URAIAN PEKERJAAN
Vol
Sat
Harga Material
( Rp )
Upah Kerja
( Rp )
A
1
set
4,500,000
set
m
m
m
m
m
m
26
28
4
28
7
6
171,600
171,600
171,600
171,600
171,600
171,600
1,500,000
1,350,000
1,250,000
1,150,000
1,025,000
975,000
m
m
m
m
m
11
9
5
9
7
141,900
141,900
141,900
141,900
141,900
1,350,000
1,250,000
1,150,000
1,025,000
975,000
m
m
17
6
107,800
107,800
1,250,000
1,125,000
Jumlah
Total Material
( Rp )
4,461,600
4,804,800
686,400
4,804,800
1,201,200
1,029,600
1,560,900
1,277,100
709,500
1,277,100
993,300
1,832,600
646,800
25,285,700.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39,000,000.00
37,800,000.00
5,000,000.00
32,200,000.00
7,175,000.00
5,850,000.00
0.00
14,850,000.00
11,250,000.00
5,750,000.00
9,225,000.00
6,825,000.00
0.00
21,250,000.00
6,750,000.00
211,925,000.00
2
NO
URAIAN PEKERJAAN
d BJLS 40 suplay
12" X 10"
10" X 10"
10" X 6"
8" X 8"
8" X 6"
4
Ducting Retern
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
a BJLS 100 Retern
BJLS 100 Retern
56" X 26"
40" X 24"
34" X 16"
36" X 24"
36" X 16"
32" X 16"
b BJLS 80 Retern
16" X 8"
12" X 8"
24" X 16"
c Plenum Reternt + Isolation In and out
d Plenum Suplay + Isilation In and out
e Reternt Air Grille Alimminium dobleduflexen
24" X 16"
16" X 8"
12" X 8"
f Diffuser 12" X 12" Aluminium + Volume Damper Justable
g Diffuser 2 slot 10 cm X 90 cm Aluminium
and Damper justable
h Flexible Duc Isolation, Glass Wool, Al Foil FR 6"
i Door air Grille and Volume damper oudoor Type
14" X 14" ( Fress Air )
j Ducting Non Isolation 14" X 14" BJLS 60
k Panel + Power kabel
Vol
Sat
m
m
m
m
m
20
3
3
44
65
70,400
70,400
70,400
70,400
70,400
1,150,000
1,025,000
975,000
850,000
750,000
m
m
m
m
m
m
32
31
7
13
10
26
171,600
171,600
171,600
171,600
171,600
171,600
1,650,000
1,500,000
1,350,000
1,250,000
1,150,000
975,000
m
m
m
set
set
14
27
36
1
1
141,900
141,900
141,900
1,350,000
1,250,000
1,150,000
set
set
set
set
10
5
6
63
5,750
5,000
5,000
270,000
set
mtr
8
31
29,000
set
m
set
1
7
1
Harga Material
( Rp )
107,800
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
1,408,000
211,200
211,200
3,097,600
4,576,000
5,491,200
5,319,600
1,201,200
2,230,800
1,716,000
4,461,600
1,986,600
3,831,300
5,108,400
57,500
25,000
30,000
17,010,000
899,000
754,600
59,626,800.00
Total Upah
( Rp )
0.00
23,000,000.00
3,075,000.00
2,925,000.00
37,400,000.00
48,750,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52,800,000.00
46,500,000.00
9,450,000.00
16,250,000.00
11,500,000.00
25,350,000.00
0.00
18,900,000.00
33,750,000.00
41,400,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
371,050,000.00
3
NO
URAIAN PEKERJAAN
EXHAUST
a, Axhaust 1- 1 Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m
Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m
Door grille 8" X 8"
b, Wall Exh 1 - 2, 600 CFM, St pres 0,8, Industrial
Dacting Non isolation 8' x 8" = 3 m
6 x 4" = 2 m
4 x 4" = 2 m
Glelle 4" X 4" = 2 set
Glelle 6" X 6" = 1 set
