RENCANA ANGGARAN BIAYA

:
:
:

SATUAN KERJA
KEGIATAN
LOKASI

:
:
:

PENATAAN BANGUNAN DAN LINGKU


PENATAAN LINGKUNGAN PERMUKIM

KEC. GALESONG SELATAN KABUPAT

NO

URAIAN PEKERJAAN

SAT

PEKERJAAN PERSIAPAN
1
Pengukuran & Setting Out
2
Pembersihan Lapangan
3
Bangsal kerja
4
Dokumentasi & pelaporan

Ls
Ls
Ls
Ls

PEKERJAAN PAGAR DEPAN DAN GERBANG


1

Galian tanah

M3

Poer Plat beton bertulang

M3

Sloef beton bertulang

M3

Kolom beton bertulang

M3

Ringbalk beton bertulang

M3

Pas. Batu bata 1/2 bata 1:4

M2

Plesteran 1:4

M2

Acian

M2

Cat anti lumut

M2

10
11

Daun pintu papan kelas I tipe pintu geser


Accesoris pintu geser

M2

12

Balok Uk. 10x10 kayu ulin

M3

13

Balok Uk. 5x10 kelas II

M3

14

Rangka atap

M2

15
16
17

Atap sirap
Nok atap
Listplank 2x (20x3) Bayam

M2

18

Rangka plafond

M2

19

Plafond eternit 100x100x4

M2

20

Cat kayu

M2

21
22
23

Cat plafond
Pas. Pitting tempel
Lampu

M2
Bh
Bh

24

Papan Uk. 2x15 kayu ulin

M3

Ls

M'
M'

PEKERJAAN CORIDOR
1

Galian tanah

M3

Pas. Batu kosong

M3

Pas. Batu gunung 1:4

M3

Sloef beton bertulang

M3

Balok Uk. 10x10 kayu ulin

M3

Balok Uk. 5x10 kayu kelas II

M3

Rangka atap

M2

8
9
10

Atap sirap
Listplank 2x (20x3) Bayam
Nok atap

M2

11
12

Cor beton tumbuk 1:3:5


Lampu

M3
Bh

13

Pas. Tegel andesit

M2

14

Cat kayu

M2

PEKERJAAN GAZEBO TIPE I


1
Umpak-umpak

M'
M'

Bh

Balok Uk. 10x10 kayu ulin

M3

Balok Uk. 5x10 kayu ulin

M3

Balok Uk. 4x6 kayu ulin

M3

Balok Uk. 2x15 kayu ulin

M3

Balok Uk. 5x10 kayu kelas II

M3

Rangka atap

M2

8
9
10

Atap sirap
Listplank 2x (20x3) Bayam
Relling kayu kelas II

M2

PEKERJAAN GAZEBO TIPE II


1
Umpak-umpak

M'
M'

Bh

Balok Uk. 10x10 kayu ulin

M3

Balok Uk. 5x10 kayu ulin

M3

Balok Uk. 4x6 kayu ulin

M3

Balok Uk. 2x15 kayu ulin

M3

Balok Uk. 5x10 kayu kelas II

M3

Rangka atap

M2

8
9
10

Atap sirap
Listplank 2x (20x3) Bayam
Relling kayu kelas II

M2
M'
M'

PEKERJAAN GAZEBO TIPE III


1

Galian tanah

M3

Umpak-umpak

Bh

Balok Uk. 10x10 kayu ulin

M3

Balok Uk. 5x10 kayu ulin

M3

Balok Uk. 4x6 kayu ulin

M3

Balok Uk. 2x15 kayu ulin (lantai dan dinding)

M3

Balok Uk. 5x10 kayu kelas II

M3

Rangka atap

M2

9
10
11
12
13

Atap sirap
Listplank 2x (20x3) Bayam
Stop kontak
Saklar Double
Lampu TL

M2
M'
Bh
Bh
Bh

PEKERJAAN TOILET UMUM


1

Galian tanah

M3

Pas. Batu kosong

M3

Pas. Batu gunung 1:4

M3

Sloef beton bertulang

M3

Kolom beton bertulang

M3

Ringbalk beton bertulang

M3

7
8

Pas. Batu bata 1:4


Pas. Kusen kayu bayam

M2

9
10

Balok Uk. 5x10 kayu kelas II


Listplank 2x (20x3) Bayam

M3

11

Plesteran 1:4

M2

12

Pas. Tegel keramik 20x20 (dinding)

M2

13

Pas. Tegel keramik 20x20 (lantai)

M2

14

Pas. Rangka atap

M2

15

Atap sirap

M2

16
17
18
19

Acian
Pas. Kloset jongkok
Pas. Pipa PVC 1/2"
Pas. Stop kran

M2
Bh
M'
Bh

20

Rangka plafond

M2

21
22
23

Plafond eternit 100x100x4


Pas. Pitting tempel
Lampu

M2
Bh
Bh

24

Cat anti lumut

M2

25

Cat plafond

M2

26
27
28
29

Cat kayu (listpank,kusen, dan pintu)


Pas. Daun pintu panil kayu bayam
Pas. Engsel pintu
Pas. Kunci pintu

M2

Bh
M'

Bh
Psg
Bh

30
31
32
32
H

Pas. Floor drain


Pas. Pipa PVC 4"
Septictank
Saklar

Bh
M'
Bh
Bh

PEKERJAAN PELATARAN PARKIR


1

Galian tanah

M3

Pas. Batu gunung 1:4

M3

Kanstin (cor beton tumbuk 1:3:5)

M3

Urugan pasir

M3

Urugan sirtu

M3

Pas. Paving block warna t = 8 cm K30

M2

Plesteran 1:4

M2

Acian

M2

Cat anti lumut

M2

PEKERJAAN LANSEKAP
1

Urugan tanah

M3

Urugan tanah humus

M3

3
4
5
6
7

Tanam
Tanam
Tanam
Tanam
Tanam

M2

rumput gajah mini sampai tumbuh


kembang kacang-kacangan
pohon pelindung t = 2 M
palem ekor tupai t = 2 M
pohon pucuk merah t = 1,5 M

PEKERJAAN PENERANG AREA


1
Kabel tanam
2
Lampu taman lengkap + tiang
3
Lampu sorot biasa

Vlb
Phn
Phn
Phn

M'
Unit
Unit

PEKERJAAN AREA MAKAM RAJA GALESONG


1

Pas. Atap sirap

M2

Cor pelat beton bertulang

M3

Urugan Pasir

M3

Pas. Paving blok natural t = 8 cm K300

M2

Cor beton tumbuk 1:3:5

M3

Pas. Tegel motif batu alam 40x40

M2

Pemb. Pintu pagar kayu ulin

M2

Cat tembok (anti lumut)

M2

Cor beton bertulang t = 15 cm

M3

10
11

Plesteran motif profil 1:2


Engsel pintu ruko

M2
Bh

PEKERJAAN BUNGUNG BARANIA


1

Balok 12/12 kayu Ulin

M3

Balok 6/12 kayu Ulin

M3

Balok 5/12 Kayu kelas II

M3

4
5

Rangka atap kayu kelas II


Listplank kayu bayam

M2

Atap sirap

M2

Lantai tehel granito 60x60

M2

Cor beton tumbuk 1:3:5

M3

Cat anti lumut

M2

10

Penutup Bungung papan 2/15 kayu ulin

M3

11

Pintu papan 2/15 kayu ulin

M3

12

Galian tanah

M3

13

Pas. Batu gunung 1:4

M3

14

Urugan pasir

M3

15

Pas. Paving block natural t = 8 cm K300

M2

16

Plesteran 1:2

M2

17
18

Acian
Angkur kuda-kuda atap

M2

19
20

Cat tembok lama


Engsel ruko

M'

