RENCANA ANGGAR

NO.

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN

1
2
3
4

Pembersihan Lapangan/Pembongkaran Bangunan Lama


Pengukuran dan Pemasangan Bowplank
Direksikeet/Pondok Kerja (Sewa)
Papan Nama Proyek

II
A
1

PEKERJAAN STRUKTUR BAWAH


PEKERJAAN TANAH DAN PONDASI
Pondasi Tapak Type K1 = 13 Unit
- Galian Tanah Pondasi
- Urugan Kembali Bekas Galian
- Urugan Pasir Alas Pondasi t = 5 cm
- Pasangan Batu Kosong t = 10 cm
- Beton Bertulang Cincin Sumuran T = 8 cm
- Beton Cyclopen Pengisi Sumuran
- Plat Pondasi Tapak Ukuran 120 x 120 cm
- Stik Kolom 30/40 cm dari Pondasi Tapak ke sloof
Pondasi Tapak Type P2 = 8 Unit
- Galian Tanah Pondasi
- Urugan Kembali Bekas Galian
- Urugan Pasir Alas Pondasi t = 5 cm
- Pasangan Batu Kosong t = 10 cm
- Beton Bertulang Cincin Sumuran T = 8 cm
- Beton Cyclopen Pengisi Sumuran
- Plat Pondasi Tapak Ukuran 120 x 120 cm
- Stik Kolom 30/30 cm dari Pondasi Tapak ke sloof
Pondasi Tapak Type PT3 = 11 Unit
- Galian Tanah Pondasi
- Urugan Kembali Bekas Galian
- Urugan Pasir Alas Pondasi t = 5 cm
- Pasangan Batu Kosong t = 10 cm
- Plat Pondasi Tapak Ukuran 120 x 120 cm
- Stik Kolom 30/30 cm dari Pondasi Tapak ke sloof
Pondasi Menerus (sloof 25/40 cm)
- Galian Tanah Pondasi Menerus
- Urugan Kembali Bekas Galian
- Urugan Pasir Alas Pondasi T = 5 cm

III
A

- Pasangan Batu Kosong Pondasi T =10 cm


- Pasangan Batu Gunung 1 : 4
Sloof Gantung (Sloof 25/40 cm)
- Galian Tanah Pondasi Menerus
- Urugan Kembali Bekas Galian
- Urugan Pasir Alas Pondasi T = 5 cm
- Pasangan Batu Kosong Pondasi T =10 cm

1
2
3
4
5
6

PEKERJAAN LANTAI I
PEKERJAAN SELASAR DAN TRAP TANGGA
Pekerjaan Selasar Depan
Galian Tanah Pondasi Menerus
Urugan Kembali Bekas Galian
Urugan Pasir Alas Pondasi T = 5 cm
Pasangan Batu Kosong Pondasi T =10 cm
Pasangan Batu Gunung 1 : 4
Pasangan Trasram Bata 1 : 2
Plesteran 1 : 2
Pekerjaan Trap Tangga Pada Selasar 2 Unit
Galian Tanah
Urugan Kembali Bekas Galian
Urugan Pasir Alas Pondasi t = 5 cm
Pasangan Batu Kosong Pondasi T =10 cm
Pasangan Trasram Bata 1 : 2
Plesteran Bata 1 : 2

B
1
2
3
4
5
6
7
8
9

PEKERJAAN PASANGAN DAN PLESTERAN


Pasangan Trasram Bata 1 : 2 dibawah Lantai
Plesteran Trasram Bata 1 : 2 dibawah Lantai
Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm
Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm
Pasangan Dinding Bata 1 : 4
Plesteran Dinding Bata 1 : 4
Pasangan Dinding Bata 1 : 4 (diatas balok 15/18)
Plesteran Dinding Bata 1 : 4 (diatas balok 15/18)
Plesteran 1 : 3 (Kolom dan Balok)

C
1
2
3
4
5
6
7

PEKERJAAN BETON BERTULANG


Sloof Beton 25/40 cm (Pondasi Menerus) p = 57 m
Sloof Beton 25/40 cm (Sloof Gantung) P = 20 m
Sloof Beton 25/40 cm (Selasar Depan) P = 20 m
Kolom Beton 30/40 cm = 10 Kolom
Kolom Beton 30/30 cm = 8 Kolom
Balok Lantai 25/40 cm P = 99 m
Balok Lantai 30/60 cm p = 14 m

1
2
3
4
5
6
7

8
9
10

Plat Lantai T = 12 cm
Balok Diatas Kosen 13/13 cm p = 32 m
Balok Pinggang 13/13 cm p = 21 m

D
1
2
3
4
5
6
7
8
9
10

PEKERJAAN RAMP/TANJAKAN PLAT BETON


Galian Tanah
Urugan Kembali Bekas Galian
Urugan Pasir Alas Pondasi T = 5 cm
Pasangan Batu Kosong Pondasi T =10 cm
Plat Pondasi Tapak Ukuran 120 x 120 cm
Stik Kolom 30/40 cm dari Pondasi Tapak ke sloof
Kolom 30/40 cm
Balok Beton 30/50 cm
Plat Lantai Tebal 12 cm
Realling Besi Hollow

E
1
2
3
4
1
2
3
4
5
6
7
1
2
3
F
1
2
1

PEKERJAAN LANTAI
Ruangan
Timbunan Tanah Bawah Lantai T = 80 cm
Timbunan Pasir Bawah Lantai T = 10 cm
Beton Tumbuk Dibawah Lantai Keramik = 5 cm
Lantai Keramik 40 x 40 cm (Polished)
Selasar Depan
Timbunan Tanah Bawah Lantai T = 75 cm
Timbunan Pasir Bawah Lantai T = 10 cm
Timbunan Pasir Bawah Lantai bawah Ramp T = 10 cm
Beton Tumbuk Dibawah Lantai Keramik = 5 cm
Beton Tumbuk Dibawah Ramp = 7 cm
Lantai Keramik 40 x 40 cm (Unpolished)
Lantai Keramik 40 x 40 cm (Unpolished) Dibawah Ramp
Trap Tangga
Timbunan Pasir T = 10 cm
Beton Tumbuk Dibawah Lantai Keramik = 5 cm
Lantai Keramik 40 x 40 cm (Unpolished)
PEKERJAAN KOSEN PINTU DAN JENDELA
KOSEN
Kosen Pintu/Ventilasi Type P1 (2 UNIT)
Kosen Jendela Type J1 (6 UNIT)
DAUN PINTU DAN JENDELA
Pintu Type P1 (3 Unit)
- Daun Pintu Panel Ukuran 55 x 210 cm
- Pasangan Jalusi Papan
Jendela Type J1 (6 Unit)

- Daun Jendela Kaca 5 mm Ukuran 60 x 80 cm


- Pasangan Jalusi Papan
G
1
2
3
4
5
6
7

PEKERJAAN PENGUNCI DAN PENGGANTUNG


Kunci Tanam 2 Slaag
Engsel Pintu 4 Inchi
Engsel Jendela 3 Inchi
Grendel Jendela
Hak Angin Jendela
Tarikan/Pegangan Jendela
Kunci Pacok Untuk Pintu Double (Atas & Bawah)

H
1
2
3
4

PEKERJAAN PENGECATAN
Cat Tembok 3 x (L/D)
Cat Langit- Langit Plat Beton
Cat Mengkilat Kosen Pintu/Jendela
Cat Mengkilat Daun Pintu/Jendela/Jalusi

I
1
2

5
6

PEKERJAAN INSTALASI LISTRIK


Box Zekering/Panel MCB
Armatur
- Lampu SL 18 Watt Setara Philips (Komplit)
Instalasi titik penerangan, instalasi termasuk
kabel NYA 2,5 mm dalam pipa PVC fitting lampu
dan kelengkapan instalasi terpasang.
Instalasi titik kontak, instalasi termasuk
kabel NYA 2,5 mm dalam pipa PVC, kotak kontak
dan kelengkapan instalasi terpasang.
Saklar Tunggal
Saklar Ganda

IV
A
1
2
3
4
5
6
7
8

PEKERJAAN LANTAI 2
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan Dinding Bata 1 : 4
Plesteran Dinding Bata 1 : 4
Pasangan Realling Dinding Pengaman Selasar Bata 1 : 4
Plesteran Realling Dinding Pengaman Bata 1 : 4
Realling Besi Galvanis 2"
Pasangan Dinding 1/2 Bata 1Pc : 4Ps Tombak Layar
Plesteran Dinding Bata 1Pc : 4Ps Tombak Layar
Plesteran 1 : 3 (Kolom dan Ringbalk)

B
1
2

PEKERJAAN BETON BERTULANG


Kolom Beton 30/40 cm = 10 Unit
Kolom Beton 30/30 cm Tinggi 380 cm = 3 Unit

3
3
4
5
6
7

Kolom Beton 30/30 cm Tinggi 270 cm = 5 Unit


Balok Diatas Kosen 13/13 cm P =32 m
Balok Pinggang 13/13 cm P = 40 m
Ring balok 18/30 cm P = 79 m
Balok Praktis 13/13 cm pada Realling Pengaman Selasar
Balok Top Gevel 15/25 cm

C
1
2

PEKERJAAN LANTAI
Pasangan Lantai Keramik 40 x 40 cm (Ruangan)
Pasangan Lantai Keramik 40 x 40 cm (Selasar)

D
1
2
3

PEKERJAAN RANGKA ATAP


Perkayuan Konstruksi Kuda-kuda
Gording Kayu 5/10 cm
Lesplang Reuter Papan Seumanthok 2,5/25 cm

E
1
2

PEKERJAAN PENUTUP ATAP


Penutup Atap Seng Spandec Warna Cat Pabrik 0.30
Rabung Seng Spandec Warna 0.35 Cat Pabrik

F
1
2
3
4
5

PEKERJAAN LANGIT-LANGIT
Rangka Plafond
Plafond Plywood T = 4 mm (Ruangan)
Plafond Plywood T = 4 mm (Selasar)
Plafond Plywood T= 4 mm (Piasan Atap)
List Profil

PEKERJAAN KOSEN PINTU DAN JENDELA


KOSEN
Kosen Pintu/Ventilasi Type P1 (2 UNIT)
Kosen Jendela Type J1 (6 UNIT)
DAUN PINTU DAN JENDELA
Pintu Type P1 (3 Unit)
- Daun Pintu Panel Ukuran 55 x 210 cm
- Pasangan Jalusi Papan
Jendela Type J1 (6 Unit)
- Daun Jendela Kaca 5 mm Ukuran 60 x 80 cm
- Pasangan Jalusi Papan
Ventilasi Atap

H
1
2
3
4

PEKERJAAN PENGUNCI DAN PENGGANTUNG


Kunci Tanam 2 Slaag
Engsel Pintu 4 Inchi
Engsel Jendela 3 Inchi
Grendel Jendela

1
2
1

5
6
7

Hak Angin Jendela


Tarikan/Pegangan Jendela
Kunci Pacok Untuk Pintu Double (Atas & Bawah)

I
1
2
3
4
5
6

PEKERJAAN PENGECATAN
Cat Tembok 3 x (L/D)
Cat Plafond Plywood dan List Plafond
Cat Mengkilat Lesplang Kayu
Cat Mengkilat Kosen Pintu/Jendela
Cat Mengkilat Daun Pintu/Jendela/Ventilasi
Residu Kap Atap

J
1
2

PEKERJAAN INSTALASI LISTRIK


Box Zekering/Panel MCB
Armatur
- Lampu SL 18 Watt Setara Philips (Komplit)
Instalasi titik penerangan, instalasi termasuk
kabel NYA 2,5 mm dalam pipa PVC fitting lampu
dan kelengkapan instalasi terpasang.
Instalasi titik kontak, instalasi termasuk
kabel NYA 2,5 mm dalam pipa PVC, kotak kontak
dan kelengkapan instalasi terpasang.
Saklar Tunggal
Saklar Ganda

5
6
K
1

PEKERJAAN LAIN-LAIN
Pekerjaan Atap Canopy
- Kuda-kuda Canopy 5/10 cm Diketam Halus
- Gording Kayu 5/10 cm diketam Halus
- Lesplang Papan Reuter 2,5/25 cm
- Penutup Atap Seng Spandec Cat Pabrik 0.30
- Cat Mengkilat Lesplang Kayu dan Canopy

RENCANA ANGGARAN BIAYA

VOLUME

STN

ANALISA

HARGA
SATUAN
(Rp.)

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

Taksir
Taksir
Taksir
Taksir

58.800
14.700
0.980
1.960
11.394
12.736
4.320
1.740

m3
m3
m3
m3
m3
m3
m3
m3

SNI-2835-2008-6.2
SNI-2835-2008-6.9
SNI-2835-2008-6.11
SNI-2836-2008-6.9
SNI-7394-2008-a
SNI-2836-2008-6.10
SNI-7394-2008-b
SNI-7394-2008-c

47,700.00
12,998.00
129,600.00
268,605.00
3,600,981.00
431,506.00
3,193,751.00
4,983,766.00

47.040
11.760
0.784
1.568
1.266
10.189
3.456
1.044

m3
m3
m3
m3
m3
m3
m3
m3

SNI-2835-2008-6.2
SNI-2835-2008-6.9
SNI-2835-2008-6.11
SNI-2836-2008-6.9
SNI-7394-2008-a
SNI-2836-2008-6.10
SNI-7394-2008-b
SNI-7394-2008-d

47,700.00
12,998.00
129,600.00
268,605.00
3,600,981.00
431,506.00
3,193,751.00
5,475,610.00

32.340
8.085
1.078
2.156
4.752
2.393

m3
m3
m3
m3
m3
m3

SNI-2835-2008-6.2
SNI-2835-2008-6.9
SNI-2835-2008-6.11
SNI-2836-2008-6.9
SNI-7394-2008-b
SNI-7394-2008-c

47,700.00
12,998.00
129,600.00
268,605.00
3,193,751.00
4,983,766.00

26.208
6.552
2.417

m3
m3
m3

SNI-2835-2008-6.1
SNI-2835-2008-6.9
SNI-2835-2008-6.11

39,000.00
Rp
129,600.00

5,000,000.00
800,000.00
2,500,000.00
550,000.00
Sub Jumlah

4.833
17.721

m3
m3

SNI-2836-2008-6.9
SNI-2836-2008-6.3

268,605.00
552,665.00

0.540
0.135
0.180
0.360

m3
m3
m3
m3

SNI-2835-2008-6.1
SNI-2835-2008-6.9
SNI-2835-2008-6.11
SNI-2836-2008-6.9

39,000.00
Rp
129,600.00
268,605.00
Sub Jumlah

5.544
1.386
0.846
1.692
6.204
8.460
14.060

m3
m3
m3
m3
m3
m2
m2

SNI-2835-2008-6.1
SNI-2835-2008-6.9
SNI-2835-2008-6.11
SNI-2836-2008-6.9
SNI-2836-2008-6.3
SNI-6897-2008-6.7
SNI-2837-2008-6.2

39,000.00
Rp
129,600.00
268,605.00
552,665.00
95,026.00
42,234.00

0.840
0.210
0.180
0.360
4.000
4.000

m3
m3
m3
m3
m2
m2

SNI-2835-2008-6.1
SNI-2835-2008-6.9
SNI-2835-2008-6.11
SNI-2836-2008-6.9
SNI-6897-2008-6.7
SNI-2837-2008-6.2

39,000.00
Rp
129,600.00
268,605.00
95,026.00
42,234.00
Sub Jumlah

29.535
59.070
10.200
20.400
121.864
257.507
7.252
14.504
143.530

m2
m2
m2
m2
m2
m2
m2
m2
m2

SNI-6897-2008-6.7
SNI-2837-2008-6.2
SNI-6897-2008-6.7
SNI-2837-2008-6.2
SNI-6897-2008-6.9
SNI-2837-2008-6.4
SNI-6897-2008-6.9
SNI-2837-2008-6.4
SNI-2837-2008-6.3

95,026.00
42,234.00
95,026.00
42,234.00
86,696.00
37,941.00
86,696.00
37,941.00
39,662.00
Sub Jumlah

5.700
2.000
2.000
5.340
3.204
9.100
2.520

m3
m3
m3
m3
m3
m3
m3

SNI-7394-2008-e
SNI-7394-2008-e
SNI-7394-2008-e
SNI-7394-2008-g
SNI-7394-2008-h
0.00
SNI-7394-2008-l

3,862,619.00
3,862,619.00
3,862,619.00
4,983,766.00
5,475,610.00
Rp
4,497,955.00

13.890
0.541
0.355

m3
m3
m3

SNI-7394-2008-m
SNI-7394-2008-i
SNI-7394-2008-i

38.220
9.555
12.740
2.548
5.616
2.246
3.888
2.925
7.817
42.300

m3
m3
m3
m3
m3
m3
m3
m3
m3
m2

SNI-2835-2008-6.1
SNI-2835-2008-6.9
SNI-2835-2008-6.11
SNI-2836-2008-6.9
SNI-7394-2008-b
SNI-7394-2008-c
SNI-7394-2008-g
SNI-7394-2008-l
SNI-7394-2008-m
Taksir

4,247,801.00
5,789,270.00
5,789,270.00
Sub Jumlah
36,937.50
0.00
150,375.00
294,869.00
3,193,751.00
4,983,766.00
4,983,766.00
4,497,955.00
4,247,801.00
420,000.00
Sub Jumlah

89.600
11.200
5.600
112.000

m3
m3
m3
m2

SNI. 2835 : 2008. 6.10


SNI-2835-2008-6.11
SNI-7394-2008-6.4
SNI-7395-2008-6.34

82,000.00
129,600.00
528,699.00
139,449.00

24.000
3.200
6.270
1.600
13.167
32.000
62.700

m3
m3
m3
m3
m3
m2
m2

SNI. 2835 : 2008. 6.10


SNI-2835-2008-6.11
SNI-2835-2008-6.11
SNI-7394-2008-6.4
SNI-7394-2008-6.4
SNI-7395-2008-6.34a
SNI-7395-2008-6.34a

82,000.00
129,600.00
129,600.00
528,699.00
528,699.00
140,509.00
140,509.00

0.180
0.180
6.600

m3
m3
m2

SNI-2835-2008-6.11
SNI-7394-2008-6.4
SNI-7395-2008-6.34a

129,600.00
528,699.00
140,509.00
Sub Jumlah

0.134
0.738

m3
m3

SNI-3434-2008-6.2
SNI-3434-2008-6.2

4.000
1.872

Unit
m2

Taksir
Taksir

Rp
Rp

700,000.00
100,000.00

24.000
9.734

Unit
m2

Taksir
Taksir

280,000.00
100,000.00
Sub Jumlah

2.000
12.000
48.000
48.000
48.000
24.000
2.000

Bh
Bh
Bh
Bh
Bh
Bh
Bh

Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,000.00
Sub Jumlah

557.805
115.750
0.218
44.707

M2
M2
M2
M2

SNI-03-Cat-6.14.N
SNI-03-Cat-6.14a.N
SNI-03-Cat-6.8.N
SNI-03-Cat-6.8.N

17,183.00
14,188.00
24,720.00
24,720.00
Sub Jumlah

1.000

Unit

Taksir

110,000.00

10.000
10.000

Bh
Ttk

Taksir
Taksir

Rp.
Rp.

2.000

Bh

Taksir

Rp.

1.000
2.000

Bh
Bh

Taksir
Taksir

Rp.
Rp.
Sub Jumlah

136.554
300.667
9.752
19.504
17.000
17.998
17.998
51.300

m2
m2
m2
m2
m'
m2
m2
m2

SNI-6897-2008-6.9
SNI-2837-2008-6.4
SNI-6897-2008-6.9
SNI-2837-2008-6.4
Taksir
SNI-6897-2008-6.9
SNI-2837-2008-6.4
SNI-2837-2008-6.3

4.560
1.026

m3
m3

SNI-7394-2008-g
SNI-7394-2008-h

86,696.00
37,941.00
86,696.00
37,941.00
70,000.00
86,696.00
37,941.00
39,662.00
Sub Jumlah
4,983,766.00
5,475,610.00

1.202
0.541
0.355
4.266
0.303
0.810

m3
m3
m3
m3
m3
m3

SNI-7394-2008-h
SNI-7394-2008-i
SNI-7394-2008-i
SNI-7394-2008-o
SNI-7394-2008-i
0.00

5,475,610.00
5,789,270.00
5,789,270.00
4,797,954.00
5,789,270.00
Rp
Sub Jumlah

112.000
32.000

m2
m2

SNI-7395-2008-6.34
SNI-7395-2008-6.34a

139,449.00
140,509.00
Sub Jumlah

3.362
1.380
15.675

m3
m3
m2

SNI 03-3434-2002 (6.28)


SNI 03-3434-2002 (6.28)
SNI-3434-2008-6.21

6,435,600.00
6,435,600.00
190,500.00
Sub Jumlah

238.280
18.400

m2
m'

SNI-03-3436-6.32.Ha
SNI-03-3436-6.36.Ha

87,550.00
60,305.00
Sub Jumlah

193.264
112.000
32.000
49.264
212.600

m2
m2
m2
m2
m'

SNI-3434-2008-6.20
SNI-2839-2008-6.5
SNI-2839-2008-6.5
SNI-2839-2008-6.5
Taksir

77,700.00
39,840.00
39,840.00
39,840.00
Rp.
Sub Jumlah

0.134
0.738

m3
m3

SNI-3434-2008-6.2
SNI-3434-2008-6.2

Rp
Rp

4.000
1.872

Unit
m2

Taksir
Taksir

700,000.00
100,000.00

24.000
9.734
4.000

Unit
m2
Unit

Taksir
Taksir
Taksir

280,000.00
100,000.00
150,000.00
Sub Jumlah

2.000
12.000
48.000
48.000

Bh
Bh
Bh
Bh

Taksir
Taksir
Taksir
Taksir

Rp.
Rp.
Rp.
Rp.

48.000
24.000
2.000

Bh
Bh
Bh

Taksir
Taksir
Taksir

389.469
193.264
31.350
27.930
44.707
1.000

m2
m2
m2
m2
m2
Pkt

SNI-03-Cat-6.14.N
SNI-03-Cat-6.14a.N
SNI-03-Cat-6.8.N
SNI-03-Cat-6.8.N
SNI-03-Cat-6.8.N
Taksir

Rp.
Rp.
22,000.00
Sub Jumlah
17,183.00
14,188.00
24,720.00
24,720.00
24,720.00
Rp.
Sub Jumlah

1.000

Unit

Taksir

110,000.00

10.000
10.000

Bh
Ttk

Taksir
Taksir

Rp.
Rp.

2.000

Bh

Taksir

Rp.

1.000
2.000

Bh
Bh

Taksir
Taksir

Rp.
Rp.
Sub Jumlah

0.08
0.16
4.70
22.40
9.40

m3
m3
m2
m2
m2

SNI 03-3434-2002 (6.28)


SNI 03-3434-2002 (6.28)

SNI-3434-2008-6.21
SNI-03-3436-6.32.Ha
SNI-03-Cat-6.8.N

6,435,600.00
6,435,600.00
190,500.00
87,550.00
24,720.00
Sub Jumlah

JUMLAH
HARGA
(Rp.)
7
5,000,000.00
800,000.00
2,500,000.00
550,000.00
8,850,000.00

2,804,760.00
191,070.60
127,008.00
526,465.80
41,031,133.14
5,495,591.38
13,797,004.32
8,671,752.84
2,243,808.00
152,856.48
101,606.40
421,172.64
4,559,014.79
4,396,473.10
11,037,603.46
5,716,536.84
1,542,618.00
105,088.83
139,708.80
579,112.38
15,176,704.75
11,923,660.16
1,022,112.00
313,178.40

1,298,167.97
9,793,776.47
21,060.00
23,328.00
96,697.80
143,309,071.33

216,216.00
#VALUE!
109,641.60
454,479.66
3,428,733.66
803,919.96
593,810.04
32,760.00
#VALUE!
23,328.00
96,697.80
380,104.00
168,936.00
#VALUE!
2,806,592.91
2,494,762.38
969,265.20
861,573.60
10,565,086.67
9,770,080.68
628,719.39
550,296.26
5,692,686.86
34,339,063.95
22,016,928.30
7,725,238.00
7,725,238.00
26,613,310.44
17,543,854.44
#VALUE!
11,334,846.60

59,001,955.89
3,130,837.22
2,054,611.92
#VALUE!
1,411,751.25
0.00
1,915,777.50
751,326.21
17,936,105.62
11,195,531.94
19,376,882.21
13,156,518.38
33,202,936.52
17,766,000.00
116,712,829.62

7,347,200.00
1,451,520.00
2,960,714.40
15,618,288.00
1,968,000.00
414,720.00
812,592.00
845,918.40
6,961,379.73
4,496,288.00
8,809,914.30
23,328.00
95,165.82
927,359.40
52,732,388.05

#VALUE!

2,800,000.00
187,200.00

6,720,000.00
973,440.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
44,000.00
#VALUE!
9,584,759.88
1,642,261.00
5,388.96
1,105,161.98
12,337,571.82
110,000.00
#VALUE!

#VALUE!

#VALUE!
#VALUE!

11,838,650.91
11,407,614.24
845,442.05
739,986.09
1,190,000.00
1,560,354.61
682,862.12
2,034,660.60
30,299,570.61
22,725,972.96
5,617,975.86

6,578,945.42
3,130,837.22
2,054,611.92
20,468,071.76
1,751,312.07
#VALUE!
#VALUE!
15,618,288.00
4,496,288.00
20,114,576.00
21,638,103.82
8,881,128.00
2,986,087.50
33,505,319.32
20,861,414.00
1,109,612.00
21,971,026.00
15,016,612.80
4,462,080.00
1,274,880.00
1,962,677.76
22,716,250.56

#VALUE!

2,800,000.00
187,200.00
6,720,000.00
973,440.00
600,000.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
44,000.00
#VALUE!
6,692,242.39
2,742,029.63
774,972.00
690,429.60
1,105,161.98
#VALUE!
#VALUE!
110,000.00
#VALUE!

#VALUE!

#VALUE!
#VALUE!

498,759.00
1,029,696.00
895,350.00
1,961,120.00
232,368.00
4,617,293.00

Dimen
No

Uraian Pekerjaan

Satuan

A.

C.

D.

E.

Lebar
b
5

Pekerjaan Persipaan
1 Mobilisasi dan demobilisasi
2 Admistrasi dan Dokumentasi
3 Pembersihan Lapangan
4 Pasang Blowplank
5 Air Kerja
6 Listrik Kerja
7 P3k Sosial
8 Direksi Keet
9 Barak Kerja

B.

