Anda di halaman 1dari 45

PEMBUATAN OVERKAPING STASIUN RANDUBLATUNG

DAOP 4 SEMARANG

BILL OF QUANTITY

NO URAIAN PEKERJAAN

1 I. PEKERJAAN BAJA
2 II. PEKERJAAN SIPIL

Jumlah
kasbon
Sisa
TY

NILAI PEKERJAAN (Rp) 10,000,000.00 10 juli 23


10,000,000.00 26 agts 23
15,000,000.00 14-Sep-23
268,771,751.07 15,000,000.00 23-Sep-23
191,943,000.00 8,000,000.00 30-Sep-23
14,850,000.00 30-Sep-23
8,380,000.00 7 okt 23
460,714,751.07 8,380,000.00 17 okt 23
115,110,000.00 3,000,000.00 16 okt 23
345,604,751.07 8,000,000.00 19 okt 23
2,500,000.00 23 juli 23
12,000,000.00 9-Sep-23
115,110,000.00
PEKERJAAN : PEMBUATAN OVERKAPING STASIUN RANDUBLATUNG
LOKASI : DAOP 4 SEMARANG

BILL OF QUANTITY

NO VOL SAT URAIAN PEKERJAAN HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
UPAH BAHAN UPAH BAHAN

4
NO VOL SAT URAIAN PEKERJAAN HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
UPAH BAHAN UPAH BAHAN

III.B. PEKERJAAN STRUKTUR BAJA


III.B.1. PEKERJAAN STRUKTUR BASEPLATE B1
1. 132.00 bh Pek. Pasang Angkur Bolt dia. 16 mm, 45,000.00 5,940,000.00
2. 253.87 kg Pek. Pemasangan Plat Baja t = 12 mm, Baseplate 6,421.98 1,630,342.40
3. 2,173.60 cm Pek. Pengelasan dengan las listrik, Las Sambungan Kolom K1 dengan 501.32 1,089,673.50
Baseplate
4. 3.06 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 45,969.00

III.B.2. PEKERJAAN STRUKTUR BASEPLATE B2


1. 24.00 bh Pek. Pasang Angkur Bolt dia. 16 mm, 45,000.00 1,080,000.00
2. 35.33 kg Pek. Pemasangan Plat Baja t = 12 mm, Baseplate 6,421.98 226,856.55
3. 317.08 cm Pek. Pengelasan dengan las listrik, Las Sambungan Kolom K2 dengan 501.32 158,957.78
Baseplate
4. 0.45 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 6,705.00

III.B.3. PEKERJAAN STRUKTUR BAJA KOLOM K1


1. 3,972.32 kg Pek. Pemasangan Profil Baja IWF, WF250x125x6x9 6,421.98 25,510,171.51
2. 62.17 kg Pek. Pemasangan Plat Baja t = 10 mm, Stiffener Kolom 6,421.98 399,267.53
3. 3,872.00 cm Pek. Pengelasan dengan las listrik, Las Stiffener Kolom 501.32 1,941,118.78
4. 132.59 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 1,988,844.00

III.B.4. PEKERJAAN STRUKTUR BAJA KOLOM K2


1. 635.85 kg Pek. Pemasangan Profil Pipa Besi, Pipa 6" 6,421.98 4,083,417.89
2. 16.96 kg Pek. Pemasangan Plat Baja t = 10 mm, Stiffener Kolom 6,421.98 108,891.14
3. 1,056.00 cm Pek. Pengelasan dengan las listrik, Las Stiffener Kolom 501.32 529,396.03
4. 11.90 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 178,446.39

III.B.5. PEKERJAAN STRUKTUR BRACING


1. 1,084.80 kg Pek. Pemasangan Profil Baja CNP, CNP 125x50x20x2,3 6,421.98 6,966,567.16
2. 298.90 kg Pek. Pemasangan Besi Polos Ø 10 mm, Bracing 6,421.98 1,919,514.07
3. 23.84 kg Pek. Pemasangan Plat Baja t = 10 mm, Stiffener 6,421.98 153,096.92
4. 16,406.70 cm Pek. Pengelasan dengan las listrik, 501.32 8,225,037.90
5. 140.65 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 2,109,721.58

III.B.6. PEKERJAAN STRUKTUR KUDA - KUDA


1. 5,698.00 kg Pek. Pemasangan Profil Baja IWF, Kuda - Kuda WF250x125x6x9 6,421.98 36,592,459.13
2. 429.11 kg Pek. Pemasangan Plat Baja t = 10 mm, Stiffener Kuda - Kuda WF 6,421.98 2,755,744.47
250x125x6x9
3. 649.90 kg Pek. Pemasangan Profil Baja IWF, Cutting WF250x125x6x9 6,421.98 4,173,631.34
4. 714.56 kg Pek. Pemasangan Profil Baja IWF, Kuda - Kuda WF150x75x5x7 6,421.98 4,588,892.17
5. 216.52 kg Pek. Pemasangan Profil Baja IWF, Cutting WF150x75x5x7 6,421.98 1,390,513.45
6. 311.34 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, Profil WF 15,000.00 4,670,058.24
7. 946.33 kg Pek. Pemasangan Profil Pipa Besi, Pipa 3" 6,421.98 6,077,301.04
8. 3,351.45 cm Pek. Pengelasan dengan las listrik, Sambungan antar Pipa 3" 501.32 1,680,156.14
9. 23.41 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, Profil Pipa 15,000.00 351,148.28
Besi
10. 5,700.64 kg Pek. Pemasangan Profil Baja CNP, Gording CNP 125x50x20x2,3 6,421.98 36,609,413.17
11. 253.03 kg Pek. Pemasangan Baja Track Stang, 6,421.98 1,624,935.18
12. 351.22 kg Pek. Pemasangan Baja Ikatan Angin, 6,421.98 2,255,539.72
13. 677.45 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, Gording, 15,000.00 10,161,782.14
Trackstang & Ikatan Angin

III.B.7. PEKERJAAN STRUKTUR SAMBUNGAN


DETAIL J1
Antar Kuda - Kuda WF 250x125x6x9
1. 80.95 kg Pek. Pemasangan Plat Baja t = 10 mm, 6,421.98 519,879.59
2. 88.00 bh Pek. Pasang Mur Baut dia. 16 mm, M16 - -
3. 3,247.20 cm Pek. Pengelasan dengan las listrik, Las antar WF 250x125x6x9, Cutting 501.32 1,627,892.80
WF 250x125x6x9, dan Plat
4. 1.25 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 18,768.75

5
NO VOL SAT URAIAN PEKERJAAN HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
UPAH BAHAN UPAH BAHAN
Kuda - Kuda WF 250x125x6x9 dan Kolom WF 250x125x6x9
1. 161.91 kg Pek. Pemasangan Plat Baja t = 10 mm, 6,421.98 1,039,759.19
2. 352.00 bh Pek. Pasang Mur Baut dia. 16 mm, M16 - -
3. 6,494.40 cm Pek. Pengelasan dengan las listrik, Las antar WF 250x125x6x9, Cutting 501.32 3,255,785.60
WF 250x125x6x9, dan Plat
4. 2.50 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 37,537.50
DETAIL J2
Antar Kuda - Kuda WF 150x75x5x7
1. 28.50 kg Pek. Pemasangan Plat Baja t = 10 mm, 6,421.98 182,997.62
2. 66.00 bh Pek. Pasang Mur Baut dia. 16 mm, M16 - -
3. 1,914.00 cm Pek. Pengelasan dengan las listrik, Las antar WF 150x75x5x7, Cutting 501.32 959,530.31
WF 150x75x5x7, dan Plat
4. 0.49 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 7,392.00
Kuda - Kuda WF 150x75x5x7 dan Kolom WF 150x75x5x7
1. 56.99 kg Pek. Pemasangan Plat Baja t = 10 mm, 6,421.98 365,995.23
2. 264.00 bh Pek. Pasang Mur Baut dia. 16 mm, M16 - -
3. 3,828.00 cm Pek. Pengelasan dengan las listrik, Las antar WF 150x75x5x7, Cutting 501.32 1,919,060.62
WF 150x75x5x7, dan Plat
4. 0.99 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 14,784.00
DETAIL J3
Kolom WF 150x75x5x7 dan Rafter 250x125x6x9
1. 19.43 kg Pek. Pemasangan Plat Baja t = 10 mm, 6,421.98 124,771.10
2. 88.00 bh Pek. Pasang Mur Baut dia. 16 mm, M16 - -
3. 1,298.00 cm Pek. Pengelasan dengan las listrik, Las antar WF 150x75x5x7 dengan 501.32 650,715.96
Plat
4. 0.35 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 5,197.50
DETAIL J4
Pipa Baja 3" dan Kolom 250x125x6x9
1. 7.36 kg Pek. Pemasangan Plat Baja t = 10 mm, 6,421.98 47,261.78
2. 24.00 bh Pek. Pasang Mur Baut dia. 12 mm, M12 - -
3. 167.57 cm Pek. Pengelasan dengan las listrik, Las Pipa Baja 3" dengan Plat 501.32 84,007.81
4. 0.12 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 1,856.25
DETAIL J5
CNP 125x50x20x2.3 dan Kolom 250x125x6x9
1. 90.28 kg Pek. Pemasangan Plat Baja t = 10 mm, 6,421.98 579,744.52
2. 160.00 bh Pek. Pasang Mur Baut dia. 12 mm, M12 - -
3. 3,920.00 cm Pek. Pengelasan dengan las listrik, Las Kolom 250x125x6x9 dengan Plat 501.32 1,965,182.24
4. 1.53 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 23,010.00

Jumlah III.B. 190,654,699.96 -


Jumlah III.

V. PEKERJAAN ARSITEKTUR
V.A. PEKERJAAN ARSITEKTUR OVERCAPING
1. 1,076.10 m² Pek. Pemasangan Atap Zincalume Spandek Tebal 0.50 mm, 18,000.00 19,369,800.00
2. 173.40 m² Pek. Pemasangan listplank GRC, 15,523.14 2,691,711.61
3. 190.80 m² Pek. Pemasangan Atap PVC Setara Alderon ( semi transparan), 18,000.00 3,434,400.00
4. 63.00 m Pek. Pemasangan atap nok Zincalume, 18,909.66 1,191,308.58
8. 126.00 m Pek. Pemasangan Talang Datar Galvalum t = 0.6 mm, 25,000.00 3,150,000.00
9. 2,360.05 kg Pek. Pemasangan Besi Siku 40x40x3, (Rangka Talang & Listplank) 6,421.98 15,156,200.98
10. 194.21 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 2,913,120.00
11. 422.42 kg Pek. Pemasangan Profil Baja CNP, Gording CNP 100x50x20x2.3 6,421.98 2,712,752.65
12. 330.00 cm Pek. Pengelasan dengan Las Listrik, Las CNP ke Kolom 501.32 165,436.26
15. 28.00 Bh Pek. Pemasangan roof drain dia. 4" besi cor, 36,932.20 1,034,101.60
16. 226.00 m' Pek. Pemasangan pipa PVC tipe D ø 4", 8,831.90 1,996,008.95
17. 66.00 Bh Klem Penggantung PVC dia 4", 10,000.00 660,000.00
18. 42.74 kg Pek. Pemasangan Profil Baja ∅10mm, Besi Penggantung PVC 6,421.98 274,443.44

V.B. PEKERJAAN ARSITEKTUR SAMBUNGAN OVERCAPING


DENGAN ATAP EKSISTING
3. 488.40 kg Pek. Pemasangan Profil Baja CNP, Gording CNP 100x50x20x2.3 6,421.98 3,136,496.50
4. 360.00 cm Pek. Pengelasan dengan Las Listrik, Las CNP ke Kolom 501.32 180,475.92
8. 158.49 m² Pek. Pemasangan Atap Zincalume Spandek Tebal 0.50 mm, 18,000.00 2,852,820.00
9. 42.00 m Pek. Pemasangan Talang Datar Galvalum t = 0.6 mm, 25,000.00 1,050,000.00
10. 436.33 kg Pek. Pemasangan Besi Siku 40x40x3, (Rangka Talang & Listplank) 6,421.98 2,802,125.25
11. 38.08 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, 15,000.00 571,200.00

6
NO VOL SAT URAIAN PEKERJAAN HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
UPAH BAHAN UPAH BAHAN

V.E. PEKERJAAN PENGGANTIAN ATAP STASIUN EKSITING


9. 1,140.33 kg Pek. Pemasangan Besi Siku 40x40x3, (Rangka Listplank) 6,421.98 7,323,201.28
10. 45.10 m Pek. Pemasangan Talang Datar Galvalum t = 0.6 mm, 25,000.00 1,127,500.00
11. 440.98 kg Pek. Pemasangan Besi Siku 40x40x3, (Rangka Talang) 6,421.98 2,831,951.79
12. 38.49 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup,(Talang) 15,000.00 577,280.00
19. 8.00 Bh Pek. Pemasangan roof drain dia. 4" besi cor, 36,932.20 295,457.60
20. 52.00 m' Pek. Pemasangan pipa PVC tipe D ø 4", 8,831.90 459,258.70
21. 16.00 Bh Klem Penggantung PVC dia 4", 10,000.00 160,000.00

