Ahsp SMK 2025
Ahsp SMK 2025
HARGA
NO URAIAN MERK/JENIS SATUAN
( Rp )
1 BALOK 8x12x5m KRUING btg 528,000
2 BALOK 8x12x4m KRUING btg 396,000
3 BALOK 5x7x3m KRUING btg 100,000
BALOK 5x7x2.5m KRUING btg 73,234
4 RENG 2X3X2,5m KRUING m 4,000
5 GENTING KEBUMEN Bh 2,300
6 PAKU kg 18,300
7 BESI 10" btg 75,000
8 BESI6" btg 38,000
9 BATA MERAH bh 1,100
10 PASIR m3 250,000
11 SPLIT m3 250,000
12 SEMEN DYNAMIX zak 58,000
13 DAUN PINTU bh
14 PINTU bh
15 PLAFOND HOLOBOX/APPLE m2 110,000
16 LIST PLAFON m' 22,375
ANALISA HARGA SATUAN PEKERJAAN ( AHSP
( sesuai Perbup Kulon ProgoNomor 14 tahun 2024 )
NO URAIAN PEKERJAAN SAT ANALISA UPAH
PEKERJA SAT KOEF UPAH UPAH / SAT
(Rp) (Rp)
A PEKERJAAN PENDAHULUAN
1 PEMBONGKARAN GENTENG m2 Pekerja OH 0.0400 Rp 95,000.00 Rp 3,800.00
( Bongkaran dipakai lagi ) Mandor OH 0.0200 Rp 120,000.00 Rp 2,400.00
Rp 6,200.00
2 PEK.PEMASANGAN USUK ( BEKAS ) DAN RENG ( BARU ) m2 Pekerja OH 0.1000 Rp 95,000.00 Rp 9,500.00
Tk,Kayu OH 0.0100 Rp 110,000.00 Rp 1,100.00
Mandor OH 0.0500 Rp 120,000.00 Rp 6,000.00
Rp 16,600.00
Rp 60,240.00
C PEKERJAAN DINDING
1 pasang bata merah 1: 2 m2 tk.batu OH 0.1000 Rp 105,000.00 Rp 10,500.00
tebal 1/2 bata pekerja OH 0.3000 Rp 95,000.00 Rp 28,500.00
Mandor OH 0.0150 Rp 120,000.00 Rp 1,800.00
Rp 40,800.00
D PEKERJAAN STRUKTUR
a] Pekerjaan Kolom Praktis 12x12
Bekisting m2 Tk. Kayu OH 0.2600 Rp 110,000.00 Rp 28,600.00
pekerja OH 0.3000 Rp 95,000.00 Rp 28,500.00
Rp 57,100.00
F PEKERJAAN PLAFOND
1.Rangka Plafond Dalam dan luar m2 tk.besi OH 0.3000 Rp 105,000.00 Rp 31,500.00
pekerja OH 0.0900 Rp 95,000.00 Rp 8,550.00
Rp 40,050.00
F PEKERJAAN KUSEN
1. Pekerjaan Kusen Pintu m3 tk.kayu OH 18.0000 Rp 110,000.00 Rp 1,980,000.00
dan Jendela pekerja OH 6.0000 Rp 95,000.00 Rp 570,000.00
Mandor OH 0.3000 Rp 120,000.00 Rp 36,000.00
Rp 2,550,000.00
2. Meni Kayu Kusen dan Kusen Pintu m2 tk.cat OH 0.7500 Rp 110,000.00 Rp 82,500.00
pekerja OH 0.0800 Rp 95,000.00 Rp 7,600.00
Rp 90,100.00
L PEKERJAAN PENGECATAN
1. Pengecatan Dinding
Plesteran dinding 1:2 dan 1:4 m2 tk.cat OH 0.0420 Rp 105,000.00 Rp 4,410.00
pekerja OH 0.0280 Rp 95,000.00 Rp 2,660.00
Rp 7,070.00
2. Mengecat Kusen dan Daun Pintu m2 tk.cat OH 0.1000 Rp 105,000.00 Rp 10,500.00
pekerja OH 0.1400 Rp 95,000.00 Rp 13,300.00
Rp 23,800.00
ATUAN PEKERJAAN ( AHSP )
on ProgoNomor 14 tahun 2024 )
MATERIAL SAT ANALISA MATERIAL HARGA SATUAN
KOEF HARGA MATRI/SAT (Rp)
(Rp)
Rp 6,200.00
Rp 27,950.00
Rp 1,034,000.00
Rp 12,475.00
Rp 673,325.00
Rp 14,237,020.00 Rp 15,249,420.00
Rp 26,609.49 Rp 43,209.49
Rp 67,500.00 Rp 90,960.00
Rp 8,445.00 Rp 16,680.00
list kayu 5cm m1 1.0500 Rp 14,500.00 Rp 15,225.00
paku kg 0.0350 Rp 18,300.00 Rp 640.50
Rp 15,865.50 Rp 22,375.50
Rp 79,750.00 Rp 424,550.00
kaca polos 5 mm m2 1.0000 Rp 154,200.00 Rp 154,200.00
list kaca m2 4.0000 Rp 2,100.00 Rp 8,400.00
paku 10-15 cm kg 0.3000 Rp 18,300.00 Rp 5,490.00
Rp 168,090.00 Rp 500,890.00
MERK
HARGA
DAN
NO URAIAN PEKERJAAN SAT VOLUME SATUAN
SPESIFIK
Rp.