Door Grille
= 1 set 9" X 9"
BANGUNAN A
Lantai 2 ICU & ICCU
Pengadaan pemasangan AC dng st Press 3,4 in wg, 4 row
Kap 10.000 CFM, 423.600 BTU/h
4 x YICA 100-CS 217 Dsshfc 12 a 4 DX Coil, lengkap terpasang
dng Filter Dryer, Penel on/of dan Control Termostat
Pemipaan tembaga dan isolasi condensat, dan pipa Drain
lengkap terpasang
2
Pengadaan Pre, medium, hepa Filter Cap 5.000 CFM
Lengkapdng Hosing, Volume damper Fress air, dan Elec
tronic Air cleaner, terpasang di Retern Dac
3
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 24 kg/m-1", Allumunium Foil AB Foil AB-631D/S
atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
a BJLS 100 suplay
54" X 26"
40" X 24"
36" X 20"
36" X 18"
34" X 20"
30" X 20"
b BJLS 80 suplay
28" X 20"
26" X 14"
24" X 18"
24" X 16"
22" X 12"
Vol
Sat
Harga Material
( Rp )
Upah Kerja
( Rp )
set
m2
m2
set
set
set
2
2
2
1
1
set
set
m
m
m
m
m
m
26
28
4
28
7
6
171,600
171,600
171,600
171,600
171,600
171,600
1,500,000
1,350,000
1,250,000
1,150,000
1,025,000
975,000
m
m
m
m
m
11
9
5
9
8
141,900
141,900
141,900
141,900
141,900
1,350,000
1,250,000
1,150,000
1,025,000
975,000
B
1
Jumlah
Total Material
( Rp )
4,461,600
4,804,800
686,400
4,804,800
1,201,200
1,029,600
1,560,900
1,277,100
709,500
1,277,100
1,135,200
22,948,200.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39,000,000.00
37,800,000.00
5,000,000.00
32,200,000.00
7,175,000.00
5,850,000.00
0.00
14,850,000.00
11,250,000.00
5,750,000.00
9,225,000.00
7,800,000.00
0.00
175,900,000.00
4
NO
URAIAN PEKERJAAN
c BJLS 60 suplay
16" X 12"
18" X 14"
d BJLS 40 suplay
12" X 10"
10" X 10"
10" X 6"
8" X 8"
8" X 6"
4
Ducting Retern
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
a BJLS 100 Retern
BJLS 100 Retern
56" X 26"
40" X 24"
34" X 16"
36" X 24"
36" X 16"
32" X 16"
b BJLS 80 Retern
16" X 8"
12" X 8"
24" X 16"
c Plenum Reternt + Isolation In and out
d Plenum Suplay + Isilation In and out
e Reternt Air Grille Alimminium dobleduflexen
24" X 16"
16" X 8"
12" X 8"
Supplying Complete Chiller installment
Placed on the foundation
Type : Air Cooled Liquid YAEP 77UC9C
cap : 150 TR,
Compressors. : semi-Hermetic reciprocating
Ambient air entering condenser 35 C
Fouling Factor : 0.044m C/KW
Cooling Capacity : 537 KW ( 153 Ton )
Water Temperature 12 C to 7 C ( Range 5C )
Weter Flow Rate 25.7 L/S ( 410 GPM )
Compressors Power 173 KW
Vol
Sat
m
m
17
6
107,800
107,800
1,250,000
1,125,000
m
m
m
m
m
*
3
3
44
65
70,400
70,400
70,400
70,400
70,400
1,150,000
1,025,000
975,000
850,000
750,000
m
m
m
m
m
m
32
31
7
13
10
26
171,600
171,600
171,600
171,600
171,600
171,600
1,650,000
1,500,000
1,350,000
1,250,000
1,150,000
975,000
m
m
m
set
set
14
27
36
1
1
141,900
141,900
141,900
1,350,000
1,250,000
1,150,000
set
set
set
10
5
6
5,750
5,000
5,000
unit
Harga Material
( Rp )
1,330,000,000
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
Total Upah
( Rp )
1,832,600
646,800
#VALUE!
