1 Biasa 3.30 3.30 1 18.32
PLEST1 1.55 PLEST1-LT1 Biasa 3.30 3.30 1 5.12
PLEST1 1.55 PLEST1-LT1 Biasa 3.30 3.30 1 5.12
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 7.45 PLEST1-LT1 Biasa 3.30 3.30 1 24.59
PLEST1 5.65 PLEST1-LT1 Biasa 3.30 3.30 1 18.64
PLEST1 5.65 PLEST1-LT1 Biasa 3.30 3.30 1 18.64
PLEST1 2.65 PLEST1-LT1 Biasa 3.30 3.30 1 8.74
PLEST1 2.65 PLEST1-LT1 Biasa 3.30 3.30 1 8.74
PLEST2 1.55 PLEST2-LT1 Biasa 1.00 1.00 1 1.55
PLEST2 1.55 PLEST2-LT1 Biasa 1.00 1.00 1 1.55
PLEST2 7.65 PLEST2-LT1 Biasa 1.00 1.00 1 7.65
PLEST2 7.65 PLEST2-LT1 Biasa 1.00 1.00 1 7.65
TRASRAM/ PLESTERAN
LAYER CAD L NAMA
BIASA h1 h2 sisi Vol
PLEST2 7.65 PLEST2-LT1 Biasa 1.00 1.00 1 7.65
PLEST2 2.65 PLEST2-LT1 Biasa 1.00 1.00 1 2.65
PLEST2 1.65 PLEST2-LT1 Biasa 1.00 1.00 1 1.65
PLEST2 1.65 PLEST2-LT1 Biasa 1.00 1.00 1 1.65
PLEST2 7.65 PLEST2-LT1 Biasa 1.00 1.00 1 7.65
PLEST2 7.65 PLEST2-LT1 Biasa 1.00 1.00 1 7.65
PLEST2 7.65 PLEST2-LT1 Biasa 1.00 1.00 1 7.65
PLEST2 2.65 PLEST2-LT1 Biasa 1.00 1.00 1 2.65
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 5.55 PLEST3-LT2 Biasa 3.30 3.30 1 18.32
PLEST3 5.55 PLEST3-LT2 Biasa 3.30 3.30 1 18.32
PLEST3 1.55 PLEST3-LT2 Biasa 3.30 3.30 1 5.12
PLEST3 1.55 PLEST3-LT2 Biasa 3.30 3.30 1 5.12
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 7.45 PLEST3-LT2 Biasa 3.30 3.30 1 24.59
PLEST3 5.65 PLEST3-LT2 Biasa 3.30 3.30 1 18.64
PLEST3 5.65 PLEST3-LT2 Biasa 3.30 3.30 1 18.64
PLEST3 2.65 PLEST3-LT2 Biasa 3.30 3.30 1 8.74
PLEST3 2.65 PLEST3-LT2 Biasa 3.30 3.30 1 8.74
TRASRAM/ PLESTERAN
LAYER CAD L NAMA
BIASA h1 h2 sisi Vol
PLEST4 1.55 PLEST4-LT2 Biasa 1.00 1.00 1 1.55
PLEST4 1.55 PLEST4-LT2 Biasa 1.00 1.00 1 1.55
PLEST4 7.65 PLEST4-LT2 Biasa 1.00 1.00 1 7.65
PLEST4 7.65 PLEST4-LT2 Biasa 1.00 1.00 1 7.65
PLEST4 7.65 PLEST4-LT2 Biasa 1.00 1.00 1 7.65
PLEST4 2.65 PLEST4-LT2 Biasa 1.00 1.00 1 2.65
PLEST4 1.65 PLEST4-LT2 Biasa 1.00 1.00 1 1.65
PLEST4 1.65 PLEST4-LT2 Biasa 1.00 1.00 1 1.65
PLEST4 7.65 PLEST4-LT2 Biasa 1.00 1.00 1 7.65
PLEST4 7.65 PLEST4-LT2 Biasa 1.00 1.00 1 7.65
PLEST4 7.65 PLEST4-LT2 Biasa 1.00 1.00 1 7.65
PLEST4 2.65 PLEST4-LT2 Biasa 1.00 1.00 1 2.65
