Anda di halaman 1dari 3

Report LPJ | Project https://app2.kokola.co.

id/eproject/lpj/report_lpj/7

LAPORAN PERTANGGUNG JAWABAN PROJECT


PROJECT KONTROL SUHU DAN RH PRODUK WAFER LAPIS GOSH UMS PT. UNIMOS

Kode Project : PROD.1-MTC.4/22/UMS/TGB.C/IN/9/5-2023

Nama Project : PROJECT KONTROL SUHU DAN RH PRODUK WAFER LAPIS GOSH UMS

Tanggal Awal Pelaksanaan Project : 10-05-2023

Tanggal Akhir Pelaksanaan Project : 21-08-2023

Realisasi Project : 31-10-2023

Team Project

Project Owner : Simson Adiguna

Project Coordinator : Simson Adiguna

Project Executor : Dovi Afandi

Project Executor : Anton Darmawan

Project Executor : Afif Tunggul P.

Project Executor : Ahmad Mikroji

Parameter Penilaian

PROPOSAL (RAB) REALISASI


NO KODE ITEM NAMA MATERIAL
SATUAN JUMLAH HARGA TOTAL SATUAN JUMLAH HARGA TOTAL
Snapring untuk bearing 6306
1 01050000000447 PIECES 300.00 990,000.00 PIECES 0.00 0.00
(H72)

2 01050000000627 Bearing 6306 BUAH 600.00 31,800,000.00 BUAH 600.00 26,539,200.00

3 01050000000641 BEARING 63305 BUAH 75.00 6,900,000.00 BUAH 75.00 6,007,500.00

4 01050000001425 Kabel Dak 35x35mm LONJOR 1.00 40,000.00 LONJOR 1.00 28,900.00

5 01050000001494 KAWAT LAS RB 3.2MM KG 20.00 640,000.00 KG 20.00 580,000.00

6 01050000001571 MAN POWER LOT 1.00 15,000,000.00 LOT 1.00 27,060,000.00


Root Cause : Correction : Corrective Action : PIC :
Problem : Due date :
Harga pada RAB dan real berbeda Tetap didatangkan karena Tetap didatangkan karena budget masih Fuad
Over Price MAN POWER 2023-12-07
kebutuhan lapangan tercukupi Fawaid

7 01050000001651 MCB 16A 3 Phase BUAH 1.00 350,000.00 BUAH 1.00 251,850.00

8 01050000001656 MCB 3P/32A MG BUAH 1.00 350,000.00 BUAH 1.00 265,000.00

9 01050000001663 MCB 1P 6A BUAH 1.00 85,000.00 BUAH 1.00 55,000.00

10 01050000003032 Mounting rel MCB/ rel MCB LONJOR 1.00 25,000.00 LONJOR 1.00 14,000.00

11 01050000003330 ISOLASI UNIBEL BIJI 3.00 28,500.00 BIJI 3.00 24,000.00

12 01050000004072 KABEL TIS 200 PAK 2.00 70,000.00 PAK 2.00 29,200.00

STOP KONTAK 2 LUBANG


13 01050000004128 BIJI 1.00 15,000.00 BIJI 3.00 33,000.00
UTICON
Root Cause : Correction : Corrective Action : PIC :
Problem : Due date :
Quantity barang pada RAB dan real Barang tetap didatangkan karena Barang tetap digunakan karena budget yg Fuad
Qty tidak sesuai STOP KONTAK 2 LUBANG UTICON 2023-12-07
berbeda kebutuhan lapangan ada masih tercukupi Fawaid

14 01050000004344 GOTRI USA 4.5mm @100pcs PAK 20.00 200,000.00 PAK 0.00 0.00
Root Cause : Correction : Corrective Action :
Problem : PIC :
Due date :
Barang belum datang Barang tetap dibuatkan PO Jika barang datang akan diIRM
Qty tidak sesuai GOTRI USA 4.5mm @100pcs Fuad
menggunakan budget internal karena project 2023-12-07
Fawaid
sudah commidioning

