PEKERJAAN INSTALASI TATA UDARA

L0KASI RSUD KEBUMEN


1
NO

URAIAN PEKERJAAN

PEKERJAAN TATA UDARA


BANGUNAN A
Lantai 1 UGD
Pengadaan pemasangan AC dng st Press 3,4 in wg, 4 row
Kap 10.000 CFM, 423.600 BTU/h
4 x YICA 100-CS 217 Dsshfc 12 a 4 DX Coil, lengkap terpasang
dng Filter Dryer, Penel on/of dan Control Termostat
Pemipaan tembaga dan isolasi condensat, dan pipa Drain
lengkap terpasang
2
Pengadaan Pre, medium, hepa Filter Cap 5.000 CFM
Lengkapdng Hosing, Volume damper Fress air, dan Elec
tronic Air cleaner, terpasang di Retern Dac
3
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 24 kg/m-1", Allumunium Foil AB Foil AB-631D/S
atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
a BJLS 100 suplay
54" X 26"
40" X 24"
36" X 20"
36" X 18"
34" X 20"
30" X 20"
b BJLS 80 suplay
28" X 20"
26" X 14"
24" X 18"
24" X 16"
22" X 12"
c BJLS 60 suplay
16" X 12"
18" X 14"

Vol

Sat

Harga Material
( Rp )

Upah Kerja
( Rp )

A
1

set

4,500,000

set

m
m
m
m
m
m

26
28
4
28
7
6

171,600
171,600
171,600
171,600
171,600
171,600

1,500,000
1,350,000
1,250,000
1,150,000
1,025,000
975,000

m
m
m
m
m

11
9
5
9
7

141,900
141,900
141,900
141,900
141,900

1,350,000
1,250,000
1,150,000
1,025,000
975,000

m
m

17
6

107,800
107,800

1,250,000
1,125,000

Jumlah

Total Material
( Rp )

4,461,600
4,804,800
686,400
4,804,800
1,201,200
1,029,600
1,560,900
1,277,100
709,500
1,277,100
993,300
1,832,600
646,800
25,285,700.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39,000,000.00
37,800,000.00
5,000,000.00
32,200,000.00
7,175,000.00
5,850,000.00
0.00
14,850,000.00
11,250,000.00
5,750,000.00
9,225,000.00
6,825,000.00
0.00
21,250,000.00
6,750,000.00
211,925,000.00

2
NO

URAIAN PEKERJAAN

d BJLS 40 suplay
12" X 10"
10" X 10"
10" X 6"
8" X 8"
8" X 6"
4
Ducting Retern
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
a BJLS 100 Retern
BJLS 100 Retern
56" X 26"
40" X 24"
34" X 16"
36" X 24"
36" X 16"
32" X 16"
b BJLS 80 Retern
16" X 8"
12" X 8"
24" X 16"
c Plenum Reternt + Isolation In and out
d Plenum Suplay + Isilation In and out
e Reternt Air Grille Alimminium dobleduflexen
24" X 16"
16" X 8"
12" X 8"
f Diffuser 12" X 12" Aluminium + Volume Damper Justable
g Diffuser 2 slot 10 cm X 90 cm Aluminium
and Damper justable
h Flexible Duc Isolation, Glass Wool, Al Foil FR 6"
i Door air Grille and Volume damper oudoor Type
14" X 14" ( Fress Air )
j Ducting Non Isolation 14" X 14" BJLS 60
k Panel + Power kabel

Vol

Sat

m
m
m
m
m

20
3
3
44
65

70,400
70,400
70,400
70,400
70,400

1,150,000
1,025,000
975,000
850,000
750,000

m
m
m
m
m
m

32
31
7
13
10
26

171,600
171,600
171,600
171,600
171,600
171,600

1,650,000
1,500,000
1,350,000
1,250,000
1,150,000
975,000

m
m
m
set
set

14
27
36
1
1

141,900
141,900
141,900

1,350,000
1,250,000
1,150,000

set
set
set
set

10
5
6
63

5,750
5,000
5,000
270,000

set
mtr

8
31

29,000

set
m
set

1
7
1

Harga Material
( Rp )

107,800

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

1,408,000
211,200
211,200
3,097,600
4,576,000
5,491,200
5,319,600
1,201,200
2,230,800
1,716,000
4,461,600
1,986,600
3,831,300
5,108,400
57,500
25,000
30,000
17,010,000
899,000
754,600
59,626,800.00

Total Upah
( Rp )

0.00
23,000,000.00
3,075,000.00
2,925,000.00
37,400,000.00
48,750,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52,800,000.00
46,500,000.00
9,450,000.00
16,250,000.00
11,500,000.00
25,350,000.00
0.00
18,900,000.00
33,750,000.00
41,400,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
371,050,000.00

