JOB SHADOWING SI PLTU UNIT 3 INDRAMAYU

LISTRIK KONTROL

21 November 2018
SURYO SARDI ATMOJO
921605UJ
ASISTEN ENJINIR LISTRIK
Frame Work Manajemen Outage

RCN 15/9/18
27-3-18
RCN
(1) REA 12/9/18
RCN - 24/6/18
(2) P3
REA - REA 28/6/17 21-07-
18 (1)
R2 P1 RCN 5/11/18
Synchron 5/11/20
REA 18

18 bln 12 bln 6 bln 3 bln 1 bln


1 mgu PASCA
Overhaul OH

25-06-18
(1)
RCN 22/09/18)
Shutdown 8/10/20
REA
18
R1 R3 P2
27-12-
RCN - RCN RCN 23-8-18
17
REA - REA 05-1-18 REA 23-4-18
PLOT KADERISASI KOORDINATOR & PM

Fan
Bidang
Project No Nama N A G
Manager Mentor
Calon Koord Fan Achmad Samsudin Actual Rencana
Mentor Azib Zaid Rendra
Nurcahyo Herwin Calon PM 1 SM PM 6 3 3
Rendra Widhya Motor Widhya P
2 Andrianto Senior Turbin Koord. Turbin 4 3 1
Mentor
Calon Koord Motor Cecep Koord. Turbin
Turbin M. Dani 3 Senior Pump 4 3 1
Riswan Hadi Cahyana Aux
Mentor Koord. Turbin
Calon Koord Turbin 4 David Martin Senior Pump 4 3 1
Gancis Lingkara B Generator Aux
Andrianto
Mentor Koord. Boiler
Calon Koord Gen 5 Azib Zaid Senior Fan 4 3 1
Mahzumi Aux
BFP
LEADER Fio Ilhamsyah Koord.
Mentor 6 Fio Ilhamsyah Senior Generator 4 3 1
Calon Koord BFP Switchgear Generator
Achmad Rindra
Cecep Cahyana 7 Suryo Sardi A Senior Proteksi Koord. Proteksi 4 3 1
Mentor
Calon Koord Swtch
Mahzumi 8 Riswan Hadi Senior Motor Koord. Motor 4 2 2
Suryo Sardi
Pompa 9 Randy Fanda Senior I&C Koord. I&C 4 3 1
I&C
Mentor
Calon Koord Pump
S.W Pudji Mentor Note:
David Martin
Calon Koord I&C Yoga Pratama Nilai GAP=1, 2 & 3 akan ditindaklanjuti dengan
Randy Fanda meningkatkan level kompetensi sesuai bidang
LANDASAN TEORI

Switchgear adalah suatu mekanisme penutupan, pemutusan dan pendukung-pendukungnya dalam satu kesatuan
(unit) terintegrasi, sehingga dapat difungsikan sebagai penghubung, pemutus, dan pelindung terhadap dua sisi
rangkaian.

SWITCHGEAR Pemeliharaan sistem tenaga listrik khususnya pemeliharaan Switchgear


adalah serangkaian tindakan atau proses kegiatan untuk mempertahankan
kondisi dan meyakinkan bahwa peralatan dapat berfungsi sebagaimana
KOMPONEN KOMPONEN mestinya sehingga dapat dicegah terjadinya gangguan yang menyebabkan
UTAMA BANTU kerusakan.

CIRCUIT RANGKAIAN
BREAKER KONTROL
Predictive

BUS BAR ISOLATOR


Overhaul Preventive
RELE
PROTEKSI
Corrective
METER
SCOPE PEKERJAAN, PERMASALAHAN DAN PENANGANAN

Pengisolasian Breaker Inspeksi Breaker Test Kontrol Breaker Pengujian CB

Pastikan breaker off Periksa kontak utama dan Roll in breaker posisi TEST Tahanan Isolasi
mekanis
Matikan MCB kontrol Nyalakan MCB kontrol Tahanan kontak
Periksa rangkaian kontrol
(terminal, coil, )
Roll out breaker Test breaker ON dan OFF dari Keserempakan
Cleaning breaker dan cek panel kontak
terminasi
Open/Close

Tuas grounding breaker 6KV rusak akibat operasi. Dalam proses


operasi tuas grounding dapat dikerjakan dalam kondisi panel
Tuas grounding rusak control ON, jika MCB control masih OFF tuas grounding berat
karena terdapat lock dan jika di paksa akan patah. Dilakukan
Permasalahan

penggantian tuas grounding baru.