15 01050000004404 MCB 6A 1P,, BIJI 2.00 156,000.00 BIJI 2.00 110,000.00

16 01050000004504 Box panel 40x30x20cm BIJI 1.00 420,000.00 BIJI 1.00 320,000.00

17 01050000004597 Lem PVC/uk.1/2kg KALENG 1.00 60,000.00 KALENG 1.00 58,000.00

CURTAIN KUNING // UK. 2mm


18 01050000004612 ROL 2.00 3,200,000.00 ROL 2.00 2,800,000.00
x 20cm

19 01050000004868 Pipa clipsal 20mm LONJOR 3.00 60,000.00 LONJOR 3.00 45,000.00

20 01050000005265 BATU POTONG WD 4 PUTIH BIJI 200.00 900,000.00 BIJI 200.00 660,000.00

21 01050000006161 KABEL NYYHY 2x1 1/2mm METER 50.00 625,000.00 METER 50.00 428,860.79

22 01050000006209 SOK PVC 3/4 DIM BIJI 12.00 60,000.00 BIJI 12.00 36,000.00

23 01050000006471 Kabel NYY 4x6 mm² (pejal) METER 30.00 1,860,000.00 METER 0.00 0.00
Root Cause : Correction : Corrective Action :
Problem : PIC :
Due date :
Barang cancel Spek yang dibutuhkan tidak sesuai SPP material dengan spesifikasi yang sesuai
Qty tidak sesuai Kabel NYY 4x6 mm² (pejal) Fuad
dengan kebutuhan lapangan dengan kebutuhan lapangan 2023-12-07
Fawaid
sehingga material tidak didatangkan

24 01050000006487 INSTALASI/UNINSTAL UNIT 1.00 35,000,000.00 UNIT 1.00 25,000,000.00

25 01050000006831 POWER SUPPLY//5A 12V PIECES 1.00 160,000.00 PIECES 1.00 236,400.00
Root Cause : Correction : Corrective Action : PIC :
Problem : Due date :
Harga diRAB dan real berbeda Barang tetap didatangkan karena FU ke procurement terkait pengadaan Fuad
Over Price POWER SUPPLY//5A 12V 2023-12-07
kebutuhan lapangan material yg harganya lebih mahal Fawaid

26 01050000008228 Klem pipa clipsal 20mm BIJI 10.00 25,000.00 BIJI 10.00 12,000.00

27 01050000008337 Keni PVC AW 3/4 dim BIJI 8.00 32,000.00 BIJI 8.00 20,000.00

SIRINE 1 SUARA//15Watt//DC
28 01050700002293 PIECES 5.00 700,000.00 PIECES 5.00 408,500.00
12V

29 01070401000260 PIPA PVC AW 3/4" BATANG 6.00 300,000.00 BATANG 6.00 240,000.00

KABEL NYYHY 2X0.75mm


30 01090102000369 METER 100.00 560,000.00 METER 100.00 498,500.00
(Serabut)

31 03010101011090 Ultragrease Top 2/COGELSA KG 5.00 28,750,000.00 KG 0.00 0.00

Rel Oven Wafer Lapis/Bahan


32 03010101011395 PIECES 16.00 152,000,000.00 PIECES 16.00 137,200,000.00
Baja/Uk. 15x50x4000mm

Roda Backing Plate Sock


33 03010101011396 PIECES 300.00 120,000,000.00 PIECES 300.00 116,130,000.00
Bearing/Bahan Baja

34 0301010101223 Terminal Block/12P/25A PIECES 1.00 12,500.00 PIECES 1.00 10,000.00

35 0301010104393 Bracket Curtain 4 lubang PIECES 40.00 2,200,000.00 PIECES 40.00 1,600,000.00

36 0301010104394 Hanger Curtain PIECES 10.00 2,000,000.00 PIECES 10.00 1,450,000.00

1 of 3 4/3/2024, 2:37 PM
Report LPJ | Project https://app2.kokola.co.id/eproject/lpj/report_lpj/7

PROPOSAL (RAB) REALISASI


NO KODE ITEM NAMA MATERIAL
SATUAN JUMLAH HARGA TOTAL SATUAN JUMLAH HARGA TOTAL
Material Jasa Pembuatan
37 0301010104923 LOT 1.00 15,000,000.00 LOT 1.00 14,697,753.62
Sekat

Cooling Box Munters Type


38 AST2012305-0000058 1.00 295,000,000.00 0.00 0.00
MLT1400 WFL UMS

Dehumidifier Type 10161024


39 AST2012305-0000059 kapasitas 85L Merk Krisbow 1.00 25,000,000.00 0.00 0.00
2023-A WFL UMS
Root Cause : Correction : Corrective Action :
Problem : PIC :
Due date :
Barang sudah datang tapi tidak masuk Pembuatan laporan manual rekap FU ke FAM/PIC aplikasi project terkait Fuad
Qty tidak sesuai Dehumidifier Type 10161024 kapasitas 85L Merk 2023-12-07
hitungan realisasi project perhitungan realisasi project Fawaid
Krisbow 2023-A WFL UMS