3
NO

URAIAN PEKERJAAN

EXHAUST
a, Axhaust 1- 1 Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m
Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m
Door grille 8" X 8"
b, Wall Exh 1 - 2, 600 CFM, St pres 0,8, Industrial
Dacting Non isolation 8' x 8" = 3 m
6 x 4" = 2 m
4 x 4" = 2 m
Glelle 4" X 4" = 2 set
Glelle 6" X 6" = 1 set
Door Grille
= 1 set 9" X 9"

BANGUNAN A
Lantai 2 ICU & ICCU
Pengadaan pemasangan AC dng st Press 3,4 in wg, 4 row
Kap 10.000 CFM, 423.600 BTU/h
4 x YICA 100-CS 217 Dsshfc 12 a 4 DX Coil, lengkap terpasang
dng Filter Dryer, Penel on/of dan Control Termostat
Pemipaan tembaga dan isolasi condensat, dan pipa Drain
lengkap terpasang
2
Pengadaan Pre, medium, hepa Filter Cap 5.000 CFM
Lengkapdng Hosing, Volume damper Fress air, dan Elec
tronic Air cleaner, terpasang di Retern Dac
3
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 24 kg/m-1", Allumunium Foil AB Foil AB-631D/S
atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
a BJLS 100 suplay
54" X 26"
40" X 24"
36" X 20"
36" X 18"
34" X 20"
30" X 20"
b BJLS 80 suplay
28" X 20"
26" X 14"
24" X 18"
24" X 16"
22" X 12"

Vol

Sat

Harga Material
( Rp )

Upah Kerja
( Rp )

set

m2
m2
set
set
set

2
2
2
1
1

set

set

m
m
m
m
m
m

26
28
4
28
7
6

171,600
171,600
171,600
171,600
171,600
171,600

1,500,000
1,350,000
1,250,000
1,150,000
1,025,000
975,000

m
m
m
m
m

11
9
5
9
8

141,900
141,900
141,900
141,900
141,900

1,350,000
1,250,000
1,150,000
1,025,000
975,000

B
1

Jumlah

Total Material
( Rp )

4,461,600
4,804,800
686,400
4,804,800
1,201,200
1,029,600
1,560,900
1,277,100
709,500
1,277,100
1,135,200
22,948,200.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39,000,000.00
37,800,000.00
5,000,000.00
32,200,000.00
7,175,000.00
5,850,000.00
0.00
14,850,000.00
11,250,000.00
5,750,000.00
9,225,000.00
7,800,000.00
0.00
175,900,000.00

4
NO

URAIAN PEKERJAAN

c BJLS 60 suplay
16" X 12"
18" X 14"
d BJLS 40 suplay
12" X 10"
10" X 10"
10" X 6"
8" X 8"
8" X 6"
4
Ducting Retern
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
a BJLS 100 Retern
BJLS 100 Retern
56" X 26"
40" X 24"
34" X 16"
36" X 24"
36" X 16"
32" X 16"
b BJLS 80 Retern
16" X 8"
12" X 8"
24" X 16"
c Plenum Reternt + Isolation In and out
d Plenum Suplay + Isilation In and out
e Reternt Air Grille Alimminium dobleduflexen
24" X 16"
16" X 8"
12" X 8"
Supplying Complete Chiller installment
Placed on the foundation
Type : Air Cooled Liquid YAEP 77UC9C
cap : 150 TR,
Compressors. : semi-Hermetic reciprocating
Ambient air entering condenser 35 C
Fouling Factor : 0.044m C/KW
Cooling Capacity : 537 KW ( 153 Ton )
Water Temperature 12 C to 7 C ( Range 5C )
Weter Flow Rate 25.7 L/S ( 410 GPM )
Compressors Power 173 KW

Vol

Sat

m
m

17
6

107,800
107,800

1,250,000
1,125,000

m
m
m
m
m

*
3
3
44
65

70,400
70,400
70,400
70,400
70,400

1,150,000
1,025,000
975,000
850,000
750,000

m
m
m
m
m
m

32
31
7
13
10
26

171,600
171,600
171,600
171,600
171,600
171,600

1,650,000
1,500,000
1,350,000
1,250,000
1,150,000
975,000

m
m
m
set
set

14
27
36
1
1

141,900
141,900
141,900

1,350,000
1,250,000
1,150,000

set
set
set

10
5
6

5,750
5,000
5,000

unit

Harga Material
( Rp )

1,330,000,000
Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

Total Upah
( Rp )

1,832,600
646,800
#VALUE!
211,200
211,200
3,097,600
4,576,000
5,491,200
5,319,600
1,201,200
2,230,800
1,716,000
4,461,600
1,986,600
3,831,300
5,108,400
57,500
25,000
30,000
2,660,000,000

0.00
21,250,000.00
6,750,000.00
0.00
#VALUE!
3,075,000.00
2,925,000.00
37,400,000.00
48,750,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52,800,000.00
46,500,000.00
9,450,000.00
16,250,000.00
11,500,000.00
25,350,000.00
0.00
18,900,000.00
33,750,000.00
41,400,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#VALUE!