Panjang
a
4

Pekerjaan Tanah dan Galian


1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Urugan Tanah Timbun
4 Urugan Pasir Urug

Ls
Ls
m2

26.00

m'

24.00

16.00
14.00

5.00
6.00

3.00
4.00

Ls
Ls
Ls
m2
m2

m3
m3
m3
m3

Pekerjaan Beton Bertulang


1 Cor Lantai Kerja
2 Pasangan Batu Gunung
3 Cor Pondasi Tapak Uk.180x180 cm
4 Cor Pondasi Tapak Uk.140x140 cm
5 Cor Sloof Uk.15x20 cm
6 Cor Balok Uk.20x45 cm
7 Cor Balok Uk.20x35 cm
8 Cor Ring Balok Uk. 15x20 cm
9 Cor Kolom Uk. 60x40 cm
10 Cor Kolom Uk. 50x30 cm
11 Cor Kolom Praktis Uk. 50x30 cm
12 Cor Plat Beton tangga
13 Cor Plat Level beton tebal 12 cm
14 Cor Plat Lantai beton Bertulang 1:2:3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

Pekerjaan Pasangan Bata / Plasteran


1 Pasangan Batu bata ad. 1 : 2
2 Pasangan dinding bata ad 1 : 4
3 Plasteran Dinding ad. 1 : 2 + Acian
4 Plasteran Dinding ad. 1 : 4 + Acian

m3
m3
m3
m3

Pekerjaan Lantai / Dinding Keramik


1 Pasangan Lantai beton cor 1:3:6 tebal 6 mm

m2

242.916
266.2

Err:509
242.916

2 Pasangan Lantai Keramik Uk.40x40 cm


3 Pasangan Lantai Keramik Uk.20x20 cm
4 Pasangan Plint Keramik Uk.10x40 cm
5 Pasangan Plint Keramik Uk.20x20 cm
F.

m2
m2
m'
m2

Pekerjaan Kusen Pintu, Jendela dan Kaca


1 Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood

bh

3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm

H.

2 Kusen Alumunium + Pintu PVC uk.70 x 215 cm


3 Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood
4 3 cm dan kaca 5 mm Bingkai Alumunium Uk.80 x 215 cm
5 Kusen Jendela Alumunium 3" + Plywood tebal 3 cm Uk. 177 x 180 cm
6 Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 50 x 270 cm
7 Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 50 x 190 cm
8 Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 347 x 457 cm

bh
bh
bh
bh
bh
bh
bh

Pekerjaan Kunci / Alat Penggantung


1 Pasang Kunci tanahm biasa
2 Pasang engsel pintu ( tiap pintu 3 engsel )
3 Pasang Engsel Jendela (tiap jendela 2 engsel)
4 Pasang grandel tanam pintu (panjang 16-30 cm)

bh
bh
bh
bh

Pekerjaan Plafond
1 Pasang plafond gypsum tebal 9 mm
2 Frame Ceiling
3 Pasang Cornice gypsum

m2
m2
m'

Pekerjaan Atap
1 Pasang Rangka Baja
2 Pasang Penutup atap genteng metal + insulation anti bocor daan panas
3 Pasang Rebung Genteng Metal
4 Pasang Lisplank GRC

m2
m2
m'
m'

Pekerjaan Pengecatan
1 Cat Tembok 3 Lapis + diplamir
2 Cat Plafond 3 lapis + diplamir
3 Cat Lisplank + pintu panel 3 lapis

m2
m2
m2

L
L1

Pekerjaan Instalasi Listrik


Panel Listrik
1 Box panel
2 MCB
3 Volt Meter & Selector switch
4 Ampere Meter & Selector switch
5 Grounding unit panel
6 Kabel NYA 10 mm2
7 Wiring panel and accessories
L2 Armature, saklar, dan Stop Kontak

Unit
Set
Unit
Unit
Unit
m'
Ls

1 Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor


2 Lampu TL bulat 20 W dilengkapi kapasitor
3 Lampu TL Bulat 20 W
4 Saklar double, setara broco
5 Stop Kontak, setara broco
6 Instalasi dengan kabel NYM 4 x 2,5 mm
7 Testing and komisioning
M

bh
bh
bh
bh
bh
Ttk
Ls

Pekerjaan Instalasi Plumbing


1 Instalasi Air
2 Kran Air
3 Kran Washtafel
4 Pemasangan Pengeriing air bak mandi
5 Memasang floor drain
6 memasang tempat sabun keramik
7 memasang closet jongkok
8 Memeasang pipa air besih type AW dia. 1 " + Accessories
9 Memeasang pipa buangan air kotor type AW dia. 3" + Accessories
10 Memeasang pipa buangan air kotor type AW dia. 4" + Accessories
11 Urinoir
12 Bak Cuci Tangan / Washtafel keramik
13 Shower

bh
bh
bh
bh
bh
bh
bh
m'
m'
m'
m'
bh
bh

Pekerjaan Septictank
1 Pekerjaan Galian tanah
2 Pekerjaan timbunan kembali lubang galian
3 Cor Plat Lantai Beton Bertulang 1 : 2 : 3
4 Cor beton 1:2:3
5 Pekerjaan Pasir Urug
6 Pasangan Bata 1:2
7 Plasteran 1 : 2
8 Ijuk
9 Pipa PVC 4"
10 Kerikil
11 Pipa Hawa

m3
m3
m3
m3
m3
m3
m2
Kg
m3
m3
m'

Dimensi
Tinggi/tebal
c
6

Unit/Luas
d
7

Kuantitatif
8
1.00
4.00
416.00
76.00
1,000.00
4.00
4.00
15.00
24.00

2.00

242.916
60.729
266.2

0.25

Err:509
Err:509

20
8
4
8
8
8
8
95.2
95.2
68
18
4
8

22+2(4+2+1+0,6+0,6+1,8+1,8)+(1+0,5+0,5
22+4+4+2+2

34

47.6

A. PEKERJAAN TANAH DAN PONDASI


Galian tanah pondasi
1.Pondasi Menerus
sumbu tegak
Sumbu
Panjang (as-as)
P. Ril
A-R
8.3
5.6
C-P
4
4
D-P
4
4
E-Q
8.3
5.6
F-T
8.3
5.6
G-T
8.3
6.5
H-P
4
4
I-P
4
4
K-R
8.3
5.6
JUMLAH
57.5
44.9
Total Panjang (as-as)
Total Panjang Ril
Lebar
Lebar
Lebar
Lebar

Sumbu
M-A
N-A
J-A
P-A
Q-A

Pondasi K1
1/2 Pondasi K1
Pondasi K2
1/2 Pondasi K2

sumbu datar
Panjang (as-as)
20
6.2
3.2
13
20

62.4
119.9 m
98.3 m
1.8 m
0.9 m
1.4 m
0.7 m

Penampang Galian 1 : 5
tinggi galian = 1 m
x = 0,2 meter
Lebar bagian bawah 1 meter

Lebar galian atas =


Luas Penampang =
Volume =

1+(2x0,2)
(1+1,4)/2*1

1.4
1.08
106.164

2.Pondasi Setempat
Pondasi K1
Lebar Pondasi K1
jumlah
tinggi galian

Volume

1.8 m
13 m
2.8 m

13x2,8x1,8x1,8

Pondasi K2
tinggi galian
Lebar Pondasi K2

117.936

2.4 m
1.4 m

jumlah
Volume
Volume Total Galian

4m
18.816
242.916

Urugan Tanah Timbun

datar
P.Ril
14.6
6.2
3.2
9.4
20

Dibawah Lantai :
Selasar Depan
Selasar Dalam
R.istirahat
Pantry
Tangga
R.Sie Keuangan
R.Sie Akademik
Teras
Volume Tanah Timbun

53.4
(Sloof)

Pondasi Batu Kali


Panjang
Penampang
Volume

m
m2
m3

m3

m3
m3

(1,7 x 20) + ( 1,5 x 20)


(4 x 8,3)+(4,3 x 7 )
4,3 x 5
4x5
3x4
8 x 4,3
8x4
7x2
5x1

(0,6+0,3)/2x0,8

64 m2
63.3 m2
21.5 m2
20 m2
12 m2
34.4 m2
32 m2
14 m2
5 m2
266.2 m2

98.3
0.36
35.388

PEKERJAAN LANTAI I
III PEKERJAAN SELASAR DA
Pekerjaan Selasar Depan d
sumbu teg
Sumbu
A-R
F-T
G-T
K-R
Selasar belakang
Sumbu
B-M
F-M
G-M
J-M
Jumlah
Total Panjang
Total Panjang Ril
Total Trasram
Lebar
Lebar
Lebar
Lebar
Lebar
Lebar

Kolom K1
Kolom K2
Pondasi K1
1/2 Pondasi K1
Pondasi K2
1/2 Pondasi K2

Penampang Galian 1 : 5
tinggi galian = 90 cm
x = 0,2 meter
Lebar bagian bawah 1 met

Lebar galian atas =


Luas Penampang =
Volume =
Transram 1:2 selasar
Tebal
Panjang
Luas Trasram 1 : 2

EKERJAAN LANTAI I
EKERJAAN SELASAR DAN TRAP TANGGA
ekerjaan Selasar Depan dan Belakang
sumbu tegak
Panjang
P. Ril
trasram
1.7
0.8
1.1
3
2.1
2.4
3
2.1
2.4
1.7
0.8
1.1

elasar belakang
Panjang
1.5
1.5
1.5
1.5

P. Ril
1.5
0.8
0.8
1.5

15.4

10.4

tal Panjang
tal Panjang Ril
tal Trasram

ebar
ebar
ebar
ebar
ebar
ebar

Sumbu
R-A
Tambahan

trasram
Sumbu
1.5 K-A
1.2
1.2
1.5

sumbu datar
Panjang
P.Ril
16
11.4
2.06
2.06

trasram
14.6
2.06

Panjang
20

P.Ril
18.6

trasram
19.4

38.06

32.06

36.06

12.4
53.46 m
42.46 m
48.46 m

Kolom K1
Kolom K2
Pondasi K1
1/2 Pondasi K1
Pondasi K2
1/2 Pondasi K2

0.6 m
0.5 m
1.8 m
0.9 m
1.4 m
0.7 m

0.4
0.3

enampang Galian 1 : 5
nggi galian = 90 cm
= 0,2 meter
ebar bagian bawah 1 meter

ebar galian atas =


uas Penampang =

1+(2x0,2)
(1+1,4)/2*0,9

1.4 m
1.08 m2
45.8568 m3

ansram 1:2 selasar

uas Trasram 1 : 2

0.2 m
48.46 m2
9.692 m2

Pekerjaan Rollag Tangga Pada Selasar

Depan
Galian Tanah

1 panjang
tinggi
Lebar galian atas =
Luas Penampang =
Volume =

1,03+1,03
1+(2x0,2)
(1+1,4)/2*0,9

2 Urugan Pasir Alas Pondasi t = 5 cm


panjang
1,03+1,03
tinggi
0.05
lebar
volume

3 Lantai Kerja Plat Beton 60 x 60 cm


panjang
1,03+1,03
tinggi
lebar
volume
4 Pasangan Trasram Bata 1 : 2
Panjang
(1,2+1,2)+2,35+4
tinggi
Luas

PEKERJAAN PASANGAN DAN PLESTERAN


1. Pasangan Trasram Bata 1 : 2 dibawah Lantai

2.06 m
1m
1.4 m
1.08 m2
1.08 m3

Tinggi
Panjang = panjang seluruh sloof
Luas
2.Plesteran Trasram Bata 1 : 2 dibawah Lantai

Luas
3. Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm

2.06 m
2.06 m
1m
0.103 m3

2.06 m
0.1 m
0.6 m
0.1236 m3

10.35 m
0.4 m
8.28 m2

sumbu tegak
Sumbu
Panjang
A-O
8.30
B-M
3.00
C-L
2.50
D-N
8.30
E-M
4.00
F-N
8.30
G-M
3.00
H-M
3.00
I-O
8.30
Total

J.Luas
29.88
10.80
9.00
29.88
14.40
29.88
10.80
10.80
29.88
175.32

Uraian
3.1 A-O = I-O
A. Luas Dinding
Panjang
tinggi
Luas
8,3x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0,6+0,3+(3x0,15)
Luas
C.Luas Kusen (JKM dan J4)
Luas
3x(0,52x0,54)+(2,36x1,8)
D. Luas Tembok 1:2
Luas
(3,1x1,5)+(0,2x4,3)
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)
3.3 C-L
A. Luas Dinding
Panjang
tinggi
Luas

3x3,6

B. Luas Dinding Tiang Beton


Tinggi
Lebar
1x0,15
Luas
C. Luas Tembok 1:2
Luas
(2,425x1,5)
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3.5 E-M
A. Luas Dinding
Panjang
tinggi
Luas
4x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0,6+0,6+0,15
Luas
C. Luas Tembok 1:2
Luas
(0,9x1,5)+(0,2x2,5)
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3.7 G-M
A. Luas Dinding
Panjang
tinggi
Luas
3x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0.15
Luas
C.Luas Kusen (P1B)
Luas
1x2,6
D. Luas Tembok 1:2
Luas
0,2x3,85
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)
sumbu Datar
Sumbu
Panjang
J-A
16.00
K-A
6.20
L-A
3.20

J.Luas
57.60
22.32
11.52

M-A
N-A

13.00
13.00

46.80
46.80
185.04

Volume Total
Sumbu Tegak+Lurus

360.36

Total

3.1 J-A
A. Luas Dinding
Panjang
tinggi
Luas
16x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0,4+0,4+0,4+(5x0,15)
Luas
C.Luas Kusen (J2B,P1B,JKM2)
Luas
(4x1,2x1,8)+(2x1x2,6)+(1,2x0,54)
D. Luas Tembok 1:2
Luas
(3,65x1,5)+(0,2x(1,75+5,05))
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3.3 L-A
A. Luas Dinding
Panjang
tinggi
Luas
1,5x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
(1x0,15)
Luas
C.Luas Kusen (PKM.PKMB)
Luas
(2X0,8x2,10)
D. Luas Tembok 1:2
Luas
(1,5x1,2)
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3.5 N-A
A. Luas Dinding
Panjang
tinggi
Luas
13x3,6
B. Luas Dinding Tiang Beton
Tinggi

Lebar
2x0,15
Luas
C.Luas Kusen (J2)
Luas
(6x1,2x2,3)
D. Luas Tembok 1:2
Luas
0,2x(13-0,3)
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

Dinding Keramik 30x60 kamar mandi

Panjang Kamar mandi


Panjang K.mandi 1
1,45+1,35+0,65
Panjang K.Mandi 2
3+0,85++1,5
tinggi
Luas
Westafel 1
Westafel 1
`
tinggi
Luas Total

1.8

0.9

LESTERAN

bawah Lantai

0.5 m
119.9 m
59.95 m2

awah Lantai

119.9 m2

atas Lantai T = 20 cm

L.Beton
Bidang Kusen
4.86
5.09
1.08
0.54
5.40
5.56
4.86
3.24
8.30
0.54
1.08
4.86
5.09
26.46
24.04

,3x3,6

3+(3x0,15)

54)+(2,36x1,8)

5)+(0,2x4,3)

3x3,6

Tembok 1:2
5.51
4.28
3.64
2.53
3.64
1.51
0.77
4.28
5.51
31.66

8.3 m
3.6 m
29.88 m2
3.6 m
1.35 m
4.86 m2
5.0904 m2
5.51 m2

Tembok 1:4
14.42
5.45
4.82
16.39
5.90
16.83
6.89
5.45
14.42
90.57

3.2 B-M = H-M


A. Luas Dinding
Panjang
tinggi
Luas
3x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
2x0,15
Luas
C. Luas Tembok 1:2
Luas
(2,85x1,5
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D

14.4196 m2

2.5 m
3.6 m
9 m2

3.4 D-N
A. Luas Dinding
Panjang
tinggi
Luas

8,3x3,6

3.6 m
0.15 m
0.54 m2

x0,15

425x1,5)

3.6375 m2

B+C+D)

4.8225 m2

3.6 m
1.35 m
4.86 m2

0,6+0,15

5)+(0,2x2,5)

3.6375 m2

B+C+D)

5.9025 m2

0.15

1x2,6

2x3,85

3.6 F-N
A. Luas Dinding
Panjang
tinggi
Luas
8,3x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0,6+(2x0,1
Luas
C.Luas Kusen (J3B dan PJ1)
Luas ((2x0,36x2,3)+(1,5x2,6))+((2x0
D. Luas Tembok 1:2
Luas
(0,2x7,55
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

4m
3.6 m
14.4 m2

4x3,6

3x3,6

B. Luas Dinding Tiang Beton


Tinggi
Lebar
0,6+0,6+(2x0
Luas
C.Luas Kusen (PJ1)
Luas
2x(0,36x2,3)+(1
D. Luas Tembok 1:2
Luas
(0,9x1,5)+(0,2
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3m
3.6 m
10.8 m2
3.6 m
0.15 m
0.54 m2
2.6 m2
0.77 m2
6.89 m2

L.Beton
Bidang Kusen
7.02
14.49
1.62
5.04
0.54
3.36

Tembok 1:2
6.84
6.41
1.80

Tembok 1:4
29.26
9.25
5.82

0.59
0.54
10.31

7.80
16.56
47.25

5.13
2.54
22.71

33.28
26.62
104.23

36.77

71.29

54.37

194.79

6x3,6

+0,4+(5x0,15)

x1x2,6)+(1,2x0,54)

0,2x(1,75+5,05))

,5x3,6

x0,15)

,5x1,2)

3x3,6

16 m
3.6 m
57.6 m2
3.6 m
1.95 m
7.02 m2
14.488 m2
6.835 m2
29.257 m2

3.2 m
3.6 m
11.52 m2
3.6
0.15
0.54 m2
3.36 m2
1.8 m2
5.82 m2

13 m
3.6 m
46.8 m2
3.6 m

3.2 K-A
A. Luas Dinding
Panjang
tinggi
Luas
6,2x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
(3x0,15)
Luas
C.Luas Kusen (PKM.PKMB)
Luas
(2X0,8x2,10)+(0,8x2,10)
D. Luas Tembok 1:2
Luas
(1,5x4,275)
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3.4 M-A
A. Luas Dinding
Panjang
tinggi
Luas
13x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
(0,4+0,4+0,15+0,15)x0,15
Luas
C.Luas Kusen (P1)
Luas
(3x1x2,6)
D. Luas Tembok 1:2
Luas
(2x1,325x1,5)+(5,75x0,2)
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

x0,15

x(13-0,3)

+1,35+0,65
,85++1,5

0.3 m
1.08 m2
16.56 m2
2.54 m2
26.62 m2

3.45 m'
5.35 m'
8.8 m'
m'
15.84 m2
1.35 m'
0.85 m'
2.2 m'
0.765 m2
16.605 m2

3x3,6

3m
3.6 m
10.8 m2

ang Beton
2x0,15

(2,85x1,5)
Tembok 1:4
A-(B+C+D)

8,3x3,6

3.6 m
0.3 m
1.08 m2
4.275 m2
5.445 m2

8.3 m
3.6 m
29.88 m2

ang Beton
0,6+0,6+(2x0,15)

2x(0,36x2,3)+(1,5x2,6)

(0,9x1,5)+(0,2x5,9)
Tembok 1:4

3.6 m
1.5 m
5.4 m2
5.556 m2
2.53 m2
16.394 m2

8,3x3,6

8.3 m
3.6 m
29.88 m2

ang Beton
0,6+(2x0,15)

3)+(1,5x2,6))+((2x0,4x1,45)+(1,22x1,3))

(0,2x7,55)
Tembok 1:4

3.6 m
0.9 m
3.24 m2
8.302 m2
1.51 m2
16.828 m2

2x3,6

x0,15)

x4,275)

3x3,6

15+0,15)x0,15

,5)+(5,75x0,2)

6.2 m
3.6 m
22.32 m2
3.6 m
0.45 m
1.62 m2
5.04 m2
6.4125 m2
9.2475 m2

13 m
3.6 m
46.8 m2
3.6 m
0.165 m
0.594 m2
7.8 m2
5.125 m2
33.281 m2

PEKERJAAN LANTAI

Ruangan
1. Timbunan Tanah Bawah Lantai T = 60 cm

Ruangan
R.Istirahat Dosen
R.Sie Keuangan
R.Sie Akademik
Pantri

5x4,3
8x4,3
8x4
5x4

Volume ruangan
107,9x0,6
Pengurangan volume kamar
4x(0,8x1,35x0,05)
mandi
Penambahan volume kamar
4x(0,65x1,35x0,05)
mandi
Volume total

21.5 m2
34.4 m2
32 m2
20 m2
107.9 m2
64.74 m3
0.216

m3

0.1755 m3
64.6995 m3

2.Timbunan Pasir Bawah Lantai T = 10 cm

Volume

107,9x0,1

10.79 m3

3. Beton Tumbuk Dibawah Lantai Keramik = 5 cm

Volume

107,9x0,05

5.395 m3

4. Lantai Keramik 40 x 40 cm (Polished)

Luas Seluruh Ruangan


Luas Kamar Mandi

4x1,6x1,5

107.9 m2
9.6 m2
98.3 m2

5. Lantai Keramik 20 x 20 cm (Polished)

Luas kamar mandi

(4x1,6x1,5)+(1,5x3)

14.1 m2

Selasar
1. Timbunan Tanah Bawah Lantai T = 60 cm

Selasar Depan
Selasar Tengah
Selasar Belakang

1,7x20
(7x8,3)-(1,5X3)
1,5x20

Volume

117,6x0,6

34 m2
53.6 m2
30 m2
117.6 m2
70.56 m3

2.Timbunan Pasir Bawah Lantai T = 10 cm

Volume

117,6x0,1

11.76 m3

3. Beton Tumbuk Dibawah Lantai Keramik = 5 cm

Volume

117,6x0,05

4. Lantai Keramik 40 x 40 cm (Polished)

5.88 m3

Luas Seluruh Selasar


Luas Kamar Mandi

3x1,5

117.6 m2
4.5 m2
113.1 m2

Rollag Tangga
1. Timbunan Tanah Bawah Lantai T = 60 cm

Luas
Volume

(7x2)+(0,6*5)
14x0,6

17 m2
10.2 m3

2.Timbunan Pasir Bawah Lantai T = 10 cm

Volume

10,2x0,1

1.7 m3

3. Beton Tumbuk Dibawah Lantai Keramik = 5 cm

Volume

10,2x0,05

0.85 m3

4. Lantai Keramik 40 x 40 cm (Polished)

Luas Seluruh rolag tangga

17-(0,8x2,35)

15.12 m2

PEKERJAAN BETON BERTULANG


1 Sloof Beton 15/25 cm (Pondasi Menerus) p = 119,9 m

Panjang sloof
Penampang sloof
Volume sloof

0,15x0,25
119,9x0,03

2 Sloof Beton 15/25 cm (Selasar Depan,belakang) P = 53,46 m


Panjang sloof
Penampang sloof
0,15x0,25
Volume sloof
53,46x0,03
3 Kolom Beton 40/60 cm = 13 Kolom
Jumlah kolom
Panjang
Penampang kolom
Volume Kolom

0,4x0,6
0,24x3,6x,13

4 Kolom Beton 30/50 cm = 4 Kolom


Jumlah kolom
Panjang
Penampang kolom
Volume Kolom

0,3x0,5
0,15x3,6x,4

5 Kolom Praktis
Jumlah kolom
Panjang
Penampang kolom
Volume Kolom
6 Balok Lantai B1 25/45 cm
sumbu tegak
Sumbu
Panjang
A-Q
D-R
E-T
F-T
L-Q
Total

0,15x0,15

sumbu datar
Sumbu
Panjang
10
L-A
10.5
O-A
13
Q-A
13
10
56.5

Panjang
Penampang Balok
Volume Balok

7 Balok Lantai B2 20/35 cm


sumbu tegak

sumbu datar

20
20
20

60

Sumbu
C-N
G-Q
H-O
I-M
Selasar

Panjang

Sumbu
3
M-A
6
N-A
13
P-A
10
(14x0,45)+19+4,8+(2x0,8)+
(2x6)+(2x2)+(2x1,2)+3,6

Total
Panjang
Penampang Balok
Volume Balok

8 Plat Lantai T
Teba;
Luas I
Luas II
Luas III
Luas IV
Luas V
Luas VI
Total
Volume

= 10 cm

4x5
6x5
3x4,7
12x4
12x6
(6,75x2)+(4,8x1,2)

53.7
85.7

Panjang
4.4
5
20

29.4

PEKERJAAN LANGIT-LANGIT

119.9 m
0.0375 m2
3.597 m3

53.46 m
0.0375 m2
2.00475 m3

13 Buah
3.6 m
0.24 m2
11.232 m3

4 Buah
3.6 m
0.15 m2
2.16 m3

17 Buah
3.6 m
0.0225 m2
1.377 m3

116.5 m
0.09 m2
10.485 m3

1 Pasang plafond gypsum tebal 9 mm


Nama
Selasar Depan
Selasar Dalam
R.istirahat
Pantry
Tangga
R.Sie Keuangan
R.Sie Akademik
Teras
Volume

2 Pasang Cornice gypsum


Selasar Depan
Selasar Dalam
R.istirahat
Pantry
Tangga
R.Sie Keuangan
R.Sie Akademik
Teras
Volume

115.1 m
0.07 m2
8.057 m3

0.1 m
20 m2
30 m2
14.1 m2
48 m2
72 m2
19.26 m2
203.36 m2
20.336 m3

GIT-LANGIT

psum tebal 9 mm
Luas
(1,7 x 20)
(4 x 8,3)+(4,3 x 7 )
4,3 x 5
4x5
3x4
8 x 4,3
8x4
7x2
5x1

2x(1,7+20)
(2x(4+8,3))+(2x(4,3+7))
2x(4,3+5)
2x(4+5)
2x(3+4)
2x(8+4,3)
2x(8+4)
(2x(7+2))+(2x(5+1))

34 m2
63.3 m2
21.5 m2
20 m2
12 m2
34.4 m2
32 m2
14 m2
5 m2
236.2 m2

43.4 m2
47.2 m2
18.6 m2
18 m2
14 m2
24.6 m2
24 m2
30 m2
219.8 m2

PEKERJAAN TANAH DAN PONDASI


- Stik Kolom 40/60 cm dari Pondasi Tapak ke sloof

A. Pondasi Tapak
Panjang
Lebar
Tinggi
Volume
Panjang
Lebar
Tinggi
Volume

1.8 m
1.8 m
0.2 m
0.648 m3
1.8 m
1.8 m
0.1 m
0.108 m3

B. Stik Kolom
Panjang
Lebar
Tinggi
Volume

0.4 m
0.6 m
2.15 m
0.516 m3

Jumlah
Volume Total

13 Buah
16.54 m3

- Stik Kolom 30/50 cm dari Pondasi Tapak ke sloof

A. Pondasi Tapak
Panjang
Lebar
Tinggi
Volume
Panjang
Lebar
Tinggi
Volume

1.4 m
1.4 m
0.2 m
0.392 m3
1.4 m
1.4 m
0.1 m
0.0653333 m3

B. Stik Kolom
Panjang
Lebar
Tinggi
Volume

0.3 m
0.5 m
1.8 m
0.27 m3

Jumlah
Volume Total

4 Buah
2.91 m3

PEKERJAAN RAMP/TANJAKAN TANGGA


1.Galian Tanah
Panjang
Lebar
Tinggi
Volume
1,48x1,5x2,1
2. Anak Tangga
Jumlah
Lebar
Panjang
Tinggi
Volume
1/2x21x1,425x0,29x0,2

1.48 m
1.5 m
2.1 m
4.662 M3

21 Buah
1.425 m
0.29 m
0.2 m
0.867825 M3

4. Stik Kolom cm dari Pondasi Tapak ke sloof

a.Stik kolom
Panjang
Lebar
Tinggi
Volume
1,48x1,5x2,1

1.5 m
0.3 m
1.25 m
0.5625 M3

b. Pondasi
Panjang
Lebar
Tinggi
Volume
1,48x1,5x2,1

1.5 m
1.18 m
0.35 m
0.75225 M3

Volume total

1.31475 m3

PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan Dinding Bata 1 : 4

sumbu tegak
Sumbu
Panjang
A-P
10.4
B-L
2.4
C-P
10.4
D-Q
2.0
E-R
8.4
F-R
7.0
G-R
7.5
H-N
4.4
I-L
1.9
J-P
10.4
Total