Bh
M2
Bh

PEKERJAAN AREA LAPANGAN


PEKERJAAN JALAN PEDESTRIAN P = 316 M
1

Galian tanah

M3

Cor beton tumbuk 1:3:5

M3

Urugan sirtu

M3

Pas. Tegel motif koral 40x40

M2

Plesteran 1:2

M2

Acian

M2

Cat anti lumut

M2
Untuk panj

PEKERJAAN PENUTUP SALURAN P = 150 M


1

M3

Cor pelat beton bertulang


Untuk panj

PEKERJAAN PLAZA
1

Galian tanah

M3

Pas. Batu gunung 1:4

M3

Urugan tanah

M3

Urugan pasir

M3

Pas. Paving block natural t = 8 cm K300

M2

Plesteran 1:2

M2

Acian

M2

8
9
10

Tanam rumput gajah mini sampai tumbuh


Tanam kembang/bunga-bunga
Tanam pohon pucuk merah t = 2,5 M

M2
Vlb
Phn

PEKERJAAN PELATARAN PARKIR


1

Galian tanah

M3

Cor beton tumbuk 1:3:5

M3

Plesteran 1:2

M2

Acian

M2

Cat anti lumut

M2

Urugan tanah

M2

7
8
9

Tanam rumput gajah mini sampai tumbuh


Tanam pohon glodogan tiang t = 2,5 M
Tanam pohon pelindung t = 2,5 M

M2

10

Urugan pasir

M3

11

Pas. Paving block natural t = 8 cm K300

M2

Pembersihan sisa pekerjaan

Ls

PEKERJAAN AKHIR
1

Phn
Phn

BANGUNAN DAN LINGKUNGAN


LINGKUNGAN PERMUKIMAN TRADISIONAL KWS. GALESONG

ONG SELATAN KABUPATEN TAKALAR

VOL

KODE

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

7=4x6

1.000
1.000
1.000
1.000

5,000,000.00
5,000,000.00
10,000,000.00
5,000,000.00

5,000,000.00
5,000,000.00
10,000,000.00
5,000,000.00
25,000,000.00

46.080

69,160.00

3,186,892.80

1.472

3,939,360.00

5,798,737.92

11.400

4,867,890.00

55,493,946.00

9.631

7,693,900.00

74,099,950.90

1.408

4,713,580.00

6,636,720.64

97.650

89,790.00

8,767,993.50

390.600

56,080.00

21,904,848.00

390.600

34,490.00

13,471,794.00

390.600

19,040.00

7,437,024.00

16.000
1.000

476,100.00
250,000.00

7,617,600.00
250,000.00

0.060

11,858,270.00

711,496.20

0.340

6,473,770.00

2,201,081.80

56.000

69,550.00

3,894,800.00

56.000
4.000
36.000

51,710.00
71,430.00
120,860.00

2,895,760.00
285,720.00
4,350,960.00

25.600

130,790.00

3,348,224.00

25.600

106,840.00

2,735,104.00

10.800

44,270.00

478,116.00

25.600
2.000
2.000

22,610.00
25,000.00
47,080.00

578,816.00
50,000.00
94,160.00

11,858,270.00

3,853,937.75
230,143,683.51

Jumlah I

0.325
Jumlah II

18.000

69,160.00

1,244,880.00

6.000

460,730.00

2,764,380.00

9.600

786,710.00

7,552,416.00

2.400

4,867,890.00

11,682,936.00

0.600

11,858,270.00

7,114,962.00

2.610

6,473,770.00

16,896,539.70

300.000

69,550.00

20,865,000.00

300.000
80.000
42.000

176,490.00
120,860.00
71,430.00

52,947,000.00
9,668,800.00
3,000,060.00

4.480
2.000

735,810.00
47,080.00

3,296,428.80
94,160.00

80.000

255,800.00

20,464,000.00

28.000

44,270.00

1,239,560.00
158,831,122.50

Jumlah III

6.00

0.120

11,858,270.00

1,422,992.40

0.123

11,858,270.00

1,458,567.21

0.106

11,858,270.00

1,256,976.62

0.324

11,858,270.00

3,842,079.48

0.403

6,473,770.00

2,608,929.31

38.500

69,550.00

2,677,675.00

38.500
22.000
16.000

176,490.00
120,860.00
250,000.00

6,794,865.00
2,658,920.00
4,000,000.00
26,721,005.02

Jumlah IV

4.00

0.080

11,858,270.00

948,661.60

0.044

11,858,270.00

521,763.88

0.029

11,858,270.00

343,889.83

0.084

11,858,270.00

996,094.68

0.214

6,473,770.00

1,385,386.78

15.750

69,550.00

1,095,412.50

15.750
14.800
8.000

176,490.00
120,860.00
250,000.00

2,779,717.50
1,788,728.00
2,000,000.00
11,859,654.77

69,160.00

1,521.52

Jumlah V
0.022

4.000

0.080

11,858,270.00

948,661.60

0.044

11,858,270.00

521,763.88

0.106

11,858,270.00

1,256,976.62

0.354

11,858,270.00

4,197,827.58

0.403

6,473,770.00

2,608,929.31

15.750

69,550.00

1,095,412.50

15.750
8.000
1.000
1.000
2.000

176,490.00
120,860.00
25,000.00
25,000.00
47,080.00

2,779,717.50
966,880.00
25,000.00
25,000.00
94,160.00
14,521,850.51

7.140

69,160.00

493,802.40

1.260

460,730.00

580,519.80

2.450

786,710.00

1,927,439.50

0.420

4,867,890.00

2,044,513.80

0.200

7,693,900.00

1,538,780.00

0.596

4,713,580.00

2,809,293.68

26.600
4.000

89,790.00
11,858,270.00

2,388,414.00
47,433,080.00

0.160
16.000

6,473,770.00
120,860.00

1,035,803.20
1,933,760.00

53.200

56,080.00

2,983,456.00

20.400

261,280.00

5,330,112.00

8.000

175,040.00

1,400,320.00

16.000

69,550.00

1,112,800.00

16.000

176,490.00

2,823,840.00

53.200
4.000
100.000
4.000

34,490.00
730,110.00
53,990.00
125,820.00

1,834,868.00
2,920,440.00
5,399,000.00
503,280.00

13.000

130,790.00

1,700,270.00

13.000
5.000
5.000

106,840.00
25,000.00
47,080.00

1,388,920.00
125,000.00
235,400.00

32.800

19,040.00

624,512.00

16.000

22,610.00

361,760.00

19.500
4.000
12.000
4.000

44,270.00
11,858,270.00
102,150.00
219,860.00

863,265.00
47,433,080.00
1,225,800.00
879,440.00

Jumlah VI

4.000
8.000
1.000
5.000

40,560.00
132,330.00
5,000,000.00
25,000.00

162,240.00
1,058,640.00
5,000,000.00
125,000.00
147,676,849.38

29.547

69,160.00

2,043,470.52

61.458

786,710.00

48,349,623.18

11.178

735,810.00

8,224,884.18

61.748

159,660.00

9,858,685.68

432.233

157,160.00

67,929,738.28

1,234.950

105,150.00

129,854,992.50

167.350

56,080.00

9,384,988.00

167.350

34,490.00

5,771,901.50

167.350

19,040.00

3,186,344.00
284,604,627.84

392.630

210,290.00

82,566,162.70

38.925

157,490.00

6,130,298.25

778.500
300.000
5.000
15.000
30.000

31,180.00
25,000.00
150,000.00
150,000.00
150,000.00

24,273,630.00
7,500,000.00
750,000.00
2,250,000.00
4,500,000.00
127,970,090.95

75,000.00
250,000.00
125,000.00

15,000,000.00
1,250,000.00
250,000.00
16,500,000.00

27.800

176,490.00

4,906,422.00

5.112

4,353,290.00

22,254,018.48

30.613

159,660.00

4,887,671.58

139.150

105,150.00

14,631,622.50

6.816

735,810.00

5,015,280.96

33.000

243,610.00

8,039,130.00

0.096

11,858,270.00

1,138,393.92

290.880

19,040.00

5,538,355.20

1.800

4,867,890.00

8,762,202.00

14.570
4.000

60,640.00
200,000.00

883,524.80
800,000.00
76,856,621.44

Jumlah VII

Jumlah VIII

Jumlah IX
200.000
5.000
2.000
Jumlah X

Jumlah XI

0.288

11,858,270.00

3,415,181.76

0.853

11,858,270.00

10,115,104.31

1.155

11,858,270.00

13,696,301.85

134.250
70.000

69,550.00
120,860.00

9,337,087.50
8,460,200.00

134.250

176,490.00

23,693,782.50

88.000

397,780.00

35,004,640.00

0.600

735,810.00

441,486.00

4.400

19,040.00

83,776.00

0.035

11,858,270.00

415,039.45

0.045

11,858,270.00

533,622.15

11.160

69,160.00

771,825.60

15.293

786,710.00

12,031,156.03

38.348

159,660.00

6,122,641.68

178.400

105,150.00

18,758,760.00

58.400

56,080.00

3,275,072.00

58.400
16.000

34,490.00
50,000.00

2,014,216.00
800,000.00

152.000
2.000

15,940.00
200,000.00

2,422,880.00
400,000.00
151,792,772.83

0.080

69,160.00

5,532.80

0.306

735,810.00

225,157.86

0.333

157,160.00

52,334.28

1.550

243,610.00

377,595.50

0.740

56,080.00

41,499.20

0.740

34,490.00

25,522.60

0.740
Sub jumlah
316.00

19,040.00

14,089.60
741,731.84
234,387,261.44

Jumlah XII

741,731.84

0.200
Sub jumlah
150.00

4,353,290.00
870,658.00

870,658.00
870,658.00
130,598,700.00

10.800

69,160.00

746,928.00

20.619

786,710.00

16,221,173.49

84.330

210,290.00

17,733,755.70

355.180

159,660.00

56,708,038.80

1,000.000

105,150.00

105,150,000.00

63.000

56,080.00

3,533,040.00

63.000

34,490.00

2,172,870.00

400.000
200.000
50.000

31,180.00
25,000.00
150,000.00

12,472,000.00
5,000,000.00
7,500,000.00
227,237,805.99

6.000

69,160.00

414,960.00

12.000

735,810.00

8,829,720.00

60.000

56,080.00

3,364,800.00

60.000

34,490.00

2,069,400.00

60.000

19,040.00

1,142,400.00

105.000

210,290.00

22,080,450.00

105.000
30.000
30.000

31,180.00
150,000.00
150,000.00

3,273,900.00
4,500,000.00
4,500,000.00

166.400

159,660.00

26,567,424.00

105,150.00

87,484,800.00
164,227,854.00

15,000,000.00

15,000,000.00
15,000,000.00

Jumlah XV

832.000
Jumlah XVI

1.000
Jumlah XVII

REKAPITULASI RENCANA ANGGARAN BIAYA


ENGINEER ESTIMATE
SATUAN KERJA
KEGIATAN

:
:

LOKASI

NO

A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q

PENATAAN
DAN
LINGKUNGAN
PENATAAN BANGUNAN
LINGKUNGAN
PERMUKIMAN
TRADISIONAL KWS.
GALESONG
KEC. GALESONG SELATAN KABUPATEN TAKALAR

URAIAN PEKERJAAN

PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN

PERSIAPAN
PAGAR DEPAN DAN GERBANG
CORIDOR
GAZEBO TIPE I
GAZEBO TIPE II
GAZEBO TIPE III
TOILET UMUM
PELATARAN PARKIR
LANSEKAP
PENERANG AREA
AREA MAKAM RAJA GALESONG
BUNGUNG BARANIA
JALAN PEDESTRIAN P = 316 M
PENUTUP SALURAN P = 150 M
PLAZA
PELATARAN PARKIR
AKHIR
REAL COST
PPN

10%
GRAND TOTAL
DIBULATKAN

TERBILANG :

Mengetahui
PPK Pelaksanaan PBL Sulsel

Ir. M. Ghazali Thaha, MT


Nip: 19650908 199803 1 002

LINGKUNGAN
RMUKIMAN
TRADISIONAL KWS.

ABUPATEN TAKALAR

JUMLAH HARGA

naan PBL Sulsel

zali Thaha, MT
08 199803 1 002

Rp
25,000,000.00
230,143,683.51
158,831,122.50
26,721,005.02
11,859,654.77
14,521,850.51
147,676,849.38
284,604,627.84
127,970,090.95
16,500,000.00
76,856,621.44
151,792,772.83
234,387,261.44
130,598,700.00
227,237,805.99
164,227,854.00
15,000,000.00
2,043,929,900.18
204,392,990.02
2,248,322,890.20
2,248,322,000.00

2,500,000,000.00

10%
250,000,000.00
2,250,000,000.00

HARGA SATUAN PEKERJA


NO.
1

HARGA SATUAN PEKERJAAN


URAIAN
2
1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M
1 M3 URUGAN PASIR
1 M3 URUGAN SIRTU
1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps
1 M3 PASANG AANSTAMPING BATU KOSONG
1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps
1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps
1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM
1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM
PEMASANGAN 1 M2 ACIAN
1 M2 PASANGAN DAUN PINTU PANEL KAYU LOKAL KLS I
1 M2 PASANG RANGKA ATAP SIRAP KAYU KELAS II
1 M3 PASANG RANGKA LANGIT - LANGIT (50 x 1,00) Cm, KAYU KAYU LOKAL KLS II
1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU LOKAL KLS I
1 M3 MEMBUAT PONDASI BETON BERTULANG (150 kg BESI + BEKISTNG)
1 M3 MEMBUAT SLOOF BETON BERTULANG (200 Kg Besi + Bekesting)
1 M3 MEMBUAT SLOOF 12/15 (170.78 Kg Besi + Bekesting)
1 M3 MEMBUAT KOLOM BETON BERTULANG (300 Kg Besi + Bekesting)
1 M3 MEMBUAT PLAT BETON BERTULANG (150 Kg Besi + Bekesting)
1 M3 MEMBUAT KOLOM PRAKTIS (11 X 11 CM)
1 M3 MEMBUAT RING BALK BETON BERTULANG (200 Kg Besi + Bekesting)
PEMASANGAN 1 KG RANGKA KUDA-KUDA BAJA IWF
1 M2 PASANG ATAP GENTENG METAL
1 M2 PASANG ATAP SIRAP KAYU
1 M' PASANG NOK SIRAP
MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN
MEMASANG 1 BUAH FLOOR DRAIN
MEMASANG 1 M' PIPA GALVANIS DIAMETER 3"
MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"
MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"
MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"
1 BUAH PASANG KUNCI TANAM BIASA
1 BUAH PASANG ENGSEL PINTU
PEMASANGAN 1 M2 LANTAI KERAMIK MOTIF BATU ALAM UKURAN 40 X 40 CM
PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 20 X 20 CM
PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 30 X 30 CM
1 M2 PASANG DINDING KERAMIK 20 X 20 CM,
1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM) K 300
1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER
1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
1 M2 RANGKA PLAFOND KAYU KLS I
1 TITIK LAMPU
1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)

1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH


1 M2 PASANGAN PAVING BLOCK WARNA (8 CM) K 300
1 M2 PENGECATAN CAT ANTI LUMUT
1 M3 URUGAN TANAH HUMUS
1 M' PASANGAN KANSTIN PERVAB
1 M3 PASANGAN BALOK KAYU KELAS I
1 M3 PASANGAN PAPAN KAYU KELAS I
1 M3 PASANGAN BALOK KAYU KELAS II
1 M2 PLAFOND ETERNIT
1 M2 PASANG TEGEL ANDESIT
PEMASANGAN 1 M2 LANTAI TEHEL GRANITO UKURAN 60 X 60 CM

JUMLAH
3
69,160.00
159,660.00
157,160.00
786,710.00
460,730.00
89,790.00
60,640.00
56,080.00
34,490.00
476,100.00
69,550.00
103,920.00
120,860.00
3,939,360.00
4,867,890.00
3,934,970.00
7,693,900.00
4,353,290.00
85,990.00
4,713,580.00
6,310.00
51,710.00
176,490.00
71,430.00
730,110.00
40,560.00
93,280.00
53,990.00
132,330.00
125,820.00
219,860.00
102,150.00
243,610.00
175,040.00
261,280.00
105,150.00
44,270.00
22,610.00
15,940.00
130,790.00
47,080.00
735,810.00
210,290.00

31,180.00
105,150.00
19,040.00
157,490.00
11,858,270.00
11,858,270.00
6,473,770.00
106,840.00
255,800.00
397,780.00

22

ANALISA SATUAN PEKERJAAN


STANDAR NASIONAL INDONESIA
TAHUN 2008
NO.
1
A.01.06

A.01.10

A.01.07

URAIAN
2
1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK
BAHAN :
Kayu 5/7 Albasiah
Paku Biasa 2"-5"
Kayu Papan 3/20 Kayu Albasiah
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
BAHAN :

Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PEMBUATAN DIREKSI KEET DAN LOS BAHAN
BAHAN :
Kayu Albasiah
Paku 4 - 7
Seng Glb BJLS 28 ( 80 x 180 cm )
Triplex 3 mm
PC (50 kg)
Pasir pasang
Bata merah
Jumlah Bahan
UPAH :
Ongkos Pasang

KOEF
3

SAT.
4

0.0100
0.0200
0.0070

m3
Kg
m3

0.1000
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

0.1000
0.0500

Oh
Oh

0.0800
0.2500
0.6200
0.5000
0.1000
0.2500
70.0000

m
kg
lbr
lbr
zak
m
bh

0.1500

ls

HAR

A.01.12

A.01.13

A.01.16

A.02.01

Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 BONGKARAN BETON BERTULANG
BAHAN :

Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 BONGKARAN DINDING TEMBOK BATA MERAH
BAHAN :

Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PAPAN NAMA PROYEK
BAHAN :
Kayu Albasiah, Balok
Paku 4 - 7
Pengecatan Kayu
Jumlah Bahan
UPAH :
Penulisan
Ongkos Pasang
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M
BAHAN :

Jumlah Bahan
UPAH :
Pekerja
Mandor

6.6670
0.3330

Oh
Oh

0.6667
0.0330

Oh
Oh

0.0420
0.2500
1.0000

m
kg
ls

0.1250
0.1250

Oh
Oh

0.7500
0.0250

Oh
Oh

A.02.13

A.02.18

A.02.22

Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
1 M3 URUGAN PASIR
BAHAN :
Pasir Urug
Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 URUGAN SIRTU
BAHAN :
Sirtu
Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)
BAHAN :
Tanah Urug (didatangkan)
Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan

A.02.23

1.2000

0.3000
0.0100

Oh
Oh

1.2000

0.2500
0.0250

Oh
Oh

1.2000

0.4500
0.0450

Oh
Oh

1.2000

0.0400
0.0100

org
org

1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH


BAHAN :
Lempengan Rumput Gajah Mini
Jumlah Bahan
UPAH :
Pekerja Setengah Terampil
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

A.03.04

A.03.13

A.04.09

A.04.11

Overhead & Profit Max. 15 %


Jumlah
Dibulatkan
1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps
BAHAN :
Batu Belah 15/20
Semen Portland
Pasir Pasang
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 PASANG AANSTAMPING BATU KOSONG
BAHAN :
Batu Belah 15/20
Pasir Urug
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm

1.2000
163.0000
0.5200

m
Kg
m

1.5000
0.7500
0.0750
0.0750

Oh
Oh
Oh
Oh

1.2000
0.4320

m
m

0.7800
0.3900
0.0390
0.0200

Oh
Oh
Oh
Oh

70.0000
18.9500
0.0380

bh
Kg
m

0.3000
0.1000
0.0100
0.0150

Oh
Oh
Oh
Oh

70.0000

bh

Semen Portland
Pasir Pasang
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
A.05.02

11.5000
0.0430

Kg
m

0.3000
0.1000
0.0100
0.0150

Oh
Oh
Oh
Oh

10.2240

Kg

0.0200

Pekerja

0.3000

Oh

Tukang Batu

0.1500

Oh

Kepala Tukang

0.0150

Oh

Mandor

0.0150

Oh

6.2400
0.0240

Kg
m

0.3000
0.1500
0.0150
0.0150

Oh
Oh
Oh
Oh

3.2500

Kg

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM


BAHAN :
Semen Portland
Pasir Pasang
Jumlah Bahan
UPAH :

Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
A.05.04

A.05.13

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM


BAHAN :
Semen Portland
Pasir Pasang
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
PEMASANGAN 1 M2 ACIAN
BAHAN :
Semen Portland
Jumlah Bahan

A.06.01

A.06.04

A.06.37

UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KELAS I
BAHAN :
Kayu Jati, Balok
Paku 10 cm
Lem kayu
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan

0.2000
0.1000
0.0100
0.0100

Oh
Oh
Oh
Oh

1.1000
1.2500
1.0000

m
kg
kg

7.0000
21.0000
2.1000
0.3500

Oh
Oh
Oh
Oh

0.0400
0.5000

m
Kg

0.3500
1.0500
0.1050
0.0180

Oh
Oh
Oh
Oh

0.0140
0.0570

m
kg

0.1200
0.1200
0.0120
0.0060

Oh
Oh
Oh
Oh

1 M2 PASANGAN DAUN PINTU PANEL KAYU LOKAL KLS I


BAHAN :
Papan Kayu
Lem kayu
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PASANG RANGKA ATAP SIRAP KAYU KELAS II
BAHAN :
Kayu KAYU LOKAL KLS II, Balok
Paku Biasa 2" - 5"
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

A.06.44

A.06.47

A.07.01

A.07.38

Overhead & Profit Max. 15 %


Jumlah Total
Dibulatkan
1 M3 PASANG RANGKA LANGIT - LANGIT (50 x 1,00) Cm, KAYU KAYU LOKAL KLS II
BAHAN :
Kaso-kaso 5x7 cm
0.0154
m
Paku Biasa 2" - 5"
0.2000
kg
Jumlah Bahan
UPAH :
Pekerja
0.1500
Oh
Tukang Kayu
0.3000
Oh
Kepala Tukang
0.0300
Oh
Mandor
0.0750
Oh
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU LOKAL KLS I
BAHAN :
Kayu Lokal Kls I, Papan
0.0108
m
Paku Biasa 2" - 5"
0.1000
kg
Jumlah Bahan
UPAH :
Pekerja
0.1000
Oh
Tukang Kayu
0.2000
Oh
Kepala Tukang
0.0200
Oh
Mandor
0.0050
Oh
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen Portland
218.0000
kg
Pasir Beton
0.5200
M3
Batu Pecah Mesin 2/3
0.8700
M3
Jumlah Bahan
UPAH :
Pekerja
1.6500
Oh
Tukang Batu
0.2500
Oh
Kepala Tukang
0.0250
Oh
Mandor
0.0800
Oh
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 MEMBUAT PONDASI BETON BERTULANG (150 kg BESI + BEKISTNG)
BAHAN :
Kayu Terentang Albasiah, Papan
0.2000
m
Paku Biasa 2" - 5"
1.5000
kg