211,200
211,200
3,097,600
4,576,000
5,491,200
5,319,600
1,201,200
2,230,800
1,716,000
4,461,600
1,986,600
3,831,300
5,108,400
57,500
25,000
30,000
2,660,000,000
0.00
21,250,000.00
6,750,000.00
0.00
#VALUE!
3,075,000.00
2,925,000.00
37,400,000.00
48,750,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52,800,000.00
46,500,000.00
9,450,000.00
16,250,000.00
11,500,000.00
25,350,000.00
0.00
18,900,000.00
33,750,000.00
41,400,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
5
NO
URAIAN PEKERJAAN
EXHAUST
a, Axhaust 1- 1 Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m
Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m
Door grille 8" X 8"
b, Wall Exh 1 - 2, 600 CFM, St pres 0,8, Industrial
Dacting Non isolation 8' x 8" = 3 m
6 x 4" = 2 m
4 x 4" = 2 m
Glelle 4" X 4" = 2 set
Glelle 6" X 6" = 1 set
Door Grille
= 1 set 9" X 9"
BANGUNAN A
Lantai 3 Perkantoran
1 Pengadaan pemasangan AC Split dinding, lengkap
terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
Kap
: 2 PK 18,000 Btu/h
2 Exhaust Ceiling a cap 100 Cfm
3 Exhaust Ceiling b cap 130 Cfm
4 Glelle 4" X 4" = 13 set
5 Glelle 6" X 6" = 4 set
6 Ducting
6 x 4"
4 x 4"
Vol
Sat
set
63
270,000
set
mtr
8
31
29,000
set
m
set
1
7
1
set
m2
m2
set
set
set
2
2
2
1
1
set
set
set
10
12
12
set
set
5
5
set
set
m
m
13
4
10
18
Harga Material
( Rp )
Upah Kerja
( Rp )
107,800
3,000,000
3,500,000
6,900,000
518,100
518,100
Jumlah
750,000
750,000
1,500,000
Total Material
( Rp )
17,010,000
899,000
754,600
30,000,000
42,000,000
82,800,000
2,590,500
2,590,500
178,644,600.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,500,000.00
9,000,000.00
18,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34,500,000.00
6
NO
B
1
URAIAN PEKERJAAN
Sat
Harga Material
( Rp )
Upah Kerja
( Rp )
BANGUNAN B
Lantai 1, Area publik, Poliklinik, Apotik, Lab
Vol
set
set
set
set
set
set
set
set
m
m
2
12
1
12
5
5
13
4
27
26
3,000,000
3,500,000
5,500,000
6,900,000
750,000
750,000
1,500,000
1,500,000
set
set
set
set
set
set
set
set
m
m
2
9
2
16
6
8
20
5
32
29
3,000,000
3,500,000
5,500,000
6,900,000
518,100
518,100
750,000
750,000
1,500,000
1,500,000
BANGUNAN B
Lantai 2, Poliklinik, Medical chek Up, Medical Record, Lab dan
Farmasi
Jumlah
Total Material
( Rp )
6,000,000
42,000,000
5,500,000
82,800,000
6,000,000
31,500,000
11,000,000
110,400,000
3,108,600
4,144,800
302,453,400.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,500,000.00
9,000,000.00
1,500,000.00
18,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,500,000.00
6,750,000.00
3,000,000.00
24,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65,250,000.00
7
NO
C
1
URAIAN PEKERJAAN
Vol
Sat
Harga Material
( Rp )
BANGUNAN C
Lantai 1, Radiologi, VK,
set
m
m
m
m
21
94
26
119
171,600
171,600
171,600
171,600
m
m
34
102
141,900
141,900
m
m
149
68
107,800
107,800
m
m
m
74
238
281
70,400
70,400
70,400
m
m
m
m
157
102
57
64
171,600