J.Luas
37.4
8.6
37.4
9.0
32.6
27.6
28.4
15.8
8.6
37.4
243.0

L.Beton
4.9
0.3
2.7
0.5
2.7
2.2
1.6
1.1
0.3
4.9
21.1

Uraian
3.1 A-P = J-P
A. Luas Dinding
Panjang
tinggi
Luas
10,4x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
(0,6x2)+0,15
Luas
C.Luas Kusen (J4, J1 dan JKM)
Luas
(0,52x0,54)+(2,36x1,8)+(2x0,4x2,3)
D. Luas Tembok 1:2
Luas
(2,5x1,5)
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3.3 C-P
A. Luas Dinding
Panjang
tinggi
Luas
10,4x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
(2x0,3)+0,15

Bidang Kusen
6.4
5.6

6.5
2.6
6.4
27.4

10.4
3.6
37.44
3.6
1.35
4.86
6.3688
3.75
22.4612

10.4
3.6
37.44
3.6
0.75

Luas
C.Luas Kusen (PJ1)
Luas
(2x0,36x2,3)+(1,5x2,6)
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3.5 E-R
A. Luas Dinding
Panjang
tinggi
Luas
(7,4x3,6)+(1x6)
B. Luas Dinding Tiang Beton
Tinggi
Lebar
(2x0,3)+0,15
Luas
C.Luas Pasangan Tembok 1:4
Luas
A-B

3.7 G-R
A. Luas Dinding
Panjang
tinggi
Luas
(6x3,6)+(1,5x4,5)
B. Luas Dinding Tiang Beton
Tinggi
Lebar
3x0,15
Luas
C.Luas Kusen (PJ1 dan J1)
Luas
(2x0,36x2,3)+(1,5x2,6)+(0,4x2,3)
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C)

sumbu Datar
Sumbu
Panjang
K-A
20.0
L-A
4.4
M-A
4.0
N-F
6.5
O-E
5.0
P-A
13.1

J.Luas
72.00
15.84
14.40
23.40
18.00
47.30

L.Beton
4.14
0.81
5.41
1.26
1.08
1.26

2.7
5.556
29.184

7,4 dan 1
3,6 dan 6
32.64
3.6
0.75
2.7
29.94

6 dan 1,5
3,6 dan 4,5
28.35
3.6
0.45
1.62
6.476
20.254

Bidang Kusen
17.38

2.60
9.20

Q-D
R-E

2.1
4.8
Total

9.27
28.80
229.01

1.35
1.20
16.51

1.84
6.53
37.54

Volume Total

472.04

37.57

64.91

3.1 K-A
A. Luas Dinding
Panjang
tinggi
Luas
20x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0,4+(5x0,15)
Luas
C.Luas Kusen (J1 dan J6)
Luas
(12x0,4x2,3)+(3,52x1,8)
D. Luas Tembok 1:2
Luas
(1,5x4,4)
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3.3 M-A
A. Luas Dinding
Panjang
tinggi
Luas
4x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
1,5x0,15
Luas
C.Luas Pasangan Tembok 1:4
Luas
A-B

3.5 O-E
A. Luas Dinding
Panjang
tinggi
Luas
5x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
2x0,15
Luas
C.Luas Kusen (P1)
Luas
1x2,6

20
3.6
72
3.6
1.15
4.14
17.376
6.6
43.884

4
3.6
14.4
3.6
1.5015
5.4054
8.9946

5
3.6
18
3.6
0.3
1.08
2.6

D.Luas Pasangan Tembok 1:4


Luas
A-(B+C)

3.7 Q-D
A. Luas Dinding
Panjang
tinggi
Luas
2,06x4,5
B. Luas Dinding Tiang Beton
Tinggi
Lebar
2x0,15
Luas
C.Luas Kusen (J1)
Luas
(2x0,4x2,3)
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C)

14.32

2.06
4.5
9.27
4.5
0.3
1.35
1.84
6.08

Tembok 1:2
3.8
3.6

3.6
3.8
14.7

m
m
m2
m
m
m2
m2
m2

Tembok 1:4
22.5
4.8
29.9
8.5
29.9
25.4
20.3
12.2
4.8
22.5
180.7

3.2 B-L = I-L


A. Luas Dinding
Panjang
tinggi
Luas
2,4x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0,5x0,15
Luas
C. Luas Tembok 1:2
Luas
(2,4x1,5)
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

2.4
3.6
8.64
3.6
0.075
0.27
3.6
4.77

m2

m
m
m2
m
m

3.4 D-Q
A. Luas Dinding
Panjang
tinggi
Luas
2x4,5
B. Luas Dinding Tiang Beton
Tinggi
Lebar
1x0,15

2
4.5
9
3.6
0.15

m2

Luas
C.Luas Pasangan Tembok 1:4
Luas
A-B

m2

0.54
8.46

m2

3.6 F-R
A. Luas Dinding
Panjang
tinggi
Luas
(6x3,6)+(1x6)
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0,3+(2x0,15)
Luas
C.Luas Pasangan Tembok 1:4
Luas
A-B

m
m
m2
m
m
m2
m2

3.8 H-N
A. Luas Dinding
Panjang
tinggi
Luas
4,4x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
2x0,15
Luas
C.Luas Kusen (P1)
Luas
1x2,6
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C)

m
m
m2
m
m
m2
m2
m2

Tembok 1:2
6.60
2.66

Tembok 1:4
43.88
7.33
8.99
22.14
14.32
36.48

6 dan 1
3,6 dan 6
27.6
3.6
0.6
2.16
25.44

4.4
3.6
15.84
3.6
0.3
1.08
2.6
12.16

m
m
m2
m
m
m2
m2
m2
m2

m
m
m2
m
m
m2
m2

m
m
m2
m
m
m2
m2

9.26

6.08
21.08
160.31

23.96

340.96

3.2 L-A
A. Luas Dinding
Panjang
tinggi
Luas
4,4x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
1,5x0,15
Luas
C. Luas Tembok 1:2
Luas
(1,775x1,5)
D.Luas Kusen (PKM)
Luas
(3x0,8x2,1)
E.Luas Pasangan Tembok 1:4
Luas
A-(B+C+D)

3.4 N-F
A. Luas Dinding
Panjang
tinggi
Luas
6,5x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0,2+0,15
Luas
C.Luas Pasangan Tembok 1:4
Luas
A-B

3.6 P-A
A. Luas Dinding
Panjang
tinggi
Luas
13,14x3,6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
3x0,15
Luas
C.Luas Kusen (J1)

4.4
3.6
15.84
3.6
0.225
0.81
2.6625
5.04
7.3275

6.5
3.6
23.4
3.6
0.35
1.26
22.14

13.14
3.6
47.304
3.6
0.45
1.62

m2

m
m
m2
m
m
m2
m2
m2

Luas
(10x0,4x2,3)
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C)

3.8 R-E
A. Luas Dinding
Panjang
tinggi
Luas
4,8x6
B. Luas Dinding Tiang Beton
Tinggi
Lebar
0.2
Luas
C.Luas Kusen (J3)
Luas
2,25x2,9
D.Luas Pasangan Tembok 1:4
Luas
A-(B+C)

9.2
36.484

4.8
6
28.8
6
0.2
1.2
6.525
21.075

PEKERJAAN BETON BERTULANG

1 Kolom Beton 40/60 cm = 11 Kolom


Jumlah kolom
Panjang
Penampang kolom
Volume Kolom

0,4x0,6
0,24x3,6x,11

2 Kolom Beton 40/60 cm Tinggi 570 cm = 2 Unit


Jumlah kolom
Panjang
Penampang kolom
0,4x0,6
Volume Kolom
0,24x3,6x,11
3 Kolom Praktis
Jumlah kolom
Panjang
Penampang kolom
Volume Kolom

m
m
m2
m
m
m2
m2
m2

4 Ring balok 15/20 cm P = 79 m


sumbu tegak
Sumbu
A-R
10+0,5
B-M
1,5+0,5
C-R
10+0,5
D-S
E-T
6,75+5,85+0,5
F-T
3+5,85
G-S
H-R
4+0,5
I-M
1,5+0,5
J-R
10+0,5+0,5
Total
Panjang
Penampang Balok
Volume Balok

m
m
m2
m
m

0,15x0,15

sumbu datar
Panjang
Sumbu
10.5
K-A
2
L-A
10.5
M-A
5
N-A
13.1
O-F
8.85
P-D
5
Q-A
4.5
R-A
2
S-T
11
T-E
72.45

m2
m2

m
m
m2
m
m
m2
m2

m
m
m2
m
m
m2
m2
m2

m
m
m2
m
m
m2
m2
m2
m2

m
m
m2
m
m
m2
m2

m
m
m2
m
m
m2

m2
m2

m
m
m2
m
m
m2
m2
m2

PEKERJAAN LANTAI
1 Pasangan Lantai Keramik 40 x 40 cm (Ruangan)

11 Buah
3.6 m
0.24 m2
9.504 m3

2 Buah
5.7 m
0.24 m2
2.736 m3

26 Buah
3.6 m
0.015 m2
1.404 m3

sumbu datar
Panjang
20-0,5-0,5
1,6+1,2+1,6
5+1
5,2+1,2+1,6
1,03+4,8+1,03
2(6,08+0,5)
2x6,08
1,03+1,03

168.89 m
0.03 m2
5.0667 m3

19
20
4.4
6
8
6.86
13.16
12.16
2.06
4.8
96.44

Ruangan
R. Rektor
R.Tunggu

R.Sie Keperetawatan
R.Tamu
R.Admistrasi
R.Sie Analisis
R.Sie Keuangan
Luas Total

(3,4x11)+(1,6x9)
3,5x8,43
1,5x6,86
1x4,8
3x3
3x4
(4x4,5)+(1,5x8)
(6,5x6,58)+(1,5x3)
2,5x2,5
2.5x2,5

2 Pasangan Lantai Keramik 20 x 20 cm (Ruangan)


K.Mandi
(2x2,8)+(1,6x2)

Luas
51.8 m2
29.505 m2
10.29 m2
4.8 m2
9 m2
12 m2
30 m2
47.27 m2
6.25 m2
62.5 m2
263.415 m2

8.8 m2

PEKERJAAN LANGIT-LANGIT

1 Pasang plafond gypsum tebal 9 mm


Nama
R. Rektor
R.Tunggu

R.Sie Keperetawatan
R.Tamu
R.Admistrasi
R.Sie Analisis
R.Sie Keuangan
K.mandi
Luas Total
2 Pasang Cornice gypsum
R. Rektor
R.Tunggu

R.Sie Keperetawatan
R.Tamu
R.Admistrasi
R.Sie Analisis
R.Sie Keuangan
K.mandi

5x11
3,5x8,43
1,5x6,86
1x4,8
(3x3)+(4,5x3)
3x4
(4x4,5)+(1,5x8)
(6,5x6,58)+(1,5x3)
2,5x2,5
2.5x2,5
1,5x1,8

2(5+11)
2x2(1,03+5)
2(4,8+5,85)
2(1,57+11)
2(1,03+7)
2(3+4)
2(4+4,5)+2(1,5+8)
2(6,5+6,58)+(1,5+3)
2(2,5+2,5)
2(2,5+2,5)
2(1,5+1,8)

Luas Total

3 Plafond Calcyboard
keliling Bangunan

Lebar
Luasn Total

20+(0,5+0,5)
10+0,5+0,5
10+0,5+0,5
(0,5+5+1,57+1,5+1,03)
(0,5+5+1,57+1,5+1,03)
0.5

Luas
55 m2
29.505 m2
10.29 m2
4.8 m2
22.5 m2
12 m2
30 m2
47.27 m2
6.25 m2
62.5 m2
2.7
282.815 m2

32 m'
24.12 m'
21.3 m'
25.14 m'
16.06 m'
14 m'
36 m'
30.66 m'
10 m'
10 m'
6.6
225.88 m'

21 m'
11 m'
11 m'
9.6 m'
9.6 m'
62.2 m'
31.1 m2

PEKERJAAN SEPTICTANK
1 Pekerjaan Galian tanah
A. Main Hole
Panjang
Lebar
tinggi
Volume
B.Septic Tank
Panjang
Lebar
tinggi
Volume
C. Filter Bed
Panjang
Lebar
tinggi
Volume
Total

3 Cor Plat Lantai 1 : 2 : 3


main hole
septic tank
filterbed
total

0,05x0,5x0,5
0,1x(0,8+0,3+0,1+1,6)x1
0,1x1,5x1

4 Cor Beton Bertulang 1:2:3


main hole
0,05x0,4x0,5
septic tank
(0,1x2,4x1,5)+(0,1x1,125x0,9)
total
5 Pekerjaan Pasir Urug
main hole

6 Pasangan Bata 1:2


main hole
septic tank
filterbed
total

0,15x1,5x1

(0,35+0,35)0,4
(2+1,62)0,9
(1,5+1,5)0,85

,05x0,5x0,5
,1x(0,8+0,3+0,1+1,6)x1

05x0,4x0,5
5)+(0,1x1,125x0,9)

PEKERJAAN BETON TAK BERTULANG

0.5 m
0.5 m
0.4 m
0.1 m3

2.4 m
1m
2m
4.8 m3

1.5 m
1m
1.5 m
2.25 m3
7.15 m3

0.0125 m3
0.28 m3
0.15 m3
0.4425 m3

0.125 m3
0.46125 m3
0.58625 m4

,15x1,5x1

0.225 m3

0,35+0,35)0,4
2+1,62)0,9
1,5+1,5)0,85

0.28 m2
3.258 m2
2.55 m2
6.088 m2

1 Beton Cor pada Selasar Belakang


A.Kolom
Tinggi
Lebar
Panjang
Jumlah
Volume
2 Beton Cor Pada Selasar Belakang
Tinggi
Lebar
Panjang 4,8+1+1
Volume

BERTULANG

4m
0.15 m
0.3 m
6 Buah
1.08 m3

1.5 m
0.3 m
6.8 m
3.06 m3

1 Sloof Beton 15/20 cm (Pondasi Menerus)

Panjang
B
H
Jumlah Tulangan Utama
Ukuran Tulangan Utama
Ukuran Sengkang
Jarak Antar Sengkang

=
=
=
=
=
=
=
=
=
=

Volume Beton
Panjang Total Tulangan Utama
Panjang Besi /Sengkang
Jumlah Sengkang
panjang Total Sengkang
Berat Tulangan Utama
Berat Sengkang
Berat Total Tulangan Utama
Berat Total Sengkang
Berat Tulangan
Persentase Penambahan Berat
Penambahan 0 %
Total Berat Tulangan
Berat Tulangan Dalam 1 M3

=
=
=
=
=
=
=
=
=
=
=
=
=
=

Harus Diisi
Jangan Diganggu
Hasil
46.8
0.6
0.4
18
20
10
0.15
11.232
842.400
1.780
312.000
555.360
2.470
0.617
2080.728
342.657
2423.385
0.000
0.000
2423.385
215.757

Chart Title
1%2%1%
4%
3% 7%

1%

1%

1% 4%

3%
48%

17%
10%

3%

7%

3%
48%

17%
10%

arus Diisi
angan Diganggu
m
m
m
m
mm
mm
m
m3
m
m/Sengkang
Buah
m
Kg/m'
Kg/m'
Kg
Kg
Kg
%
Kg
Kg
kg/m3

Tulangan baja
Polos
Deform
P6
D6
P8
D8
P9
D9
P10
D10
P12
D12
P13
D13
P14
D14
P16
D16
P18
D18
P19
D19
P20
D20
P22
D22
P25
D25
D28
D29
P32
D32
D36
D40
D50

Diameter
nimonal
(mm)

Luas
nominal
(cm2)

Berat
nominal
(Kg/m)

6
8
9
10
12
13
14
16
18
19
20
22
25
28
29
32
36
40
50

0.283
0.503
0.636
0.785
1.131
1.327
1.540
2.011
2.545
2.835
3.142
3.801
4.909
6.157
6.605
8.043
10.179
12.565
19.635

0.222
0.395
0.499
0.617
0.888
1.040
1.210
1.580
2.000
2.300
2.470
2.980
3.850
4.830
5.190
6.310
7.990
9.870
15.400

itle

1
2

1% 4%

3
4
5
6

48%

7
8
9
10
11

Tulangan Utama
Sengkang
Tulangan Utama

4
5
6
48%

7
8
9
10
11
12
13
14

No

Uraian Pekerjaan

Satuan

PEKERJAAN PERSIAPAN

Mobilisasi dan demobilisasi

Ls

Admistrasi dan Dokumentasi

Ls

Pembersihan Lapangan

m2

Pasang Blowplank

m'

Air Kerja

Ls

Listrik Kerja

Ls

P3k Sosial

Ls

Direksi Keet

m2

Barak Kerja

m2

II

PEKERJAAN STRUKTUR BAWAH

PEKERJAAN TANAH DAN PONDASI

Pondasi Tapak Type P1 = 13 Unit


- Galian Tanah Pondasi

m3

- Urugan Kembali Bekas Galian

m3

- Urugan Pasir Alas Pondasi t = 5 cm

m3

- Lantai Kerja Plat Beton 180 x 180 cm

m3

- Tapak pondasi 180 x 180 dan Stik Kolom 40/60 cm

m3

dari Pondasi Tapak ke sloof


2

Pondasi Tapak Type P2 = 4 Unit


- Galian Tanah Pondasi

m3

- Urugan Kembali Bekas Galian

m3

- Urugan Pasir Alas Pondasi t = 5 cm

m3

- Lantai Kerja Plat Beton 140 x 140 cm

m3

- Tapak pondasi 140 x 140 dan Stik Kolom 30/50 cm

m3

dari Pondasi Tapak ke sloof


3

Pondasi Menerus (sloof 15/25 cm)


- Galian Tanah Pondasi Menerus

m3

- Urugan Kembali Bekas Galian

m3

- Urugan Pasir Alas Pondasi t = 5 cm

m3

- Lantai Kerja Plat Beton 60 x 60 cm

m3

- Pasangan Batu Gunung 1 : 4

m3

III

PEKERJAAN LANTAI I

PEKERJAAN SELASAR DAN TRAP TANGGA


Pekerjaan Selasar Depan dan Belakang

Galian Tanah Pondasi Menerus

m3

Urugan Kembali Bekas Galian

m3

Urugan Pasir Alas Pondasi t = 5 cm

m3

Lantai Kerja Plat Beton

m3

Pasangan Batu Gunung 1 : 4

m3

Pasangan Trasram Bata 1 : 2

m3

Plesteran 1 : 2

m3

Pekerjaan Rollag Tangga Pada Selasar


1

Galian Tanah

m3

Urugan Kembali Bekas Galian

m3

Urugan Pasir Alas Pondasi t = 5 cm

m3

Lantai Kerja Plat Beton 60 x 60 cm

m3

Pasangan Trasram Bata 1 : 2

m2

Plesteran Bata 1 : 2

m2

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Trasram Bata 1 : 2 dibawah Lantai

m2

Plesteran Trasram Bata 1 : 2 dibawah Lantai

m2

Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm

m2

Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm

m2

Pasangan Dinding Bata 1 : 4

m2

Plesteran Dinding Bata 1 : 4

m2

Dinding Keramik 30x60 kamar mandi

m2

Plesteran 1 : 3 (Kolom dan Balok)

m2

PEKERJAAN BETON BERTULANG

Sloof Beton 15/25 cm (Pondasi Menerus)

m3

Sloof Beton 15/25 cm (Selasar Depan,belakang)

m3

Kolom Beton 40/60 cm = 13 Kolom

m3

Kolom Beton 30/50 cm = 4 Kolom

m3

Kolom Praktis

m3

Balok Lantai 20/45 cm

m3

Balok Lantai 20/35 cm

m3

Plat Lantai T = 10 cm

m3

PEKERJAAN RAMP/TANJAKAN TANGGA

Galian Tanah

m3

Urugan Kembali Bekas Galian

m3

Urugan Pasir Alas Pondasi t = 5 cm

m3

Lantai Kerja Plat Beton 150 x 150 cm

m3

Pondasi dan Stik Kolom dari Pondasi Tapak ke sloof

m3

Bordes

m3

Anak Tangga

m3

Plat Lantai Tebal 6 cm

m3

10

Realling Besi Hollow

m2

11

Keramik + Spesi

m2

PEKERJAAN LANTAI
Ruangan

Timbunan Tanah Bawah Lantai T = 60 cm

m3

Timbunan Pasir Bawah Lantai T = 10 cm

m3

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

m3

Lantai Keramik 40 x 40 cm (Polished)

m2

Lantai Keramik 20 x 20 cm (Polished) kamar mandi

m2

Selasar
1

Timbunan Tanah Bawah Lantai T = 60 cm

m3

Timbunan Pasir Bawah Lantai T = 10 cm

m3

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

m3

Lantai Keramik 40 x 40 cm (polished)

m2

Rollag Tangga
1

Timbunan Tanah Bawah Lantai T = 60 cm

m3

Timbunan Pasir T = 10 cm

m3

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

m3

Lantai Keramik 40 x 40 cm (Polished)

m2

PEKERJAAN KOSEN PINTU DAN JENDELA

Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood

bh

3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)

Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM )

bh

Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)

bh

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

bh

dan Bingkai Alumunium Uk. 120 x 230 cm (J2)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

bh

dan Bingkai Alumunium Uk. 120 x 168 cm (J2B)

Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 145 x 202 cm (J3B)

bh

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

bh

dan Bingkai Alumunium Uk. 180 x 236 cm (J4)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

bh

dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

bh

dan Bingkai Alumunium Uk. 54 x 120 cm (JKM2)

PEKERJAAN PENGUNCI DAN PENGGANTUNG

Kunci Tanam 2 Slaag

bh

Engsel Pintu 4 Inchi

bh

Engsel Jendela 3 Inchi

bh

Grendel Jendela

bh

Hak Angin Jendela

bh

Tarikan/Pegangan Jendela

bh

PEKERJAAN LANGIT-LANGIT

I1

I2

1 Pasang plafond gypsum tebal 9 mm

m2

2 Frame rangka plafond

m2

3 Pasang Cornice gypsum

m'

PEKERJAAN INSTALASI LISTRIK

Panel Listrik
1 Box panel

Unit

2 MCB

Set

3 Volt Meter & Selector switch

Unit

4 Ampere Meter & Selector switch

Unit

5 Grounding unit panel

Unit

6 Kabel NYA 10 mm2

m'

7 Wiring panel and accessories

Ls

Armature, saklar, dan Stop Kontak


1 Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor

bh

2 Lampu TL bulat 20 W dilengkapi kapasitor

bh

3 Lampu TL Bulat 20 W

bh

4 Saklar double, setara broco

bh

5 Stop Kontak, setara broco

bh

6 Instalasi dengan kabel NYM 4 x 2,5 mm

Ttk

7 Testing and komisioning

Ls

PEKERJAAN PENGECATAN

1 Cat Tembok 3 Lapis + diplamir

m2

2 Cat Plafond 3 lapis + diplamir

m2

IV

PEKERJAAN LANTAI 2

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Dinding Bata 1 : 4

m2

Plesteran Dinding Bata 1 : 4

m2

Plesteran 1 : 3 (Kolom dan Ringbalk)

m2

PEKERJAAN BETON BERTULANG

Kolom Beton 40/60 cm = 11 Kolom

m3

Kolom Beton 40/60 cm Tinggi 570 cm = 2 Unit

m3

Kolom Praktis = 26 kolom

m3

Ring balok 15/20 cm

m3

PEKERJAAN BETON TAK BERTULANG

Kolom Cor pada Bagian Belakang Gedung

2 Beton Cor Pada Selasar Belakang

m3
m3

PEKERJAAN LANTAI

Pasangan Lantai Keramik 40 x 40 cm (Ruangan)

m2

Pasangan Lantai Keramik 20 x 20 cm (Kamar Mandi)

m2

PEKERJAAN RANGKA ATAP


1 Pasang Rangka Baja

m2

2 Pasang Penutup atap genteng metal + insulation anti bocor daan panas

m2

3 Pasang Rebung Genteng Metal

m'

4 Pasang Lisplank GRC

m'

PEKERJAAN LANGIT-LANGIT

Pasang plafond gypsum tebal 9 mm

m2

Frame rangka plafond

m2

Pasang Cornice gypsum

m2

Plafond Calcyboard

m2

PEKERJAAN INSTALASI LISTRIK

Armature, saklar, dan Stop Kontak


1 Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor

bh

2 Lampu TL bulat 20 W dilengkapi kapasitor

bh

3 Lampu TL Bulat 20 W

bh

4 Saklar double, setara broco

bh

5 Stop Kontak, setara broco

bh

6 Instalasi dengan kabel NYM 4 x 2,5 mm

Ttk

7 Testing and komisioning

Ls

PEKERJAAN KOSEN PINTU DAN JENDELA


KOSEN

Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood

bh

3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)

Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM)

bh

Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)

bh

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

bh

dan Bingkai Alumunium Uk. 40 x 230 cm (J1)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

bh

dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)

Kusen Jendela Alumunium 3" + Kaca polos 5 mm 225 x 290 cm (J3)

bh

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

bh

dan Bingkai Alumunium Uk. 180 x 236 cm (J4)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

bh

dan Bingkai Alumunium Uk. 180 x 352 cm (J6)

PEKERJAAN PENGUNCI DAN PENGGANTUNG

Kunci Tanam 2 Slaag

bh

Engsel Pintu 4 Inchi

bh

Engsel Jendela 3 Inchi

bh

Grendel Jendela

bh

Hak Angin Jendela

bh

Tarikan/Pegangan Jendela

bh

PEKERJAAN PENGECATAN

1 Cat Tembok 3 Lapis + diplamir

m2

2 Cat Plafond 3 lapis + diplamir

m2

PEKERJAAN INSTALASI PLUMBING


1 Instalasi Air

bh

2 Kran Air

bh

3 Kran Washtafel

bh

4 Pemasangan Pengeriing air bak mandi

bh

5 Memasang floor drain

bh

6 memasang tempat sabun keramik

bh

7 memasang closet jongkok

bh

8 Memasang pipa air besih type AW dia. 1 " + Accessories

m'

9 Memasang pipa buangan air kotor type AW dia. 3" + Accessories

m'

10 Memasang pipa buangan air kotor type AW dia. 4" + Accessories

m'

11 Urinoir

bh

12 Bak Cuci Tangan / Washtafel keramik

bh

13 Shower
VI

PEKERJAAN SEPTICTANK
1 Pekerjaan Galian tanah

m3

2 Pekerjaan timbunan kembali lubang galian

m3

3 Cor Plat Lantai kerja 1 : 2 : 3

m3

4 Cor Beton Bertulang 1:2:3

m3

5 Pekerjaan Pasir Urug

m3

6 Pasangan Bata 1:2

m2

7 Plasteran 1 : 2

m2

8 Ijuk

Kg

9 Pipa PVC 4"

m'