PLEST5 7.85 PLEST5-ATP Biasa 1.00 1.00 1 7.85
PLEST5 7.85 PLEST5-ATP Biasa 1.00 1.00 1 7.85
PLEST5 7.85 PLEST5-ATP Biasa 1.00 1.00 1 7.85
PLEST5 7.85 PLEST5-ATP Biasa 1.00 1.00 1 7.85
PLEST5 7.85 PLEST5-ATP Biasa 1.00 1.00 1 7.85
PLEST5 7.85 PLEST5-ATP Biasa 1.00 1.00 1 7.85
PLEST6 7.85 PLEST6-ATP Biasa 2.80 2.80 1 21.98
PLEST6 7.85 PLEST6-ATP Biasa 2.80 2.80 1 21.98
PLEST6 7.85 PLEST6-ATP Biasa 2.80 2.80 1 21.98
PLEST6 7.85 PLEST6-ATP Biasa 2.80 2.80 1 21.98
PLEST6 7.85 PLEST6-ATP Biasa 2.80 2.80 1 21.98
PLEST6 7.85 PLEST6-ATP Biasa 2.80 2.80 1 21.98
PLEST7 7.85 PLEST7-ATP Biasa 0.75 0.75 1 5.89
PLEST7 7.85 PLEST7-ATP Biasa 0.75 0.75 1 5.89
PLEST7 7.85 PLEST7-ATP Biasa 0.75 0.75 1 5.89
PLEST7 7.85 PLEST7-ATP Biasa 0.75 0.75 1 5.89
PLEST7 7.85 PLEST7-ATP Biasa 0.75 0.75 1 5.89
PLEST7 7.85 PLEST7-ATP Biasa 0.75 0.75 1 5.89
PLEST8 7.85 PLEST8-ATP Biasa 3.00 0.97 1 15.58
PLEST8 7.85 PLEST8-ATP Biasa 3.00 0.97 1 15.58
TRASRAM/ PLESTERAN
LAYER CAD L NAMA
BIASA h1 h2 sisi Vol
PLEST8 7.85 PLEST8-ATP Biasa 3.00 0.97 1 15.58
PLEST8 7.85 PLEST8-ATP Biasa 3.00 0.97 1 15.58
PLEST9 1.85 PLEST9-ATP Biasa 1.64 1.20 1 2.63
PLEST9 1.85 PLEST9-ATP Biasa 1.64 1.20 1 2.63
PLEST9 1.85 PLEST9-ATP Biasa 1.64 1.20 1 2.63
PLEST9 1.85 PLEST9-ATP Biasa 1.64 1.20 1 2.63
acian beton
1 1 1
h1 acian tembok h2 acian tembok 1
dan beton dan beton
1 1 1
RUANG KELAS RUANG PRAKTEK
±0.00 ±0.00
1
1 1 1
NK
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
NK
2 2
TEMBOK PLESTERAN ACIAN K. DINDING
2 2 2 2
TIPE 0 TIPE 0 TIPE 2 TIPE 0
hi 0 hi 0 hi 100 hi 0
h2 0 h2 0 h2 100 h2 0
TRASRAM 0 TRASRAM 0 MAT
BIASA 0 BIASA 0 NAMA ACIAN2-LT1
acian beton 3 3 3
h1 acian tembok h2 acian tembok
dan beton dan beton 3 3
3 RUANG KELAS
±0.00
3 RUANG PRAKTEK
±0.00
3
3 3 3
NK
acian beton
h1 acian tembok h2 acian tembok
RUANG KELAS
±0.00
RUANG PRAKTEK
±0.00
4 4
4 4 4 4
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
5 5 5
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
6 6 6
7 7 7
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
8 8
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
9 9