171,600
171,600
171,600
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
3,603,600
16,130,400
4,461,600
20,420,400
4,824,600
14,473,800
16,062,200
7,330,400
5,209,600
16,755,200
19,782,400
26,941,200
17,503,200
9,781,200
10,982,400
194,262,200.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
8
NO
URAIAN PEKERJAAN
d
e
f
g
h
i
j
k
l
m
n
o
p
q
36" X 16"
32" X 16"
BJLS 80 Retern
16" X 8"
12" X 8"
24" X 16"
Plenum Reternt + Isolation In and out
Plenum Suplay + Isilation In and out
Reternt Air Grille Alimminium dobleduflexen
24" X 16"
16" X 8"
12" X 8"
Diffuser 9" X 9" Aluminium + Volume Damper Justable
Diffuser 2 slot 10 cm X 90 cm Aluminium
and Damper justable
Flexible Duc Isolation, Glass Wool, Al Foil FR 6"
Door air Grille and Volume damper oudoor Type
14" X 14" ( Fress Air )
Ducting Non Isolation 14" X 14" BJLS 60
Panel + Power kabel
Exhaust Ceiling a cap 100 Cfm
Exhaust Ceiling b cap 130 Cfm
Glelle 4" X 4" = 13 set
Glelle 6" X 6" = 4 set
Ducting
6 x 4"
4 x 4"
10 X 14
Bangunan C
Lantai 2, IBS, Haemodialisa, CSSD
a Pengadaan pemasangan AC dng st Press 3,4 in wg, 4 row
Kap 7.000 CFM, 285.100 BTU/h
2 x YICA 125-CS 156 Dsshfc 12 a 4 DX Coil, lengkap terpasang
dng Filter Dryer, Penel on/of dan Control Termostat
Pemipaan tembaga dan isolasi condensat, dan pipa Drain
lengkap terpasang
Vol
Sat
m
m
65
138
171,600
171,600
m
m
m
set
set
68
119
144
4
4
141,900
141,900
141,900
set
set
set
set
20
27
36
204
5,750
5,000
5,000
260,000
set
mtr
40
155
29,000
set
m
set
set
set
m
m
m
4
36
4
7
6
40
29
32
29
37
set
set
set
Harga Material
( Rp )
107,800
518,100
518,100
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
11,154,000
23,680,800
9,649,200
16,886,100
20,433,600
115,000
135,000
180,000
53,040,000
4,495,000
3,880,800
3,626,700
3,108,600
150,384,800.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
9
NO
URAIAN PEKERJAAN
c
d
e
Vol
Sat
272
171,600
m
m
m
m
69
140
35
38
107,800
107,800
107,800
107,800
m
m
m
m
60
27
51
272
70,400
70,400
70,400
70,400
m
m
272
103
171,600
171,600
78
141,900
m
m
77
94
107,800
107,800
m
set
set
21
5
5
70,400
set
set
set
set
set
set
set
21
12
16
16
16
21
11
Harga Material
( Rp )
5,000
5,750
5,000
5000
5000
5000
5,000
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
46,675,200
7,438,200
15,092,000
3,773,000
4,096,400
4,224,000
1,900,800
3,590,400
19,148,800
46,675,200
17,674,800
11,068,200
8,300,600
10,133,200
1,478,400
105,000
69,000
80,000
80,000
80,000
105,000
55,000
201,843,200.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
10
NO
URAIAN PEKERJAAN
10 X 14
EXHAUST DUCT & FAN
c, Cintrifugal Exhaust 1- 3, 600 Cfm st 1 In Wg Industrial
Dacting Non isolation 12" x 10" = 14 m
6 x 6" = 12 m
6" x 4" = 8 m
4 x 4" = 4 m
Glelle 4" X 4" = 4 set
Glelle 6" X 6" = 1 set
d, Wall Exhaust 1- 4, 600 Cfm st 1,2 In Wg Industrial
Dacting Non isolation 12" x 12" = 16 m
12" x 10" = 16 m
