Kec. Beji
Kec. Sukmajaya
VOLUME
NO. KECAMATAN VOLUME (Ton)
(Kg)
1. PANCORAN MAS 101.550 101,5
2. SUKMAJAYA 186.020 186
3. BEJI 146.580 146,8
TOTAL 434,15
Jumlah 255,800 258,495 259,400 260,308 261,219 262,133 263,051 263,971 264,895 265,822
Jumlah Timbulan Sampah per hari (l/hari) 664,333 666,658 668,991 671,333 673,683 676,040 678,407 680,781 683,164
Jumlah Timbulan Sampah (m3/hari) 664 667 669 671 674 676 678 681 683
Sampah Campur
Sampah Campur
Sampah Campur
Sampah Campur
Sampah Campur
Unit Penerima
3 Organik Taman (OT)
4 Organik mudah terbakar
5 Pempers
6 Inert
Jumlah 200 100% 200 100% 200 100% 200 100% 200 100%
1 Anorganik Daur Ulang (AUD) 44.8 22% 44.8 22% 44.8 22% 10 22% 10 22%
2 Organik Dapur (OD) 64.56 32% 64.56 32% 64.56 32% 80 32% 80 32%
3 Organik Taman (OT) 4.14 2% 4.14 2% 4.14 2% 2 2% 2 2%
4 Anorganik mudah terbakar 45.84 23% 45.84 23% 45.84 23% 93 23% 93 23%
5 Pempers 21.72 11% 21.72 11% 21.72 11% 10 11% 10 11%
Inert (pasir, tanah, debu,
6 pecahan kaca/beling, potongan
kabel, dll) 18.92 9% 18.92 9% 18.92 9% 5 9% 5 9%
Jumlah 199.98 100% 199.98 100% 199.98 100% 200 100% 200 100%
Offtaker Offtaker Offtaker Offtaker Offtaker
1 Anorganik Daur Ulang (AUD)
44.8 22% 44.8 22% 44.8 22% 10 22% 10 22%
iterasi pemilihan
konfigurasi
peralatan
Iterasi / Gagal
F Hasil Perhitungan dari Sheet Kebutuhan lahan
MTT Kebutuhan Lahan MTT 1 MTT 2 Kebutuhan lahan sesuai
MBTT XXX M XXX M dengan yang sudah ditatapkan
Kebutuhan Lahan ≤ XXX m2
Lolos Lolos di tiap kota
Iterasi / Gagal
G Hasil Perhitungan dari Sheet Waktu Pengadaan
MTT Waktu Pengadaan MTT 1 MTT 2 Teknologi dengan kemungkinan untuk selesai
Perkiraan Waktu Selesai Desember 2024 Agustus 2024 konstruksi maksimal pada awal oktober 2024
Konstruksi Gagal Lolos
Waktu Pengadaan
Lolos
Teknologi Terpilih