Frame Work Manajemen Outage
RCN 15/9/18
27-3-18
RCN
(1) REA 12/9/18
RCN - 24/6/18
(2) P3
REA - REA 28/6/17 21-07-
18 (1)
R2 P1 RCN 5/11/18
Synchron 5/11/20
REA 18
25-06-18
(1)
RCN 22/09/18)
Shutdown 8/10/20
REA
18
R1 R3 P2
27-12-
RCN - RCN RCN 23-8-18
17
REA - REA 05-1-18 REA 23-4-18
PLOT KADERISASI KOORDINATOR & PM
Fan
Bidang
Project No Nama N A G
Manager Mentor
Calon Koord Fan Achmad Samsudin Actual Rencana
Mentor Azib Zaid Rendra
Nurcahyo Herwin Calon PM 1 SM PM 6 3 3
Rendra Widhya Motor Widhya P
2 Andrianto Senior Turbin Koord. Turbin 4 3 1
Mentor
Calon Koord Motor Cecep Koord. Turbin
Turbin M. Dani 3 Senior Pump 4 3 1
Riswan Hadi Cahyana Aux
Mentor Koord. Turbin
Calon Koord Turbin 4 David Martin Senior Pump 4 3 1
Gancis Lingkara B Generator Aux
Andrianto
Mentor Koord. Boiler
Calon Koord Gen 5 Azib Zaid Senior Fan 4 3 1
Mahzumi Aux
BFP
LEADER Fio Ilhamsyah Koord.
Mentor 6 Fio Ilhamsyah Senior Generator 4 3 1
Calon Koord BFP Switchgear Generator
Achmad Rindra
Cecep Cahyana 7 Suryo Sardi A Senior Proteksi Koord. Proteksi 4 3 1
Mentor
Calon Koord Swtch
Mahzumi 8 Riswan Hadi Senior Motor Koord. Motor 4 2 2
Suryo Sardi
Pompa 9 Randy Fanda Senior I&C Koord. I&C 4 3 1
I&C
Mentor
Calon Koord Pump
S.W Pudji Mentor Note:
David Martin
Calon Koord I&C Yoga Pratama Nilai GAP=1, 2 & 3 akan ditindaklanjuti dengan
Randy Fanda meningkatkan level kompetensi sesuai bidang
LANDASAN TEORI
Switchgear adalah suatu mekanisme penutupan, pemutusan dan pendukung-pendukungnya dalam satu kesatuan
(unit) terintegrasi, sehingga dapat difungsikan sebagai penghubung, pemutus, dan pelindung terhadap dua sisi
rangkaian.
CIRCUIT RANGKAIAN
BREAKER KONTROL
Predictive
Pastikan breaker off Periksa kontak utama dan Roll in breaker posisi TEST Tahanan Isolasi
mekanis
Matikan MCB kontrol Nyalakan MCB kontrol Tahanan kontak
Periksa rangkaian kontrol
(terminal, coil, )
Roll out breaker Test breaker ON dan OFF dari Keserempakan
Cleaning breaker dan cek panel kontak
terminasi
Open/Close
1.List pekerjaan SPK baru lebih jelas karena menyampaikan dari detail
equipment yang lebih rinci ( MCC Turbine A dan B, MCC Boiler A dan B, Dry
Trafo PC A dan B, Dry trafo ESP A dan B, dry trafo Eksitasi) di bandingkan SPK
lama yang hanya menyantumkan (MCC, Dry trafo)
Note : Note :
PT PJB UBJOM PT. PJB SERVICES PT PJB UBJOM PT. PJB SERVICES PT PJB UBJOM PT. PJB SERVICES
Des cri pti on Des cri pti on Des cri pti on
Revi ewed & Approved by Checked by Ins pected by Revi ewed & Approved by Checked by Ins pected by Revi ewed & Approved by Checked by Ins pected by
Na me Eko Sus i l o Yus uf Sa fa ri Suryo Sa rdi Atmojo Na me Eko Sus i l o Yus uf Sa fa ri Suryo Sa rdi Atmojo Na me Eko Sus i l o Yus uf Sa fa ri Suryo Sa rdi Atmojo
Pos i ti on QC Koordi na tor Tekni s i Pos i ti on QC Koordi na tor Tekni s i Pos i ti on QC Koordi na tor Tekni s i
Approva l Da te Approva l Da te Approva l Da te
KESIMPULAN PARAMETER OPERASI DAN REKOMENDASI
Switchgear dinyatakan handal dimana mampu bekerja sebagai penghubung, pemutus dan
pelindung antara supply dengan beban.
Kerusakan tuas grounding pada PLTU Indramayu di akibatkan dari kesalahan operasi
dimana operator hendak melepas grounding saat kondisi MCB control masih OFF. Karena
dalam system pengaman terdapat lock berupa coil.
Ketidak sesuaian Modul proteksi Mill 3A harus segera di tindak lanjuti karena dapat
mengakibatkan motor terbakar sampai unit shutdown.