RINCIAN PENAWARAN BIAYA
KONSULTAN PENGENDALI MUTU INDEPENDEN (PMI)
KONSTRUKSI JALAN TOL
RUAS PEKANBARU - PADANG SEKSI SICINCIN-PADANG
3
BLP #REF!
BLNP #REF!
5,486,900,000.00
Tahun 1 Tahun 2
5,075,160,000.0
382,034,842 380,522,928
25% 12%
6% 3%
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JADWAL PELAKSANAAN PEKERJAAN
KONSULTAN PENGENDALI MUTU INDEPENDEN (PMI) KONSTRUKSI JALAN TOL
RUAS PEKANBARU - PADANG SEKSI SICINCIN-PADANG
365
September-23 October-23 November-23 December-23 January-24 February-24 March-24 April-24 May-24 June-24 July-24 August-24
M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25 M-26 M-27 M-28 M-29 M-30 M-31 M-32 M-33 M-34 M-35 M-36 M-37 M-38 M-39 M-40 M-41 M-42 M-43 M-44 M-45 M-46 M-47 M-48
Bobot
Jenis Barang/Jasa Set Volume 05/09 12/09 19/09 26/09 05/10 12/10 19/10 26/10 04/11 11/11 18/11 25/11 04/12 11/12 18/12 25/12 03/01 10/01 17/01 24/01 02/02 09/02 16/02 23/02 03/03 10/03 17/03 24/03 02/04 09/04 16/04 23/04 02/05 09/05 16/05 23/05 01/06 08/06 15/06 22/06 01/07 08/07 15/07 22/07 31/07 07/08 14/08 21/08 KET
(%)
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd
11/09 18/09 25/09 04/10 11/10 18/10 25/10 03/11 10/11 17/11 24/11 03/12 10/12 17/12 24/12 02/01 09/01 16/01 23/01 01/02 08/02 15/02 22/02 02/03 09/03 16/03 23/03 01/04 08/04 15/04 22/04 01/05 08/05 15/05 22/05 31/05 07/06 14/06 21/06 30/06 07/07 14/07 21/07 30/07 06/08 13/08 20/08 29/08
Tenaga Ahli
100%
Team Leader OB 12.00 9.486 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237 0.184 0.184 0.184 0.237
Ahli Quality Assurance OB 12.00 8.765 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219
Ahli Quality Control OB 12.00 8.765 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219 0.170 0.170 0.170 0.219
Ahli Teknik Jalan OB 12.00 7.685 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192
90%
Ahli Jembatan OB 12.00 7.685 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192
Ahli K3 Konstruksi OB 12.00 7.685 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192
Ahli BIM Specialist/Geodesi OB 12.00 7.685 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192 0.149 0.149 0.149 0.192
Asisten Tenaga Ahli Jalan OB 12.00 3.464 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087
Asisten Ahli Teknik Jembatan OB 12.00 3.464 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087
Asisten Ahli K3 Konstruksi OB 12.00 3.464 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 0.067 0.067 0.067 0.087 70%
Tenaga Pendukung
Drafter OB 12.00 2.887 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072 0.056 0.056 0.056 0.072
Sekretaris OB 12.00 1.837 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 0.036 0.036 0.036 0.046 60%
Operator OB 12.00 1.575 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039 0.031 0.031 0.031 0.039
Pengemudi -1 OB 24.00 2.257 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056 0.044 0.044 0.044 0.056
