B UNIT
1 Kanko
1.1 Luas Dasar Bangunan 9,032 M2
2 Pusat Perbelanjaan
2.1 Luas Dasar Bangunan 9,918 M2
2.2 Luas Struktur area 64,066 M2
a Bangunan Utama 64,066 M2
- Luas Stuktur Komersil 32,234 M2
Semi Basement 2,480 M2 Fasum (Stasiun Baru)
G Fl. 9,918 M2
1st Fl. 9,918 M2
2nd Fl. 9,918 M2
- Luas Struktur Parkir 31,832 M2
Semi Basement 7,438 M2
1st Fl. 9,772 M2
2nd Fl. 9,772 M2
3rd Fl. 4,850 M2
Jumlah Kendaraan Yang bIsa Diparkir 1060 Cars
Rasio Coefficient parkir 30 M2
2.3 Yang Dapat Dijual 18,870 M2
a Bangunan Utama
Untuk Dijual 48% 9,102 M2
1 Retail 9,102 M2
G Fl. 3,451 M2 0%
1st Fl. 2,701 M2 0%
2nd Fl. 2,950 M2 0%
2 Mini Anchor - M2
3 Food Court - M2
b Untuk Disewakan 52% 9,769 M2
1 Ritel - M2
2 Mini Anchor 1,500 M2
1st Fl. 750 M2 25%
2nd Fl. 750 M2 25%
3 Anchor 7,500 M2
G Fl. 2,500 M2 25% Department Store
1st Fl. 2,500 M2 25% Department Store
2nd Fl. 2,500 M2 25% Department Store
4 Food Court 769 M2
2nd Fl. 769 M2 25%
3 Lahan Parkir
3.1 Jumlah Unit Mobil 25 M2 / car 1,210 Mobil
a Kanko 150 Mobil
b Shopping Mall 1,060 Mobil
3.2 Jumlah Unit Motor 500 Unit
3.1 Preliminary
a Pagar Keliling Rp 150
b Direksikit Rp 125
c pembersihan Lahan Rp 555
d Premilimary Survey Topografi Rp 100
Sub Total Rp 930
3.2 Konstruksi
a Ruko Rp 43,893
b Pusat Perbelanjaan
- Structure & Finishing Rp 92,896
- M/E Rp 64,066
c Infrastruktur Rp 2,187
3.3 Biaya Kontigensi Rp -
3.4 Pajak Rp -
2 Pusat Perbelanjaan
II PENDAPATAN SEWA
Inflasi USD-IDR Konfersi Mata Uang Asing Kenaikan 1.5% p.a
Tahun 1 Rp 9,000 per USD
PUSAT PERBELANJAAN
1 Arsitek 100% 20% 20% 10% 10% 10% 10% 10% 10%
2 Struktur & M/E 100% 20% 20% 10% 10% 10% 10% 10% 10%
3 Special Landscape & Lighting 100% 80% 20%
4 Quality Surveyor 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 1% 1% 2% 11% 5% 5% 6% 5% 6%
5 Konsultan 100% 0% 10% 15% 15% 15% 15% 15% 10% 5%
C JADWAL KONSTRUKSI
1 Preliminary
a Pagar Keliling 100% 50% 50%
b Direksikit 100% 100%
c Pembersihan Lahan 100% 10% 15% 35% 40%
d Pembuatan Bowplank 100% 30% 40% 30%
2 Konstruksi
a Ruko 100% 2% 4% 6% 6% 9% 7% 6% 5% 7% 8% 11%
b Pusat Perbelanjaan
- Struktur dan penyelesaian 100% 20% 8% 8% 10% 7% 7%
- M/E 100%
c Infrastruktur 100% 2% 5% 5% 7% 7% 7% 7% 8% 8% 7% 5%
Jadwal Pelaksanaan
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun
Tahun Persada
3 Indah
JADWAL PELAKSANAAN 1 2 3 4 5 6 7 8 9 10 11 12
A TANAH
1 Arsitek 100%
2 Struktur & M/E 100%
3 Special Landscape & Lighting 100%
4 Quality Surveyor 100% 17% 10% 7% 6% 5% 3% 3% 2% 2% 2% 1% 0%
5 Konsultan 100%
C JADWAL KONSTRUKSI
1 Preliminary
a Pagar Keliling 100%
b Direksikit 100%
c Pembersihan Lahan 100%
d Pembuatan Bowplank 100%
2 Konstruksi
a Ruko 100% 12% 10% 4% 3%
b Pusat Perbelanjaan
- Struktur dan penyelesaian 100% 6% 6% 6% 5% 5% 3% 3% 2% 2% 2% 2% 1%
- M/E 100% 35% 17% 10% 8% 7% 7% 5% 4% 3% 3% 1%
c Infrastruktur 100% 4% 4% 4% 4% 4% 4% 2% 2% 2% 1% 1%
Nilai Investasi
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun Persada Indah
Harga Total Tahun 1
No. Jumlah Dalam Jutaan Rupiah Vol Satuan Per Unit Harga 1 2 3 4 5 6 7 8 9 10 11 12
A BIAYA LAHAN
3 Biaya Ijin-Ijin
a Amdal 1 L/S 500.00 500 - - - - - - - 500 - - - -
b Zonning 48,464 M2 0.04 2,908 - - - - - - - 1,454 1,454 - - -
c IMB
- Ruko 32,513 M2 0.03 975 - - - - - - - - - 390 293 293
- Pusat Perbelanjaan 64,066 M2 0.05 3,203 - - - - - - - - - - - 1,281
Sub Total 7,587 - - - - - - - 1,954 1,454 390 293 1,574
4 Pembersihan Lahan
a Bangunan Liar /Kaki 5 1 L/S 850.00 850 - - - - - - - - 213 425 213 -
b Rumah Dinas
1 Aktif 4 KK 50.00 200 - - - - - - - - 50 100 50 -
2 Pensiunan 26 KK 50.00 1,300 - - - - - - - - 325 650 325 -
3 Lain-lain 9 KK 50.00 450 - - - - - - - - 113 225 113 -
c Balai Yasa 1 L/S 75.00 75 - - - - - - - - 19 38 19 -
b Biaya Operasional 1 L/S 750.00 750 - - - - - - - - 375 188 188 -
Sub Total 3,625 - - - - - - - - 1,094 1,625 906 -
A BIAYA LAHAN
3 Biaya Ijin-Ijin
a Amdal 1 L/S 500.00 500 - - - - - - - - - - - -
b Zonning 48,464 M2 0.04 2,908 - - - - - - - - - - - -
c IMB
- Ruko 32,513 M2 0.03 975 - - - - - - - - - - - -
- Pusat Perbelanjaan 64,066 M2 0.05 3,203 961 961 - - - - - - - - - -
Sub Total 7,587 961 961 - - - - - - - - - -
4 Pembersihan Lahan
a Bangunan Liar /Kaki 5 1 L/S 850.00 850 - - - - - - - - - - - -
b Rumah Dinas
1 Aktif 4 KK 50.00 200 - - - - - - - - - - - -
2 Pensiunan 26 KK 50.00 1,300 - - - - - - - - - - - -
3 Lain-lain 9 KK 50.00 450 - - - - - - - - - - - -
c Balai Yasa 1 L/S 75.00 75 - - - - - - - - - - - -
b Biaya Operasional 1 L/S 750.00 750 - - - - - - - - - - - -
Sub Total 3,625 - - - - - - - - - - - -
Total 29,985 6,598 2,966 2,377 2,224 2,015 2,015 775 325 98 - - -
Nilai Investasi
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun Persada Indah
Harga Total Tahun 3
No. Jumlah Dalam Jutaan Rupiah Vol Satuan Per Unit Harga 1 2 3 4 5 6 7 8 9 10 11 12
A BIAYA LAHAN
3 Biaya Ijin-Ijin
a Amdal 1 L/S 500.00 500 - - - - - - - - - - - -
b Zonning 48,464 M2 0.04 2,908 - - - - - - - - - - - -
c IMB
- Ruko 32,513 M2 0.03 975 - - - - - - - - - - - -
- Pusat Perbelanjaan 64,066 M2 0.05 3,203 - - - - - - - - - - - -
Sub Total 7,587 - - - - - - - - - - - -
4 Pembersihan Lahan
a Bangunan Liar /Kaki 5 1 L/S 850.00 850 - - - - - - - - - - - -
b Rumah Dinas
1 Aktif 4 KK 50.00 200 - - - - - - - - - - - -
2 Pensiunan 26 KK 50.00 1,300 - - - - - - - - - - - -
3 Lain-lain 9 KK 50.00 450 - - - - - - - - - - - -
c Balai Yasa 1 L/S 75.00 75 - - - - - - - - - - - -
b Biaya Operasional 1 L/S 750.00 750 - - - - - - - - - - - -
Sub Total 3,625 - - - - - - - - - - - -
Total 29,985 - - - - - - - - - - - -
Nilai Investasi
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun Persada Indah
Harga Total Tahun 1
No. Jumlah Dalam Jutaan Rupiah Vol Satuan Per Unit Harga 1 2 3 4 5 6 7 8 9 10 11 12
1 Arsitektur 202,113 Rp 1% 2,021 - - - - - 404 404 202 202 202 202 202
2 Structure & M/E 1% 2,021 - - - - - - - 404 404 202 202 202
3 Special Landscape & Lighting 1% 2,021 - - - - - - - - - - 1,617 404
4 Quality Surveyor 0.50% 1,011 - - - - - - - - - - - -
5 Other Consultants 1% 2,021 - - - - - - - 202 303 303 303 303
Sub Total 9,095 - - - - - 404 404 808 910 707 2,324 1,112
Pajak (PPn+PPH) 0% - - - - - - - - - - - - -
C KONSTRUKSI
1 Preliminary
a Pagar Keliling 1 L/S 150.00 150 - - - - - - - - 75 75 - -
b Direksikit 1 L/S 75.00 125 - - - - - - - - - 125 - -
c Pembersihan Lahan 37,000 M2 0.02 555 - - - - - - - - - - 56 83
d Premilimary Survey Topografi 1 L/S 100.00 100 - - - - - - - - - - - -
Sub Total 930 - - - - - - - - 75 200 56 83
2 Konstruksi
a Ruko 32,513 M2 1.35 43,893 - - - - - - - - - - - -
b Pusat Perbelanjaan 64,066 M2 - - - - - - - - - - - -
- Structure & Finishing 1.45 92,896 - - - - - - - - - - - -
- M/E 1.00 64,066 - - - - - - - - - - - -
c Infrastruktur 21,874 M2 0.10 2,187 - - - - - - - - - - - -
Sub Total 202,113 - - - - - - - - - - - -
TOTAL BIAYA PROYEK 242,123 - - - - - 404 404 2,762 3,532 2,923 4,115 3,533
Nilai Investasi
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun Persada Indah
Harga Total Tahun 2
No. Jumlah Dalam Jutaan Rupiah Vol Satuan Per Unit Harga 1 2 3 4 5 6 7 8 9 10 11 12
C KONSTRUKSI
1 Preliminary
a Pagar Keliling 1 L/S 150.00 150 - - - - - - - - - - - -
b Direksikit 1 L/S 75.00 125 - - - - - - - - - - - -
c Pembersihan Lahan 37,000 M2 0.02 555 194 222 - - - - - - - - - -
d Premilimary Survey Topografi 1 L/S 100.00 100 30 40 30 - - - - - - - - -
Sub Total 930 224 262 30 - - - - - - - - -
2 Konstruksi
a Ruko 32,513 M2 1.35 43,893 - 878 1,756 2,634 2,634 3,950 3,072 2,634 2,195 3,072 3,511 4,828
b Pusat Perbelanjaan 64,066 M2 - - - - - - - - - - - -
- Structure & Finishing 1.45 92,896 - - - - - - 18,579 7,432 7,432 9,290 6,503 6,503
- M/E 1.00 64,066 - - - - - - - - - - - -
c Infrastruktur 21,874 M2 0.10 2,187 - 44 109 109 153 153 153 153 175 175 153 109
Sub Total 202,113 - 922 1,865 2,743 2,787 4,103 21,805 10,218 9,801 12,537 10,167 11,440
Sub Total (1+2) 203,043 224 1,184 1,895 2,743 2,787 4,103 21,805 10,218 9,801 12,537 10,167 11,440
Biaya Kontigensi 0.0% - - - - - - - - - - - - -
Pajak (PPn+PPH) 0.0% - - - - - - - - - - - - -
Total 203,043 224 1,184 1,895 2,743 2,787 4,103 21,805 10,218 9,801 12,537 10,167 11,440
TOTAL BIAYA PROYEK 242,123 7,530 4,559 4,585 4,980 4,816 6,139 22,689 10,594 9,949 12,600 10,218 11,497
Nilai Investasi
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun Persada Indah
Harga Total Tahun 3
No. Jumlah Dalam Jutaan Rupiah Vol Satuan Per Unit Harga 1 2 3 4 5 6 7 8 9 10 11 12
C KONSTRUKSI
1 Preliminary
a Pagar Keliling 1 L/S 150.00 150 - - - - - - - - - - - -
b Direksikit 1 L/S 75.00 125 - - - - - - - - - - - -
c Pembersihan Lahan 37,000 M2 0.02 555 - - - - - - - - - - - -
d Premilimary Survey Topografi 1 L/S 100.00 100 - - - - - - - - - - - -
Sub Total 930 - - - - - - - - - - - -
2 Konstruksi
a Ruko 32,513 M2 1.35 43,893 5,267 4,389 1,756 1,317 - - - - - - - -
b Pusat Perbelanjaan 64,066 M2 - - - - - - - - - - - -
- Structure & Finishing 1.45 92,896 5,574 5,574 5,574 4,645 4,645 2,322 2,322 1,393 1,393 1,393 1,393 929
- M/E 1.00 64,066 22,423 10,891 6,407 5,125 4,485 4,485 3,203 2,563 1,922 1,922 641 -
c Infrastruktur 21,874 M2 0.10 2,187 87 87 87 87 87 87 44 44 44 22 22 -
Sub Total 202,113 33,351 20,942 13,824 11,174 9,217 6,895 5,569 4,000 3,359 3,337 2,056 929
Sub Total (1+2) 203,043 33,351 20,942 13,824 11,174 9,217 6,895 5,569 4,000 3,359 3,337 2,056 929
Biaya Kontigensi 0.0% - - - - - - - - - - - - -
Pajak (PPn+PPH) 0.0% - - - - - - - - - - - - -
Total 203,043 33,351 20,942 13,824 11,174 9,217 6,895 5,569 4,000 3,359 3,337 2,056 929
TOTAL BIAYA PROYEK 242,123 33,518 21,046 13,893 11,230 9,263 6,929 5,597 4,020 3,376 3,354 2,066 934
Arus Kas
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun Persada Indah
Tahun 1 Tahun 2 Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8 Tahun 9 Tahun 10 Tahun 11 Tahun 12
Jumlah Dalam Jutaan Rupiah Total
PENDAPATAN
1 Penjualan 253,481 24,927 168,437 60,117 - - - - - - - - -
2 Sewa 654,872 21,672 15,990 6,513 - - - - 48,133 - - - -
Total Pendapatan 908,353 46,599 184,427 66,629 - - - - 48,133 - - - -
- - - - - - - -
HARGA POKOK PENJUALAN
Biaya Konstruksi 119,599 - 58,047 61,552 - - - - - - - - -
Total Biaya 119,599 - 58,047 61,552 - - - - - - - - -
BIAYA OPERASIONAL
1 Biaya perawatan - - - - - - - - - - - - -
2 Biaya pemasaran - - - - - - - - - - - - -
3 Biaya Umum dan Administrasi 0 0 - - - - - - - - - - -
4 Biaya Operasional Hotel -
5 Biaya Bunga - - - - - - - - - - - - -
6 pajak - - - - - - - - - - - - -
Total Biaya operasional 0 0 - - - - - - - - - - -
PENDAPATAN SEBELUM PENDAPATAN & BIAYA LAIN2 678,858 46,599 124,473 (352) (5,495) (5,495) (5,495) (5,495) 42,638 (5,495) (5,495) (5,495) (5,495)
Pajak - - - 0 - - - - - - - -
- - - - - - - - - - - -
PENDAPATAN BERSIH 678,858 46,599 124,473 (352) (5,495) (5,495) (5,495) (5,495) 42,638 (5,495) (5,495) (5,495) (5,495)
Rugi Laba
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun Persada Indah
Tahun 13 Tahun 14 Tahun 15 Tahun 16 Tahun 17 Tahun 18 Tahun 19 Tahun 20 Tahun 21 Tahun 22 Tahun 23 Tahun 24
Jumlah Dalam Jutaan Rupiah
Total
PENDAPATAN
1 Penjualan 253,481 - - - - - - - - - - - -
2 Sewa 654,872 68,245 - - - - 103,114 - - - - 155,800 -
Total Pendapatan 908,353 68,245 - - - - 103,114 - - - - 155,800 -
BIAYA OPERASIONAL
1 Biaya perawatan - - - - - - - - - - - - -
2 Biaya pemasaran - - - - - - - - - - - - -
3 Biaya Umum dan Administrasi 0 - - - - - - - - - - - -
4 Biaya Operasional Hotel -
5 Biaya Bunga - - - - - - - - - - - - -
6 pajak - - - - - - - - - - - - -
Total Biaya operasional 0 - - - - - - - - - - - -
PENDAPATAN SEBELUM PENDAPATAN & BIAYA LAIN2 678,858 62,750 (5,495) (5,495) (5,495) (5,495) 97,619 (5,495) (5,495) (5,495) (3,588) 155,736 -
Pajak - - - - - - - - - - - -
- - - - - - - - - - - -
PENDAPATAN BERSIH 678,858 62,750 (5,495) (5,495) (5,495) (5,495) 97,619 (5,495) (5,495) (5,495) (3,588) 155,736 -
Rugi Laba
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun Persada Indah
Tahun 25 Tahun 26 Tahun 27 Tahun 28 Tahun 29 Tahun 30 Tahun 31 Tahun 32 Tahun 33 Tahun 34
Jumlah Dalam Jutaan Rupiah
Total
PENDAPATAN
1 Penjualan 253,481 - - - - - - - - - -
2 Sewa 654,872 - - - 235,405 - - - - - -
Total Pendapatan 908,353 - - - 235,405 - - - - - -
BIAYA OPERASIONAL
1 Biaya perawatan - - - - - - - - - - -
2 Biaya pemasaran - - - - - - - - - - -
3 Biaya Umum dan Administrasi 0 - - - - - - - - - -
4 Biaya Operasional Hotel -
5 Biaya Bunga - - - - - - - - - - -
6 pajak - - - - - - - - - - -
Total Biaya operasional 0 - - - - - - - - - -
Pajak - - - - - - - - - -
- - - - - - - - - -
PENDAPATAN BERSIH 678,858 - - - 235,405 - - - - - -
Analisa Keuangan
Emplasemen Stasiun Gubeng
Surabaya
PT Surya Bangun Persada Indah
Skema Kompensasi
1 Tanah ± 48,800
2 Invetasi
Investasi Bersih 242,123
Year 1
Consolidated Sales Assumptions
Total 1 2 3 4 5 6 7 8 9 10 11 12
SALES VOLUME
Kanko unit 148 0 0 0 0 0 0 0 0 20 6 6 6
Shopping Center area 9,099 0 0 0 0 0 0 0 0 0 0 0 0
Year 2
Consolidated Sales Assumptions
Total 1 2 3 4 5 6 7 8 9 10 11 12
SALES VOLUME
Kanko unit 148 6 6 6 6 6 6 6 6 6 7 7 7
Shopping Center area 9,099 1365 1365 1365 364 364 364 364 364 364 364 364 273
Total Sales Value 253,481 23,622 23,622 23,622 10,425 10,425 10,425 10,904 10,904 10,904 11,705 11,705 10,176
A/R 39,065 59,977 78,123 81,990 84,775 88,284 91,740 94,699 97,214 99,918 101,798 102,925
CASH IN 253,481 2,582 2,709 5,476 6,558 7,639 6,916 7,448 7,945 8,388 9,001 9,825 9,049
Consolidated Sales Assumption
Gubeng Squre
SURABAYA
Year 3
Consolidated Sales Assumptions
Total 1 2 3 4 5 6 7 8 9 10 11 12
SALES VOLUME
Kanko unit 148 7 7 7 7 7 0 0 0 0 0 0 0
Shopping Center area 9,099 0 0 364 382 401 421 251 0 0 0 0 0
Total Sales Value 253,481 5,589 5,589 12,027 12,345 12,681 7,446 4,439 - - - - -
A/R 99,041 94,942 98,018 101,749 105,274 104,415 100,897 92,738 85,135 78,434 72,293 66,497
CASH IN 253,481 9,473 9,688 8,951 8,614 9,157 8,305 7,957 8,159 7,603 6,701 6,140 5,796
Consolidated Sales Assumption
Gubeng Squre
SURABAYA
Year 4
Consolidated Sales Assumptions
Total 1 2 3 4 5 6 7 8 9 10 11 12
SALES VOLUME
Kanko unit 148 0 0 0 0 0 0 0 0 0 0 0 0
Shopping Center area 9,099 0 0 0 0 0 0 0 0 0 0 0 0
A/R 61,045 55,900 50,954 46,207 41,811 37,774 34,054 30,639 27,382 24,177 21,192 18,430
CASH IN 253,481 5,452 5,145 4,946 4,747 4,396 4,037 3,720 3,415 3,257 3,204 2,986 2,761
Consolidated Sales Assumption
Gubeng Squre
SURABAYA
Year 5
Consolidated Sales Assumptions
Total 1 2 3 4 5 6 7 8 9 10 11 12
SALES VOLUME
Kanko unit 148 0 0 0 0 0 0 0 0 0 0 0 0
Shopping Center area 9,099 0 0 0 0 0 0 0 0 0 0 0 0
A/R 15,898 13,602 11,669 10,028 8,676 7,494 6,403 5,405 4,501 3,692 2,977 2,355
CASH IN 253,481 2,532 2,296 1,933 1,642 1,351 1,182 1,092 998 904 809 715 621
Consolidated Sales Assumption
Gubeng Squre
SURABAYA
Year 6
Consolidated Sales Assumptions
Total 1 2 3 4 5 6 7 8 9 10 11 12
SALES VOLUME
Kanko unit 148 0 0 0 0 0 0 0 0 0 0 0 0
Shopping Center area 9,099 0 0 0 0 0 0 0 0 0 0 0 0
Year 1
Sales Assumptions
Total 1 2 3 4 5 6 7 8 9 10
A KANKO
SALES GROWTH
1 Block Sales 100%
2 Retail Sales 5%
SALES VOLUME
1 Blok Sales (Progress Volume) 100%
Blok Sales (Volume) 20 20
2 Retail Sales (Progress Volume) 0% 5%
Retail Sales (Volume)
0 6.4
- Cash Payment 20 0 1
- 12 X Installments Payment 20 0 1
- 24 X Installments Payment 48 0 2
- 36 X Installments Payment 40 0 2
Total Sales Volume 148 20 6
AVERAGE SELLING PRICE (RP MILLIONS / UNIT)
1 Blok Sales Price 600 600
2 Retail Sales Price 850 765 765
- Cash Payment 604 604
- 12 X Installments Payment 684 684
- 24 X Installments Payment 710 710
- 36 X Installments Payment 765 765
SALES VALUE (RP MILLIONS)
1 Blok Sales 12,000 12,000
2 Retail Sales 97,861 - 4,309
- Cash Payment - 637
- 12 X Installments Payment - 700
- 24 X Installments Payment - 1,442
- 36 X Installments Payment - 1,530
Total Sales Value 109,861 12,000 4,309
COLLECTIONS (RP MILLIONS)