Jumlah V. 78,117,051.11 -

JUMLAH TOTAL 268,771,751.07


JUMLAH RAYA 268,771,751.07
JUMLAH RAYA (Pembulatan) 268,771,700.00

7
ANALISIS HARGA SATUAN STRUKTUR DAN ARSITEKTUR
PEMBUATAN OVERKAPING STASIUN RANDUBLATUNG

1 m2 Pembuatan gudang semen dan alat-alat


Bahan An SNI (Revisi) 6.6.1
1.7000 btg Dolken kayu Ø 8-10 / 400 cm Rp. 15,000.00 = 25,500.00
0.2100 m3 Kayu bekisting Rp. 3,400,000.00 = 714,000.00
0.3000 kg Paku biasa 2" - 5" Rp. 16,500.00 = 4,950.00
10.5000 kg Semen Portland Rp. 1,300.00 = 13,650.00
0.0300 m3 pasir beton Rp. 210,000.00 = 6,300.00
0.0500 m3 Koral beton Rp. 285,000.00 = 14,250.00
1.5000 lbr Seng BJLS gelombang uk; 80 x 180 cm Rp. 65,000.00 = 97,500.00

Upah An SNI (Revisi) 6.6.2


1.0000 oh Pekerja Rp. 75,000.00 =
2.0000 oh Tukang kayu Rp. 90,000.00 = 180,000.00
0.2000 oh Kepala Tukang Rp. 90,000.00 = 18,000.00
0.0500 oh Mandor Rp. 106,610.00 = 5,330.50 +
JUMLAH = 203,330.50 876,150.00

2 m2 Pembuatan bedeng buruh


Bahan An SNI (Revisi) 6.9.1
1.2500 btg Dolken kayu Ø 8-10 / 400 cm Rp. 15,000.00 = 18,750.00
0.1860 m3 Kayu bekisting Rp. 3,400,000.00 = 632,400.00
0.3000 kg Paku biasa 2" - 5" Rp. 16,500.00 = 4,950.00
18.0000 kg Semen Portland Rp. 1,300.00 = 23,400.00
0.0300 m3 Pasir beton Rp. 210,000.00 = 6,300.00
0.0500 m3 koral beton Rp. 285,000.00 = 14,250.00
1.5000 lbr Seng BJLS gelombang uk; 80 x 180 cm Rp. 65,000.00 = 97,500.00
1.3500 lbr Plywood 1.22 x 2.44 x 6 mm Rp. 80,000.00 = 108,000.00

Upah An SNI (Revisi) 6.9.2


1.0000 oh Pekerja Rp. 75,000.00 = 75,000.00
2.0000 oh Tukang kayu Rp. 90,000.00 = 180,000.00
0.2000 oh Kepala Tukang Rp. 90,000.00 = 18,000.00
0.0500 oh Mandor Rp. 106,610.00 = 5,330.50 +
JUMLAH = 278,330.50 905,550.00

3 m³ Pek. Galian Tanah berbatu Semi Mekanis sedalam >1 s/d 2 m


Upah Permen PUPR Nomor 1 Tahun 2022
0.563 oh Pekerja Rp. 75,000.00 = 42,225.00
0.056 oh Mandor Rp. 106,610.00 = 5,970.16
Bahan
1.250 liter Minyak Solar Rp. 16,900.00 21,125.00
0.750 jam Sewa Jack Hammer Rp. 25,000.00 18,750.00 +
JUMLAH = 48,195.16 39,875.00

4 m³ Pek. Pengurugan dengan pasir urug


Bahan An. SNI ( Revisi ) 6.11.1
1.2000 m³ Pasir Urug Rp. 110,000.00 = 132,000.00

Upah An. SNI ( Revisi ) 6.11.2


0.3000 oh Pekerja Rp. 75,000.00 = 22,500.00
0.0100 oh Mandor Rp. 106,610.00 = 1,066.10 +
JUMLAH = 23,566.10 132,000.00

11
5 m³ Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr
Bahan An. SNI ( Revisi ) 6.1.1
218.0000 kg Semen Portland Rp. 1,300.00 = 283,400.00
0.5200 m³ Pasir Beton Rp. 210,000.00 = 109,200.00
0.8700 m³ Koral Beton Rp. 285,000.00 = 247,950.00

Upah An. SNI ( Revisi ) 6.1.2


1.6500 oh Pekerja Rp. 75,000.00 = 123,750.00
0.2500 oh Tukang Batu Rp. 90,000.00 = 22,500.00
0.0250 oh Kepala Tukang Rp. 90,000.00 = 2,250.00
0.0800 oh Mandor Rp. 106,610.00 = 8,528.80 +
JUMLAH = 157,028.80 640,550.00

6 m³ Pek. Pengurugan tanah bekas galian


Upah An. SNI ( Revisi ) 6.11.2
0.2500 oh Pekerja Rp. 75,000.00 = 18,750.00
0.0080 oh Mandor Rp. 106,610.00 = 852.88 +
19,602.88 -

7 m³ Pek. Pengurugan Tanah Dengan Tanah Urug


Bahan An. SNI ( Revisi ) 6.9.1
1.2000 m³ Tanah Urug Rp. 60,000.00 = 72,000.00

Upah An. SNI ( Revisi ) 6.9.2


0.0000 oh Pekerja Rp. 75,000.00 = -
0.0000 oh Mandor Rp. 106,610.00 = - +
JUMLAH = - 72,000.00

8 m Pek. Pemasangan Turap Penahan Tanah


Bahan AHS Prasarana PT KAI 2012
0.1500 m3 Lanan Papan Rp. 3,400,000.00 = 510,000.00
1.000 kg Paku Rp. 16,500.00 = 16,500.00

Upah AHS Prasarana PT KAI 2012


5.0000 oh Tukang Rp. 90,000.00 = 450,000.00
2.0000 oh Tukang Rp. 90,000.00 = 180,000.00 +
JUMLAH = 630,000.00 526,500.00

9 m³ Pek. Pembuatan Beton dengan mutu K.200


Bahan Permen PUPR 2022
352.00 kg Semen Portland Rp. 1,300.00 = 457,600.00
0.52 m³ Pasir Beton Rp. 210,000.00 = 109,650.00
0.57 m³ Koral Beton Rp. 285,000.00 = 163,241.67

Upah Permen PUPR 2022


1.650 oh Pekerja Rp. 75,000.00 = 123,750.00
0.275 oh Tukang Batu Rp. 90,000.00 = 24,750.00
0.028 oh Kepala Tukang Rp. 90,000.00 = 2,520.00
0.083 oh Mandor Rp. 106,610.00 = 8,848.63 +
JUMLAH = 159,868.63 730,491.67

12
10 kg Pek. Pembesian dengan Besi Ulir
Bahan An. SNI ( Revisi ) 6.25.1
1.0500 kg Besi Beton Ulir Rp. 11,200.00 = 11,760.00
0.0150 kg Kawat Beton Rp. 19,000.00 = 285.00

Upah An. SNI ( Revisi ) 6.25.2


0.0070 oh Pekerja Rp. 75,000.00 = 525.00
0.0070 oh Tukang Besi Rp. 90,000.00 = 630.00
0.0007 oh Kepala Tukang Rp. 90,000.00 = 63.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 1,249.98 12,045.00

11 m² Pek. Pemasangan Bekisting untuk pondasi


Bahan An. SNI ( Revisi ) 6.28.1
0.0400 m³ Kayu Terentang / Meranti Rp. 3,600,000.00 = 144,000.00
0.3000 kg Paku biasa 2" - 5" Rp. 16,500.00 = 4,950.00
0.1000 ltr Minyak Bekisting Rp. 12,000.00 = 1,200.00

Upah An. SNI ( Revisi ) 6.28.2


0.3000 oh Pekerja Rp. 75,000.00 = 22,500.00
0.2600 oh Tukang Kayu Rp. 90,000.00 = 23,400.00
0.0260 oh Kepala Tukang Rp. 90,000.00 = 2,340.00
0.0050 oh Mandor Rp. 106,610.00 = 533.05 +
JUMLAH = 48,773.05 150,150.00
dipakai 3 x 50,050.00

12 kg Pek. Pembesian dengan Besi Polos Ø8


Bahan An. SNI ( Revisi ) 6.25.1
1.0500 kg Besi Beton Polos Ø 8 mm Rp. 11,200.00 = 11,760.00
0.0150 kg Kawat Beton Rp. 19,000.00 = 285.00

Upah An. SNI ( Revisi ) 6.25.2


0.0070 oh Pekerja Rp. 75,000.00 = 525.00
0.0070 oh Tukang Besi Rp. 90,000.00 = 630.00
0.0007 oh Kepala Tukang Rp. 90,000.00 = 63.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 1,249.98 12,045.00

13 m² Pek. Pemasangan Bekisting untuk Kolom Beton


Bahan An. SNI ( Revisi ) 6.30.1
0.0400 m³ Kayu bekisting Rp. 3,400,000.00 = 136,000.00
0.4000 kg Paku biasa 2" - 5" Rp. 16,500.00 = 6,600.00
0.2000 ltr Minyak Bekisting Rp. 12,000.00 = 2,400.00
0.0150 m³ Kayu Perancah Rp. 3,600,000.00 = 54,000.00
0.3500 lbr Multiplek Film 12 mm Rp. 200,000.00 = 70,000.00
2.0000 btg Dolken kayu Ø 8-10 / 400 cm Rp. 15,000.00 = 30,000.00

Upah An. SNI ( Revisi ) 6.30.2


0.3000 oh Pekerja Rp. 75,000.00 = 22,500.00
0.3300 oh Tukang Kayu Rp. 90,000.00 = 29,700.00
0.0330 oh Kepala Tukang Rp. 90,000.00 = 2,970.00
0.0060 oh Mandor Rp. 106,610.00 = 639.66 +
JUMLAH = 55,809.66 299,000.00
dipakai 2x 149,500.00

13
14 m³ Pek. Grouting
Bahan PUPR28-2016
1200.000 kg Semen Grout Rp. 1,300.00 = 1,560,000.00
0.482 m3 Screening Rp. 145.00 = 69.82
350.000 L Air Rp. 70.00 = 24,500.00 +
JUMLAH = 1,584,569.82

15 bh Pek. Pasang Angkur Bolt dia. 16 mm


Bahan
1.0000 bh Angkur Baut M16 Rp. 65,000.00 = 65,000.00 +
JUMLAH = - 65,000.00

16 kg Pek. Pemasangan Plat Baja t = 12 mm


Bahan An. SNI ( Revisi ) 6.1.1
1.0000 kg Plat Baja t=12mm Rp. 15,700.00 = 15,700.00
0.0000 kg Meni besi Rp. 0.00 = -

Upah An. SNI ( Revisi ) 6.1.2


0.0060 oh Pekerja Rp. 75,000.00 = 450.00
0.0600 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 15,700.00

17 cm Pek. Pengelasan dengan Las Listrik


Bahan
0.400 Kg Kawat las/Elektroda E7016 Rp. 36,000.00 = 14,400.00
0.300 ltr Minyak Solar Rp. 16,900.00 = 5,070.00
0.040 ltr Minyak Pelumas Rp. 58,000.00 = 2,320.00

Upah
0.0400 oh Pekerja Rp. 75,000.00 = 3,000.00
0.0200 oh Tukang Besi Rp. 90,000.00 = 1,800.00
0.0020 oh Mandor Rp. 106,610.00 = 213.22
JUMLAH = 5,013.22 21,790.00
per 1 cm = 501.32 2,179.00

18 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup


Bahan
0.2000 kg Meni besi Rp. 25,000.00 = 5,000.00
0.1500 kg Plamir Rp. 12,000.00 = 1,800.00
0.1700 kg Cat Dasar setara Emco Rp. 90,000.00 = 15,300.00
0.2600 kg Cat Penutup 2 kali setara Emco Rp. 90,000.00 = 23,400.00

Upah
0.0700 oh Pekerja Rp. 75,000.00 = 5,250.00
0.0090 oh Tukang Cat Rp. 90,000.00 = 810.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0025 oh Mandor Rp. 106,610.00 = 266.53 +
JUMLAH = 6,866.53 45,500.00

14
19 kg Pek. Pemasangan Profil Baja IWF
Bahan An. SNI ( Revisi ) 6.1.1
1.1000 kg Besi Baja Profil WF Rp. 16,000.00 = 17,600.00
0.0000 kg Meni besi Rp. 0.00 = -

Upah An. SNI ( Revisi ) 6.1.2


0.0060 oh Pekerja Rp. 75,000.00 = 450.00
0.0600 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 17,600.00

20 kg Pek. Pemasangan Plat Baja t = 10 mm


Bahan An. SNI ( Revisi ) 6.1.1
1.1000 kg Plat Baja t=10mm Rp. 16,000.00 = 17,600.00
0.0000 kg Meni besi Rp. 0.00 = -

Upah An. SNI ( Revisi ) 6.1.2


0.0060 oh Pekerja Rp. 75,000.00 = 450.00
0.0600 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 17,600.00

21 kg Pek. Pemasangan Profil Pipa Besi


Bahan An. SNI ( Revisi ) 6.1.1
1.1000 kg Pipa Besi Rp. 19,150.00 = 21,065.00
0.0800 kg Meni besi Rp. 0.00 = -