Pesuruh Kantor OB 12.00 1.050 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026
50%
Biaya Langsung Non Personil
Sewa Kantor termasuk furniture m2 1,224 3.685 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092 0.072 0.072 0.072 0.092
Sewa Komputer PC-1 Unit.Bln 24.00 0.656 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016 0.013 0.013 0.013 0.016
Sewa Laptop Unit.Bln 36.00 1.653 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041 0.032 0.032 0.032 0.041
40%
Sewa Printer Color Laser Jet A-4 Unit.Bln 12.00 0.198 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005
Sewa Printer Color A-3 Unit.Bln 12.00 0.221 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006 0.004 0.004 0.004 0.006
Sewa Scanner Color A-4 Unit.Bln 12.00 0.105 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003 0.002 0.002 0.002 0.003
Sewa Scanner Color A-3 Unit.Bln 12.00 0.140 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
30%
Sewa Kendaraan Roda 4 -1 Unit.Bln 24.00 8.530 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213 0.166 0.166 0.166 0.213
Sewa mesin fotokopi Unit.Bln 12.00 0.699 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017 0.014 0.014 0.014 0.017
Alat Tulis Kantor Bulan 12.00 0.816 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020 0.016 0.016 0.016 0.020
Bahan Komputer Bulan 12.00 0.583 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015 0.011 0.011 0.011 0.015
Komunikasi/ Internet/ Telepon Bulan 12.00 0.757 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 0.015 0.015 0.015 0.019 20%
Rapat bulanan LS 12.00 0.551 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046
Laporan Bulanan Set 36.00 0.079 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
Ringkasan Eksekutif Set 36.00 0.079 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
Bobot Rencana Kumulatif (%) 0.00 1.863 3.985 5.847 8.311 10.174 12.037 13.899 16.353 18.216 20.079 21.942 24.396 26.258 28.121 29.984 32.438 35.006 36.869 38.732 41.691 43.554 45.416 47.279 49.733 51.596 53.458 55.321 57.775 60.046 61.909 63.772 66.731 68.594 70.456 72.319 74.773 76.636 78.498 80.361 82.815 85.086 86.949 88.812 91.771 93.634 95.496 97.359 100.00
Deviasi (%)
Tenaga Pendukung
Drafter OB 4.00 2.967 0.173 0.173 0.173 0.223 0.173 0.173 0.173 0.223 0.173 0.173 0.173 0.223 0.173 0.173 0.173 0.223
Sekretaris OB 4.00 1.888 0.110 0.110 0.110 0.142 0.110 0.110 0.110 0.142 0.110 0.110 0.110 0.142 0.110 0.110 0.110 0.142 60%
Operator OB 4.00 1.618 0.094 0.094 0.094 0.121 0.094 0.094 0.094 0.121 0.094 0.094 0.094 0.121 0.094 0.094 0.094 0.121
Pengemudi -1 OB 8.00 2.319 0.135 0.135 0.135 0.174 0.135 0.135 0.135 0.174 0.135 0.135 0.135 0.174 0.135 0.135 0.135 0.174
Pesuruh Kantor OB 4.00 1.079 0.063 0.063 0.063 0.081 0.063 0.063 0.063 0.081 0.063 0.063 0.063 0.081 0.063 0.063 0.063 0.081
50%
Biaya Langsung Non Personil
Sewa Kantor termasuk furniture m2 408.00 3.786 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284