Sales - 918
A/R 12,000 14,191
CASH IN 109,861 - 2,118
1 Block Sale Collection
- Sales
- A/R 12,000 10,800
- CASH IN 12,000 1,200
Sales Assumption
Gubeng Square
SURABAYA
11 12
10% 15%
5% 5%
6.4 6.4
1 1
1 1
2 2
2 2
6 6
765 765
604 604
684 684
710 710
765 765
-
4,309 4,309
637 637
700 700
1,442 1,442
1,530 1,530
4,309 4,309
918 918
16,172 18,026
2,328 2,455
10,000 9,200
800 800
Sales Assumption
Gubeng Square
SURABAYA
Year 2
1 2 3 4 5 6 7 8 9 10 11 12
20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75%
5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4
1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2
6 6 6 6 6 6 6 6 6 7 7 7
765 765 765 765 765 765 850 850 850 850 850 850
604 604 604 604 604 604 672 672 672 672 672 672
684 684 684 684 684 684 760 760 760 760 760 760
710 710 710 710 710 710 789 789 789 789 789 789
765 765 765 765 765 765 850 850 850 850 850 850
4,309 4,309 4,309 4,309 4,309 4,309 4,788 4,788 4,788 5,589 5,589 5,589
637 637 637 637 637 637 707 707 707 707 707 707
700 700 700 700 700 700 778 778 778 778 778 778
1,442 1,442 1,442 1,442 1,442 1,442 1,603 1,603 1,603 2,404 2,404 2,404
1,530 1,530 1,530 1,530 1,530 1,530 1,700 1,700 1,700 1,700 1,700 1,700
4,309 4,309 4,309 4,309 4,309 4,309 4,788 4,788 4,788 5,589 5,589 5,589
918 918 918 918 918 918 1,020 1,020 1,020 1,190 1,190 1,190
19,752 21,352 22,825 24,171 25,390 26,482 27,824 28,971 29,977 31,473 32,448 34,501
2,582 2,709 2,836 2,963 3,090 3,217 3,446 3,641 3,782 4,093 4,615 3,536
8,400 7,600 6,800 6,000 5,200 4,400 3,600 2,800 2,000 1,200 - -
800 800 800 800 800 800 800 800 800 800 1,200 -
Sales Assumption
Gubeng Square
SURABAYA
Year 3
1 2 3 4 5 6 7 8 9 10 11 12
80% 85% 90% 95% 100% 100% 100% 100% 100% 100%
5% 5% 5% 5% 5% 0% 0% 0% 0% 0%
850 850 850 850 850 850 850 850 850 850
672 672 672 672 672 672 672 672 672 672
760 760 760 760 760 760 760 760 760 760
789 789 789 789 789 789 789 789 789 789
850 850 850 850 850 850 850 850 850 850
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
Year 4
1 2 3 4 5 6 7 8 9 10 11 12
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
23,750 21,800 19,947 18,193 16,537 14,979 13,468 12,010 10,605 9,252 8,012 6,885
2,048 1,950 1,852 1,754 1,656 1,558 1,511 1,458 1,406 1,353 1,240 1,127
-
-
Sales Assumption
Gubeng Square
SURABAYA
Year 5
1 2 3 4 5 6 7 8 9 10 11 12
-
-
-
-
-
-
- - - - - - - - - - - -
5,870 4,969 4,181 3,505 2,943 2,493 2,078 1,700 1,360 1,058 793 567
1,014 901 788 675 562 450 416 378 340 302 264 227
Sales Assumption
Gubeng Square
SURABAYA
Year 6
1 2 3 4 5 6 7 8 9 10 11 12
- - - - - - - - - - - -
378 227 113 38 0 0 0 0 0 0 0 0
189 151 113 76 38 0 0 0 0 0 0 0
Sales Assumption
Gubeng Square
SURABAYA
Year 7
1 2 3 4 5 6 7 8 9 10 11 12
-
0
0
Sales Assumption
Gubeng Square
SURABAYA
Year 8
1 2 3 4 5 6 7 8 9 10 11 12
Sales Assumption
Gubeng Square
SURABAYA
Year 9
1 2 3 4 5 6 7 8 9 10 11 12
Sales Assumption
Gubeng Square
SURABAYA
Year 10 Year 11
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
Sales Assumption
Gubeng Square
SURABAYA
Year 11
7 8 9 10 11 12
Sales Assumption
Gubeng Square
SURABAYA
918 918
6,172 8,826
1,528 1,655
918 918
484 484
46 46
46 91
47 47
47 95
34 34
34 68
Sales Assumption
Gubeng Square
SURABAYA
918 918 918 918 918 918 1,020 1,020 1,020 1,190 1,190 1,190
11,352 13,752 16,025 18,171 20,190 22,082 24,224 26,171 27,977 30,273 32,448 34,501
1,782 1,909 2,036 2,163 2,290 2,417 2,646 2,841 2,982 3,293 3,415 3,536
918 918 918 918 918 918 1,020 1,020 1,020 1,190 1,190 1,190
484 484 484 484 484 484 484 537 537 537 537 537
46 46 46 46 46 46 46 51 51 51 51 51
- (46) (46)
137 182 228 274 319 365 410 461 512 562 567 572
47 47 47 47 47 47 47 53 53 53 79 79
142 189 237 284 331 379 426 479 531 584 663 742
34 34 34 34 34 34 34 38 38 38 38 38
102 136 170 204 238 272 306 344 382 419 457 495
Sales Assumption
Gubeng Square
SURABAYA
533 570 608 646 684 722 722 722 722 722 722 722
Sales Assumption
Gubeng Square
SURABAYA
-
23,750 21,800 19,947 18,193 16,537 14,979 13,468 12,010 10,605 9,252 8,012 6,885
2,048 1,950 1,852 1,754 1,656 1,558 1,511 1,458 1,406 1,353 1,240 1,127
- - - - - - - - - - - -
- - - - - - - - - - - -
-
(51) (51) (51) (51) (51) (51) - - - - - -
253 203 152 101 51 (0) (0) (0) (0) (0) (0) (0)
- - - - - - - - - - - -
(47) (47) (47) (47) (47) (47) (47) (53) (53) (53) (79) (79)
1,073 1,026 979 931 884 837 789 737 684 631 552 474
- - - - - - - - - - - -
(34) (34)
722 722 722 722 722 722 722 722 722 722 688 654
Sales Assumption
Gubeng Square
SURABAYA
5,870 4,969 4,181 3,505 2,943 2,493 2,078 1,700 1,360 1,058 793 567
1,014 901 788 675 562 450 416 378 340 302 264 227
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
(0)
- - - - - - -
(79) (79) (79) (79) (79) (79) - - - - - -
395 316 237 158 79 0 0 0 0 0 0 0
- -
(34) (34) (34) (34) (34) (34) (34) (38) (38) (38) (38) (38)
620 586 552 518 484 450 416 378 340 302 264 227
Sales Assumption
Gubeng Square
SURABAYA
- - - - - - - - - - - -
- - - - - - - - - - - -
0 0 0 0 0 0 0 0 0 0 0 0
0
0
-
-
-
0
- - - - - - - - - - - -
0
Sales Assumption
Gubeng Square
SURABAYA
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
-
Sales Assumption
Gubeng Square
SURABAYA
Sales Assumption
Gubeng Square
SURABAYA
Sales Assumption
Gubeng Square
SURABAYA
Year 1
Sales Assumptions
Total 1 2 3 4 5 6 7 8 9 10
B SHOPPING CENTER
SALES GROWTH (OCCUPANCY)
1 Retail Sales
Sales During Construction 15%
Sales After Launching 4.0%
Occupancy After Construction 5%
Total Occupancy 0% 0% 0%
SALES VOLUME
1 Retail Sales (Progress Volume) 0% 0% 0%
Retail Sales (Volume)
A Main Building (M2)
- Cash Payment 0 0 0
- 12 X Installments Payment 0 0 0
- 18 X Installments Payment 0 0 0
- 36 X Installments Payment 0 0 0
- 48 X Installments Payment 0 0 0
Sub Total Volume 9,099 0 0 0
AVERAGE SELLING PRICE
1 Retail Sales Price
A Main Building (Rp Millions / M2) 30
- Cash Payment 0 0 0
- 12 X Installments Payment 0 0 0
- 18 X Installments Payment 0 0 0
- 36 X Installments Payment 0 0 0
- 48 X Installments Payment 0 0 0
SALES VALUE (RP MILLIONS)
1 Retail Sales Value
A Main Building
- Cash Payment - - -
- 12 X Installments Payment - - -
- 18 X Installments Payment - - -
- 36 X Installments Payment - - -
- 48 X Installments Payment - - -
Sub Total 143,620 - - -
Total Sales Value 143,620 - - -
11 12
0% 0%
0% 0%
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sales Assumption
Gubeng Square
SURABAYA
Year 2
1 2 3 4 5 6 7 8 9 10 11 12
15% 30% 45% 49% 53% 57% 61% 65% 69% 73% 77% 80%
0 0 0 0 0 0 0 0 0 0
18 18 18 21 21 21 21 21 21 21 21 21
19 19 19 23 23 23 23 23 23 23 23 23
20 20 20 24 24 24 24 24 24 24 24 24
22 22 22 27 27 27 27 27 27 27 27 27
24 24 24 29 29 29 29 29 29 29 29 29
1,686 1,686 1,686 534 534 534 534 534 534 534 534 400
5,506 5,506 5,506 1,743 1,743 1,743 1,743 1,743 1,743 1,743 1,743 1,308
5,721 5,721 5,721 1,812 1,812 1,812 1,812 1,812 1,812 1,812 1,812 1,359
6,400 6,400 6,400 2,027 2,027 2,027 2,027 2,027 2,027 2,027 2,027 1,520
- - - - - - - - - - - -
19,313 19,313 19,313 6,116 6,116 6,116 6,116 6,116 6,116 6,116 6,116 4,587
19,313 19,313 19,313 6,116 6,116 6,116 6,116 6,116 6,116 6,116 6,116 4,587
- - - - - - - - - - - -
19,313 38,625 55,298 57,819 59,385 61,802 63,916 65,728 67,237 68,445 69,350 68,424
- - 2,640 3,595 4,549 3,699 4,002 4,304 4,606 4,908 5,211 5,513
- - - - - - - - - - - -
- - - - - - - - - - - -
- - 1,686 1,686 1,686 534 534 534 534 534 534 534
- - 459 459 459 145 145 145 145 145 145 145
- - -
- - 459 918 1,376 1,522 1,667 1,812 1,958 2,103 2,248 2,393
Sales Assumption
Gubeng Square
SURABAYA
Year 3
1 2 3 4 5 6 7 8 9 10 11 12
80% 80%
84% 88% 93% 97% 100% 100% 100% 100% 100% 100%
80% 80% 84% 88% 93% 97% 100% 100% 100% 100% 100% 100%
0% 0% 4% 4% 4% 5% 3% 0% 0% 0% 0% 0%
0 0 36 38 40 42 25 0 0 0 0 0
0 0 109 115 120 126 75 0 0 0 0 0
0 0 109 115 120 126 75 0 0 0 0 0
0 0 109 115 120 126 75 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 364 382 401 421 251 0 0 0 0 0
0 0 0 0 0 0 0 30 30 30 30 30
21 21 22 22 22 22 22 22 22 22 22 22
23 23 24 24 24 24 24 24 24 24 24 24
24 24 25 25 25 25 25 25 25 25 25 25
27 27 28 28 28 28 28 28 28 28 28 28
29 29 30 30 30 30 30 30 30 30 30 30
- - - - - - - - - - - -
62,609 56,701 58,089 60,255 62,335 64,553 63,530 57,814 52,604 48,245 44,349 40,699
5,815 5,908 5,049 4,590 5,011 5,228 5,462 5,716 5,210 4,359 3,896 3,650
- - - - - - - - - - - -
- - - - - - - - - - - -
534 400 - - 562 590 619 650 387 - - -
145 109 - - 153 161 168 177 105 - - -
- - (459) (459) (459) (145) (145) (145) (145) (145) (145) (145)
2,539 2,648 2,189 1,730 1,424 1,439 1,463 1,494 1,454 1,309 1,164 1,019
Sales Assumption
Gubeng Square
SURABAYA
Year 4
1 2 3 4 5 6 7 8 9 10 11 12
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
30 30 30 30 30 30 30 30 30 30 30 30
22 22 22 22 22 22 22 22 22 22 22 22
24 24 24 24 24 24 24 24 24 24 24 24
25 25 25 25 25 25 25 25 25 25 25 25
28 28 28 28 28 28 28 28 28 28 28 28
30 30 30 30 30 30 30 30 30 30 30 30
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
37,295 34,100 31,006 28,013 25,274 22,795 20,586 18,629 16,777 14,926 13,180 11,546
3,404 3,195 3,094 2,993 2,740 2,478 2,209 1,957 1,852 1,852 1,746 1,634
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
(145) (109) - - (153) (161) (168) (177) (105) - - -
873 764 764 764 611 451 282 105 - - - -
Sales Assumption
Gubeng Square
SURABAYA
Year 5
1 2 3 4 5 6 7 8 9 10 11 12
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
30 30 30 30 30 30 30 30 30 30 30 30
22 22 22 22 22 22 22 22 22 22 22 22
24 24 24 24 24 24 24 24 24 24 24 24
25 25 25 25 25 25 25 25 25 25 25 25
28 28 28 28 28 28 28 28 28 28 28 28
30 30 30 30 30 30 30 30 30 30 30 30
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
10,028 8,633 7,489 6,522 5,733 5,001 4,325 3,705 3,141 2,634 2,183 1,789
1,518 1,395 1,144 967 789 732 676 620 564 507 451 395
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
Year 6
1 2 3 4 5 6 7 8 9 10 11 12
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
30 30 30 30 30 30 30 30 30 30 30 30
22 22 22 22 22 22 22 22 22 22 22 22
24 24 24 24 24 24 24 24 24 24 24 24
25 25 25 25 25 25 25 25 25 25 25 25
28 28 28 28 28 28 28 28 28 28 28 28
30 30 30 30 30 30 30 30 30 30 30 30
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
1,450 1,154 858 562 325 150 41 0 0 0 0 0
338 296 296 296 237 175 109 41 - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
Year 7
1 2 3 4 5 6 7 8 9 10 11 12
0% 0% 0% 0%
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
30 30 30 30
22 22 22 22
24 24 24 24
25 25 25 25
28 28 28 28
30 30 30 30
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0 0 0 0 0 0 0 0 0 0 0 0
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
Year 8
1 2 3 4 5 6 7 8 9 10 11 12
0 0 0 0 0 0 0 0 0 0 0 0
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
Year 9
1 2 3 4 5 6 7 8 9 10 11 12
0 0 0 0 0 0 0 0 0 0 0 0
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
Year 10 Year 11
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
0 0 0 0
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Sales Assumption
Gubeng Square
SURABAYA
Year 11
7 8 9 10 11 12
Sales Assumption
Gubeng Square
SURABAYA
18 X Installments Payment -
-
36 X Installments Payment -
-
48 X Installments Payment -
Sales Assumption
Gubeng Square
SURABAYA
- -
- -
- -
- -
- -
- -
Sales Assumption
Gubeng Square
SURABAYA
- - 318 318 318 101 101 101 101 101 101 101
- - 318 636 954 1,054 1,155 1,255 1,356 1,457 1,557 1,658
- - 178 178 178 56 56 56 56 56 56 56
- - 178 356 533 590 646 702 759 815 871 927
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
984 1,026 1,026 1,026 1,085 1,147 1,213 1,281 1,322 1,322 1,322 1,322
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
- - - - - - - - - - - -
(101) (101) (101) (101) (101) (101) (101) (75) - - (106) (111)
1,209 1,108 1,008 907 806 706 605 529 529 529 423 312
- - - - - - - - - - - -
- - -
1,322 1,322 1,322 1,322 1,322 1,322 1,322 1,322 1,322 1,322 1,322 1,322
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
- - - - - - - - - - - -
(117) (123) (73) - - - - - - - - -
196 73 - - - - - - - - - -
- - - - - - - - - - - -
- - (178) (178) (178) (56) (56) (56) (56) (56) (56) (56)
1,322 1,322 1,144 967 789 732 676 620 564 507 451 395
- - - - - - - - - - - -
- - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
(56) (42) - - (59) (62) (65) (69) (41) - - -
338 296 296 296 237 175 109 41 - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
- - - - - - - - - - - -
- - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - -
- - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - -
- - - - - - - - - - - -
Sales Assumption
Gubeng Square
SURABAYA
- - - -
- - - -
- - - -
- - - -
- - - -
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 1
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 29%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 2
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 35% 41% 47% 53% 58% 60% 62% 64% 66% 69% 71% 73%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 3
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 75% 78% 80% 82% 85% 87% 88% 89% 91% 92% 93% 94%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 4
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 94% 95% 95% 96% 96% 96% 96% 96% 96% 96% 96% 96%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 5
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 6
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 7
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 8
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 9
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 10
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 11
Consolidated Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
OCCUPANCY RATE
1 Shopping Mall 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22 Year 23
Consolidated Lease Assumption
OCCUPANCY RATE
1 Shopping Mall 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 96%
-
Consolidated Lease Assumption
Gubeng Square
SURABAYA
Total Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Consolidated Lease Assumption
OCCUPANCY RATE
1 Shopping Mall 96% 96% 96% 96% 96% 96% 96% 96% 96% 96% 0%
-
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 1
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 9,000 9,011 9,023 9,034 9,045 9,056 9,068 9,079 9,090 9,102 9,113 9,125
USD Rate in Rp 9,000 9,011 9,023 9,034 9,045 9,056 9,068 9,079 9,090 9,102 9,113 9,125
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 0% 0% 0% 0%
2 Mini Anchor 0% 0% 0% 15%
3 Anchor 0% 0% 0% 95%
4 Food Court 0% 0% 0% 5%
REVENUE
1 Retail - - - - -
2 Mini Anchor 142,817 - - - 1,480
3 Anchor 298,458 - - - 19,528
4 Food Court 213,597 - - - 664
654,872 - - - - - - - - - - - 21,672
1,084
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 1
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
29,206 12,517
- - -
USD Rate in Rp 9,000 9,011 9,023 9,034 9,045 9,056 9,068 9,079 9,090 9,102 9,113 9,125
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL Year 2
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 9,136 9,147 9,159 9,170 9,182 9,193 9,205 9,216 9,228 9,239 9,251 9,262
USD Rate in Rp 9,136 9,147 9,159 9,170 9,182 9,193 9,205 9,216 9,228 9,239 9,251 9,262
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 0% 5% 9% 14% 18% 22% 27% 31% 36% 40% 45% 49%
2 Mini Anchor 30% 45% 60% 75% 85% 85% 85% 85% 85% 85% 85% 85%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 9% 14% 18% 22% 27% 31% 36% 40% 45% 49% 54% 59%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 1,482 1,484 1,486 1,487 993 - - - - - - -
3 Anchor 298,458 1,029 - - - - - - - - - - -
4 Food Court 213,597 665 665 666 667 668 669 670 670 671 672 673 674
654,872 3,176 2,149 2,152 2,154 1,661 669 670 670 671 672 673 674
TOTAL Year 2
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
159 159 159 159 159 159
107 107 107 107 107 107
