Harga Satuan
No Uraian Satuan Volume Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6
A SARANA SANITASI
1 Bilik Luar + Saptictank + Resapan + Grease Trap ( Design Tipical 1) Unit 6,00 11.393.000,00 68.358.000,00
2 Bilik Dalam + Saptictank + Resapan + Grease Trap ( Design Tipical 2) Unit 39,00 10.668.000,00 416.052.000,00
I BAHAN
1 Buis Dia 80 uk. 0,5 m 135,00 129,00 bh 176.500,00 22.768.500 22.768.500
2 Pasir Pasang 85,59 86,00 M3 310.000,00 26.660.000 26.660.000
3 Kerikil (maksimum 30 mm) 45,29 45,00 M3 275.000,00 12.375.000 12.375.000
4 Batu Belah 32,25 32,00 M3 160.000,00 5.120.000 5.120.000
5 Semen Portland 846,56 847,00 ZAK 52.000,00 44.044.000 44.044.000
6 Plastik cor 408,24 408,00 M2 1.900,00 775.200 775.200
7 Bata Merah 31.232,25 31.232,00 bh 700,00 21.862.400 21.862.400
8 Besi die 8 2.293,78 466,00 btg 60.000,00 27.960.000 27.960.000
9 Besi die 6 532,59 179,00 btg 35.000,00 6.265.000 6.265.000
10 Besi die 10 1.326,34 187,00 btg 84.500,00 15.801.500 15.801.500
11 Kawat Beton 62,08 62,00 KG 24.000,00 1.488.000 1.488.000
12 Kayu kelas III (4x pakai) 1,18 1,00 M3 2.300.000,00 2.300.000 2.300.000
13 Kaso 5/7 2,24 2,00 M3 135.000,00 270.000 270.000
14 Paku 5 cm - 10 cm 61,79 62,00 KG 23.000,00 1.426.000 1.426.000
15 Plywood tebal 9 mm 22,50 22,00 LBR 138.000,00 3.036.000 3.036.000
16 Papan 2/15 2,15 2,00 m3/lbr 8.950,00 17.900 17.900
17 Keramik 59,40 59,00 BH 63.800,00 3.764.200 3.764.200
18 Semen Warna 89,10 89,00 Kg 16.000,00 1.424.000 1.424.000
19 Plamuur 89,24 89,00 Kg 19.500,00 1.735.500 1.735.500
20 Cat dasar 89,24 89,00 Kg 24.000,00 2.136.000 2.136.000
21 Cat penutup 232,01 232,00 KG 34.000,00 7.888.000 7.888.000
22 Ijuk 10,60 11,00 KG 32.000,00 352.000 352.000
23 Floor Drain 45,00 45,00 BH 15.000,00 675.000 675.000
24 Closet Jongkok 45,00 45,00 BH 190.000 8.550.000 8.550.000
25 Pintu Aluminium 45,00 45,00 BH 325.000,00 14.625.000 14.625.000
26 Penutup Atap Spandek 0,3 mm 44,69 45,00 M2 37.000,00 1.665.000 1.665.000
27 Paku sekrup 336,00 336,00 BH 900,00 302.400 302.400
28 Baja Ringan C.75.75 tebal 0.55 17,92 18,00 btg 93.000,00 1.674.000 1.674.000
29 Dyna bolt 33,60 41,00 BH 2.000,00 82.000 82.000
30 Pipa galvanis 1-1/4” 108,00 108,00 M 26.800,00 2.894.400 2.894.400
31 Pipa PVC Ø 3" D 216,00 216,00 M 28.000,00 6.048.000 6.048.000
32 Pipa PVC Ø 2" D 216,00 216,00 M 20.000,00 4.320.000 4.320.000
33 Pipa PVC Ø 1/2" D 216,00 216,00 M 7.000,00 1.512.000 1.512.000
34 Kran Air Ø 1/2" 45,00 45,00 bh 19.400,00 873.000 873.000
35 Fitting Lampu 50,00 50,00 bh 6.000,00 300.000 300.000
36 Lampu 5 watt 51,00 51,00 bh 10.000,00 510.000 510.000
37 Kabel NYM 2x1,5mm 44,00 44,00 m 5.000,00 220.000 220.000
38 Sakelar Tunggal 51,00 51,00 bh 15.000,00 765.000 765.000
35 Bekas Botol Air Mineral 14.175,00 14.175,00 set 2.000,00 28.350.000 28.350.000