Sewa Komputer PC-1 Unit.Bln 8.00 0.674 0.039 0.039 0.039 0.051 0.039 0.039 0.039 0.051 0.039 0.039 0.039 0.051 0.039 0.039 0.039 0.051
Sewa Laptop Unit.Bln 12.00 1.699 0.099 0.099 0.099 0.127 0.099 0.099 0.099 0.127 0.099 0.099 0.099 0.127 0.099 0.099 0.099 0.127
Sewa Printer Color Laser Jet A-4 Unit.Bln 4.00 0.204 0.012 0.012 0.012 0.015 0.012 0.012 0.012 0.015 0.012 0.012 0.012 0.015 0.012 0.012 0.012 0.015 40%
Sewa Printer Color A-3 Unit.Bln 4.00 0.228 0.013 0.013 0.013 0.017 0.013 0.013 0.013 0.017 0.013 0.013 0.013 0.017 0.013 0.013 0.013 0.017
Sewa Scanner Color A-4 Unit.Bln 4.00 0.108 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008
Sewa Scanner Color A-3 Unit.Bln 4.00 0.144 0.008 0.008 0.008 0.011 0.008 0.008 0.008 0.011 0.008 0.008 0.008 0.011 0.008 0.008 0.008 0.011
Sewa Kendaraan Roda 4 -1 Unit.Bln 8.00 8.765 0.511 0.511 0.511 0.657 0.511 0.511 0.511 0.657 0.511 0.511 0.511 0.657 0.511 0.511 0.511 0.657 30%
Sewa mesin fotokopi Unit.Bln 4.00 0.718 0.042 0.042 0.042 0.054 0.042 0.042 0.042 0.054 0.042 0.042 0.042 0.054 0.042 0.042 0.042 0.054
Alat Tulis Kantor Bulan 4.00 0.838 0.049 0.049 0.049 0.063 0.049 0.049 0.049 0.063 0.049 0.049 0.049 0.063 0.049 0.049 0.049 0.063
Bahan Komputer Bulan 4.00 0.599 0.035 0.035 0.035 0.045 0.035 0.035 0.035 0.045 0.035 0.035 0.035 0.045 0.035 0.035 0.035 0.045
Komunikasi/ Internet/ Telepon Bulan 4.00 0.778 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058 20%
Alat Pelindung Diri LS 0.47 0.799 0.799
Biaya Perjalanan Dinas LS - 0.000
Rapat bulanan LS 4.00 0.566 0.142 0.142 0.142 0.142
Laporan Pendahuluan Set 3.00 0.030 0.030
10%
Laporan Bulanan Set 12.00 0.081 0.020 0.020 0.020 0.020
Laporan Akhir Set - 0.000
Ringkasan Eksekutif Set 12.00 0.081 0.020 0.020 0.020 0.020
SSD Produk Akhir Laporan Set - 0.000 0%
Bobot Rencana (%) 100.00 6.541 5.742 5.742 7.596 5.742 5.742 5.742 7.565 5.742 5.742 5.742 7.565 5.742 5.742 5.742 7.565
Bobot Rencana Kumulatif (%) 0.00 6.541 12.284 18.026 25.622 31.364 37.107 42.849 50.415 56.157 61.900 67.642 75.207 80.950 86.692 92.435 100.00
Bobot Realisasi (%)
Bobot Bobot Realisasi Kumulatif (%) 0.00
Deviasi (%)
Rapat bulanan LS 12.00 0.551 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046
Laporan Bulanan Set 36.00 0.079 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 10%
Ringkasan Eksekutif Set 36.00 0.079 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
Bobot Rencana (%) 4,579,216,960.0 4,572,137,642.8 100.27 100.00 1.860 0.524 1.594 1.860 2.460 1.860 1.860 1.860 2.450 1.860 1.860 1.860 2.450 1.860 1.860 1.860 2.450 2.445 1.690 1.711 2.946 1.866 1.866 1.866 2.467 1.866 1.866 1.866 2.467 2.325 1.866 1.866 2.972 1.866 1.866 1.866 2.467 1.866 1.866 1.866 2.467 2.325 1.866 1.866 2.972 1.866 1.866 1.866 2.779