A.07.47

A.07.49

Minyak Bekisting
0.4000
Besi Beton Polos
157.5000
Kawat Beton
2.2500
Semen Portland
336.0000
Pasir Beton
0.5400
Kerikil 0,5-1 cm
0.8100
Jumlah Bahan
UPAH :
Pekerja
5.3000
Tukang Batu
0.2750
Tukang Kayu
1.3000
Tukang Besi
1.0500
Kepala Tukang
0.2620
Mandor
0.2650
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 MEMBUAT SLOOF BETON BERTULANG (200 Kg Besi + Bekesting)
BAHAN :
Bekesting Albasiah
0.2700
Paku 5 - 7 cm
2.0000
Pelumas Bekesting
0.4000
Besi Beton Polos U 24
210.0000
Kawat Beton
3.0000
Semen Portland
336.0000
Pasir Beton
0.5400
Kerikil 0,5-1 cm
0.8100
Jumlah Bahan
UPAH :
Tukang Batu
0.2750
Tukang Kayu
1.5600
Tukang Besi
1.4000
Kepala Tukang
0.3230
Pekerja
5.6500
Mandor
0.2830
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT SLOOF 12/15 (170.78 Kg Besi + Bekesting)
BAHAN :
Bekesting Albasiah
0.3700
Paku 5 - 7 cm
1.5000
Pelumas Bekesting
0.4000
Besi Beton Polos U 24
170.7800
Kawat Beton
2.2500
Semen Portland
6.4600
Pasir Beton
0.5200
Kerikil 0,5-1 cm
0.7800
Jumlah Bahan

lt
kg
kg
kg
m3
m3

Oh
Oh
Oh
Oh
Oh
Oh

m
kg
lt
kg
kg
kg
m
m

org
org
org
org
org
org

m
kg
lt
kg
kg
zak
m
m

A.07.51

A.07.53

UPAH :
Tukang Batu
0.3500
Tukang Kayu
1.0400
Tukang Besi
1.0500
Kepala Tukang
0.2450
Pembantu Tukang
3.0000
Mandor
0.1225
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT SLOOF 15/20 (116.89 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah
0.2900
Paku 5 - 7 cm
1.5000
Pelumas Bekesting
0.4000
Besi Beton Polos U 24
116.8900
Kawat Beton
2.2500
Semen Portland
6.4600
Pasir Beton
0.5200
Kerikil 0,5-1 cm
0.7800
Jumlah Bahan
UPAH :
Tukang Batu
0.3500
Tukang Kayu
1.0400
Tukang Besi
1.0500
Kepala Tukang
0.2450
Pembantu Tukang
3.0000
Mandor
0.1225
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM BETON BERTULANG (300 Kg Besi + Bekesting)
BAHAN :
Bekesting Albasiah
Paku 5 - 7 cm
Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Batu Pecah 2/3
Kayu kelas II balok
plywood 9 mm
Jumlah Bahan
UPAH :
Tukang Batu
Tukang Kayu

0.4000
4.0000
2.0000
315.0000
4.5000
336.0000
0.5400
0.8100
0.1500
3.5000

0.2750
1.6500

org
org
org
org
org
org

m
kg
lt
kg
kg
zak
m
m

org
org
org
org
org
org

m
kg
lt
kg
kg
kg
m
m
m
Lembar

org
org

A.07.54

Tukang Besi
2.1000
Kepala Tukang
0.4030
Pekerja
7.0500
Mandor
0.3530
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT PLAT BETON BERTULANG (150 Kg Besi + Bekesting)

A.07.55

BAHAN :
Bekesting Albasiah
Paku 5 - 7 cm
Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Kerikil 0,5-1 cm
Kayu kelas II balok
plywood 9 mm
Jumlah Bahan
UPAH :
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM PRAKTIS (11 X 11 CM)
BAHAN :
Bekesting Albasiah
Paku 5 - 7 cm
Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Kerikil 0,5-1 cm
Jumlah Bahan
UPAH :

0.3200
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1200
2.8000

org
org
org
org

m
kg
lt
kg
kg
kg
m
m
m
Lembar

0.2750
1.3000
1.0500
0.2650
5.3000
0.2650

org
org
org
org
org
org

0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090

m
kg
lt
kg
kg
zak
m
m

A.07.57

A.07.60

Tukang Batu
0.0200
Tukang Kayu
0.0200
Tukang Besi
0.0200
Kepala Tukang
0.0060
Pekerja
0.1800
Mandor
0.0090
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM 15/20 (116.889 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah
0.4700
Paku 5 - 7 cm
1.5000
Pelumas Bekesting
0.4000
Besi Beton Polos U 24
116.8890
Kawat Beton
2.2500
Semen Portland
6.4600
Pasir Beton
0.5200
Kerikil 0,5-1 cm
0.7800
Jumlah Bahan
UPAH :
Tukang Batu
0.3500
Tukang Kayu
1.0400
Tukang Besi
1.0500
Kepala Tukang
0.2450
Pekerja
3.0000
Mandor
0.1225
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM 20/20 (91.334 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah
0.4400
Paku 5 - 7 cm
1.5000
Pelumas Bekesting
0.4000
Besi Beton Polos U 24
91.3340
Kawat Beton
2.2500
Semen Portland
6.4600
Pasir Beton
0.5200
Kerikil 0,5-1 cm
0.7800
Jumlah Bahan
UPAH :
Tukang Batu
0.3500
Tukang Kayu
1.0400
Tukang Besi
1.0500
Kepala Tukang
0.2450
Pekerja
3.0000

org
org
org
org
org
org

m
kg
lt
kg
kg
zak
m
m

org
org
org
org
org
org

m
kg
lt
kg
kg
zak
m
m

org
org
org
org
org

A.07.62

A.07.63

Mandor
0.1225
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM 30/30 (74,67 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah
0.3500
Paku 5 - 7 cm
1.5000
Pelumas Bekesting
0.4000
Besi Beton Polos U 24
74.6700
Kawat Beton
2.2500
Semen Portland
6.4600
Pasir Beton
0.5200
Kerikil 0,5-1 cm
0.7800
Jumlah Bahan
UPAH :
Tukang Batu
0.3500
Tukang Kayu
1.0400
Tukang Besi
1.0500
Kepala Tukang
0.2450
Pekerja
3.0000
Mandor
0.1225
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM 40/25 (153,067 Kg Besi + Bekesting)
DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah
0.2900
Paku 5 - 7 cm
1.5000
Pelumas Bekesting
0.4000
Besi Beton Polos U 24
153.0670
Kawat Beton
2.2500
Semen Portland
6.4600
Pasir Beton
0.5200
Batu Pecah 2/3
0.7800
Jumlah Bahan
UPAH :
Tukang Batu
0.3500
Tukang Kayu
1.0400
Tukang Besi
1.0500
Kepala Tukang
0.2450
Pekerja
3.0000
Mandor
0.1225
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah

org

m
kg
lt
kg
kg
zak
m
m

org
org
org
org
org
org

m
kg
lt
kg
kg
zak
m
m

org
org
org
org
org
org

A.07.64

Dibulatkan
1 M3 MEMBUAT RING BALK BETON BERTULANG (200 Kg Besi + Bekesting)

A.07.65

BAHAN :
Bekesting Albasiah
0.3200
Paku 5 - 7 cm
3.2000
Pelumas Bekesting
1.6000
Besi Beton Polos U 24
210.0000
Kawat Beton
3.0000
Semen Portland
336.0000
Pasir Beton
0.5400
Kerikil 0,5-1 cm
0.8100
Kayu kelas II balok
0.1400
Plywood 9 mm
2.8000
Jumlah Bahan
UPAH :
Tukang Batu
0.3500
Tukang Kayu
1.0400
Tukang Besi
1.0500
Kepala Tukang
0.2450
Pekerja
3.0000
Mandor
0.1225
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT dinding beton bertulang (150 Kg Besi + Bekesting)
BAHAN :
Bekesting Albasiah
Paku 5 - 7 cm
Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Kerikil 0,5-1 cm
Kayu kelas II balok
Plywood 9 mm
Jumlah Bahan
UPAH :
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan

0.2400
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000

0.2750
1.3000
1.0500
0.2620
5.3000
0.2650

m
kg
lt
kg
kg
kg
m
m
m
Lembar

org
org
org
org
org
org

m
kg
lt
kg
kg
kg
m
m
m
Lembar

org
org
org
org
org
org

A.07.65

1 M3 MEMBUAT dinding beton bertulang (200 Kg Besi + Bekesting)

A.07.67

BAHAN :
Bekesting Albasiah
Paku 5 - 7 cm
Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Kerikil 0,5-1 cm
Kayu kelas II balok
Plywood 9 mm
Jumlah Bahan
UPAH :
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 MEMBUAT RING BALK BETON BERTULANG (10 X 15 CM)

A.08.02

BAHAN :
Bekesting Albasiah
Paku 5 - 7 cm
Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Kerikil 0,5-1 cm
Jumlah Bahan
UPAH :
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M2 PASANG ATAP GENTENG METAL
BAHAN :
Genteng Metal

0.2500
3.0000
1.2000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1050
2.5000

m
kg
lt
kg
kg
kg
m
m
m
Lembar

0.2750
1.5600
1.4000
0.3230
5.6500
0.2830

org
org
org
org
org
org

0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150

m
kg
lt
kg
kg
kg
m
m

0.0330
0.0330
0.0330
0.0100
0.2970
0.0150

org
org
org
org
org
org

1.0200

buah

A.08.03

A.08.13

A.10.02

Paku Biasa 2" - 5"


Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %
Jumlah Total
Dibulatkan
1 M2 PASANG ATAP SIRAP KAYU
BAHAN :
Sirap Kayu
Paku Biasa 2" - 5"
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M' PASANG NOK SIRAP
BAHAN :
Seng plat
Paku Biasa 2" - 5"
Paku biasa 1/2"-1"
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN
BAHAN :
Kloset Jongkok porselen
Semen Portland
Pasir Pasang
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang

0.2000

kg

0.2000
0.1000
0.0100
0.0010

Oh
Oh
Oh
Oh

1.0000
0.2000

ikat
kg

0.1660
0.2500
0.0250
0.0080

Oh
Oh
Oh
Oh

0.4000
0.0500
0.0500

lbr
kg
kg

0.1250
0.2500
0.0250
0.0060

Oh
Oh
Oh
Oh

1.0000
6.0000
0.0100

bh
kg
m

1.0000
1.5000
0.1500

Oh
Oh
Oh

A.10.08

A.10.25

A.10.32

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
MEMASANG 1 BUAH FLOOR DRAIN
BAHAN :
Floor Drain
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
BAHAN :
Pipa Galvanis
Perlengkapan
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"
BAHAN :
Pipa PVC
Perlengkapan
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"
BAHAN :
Pipa PVC
Perlengkapan

0.1600

Oh

1.0000

Unit

0.0100
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

1.2000
0.3500

1,2 m'
hrg pipa

0.1350
0.2250
0.0225
0.0068

Oh
Oh
Oh
Oh

1.2000
0.3500

m'
hrg pipa

0.0360
0.0600
0.0060
0.0020

Oh
Oh
Oh
Oh

1.2000
0.3500

m'
hrg pipa

A.10.35

A.10.37

Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"
BAHAN :
Kran Air
Seal tape
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan

0.0810
0.1350
0.0135
0.0040

Oh
Oh
Oh
Oh

1.0000
0.0250

bh
bh

0.0100
0.4000
0.0040
0.0005

Oh
Oh
Oh
Oh

1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA ( KANTOR TYPE BESAR )


Galian tanah

7.5000

Pasir urug

0.3570

Lantai kerja

3.7500

25.0000

Plat beton penutup & balok

0.5000

Pipa PVC 4" jenis AW + sambungan

9.0000

m1

Pipa GIP 1/2"

2.0000

m1

Galian tanah untuk rembesan

5.6250

Pas. injuk

9.0000

kg

Urugan kerikil 3,5 cm

1.7500

Pipa PVC 4" berlobang jenis AW

6.0000

m1

Urugan kembali perataan tanah

1.8750

1.0000

bh

0.0100

Oh

Pas. bata 1 PC : 2 PS + Plesteran

Jumlah
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
A.12.02

1 BUAH PASANG KUNCI TANAM BIASA


BAHAN :
Kunci Tanam biasa
Jumlah Bahan
UPAH :
Pekerja

A.12.05

A.12.33

A.13.42

A.13.47

Tukang Kayu
0.5000
Kepala Tukang
0.0100
Mandor
0.0050
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 BUAH PASANG ENGSEL PINTU
BAHAN :
Engsel pIntu
1.0000
Jumlah Bahan
UPAH :
Pekerja
0.0150
Tukang Kayu
0.1500
Kepala Tukang
0.0150
Mandor
0.00800
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M1 PEK.PAGAR DEPAN TRALIS STANDARD
Galian Tanah
0.4500
Urugan Pasir 10 cm'
0.0800
Pasang Aanstamping
0.1200
Pas.Batu Belah 1 pc : 4 psr
0.2000
Plesteran & Acian 1 pc : 4 psr
0.4100
Beton Tulang ( 100 kg/m3 )
0.0563
Pagar Tralis
1.5000
Pengecatan
1.0000
Jumlah
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
PEMASANGAN 1 M2 LANTAI KERAMIK MOTIF BATU ALAM UKURAN 40 X 40 CM
BAHAN :
Keramik motif batu alam
12.0000
Semen Portland
8.4000
Pasir Pasang
0.0420
Semen Warna
0.5000
Jumlah Bahan
UPAH :
Pekerja
0.6200
Tukang Batu
0.3500
Kepala Tukang
0.0350
Mandor
0.00300
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 20 X 20 CM

Oh
Oh
Oh

bh

Oh
Oh
Oh
Oh

m
m
m
m
m
m
m'
m

bh
kg
m3
kg

Oh
Oh
Oh
Oh

A.13.68

A.13.87

A.14.08

BAHAN :
Ubin keramik 20 x 20 cm
26.5000
bh
Semen Portland
10.4000
kg
Pasir Pasang
0.0450
m3
Semen Warna
1.6200
kg
Jumlah Bahan
UPAH :
Pekerja
0.0900
Oh
Tukang Batu
0.0900
Oh
Kepala Tukang
0.0090
Oh
Mandor
0.00500
Oh
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PASANG DINDING KERAMIK 20 X 20 CM,
BAHAN :
Keramik 20 x 20 cm
26.5000
bh
Semen Portland
9.3000
kg
Pasir Pasang
0.0180
m3
Semen Warna
1.9400
kg
Jumlah Bahan
UPAH :
Pekerja
0.9000
Oh
Tukang Batu
0.4500
Oh
Kepala Tukang
0.0450
Oh
Mandor
0.04500
Oh
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM) K 300
BAHAN :
Paving Block Natural 8 cm
1.0100
m
Jumlah Bahan
UPAH :
Pekerja
0.2500
org
Tukang Batu
0.5000
org
Kepala Tukang Batu
0.0250
org
Mandor
0.0030
org
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTU
BAHAN :
Cat Meni
0.2000
kg
Plamir
0.1500
kg
Cat dasar
0.1700
kg
Cat Penutup
0.2600
kg

A.14.14

A.14.15

A.14.39

Kuas
0.0100
kg
Pengencer
0.0300
kg
ampelas
0.2000
kg
Jumlah Bahan
UPAH :
Pekerja
0.0700
Oh
Tukang Cat
0.0090
Oh
Kepala Tukang
0.0060
Oh
Mandor
0.0030
Oh
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
BAHAN :
Plamir
0.1000
kg
Cat dasar
0.1000
kg
Cat Penutup 2 x
0.2600
kg
Jumlah Bahan
UPAH :
Pekerja
0.0200
Oh
Tukang Cat
0.0630
Oh
Kepala Tukang
0.0063
Oh
Mandor
0.0030
Oh
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
BAHAN :
Cat dasar
0.1200
kg
Cat Penutup 2 x
0.1800
lbr
Jumlah Bahan
UPAH :
Pekerja
0.0280
Oh
Tukang Cat
0.0420
Oh
Kepala Tukang
0.0042
Oh
Mandor
0.0030
Oh
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 zak
zak
PC =
= 50
50
kg =
= 40
40 liter
liter
= 0.04
0.04
m3
= 1/25 m3
m3
1 M2
RANGKA
PLAFOND
KAYU
KLSm3
I =
PC
kg
=
11m3
Beton
memerlukan
= .
(bb)1/25
..kg (Hasil Perhitungan )
maka
setiap
jarak
:
(1
/
(275
/
(
L
+
75
)))
/25
x
BAHAN
:
Lebih setiap
dari 30jarak
m' : : (1 / (275
a / ( L: +Upah
maka
75 )))Pekerja
/25 x aa Setempat ( rupiah )
L
:
Jarak
angkut
dalam m1
Papan
Kayu
1 Rp. ..
0.0090
m2
(bb) kg
besiKls
beton
L
=
10
m1
=
0,01236
x
k
:
Harga
angkutan
per
L
=
10
m1
=
0,01236
x
aa m3
Paku
0.2500
kg
=
50 m1
m1
=
0,01818
x
( Termasuk xharga
bahan
dan peralatan angkut: bambu, dll)
LL
=
50
=
0,01818
aa
Jumlah
Bahan
=
100 m1
m1
=
0,02545
LL : =
100
=
0,02545
xx
aa
UPAH
L
=
200
m1
=
0,04000
x
L
=
200 m1
=
0,04000
x
aa
Pekerja
0.2000
org
L
=
300
m1
=
0,05454
x
L
=
300 m1
=
0,05454
x
aa
Tk. Cat
0.3000
org
Ket.
:
L
=
Jarak
angkut
dalam
m1
Ket. : L = Jarak angkut dalam m1
= Upah
Upah pekerja
pekerja setempat
setempat (( Rupiah
Rupiah ))
aa =

