Form 6

HSSE PERFORMANCE KONTRAKTOR DAN KONSULTAN SUPERVISI KONSTRUKSI


PROYEK PEMBANGUNAN PLTU PALU-3 (2X50MW)
PT. PLN PUSMANPRO DAN WIKA-DHI-KOEN
BULAN JANUARI TAHUN 2024

NO URAIAN JUMLAH SATUAN PENJELASAN SINGKAT KETERANGAN


1 FAT (Fatality) n/a
2 LTI (Lost Time Injury) n/a
3 RWDC (Restricted Work Day Case) n/a
4 MTC ( Medical Treatment Case) n/a
5 FAC ( First Aid Case) n/a
6 ED (Environmental Demage) n/a
7 FIRE n/a
8 NMI (Near Miss) n/a

RINGKASAN MANHOURS PROYEK PEMBANGUNAN PLTU PALU-3(2X50MW)


BULAN JANUARI TAHUN 2024

MANHOUR
NO. PERUSAHAAN JUMLAH MANPOWER WORK HOURS MANHOURS JUMLAH INSIDENT LOST TIME WITHOUT LOST FR SR IR
TIME
a b c d e f=c-e f*1000000/c e*1000000/b d/a*100%
1 KSO WIKA-DHI-KOEN
20/12/2023 1.290 7.435 9.591.040 0 0 9.591.040 0,000 0,000 0,0000
20/01/2024 1.310 7.717 10.108.940 0 0 10.108.940 0,000 0,000 0,0000
2 PT.PLN PUSMANPRO
25/12/2023 29 4.184 121.329 0 0 121.329 0,000 0,000 0,000
25/01/2024 33 3.857 127.265 0 0 127.265 0,000 0,000 0,000

Disetujui Oleh, Dibuat Oleh,


PTL PLTU Palu-3(2X50MW) HSE SPV

ANGGI ARIVIAN MUHAMMAD AWAL RAMADHAN