Bobot Rencana Kumulatif (%) 0.00 1.860 2.384 3.979 5.838 8.298 10.158 12.018 13.878 16.328 18.188 20.048 21.908 24.358 26.218 28.078 29.938 32.388 34.833 36.523 38.234 41.180 43.046 44.912 46.779 49.246 51.112 52.978 54.844 57.311 59.636 61.502 63.368 66.340 68.206 70.072 71.938 74.405 76.271 78.138 80.004 82.471 84.796 86.662 88.528 91.499 93.366 95.232 97.098 99.8766394
Bobot Realisasi (%) 1.860 0.524 1.594 1.860 2.460 1.860 1.860 1.860 2.450 1.860 1.860 1.860 4.787 1.788 1.788 1.788 2.371 1.618 1.618 1.639 2.141 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Bobot Bobot Realisasi Kumulatif (%) 0.00 1.860 2.384 3.979 5.838 8.298 10.158 12.018 13.878 16.328 18.188 20.048 21.908 26.695 28.483 30.271 32.060 34.431 36.049 37.667 39.307 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.448 41.45
Deviasi (%) - - - - - - - - - - - - 2.336 2.265 2.193 2.122 2.043 1.216 1.144 1.073 0.268
Bobot Rencana (%) 4,572,216,960.0 4,572,217,646.0 100.27 100.00 1.863 0.525 1.597 1.863 2.464 1.863 1.863 1.863 2.454 1.863 1.863 1.863 2.454 1.863 1.863 1.863 2.454 2.568 1.863 1.908 2.883 1.698 1.698 2.029 2.471 1.869 1.869 1.869 2.471 2.199 1.869 1.869 2.976 1.869 1.869 1.869 2.471 1.869 1.869 1.869 2.471 2.199 1.869 1.869 2.976 1.869 1.869 1.869 2.782
Bobot Rencana Kumulatif (%) 0.00 1.863 2.388 3.985 5.847 8.311 10.174 12.037 13.899 16.353 18.216 20.079 21.942 24.396 26.258 28.121 29.984 32.438 35.006 36.869 38.777 41.660 43.358 45.056 47.085 49.556 51.424 53.293 55.162 57.633 59.832 61.701 63.569 66.545 68.414 70.283 72.152 74.622 76.491 78.360 80.228 82.699 84.898 86.767 88.636 91.611 93.480 95.349 97.218 100.000
Bobot Realisasi (%) 1.863 0.525 1.597 1.863 2.464 1.863 1.863 1.863 2.454 1.863 1.863 1.863 4.794 1.791 1.791 1.791 2.375 1.621 1.621 1.666 2.121 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Bobot Bobot Realisasi Kumulatif (%) 0.00 1.863 2.388 3.985 5.847 8.311 10.174 12.037 13.899 16.353 18.216 20.079 21.942 26.735 28.527 30.318 32.109 34.484 36.104 37.725 39.391 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.512 41.51
Deviasi (%) - - - - - - - - - - - - 2.340 2.268 2.197 2.125 2.046 1.098 0.856 0.614 - 0.148
-0.013557
-0.012769
-0.011886
-0.011886
-0.011886
-0.004475
0.015938
-0.002097
-0.005358
-0.005358
-0.005358
-0.004465
-0.002842
-0.002436
-0.003491
-0.001624
-0.005699
-0.001015
0.000934
-0.002557
0.006274
-0.000306
-0.000342
-0.000162
-0.000216
-0.013193
-0.001081
-0.001262
-0.000901
-0.001172
-0.000861
-0.002344
-0.000852
-1.52E-05
-0.000122
-5.41E-05
-3.55E-05
-0.000122
-5.41E-05
0
0
JADWAL PELAKSANAAN PEKERJAAN TAHUN 2023
KONSULTAN PENGENDALI MUTU INDEPENDEN (PMI) KONSTRUKSI JALAN TOL
RUAS PEKANBARU - PADANG SEKSI SICINCIN-PADANG
365
September-23 October-23 November-23 December-23
M-1 M-2 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
Bobot
Jenis Barang/Jasa SAT Volume 05/09 12/09 13/09 19/09 26/09 05/10 12/10 19/10 26/10 04/11 11/11 18/11 25/11 04/12 11/12 18/12 25/12 KET
(%)
sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd sd