10 Kerikil

m3

11 Pipa Hawa

bh

Panjang
a
4

Dimensi
Lebar
Tinggi/tebal
b
c
5

Unit/Luas
d

Kuantitatif

1.00
4.00
26.00

16.00

24.00

14.00

416.00
2.00

76.00
1000.00
4.00
4.00

5.00

3.00

15.00

6.00

4.00

24.00

1.80

1.80

2.80

117.94

13.00

117.94

0.25

29.48

1.80

1.80

0.05

13.00

2.11

1.80

1.80

0.10

13.00

4.21

13.00

16.54

4.00

18.82

0.25

4.70

1.40

1.40

2.40

18.82
1.40

1.40

0.05

4.00

0.39

1.40

1.40

0.10

4.00

0.78

4.00

2.91

106.16
106.16

98.30

1.00

0.05

98.30

0.60

0.10

98.30

0.25

26.54

4.00

19.66
5.90

0.36

35.39

45.86
45.86

0.25

11.46

42.46

1.00

0.05

2.12

42.46

0.60

0.10

2.55

42.46

0.36

48.46

0.20

9.69

15.29
9.69

2.00

19.38
1.08

0.25

0.27
6.09
6.09
8.28

2.00

16.56

59.95
119.90
54.37
54.37

2.00

108.74
194.79

194.79

2.00

389.58
16.61

26.46

2.00

52.92

3.60
2.00
11.23
2.16
1.38
10.49
8.06
20.34

1.48

1.50

2.10

4.66
1.48

4.66
0.25

1.50

0.05

1.17
0.11

1.48

1.48

0.10

0.22
1.31

1.50

3.00

0.10

1.43

0.19

0.29

21.00

0.82

3.25

1.43

0.06

2.00

0.56

0.45

45.00
1.43

0.30

21.00

8.98

64.70
10.79
5.40
98.30
14.10
70.56
11.76
5.88
113.10
10.20
1.70
0.85
15.12

2.00
6.00
6.00
6.00
4.00
1.00
1.00
6.00
1.00

14.00
30.00
68.00
24.00
48.00
24.00

236.20
236.20
219.80

1.00
7.00
1.00
1.00
1.00
80.00
1.00
15.00
18.00
12.00
6.00
10.00
45.00
1.00

289.07

2.00

578.15
236.20

340.96
21.06

2.00

681.92

2.00

42.12

9.50
2.74
1.40
5.07

1.08
3.06

263.42
8.80

475.12
475.12
40.80
307.50

282.82
282.82
225.88
31.10

22.00
12.00
5.00
6.00
10.00
39.00
1.00

2.00
3.00
2.00
30.00
2.00
1.00
2.00
1.00

14.00
16.00
92.00
42.00
84.00
42.00

407.13

2.00

814.27
282.82

20.00
8.00
4.00
8.00
8.00
8.00
8.00
95.20
95.20
68.00
18.00

4.00
8.00

7.15
0.25

1.79
0.44
0.59
0.23
6.09

6.09

2.00

12.18
50.00
16.00

1.00

0.90

0.40

0.36
1.00

(3x2)+(2x6)+(2x6)
(6x2x2)+(4x2x2)+(2x2)+(4x2)+(6x2)+(2x2)
6+4+2+4+6+2

(3x2)+(3x2)+(2x2)
(30x2)+(2x1x2)+(2x4x2)+(6x2)
30+2+4+6

22+2(4+2+1+0,6+0,6+1,8+1,8)+(1+0,5+0
22+4+4+2+2

34

47.6

REKAPITULASI BIAYA
GEDUNG REKTORAT UPTD PENDIDIKAN KESEHAT

NO

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN

II

PEKERJAAN STRUKTUR BAWAH

PEKERJAAN TANAH DAN PONDASI

III

PEKERJAAN LANTAI I

PEKERJAAN SELASAR DAN TRAP TANGGA

PEKERJAAN PASANGAN DAN PLESTERAN

PEKERJAAN BETON BERTULANG

PEKERJAAN RAMP/TANJAKAN PLAT BETON

PEKERJAAN LANTAI

PEKERJAAN KOSEN PINTU DAN JENDELA

PEKERJAAN PENGUNCI DAN PENGGANTUNG

PEKERJAAN LANGIT-LANGIT

PEKERJAAN INSTALASI LISTRIK

PEKERJAAN PENGECATAN

SUB TO
IV

PEKERJAAN LANTAI 2

PEKERJAAN PASANGAN DAN PLESTERAN

PEKERJAAN BETON BERTULANG

PEKERJAAN BETON TAK BERTULANG

PEKERJAAN LANTAI

PEKERJAAN RANGKA ATAP

PEKERJAAN LANGIT-LANGIT

PEKERJAAN INSTALASI LISTRIK

PEKERJAAN KOSEN PINTU DAN JENDELA

PEKERJAAN PENGUNCI DAN PENGGANTUNG

PEKERJAAN PENGECATAN

V
VI

PEKERJAAN INSTALASI PLUMBING


PEKERJAAN SEPTICTANK

SUB TOT
JUMLAH I + II + III + IV + V + VI
PPN 10 %

TOTAL BIAYA
Terbilang :

DIBULATKAN
Satu Milyar Empat Ratus Enam Puluh Dua Juta Delapan Ratus Delapan Puluh Delap

Mengetahui :
KEPALA SEKOLAH MIN MEUREDUE

APITULASI BIAYA
PTD PENDIDIKAN KESEHATAN ACEH
TOTAL
JUMLAH
(Rp)
3

AAN

SUB TOTAL I +II+III

SUB TOTAL IV+V+VI


JUMLAH I + II + III + IV + V + VI

Rp.

27,458,000.00

Rp.

129,278,322.47

Rp.

20,162,251.19

Rp.

58,718,105.52

Rp.

356,834,784.36

Rp.

34,207,423.21

Rp.

58,217,469.83

Rp.

54,300,000.00

Rp.

4,152,000.00

Rp.

16,871,688.80

Rp.

12,932,000.00

Rp.

13,740,714.83

Rp.

786,872,760.21

Rp.

60,461,456.56

Rp.

100,138,661.26

Rp.

3,084,552.54

Rp.

40,432,619.64

Rp.

185,907,344.00

Rp.

20,947,967.96

Rp.

7,510,000.00

Rp.

72,100,000.00

Rp.

5,098,000.00

Rp.

18,617,394.37

Rp.

22,438,000.00

Rp.

6,290,326.64

Rp.

543,026,322.96

Rp.

1,329,899,083.18

Rp.

132,989,908.32

TOTAL BIAYA

Rp.

1,462,888,991.50

DIBULATKAN
Rp.
lapan Ratus Delapan Puluh Delapan Ribu Rupiah

1,462,888,000.00

RENCANA ANGGARAN BIAYA


GEDUNG REKTORAT UPTD PENDIDIKAN KES

NO.

URAIAN PEKERJAAN

VOLUME

STN

PEKERJAAN PERSIAPAN

Mobilisasi dan demobilisasi

1.000

Ls

Admistrasi dan Dokumentasi

4.000

Ls

Pembersihan Lapangan

416.000

m2

Pasang Blowplank

76.000

m'

Air Kerja

1,000.000

Ls

Listrik Kerja

4.000

Ls

P3k Sosial

4.000

Ls

Direksi Keet

15.000

m2

Barak Kerja

24.000

m2

II

PEKERJAAN STRUKTUR BAWAH

PEKERJAAN TANAH DAN PONDASI

Pondasi Tapak Type P1 = 13 Unit


117.936

m3

29.484

m3

- Urugan Pasir Alas Pondasi t = 5 cm

2.106

m3

- Lantai Kerja Plat Beton 180 x 180 cm

4.212

m3

16.536

m3

18.816

m3

- Urugan Kembali Bekas Galian

4.704

m3

- Urugan Pasir Alas Pondasi t = 5 cm

0.392

m3

- Lantai Kerja Plat Beton 140 x 140 cm

0.784

m3

- Tapak pondasi 140 x 140 dan Stik Kolom 30/50 cm

2.909

m3

- Galian Tanah Pondasi Menerus

106.164

m3

- Urugan Kembali Bekas Galian

26.541

m3

- Urugan Pasir Alas Pondasi t = 5 cm

19.660

m3

- Lantai Kerja Plat Beton 60 x 60 cm

5.898

m3

- Galian Tanah Pondasi


- Urugan Kembali Bekas Galian

- Tapak pondasi 180 x 180 dan Stik Kolom 40/60 cm


dari Pondasi Tapak ke sloof
2

Pondasi Tapak Type P2 = 4 Unit


- Galian Tanah Pondasi

dari Pondasi Tapak ke sloof


3

Pondasi Menerus (sloof 15/25 cm)

- Pasangan Batu Gunung 1 : 4

III

PEKERJAAN LANTAI I

PEKERJAAN SELASAR DAN TRAP TANGGA

35.388

m3

Pekerjaan Selasar Depan dan Belakang


1

Galian Tanah Pondasi Menerus

45.857

m3

Urugan Kembali Bekas Galian

11.464

m3

Urugan Pasir Alas Pondasi t = 5 cm

2.123

m3

Lantai Kerja Plat Beton

2.548

m3

Pasangan Batu Gunung 1 : 4

15.286

m3

Pasangan Trasram Bata 1 : 2

9.692

m2

Plesteran 1 : 2

19.384

m2

Pekerjaan Trap Tangga Pada Selasar 2 Unit


1

Galian Tanah

1.080

m3

Urugan Kembali Bekas Galian

0.270

m3

Urugan Pasir Alas Pondasi t = 5 cm

6.088

m3

Lantai Kerja Plat Beton 60 x 60 cm

6.088

m3

Pasangan Trasram Bata 1 : 2

8.280

m2

Plesteran 1 : 2

16.560

m2

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Trasram Bata 1 : 2 dibawah Lantai

59.950

m2

Plesteran Trasram Bata 1 : 2 dibawah Lantai

119.900

m2

Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm

54.368

m2

Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm

108.735

m2

Pasangan Dinding Bata 1 : 4

194.792

m2

Plesteran Dinding Bata 1 : 4

389.583

m2

Dinding Keramik 30x60 kamar mandi

16.605

m2

Plesteran 1 : 3 (Kolom dan Balok)

52.920

m2

PEKERJAAN BETON BERTULANG

Sloof Beton 15/25 cm (Pondasi Menerus)

3.597

m3

Sloof Beton 15/25 cm (Selasar Depan,belakang)

2.005

m3

Kolom Beton 40/60 cm = 13 Kolom

11.232

m3

Kolom Beton 30/50 cm = 4 Kolom

2.160

m3

Kolom Praktis

1.377

m3

Balok Lantai 20/45 cm

10.485

m3

Balok Lantai 20/35 cm

8.057

m3

Plat Lantai T = 10 cm

20.336

m3

PEKERJAAN RAMP/TANJAKAN PLAT BETON

Galian Tanah

4.662

m3

Urugan Kembali Bekas Galian

1.166

m3

Urugan Pasir Alas Pondasi t = 5 cm

0.111

m3

Lantai Kerja Plat Beton 150 x 150 cm

0.219

m3

Pondasi dan Stik Kolom dari Pondasi Tapak ke sloof

1.315

m3

Bordes

0.450

m3

Anak Tangga

0.824

m3

Plat Lantai Tebal 6 cm

0.556

m3

Realling Besi Hollow

45.000

m'

10

Keramik + Spesi

8.978

m2

PEKERJAAN LANTAI
Ruangan

Timbunan Tanah Bawah Lantai T = 60 cm

64.700

m3

Timbunan Pasir Bawah Lantai T = 10 cm

10.790

m3

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

5.395

m3

Lantai Keramik 40 x 40 cm (Polished)

98.300

m2

Lantai Keramik 20 x 20 cm (Polished) kamar mandi

14.100

m2

Selasar
1

Timbunan Tanah Bawah Lantai T = 60 cm

70.560

m3

Timbunan Pasir Bawah Lantai T = 10 cm

11.760

m3

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

5.880

m3

Lantai Keramik 40 x 40 cm (polished)

113.100

m2

10.200

m3

Rollag Tangga
1

Timbunan Tanah Bawah Lantai T = 60 cm

Timbunan Pasir T = 10 cm

1.700

m3

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

0.850

m3

Lantai Keramik 40 x 40 cm (Polished)

15.120

m2

PEKERJAAN KOSEN PINTU DAN JENDELA

Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood

2.000

Bh

3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)

Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM )

6.000

Bh

Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)

6.000

Bh

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

6.000

Bh

dan Bingkai Alumunium Uk. 120 x 230 cm (J2)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

4.000

Bh

dan Bingkai Alumunium Uk. 120 x 168 cm (J2B)

Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 145 x 202 cm (J3B)

1.000

Bh

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

1.000

Bh

6.000

Bh

1.000

Bh

dan Bingkai Alumunium Uk. 180 x 236 cm (J4)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 54 x 120 cm (JKM2)

PEKERJAAN PENGUNCI DAN PENGGANTUNG

Kunci Tanam 2 Slaag

14.000

Bh

Engsel Pintu 4 Inchi

30.000

Bh

Engsel Jendela 3 Inchi

68.000

Bh

Grendel Jendela

24.000

Bh

Hak Angin Jendela

48.000

Bh

Tarikan/Pegangan Jendela

24.000

Bh

PEKERJAAN LANGIT-LANGIT

Pasang plafond gypsum tebal 9 mm

236.200

m2

Frame rangka plafond

236.200

m2

Pasang Cornice gypsum

219.800

m'

PEKERJAAN INSTALASI LISTRIK

I1

Panel Listrik

Box panel

1.000

Unit

MCB

7.000

Set

Volt Meter & Selector switch

1.000

Unit

Ampere Meter & Selector switch

1.000

Unit

Grounding unit panel

1.000

Unit

Kabel NYA 10 mm2

80.000

m'

Wiring panel and accessories

1.000

Ls

Armature, saklar, dan Stop Kontak


1

Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor

15.000

bh

Lampu TL bulat 20 W dilengkapi kapasitor

18.000

bh

Lampu TL Bulat 20 W

12.000

bh

Saklar double, setara broco

6.000

bh

Stop Kontak, setara broco

10.000

bh

Instalasi dengan kabel NYM 4 x 2,5 mm

45.000

Ttk

Testing and komisioning

1.000

Ls

PEKERJAAN PENGECATAN

Cat Tembok 3 Lapis + diplamir

578.146

m2

Cat Plafond 3 lapis + diplamir

236.200

m2

IV

PEKERJAAN LANTAI 2

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Dinding Bata 1 : 4

340.962

m2

Plesteran Dinding Bata 1 : 4

681.923

m2

Plesteran 1 : 3 (Kolom dan Ringbalk)

42.120

m2

PEKERJAAN BETON BERTULANG

Kolom Beton 40/60 cm = 11 Kolom

9.504

m3

Kolom Beton 40/60 cm Tinggi 570 cm = 2 Unit

2.736

m3

Kolom Praktis = 26 kolom

1.404

m3

Ring balok 15/20 cm

5.067

m3

PEKERJAAN BETON TAK BERTULANG

Kolom Cor pada Bagian Belakang Gedung

1.080

m3

Beton Cor Pada Selasar Belakang

3.060

m3

PEKERJAAN LANTAI

Pasangan Lantai Keramik 40 x 40 cm (Ruangan)

263.415

m2

Pasangan Lantai Keramik 20 x 20 cm (Kamar Mandi)

8.800

m2

PEKERJAAN RANGKA ATAP

Pasang Rangka Baja

475.120

m2

Pasang Penutup atap genteng metal + insulation anti bocor daan panas

475.120

m2

Pasang Rebung Genteng Metal

40.800

m'

Pasang Lisplank GRC

307.500

m'

PEKERJAAN LANGIT-LANGIT

Pasang plafond gypsum tebal 9 mm

282.815

m2

Frame rangka plafond

282.815

m2

Pasang Cornice gypsum

225.880

m2

Plafond Calcyboard

31.100

m2

PEKERJAAN INSTALASI LISTRIK


22.000

bh

Armature, saklar, dan Stop Kontak


1

Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor

Lampu TL bulat 20 W dilengkapi kapasitor

12.000

bh

Lampu TL Bulat 20 W

5.000

bh

Saklar double, setara broco

6.000

bh

Stop Kontak, setara broco

10.000

bh

Instalasi dengan kabel NYM 4 x 2,5 mm

39.000

Ttk

Testing and komisioning

1.000

Ls

PEKERJAAN KOSEN PINTU DAN JENDELA

Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood

2.000

Bh

3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)

Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM)

3.000

Bh

Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)

2.000

Bh

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

30.000

Bh

2.000

Bh

dan Bingkai Alumunium Uk. 40 x 230 cm (J1)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)

Kusen Jendela Alumunium 3" + Kaca polos 5 mm 225 x 290 cm (J3)

1.000

Bh

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

2.000

Bh

1.000

Bh

dan Bingkai Alumunium Uk. 180 x 236 cm (J4)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 180 x 352 cm (J6)

PEKERJAAN PENGUNCI DAN PENGGANTUNG

Kunci Tanam 2 Slaag

14.000

Bh

Engsel Pintu 4 Inchi

16.000

Bh

Engsel Jendela 3 Inchi

92.000

Bh

Grendel Jendela

42.000

Bh

Hak Angin Jendela

84.000

Bh

Tarikan/Pegangan Jendela

42.000

Bh

PEKERJAAN PENGECATAN

Cat Tembok 3 Lapis + diplamir

814.267

m2

Cat Plafond 3 lapis + diplamir

282.815

m2

PEKERJAAN INSTALASI PLUMBING

Instalasi Air

20.000

Bh

Kran Air

8.000

Bh

Kran Washtafel

4.000

Bh

Pemasangan Pengeriing air bak mandi

8.000

Bh

Memasang floor drain

8.000

Bh

memasang tempat sabun keramik

8.000

Bh

memasang closet jongkok

8.000

Bh

Memasang pipa air besih type AW dia. 1 " + Accessories

95.200

m'

Memasang pipa buangan air kotor type AW dia. 3" + Accessories

95.200

m'

10

Memasang pipa buangan air kotor type AW dia. 4" + Accessories

68.000

m'

11

Urinoir

18.000

Bh

12

Bak Cuci Tangan / Washtafel keramik

4.000

Bh

13

Shower

8.000

Bh

VI

PEKERJAAN SEPTICTANK

AN BIAYA
DIKAN KESEHATAN ACEH

ANALISA
5

HARGA

JUMLAH

SATUAN

HARGA

(Rp.)

(Rp.)

Taksir

2,500,000.00

2,500,000.00

Taksir

400,000.00

1,600,000.00

Taksir

3,000.00

1,248,000.00

Taksir

15,000.00

1,140,000.00

Taksir

2,500.00

2,500,000.00

Taksir

350,000.00

1,400,000.00

Taksir

60,000.00

240,000.00

Taksir

450,000.00

6,750,000.00

Taksir

420,000.00

10,080,000.00

Sub Jumlah

27,458,000.00

SNI-2835-2008-6.3

67,355.00

7,943,579.28

SNI-2835-2008-6.9

15,542.00

458,240.33

SNI-2835-2008-6.11

132,650.00

279,360.90

SNI-7394-2008-6.4

542,099.00

2,283,320.99

5,008,957.00

82,828,112.95

SNI-2835-2008-6.3

67,355.00

1,267,351.68

SNI-2835-2008-6.9

15,542.00

73,109.57

SNI-2835-2008-6.11

132,650.00

51,998.80

SNI-7394-2008-6.4

542,099.00

425,005.62

6,581,626.00

19,148,143.91

SNI-2835-2008-6.1

46,625.00

4,949,896.50

SNI-2835-2008-6.9

15,541.67

412,491.38

SNI-2835-2008-6.11

132,650.00

2,607,899.00

SNI-7394-2008-6.4

542,099.00

3,197,299.90

SNI-7394-2008-A

SNI-7394-2008-A

SNI-2836-2008-6.3

568,415.00
Sub Jumlah

3,352,511.67
129,278,322.47

SNI-2835-2008-6.1

46,625.00

2,138,073.30

SNI-2835-2008-6.9

15,541.67

178,172.78

SNI-2835-2008-6.11

132,650.00

281,615.95

SNI-7394-2008-6.4

542,099.00

1,381,051.41

SNI-2836-2008-6.3

568,415.00

8,688,564.32

SNI-6897-2008-6.7

93,151.00

902,819.49

SNI-2837-2008-6.2

46,134.00

894,261.46

SNI-2835-2008-6.1

46,625.00

50,355.00

SNI-2835-2008-6.9

15,541.67

4,196.25

SNI-2835-2008-6.11

132,650.00

807,573.20

SNI-7394-2008-6.4

542,099.00

3,300,298.71

SNI-6897-2008-6.7

93,151.00

771,290.28

SNI-2837-2008-6.2

46,134.00

763,979.04

Sub Jumlah

20,162,251.19

SNI-6897-2008-6.7

93,151.00

5,584,402.45

SNI-2837-2008-6.2

46,134.00

5,531,466.60

SNI-6897-2008-6.7

93,151.00

5,064,386.99

SNI-2837-2008-6.2

46,134.00

5,016,380.49

SNI-6897-2008-6.9

84,821.00

16,522,426.79

SNI-2837-2008-6.4

41,841.00

16,300,559.04

SNI-7395-2008-6.34a

149,609.00

2,484,257.45

SNI-2837-2008-6.3

41,841.00

2,214,225.72

Sub Jumlah

58,718,105.52

SNI-7394-2008-C

4,679,742.00

16,833,031.97

SNI-7394-2008-D

5,302,400.00

10,629,986.40

SNI-7394-2008-E

4,622,725.00

51,922,447.20

SNI-7394-2008-F

5,270,304.00

11,383,856.64

SNI-7394-2008-G

3,864,685.00

5,321,671.25

SNI-7394-2008-H

7,221,478.00

75,717,196.83

SNI-7394-2008-I

6,680,161.00

53,822,057.18

SNI-7394-2008-J

6,451,836.00

131,204,536.90

Sub Jumlah

356,834,784.36

SNI-2835-2008-6.3

67,355.00

314,009.01

SNI-2835-2008-6.9

22,451.67

26,167.42

SNI-2835-2008-6.11

132,650.00

14,724.15

SNI-7394-2008-6.4

542,099.00

118,741.36

SNI-7394-2008-K

2,772,586.00

3,645,257.44

SNI-7394-2008-L

5,829,878.00

2,623,445.10

SNI-7394-2008-6.8

745,061.00

614,253.43

SNI-7394-2008-M

5,437,637.00

3,021,966.76

Taksir

500,000.00

22,500,000.00

SNI-7395-2008-6.36

148,021.00

1,328,858.53

Sub Jumlah

34,207,423.21

SNI-2835 : 2008. 6.10

87,250.00

5,645,031.38

SNI-2835-2008-6.11

132,650.00

1,431,293.50

SNI-7394-2008-6.4a

542,099.00

2,924,624.11

SNI-7395-2008-6.34

148,549.00

14,602,366.70

SNI-7395-2008-6.36

148,021.00

2,087,096.10

SNI-2835 : 2008. 6.10

87,250.00

6,156,360.00

SNI-2835-2008-6.11

132,650.00

1,559,964.00

SNI-7394-2008-6.4a

542,099.00

3,187,542.12

SNI-7395-2008-6.34

148,549.00

16,800,891.90

SNI-2835 : 2008. 6.10

87,250.00

889,950.00

SNI-2835-2008-6.11

132,650.00

225,505.00

SNI-7394-2008-6.4a

542,099.00

460,784.15

SNI-7395-2008-6.34

148,549.00

2,246,060.88

Sub Jumlah

58,217,469.83

Taksir

3,000,000.00

6,000,000.00

Taksir

800,000.00

4,800,000.00

Taksir

2,000,000.00

12,000,000.00

Taksir

2,600,000.00

15,600,000.00

Taksir

1,500,000.00

6,000,000.00

Taksir

2,500,000.00

2,500,000.00

Taksir

5,200,000.00

5,200,000.00

Taksir

300,000.00

1,800,000.00

Taksir

400,000.00

400,000.00

Sub Jumlah

54,300,000.00

Taksir

120,000.00

1,680,000.00

Taksir

16,000.00

480,000.00

Taksir

12,000.00

816,000.00

Taksir

11,000.00

264,000.00

Taksir

12,000.00

576,000.00

Taksir

14,000.00

336,000.00

Sub Jumlah

4,152,000.00

SNI-2839-2008-6.7

35,999.00

8,502,963.80

Anl. Taksir (a)

26,125.00

6,170,725.00

Taksir

10,000.00

2,198,000.00

Sub Jumlah

16,871,688.80

Taksir

230,000.00

230,000.00

Taksir

46,000.00

322,000.00

Taksir

100,000.00

100,000.00

Taksir

1,900,000.00

1,900,000.00

Taksir

150,000.00

150,000.00

Taksir

21,500.00

1,720,000.00

Taksir

400,000.00

400,000.00

Taksir

70,000.00

1,050,000.00

Taksir

45,000.00

810,000.00

Taksir

40,000.00

480,000.00

Taksir

20,000.00

120,000.00

Taksir

120,000.00

1,200,000.00

Taksir

90,000.00

4,050,000.00

Taksir

400,000.00

400,000.00

Sub Jumlah

12,932,000.00

SNI-03-Cat-6.14.N

17,742.00

10,257,473.43

SNI-03-Cat-6.14a.N

14,747.00

3,483,241.40

Sub Jumlah

13,740,714.83

SNI-6897-2008-6.9

84,821.00

28,920,695.39

SNI-2837-2008-6.4

43,562.00

29,705,929.73

SNI-2837-2008-6.3

43,562.00

1,834,831.44

Sub Jumlah

60,461,456.56

SNI-7394-2008-N

4,622,725.00

43,934,378.40

SNI-7394-2008-N

4,622,725.00

12,647,775.60

SNI-7394-2008-G

3,864,685.00

5,426,017.74

SNI-7394-2008-P

7,525,705.00

38,130,489.52

Sub Jumlah

100,138,661.26

SNI-7394-2008-6.8

745,061.00

804,665.88

SNI-7394-2008-6.8

745,061.00

2,279,886.66

Sub Jumlah

3,084,552.54

SNI-7395-2008-6.34

148,549.00

39,130,034.84

SNI-7395-2008-6.36

148,021.00

1,302,584.80

Sub Jumlah

40,432,619.64

Taksir

170,000.00

80,770,400.00

Anl.Taksir (b)

156,150.00

74,189,988.00

Anl.Taksir c

80,195.00

3,271,956.00

Taksir

90,000.00

27,675,000.00

Sub Jumlah

185,907,344.00

SNI-2839-2008-6.7

35,999.00

10,181,057.19

Anl. Taksir (a)

26,125.00

7,388,541.88

Taksir

10,000.00

2,258,800.00

SNI-2839-2008-6.7

35,999.00

1,119,568.90

Sub Jumlah

Taksir

70,000.00

20,947,967.96

1,540,000.00

Taksir

45,000.00

540,000.00

Taksir

40,000.00

200,000.00

Taksir

20,000.00

120,000.00

Taksir

120,000.00

1,200,000.00

Taksir

90,000.00

3,510,000.00

Taksir

400,000.00

400,000.00

Sub Jumlah

7,510,000.00

Taksir

3,000,000.00

6,000,000.00

Taksir

800,000.00

2,400,000.00

Taksir

2,000,000.00

4,000,000.00

Taksir

1,300,000.00

39,000,000.00

Taksir

300,000.00

600,000.00

Taksir

1,900,000.00

1,900,000.00

Taksir

5,200,000.00

10,400,000.00

Taksir

7,800,000.00

7,800,000.00

Sub Jumlah

72,100,000.00

Taksir

120,000.00

1,680,000.00

Taksir

16,000.00

256,000.00

Taksir

12,000.00

1,104,000.00

Taksir

11,000.00

462,000.00

Taksir

12,000.00

1,008,000.00

Taksir

14,000.00

588,000.00

Sub Jumlah

5,098,000.00

SNI-03-Cat-6.14.N

17,742.00

14,446,721.57

SNI-03-Cat-6.14a.N

14,747.00

4,170,672.81

Sub Jumlah

18,617,394.37

Taksir

17,000.00

340,000.00

Taksir

30,000.00

240,000.00

Taksir

60,000.00

240,000.00

Taksir

200,000.00

1,600,000.00

Taksir

32,000.00

256,000.00

Taksir

60,000.00

480,000.00

Taksir

210,000.00

1,680,000.00

Taksir

22,500.00

2,142,000.00

Taksir

37,500.00

3,570,000.00

Taksir

62,500.00

4,250,000.00

Taksir

220,000.00

3,960,000.00

Taksir

800,000.00

3,200,000.00

Taksir

60,000.00

480,000.00

Sub Jumlah

22,438,000.00

JADWAL WA
Nama Penawar
Nama Pekerjaan
Tahun Anggaran

: CV. SULTAN AGUNG


: Pembangunan RKB Bertingkat SDLB Negeri Labui (Otsus)
: 2013

NO.