108 108 108 108 108 108
108 108 108 108 108 108
83 83 83 83 83 83
33 33 33 33 33 33
33 33 33 33 33 33
34 34 34 34 34
34 34 34 34
34 34 34
34 34
34
29,206 12,517
1 DP ( 6 Installments) 30% 1,242 1,350 1,457 1,565 1,648 598 473 399 325 251 201 201
2 Credit (36 Installments) 70%
USD Rate in Rp 9,136 9,147 9,159 9,170 9,182 9,193 9,205 9,216 9,228 9,239 9,251 9,262
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 3
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 9,274 9,286 9,297 9,309 9,320 9,332 9,344 9,355 9,367 9,379 9,390 9,402
USD Rate in Rp 9,274 9,286 9,297 9,309 9,320 9,332 9,344 9,355 9,367 9,379 9,390 9,402
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 54% 59% 63% 68% 72% 77% 78% 80% 81% 83% 84% 86%
2 Mini Anchor 85% 85% 85% 85% 85% 85% 87% 88% 90% 92% 94% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 63% 68% 72% 77% 81% 86% 87% 89% 91% 93% 94% 95%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 - - - - - - 172 175 179 183 187 117
3 Anchor 298,458 - - - - - - - - - - - -
4 Food Court 213,597 675 675 676 677 678 679 258 264 269 275 281 91
654,872 675 675 676 677 678 679 430 439 449 458 468 209
TOTAL Year 3
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
34
34 34
34 34 34
34 34 34 34
34 34 34 34 34
34 34 34 34 34 34
29,206 12,517 41 41 41 41 41
51 51 51 51
68 68 68
102 102
204
22 22 22 23 23 10
- - - - - -
1 DP ( 6 Installments) 30% 202 209 226 260 328 498 22 43 66 89 112 123
2 Credit (36 Installments) 70% 811 811 811 811 811 811
USD Rate in Rp 9,274 9,286 9,297 9,309 9,320 9,332 9,344 9,355 9,367 9,379 9,390 9,402
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 4
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 9,414 9,426 9,438 9,449 9,461 9,473 9,485 9,497 9,509 9,520 9,532 9,544
USD Rate in Rp 9,414 9,426 9,438 9,449 9,461 9,473 9,485 9,497 9,509 9,520 9,532 9,544
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 88% 90% 91% 93% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 - - - - - - - - - - - -
3 Anchor 298,458 - - - - - - - - - - - -
4 Food Court 213,597 - - - - - - - - - - - -
654,872 - - - - - - - - - - - -
TOTAL Year 4
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
29,206 12,517
- - - - - - - - - - - -
(22) (22) (22) (23) (23) (10) - - - - - -
1 DP ( 6 Installments) 30% 101 79 57 34 10 - - - - - - -
2 Credit (36 Installments) 70% 811 811 811 811 811 811 811 811 811 811 811 811
8 9 9 9 9 4 - - - - - -
- - - - - - - - - - - -
8 17 26 35 44 48 48 48 48 48 48 48
USD Rate in Rp 9,414 9,426 9,438 9,449 9,461 9,473 9,485 9,497 9,509 9,520 9,532 9,544
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 5
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 9,556 9,568 9,580 9,592 9,604 9,616 9,628 9,640 9,652 9,664 9,676 9,688
USD Rate in Rp 9,556 9,568 9,580 9,592 9,604 9,616 9,628 9,640 9,652 9,664 9,676 9,688
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 - - - - - - - - - - - -
3 Anchor 298,458 - - - - - - - - - - - -
4 Food Court 213,597 - - - - - - - - - - - -
654,872 - - - - - - - - - - - -
TOTAL Year 5
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
29,206 12,517
- - - - - - - - - - - -
- - - - - - - - - - - -
1 DP ( 6 Installments) 30% - - - -
2 Credit (36 Installments) 70% 811 811 811 811 811 811 811 811 811 811 811 811
- - - - - - - - - - - -
- - - - - - - - - - - -
48 48 48 48 48 48 48 48 48 48 48 48
USD Rate in Rp 9,556 9,568 9,580 9,592 9,604 9,616 9,628 9,640 9,652 9,664 9,676 9,688
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 6
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 9,701 9,713 9,725 9,737 9,749 9,761 9,773 9,786 9,798 9,810 9,822 9,835
USD Rate in Rp 9,701 9,713 9,725 9,737 9,749 9,761 9,773 9,786 9,798 9,810 9,822 9,835
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 - - - - - - - - - - - -
3 Anchor 298,458 - - - - - - - - - - - -
4 Food Court 213,597 - - - - - - - - - - - -
654,872 - - - - - - - - - - - -
TOTAL Year 6
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
29,206 12,517
- - - - - - - - - - - -
- - - - - - - - - - - -
1 DP ( 6 Installments) 30%
2 Credit (36 Installments) 70% 811 811 811 811 811 811
- - - - - - - - - - - -
- - - - - - - - - - - -
48 48 48 48 48 48 48 48 48 48 48 48
USD Rate in Rp 9,701 9,713 9,725 9,737 9,749 9,761 9,773 9,786 9,798 9,810 9,822 9,835
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 7
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 9,847 9,859 9,872 9,884 9,896 9,909 9,921 9,934 9,946 9,958 9,971 9,983
USD Rate in Rp 9,847 9,859 9,872 9,884 9,896 9,909 9,921 9,934 9,946 9,958 9,971 9,983
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 - - - - - - - - - - - -
3 Anchor 298,458 - - - - - - - - - - - -
4 Food Court 213,597 - - - - - - - - - - - -
654,872 - - - - - - - - - - - -
TOTAL Year 7
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
29,206 12,517
- - - - - - - - - - - -
- - - - - - - - - - - -
1 DP ( 6 Installments) 30%
2 Credit (36 Installments) 70%
- - - - - - - - - - - -
(8) (9) (9) (9) (9) (4) - - - - - -
39 31 22 13 4 - - - - - - -
USD Rate in Rp 9,847 9,859 9,872 9,884 9,896 9,909 9,921 9,934 9,946 9,958 9,971 9,983
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 8
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 9,996 10,008 10,021 10,033 10,046 10,058 10,071 10,084 10,096 10,109 10,121 10,134
USD Rate in Rp 9,996 10,008 10,021 10,033 10,046 10,058 10,071 10,084 10,096 10,109 10,121 10,134
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 - - - - - - - - 10,514 - - -
3 Anchor 298,458 - - - - - - - - 21,903 - - -
4 Food Court 213,597 - - - - - - - - 15,716 - - -
654,872 - - - - - - - - 48,133 - - -
TOTAL Year 8
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
29,206 12,517
- - - - - - - - 2,407 - - -
- - - - - - - - - - - -
1 DP ( 6 Installments) 30% - - 2,407 2,407 2,407 2,407
2 Credit (36 Installments) 70%
- - - - -
- - - - -
- - - - -
USD Rate in Rp 9,996 10,008 10,021 10,033 10,046 10,058 10,071 10,084 10,096 10,109 10,121 10,134
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 9
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 10,147 10,159 10,172 10,185 10,198 10,210 10,223 10,236 10,249 10,261 10,274 10,287
USD Rate in Rp 10,147 10,159 10,172 10,185 10,198 10,210 10,223 10,236 10,249 10,261 10,274 10,287
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 - - - - - - - - - - - -
3 Anchor 298,458 - - - - - - - - - - - -
4 Food Court 213,597 - - - - - - - - - - - -
654,872 - - - - - - - - - - - -
TOTAL Year 9
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
29,206 12,517
- - - - - - - - - - - -
- - (2,407) - - - - - - - - -
1 DP ( 6 Installments) 30% 2,407 2,407 - - - - - - - - - -
2 Credit (36 Installments) 70%
936 - - - - - - - - -
- - - - - - - - - -
936 936 936 936 936 936 936 936 936 936
USD Rate in Rp 10,147 10,159 10,172 10,185 10,198 10,210 10,223 10,236 10,249 10,261 10,274 10,287
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 10
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 10,300 10,313 10,326 10,339 10,352 10,364 10,377 10,390 10,403 10,416 10,429 10,442
USD Rate in Rp 10,300 10,313 10,326 10,339 10,352 10,364 10,377 10,390 10,403 10,416 10,429 10,442
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 - - - - - - - - - - - -
3 Anchor 298,458 - - - - - - - - - - - -
4 Food Court 213,597 - - - - - - - - - - - -
654,872 - - - - - - - - - - - -
TOTAL Year 10
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
29,206 12,517
- - - - - - - - - - - -
- - - - - - - - - - - -
1 DP ( 6 Installments) 30% - - - - - - - - - - - -
2 Credit (36 Installments) 70%
- - - - - - - - - - - -
- - - - - - - - - - - -
936 936 936 936 936 936 936 936 936 936 936 936
USD Rate in Rp 10,300 10,313 10,326 10,339 10,352 10,364 10,377 10,390 10,403 10,416 10,429 10,442
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 11
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
USD Rate in Rp 10,456 10,469 10,482 10,495 10,508 10,521 10,534 10,547 10,561 10,574 10,587 10,600
USD Rate in Rp 10,456 10,469 10,482 10,495 10,508 10,521 10,534 10,547 10,561 10,574 10,587 10,600
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - -
2 Mini Anchor 142,817 - -
3 Anchor 298,458 - -
4 Food Court 213,597 - -
654,872 - -
TOTAL Year 11
Lease Assumption
1 2 3 4 5 6 7 8 9 10 11 12
29,206 12,517
- - - - - - - - - - - -
- - - - - - - - - - - -
1 DP ( 6 Installments) 30% - - - - - - - - - - - -
2 Credit (36 Installments) 70%
- - - - - - - - - - - -
- - - - - - - - - - - -
936 936 936 936 936 936 936 936 936 936 936 936
USD Rate in Rp 10,456 10,469 10,482 10,495 10,508 10,521 10,534 10,547 10,561 10,574 10,587 10,600
TOTAL Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22 Year 23
Lease Assumption
USD Rate in Rp 10,613 10,773 10,934 11,098 11,265 11,434 11,605 11,779 11,956 12,135 12,317 12,502
USD Rate in Rp 10,613 10,773 10,934 11,098 11,265 11,434 11,605 11,779 11,956 12,135 12,317 12,502
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - - - - - - - - - - - -
2 Mini Anchor 142,817 - 14,906 - - - - 22,523 - - - - 34,031
3 Anchor 298,458 - 31,055 - - - - 46,923 - - - - 70,897
4 Food Court 213,597 - 22,283 - - - - 33,669 - - - - 50,872
TOTAL Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22 Year 23
Lease Assumption
29,206 12,517
1 DP ( 6 Installments) 30%
2 Credit (36 Installments) 70%
1,872 20,473 15,924 15,924 15,924 30,934 24,060 24,060 24,060 46,740
USD Rate in Rp 10,613 10,773 10,934 11,098 11,265 11,434 11,605 11,779 11,956 12,135 12,317 12,502
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Lease Assumption
USD Rate in Rp 12,690 12,880 13,073 13,269 13,468 13,670 13,875 14,084 14,295 14,509 14,727
USD Rate in Rp 12,690 12,880 13,073 13,269 13,468 13,670 13,875 14,084 14,295 14,509 14,727
SHOPPING CENTER
OCCUPANCY RATE
1 Retail 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2 Mini Anchor 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3 Anchor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Food Court 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
REVENUE
1 Retail - - - - - - - - - - -
2 Mini Anchor 142,817 - - - - 51,419 - - - - -
3 Anchor 298,458 - - - - 107,122 - - - - -
4 Food Court 213,597 - - - - 76,864 - - - - -
654,872 - - - - 235,405 - - - - -
TOTAL Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Lease Assumption
29,206 12,517
1 DP ( 6 Installments) 30%
2 Credit (36 Installments) 70%
USD Rate in Rp 12,690 12,880 13,073 13,269 13,468 13,670 13,875 14,084 14,295 14,509 14,727
Total Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Cash In #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Revenue #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Lease Assumption
Stasiun Purwosari
SOLO
TOTAL
Lease Assumption
29,206 12,517
1 DP ( 6 Installments) 30%
2 Credit (36 Installments) 70%
USD Rate in Rp
Accumulated Cash In
TOTAL
Lease Assumption
29,206 12,517
1 DP ( 6 Installments) 30%
2 Credit (36 Installments) 70%
USD Rate in Rp
Accumulated Cash In
Revenue
Accumulated Revenue
Hotel Department Assumption
Stasiun Purwosari
SOLO
Year 1
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate
Revenue
1 Room Department Revenue
- President Suite -
- Grand Suite -
- Junior Suite -
- Executive Room -
- Standard Room -
- Allowance & Rabates 0.50% -
Net Room Department Revenue -
Year 2
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate
Revenue
1 Room Department Revenue
- President Suite -
- Grand Suite -
- Junior Suite -
- Executive Room -
- Standard Room -
- Allowance & Rabates 0.50% -
Net Room Department Revenue -
Year 3
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate
Revenue
1 Room Department Revenue
- President Suite - - -
- Grand Suite - - -
- Junior Suite - - -
- Executive Room - - -
- Standard Room - - -
- Allowance & Rabates 0.50% - - -
Net Room Department Revenue - - -
Year 4
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - - -
Year 5
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate 40% 40% 41% 41% 41% 42% 42% 42% 43% 43% 43% 44%
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - - -
Year 6
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate 44% 45% 45% 45% 46% 46% 46% 47% 47% 48% 48% 48%
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - - -
- - - - - - - -
2 Food & Beverages Department - - - - - - - - - - - - -
3 Telephone Department - - - - - - - - - - - - -
4 Commercial Department - - - - - - - - - - - - -
5 Other Departments - - - - - - - - - - - - -
Year 7
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate 49% 49% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - - -
- - - - - - - - - - -
2 Food & Beverages Department - - - - - - - - - - - - -
3 Telephone Department - - - - - - - - - - - - -
4 Commercial Department - - - - - - - - - - - - -
5 Other Departments - - - - - - - - - - - - -
Year 8
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - - -
- - - - - - - - - - -
2 Food & Beverages Department - - - - - - - - - - - - -
3 Telephone Department - - - - - - - - - - - - -
4 Commercial Department - - - - - - - - - - - - -
5 Other Departments - - - - - - - - - - - - -
Year 9
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - - -
- - - - - - - - - - - -
2 Food & Beverages Department - - - - - - - - - - - - -
3 Telephone Department - - - - - - - - - - - - -
4 Commercial Department - - - - - - - - - - - - -
5 Other Departments - - - - - - - - - - - - -
Year 10
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - - -
- - - - - - - - - - - -
2 Food & Beverages Department - - - - - - - - - - - - -
3 Telephone Department - - - - - - - - - - - - -
4 Commercial Department - - - - - - - - - - - - -
5 Other Departments - - - - - - - - - - - - -
Year 11
Hotel Department Assumption Total
1 2 3 4 5 6 7 8 9 10 11 12
Occupancy Rate 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - - -
- - - - - - - - - - - -
2 Food & Beverages Department - - - - - - - - - - - - -
3 Telephone Department - - - - - - - - - - - - -
4 Commercial Department - - - - - - - - - - - - -
5 Other Departments - - - - - - - - - - - - -
Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22 Year 23
Hotel Department Assumption Total
Occupancy Rate 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - - -
- - - - - - - - - - - -
2 Food & Beverages Department - - - - - - - - - - - - -
3 Telephone Department - - - - - - - - - - - - -
4 Commercial Department - - - - - - - - - - - - -
5 Other Departments - - - - - - - - - - - - -
Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Hotel Department Assumption Total
Occupancy Rate 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
Revenue
1 Room Department Revenue
- President Suite - - - - - - - - - - - -
- Grand Suite - - - - - - - - - - - -
- Junior Suite - - - - - - - - - - - -
- Executive Room - - - - - - - - - - - -
- Standard Room - - - - - - - - - - - -
- Allowance & Rabates 0.50% - - - - - - - - - - - -
Net Room Department Revenue - - - - - - - - - - - -
- - - - - - - - - - -
2 Food & Beverages Department - - - - - - - - - - - -
3 Telephone Department - - - - - - - - - - - -
4 Commercial Department - - - - - - - - - - - -
5 Other Departments - - - - - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour
** Motorcycles Rp - per Hour
a Car Hours -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,000 9,011 #REF! #REF! #REF! #REF! #REF!
Price Increase (Rp) 100% 100% 100%
1 Ruko -
2 Shopping Center -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour -
** Motorcycles Rp - per Hour
a Car Hours -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp #REF! #REF! #REF! #REF! #REF! 9,023 9,034
Price Increase (Rp) 100% 100% 100% 100% 100% 100% 100%
1 Ruko -
2 Shopping Center -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,045 9,056 9,068 9,079 9,090 9,102 9,113