LL
LL
LL
LL

A.14.40

A.14.41

A.14.42

=
=
=
=
=
=
=
=

50 m1
m1
50
100 m1
m1
100
200 m1
m1
200
300
m1
300 m1

=
=
=
=
=
=
=
=

0,01818
0,01818
0,02545
0,02545
0,04000
0,04000
0,05454
0,05454

xx
xx
xx
xx

aa
aa
aa
aa

Ket.
L=
= Jarak
Jarak
angkut dalam
dalam m1
m1
Kep.
tukang
cat angkut
Ket.
:: L
a
=
Upah
pekerja
setempat
Rupiah ))
a
=
Upah
pekerja
setempat
(( Rupiah
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M2 ATAP ALUMINIUM SPANDEK GELOMBANG KECIL
BAHAN :
Atap Spandek Gelombang Kecil
Paku Seng
Jumlah Bahan
UPAH :
Pekerja
Tk. Cat
Kep. tukang cat
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 TITIK LAMPU
BAHAN :
Kabel NYM 2 x 2,5
Karduit Pipa 6/8"c
Fitting Plafond
Saklar
Bola Lampu
Tee Dos
Inbow Dos
Sock
Klem Konduit
Lastdop
Flexible Pipe
Eldow
Paku, Sekrup, Fisher (10% harga conduit)
Jumlah Bahan
UPAH :
Pekerja
Tukang Listrik
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M' PLINT KERAMIK 10 X 40
BAHAN :
Plint Keramik10 x 40
Semen portland
Semen Warna
Pasir Pasang

0.0300
0.0100

org
org

1.3500
0.2000

m2
kg

0.2000
0.1000
0.0100
0.0010

org
org
org
org

12.0000
12.0000
1.0000
1.0000
1.0000
1.0000
1.0000
3.0000
9.0000
3.0000
1.0000
2.0000
10.0000

m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
m'
bh
%

0.1500
0.3000
0.0200

org
org
org

2.6500
1.1400
0.1000
0.0030

bh
kg
g
m3

A.14.43

A.14.44

A.13.87

Jumlah Bahan
UPAH :
Pekerja
0.0900
Tukang Batu
0.0900
Kep. Tukang
0.0090
Mandor
0.0050
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M2 DAUN JENDELA KACA
BAHAN :
Papan Kayu Kls 1
0.0350
Paku
0.0500
Kaca 5mm
0.8000
Jumlah Bahan
UPAH :
Pekerja
0.8000
Tukang Kayu
2.0000
Kep. Tukang
0.2000
Mandor
0.0400
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 LANTAI KERJA BETON MUTU f'c=7,4 Mpa (K 100), Slump (3-6), w/c = 0,87
BAHAN :
Semen Portland
230.0000
Pasir Beton
893.0000
Kerikil (maks 30mm)
1,027.0000
Air
200.0000
Jumlah Bahan
UPAH :
Pekerja
1.2000
Tukang Batu
0.2000
Kep. Tukang
0.0200
Mandor
0.0600
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M2 PASANGAN PAVING BLOCK WARNA (8 CM) K 300
BAHAN :
Paving Block Natural 8 cm
1.0100
Jumlah Bahan
UPAH :
Pekerja
0.2500
Tukang Batu
0.5000
Kepala Tukang Batu
0.0250
Mandor
0.0030

org
org
org
org

m3
kg
m2

org
org
org
org

kg
kg
kg
lt

org
org
org
org

org
org
org
org

A.14.14

A.02.13

A.14.44

A.06.01

Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M2 PENGECATAN CAT ANTI LUMUT
BAHAN :
Cat anti lumut
Kuas
Jumlah Bahan
UPAH :
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 URUGAN TANAH HUMUS
BAHAN :
Tanah humus
Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M' PASANGAN KANSTIN PERVAB
BAHAN :
Kanstin Pervab
Pasir pasangan
Semen portland
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kep. Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah
Dibulatkan
1 M3 PASANGAN BALOK KAYU KELAS I
BAHAN :
Kayu KelasI, Balok
Paku 10 cm

0.1000
0.0100

kg
bh

0.0200
0.0630
0.0063
0.0030

Oh
Oh
Oh
Oh

1.2000

0.4500
0.0450

Oh
Oh

2.5000
0.0100
0.0600

Bh
m
kg

0.1600
0.1800
0.0200
0.0100

org
org
org
org

1.1000
1.2500

m
kg

A.06.01

A.06.01

A.14.37

Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 PASANGAN PAPAN KAYU KELAS I
BAHAN :
Kayu KelasI, Balok
Paku 10 cm
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M3 PASANGAN BALOK KAYU KELAS II
BAHAN :
Kayu Kelas II, Balok
Paku 10 cm
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
1 M2 PLAFOND ETERNIT
BAHAN :
Plafond eternit 100x100x4
Paku
Jumlah Bahan
UPAH :
Pekerja
Tk. Jayu
Kep. tukang kayu
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

7.0000
21.0000
2.1000
0.3500

Oh
Oh
Oh
Oh

1.1000
1.2500

m
kg

7.0000
21.0000
2.1000
0.3500

Oh
Oh
Oh
Oh

1.1000
1.2500

m
kg

7.0000
21.0000
2.1000
0.3500

Oh
Oh
Oh
Oh

1.1000
0.0100

m2
kg

0.0300
0.0700
0.0070
0.0040

org
org
org
org

A.13.02

A.13.42

Overhead & Profit Max. 15 %


Jumlah
Dibulatkan
1 M2 PASANG TEGEL ANDESIT
BAHAN :
Batu alam andesit
1.0000
Semen portland
11.3800
Pasir Pasang
0.0420
Jumlah Bahan
UPAH :
Pekerja
0.6200
Tukang Batu
0.3500
Kepala Tukang
0.0350
Mandor
0.03500
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan
PEMASANGAN 1 M2 LANTAI TEHEL GRANITO UKURAN 60 X 60 CM
BAHAN :
Tehel granito 60x60
3.1000
Semen Portland
9.6000
Pasir Pasang
0.0450
Semen Warna
1.5000
Jumlah Bahan
UPAH :
Pekerja
0.2400
Tukang Batu
0.1200
Kepala Tukang
0.0120
Mandor
0.01200
Jumlah Pekerja
Jumlah Bahan + Pekerja
Overhead & Profit Max. 15 %
Jumlah Total
Dibulatkan

m2
kg
m3

Oh
Oh
Oh
Oh

bh
kg
m3
kg

Oh
Oh
Oh
Oh

EKERJAAN
INDONESIA
8
HARGA SAT.
5

JUMLAH
6=(3x5)

5,950.00

5,950.00
5,950.00

5,950.00
5,950.00

743.75
743.75
1,487.50
7,437.50
743.75
8,181.25
8,180.00

80,000.00
115,000.00

60,000.00
2,875.00

62,875.00
62,875.00
6,287.50
69,162.50

100,000.00

120,000.00
120,000.00

80,000.00
115,000.00

24,000.00
1,150.00
25,150.00
145,150.00
14,515.00
159,665.00
159,660.00

100,000.00

120,000.00
120,000.00

80,000.00
115,000.00

20,000.00
2,875.00
22,875.00
142,875.00
14,287.50
157,162.50
157,160.00

125,000.00

150,000.00
150,000.00

80,000.00
115,000.00

36,000.00
5,175.00
41,175.00
191,175.00
19,117.50
210,292.50
210,290.00

20,000.00

24,000.00
24,000.00

80,000.00
115,000.00

3,200.00
1,150.00
4,350.00
28,350.00

2,835.00
31,185.00
31,180.00

225,000.00
1,140.00
100,000.00

270,000.00
185,820.00
52,000.00
507,820.00

80,000.00
95,000.00
100,000.00
115,000.00

120,000.00
71,250.00
7,500.00
8,625.00
207,375.00
715,195.00
71,519.50
786,714.50
786,710.00

225,000.00
100,000.00

270,000.00
43,200.00
313,200.00

80,000.00
95,000.00
100,000.00
115,000.00

62,400.00
37,050.00
3,900.00
2,300.00
105,650.00
418,850.00
41,885.00
460,735.00
460,730.00

400.00
1,140.00
100,000.00

28,000.00
21,603.00
3,800.00
53,403.00

80,000.00
95,000.00
100,000.00
115,000.00

24,000.00
9,500.00
1,000.00
1,725.00
36,225.00
89,628.00
8,962.80
98,590.80
98,590.00

400.00

28,000.00

1,140.00
100,000.00

13,110.00
4,300.00
45,410.00

80,000.00
95,000.00
100,000.00
115,000.00

24,000.00
9,500.00
1,000.00
1,725.00
36,225.00
81,635.00
8,163.50
89,798.50
89,790.00

1,140.00

11,655.36

100,000.00

2,000.00
13,655.36

80,000.00

24,000.00

95,000.00

14,250.00

100,000.00

1,500.00

115,000.00

1,725.00
41,475.00
55,130.36
5,513.04
60,643.40
60,640.00

1,140.00
100,000.00

7,113.60
2,400.00
9,513.60

80,000.00
95,000.00
100,000.00
115,000.00

24,000.00
14,250.00
1,500.00
1,725.00
41,475.00
50,988.60
5,098.86
56,087.46
56,080.00

1,140.00

3,705.00
3,705.00

80,000.00
95,000.00
100,000.00
115,000.00

16,000.00
9,500.00
1,000.00
1,150.00
27,650.00
31,355.00
3,135.50
34,490.50

7,250,000.00
20,000.00
5,000.00

7,975,000.00
25,000.00
5,000.00
7,975,000.00

80,000.00
95,000.00
100,000.00
115,000.00

560,000.00
1,995,000.00
210,000.00
40,250.00
2,805,250.00
10,780,250.00
1,078,025.00
11,858,275.00
11,858,270.00

7,250,000.00
5,000.00

290,000.00
2,500.00
292,500.00

80,000.00
95,000.00
100,000.00
115,000.00

28,000.00
99,750.00
10,500.00
2,070.00
140,320.00
432,820.00
43,282.00
476,102.00
476,100.00

2,800,000.00
20,000.00

39,200.00
1,140.00
40,340.00

80,000.00
95,000.00
100,000.00
115,000.00

9,600.00
11,400.00
1,200.00
690.00
22,890.00
63,230.00

6,323.00
69,553.00
69,550.00

2,750,000.00
20,000.00

42,350.00
4,000.00
42,350.00

80,000.00
95,000.00
100,000.00
115,000.00

12,000.00
28,500.00
3,000.00
8,625.00
52,125.00
94,475.00
9,447.50
103,922.50
103,920.00

7,250,000.00
20,000.00

78,300.00
2,000.00
80,300.00

80,000.00
95,000.00
100,000.00
115,000.00

8,000.00
19,000.00
2,000.00
575.00
29,575.00
109,875.00
10,987.50
120,862.50
120,860.00

1,140.00
110,000.00
225,000.00

248,520.00
57,200.00
195,750.00
501,470.00

80,000.00
95,000.00
100,000.00
115,000.00

132,000.00
23,750.00
2,500.00
9,200.00
167,450.00
668,920.00
66,892.00
735,812.00
735,810.00

2,750,000.00
20,000.00

550,000.00
30,000.00

10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

4,000.00
1,575,000.00
67,500.00
383,040.00
59,400.00
182,250.00
2,851,190.00

80,000.00
95,000.00
95,000.00
95,000.00
100,000.00
115,000.00

424,000.00
26,125.00
123,500.00
99,750.00
26,200.00
30,475.00
730,050.00
3,581,240.00
358,124.00
3,939,364.00
3,939,360.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

742,500.00
40,000.00
4,000.00
2,100,000.00
90,000.00
383,040.00
59,400.00
182,250.00
3,601,190.00

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

26,125.00
148,200.00
133,000.00
32,300.00
452,000.00
32,545.00
824,170.00
4,425,360.00
442,536.00
4,867,896.00
4,867,890.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

1,017,500.00
30,000.00
4,000.00
1,707,800.00
67,500.00
7,364.40
57,200.00
175,500.00
3,066,864.40

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

33,250.00
98,800.00
99,750.00
24,500.00
240,000.00
14,087.50
510,387.50
3,577,251.90
357,725.19
3,934,977.09
3,934,970.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

797,500.00
30,000.00
4,000.00
1,168,900.00
67,500.00
7,364.40
57,200.00
175,500.00
2,307,964.40

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

33,250.00
98,800.00
99,750.00
24,500.00
240,000.00
14,087.50
510,387.50
2,818,351.90
281,835.19
3,100,187.09
3,100,180.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00
2,800,000.00
125,000.00

1,100,000.00
80,000.00
20,000.00
3,150,000.00
135,000.00
383,040.00
59,400.00
182,250.00
420,000.00
437,500.00
5,967,190.00

95,000.00
95,000.00

26,125.00
156,750.00

95,000.00
100,000.00
80,000.00
115,000.00

199,500.00
40,300.00
564,000.00
40,595.00
1,027,270.00
6,994,460.00
699,446.00
7,693,906.00
7,693,900.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00
2,800,000.00
125,000.00

880,000.00
64,000.00
16,000.00
1,575,000.00
67,500.00
383,040.00
59,400.00
182,250.00
336,000.00
350,000.00
3,227,190.00

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

26,125.00
123,500.00
99,750.00
26,500.00
424,000.00
30,475.00
730,350.00
3,957,540.00
395,754.00
4,353,294.00
4,353,290.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

5,500.00
200.00
30,000.00
13,500.00
4,560.00
660.00
2,025.00
56,445.00

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

1,900.00
1,900.00
1,900.00
600.00
14,400.00
1,035.00
21,735.00
78,180.00
7,818.00
85,998.00
85,990.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

1,292,500.00
30,000.00
4,000.00
1,168,890.00
67,500.00
7,364.40
57,200.00
175,500.00
2,802,954.40

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

33,250.00
98,800.00
99,750.00
24,500.00
240,000.00
14,087.50
510,387.50
3,313,341.90
331,334.19
3,644,676.09
3,644,670.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

1,210,000.00
30,000.00
4,000.00
913,340.00
67,500.00
7,364.40
57,200.00
175,500.00
2,464,904.40

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00

33,250.00
98,800.00
99,750.00
24,500.00
240,000.00

115,000.00

14,087.50
510,387.50
2,975,291.90
297,529.19
3,272,821.09
3,272,820.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

962,500.00
30,000.00
4,000.00
746,700.00
67,500.00
7,364.40
57,200.00
175,500.00
2,050,764.40

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

33,250.00
98,800.00
99,750.00
24,500.00
240,000.00
14,087.50
510,387.50
2,561,151.90
51,038.75
3,122,578.15
3,122,570.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

797,500.00
30,000.00
4,000.00
1,530,670.00
67,500.00
7,364.40
57,200.00
175,500.00
2,669,734.40

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

33,250.00
98,800.00
99,750.00
24,500.00
240,000.00
14,087.50
510,387.50
3,180,121.90
318,012.19
3,498,134.09

3,498,130.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00
2,800,000.00
125,000.00

880,000.00
64,000.00
16,000.00
2,100,000.00
90,000.00
383,040.00
59,400.00
182,250.00
392,000.00
350,000.00
3,774,690.00

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

33,250.00
98,800.00
99,750.00
24,500.00
240,000.00
14,087.50
510,387.50
4,285,077.50
428,507.75
4,713,585.25
4,713,580.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00
2,800,000.00
125,000.00

660,000.00
64,000.00
16,000.00
1,575,000.00
67,500.00
383,040.00
59,400.00
182,250.00
448,000.00
350,000.00
3,007,190.00