Upah An. SNI ( Revisi ) 6.1.2


0.0060 oh Pekerja Rp. 75,000.00 = 450.00
0.0600 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 21,065.00

22 kg Pek. Pemasangan Profil Baja CNP


Bahan An. SNI ( Revisi ) 6.1.1
1.1000 kg Baja Profil CNP Rp. 16,000.00 = 17,600.00
0.0000 kg Meni besi Rp. 0.00 = -

Upah An. SNI ( Revisi ) 6.1.2


0.0060 oh Pekerja Rp. 75,000.00 = 450.00
0.0600 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 17,600.00

23 kg Pek. Pemasangan Besi Polos Ø 10 mm


Bahan An. SNI ( Revisi ) 6.1.1
1.0500 kg Besi Beton Polos Ø 10 mm Rp. 11,200.00 = 11,760.00

Upah An. SNI ( Revisi ) 6.1.1


0.006 oh Pekerja Rp. 75,000.00 = 450.00
0.060 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.006 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 11,760.00

15
24 kg Pek. Pemasangan Baja Track Stang
Bahan An. SNI ( Revisi ) 6.1.1
1.1000 kg Baja Track Stang Rp. 16,000.00 = 17,600.00
0.0000 kg Meni besi Rp. 25,000.00 = -

Upah An. SNI ( Revisi ) 6.1.2


0.0060 oh Pekerja Rp. 75,000.00 = 450.00
0.0600 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 17,600.00

25 kg Pek. Pemasangan Baja Ikatan Angin


Bahan An. SNI ( Revisi ) 6.1.1
1.1000 kg Baja Ikatan Angin Rp. 16,000.00 = 17,600.00
0.0000 kg Meni besi Rp. 25,000.00 = -

Upah An. SNI ( Revisi ) 6.1.2


0.0060 oh Pekerja Rp. 75,000.00 = 450.00
0.0600 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 17,600.00

26 bh Pek. Pasang Mur Baut dia. 16 mm


Bahan
1.0000 bh Baut M16 Rp. 3,800.00 = 3,800.00 +
JUMLAH = - 3,800.00

27 bh Pek. Pasang Mur Baut dia. 12 mm


Bahan
1.0000 bh Baut M12 Rp. 3,800.00 = 3,800.00 +
JUMLAH = - 3,800.00

28 m Pek. Pemasangan Pipa Beton bulat dia 40 cm


Bahan An. SNI ( Revisi ) 6.15.1
1.1000 bh Buis beton bulat dia 40 cm Rp. 70,000.00 = 77,000.00
10.3000 kg Semen Portland Rp. 1,300.00 = 13,390.00
0.0610 m³ Pasir Pasang Rp. 180,000.00 = 10,980.00
0.0000 m³ Pasir Urug Rp. 110,000.00 = -

Upah An. SNI ( Revisi ) 6.15.2


0.3800 oh Pekerja Rp. 75,000.00 = 28,500.00
0.1900 oh Tukang Batu Rp. 90,000.00 = 17,100.00
0.0190 oh Kepala Tukang Rp. 90,000.00 = 1,710.00
0.0190 oh Mandor Rp. 106,610.00 = 2,025.59 +
JUMLAH = 49,335.59 101,370.00

29 kg Pek. Pemasangan Baja Siku 50x50x5


Bahan An. SNI ( Revisi ) 6.1.1
1.1000 kg Baja Siku 50x50x5 Rp. 16,000.00 = 17,600.00
0.0000 kg Meni besi Rp. 0.00 = -

Upah An. SNI ( Revisi ) 6.1.2


0.0060 oh Pekerja Rp. 75,000.00 = 450.00
0.0600 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 17,600.00

16
30 m² Pek. Pemasangan bekisting untuk dinding
Bahan An. SNI ( Revisi ) 6.33.1
0.0300 m3 Kayu bekisting Rp. 3,400,000.00 = 102,000.00
0.4000 kg Paku biasa 2" - 5" Rp. 16,500.00 = 6,600.00
0.2000 liter Minyak bekisting Rp. 12,000.00 = 2,400.00
0.0000 m3 Kayu balok bekisting Rp. 3,400,000.00 = -
0.3500 Lbr Plywood tebal 9 mm Rp. 120,000.00 = 42,000.00
3.0000 Btg Dolken kayu Ø 8-10 / 400 cm Rp. 15,000.00 = 45,000.00

Upah An. SNI ( Revisi ) 6.33.2


0.3200 oh Pekerja Rp. 75,000.00 = 24,000.00
0.3300 oh Tukang kayu Rp. 90,000.00 = 29,700.00
0.0330 oh Kepala Tukang Rp. 90,000.00 = 2,970.00
0.0060 oh Mandor Rp. 106,610.00 = 639.66 +
JUMLAH = 57,309.66 198,000.00
Dipakai 2 x 99,000.00

31 bh Pek. Pemasangan Angkur Ø10


Bahan An. SNI ( Revisi ) 6.1.1
1.1000 bh Angkur Baut Ø10 Rp. 23,000.00 = 25,300.00 +
JUMLAH = - 25,300.00

32 m Pek. Pemasangan U-Ditch uk. (30x40x120) + Penutup


Bahan
0.8333 bh U-Ditch 30x40x120 Rp. 280,000.00 = 233,333.33
1.6667 bh Penutup U-Ditch Uk 40x60 Rp. 170,000.00 = 283,333.33
10.3000 kg Semen Portland Rp. 1,300.00 = 13,390.00
0.0610 m³ Pasir pasang Rp. 180,000.00 = 10,980.00
0.0690 m³ Pasir Urug Rp. 110,000.00 = 7,590.00

Upah An. SNI ( Revisi ) 6.15.2


0.3800 oh Pekerja Rp. 75,000.00 = 28,500.00
0.1900 oh Tukang Batu Rp. 90,000.00 = 17,100.00
0.0190 oh Kepala Tukang Rp. 90,000.00 = 1,710.00
0.0190 oh Mandor Rp. 106,610.00 = 2,025.59 +
JUMLAH = 49,335.59 548,626.67

33 m Pek. Pemasangan Pipa BSP sch. 40 Ø 6" t = 7.1 mm


Bahan An. SNI ( Revisi ) 6.19.1
1.0000 m Pipa BSP sch. 40 ø 6" t=7.1mm Rp. 47,000.00 = 47,000.00
35.0000 % Perlengkapan Rp. 47,000.00 = 16,450.00

Upah An. SNI ( Revisi ) 6.19.2


0.1350 oh Pekerja Rp. 75,000.00 = 10,125.00
0.2250 oh Tukang Rp. 90,000.00 = 20,250.00
0.0230 oh Kepala Tukang Rp. 90,000.00 = 2,070.00
0.0070 oh Mandor Rp. 106,610.00 = 746.27 +
JUMLAH = 33,191.27 63,450.00

17
34 m² Pek. Pemasangan Atap Zincalume Spandek Tebal 0.50 mm
Bahan An. SNI
1.3700 m² Atap Galvalume (Roofdeck) 10 Gelombang Rp. 53,000.00 = 72,610.00
4.0000 bh Paku rifet Rp. 300.00 = 1,200.00

Upah An. SNI


0.0210 oh Pekerja Rp. 75,000.00 = 1,575.00
0.0110 oh Tukang Kayu Rp. 90,000.00 = 990.00
0.0040 oh Mandor Rp. 106,610.00 = 426.44
1.0000 Ls Biaya mekanik/peralatan Rp. 12,000.00 = 12,000.00 +
JUMLAH = 14,991.44 73,810.00

35 m² Pek. Pemasangan Listplank GRC


Bahan An. SNI ( Revisi ) 6.13.1
0.3640 lbr GRC uk. 1.2 x 2.4 m tebal 9 mm Rp. 213,000.00 = 77,532.00
0.1000 kg Paku biasa 2" - 5" Rp. 16,500.00 = 1,650.00

Upah An. SNI ( Revisi ) 6.13.2


0.0700 oh Pekerja Rp. 75,000.00 = 5,250.00
0.1000 oh Tukang Kayu Rp. 90,000.00 = 9,000.00
0.0100 oh Kepala Tukang Kayu Rp. 90,000.00 = 900.00
0.0035 oh Mandor Rp. 106,610.00 = 373.14 +
JUMLAH = 15,523.14 79,182.00

36 m² Pek. Pemasangan Atap PVC Setara Alderon ( semi transparan)


Bahan
1.3700 lbr Atap UPVC Semi Trasnparan Setara Alderon Rp. 210,000.00 = 287,700.00
4.0000 bh Sekrup Alderon Rp. 300.00 = 1,200.00

Upah
0.0210 oh Pekerja Rp. 75,000.00 = 1,575.00
0.0110 oh Tukang Kayu Rp. 90,000.00 = 990.00
0.0040 oh Mandor Rp. 106,610.00 = 426.44
1.0000 oh Biaya Mekanik/peralatan Rp. 12,000.00 = 12,000.00 +
JUMLAH = 14,991.44 288,900.00

37 m Pek. Pemasangan atap nok Zincalume


Bahan An. SNI ( Revisi ) 6.39.1
0.3000 lbr Nok galvalum 0.3 mm Rp. 95,000.00 = 28,500.00
6.0000 bh Paku rifet Rp. 300.00 = 1,800.00

Upah An. SNI ( Revisi ) 6.39.2


0.1500 oh Pekerja Rp. 75,000.00 = 11,250.00
0.0700 oh Tukang Kayu Rp. 90,000.00 = 6,300.00
0.0080 oh Kepala Tukang Rp. 90,000.00 = 720.00
0.0060 oh Mandor Rp. 106,610.00 = 639.66 +
JUMLAH = 18,909.66 30,300.00

38 m² Pek. Pengecatan Cat Eksterior Dulux Weathershield


Bahan An. SNI ( Revisi ) 6.14.1
0.1000 kg Plamir Rp. 12,000.00 = 1,200.00
0.1200 lbr Ampelas Rp. 4,200.00 = 504.00
0.0330 bh Kuwas / roll Rp. 21,000.00 = 693.00
0.1100 kg Cat Dasar Eskterior setara Dulux (1x) weathe Rp. 55,000.00 = 6,050.00
0.2200 kg Cat Penutup Eskterior setara Dulux (2x) weat Rp. 55,000.00 = 12,100.00

18
Upah An. SNI ( Revisi ) 6.14.2
0.0280 oh Pekerja Rp. 75,000.00 = 2,100.00
0.0420 oh Tukang Cat Rp. 90,000.00 = 3,780.00
0.0042 oh Kepala Tukang Rp. 90,000.00 = 378.00
0.0025 oh Mandor Rp. 106,610.00 = 266.53 +
. JUMLAH = 6,524.53 20,547.00

39 m² Pek. Pemasangan acian


Bahan Permen PUPR Nomor 1 Tahun 2022
3.2500 kg Semen Portland Rp. 1,300.00 = 4,225.00
Upah Permen PUPR Nomor 1 Tahun 2022
0.2000 oh Pekerja Rp. 75,000.00 = 15,000.00
0.1000 oh Tukang Batu Rp. 90,000.00 = 9,000.00
0.0100 oh Kepala Tukang Batu Rp. 90,000.00 = 900.00
0.0100 oh Mandor Rp. 106,610.00 = 1,066.10 +
JUMLAH = 25,966.10 4,225.00

40 m² Pek. Pengecatan Tembok Baru Eksterior Dulux Weathershield ( Ngamplas. 1 x cat dasar. 2x cat penutup)
Bahan An. SNI ( Revisi ) 6.14.1
0.1000 kg Plamir Rp. 12,000.00 = 1,200.00
0.2500 lbr Ampelas Rp. 4,200.00 = 1,050.00
0.0200 bh Kuas Rp. 13,500.00 = 270.00
0.1000 kg Cat Dasar Eskterior setara Dulux (1x) weathe Rp. 55,000.00 = 5,500.00
0.2600 kg Cat Penutup Eskterior setara Dulux (2x) weat Rp. 55,000.00 = 14,300.00

Upah An. SNI ( Revisi ) 6.14.2


0.0200 oh Pekerja Rp. 75,000.00 = 1,500.00
0.0630 oh Tukang Cat Rp. 90,000.00 = 5,670.00
0.0063 oh Kepala Tukang Rp. 90,000.00 = 567.00
0.0025 oh Mandor Rp. 106,610.00 = 266.53 +
. JUMLAH = 8,003.53 22,320.00

41 m Pek. Pemasangan Talang Datar Galvalum t = 0.6 mm


Bahan An. SNI ( Revisi ) 6.18.1
1.0500 lbr Plat Galvalume T=0.6 mm Rp. 58,000.00 = 60,900.00
0.0150 Kg Paku biasa 2" - 5" Rp. 16,500.00 = 247.50
0.5000 Kg Besi strip Rp. 0.00 = -

Upah An. SNI ( Revisi ) 6.14.2


0.0280 oh Pekerja Rp. 75,000.00 = 2,100.00
0.0420 oh Tukang Cat Rp. 90,000.00 = 3,780.00
0.0042 oh Kepala Tukang Rp. 90,000.00 = 378.00
0.0025 oh Mandor Rp. 106,610.00 = 266.53 +
. JUMLAH = 6,524.53 61,147.50