URAIAN KEGIATAN

VOLUME

SAT.

HARGA

JUMLAH

SATUA

HARGA

(Rp.)

(Rp.)

PEKERJAAN PERSIAPAN

Mobilisasi dan demobilisasi

1.00

Ls

2,500,000.00

2,500,000.00

Admistrasi dan Dokumentasi

4.00

Ls

400,000.00

1,600,000.00

Pembersihan Lapangan

416.00

m2

3,000.00

1,248,000.00

Pasang Blowplank

76.00

m'

15,000.00

1,140,000.00

Air Kerja

1,000.00

Ls

2,500.00

2,500,000.00

Listrik Kerja

4.00

Ls

350,000.00

1,400,000.00

P3k Sosial

4.00

Ls

60,000.00

240,000.00

Direksi Keet

15.00

m2

450,000.00

6,750,000.00

II

PEKERJAAN STRUKTUR BAWAH

PEKERJAAN TANAH DAN PONDASI

Pondasi Tapak Type P1 = 13 Unit


117.94

m3

67,355.00

7,943,579.28

29.48

m3

15,542.00

458,240.33

- Urugan Pasir Alas Pondasi t = 5 cm

2.11

m3

132,650.00

279,360.90

- Lantai Kerja Plat Beton 180 x 180 cm

4.21

m3

542,099.00

2,283,320.99

16.54

m3

5,008,957.00

82,828,112.95

18.82

m3

67,355.00

1,267,351.68

- Urugan Kembali Bekas Galian

4.70

m3

15,542.00

73,109.57

- Urugan Pasir Alas Pondasi t = 5 cm

0.39

m3

132,650.00

51,998.80

- Galian Tanah Pondasi


- Urugan Kembali Bekas Galian

- Tapak pondasi 180 x 180 dan Stik Kolom 40/60 cm


dari Pondasi Tapak ke sloof
2

Pondasi Tapak Type P2 = 4 Unit


- Galian Tanah Pondasi

- Lantai Kerja Plat Beton 140 x 140 cm

0.78

m3

542,099.00

425,005.62

- Tapak pondasi 140 x 140 dan Stik Kolom 30/50 cm

2.91

m3

6,581,626.00

19,148,143.91

- Galian Tanah Pondasi Menerus

106.16

m3

46,625.00

4,949,896.50

- Urugan Kembali Bekas Galian

26.54

m3

15,541.67

412,491.38

- Urugan Pasir Alas Pondasi t = 5 cm

19.66

m3

132,650.00

2,607,899.00

- Lantai Kerja Plat Beton 60 x 60 cm

5.90

m3

542,099.00

3,197,299.90

35.39

m3

568,415.00

20,115,070.02

dari Pondasi Tapak ke sloof


3

Pondasi Menerus (sloof 15/25 cm)

- Pasangan Batu Gunung 1 : 4


III

PEKERJAAN LANTAI I

PEKERJAAN SELASAR DAN TRAP TANGGA


Pekerjaan Selasar Depan dan Belakang

Galian Tanah Pondasi Menerus

45.86

m3

46,625.00

2,138,073.30

Urugan Kembali Bekas Galian

11.46

m3

15,541.67

178,172.78

Urugan Pasir Alas Pondasi t = 5 cm

2.12

m3

132,650.00

281,615.95

Lantai Kerja Plat Beton

2.55

m3

542,099.00

1,381,051.41

Pasangan Batu Gunung 1 : 4

15.29

m3

568,415.00

8,688,564.32

Pasangan Trasram Bata 1 : 2

9.69

m2

93,151.00

902,819.49

Plesteran 1 : 2

19.38

m2

46,134.00

894,261.46

Pekerjaan Trap Tangga Pada Selasar 2 Unit


1

Galian Tanah

1.08

m3

46,625.00

50,355.00

Urugan Kembali Bekas Galian

0.27

m3

15,541.67

4,196.25

Urugan Pasir Alas Pondasi t = 5 cm

6.09

m3

132,650.00

807,573.20

Lantai Kerja Plat Beton 60 x 60 cm

6.09

m3

542,099.00

3,300,298.71

Pasangan Trasram Bata 1 : 2

8.28

m2

93,151.00

771,290.28

Plesteran 1 : 2

16.56

m2

46,134.00

763,979.04

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Trasram Bata 1 : 2 dibawah Lantai

59.95

m2

93,151.00

5,584,402.45

Plesteran Trasram Bata 1 : 2 dibawah Lantai

119.90

m2

46,134.00

5,531,466.60

Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm

54.37

m2

93,151.00

5,064,386.99

Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm

108.74

m2

46,134.00

5,016,380.49

Pasangan Dinding Bata 1 : 4

194.79

m2

84,821.00

16,522,426.79

Plesteran Dinding Bata 1 : 4

389.58

m2

41,841.00

16,300,559.04

Dinding Keramik 30x60 kamar mandi

16.61

m2

149,609.00

2,484,257.45

Plesteran 1 : 3 (Kolom dan Balok)

52.92

m2

41,841.00

2,214,225.72

PEKERJAAN BETON BERTULANG

Sloof Beton 15/25 cm (Pondasi Menerus)

3.60

m3

4,679,742.00

16,833,031.97

Sloof Beton 15/25 cm (Selasar Depan,belakang)

2.00

m3

5,302,400.00

10,629,986.40

Kolom Beton 40/60 cm = 13 Kolom

11.23

m3

4,622,725.00

51,922,447.20

Kolom Beton 30/50 cm = 4 Kolom

2.16

m3

5,270,304.00

11,383,856.64

Kolom Praktis

1.38

m3

3,864,685.00

5,321,671.25

Balok Lantai 20/45 cm

10.49

m3

7,221,478.00

75,717,196.83

Balok Lantai 20/35 cm

8.06

m3

6,680,161.00

53,822,057.18

Plat Lantai T = 10 cm

20.34

m3

6,451,836.00

131,204,536.90

PEKERJAAN RAMP/TANJAKAN PLAT BETON

Galian Tanah

4.66

m3

67,355.00

314,009.01

Urugan Kembali Bekas Galian

1.17

m3

22,451.67

26,167.42

Urugan Pasir Alas Pondasi t = 5 cm

0.11

m3

132,650.00

14,724.15

Lantai Kerja Plat Beton 150 x 150 cm

0.22

m3

542,099.00

118,741.36

Pondasi dan Stik Kolom dari Pondasi Tapak ke sloof

1.31

m3

2,772,586.00

3,645,257.44

Bordes

0.45

m3

5,829,878.00

2,623,445.10

Anak Tangga

0.82

m3

745,061.00

614,253.43

Plat Lantai Tebal 6 cm

0.56

m3

5,437,637.00

3,021,966.76

Realling Besi Hollow

45.00

m'

500,000.00

22,500,000.00

10

Keramik + Spesi

8.98

m2

148,021.00

1,328,858.53

PEKERJAAN LANTAI
Ruangan

Timbunan Tanah Bawah Lantai T = 60 cm

64.70

m3

87,250.00

5,645,031.38

Timbunan Pasir Bawah Lantai T = 10 cm

10.79

m3

132,650.00

1,431,293.50

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

5.40

m3

542,099.00

2,924,624.11

Lantai Keramik 40 x 40 cm (Polished)

98.30

m2

148,549.00

14,602,366.70

Lantai Keramik 20 x 20 cm (Polished) kamar mandi

14.10

m2

148,021.00

2,087,096.10

Selasar
1

Timbunan Tanah Bawah Lantai T = 60 cm

70.56

m3

87,250.00

6,156,360.00

Timbunan Pasir Bawah Lantai T = 10 cm

11.76

m3

132,650.00

1,559,964.00

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

5.88

m3

542,099.00

3,187,542.12

Lantai Keramik 40 x 40 cm (polished)

113.10

m2

148,549.00

16,800,891.90

10.20

m3

87,250.00

889,950.00

Rollag Tangga
1

Timbunan Tanah Bawah Lantai T = 60 cm

Timbunan Pasir T = 10 cm

1.70

m3

132,650.00

225,505.00

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

0.85

m3

542,099.00

460,784.15

Lantai Keramik 40 x 40 cm (Polished)

15.12

m2

148,549.00

2,246,060.88

2.00

Bh

3,000,000.000

6,000,000.00

PEKERJAAN KOSEN PINTU DAN JENDELA

Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood


3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)

Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM )

6.00

Bh

800,000.000

4,800,000.00

Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)

6.00

Bh

2,000,000.000

12,000,000.00

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

6.00

Bh

2,600,000.000

15,600,000.00

4.00

Bh

1,500,000.000

6,000,000.00

dan Bingkai Alumunium Uk. 120 x 230 cm (J2)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 120 x 168 cm (J2B)

Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 145 x 202 cm (J3B)

1.00

Bh

2,500,000.000

2,500,000.00

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

1.00

Bh

5,200,000.000

5,200,000.00

6.00

Bh

300,000.000

1,800,000.00

1.00

Bh

400,000.000

400,000.00

dan Bingkai Alumunium Uk. 180 x 236 cm (J4)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 54 x 120 cm (JKM2)

PEKERJAAN PENGUNCI DAN PENGGANTUNG

Kunci Tanam 2 Slaag

14.00

Bh

120,000.00

1,680,000.00

Engsel Pintu 4 Inchi

30.00

Bh

16,000.00

480,000.00

Engsel Jendela 3 Inchi

68.00

Bh

12,000.00

816,000.00

Grendel Jendela

24.00

Bh

11,000.00

264,000.00

Hak Angin Jendela

48.00

Bh

12,000.00

576,000.00

Tarikan/Pegangan Jendela

24.00

Bh

14,000.00

336,000.00

PEKERJAAN LANGIT-LANGIT

Pasang plafond gypsum tebal 9 mm

236.20

m2

35,999.00

8,502,963.80

Frame rangka plafond

236.20

M2

26,125.00

6,170,725.00

Pasang Cornice gypsum

219.80

M2

10,000.00

2,198,000.00

PEKERJAAN INSTALASI LISTRIK


Panel Listrik

Box panel

1.00

Unit

230,000.00

230,000.00

MCB

7.00

Set

46,000.00

322,000.00

Volt Meter & Selector switch

1.00

Unit

100,000.00

100,000.00

Ampere Meter & Selector switch

1.00

Unit

1,900,000.00

1,900,000.00

Grounding unit panel

1.00

Unit

150,000.00

150,000.00

Kabel NYA 10 mm2

80.00

m'

21,500.00

1,720,000.00

1.00

Ls

400,000.00

400,000.00

Wiring panel and accessories


Armature, saklar, dan Stop Kontak

Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor

15.00

bh

70,000.00

1,050,000.00

Lampu TL bulat 20 W dilengkapi kapasitor

18.00

bh

45,000.00

810,000.00

Lampu TL Bulat 20 W

12.00

bh

40,000.00

480,000.00

Saklar double, setara broco

6.00

bh

20,000.00

120,000.00

Stop Kontak, setara broco

10.00

bh

120,000.00

1,200,000.00

Instalasi dengan kabel NYM 4 x 2,5 mm

45.00

Ttk

90,000.00

4,050,000.00

Testing and komisioning

1.00

Ls

400,000.00

400,000.00

PEKERJAAN PENGECATAN

Cat Tembok 3 Lapis + diplamir

578.15

m2

17,742.00

10,257,473.43

Cat Plafond 3 lapis + diplamir

236.20

m2

14,747.00

3,483,241.40

IV

PEKERJAAN LANTAI 2

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Dinding Bata 1 : 4

340.96

m2

84,821.00

28,920,695.39

Plesteran Dinding Bata 1 : 4

681.92

m2

43,562.00

29,705,929.73

Plesteran 1 : 3 (Kolom dan Ringbalk)

42.12

m2

43,562.00

1,834,831.44

PEKERJAAN BETON BERTULANG

Kolom Beton 40/60 cm = 11 Kolom

9.50

m3

4,622,725.00

43,934,378.40

Kolom Beton 40/60 cm Tinggi 570 cm = 2 Unit

2.74

m3

4,622,725.00

12,647,775.60

Kolom Praktis = 26 kolom

1.40

m3

3,864,685.00

5,426,017.74

Ring balok 15/20 cm

5.07

m3

7,525,705.00

38,130,489.52

PEKERJAAN BETON TAK BERTULANG

Kolom Cor pada Bagian Belakang Gedung

1.08

m3

745,061.00

804,665.88

Beton Cor Pada Selasar Belakang

3.06

m3

745,061.00

2,279,886.66

PEKERJAAN LANTAI

Pasangan Lantai Keramik 40 x 40 cm (Ruangan)

263.42

m2

148,549.00

39,130,034.84

Pasangan Lantai Keramik 20 x 20 cm (Kamar Mandi)

8.80

m2

148,021.00

1,302,584.80

PEKERJAAN RANGKA ATAP

Pasang Rangka Baja

475.12

m2

170,000.00

80,770,400.00

Pasang Penutup atap genteng metal + insulation anti bocor daan panas

475.12

m2

156,150.00

74,189,988.00

Pasang Rebung Genteng Metal

40.80

m'

80,195.00

3,271,956.00

Pasang Lisplank GRC

307.50

m'

90,000.00

27,675,000.00

PEKERJAAN LANGIT-LANGIT

Pasang plafond gypsum tebal 9 mm

282.82

m2

35,999.00

10,181,057.19

Frame rangka plafond

282.82

m2

26,125.00

7,388,541.88

Pasang Cornice gypsum

225.88

m2

10,000.00

2,258,800.00

Plafond Calcyboard

PEKERJAAN INSTALASI LISTRIK

31.10

m2

35,999.00

1,119,568.90

Armature, saklar, dan Stop Kontak


1

Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor

22.00

bh

70,000.00

1,540,000.00

Lampu TL bulat 20 W dilengkapi kapasitor

12.00

bh

45,000.00

540,000.00

Lampu TL Bulat 20 W

5.00

bh

40,000.00

200,000.00

Saklar double, setara broco

6.00

bh

20,000.00

120,000.00

Stop Kontak, setara broco

10.00

bh

120,000.00

1,200,000.00

Instalasi dengan kabel NYM 4 x 2,5 mm

39.00

Ttk

90,000.00

3,510,000.00

Testing and komisioning

1.00

Ls

400,000.00

400,000.00

2.00

Bh

3,000,000.00

6,000,000.00

PEKERJAAN KOSEN PINTU DAN JENDELA

Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood


3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)

Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM)

3.00

Bh

800,000.00

2,400,000.00

Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)

2.00

Bh

2,000,000.00

4,000,000.00

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

30.00

Bh

1,300,000.00

39,000,000.00

2.00

Bh

300,000.00

600,000.00

dan Bingkai Alumunium Uk. 40 x 230 cm (J1)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)

Kusen Jendela Alumunium 3" + Kaca polos 5 mm 225 x 290 cm (J3)

1.00

Bh

1,900,000.00

1,900,000.00

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

2.00

Bh

5,200,000.00

10,400,000.00

1.00

Bh

7,800,000.00

7,800,000.00

dan Bingkai Alumunium Uk. 180 x 236 cm (J4)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

PEKERJAAN PENGUNCI DAN PENGGANTUNG

Kunci Tanam 2 Slaag

14.00

Bh

120,000.00

1,680,000.00

Engsel Pintu 4 Inchi

16.00

Bh

16,000.00

256,000.00

Engsel Jendela 3 Inchi

92.00

Bh

12,000.00

1,104,000.00

Grendel Jendela

42.00

Bh

11,000.00

462,000.00

Hak Angin Jendela

84.00

Bh

12,000.00

1,008,000.00

Tarikan/Pegangan Jendela

42.00

Bh

14,000.00

588,000.00

PEKERJAAN PENGECATAN

Cat Tembok 3 Lapis + diplamir

814.27

m2

17,742.00

14,446,721.57

Cat Plafond 3 lapis + diplamir

282.82

m2

14,747.00

4,170,672.81

PEKERJAAN INSTALASI PLUMBING

Instalasi Air

20.00

Bh

17,000.00

340,000.00

Kran Air

8.00

Bh

30,000.00

240,000.00

Kran Washtafel

4.00

Bh

60,000.00

240,000.00

Pemasangan Pengeriing air bak mandi

8.00

Bh

200,000.00

1,600,000.00

Memasang floor drain

8.00

Bh

32,000.00

256,000.00

memasang tempat sabun keramik

8.00

Bh

60,000.00

480,000.00

memasang closet jongkok

8.00

Bh

210,000.00

1,680,000.00

Memasang pipa air besih type AW dia. 1 " + Accessories

95.20

m'

22,500.00

2,142,000.00

Memasang pipa buangan air kotor type AW dia. 3" + Accessories

95.20

m'

37,500.00

3,570,000.00

10

Memasang pipa buangan air kotor type AW dia. 4" + Accessories

68.00

m'

62,500.00

4,250,000.00

11

Urinoir

18.00

Bh

220,000.00

3,960,000.00

12

Bak Cuci Tangan / Washtafel keramik

4.00

Bh

800,000.00

3,200,000.00

13

Shower

8.00

Bh

60,000.00

480,000.00

VI

PEKERJAAN SEPTICTANK

Pekerjaan Galian tanah

7.15

m3

56,925.00

407,013.75

Pekerjaan timbunan kembali lubang galian

1.79

m3

15,542.00

27,781.33

Cor Plat Lantai kerja 1 : 2 : 3

0.44

m3

6,451,836.00

2,854,937.43

Cor Beton Bertulang 1:2:3

0.59

m3

745,061.00

436,792.01

Pekerjaan Pasir Urug

0.23

m3

132,650.00

29,846.25

Pasangan Bata 1:2

6.09

m2

93,151.00

567,103.29

Plasteran 1 : 2

12.18

m2

46,134.00

561,727.58

Ijuk

50.00

Kg

16,662.50

833,125.00

Pipa PVC 4"

16.00

m'

32,000.00

512,000.00

10

Kerikil

0.36

m3

125,000.00

45,000.00

11

Pipa Hawa
TOTAL HARGA (Rp.)
TOTAL BOBOT (%)
PROGRES RENCANA MINGGUAN (%)
PROGRES RENCANA KUMULATIF MINGGUAN (%)

1.00

Bh

15,000.00

15,000.00
1,336,581,641.53

WAL WAKTU PELAKSANAAN

Jadwal Waktu Pelaksanaan

BOBOT
Bulan Ke - I

PEK.
(%)

0.187

0.19

0.120

0.12

0.093

0.09

0.085

0.09

0.187

0.19

0.105

0.10

0.018

0.02

0.505

0.51

0.594

0.59

0.034

0.03

0.021

0.02

0.171

0.17

6.197

0.095

0.09

0.005

0.01

0.004

0.00

Bulan Ke - II
4

3.10

3.10

Bulan Ke - III
8

10

11

Bulan Ke - IV
12

13

14

15

Bulan Ke - V
16

17

18

92.07

0.032

0.03

1.433

1.43

88.83

0.370

0.19

0.031

0.03

0.19

0.195

0.20

0.239

0.24

1.505

0.75

0.160

0.16

0.013

0.01

86.23

0.75

0.021

0.02

0.103

0.10

0.650

0.65

83.62

0.068

0.07

0.067

0.07

0.004

0.004

0.000

0.000

0.060

0.060

0.247

0.25

0.058

0.06

0.057

0.06

0.418

0.42

0.414
0.379

0.21
0.38

0.21

0.375
1.236

0.19

0.19

0.41

0.41

1.24

1.220
0.186

0.41

0.19

0.166

75.19

0.17

1.259

1.26

0.795

0.80

3.885

3.88

0.852

0.85

0.398

0.40

5.665

5.66

4.027

4.03

9.816

4.91

4.91

0.023

0.02

0.002

0.00

0.001

0.00

0.009

0.01

0.273

0.27

0.196

0.20

0.046

0.05

0.226

0.23

1.683

1.68

0.099

0.10

0.422

0.42

0.107

0.11

66.24

0.219

0.22

1.093

0.55

0.156
0.461

0.16
0.46

0.117

0.12

0.238

0.24

1.257

1.26

60.91
0.067

0.07

0.017

0.02

0.034

0.03

0.168

0.17

0.449

0.45

0.359

0.36

0.898

0.90

1.167

1.17

0.449

0.45

0.187

0.19

0.389

0.39

0.135

0.13

0.030

0.03

55.66

0.126

0.13

0.036

0.04

0.061

0.06

0.020

0.02

0.043

0.04

0.025

0.03

48.61
0.636

0.64

0.462

0.46

0.164

0.16

0.017

0.02

0.024

0.02

0.007

0.01

0.142

0.14

0.011

0.01

0.129

0.13

0.030

0.03

0.079

42.43

0.08

0.061

0.06

0.036

0.04

0.009

0.01

0.090

0.09

0.303

0.30

0.030

0.03

0.767

0.261

2.164

37.06

0.72

2.223
0.137

0.72

0.72

0.56

0.56

0.56

0.56

0.14

3.287

3.29

0.946

0.95

0.406

0.41

2.853

2.85

0.060

0.06

0.171

0.17

2.928
0.097

6.043

3.02

1.08

5.551

5.55

0.245

0.24

2.071

2.07

0.762

0.76

0.553

0.55

0.169

0.17

0.084

0.08

0.115

0.12

0.040

0.04

0.015

0.01

0.009

0.01

0.090

0.09

0.263

0.26

0.030

0.03

20.70

0.449

0.45

0.180

0.18

0.299

0.30

2.918

2.92

0.045

0.04

0.142

0.14

0.778

0.78

0.584

0.58

0.126

0.13

0.019

0.02

0.083

0.08

0.035
0.075

13.70

0.03
0.08

13.70
0.044

0.04

1.081
0.312

0.025

10.28

0.03

0.018

0.02

0.018

0.02

0.120

0.12

0.019

0.02

0.036

0.04

0.126

0.13

0.160

0.16

0.267

6.96

0.318

0.27
0.32

0.296

0.30

0.239

0.24

0.036

0.04

0.030

0.03

0.002

3.86

0.214

0.00
0.21

0.033

0.03

0.002

0.00

0.042

2.20

0.042
0.062

0.04
0.04
0.06

1.30

0.038
0.003

0.04
0.00

0.00

1.30
0.001

0.00

0.00
100.00
-

1.30

0.90

1.66

3.10

3.31

3.43

7.00

16.36

5.38

6.18

7.05

5.25

5.33

8.96

8.43

2.62

2.60

3.23

1.30

2.20

3.86

6.96

10.28

13.70

20.70

37.06

42.43

48.61

55.66

60.91

66.24

75.19

83.62

86.23

88.83

92.07

Waktu Pelaksanaan
Bulan Ke - V
19

KET (%)
20
100
98.06

95.64

92.07

88.83

86.23

83.62

75

75.19

66.24

0.55

60.91

50

55.66

48.61

42.43

0.77

0.26

25

2.93
0.10

1.08
0.31

3.57

2.42

95.64

98.06

JADWAL WAKTU PELAKSAN


Nama Penawar
Nama Pekerjaan
Tahun Anggaran

: CV. SULTAN AGUNG


: Pembangunan RKB Bertingkat SDLB Negeri Labui (Otsus)
: 2013

NO.

URAIAN KEGIATAN

JUMLAH

BOBOT

HARGA

PEK.

(Rp.)
I

PEKERJAAN PERSIAPAN

27,458,000.00

(%)
2.065

129,278,322.47

9.721

II

PEKERJAAN STRUKTUR BAWAH

PEKERJAAN TANAH DAN PONDASI

III

PEKERJAAN LANTAI I

PEKERJAAN SELASAR DAN TRAP TANGGA

20,162,251.19

1.516

PEKERJAAN PASANGAN DAN PLESTERAN

58,718,105.52

4.415

PEKERJAAN BETON BERTULANG

356,834,784.36

26.832

PEKERJAAN RAMP/TANJAKAN PLAT BETON

34,207,423.21

2.572

PEKERJAAN LANTAI

58,217,469.83

4.378

PEKERJAAN KOSEN PINTU DAN JENDELA

54,300,000.00

4.083

PEKERJAAN PENGUNCI DAN PENGGANTUNG

4,152,000.00

0.312

PEKERJAAN LANGIT-LANGIT

16,871,688.80

1.269

PEKERJAAN INSTALASI LISTRIK

12,932,000.00

0.972

PEKERJAAN PENGECATAN

13,740,714.83

1.033

IV

PEKERJAAN LANTAI 2

PEKERJAAN PASANGAN DAN PLESTERAN

60,461,456.56

4.546

PEKERJAAN BETON BERTULANG

100,138,661.26

7.530

PEKERJAAN BETON TAK BERTULANG

3,084,552.54

0.232

PEKERJAAN LANTAI

40,432,619.64

3.040

PEKERJAAN RANGKA ATAP

185,907,344.00

13.979

Bulan Ke - I
1

1.62

1.62

1.62

1.62

0.19

0.19

5.37

5.37

2.06

5.37

PEKERJAAN LANGIT-LANGIT

PEKERJAAN INSTALASI LISTRIK

PEKERJAAN KOSEN PINTU DAN JENDELA

PEKERJAAN PENGUNCI DAN PENGGANTUNG

PEKERJAAN PENGECATAN

V
VI

PEKERJAAN INSTALASI PLUMBING


PEKERJAAN SEPTICTANK
TOTAL HARGA (Rp.)
TOTAL BOBOT (%)

20,947,967.96

1.575

7,510,000.00

0.565

72,100,000.00

5.421

5,098,000.00

0.383

18,617,394.37

1.400

22,438,000.00

1.687

6,290,326.64

0.473

1,329,899,083.18
100.00

PROGRES RENCANA MINGGUAN (%)


PROGRES RENCANA KUMULATIF MINGGUAN (%)

2.06

1.62

6.99

7.18

7.18

2.06

3.68

10.67

17.85

25.02

TU PELAKSANAAN

Jadwal Waktu Pelaksanaan


Bulan Ke - II
6

1.62

1.62

0.19

0.19

5.37

Bulan Ke - III
8

10

11

0.19

0.19

0.19

0.19

0.55

0.55

0.55

1.29

1.29

0.34

0.34

Bulan Ke - IV
12

13

14

15

Bulan Ke - V
16

0.55

0.55

0.55

0.55

0.55

0.34

0.34

0.34

0.34

0.34

17

18

19

KET (%)
20

5.37
0.34

0.34

0.34

0.34

0.34

0.34

4.08
0.31
1.27
0.97
1.03

0.91
3.76

0.91

0.91

0.91

0.91

3.76
0.23
3.04
4.66

4.66

4.66

1.58
0.56
5.42
0.38
1.40
1.69
0.47

7.18

7.51

4.61

1.39

2.36

3.34

4.65

10.22

6.69

6.46

3.94

7.05

3.29

3.85

2.43

32.20

39.71

44.32

45.71

48.08

51.41

56.07

66.29

72.98

79.44

83.37

90.42

93.72

97.57

100.00

JADWAL WA
Nama Penawar
Nama Pekerjaan
Tahun Anggaran

: CV. SULTAN AGUNG


: Pembangunan RKB Bertingkat SDLB Negeri Labui (Otsus)
: 2013

NO.