6" x 4" = 8 m
4" x 4"
= 4 m
Glelle 4" X 4" = 4 set
Vol
Sat
set
70
260,000
set
mtr
47
217
34,500
set
m
set
4
21
4
set
102
set
m
set
4
27
5
set
set
mtr
set
set
set
set
m
m
m
10
4
204
8
7
40
29
32
29
37
m2
m2
m2
set
set
12
8
4
4
8
m2
m2
m2
set
16
8
4
8
Harga Material
( Rp )
107,800
107,800
5,576,500
29,000
518,100
518,100
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
18,200,000
7,486,500
2,263,800
2,910,600
27,882,500
5,916,000
4,144,800
3,626,700
72,430,900
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
11
NO
URAIAN PEKERJAAN
D
1
a
e
f
g
BANGUNAB D
Lantai 1, Fhisio Traphy,
Split Duc 1 - 5
YIDX150,2XYICA075, 5.000 CFM
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 24 kg/m-1", Allumunium Foil AB Foil AB-631D/S
atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
Ducting Suply
BJLS 100 suplay
36" X 18"
BJLS 80 suplay
24" X 16"
22" X 14"
BJLS 60 suplay
20" X 14"
18" X 14"
BJLS 40 suplay
12" X 10"
10" X 10"
9" X 8"
Ducting Retern
Pengadaan Pemasangann Ducting AC terpasang lengkap
Dengan Gantungan, Bobokan, Hanger, Solasi glaswol
Density 16 kg/m-1", Allumunium Foil AB Foil AB-S/S
atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi
Duc tape ..dan bantu lainnya
BJLS 80 Retern
24" X 24"
BJLS 60 Reternt
16" X 16"
Plenum Reternt + Isolation In side and out side
Plenum Suplay + Isilation Inside and out
Reternt Air Grille Alimminium dobleduflexen
60 cm X 30 cm
12" X 12"
16" X 16"
Diffuser 8" X 8" Aluminium + Volume Damper Justable
Vol
Sat
Harga Material
( Rp )
set
171,600
m
m
4
10
141,900
141,900
m
m
12
14
107,800
107,800
m
m
m
5
20
44
70,400
70,400
70,400
52
141,900
m
set
set
53
1
1
107,800
set
set
set
set
2
2
5
22
5,000
5,000
5,000
255,000
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
1,372,800
567,600
1,419,000
1,293,600
1,509,200
352,000
1,408,000
3,097,600
7,378,800
5,713,400
10,000
10,000
25,000
5,610,000
29,767,000.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
12
NO
URAIAN PEKERJAAN
Vol
Sat
Harga Material
( Rp )
260,000
set
set
m
set
1
14
1
107,800
171,600
m
m
m
m
10
24
7
9
141,900
141,900
141,900
141,900
m
m
12
12
107,800
107,800
m
m
m
5
5
23
70,400
70,400
70,400
m
m
9
15
70,400
70,400
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
2,340,000
1,509,200
1,372,800
1,419,000
3,405,600
993,300
1,277,100
1,293,600
1,293,600
352,000
352,000
1,619,200
633,600
1,056,000
18,917,000.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
13
NO
URAIAN PEKERJAAN
Vol
Sat
Harga Material
( Rp )
Upah Kerja
( Rp )
m2
m2
m2
set
set
12
8
4
4
set
set
set
set
set
set
3
3
2
4
4
4
3,000,000
3,500,000
5,500,000
6,900,000
518,100
518,100
750,000
750,000
1,500,000
E
BANGUNAN E
1 a Rawat Inap Bang A, Lantai 1
Pengadaan pemasangan AC Split dinding, lengkap
terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
set
set
1
21
3,000,000
3,500,000
750,000
750,000
Jumlah
Total Material
( Rp )