36 Grease Trap Precast 45,00 45,00 unit 230.000,00 10.350.000 10.350.000
37 Elbow PVC AW Ø 2" 90,00 90,00 bh 12.000,00 1.080.000 1.080.000
38 Tee PVC AW Ø 2" 45,00 45,00 bh 12.000,00 540.000 540.000
39 Tee PVC AW Ø 3" 45,00 45,00 bh 16.000,00 720.000 720.000
40 Tee GIP dia 1-1/4" 45,00 45,00 bh 25.000,00 1.125.000 1.125.000
41 Tutup Buis Beton dia. 80 (precast) 45,00 45,00 bh 86.000,00 3.870.000 3.870.000
42 Manhole 30 90,00 90,00 bh 80.000,00 7.200.000 7.200.000
44 Prasasti Uk 20x30 45,00 45,00 Unit 60.000,00 2.700.000 2.700.000
310.420.000 310.420.000 62,08%
II ALAT
- -
III UPAH
1 Pekerja 1.131,59 1.111,00 HOK 90.000,00 99.990.000 99.990.000
2 Tukang 740,32 740,00 HOK 100.000,00 74.000.000 74.000.000
Sub Jumlah I 22.225.320,00 76.303.800,00 0,00 98.529.120,00 0,00 0,00 0,00 0,00 0,00 95.829.120,00 95.829.120,00
HARGA SATUAN JUMLAH KONSTRIBUSI MASYARAKAT BIAYA
JUMLAH BANTUAN TOTAL PROYEK
NO. URAIAN PEKERJAAN. SAT VOL. UPAH BAHAN ALAT TOTAL UPAH BAHAN ALAT TOTAL UPAH BAHAN ALAT TOTAL BOP
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
II PEKERJAAN SEPTICTANK TYPE 1 (1-5 Jiwa)
1 Galian Tanah Biasa 1 m m3 97,20 65.000,00 0,00 65.000,00 6.318.000,00 - - 6.318.000,00 - - - - - 6.318.000,00 6.318.000,00
2 Plat Tutup Beton ( tb. 10 cm ) 0,00 0,00 - -
a. Pembesian kg 303,72 1.330,00 14.235,00 15.565,00 403.954,10 4.323.523,81 - 4.727.477,91 - - - - - 4.727.477,91 4.727.477,91
b. Beton Campuran 1PC : 2Ps : 3Kr m3 5,61 185.000,00 911.221,75 1.096.221,75 1.038.689,44 5.116.088,66 - 6.154.778,10 - - - - - 6.154.778,10 6.154.778,10
3 Bekisting Plat Tutup Beton ( tb. 10 cm ) (1x pakai) m2 29,40 92.400,00 146.750,00 239.150,00 2.716.560,00 4.314.450,00 - 7.031.010,00 - - - - - 7.031.010,00 7.031.010,00
4 Tangki Septik Beton ( tb. 10 cm ) 0,00 0,00 - -
a. Pembesian kg 1.847,96 1.330,00 14.235,00 15.565,00 2.457.788,42 26.305.727,91 - 28.763.516,33 - - - - - 28.763.516,33 28.763.516,33
b. Beton Campuran 1PC : 2Ps : 3Kr m3 35,36 185.000,00 911.221,75 1.096.221,75 6.541.785,00 32.221.712,16 - 38.763.497,16 - - - - - 38.763.497,16 38.763.497,16
5 Bekisting Tangki Septik Beton ( tb. 10 cm ) (1x pakai) m2 34,88 92.400,00 121.250,00 213.650,00 3.222.450,00 4.228.593,75 - 7.451.043,75 - - - - - 7.451.043,75 7.451.043,75
Dinding Sekat tb. 6 cm 0,00 0,00 - -
a. Pembesian kg 208,27 1.330,00 14.235,00 15.565,00 276.997,10 2.964.702,04 - 3.241.699,14 - - - - - 3.241.699,14 3.241.699,14
b. Beton Campuran 1PC : 2Ps : 3Kr m3 2,38 185.000,00 911.221,75 1.096.221,75 439.560,00 2.165.062,87 - 2.604.622,87 - - - - - 2.604.622,87 2.604.622,87
Bekisting Dinding Sekat m2 86,40 50.400,00 58.100,00 108.500,00 4.354.560,00 5.019.840,00 - 9.374.400,00 - - - - - 9.374.400,00 9.374.400,00
6 Pipa Ventilasi Udara GIP dia 1-1/4" m' 90,00 13.860,00 32.040,00 45.900,00 1.247.400,00 2.883.600,00 - 4.131.000,00 - - - - - 4.131.000,00 4.131.000,00