ASI
1 2 3 4 5
A. PEKERJAAN PERSIAPAN/PENDAHULUAN
1 Pekerjaan Bongkar Genting dan Bubungan m2 140.0000 Rp. 6,200
2 Pekerjaan Bongkar Kaso dan Reng m 2
140.0000 Rp. 27,950
3 Pekerjaan Bongkar Gording Kayu Kruing m 3
0.2304 Rp. 1,034,000
4 Pekerjaan Bongkar Dinding /Bobok m3 0.3168 Rp. 673,325
Sub Total A
B. PEKERJAAN RANGKA ATAP
1 Pekerjaan Pemasangan Gording m3 0.2880 Rp. 15,249,420
2 Pekerjaan Pemasangan Usuk Lama dan Reng Baru m2 66.0000 Rp. 43,209
3 Pekerjaan Pemasangan Usuk Baru dan Reng Baru m 2
88.0000 Rp. 184,991
4 Pekerjaan Pemasangan Genting Lama m 2
140.0000 Rp. 23,460
5 Pekerjaan Pemasangan Genting Baru m2 14.0000 Rp. 90,960
6 Pekerjaan Pemasangan Bubungan m 1
14.0000 Rp. 128,101
Sub Total B
C PEKERJAAN DINDING
Pekerjaan Pemasangan Batu Bata Merah 1:2 m2 23.5000 Rp. 161,800
Pekerjaan Plesteran dan Acian 1:4 tebal 15mm+acian m 2
47 Rp. 60,220
Pekerjaan Pengecatan Dinding Baru m2 47 Rp. 13,860
Sub Total C
D PEKERJAAN STRUKTUR
1 Pekerjaan Kolom Praktis 12/12
- Pekerjaan Bekesting m2 0.8640 Rp. 130,630
- Pekerjaan Pembesian kg 12.7492 Rp. 18,879
- Pekerjaan Beton m3 0.0518 Rp. 1,126,807
2 Pekerjaan Ring Balok 12/15
- Pekerjaan Bekesting m2 4.9900 Rp. 130,630
- Pekerjaan Pembesian kg 57.3098 Rp. 18,879
- Pekerjaan Beton m3 0.3000 Rp. 1,126,807
Sub Total D
E PEKERJAAN PLAFOND
1 Pekerjaan Rangka Plafond dalam dan luar m2 141.0000 Rp. 86,700
2 Pekerjaan Penutup Plafond m2 141.0000 Rp. 35,300
3 Pekerjaan Pengecatan Plafond Wiratex kg 141.0000 Rp. 16,700
4 Pekerjaan List Tepi uk 5 cm m1 86.0000 Rp. 22,400
Sub Total E
F PEKERJAAN KUSEN -KUSEN DAN PINTU
1 Pekerjaan Kusen dan Jendela m3 0.2707 Rp. 4,636,375
2 Pekerjaan Cat Meni m2 11.3648 Rp. 161,349
3 Pekerjaan Pintu m 2
7.36 Rp. 424,550
4 Pekerjaan Pemasangan Kaca 5mm m 2
2.6934 Rp. 500,890
5 Pekerjaan Pengecatan Kusen,Pintu dan Jendela Avian m2 11.3648 Rp. 117104.3
Sub Total F
JUMLAH
BELANJA MATERIAL Rp. 46,656,897
BELANJA TENAGA Rp. 31,416,000
PPN/PPH MATERIAL( 11%)
PAJAK TENAGA( 1/2 ) 6%
PERBUB KULON PROGO
OR 14 TAHUN 2024
JUMLAH
HARGA
Rp.