URAIAN KEGIATAN

VOLUME

SAT.

HARGA

JUMLAH

SATUA

HARGA

(Rp.)

(Rp.)

PEKERJAAN PERSIAPAN

Mobilisasi dan demobilisasi

1.00

Ls

2,500,000.00

2,500,000.00

Admistrasi dan Dokumentasi

4.00

Ls

400,000.00

1,600,000.00

Pembersihan Lapangan

416.00

m2

3,000.00

1,248,000.00

Pasang Blowplank

76.00

m'

15,000.00

1,140,000.00

Air Kerja

1,000.00

Ls

2,500.00

2,500,000.00

Listrik Kerja

4.00

Ls

350,000.00

1,400,000.00

P3k Sosial

4.00

Ls

60,000.00

240,000.00

Direksi Keet

15.00

m2

450,000.00

6,750,000.00

II

PEKERJAAN STRUKTUR BAWAH

PEKERJAAN TANAH DAN PONDASI

Pondasi Tapak Type P1 = 13 Unit


117.94

m3

67,355.00

7,943,579.28

29.48

m3

15,542.00

458,240.33

- Urugan Pasir Alas Pondasi t = 5 cm

2.11

m3

132,650.00

279,360.90

- Lantai Kerja Plat Beton 180 x 180 cm

4.21

m3

542,099.00

2,283,320.99

16.54

m3

5,008,957.00

82,828,112.95

18.82

m3

67,355.00

1,267,351.68

- Urugan Kembali Bekas Galian

4.70

m3

15,542.00

73,109.57

- Urugan Pasir Alas Pondasi t = 5 cm

0.39

m3

132,650.00

51,998.80

- Galian Tanah Pondasi


- Urugan Kembali Bekas Galian

- Tapak pondasi 180 x 180 dan Stik Kolom 40/60 cm


dari Pondasi Tapak ke sloof
2

Pondasi Tapak Type P2 = 4 Unit


- Galian Tanah Pondasi

- Lantai Kerja Plat Beton 140 x 140 cm

0.78

m3

542,099.00

425,005.62

- Tapak pondasi 140 x 140 dan Stik Kolom 30/50 cm

2.91

m3

6,581,626.00

19,148,143.91

- Galian Tanah Pondasi Menerus

106.16

m3

46,625.00

4,949,896.50

- Urugan Kembali Bekas Galian

26.54

m3

15,541.67

412,491.38

- Urugan Pasir Alas Pondasi t = 5 cm

19.66

m3

132,650.00

2,607,899.00

- Lantai Kerja Plat Beton 60 x 60 cm

5.90

m3

542,099.00

3,197,299.90

35.39

m3

568,415.00

20,115,070.02

dari Pondasi Tapak ke sloof


3

Pondasi Menerus (sloof 15/25 cm)

- Pasangan Batu Gunung 1 : 4


III

PEKERJAAN LANTAI I

PEKERJAAN SELASAR DAN TRAP TANGGA


Pekerjaan Selasar Depan dan Belakang

Galian Tanah Pondasi Menerus

45.86

m3

46,625.00

2,138,073.30

Urugan Kembali Bekas Galian

11.46

m3

15,541.67

178,172.78

Urugan Pasir Alas Pondasi t = 5 cm

2.12

m3

132,650.00

281,615.95

Lantai Kerja Plat Beton

2.55

m3

542,099.00

1,381,051.41

Pasangan Batu Gunung 1 : 4

15.29

m3

568,415.00

8,688,564.32

Pasangan Trasram Bata 1 : 2

9.69

m2

93,151.00

902,819.49

Plesteran 1 : 2

19.38

m2

46,134.00

894,261.46

Pekerjaan Trap Tangga Pada Selasar 2 Unit


1

Galian Tanah

1.08

m3

46,625.00

50,355.00

Urugan Kembali Bekas Galian

0.27

m3

15,541.67

4,196.25

Urugan Pasir Alas Pondasi t = 5 cm

6.09

m3

132,650.00

807,573.20

Lantai Kerja Plat Beton 60 x 60 cm

6.09

m3

542,099.00

3,300,298.71

Pasangan Trasram Bata 1 : 2

8.28

m2

93,151.00

771,290.28

Plesteran 1 : 2

16.56

m2

46,134.00

763,979.04

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Trasram Bata 1 : 2 dibawah Lantai

59.95

m2

93,151.00

5,584,402.45

Plesteran Trasram Bata 1 : 2 dibawah Lantai

119.90

m2

46,134.00

5,531,466.60

Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm

54.37

m2

93,151.00

5,064,386.99

Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm

108.74

m2

46,134.00

5,016,380.49

Pasangan Dinding Bata 1 : 4

194.79

m2

84,821.00

16,522,426.79

Plesteran Dinding Bata 1 : 4

389.58

m2

41,841.00

16,300,559.04

Dinding Keramik 30x60 kamar mandi

16.61

m2

149,609.00

2,484,257.45

Plesteran 1 : 3 (Kolom dan Balok)

52.92

m2

41,841.00

2,214,225.72

PEKERJAAN BETON BERTULANG

Sloof Beton 15/25 cm (Pondasi Menerus)

3.60

m3

4,679,742.00

16,833,031.97

Sloof Beton 15/25 cm (Selasar Depan,belakang)

2.00

m3

5,302,400.00

10,629,986.40

Kolom Beton 40/60 cm = 13 Kolom

11.23

m3

4,622,725.00

51,922,447.20

Kolom Beton 30/50 cm = 4 Kolom

2.16

m3

5,270,304.00

11,383,856.64

Kolom Praktis

1.38

m3

3,864,685.00

5,321,671.25

Balok Lantai 20/45 cm

10.49

m3

7,221,478.00

75,717,196.83

Balok Lantai 20/35 cm

8.06

m3

6,680,161.00

53,822,057.18

Plat Lantai T = 10 cm

20.34

m3

6,451,836.00

131,204,536.90

PEKERJAAN RAMP/TANJAKAN PLAT BETON

Galian Tanah

4.66

m3

67,355.00

314,009.01

Urugan Kembali Bekas Galian

1.17

m3

22,451.67

26,167.42

Urugan Pasir Alas Pondasi t = 5 cm

0.11

m3

132,650.00

14,724.15

Lantai Kerja Plat Beton 150 x 150 cm

0.22

m3

542,099.00

118,741.36

Pondasi dan Stik Kolom dari Pondasi Tapak ke sloof

1.31

m3

2,772,586.00

3,645,257.44

Bordes

0.45

m3

5,829,878.00

2,623,445.10

Anak Tangga

0.82

m3

745,061.00

614,253.43

Plat Lantai Tebal 6 cm

0.56

m3

5,437,637.00

3,021,966.76

Realling Besi Hollow

45.00

m'

500,000.00

22,500,000.00

10

Keramik + Spesi

8.98

m2

148,021.00

1,328,858.53

PEKERJAAN LANTAI
Ruangan

Timbunan Tanah Bawah Lantai T = 60 cm

64.70

m3

87,250.00

5,645,031.38

Timbunan Pasir Bawah Lantai T = 10 cm

10.79

m3

132,650.00

1,431,293.50

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

5.40

m3

542,099.00

2,924,624.11

Lantai Keramik 40 x 40 cm (Polished)

98.30

m2

148,549.00

14,602,366.70

Lantai Keramik 20 x 20 cm (Polished) kamar mandi

14.10

m2

148,021.00

2,087,096.10

Selasar
1

Timbunan Tanah Bawah Lantai T = 60 cm

70.56

m3

87,250.00

6,156,360.00

Timbunan Pasir Bawah Lantai T = 10 cm

11.76

m3

132,650.00

1,559,964.00

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

5.88

m3

542,099.00

3,187,542.12

Lantai Keramik 40 x 40 cm (polished)

113.10

m2

148,549.00

16,800,891.90

10.20

m3

87,250.00

889,950.00

Rollag Tangga
1

Timbunan Tanah Bawah Lantai T = 60 cm

Timbunan Pasir T = 10 cm

1.70

m3

132,650.00

225,505.00

Beton Tumbuk Dibawah Lantai Keramik = 5 cm

0.85

m3

542,099.00

460,784.15

Lantai Keramik 40 x 40 cm (Polished)

15.12

m2

148,549.00

2,246,060.88

2.00

Bh

3,000,000.000

6,000,000.00

PEKERJAAN KOSEN PINTU DAN JENDELA

Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood


3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)

Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM )

6.00

Bh

800,000.000

4,800,000.00

Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)

6.00

Bh

2,000,000.000

12,000,000.00

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

6.00

Bh

2,600,000.000

15,600,000.00

4.00

Bh

1,500,000.000

6,000,000.00

dan Bingkai Alumunium Uk. 120 x 230 cm (J2)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 120 x 168 cm (J2B)

Kusen Jendela Alumunium 3" + Jalusi Alumunium Uk. 145 x 202 cm (J3B)

1.00

Bh

2,500,000.000

2,500,000.00

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

1.00

Bh

5,200,000.000

5,200,000.00

6.00

Bh

300,000.000

1,800,000.00

1.00

Bh

400,000.000

400,000.00

dan Bingkai Alumunium Uk. 180 x 236 cm (J4)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 54 x 120 cm (JKM2)

PEKERJAAN PENGUNCI DAN PENGGANTUNG

Kunci Tanam 2 Slaag

14.00

Bh

120,000.00

1,680,000.00

Engsel Pintu 4 Inchi

30.00

Bh

16,000.00

480,000.00

Engsel Jendela 3 Inchi

68.00

Bh

12,000.00

816,000.00

Grendel Jendela

24.00

Bh

11,000.00

264,000.00

Hak Angin Jendela

48.00

Bh

12,000.00

576,000.00

Tarikan/Pegangan Jendela

24.00

Bh

14,000.00

336,000.00

PEKERJAAN LANGIT-LANGIT

Pasang plafond gypsum tebal 9 mm

236.20

m2

35,999.00

8,502,963.80

Frame rangka plafond

236.20

M2

26,125.00

6,170,725.00

Pasang Cornice gypsum

219.80

M2

10,000.00

2,198,000.00

PEKERJAAN INSTALASI LISTRIK


Panel Listrik

Box panel

1.00

Unit

230,000.00

230,000.00

MCB

7.00

Set

46,000.00

322,000.00

Volt Meter & Selector switch

1.00

Unit

100,000.00

100,000.00

Ampere Meter & Selector switch

1.00

Unit

1,900,000.00

1,900,000.00

Grounding unit panel

1.00

Unit

150,000.00

150,000.00

Kabel NYA 10 mm2

80.00

m'

21,500.00

1,720,000.00

1.00

Ls

400,000.00

400,000.00

Wiring panel and accessories


Armature, saklar, dan Stop Kontak

Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor

15.00

bh

70,000.00

1,050,000.00

Lampu TL bulat 20 W dilengkapi kapasitor

18.00

bh

45,000.00

810,000.00

Lampu TL Bulat 20 W

12.00

bh

40,000.00

480,000.00

Saklar double, setara broco

6.00

bh

20,000.00

120,000.00

Stop Kontak, setara broco

10.00

bh

120,000.00

1,200,000.00

Instalasi dengan kabel NYM 4 x 2,5 mm

45.00

Ttk

90,000.00

4,050,000.00

Testing and komisioning

1.00

Ls

400,000.00

400,000.00

PEKERJAAN PENGECATAN

Cat Tembok 3 Lapis + diplamir

578.15

m2

17,742.00

10,257,473.43

Cat Plafond 3 lapis + diplamir

236.20

m2

14,747.00

3,483,241.40

IV

PEKERJAAN LANTAI 2

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Dinding Bata 1 : 4

340.96

m2

84,821.00

28,920,695.39

Plesteran Dinding Bata 1 : 4

681.92

m2

43,562.00

29,705,929.73

Plesteran 1 : 3 (Kolom dan Ringbalk)

42.12

m2

43,562.00

1,834,831.44

PEKERJAAN BETON BERTULANG

Kolom Beton 40/60 cm = 11 Kolom

9.50

m3

4,622,725.00

43,934,378.40

Kolom Beton 40/60 cm Tinggi 570 cm = 2 Unit

2.74

m3

4,622,725.00

12,647,775.60

Kolom Praktis = 26 kolom

1.40

m3

3,864,685.00

5,426,017.74

Ring balok 15/20 cm

5.07

m3

7,525,705.00

38,130,489.52

PEKERJAAN BETON TAK BERTULANG

Kolom Cor pada Bagian Belakang Gedung

1.08

m3

745,061.00

804,665.88

Beton Cor Pada Selasar Belakang

3.06

m3

745,061.00

2,279,886.66

PEKERJAAN LANTAI

Pasangan Lantai Keramik 40 x 40 cm (Ruangan)

263.42

m2

148,549.00

39,130,034.84

Pasangan Lantai Keramik 20 x 20 cm (Kamar Mandi)

8.80

m2

148,021.00

1,302,584.80

PEKERJAAN RANGKA ATAP

Pasang Rangka Baja

475.12

m2

170,000.00

80,770,400.00

Pasang Penutup atap genteng metal + insulation anti bocor daan panas

475.12

m2

156,150.00

74,189,988.00

Pasang Rebung Genteng Metal

40.80

m'

80,195.00

3,271,956.00

Pasang Lisplank GRC

307.50

m'

90,000.00

27,675,000.00

PEKERJAAN LANGIT-LANGIT

Pasang plafond gypsum tebal 9 mm

282.82

m2

35,999.00

10,181,057.19

Frame rangka plafond

282.82

m2

26,125.00

7,388,541.88

Pasang Cornice gypsum

225.88

m2

10,000.00

2,258,800.00

Plafond Calcyboard

PEKERJAAN INSTALASI LISTRIK

31.10

m2

35,999.00

1,119,568.90

Armature, saklar, dan Stop Kontak


1

Lampu TL 2 x 40 W, setara artolite dilengkapi kapasitor

22.00

bh

70,000.00

1,540,000.00

Lampu TL bulat 20 W dilengkapi kapasitor

12.00

bh

45,000.00

540,000.00

Lampu TL Bulat 20 W

5.00

bh

40,000.00

200,000.00

Saklar double, setara broco

6.00

bh

20,000.00

120,000.00

Stop Kontak, setara broco

10.00

bh

120,000.00

1,200,000.00

Instalasi dengan kabel NYM 4 x 2,5 mm

39.00

Ttk

90,000.00

3,510,000.00

Testing and komisioning

1.00

Ls

400,000.00

400,000.00

2.00

Bh

3,000,000.00

6,000,000.00

PEKERJAAN KOSEN PINTU DAN JENDELA

Kusen Pintu Alumunium 4" + Daun Pintu Double Plywood


3 cm dan kaca 5 mm Bingkai Alumunium Uk.130 x 215 cm (PJ1)

Kusen Alumunium + Pintu PVC uk.70 x 215 cm (PKM)

3.00

Bh

800,000.00

2,400,000.00

Kusen Pintu Alumunium 4" + Daun Pintu Multiplex 9 mm (P1)

2.00

Bh

2,000,000.00

4,000,000.00

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

30.00

Bh

1,300,000.00

39,000,000.00

2.00

Bh

300,000.00

600,000.00

dan Bingkai Alumunium Uk. 40 x 230 cm (J1)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm


dan Bingkai Alumunium Uk. 52 x 54 cm (JKM)

Kusen Jendela Alumunium 3" + Kaca polos 5 mm 225 x 290 cm (J3)

1.00

Bh

1,900,000.00

1,900,000.00

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

2.00

Bh

5,200,000.00

10,400,000.00

1.00

Bh

7,800,000.00

7,800,000.00

dan Bingkai Alumunium Uk. 180 x 236 cm (J4)

Kusen Jendela Alumunium 3" + Daun Jendela kaca polos 5 mm

PEKERJAAN PENGUNCI DAN PENGGANTUNG

Kunci Tanam 2 Slaag

14.00

Bh

120,000.00

1,680,000.00

Engsel Pintu 4 Inchi

16.00

Bh

16,000.00

256,000.00

Engsel Jendela 3 Inchi

92.00

Bh

12,000.00

1,104,000.00

Grendel Jendela

42.00

Bh

11,000.00

462,000.00

Hak Angin Jendela

84.00

Bh

12,000.00

1,008,000.00

Tarikan/Pegangan Jendela

42.00

Bh

14,000.00

588,000.00

PEKERJAAN PENGECATAN

Cat Tembok 3 Lapis + diplamir

814.27

m2

17,742.00

14,446,721.57

Cat Plafond 3 lapis + diplamir

282.82

m2

14,747.00

4,170,672.81

PEKERJAAN INSTALASI PLUMBING

Instalasi Air

20.00

Bh

17,000.00

340,000.00

Kran Air

8.00

Bh

30,000.00

240,000.00

Kran Washtafel

4.00

Bh

60,000.00

240,000.00

Pemasangan Pengeriing air bak mandi

8.00

Bh

200,000.00

1,600,000.00

Memasang floor drain

8.00

Bh

32,000.00

256,000.00

memasang tempat sabun keramik

8.00

Bh

60,000.00

480,000.00

memasang closet jongkok

8.00

Bh

210,000.00

1,680,000.00

Memasang pipa air besih type AW dia. 1 " + Accessories

95.20

m'

22,500.00

2,142,000.00

Memasang pipa buangan air kotor type AW dia. 3" + Accessories

95.20

m'

37,500.00

3,570,000.00

10

Memasang pipa buangan air kotor type AW dia. 4" + Accessories

68.00

m'

62,500.00

4,250,000.00

11

Urinoir

18.00

Bh

220,000.00

3,960,000.00

12

Bak Cuci Tangan / Washtafel keramik

4.00

Bh

800,000.00

3,200,000.00

13

Shower

8.00

Bh

60,000.00

480,000.00

VI

PEKERJAAN SEPTICTANK

Pekerjaan Galian tanah

7.15

m3

56,925.00

407,013.75

Pekerjaan timbunan kembali lubang galian

1.79

m3

15,542.00

27,781.33

Cor Plat Lantai kerja 1 : 2 : 3

0.44

m3

6,451,836.00

2,854,937.43

Cor Beton Bertulang 1:2:3

0.59

m3

745,061.00

436,792.01

Pekerjaan Pasir Urug

0.23

m3

132,650.00

29,846.25

Pasangan Bata 1:2

6.09

m2

93,151.00

567,103.29

Plasteran 1 : 2

12.18

m2

46,134.00

561,727.58

Ijuk

50.00

Kg

16,662.50

833,125.00

Pipa PVC 4"

16.00

m'

32,000.00

512,000.00

10

Kerikil

0.36

m3

125,000.00

45,000.00

11

Pipa Hawa
TOTAL HARGA (Rp.)
TOTAL BOBOT (%)
PROGRES RENCANA MINGGUAN (%)
PROGRES RENCANA KUMULATIF MINGGUAN (%)

1.00

Bh

15,000.00

15,000.00
1,336,581,641.53

WAL WAKTU PELAKSANAAN

Jadwal Waktu Pelaksanaan

BOBOT
Bulan Ke - I

PEK.
(%)

0.187

0.19

0.120

0.12

0.093

0.09

0.085

0.09

0.187

0.19

0.105

0.10

0.018

0.02

0.505

0.51

0.594

0.59

0.034

0.03

0.021

0.02

0.171

0.17

6.197

0.095

0.09

0.005

0.01

0.004

0.00

Bulan Ke - II
4

3.10

3.10

Bulan Ke - III
8

10

11

Bulan Ke - IV
12

13

14

15

Bulan Ke - V
16

17

18

91.60

0.032

0.03

1.433

1.43

0.370

0.19

0.031

0.03

0.19

0.195

0.20

0.239

0.24

1.505

0.75

0.160

0.16

0.013

0.01

86.69
0.75

0.021

0.02

0.103

0.10

0.650

0.65

0.068

0.07

0.067

0.07

0.004

0.004

0.000

0.000

0.060

0.060

0.247

0.247

0.058

0.058

0.057

0.057

0.418

77.67

0.42

0.414
0.379

80.35

0.21
0.38

0.21

77.67

0.375
1.236

0.19

0.19

0.41

0.41

1.24

1.220
0.186

0.41

0.19

0.166

0.17

1.259

1.26

0.795

0.80

73.91

3.885

3.88

0.852

0.85

0.398

0.40

5.665

5.66

4.027

4.03

9.816

4.91

4.91

0.023

0.02

0.002

0.00

0.001

0.00

0.009

0.01

0.273

0.27

0.196

0.20

0.046

0.05

0.226

0.23

1.683

1.68

0.099

0.10

0.422

0.42

0.107

0.11

64.73

64.73

0.219

0.22

1.093

0.55

0.156
0.461

0.16
0.46

0.117

0.12

0.238

0.24

1.257

1.26

0.067

0.07

0.017

0.02

0.034

0.03

0.168

0.17

0.449

0.45

0.359

0.36

0.898

0.90

1.167

1.17

0.449

0.45

0.187

0.19

0.389

0.39

0.135

0.13

0.030

0.03

56.79

51.42

51.42
0.126

0.13

0.036

0.04

0.061

0.06

0.020

0.02

0.043

0.04

0.025

0.03

48.61
0.636

0.64

0.462

0.46

0.164

0.16

0.017

0.02

0.024

0.02

0.007

0.01

0.142

0.14

0.011

0.01

0.129

0.13

0.030

0.03

0.079

42.43

0.08

0.061

0.06

0.036

0.04

0.009

0.01

0.090

0.09

0.303

0.30

0.030

0.03

0.767

0.261

37.06
2.164

0.72

2.223
0.137

0.72

0.72

0.56

0.56

0.56

0.14

3.287

3.29

0.946

0.95

0.406

0.41

2.853

2.85

0.060

0.06

0.171

0.17

2.928
0.097

6.043

3.02

1.08

5.551

5.55

0.245

0.24

2.071

2.07

0.762

0.76

0.553

0.55

0.169

0.17

0.56

0.084

0.08

0.115

0.12

0.040

0.04

0.015

0.01

0.009

0.01

0.090

0.09

0.263

0.26

0.030

0.03

20.70
0.449

0.45

0.180

0.18

0.299

0.30

2.918

2.92

0.045

0.04

0.142

0.14

0.778

0.78

0.584

0.58

0.126

0.13

0.019

0.02

0.083

0.08

0.035
0.075

13.70

0.03
0.08

13.70
0.044

0.04

1.081
0.312

10.28

0.025

0.03

0.018

0.02

0.018

0.02

0.120

0.12

0.019

0.02

0.036

0.04

0.126

0.13

0.160

0.16

6.96

0.267

0.27

0.318

0.32

0.296

0.30

0.239

0.24

0.036

0.04

0.030

3.86

0.002
0.214
0.033
0.002
0.042

2.03

0.042
0.062
0.038
0.003
0.00

1.30

1.30

0.001
0.00

100.00
-

1.30

0.73

1.83

3.10

3.31

3.43

7.00

16.36

5.38

6.18

2.81

5.37

7.94

9.19

3.75

2.68

6.33

4.91

1.30

2.03

3.86

6.96

10.28

13.70

20.70

37.06

42.43

48.61

51.42

56.79

64.73

73.91

77.67

80.35

86.69

91.60

Waktu Pelaksanaan
Bulan Ke - V
19

KET (%)
20
98.06

95.64

91.60

100

86.69

75

80.35

77.67

77.67

73.91

64.73

64.73

0.55

50

56.79

51.42

51.42

48.61

43

0.77

0.26

25

2.93
0.10

1.08
0.31

0.03
0.00
0.21
0.03
0.00
0.04
0.04
0.06
0.04
0.00

0.00

4.04

2.42

95.64

98.06

ANALISA TEKNIS

NAMA PEKERJAAN

: GEDUNG REKTORAT UPTD PENDIDIKAN KESEHATAN ACEH

Pondasi Tapak Type P1 = 13 Unit


- Galian Tanah Pondasi
Volume Pekerjaan

117.936 M3

Faktor Tenaga Kerja

1.12

Kapasitas Kerja

1 / 1,12

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.90

19 Orang
117,936 / ( 0,9 x 19 )

- Urugan Kembali Bekas Galian


Volume Pekerjaan

29.484 m3

Faktor Tenaga Kerja

0.37

Kapasitas Kerja

1 / 0.37

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

2.70

3 Orang
29,484 / ( 2,69 x 3 )

- Urugan Pasir Alas Pondasi t = 5 cm


Volume Pekerjaan

2.106 m3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.23

1 Orang
2,106 / ( 3.23 x 1 )

Penggunaan Bahan
Pasir Urug

1.20

M3

- Lantai Kerja Plat Beton 180 x 180 cm


Volume Pekerjaan

4.212 m3

Faktor Tenaga Kerja

1.48

Kapasitas Kerja

1 / 1.48

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3 Orang
4,212 / ( 0.68 x 3 )

0.68

Penggunaan Bahan

Semen Portland

230.000

Kg

Pasir Beton

0.638

M3

Kerikil

0.761

M3

- Tapak pondasi 180 x 180 dan Stik Kolom 40/60 cm


Volume Pekerjaan

16.536 m3

Faktor Tenaga Kerja

3.65

Kapasitas Kerja

1 / 3.65

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

16,536 / ( 0.27 x 5 )

384.000

Kg

x
x

0.27

9 Orang

Penggunaan Bahan

Semen Portland

Pasir Beton

0.494

M3

Kerikil

0.770

M3

Besi Polos

288.518

Kg

Bekisting

4.000

M2

Pondasi Tapak Type P2 = 4 Unit


- Galian Tanah Pondasi
Volume Pekerjaan

18.816 M3

Faktor Tenaga Kerja

1.12

Kapasitas Kerja

1 / 1,12

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.90

8 Orang
18,816 / ( 0,9 x 8 )

- Urugan Kembali Bekas Galian


Volume Pekerjaan

4.704 M3

Faktor Tenaga Kerja

0.37

Kapasitas Kerja

1 / 0.37

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

2.70

2 Orang
4,704 / ( 2,69 x 3 )

- Urugan Pasir Alas Pondasi t = 5 cm


Volume Pekerjaan

0.392 M3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

3.23

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

1 Orang
0,392 / ( 3.23 x 1 )

Penggunaan Bahan
Pasir Urug

1.20

M3

- Lantai Kerja Plat Beton 140 x 140 cm


Volume Pekerjaan

0.784 m3

Faktor Tenaga Kerja

2.81

Kapasitas Kerja

1 / 1.48

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.36

3 Orang
0,784 / ( 0.36 x 3 )

Penggunaan Bahan

Semen Portland

230.000

Kg

Pasir Beton

0.638

M3

Kerikil

0.761

M3

- Tapak pondasi 140 x 140 dan Stik Kolom 30/50 cm


Volume Pekerjaan

2.909 m3

Faktor Tenaga Kerja

3.65

Kapasitas Kerja

1 / 3.65

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.27

4 Orang
2,909 / ( 0.27 x 4 )

Penggunaan Bahan

Semen Portland

384.000

Kg

x
x

Pasir Beton

0.494

M3

Kerikil

0.770

M3

Besi Polos

288.518

Kg

4.000

M2

Volume Pekerjaan

106.164 m3

Faktor Tenaga Kerja

0.78

Kapasitas Kerja

1 / 0,78

Bekisting

Pondasi Menerus (sloof 15/25 cm)