42 kg Pek. Pemasangan Besi Siku 40x40x3


Bahan An. (Revisi) 6.1.1
1.100 kg Baja Siku 40x40x3 Rp. 16,000.00 = 17,600.00
0.080 kg Meni besi Rp. 0.00 = -

Upah An. (Revisi) 6.1.2


0.0060 oh Pekerja Rp. 75,000.00 = 450.00
0.0600 oh Tukang Cat Rp. 90,000.00 = 5,400.00
0.0060 oh Kepala Tukang Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
. JUMLAH = 6,421.98 17,600.00

19
43 m Pek. Pemasangan Kusen Aluminium 4"
Bahan An. SNI ( Revisi ) 6.12.1
1.0000 m Kusen Alumunium Warna 1.3mm (4") Rp. 80,000.00 = 80,000.00

Upah
0.1040 oh Pekerja Rp. 75,000.00 = 7,800.00
0.1040 oh Tukang Besi Rp. 90,000.00 = 9,360.00
0.0010 oh Kepala Tukang Besi Rp. 90,000.00 = 90.00
0.0001 oh Mandor Rp. 106,610.00 = 5.33 +
JUMLAH = 17,255.33 80,000.00

44 m² Pek. Pemasangan sunscreen alluminium


Bahan PERMEN PUPR28 - 2016 (A.4.2.1.9)
1.000 m² Jalusi Aluminium 1331 Black Rp. 300,000.00 = 300,000.00

Upah PERMEN PUPR28 - 2016 (A.4.2.1.9)


0.080 oh Pekerja Rp. 75,000.00 = 6,000.00
0.800 oh Tukang Rp. 90,000.00 = 72,000.00
0.080 oh Kepala Tukang Rp. 90,000.00 = 7,200.00
0.004 oh Mandor Rp. 106,610.00 = 426.44 +
JUMLAH = 85,626.44 300,000.00

45 Bh Pek. Pemasangan roof drain dia. 4" besi cor


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Roof Drain diameter 4" Rp. 55,000.00 = 55,000.00
10.000 % Perlengkapan Rp. = 5,500.00

Upah An. SNI ( Revisi ) 6.32.2


0.200 Oh Pekerja Rp. 75,000.00 = 15,000.00
0.200 Oh Tukang Rp. 90,000.00 = 18,000.00
0.020 Oh Kepala Tukang Rp. 90,000.00 = 1,800.00
0.020 Oh Mandor Rp. 106,610.00 = 2,132.20 +
JUMLAH = 36,932.20 60,500.00

46 m' Pek. Pemasangan pipa PVC tipe D ø 4"


Bahan An. SNI ( Revisi ) 6.24.1
1.000 m' Pipa PVC tipe D Ø 4" Rp. 36,000.00 = 36,000.00
35.000 % Perlengkapan Rp. = 12,600.00

Upah An. SNI ( Revisi ) 6.24.2


0.036 Oh Pekerja Rp. 75,000.00 = 2,700.00
0.060 Oh Tukang Rp. 90,000.00 = 5,400.00
0.006 Oh Kepala Tukang Rp. 90,000.00 = 540.00
0.00180 Oh Mandor Rp. 106,610.00 = 191.90 +
JUMLAH = 8,831.90 48,600.00

47 Bh Klem Penggantung PVC dia 4"


Bahan
1.0000 Buah Klem Penggantung Rp. 12,000.00 = 12,000.00
Upah
+
JUMLAH = - 12,000.00

20
48 kg Pek. Pemasangan Profil Baja ∅10mm
Bahan An. SNI ( Revisi ) 6.1.1
1.100 kg Besi Beton Polos Ø 10 mm Rp. 11,200.00 = 12,320.00

Upah An. SNI ( Revisi ) 6.1.2


0.006 oh Pekerja Rp. 75,000.00 = 450.00
0.060 oh Tukang Besi Rp. 90,000.00 = 5,400.00
0.006 oh Kepala Tukang besi Rp. 90,000.00 = 540.00
0.0003 oh Mandor Rp. 106,610.00 = 31.98 +
JUMLAH = 6,421.98 12,320.00

49 m² Pek. Pembongkaran Atap


Upah Perwal Yogyakarta No 161 Tahun 2016
0.2000 oh Pekerja Rp. 75,000.00 = 15,000.00
0.0100 oh Mandor Rp. 106,610.00 = 1,066.10 +
JUMLAH = 16,066.10 -

50 m² Pek. Pembongkaran plafond (dengan rangka)


Upah Perwal Yogyakarta No 161 Tahun 2016
0.15 oh Pekerja Rp. 75,000.00 = 11,250.00
0.0075 oh Tukang Kayu Rp. 90,000.00 = 675.00 +
JUMLAH = 11,925.00 -

51 m² Pek. Pemasangan kaca Acrilic bening tebal 5 mm


Bahan An. SNI ( Revisi ) 6.20.1
1.100 m² Acrylic bening tebal 5 mm Rp. 325,000.00 = 357,500.00

Upah An. SNI ( Revisi ) 6.20.2


0.015 oh Pekerja Rp. 75,000.00 = 1,125.00
0.150 oh Tukang Rp. 90,000.00 = 13,500.00
0.015 oh Kepala Tukang Rp. 90,000.00 = 1,350.00
0.001 oh Mandor Rp. 106,610.00 = 79.96 +
JUMLAH = 16,054.96 357,500.00

52 m² Pek. Pemasangan rangka besi hollow galvalum 40x40 untuk plafond


Bahan PUPR28-2016 (A.4.2.1.21.)
4.0000 m Hollow Galvalume 4 x 4 P= 6 m tb 0.2 mm Rp. 8,000.00 = 32,000.00
1.0000 Ls Assesoris ( Perkuaran, las dll) Rp. 8,000.00 = 8,000.00

Upah PUPR28-2016 (A.4.2.1.21.)


0.3500 oh Pekerja Rp. 75,000.00 = 26,250.00
0.3500 oh Tukang besi Rp. 90,000.00 = 31,500.00
0.0350 oh Kepala Tukang Rp. 90,000.00 = 3,150.00
0.0180 oh Mandor Rp. 106,610.00 = 1,918.98 +
JUMLAH = 62,818.98 40,000.00

53 m² Pek. Pemasangan langit-langit GRC t=9 mm


Bahan An. SNI ( Revisi ) 6.24.1
0.3640 lbr GRC uk. 1.2 x 2.4 m tebal 9 mm Rp. 213,000.00 = 77,532.00
0.1100 kg Paku Sekrup Rp. 0.00 = -

Upah An. SNI ( Revisi ) 6.24.2


0.1000 oh Pekerja Rp. 75,000.00 = 7,500.00
0.0500 oh Tukang Kayu Rp. 90,000.00 = 4,500.00
0.0050 oh Kepala Tukang Rp. 90,000.00 = 450.00
0.0050 oh Mandor Rp. 106,610.00 = 533.05 +
JUMLAH = 12,983.05 77,532.00

21
54 Ltr Lapisan Aspal Pengikat ( Tack Coat)
Bahan PERMEN PU NO 1 TAHUN 2022
1.7895 Kg Aspal Pertamina Pen 60/70 Rp. 17,200.00 = 30,779.40
Upah PERMEN PU NO 1 TAHUN 2022
0.0189 jam Pekerja Rp. 75,000.00 = 1,417.50
0.0047 jam Mandor Rp. 106,610.00 = 501.07
Alat PERMEN PU NO 1 TAHUN 2022
0.00002 Jam Sewa Aspal Sprayer Rp. 80,000.00 = 1.60
0.0047 Jam Sewa Compresor Rp. 225,000.00 = 1,066.50 +
JUMLAH = 2,986.67 30,779.40

55 ton Pek. Pengaspalan dengan Sand Sheet Tebal 2 cm


Bahan PERBUP No 23 tahun 2021
1.0300 ton Sand Sheet Rp. 1,200,000.00 = 1,236,000.00
Sewa
PERBUP No 23 tahun 2021
Alat
0.0108 jam Sewa Wheel Loader Rp. 280,000.00 = 3,024.00
0.0201 jam Sewa Asphalt Mixing Plant Rp. 8,200,000.00 = 164,820.00
0.0201 jam Sewa Genset 250 Kva Rp. 550,000.00 = 11,055.00
0.6980 jam Sewa Dump Truck 8-10m³ Rp. 430,000.00 = 300,140.00
0.0290 jam Sewa Asphalt Finisher Rp. 1,100,000.00 = 31,900.00
0.0000 jam Sewa Tandem Roller Rp. 150,000.00 = -
0.0367 jam Sewa Tire Roller Rp. 310,000.00 = 11,377.00
1.0000 ls Alat Bantu Rp. 10,000.00 = 10,000.00
Upah PERBUP No 23 tahun 2021
0.8375 jam Pekerja Rp. 75,000.00 = 62,812.50
0.0698 jam Mandor Rp. 106,610.00 = 7,441.38 +
JUMLAH = 70,253.88 1,768,316.00

56 m² Plesteran; 1 Pc : 4 Ps; tebal 15 mm


Bahan An. SNI ( Revisi ) 6.4.1
5.2000 Kg Semen portland Rp. 1,300.00 = 6,760.00
0.0200 m3 Pasir Pasang Rp. 180,000.00 = 3,600.00

Upah An. SNI ( Revisi ) 6.4.2


0.2000 Oh Pekerja Rp. 75,000.00 = 15,000.00
0.1500 Oh Tukang batu Rp. 90,000.00 = 13,500.00
0.0150 Oh Kepala tukang Rp. 90,000.00 = 1,350.00
0.0100 Oh Mandor Rp. 106,610.00 = 1,066.10 +
JUMLAH = 30,916.10 10,360.00

57 m¹ Pek. Pemasangan Difable Pave ukuran 30 x 30 cm


Bahan An. SNI ( Revisi ) 6.48.1
1.050 m Difable Pave 30x30x4 cm Rp. 70,000.00 = 73,500.00
7.454 Kg Semen portland Rp. 1,300.00 = 9,690.20
3.926 kg Kapur bubuk Rp. 10,000.00 = 39,260.00
0.042 m3 Pasir Pasang Rp. 180,000.00 = 7,560.00
0.300 Kg Semen warna Rp. 1,400.00 = 420.00

Upah An. SNI ( Revisi ) 6.48.2


0.240 oh Pekerja Rp. 75,000.00 = 18,000.00
0.120 oh Tukang Batu Rp. 90,000.00 = 10,800.00
0.0120 oh Kepala Tukang Rp. 90,000.00 = 1,080.00
0.0125 oh Mandor Rp. 106,610.00 = 1,332.63 +
JUMLAH = 31,212.63 130,430.20

22
58 m² Pek. Pengecatan dengan Cat Berpasir
Bahan An. SNI ( Revisi ) 6.20.1
0.500 kg Cat Berpasir setara Tennokote Rp. 85,000.00 = 42,500.00
0.020 m² Kuwas / roll Rp. 21,000.00 = 420.00

Upah An. SNI ( Revisi ) 6.20.2


0.020 oh Pekerja Rp. 75,000.00 = 1,500.00
0.200 oh Tukang Cat Rp. 90,000.00 = 18,000.00
0.0200 oh Kepala Tukang Rp. 90,000.00 = 1,800.00
0.0100 oh Mandor Rp. 106,610.00 = 1,066.10 +
JUMLAH = 22,366.10 42,920.00

59 m Pek. Pemasangan Railing Stainless Steel


Bahan
2.500 m Pipa stainless 304 2 1/2" tebal 1,5 mm Rp. 80,000.00 = 200,000.00
3.000 m Pipa stainless 304 1" tebal 1,5 mm Rp. 60,000.00 = 180,000.00
35.00 % Perlengkapan Rp. 380,000.00 = 133,000.00

Upah Perwal No 121 Yogyakarta Tahun 2016


1.3000 oh Pekerja Rp. 75,000.00 = 97,500.00
0.6500 oh Tukang Rp. 90,000.00 = 58,500.00
0.0650 oh Kepala Tukang Rp. 90,000.00 = 5,850.00
0.0650 oh Mandor Rp. 106,610.00 = 6,929.65 +
JUMLAH = 168,779.65 513,000.00

60 m² Pek. Pembongkaran Genteng (tidak dipakai)


Upah Perwal No 121 Yogyakarta Tahun 2016
0.2000 oh Pekerja Rp. 75,000.00 = 15,000.00
0.0100 oh Mandor Rp. 106,610.00 = 1,066.10 +
JUMLAH = 16,066.10 -

61 m² Pek. Pembongkaran Rangka Atap/Reng/Kaso


Upah Perwal No 121 Yogyakarta Tahun 2016
0.2000 oh Pekerja Rp. 75,000.00 = 15,000.00
0.0100 oh Mandor Rp. 106,610.00 = 1,066.10 +
JUMLAH = 16,066.10 -

62 m² Pek. Pemasangan rangka atap kayu kamper untuk Genteng Plentong


Bahan An. SNI (Revisi) 6.32.1
0.0120 m³ Kayu Meranti usuk 5/7 & 4/6. Rp. 3,600,000.00 = 43,200.00
0.1500 kg Paku biasa 2" - 5" Rp. 16,500.00 = 2,475.00

