Anda di halaman 1dari 7

METHODE SHORING & FORM WORK PIERHEAD

PROYEK PEMBANGUNAN JALAN TOLL TEBING TINGGI JUNCTIN


RAMP 4
TAHAPAN PERENCANAAN PEKERJAANAN SHORING & FORM WORK
PIERHEAD
1. Statika Calculation
2. Design Methode & Shop Drawing
3. Pelaksanaan Pekerjaan Konstruksi
- Schedule Pelaksanaan
- Tahapan Konstruksi
- Pemasangan Shoring & Form Work
- Pembongkaran Form Work & Shoring
TAHAPAN PERENCANAAN PEKERJAANAN SHORING & FORM WORK
PIERHEAD
1. Statika Calculation
- Safety Factor minimal yang di gunakan 2,5
- Standard SNI Baja – SNI 1729-2015
- Standard Bangunan & Struktur Beton Bertulang SNI1727-2013
- Standard Form Work ACI-347
- Perangkat lunak SAP2000
TAHAPAN PERENCANAAN PEKERJAANAN SHORING & FORM WORK
PIERHEAD
2. Design Methode & Shop Drawing
- Design methode shoring & form work adalah out put dari perhitungan statika

calculation
- Design Methode & Shop Drawing untuk menentukan BOQ materials & bahan

& sebagai control pelaksanaan konstruksi pemasangan shoring


TAHAPAN PERENCANAAN PEKERJAANAN SHORING & FORM WORK
PIERHEAD
3. Pelaksanaan Pekerjaan Konstruksi
- Schedule Pelaksanaan
- Tahapan Konstruksi
- Pemasangan Shoring & Form Work
- Pembongkaran Form Work & Shoring
3. Pelaksanaan Pekerjaan Konstruksi
- Schedule Pelaksanaan
Masa kosntruksi perkerjaan shoring & form work total 20 pier = 150 hari
4 sept ~ 31 januari 2021
- Jumlah set shoring = 5 set
- Bottom form = 5 set
- Side form = 3 set
3. Pelaksanaan Pekerjaan Konstruksi
- Schedule Pelaksanaan
PT. BERLIAN DJAYA
NUSANTARA

Office : Jl. Kumbang Raya no.114 , Pegadungan Kalideres , Jakarta Barat

Work Shop : Jl. Raya Legok - Parung Panjang no.99 Legok Tangerang

SEQUENCE PEKERJAAN BEKISTING P12 & P13


PROYEK TEBING TINGGI JUNCTION

BONGK
PASANG PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR PASANG BONGKAR
AR

Invest Invest Rent Rent Rent

65

16 32 16 32

Stressing

Cor Tahap 2 14/01/2021 11/01/2021 03/01/2021 31/12/2020 28/12/2020 12/12/2020 09/12/2020 01/12/2020 29/09/2020 26/09/2020 28/11/2020 02/10/2020 23/09/2020 23/10/2020 25/11/2020 09/11/2020 06/11/2020 29/10/2020 26/10/2020 20/09/2020

Side Form Tahap2 14/01/2021 11/01/2021 03/01/2021 31/12/2020 28/12/2020 12/12/2020 09/12/2020 01/12/2020 29/09/2020 26/09/2020 28/11/2020 02/10/2020 23/09/2020 23/10/2020 25/11/2020 09/11/2020 06/11/2020 29/10/2020 26/10/2020 20/09/2020

Cor Tahap 1 12/01/2021 09/01/2021 01/01/2021 29/12/2020 26/12/2020 10/12/2020 07/12/2020 29/11/2020 27/09/2020 24/09/2020 26/11/2020 30/09/2020 21/09/2020 21/10/2020 23/11/2020 07/11/2020 04/11/2020 27/10/2020 24/10/2020 18/09/2020

Side Form 12/01/2021 09/01/2021 01/01/2021 29/12/2020 26/12/2020 10/12/2020 07/12/2020 29/11/2020 27/09/2020 24/09/2020 26/11/2020 30/09/2020 21/09/2020 21/10/2020 23/11/2020 07/11/2020 04/11/2020 27/10/2020 24/10/2020 18/09/2020

Besi 10/01/2021 07/01/2021 30/12/2020 27/12/2020 24/12/2020 08/12/2020 05/12/2020 27/11/2020 25/09/2020 22/09/2020 24/11/2020 28/09/2020 19/09/2020 19/10/2020 21/11/2020 05/11/2020 02/11/2020 25/10/2020 22/10/2020 16/09/2020

Bottom Form Work 05/01/2021 02/01/2021 25/12/2020 22/12/2020 19/12/2020 03/12/2020 30/11/2020 22/11/2020 20/09/2020 17/09/2020 19/11/2020 23/09/2020 14/09/2020 14/10/2020 16/11/2020 31/10/2020 28/10/2020 20/10/2020 17/10/2020 11/09/2020

End 03/01/202103/02/2021 31/12/2020 31/01/2021 23/12/2020 23/01/2021 20/12/2020 20/01/2021 17/12/2020 17/01/2021 01/12/2020 01/01/2021 28/11/2020 29/12/2020 20/11/2020 21/12/2020 18/09/2020 24/10/2020 15/09/2020 16/10/2020 17/11/2020 18/12/2020 21/09/2020 27/10/2020 12/09/2020 13/10/2020 12/10/2020 12/11/2020 14/11/2020 15/12/2020 29/10/2020 29/11/2020 26/10/2020 26/11/2020 18/10/2020 18/11/2020 15/10/2020 15/11/2020 09/09/2020 10/10/2020
Install Shoring

Start 29/12/2020 30/01/2021 26/12/2020 27/01/2021 18/12/2020 19/01/2021 15/12/2020 16/01/2021 12/12/2020 13/01/2021 26/11/2020 28/12/2020 23/11/2020 25/12/2020 15/11/2020 17/12/2020 13/09/2020 20/10/2020 10/09/2020 12/10/2020 12/11/2020 14/12/2020 16/09/2020 23/10/2020 07/09/2020 09/10/2020 07/10/2020 08/11/2020 09/11/2020 11/12/2020 24/10/2020 25/11/2020 21/10/2020 22/11/2020 13/10/2020 14/11/2020 10/10/2020 11/11/2020 04/09/2020 06/10/2020

Preparation Work
ITEM
OF P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 P18 P19 P20 P21 P22 P23
WORK