#VALUE!

5
NO

URAIAN PEKERJAAN

f Diffuser 12" X 12" Aluminium + Volume Damper Justable


g Diffuser 2 slot 10 cm X 90 cm Aluminium
and Damper justable
h Flexible Duc Isolation, Glass Wool, Al Foil FR 6"
i Door air Grille and Volume damper oudoor Type
14" X 14" ( Fress Air )
j Ducting Non Isolation 14" X 14" BJLS 60
k Panel + Power kabel
5

EXHAUST
a, Axhaust 1- 1 Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m
Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m
Door grille 8" X 8"
b, Wall Exh 1 - 2, 600 CFM, St pres 0,8, Industrial
Dacting Non isolation 8' x 8" = 3 m
6 x 4" = 2 m
4 x 4" = 2 m
Glelle 4" X 4" = 2 set
Glelle 6" X 6" = 1 set
Door Grille
= 1 set 9" X 9"

BANGUNAN A
Lantai 3 Perkantoran
1 Pengadaan pemasangan AC Split dinding, lengkap
terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
Kap
: 2 PK 18,000 Btu/h
2 Exhaust Ceiling a cap 100 Cfm
3 Exhaust Ceiling b cap 130 Cfm
4 Glelle 4" X 4" = 13 set
5 Glelle 6" X 6" = 4 set
6 Ducting
6 x 4"
4 x 4"

Vol

Sat

set

63

270,000

set
mtr

8
31

29,000

set
m
set

1
7
1

set

m2
m2
set
set
set

2
2
2
1
1

set
set
set

10
12
12

set
set

5
5

set
set
m
m

13
4
10
18

Harga Material
( Rp )

Upah Kerja
( Rp )

107,800

3,000,000
3,500,000
6,900,000
518,100
518,100

Jumlah

750,000
750,000
1,500,000

Total Material
( Rp )

17,010,000
899,000
754,600
30,000,000
42,000,000
82,800,000
2,590,500
2,590,500
178,644,600.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,500,000.00
9,000,000.00
18,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34,500,000.00

6
NO

B
1

URAIAN PEKERJAAN

Sat

Harga Material
( Rp )

Upah Kerja
( Rp )

BANGUNAN B
Lantai 1, Area publik, Poliklinik, Apotik, Lab

a Pengadaan pemasangan AC Split dinding, lengkap


terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
Kap
: 1,5 PK 12,000 Btu/h
Kap
: 2 PK 18,000 Btu/h
b Exhaust Ceiling a cap 100 Cfm
c Exhaust Ceiling b cap 130 Cfm
d Glelle 4" X 4" = 13 set
e Glelle 6" X 6" = 4 set
f Ducting
6 x 4"
4 x 4"

Vol

set
set
set
set
set
set
set
set
m
m

2
12
1
12
5
5
13
4
27
26

3,000,000
3,500,000
5,500,000
6,900,000

750,000
750,000
1,500,000
1,500,000

set
set
set
set
set
set
set
set
m
m

2
9
2
16
6
8
20
5
32
29

3,000,000
3,500,000
5,500,000
6,900,000
518,100
518,100

750,000
750,000
1,500,000
1,500,000

BANGUNAN B
Lantai 2, Poliklinik, Medical chek Up, Medical Record, Lab dan
Farmasi

a Pengadaan pemasangan AC Split dinding, lengkap


terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
Kap
: 1,5 PK 12,000 Btu/h
Kap
: 2 PK 18,000 Btu/h
b Exhaust Ceiling a cap 100 Cfm
c Exhaust Ceiling b cap 130 Cfm
d Glelle 4" X 4" = 13 set
e Glelle 6" X 6" = 4 set
f Ducting
6 x 4"
4 x 4"

Jumlah

Total Material
( Rp )

6,000,000
42,000,000
5,500,000
82,800,000
6,000,000
31,500,000
11,000,000
110,400,000
3,108,600
4,144,800
302,453,400.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,500,000.00
9,000,000.00
1,500,000.00
18,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,500,000.00
6,750,000.00
3,000,000.00
24,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65,250,000.00

7
NO

C
1

URAIAN PEKERJAAN

Vol

Sat

Harga Material
( Rp )