Price Increase (Rp) 100% 100% 100% 100% 100% 100% 100%
1 Ruko - - - - -
2 Shopping Center - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,125 9,136 9,147 9,159 9,170 9,182 9,193
Price Increase (Rp) 100% 100% 100% 110% 110% 110% 110%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,205 9,216 9,228 9,239 9,251 9,262 9,274
Price Increase (Rp) 110% 110% 110% 110% 110% 110% 110%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,286 9,297 9,309 9,320 9,332 9,344 9,355
Price Increase (Rp) 110% 120% 120% 120% 120% 120% 120%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,367 9,379 9,390 9,402 9,414 9,426 9,438
Price Increase (Rp) 120% 120% 120% 120% 120% 120% 130%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,449 9,461 9,473 9,485 9,497 9,509 9,520
Price Increase (Rp) 130% 130% 130% 130% 130% 130% 130%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,532 9,544 9,556 9,568 9,580 9,592 9,604
Price Increase (Rp) 130% 130% 130% 130% 140% 140% 140%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,616 9,628 9,640 9,652 9,664 9,676 9,688
Price Increase (Rp) 140% 140% 140% 140% 140% 140% 140%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,701 9,713 9,725 9,737 9,749 9,761 9,773
Price Increase (Rp) 140% 140% 150% 150% 150% 150% 150%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,786 9,798 9,810 9,822 9,835 9,847 9,859
Price Increase (Rp) 150% 150% 150% 150% 150% 150% 150%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,872 9,884 9,896 9,909 9,921 9,934 9,946
Price Increase (Rp) 160% 160% 160% 160% 160% 160% 160%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 9,958 9,971 9,983 9,996 10,008 10,021 10,033
Price Increase (Rp) 160% 160% 160% 160% 160% 170% 170%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 10,046 10,058 10,071 10,084 10,096 10,109 10,121
Price Increase (Rp) 170% 170% 170% 170% 170% 170% 170%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 10,134 10,147 10,159 10,172 10,185 10,198 10,210
Price Increase (Rp) 170% 170% 170% 180% 180% 180% 180%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 10,223 10,236 10,249 10,261 10,274 10,287 10,300
Price Increase (Rp) 180% 180% 180% 180% 180% 180% 180%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 10,313 10,326 10,339 10,352 10,364 10,377 10,390
Price Increase (Rp) 180% 190% 190% 190% 190% 190% 190%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 10,403 10,416 10,429 10,442 10,456 10,469 10,482
Price Increase (Rp) 190% 190% 190% 190% 190% 190% 200%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
A PARKING INCOME
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 10,495 10,508 10,521 10,534 10,547 10,561 10,574
Price Increase (Rp) 210% 220% 230% 240% 250% 260% 270%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
A PARKING INCOME
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 10,587 10,600 10,613 10,773 10,934 11,098 11,265
Price Increase (Rp) 280% 290% 300% 310% 320% 330% 340%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
A PARKING INCOME
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour - - - - - - -
** Motorcycles Rp - per Hour
a Car Hours - - - - - - - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - - - - - - - -
Profit Sharing to PT KA 70% - - - - - - - -
Income Before VAT - - - - - - - -
VAT 30% - - - - - - - -
B SERVICES CHARGES
USD Rate in Rp 11,434 11,605 11,779 11,956 12,135 12,317 12,502
Price Increase (Rp) 350% 360% 370% 380% 390% 400% 410%
1 Ruko - - - - - - - -
2 Shopping Center - - - - - - - -
Total Service Charges Income - - - - - - - -
VAT 20% - - - - - - - -
Income After VAT - - - - - - - -
A PARKING INCOME
Occupancy
Senin 65%
Selasa 65%
Rabu 65%
Kamis 65%
Jumat 85%
Sabtu 97%
Minggu 97%
Tariffs
Beginning Tarrifs
** Car Rp - per Hour -
** Motorcycles Rp - per Hour
a Car Hours - -
-
2 Motorcycle Parking Revenue
Senin
Selasa
Rabu
Kamis
Jumat
Sabtu
Minggu
Total Motors in a week
Total Motors in a month
Income Before Tax & Profit Sharing - -
Profit Sharing to PT KA 70% - -
Income Before VAT - -
VAT 30% - -
B SERVICES CHARGES
USD Rate in Rp 12,690
Price Increase (Rp) 420%
1 Ruko - -
2 Shopping Center - -
Total Service Charges Income - -
VAT 20% - -
Income After VAT - -
Grace Period
Beginning Debt after Grace Period 94,177
Interest Rate 0%
Payment Period 7
LOAN
(IN RP MILLIONS) 1 2
Interest -
Interest Payment -
Outstanding Debt
Year 1
3 4 5 6 7 8 9 10 11
- - - - - - - - -
- - - - - - - - -
- - - - -
- - -
Year 2
12 1 2 3 4 5 6 7 8
- - - - - - - 11,147 4,459
- - - - - - - 11,147 4,459
- - - - - - - - -
- - - - - - - 11,147 15,606
Year 3
9 10 11 12 1 2 3 4 5
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
1,121 1,121 1,121 1,121 1,121 1,121 1,121 1,121 1,121 1,121
- - - - - - - - - -
13,454 12,333 11,212 10,090 8,969 7,848 6,727 5,606 4,485 3,363
Year 12
10 11 12 1 2 3 4 5 6 7
- - -
- - -
- - -
2,242 1,121 0 0 0 0
ar 12
8 9 10 11 12
Amortisasi & Fixed Aseets
0
0
0
Rp.000.000
Amounts
No. in Rp Millions Group %
A Land
1 Land Compensation Cost to PT KA IV 5%
2 Certificate Cost (SHP to SHPL) IV 5%
3 Certificate Cost (SHGB on SHPL) IV 5%
4 Licenses Cost
Amdal IV 5%
IPPT IV 5%
IMB IV 5%
Kanko IV 5%
Shopping Center IV 5%
IV 5%
5 Land Sterilization IV 5%
a Bangunan Liar /Kaki 5 IV 5%
b Rumah Dinas IV 5%
1 Aktif IV 5%
2 Pensiunan IV 5%
3 Lain-lain IV 5%
c Balai Yasa IV 5%
d Biaya Operasional IV 5%
Total 7,659
Accumulated
Amortisasi akan diakukan pada saat semua pekerjaan pembagunan telah selesai/ atau telah dilakukan penjualan
Land Cost
Accumulated
Planing & Design
Accumulated Planing & Design
Total
Year 1 (2003)
Total
1 2 3 4 5 6 7
-
3,635
1,238
500
2,908
-
975
3,203
-
850
-
200
1,300
450
75
750
4,925
2,592
1,569
4,815
29,985
9,095
39,080
4,925 0 - - - - - -
0 - - - - - -
9,100 - - - - - 404 404
- - - - - 404 808
- -
1
1
2
Year 2 (2004)
4 5 6 7 8 9 10 11
- - - - - - - -
- - - - - - -
15 15 15 15 15 15 15
5 5 5 5 5 5 5
- - - - - - -
2 2 2 2 2 2 2
12 12 12 12 12 12 12
- - - - - - -
4 4 4 4 4 4 4
13 13 13 13 13 13 13
- - - - - - -
- - - - - - -
4 4 4 4 4 4 4
- - - - - - -
1 1 1 1 1 1 1
5 5 5 5 5 5 5
- - - - - - -
21 21 21 21 21 21 21
11 11 11 11 11 11 11
93 93 93 93 93 93 93
93 186 279 372 465 558 651
38 38 38 38 38 38 38
- 38 76 114 152 189 227 265
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
57 167 105 69 56 46 34 28
8,526 8,693 8,798 8,867 8,923 8,969 9,003 9,031
1
2
4
2005)
8 9 10 11 12 1 2 3
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
744 837 930 1,023 1,116 1,209 1,302 1,395
38 38 38 38 38 38 38 38
303 341 379 417 455 493 531 568
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
20 17 17 10 5 - - -
9,051 9,068 9,085 9,095 9,100 9,100 9,100 9,100
1
1
2
Year 4 (2006)
4 5 6 7 8 9 10 11
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
1,488 1,581 1,674 1,767 1,861 1,954 2,047 2,140
38 38 38 38 38 38 38 38
606 644 682 720 758 796 834 872
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
2,233 2,326 2,419 2,512 2,605 2,698 2,791 2,884
38 38 38 38 38 38 38 38
910 947 985 1,023 1,061 1,099 1,137 1,175
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
2,977 3,070 3,163 3,256 3,349 3,442 3,535 3,628
38 38 38 38 38 38 38 38
1,213 1,251 1,288 1,326 1,364 1,402 1,440 1,478
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
3,721 3,814 3,907 4,000 4,093 4,186 4,279 4,372
38 38 38 38 38 38 38 38
1,516 1,554 1,592 1,630 1,667 1,705 1,743 1,781
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
4,465 4,558 4,651 4,744 4,837 4,930 5,023 5,116
38 38 38 38 38 38 38 38
1,819 1,857 1,895 1,933 1,971 2,008 2,046 2,084
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
5,209 5,302 5,395 5,489 5,582 5,675 5,768 5,861
38 38 38 38 38 38 38 38
2,122 2,160 2,198 2,236 2,274 2,312 2,350 2,387
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
5,954 6,047 6,140 6,233 6,326 6,419 6,512 6,605
38 38 38 38 38 38 38 38
2,425 2,463 2,501 2,539 2,577 2,615 2,653 2,691
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
6,698 6,791 6,884 6,977 7,070 7,163 7,256 7,349
38 38 38 38 38 38 38 38
2,729 2,766 2,804 2,842 2,880 2,918 2,956 2,994
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
7,442 7,535 7,628 7,721 7,814 7,907 8,000 8,093
38 38 38 38 38 38 38 38
3,032 3,070 3,107 3,145 3,183 3,221 3,259 3,297
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
8,186 8,279 8,372 8,465 8,558 8,651 8,744 8,837
38 38 38 38 38 38 38 38
3,335 3,373 3,411 3,449 3,486 3,524 3,562 3,600
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 15 15 15
5 5 5 5 5 5 5 5
- - - - - - - -
2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12
- - - - - - - -
4 4 4 4 4 4 4 4
13 13 13 13 13 13 13 13
- - - - - - - -
- - - - - - - -
4 4 4 4 4 4 4 4
- - - - - - - -
1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5
- - - - - - - -
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
93 93 93 93 93 93 93 93
8,930 9,023 9,116 9,210 9,303 9,396 9,489 9,582
38 38 38 38 38 38 38 38
3,638 3,676 3,714 3,752 3,790 3,828 3,865 3,903
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
15 15 15 15 15 182 182 182
5 5 5 5 5 62 62 62
- - - - - - - -
2 2 2 2 2 25 25 25
12 12 12 12 12 145 145 145
- - - - - - - -
4 4 4 4 4 49 49 49
13 13 13 13 13 160 160 160
- - - - - - - -
- - - - - - - -
4 4 4 4 4 43 43 43
- - - - - - - -
1 1 1 1 1 10 10 10
5 5 5 5 5 65 65 65
- - - - - - - -
21 21 21 21 21 246 246 246
11 11 11 11 11 130 130 130
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- - - - - - - -
182 182 182 182 182 182 182 182
62 62 62 62 62 62 62 62
- - - - - - - -
25 25 25 25 25 25 25 25
145 145 145 145 145 145 145 145
- - - - - - - -
49 49 49 49 49 49 49 49
160 160 160 160 160 160 160 160
- - - - - - - -
- - - - - - - -
43 43 43 43 43 43 43 43
- - - - - - - -
10 10 10 10 10 10 10 10
65 65 65 65 65 65 65 65
- - - - - - - -
246 246 246 246 246 246 246 246
130 130 130 130 130 130 130 130
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
0 0 0 0 0 0 0 0
4,925 4,925 4,925 4,925 4,925 4,925 4,925 4,925
- - - - - - - -
9,100 9,100 9,100 9,100 9,100 9,100 9,100 9,100
- -
3,635 -
1,238 -
- -
500 -
2,908 -
- -
975 -
3,203 -
- -
- -
850 -
- -
200 -
1,300 -
- -
4,925 -
2,592 -
(29,985)
9,095 -
31,421
0 0 0 0
4,925 4,925 4,925 4,925
- - - -
9,100 9,100 9,100 9,100
Year 1 (2003)
Amounts in Rp Millions
Total 1 2 3 4 5 6 7 8 9 10 11
GROUP IV - 20 YEARS
Permanent Building
1 IV -
2 IV -
3 IV -
4 Shopping Center IV 81,256 - - - - - - - - - - -
5 Infrastructure IV 2,187 - - - - - - - - - - -
6 IV -
7 IV -
Total Building IV 83,443 - - - - - - - - - - -
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center - - - - - - - - - - -
5 Infrastructure - - - - - - - - - - -
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - -
2 -5% - -
3 -5% - -
4 Shopping Center -5% 4,967 (76,289)
5 Infrastructure -5% 1 (2,186)
6 -5% - -
7 -5% - -
Total (78,475) - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center - - - - - - - 9,618 13,465 17,312 22,121
5 Infrastructure - - 44 153 262 416 569 722 875 1,050 1,225
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - -
3 -5% - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186)
6 -5% - -
7 -5% - -
Total (78,475) - - - - - - - (318) (318) (318) (318)
Accumulated Depreciation - - - - - - - (318) (636) (954) (1,271)
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 25,488 28,854 43,347 51,871 58,073 63,131 67,857 71,381 74,241 76,289 78,005
5 Infrastructure 1,378 1,487 1,575 1,662 1,750 1,837 1,925 2,012 2,056 2,100 2,144
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9)
6 -5% - -
7 -5% - -
Total (78,475) (318) (318) (318) (318) (318) (318) (318) (318) (318) (326) (327)
Accumulated Depreciation (1,589) (1,907) (2,225) (2,543) (2,861) (3,179) (3,497) (3,814) (4,132) (4,459) (4,785)
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 79,722 80,775 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,166 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
6 -5% - - - - - - - -
7 -5% - -
Total (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (5,112) (5,439) (5,766) (6,093) (6,420) (6,747) (7,074) (7,401) (7,728) (8,055) (8,382)
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
6 -5% - - - - - - - - - - - - -
7 -5% - - - - -
Total (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (8,709) (9,036) (9,363) (9,690) (10,017) (10,344) (10,671) (10,998) (11,325) (11,652) (11,979)
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
6 -5% - - - - - - - - - - - - -
7 -5% - - - - - - - - - - - - -
Total (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (12,306) (12,633) (12,960) (13,287) (13,614) (13,941) (14,268) (14,595) (14,922) (15,249) (15,576)
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
6 -5% - - - - - - - - - - - - -
7 -5% - - - - - - - - - - - - -
Total (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (15,903) (16,230) (16,557) (16,884) (17,211) (17,538) (17,865) (18,192) (18,518) (18,845) (19,172)
Year 7 (Th.2009)
Amounts in Rp Millions
Total 6 7 8 9 10 11 12 1 2 3 4
GROUP IV - 20 YEARS
Permanent Building
1 IV -
2 IV -
3 IV -
4 Shopping Center IV 81,256 - - - - - - - - - - -
5 Infrastructure IV 2,187 - - - - - - - - - - -
6 IV -
7 IV -
Total Building IV 83,443 - - - - - - - - - - -
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
6 -5% - - - - - - - - - - - - -
7 -5% - - - - - - - - - - - - -
Total (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (19,499) (19,826) (20,153) (20,480) (20,807) (21,134) (21,461) (21,788) (22,115) (22,442) (22,769)
Year 8 (Th.2010)
Amounts in Rp Millions
Total 5 6 7 8 9 10 11 12 1 2 3
GROUP IV - 20 YEARS
Permanent Building
1 IV -
2 IV -
3 IV -
4 Shopping Center IV 81,256 - - - - - - - - - - -
5 Infrastructure IV 2,187 - - - - - - - - - - -
6 IV -
7 IV -
Total Building IV 83,443 - - - - - - - - - - -
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
6 -5% - - - - - - - - - - - - -
7 -5% - - - - - - - - - - - - -
Total (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (23,096) (23,423) (23,750) (24,077) (24,404) (24,731) (25,058) (25,385) (25,712) (26,039) (26,366)
Year 9 (Th.2011)
Amounts in Rp Millions
Total 4 5 6 7 8 9 10 11 12 1 2
GROUP IV - 20 YEARS
Permanent Building
1 IV -
2 IV -
3 IV -
4 Shopping Center IV 81,256 - - - - - - - - - - -
5 Infrastructure IV 2,187 - - - - - - - - - - -
6 IV -
7 IV -
Total Building IV 83,443 - - - - - - - - - - -
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
6 -5% - - - - - - - - - - - - -
7 -5% - - - - - - - - - - - - -
Total (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (26,693) (27,020) (27,347) (27,674) (28,001) (28,328) (28,655) (28,982) (29,309) (29,636) (29,963)
Year 10 (Th.2012)
Amounts in Rp Millions
Total 3 4 5 6 7 8 9 10 11 12 1
GROUP IV - 20 YEARS
Permanent Building
1 IV -
2 IV -
3 IV -
4 Shopping Center IV 81,256 - - - - - - - - - - -
5 Infrastructure IV 2,187 - - - - - - - - - - -
6 IV -
7 IV -
Total Building IV 83,443 - - - - - - - - - - -
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
6 -5% - - - - - - - - - - - - -
7 -5% - - - - - - - - - - - - -
Total (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (30,290) (30,617) (30,944) (31,271) (31,598) (31,925) (32,252) (32,579) (32,906) (33,233) (33,560)
Year 11 (Th.2013)
Amounts in Rp Millions
Total 2 3 4 5 6 7 8 9 10 11 12
GROUP IV - 20 YEARS
Permanent Building
1 IV -
2 IV -
3 IV -
4 Shopping Center IV 81,256 - - - - - - - - - - -
5 Infrastructure IV 2,187 - - - - - - - - - - -
6 IV -
7 IV -
Total Building IV 83,443 - - - - - - - - - - -
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318) (318)
5 Infrastructure -5% 1 (2,186) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9) (9)
6 -5% - - - - - - - - - - - - -
7 -5% - - - - - - - - - - - - -
Total (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (33,887) (34,214) (34,541) (34,868) (35,195) (35,522) (35,849) (36,176) (36,503) (36,830) (37,157)
Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22
Amounts in Rp Millions
Total 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
GROUP IV - 20 YEARS
Permanent Building
1 IV -
2 IV -
3 IV -
4 Shopping Center IV 81,256 - - - - - - - - - - -
5 Infrastructure IV 2,187 - - - - - - - - - - -
6 IV -
7 IV -
Total Building IV 83,443 - - - - - - - - - - -
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - - - - - - - - - - - -
2 -5% - - - - - - - - - - - - -
3 -5% - - - - - - - - - - - - -
4 Shopping Center -5% 4,967 (76,289) (3,814) (3,814) (3,814) (3,814) (3,814) (3,814) (3,814) (3,814) (3,814) (3,814) (1,907)
5 Infrastructure -5% 1 (2,186) (109) (109) (109) (109) (109) (109) (109) (109) (109) (109) (109)
6 -5% - - - - - - - - - - - - -
7 -5% - - - - - - - - - - - - -
Total (78,475) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (2,017)
Accumulated Depreciation (41,080) (45,004) (48,928) (52,852) (56,776) (60,700) (64,623) (68,547) (72,471) (76,395) (78,412)
Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33
Amounts in Rp Millions
Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
GROUP IV - 20 YEARS
Permanent Building
1 IV -
2 IV -
3 IV -
4 Shopping Center IV 81,256 - - - - - - - - - - -
5 Infrastructure IV 2,187 - - - - - - - - - - -
6 IV -
7 IV -
Total Building IV 83,443 - - - - - - - - - - -
Accumulation
1 - - - - - - - - - - -
2 - - - - - - - - - - -
3 - - - - - - - - - - -
4 Shopping Center 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256 81,256
5 Infrastructure 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187 2,187
6 - - - - - - - - - - -
7 - - - - - - - - - - -
Depreciation
1 -5% - -
2 -5% - - -
3 -5% - -
4 Shopping Center -5% 4,967 (76,289)
5 Infrastructure -5% 1 (2,186) (64)
6 -5% - - - -
7 -5% - - - - -
Total (78,475) (64) - - - - - - - - - -
Accumulated Depreciation (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475)
Year 34
Amounts in Rp Millions
Total 2036
GROUP IV - 20 YEARS
Permanent Building
1 IV -
2 IV -
3 IV -
4 Shopping Center IV 81,256 -
5 Infrastructure IV 2,187 -
6 IV -
7 IV -
Total Building IV 83,443 -
Accumulation
1 - -
2 - -
3 - -
4 Shopping Center 81,256 -
5 Infrastructure 2,187 -
6 - -
7 - -
Depreciation
1 -5% - -
2 -5% - -
3 -5% - -
4 Shopping Center -5% 4,967 (76,289)
5 Infrastructure -5% 1 (2,186)
6 -5% - -
7 -5% - -
Total (78,475) -
Accumulated Depreciation (78,475)
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory -
Depreciation -5% -
-
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Year 1 (2003)
Amounts in Rp Millions
Total 1 2 3 4 5 6 7 8 9 10 11
Fixed Assets Consolidation
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase - - - - - - - - - - -
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 1 (2003) Year 2 (2004)
Amounts in Rp Millions
Total 12 1 2 3 4 5 6 7 8 9 10
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 - 0
Commisioners 2 0 - 0
Pres. Dir 1 0 - 0
Directors 2 0 - 0
2 Operational Vehicle -
Sr. Mgr 0 - - -
Jr. Mgr 0 - - -
Supervisor 0 - - -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory - -
Depreciation -5% - - - - - - - - - - -
-
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Purchase
Group IV 83,443 83,443 - - 44 109 109 153 153 9,771 4,000 4,022 4,984
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - 44 109 109 153 153 9,771 4,000 4,022 4,984
Accumulated Purchase - - 44 153 262 416 569 10,340 14,340 18,362 23,346
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 2 (2004) Year 3 (2005)
Amounts in Rp Millions
Total 11 12 1 2 3 4 5 6 7 8 9
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle -
Pres. Com 1 0 - -
Commisioners 2 0 - -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 - -
-
Depreciation
1 Top Management Vehicle - -
Pres. Com -12.50% - - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory - -
Depreciation -5% - - - - - - - - - - - -
- - - - - - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Purchase
Group IV 83,443 83,443 3,519 3,476 14,581 8,611 6,289 5,145 4,814 3,611 2,904 2,092 1,760
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 3,519 3,476 14,581 8,611 6,289 5,145 4,814 3,611 2,904 2,092 1,760
Accumulated Purchase 26,866 30,341 44,922 53,533 59,823 64,968 69,782 73,393 76,297 78,389 80,149
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 3 (2005) Year 4 (2006)
Amounts in Rp Millions
Total 10 11 12 1 2 3 4 5 6 7 8
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 - -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory -
Depreciation -5% - - - - - - - - - - - -
- - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Purchase
Group IV 83,443 83,443 1,738 1,075 481 - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 1,738 1,075 481 - - - - - - - -
Accumulated Purchase 81,887 82,962 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 4 (2006) Year 5 (2007)
Amounts in Rp Millions
Total 9 10 11 12 1 2 3 4 5 6 7
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 - -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory -
Depreciation -5% - - - - - - - - - - - -
- - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 5 (2007) Year 6 (Th.2008)
Amounts in Rp Millions
Total 8 9 10 11 12 1 2 3 4 5 6
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory -
Depreciation -5% - - - - - -
- - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 6 (Th.2008) Yea
Amounts in Rp Millions
Total 7 8 9 10 11 12 1 2 3 4 5
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory - -
Depreciation -5% - - - - -
- - - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 7 (Th.2009)
Amounts in Rp Millions
Total 6 7 8 9 10 11 12 1 2 3 4
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory -
Depreciation -5% - - - - - - - - - - - -
-
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Year 7 (Th.2009)
Amounts in Rp Millions
Total 6 7 8 9 10 11 12 1 2 3 4
Fixed Assets Consolidation
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 8 (Th.2010)
Amounts in Rp Millions
Total 5 6 7 8 9 10 11 12 1 2 3
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory - -
Depreciation -5% - - - - - - - - - - - -
- - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Year 8 (Th.2010)
Amounts in Rp Millions
Total 5 6 7 8 9 10 11 12 1 2 3
Fixed Assets Consolidation
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 9 (Th.2011)
Amounts in Rp Millions
Total 4 5 6 7 8 9 10 11 12 1 2
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory -
Depreciation -5% - - - - - - - - - - - -
- - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Year 9 (Th.2011)
Amounts in Rp Millions
Total 4 5 6 7 8 9 10 11 12 1 2
Fixed Assets Consolidation
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 10 (Th.2012)
Amounts in Rp Millions
Total 3 4 5 6 7 8 9 10 11 12 1
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 - -
Commisioners 2 0 - -
Pres. Dir 1 0 - -
Directors 2 0 - -
2 Operational Vehicle - -
Sr. Mgr 0 - -
Jr. Mgr 0 - -
Supervisor 0 - -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - -
Commisioners -12.50% - - - - - -
Pres. Dir -12.50% - - - - - -
Directors -12.50% - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory -
Depreciation -5% - - - - - - - - - - - -
- - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Year 10 (Th.2012)
Amounts in Rp Millions
Total 3 4 5 6 7 8 9 10 11 12 1
Fixed Assets Consolidation
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 11 (Th.2013)
Amounts in Rp Millions
Total 2 3 4 5 6 7 8 9 10 11 12
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory -
Depreciation -5% -
- - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Year 11 (Th.2013)
Amounts in Rp Millions
Total 2 3 4 5 6 7 8 9 10 11 12
Fixed Assets Consolidation
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22
Amounts in Rp Millions
Total 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 - -
Commisioners 2 0 - -
Pres. Dir 1 0 - -
Directors 2 0 - -
2 Operational Vehicle -
Sr. Mgr 0 - -
Jr. Mgr 0 - -
Supervisor 0 - -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - - - - - - -
Commisioners -12.50% - - - - - - - - - - - -
Pres. Dir -12.50% - - - - - - - - - - - -
Directors -12.50% - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory - - - -
Depreciation -5% - - - - - - - - - - - -
- - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22
Amounts in Rp Millions
Total 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Fixed Assets Consolidation
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33
Amounts in Rp Millions
Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - - - - - - -
Commisioners -12.50% - - - - - - -
Pres. Dir -12.50% - - - - - - -
Directors -12.50% - - - - - - -
Sub Total - - - - - - - - - - - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - - - - - - - - - - - -
Jr. Mgr -12.50% - - - - - - - - - - - - -
Supervisor(Motor) -12.50% - - - - - - - - - - - - -
Total Depreciation - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
GROUP I - 4 YEARS
Office Inventory - - -
Depreciation -5% - - - - - - - - - -
-
Sub Total - - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33
Amounts in Rp Millions
Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Fixed Assets Consolidation
Purchase
Group IV 83,443 83,443 - - - - - - - - - - -
Group III -
Group II - - - - - - - - - - - - -
Group I - - - - - - - - - - - - -
Total 83,443 83,443 - - - - - - - - - - -
Accumulated Purchase 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 34
Amounts in Rp Millions
Total 2036
GROUP II - 8 YEARS
Vehicle
1 Top Management Vehicle
Pres. Com 1 0 -
Commisioners 2 0 -
Pres. Dir 1 0 -
Directors 2 0 -
2 Operational Vehicle -
Sr. Mgr 0 -
Jr. Mgr 0 -
Supervisor 0 -
-
Depreciation
1 Top Management Vehicle -
Pres. Com -12.50% - -
Commisioners -12.50% - -
Pres. Dir -12.50% - -
Directors -12.50% - -
Sub Total - -
-
2 Operational Vehicle
Sr. Mgr -12.50% - - -
Jr. Mgr -12.50% - - -
Supervisor(Motor) -12.50% - - -
Total Depreciation - -
Accumulated Depreciation -
GROUP I - 4 YEARS
Office Inventory -
Depreciation -5% -
-
Sub Total - -
Accumulated Depreciation -
Year 34
Amounts in Rp Millions
Total 2036
Fixed Assets Consolidation
Purchase
Group IV 83,443 83,443 -
Group III -
Group II - - -
Group I - - -
Total 83,443 83,443 -
Accumulated Purchase 83,443 83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 1 (2003)
Amounts in Rp Millions
Total 1 2 3 4 5 6 7 8 9 10 11
Depreciation (78,475) - - - - - - - - - - -
Accumulated Depreciation - - - - - - - - - - -
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 1 (2003) Year 2 (2004)
Amounts in Rp Millions
Total 12 1 2 3 4 5 6 7 8 9 10
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 2 (2004) Year 3 (2005)
Amounts in Rp Millions
Total 11 12 1 2 3 4 5 6 7 8 9
Depreciation (78,475) (318) (318) (318) (318) (318) (318) (318) (318) (318) (326) (327)
Accumulated Depreciation (1,589) (1,907) (2,225) (2,543) (2,861) (3,179) (3,497) (3,814) (4,132) (4,459) (4,785)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 3 (2005) Year 4 (2006)
Amounts in Rp Millions
Total 10 11 12 1 2 3 4 5 6 7 8
Depreciation (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (5,112) (5,439) (5,766) (6,093) (6,420) (6,747) (7,074) (7,401) (7,728) (8,055) (8,382)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 4 (2006) Year 5 (2007)
Amounts in Rp Millions
Total 9 10 11 12 1 2 3 4 5 6 7
Depreciation (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (8,709) (9,036) (9,363) (9,690) (10,017) (10,344) (10,671) (10,998) (11,325) (11,652) (11,979)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 5 (2007) Year 6 (Th.2008)
Amounts in Rp Millions
Total 8 9 10 11 12 1 2 3 4 5 6
Depreciation (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (12,306) (12,633) (12,960) (13,287) (13,614) (13,941) (14,268) (14,595) (14,922) (15,249) (15,576)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 6 (Th.2008) Yea
Amounts in Rp Millions
Total 7 8 9 10 11 12 1 2 3 4 5
Depreciation (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (15,903) (16,230) (16,557) (16,884) (17,211) (17,538) (17,865) (18,192) (18,518) (18,845) (19,172)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 7 (Th.2009)
Amounts in Rp Millions
Total 6 7 8 9 10 11 12 1 2 3 4
Depreciation (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (19,499) (19,826) (20,153) (20,480) (20,807) (21,134) (21,461) (21,788) (22,115) (22,442) (22,769)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 8 (Th.2010)
Amounts in Rp Millions
Total 5 6 7 8 9 10 11 12 1 2 3
Depreciation (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (23,096) (23,423) (23,750) (24,077) (24,404) (24,731) (25,058) (25,385) (25,712) (26,039) (26,366)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 9 (Th.2011)
Amounts in Rp Millions
Total 4 5 6 7 8 9 10 11 12 1 2
Depreciation (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (26,693) (27,020) (27,347) (27,674) (28,001) (28,328) (28,655) (28,982) (29,309) (29,636) (29,963)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 10 (Th.2012)
Amounts in Rp Millions
Total 3 4 5 6 7 8 9 10 11 12 1
Depreciation (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (30,290) (30,617) (30,944) (31,271) (31,598) (31,925) (32,252) (32,579) (32,906) (33,233) (33,560)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 11 (Th.2013)
Amounts in Rp Millions
Total 2 3 4 5 6 7 8 9 10 11 12
Depreciation (78,475) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327) (327)
Accumulated Depreciation (33,887) (34,214) (34,541) (34,868) (35,195) (35,522) (35,849) (36,176) (36,503) (36,830) (37,157)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22
Amounts in Rp Millions
Total 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Depreciation (78,475) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (3,924) (2,017)
Accumulated Depreciation (41,080) (45,004) (48,928) (52,852) (56,776) (60,700) (64,623) (68,547) (72,471) (76,395) (78,412)
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33
Amounts in Rp Millions
Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
83,443
Fixed Assets
Kaliki Square
Jl. Pasirkaliki Bandung
PT. CITRA BUANA PRASIDA
Year 34
Amounts in Rp Millions
Total 2036
Depreciation (78,475) -
Accumulated Depreciation (78,475)
4,968
83,443
Overhead
Stasiun Puwosari
SOLO
Total Year 1
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Year 1 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 2
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 100% 100% 100% 100% 100% 100%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 2 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 100%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure - -
Sub Total - -
Total Year 3
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 3 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 100%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure - -
Sub Total - -
Total Year 4
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 110% 110% 110% 110% 110% 110% 110% 110% 110% 110% 110%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 4 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 110%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 5
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 110% 110% 110% 110% 110% 110% 110% 110% 110% 110% 110%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Year 5 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 110%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 6
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 121% 121% 121% 121% 121% 121% 121% 121% 121% 121% 121%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Year 6 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 121%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 7