Dehumidifier Type 10161024


40 AST2012305-0000060 kapasitas 85L Merk Krisbow 1.00 25,000,000.00 0.00 0.00
2023-B WFL UMS
Root Cause : Correction : Corrective Action :
Problem : PIC :
Due date :
Barang sudah datang tapi tidak masuk Pembuatan laporan manual rekap FU ke FAM/PIC aplikasi project terkait Fuad
Qty tidak sesuai Dehumidifier Type 10161024 kapasitas 85L Merk 2023-12-07
hitungan realisasi project perhitungan realisasi project Fawaid
Krisbow 2023-B WFL UMS

Dehumidifier Type 10161024


41 AST2012305-0000070 kapasitas 85L Merk Krisbow 1.00 25,000,000.00 0.00 0.00
2023-C WFL UMS

42 - - - 0.00 0.00 METER 10.00 391,000.00

43 - - - 0.00 0.00 METER 30.00 2,907,000.00

44 - - - 0.00 0.00 PIECES 1.00 2,000,000.00

45 - - - 0.00 0.00 LOT 0.40 13,800,000.00

46 - - - 0.00 0.00 BUAH 2.00 116,400.00

47 - - - 0.00 0.00 BUAH 1.00 656,850.00

TOTAL RAB Rp TOTAL REALISASI Rp 382,719,914.41


790,574,000.00

PROSENTASE PEMAKAIAN SUPPLIES 48.41%

BUKTI FINISH PROJECT:

NO DESKRIPSI NILAI CATATAN

1 Suhu dan RH pada produk mencapai standar yang dibutuhkan untuk 1 Sudah dilakukan penyesuaian oleh vendor dan dicek oleh
cooling book MBD

TOTAL 1

Saran Rasio Penilaian:


• 0-0,49 = Ditolak
• 0,5-0,99 = Diterima dengan catatan
• 1-2 = Diterima

Kesimpulan Commissioning
Diterima, dan dapat diserah terimakan ke pihak pengguna.
Rencana serah terima tanggal 31-10-2023

EVALUASI PROJECT

Budget : Pemakaian budget masih sesuai dengan target (tidak melebihi dari RAB)

Time : Waktu ada kemunduran dikarenakan perlunya kalibrasi ulang terhadap suhu dan RH

Process : Ada beberapa kendala dimaterial yg digunakan tidak sesuai dengan kebutuhan lapangan sehingga harus cancel dan datangkan barang baru sesuai kebutuhan

Approval note

Wahyu Sandy Vella


Simson Simson Dovi Anton Afif Ahmad M. Reza Khusni Rina Heru Michael Richard
Widy Sunarto Yuda Carella
Adiguna Adiguna Afandi Darmawan Tunggul P. Mikroji Rachmansyah Amalia Tetimau Setiawan Tong Cahadi
Indarko Christyadi Wijaya

Cost
Project Project Project Project Project Project Planning Project Managing
Stakeholder Stakeholder Stakeholder Stakeholder Stakeholder Stakeholder Stakeholder
Owner Coordinator Executor Executor Executor Executor And Manager Director
Control

Approve Approve Approve oke Hasil Approve 1) Real > Approve approve approved oke - - ok By By
Project RAB -> System System
sudah Minimize !
digunakan 2) Next
sesuai diberi
standard penjelasan
yg Real <
ditargetkan RAB ?
Efisien ?
Price/Qty
? 3)
Improve
system
Realisasi
sesuai
Jurnal Acc
?

Dibuat Oleh, Diketahui Oleh, Disetujui Oleh,

   
    
Afif Wahyu Michael Richard
Simson Simson Dovi Anton Ahmad  
Tunggul Widy     Tong Cahadi
Adiguna Adiguna Afandi Darmawan Mikroji  Sandy Vella
P. Indarko M. Reza Khusni Rina Heru Project Managing
Project Project Project Project Project Sunarto Yuda Carella
Project Cost Rachmansyah Amalia Tetimau Setiawan Manager Director
Owner Coordinator Executor Executor Executor Stakeholder Christyadi Wijaya
Executor Planning Stakeholder Stakeholder Stakeholder Stakeholder
Stakeholder Stakeholder
And
Control

2 of 3 4/3/2024, 2:37 PM
Report LPJ | Project https://app2.kokola.co.id/eproject/lpj/report_lpj/7

3 of 3 4/3/2024, 2:37 PM

Anda mungkin juga menyukai