Upah An. SNI (Revisi) 6.32.2


0.1000 oh Pekerja Rp. 75,000.00 = 7,500.00
0.1000 oh Tukang Kayu Rp. 90,000.00 = 9,000.00
0.0100 oh Kepala Tukang Kayu Rp. 90,000.00 = 900.00
0.0050 oh Mandor Rp. 106,610.00 = 533.05 +
JUMLAH = 17,933.05 45,675.00

63 m² Pek. Pemasangan atap genteng Kodok Glazur


Bahan An. SNI ( Revisi ) 6.1.1
25.0000 bh Genteng Kodok Glazur Rp. 4,000.00 = 100,000.00

Upah An. SNI ( Revisi ) 6.1.2


0.1500 oh Pekerja Rp. 75,000.00 = 11,250.00
0.0750 oh Tukang Kayu Rp. 90,000.00 = 6,750.00
0.0080 oh Kepala Tukang Rp. 90,000.00 = 720.00
0.0080 oh Mandor Rp. 106,610.00 = 852.88 +
JUMLAH = 19,572.88 100,000.00

23
64 m² Pek. Pemasangan bubungan genteng kodok glazur
Bahan An. SNI ( Revisi ) 6.5.1
5.0000 bh Nok Genteng Kodok Glazur Rp. 14,000.00 = 70,000.00
8.0000 kg Semen Portland Rp. 1,300.00 = 10,400.00
0.0320 m3 Pasir pasang Rp. 180,000.00 = 5,760.00

Upah An. SNI ( Revisi ) 6.5.2


0.4000 oh Pekerja Rp. 75,000.00 = 30,000.00
0.2000 oh Tukang Kayu Rp. 90,000.00 = 18,000.00
0.0200 oh Kepala Tukang Rp. 90,000.00 = 1,800.00
0.0020 oh Mandor Rp. 106,610.00 = 213.22 +
JUMLAH = 50,013.22 86,160.00

65 m² Pek. Pengecatan Tembok Lama Eksterior Dulux Weathershield Powerflexx ( Ngamplas. 1 x cat dasar. 2x cat penutup)
Bahan An. SNI ( Revisi ) 6.14.1
0.1000 kg Plamir Tembok Rp. 12,000.00 = 1,200.00
0.1200 lbr Ampelas Rp. 4,200.00 = 504.00
0.0330 bh Kuwas / roll Rp. 21,000.00 = 693.00
Cat Dasar Eskterior setara Dulux (1x)
0.1100 kg Rp. 55,000.00 = 6,050.00
weathershield
Cat Penutup Eskterior setara Dulux (2x)
0.2200 kg Rp. 55,000.00 = 12,100.00
weathershield

Upah An. SNI ( Revisi ) 6.14.2


0.0280 oh Pekerja Rp. 75,000.00 = 2,100.00
0.0420 oh Tukang Cat Rp. 90,000.00 = 3,780.00
0.0042 oh Kepala Tukang Rp. 90,000.00 = 378.00
0.0025 oh Mandor Rp. 106,610.00 = 266.53 +
. JUMLAH = 6,524.53 20,547.00

66 m² Pek. Pengecatan Tembok Lama Interior Dulux Pentalite ( Ngamplas. 1 x cat dasar. 2x cat penutup)
Bahan An. SNI ( Revisi ) 6.14.1
0.1000 kg Plamir Tembok Rp. 12,000.00 = 1,200.00
0.1200 lbr Ampelas Rp. 4,200.00 = 504.00
0.0330 bh Kuwas / roll Rp. 21,000.00 = 693.00
0.1100 kg Cat Dasar Interior setara Dulux (1x) pentalite Rp. 60,000.00 = 6,600.00
0.2200 kg Cat Penutup Interior setara Dulux (2x) pental Rp. 60,000.00 = 13,200.00

Upah An. SNI ( Revisi ) 6.14.2


0.0280 oh Pekerja Rp. 75,000.00 = 2,100.00
0.0420 oh Tukang Cat Rp. 90,000.00 = 3,780.00
0.0042 oh Kepala Tukang Rp. 90,000.00 = 378.00
0.0025 oh Mandor Rp. 106,610.00 = 266.53 +
. JUMLAH = 6,524.53 22,197.00

67 m² Pek. Pengerokan cat tembok


Bahan An. SNI ( Revisi ) 6.1.1
0.0500 ltr Neorever (Bahan Pelunak) Rp. 40,000.00 = 2,000.00

Upah An. SNI ( Revisi ) 6.1.2


0.0660 oh Tukang Cat Rp. 90,000.00 = 5,940.00
0.0660 oh Kepala Tukang Cat Rp. 90,000.00 = 5,940.00
0.0400 oh Mandor Rp. 106,610.00 = 4,264.40 +
JUMLAH = 16,144.40 2,000.00

24
68 m³ Pek. Pembongkaran Beton dengan Jack Hammer
Bahan PERMEN PUPR28-2016
2.5000 ltr Minyak Solar Rp. 16,900.00 42,250.00
2.0000 jam Sewa Jack Hammer Rp. 25,000.00 50,000.00

Upah PERMEN PUPR28-2016


1.2000 oh Pekerja Rp. 75,000.00 = 90,000.00
0.1200 oh Mandor Rp. 106,610.00 = 12,793.20 +
JUMLAH = 102,793.20 92,250.00

69 m² Pek. Pemasangan bata merah tebal 1 bata ad.1 Pc : 3 Ps


Bahan An. SNI ( Revisi ) 6.3.1
140.0000 bh Bata Merah uk.5x11x22cm Rp. 650.00 = 91,000.00
28.7400 kg Semen Portland Rp. 1,300.00 = 37,362.00
0.0800 m³ Pasir Pasang Rp. 180,000.00 = 14,400.00

Upah An. SNI ( Revisi ) 6.3.2


0.6400 oh Pekerja Rp. 75,000.00 = 48,000.00
0.2000 oh Tukang Batu Rp. 90,000.00 = 18,000.00
0.0200 oh Kepala Tukang Rp. 90,000.00 = 1,800.00
0.0300 oh Mandor Rp. 106,610.00 = 3,198.30 +
JUMLAH = 70,998.30 142,762.00

ANALISIS HARGA SATUAN MEKANIKAL, ELEKTRIKAL & PLUMBING


PEMBUATAN OVERKAPING STASIUN RANDUBLATUNG

1 unit Pek. Pemasangan Panel Unit Lighting Panel


Bahan
1.000 bh Panel Box 60x40x20 cm Rp. 355,000.00 = 355,000.00
1.000 bh MCCB 3P 25A Setara Schneider Rp. 95,000.00 = 95,000.00
13.000 bh MCB 1P 10 A Setara Scheneider Rp. 85,000.00 = 1,105,000.00
3.000 bh CT 30/5A OTTO Rp. 64,000.00 = 192,000.00
3.000 btg Busbar sisir Rp. 850,000.00 = 2,550,000.00
1.000 bh Rel Nol & Ground Rp. 260,000.00 = 260,000.00
2.000 btg Rel MCB Rp. 16,000.00 = 32,000.00
1.00 bh Selector Switch Rp. 135,000.00 = 135,000.00
1.00 bh Arrester 3p+n, 20 kA Rp. 235,000.00 = 235,000.00
3.00 bh Pilot Lamp Rp. 8,000.00 = 24,000.00
1.00 bh Ampere Meter Digital DM3110 setara Schneider Rp. 512,000.00 = 512,000.00
3.00 bh Volt Meter Digital DM3210 setara Schneider Rp. 55,000.00 = 165,000.00
1.00 bh Timer Analog theben sul 181 d Rp. 160,000.00 = 160,000.00
1.00 bh Contactor 3p, 25a setara scheneider LC1D12 Rp. 560,000.00 = 560,000.00
5.000 % Pelengkap Instalasi Rp. 6,380,000.00 = 319,000.00
Upah
5.000 % Upah Rp. 6,699,000.00 = 334,950.00
JUMLAH = 334,950.00 6,699,000.00

2 bh Penambahan MCCB pada SDP Stasion 25A


Bahan An. SNI ( Revisi ) 6.21.1
1.00000 bh MCCB 3P 25A Setara Schneider Rp. 95,000.00 = 95,000.00
5.00000 % Perlengkapan Instalasi Rp. 95,000.00 = 4,750.00

Upah An. SNI ( Revisi ) 6.21.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 99,750.00

25
3 m Pek. Pemasangan Kabel Power NYY 4x10 mm + NYA 10 mm
Bahan An. SNI ( Revisi ) 6.10.1
1.00000 m Kabel NYY 4 x 10 mm² Rp. 17,000.00 = 17,000.00
1.00000 m Kabel NYA 1 x 10 mm² Rp. 20,000.00 = 20,000.00
5.00000 % Perlengkapan Instalasi Rp. 17,000.00 = 850.00

Upah An. SNI ( Revisi ) 6.10.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 37,850.00

4 bh Pek. Pemasangan Lampu LED setara Opple Lampu LED Highbay-P4 110W-5700-100D-GY-GP
Bahan An. SNI ( Revisi ) 6.33.1
1.00000 bh Lampu LED Highbay-P4 110W-5700-100D- Rp. 650,000.00 = 650,000.00
5.00000 % Perlengkapan Instalasi Rp. 650,000.00 = 32,500.00

Upah An. SNI ( Revisi ) 6.33.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 682,500.00

5 bh Pek. Pemasangan Lampu Emergency Twin spot LED 2x3 watt


Bahan An. SNI ( Revisi ) 6.34.1
1.00000 bh Emergency Twin spot LED 2x3 watt Rp. 439,000.00 = 439,000.00
5.00000 % Perlengkapan Instalasi Rp. 439,000.00 = 21,950.00

Upah An. SNI ( Revisi ) 6.34.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 460,950.00

6 bh Pek. Pemasangan Lampu LED setara Opple Lampu LED Waterproof-UQ L1200-30W-5700-FR-GP
Bahan An. SNI ( Revisi ) 6.33.1
1.0000 bh Lampu LED Waterproof-UQ L1200-30W-57 Rp. 390,000.00 = 390,000.00
5.0000 % Perlengkapan Instalasi Rp. 390,000.00 = 19,500.00

Upah An. SNI ( Revisi ) 6.33.2


0.1660 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.1660 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.0330 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.0170 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 409,500.00

7 ttk Pek. Instalasi Titik Lampu Dalam


Bahan An. SNI ( Revisi ) 6.3.1
15.00000 m Kabel NYM 3 x 2.5 mm² Rp. 17,000.00 = 255,000.00
15.00000 m Conduit pipa Ø 20 Rp. 4,000.00 = 60,000.00
5.00000 % Perlengkapan Instalasi Rp. 315,000.00 = 15,750.00

Upah An. SNI ( Revisi ) 6.3.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 330,750.00

26
8 m Pek. Pemasangan kabel Ladder Type U 20x10 cm + Cover
Bahan An. SNI ( Revisi ) 6.14.1
1.00000 m kabel ladder Type U 20x10 cm Rp. 9,000.00 = 9,000.00
1.00000 m Cover 20 cm Rp. 8,000.00 = 8,000.00
5.00000 % Perlengkapan Instalasi Rp. 9,000.00 = 450.00

Upah An. SNI ( Revisi ) 6.14.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 17,450.00

9 m Pek. Pemasang Grounding box


Bahan An. SNI ( Revisi ) 6.38.1
1.00000 m Grounding box 40x40x40cm Rp. 320,000.00 = 320,000.00
5.00000 % Perlengkapan Instalasi Rp. 320,000.00 = 16,000.00

Upah An. SNI ( Revisi ) 6.38.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 336,000.00

10 m Pek. Pemasang Grounding Rod 3/4" Full Tembaga


Bahan An. SNI ( Revisi ) 6.39.1
1.00000 m Grounding Rod 3/4" Full Tembaga Rp. 180,000.00 = 180,000.00
5.00000 % Perlengkapan Instalasi Rp. 180,000.00 = 9,000.00

Upah An. SNI ( Revisi ) 6.39.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 189,000.00

11 m Pek. Pemasangan Kabel pentanahan ( BC 70 mm )


Bahan An. SNI ( Revisi ) 6.41.1
1.00000 m Kabel BC 70 Rp. 15,500.00 = 15,500.00
5.00000 % Perlengkapan Instalasi Rp. 15,500.00 = 775.00

Upah An. SNI ( Revisi ) 6.14.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 16,275.00

12 un Pek. Relokasi Tiang Lampu


Bahan
1.00000 m Tiang PJU Oktagonal 7 M Doubel Rp. - = -
Perlengkapan instalasi Tiang PJU
5.00000 % Rp. 8,000,000.00 = 400,000.00
Oktagonal 7 M Doubel
- ON SITE
- Angkur
-Plat besi 30 x 30 cm

27
Upah
0.86400 Oh Pekerja Rp. 75,000.00 = 64,800.00
1.44000 Oh Tukang Rp. 90,000.00 = 129,600.00
0.14400 Oh Kepala tukang Rp. 90,000.00 = 12,960.00
0.04320 Oh Mandor Rp. 106,610.00 = 4,605.55 +
JUMLAH = 211,965.55 400,000.00