Rp. 868,000
Rp. 3,913,000
Rp. 238,234
Rp. 213,309
Rp. 5,232,543
Rp. 4,391,833
Rp. 2,851,826
Rp. 16,279,208
Rp. 3,284,400
1,273,440
1,793,414
Rp. 29,874,121
Rp. 3,802,300
Rp. 2,830,340
Rp. 651,420
Rp. 7,284,060
Rp. 112,864
Rp. 240,692
Rp. 58,414
Rp. 651,844
Rp. 1,081,952
Rp. 338,042
Rp. 2,483,808
Rp. 12,224,700
Rp. 4,977,300
Rp. 2,354,700
Rp. 1,926,400
Rp. 24,304,950
Rp. 1,255,067
Rp. 1,833,697
Rp. 3,124,688
Rp. 1,349,097
Rp. 1,330,867
Rp. 8,893,416
Rp. 78,072,897
5,132,259
942,480
Rp. 84,147,636
ANALISA HARGA SATUAN PEKERJAAN ( AHSP
( sesuai Perbup Kulon ProgoNomor 14 tahun 2024 )
NO URAIAN PEKERJAAN SAT ANALISA UPAH
PEKERJA SAT KOEF UPAH UPAH / SAT
(Rp) (Rp)
A PEKERJAAN PENDAHULUAN
1 PEMBONGKARAN GENTENG m2 Pekerja OH 0.0400 Rp 80,000.00 Rp 3,200.00
( Bongkaran dipakai lagi ) Mandor OH 0.0200 Rp 100,000.00 Rp 2,000.00
Rp 5,200.00
2 PEK.PEMASANGAN USUK ( BEKAS ) DAN RENG ( BARU ) m2 Pekerja OH 0.1000 Rp 80,000.00 Rp 8,000.00
Tk,Kayu OH 0.0100 Rp 90,000.00 Rp 900.00
Mandor OH 0.0500 Rp 100,000.00 Rp 5,000.00
Rp 13,900.00
Rp 50,200.00
C PEKERJAAN DINDING
1 pasang bata merah 1: 2 m2 tk.batu OH 0.1000 Rp 80,000.00 Rp 8,000.00
tebal 1/2 bata pekerja OH 0.3000 Rp 90,000.00 Rp 27,000.00
Mandor OH 0.0150 Rp 100,000.00 Rp 1,500.00
Rp 36,500.00
D PEKERJAAN STRUKTUR
a] Pekerjaan Kolom Praktis 12x12
Bekisting m2 Tk. Kayu OH 0.2600 Rp 90,000.00 Rp 23,400.00
pekerja OH 0.3000 Rp 80,000.00 Rp 24,000.00
Rp 47,400.00
F PEKERJAAN PLAFOND
1.Rangka Plafond Dalam dan luar m2 tk.besi OH 0.3000 Rp 90,000.00 Rp 27,000.00
pekerja OH 0.0900 Rp 80,000.00 Rp 7,200.00
Rp 7,200.00
F PEKERJAAN KUSEN
1. Pekerjaan Kusen Pintu m3 tk.kayu OH 18.0000 Rp 90,000.00 Rp 1,620,000.00
dan Jendela pekerja OH 6.0000 Rp 80,000.00 Rp 480,000.00
Mandor OH 0.3000 Rp 100,000.00 Rp 30,000.00
Rp 2,100,000.00
2. Meni Kayu Kusen dan Kusen Pintu m2 tk.cat OH 0.7500 Rp 90,000.00 Rp 67,500.00
pekerja OH 0.0800 Rp 80,000.00 Rp 6,400.00
Rp 73,900.00
L PEKERJAAN PENGECATAN
1. Pengecatan Dinding
Plesteran dinding 1:2 dan 1:4 m2 tk.cat OH 0.0420 Rp 90,000.00 Rp 3,780.00
pekerja OH 0.0280 Rp 80,000.00 Rp 2,240.00
Rp 6,020.00
2. Mengecat Kusen dan Daun Pintu m2 tk.cat OH 0.1000 Rp 90,000.00 Rp 9,000.00
pekerja OH 0.1400 Rp 80,000.00 Rp 11,200.00
Rp 20,200.00
ATUAN PEKERJAAN ( AHSP )
on ProgoNomor 14 tahun 2024 )
MATERIAL SAT ANALISA MATERIAL HARGA SATUAN
KOEF HARGA MATRI/SAT (Rp)
(Rp)
Rp 5,200.00
Rp 23,000.00
Rp 860,000.00
Rp 10,500.00
Rp 566,660.00
Rp 12,374,500.00 Rp 13,208,500.00
0.847
Reng Kayu Kruing ( 2X3 cm ) m3 0.0027 Rp 6,700,000.00 Rp 18,090.00 7040
Paku kg 0.1500 Rp 18,300.00 Rp 2,745.00 1.122
Rp 20,835.00 Rp 34,735.00
Rp 67,500.00 Rp 87,050.00
Rp 8,445.00 Rp 15,245.00
list kayu 5cm m1 1.0500 Rp 14,500.00 Rp 15,225.00
paku kg 0.0350 Rp 18,300.00 Rp 640.50
Rp 15,865.50 Rp 21,265.50
Rp 79,750.00 Rp 363,750.00
kaca polos 5 mm m2 1.0000 Rp 120,000.00 Rp 120,000.00
list kaca m2 4.0000 Rp 2,100.00 Rp 8,400.00
paku 10-15 cm kg 0.3000 Rp 17,000.00 Rp 5,100.00
Rp 133,500.00 Rp 417,500.00
MERK
HARGA
DAN
NO URAIAN PEKERJAAN SAT VOLUME SATUAN
SPESIFIK
Rp.