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

26,125.00
123,500.00
99,750.00
26,200.00
424,000.00
30,475.00
730,050.00
3,737,240.00
373,724.00
4,110,964.00
4,110,960.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00
2,800,000.00
125,000.00

687,500.00
60,000.00
12,000.00
2,100,000.00
90,000.00
383,040.00
59,400.00
182,250.00
294,000.00
312,500.00
3,574,190.00

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

26,125.00
148,200.00
133,000.00
32,300.00
452,000.00
32,545.00
824,170.00
4,398,360.00
439,836.00
4,838,196.00
4,838,190.00

2,750,000.00
20,000.00
10,000.00
10,000.00
30,000.00
1,140.00
110,000.00
225,000.00

8,250.00
400.00
36,000.00
1,500.00
6,270.00
990.00
3,375.00
56,785.00

95,000.00
95,000.00
95,000.00
100,000.00
80,000.00
115,000.00

3,135.00
3,135.00
3,135.00
1,000.00
23,760.00
1,725.00
35,890.00
92,675.00
9,267.50
101,942.50
101,940.00

20,000.00

20,400.00

20,000.00

4,000.00
20,400.00

80,000.00
95,000.00
100,000.00
115,000.00

16,000.00
9,500.00
1,000.00
115.00
26,615.00
47,015.00
4,701.50
51,716.50
51,710.00

120,000.00
20,000.00

120,000.00
4,000.00
120,000.00

80,000.00
95,000.00
100,000.00
115,000.00

13,280.00
23,750.00
2,500.00
920.00
40,450.00
160,450.00
16,045.00
176,495.00
176,490.00

65,000.00
20,000.00
20,000.00

26,000.00
1,000.00
1,000.00
28,000.00

80,000.00
95,000.00
100,000.00
115,000.00

10,000.00
23,750.00
2,500.00
690.00
36,940.00
64,940.00
6,494.00
71,434.00
71,430.00

400,000.00
1,140.00
100,000.00

400,000.00
6,840.00
1,000.00
407,840.00

80,000.00
95,000.00
100,000.00

80,000.00
142,500.00
15,000.00

115,000.00

18,400.00
255,900.00
663,740.00
66,374.00
730,114.00
730,110.00

25,000.00

25,000.00
25,000.00

80,000.00
95,000.00
100,000.00
115,000.00

800.00
9,500.00
1,000.00
575.00
11,875.00
36,875.00
3,687.50
40,562.50
40,560.00

37,500.00
13,125.00

45,000.00
4,593.75
49,593.75

80,000.00
95,000.00
100,000.00
115,000.00

10,800.00
21,375.00
2,250.00
782.00
35,207.00
84,800.75
8,480.08
93,280.83
93,280.00

30,000.00
10,500.00

36,000.00
3,675.00
39,675.00

80,000.00
95,000.00
100,000.00
115,000.00

2,880.00
5,700.00
600.00
230.00
9,410.00
49,085.00
4,908.50
53,993.50
53,990.00

75,000.00
26,250.00

90,000.00
9,187.50

99,187.50
80,000.00
95,000.00
100,000.00
115,000.00

6,480.00
12,825.00
1,350.00
460.00
21,115.00
120,302.50
12,030.25
132,332.75
132,330.00

75,000.00
5,000.00

75,000.00
125.00
75,125.00

80,000.00
95,000.00
100,000.00
115,000.00

800.00
38,000.00
400.00
57.50
39,257.50
114,382.50
11,438.25
125,820.75
125,820.00

145,150.00

51,818.55

668,920.00

2,508,450.00

2,560,268.55
256,026.86
2,816,295.41
2,816,290.00

150,000.00

150,000.00
150,000.00

80,000.00

800.00

95,000.00
100,000.00
115,000.00

47,500.00
1,000.00
575.00
49,875.00
199,875.00
19,987.50
219,862.50
219,860.00

75,000.00

75,000.00
75,000.00

80,000.00
95,000.00
100,000.00
115,000.00

1,200.00
14,250.00
1,500.00
920.00
17,870.00
92,870.00
9,287.00
102,157.00
102,150.00

62,875.00
145,150.00
418,850.00
715,195.00
50,988.60
-

28,293.75
11,612.00
50,262.00
143,039.00
20,905.33
254,112.08
25,411.21
279,523.28
279,520.00

10,000.00
1,140.00
100,000.00
2,000.00

120,000.00
9,576.00
4,200.00
1,000.00
134,776.00

80,000.00
95,000.00
100,000.00
115,000.00

49,600.00
33,250.00
3,500.00
345.00
86,695.00
221,471.00
22,147.10
243,618.10
243,610.00

4,615.38
1,140.00
100,000.00
2,000.00

122,307.69
11,856.00
4,500.00
3,240.00
141,903.69

80,000.00
95,000.00
100,000.00
115,000.00

7,200.00
8,550.00
900.00
575.00
17,225.00
159,128.69
15,912.87
175,041.56
175,040.00

3,653.85
1,140.00
100,000.00
2,000.00

96,826.92
10,602.00
1,800.00
3,880.00
113,108.92

80,000.00
95,000.00
100,000.00
115,000.00

72,000.00
42,750.00
4,500.00
5,175.00
124,425.00
237,533.92
23,753.39
261,287.32
261,280.00

25,000.00

25,250.00
25,250.00

80,000.00
95,000.00
100,000.00
115,000.00

20,000.00
47,500.00
2,500.00
345.00
70,345.00
95,595.00
9,559.50
105,154.50
105,150.00

35,000.00
20,000.00
35,000.00
65,000.00

7,000.00
3,000.00
5,950.00
16,900.00

R, 2 LAPIS CAT PENUTUP

25,000.00
5,000.00
5,000.00

250.00
150.00
1,000.00
32,850.00

80,000.00
95,000.00
100,000.00
115,000.00

5,600.00
855.00
600.00
345.00
7,400.00
40,250.00
4,025.00
44,275.00
44,270.00

20,000.00
35,000.00
25,000.00

2,000.00
3,500.00
6,500.00
12,000.00

80,000.00
95,000.00
100,000.00
115,000.00

1,600.00
5,985.00
630.00
345.00
8,560.00
20,560.00
2,056.00
22,616.00
22,610.00

25,000.00
25,000.00

3,000.00
4,500.00
7,500.00

80,000.00
95,000.00
100,000.00
115,000.00

2,240.00
3,990.00
420.00
345.00
6,995.00
14,495.00
1,449.50
15,944.50
15,940.00

7,250,000.00
20,000.00

65,250.00
5,000.00
70,250.00

80,000.00
95,000.00

16,000.00
28,500.00

APIS CAT PENUTUP)

100,000.00
115,000.00

3,000.00
1,150.00
48,650.00
118,900.00
11,890.00
130,790.00
130,790.00

75,000.00
20,000.00

101,250.00
4,000.00
105,250.00

80,000.00
95,000.00
100,000.00
115,000.00

16,000.00
9,500.00
1,000.00
115.00
26,615.00
131,865.00
13,186.50
145,051.50
145,050.00

80,000.00
95,000.00
115,000.00

12,000.00
28,500.00
2,300.00
42,800.00
42,800.00
4,280.00
47,080.00
47,080.00

12,000.00
1,140.00
2,000.00
100,000.00

31,800.00
1,299.60
200.00
300.00

33,599.60
80,000.00
95,000.00
100,000.00
115,000.00

7,200.00
8,550.00
900.00
575.00
17,225.00
50,824.60
5,082.46
55,907.06
55,900.00

7,250,000.00
20,000.00
130,000.00

253,750.00
1,000.00
104,000.00
358,750.00

80,000.00
95,000.00
100,000.00
115,000.00

64,000.00
190,000.00
20,000.00
4,600.00
278,600.00
637,350.00
63,735.00
701,085.00
701,080.00

1,140.00
100,000.00
225,000.00
100.00

262,200.00
89,300,000.00
231,075,000.00
20,000.00
320,657,200.00

80,000.00
95,000.00
100,000.00
115,000.00

96,000.00
19,000.00
2,000.00
6,900.00
123,900.00
320,781,100.00
32,078,110.00
352,859,210.00
352,859,210.00

25,000.00

25,250.00
25,250.00

80,000.00
95,000.00
100,000.00
115,000.00

20,000.00
47,500.00
2,500.00
345.00

70,345.00
95,595.00
9,559.50
105,154.50
105,150.00

85,000.00
25,000.00

8,500.00
250.00
8,750.00

80,000.00
95,000.00
100,000.00
115,000.00

1,600.00
5,985.00
630.00
345.00
8,560.00
17,310.00
1,731.00
19,041.00
19,040.00

85,000.00

102,000.00
102,000.00

80,000.00
115,000.00

36,000.00
5,175.00
41,175.00
143,175.00
14,317.50
157,492.50
157,490.00

45,000.00
100,000.00
1,140.00

112,500.00
1,000.00
68.40
113,568.40

80,000.00
95,000.00
100,000.00
115,000.00

12,800.00
17,100.00
2,000.00
1,150.00
33,050.00
146,618.40
14,661.84
161,280.24
161,280.00

7,250,000.00
20,000.00

7,975,000.00
25,000.00

7,975,000.00
80,000.00
95,000.00
100,000.00
115,000.00

560,000.00
1,995,000.00
210,000.00
40,250.00
2,805,250.00
10,780,250.00
1,078,025.00
11,858,275.00
11,858,270.00

7,250,000.00
20,000.00

7,975,000.00
25,000.00
7,975,000.00

80,000.00
95,000.00
100,000.00
115,000.00

560,000.00
1,995,000.00
210,000.00
40,250.00
2,805,250.00
10,780,250.00
1,078,025.00
11,858,275.00
11,858,270.00

2,800,000.00
20,000.00

3,080,000.00
25,000.00
3,080,000.00

80,000.00
95,000.00
100,000.00
115,000.00

560,000.00
1,995,000.00
210,000.00
40,250.00
2,805,250.00
5,885,250.00
588,525.00
6,473,775.00
6,473,770.00

75,000.00
20,000.00

82,500.00
200.00
82,700.00

80,000.00
95,000.00
100,000.00
115,000.00

2,400.00
6,650.00
700.00
460.00
10,210.00
92,910.00

13,936.50
106,846.50
106,840.00

125,000.00
1,140.00
100,000.00

125,000.00
12,973.20
4,200.00
142,173.20

80,000.00
95,000.00
100,000.00
115,000.00

49,600.00
33,250.00
3,500.00
4,025.00
90,375.00
232,548.20
23,254.82
255,803.02
255,800.00

100,000.00
1,140.00
100,000.00
2,000.00

310,000.00
10,944.00
4,500.00
3,000.00
328,444.00

80,000.00
95,000.00
100,000.00
115,000.00

19,200.00
11,400.00
1,200.00
1,380.00
33,180.00
361,624.00
36,162.40
397,786.40
397,780.00

DAERAH
2

Kode
Upah
5

Kode
bahan
5

1
KOTA BEKASI

2
KOTA BANDUNG

3
KOTA BOGOR

4
KOTA CIMAHI

5
KOTA DEPOK

6
KABUPATEN SUMEDANG

7
KABUPATEN BANDUNG

8
KABUPATEN BEKASI

9
KABUPATEN KARAWANG

10
KABUPATEN PURWAKARTA

11
KABUPATEN BOGOR

12
KOTA CIREBON

13
KOTA SUKABUMI

14
KABUPATEN INDRAMAYU

15
KABUPATEN CIREBON

16
KOTA TASIKMALAYA

17
KABUPATEN CIANJUR

18
KABUPATEN SUKABUMI

19
KABUPATEN SUBANG

20
KABUPATEN GARUT

21
KABUPATEN TASIKMALAYA

22
KABUPATEN CIAMIS

23

KABUPATEN KUNINGAN

24

KABUPATEN MAJALENGKA

3.26

0.12

4.36

0.0225
44.4444444444
158.42
222.5

46.725
205.145

11.1111111111
40.94
76.6666666667
33.7333333333
74.6733333333

10.000
126.4
66.6666666667
26.6666666667
153.0666666667

66.6666666667
165.3333333333
44
209.3333333333

5500

1833.3333333333

DAFTAR SATUAN HARGA BAHAN


TAHUN 2008
KODE

NO.
1

BA01
BA02
BA03
BA04
BA05
BA06
BA07
BA08
BA09
BA10
BA11

BA12
BA13
BA14
BA15
BA16
BA17
BA18
BA19
BA20
BA21
BA22
BA23
BA24
BA25
BA26
BA27
BA28
BA29
BA30

A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

BA31
BA32

BA32'
BA33
BA34
BA34'
BA35
BA36
BA37
BA38
BA39
BA40
BA41
BA42
BA43

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
B

BD01
BD02
BD02'
BD03
BD04
BD05
BD06
BD07
BD07'

1
2
3
4
5
6
7
8
9
10

BD07"
BD08
BD09
BD10
BD11
BD12
BD13
BD14
BD15
BD16
BD17
BD18
BD19
BD19'
BD20
BD21
BD22
BD23
BD24
BD25
BD26
BD27
BD28
BD29
BD30
BD31
BD32
BD32'
BD33
BD34
BD35
BD36
BD37
BD38
BD39
BD40
BD41
BD42
BD42'

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

56
57
58
59
60
61

BF01'
BF01
BF02
BF03
BF03'
BF04
BF04'
BF04"
BF05
BF06
BF07
BF07'
BF08
BF09
BF10
BF11
BF12
BF13
BF14'
BF14"
BF14
BF15
BF16
BF17
BF18
BF19
BF19'
BF19"
BF20
BF21
BF22
BF23
BF24

C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

BF25
BF26
BF27
BF28
BF29
BF30
BF31

BH01
BH02
BH03
BH04
BH05
BH06

BJ01
BJ02
BJ03
BJ04
BJ06

BJ07
BJ08
BJ09
BJ10
BJ11
BJ12
BJ13
BJ14
BJ15

37
38
39
40
41
42
43
44
45
46
47
48
49
50
D
1
2
3
4
5
6
7

E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

BJ16
BJ17
BJ18
BJ19
BJ20
BJ21
BJ22
BJ23
BJ24

BL01
BL02
BL03
BL04
BL05
BL06
BL07
BL07'
BL07"
BL08
BL09
BL10
BL11
BL12
BL13
BL14
BL15
BL16
BL17
BL18
BL19
BL20

BL21
BL22
BL23
BL24
BL25

20
21
22
23
24
25
26
27
28
29
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

BL26
BL27
BL28
BL29
BL30
BL31
BL32
BL33
BL34
BL35
BL36
BL37
BL42

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

BN01
BN02
BN03
BN04
BN05
BN06
BN07
BN08
BN09
BN10
BN11
BN12
BN13
BN14
BN15

G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BP01

H
1

BP02
BP03
BP04
BP05
BP07
BP08
BP09
BP10
BP10,
BP10'
BP10"
BP11
BP14
BP15

BP16
BP17
BP18
BP19
BP20
BP21
BP22
BP23
BP24
BP25
BP26
BP27
BP28
BP29
BP30
BP31
BP32
BP33
BP34
BP35
BP36
BP37
BP38
BP39
BP40
BP41

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

BP42
BP43
BP44
BP45
BP46
BP47
BP48
BP49
BP50
BP51
BP52
BP53

BR01
BR02
BR03

BR04
BR05
BR06
BR07
BR08
BR09
BR10
BR11

BS01
BS02
BS03

47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14

J
1
2
3

BS04
BS05
BS06

BS07
BS08
BS09
BS10
BS11
BS12

BT01
BT02
BT03
BT04
BT05
BT06
BT07
BT08
BT08'
BT09
BT10
BT11
BT12
BT13
BT14
BT15
BT16
BT17
BT18
BT19
BT20
BT21
BT22
BT23
BT24
BT25

4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
K
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

BT26
BT27
BT28
BT29
BT30
BT31
BT32
BT33
BT34
BT35
BT36
BT37
BT38
BT39
BT40
BT41
BT42
BT43
BT44
BT45
BT46
BT47
BT48
BT49
BT50
BT51
BT52
BT53