13 unit Pek. Pemasang Proteksi Petir Radius 100 m


Bahan An. SNI ( Revisi ) 6.17.1
1.00000 m Air Terminal Radius 100 m Rp. 1,700,000.00 = 1,700,000.00
5.00000 % Perlengkapan Instalasi Rp. 1,700,000.00 = 85,000.00

Upah An. SNI ( Revisi ) 6.17.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 1,785,000.00

14 unit Pek. Pemasang FR-P Mast - 2M dan Counter Strike


Bahan An. SNI ( Revisi ) 6.17.1
1.00000 m FR-P Mast - 2M dan Counter Strike Rp. 8,000.00 = 8,000.00
5.00000 % Perlengkapan Instalasi Rp. 8,000.00 = 400.00

Upah An. SNI ( Revisi ) 6.17.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 8,400.00

15 m Pek. Pemasangan Kabel Coaxial 2x35 mm²


Bahan An. SNI ( Revisi ) 6.41.1
1.00000 m Coaxial 2x35 mm² Rp. 222,000.00 = 222,000.00
5.00000 % Perlengkapan Instalasi Rp. 222,000.00 = 11,100.00

Upah An. SNI ( Revisi ) 6.41.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 233,100.00

16 unit Pek. Pemasang Obstruction light


Bahan An. SNI ( Revisi ) 6.17.1
1.00000 m Obstruction Light Rp. 27,000.00 = 27,000.00
5.00000 % Perlengkapan Instalasi Rp. 27,000.00 = 1,350.00

Upah An. SNI ( Revisi ) 6.17.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 28,350.00

28
17 unit Pek. Pemasangan Media Player
Bahan An. SNI ( Revisi ) 6.47.1
1.00000 m Media Player Rp. 15,000.00 = 15,000.00
5.00000 % Perlengkapan Instalasi Rp. 15,000.00 = 750.00

Upah An. SNI ( Revisi ) 6.47.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 15,750.00

18 unit Pek. Pemasangan Emergency Message Panel


Bahan An. SNI ( Revisi ) 6.47.1
1.00000 m Emergency Message Panel Rp. 3,000.00 = 3,000.00
5.00000 % Perlengkapan Instalasi Rp. 3,000.00 = 150.00

Upah An. SNI ( Revisi ) 6.47.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 3,150.00

19 unit Pek. Wireless Set (Dual Wireless Handheld Set)+Desk Stand Mic
Bahan An. SNI ( Revisi ) 6.47.1
1.00000 m Wireless Set (Dual Wireless Handheld Set)+ Rp. 205,000.00 = 205,000.00
5.00000 % Perlengkapan Instalasi Rp. 205,000.00 = 10,250.00

Upah An. SNI ( Revisi ) 6.47.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 215,250.00

20 unit Pek. Pemasangan Pre Amplifier Mixer Panel dan Remote Interface
Bahan An. SNI ( Revisi ) 6.47.1
1.00000 m Pre Amplifier Mixer Panel + Z-FV200RF-AS Rp. 2,400,000.00 = 2,400,000.00
5.00000 % Perlengkapan Instalasi Rp. 2,400,000.00 = 120,000.00

Upah An. SNI ( Revisi ) 6.47.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 2,520,000.00

29
21 unit Pek. Pemasangan Power Amplifier 240 Watt
Bahan An. SNI ( Revisi ) 6.47.1
1.00000 m Power Amplifier 240 Watt Z-FV224PA-AS Rp. 1,790,000.00 = 1,790,000.00
5.00000 % Perlengkapan Instalasi Rp. 1,790,000.00 = 89,500.00

Upah An. SNI ( Revisi ) 6.47.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 1,879,500.00

22 unit Pek. Pemasangan Speaker Selector 10 ch


Bahan An. SNI ( Revisi ) 6.47.1
1.00000 m Speaker Selector 10 ch Rp. 410,000.00 = 410,000.00
5.00000 % Perlengkapan Instalasi Rp. 410,000.00 = 20,500.00

Upah An. SNI ( Revisi ) 6.47.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 430,500.00

23 unit Pek. Pemasangan Wide Horn Speaker 15W


Bahan An. SNI ( Revisi ) 6.47.1
1.00000 m Wide Horn Speaker 15W Rp. 312,000.00 = 312,000.00
5.00000 % Perlengkapan Instalasi Rp. 312,000.00 = 15,600.00

Upah An. SNI ( Revisi ) 6.47.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 327,600.00

24 unit Pek. Pemasangan Cabinet Rack with Accessories


Bahan An. SNI ( Revisi ) 6.47.1
1.00000 m Cabinet Rack with Accessories Rp. 2,480,000.00 = 2,480,000.00
5.00000 % Perlengkapan Instalasi Rp. 2,480,000.00 = 124,000.00

Upah An. SNI ( Revisi ) 6.47.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 2,604,000.00

30
25 ttk Pek. Instalasi Titik Sound System
Bahan An. SNI ( Revisi ) 6.6.1
24.00000 m Kabel NYMHY 2 x 2.5 mm² Rp. 14,000.00 = 336,000.00
24.00000 m Conduit pipa Ø 20 Rp. 4,000.00 = 96,000.00
5.00000 % Perlengkapan Instalasi Rp. 432,000.00 = 21,600.00

Upah An. SNI ( Revisi ) 6.6.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 453,600.00

26 unit Pek. Pemasangan Kabel Power NYY 4x16 mm + NYA 16 mm


Bahan An. SNI ( Revisi ) 6.10.1
1.00000 m Kabel NYY 4 x 16 mm² Rp. 145,000.00 = 145,000.00
1.00000 m Kabel NYA 1 x 16 mm² Rp. 31,000.00 = 31,000.00
5.00000 % Perlengkapan Instalasi Rp. 176,000.00 = 8,800.00

Upah An. SNI ( Revisi ) 6.10.2


0.16600 oh Pembantu Tukang Listrik Rp. 90,000.00 = 14,940.00
0.16600 oh Tukang Listrik Rp. 90,000.00 = 14,940.00
0.03300 oh Kepala Tukang Listrik Rp. 100,000.00 = 3,300.00
0.01700 oh Mandor Rp. 106,610.00 = 1,812.37 +
JUMLAH = 34,992.37 184,800.00

Semarang, Maret 2023


Mengetahui Mengetahui
Asman Mekanikal dan Asman Perawatan Bangunan Dinas
Elektrikal Stasiun
Daerah Operasi 4 Semarang Daerah Operasi 4 Semarang

TOMMY P. SINURAYA AHMAD YUSRAN


NIPP. 68312 NIPP. 71834

31
HARGA SATUAN
PEMBUATAN OVERKAPING STASIUN RANDUBLATUNG
Harga
No Uraian Satuan Ket
(Rp)

upah
1 Pek. Pembersihan Lapangan dan Peralatan, ls 5,000,000.00
2 Pek. Shop Drawing dan As Built Drawing pkt 10,000,000.00
3 Pek. Mobilisasi dan demobilisasi Alat pkt 15,000,000.00
4 Testing & Commisioning ls 20,000,000.00
5 Pek. Pembersihan Akhir ls 7,000,000.00
6 Kepala Tukang oh 90,000.00
7 Kepala Tukang Batu oh 90,000.00
8 Kepala Tukang Besi oh 90,000.00
9 Kepala Tukang Cat oh 90,000.00
10 Kepala Tukang Kayu oh 90,000.00
11 Kepala Tukang Listrik oh 100,000.00
12 Mandor oh 106,610.00
13 Pekerja oh 75,000.00
14 Pembantu Tukang Listrik oh 90,000.00
15 Tukang oh 90,000.00
16 Tukang Batu oh 90,000.00
17 Tukang Besi oh 90,000.00
18 Tukang Cat oh 90,000.00
19 Tukang Kayu oh 90,000.00
20 Tukang Listrik oh 90,000.00
21 Tukang Listrik oh 90,000.00

bahan
22 Acrylic bening tebal 5 mm m² 325,000.00
23 Ampere Meter Digital DM3110 setara Schneider bh 512,000.00
24 Angkur Baut M16 bh 65,000.00
25 Angkur Baut Ø10 bh 23,000.00
26 Arrester 3p+n, 20 kA bh 235,000.00
27 Bata Merah uk.5x11x22cm bh 650.00
28 Baut M16 bh 3,800.00
29 Buis beton bulat dia 40 cm bh 70,000.00
30 Contactor 3p, 25a setara scheneider LC1D12 bh 560,000.00
31 CT 30/5A OTTO bh 64,000.00
32 Emergency Twin spot LED 2x3 watt bh 439,000.00
33 Genteng Kodok Glazur bh 4,000.00
34 Kuas bh 13,500.00
35 Kuwas / roll bh 21,000.00
36 Lampu LED Highbay-P4 110W-5700-100D-GY-GP bh 650,000.00
37 MCB 1P 10 A Setara Scheneider bh 85,000.00
38 MCCB 3P 25A Setara Schneider bh 95,000.00
39 Nok Genteng Kodok Glazur bh 14,000.00
40 Paku rifet bh 300.00
41 Panel Box 60x40x20 cm bh 355,000.00
Harga
No Uraian Satuan Ket
(Rp)

42 Penutup U-Ditch Uk 40x60 bh 170,000.00


43 Pilot Lamp bh 8,000.00
44 Rel Nol & Ground bh 260,000.00
45 Roof Drain diameter 4" bh 55,000.00
46 Sekrup Alderon bh 300.00
47 Selector Switch bh 135,000.00
48 Timer Analog theben sul 181 d bh 160,000.00
49 U-Ditch 30x40x120 bh 280,000.00
50 Volt Meter Digital DM3210 setara Schneider bh 55,000.00
Harga
No Uraian Satuan Ket
(Rp)

51 Busbar sisir btg 850,000.00


52 Dolken kayu Ø 8-10 / 400 cm Btg 15,000.00
53 Rel MCB btg 16,000.00
54 Klem Penggantung Buah 12,000.00
55 Sewa Aspal Sprayer Jam 80,000.00
56 Sewa Asphalt Finisher jam 1,100,000.00
57 Sewa Asphalt Mixing Plant jam 8,200,000.00
58 Sewa Compresor Jam 225,000.00
59 Sewa Dump Truck 8-10m³ jam 430,000.00
60 Sewa Genset 250 Kva jam 550,000.00
61 Sewa Jack Hammer jam 25,000.00
62 Sewa Tandem Roller jam 150,000.00
63 Sewa Tire Roller jam 310,000.00
64 Sewa Wheel Loader jam 280,000.00
65 Aspal Pertamina Pen 60/70 Kg 17,200.00
66 Baja Ikatan Angin kg 16,000.00
67 Baja Profil CNP kg 16,000.00
68 Baja Siku 40x40x3 kg 16,000.00
69 Baja Siku 50x50x5 kg 16,000.00
70 Baja Track Stang kg 16,000.00
71 Besi Baja Profil WF kg 16,000.00
72 Besi Beton Polos Ø 10 mm kg 11,200.00
73 Besi Beton Polos Ø 8 mm kg 11,200.00
74 Besi Beton Ulir kg 11,200.00
75 Cat Berpasir setara Tennokote kg 85,000.00
76 Cat Dasar Eskterior setara Dulux (1x) weathershield kg 55,000.00
77 Cat Dasar Interior setara Dulux (1x) pentalite kg 60,000.00
78 Cat Dasar setara Emco kg 90,000.00
79 Cat Penutup 2 kali setara Emco kg 90,000.00
80 Cat Penutup Eskterior setara Dulux (2x) weathershield kg 55,000.00
81 Cat Penutup Interior setara Dulux (2x) pentalite kg 60,000.00
82 Kapur bubuk kg 10,000.00
83 Kawat Beton kg 19,000.00
84 Kawat las/Elektroda E7016 Kg 36,000.00
85 Meni besi kg 25,000.00
86 Paku kg 16,500.00
87 Paku biasa 2" - 5" kg 16,500.00
88 Pipa Besi kg 19,150.00
89 Plamir kg 12,000.00
90 Plamir Tembok kg 12,000.00
91 Plat Baja t=10mm kg 16,000.00
92 Plat Baja t=12mm kg 16,000.00
93 Semen Grout kg 1,300.00
94 Semen Portland kg 1,300.00
95 Semen warna Kg 1,400.00
96 Air L 70.00
97 Ampelas lbr 4,200.00
Harga
No Uraian Satuan Ket
(Rp)

