SCHEDULE PENUGASAN PERSONIL

Konsolidasi Pengawasan Rehabilitasi Jalan Provinsi di Ruas Sicincin-Kurai Taji (P.028), Pengawasan Rehabilitasi
Jalan Provinsi Pada Ruas Sp. Ganting Payo - Batas Tanah Datar - Sumani (P.092), Pengawasan Rehabilitasi Jalan
Provinsi di Ruas Simpang Koto Mam bang - Balingka (P.078), Pengawasan Rehabilitasi Jalan Provinsi di Ruas Lubuk
Sikaping (Simp. Daliak) - Talu (Simp. Gantiang) (P.096), Pengawasan Rehabilitasi Jalan Provinsi di Ruas Pangkalan
Koto Baru - Sialang - Gelugur (P.076)

B U L A N
No. NAMA JABATAN Jumlah MM KET
Bulan 1 Bulan 2 Bulan 3 Bulan 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A. Tenaga Ahli

Team Leader merangkap


1 SYAMSUL NASRI, ST 1x4 1x4
SE

Quality Engineer /
2 ILHAMDI, ST 1x4 1x4
Quantity Engineer

Health Safety and


3 FADLAN HAMID, ST Environment (HSE) 1 x 3,5 1 x 3,5
Engineer

B. Tenaga Pendukung

Inspector 1 / Lab.
1 To Be Name 1x3 1x3
Technician 1

Inspector 2 / Lab.
2 To Be Name 1x4 1x4
Technician 2

Inspector 3 / Lab.
3 To Be Name 1x3 1x3
Technician 3

Inspector 4 / Lab.
4 To Be Name 1x4 1x4
Technician 4

Inspector 5 / Lab.
5 To Be Name 1x4 1x4
Technician 5

6 To Be Name Surveyor 1x4 1x4


Provinsi di Ruas Sicincin-Kurai Taji (P.028),
Pengawasan Rehabilitasi Jalan Provinsi Pada
DAFTAR PERSONIL
Ruas Sp. Ganting Payo - Batas Tanah Datar -
Sumani (P.092), Pengawasan Rehabilitasi Jalan
Provinsi di Ruas Simpang Koto Mam bang -
Balingka (P.078), Pengawasan Rehabilitasi
Jalan Provinsi di Ruas Lubuk Sikaping (Simp.
No.
Daliak) NAMA
- Talu (Simp. JABATAN Gantiang) (P.096),
Jumlah MM KET

Pengawasan Rehabilitasi Jalan Provinsi di Ruas


Pangkalan Koto Baru
A. Tenaga Ahli Profesional
1 SYAMSUL NASRI, ST
- Sialang - Gelugur6 (P.076)
Team Leader merangkap SE 6.00
2 #REF! #REF! 6 6.00
B. Tenaga Penunjang
1 To Be Name Inspector 1 / Lab. Technician 1 6 6.00
2 #REF! #REF! 6 6.00
#REF! #REF! -
#REF! #REF! 6.00