Modul mill 3A tidak sesuai dengan modul semestinya dimana mill


Modul Mill 3A tidak 3A menggunakan modul trafo bukan modul motor. Settingan
sesuai proteksinya pun tidak aktif. Info terakhir akan dilakukan
penggantian oleh pihak UBJOM
PERBANDINGAN IK AWAL DAN IK REVIEW
PERBANDINGAN SPK AWAL DAN SPK REVIEW

1.Tata letak progress harian dimana SPK update mengacu


dari tiap equipment tidak per list pekerjaanya (seperti yang
ada pada WBS). Hal ini menjadikan pekerja lebih fokus
pada satu point yang dikerjakan sehingga,lebih mudah
dalam mengontrol pekerjaan.

Waktu pelaksanaan pekerjaan lebih mudah untuk di target


dengan perubahan SPK yang mengacu pada tiap
equipment.

1.List pekerjaan SPK baru lebih jelas karena menyampaikan dari detail
equipment yang lebih rinci ( MCC Turbine A dan B, MCC Boiler A dan B, Dry
Trafo PC A dan B, Dry trafo ESP A dan B, dry trafo Eksitasi) di bandingkan SPK
lama yang hanya menyantumkan (MCC, Dry trafo)

1.Dalam penggunaan Tools juga lebih jelas dan mudah untuk di


monitoring dengan update SPK dari tiap equipment.
PT PEMBANGKITAN JAWA BALI SERVICES PT PEMBANGKITAN JAWA BALI SERVICES PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 2
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 2
FORM UJI DAN STANDART
SIAP INTEGRATED MANAGEMENT SYSTEM
SERIOUS INSPECTION UNIT 2
PT.PJB UBJ O&M PLTU INDRAMAYU 2018 PT.PJB UBJ O&M PLTU INDRAMAYU 2018 PT.PJB UBJ O&M PLTU INDRAMAYU 2018
Des cri pti on BREAKER Des cri pti on BREAKER 6KV
Des cri pti on BREAKER
Equi pment BREAKER 6 KV Equi pment RELAY PROTECTION BREAKER 6KV
TEST SHEET Document Number TEST SHEET
Equi pment BREAKER 6 KV INSPECTION SHEET Document Number
Document Number
Is s ued 08 Mei 2017 Is s ued 08 Mei 2017
Is s ued 08 Mei 2017
Ta s k No. : WT110085 Revi s i on : 00 Secti on : El ectri c Ta s k No. : WT110086 Revi s i on : 00 Secti on : El ectri c
Ta s k No. : WT110085 Revi s i on : 00 Secti on : El ectri c
WO No. : SE218A0041 Pa ge : Da te : Ma ret 2018
WO No. : SE218A0041 Pa ge : Da te : Ma ret 2018 WO No. : SE218A0041 Pa ge : Da te : Ma ret 2018