98 Atap UPVC Semi Trasnparan Setara Alderon lbr 210,000.00


99 GRC uk. 1.2 x 2.4 m tebal 9 mm lbr 213,000.00
Harga
No Uraian Satuan Ket
(Rp)

100 Multiplek Film 12 mm lbr 200,000.00


101 Nok galvalum 0.3 mm lbr 95,000.00
102 Plat Galvalume T=0.6 mm lbr 58,000.00
103 Plywood 1.22 x 2.44 x 6 mm lbr 80,000.00
104 Plywood tebal 9 mm Lbr 120,000.00
105 Seng BJLS gelombang uk; 80 x 180 cm lbr 65,000.00
106 Minyak Solar liter 16,900.00
107 Alat Bantu ls 10,000.00
108 Assesoris ( Perkuaran, las dll) Ls 5,000,000.00
109 Biaya mekanik/peralatan Ls 12,000.00
110 Minyak Bekisting ltr 12,000.00
111 Minyak Pelumas ltr 58,000.00
112 Neorever (Bahan Pelunak) ltr 40,000.00
113 Air Terminal Radius 100 m m 1,700,000.00
114 Cabinet Rack with Accessories m 2,480,000.00
115 Coaxial 2x35 mm² m 222,000.00
116 Conduit pipa Ø 20 m 4,000.00
117 Cover 20 cm m 8,000.00
118 Difable Pave 30x30x4 cm m 70,000.00
119 Emergency Message Panel m 3,000.00
120 FR-P Mast - 2M dan Counter Strike m 8,000.00
121 Grounding box 40x40x40cm m 320,000.00
122 Grounding Rod 3/4" Full Tembaga m 180,000.00
123 Hollow Galvalume 4 x 4 P= 6 m tb 0.2 mm m 8,000.00
124 Kabel BC 70 m 15,500.00
125 kabel ladder Type U 20x10 cm m 9,000.00
126 Kabel NYA 1 x 10 mm² m 20,000.00
127 Kabel NYA 1 x 16 mm² m 31,000.00
128 Kabel NYM 3 x 2.5 mm² m 17,000.00
129 Kabel NYMHY 2 x 2.5 mm² m 14,000.00
130 Kabel NYY 4 x 10 mm² m 17,000.00
131 Kabel NYY 4 x 16 mm² m 145,000.00
132 Kusen Alumunium Warna 1.3mm (4") m 80,000.00
133 Media Player m 15,000.00
134 Obstruction Light m 27,000.00
135 Pipa BSP sch. 40 ø 6" t=7.1mm m 47,000.00
136 Pipa stainless 304 1" tebal 1,5 mm m 60,000.00
137 Pipa stainless 304 2 1/2" tebal 1,5 mm m 80,000.00
138 Power Amplifier 240 Watt Z-FV224PA-AS m 1,790,000.00
139 Pre Amplifier Mixer Panel + Z-FV200RF-AS m 2,400,000.00
140 Speaker Selector 10 ch m 410,000.00
141 Wide Horn Speaker 15W m 312,000.00
142 Wireless Set (Dual Wireless Handheld Set)+Desk Stand Mic m 205,000.00
143 Pipa PVC tipe D Ø 4" m' 36,000.00
144 Atap Galvalume (Roofdeck) 10 Gelombang Tebal 0.5mm m² 53,000.00
145 Jalusi Aluminium 1331 Black m² 300,000.00
146 Kayu balok bekisting m3 3,400,000.00
Harga
No Uraian Satuan Ket
(Rp)

147 Kayu bekisting m3 3,400,000.00


148 Koral beton m3 285,000.00
Harga
No Uraian Satuan Ket
(Rp)

149 Lanan Papan m3 3,400,000.00


150 Pasir beton m3 210,000.00
151 Screening m3 145.00
152 Kayu Meranti usuk 5/7 & 4/6. m³ 3,600,000.00
153 Kayu Perancah m³ 3,600,000.00
154 Kayu Terentang / Meranti m³ 3,600,000.00
155 Pasir Pasang m³ 180,000.00
156 Pasir Urug m³ 110,000.00
157 Tanah Urug m³ 60,000.00
158 Sand Sheet ton 1,200,000.00
159 Penambahan daya listrik PLN, dari 7700 ke 16500 VA 3,000.00
160 Jaminan Langganan VA 900.00
161 SLO VA 700.00
162 Pek. Pengadaan APD dan Rambu pkt 5,000,000.00
163 Pek. Sewa Scaffolding pkt 9,000,000.00
164 Pek. Pengadaan Listrik dan Air kerja ls 10,000,000.00
165 Pek. Pengadaan Terpal untuk perapihan tanah bekas galian pkt 1,500,000.00
166 Sumur Resapan unit 800,000.00
167 Materai bh 11,000.00
168 Baut M12 bh 3,800.00
169 Lampu LED Waterproof-UQ L1200-30W-5700-FR-GP bh 390,000.00
170 Perlengkapan instalasi Tiang PJU Oktagonal 7 M Doubel % 8,000,000.00
LIST MATERIAL WF RANDU BELATUNG

NO URAIAN PEKERJAAN TOTAL KG Berat /Btg JUMLAH BTG

1 WF250x125x6x9 10,320.22 355.00 29 btg


2 WF150x75x5x7 931.08 168.00 6 btg
3 CNP 125x50x20x2,3 6,785.44 27.10 251 btg
4 Plat Baja t = 12 mm, 289.19 280.00 1 lbr
5 Plat Baja t = 10 mm, 977.49 233.30 4 lbr
6 CNP 100x50x20x2.3 910.82 24.40 37 btg
7 Besi Siku 40x40x3 4,377.69 11.00 398 btg
8 Siku 50x50x5, 196.04 22.50 9 btg
9 Besi Ulir, D13 4,147.40 12.50 332 btg
10 Besi Polos Ø8, 310.22 4.74 65 btg
11 Besi Polos Ø 10 mm 298.90 7.40 40 btg

PT.JASA KARYA NUSANTARA

AGUS SUYANTO
Direktur Utama
PEKERJAAN : PEMBUATAN OVERKAPING STASIUN RANDUBLATUNG
LOKASI : DAOP 4 SEMARANG

BILL OF QUANTITY

NO VOL SAT URAIAN PEKERJAAN HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
UPAH BAHAN UPAH BAHAN

I. PEKERJAAN PERSIAPAN
1. 1.00 Is Pek. Pembersihan Lapangan dan Peralatan,
2. 6.00 m2 Pembuatan gudang semen dan alat-alat, 200,000.00 1,200,000.00
3. 16.00 m2 Pembuatan bedeng buruh,
4. 1.00 pkt Pek. Pengadaan APD dan Rambu
5. 1.00 pkt Pek. Sewa Scaffolding - -
6. 1.00 pkt Pek. Shop Drawing dan As Built Drawing
7. 1.00 pkt Pek. Mobilisasi dan demobilisasi Alat
8. 1.00 ls Pek. Pengadaan Listrik dan Air kerja
9. 1.00 pkt Pek. Pengadaan Terpal untuk perapihan tanah bekas galian - -

Jumlah I. 1,200,000.00 -

II. PEKERJAAN TANAH


1. 170.28 m³ Pek. Galian Tanah berbatu Semi Mekanis sedalam >1 s/d 2 m, 35,000.00 5,959,800.00
2. 3.68 m³ Pek. Pengurugan dengan pasir urug, t = 5 cm 23,566.10 86,676.12
3. 3.18 m³ Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, untuk lantai kerja 130,000.00 413,920.00
pondasi t=5cm
4. 144.81 m³ Pek. Pengurugan tanah bekas galian, 10,000.00 1,448,080.00
5. 43.44 m³ Pek. Pengurugan Tanah Dengan Tanah Urug, - -
6. 37.40 m Pek. Pemasangan Turap Penahan Tanah, 200,000.00 7,480,000.00

Jumlah II. 15,388,476.12 -

III. PEKERJAAN STRUKTUR OVERCAPING


III.A. PEKERJAAN STRUKTUR BETON
III.A.1. PEKERJAAN STRUKTUR PILECAP PC1
1. 17.95 m³ Pek. Pembuatan Beton dengan mutu K.200, 130,000.00 2,333,760.00
2. 2,014.77 kg Pek. Pembesian dengan Besi Ulir, D13-150 1,000.00 2,014,767.14
3. 43.56 m² Pek. Pemasangan Bekisting untuk pondasi, 35,000.00 1,524,600.00

III.A.2. PEKERJAAN STRUKTUR PILECAP PC2


1. 1.15 m³ Pek. Pembuatan Beton dengan mutu K.200, 130,000.00 149,760.00
2. 154.71 kg Pek. Pembesian dengan Besi Ulir, D13-150 1,000.00 154,708.51
3. 5.76 m² Pek. Pemasangan Bekisting untuk pondasi, 35,000.00 201,600.00

III.A.3. PEKERJAAN STRUKTUR KOLOM PEDESTAL PD1


1. 9.70 m³ Pek. Pembuatan Beton dengan mutu K.200, 130,000.00 1,261,260.00
2. 1,115.70 kg Pek. Pembesian dengan Besi Ulir, 1,000.00 1,115,701.75
3. 285.01 kg Pek. Pembesian dengan Besi Polos Ø8, 1,000.00 285,009.63
4. 110.88 m² Pek. Pemasangan Bekisting untuk Kolom Beton, + Multiplek Film 12 mm 35,000.00 3,880,800.00
5. 0.13 m³ Pek. Grouting, - -

III.A.4. PEKERJAAN STRUKTUR KOLOM PEDESTAL PD2


1. 0.60 m³ Pek. Pembuatan Beton dengan mutu K.200, 130,000.00 78,487.50
2. 103.33 kg Pek. Pembesian dengan Besi Ulir, 1,000.00 103,327.95
3. 25.21 kg Pek. Pembesian dengan Besi Polos Ø8, 1,000.00 25,209.18
4. 9.66 m² Pek. Pemasangan Bekisting untuk Kolom Beton, + Multiplek Film 12 mm 35,000.00 338,100.00
5. 0.02 m³ Pek. Grouting, - -

Jumlah III.A 13,467,091.66 -

IV. PEKERJAAN SALURAN


Saluran Type A
1. 15.35 m³ Pek. Galian Tanah berbatu Semi Mekanis sedalam >1 s/d 2 m, 35,000.00 - 537,089.28 -
2. 0.43 m³ Pek. Pengurugan tanah bekas galian, 10,000.00 - 4,308.96 -
3. 0.13 m³ Pek. Pengurugan Tanah Dengan Tanah Urug, - - - -
4. 42.40 m Pek. Pemasangan Pipa Beton bulat dia 40 cm, 25,000.00 1,060,000.00

Bak Kontrol BK1


1. 5.63 m³ Pek. Galian Tanah berbatu Semi Mekanis sedalam >1 s/d 2 m, 35,000.00 - 197,156.40 -
2. 3.22 m³ Pek. Pembuatan Beton dengan mutu K.200, Dinding + Tutup 130,000.00 - 419,125.20 -
3. 391.56 kg Pek. Pembesian dengan Besi Ulir, D13 1,000.00 - 391,564.24 -
4. 90.48 kg Pek. Pemasangan Baja Siku 50x50x5,
5. 53.38 m² Pek. Pemasangan bekisting untuk dinding, Dinding + Tutup 35,000.00 1,868,328.00
6. 56.00 bh Pek. Pemasangan Angkur Ø10, - -
Saluran Type B
7. 13.20 m³ Pek. Galian Tanah berbatu Semi Mekanis sedalam >1 s/d 2 m, 35,000.00 - 462,117.60 -
8. 0.28 m³ Pek. Pengurugan tanah bekas galian, 10,000.00 - 2,815.80 -
9. 0.08 m³ Pek. Pengurugan Tanah Dengan Tanah Urug, - - - -
10. 42.40 m Pek. Pemasangan U-Ditch uk. (30x40x120) + Penutup, 38,000.00 1,611,200.00

Bak Kontrol BK2


1. 6.19 m³ Pek. Galian Tanah berbatu Semi Mekanis sedalam >1 s/d 2 m, 35,000.00 - 216,776.00 -
2. 3.66 m³ Pek. Pembuatan Beton dengan mutu K.200, Dinding + Tutup 130,000.00 - 475,618.00 -
3. 367.33 kg Pek. Pembesian dengan Besi Ulir, D13 1,000.00 - 367,328.51 -
4. 105.56 kg Pek. Pemasangan Baja Siku 50x50x5,
5. 55.67 m² Pek. Pemasangan bekisting untuk dinding, Dinding + Tutup 35,000.00 1,948,520.00

Sumur Resapan
1. 43.77 m³ Pek. Galian Tanah berbatu Semi Mekanis sedalam >1 s/d 2 m, 35,000.00 1,531,903.41
3. 8.00 unit Sumur Resapan - -
2. 12.00 m Pek. Pemasangan Pipa BSP sch. 40 Ø 6" t = 7.1 mm, menuju sumur resapan 33,191.27 398,295.24