27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71

BT54
BT55
BT56
BT57
BT58
BT59
BT60
BT61
BT62
BT63
BT64
BT65
BT66
BT67

BV01
BV02
BV03
BV04
BV05
BV06
BV07

BV08
BV09
BV10
BV11

72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
L
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BV12
BV13
BV14
BV15
BV16
BV17
BV18
BV19
BV20
BV21
BV22
BV23
BV24

BV25
BV26
BV27
BV28
BV29
BV30
BV31
BV32
BV33
BV34
BV35

BX01
BX02
BX03
BX04
BX05
BX06

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
M
1
2
3
4
5
6
7
8
9

BX07
BX08
BX09
BX10
BX11
BX12
BX13
BX14
BX15
BX16

BX17
BX18
BX19
BX20
BX21
BX22
BX23
BX24
BX25
BX26
BX27

BX28
BX29
BX30
BX31
BX32
BX33

BX34
BX35
BX36

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

55
56
57
58
59

BZ01
BZ02
BZ03
BZ04
BZ05
BZ06
BZ07
BZ08
BZ09
BZ10
BZ11
BZ12
BZ13

BZ16
BZ17
BZ18
BZ19
BZ20
BZ21
BZ22
BZ23
BZ24
BZ25
BZ26
BZ27
BZ28
BZ29
BZ30
BZ31
BZ32
BZ33
BZ34
BZ35
BZ36

N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
O
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

BZ37
BZ38
BZ39
BZ40
BZ41
BZ42

BZ43
BZ44
BZ45
BZ46
BZ47
BZ48
BZ49
BZ50
BZ51

BZ53
BZ54

BZ55
BZ56
BZ57
BZ58
BZ59
BZ60
BZ61
BZ62
BZ63
BZ64
BZ65
BZ66
BZ67
BZ68
BZ69
BZ70
BZ71
BZ72
BZ73

22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

BZ74
BZ75
BZ76
BZ77
BZ78
BZ79
BZ80

CC01
CC02
CC03
CC04
CC05
CC06
CC07
CC08
CC09
CC10
CC11
CC12

67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
P
1
2
3
4
5
6
7
8
9
10
11
12
13

CC13
CC14
CC15
CC16
CC17
CC18
CC19
CC20
CC21
CC22
CC23
CC24
CC25
CC26
CC27
CC28
CC29
CC30
CC31
CC32

CE01
CE02
CE03
CE04

CG01
CG02

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Q
1
2
3
4
5
6
7
8
9
R
1
2

CG03
CG04
CG05
CG06
CG07
CG08
CG09
CG10
CG11

3
4
5
6
7
8
9
10
11

CI01
CI02
CI03
CI05
CI06

S
1
2
3
4
5
T

CJ09
CJ10
CJ11
CJ12
CJ13
CJ14

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

CL01
CL02
CL03
CL04
CL05
CL06
CL07
CL08

U
1
2
3
4
5
6
7
8

CJ01
CJ02
CJ02'
CJ03
CJ04
CJ05
CJ06
CJ07
CJ08

CL09
CL10

9
10
V

CN01
CN02
CN03
CN04
CN05
CN06
CN07
CN08
CN09
CN10
CN11
CN12
CN13
CN14
CN15
CN16
CN17
CN18
CN19
CN20
CN21
CN22
CN23
CN24
CN25
CN26
CN27
CN28
CN29
CN30
CN31
CN32
CN33
CN34
CN35
CN36
CN37
CN38
CN39
CN40

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

CN41
CN42
CN43
CN44
CN45
CN46

CP01
CP02
CP03
CP04
CP05
CP06
CP07
CP08
CP09
CP10
CP11
CP12

41
42
43
44
45
46
W
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
772
773
774
775
776
777
778
X
1
2
3
4
5
6
7
8
9
10
11
12
13

14
15
16
17
18
19
20
21
22

DAFTAR SATUAN HARGA BAHAN


KABUPATEN TAKALAR

TAHUN 2008
JENIS BAHAN BANGUNAN
2
AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
Pasir Urug
Sirtu
Pasir Teras
Pasir Pasang Kali
Pasir Beton
Abu Batu / Screen
Batu Gosok ( Apung )
Screen
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Pecah Mesin 7/10
Batu Pecah Mesin 10/15
Batu Belah Pondasi 15/20
Batu Bronjol ( Untuk Bronjong )
Batu Koral Beton Kali ( Pecah Tangan )
Batu Tempel Hitam
Batu Pinggir Beton 10 x 20 x 35
Batu Pinggir Beton 15 x 35 x 50 ( K -225 )
Batu Telor
Batako kecil 8 x 10 x 20
Batako Besar 8 x 20 x 30
Con Blok 8 x 20 x 40 (Holowblock)
Bata Merah Bakar Kelas I
Bata Merah Bakar Kelas II
Bata Merah Oven
Roster Beton 20 x 20
Roster Beton 30 x 30
Grass Blok 20 x 20
Grass Blok 30 x 30
Paving Blok Natural
Paving Blok Warna

Paving Blok Natural 6 cm


Paving Blok Warna 8 cm K300
Paving Blok Natural 8 cm
a. Bentuk Hexagonal (1m2 = 27 bh)
b. Bentuk Tiga Berlian (1m2 = 50 bh)
c. Bentuk Segi Panjang (1m2 = 50 bh)
Paving Blok Warna 8 cm
Paving Blok Biasa
Kanstin Paving Blok
Semen PC Tiga Roda / 50 kg *M080
Semen PC Tiga Roda
Semen Putih
Kanstin Pervab
Readymix Beton K 300, tanpa pompa ( selang )
Readymix Beton K 225, tanpa pompa ( selang )
Readymix Beton K 175, tanpa pompa ( selang )
Kapur Pasang/ kapur tembok
Kapur Sirih
Semen Warna
Tanah Liat
Tanah Urug (dilokasi)
Rumput
Hollow Block 20
Hollow Block 15
Hollow Block 10
Roster Terawang Keramik
Batu Candi
Batu Sikat 0,5 / 2 cm
Batu Alam andesit
Batu Belah Susunan Sirih
Kerikil 0,5 - 1 cm
Tanah humus
BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
Plamir Tembok
Cat Tembok ICI Eksterior ( BETON )
Cat Tembok Kelas II
Cat Tembok ICI Interior ( PLAFOND DAN DINDING )
Cat Tembok Vinilex
Cat Dasar ICI untuk Interior ( 2 Pelapis )
Cat Tembok Sanlex
Cat Tahan Asam
Cat Berkilat/Cat kayu
Cat Jembatan *M090

Plamir Kayu
Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )
Cat Marka / Spotlight
Water Profing Emulsion
Water Profing Membrance
Rool Cat Tembok
Kape Tembok
Kape Kayu
Soligneum 1 blek
Plincote
Pengawetan Kayu
Pengopenan Kayu
Kwas 3"
Kwas 2'
Oker
Oyan
Oten (Pewarna Plitur )
Spirtus
Bahan Plitur Kripik ( Sirlak India )
Dempul Lilin
Dempul Plitur
Dempul Halus / Imfra ( Wood Filler )
Terpentin
Tiner A
Tiner B
Kumpon
Melamik
Impra
Dempul Plastik
Dempul Duco
Ampelas
Dempul Kayu Cap Kucing
Meni Kayu / Besi
Meni Sincromat
Cat Kayu Sieve
Cat Besi Sieve
Cat Besi Duco Danaglos/ICI
Cat Bron
Sirlak
Lem Fox
Cat kayu penutup
Kuas
Pengencer
ampelas
Politur

Politur jadi
Vernis
Dempul
Cat anti lumut
Besi siku 50.50.5
Besi siku 80.80.8

BAHAN KAYU BERIKUT BAHAN JADINYA


Bambu Biasa
Bambu 5 s.d 7
Bambu 7 s.d 10
Bambu Gombong
Papan Terentang
Kayu Kamper Singkil / Kapur (K. Samarinda Klas II)
Kayu Lokal Kelas II
Kayu Papan Lokal Kelas II
Kayu Papan Kamper
Kayu Balok kelas I
Kayu Papan Super kelas I
Kayu Balok Kamper
Kayu Balok Kruing
Kayu Balok Kamper Medan
Kayu Papan Kamper Medan
Kayu Balok Kamper Banjar
Kayu Papan Kamper Banjar
Kayu Balok Kamper Samarinda
Kayu Papan Kamper Samarinda
Kayu Balok Rasamala
Kayu Balok jati
Kayu Papan Jati
Kayu Jati Jatim Tua dia. 40 cm
Kayu Jati Jateng Tua dia. 40 cm
Kayu Jati Jabar Tua dia. 40 cm
Kayu Jati Jabar dia. 40 cm kebawah
Kayu Hutan Kelas I ( Segeng, Mahoni, Laban )
Kayu Balok Albasiah
Kayu Papan Albasia
Kayu Kruing
Kayu Papan Borneo
Dolken 8 s/d 10 uk.4m'
Dolken 7 s/d 10
List profil kamper 1 cm
List profil kamper 2 cm
List profil kamper 4 cm

List profil kamper 5 cm


List profil kamper 10 cm
Pegangan Tangga profil Jati
Pegangan Tangga profil Kamper
Kayu Reng 2/3 Borneo
Kayu Reng 2/3 Kamper Banjar
Kayu Reng 3/4 Kamper Banjar
Reng Kayu Kls II
List profil Kayu Lokal KLs II 4 cm
lem kayu
Kaso-kaso 5x7 cm
Perancah kayu
Bilik Bambu
List Kayu 2/4
BAHAN PENUTUP RANGKA PLAFOND
Bahan plafond Enternit 100 X 100 TEBAL 4 mm
Bahan plafond hardpleks 5 mm 120 x 240
Bahan plafond Asbes Semen 5 mm
Gypsum 120 x 240 t = 9 mm ex DN
Gypsum 120 x 240 t = 9 mm ex Luar
Acustik Amstrong 60 x 120
GRC 120 x 240

BAHAN KAYU LAPIS


Triplek 3 mm 120 x 240
Triplek 4 mm 120 x 240
Triplek 4 mm Ukuran Pintu
Triplek 6 mm 120 x 240
Jabar Wood 4 mm
Plywood 18 mm 120 x 240
Plywood 4 mm 120 x 240
Plywood 3 mm 120 x 240
Plywood 3 mm ukuran Pintu
Plywood 4 mm ukuran Pintu
Bilik Bambu ( tanpa kulit )
Bilik Bambu ( dengan kulit )
Bilik Bambu Hitam Variasi
Wall Paper ( kls menengah )
Multiplek 9 mm 120 x 240
Multiplek 12 mm 120 x 240
Multiplek 18 mm 120 x 240
Play Wood 18 mm 120 x 240
Teak Wood 3 mm 120 x 240

Teak Wood 4 mm 120 x 240


Teak Wood 3 mm 120 x 240 Ukuran Pintu
Teak Wood ukuran Pintu 4 mm
Tacon ( tahan bakar )
Supercon
Melamin 4 mm 120 x 240
Melamin TIK 4 mm
Formika 120 x 240
Formika Ukuran Pintu
Plywood 9 mm 120 x 240
BAHAN LANTAI DAN PELAPIS DINDING
Tegel PC 20 x 20
Plin Tegel PC 10 x 20
Tegel PC 30 x 30
Plin Tegel PC 15 x 30
Tegel Warna 20 x 20
Plin Tegel Warna 10 x 20
Tegel Warna 30 x 30
Ubin Keramik 30 x 30 cm KW 1
Ubin Keramik 20 x 20 cm KW 1
Plin Tegel Warna 15 x 30
Tegel Wafel PC 20 x 20
Tegel Wafel Warna 20 x 20
Tegel Badak PC 30 x 30
Poslin 11 x 11 Warna Standar DN
Poslin 11 x 11 Warna Khusus DN
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos
Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip
Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip
Keramik 20 x 20 (KM) KWI DN Putih Polos
Keramik 20 x 25 Dinding KM KWI DN Corak
Keramik 30 x 30 KW I DN putih polos
Keramik 30 x 30 KW I DN Warna/Corak / Anti Slip
Granito Tile Esenssza 30 x 30 polis
Granito Tile Esenssza 40 x 40 un polis
Granito Tile Esenssza 60 x 60 polis
Granito Tile Esenssza 60 x 60 un polis
Keramik 40 x 40 cm
Keramik Mozaik 30 x 30 cm
Vinyl Lantai standar
Karpet Kelas Baik LN
Karpet Kelas Sedang LN
Stairnosing keramik 10/20
Stairnosing fiber

Taraso Kerang 30 x 30
Plin Taraso 10 x 30
Granit Alam LN Ukuran Besar
Granit Alam LN Ukuran Kecil
Granit Alam DN Ukuran Besar
Granit Alam DN Ukuran Kecil
Marmer Alam Lampung Ukuran Besar
Marmer Alam Lampung Ukuran Kecil
Marmer Alam Citatah Ukuran Besar
Marmer Alam Citatah Ukuran Kecil
Marmer Sintetis
Bata Karawang
Campuran untuk Kedap Air (AM)
Lantai Parket
Stepnozing
Plint Keramik 5/20
Keramik Lantai Antislip sekualitas Romance KW I Warna 33x33 cm
Keramik Lantai sekualitas Romance KW I Warna 33x33 cm
Ubin teralux marmer 30 x 30 cm
Keramik motif batu alam 40 x 40 cm
Ubin teralux marmer 60 x 60 cm
Plin teralux marmer
Plin keramik 10x40
Tehel granito Uk 60x60

BAHAN SALURAN AIR KOTOR / BERSIH


Grafel 1/2 d.20 cm
Grafel 1/2 d.30 cm
Grafel 1/2 d.40 cm
Buis Beton 20 cm ( 1 m' )
Buis Beton 30 cm ( 1 m' )
Buis Beton 40 cm ( 1 m' )
Buis Beton 50 cm ( 1 m' )
Buis Beton 60 cm ( 1 m' ) *M031
Buis Beton 100 cm ( 0.50 m ) *M035
Buis Beton 80 cm ( 0.50 m ) *M033
Buis Tanah 10 cm ( 0.50 m )
Buis Tanah 15 cm ( 0.50 m )
Buis Tanah 20 cm ( 0.50 m )
Buis Tanah 25 cm ( 0.50 m )
Injuk
BAHAN LOGAM DAN BAHAN JADINYA
Besi Beton U-24 Rata - Rata *M167'

Besi Beton U-39 / U-32 Rata - Rata *M167


Pagar BRC Lengkap Tiang ( Tanpa Pondasi )
Bondek
Ongkos Galfanis Besi
Kawat Duri
Kawat Pengikat
Kawat Bronjong 4 mm
Kawat Tembaga
Baja Siku / Profil DN
Baja IWF DN SII
Baja IWF Jepang
Baja Kontruksi Jembatan *M165
Kawat Beton *M168
Kawat Bronjong 4 mm *M162
Kawat Tembaga
Baut Baja *M163
Besi Galvanisir * M164
Baja Tralis *M161
Ram Nyamuk Hijau
Ram Kawat 1 x 1 cm
Ram Ayam
Kawat Kasa 1 x 1 cm ( Putih )
Kawat Harmonika 4 cm
Kawat Harmonika 2 cm
Kawat Las Listrik
Wiremesh M8
Wiremesh M6
Timah
Timah Hitam
Ram Nyamuk Aluminium
Plat Srip 2 x 30 mm ( 6 m1)
Plat Srip 3 x 30 mm ( 6 m1)
Plat Alumunium 0.2 mm
Plat Alumunium 0.3 mm
Plat Alumunium 0.4 mm
Plat Alumunium 0.5 mm
Plat Alumunium 0.6 mm
Plat Alumunium 0.1 mm
Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " )
Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " )
Kusen Alumunium 4" CA
Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories )
Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories )
Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )
Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )

Handle Alumunium ( Tarikan Pintu Alumunium )