7 Tee GIP dia 1-1/4" bh 45,00 0,00 25.000,00 25.000,00 - 1.125.000,00 - 1.125.000,00 - - - - - 1.125.000,00 1.125.000,00
8 Plastik m2 388,80 720,00 2.100,00 2.820,00 279.936,00 816.480,00 - 1.096.416,00 - - - - - 1.096.416,00 1.096.416,00
9 Tutup manhole dia. 30 cm tebal 10 cm (precast) BH 90,00 0,00 80.000,00 80.000,00 - 7.200.000,00 - 7.200.000,00 - - - - - 7.200.000,00 7.200.000,00
Sub Jumlah II 29.297.680,06 98.684.781,20 0,00 127.982.461,26 0,00 0,00 0,00 0,00 0,00 127.982.461,26 127.982.461,26
III PEKERJAAN RESAPAN
1 Galian Tanah Biasa m3 52,99 63.000,00 63.000,00 3.338.212,50 - - 3.338.212,50 - - - - - 3.338.212,50 3.338.212,50
2 Pas. Buis Beton dia 80 bh 135,00 18.000,00 175.000,00 193.000,00 2.430.000,00 23.625.000,00 - 26.055.000,00 - - - - - 26.055.000,00 26.055.000,00
3 Tutup Buis Beton dia. 80 (precast) bh 45,00 86.000,00 86.000,00 - 3.870.000,00 - 3.870.000,00 - - - - - 3.870.000,00 3.870.000,00
4 Pas Batu Kosong m3 7,07 74.100,00 202.000,00 276.100,00 523.516,50 1.427.130,00 - 1.950.646,50 - - - - - 1.950.646,50 1.950.646,50
5 Pas Batu Split m3 3,53 73.200,00 324.500,00 397.700,00 258.579,00 1.146.296,25 - 1.404.875,25 - - - - - 1.404.875,25 1.404.875,25
6 Pemasangan Ijuk t.10 cm kg 1,77 13.500,00 204.000,00 217.500,00 23.844,38 360.315,00 - 384.159,38 - - - - - 384.159,38 384.159,38
Sub Jumlah III 6.574.152,38 30.428.741,25 0,00 37.002.893,63 0,00 0,00 0,00 0,00 0,00 37.002.893,63 37.002.893,63
Jumlah Total 147.558.244,13 336.856.367,76 0,00 484.414.611,89 0,00 0,00 0,00 0,00 15.590.000,00 500.004.602,79 500.004.602,79
Pembulatan 147.558.240,00 336.856.367,00 0,00 484.414.607,00 0,00 0,00 0,00 0,00 15.590.000,00 500.004.607,00 500.004.600,00
Persentase Biaya 29,51% 67,37% 0,00% 96,88% 0,00% 0,00% 0,00% 0,00% 3,12% 100,00% 100,00%
RENCANA ANGGARAN BIAYA PER UNIT TYPE 1
SANITASI PERDESAAN PADAT KARYA TAHAP I TA. 2022
Jumlah
Total
NO. URAIAN PEKERJAAN. SAT Panjang Lebar Tinggi Jumlah Bang. : 1
Volume
Unit
Jumlah
Total
NO. URAIAN PEKERJAAN. SAT Panjang Lebar Tinggi Jumlah Bang. : 6
Volume
Unit
Jumlah
Total
NO. URAIAN PEKERJAAN. SAT Panjang Lebar Tinggi Jumlah Bang. : 1
Volume
Unit
Jumlah
Total
NO. URAIAN PEKERJAAN. SAT Panjang Lebar Tinggi Jumlah Bang. : 39
Volume
Unit
HARGA
URAIAN KEGIATAN VOL SATUAN JUMLAH
NO SATUAN
1 ALAT TULIS KANTOR (ATK) TERMASUK MATERAI : 1 ls Rp 855.000 Rp 855.000
2 PEMBUATAN DOKUMEN LPJ KSM (Cetak, Foto Copy, Jilid)1 ls Rp 6.000.000 Rp 6.000.000
3 ALAT PELINDUNG DIRI DAN KESELAMATAN KERJA (APD K3) 1 ls Rp 3.620.000 Rp 3.620.000
4 KAMPANYE PHBS 1 ls Rp 2.775.000 Rp 2.775.000
5 KEGIATAN REMBUK WARGA 1 ls Rp 1.200.000 Rp 1.200.000
6 MEDIA INFORMASI PELAKSANAAN KEGIATAN 1 ls Rp 390.000 Rp 390.000
7 TRANSPORT KSM 1 ls Rp 750.000 Rp 750.000