Jumlah IV. 11,492,146.64 -

V. PEKERJAAN ARSITEKTUR
V.A. PEKERJAAN ARSITEKTUR OVERCAPING
1. 1,076.10 m² Pek. Pemasangan Atap Zincalume Spandek Tebal 0.50 mm,
2. 173.40 m² Pek. Pemasangan listplank GRC,
3. 190.80 m² Pek. Pemasangan Atap PVC Setara Alderon ( semi transparan),
4. 63.00 m Pek. Pemasangan atap nok Zincalume,
5. 173.40 m² Pek. Pengecatan Cat Eksterior Dulux Weathershield, (Listplank GRC)
6. 6.16 m² Pek. Pemasangan acian, (Kaki Kolom)
7. 6.16 m² Pek. Pengecatan Tembok Baru Eksterior Dulux Weathershield ( Ngamplas. 1 x
cat dasar. 2x cat penutup), (Kaki Kolom)
8. 126.00 m Pek. Pemasangan Talang Datar Galvalum t = 0.6 mm,
9. 2,360.05 kg Pek. Pemasangan Besi Siku 40x40x3, (Rangka Talang & Listplank)
10. 194.21 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup,
11. 422.42 kg Pek. Pemasangan Profil Baja CNP, Gording CNP 100x50x20x2.3
12. 330.00 cm Pek. Pengelasan dengan Las Listrik, Las CNP ke Kolom
13. 302.40 m Pek. Pemasangan kusen aluminium 4",
14. 54.00 m² Pek. Pemasangan sunscreen alluminium,
15. 28.00 Bh Pek. Pemasangan roof drain dia. 4" besi cor,
16. 226.00 m' Pek. Pemasangan pipa PVC tipe D ø 4",
17. 66.00 Bh Klem Penggantung PVC dia 4",
18. 42.74 kg Pek. Pemasangan Profil Baja ∅10mm, Besi Penggantung PVC

V.B. PEKERJAAN ARSITEKTUR SAMBUNGAN OVERCAPING DENGAN


ATAP EKSISTING
1. 153.31 m² Pek. Pembongkaran Atap, 10,000.00 1,533,100.00
2. 79.20 m² Pek. Pembongkaran plafond (dengan rangka), 10,000.00 792,000.00
3. 488.40 kg Pek. Pemasangan Profil Baja CNP, Gording CNP 100x50x20x2.3 - -
4. 360.00 cm Pek. Pengelasan dengan Las Listrik, Las CNP ke Kolom - -
5. 311.36 m Pek. Pemasangan kusen aluminium 4", - -
6. 84.00 m² Pek. Pemasangan sunscreen alluminium, - -
7. 49.00 m² Pek. Pemasangan kaca Acrilic bening tebal 5 mm,
8. 158.49 m² Pek. Pemasangan Atap Zincalume Spandek Tebal 0.50 mm, - -
9. 42.00 m Pek. Pemasangan Talang Datar Galvalum t = 0.6 mm, - -
10. 436.33 kg Pek. Pemasangan Besi Siku 40x40x3, (Rangka Talang & Listplank) - -
11. 38.08 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup, - -
12. 265.20 m² Pek. Pemasangan rangka besi hollow galvalum 40x40 untuk plafond, 10,000.00 2,652,000.00
13. 265.20 m² Pek. Pemasangan langit-langit GRC t=9 mm, 12,000.00 3,182,400.00
14. 265.20 m² Pek. Pengecatan Cat Eksterior Dulux Weathershield, (langit-langit GRC) - -

15. 0.15 m² Pek. Pemasangan acian, (Kaki Kolom) - -


16. 0.15 m² Pek. Pengecatan Tembok Baru Eksterior Dulux Weathershield ( Ngamplas. 1 x - -
cat dasar. 2x cat penutup), (Kaki Kolom)

V.C. PEKERJAAN FINISHING PERON


1. 344.76 Ltr Lapisan Aspal Pengikat ( Tack Coat),
2. 39.65 ton Pek. Pengaspalan dengan Sand Sheet Tebal 2 cm,
3. 1,126.13 m² Plesteran; 1 Pc : 4 Ps; tebal 15 mm,
4. 1,126.13 m² Pek. Pemasangan acian, (Dinding Peron)
5. 1,126.13 m² Pek. Pengecatan Cat Eksterior Dulux Weathershield, (Dinding Peron) 6,000.00 6,756,781.20
6. 27.30 m¹ Pek. Pemasangan Difable Pave ukuran 30 x 30 cm, (Motif Dots)
7. 111.30 m¹ Pek. Pemasangan Difable Pave ukuran 30 x 30 cm, (Motif Lines)
8. 562.60 m² Pek. Pengecatan dengan Cat Berpasir, (Garis batas aman)
9. 1,088.11 m² Pek. Pengecatan dengan Cat Berpasir, (Garis Bahaya Hitam/Kuning)
10. 56.70 m Pek. Pemasangan Railing Stainless Steel,

V.D. PEKERJAAN PENAMBAHAN RAMP


1. 55.08 m³ Pek. Pembongkaran Beton dengan Jack Hammer, 75,000.00 4,131,000.00
2. 10.98 m² Pek. Pemasangan bata merah tebal 1 bata ad.1 Pc : 3 Ps, 25,000.00 274,500.00
3. 8.95 m³ Pek. Pengurugan Tanah Dengan Tanah Urug, - - - -
4. 3.08 m³ Pek. Pengurugan dengan pasir urug, 15,000.00 - 46,170.00 -
5. 2.15 m³ Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, (Lantai Ramp T=7cm) 130,000.00 - 280,098.00 -

6. 10.98 set Plesteran; 1 Pc : 4 Ps; tebal 15 mm, - -


7. 10.98 m² Pek. Pemasangan acian, (Dinding Peron) - -
8. 10.98 m Pek. Pengecatan Cat Eksterior Dulux Weathershield, (Dinding Peron) 6,000.00 - 65,880.00

V.E. PEKERJAAN PENGGANTIAN ATAP STASIUN EKSITING


1. 892.10 m² Pek. Pembongkaran Genteng (tidak dipakai), 7,000.00 - 6,244,700.00 -
2. 892.10 m² Pek. Pembongkaran Rangka Atap/Reng/Kaso, 7,000.00 - 6,244,700.00 -
3. 241.10 m² Pek. Pembongkaran plafond (dengan rangka), (plafond overstek Atap) 10,000.00 - 2,411,000.00 -
4. 892.10 m² Pek. Pemasangan rangka atap kayu kamper untuk Genteng Plentong, 15,000.00 13,381,500.00
5. 892.10 m² Pek. Pemasangan atap genteng Kodok Glazur, 16,000.00 14,273,600.00
6. 45.10 m² Pek. Pemasangan bubungan genteng kodok glazur, 35,000.00 1,578,500.00
7. 89.16 m² Pek. Pemasangan listplank GRC, - - - -
8. 89.16 m² Pek. Pengecatan Cat Eksterior Dulux Weathershield, (listplank GRC) 6,000.00 - 534,960.00 -
9. 1,140.33 kg Pek. Pemasangan Besi Siku 40x40x3, (Rangka Listplank) - - - -
10. 45.10 m Pek. Pemasangan Talang Datar Galvalum t = 0.6 mm, - - - -
11. 440.98 kg Pek. Pemasangan Besi Siku 40x40x3, (Rangka Talang) - - - -
12. 38.49 m² Pek. Pengecatan zincrommate 1x cat dasar & 2x Cat penutup,(Talang) - -
13. 683.07 m² Pek. Pengecatan Tembok Lama Eksterior Dulux Weathershield Powerflexx 6,000.00 4,098,450.00
( Ngamplas. 1 x cat dasar. 2x cat penutup),
14. 1,186.80 m² Pek. Pengecatan Tembok Lama Interior Dulux Pentalite ( Ngamplas. 1 x cat 6,000.00 7,120,800.00
dasar. 2x cat penutup),
15. 1,869.88 m² Pek. Pengerokan cat tembok, 16,144.40 30,188,009.95
16. 241.10 m² Pek. Pemasangan rangka besi hollow galvalum 40x40 untuk plafond, (plafond 10,000.00 - 2,411,000.00 -
overstek atap)
17. 241.10 m² Pek. Pemasangan langit-langit GRC t=9 mm, (plafond overstek atap) 12,000.00 - 2,893,200.00 -
18. 241.10 m² Pek. Pengecatan Cat Eksterior Dulux Weathershield, (plafond overstek atap) 6,000.00 - 1,446,600.00 -

19. 8.00 Bh Pek. Pemasangan roof drain dia. 4" besi cor, 10,000.00 - 80,000.00 -
20. 52.00 m' Pek. Pemasangan pipa PVC tipe D ø 4", 10,000.00 - 520,000.00 -
21. 16.00 Bh Klem Penggantung PVC dia 4", 10,000.00 - 160,000.00 -

Jumlah V. 113,300,949.15 -

JUMLAH TOTAL 154,848,663.57


LIST MATERIAL RANDU BELATUNG

NO URAIAN PEKERJAAN TOTAL KG Berat /Btg RAB BTG REAL BTG

1 Pek. Pemasangan Profil Pipa Besi, Pipa 3" sch 40 946.33 61.80 15 btg 12 btg
2 Besi Siku 40x40x3 288 btg 110 btg
3 Pek. Pemasangan Profil Pipa Besi, Pipa 6" sch 40 635.85 169.32 4 btg 2 btg

PT.JASA KARYA NUSANTARA

AGUS SUYANTO
Direktur Utama
LIST ATAP KANOPI RANDU BELATUNG

NO URAIAN PEKERJAAN VOL SAT KET

ATAP SPANDEK
1 Panjang 2.5 m 10.00 lbr
2 Panjang 5.5 m 25.00 lbr
3 Panjang 4.5 m 10.00 lbr
PEKERJAAN : PEMBUATAN OVERKAPING STASIUN RANDUBLATUNG
LOKASI : DAOP 4 SEMARANG

BILL OF QUANTITY

NO VOL SAT URAIAN PEKERJAAN HARGA SATUAN (Rp)


UPAH

I. PEKERJAAN PERSIAPAN
1. 1.00 Is Pek. Pembersihan Lapangan dan Peralatan, 5,000,000.00
2. 6.00 m2 Pembuatan gudang semen dan alat-alat, 203,330.50
3. 16.00 m2 Pembuatan bedeng buruh,
5. 1.00 pkt Pek. Sewa Scaffolding -
8. 1.00 ls Pek. Pengadaan Listrik dan Air kerja -

Jumlah I.

II. PEKERJAAN TANAH


1. 165.00 m³ Pek. Galian Tanah berbatu Semi Mekanis sedalam >1 s/d 2 m, 48,195.16
2. 3.68 m³ Pek. Pengurugan dengan pasir urug, t = 5 cm 23,566.10
4. 144.81 m³ Pek. Pengurugan tanah bekas galian, 19,602.88
5. 43.44 m³ Pek. Pengurugan Tanah Dengan Tanah Urug, -
6. 37.40 m Pek. Pemasangan Turap Penahan Tanah, 630,000.00

Jumlah II.

III. PEKERJAAN STRUKTUR OVERCAPING


III.A. PEKERJAAN STRUKTUR BETON
III.A.1. PEKERJAAN STRUKTUR PILECAP PC1
1. 17.95 m³ Pek. Pembuatan Beton dengan mutu K.200, 159,868.63
2. 2,014.77 kg Pek. Pembesian dengan Besi Ulir, D13-150 1,249.98
3. 43.56 m² Pek. Pemasangan Bekisting untuk pondasi, 48,773.05
III.A.2. PEKERJAAN STRUKTUR PILECAP PC2
2. 154.71 kg Pek. Pembesian dengan Besi Ulir, D13-150 1,249.98

III.A.3. PEKERJAAN STRUKTUR KOLOM PEDESTAL PD1


1. 7.01 m³ Pek. Pembuatan Beton dengan mutu K.200, 159,868.63
2. 1,115.70 kg Pek. Pembesian dengan Besi Ulir,D13 1,249.98
3. 285.01 kg Pek. Pembesian dengan Besi Polos Ø8, 1,249.98
4. 80.08 m² Pek. Pemasangan Bekisting untuk Kolom Beton, + Multiplek Film 12 mm 55,809.66

III.A.4. PEKERJAAN STRUKTUR KOLOM PEDESTAL PD2


2. 103.33 kg Pek. Pembesian dengan Besi Ulir, D13 1,249.98
3. 25.21 kg Pek. Pembesian dengan Besi Polos Ø8, 1,249.98

Jumlah III.A
Jumlah total

JUMLAH RAYA (Pemb


HARGA SATUAN (Rp) NILAI PEKERJAAN (Rp)
BAHAN UPAH BAHAN

5,000,000.00
876,150.00 1,219,983.00 5,256,900.00
500,000.00 8,000,000.00
9,000,000.00 - 9,000,000.00
7,000,000.00 - 7,000,000.00

6,219,983.00 29,256,900.00

39,875.00 7,952,201.40 6,579,375.00 0.81 4.86


132,000.00 86,676.12 485,496.00
- 2,838,653.85 -
72,000.00 - 3,127,852.80
526,500.00 23,562,000.00 19,691,100.00

34,439,531.36 29,883,823.80

730,491.67 2,869,961.65 13,113,786.40 17.952 0.816


12,045.00 2,518,424.67 24,267,870.19
50,050.00 2,124,554.06 2,180,178.00

12,045.00 193,383.01 1,863,464.00

730,491.67 1,120,199.49 5,118,555.11 7.007 0.3185


12,045.00 1,394,608.23 13,438,627.63
12,045.00 356,257.19 3,432,940.97
149,500.00 4,469,237.57 11,971,960.00 80.08 3.64

12,045.00 129,158.18 1,244,585.11


12,045.00 31,511.05 303,644.63

15,207,295.09 76,935,612.04
55,866,809.45 136,076,335.84

JUMLAH TOTAL 55,866,809.45 136,076,335.84


JUMLAH RAYA 191,943,145.30
JUMLAH RAYA (Pembulatan) 191,943,000.00