BANGUNAN C
Lantai 1, Radiologi, VK,

a YIDX 300, 3XYICA100, 10.900 CFM


Ducting Suply
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 24 kg/m-1", Allumunium Foil AB Foil AB-631D/S
atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
b SPLIT DUC 1-1
Ducting Suply
BJLS 100 suplay
42" X 22"
26" X 18"
32" X 22"
30" X 20"
BJLS 80 suplay
20" X 16"
20" X 14"
BJLS 60 suplay
18" X 14"
16" X 10"
BJLS 40 suplay
12" X 10"
10" X 8"
8" X 6"
c Ducting Retern
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
BJLS 100 Retern
BJLS 100 Retern
56" X 26"
40" X 24"
34" X 16"
36" X 24"

set

m
m
m
m

21
94
26
119

171,600
171,600
171,600
171,600

m
m

34
102

141,900
141,900

m
m

149
68

107,800
107,800

m
m
m

74
238
281

70,400
70,400
70,400

m
m
m
m

157
102
57
64

171,600
171,600
171,600
171,600
Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

3,603,600
16,130,400
4,461,600
20,420,400
4,824,600
14,473,800
16,062,200
7,330,400
5,209,600
16,755,200
19,782,400
26,941,200
17,503,200
9,781,200
10,982,400
194,262,200.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

8
NO

URAIAN PEKERJAAN

d
e
f

g
h
i
j
k
l
m
n
o
p
q

36" X 16"
32" X 16"
BJLS 80 Retern
16" X 8"
12" X 8"
24" X 16"
Plenum Reternt + Isolation In and out
Plenum Suplay + Isilation In and out
Reternt Air Grille Alimminium dobleduflexen
24" X 16"
16" X 8"
12" X 8"
Diffuser 9" X 9" Aluminium + Volume Damper Justable
Diffuser 2 slot 10 cm X 90 cm Aluminium
and Damper justable
Flexible Duc Isolation, Glass Wool, Al Foil FR 6"
Door air Grille and Volume damper oudoor Type
14" X 14" ( Fress Air )
Ducting Non Isolation 14" X 14" BJLS 60
Panel + Power kabel
Exhaust Ceiling a cap 100 Cfm
Exhaust Ceiling b cap 130 Cfm
Glelle 4" X 4" = 13 set
Glelle 6" X 6" = 4 set
Ducting
6 x 4"
4 x 4"

10 X 14
Bangunan C
Lantai 2, IBS, Haemodialisa, CSSD
a Pengadaan pemasangan AC dng st Press 3,4 in wg, 4 row
Kap 7.000 CFM, 285.100 BTU/h
2 x YICA 125-CS 156 Dsshfc 12 a 4 DX Coil, lengkap terpasang
dng Filter Dryer, Penel on/of dan Control Termostat
Pemipaan tembaga dan isolasi condensat, dan pipa Drain
lengkap terpasang

Vol

Sat

m
m

65
138

171,600
171,600

m
m
m
set
set

68
119
144
4
4

141,900
141,900
141,900

set
set
set
set

20
27
36
204

5,750
5,000
5,000
260,000

set
mtr

40
155

29,000

set
m
set

set
set
m
m
m

4
36
4
7
6
40
29
32
29
37

set

set
set

Harga Material
( Rp )

107,800
518,100
518,100

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

11,154,000
23,680,800
9,649,200
16,886,100
20,433,600
115,000
135,000
180,000
53,040,000
4,495,000
3,880,800
3,626,700
3,108,600
150,384,800.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

9
NO

URAIAN PEKERJAAN

c
d
e

BJLS 100 suplay


40" X 20"
BJLS 60 suplay
20" X 16"
18" X 14"
18" X 12"
16" X 12"
BJLS 40 suplay
14" X 14"
14" X 10"
12" X 10"
9" X 9"
Ducting Retern
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
BJLS 100 Retern
48" X 24"
38" X 24"
BJLS 80 Reternt
24" X 16"
BJLS 60 Reternt
20" X 16"
16" X 16"
BJLS 40 Reternt
12" X 8"
Plenum Reternt + Isolation In side and out side
Plenum Suplay + Isilation Inside and out
Reternt Air Grille Alimminium dobleduflexen
60 cm X 30 cm
24" X 16"
16" X 8"
16" X 16"
16" X 16"
12" X 12"
12" X 8"

Vol

Sat

272

171,600

m
m
m
m

69
140
35
38

107,800
107,800
107,800
107,800

m
m
m
m

60
27
51
272

70,400
70,400
70,400
70,400

m
m

272
103

171,600
171,600

78

141,900

m
m

77
94

107,800
107,800

m
set
set

21
5
5

70,400

set
set
set
set
set
set
set

21
12
16
16
16
21
11

Harga Material
( Rp )

5,000
5,750
5,000
5000
5000
5000
5,000
Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

46,675,200
7,438,200
15,092,000
3,773,000
4,096,400
4,224,000
1,900,800
3,590,400
19,148,800
46,675,200
17,674,800
11,068,200
8,300,600
10,133,200
1,478,400
105,000
69,000
80,000
80,000
80,000
105,000
55,000
201,843,200.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