11/09 12/09 18/09 25/09 04/10 11/10 18/10 25/10 03/11 10/11 17/11 24/11 03/12 10/12 17/12 24/12 02/01
Biaya Langsung Personil
Tenaga Ahli
100%
Team Leader OB 4.00 9.748 0.569 0.081 0.487 0.569 0.731 0.569 0.569 0.569 0.731 0.569 0.569 0.569 0.731 0.569 0.569 0.569 0.731
0.569 0.081
Ahli Quality Assurance OB 4.00 9.007 0.525 0.075 0.450 0.525 0.676 0.525 0.525 0.525 0.676 0.525 0.525 0.525 0.676 0.525 0.525 0.525 0.676
0.525 0.075
Ahli Quality Control OB 4.00 9.007 0.525 0.075 0.450 0.525 0.676 0.525 0.525 0.525 0.676 0.525 0.525 0.525 0.676 0.525 0.525 0.525 0.676
0.525 0.075
Ahli Teknik Jalan OB 4.00 7.897 0.461 0.066 0.395 0.461 0.592 0.461 0.461 0.461 0.592 0.461 0.461 0.461 0.592 0.461 0.461 0.461 0.592
0.461 0.066 90%
Ahli Jembatan OB 4.00 7.897 0.461 0.066 0.395 0.461 0.592 0.461 0.461 0.461 0.592 0.461 0.461 0.461 0.592 0.461 0.461 0.461 0.592
0.461 0.066
Ahli K3 Konstruksi OB 4.00 7.897 0.461 0.066 0.395 0.461 0.592 0.461 0.461 0.461 0.592 0.461 0.461 0.461 0.592 0.461 0.461 0.461 0.592
0.461 0.066
Ahli BIM Specialist/Geodesi OB 4.00 7.897 0.461 0.066 0.395 0.461 0.592 0.461 0.461 0.461 0.592 0.461 0.461 0.461 0.592 0.461 0.461 0.461 0.592
0.461 0.066
Visiting Specialist/Narasumber OJ - 0.000 80%
Laporan Bulanan Set 12.00 0.081 0.020 0.020 0.020 0.020 10%
Ahli Quality Assurance OB 8.00 8.649 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324
Ahli Quality Control OB 8.00 8.649 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324 0.252 0.252 0.252 0.324
Ahli Teknik Jalan OB 8.00 7.583 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284
90%
Ahli Jembatan OB 8.00 7.583 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284
Ahli K3 Konstruksi OB 8.00 7.583 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284
Ahli BIM Specialist/Geodesi OB 8.00 7.583 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284 0.221 0.221 0.221 0.284
Asisten Ahli Teknik Jembatan OB 8.00 3.418 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128
Asisten Ahli K3 Konstruksi OB 8.00 3.418 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128 0.100 0.100 0.100 0.128
70%
Tenaga Pendukung
Drafter OB 8.00 2.849 0.083 0.083 0.083 0.107 0.083 0.083 0.083 0.107 0.083 0.083 0.083 0.107 0.083 0.083 0.083 0.107 0.083 0.083 0.083 0.107 0.083 0.083 0.083 0.107 0.083 0.083 0.083 0.107 0.083 0.083 0.083 0.107
Sekretaris OB 8.00 1.813 0.053 0.053 0.053 0.068 0.053 0.053 0.053 0.068 0.053 0.053 0.053 0.068 0.053 0.053 0.053 0.068 0.053 0.053 0.053 0.068 0.053 0.053 0.053 0.068 0.053 0.053 0.053 0.068 0.053 0.053 0.053 0.068
Operator OB 8.00 1.554 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058 0.045 0.045 0.045 0.058
60%
Pengemudi -1 OB 16.00 2.227 0.065 0.065 0.065 0.084 0.065 0.065 0.065 0.084 0.065 0.065 0.065 0.084 0.065 0.065 0.065 0.084 0.065 0.065 0.065 0.084 0.065 0.065 0.065 0.084 0.065 0.065 0.065 0.084 0.065 0.065 0.065 0.084