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 121% 121% 121% 121% 121% 121% 121% 121% 121% 121% 121%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Year 7 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 121%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 8
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 133% 133% 133% 133% 133% 133% 133% 133% 133% 133% 133%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Year 8 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 133%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 9
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 133% 133% 133% 133% 133% 133% 133% 133% 133% 133% 133%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Year 9 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 133%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 10
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 133% 133% 133% 133% 133% 133% 133% 133% 133% 133% 133%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Year 10 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 133%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 11
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
1 Maintainance Expenses
Increase 146% 146% 146% 146% 146% 146% 146% 146% 146% 146% 146%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Year 11 Total
Amounts in Rp Million Price 12
1 Maintainance Expenses
Increase 146%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22
Amounts in Rp Million Price
1 Maintainance Expenses
Increase 146% 161% 161% 177% 177% 195% 195% 214% 214% 236% 236%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Total Year 23
Amounts in Rp Million Price
1 Maintainance Expenses
Increase 259%
Operation (M2)
1.2 Cleaning
a Wages - -
b Material
- Equipment - -
- Suplies - -
- Fumigasi - -
Sub Total - -
1.3 Security
a Wages - -
Sub Total - -
1.4 Spareparts
b Infrastructure -
Sub Total - -
Total Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Amounts in Rp Million Price
1 Maintainance Expenses
Increase 259% 285% 285% 314% 314% 345% 345% 380% 380% 418% 418%
Operation (M2)
1.2 Cleaning
a Wages - - - - - - - - - - - -
b Material
- Equipment - - - - - - - - - - - -
- Suplies - - - - - - - - - - - -
- Fumigasi - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.3 Security
a Wages - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
1.4 Spareparts
b Infrastructure -
Sub Total - - - - - - - - - - - -
Total Year 1
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 1 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 2
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 2 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 3
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 3 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 4
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 4 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 5
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 5 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 6
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 6 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 7
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 7 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 8
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 8 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 9
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 9 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 10
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept - - - - - - - - - - - -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 10 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept - -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept - -
b Leasing Dept. - -
Sub Total - -
Total Year 11
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Year 11 Total
Amounts in Rp Million Price 12
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept -
b Leasing Dept. - -
Sub Total - -
Total Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22
Amounts in Rp Million Price
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Total Year 23
Amounts in Rp Million Price
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept -
b Leasing Dept. -
Sub Total - -
2.4 Entertainment
a Direct Sales Dept -
b Leasing Dept. - -
Sub Total - -
2.5 Transportation
a Direct Sales Dept -
b Leasing Dept. - -
Sub Total - -
Total Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Amounts in Rp Million Price
2 Marketing Expenses
2.3 Wages
a Direct Sales Dept -
b Leasing Dept. -
Sub Total - - - - - - - - - - - -
2.4 Entertainment
a Direct Sales Dept -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
2.5 Transportation
a Direct Sales Dept -
b Leasing Dept. - - - - - - - - - - - -
Sub Total - - - - - - - - - - - -
Total Year 1
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 100% 100% 100% 100% 100% 100% 100%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - -
b Travel Expenses - - - - - - - - -
c Electricity - - - - - - - - -
d Telephone - - - - - - - - -
e PAM - - - - - - - - -
f Computer - - - - - - - - -
g Lease - - - - - - - - -
h ATK - - - - - - - - -
i Internet - - - - - - - - -
j Stamp & Duty - - - - - - - - -
k Security - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - -
m Inventory Maintainance - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - -
o Motor Maintainance - - - - - - - - -
p Bank Administration Exp. - - - - - - - - -
q Food & Baverages - - - - - - - - -
r PBB - - - - - - - - -
s Printing & Copyings - - - - - - - - -
t Maintanance Operasional - - - - - - - - -
u Others - - - - - - - - -
Sub total - - - - - - - - -
3.3 Others
a Sumbangan - - -
b Deviden 0 0
c Loan Interests - -
d Taxes - -
Sub total 0 0.00 -
TOTAL OVERHEAD 0 - - - - - - - - - 0 -
Overhead
Stasiun Puwosari
SOLO
Year 1 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 100%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 2
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3.2 Materials
Usage 30% 114% 138% 174% 172% 172% 172% 172% 172% 172% 172%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 2 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 100%
3.2 Materials
Usage 172%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 3
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 110% 110% 110% 110% 110% 110% 110% 110% 110% 110% 110%
3.2 Materials
Usage 172% 172% 172% 172% 172% 172% 172% 172% 172% 172% 172%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 3 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 110%
3.2 Materials
Usage 172%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 4
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 120% 120% 120% 120% 120% 120% 120% 120% 120% 120% 120%
3.2 Materials
Usage 172% 172% 172% 172% 172% 172% 172% 172% 172% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 4 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 120%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 5
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 130% 130% 130% 130% 130% 130% 130% 130% 130% 130% 130%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 5 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 130%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 6
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 140% 140% 140% 140% 140% 140% 140% 140% 140% 140% 140%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 6 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 140%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 7
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 150% 150% 150% 150% 150% 150% 150% 150% 150% 150% 150%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 7 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 150%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 8
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 160% 160% 160% 160% 160% 160% 160% 160% 160% 160% 160%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 8 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 160%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 9
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 170% 170% 170% 170% 170% 170% 170% 170% 170% 170% 170%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 9 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 170%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 10
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 180% 180% 180% 180% 180% 180% 180% 180% 180% 180% 180%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 10 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 180%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 11
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
-
3 General and Administration Expenses
Increase 10% 190% 190% 190% 190% 190% 190% 190% 190% 190% 190% 190%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Year 11 Total
Amounts in Rp Million Price 12
-
3 General and Administration Expenses
Increase 10% 190%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22
Amounts in Rp Million Price
-
3 General and Administration Expenses
Increase 10% 200% 210% 220% 230% 240% 250% 260% 270% 280% 290% 300%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Total Year 23
Amounts in Rp Million Price
-
3 General and Administration Expenses
Increase 10% 310%
3.2 Materials
Usage 30%
a Gas,Parking,Tol - -
b Travel Expenses - -
c Electricity - -
d Telephone - -
e PAM - -
f Computer - -
g Lease - -
h ATK - -
i Internet - -
j Stamp & Duty - -
k Security - -
l Licensens (Ijin-Ijin) - -
m Inventory Maintainance - -
n Maintainance & Cleaning Services - -
o Motor Maintainance - -
p Bank Administration Exp. - -
q Food & Baverages - -
r PBB - -
s Printing & Copyings - -
t Maintanance Operasional - -
u Others - -
Sub total - -
3.3 Others
a Sumbangan - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 -
TOTAL OVERHEAD 0 -
Overhead
Stasiun Puwosari
SOLO
Total Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Amounts in Rp Million Price
-
3 General and Administration Expenses
Increase 10% 320% 330% 340% 350% 360% 370% 380% 390% 400% 410% 420%
3.2 Materials
Usage 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
a Gas,Parking,Tol - - - - - - - - - - - -
b Travel Expenses - - - - - - - - - - - -
c Electricity - - - - - - - - - - - -
d Telephone - - - - - - - - - - - -
e PAM - - - - - - - - - - - -
f Computer - - - - - - - - - - - -
g Lease - - - - - - - - - - - -
h ATK - - - - - - - - - - - -
i Internet - - - - - - - - - - - -
j Stamp & Duty - - - - - - - - - - - -
k Security - - - - - - - - - - - -
l Licensens (Ijin-Ijin) - - - - - - - - - - - -
m Inventory Maintainance - - - - - - - - - - - -
n Maintainance & Cleaning Services - - - - - - - - - - - -
o Motor Maintainance - - - - - - - - - - - -
p Bank Administration Exp. - - - - - - - - - - - -
q Food & Baverages - - - - - - - - - - - -
r PBB - - - - - - - - - - - -
s Printing & Copyings - - - - - - - - - - - -
t Maintanance Operasional - - - - - - - - - - - -
u Others - - - - - - - - - - - -
Sub total - - - - - - - - - - - -
3.3 Others
a Sumbangan - - - - - - - - - - - -
b Deviden 0
c Loan Interests -
d Taxes -
Sub total 0 - - - - - - - - - - -
TOTAL OVERHEAD 0 - - - - - - - - - - -
Overhead
Stasiun Puwosari
SOLO
Total Year 1
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 1 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 2
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 2 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 3
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 3 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 4
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 4 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 5
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 5 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 6
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 6 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 7
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 7 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 8
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 8 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 9
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 9 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 10
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 10 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 11
Amounts in Rp Million Price 1 2 3 4 5 6 7 8 9 10 11
Overhead
Stasiun Puwosari
SOLO
Year 11 Total
Amounts in Rp Million Price 12
Overhead
Stasiun Puwosari
SOLO
Total Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22
Amounts in Rp Million Price
Overhead
Stasiun Puwosari
SOLO
Total Year 23
Amounts in Rp Million Price
Overhead
Stasiun Puwosari
SOLO
Total Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Amounts in Rp Million Price
Number of Personnels
Stasiun Purwosari
SOLO
2 Senior Manager
- Marketing Manager 1 person +1
1 1 1 1 1 1 1 1
- GA &HRD 1 person +1
1 1 1 1
- Project Manager 0 persons +1
1 1 1 1
- GM Mall 1 person +1
1
- GM Hotel 1 person +1
1
Total Number in Charged 4 persons - - - - - - - - 1 1 1 1 3 3 3 5
3 Junior Manager
- Sales Manager 1 person +1
1 1 1 1 1 1 1 1
- Leasing Manager 1 person +1
1 1 1 1 1 1
- Promotion & PR Manager 1 person +1
1 1 1 1 1 1 1 1
- Construction Manager 1 person +1
1 1 1 1
- Technical Manager 1 person +1
1 1 1 1
- Legal & Credit Manager 1 person +1
1 1 1 1 1 1 1 1
- Finance & Accounting Manager 1 person +1
1 1 1 1 1 1 1 1
- IT Manager 1 person +1
1 1 1 1
Total Number in Charged 8 persons - - - - - - - - 4 4 5 5 8 8 8 8
Number of Personnels
Stasiun Purwosari
SOLO
Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Amounts in Persons
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
A GENERAL & ADMINISTRATION
1 Boards
- President Comissioner
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Commisioners
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- President Director
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Directors
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Total Number in Charged 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
2 Senior Manager
- Marketing Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- GA &HRD
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Project Manager -+1
- - - - - - - - - - - - - - -
- GM Mall
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- GM Hotel
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Number in Charged 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
3 Junior Manager
- Sales Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Leasing Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Promotion & PR Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Construction Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Technical Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Legal & Credit Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Finance & Accounting Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- IT Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Number in Charged 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Number of Personnels
Stasiun Purwosari
SOLO
Year 21 Year 22 Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Amounts in Persons
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A GENERAL & ADMINISTRATION
1 Boards
- President Comissioner
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Commisioners
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- President Director
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Directors
2 2 2 2 2 2 2 2 2 2 2 2 2 2
Total Number in Charged 6 6 6 6 6 6 6 6 6 6 6 6 6 6
2 Senior Manager
- Marketing Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- GA &HRD
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Project Manager
- - - - - - - - - - - - - -
- GM Mall
