Anda di halaman 1dari 4

a.

LANGSIR BAHAN2 UNTUK KITCHEN AMPHI


b.PEMASANGAN KERAMIK DINDING KITCHEN AMPHI
b.PEMASANGAN KERAMIK DINDING KITCHEN AMPHI
PLASTER DINDING TANGGULAN LAPIS MEMBRAN ATAP BOCOR DI KAMAR HOTEL 10.12.16.18
PLASTER DINDING TANGGULAN LAPIS MEMBRAN ATAP BOCOR DI KAMAR HOTEL 10.12.16.18,
D. PASANG DINDING BATA TUTUP KACA LUAR ROOM HL 07 PASANG TANGGULAN KACA SAMPING LUAR TANGGA ARAH ROOF
D. PASANG DINDING BATA TUTUP KACA LUAR ROOM HL 07 PASANG TANGGULAN KACA SAMPING LUAR TANGGA ARAH ROOF
E.GALIAN TANAH DAN BOBO UNTUK JALUR PIPA DI LONGSORAN AGRO
f.LANGSIR BAHAN UNTUK PENGEASPALAN
g. PENYISIPAN /PENGASPALAN JALAN BERLOBANG
g. PENYISIPAN /PENGASPALAN JALAN BERLOBANG
h PERBAIKN BOCOR AREA SHAFF LT 5 KIRI, KANAN , PRESIDEN SUITE
h PERBAIKN BOCOR AREA SHFF LT 5 KIRI, KANAN , PRESIDEN SUITE

wasimin
JAKA
THONY JHON
1 95,000.00 95,000.00
5 95,000.00 475,000.00
5 141,000.00 705,000.00
0.5 95,000.00 47,500.00
0.5 141,000.00 70,500.00
1 95,000.00 95,000.00 236,000.00 3
1 141,000.00 141,000.00
1 95,000.00 95,000.00
1 95,000.00 95,000.00
1.5 141,000.00 211,500.00
1.5 95,000.00 142,500.00
1 141,000.00 141,000.00
1 95,000.00 95,000.00
2,409,000.00

1,140,000.00 - 1,140,000.00
1,269,000.00 (189,000.00) 1,080,000.00
189,000.00
78,666.67

LANGSIR BESI SIKU BEKAS BONGKARAN KANDANG BRUNG KE AGRO


a. LANGSIR BAHAN2 UNTUK 1 95,000.00 95,000.00
b.PEMASANGAN KERAMIK DI 5 95,000.00 475,000.00
b.PEMASANGAN KERAMIK DI 5 141,000.00 705,000.00
PLASTER DINDING TANGGULA 0.5 95,000.00 47,500.00
PLASTER DINDING TANGGULA 0.5 141,000.00 70,500.00
D. PASANG DINDING BATA 1 95,000.00 95,000.00
D. PASANG DINDING BATA 1 141,000.00 141,000.00
E.GALIAN TANAH DAN BOBO 1 95,000.00 95,000.00
f.LANGSIR BAHAN UNTUK P 1 95,000.00 95,000.00
g. PENYISIPAN /PENGASPAL 1.5 141,000.00 211,500.00
g. PENYISIPAN /PENGASPAL 1.5 95,000.00 142,500.00
h PERBAIKN BOCOR AREA SHAF 1 141,000.00 141,000.00
h PERBAIKN BOCOR AREA SHFF 1 95,000.00 95,000.00
total 2,409,000.00

Anda mungkin juga menyukai