10
NO

URAIAN PEKERJAAN

f Diffuser 9" X 9" Aluminium + Volume Damper Justable


Diffuser 3 slot 16" X 48" Aluminium
and Damper justable
g Flexible Duc Isolation, Glass Wool, Al Foil FR 8"
h Door air Grille and Volume damper oudoor Type
14" X 14" ( Fress Air )
i Ducting Non Isolation 14" X 14" BJLS 60
j Panel + Power kabel
k Diffuser 2 slot 15 cm X 120 cm Aluminium
and Damper justable
l Door air Grille and Volume damper oudoor Type
18" X 18" ( Fress Air )
m Ducting Non Isolation 18" X 18" BJLS 60
n Electronic Air Cleaner Cap 2000 CFM
o Filter and hosing, hanger include, Pre Filter, medium
filter, hepa Filter Capasity 4.000 CFM
p Panel + Power kabel
q Flexible Duc Isolation, Glass Wool, Al Foil FR 6"
r Exhaust Ceiling a cap 100 Cfm
s Exhaust Ceiling b cap 130 Cfm
t Glelle 4" X 4" = 13 set
u Glelle 6" X 6" = 4 set
v Ducting
6 x 4"
4 x 4"

10 X 14
EXHAUST DUCT & FAN
c, Cintrifugal Exhaust 1- 3, 600 Cfm st 1 In Wg Industrial
Dacting Non isolation 12" x 10" = 14 m
6 x 6" = 12 m
6" x 4" = 8 m
4 x 4" = 4 m
Glelle 4" X 4" = 4 set
Glelle 6" X 6" = 1 set
d, Wall Exhaust 1- 4, 600 Cfm st 1,2 In Wg Industrial
Dacting Non isolation 12" x 12" = 16 m
12" x 10" = 16 m
6" x 4" = 8 m
4" x 4"
= 4 m
Glelle 4" X 4" = 4 set

Vol

Sat

set

70

260,000

set
mtr

47
217

34,500

set
m
set

4
21
4

set

102

set
m
set

4
27
5

set
set
mtr
set
set
set
set
m
m
m

10
4
204
8
7
40
29
32
29
37

m2
m2
m2
set
set

12
8
4
4
8

m2
m2
m2
set

16
8
4
8

Harga Material
( Rp )

107,800

107,800
5,576,500

29,000
518,100
518,100

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

18,200,000
7,486,500
2,263,800
2,910,600
27,882,500
5,916,000
4,144,800
3,626,700
72,430,900

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

11
NO

URAIAN PEKERJAAN

D
1
a

e
f
g

BANGUNAB D
Lantai 1, Fhisio Traphy,
Split Duc 1 - 5
YIDX150,2XYICA075, 5.000 CFM
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 24 kg/m-1", Allumunium Foil AB Foil AB-631D/S
atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
Ducting Suply
BJLS 100 suplay
36" X 18"
BJLS 80 suplay
24" X 16"
22" X 14"
BJLS 60 suplay
20" X 14"
18" X 14"
BJLS 40 suplay
12" X 10"
10" X 10"
9" X 8"
Ducting Retern
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
BJLS 80 Retern
24" X 24"
BJLS 60 Reternt
16" X 16"
Plenum Reternt + Isolation In side and out side
Plenum Suplay + Isilation Inside and out
Reternt Air Grille Alimminium dobleduflexen
60 cm X 30 cm
12" X 12"
16" X 16"
Diffuser 8" X 8" Aluminium + Volume Damper Justable

Vol

Sat

Harga Material
( Rp )

set

171,600

m
m

4
10

141,900
141,900

m
m

12
14

107,800
107,800

m
m
m

5
20
44

70,400
70,400
70,400

52

141,900

m
set
set

53
1
1

107,800

set
set
set
set

2
2
5
22

5,000
5,000
5,000
255,000
Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

1,372,800
567,600
1,419,000
1,293,600
1,509,200
352,000
1,408,000
3,097,600
7,378,800
5,713,400
10,000
10,000
25,000
5,610,000
29,767,000.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

12
NO

URAIAN PEKERJAAN

i Diffuser 9" X 9" Aluminium + Volume Damper Justable


j Diffuser 2 slot 10 cm X 90 cm Aluminium
and Damper justable
k Door air Grille and Volume damper oudoor Type
14" X 14" ( Fress Air )
l Ducting Non Isolation 14" X 14" BJLS 60
m Panel + Power kabel
2
Lantai 2, Fhisio Traphy,
a YIDX250,2XYICA125, 8.500 CFM
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 24 kg/m-1", Allumunium Foil AB Foil AB-631D/S
atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
b Ducting Suply
BJLS 100 suplay
42" X 16"
BJLS 80 suplay
28" X 14"
26" X 14"
24" X 14"
22" X 12"
BJLS 60 suplay
20" X 12"
18" X 12"
BJLS 40 suplay
12" X 10"
10" X 10"
10" X 8"
c Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
BJLS 40 Reternt
14" X 12"
14" X 8"