- Galian Tanah Pondasi

1.29

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

9 Orang
106,164 / ( 1.29 x 9 )

- Urugan Kembali Bekas Galian


Volume Pekerjaan

26.541 m3

Faktor Tenaga Kerja

0.26

Kapasitas Kerja

1 / 0.26

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.87

2 Orang
26,541 / ( 2,67 x 2 )

- Urugan Pasir Alas Pondasi t = 5 cm


Volume Pekerjaan

19.660 m3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.23

3 Orang
19,66 / ( 3.23 x 3 )

Penggunaan Bahan
Pasir Urug

1.20

M3

- Lantai Kerja Plat Beton 60 x 60 cm


Volume Pekerjaan

5.898 m3

Faktor Tenaga Kerja

2.81

Kapasitas Kerja

1 / 2,81

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.36

5 Orang
5,898 / ( 0.36 x 5 )

Penggunaan Bahan

Semen Portland

230.000

Kg

x
x
x

Pasir Beton

0.638

M3

Kerikil

0.761

M3

- Pasangan Batu Gunung 1 : 4


Volume Pekerjaan

35.388 m3

Faktor Tenaga Kerja

2.40

Kapasitas Kerja

1 / 2.40

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

8 Orang
35,388 / ( 0.42 x 8 )

0.42

Penggunaan Bahan

Batu Kali/Gunung

1.200

M3

Semen Portland

163.000

Kg

Pasir Pasang

0.520

M3

III

PEKERJAAN LANTAI I

PEKERJAAN SELASAR DAN TRAP TANGGA


Pekerjaan Selasar Depan

Galian Tanah Pondasi Menerus


Volume Pekerjaan

45.857 m3

Faktor Tenaga Kerja

0.78

Kapasitas Kerja

1 / 0.78

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

1.29

6 Orang
45,857 / ( 1,29 x 6)

Urugan Kembali Bekas Galian


Volume Pekerjaan

1.386 m3

Faktor Tenaga Kerja

0.26

Kapasitas Kerja

1 / 0.26

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.87

1 Orang
1.386 / ( 3.87 x 1 )

Urugan Pasir Alas Pondasi T = 5 cm


Volume Pekerjaan

2.123 m3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.23

1 Orang
2,123 / ( 3.23 x 1 )

Penggunaan Bahan
Pasir Urug
4

1.2 M3

Lantai Kerja Plat Beton


Volume Pekerjaan

Faktor Tenaga Kerja

2.81

Kapasitas Kerja

1 / 2,81

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

Penggunaan Bahan

2.548 m3
=

4 Orang
2,548 / ( 0.36 x 4 )

0.36

Semen Portland

230.000

Kg

Pasir Beton

0.638

M3

Kerikil

0.761

M3

Pasangan Batu Gunung 1 : 4


Volume Pekerjaan

15.286 m3

Faktor Tenaga Kerja

2.40

Kapasitas Kerja

1 / 2.40

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.42

7 Orang
15,286 / ( 0.42 x 7 )

Penggunaan Bahan

Batu Kali/Gunung

1.200 M3

Semen Portland

163.000 Kg

Pasir Pasang

0.520 M3

Volume Pekerjaan

9.692 m2

Faktor Tenaga Kerja

0.43

Kapasitas Kerja

1 / 0.43

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

Pasangan Trasram Bata 1 : 2

2.35

3 Orang
9,692 / ( 2.35 x 3 )

Penggunaan Bahan

Batu bata

70.000 Buah

Semen Portland

18.950

Kg

Pasir Pasang

0.038

M3

x
x
x

Plesteran 1 : 2
Volume Pekerjaan

19.384 m2

Faktor Tenaga Kerja

0.48

Kapasitas Kerja

1 / 0.48

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

19,384 / ( 2.08 x 3 )

Semen Portland

10.224

Kg

Pasir Pasang

0.020

M3

2.08

3 Orang

Penggunaan Bahan

Pekerjaan Trap Tangga Pada Selasar 2 Unit


1

Galian Tanah
Volume Pekerjaan

1.080 m3

Faktor Tenaga Kerja

0.78

Kapasitas Kerja

1 / 0.78

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

1.29

3 Orang
2,225 / ( 1,29 x 3)

Urugan Kembali Bekas Galian


Volume Pekerjaan

0.270 m3

Faktor Tenaga Kerja

0.26

Kapasitas Kerja

1 / 0.26

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.87

1 Orang
0.556/ ( 3.87 x 1 )

Urugan Pasir Alas Pondasi t = 5 cm


Volume Pekerjaan

6.088 m3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.23

1 Orang
6,088/ ( 3.23 x 1 )

Penggunaan Bahan
Pasir Urug
4

1.20

M3

Lantai Kerja Plat Beton 60 x 60 cm


Volume Pekerjaan

6.088 m3

Faktor Tenaga Kerja

2.81

Kapasitas Kerja

1 / 2,81

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.36

4 Orang
6,088 / ( 0.36 x 4 )

Penggunaan Bahan

Semen Portland

230.000

Kg

Pasir Beton

0.638

M3

Kerikil

0.761

M3

Pasangan Trasram Bata 1 : 2


Volume Pekerjaan

8.280 m2

Faktor Tenaga Kerja

0.43

Kapasitas Kerja

1 / 0.43

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

2.35

2 Orang
8,28 / ( 2.35 x 2 )

Penggunaan Bahan

Batu bata

70.000 Buah

Semen Portland

18.950

Kg

Pasir Pasang

0.038

M3

Plesteran Bata 1 : 2
Volume Pekerjaan

16.560 M2

Faktor Tenaga Kerja

0.48

Kapasitas Kerja

1 / 0.48

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

2.08

2 Orang
16,56 / ( 2.08 x 2)

Penggunaan Bahan

Semen Portland

10.224

Kg

Pasir Pasang

0.020

M3

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Trasram Bata 1 : 2 dibawah Lantai


Volume Pekerjaan

59.950 m2

Faktor Tenaga Kerja

0.43

Kapasitas Kerja

1 / 0.43

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

2.35

6 Orang
59,95 / ( 2.35 x 6 )

Penggunaan Bahan

Batu bata

70.000 Buah

Semen Portland

18.950

Kg

Pasir Pasang

0.038

M3

Volume Pekerjaan

119.900 m2

Faktor Tenaga Kerja

0.48

Kapasitas Kerja

1 / 0.48

Jumlah Tenaga Kerja

Plesteran Trasram Bata 1 : 2 dibawah Lantai

6 Orang

2.08

Waktu Yang Dibutuhkan

119,9 / ( 2.08 x 6 )

Penggunaan Bahan

Semen Portland
Pasir Pasang
3

=
=

10.224

Kg

0.020

M3

Pasangan Trasram Bata 1 : 2 diatas Lantai T = 20 cm


Volume Pekerjaan

54.368 m2

Faktor Tenaga Kerja

0.43

Kapasitas Kerja

1 / 0.43

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

2.35

4 Orang
54,368/ ( 2.35 x 4 )

Penggunaan Bahan

Batu bata

70.000 Buah

Semen Portland

18.950

Kg

Pasir Pasang

0.038

M3

Plesteran Trasram Bata 1 : 2 diatas Lantai T = 20 cm


Volume Pekerjaan

108.735 m2

Faktor Tenaga Kerja

0.48

Kapasitas Kerja

1 / 0.48

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

2.08

6 Orang
108,735 / ( 2.08 x 6 )

Penggunaan Bahan
10.224

Kg

0.020

M3

Volume Pekerjaan

121.864 m2

Faktor Tenaga Kerja

0.43

Kapasitas Kerja

1 / 0.43

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

Semen Portland
Pasir Pasang
5

Pasangan Dinding Bata 1 : 4

2.35

9 Orang
121.864 / ( 2.35 x 9 )

Penggunaan Bahan

Batu bata

80.000 Buah

Semen Portland

11.500

Kg

Pasir Pasang

0.043

M3

Volume Pekerjaan

389.583 m2

Faktor Tenaga Kerja

0.48

Kapasitas Kerja

1 / 0.48

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

Plesteran Dinding Bata 1 : 4

2.08

10 Orang
389,583 / ( 2.08 x 10 )

Penggunaan Bahan

Semen Portland

6.240

Kg

Pasir Pasang

0.024

M3

Dinding Keramik 30x60 kamar mandi


Volume Pekerjaan

16.605 m2

Faktor Tenaga Kerja

1.12

Kapasitas Kerja

1 / 1,12

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

16,605 / ( 0,89 x 4 )

Keramik

1.060

M2

Semen Portland

8.190

Kg

Pasir Pasang

0.045

M3

0.89

4 Orang

Penggunaan Bahan

Plesteran 1 : 3 (Kolom dan Balok)


Volume Pekerjaan

52.920 m2

Faktor Tenaga Kerja

0.48

Kapasitas Kerja

1 / 0.48

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

52,92 / ( 2.08 x 12 )

Semen Portland

7.776

Kg

Pasir Pasang

0.023

M3

2.08

7 Orang

Penggunaan Bahan

PEKERJAAN BETON BERTULANG

Sloof Beton 15/25 cm (Pondasi Menerus)


Volume Pekerjaan

Faktor Tenaga Kerja

3.597 m3
2.84

Kapasitas Kerja

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

1 / 2,84

0.35

3 Orang
3,597 / ( 0,35 x 3 )

Penggunaan Bahan

Semen Portland

384.000

Kg

Pasir Beton

0.494

M3

Kerikil

0.770

M3

Besi Polos

257.220

Kg

Bekisting

4.000

M2

Sloof Beton 15/25 cm (Selasar Depan,belakang)


Volume Pekerjaan

2.005 m3

Faktor Tenaga Kerja

2.84

Kapasitas Kerja

1 / 2,84

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.35

2 Orang
2 / ( 0,35 x 3 )

Penggunaan Bahan

Semen Portland

384.000

Kg

Pasir Beton

0.494

M3

Kerikil

0.770

M3

Besi Polos

307.813

Kg

Bekisting

4.000

M2

Kolom Beton 40/60 cm = 13 Kolom


Volume Pekerjaan

11.232 m3

Faktor Tenaga Kerja

3.88

Kapasitas Kerja

1 / 3.88

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

11,232 / ( 0.26 x 10 )

Semen Portland

384.000

Kg

Pasir Beton

0.494

M3

x
x

0.26

10 Orang

Penggunaan Bahan

Kerikil

0.770

M3

Besi Polos

215.757

Kg

Bekisting

4.000

M2

Kolom Beton 30/50 cm = 4 Kolom


Volume Pekerjaan

2.160 m3

Faktor Tenaga Kerja

3.88

Kapasitas Kerja

1 / 3.88

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.26

5 Orang
3.204 / ( 0.26 x 6 )

Penggunaan Bahan

Semen Portland

384.000

Kg

Pasir Beton

0.494

M3

Kerikil

0.770

M3

Besi Polos

268.376

Kg

Bekisting

4.000

M2

Kolom Praktis
Volume Pekerjaan

1.377 m3

Faktor Tenaga Kerja

3.88

Kapasitas Kerja

1 / 3.88

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.26

2 Orang
0,918 / ( 0.26 x 2 )

Penggunaan Bahan

Semen Portland

384.000

Kg

Pasir Beton

0.494

M3

Kerikil

0.770

M3

x
x
x

Besi Polos

154.163

Kg

Bekisting

125.360

M2

Volume Pekerjaan

10.485 m3

Faktor Tenaga Kerja

3.88

Kapasitas Kerja

1 / 3.89

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

10,485 / ( 0.26 x 6 )

Semen Portland

384.000

Kg

Pasir Beton

0.494

M3

Kerikil

0.770

M3

49.320

Kg

Balok Lantai 20/45 cm

0.26

6 Orang

Penggunaan Bahan

Besi Polos

Bekisting

4.000

M2

Balok Lantai 20/35 cm


Volume Pekerjaan

8.057 m3

Faktor Tenaga Kerja

3.88

Kapasitas Kerja

1 / 3.88

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.26

6 Orang
8,057 / ( 0.26 x 6 )

Penggunaan Bahan

Semen Portland

384.000

Kg

Pasir Beton

0.494

M3

Kerikil

0.770

M3

Besi Polos

267.480

Kg

Bekisting

4.000

M2

Plat Lantai T = 10 cm
Volume Pekerjaan

20.336 m3

Faktor Tenaga Kerja

3.88

Kapasitas Kerja

1 / 3.88

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.26

10 Orang
20,336 / ( 0.32 x 10 )

Penggunaan Bahan

Semen Portland

384.000

Kg

x
x

Pasir Beton

0.494

M3

Kerikil

0.770

M3

Besi Polos

348.780

Kg

Bekisting

4.000

M2

Volume Pekerjaan

4.662 m3

Faktor Tenaga Kerja

1.12

Kapasitas Kerja

1 / 1,12

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

PEKERJAAN RAMP/TANJAKAN PLAT BETON

Galian Tanah

Urugan Kembali Bekas Galian

3 Orang
4,662 / ( 1,29 x 6)

0.90

Volume Pekerjaan

1.166 m3

Faktor Tenaga Kerja

0.37

Kapasitas Kerja

1 / 0.37

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

2.70

1 Orang
1,166 / ( 3.87 x 1 )

Urugan Pasir Alas Pondasi T = 5 cm


Volume Pekerjaan

0.111 m3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.23

1 Orang
0,111 / ( 3.23 x 1 )

Penggunaan Bahan
Pasir Urug

1.20

M3

Lantai Kerja Plat Beton 150 x 150 cm


Volume Pekerjaan

0.219 m3

Faktor Tenaga Kerja

2.81

Kapasitas Kerja

1 / 2,81

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.36

1 Orang
0,219 / ( 0.36 x 2 )

Penggunaan Bahan

Semen Portland

230.000

Kg

Pasir Beton

0.638

M3

Kerikil

0.761

M3

Pondasi dan Stik Kolom dari Pondasi Tapak ke sloof


Volume Pekerjaan

1.315 m3

Faktor Tenaga Kerja

3.65

Kapasitas Kerja

1 / 3.65

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.27

2 Orang
1,315 / ( 0.27 x 3 )

Penggunaan Bahan

Semen Portland

384.000 Kg

Pasir Beton

0.494 M3

Kerikil

0.770 M3

Besi Polos

288.518 Kg

Bekisting

4.000 M2

Volume Pekerjaan

0.450 m3

Faktor Tenaga Kerja

3.88

Kapasitas Kerja

1 / 3.88

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

Bordes

0.26

2 Orang
0,428 / ( 0.26 x 1 )

Penggunaan Bahan

Semen Portland

384.000

Kg

Pasir Beton

0.494

M3

x
x

Kerikil

0.770

M3

Besi Polos

245.813

Kg

Bekisting

4.000

Kg

Anak Tangga
Volume Pekerjaan

0.824 m3

Faktor Tenaga Kerja

2.81

Kapasitas Kerja

1 / 2,81

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.36

2 Orang
0,824 / ( 0.26 x 2 )

Penggunaan Bahan

Semen Portland

230.000

Kg

x
x
x

Pasir Beton

0.638

M3

Kerikil

0.761

M3

Plat Lantai Tebal 6 cm


Volume Pekerjaan

Faktor Tenaga Kerja

3.88

Kapasitas Kerja

1 / 3.89

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

Penggunaan Bahan

0.556 m3
=

2 Orang
0,292 / ( 0.26 x 2 )

0.26

Semen Portland

384.000

Kg

Pasir Beton

0.494

M3

Kerikil

0.770

M3

Besi Polos

219.544

Kg

Bekisting

4.000

M2

Keramik + Spesi
Volume Pekerjaan

8.978 m2

Faktor Tenaga Kerja

1.12

Kapasitas Kerja

1 / 1,12

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.89

4 Orang
8,978/ ( 0.89 x 4 )

Penggunaan Bahan

Keramik Lantai 20 x 20 cm

1.060

M2

Semen Portland

10.400

Kg

Pasir Pasang

0.045

M3

Semen Putih (warna)

1.620

Kg

PEKERJAAN LANTAI
Ruangan

Timbunan Tanah Bawah Lantai T = 60 cm


Volume Pekerjaan

64.700 m3

Faktor Tenaga Kerja

0.55

Kapasitas Kerja

1 / 0.55

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

1.82

8 Orang
64,70 / ( 1.82 x 8 )

Penggunaan Bahan

Tanah Urug
2

1.200

M3

Timbunan Pasir Bawah Lantai T = 10 cm


Volume Pekerjaan

10.790 m3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

2 Orang
10.790 / ( 3.23 x 2 )

3.23

Penggunaan Bahan

Pasir Urug
3

1.200

M3

Beton Tumbuk Dibawah Lantai Keramik = 5 cm


Volume Pekerjaan

5.395 m3

Faktor Tenaga Kerja

1.48

Kapasitas Kerja

1 / 1.48

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.68

3 Orang
5.395 / ( 0.68 x 3 )

Penggunaan Bahan

Semen Portland

230.000

Kg

Pasir Beton

0.638

M3

Kerikil

0.761

M3

Lantai Keramik 40 x 40 cm (Polished)


Volume Pekerjaan

98.300 m2

Faktor Tenaga Kerja

1.12

Kapasitas Kerja

1 / 1.12

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.89

10 Orang
98.300 / ( 0.89 x 10 )

Penggunaan Bahan

Keramik Lantai 40 x 40 cm

1.060

M2

Semen Portland

8.190

Kg

x
x
x

Pasir Pasang

0.045

M3

Semen Putih (warna)

1.620

Kg

Lantai Keramik 20 x 20 cm (Polished) kamar mandi


Volume Pekerjaan

14.100 m2

Faktor Tenaga Kerja

1.12

Kapasitas Kerja

1 / 1.12

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.89

10 Orang
14.100 / ( 0.89 x 10 )

Penggunaan Bahan

Keramik Lantai 20 x 20 cm

1.060

M2

Semen Portland

10.400

Kg

0.045

M3

Pasir Pasang

Semen Putih (warna)

1.620

Kg

Selasar
1

Timbunan Tanah Bawah Lantai T = 60 cm


Volume Pekerjaan

70.560 m3

Faktor Tenaga Kerja

0.55

Kapasitas Kerja

1 / 0.55

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

24.000 / ( 1.82 x 5 )

1.200

1.82

5 Orang

Penggunaan Bahan

Tanah Urug

M3

Timbunan Pasir Bawah Lantai T = 10 cm


Volume Pekerjaan

11.760 m3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

11,7600 / ( 3.23 x 2 )

1.200

3.23

2 Orang

Penggunaan Bahan

Pasir Urug
3

M3

Timbunan Pasir Bawah Lantai bawah Ramp T = 10 cm


Volume Pekerjaan

6.270 m3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.23

1 Orang
6.270 / ( 3.23 x 1 )

Penggunaan Bahan

Pasir Urug
4

1.200

M3

Beton Tumbuk Dibawah Lantai Keramik = 5 cm


Volume Pekerjaan

Faktor Tenaga Kerja

1.600 m3
1.48

Kapasitas Kerja

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

1 / 1.48

0.68

2 Orang
1.600 / ( 0.68 x 2 )

Penggunaan Bahan

Semen Portland

230.000

Kg

Pasir Beton

0.638

M3

Kerikil

0.761

M3

Rollag Tangga
1

Timbunan Tanah Bawah Lantai T = 60 cm


Volume Pekerjaan

10.200 m3

Faktor Tenaga Kerja

0.55

Kapasitas Kerja

1 / 0,55

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

1.82

4 Orang
10,2/ ( 0.68 x 4 )

Penggunaan Bahan

Tanah Urug

1.200

Kg

Timbunan Pasir T = 10 cm
Volume Pekerjaan

0.310 M3

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

3.23

1 Orang
0,31 / ( 0.89 x 1 )

Penggunaan Bahan

Pasir Urug
3

1.200

M3

Beton Tumbuk Dibawah Lantai Keramik = 5 cm


Volume Pekerjaan

Faktor Tenaga Kerja

0.31

Kapasitas Kerja

1 / 0.31

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

Penggunaan Bahan

0.850 M3
=

1 Orang
0,85 / ( 0.89 x 1 )

3.23

Pasir Urug

1.200

M3

Lantai Keramik 40 x 40 cm (Polished)


Volume Pekerjaan

15.120 M2

Faktor Tenaga Kerja

1.12

Kapasitas Kerja

1 / 1,12

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

0.89

6 Orang
15,12 / ( 0,89 x 6 )

Penggunaan Bahan

Keramik Lantai 40 x 40 cm

1.060

M2

Semen Portland

8.190

Kg

Pasir Pasang

0.045

M3

Semen Putih (warna)

1.620

Kg

Volume Pekerjaan

282.815 m2

Faktor Tenaga Kerja

0.16

Kapasitas Kerja

1 / 0,16

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

PEKERJAAN LANGIT-LANGIT

Pasang plafond gypsum tebal 9 mm

6.25

6 Orang
282,815 / ( 6,25 x 6 )

Penggunaan Bahan

Gypsum board tebal 9 mm

0.364

Lbr

Paku skrup

0.110

Kg

Volume Pekerjaan

578.146 m2

Faktor Tenaga Kerja

0.09

Kapasitas Kerja

1 / 0,092

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

578,146/ ( 0.09 x 6 )

0.100

PEKERJAAN PENGECATAN

Cat Tembok 3 Lapis + diplamir

10.89

6 Orang

Penggunaan Bahan

Plamir

Kg

Cat Tembok Dasar

0.100

Kg

Cat Tembok Penutup2 x

0.260

Kg

Volume Pekerjaan

236.200 m2

Faktor Tenaga Kerja

0.09

Kapasitas Kerja

1 / 0,09

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

236,2 / ( 10,89 x 6 )