Pesuruh Kantor OB 8.00 1.036 0.030 0.030 0.030 0.039 0.030 0.030 0.030 0.039 0.030 0.030 0.030 0.039 0.030 0.030 0.030 0.039 0.030 0.030 0.030 0.039 0.030 0.030 0.030 0.039 0.030 0.030 0.030 0.039 0.030 0.030 0.030 0.039
50%
Sewa Komputer PC-1 Unit.Bln 16.00 0.647 0.019 0.019 0.019 0.024 0.019 0.019 0.019 0.024 0.019 0.019 0.019 0.024 0.019 0.019 0.019 0.024 0.019 0.019 0.019 0.024 0.019 0.019 0.019 0.024 0.019 0.019 0.019 0.024 0.019 0.019 0.019 0.024
Sewa Laptop Unit.Bln 24.00 1.632 0.048 0.048 0.048 0.061 0.048 0.048 0.048 0.061 0.048 0.048 0.048 0.061 0.048 0.048 0.048 0.061 0.048 0.048 0.048 0.061 0.048 0.048 0.048 0.061 0.048 0.048 0.048 0.061 0.048 0.048 0.048 0.061
Sewa Printer Color Laser Jet A-4 Unit.Bln 8.00 0.195 0.006 0.006 0.006 0.007 0.006 0.006 0.006 0.007 0.006 0.006 0.006 0.007 0.006 0.006 0.006 0.007 0.006 0.006 0.006 0.007 0.006 0.006 0.006 0.007 0.006 0.006 0.006 0.007 0.006 0.006 0.006 0.007
Sewa Printer Color A-3 Unit.Bln 8.00 0.218 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008 0.006 0.006 0.006 0.008
40%
Sewa Scanner Color A-4 Unit.Bln 8.00 0.103 0.003 0.003 0.003 0.004 0.003 0.003 0.003 0.004 0.003 0.003 0.003 0.004 0.003 0.003 0.003 0.004 0.003 0.003 0.003 0.004 0.003 0.003 0.003 0.004 0.003 0.003 0.003 0.004 0.003 0.003 0.003 0.004
Sewa Scanner Color A-3 Unit.Bln 8.00 0.138 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005 0.004 0.004 0.004 0.005
Sewa Kendaraan Roda 4 -1 Unit.Bln 16.00 8.417 0.245 0.245 0.245 0.316 0.245 0.245 0.245 0.316 0.245 0.245 0.245 0.316 0.245 0.245 0.245 0.316 0.245 0.245 0.245 0.316 0.245 0.245 0.245 0.316 0.245 0.245 0.245 0.316 0.245 0.245 0.245 0.316
Sewa mesin fotokopi Unit.Bln 8.00 0.690 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026 0.020 0.020 0.020 0.026
30%
Alat Tulis Kantor Bulan 8.00 0.805 0.023 0.023 0.023 0.030 0.023 0.023 0.023 0.030 0.023 0.023 0.023 0.030 0.023 0.023 0.023 0.030 0.023 0.023 0.023 0.030 0.023 0.023 0.023 0.030 0.023 0.023 0.023 0.030 0.023 0.023 0.023 0.030
Bahan Komputer Bulan 8.00 0.575 0.017 0.017 0.017 0.022 0.017 0.017 0.017 0.022 0.017 0.017 0.017 0.022 0.017 0.017 0.017 0.022 0.017 0.017 0.017 0.022 0.017 0.017 0.017 0.022 0.017 0.017 0.017 0.022 0.017 0.017 0.017 0.022
Komunikasi/ Internet/ Telepon Bulan 8.00 0.747 0.022 0.022 0.022 0.028 0.022 0.022 0.022 0.028 0.022 0.022 0.022 0.028 0.022 0.022 0.022 0.028 0.022 0.022 0.022 0.028 0.022 0.022 0.022 0.028 0.022 0.022 0.022 0.028 0.022 0.022 0.022 0.028
Rapat bulanan LS 8.00 0.544 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068
Laporan Bulanan Set 24.00 0.078 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 10%
Ringkasan Eksekutif Set 24.00 0.078 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
Rapat bulanan LS 8.00 0.544 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068
Laporan Bulanan Set 24.00 0.078 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 10%
Ringkasan Eksekutif Set 24.00 0.078 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010