HASIL TEST KESEREMPAKAN BREAKER MV SWGR BUS BBA CONDENSATE PUMP A


HASIL TEST KESEREMPAKAN BREAKER MV SWGR BUS BBA

Contact Time Tahanan Delta Time


SPESIFIKASI PROTECTION CIRCUIT BREAKER
No Equipment TEST Ket Contact Time Tahanan Delta Time
CH Time (S) Kontak (mS) No Equipment TEST Ket Manufactured : GUODIAN NANJING AUTOMATION
CH Time (S) Kontak (mS)
R 61,2 60,18 Type Relay : NEP 998A
R 61,2 60,18
Open to Cl os e S 60,9 28,24 0,6 Ratio CT : 300/1 A
Open to Cl os e S 60,9 28,24 0,6
T 60,6 38,76 T 60,6 38,76
Ratio ZCT : 60/1 A
1 BFP A 1 BFP A
R 36,5 R 36,5 Rated Power : 1000 KW
Cl os e to Open S 36,5 0,3 Cl os e to Open S 36,5 0,3 Rated Current : Ip = 121 A Is = 0,40 A
T 38,8 T 38,8 Rated Voltage : 6000 V
R 61,5 33,96 R 61,5 33,96
Open to Cl os e S 61,1 39,3 0,4 Open to Cl os e S 61,1 39,3 0,4 Initial Test : Arus Injeksi I set X 1,1
T 61,4 32,39 T 61,4 32,39
2 BFP C 2 BFP C
R 37,5 R 37,5
Cl os e to Open S 37,2 0,6 Setting Test Result
Cl os e to Open S 37,2 0,6
T 37,8 T 37,8
Test Protection
R 60,7 32,36 R 60,7 32,36
Value ( A ) Time ( Sec ) Value ( A ) Time ( Sec )
Open to Cl os e S 60,5 42,38 0,2 Open to Cl os e S 60,5 42,38 0,2
T 60,5 28,38 Starting 4,40 15 4,84 15,07
3 CEP A T 60,5 28,38
R 39 3 CEP A
R 39 Instant OC 3,20 0,06 3,52 0,103
Cl os e to Open S 39,2 0,3 Cl os e to Open S 39,2 0,3
T 39,3 T 39,3
Definite OC 0,60 20 0,66 20,04
R 58,6 45,0 R 58,6 45,0 Neg Sequence 0,24 3 0,264 3,05
Open to Cl os e S 58,7 34,21 0,1 Open to Cl os e S 58,7 34,21 0,1
T 58,7 33,1 T 58,7 33,1 Locked Rotor 0,80 15 0,88 15,04
4 CWP A 4 CWP A
R 38,1 R 38,1 Ground Fault 0,25 0,3 0,275 0,34
Cl os e to Open S 38,1 0,1 Cl os e to Open S 38,1 0,1
T 38,0 T 38,0 Test result
R 60,0 28,01 R 60,0 28,01
Open to Cl os e S 59,3 43,91 0,9 Open to Cl os e S 59,3 43,91 0,9 Overheat 1.5 X I set 2 X I set 3 X I set 4 X I set
T 60,2 28,3 T 60,2 28,3
5 PAF A 5 PAF A 238.10 Sec 114.55 Sec 46.29 Sec 25.20 Sec
R 37,5 R 37,5
Cl os e to Open S 37,8 0,3 Cl os e to Open S 37,8 0,3
T 37,6 T 37,6 Note : Dari hasil pengujian setting modul proteksi masih dalam kondisi normal.

Note : Note :

ACCEPTED / REWORK / REPLACE ACCEPTED / REWORK / REPLACE ACCEPTED / REWORK / REPLACE


RECOMMENDATION RECOMMENDATION RECOMMENDATION
(by Qua l i ty Control ) (by Qua l i ty Control ) (by Qua l i ty Control )
Mea s uri ng Tool Mea s uri ng Tool Mea s uri ng Tool ISA - DRTS 66

PT PJB UBJOM PT. PJB SERVICES PT PJB UBJOM PT. PJB SERVICES PT PJB UBJOM PT. PJB SERVICES
Des cri pti on Des cri pti on Des cri pti on
Revi ewed & Approved by Checked by Ins pected by Revi ewed & Approved by Checked by Ins pected by Revi ewed & Approved by Checked by Ins pected by

Si gna ture Si gna ture Si gna ture

Na me Eko Sus i l o Yus uf Sa fa ri Suryo Sa rdi Atmojo Na me Eko Sus i l o Yus uf Sa fa ri Suryo Sa rdi Atmojo Na me Eko Sus i l o Yus uf Sa fa ri Suryo Sa rdi Atmojo
Pos i ti on QC Koordi na tor Tekni s i Pos i ti on QC Koordi na tor Tekni s i Pos i ti on QC Koordi na tor Tekni s i
Approva l Da te Approva l Da te Approva l Da te
KESIMPULAN PARAMETER OPERASI DAN REKOMENDASI

Switchgear dinyatakan handal dimana mampu bekerja sebagai penghubung, pemutus dan
pelindung antara supply dengan beban.

Kerusakan tuas grounding pada PLTU Indramayu di akibatkan dari kesalahan operasi
dimana operator hendak melepas grounding saat kondisi MCB control masih OFF. Karena
dalam system pengaman terdapat lock berupa coil.

Ketidak sesuaian Modul proteksi Mill 3A harus segera di tindak lanjuti karena dapat
mengakibatkan motor terbakar sampai unit shutdown.
Thank You