TEMBOK PLESTERAN ACIAN K. DINDING
TIPE 0 TIPE 0 TIPE 9 TIPE 0
hi 0 hi 0 hi 164 hi 0
h2 0 h2 0 h2 120 h2 0
TRASRAM 0 TRASRAM 0 MAT
BIASA 0 BIASA 0 NAMA ACIAN9-ATP
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
10 10 10
10
10 RUANG KELAS
±0.00
RUANG PRAKTEK
±0.00
10
10 10 10
NK
acian beton
h1 acian tembok h2 11 11 11
acian tembok
dan beton dan beton
11 RUANG KELAS
±0.00 11 RUANG PRAKTEK
±0.00
11
11
11 11 11
NK
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
NK
12 12
12 12 12
TEMBOK PLESTERAN ACIAN K. DINDING
TIPE 0 TIPE 0 TIPE 12 TIPE 0
hi 0 hi 0 hi 100 hi 0
h2 0 h2 0 h2 100 h2 0
TRASRAM 0 TRASRAM 0 MAT
BIASA 0 BIASA 0 NAMA CATSEL-LT1
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
13 13 13 13
13
RUANG KELAS RUANG PRAKTEK
±0.00 ±0.00
13
NK
13 13 13
TEMBOK PLESTERAN ACIAN K. DINDING
TIPE 0 TIPE 0 TIPE 13 TIPE 0
hi 0 hi 0 hi 400 hi 0
h2 0 h2 0 h2 400 h2 0
TRASRAM 0 TRASRAM 0 MAT
BIASA 0 BIASA 0 NAMA CATEXT-LT2
acian beton
h1 acian tembok h2 14 14 14
acian tembok
dan beton dan beton
14 RUANG KELAS
±0.00 14 RUANG PRAKTEK
±0.00
14
14
14 14 14
NK
acian beton
h1 acian tembok h2 acian tembok
dan beton dan beton
NK
15 15
15 15 15 15
TEMBOK PLESTERAN ACIAN K. DINDING
TIPE 0 TIPE 0 TIPE 15 TIPE 0
hi 0 hi 0 hi 100 hi 0
h2 0 h2 0 h2 100 h2 0
TRASRAM 0 TRASRAM 0 MAT
BIASA 0 BIASA 0 NAMA CATSEL-LT2
ACIAN
LAYER CAD L NAMA
t1 t2 sisi Volume
ACIAN1 88.40 ACIAN1-LT1 3.88 3.88 1 342.99
ACIAN1 31.40 ACIAN1-LT1 3.88 3.88 1 121.81
ACIAN1 48.40 ACIAN1-LT1 3.88 3.88 1 187.79
ACIAN2 30.85 ACIAN2-LT1 1.00 1.00 1 30.85
ACIAN2 32.25 ACIAN2-LT1 1.00 1.00 1 32.25
ACIAN3 88.40 ACIAN3-LT2 3.88 3.88 1 342.99
ACIAN3 31.40 ACIAN3-LT2 3.88 3.88 1 121.81
ACIAN3 48.40 ACIAN3-LT2 3.88 3.88 1 187.79
ACIAN4 30.85 ACIAN4-LT2 1.00 1.00 1 30.85
ACIAN4 32.25 ACIAN4-LT2 1.00 1.00 1 32.25
ACIAN5 24.45 ACIAN5-ATP 1.00 1.00 1 24.45
ACIAN5 23.85 ACIAN5-ATP 1.00 1.00 1 23.85
ACIAN6 23.85 ACIAN6-ATP 2.80 2.80 1 66.78
ACIAN6 23.85 ACIAN6-ATP 2.80 2.80 1 66.78
ACIAN7 23.85 ACIAN7-ATP 0.75 0.75 1 17.89
ACIAN7 24.15 ACIAN7-ATP 0.75 0.75 1 18.11
ACIAN8 8.15 ACIAN8-ATP 3.00 0.97 1 16.18
ACIAN8 8.15 ACIAN8-ATP 3.00 0.97 1 16.18