9,000,000
10,500,000
11,000,000
27,600,000
2,072,400
2,072,400
3,000,000
73,500,000
138,744,800.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,250,000.00
2,250,000.00
3,000,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
750,000.00
15,750,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24,000,000.00
14
NO
URAIAN PEKERJAAN
Vol
Sat
m2
m2
m2
m2
m2
m2
m2
m2
set
set
16
2
3
4
3
7
4
9
11
set
set
16
7
m2
m2
m2
m2
m2
m2
m2
m2
set
set
16
3
3
4
4
7
4
9
Harga Material
( Rp )
x 4"
= 16 m
= 2 m
= 3 m
= 4 m
= 3 m
= 7 m
= 4 m
= 9 m
= 11 set
= 1 set
x 4"
= 16 m
= 3 m
= 3 m
= 4 m
= 4 m
= 7 m
= 4 m
= 9 m
= 12 set
= 1 set
3,000,000
3,500,000
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
48,000,000
24,500,000
72,500,000.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
15
NO
F
1
URAIAN PEKERJAAN
Sat
Harga Material
( Rp )
BANGUNAN F
Rawat Inap Bang B, Lantai 1
Vol
x 4"
= 16 m
= 2 m
= 3 m
= 2 m
= 3 m
= 8 m
= 4 m
= 12 m
= 12 set
= 1 set
set
set
8
7
m2
m2
m2
m2
m2
m2
m2
m2
set
set
16
2
3
2
3
8
4
12
12
2
set
set
9
7
m2
m2
m2
m2
m2
m2
16
2
3
2
3
8
3,000,000
3,500,000
x 4"
= 16 m
= 2 m
= 3 m
= 2 m
= 3 m
= 8 m
3,000,000
3,500,000
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
24,000,000
24,500,000
27,000,000
24,500,000
100,000,000.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
16
NO
URAIAN PEKERJAAN
14" x 10"
16" x 10"
Grelle
4" X 4"
Door Grille 18" X 18"
G
1
= 4 m
= 12 m
= 12 set
= 1 set
Sat
m2
m2
set
4
12
12
set
set
set
7
3
m2
m2
m2
m2
m2
m2
m2
m2
set
set
16
2
3
2
3
8
4
12
12
2
set
set
7
2
Harga Material
( Rp )
BANGUNAN G
Rawat Inap Bang C, Lantai 1
Vol
x 4"
= 16 m
= 2 m
= 3 m
= 2 m
= 3 m
= 8 m
= 4 m
= 12 m
= 12 set
= 1 set
3,000,000
3,500,000
3,000,000
3,500,000
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
21,000,000
10,500,000
21,000,000
7,000,000
59,500,000.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
17
NO
URAIAN PEKERJAAN
Vol
Sat
m2
m2
m2
m2
m2
m2
m2
m2
set
set
16
2
3
2
3
8
4
12
12
2
set
set
7
3
m2
m2
m2
m2
m2
m2
m2
m2
set
set
16
2
3
2
3
8
4
12
12
2
Harga Material
( Rp )
x 4"
= 16 m
= 2 m
= 3 m
= 2 m
= 3 m
= 8 m
= 4 m
= 12 m
= 12 set
= 1 set
BANGUNAN H
a Rawat Inap Bang D, Lantai 1
Pengadaan pemasangan AC Split dinding, lengkap
terpasang dengan hanger Indor unit, pondasi outdoor
termasuk pemipaan refigeran, drain, kabel power ke P
AC, kabel control, Thermosstat, lengkap terpasang
Type
: Dinding Wireless, Produc Nasional, Daikin
Kap
: 0,75 PK 6,000 Btu/h
Kap
: 1 PK 8,000 Btu/h
Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial
Dacting Non isolation 4" x 4"
= 16 m
6" x 4"
= 2 m
8" x 4"
= 3 m
10" x 4"
= 2 m
10" x 8"
= 3 m
12" x 8"
= 8 m
14" x 10"
= 4 m
16" x 10"
= 12 m
Grelle
4" X 4"
= 12 set
Door Grille 18" X 18"
= 1 set
3,000,000
3,500,000
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
21,000,000
10,500,000
31,500,000.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