Vol

Sat

Harga Material
( Rp )

260,000

set

set
m
set

1
14
1

107,800

171,600

m
m
m
m

10
24
7
9

141,900
141,900
141,900
141,900

m
m

12
12

107,800
107,800

m
m
m

5
5
23

70,400
70,400
70,400

m
m

9
15

70,400
70,400

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

2,340,000
1,509,200
1,372,800
1,419,000
3,405,600
993,300
1,277,100
1,293,600
1,293,600
352,000
352,000
1,619,200
633,600
1,056,000
18,917,000.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

13
NO

URAIAN PEKERJAAN

Vol

Sat

Harga Material
( Rp )

Upah Kerja
( Rp )

d EXHAUST DUCT & FAN


Cintrifugal Exhaust 1- 3, 600 Cfm st 1 In Wg Industrial
Dacting Non isolation 12" x 10" = 14 m
6 x 6" = 12 m
6" x 4" = 8 m
4 x 4" = 4 m
Glelle 4" X 4" = 4 set
Glelle 6" X 6" = 1 set

m2
m2
m2
set
set

12
8
4
4

e Pengadaan pemasangan AC Split dinding, lengkap


terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
Kap
: 1,5 PK 12,000 Btu/h
Kap
: 2 PK 18,000 Btu/h
f Exhaust Ceiling a cap 100 Cfm
g Exhaust Ceiling b cap 130 Cfm

set
set
set
set
set
set

3
3
2
4
4
4

3,000,000
3,500,000
5,500,000
6,900,000
518,100
518,100

750,000
750,000
1,500,000

E
BANGUNAN E
1 a Rawat Inap Bang A, Lantai 1
Pengadaan pemasangan AC Split dinding, lengkap
terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h

set
set

1
21

3,000,000
3,500,000

750,000
750,000

Jumlah

Total Material
( Rp )

9,000,000
10,500,000
11,000,000
27,600,000
2,072,400
2,072,400
3,000,000
73,500,000
138,744,800.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,250,000.00
2,250,000.00
3,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
750,000.00
15,750,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24,000,000.00

14
NO

URAIAN PEKERJAAN

Vol

Sat

m2
m2
m2
m2
m2
m2
m2
m2
set
set

16
2
3
4
3
7
4
9
11

set
set

16
7

m2
m2
m2
m2
m2
m2
m2
m2
set
set

16
3
3
4
4
7
4
9

Harga Material
( Rp )

b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial


Dacting Non isolation 4"
6" x 4"
8" x 4"
10" x 4"
10" x 8"
12" x 8"
14" x 10"
16" x 10"
Grelle
4" X 4"
Door Grille 18" X 18"

x 4"
= 16 m
= 2 m
= 3 m
= 4 m
= 3 m
= 7 m
= 4 m
= 9 m
= 11 set
= 1 set

Rawat Inap Bang A, Lantai 2

a Pengadaan pemasangan AC Split dinding, lengkap


terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
6 Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial
Dacting Non isolation 4"
6" x 4"
8" x 4"
10" x 4"
10" x 8"
12" x 8"
14" x 10"
16" x 10"
Grelle
4" X 4"
Door Grille 18" X 18"

x 4"
= 16 m
= 3 m
= 3 m
= 4 m
= 4 m
= 7 m
= 4 m
= 9 m
= 12 set
= 1 set

3,000,000
3,500,000

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

48,000,000
24,500,000
72,500,000.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

15
NO

F
1

URAIAN PEKERJAAN

Sat

Harga Material
( Rp )

BANGUNAN F
Rawat Inap Bang B, Lantai 1

a Pengadaan pemasangan AC Split dinding, lengkap


terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial
Dacting Non isolation 4"
6" x 4"
8" x 4"
10" x 4"
10" x 8"
12" x 8"
14" x 10"
16" x 10"
Grelle
4" X 4"
Door Grille 18" X 18"

Vol

x 4"
= 16 m
= 2 m
= 3 m
= 2 m
= 3 m
= 8 m
= 4 m
= 12 m
= 12 set
= 1 set

set
set

8
7

m2
m2
m2
m2
m2
m2
m2
m2
set
set

16
2
3
2
3
8
4
12
12
2

set
set

9
7

m2
m2
m2
m2
m2
m2

16
2
3
2
3
8

3,000,000
3,500,000

Rawat Inap Bang B, Lantai 2

a Pengadaan pemasangan AC Split dinding, lengkap


terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial
Dacting Non isolation 4"
6" x 4"
8" x 4"
10" x 4"
10" x 8"
12" x 8"

x 4"
= 16 m
= 2 m
= 3 m
= 2 m
= 3 m
= 8 m

3,000,000
3,500,000

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

24,000,000
24,500,000
27,000,000
24,500,000
100,000,000.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