ACIAN8 7.85 ACIAN8-ATP 3.00 0.97 1 15.58
ACIAN8 7.85 ACIAN8-ATP 3.00 0.97 1 15.58
ACIAN9 1.85 ACIAN9-ATP 1.60 1.20 1 2.59
ACIAN9 1.85 ACIAN9-ATP 1.60 1.20 1 2.59
ACIAN9 1.85 ACIAN9-ATP 1.60 1.20 1 2.59
ACIAN9 1.85 ACIAN9-ATP 1.60 1.20 1 2.59
ACIAN
LAYER CAD L NAMA
t1 t2 sisi Volume
ACIAN
LAYER CAD L NAMA
t1 t2 sisi Volume
ACIAN10 73.32 Cat_ExLT1 4.00 4.00 1 293.28
ACIAN11 31.40 Cat_IntLT1 3.20 3.20 1 100.48
ACIAN11 48.40 Cat_IntLT1 3.20 3.20 1 154.88
ACIAN11 15.10 Cat_IntLT1 3.20 3.20 1 48.32
ACIAN10 1.40 Cat_ExLT1 4.00 4.00 1 5.60
ACIAN10 1.40 Cat_ExLT1 4.00 4.00 1 5.60
ACIAN10 1.40 Cat_ExLT1 4.00 4.00 1 5.60
ACIAN10 1.40 Cat_ExLT1 4.00 4.00 1 5.60
ACIAN10 1.40 Cat_ExLT1 4.00 4.00 1 5.60
ACIAN12 1.55 Cat_SelLT1 1.00 1.00 1 1.55
ACIAN12 1.55 Cat_SelLT1 1.00 1.00 1 1.55
ACIAN12 7.65 Cat_SelLT1 1.00 1.00 1 7.65
ACIAN12 7.65 Cat_SelLT1 1.00 1.00 1 7.65
ACIAN12 7.65 Cat_SelLT1 1.00 1.00 1 7.65
ACIAN12 7.65 Cat_SelLT1 1.00 1.00 1 7.65
ACIAN12 7.65 Cat_SelLT1 1.00 1.00 1 7.65
ACIAN12 7.65 Cat_SelLT1 1.00 1.00 1 7.65
ACIAN12 1.65 Cat_SelLT1 1.00 1.00 1 1.65
ACIAN12 1.65 Cat_SelLT1 1.00 1.00 1 1.65
ACIAN12 1.75 Cat_SelLT1 1.00 1.00 1 1.75
ACIAN12 1.75 Cat_SelLT1 1.00 1.00 1 1.75
ACIAN13 73.30 Cat_ExtL2 4.00 4.00 1 293.20
ACIAN13 1.40 Cat_ExtL2 4.00 4.00 1 5.60
ACIAN13 1.40 Cat_ExtL2 4.00 4.00 1 5.60
ACIAN13 1.40 Cat_ExtL2 4.00 4.00 1 5.60
ACIAN13 1.40 Cat_ExtL2 4.00 4.00 1 5.60
ACIAN13 1.40 Cat_ExtL2 4.00 4.00 1 5.60
ACIAN14 31.40 Cat_IntLT2 3.20 3.20 1 100.48
ACIAN
LAYER CAD L NAMA
t1 t2 sisi Volume
ACIAN14 48.40 Cat_IntLT2 3.20 3.20 1 154.88
ACIAN15 1.55 Cat_SelLT2 1.00 1.00 1 1.55
ACIAN15 1.55 Cat_SelLT2 1.00 1.00 1 1.55
ACIAN15 7.65 Cat_SelLT2 1.00 1.00 1 7.65
ACIAN15 7.65 Cat_SelLT2 1.00 1.00 1 7.65
ACIAN15 7.65 Cat_SelLT2 1.00 1.00 1 7.65
ACIAN15 7.65 Cat_SelLT2 1.00 1.00 1 7.65
ACIAN15 7.65 Cat_SelLT2 1.00 1.00 1 7.65
ACIAN15 7.65 Cat_SelLT2 1.00 1.00 1 7.65
ACIAN15 2.65 Cat_SelLT2 1.00 1.00 1 2.65
ACIAN15 2.65 Cat_SelLT2 1.00 1.00 1 2.65
ACIAN15 1.65 Cat_SelLT2 1.00 1.00 1 1.65
ACIAN15 1.65 Cat_SelLT2 1.00 1.00 1 1.65
Exterior 755.88
Interior 559.04
Bukaan Kusen 123.85