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- GM Hotel
1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Number in Charged 4 4 4 4 4 4 4 4 4 4 4 4 4 4
3 Junior Manager
- Sales Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Leasing Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Promotion & PR Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Construction Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Technical Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Legal & Credit Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Finance & Accounting Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- IT Manager
1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Number in Charged 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Number of Personnels
Stasiun Purwosari
SOLO
4 Supervisor
- Leasing Executive 2 persons +1 +1 +0 +0
1 2 2 2
- Event Organiser 1 person +1
1 1 1 1 1 1 1 1
- Maintanance Supervisor 4 persons +1 +1 +1 +1
1 2 3 4
- Parking Supervisor 2 persons +1 +0 +1
1 1 1 2
- Personel & Security Supervisor 4 persons +1 +1 +0 +2
1 2 2 4
- Credit 1 person +1
1 1 1 1
- Accounting 1 person +1
1 1 1 1
- Finance 1 person +1
1 1 1 1
- Purchasing 1 person +1
1 1 1 1
- Cashier 1 person +1
1 1 1 1
- Secretary 1 person +1
1 1 1 1
Total Number in Charged 19 persons - - - - - - - - 1 1 1 1 11 14 15 19
Number of Personnels
Stasiun Purwosari
SOLO
Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Amounts in Persons
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
A GENERAL & ADMINISTRATION
4 Supervisor
- Leasing Executive
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Event Organiser
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Maintanance Supervisor
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Parking Supervisor
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Personel & Security Supervisor
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Credit
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Accounting
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Finance
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Purchasing
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Cashier
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Secretary
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Number in Charged 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Number of Personnels
Stasiun Purwosari
SOLO
Year 21 Year 22 Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Amounts in Persons
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A GENERAL & ADMINISTRATION
4 Supervisor
- Leasing Executive
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Event Organiser
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Maintanance Supervisor
4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Parking Supervisor
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Personel & Security Supervisor
4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Credit
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Accounting
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Finance
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Purchasing
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Cashier
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Secretary
1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Number in Charged 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Number of Personnels
Stasiun Purwosari
SOLO
5 Staffs
- Leasing Officer 12 persons +3 +3 +3 +3
3 6 9 12
- Graphic Desginer 1 person +1
1 1 1 1 1 1 1 1
- Parking Administrator 6 persons +1 +3 +2
1 1 4 6
- Technical Maintainance 2 persons +1 +1
1 1 1 2
- Mechanical Maintanance 2 persons +1 +1
1 1 1 2
- Personel & Security 4 persons +1 +1 +1 +1
1 2 3 4
- Kredit 4 persons +2 +1 +0 +1
2 3 3 4
- Taxation 1 person +1
1 1 1 1
- A/P 2 persons +1 +0 +1
1 1 2 2
- Accounting Clerk 2 Persons +1 +1
1 1 1 2
- Collector A/R 4 persons +1 +1 +1 +1
1 2 3 4
- Verifikator 1 person +1
1 1 1 1
- Purchasing 2 persons +1 +1 +0
1 1 2 2
- IT Technician 2 persons +1 +1
1 1 2 2
- Telp. Operator 3 persons +1 +1 +0 +1
1 2 2 3
- Front Office 1 person +1 +0
1 1 1 1
Total Number in Charged 49 persons - - - - - - - - 1 1 1 1 19 26 37 49
Number of Personnels
Stasiun Purwosari
SOLO
Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Amounts in Persons
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
A GENERAL & ADMINISTRATION
5 Staffs
- Leasing Officer
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
- Graphic Desginer
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Parking Administrator
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
- Technical Maintainance
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Mechanical Maintanance
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Personel & Security
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Kredit
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Taxation
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- A/P
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Accounting Clerk
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Collector A/R
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Verifikator
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Purchasing
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- IT Technician
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Telp. Operator
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
- Front Office
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Number in Charged 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Number of Personnels
Stasiun Purwosari
SOLO
Year 21 Year 22 Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Amounts in Persons
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A GENERAL & ADMINISTRATION
5 Staffs
- Leasing Officer
12 12 12 12 12 12 12 12 12 12 12 12 12 12
- Graphic Desginer
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Parking Administrator
6 6 6 6 6 6 6 6 6 6 6 6 6 6
- Technical Maintainance
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Mechanical Maintanance
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Personel & Security
4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Kredit
4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Taxation
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- A/P
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Accounting Clerk
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Collector A/R
4 4 4 4 4 4 4 4 4 4 4 4 4 4
- Verifikator
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- Purchasing
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- IT Technician
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Telp. Operator
3 3 3 3 3 3 3 3 3 3 3 3 3 3
- Front Office
1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total Number in Charged 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Number of Personnels
Stasiun Purwosari
SOLO
6 Operasional
- Technicians 13 persons +2 +1 +10
2 2 2 2 3 3 13
- Mechanics 13 persons +2 +1 +10
2 2 2 2 3 3 13
- Satpam 5 persons +3 +2
3 3 3 3 3 3 5
- Ground Parking Service 60 persons +36 +24
- - - 36 60 60 60
- OB 2 persons +2
- - - 2 2 2 2
- Driver 2 persons +2
- - - 2 2 2 2
Total Number in Charged 95 persons - - - - - - - - - 7 7 7 47 73 73 95
Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Amounts in Persons
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
A GENERAL & ADMINISTRATION
6 Operasional
- Technicians
13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
- Mechanics
13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
- Satpam
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
- Ground Parking Service
60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
- OB
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Driver
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Total Number in Charged 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95
TOTAL G & A 181 181 181 181 181 181 181 181 181 181 181 181 181 181 181
Number of Personnels
Stasiun Purwosari
SOLO
Year 21 Year 22 Year 23 Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Amounts in Persons
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A GENERAL & ADMINISTRATION
6 Operasional
- Technicians
13 13 13 13 13 13 13 13 13 13 13 13 13 13
- Mechanics
13 13 13 13 13 13 13 13 13 13 13 13 13 13
- Satpam
5 5 5 5 5 5 5 5 5 5 5 5 5 5
- Ground Parking Service
60 60 60 60 60 60 60 60 60 60 60 60 60 60
- OB
2 2 2 2 2 2 2 2 2 2 2 2 2 2
- Driver
2 2 2 2 2 2 2 2 2 2 2 2 2 2
Total Number in Charged 95 95 95 95 95 95 95 95 95 95 95 95 95 95
TOTAL G & A 181 181 181 181 181 181 181 181 181 181 181 181 181 181
Discount Discount
Interest p.a
CASH KPR 12X 18X 24X 36X 48X Cash 12X
20% 31.55% 23.91% 20.19% 16.37% 8.40% 0% 25.26% 16.92%
18% 29.07% 21.97% 18.55% 15.03% 7.69% 0% 23.17% 15.47%
16% 26.49% 19.97% 16.84% 13.62% 6.97% 0% 20.99% 13.97%
14% 23.76% 17.85% 15.05% 12.16% 6.23% 0% 18.72% 12.43%
12% 20.88% 15.65% 13.10% 10.62% 5.40% 0% 16.38% 10.84%
Discount Discount Discount
18X 24X 36X Cash 12X 18X 24X Cash 12X
12.87% 8.70% 0.00% 18.13% 9.00% 4.56% 0.00% 10.00% 0.00%
11.77% 7.95% 0.00% 16.54% 8.18% 4.15% 0.00% 9.10% 0.00%
10.60% 7.15% 0.00% 14.91% 7.35% 3.72% 0.00% 8.15% 0.00%
9.42% 6.34% 0.00% 13.22% 6.50% 3.29% 0.00% 7.19% 0.00%
8.21% 5.52% 0.00% 11.49% 5.63% 2.85% 0.00% 6.21% 0.00%
Balance Sheet
Stasiun Purwosari
SOLO
Year 1
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 0 0 0 (3,177) (4,997) (2,997) (997) 1,003 3,003 7,121 11,449 11,989
A/R 0 0 0 0 0 0 0 0 12,000 14,191 16,172 38,614
Sub Total 0 0 0 (3,177) (4,997) (2,997) (997) 1,003 15,003 21,312 27,621 50,602
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 0 0 0 0 0 0 0 0 0 0 0 0
Total Fixed Assets 0 0 0 0 0 0 0 0 0 0 0 0
Accumulated Depreciation 0 0 0 0 0 0 0 0 0 0 0 0
Net Fixed Assets 0 0 0 0 0 0 0 0 0 0 0 0
Other Assets 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization 0 0 0 0 0 0 0 0 0 0 0 0
Net other Assets 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 0 0 0 0 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 0 0 0 0 0 0 0 0 12,000 16,309 20,618 46,599
Total Equity 0 0 0 0 5,000 5,000 5,000 5,000 17,000 21,309 25,618 51,599
TOTAL LIABILITIES & EQUITY 0 0 0 (3,177) 3 407 811 1,620 14,529 19,546 26,327 48,666
Balance Sheet
Stasiun Purwosari
SOLO
Year 2
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 17,793 20,029 24,047 28,674 34,422 37,074 22,588 20,416 19,180 15,832 15,641 13,394
A/R 61,586 83,298 102,138 106,594 109,392 112,971 116,624 119,855 122,717 125,842 128,194 129,793
Sub Total 79,379 103,327 126,185 135,269 143,815 150,046 139,213 140,271 141,897 141,674 143,834 143,187
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 0 44 153 262 416 569 10,340 14,340 18,362 23,346 26,866 30,341
Total Fixed Assets 0 44 153 262 416 569 10,340 14,340 18,362 23,346 26,866 30,341
Accumulated Depreciation 0 0 0 0 0 0 (318) (636) (954) (1,271) (1,589) (1,907)
Net Fixed Assets 0 44 153 262 416 569 10,022 13,704 17,409 22,075 25,276 28,434
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization 0 0 0 0 0 0 0 0 0 0 0 0
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 73,397 98,290 122,308 132,253 141,705 148,849 148,070 153,108 158,586 163,092 168,505 171,072
Total Equity 78,397 103,290 127,308 137,253 146,705 153,849 153,070 158,108 163,586 168,092 173,505 176,072
TOTAL LIABILITIES & EQUITY 78,397 103,290 127,308 137,253 146,705 153,849 153,070 158,108 163,586 168,092 173,505 176,072
Balance Sheet
Stasiun Purwosari
SOLO
Year 3
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 500 500 500 500 500 500 500 500 500 500 500 1,757
A/R 126,382 122,749 126,276 130,424 134,299 133,620 129,700 121,125 113,094 105,950 99,354 92,833
Sub Total 126,882 123,249 126,776 130,924 134,799 134,120 130,200 121,625 113,594 106,450 99,854 94,589
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 44,922 53,533 59,823 64,968 69,782 73,393 76,297 78,389 80,149 81,887 82,962 83,443
Total Fixed Assets 44,922 53,533 59,823 64,968 69,782 73,393 76,297 78,389 80,149 81,887 82,962 83,443
Accumulated Depreciation (2,225) (2,543) (2,861) (3,179) (3,497) (3,814) (4,132) (4,459) (4,785) (5,112) (5,439) (5,766)
Net Fixed Assets 42,697 50,990 56,962 61,789 66,285 69,579 72,165 73,930 75,364 76,775 77,523 77,677
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization (131) (262) (393) (524) (655) (786) (916) (1,047) (1,178) (1,309) (1,440) (1,571)
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 158,117 151,602 156,322 162,867 171,374 175,766 177,521 175,595 173,987 172,388 171,417 170,720
Total Equity 163,117 156,602 161,322 167,867 176,374 180,766 182,521 180,595 178,987 177,388 176,417 175,720
TOTAL LIABILITIES & EQUITY 174,066 178,701 188,137 197,038 205,323 207,842 206,405 199,484 192,772 186,926 180,957 175,720
Balance Sheet
Stasiun Purwosari
SOLO
Year 4
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 8,130 14,182 20,021 25,648 30,909 35,805 40,384 44,658 48,774 52,838 56,682 60,303
A/R 86,460 80,408 74,568 68,941 63,680 58,784 54,205 49,931 45,815 41,752 37,907 34,287
Sub Total 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (6,093) (6,420) (6,747) (7,074) (7,401) (7,728) (8,055) (8,382) (8,709) (9,036) (9,363) (9,690)
Net Fixed Assets 77,350 77,023 76,696 76,369 76,042 75,715 75,388 75,061 74,734 74,407 74,080 73,753
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization (1,702) (1,833) (1,964) (2,095) (2,226) (2,357) (2,488) (2,618) (2,749) (2,880) (3,011) (3,142)
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 170,262 169,804 169,346 168,888 168,430 167,972 167,515 167,057 166,599 166,141 165,683 165,225
Total Equity 175,262 174,804 174,346 173,888 173,430 172,972 172,515 172,057 171,599 171,141 170,683 170,225
TOTAL LIABILITIES & EQUITY 175,262 174,804 174,346 173,888 173,430 172,972 172,515 172,057 171,599 171,141 170,683 170,225
Balance Sheet
Stasiun Purwosari
SOLO
Year 5
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 63,693 66,849 69,640 72,141 74,351 76,392 78,343 80,199 81,962 83,630 85,205 86,685
A/R 30,896 27,741 24,949 22,448 20,238 18,197 16,247 14,390 12,628 10,959 9,385 7,904
Sub Total 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (10,017) (10,344) (10,671) (10,998) (11,325) (11,652) (11,979) (12,306) (12,633) (12,960) (13,287) (13,614)
Net Fixed Assets 73,426 73,099 72,772 72,445 72,118 71,791 71,464 71,137 70,810 70,483 70,156 69,829
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization (3,273) (3,404) (3,535) (3,666) (3,797) (3,928) (4,059) (4,189) (4,320) (4,451) (4,582) (4,713)
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 164,767 164,309 163,851 163,393 162,935 162,478 162,020 161,562 161,104 160,646 160,188 159,730
Total Equity 169,767 169,309 168,851 168,393 167,935 167,478 167,020 166,562 166,104 165,646 165,188 164,730
TOTAL LIABILITIES & EQUITY 169,767 169,309 168,851 168,393 167,935 167,478 167,020 166,562 166,104 165,646 165,188 164,730
Balance Sheet
Stasiun Purwosari
SOLO
Year 6
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 88,071 89,377 90,646 91,876 93,010 94,044 94,201 94,289 94,337 94,385 94,432 94,480
A/R 6,518 5,212 3,944 2,713 1,579 546 389 300 252 205 157 109
Sub Total 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (13,941) (14,268) (14,595) (14,922) (15,249) (15,576) (15,903) (16,230) (16,557) (16,884) (17,211) (17,538)
Net Fixed Assets 69,502 69,175 68,848 68,521 68,194 67,867 67,540 67,213 66,886 66,559 66,232 65,906
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization (4,844) (4,975) (5,106) (5,237) (5,368) (5,499) (5,630) (5,761) (5,891) (6,022) (6,153) (6,284)
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 159,272 158,814 158,356 157,899 157,441 156,983 156,525 156,067 155,609 155,151 154,693 154,235