Kait Angin alumunium
Karet Asisoris Kusen / Pintu Alumunium
Seng Plat BJLS 30 dia. 60 cm ( 100 m1 )
Seng Plat BJLS 30 dia. 90 cm ( 100 m1 )
Plat Besi Tipis 1 mm
Plat Besi Tipis 0.5 mm
Plat Besi 2 mm s/d 5 mm
Plat Besi 6 mm s/d 10 mm
Plat Besi 10 mm Ke atas
Lem Kuning (aibond)
Lem Fox
Pintu Besi Baja
Rolling door Besi
Pintu Aluminium
Pintu Swing 5mm
Pintu Swing 8mm
Teralis Besi strip
Besi Teralis
Profil allumunium
Skrup fixer
Sealant
Besi strip tebal 5 mm
BAHAN KACA
Kaca Polos 2 mm
Kaca Polos 3 mm
Kaca Polos 5 mm
Kaca Polos Tebal 8 mm
Kaca Polos Tebal 12 mm
Kaca Rayband 5 mm ( ASAHI )
Kaca Rayband 8 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )
Kaca Patri Lokal Terpasang ( ASAHI )
Kaca Patri EX Luar negeri terpasang
Kaca 6 mm Gravir
Glass Block DN 20 x 20
Glass Block 20 x 20 Ex LN
Profil kaca

BAHAN PAKU DAN MUR BAUT


Paku 3 cm
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
Paku 8 cm s/d 12 cm

Paku 2 cm s/d 4 cm /Paku Tripleks - Bilik


Paku 1/2 cm s/d 1 cm /Paku seng-Plat Poil
Paku Baja Jembatan *M166
Paku Beton 2 cm s/d 5 cm
Paku Kait Lengkap
Paku Cacing
Paku Seng Glb. / Paku Asbes Glb.
Paku Skrup
Besi Beugel kuda - kuda
Duk Angker
Angker Mur Baut dia.19 / panjang 60 cm
Mur Baut HTB dia. 19 s/d 16 (5 cm)
Mur Baut Biasa dia.19 s/d 16 (5 cm)
Piser dia. 12 s/d 20 cm
Besi strip
Paku Seng
Kawat ayam BRC dia 20 Cm
BAHAN PERPIPAAN
Besi Pipa untuk Hydrant BSP 1"
Besi Pipa untuk Hydrant BSP 1,25"
Besi Pipa untuk Hydrant BSP 1,5"
Besi Pipa untuk Hydrant BSP 2"
Besi Pipa untuk Hydrant BSP 2,5"
Besi Pipa untuk Hydrant BSP 3"
Besi Pipa untuk Hydrant BSP 4"
Besi Pipa untuk Hydrant BSP 6"
Hydrant
Besi Pipa Hitam 1" t=2 mm
Besi Pipa Hitam 2" t=2 mm
Besi Pipa Hitam 3" t=2 mm
Besi Pipa Hitam 4" t=2 mm
Besi Pipa Hitam 6" t=2 mm
Pipa GIP Medium A 1/2" ( 6 m1 )
Pipa GIP Medium A 3/4" ( 6 m1 )
Pipa GIP Medium A 1" ( 6 m1 )
Pipa GIP Medium A 1 1/4" ( 6 m1 )
Pipa GIP Medium A 1 1/2" ( 6 m1 )
Pipa GIP Medium A 1 3/4"( 6 m1 )
Pipa GIP Medium A 2" ( 6 m1 )
Pipa GIP Medium A 2 1/2" ( 6 m1 )
Pipa GIP Medium A 3" ( 6 m1 )
Pipa GIP Medium A 4" ( 6 m1 )
Macam2 Sambungan GIP 1/2"
Macam2 Sambungan GIP 3/4"

Macam2 Sambungan GIP 1"


Macam2 Sambungan GIP 1 1/4"
Macam2 Sambungan GIP 11/2"
Macam2 Sambungan GIP 13/4"
Macam2 Sambungan GIP 2"
Macam2 Sambungan GIP 2 1/2"
Macam2 Sambungan GIP 3"
Macam2 Sambungan GIP 4"
Pipa PVC RUCIKA type AW 1/2"
Pipa PVC RUCIKA type AW 3/4"
Pipa PVC RUCIKA type AW 1"
Pipa PVC RUCIKA type AW 1 1/4"
Pipa PVC RUCIKA type AW 1 1/2"
Pipa PVC RUCIKA type AW 2"
Pipa PVC RUCIKA type AW 2 1/2"
Pipa PVC RUCIKA type AW 3"
Pipa PVC RUCIKA type AW 4"
Pipa PVC RUCIKA type AW 6"
Pipa PVC RUCIKA type AW 8"
Pipa PVC MASPION ABU 1/2" (AW)
Pipa PVC MASPION ABU 3/4" (AW)
Pipa PVC MASPION ABU 1" (AW)
Pipa PVC MASPION ABU 1 1/4" (AW)
Pipa PVC MASPION ABU 1 1/2" (AW)
Pipa PVC MASPION ABU 2" (AW)
Pipa PVC MASPION ABU 2 1/2" (AW)
Pipa PVC MASPION ABU 3" (AW)
Pipa PVC MASPION ABU 4" (AW)
Pipa PVC MASPION ABU 6" (AW)
Pipa GI Diameter 0,5"
Pipa GI Diameter 0,75"
Pipa GI Diameter 1"
Pipa GI Diameter 1,25"
Pipa GI Diameter 1,5"
Pipa GI Diameter 2"
Pipa GI Diameter 2,5"
Pipa GI Diameter 3"
Pipa GI Diameter 4"
Knie PVC Diameter 0,5"
Knie PVC Diameter 0,75"
Knie PVC Diameter 1"
Knie PVC Diameter 2"
Knie PVC Diameter 3"
Knie PVC Diameter 4"
Tee PVC Diameter 0,5"

Tee PVC Diameter 0,75"


Tee PVC Diameter 1"
Tee PVC Diameter 2"
Tee PVC Diameter 3"
Tee PVC Diameter 4"
Kran Diameter 0,5"
Fiet Kran Diameter 0,5"
Fiet Kran Diameter 0,75"
Fiet Kran Diameter 1"
Fiet Kran Diameter 2"
Fiet Kran Diameter 3"
Fiet Kran Diameter 4"
Macam2 Sambungan Paralon 1/2"
Macam2 Sambungan Paralon 3/4"
Macam2 Sambungan Paralon 1"
Macam2 Sambungan Paralon 1 1/4"
Macam2 Sambungan Paralon 1 1/2"
Macam2 Sambungan Paralon 1 3/4"
Macam2 Sambungan Paralon 2"
Macam2 Samb. Paralon 2 1/2"
Macam2 Samb. Paralon 3"
Macam2 Samb. Paralon 4"
Sambungan Pipa PVC Jenis AW 4 " TY
Lem Paralon
Solatip Leideng
Pipa PVC 4" berlobang jenis AW
BAHAN SANITAIR
Stop Kran 1/2 " KIT
Stop Kran 3/4 " KIT
Stop Kran 1 " KIT
Stop Kran 1 1/2 " KIT
Stop Kran 2 " KIT
Stop Kran 2 1/2" KIT
Stop Kran 3 " KIT
Fiet kran 3/4"
Fiet kran 1"
Fiet kran 2"
Fiet kran 3"
Fiet kran 4"
Lem Paralon
Double Neple 1/2 "
Water Mur 1/2 "
Gate Walve 1/2 "
Saringan Air Lt KM Stainless Steel

Apooer Bath Tube


Kran stain less Lokal Kait
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2 "
Kran Tembok ITAP dia. 1/2 "
Kran Bebek Sun Eui 1/2 "
Kran Bebek ITAP 1/2 "
Kran Panas Dingin San Eui Standard
Bath Cape Washteren
Tempat Sabun Poslin
Wastafel Lengkap TOTO LW 230
Wastafel Lengkap INA
Closet Duduk Poslin (INA) Lengkap
Closet Jongkok Poslin (INA)
Closet Jongkok Teraso
Closet Jongkok Poslin warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
Closet Duduk Warna Standard TOTO C 240 Lengkap
Wastafel Bulat Warna Standard Lengkap
Closet Duduk Warna Standard lengkap INA
Urinoar Lengkap TOTO Warna Standard lengkap
Penyekat Poslin Urinoar TOTO
Kitchen Zink Stainless Standard Lokal ( 1 Lobang )
Kitchen Zink Stainless Non Standard Franke ( 1 Lobang )
Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )
Selotip
Bak Mandi Teraso
Bak Mandi Fiber Glass 60 x 6
Floordrain stainless
Bak cuci piring
waterdrain

BAHAN PENUTUP ATAP


Atap Plastik Gelombang 80 x 180
Atap Fiber Glass Tipis 80 x 180 (gelombang)
Atap Fiber Glass Tebal 80 x 180 (gelombang)
Atap Aluminium Natural USR 26 ( JAINDO )
Atap Aluminium Warna USR 26 ( JAINDO )
Atap Asbes Gel. Kecil 4 mm 80 x 180
Bubung Asbes
Atap Asbes Gel. 4 mm 90 x 180
Atap Asbes Gel. 5 mm 90 x 180

Atap Asbes Gel. Besar 5 mm 90 x 240


Atap Tegola Kubota, lengkap
Atap Multiroof
Atap Tegola Kwalitas Sedang
Aluminium foile
Atap Genteng Plentong pres Bakar KW 1
Atap Genteng Plentong pres Molen Oven KW1
Atap Genteng Flam pres Molen Oven Jatiwangi
Genting Morando
Bubung Genteng pres Bulat Ex Jatiwangi
Genteng Bubungan Ex Jatiwangi Segi Tiga
Genteng Bubungan Beton
Genteng Beton Warna 14,5/m2
Genteng Beton Natural
Genteng Metal ( Rainbow Roof )
Genteng Metal Hana
Nok Atas Metal ( Rainbow Roof )
Nok Atas Metal Hana
Nok Pinggir Metal ( Rainbow Roof )
Nok Pinggir Hana
Wall Flashing ( Rainbow Roof )
Wall Flashing Hana
Atap Genteng Beton Warna 14,5/m2
Genteng Beton Natural
Sirap Kelas I ( 80 / m2 )
Sirap
Genteng Keramik
Genteng Keramik Natural Intan 14,5 / m2
Genteng Keramik Glasur Standard 14,5 / m2
Genteng Keramik Glasur Special 14,5 / m2
Genteng Keramik Glasur Premium 14,5 / m2
Genteng Murando Natural 1m2 = 18 bh
Genteng Murando Glasur 1m2 = 20 bh
Genting Magas
Genteng Super Roof Multicolor
Bubung Murando Natural
Bubung Murando Glasur
Bubungan Genteng Keramik
Bubungan Genteng Palentong
Bubungan Genteng Murando
Bubungan asbes
Bubungan Genting Flam
Bubungan Genting Magas eks banjar
Bubungan Genteng Super Roof Multicolor
Genteng Aspal

Genteng Kodok
Bubungan Genteng Kodok
Seng plat
Seng gelombang
Spandek Gelombang Kecil
BAHAN MEKANIKAL
Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW )
Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW )
Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW )
Presure Tank kap. 500 liter lengkap
Hydran Box dalam Gedung (lengkap)
Fire House 1.5 x 30 m + nose
Exhouse Fan H 360 W 60 x 60 cm
Exhouse Fan H 380 W CFM 55 x 55 cm
Exhouse Fan H 100 W 40 x 40 cm
AC Split 3 PK Setara TOSHIBA
AC Split 2 PK Setara TOSHIBA
AC Split 1 PK Setara TOSHIBA
Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )
AC Split 1 PK Setara Canghong
AC Split 2 PK Setara Canghong
BAHAN ELEKTRIKAL
Kabel NYA 1x 1.5 Prima (1 rol = 50 m')
Kabel NYA 1x 2.5 Prima (1 rol = 50 m')
Kabel NYM 2 x 1.5 Prima (1 rol = 50 m')
Kabel NYM 3 x 1.5 Prima (1 rol = 50 m')
Kabel NYM 2 x 2.5 Prima (1 rol = 50 m')
Kabel NYM 3 x 2.5 Prima (1 rol = 50 m')
Kabel NYM 4 x 2.5 Prima (1 rol = 50 m')
Kabel NYM 2 x 4 Prima (1 rol = 50 m')
Kabel NYM 3 x 4 Prima (1 rol = 50 m')
Kabel NYM 4 x 4 Prima (1 rol = 50 m')
Kabel NYM 2 x 6 Prima (1 rol = 50 m')
Kabel NYM 3 x 6 Prima (1 rol = 50 m')
Kabel NYM 4 x 6 Prima (1 rol = 50 m')
Kabel NYM 2 x 10 Prima (1 rol = 50 m')
Kabel NYM 3 x 10 Prima (1 rol = 50 m')
Kabel NYM 4 x 10 Prima (1 rol = 50 m')
Kabel NYM 4 x 16 Supreme (1 rol = 50 m')
Kabel NYY 2 x 4 Prima (1 rol = 50 m')
Kabel NYY 3 x 4 Prima (1 rol = 50 m')
Kabel NYY 4 x 4 Prima (1 rol = 50 m')
Kabel NYY 2 x 6 Prima (1 rol = 50 m')

Kabel NYY 3 x 6 Prima (1 rol = 50 m')


Kabel NYY 4 x 6 Prima (1 rol = 50 m')
Kabel NYY 2 x 10 Prima (1 rol = 50 m')
Kabel NYY 3 x 10 Prima (1 rol = 50 m')
Kabel NYY 4 x 10 Prima (1 rol = 50 m')
Kabel NYY 4 x 16 Prima (1 rol = 50 m')
Kabel Tembaga
Kabel Tik 2 10 mm
NSFB FUJI EA - 100 A
NSFB FUJI EA - 150 A
Rumah Panel 30 x 60 cm (kosong)
Skring Kas 2 grop Biasa
Skring Kas 3 grop Biasa
Skring Kas 5 grop Biasa
MCB Mercury
MCB 1 PAS
MCB 3 PAS
Tahanan 50 A Merk Fuji
Saklar Tunggal Biasa
Saklar Ganda Biasa
Saklar Magnet 25 PK
Saklar Broko Tunggal Standard ( 1 Phase )
Saklar Broko Seri Standard ( 1 Phase )
Stop Kontak Biasa
Stop Kontak Putar
Stop Kontak Broko Standard ( 1 Phase )
Stop Kontak Broko 3 Phase ( Out Bow )
Stop Kontak Broko 3 Phase ( In Bow )
Stop Kontak Handle 3 Phase
Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat )
Lampu pijar 25 Watt s/d 100 Watt
Lampu Neon TL Philip 20 W
Lampu Neon TL Philip 40 W
Trapo TL 20 W ( Philip )
Trapo TL 40 W ( Philip )
Trapo TL 20 W ( Sinar )
Trapo TL 40 W ( Sinar )
Trapo Ballas
Stater Neon Philip
Stater Neon Biasa
Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan )
Down Light + SL 25 W
Lampu SL Philip 25 W
Lampu Sirkel TL 20 W Lengkap
Lampu Mercuri 80 W

Lampu Mercuri 250 W


Lampu Son 150 W
Lampu Taman + Tiang + Lampu 1 Buah
Lampu Baret 30 cm + Neon
Lampu Neon Arcrilik 2 x 40 W lengkap
Pentanahan Penangkal Petir
Pentanahan Panel
Pipa Penangkal Petir
Box Sekering
Box Lampu Mercury
Terminal Kabel
Tangkai Box lampu 3 m
Stainless steel
Capasitor
Link Buckle
Stoping Buckle
Wed Clem
Tiang Besi 7m
Ignitor SN
Tap Connector
Fitting Plafond
Bola Lampu
Tee Dos
Inbow Dos
Sock
Klem Conduit
Lastdop
Flexible Pipe
Eldow
Karduit Pipa 6/8'' C
BAHAN ALAT PENGANTUNG DAN KUNCI
Kunci Silinder ALFA untuk Pintu Alumunium
Tarikan Pintu
Kunci 2 Slaag ROYAL
Rel Henderson Lengkap
Rel Maraton I Pintu
Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226
Kunci 2 Slaag Ancor Asli
Kunci 2 Slaag ISO
Kunci KM Bulat Kualitas Biasa
Kunci KM Bulat Sekwalitas ALFA
Kunci 2 Slaag Silinder Utama Standard
Kunci Gembok
Kunci tanam Slaag Royal