Lain-lain 190.71
h1 keramik dinding h2
KERAMIK DINDING
LAYER CAD L NAMA
h1 h2 Vol
MATERIAL
DATA ITEM PEKERJAAN
NK
NK
LAYER
PANJANG PLINT KERAMIK MATERIAL POSISI NAMA TIPE
CAD
PLTILE1 29.67 29.67 10x40 cm Interior PLINT-LT1
PLTILE1 32.45 32.45 10x40 cm Interior PLINT-LT1
PLTILE1 13.40 13.40 10x40 cm Interior PLINT-LT1
PLTILE1 27.57 27.57 10x40 cm Interior PLINT-LT1
PLTILE1 5.83 5.83 10x40 cm Interior PLINT-LT1
PLTILE1 0.95 0.95 10x40 cm Interior PLINT-LT1
PLTILE1 5.82 5.82 10x40 cm Interior PLINT-LT1
PLTILE1 7.63 7.63 10x40 cm Interior PLINT-LT1
PLTILE1 2.85 2.85 10x40 cm Interior PLINT-LT1
PLTILE2 29.67 29.67 10x40 cm Interior PLINT-LT2
PLTILE2 32.45 32.45 10x40 cm Interior PLINT-LT2
PLTILE2 13.40 13.40 10x40 cm Interior PLINT-LT2
PLTILE2 33.25 33.25 10x40 cm Interior PLINT-LT2
PLTILE2 5.83 5.83 10x40 cm Interior PLINT-LT2
PLTILE2 5.82 5.82 10x40 cm Interior PLINT-LT2
PLTILE2 7.63 7.63 10x40 cm Interior PLINT-LT2
PLTILE2 0.95 0.95 10x40 cm Interior PLINT-LT2
PLTILE1 4.68 4.68 10x40 cm Interior PLINT-LT1
Jumlah 259.85
DATA ITEM PEKERJAAN
NK
PLAFON NAMA
TIPE 1 PLF-LT1
MATERIAL GYPSUM
POSISI INTERIOR
Modul 60x60cm ; besi hollow 1x40.40.2mm
NK
PLAFON NAMA
TIPE 2 PLF-LT2
MATERIAL GYPSUM
POSISI INTERIOR
Modul 60x60cm ; besi hollow 1x40.40.2mm
CELLING1 229.39 229.39 229.39 Gypsum 9 mm Interior PLF-LT1 Modul 60x60cm ; besi hollow 1x40.40.2mm
CELLING2 241.62 241.62 241.62 Gypsum 9 mm Interior PLF-LT2 Modul 60x60cm ; besi hollow 1x40.40.2mm
NK
NK
LAYER
PANJANG LIST PLAFOND MATERIAL POSISI NAMA TIPE
CAD
LISTCELL1 31.40 31.40 Profil Gypsum Interior LIST-LT1
LISTCELL1 48.40 48.40 Profil Gypsum Interior LIST-LT1
LISTCELL1 63.20 63.20 Profil Gypsum Interior LIST-LT1
LISTCELL2 48.40 48.40 Profil Gypsum Interior LIST-LT2
LISTCELL2 71.80 71.80 Profil Gypsum Interior LIST-LT2
LISTCELL2 31.40 31.40 Profil Gypsum Interior LIST-LT2
Jumlah 294.60
DATA ITEM PEKERJAAN
NK
ATAP
ATAP
TIPE 1 MATERIAL METAL SUDUT 15 RANGKA METAL
Jumlah 374.77
Proyek :
Lokasi :
Nama Bangunan :
Tahun Anggaran :
Item :Pekerjaan
Kusen, Pintu, Jendela, Boven dan Partisi
NAMA KUSEN/RANGKA
SKETSA JUMLAH
KUSEN FUNGSI DIMENSI
MAT.