18
NO
URAIAN PEKERJAAN
Vol
Sat
set
set
7
3
m2
m2
m2
m2
m2
m2
m2
m2
set
set
16
2
3
2
3
8
4
12
12
2
Harga Material
( Rp )
3,000,000
3,500,000
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
21,000,000
10,500,000
31,500,000.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
19
NO
URAIAN PEKERJAAN
Vol
Sat
Harga Material
( Rp )
BANGUNAN I
Dapur, Loundry, Rg Jenasah, & Workshop
a, Centrifugal Exhaust 2A - 5, 1.050 Cfm st 2 In Wg Industrial
Dacting Non isolation 18" x 12" = 26 m
14" x 12" = 19 m
8" x 8"
= 24 m
Grelle 8" X 8" = 7 set
m2
m2
m2
set
26
19
24
7
m2
m2
set
26
26
2
set
m2
m2
m2
set
26
7
3
6
set
m2
m2
m2
m2
m2
m2
m2
m2
set
set
16
2
3
4
3
7
4
9
19
1
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20
NO
URAIAN PEKERJAAN
BANGUNAN K, ASRAMA LT 1
a a, Wall Exhaust 1- 4, 600 Cfm st 1,2 In Wg Industrial
Dacting Non isolation 12" x 12" = 16 m
12" x 10" = 16 m
6" x 4" = 8 m
4" x 4"
= 4 m
Glelle 4" X 4" = 4 set
Vol
Sat
m2
m2
m2
m2
16
16
8
4
set
set
set
4
4
m2
m2
m2
m2
set
14
12
8
4
4
set
set
set
0
16
Harga Material
( Rp )
518,000
518,000
3,500,000
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
2,072,000
2,072,000
56,000,000
60,144,000.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
21
NO
URAIAN PEKERJAAN
Vol
Sat
Harga Material
( Rp )
b BANGUNAN K, Rg Serbaguna LT 2
set
m
m
m
m
4
4
4
31
171,600
171,600
171,600
171,600
m
m
7
20
141,900
141,900
m
m
26
14
107,800
107,800
m
m
m
10
51
36
70,400
70,400
70,400
m
m
m
m
23
20
13
14
171,600
171,600
171,600
171,600
Jumlah
Upah Kerja
( Rp )
Total Material
( Rp )
686,400
686,400
686,400
5,319,600
993,300
2,838,000
2,802,800
1,509,200
704,000
3,590,400
2,534,400
3,946,800
3,432,000
2,230,800
2,402,400
34,362,900.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
22
NO
URAIAN PEKERJAAN
36" X 16"
32" X 16"
BJLS 80 Retern
16" X 8"
12" X 8"
24" X 16"
Plenum Reternt + Isolation In and out
Plenum Suplay + Isilation In and out
Reternt Air Grille Alimminium dobleduflexen
24" X 16"
16" X 8"
12" X 8"
Diffuser 9" X 9" Aluminium + Volume Damper Justable
Diffuser 2 slot 10 cm X 90 cm Aluminium
and Damper justable
Flexible Duc Isolation, Glass Wool, Al Foil FR 6"
Door air Grille and Volume damper oudoor Type
14" X 14" ( Fress Air )
Ducting Non Isolation 14" X 14" BJLS 60
Panel + Power kabel
Exhaust Ceiling a cap 100 Cfm
Exhaust Ceiling b cap 130 Cfm
Vol
Sat
m
m
11
36
171,600
171,600
m
m
m
set
set
10
18
36
1
1
141,900
141,900
141,900
set
set
set
set
3
4
2
27
5,750
5,000
5,000
260,000
set
mtr
20
36
29,000
set
m
set
set
set
1
10
1
1
1
Harga Material
( Rp )
107,800
518,100
518,100
Jumlah
TOTAL PEKERJAAN AC
Upah Kerja
( Rp )
Total Material
( Rp )
1,887,600
6,177,600
1,419,000
2,554,200
5,108,400
17,250
20,000
10,000
7,020,000
1,044,000
1,078,000
518,100
518,100
27,372,250.00
Total Upah
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
2,694,812,750.00