Total Equity 164,272 163,814 163,356 162,899 162,441 161,983 161,525 161,067 160,609 160,151 159,693 159,235
TOTAL LIABILITIES & EQUITY 164,272 163,814 163,356 162,899 162,441 161,983 161,525 161,067 160,609 160,151 159,693 159,235
Balance Sheet
Stasiun Purwosari
SOLO
Year 7
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 94,519 94,550 94,572 94,585 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589
A/R 70 39 17 4 0 0 0 0 0 0 0 0
Sub Total 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (17,865) (18,192) (18,518) (18,845) (19,172) (19,499) (19,826) (20,153) (20,480) (20,807) (21,134) (21,461)
Net Fixed Assets 65,579 65,252 64,925 64,598 64,271 63,944 63,617 63,290 62,963 62,636 62,309 61,982
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization (6,415) (6,546) (6,677) (6,808) (6,939) (7,070) (7,201) (7,332) (7,463) (7,593) (7,724) (7,855)
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 153,777 153,319 152,862 152,404 151,946 151,488 151,030 150,572 150,114 149,656 149,198 148,740
Total Equity 158,777 158,319 157,862 157,404 156,946 156,488 156,030 155,572 155,114 154,656 154,198 153,740
TOTAL LIABILITIES & EQUITY 158,777 158,319 157,862 157,404 156,946 156,488 156,030 155,572 155,114 154,656 154,198 153,740
Balance Sheet
Stasiun Purwosari
SOLO
Year 8
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 96,996 99,403 101,809 104,216
A/R 0 0 0 0 0 0 0 0 45,726 43,320 40,913 38,506
Sub Total 94,589 94,589 94,589 94,589 94,589 94,589 94,589 94,589 142,722 142,722 142,722 142,722
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (21,788) (22,115) (22,442) (22,769) (23,096) (23,423) (23,750) (24,077) (24,404) (24,731) (25,058) (25,385)
Net Fixed Assets 61,655 61,328 61,001 60,674 60,347 60,020 59,693 59,366 59,039 58,712 58,385 58,058
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization (7,986) (8,117) (8,248) (8,379) (8,510) (8,641) (8,772) (8,903) (9,034) (9,165) (9,295) (9,426)
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 148,282 147,825 147,367 146,909 146,451 145,993 145,535 145,077 192,752 192,294 191,836 191,379
Total Equity 153,282 152,825 152,367 151,909 151,451 150,993 150,535 150,077 197,752 197,294 196,836 196,379
TOTAL LIABILITIES & EQUITY 153,282 152,825 152,367 151,909 151,451 150,993 150,535 150,077 197,752 197,294 196,836 196,379
Balance Sheet
Stasiun Purwosari
SOLO
Year 9
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 106,623 109,029 109,965 110,901 111,837 112,773 113,709 114,645 115,581 116,517 117,453 118,389
A/R 36,100 33,693 32,757 31,821 30,885 29,949 29,014 28,078 27,142 26,206 25,270 24,334
Sub Total 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (25,712) (26,039) (26,366) (26,693) (27,020) (27,347) (27,674) (28,001) (28,328) (28,655) (28,982) (29,309)
Net Fixed Assets 57,731 57,404 57,077 56,750 56,423 56,096 55,769 55,442 55,115 54,788 54,461 54,134
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization (9,557) (9,688) (9,819) (9,950) (10,081) (10,212) (10,343) (10,474) (10,605) (10,736) (10,866) (10,997)
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 190,921 190,463 190,005 189,547 189,089 188,631 188,173 187,715 187,257 186,799 186,342 185,884
Total Equity 195,921 195,463 195,005 194,547 194,089 193,631 193,173 192,715 192,257 191,799 191,342 190,884
TOTAL LIABILITIES & EQUITY 195,921 195,463 195,005 194,547 194,089 193,631 193,173 192,715 192,257 191,799 191,342 190,884
Balance Sheet
Stasiun Purwosari
SOLO
Year 10
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 119,324 120,260 121,196 122,132 123,068 124,004 124,940 125,876 126,812 127,748 128,684 129,620
A/R 23,398 22,462 21,526 20,590 19,654 18,718 17,782 16,847 15,911 14,975 14,039 13,103
Sub Total 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (29,636) (29,963) (30,290) (30,617) (30,944) (31,271) (31,598) (31,925) (32,252) (32,579) (32,906) (33,233)
Net Fixed Assets 53,807 53,480 53,153 52,826 52,499 52,172 51,845 51,518 51,191 50,864 50,537 50,210
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization (11,128) (11,259) (11,390) (11,521) (11,652) (11,783) (11,914) (12,045) (12,176) (12,307) (12,438) (12,568)
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 185,426 184,968 184,510 184,052 183,594 183,136 182,678 182,220 181,762 181,305 180,847 180,389
Total Equity 190,426 189,968 189,510 189,052 188,594 188,136 187,678 187,220 186,762 186,305 185,847 185,389
TOTAL LIABILITIES & EQUITY 190,426 189,968 189,510 189,052 188,594 188,136 187,678 187,220 186,762 186,305 185,847 185,389
Balance Sheet
Stasiun Purwosari
SOLO
Year 11
Amount in Rp Millions
1 2 3 4 5 6 7 8 9 10 11 12
ASSETS
Current Assset
Cash & Bank 130,556 131,491 132,427 133,363 134,299 135,235 136,171 137,107 138,043 138,979 139,915 140,851
A/R 12,167 11,231 10,295 9,359 8,423 7,487 6,551 5,616 4,680 3,744 2,808 1,872
Sub Total 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722 142,722
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (33,560) (33,887) (34,214) (34,541) (34,868) (35,195) (35,522) (35,849) (36,176) (36,503) (36,830) (37,157)
Net Fixed Assets 49,883 49,556 49,229 48,902 48,575 48,248 47,921 47,594 47,267 46,940 46,613 46,286
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Accumulated Amortization (12,699) (12,830) (12,961) (13,092) (13,223) (13,354) (13,485) (13,616) (13,747) (13,878) (14,009) (14,140)
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 179,931 179,473 179,015 178,557 178,099 177,641 177,183 176,725 176,268 175,810 175,352 174,894
Total Equity 184,931 184,473 184,015 183,557 183,099 182,641 182,183 181,725 181,268 180,810 180,352 179,894
TOTAL LIABILITIES & EQUITY 184,931 184,473 184,015 183,557 183,099 182,641 182,183 181,725 181,268 180,810 180,352 179,894
Balance Sheet
Stasiun Purwosari
SOLO
Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 21 Year 22 Year 23
Amount in Rp Millions
ASSETS
Current Assset
Cash & Bank 142,722 163,196 179,120 195,043 210,967 210,967 241,901 265,961 290,021 314,081 314,081 360,821
A/R 9,359 57,130 41,207 25,283 9,359 9,359 81,539 57,479 33,419 9,359 9,359 118,419
Sub Total 152,082 220,326 220,326 220,326 220,326 220,326 323,441 323,441 323,441 323,441 323,441 479,240
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (41,080) (45,004) (48,928) (52,852) (56,776) (60,700) (64,623) (68,547) (72,471) (76,395) (78,412) (78,475)
Net Fixed Assets 42,363 38,439 34,515 30,591 26,667 22,743 18,820 14,896 10,972 7,048 5,032 4,968
Other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
Accumulated Amortization (15,711) (17,282) (18,853) (20,424) (21,995) (23,566) (25,137) (26,708) (28,279) (29,850) (31,421) 0
Net other Assets #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0
TOTAL ASSETS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 484,208
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 169,399 232,149 226,654 221,159 215,664 210,169 307,788 302,294 296,799 291,304 287,716 443,452
Total Equity 174,399 237,149 231,654 226,159 220,664 215,169 312,788 307,294 301,799 296,304 292,716 448,452
TOTAL LIABILITIES & EQUITY 174,399 237,149 231,654 226,159 220,664 215,169 312,788 307,294 301,799 296,304 292,716 448,452
Balance Sheet
Stasiun Purwosari
SOLO
Year 24 Year 25 Year 26 Year 27 Year 28 Year 29 Year 30 Year 31 Year 32 Year 33 Year 34
Amount in Rp Millions
ASSETS
Current Assset
Cash & Bank 397,175 433,528 469,881 469,881 540,503 595,431 650,359 705,287 705,287 705,287 705,287
A/R 82,066 45,713 9,359 9,359 174,143 119,215 64,287 9,359 9,359 9,359 0
Sub Total 479,240 479,240 479,240 479,240 714,646 714,646 714,646 714,646 714,646 714,646 705,287
Fixed Assets
Group I 0 0 0 0 0 0 0 0 0 0 0
Group II 0 0 0 0 0 0 0 0 0 0 0
Group III 0 0 0 0 0 0 0 0 0 0 0
Group IV 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Total Fixed Assets 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443 83,443
Accumulated Depreciation (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475) (78,475)
Net Fixed Assets 4,968 4,968 4,968 4,968 4,968 4,968 4,968 4,968 4,968 4,968 4,968
Other Assets 0 0 0 0 0 0 0 0 0 0 0
Accumulated Amortization 0 0 0 0 0 0 0 0 0 0 0
Net other Assets 0 0 0 0 0 0 0 0 0 0 0
TOTAL ASSETS 484,208 484,208 484,208 484,208 719,613 719,613 719,613 719,613 719,613 719,613 710,254
Equity
Shareholders' Equity 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
Profit & Loss 443,452 443,452 443,452 443,452 678,858 678,858 678,858 678,858 678,858 678,858 678,858
Total Equity 448,452 448,452 448,452 448,452 683,858 683,858 683,858 683,858 683,858 683,858 683,858
TOTAL LIABILITIES & EQUITY 448,452 448,452 448,452 448,452 683,858 683,858 683,858 683,858 683,858 683,858 683,858
Income Statement
0
0
0
Periode 2003-2005
TOTAL
1 2
Fixed Assets - - -
83,443 - -
Other Assets 0 -
14,025 0 -
Saleable Assets - -
119,599 - -
Contigency - -
- - -
Tax - -
- - -
- -
Overhead
A/P Overhead
Beginning Balance - -
Payment - -
1 Maintainance
2 Marketing
3 GA
4 Hotel
5 Tax - -
Ending Balance - -
Beginning Balance - -
Cash In - -
Cash Balance After Cash in - -
Minimum Cash Balance - -
Available Cash for use - -
Beginning Balance - -
Payment
Ending Balance -
Year 1 (2003)
3 4 5 6 7 8 9 10
- - - - - - - -
- - - - - - - -
- - - 404 808 1,617 2,526 3,234
- - - 404 404 808 910 707
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - 404 808 1,617 2,526 3,234
- - - - - - - 0
- - - - - - - -
- - - - - - - -
- - - - - - - 0
- - - - - - - -
- - - - - - - -
- - (3,177) (2,997) (997) 1,003 3,003 7,121
- 3,177 1,820 - - - - -
- (3,177) (4,997) (2,997) (997) 1,003 3,003 7,121
- - - - - - - -
Year 2 (2004)
11 12 1 2 3 4 5
0 0 - - - - -
- 0 - - - - -
- - - - - -
- - - - - -
0 - - - - -
- - - - - -
- - - - - - -
0 - - - - - -
- 0 - - - - -
- - - - - - -
11,449 16,989 15,813 21,852 26,963 32,170 37,962
- 5,000 (1,980) 1,823 2,916 3,495 3,539
11,449 11,989 17,793 20,029 24,047 28,674 34,422
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
41,937 44,995 30,932 29,129 28,432 25,859 24,891
4,863 22,406 10,516 9,949 12,600 10,218 11,497
37,074 22,588 20,416 19,180 15,832 15,641 13,394
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
23,069 10,397 9,677 9,374 9,985 9,303 9,289
22,569 9,897 9,177 8,874 9,485 8,803 8,789
500 500 500 500 500 500 500
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
9,514 8,980 8,101 7,564 7,230 8,130 14,182
9,014 8,480 7,601 7,064 5,474 - -
500 500 500 500 1,757 8,130 14,182
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
20,021 25,648 30,909 35,805 40,384 44,658
- - - - - -
20,021 25,648 30,909 35,805 40,384 44,658
- - - - - -
- - - - - -
9 10 11 12 1 2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
48,774 52,838 56,682 60,303 63,693 66,849
- - - - - -
48,774 52,838 56,682 60,303 63,693 66,849
- - - - - -
- - - - - -
Year 5 (Th.2007)
3 4 5 6 7 8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
69,640 72,141 74,351 76,392 78,343 80,199
- - - - - -
69,640 72,141 74,351 76,392 78,343 80,199
- - - - - -
- - - - - -
9 10 11 12 1 2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
81,962 83,630 85,205 86,685 88,071 89,377
- - - - - -
81,962 83,630 85,205 86,685 88,071 89,377
- - - - - -
- - - - - -
Year 6 (Th.2008)
3 4 5 6 7 8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
90,646 91,876 93,010 94,044 94,201 94,289
- - - - - -
90,646 91,876 93,010 94,044 94,201 94,289
- - - - - -
- - - - - -
9 10 11 12 1 2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
94,337 94,385 94,432 94,480 94,519 94,550
- - - - - -
94,337 94,385 94,432 94,480 94,519 94,550
- - - - - -
- - - - - -
Year 7 (Th.2009)
3 4 5 6 7 8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
94,572 94,585 94,589 94,589 94,589 94,589
- - - - - -
94,572 94,585 94,589 94,589 94,589 94,589
- - - - - -
- - - - - -
9 10 11 12 1 2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
94,589 94,589 94,589 94,589 94,589 94,589
- - - - - -
94,589 94,589 94,589 94,589 94,589 94,589
- - - - - -
- - - - - -
Year 8 (Th.2010)
3 4 5 6 7 8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
94,589 94,589 94,589 94,589 94,589 94,589
- - - - - -
94,589 94,589 94,589 94,589 94,589 94,589
- - - - - -
- - - - - -
9 10 11 12 1 2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
96,996 99,403 101,809 104,216 106,623 109,029
- - - - - -
96,996 99,403 101,809 104,216 106,623 109,029
- - - - - -
- - - - - -
Year 9 (Th.2011)
3 4 5 6 7 8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
109,965 110,901 111,837 112,773 113,709 114,645
- - - - - -
109,965 110,901 111,837 112,773 113,709 114,645
- - - - - -
- - - - - -
9 10 11 12 1 2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
115,581 116,517 117,453 118,389 119,324 120,260
- - - - - -
115,581 116,517 117,453 118,389 119,324 120,260
- - - - - -
- - - - - -
Year 10 (Th.2012)
3 4 5 6 7 8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
121,196 122,132 123,068 124,004 124,940 125,876
- - - - - -
121,196 122,132 123,068 124,004 124,940 125,876
- - - - - -
- - - - - -
9 10 11 12 1 2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
126,812 127,748 128,684 129,620 130,556 131,491
- - - - - -
126,812 127,748 128,684 129,620 130,556 131,491
- - - - - -
- - - - - -
Year 11 (Th.2013)
3 4 5 6 7 8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
132,427 133,363 134,299 135,235 136,171 137,107
- - - - - -
132,427 133,363 134,299 135,235 136,171 137,107
- - - - - -
- - - - - -
Year 12 Year 13
9 10 11 12 2014 2015
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
138,043 138,979 139,915 140,851 142,722 163,196
- - - - - -
138,043 138,979 139,915 140,851 142,722 163,196
- - - - - -
- - - - - -
Year 14 Year 15 Year 16 Year 17 Year 18 Year 19
2016 2017 2018 2019 2020 2021
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
179,120 195,043 210,967 210,967 241,901 265,961
- - - - - -
179,120 195,043 210,967 210,967 241,901 265,961
- - - - - -
- - - - - -
Year 20 Year 21 Year 22 Year 23 Year 24 Year 25
2022 2023 2024 2025 2026 2027
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
290,021 314,081 314,081 360,821 397,175 433,528
- - - - - -
290,021 314,081 314,081 360,821 397,175 433,528
- - - - - -
- - - - - -
Year 26 Year 27 Year 28 Year 29 Year 30 Year 31
2028 2029 2030 2031 2032 2033
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
469,881 469,881 540,503 595,431 650,359 705,287
- - - - - -
469,881 469,881 540,503 595,431 650,359 705,287
- - - - - -
- - - - - -
Year 32 Year 33 Year 34
2034 2035 2036
- - -
- - - 217,066
- - - 0
- - - 0 0
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - -
- - -
705,287 705,287 705,287 #REF!
- - -
705,287 705,287 705,287 18,799,303.90
#REF! #REF!
- - -
- - -
BANK LOAN & REPAYMENT
#REF!
#REF!
#REF!
Bank Loan
1 Investment Rp
2 Working Capital Rp
Total Bank Loan Rp
Grace Period
Beginning Debt after Grace Period Years
Investment Loan Period (Including Grace Period) Years
Interest Rate %
INVESTMENT LOAN
Withdrawal
Investment Repayment
% of Investment Repayment
Accumulated % of Investment Repayment
Interest
Outstanding Debt
Withdrawal
WC Repayment
% of Investment Repayment
Accumulated % of Investment Repayment
Interest
Outstanding Debt
Daftar Harga
Ruko Kaliki Square
Harga Pra Launching
Berlaku Mulai 1 Agustus 2003
Catatan:
- Harga dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu.
Page 458
- Harga sudah termasuk PPN, belum termasuk PBHTB, dan Biaya Notaris
- Khusus untuk pemohon KPR, harga belum termasuk asuransi jiwa, dan biaya Bank
Daftar Harga
Citiwalk Outdoor Kaliki Square
Harga Pra Launching
Berlaku Mulai 1 Agustus 2003
Catatan:
- Harga dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu.
Page 459
- Harga sudah termasuk PPN, belum termasuk PBHTB, dan Biaya Notaris
- Khusus untuk pemohon KPR, harga belum termasuk asuransi jiwa, dan biaya Bank