b h
PJ-1 4.00 Bukaan 0.00 0.00 0.00
PJ-1 4.00 Kusen Aluminium 0.00 0.00
PJ-1 4.00 Pintu 0.00 0.00 0.00
P-1 2.00 Bukaan 0.00 0.00 0.00
P-1 2.00 Kusen Aluminium 0.00 0.00
P-1 2.00 Pintu 0.00 0.00 0.00
J-1 6.00 Bukaan 0.00 0.00 0.00
J-1 6.00 Kusen Aluminium 0.00 0.00
J-1 6.00 Jendela 0.00 0.00 0.00
J-2 14.00 Bukaan 0.00 0.00 0.00
J-2 14.00 Kusen Aluminium 0.00 0.00
J-2 14.00 Jendela 0.00 0.00 0.00
BACKUP DATA PEKERJAAN
PARAMETER
ASESORIES NAMA
LAYER CAD
ENGSELPINTU ENGSELJENDE ENGSEL KAIT ANGIN SPRIN KNIP TBH1 TBH2
LA BOVEN
0.00 0.00 0.00 0.00 0.00 0.00 0.00 KUSEN1
0.00 0.00 0.00 0.00 0.00 0.00 0.00 KUSEN2
6.00 4.00 0.00 4.00 2.00 0.00 0.00 KUSEN3
0.00 0.00 0.00 0.00 0.00 0.00 0.00 KUSEN4
0.00 0.00 0.00 0.00 0.00 0.00 0.00 KUSEN5
6.00 0.00 0.00 0.00 0.00 0.00 0.00 KUSEN6
0.00 0.00 0.00 0.00 0.00 0.00 0.00 KUSEN7
0.00 0.00 0.00 0.00 0.00 0.00 0.00 KUSEN8
0.00 4.00 0.00 4.00 2.00 0.00 0.00 KUSEN9
0.00 0.00 0.00 0.00 0.00 0.00 0.00 KUSEN10
0.00 0.00 0.00 0.00 0.00 0.00 0.00 KUSEN11
0.00 4.00 0.00 4.00 2.00 0.00 0.00 KUSEN12
3
GROUP
1.00
1.00
1.00
2.00
2.00
2.00
3.00
3.00
3.00
4.00
4.00
4.00
PERHITUNGAN VOLUME
JUMLAH BUKAAN
Bukaan 123.85
Total 0
Rupiah
Ratus Se
Ratus
Ribu 1 Satu
Juta 2 Dua
Puluh 3 Tiga
puluh
Belas 4 Empat
Sen 5 Lima
Rupiah 6 Enam
000000000 7 Tujuh
spasi 8 Delapan
Milyar 9 Sembilan
Trilyun
Rupiah
000000000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Luas Lahan : 39.132 m2 100%
Luas Bangunan 1 1139 m2 34391%
Luas Bangunan 2 464 m2
Luas Bangunan 3 560 m2
Luas Bangunan 4 1512 m2
Luas Bangunan 5 545 m2
Luas Bangunan 6 1466 m2
Luas Bangunan 7 860 m2
Luas Bangunan 8 467 m2
Luas Bangunan 9 1887 m2
Luas Bangunan 10 502 m2
Luas Bangunan 11 287 m2
Luas Bangunan 12 370 m2
Luas Bangunan 13 541 m2
Luas Bangunan 14 409 m2
Luas Bangunan 15 234 m2
Luas Bangunan 16 652 m2
Luas Bangunan 17 319 m2
Luas Bangunan 18 440 m2
Luas Bangunan 19 104 m2
Luas Bangunan 20 352 m2
Luas Bangunan 21 348 m2
Total 13,458.00 m2
Total 0
Rupiah
Ratus Se
Ratus
Ribu 1 Satu
Juta 2 Dua
Puluh 3 Tiga
puluh
Belas 4 Empat
Sen 5 Lima
Rupiah 6 Enam
000000000 7 Tujuh
spasi 8 Delapan
Milyar 9 Sembilan
Trilyun
Rupiah
000000000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0