Kunci tanam Slaag Ancor


Kunci 2 Slaag Kuda Terbang
Kunci Jendela
Espangolet
Grendel Hitam Biasa 15 cm
Grendel 15 cm
Grendel 5 cm biasa
Hak Angin Kait Jendela Biasa
Hak Angin Jendela Antik
Hak Angin Sendok Stainless / Kuningan
Nako Lengkap Tralis 1 Daun
Sloot Pintu berikut Rantai
Sloot Jendela Tunggal
Engsel Pintu Biasa
Engsel Pintu Unilon Standard
Engsel Jendela Biasa
Engsel Jendela Unilon
Engsel Patrun
Engsel Harmonika
Engsel Floring
Door Closer Kelas Standard ( Kelas Sedang )
Door Closer Kelas Standard ( Kelas Baik )
Door Closer Kelas Rendah
Tarikan Almari Rata - rata
Seng BJLS 30 lebar 60cm (1 rol 50 m' )
Seng BJLS 30 lebar 90cm (1 rol 50 m' )
Reiling Tangga Stainlessteel
Kunci tanam antik
Engsel angin
Kunci Lemari
BAHAN PENGIKAT UNTUK KONTRUKSI JALAN
Hotmix Jadi berikut alat dan bahan bakar ( T = 5 cm => 9 m2 )
Aspal ( ESO ) 1 Drum 150 Kg
Aspal Curah
Aspal RC 70 ( Cilacap )
Aspal Bitumen * M061
As Buton *M062
Minyak Fluk *M063
Minyak Aspal *M064
Minyak Tanah *M065
BAHAN PENGHISAP AIR SUMUR DALAM
Pompa Kodok
Pompa Dragon Tegal

Pompa Dragon Asli


Mesin Pompa Air 100 W - Sanyo
Mesin Pompa Air 150 W - Sanyo
Pompa Zet pump 250 W - Sanyo
Pompa Zet pump 450 W - Sanyo
Pompa Submersible kap. 150 liter/menit 3 kW
Gear Pump kap. 60 liter/menit
Deep Well dengan kelengkapannya kap. 150 liter/menit
Hand Oil Pump
BAHAN PENAMPUNG AIR
Tangki Air Fiber Glass 0.5 m3 ( Excel )
Tangki Air Fiber Glass 1 m3 ( Excel )
Tangki Air Fiber Glass 2 m3 ( Excel )
Bak Taraso WC 40 x 40
Bak KM Taraso 60 x 60
BIAYA QUALITY CONTROL , IZIN - IZIN, PENGUKURAN
DAN BIAYA PENYAMBUNGAN
Penyambungan Listrik PLN
IMB Bertingkat Rata - rata (Rumah )
IMB Bertingkat Rata - rata (Kantor)
IMB tidak bertingkat Rata - rata (Rumah / Kantor)
IMB Bertingkat Rata - rata (untuk Usaha)
IMB tidak bertingkat Rata - rata (untuk Usaha)
Sondir Rata - rata
Pengukuran Site + Patok
Biaya Tes Jalan ( quality control )
Biaya Tes 1 Macam Beton
Biaya Pengujian Bahan Agregat
Biaya Pengujian Listrik + gambar + trafo & Adm
Izin Sumur Artesis Lengkap
Penyambungan PDAM untuk rumah
Geolistrik
Geolistrik
ALAT TUKANG.
Palu 0,5 kg
Cangkul
Singkup
Sekrop
Pengki
Linggis
Rool Meter 30 meter ( Bahan Plastik )
Rool Meter 5 meter ( Bahan Besi )

Selang Plastik untuk Water Pas dia. 0.5 cm


Water Pas Alumuniumm 60 cm
STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK
TRUK, KENDARAAN RODA 4 & LAINNYA
Sewa Mesin Gilas 8 Ton s/d 10 ton
Tirud Roller 3 Jam / hari
Tamdam Roller 6 - 8 Ton 5 Jam / hr
Tamdam Roller 8 - 10 Ton 5 Jam / hr
Roller Viberator - Ped 1 Ton 4 Jam /hr
Roller Viberator - Self 7 Ton 5 Jam /hr
Roller 3 Wheeled - 8 Ton 5 Jam /hr
Roller Pneumatic 8 - 15 Ton 5 Jam /hr
Loader Wheeled 5 Jam /hr
Sewa Kran 30 Ton
Sewa Exavator Backhoe 5 Jam /hari
Sewa Draklint
Whell Loader
Buldozer 4 Jam /hr
Ecavator Hydr 1 m3
Backu
Motor Grader 5 Jam /hr
Pheumatic Drill Hammer 3 Jam / hr
Vibro Roller
Stone Crusher
AMP
Teractor Equament 2 Jam /hr
Screning Plent 5 Jam /hr
Asphal Finisher
Asphal Melting Kalte
Asphal Spayer
Asphal MIxing Plant
Sprayer,Self - Prop. 10001 4 Jam/hr
Stamper, Viberator Plate 3 Jam /hari
Crusher / SCR
Concrete Mixer 0.125 m3
Concrete Mixer 0.5 m3
Concrete Viberator
Pick Up
Dump Truck 3.5 Ton
Dump Truck 5 Ton 4 Jam /hr
Flatbed Truck 3.5 Ton
Truck 3/4 ( Colt Disel )
Truck Fuso
Mesin Las Listrik 18 pk 8 jam

Mesin Pompa Air 3 "


Stamper 8 Jam
Compresor Air
Pump Water ( 5 cm ) 30 m3 / hari
Trailler, Towed 1 Ton 3 Jam/hr
Water Tank Truck 2 Jam/hr
BAHAN BAKAR DAN PELUMAS
Minyak Tanah
Kapur Bakar *M081
Kayu Bakar *M070
Bahan Bakar Residu
Minyak Solar
Bensin Premium
Plus Oil
Minyak Pelumas
Elpiji / botol
Asitilin / botol
Angin ( 02 ) / botol
Kawat Las Listrik
Karbit
Aspal
Aspal Kemas Pand Grade 60/70
Pintu Air Sorong 50 x 50 cm
Pintu Air Double Stang 1 x 2 Meter
Pintu Air Double Stang 1,5 x 2 Meter
Pintu Air Double Stang 1 x 2,5 Meter
Pintu Air Double Stang 1,5 x 2,5 Meter
Pintu Air Stang Tunggal 1x 1,5 Meter
Pintu Air Stang Tunggal 0,5 x 1 Meter
BAHAN FASILITAS LALU LINTAS
Rambu Jalan Uk. 45 x 45 cm
Rambu Jalan Uk. 60 x 60 cm
Rambu Jalan Uk. 70 x 70 cm
RPPJ Uk. 105 x 140 cm
RPPJ Uk. 120 x 160 cm
Pagar Pengaman Jalan
Marka Jalan (Road Marking) Uk. 0,2 x 12 cm
Paku Marka uk. 2 x 10 x 10 cm
Paku Marka uk. 2 x 10 x 12 cm
Apill (Trafic Light)-Simpang Tiga
Apill (Trafic Light)-Simpang Empat
Lampu Peringatan (Warning Light)
Patok Tikungan (dilineator) bahan plastik

Patok Tikungan (dilineator) pipa besi


Cermin Tikungan
Kerucut Lalu Lintas Uk. 90 cm
Kerucut Lalu Lintas Uk. 75 cm
Kerucut Lalu Lintas Uk. 60 cm
Timbangan Portable
Peralatan PKB otomatik
Peralatan PKB semi otomatik
Peralatan Uji Pemeriksaan dan Pengawasan Kb di Jalan

BAHAN

AR

SAT

HARGA SAT.
Rp.

m
m
m
m
m
m
kg
m
m
m
m
m
m
m
m
m
m
m
bh
bh
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

100,000.00
100,000.00
100,000.00
100,000.00
110,000.00
125,000.00

225,000.00
225,000.00
225,000.00
225,000.00
225,000.00
225,000.00
225,000.00
350,000.00
225,000.00
125,000.00
125,000.00

400.00

78.57

m
m
m
bh
bh
bh
m
bh
bh
zak
Kg
zak
bh
m
m
m
m
kg
kg
m
m
m
bh
bh
bh
bh
m2
m2
m2
m3
m3
m3

kg
kg
Kg
lt
kg
lt
kg
kg
kg
kg

25,000.00
25,000.00

57,000.00
1,140.00
45,000.00

2,000.00
125,000.00
20,000.00

125,000.00

85,000.00

20,000.00

2720
25,000.00
35,000.00

kg
lt
kg
kg
ml
bh
bh
bh
5 lt
kg
m
m
bh
bh
kg
bks
bks
lt
kg
kg
kg
kg
lt
lt
lt
kg
kg
kg
kg
kg
lbr
kg
kg
kg
kg
kg
kg
kg
kg
bh
kg
bh
kg
Lbr
L

65,000.00
25,000.00
5,000.00
5,000.00

L
L
kg
kg
kg
kg

bt
bt
bt
bt
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
bt
bt
m1
m1
m1

85,000.00

2,800,000.00
2,800,000.00
7,250,000.00
7,250,000.00

2,750,000.00

m1
m1
m1
m1
m
m1
m1
m1
m1
kg
m
m
m2
m3

m
lbr
m
lbr
lbr
lbr
lbr

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m
m
m
m
lbr
lbr
lbr
lbr
lbr

5,000.00
2,750,000.00

75,000.00

54000

2.88
0.18
0

16

lbr
lbr
lbr
m
m
lbr
lbr
lbr
lbr
lbr

bh
bh
bh
bh
bh
bh
bh
dus
dus
bh
bh
bh
bh
m
m
m
m
m
m
m
m
m
m
m
m
m
dus
dus
m
m
m
bh
m'

2.88
0

125,000.00

82.6446281

95,000.00

0.16

120,000.00

6.25

m
bh
m
m
m
m
m
m
m
m
m
bh
ltr
m
m'
bh
m2
m2
m
m
m
bh
bh
m

0.36 2.7777777778
0.16
6.25

120,000.00

12,000.00
300,000.00

m1
m1
m1
m1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg

kg

10,000.00

8760

0
0

kg
m
m
kg
m1
m1
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m
m
m
m
m
m
kg
m
m
kg
kg
m
bt
bt
m
m
m
m
m
m
m1
m1
m1
m
m
m
m

30,000.00

bh
ps
m1
m1
m1
kg
kg
kg
kg
kg
kg
kg
m2
m2
m
unt
unt
m2
m2
m
buah
tube
kg

m
m
m
m
m
m
m
m
m
m
m
bh
bh
m

kg
kg
kg

1.44

130,000.00

20,000.00
20,000.00

kg
kg
kg
kg
bh
kg
kg
kg
kg
kg
bh
bh
bh
bh
kg
kg
kg
1.
bt
bt
bt
bt
bt
bt
bt
bt
bh
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh

20,000.00

25,000.00

156000
258000
0

225,000.00

1140000

bh
bh
bh
bh
bh
bh
bh
bh
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh

120,000.00

24000

300,000.00

56000
78400
110000
159000
244800

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
gl
m1

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

75,000.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
bh
unit
unit
set
bh
bh
unit
unit
unit
unit
unit
bh
unit
lbr
bh
bh
bh
bh
bh
bh
bh
bh
bh

lbr
lbr
lbr
m
m
lbr
lbr
lbr
lbr

400,000.00

5,000.00

25,000.00

lbr
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m1
m1
bh
m1
m1
m1
m
m
ikat
m
bh
m
m
m
m
bh
bh
bh
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

20,000.00

120,000.00

bh
bh
lbr
lbr
m

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1 BTU
unit
unit
1.5
ROLL
ROLL
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

65,000.00
75,000.00

m'
m'
m'
m'
m'
m'
Kg
m'
bh
bh
unt
unt
unt
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

bh
bh
bh
bh
bh
ttk
ttk
bh
set
bh
bh
bh
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'

bh
bh
bh
bh
unt
bh
bh
bh
bh
bh
bh
bh
bh

250,000.00

150,000.00

bh
bh
bh
ps
bh
bh
bh
ps
ps
bh
dn
bh
bh
bh
ps
bh
ps
ps
m1
unit
unt
unt
unt
bh
m1
m1
m'
Bh
Bh
bh

ton
kg
kg
kg
kg
kg
Lt
Lt
Lt

unit
unit

75,000.00

54,500
68250
90500

272,500
350,000
452,500

unit
unit
unit
unit
unit
unit
unit
unit
unit

bh
bh
bh
bh
bh

1w
m
m
m
m
m
1 ttk
m
ttk
1 spl
1 spl
1 watt
unit
unit
1 ttk
1 ttk

bh
bh
bh
bh
bh
bh
bh
bh

bh
bh

hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
jam
jam
hari
hari
hari
jam
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari

0.25

218,000

0.25
0.25

hari
hari
hari
hari
hari
hari

lt
m
m
lt
lt
lt
lt
lt
15 kg
15.1 kg
btl
kg
kg
ltr
Drum

bh
bh
bh
bh
bh
bh
m
bh
bh
unit
unit
unit
bh

273,000
362,000

10,000.00

46,250
48,750
626,424,000

231,250
243,750
3,132,120,000

bh
unit
bh
bh
bh
unit
unit
unit
unit

22

0
0

1,075,000

54,500

270,000 270000

68,250
90,500

350,000 350000
450,000 900000

DAFTAR SATUAN UPAH


NO.

JENIS PEKERJA BANGUNAN

kode
PK01

PEKERJA

PK02

PEKERJA SETENGAH TERAMPIL

PK03

PEKERJA TERAMPIL

PK03A

TUKANG GALI

PK04

TUKANG BATU SETENGAH TERAMPIL

PK05

TUKANG BATU TERAMPIL

PK06

KEPALA TUKANG BATU

PK07

TUKANG KAYU SETENGAH TERAMPIL

PK08

TUKANG KAYU TERAMPIL

PK09

10

KEPALA TUKANG KAYU

PK10

11

TUKANG CAT / PELITUR SETENGAH TERAMPIL

PK11

12

TUKANG CAT / PELITUR TERAMPIL

PK12

13

KEPALA TUKANG CAT / PELITUR

PK13

14

TUKANG BESI BETON SETENGAH TERAMPIL

PK14

15

TUKANG BESI BETON TERAMPIL

PK15

16

KEPALA TUKANG BESI BETON

PK16

17

TUKANG BESI PROFIL SETENGAH TERAMPIL

PK17

18

TUKANG BESI PROFIL TERAMPIL

PK18

19

KEPALA TUKANG BESI PROFIL

PK19

20

MANDOR

PK20

21

OPERATOR MEKANIK

PK21

22

PEMBANTU OPERATOR / MEKANIK

23

OPERATOR ALAT BERAT TERLATIH

PK22

24

SUPIR TRUK

PK23

25

KENEK TRUK

PK24

26

PENJAGA MALAM

PK25

27

TUKANG ASPAL

L.101

28

BURUH LAPANGAN TAK TERLATIH

L.103

29

BURUH LAPANGAN KURANG TERLATIH

L.106

30
31

BURUH LAPANGAN TERLATIH


TUKANG LAS KONSTRUKSI

32

TUKANG KHUSUS ALUMUNIUM

SATUAN UPAH PEKERJA


HARGA UPAH
Rp.

SATUAN WAKTU

80,000

1 ORANG/ HR/ 8 JAM

80,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

95,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM

100,000

1 ORANG/ HR/ 8 JAM

95,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM

100,000

1 ORANG/ HR/ 8 JAM

95,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

115,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

crystal palace
norwich
sheffield
canbur
rayo vallecano
barcelona over 3
carvi 0.05
citadella 0.05

Anda mungkin juga menyukai