ASI
1 2 3 4 5
A. PEKERJAAN PERSIAPAN/PENDAHULUAN
1 Pekerjaan Bongkar Genting dan Bubungan m2 140.0000 Rp.
2 Pekerjaan Bongkar Kaso dan Reng m 2
140.0000 Rp.
3 Pekerjaan Bongkar Gording Kayu Kruing m 3
0.2304 Rp.
4 Pekerjaan Bongkar Dinding /Bobok m3 0.3168 Rp.
Sub Total A
B. PEKERJAAN RANGKA ATAP
1 Pekerjaan Pemasangan Gording m3 0.2880 Rp.
2 Pekerjaan Pemasangan Usuk Lama dan Reng Baru m2 66.0000 Rp.
3 Pekerjaan Pemasangan Usuk Baru dan Reng Baru m 2
88.0000 Rp.
4 Pekerjaan Pemasangan Genting Lama m 2
140.0000 Rp.
5 Pekerjaan Pemasangan Genting Baru m2 14.0000 Rp.
6 Pekerjaan Pemasangan Bubungan m 1
14.0000 Rp.
Sub Total B
C PEKERJAAN DINDING
Pekerjaan Pemasangan Batu Bata Merah 1:2 m2 23.5000 Rp.
Pekerjaan Plesteran dan Acian 1:4 tebal 15mm+acian m 2
47 Rp.
Pekerjaan Pengecatan Dinding Baru m2 47 Rp.
Sub Total C
D PEKERJAAN STRUKTUR
1 Pekerjaan Kolom Praktis 12/12
- Pekerjaan Bekesting m2 0.8640 Rp.
- Pekerjaan Pembesian kg 12.7492 Rp.
- Pekerjaan Beton m3 0.0518 Rp.
2 Pekerjaan Ring Balok 12/15
- Pekerjaan Bekesting m2 4.9900 Rp.
- Pekerjaan Pembesian kg 57.3098 Rp.
- Pekerjaan Beton m3 0.3000 Rp.
Sub Total D
E PEKERJAAN PLAFOND
1 Pekerjaan Rangka Plafond dalam dan luar m2 141.0000
2 Pekerjaan Penutup Plafond m2 141.0000 Rp.
3 Pekerjaan Pengecatan Plafond Wiratex kg 141.0000
4 Pekerjaan List Tepi uk 5 cm m1 86.0000 Rp.
Sub Total E
F PEKERJAAN KUSEN -KUSEN DAN PINTU
1 Pekerjaan Kusen dan Jendela m3 0.2707
2 Pekerjaan Cat Meni m2 11.3648
Rp.
3 Pekerjaan Pintu m 2
7.36
4 Pekerjaan Pemasangan Kaca 5mm m2 2.6934
5 Pekerjaan Pengecatan Kusen,Pintu dan Jendela Avian m2 11.3648
Sub Total F
JUMLAH
BELANJA MATERIAL Rp.
BELANJA TENAGA Rp.
PPN/PPH MATERIAL( 11%)
PAJAK TENAGA( 1/2 ) 6%
AHSP RIIL/LOKAL
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
Rp. 5,300,000
Rp. 63,597,666
33,364,166
30,233,500
5,132,259
942,480
Rp. 69,672,405