16
NO

URAIAN PEKERJAAN

14" x 10"
16" x 10"
Grelle
4" X 4"
Door Grille 18" X 18"

G
1

= 4 m
= 12 m
= 12 set
= 1 set

Sat

m2
m2
set

4
12
12

set

set
set

7
3

m2
m2
m2
m2
m2
m2
m2
m2
set
set

16
2
3
2
3
8
4
12
12
2

set
set

7
2

Harga Material
( Rp )

BANGUNAN G
Rawat Inap Bang C, Lantai 1

a Pengadaan pemasangan AC Split dinding, lengkap


terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial

Vol

Dacting Non isolation 4"


6" x 4"
8" x 4"
10" x 4"
10" x 8"
12" x 8"
14" x 10"
16" x 10"
Grelle
4" X 4"
Door Grille 18" X 18"
Rawat Inap Bang C, Lantai 2

x 4"
= 16 m
= 2 m
= 3 m
= 2 m
= 3 m
= 8 m
= 4 m
= 12 m
= 12 set
= 1 set

a Pengadaan pemasangan AC Split dinding, lengkap


terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h

3,000,000
3,500,000

3,000,000
3,500,000

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

21,000,000
10,500,000
21,000,000
7,000,000
59,500,000.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

17
NO

URAIAN PEKERJAAN

Vol

Sat

m2
m2
m2
m2
m2
m2
m2
m2
set
set

16
2
3
2
3
8
4
12
12
2

set
set

7
3

m2
m2
m2
m2
m2
m2
m2
m2
set
set

16
2
3
2
3
8
4
12
12
2

Harga Material
( Rp )

b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial


Dacting Non isolation 4"
6" x 4"
8" x 4"
10" x 4"
10" x 8"
12" x 8"
14" x 10"
16" x 10"
Grelle
4" X 4"
Door Grille 18" X 18"

x 4"
= 16 m
= 2 m
= 3 m
= 2 m
= 3 m
= 8 m
= 4 m
= 12 m
= 12 set
= 1 set

BANGUNAN H
a Rawat Inap Bang D, Lantai 1
Pengadaan pemasangan AC Split dinding, lengkap
terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial
Dacting Non isolation 4" x 4"
= 16 m
6" x 4"
= 2 m
8" x 4"
= 3 m
10" x 4"
= 2 m
10" x 8"
= 3 m
12" x 8"
= 8 m
14" x 10"
= 4 m
16" x 10"
= 12 m
Grelle
4" X 4"
= 12 set
Door Grille 18" X 18"
= 1 set

3,000,000
3,500,000

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

21,000,000
10,500,000
31,500,000.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

18
NO

URAIAN PEKERJAAN

b Rawat Inap Bang D, Lantai 2


Pengadaan pemasangan AC Split dinding, lengkap
terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial
Dacting Non isolation 4" x 4"
= 16 m
6" x 4"
= 2 m
8" x 4"
= 3 m
10" x 4"
= 2 m
10" x 8"
= 3 m
12" x 8"
= 8 m
14" x 10"
= 4 m
16" x 10"
= 12 m
Grelle
4" X 4"
= 12 set
Door Grille 18" X 18"
= 1 set

Vol

Sat

set
set

7
3

m2
m2
m2
m2
m2
m2
m2
m2
set
set

16
2
3
2
3
8
4
12
12
2

Harga Material
( Rp )

3,000,000
3,500,000

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

21,000,000
10,500,000
31,500,000.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

19
NO

URAIAN PEKERJAAN

Vol

Sat

Harga Material
( Rp )

BANGUNAN I
Dapur, Loundry, Rg Jenasah, & Workshop
a, Centrifugal Exhaust 2A - 5, 1.050 Cfm st 2 In Wg Industrial
Dacting Non isolation 18" x 12" = 26 m
14" x 12" = 19 m
8" x 8"
= 24 m
Grelle 8" X 8" = 7 set

m2
m2
m2
set

26
19
24
7

b, Centrifugal Exhaust 2A - 6, 400 Cfm st 1,2 In Wg Industrial


Dacting Non isolation 18" x 12" = 26 m
10" x 10" = 26 m
Grelle 6" X 6" = 2 set

m2
m2
set

26
26
2

c, Wall Exh 2A - 7, 200 CFM, St pres 0,8, Industrial

set

d, Centrifugal Exhaust 1C - 1, 350 Cfm st 1,2 In Wg Industrial


Dacting Non isolation 12" x 12" = 26 m
8" x 6"
= 7 m
6" x 4"
= 3 m
Grelle 6" X 6" = 6 set

m2
m2
m2
set

26
7
3
6

e, Exhaust Fan Kitchen Cap 11.000 CFM Axial St Pres 1 In WG


Set Hood and Ducting ( 2 )

set

f, Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial


Dacting Non isolation 4" x 4"
= 16 m
6" x 4"
= 2 m
8" x 4"
= 3 m
10" x 4"
= 4 m
10" x 8"
= 3 m
12" x 8"
= 7 m
14" x 10"
= 4 m
16" x 10"
= 9 m
Grelle
4" X 4"
= 10 set
Door Grille 18" X 18"
= 1 set

m2
m2
m2
m2
m2
m2
m2
m2
set
set

16
2
3
4
3
7
4
9
19
1

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

20
NO

URAIAN PEKERJAAN

BANGUNAN K, ASRAMA LT 1
a a, Wall Exhaust 1- 4, 600 Cfm st 1,2 In Wg Industrial
Dacting Non isolation 12" x 12" = 16 m
12" x 10" = 16 m
6" x 4" = 8 m
4" x 4"
= 4 m
Glelle 4" X 4" = 4 set

Vol

Sat

m2
m2
m2
m2

16
16
8
4

set

b, Exhaust Ceiling a cap 100 Cfm


c, Exhaust Ceiling b cap 150 Cfm

set
set

4
4

d, Cintrifugal Exhaust 1- 3, 600 Cfm st 1 In Wg Industrial


Dacting Non isolation 12" x 10" = 14 m
6 x 6" = 12 m
6" x 4" = 8 m
4 x 4" = 4 m
Glelle 4" X 4" = 4 set
Glelle 6" X 6" = 1 set

m2
m2
m2
m2
set

14
12
8
4
4

set

e, Pengadaan pemasangan AC Split dinding, lengkap


terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h

set
set

0
16

Harga Material
( Rp )

518,000
518,000

3,500,000

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

2,072,000
2,072,000
56,000,000
60,144,000.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

21
NO

URAIAN PEKERJAAN

Vol

Sat

Harga Material
( Rp )

b BANGUNAN K, Rg Serbaguna LT 2

YIDX 300, 3XYICA100, 10.900 CFM


Ducting Suply
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 24 kg/m-1", Allumunium Foil AB Foil AB-631D/S
atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
SPLIT DUC 1-1
Ducting Suply
BJLS 100 suplay
42" X 22"
26" X 18"
32" X 22"
30" X 20"
BJLS 80 suplay
20" X 16"
20" X 14"
BJLS 60 suplay
18" X 14"
16" X 10"
BJLS 40 suplay
12" X 10"
10" X 8"
8" X 6"
Ducting Retern
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
BJLS 100 Retern
BJLS 100 Retern
56" X 26"
40" X 24"
34" X 16"
36" X 24"

set

m
m
m
m

4
4
4
31

171,600
171,600
171,600
171,600

m
m

7
20

141,900
141,900

m
m

26
14

107,800
107,800

m
m
m

10
51
36

70,400
70,400
70,400

m
m
m
m

23
20
13
14

171,600
171,600
171,600
171,600

Jumlah

Upah Kerja
( Rp )

Total Material
( Rp )

686,400
686,400
686,400
5,319,600
993,300
2,838,000
2,802,800
1,509,200
704,000
3,590,400
2,534,400
3,946,800
3,432,000
2,230,800
2,402,400
34,362,900.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

22
NO

URAIAN PEKERJAAN

36" X 16"
32" X 16"
BJLS 80 Retern
16" X 8"
12" X 8"
24" X 16"
Plenum Reternt + Isolation In and out
Plenum Suplay + Isilation In and out
Reternt Air Grille Alimminium dobleduflexen
24" X 16"
16" X 8"
12" X 8"
Diffuser 9" X 9" Aluminium + Volume Damper Justable
Diffuser 2 slot 10 cm X 90 cm Aluminium
and Damper justable
Flexible Duc Isolation, Glass Wool, Al Foil FR 6"
Door air Grille and Volume damper oudoor Type
14" X 14" ( Fress Air )
Ducting Non Isolation 14" X 14" BJLS 60
Panel + Power kabel
Exhaust Ceiling a cap 100 Cfm
Exhaust Ceiling b cap 130 Cfm

Vol

Sat

m
m

11
36

171,600
171,600

m
m
m
set
set

10
18
36
1
1

141,900
141,900
141,900

set
set
set
set

3
4
2
27

5,750
5,000
5,000
260,000

set
mtr

20
36

29,000

set
m
set
set
set

1
10
1
1
1

Harga Material
( Rp )

107,800
518,100
518,100

Jumlah

TOTAL PEKERJAAN AC

Upah Kerja
( Rp )

Total Material
( Rp )

1,887,600
6,177,600
1,419,000
2,554,200
5,108,400
17,250
20,000
10,000
7,020,000
1,044,000
1,078,000
518,100
518,100
27,372,250.00

Total Upah
( Rp )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

2,694,812,750.00