Dempul

0.080

Kg

Cat Tembok Penutup2 x

0.250

Kg

Volume Pekerjaan

340.962 m2

Faktor Tenaga Kerja

0.43

Kapasitas Kerja

1 / 0,43

Jumlah Tenaga Kerja

Waktu Yang Dibutuhkan

Cat Plafond 3 lapis + diplamir

10.89

6 Orang

Penggunaan Bahan

IV

PEKERJAAN LANTAI 2

PEKERJAAN PASANGAN DAN PLESTERAN

Pasangan Dinding Bata 1 : 4

2.35

10 Orang
340,96 / ( 2,35 x 10 )

Penggunaan Bahan

Batu bata

70.000 Buah

Semen Portland

11.500 Kg

Pasir Pasang

0.043 M3

Volume Pekerjaan

681.923 M2

Faktor Tenaga Kerja

0.48

Kapasitas Kerja

1 / 0,43

Plesteran Dinding Bata 1 : 4

2.08

KNIS

M3/Org/Hari
=

6.93

Hari

Minggu

Hari

Minggu

Hari

Minggu

M3/Org/Hari
=

3.64

M3/Org/Hari
=

0.65

2.11

M3

2.53 M3

M3/Org/Hari
=

2.08

Hari

Minggu

4.212

Kg

968.76 Kg

4.212

M3

2.69 M3

4.212

M3

3.21 M3

M3/Org/Hari
=

6.71

Hari

Minggu

16.536

Kg

6,349.82 Kg

16.536

M3

8.17 M3

16.536

M3

12.73 M3

16.536

Kg

2,366.70 Kg

16.536

M2

66.14 M2

M3/Org/Hari
=

2.63

Hari

Minggu

Hari

Minggu

M3/Org/Hari
=

M3/Org/Hari

0.87

0.12

0.39

M3

Hari

Minggu

0.47 M3

M3/Org/Hari
=

0.73

Hari

Minggu

0.784

Kg

180.32 Kg

0.784

M3

0.50 M3

0.784

M3

0.60 M3

M3/Org/Hari
=

2.66

Hari

Minggu

2.909

Kg

1,117.18 Kg

2.909

M3

1.44 M3

2.909

M3

2.24 M3

2.909

Kg

2,366.70 Kg

2.909

M2

11.64 M2

M3/Org/Hari

9.14

10

Hari

Minggu

Hari

Minggu

Hari

Minggu

M3/Org/Hari
=

3.43

M3/Org/Hari
=

2.03

19.660

M3

23.59 M3

M3/Org/Hari
=

3.31

Hari

Minggu

5.898

Kg

1,356.54 Kg

5.898

M3

3.76 M3

5.898

M3

4.49 M3

M3/Org/Hari
=

10.62

11

Hari

Minggu

35.388

M3

42.47 M3

35.388

Kg

5,768.24 Kg

35.388

M3

18.40 M3

M3/Org/Hari
=

5.92

Hari

Minggu

Hari

Minggu

Hari

Minggu

M3/Org/Hari
=

0.36

M3/Org/Hari
=

0.66

2.123 M3

23.592 M3

M3/Org/Hari
=

1.79

Hari

Minggu

2.548

Kg

585.95 Kg

2.548

M3

1.63 M3

2.548

M3

1.94 M3

M3/Org/Hari
=

5.24

Hari

Minggu

15.286

M3

18.34 M3

15.286

Kg

2,491.55 Kg

15.286

M3

7.95 M3

M2/Org/Hari
=

1.37

Hari

Minggu

9.692

Buah

678.44 Buah

9.692

Kg

183.66 Kg

9.692

M3

0.37 M3

M2/Org/Hari
=

3.10

Hari

Minggu

19.384

Kg

198.18 Kg

19.384

M3

0.39 M3

M3/Org/Hari
=

0.28

Hari

Minggu

Hari

Minggu

Hari

Minggu

M3/Org/Hari
=

0.07

M3/Org/Hari
=

1.89

6.088

M3

7.31 M3

M3/Org/Hari
=

4.27

Hari

Minggu

6.088

Kg

1,400.24 Kg

6.088

M3

3.88 M3

6.088

M3

4.63 M3

M2/Org/Hari
=

1.76

Hari

Minggu

8.280

Buah

579.60 Buah

8.280

Kg

156.91 Kg

8.280

M3

0.31 M3

M2/Org/Hari
=

3.97

Hari

Minggu

16.560

Kg

169.31 Kg

16.560

M3

0.33 M3

M2/Org/Hari
=

4.25

Hari

Minggu

59.950

Buah

4,196.50 Buah

59.950

Kg

1,136.05 Kg

59.950

M3

2.28 M3

M2/Org/Hari

9.59

10

Hari

Minggu

119.900

Kg

1,225.86 Kg

119.900

M3

2.40 M3

M2/Org/Hari
=

5.78

Hari

Minggu

54.368

Buah

3,805.73 Buah

54.368

Kg

1,030.26 Kg

54.368

M3

2.07 M3

M2/Org/Hari
=

8.70

Hari

Minggu

108.735

Kg

1,111.71 Kg

108.735

M3

2.17 M3

M2/Org/Hari
=

121.864

5.75

Buah

Hari

Minggu

9,749.09 Buah

121.864

Kg

1,401.43 Kg

121.864

M3

5.24 M3

M2/Org/Hari
=

18.70

19

Hari

Minggu

389.583

Kg

2,431.00 Kg

389.583

M3

9.35 M3

M2/Org/Hari
=

4.65

Hari

Minggu

16.605

M2

17.60 M2

16.605

Kg

135.99 Kg

16.605

M3

0.75 M3

M2/Org/Hari
=

3.63

Hari

Minggu

52.920

Kg

411.51 Kg

52.920

M3

1.22 M3

M3/Org/Hari
=

3.40

Hari

Minggu

3.597

Kg

1,381.25 Kg

3.597

M3

1.78 M3

3.597

M3

2.77 M3

3.597

Kg

1,156.52 Kg

3.597

M2

14.39 M2

M3/Org/Hari
=

2.84

Hari

Minggu

2.005

Kg

769.82

Kg

2.005

M3

0.99

M3

2.005

M3

1.54

M3

2.005

Kg

493.67

Kg

2.005

M2

8.02

M2

M3/Org/Hari
=

4.35

Hari

Minggu

11.232

Kg

4,313.09 Kg

11.232

M3

5.55 M3

11.232

M3

8.64 M3

11.232

Kg

2,423.39 Kg

11.232

M2

44.93 M2

M3/Org/Hari
=

1.67

Hari

Minggu

2.160

Kg

829.44 Kg

2.160

M3

1.07 M3

2.160

M3

1.66 M3

2.160

Kg

579.69 Kg

2.160

M2

8.64 M2

M3/Org/Hari
=

2.67

Hari

Minggu

1.377

Kg

528.77 Kg

1.377

M3

0.68 M3

1.377

M3

1.06 M3

1.377

Kg

212.28 Kg

1.377

M2

172.62 M2

M3/Org/Hari
=

6.77

Hari

Minggu

10.485

Kg

4,026.24 Kg

10.485

M3

5.18 M3

10.485

M3

8.07 M3

10.485

Kg

517.12 Kg

10.485

M2

41.94 M2

M3/Org/Hari
=

5.21

Hari

Minggu

8.057

Kg

3,093.89 Kg

8.057

M3

3.98 M3

8.057

M3

6.20 M3

8.057

Kg

1,355.24 Kg

3.877

M2

15.51 M2

M3/Org/Hari
=

7.88

Hari

Minggu

20.336

Kg

7,809.02 Kg

20.336

M3

10.05 M3

20.336

M3

15.65 M3

20.336

Kg

4,494.79 Kg

20.336

M2

81.34 M2

M3/Org/Hari
=

1.74

Hari

Minggu

M3/Org/Hari
=

0.43

Hari

Minggu

Hari

Minggu

M3/Org/Hari
=

0.03

0.111

M3

0.13 M3

M3/Org/Hari
=

0.61

Hari

Minggu

0.219

Kg

50.38 Kg

0.219

M3

0.14 M3

0.219

M3

0.17 M3

M3/Org/Hari
=

2.40

Hari

Minggu

1.315

Kg

504.86 Kg

1.315

M3

0.65 M3

1.315

M3

1.01 M3

1.315

Kg

379.33 Kg

1.315

M2

5.26 M2

M3/Org/Hari
=

0.87

Hari

Minggu

0.450

Kg

172.80 Kg

0.450

M3

0.22 M3

0.450

M3

0.35 M3

0.450

Kg

110.62 Kg

0.450

Kg

1.80 Kg

M3/Org/Hari
=

1.16

Hari

Minggu

0.824

Kg

189.62 Kg

0.824

M3

0.53 M3

0.824

M3

0.63 M3

M3/Org/Hari
=

1.08

Hari

Minggu

0.556

Kg

213.41 Kg

0.556

M3

0.27 M3

0.556

M3

0.43 M3

0.556

Kg

122.01 Kg

0.556

M2

2.22 M2

M2/Org/Hari
=

2.51

Hari

Minggu

8.978

M2

9.52 M2

8.978

Kg

93.37 Kg

8.978

M3

0.40 M3

8.978

Kg

14.54 Kg

M3/Org/Hari
=

64.700

4.45

M3

Hari

Minggu

77.64 M3

M3/Org/Hari
=

1.67

Hari

Minggu

10.790

M3

12.95 M3

M3/Org/Hari
=

2.66

Hari

Minggu

5.395

Kg

1,240.85 Kg

5.395

M3

3.44 M3

5.395

M3

4.11 M3

M2/Org/Hari
=

11.01

12

Hari

Minggu

98.300

M2

104.20 M2

98.300

Kg

805.08 Kg

98.300

M3

4.42 M3

98.300

Kg

159.25 Kg

M2/Org/Hari
=

1.58

Hari

Minggu

14.100

M2

14.95 M2

14.100

Kg

146.64 Kg

14.100

M3

0.63 M3

14.100

Kg

22.84 Kg

M3/Org/Hari
=

7.76

70.560

M3

Hari

Minggu

84.67 M3

M3/Org/Hari
=

1.82

11.760

M3

Hari

Minggu

14.11 M3

M3/Org/Hari
=

1.94

6.270

M3

Hari

Minggu

7.52 M3

M3/Org/Hari
=

1.18

Hari

Minggu

1.600

Kg

368.00 Kg

1.600

M3

1.02 M3

1.600

M3

1.22 M3

M3/Org/Hari
=

1.40

10.200

Kg

Hari

Minggu

12.24 Kg

M2/Org/Hari
=

0.10

0.310

M3

Hari

Minggu

0.37 M3

M2/Org/Hari
=

0.26

Hari

Minggu

0.850

M3

1.02 M3

M2/Org/Hari
=

2.82

Hari

Minggu

15.120

M2

16.03 M2

15.120

Kg

123.83 Kg

15.120

M3

0.68 M3

15.120

Kg

24.49 Kg

M2/Org/Hari
=

7.54

Hari

Minggu

282.815

Lbr

102.94 Lbr

282.815

Kg

31.11 Kg

M2/Org/Hari
=

578.146

8.85

Kg

Hari

Minggu

57.81 Kg

578.146

Kg

57.81 Kg

578.146

Kg

150.32 Kg

M2/Org/Hari
=

3.61

Hari

Minggu

236.200

Kg

18.90 Kg

236.200

Kg

59.05 Kg

14.49

15

Hari

Minggu

M2/Org/Hari
=

340.962

Buah

340.962

Kg

3,921.06 Kg

340.962

M3

14.66 M3

M2/Org/Hari

23,867.31 Buah

DAFTAR ANALISA HARGA SATUAN


Analisa

Uraian

Harga Satuan

SNI-2835-2008-6.1
1 M3 Galian tanah biasa sedalam 1 m
0.750

OH

Pekerja

@Rp

0.025

OH

Mandor

@Rp

0.775

Jumlah
Dibulatkan

SNI-2835-2008-6.2
1 M3 Galian tanah biasa sedalam 2 m
0.900

OH

Pekerja

@Rp

0.045

OH

Mandor

@Rp

0.945

Jumlah
Dibulatkan

SNI-2835-2008-6.3
1 M3 Galian tanah biasa sedalam 3 m
1.050

OH

Pekerja

@Rp

0.067

OH

Mandor

@Rp

1.117

Jumlah
Dibulatkan

SNI-2835-2008-6.9
1 M3 Urugan tanah kembali
0.250

OH

Pekerja

@Rp

0.008

OH

Mandor

@Rp

0.258

Jumlah
Dibulatkan

SNI-2835-2008-6.11
1 M3 Urugan Pasir
1.200

M3

Pasir Urug

@Rp

0.300

OH

Pekerja

@Rp

0.010

OH

Mandor

@Rp

0.310

Jumlah
Dibulatkan

SNI-2835 : 2008. 6.10


Mengurug 1 M3 Timbunan & Pemadatan Tanah
1.200

M3

Tanah Urug

@Rp

0.500

OH

Pekerja

@Rp

0.050

OH

Mandor

@Rp

0.550

Jumlah

Dibulatkan
SNI-2836-2008-6.3
1 M3 Pondasi Batu Kali/Gunung 1 : 4
1.200

M3

Batu Kali/Gunung

@Rp

163.000

Kg

Semen Portland

@Rp

0.520

M3

Pasir Pasang

@Rp

1.500

OH

Pekerja

@Rp

0.750

OH

Tukang

@Rp

0.075

OH

Kepala Tukang

@Rp

0.075

OH

Mandor

@Rp

2.400

Jumlah
Dibulatkan

SNI-2835 : 2008. 6.14


Memasang 1 M2 Lapisan Ijuk tebal 10 cm
6.000

Kg

Ijuk

@Rp

0.150

OH

Pekerja

@Rp

0.015

OH

Mandor

@Rp

0.165

Jumlah
Dibulatkan

SNI-6897-2008-6.7
1 M2 Pasangan Bata Merah tebal 1/2 bata adukan 1Pc : 2PP
70.000

Buah

Batu bata

@Rp

18.950

Kg

Semen Portland

@Rp

0.038

M3

Pasir Pasang

@Rp

0.300

OH

Pekerja

@Rp

0.100

OH

Tukang

@Rp

0.010

OH

Kepala Tukang

@Rp

0.015

OH

Mandor

@Rp

0.425

Jumlah
Dibulatkan

SNI-6897-2008-6.9
1 M2 Pasangan Bata Merah tebal 1/2 bata adukan 1Pc : 4Ps
70.000

Buah

Batu bata

@Rp

11.500

Kg

Semen Portland

@Rp

0.043

M3

Pasir Pasang

@Rp

0.300

OH

Pekerja

@Rp

0.100

OH

Tukang

@Rp

0.010

OH

Kepala Tukang

@Rp

0.015

OH

Mandor

@Rp

0.425

Jumlah
Dibulatkan

SNI-2837-2008-6.2
1 M2 Plesteran 1 Pc : 2 Ps : tebal 15 mm
10.224

Kg

Semen Portland

@Rp

0.020

M3

Pasir Pasang

@Rp

0.300

OH

Pekerja

@Rp

0.150

OH

Tukang

@Rp

0.015

OH

Kepala Tukang

@Rp

0.015

OH

Mandor

@Rp

0.480

Jumlah
Dibulatkan

SNI-2837-2008-6.3
1 M2 Plesteran 1 Pc : 3 Ps : tebal 15 mm
7.776

Kg

Semen Portland

@Rp

0.023

M3

Pasir Pasang

@Rp

0.300

OH

Pekerja

@Rp

0.150

OH

Tukang

@Rp

0.015

OH

Kepala Tukang

@Rp

0.015

OH

Mandor

@Rp

0.480

Jumlah
Dibulatkan

SNI-2837-2008-6.4
1 M2 Plesteran 1 Pc : 4 Ps : tebal 15 mm
6.240

Kg

Semen Portland

@Rp

0.024

M3

Pasir Pasang

@Rp

0.300

OH

Pekerja

@Rp

0.150

OH

Tukang

@Rp

0.015

OH

Kepala Tukang

@Rp

0.015

OH

Mandor

@Rp

0.480

Jumlah
Dibulatkan

SNI-7394-2008-6.4
1 M3 Lantai Kerja Beton Cor Mutu f'c = 7,4 Mpa (K 100)
230.000

Kg

Semen Portland

@Rp

0.638

M3

Pasir Beton

@Rp

0.761

M3

Kerikil

@Rp

1.200

OH

Pekerja

@Rp

0.200

OH

Tukang

@Rp

0.020

OH

Kepala Tukang

@Rp

0.060

OH

Mandor

@Rp

1.480

Jumlah
Dibulatkan

SNI-7394-2008-6.4a
1 M2 Lantai Cor Beton Tumbuk Tebal 5 Cm
0.050

Kali

SNI-7394-2008-6.4

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-6.5
Membuat 1 M3 Beton Mutu f'c = 14.5 Mpa (K 175), Slump (12 2) cm, w/c = 0.66
326.000

Kg

Semen Portland

@Rp

0.543

M3

Pasir Beton

@Rp

0.762

M3

Kerikil

@Rp

1.650

OH

Pekerja

@Rp

0.275

OH

Tukang

@Rp

0.028

OH

Kepala Tukang

@Rp

0.083

OH

Mandor

@Rp

2.036

Jumlah
Dibulatkan

SNI-7394-2008-6.7
Membuat 1 M3 Beton Mutu f'c = 19.3 Mpa (K 225), Slump (12 2) cm, w/c = 0.58
371.000

Kg

Semen Portland

@Rp

0.499

M3

Pasir Beton

@Rp

0.776

M3

Kerikil

@Rp

1.650

OH

Pekerja

@Rp

0.275

OH

Tukang

@Rp

0.028

OH

Kepala Tukang

@Rp

0.083

OH

Mandor

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-6.8
Membuat 1 M3 Beton Mutu f'c = 21.7 Mpa (K 250), Slump (12 2) cm, w/c = 0.56
384.000

Kg

Semen Portland

@Rp

0.494

M3

Pasir Beton

@Rp

0.770

M3

Kerikil

@Rp

1.650

OH

Pekerja

@Rp

0.275

OH

Tukang

@Rp

0.028

OH

Kepala Tukang

@Rp

0.083

OH

Mandor

2.806

@Rp
Jumlah
Dibulatkan

Beton Ready Mix K 250


1 M3 Beton Mutu f'c = 21.7 Mpa (K 250), Slump (12 2) cm, w/c = 0.56
SNI-7394-2008-6.17
1 Kg Pembesian dengan Besi Polos
1.050

Kg

Besi Beton Polos

@Rp

0.015

Kg

Kawat Beton

@Rp

0.007

OH

Pekerja

@Rp

0.007

OH

Tukang

@Rp

0.0007

OH

Kepala Tukang

@Rp

0.0004

OH

Mandor

@Rp

0.015

Jumlah
Dibulatkan

SNI-7394-2008-6.17a
1 Kg Pembesian dengan Besi Ulir
1.050

Kg

Besi Beton Ulir

@Rp

0.015

Kg

Kawat Beton

@Rp

0.007

OH

Pekerja

@Rp

0.007

OH

Tukang

@Rp

0.0007

OH

Kepala Tukang

@Rp

0.0004

OH

Mandor

@Rp

0.015

Jumlah
Dibulatkan

SNI-7394-2008-6.20
1 m2 Bekisting untuk Pondasi
0.040

M3

Kayu/Papan Bekisting

@Rp

0.300

Kg

Paku Kayu

@Rp

0.100

Ltr

Minyak Bekisting

@Rp

0.520

OH

Pekerja

@Rp

0.260

OH

Tukang

@Rp

0.026

OH

Kepala Tukang

@Rp

0.026

OH

Mandor

@Rp

0.832

Jumlah
Dibulatkan

SNI-7394-2008-6.21

1 m2 Bekisting untuk Sloof


0.045

M3

Kayu/Papan Bekisting

@Rp

0.300

Kg

Paku Kayu

@Rp

0.100

Ltr

Minyak Bekisting

@Rp

0.520

OH

Pekerja

@Rp

0.260

OH

Tukang

@Rp

0.026

OH

Kepala Tukang

@Rp

0.026

OH

Mandor

@Rp

0.832

Jumlah
Dibulatkan

SNI-7394-2008-6.22
1 m2 Bekisting untuk Kolom
0.040

M3

Kayu/Papan Bekisting

@Rp

0.400

Kg

Paku Kayu

@Rp

0.200

Ltr

Minyak Bekisting

@Rp

0.015

M3

Balok Kayu setara Kelas III

@Rp

0.350

Lbr

Plywood Tebal 9 mm

@Rp

2.000

Btg

Dolken Kayu 8 - 10 cm Pjg 4 m

@Rp

0.660

OH

Pekerja

@Rp

0.330

OH

Tukang

@Rp

0.033

OH

Kepala Tukang

@Rp

0.033

OH

Mandor

@Rp

1.056

Jumlah
Dibulatkan

SNI-7394-2008-6.23
1 m2 Bekisting untuk Balok
0.040

M3

Kayu/Papan Bekisting

@Rp

0.400

Kg

Paku Kayu

@Rp

0.200

Ltr

Minyak Bekisting

@Rp

0.018

M3

Balok Kayu setara Kelas III

@Rp

0.350

Lbr

Plywood Tebal 9 mm

@Rp

2.000

Btg

Dolken Kayu 8 - 10 cm Pjg 4 m

@Rp

0.660

OH

Pekerja

@Rp

0.330

OH

Tukang

@Rp

0.033

OH

Kepala Tukang

@Rp

0.033

OH

Mandor

@Rp

1.056

Jumlah
Dibulatkan

SNI-7394-2008-6.24
1 m2 Bekisting untuk Plat Lantai

0.040

M3

Kayu/Papan Bekisting

@Rp

0.400

Kg

Paku Kayu

@Rp

0.200

Ltr

Minyak Bekisting

@Rp

0.015

M3

Balok Kayu setara Kelas III

@Rp

0.350

Lbr

Plywood Tebal 9 mm

@Rp

6.000

Btg

Dolken Kayu 8 - 10 cm Pjg 4 m

@Rp

0.660

OH

Pekerja

@Rp

0.330

OH

Tukang

@Rp

0.033

OH

Kepala Tukang

@Rp

0.033

OH

Mandor

@Rp

1.056

Jumlah
Dibulatkan

SNI-7394-2008-A
1 m3 Beton Bertulang Pondasi Tapak + Stik Kolom 180x180
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

288.520

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Pondasi (SNI-7394-2008-6.20)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-B
1 m3 Beton Bertulang Pondasi Tapak + Stik Kolom 140x140
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

343.121

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Pondasi (SNI-7394-2008-6.20)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-C
1 m3 Beton Bertulang Sloof Beton 15/25 (Pondasi Menerus)
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

257.220

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Sloof (SNI-7394-2008-6.21)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-D
1 m3 Beton Bertulang Sloof Beton 15/25 (selasar)
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

307.813

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Sloof (SNI-7394-2008-6.21)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-E
1 m3 Beton Bertulang Kolom, 40/60 cm (Lantai I)
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

215.757

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Kolom (SNI-7394-2008-6.22)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-F
1 m3 Beton Bertulang Kolom, 30/50 cm (Lantai I)
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

268.376

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Kolom (SNI-7394-2008-6.22)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-G
1 m3 Beton Bertulang Kolom Praktis
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

154.163

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Kolom (SNI-7394-2008-6.22)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-H
1 m3 Beton Bertulang Balok 20/45 cm
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

311.464

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

8.475

M2

Bekisting Balok (SNI-7394-2008-6.23)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-I
1 m3 Beton Bertulang Balok 20/35 cm
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

267.480

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

8.475

M2

Bekisting Balok (SNI-7394-2008-6.23)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-J
1 m3 Beton Bertulang Plat Lantai
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

348.780

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Plat Lantai (SNI-7394-2008-6.24

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-K
1 m3 Beton Bertulang Pondasi Tapak + Stik Kolom Ramp Tangga
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

88.029

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Pondasi (SNI-7394-2008-6.20)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-L
1 m3 Beton Bertulang Bordes
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

245.813

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Pondasi (SNI-7394-2008-6.20)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-M
1 m3 Beton Bertulang Plat Tanjakan Tangga
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

219.544

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Pondasi (SNI-7394-2008-6.20)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-N
1 m3 Beton Bertulang Kolom, 40/60 cm (Lantai II)
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

215.757

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

4.000

M2

Bekisting Kolom (SNI-7394-2008-6.22)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-7394-2008-P
1 m3 Beton Bertulang Ring Balok 15/20 cm
1.000

M3

SNI-7394-2008-6.8 (K250)

@Rp

336.184

Kg

Besi Polos (SNI-7394-2008-6.17)

@Rp

8.475

M2

Bekisting Balok (SNI-7394-2008-6.23)

@Rp

1.000

Ls

Membongkar dan Menyiram Beton

@Rp
Jumlah
Dibulatkan

SNI-3434-2008-6.20
1 M2 Rangka Langit-langit
0.0110

M3

Kayu Rangka Plafond

@Rp

0.250

Kg

Paku Kayu

@Rp

0.200

OH

Pekerja

@Rp

0.300

OH

Tukang

@Rp

0.030

OH

Kepala Tukang

@Rp

0.010

OH

Mandor

@Rp
Jumlah
Dibulatkan

SNI-3434-2008-6.2
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela,
kayu kelas II atau III
1.2000
M3
Balok kayu Kelas II

@Rp

1.250

Kg

Paku 10 cm

@Rp

1.000

Kg

Lem kayu

@Rp

6.000

OH

Pekerja

@Rp

18.000

OH

Tukang

@Rp

1.800

OH

Kepala Tukang

@Rp

0.300

OH

Mandor

@Rp

Jumlah
Dibulatkan
SNI-3434-2008-6.21
1 M2 Papan Lisplank, Kayu Kelas II
1.0500

M2

Papan Listplang Kayu Kelas II

@Rp

0.100

Kg

Paku kayu

@Rp

0.100

OH

Pekerja

@Rp

0.200

OH

Tukang

@Rp

0.020

OH

Kepala Tukang

@Rp

0.005

OH

Mandor

@Rp
Jumlah
Dibulatkan

SNI-7395-2008-6.34
1 M2 Lantai keramik 40 x 40 cm (Polished)
1.060

M2

Keramik Lantai 40 x 40 cm

@Rp

8.190

Kg

Semen Portland

@Rp

0.045

M3

Pasir Pasang

@Rp

1.620

Kg

Semen Putih (warna)

@Rp

0.700

OH

Pekerja

@Rp

0.350

OH

Tukang

@Rp

0.035

OH

Kepala Tukang

@Rp

0.035

OH

Mandor

@Rp

1.120

Jumlah
Dibulatkan

SNI-7395-2008-6.34a
1 M2 Lantai keramik 40 x 40 cm (Unpolished)
1.060

M2

Keramik Lantai 40 x 40 cm

@Rp

8.190

Kg

Semen Portland

@Rp

0.045

M3

Pasir Pasang

@Rp

1.620

Kg

Semen Putih (warna)

@Rp

0.700

OH

Pekerja

@Rp

0.350

OH

Tukang

@Rp

0.035

OH

Kepala Tukang

@Rp

0.035

OH

Mandor

@Rp

1.120

Jumlah
Dibulatkan

SNI-7395-2008-6.35
1 M2 Lantai keramik 30 x 30 cm

1.060

M2

Keramik Lantai 30 x 30 cm

@Rp

10.000

Kg

Semen Portland

@Rp

0.045

M3

Pasir Pasang

@Rp

1.500

Kg

Semen Putih (warna)

@Rp

0.700

OH

Pekerja

@Rp

0.350

OH

Tukang

@Rp

0.035

OH

Kepala Tukang

@Rp

0.035

OH

Mandor

@Rp

1.120

Jumlah
Dibulatkan

SNI-7395-2008-6.36
1 M2 Lantai keramik 20 x 20 cm
1.060

M2

Keramik Lantai 20 x 20 cm

@Rp

10.400

Kg

Semen Portland

@Rp

0.045

M3

Pasir Pasang

@Rp

1.620

Kg

Semen Putih (warna)

@Rp

0.700

OH

Pekerja

@Rp

0.350

OH

Tukang

@Rp

0.035

OH

Kepala Tukang

@Rp

0.035

OH

Mandor

@Rp

1.120

Jumlah
Dibulatkan

SNI-7395-2008-6.54
1 M2 Dinding keramik 20 x 25 cm
1.060

M2

Keramik Dinding 20 x 25 cm

@Rp

9.300

Kg

Semen Portland

@Rp

0.018

M3

Pasir Pasang

@Rp

1.940

Kg

Semen Putih (warna)

@Rp

0.600

OH

Pekerja

@Rp

0.450

OH

Tukang

@Rp

0.045

OH

Kepala Tukang

@Rp

0.045

OH

Mandor

@Rp

1.140

Jumlah
Dibulatkan

SNI-2839-2008-6.5
1 M2 Langit-langit Plywood tebal 4 mm
0.375

Lbr

Plywood tebal 4 mm

@Rp

0.030

Kg

Paku Tripleks

@Rp

0.100

OH

Pekerja

@Rp

0.100

OH

Tukang

@Rp

0.010

OH

Kepala Tukang

@Rp

0.005

OH

Mandor

@Rp

0.215

Jumlah
Dibulatkan

SNI-2839-2008-6.7
1 M2 Langit-langit Gypsum board tebal 9 mm
0.364

Lbr

Gypsum board tebal 9 mm

@Rp

0.110

Kg

Paku skrup

@Rp

0.100

OH

Pekerja

@Rp

0.050

OH

Tukang

@Rp

0.005

OH

Kepala Tukang

@Rp

0.005

OH

Mandor

@Rp

0.160

Jumlah
Dibulatkan

Analisa Taksir (a)


1 M2 Frame Rangka Plafond
0.920

M'

Top Cross

@Rp

0.200

M'

Furing Channel

@Rp

1.850

M'

Wall Angel (Lokal)

@Rp

0.200

Bh

Connector

@Rp

1.300

Bh

Suspension Spring Clip 5 mm

@Rp

0.650

Bh

Suspension Rod Clip 5 mm

@Rp

0.650

Bh

Besi Angel Bracket

@Rp

0.650

Bh

Baut Ramset

@Rp

0.650

Bh

Paku Sekrup

@Rp

0.100

OH

Pekerja

@Rp

0.050

OH

Tukang

@Rp

0.005

OH

Kepala Tukang

@Rp

0.005

OH

Mandor

@Rp

0.050

OH

Pekerja

@Rp

0.050

OH

Tukang

@Rp

0.005

OH

Kepala Tukang

@Rp

0.003

OH

Mandor

@Rp

0.108

Jumlah
Dibulatkan

Analisa Taksir (b)


1 M2 Atap Genteng Metal
1.100

M2

Geteng Metal

@Rp

8.000

Bh

Paku Ulir

@Rp

0.200

OH

Pekerja

@Rp

0.100

OH

Tukang

@Rp

0.010

OH

Kepala Tukang

@Rp

0.010

OH

Mandor

@Rp

0.320

Jumlah
Dibulatkan

AnalisaTaksir c
1 M' Rabung Genteng Metal
1.100

Bubungan Genteng Metal

@Rp

6.000

Kg

Paku Ulir

@Rp

0.250

OH

Pekerja

@Rp

0.150

OH

Tukang

@Rp

0.015

OH

Kepala Tukang

@Rp

0.013

OH

Mandor

@Rp

0.428

Jumlah
Dibulatkan

SNI-03-Cat-6.8.N
1 M2 Mengecat Bidang Kayu Baru 1 lapis dempul, 1 lapis cat dasar 2 lapis cat penutup
0.200

Kg

Cat Menie

@Rp

0.150

Kg

Dempul

@Rp

0.170

Kg

Cat Kayu Dasar

@Rp

0.200

Kg

Cat Kayu Penutup 2 x

@Rp

0.070

OH

Pekerja

@Rp

0.009

OH

Tukang

@Rp

0.006

OH

Kepala Tukang

@Rp

0.003

OH

Mandor

@Rp

0.088

Jumlah
Dibulatkan

SNI-03-Cat-6.14.N
1 M2 Mengecat Tembok Baru 1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup
0.100

Kg

Plamir

@Rp

0.100

Kg

Cat Tembok Dasar

@Rp

0.260

Kg

Cat Tembok Penutup2 x

@Rp

0.020

OH

Pekerja

@Rp

0.063

OH

Tukang

@Rp

0.006

OH

Kepala Tukang

@Rp

0.003

OH

Mandor

@Rp

0.092

Jumlah

Dibulatkan
SNI-03-Cat-6.14a.N
1 M2 Mengecat Plafond Baru, Dempul, 2 lapis cat penutup
0.080

Kg

Dempul

@Rp

0.250

Kg

Cat Tembok Penutup2 x

@Rp

0.020

OH

Pekerja

@Rp

0.063

OH

Tukang

@Rp

0.006

OH

Kepala Tukang

@Rp

0.003

OH

Mandor

@Rp

0.092

Jumlah
Dibulatkan

R ANALISA HARGA SATUAN


Harga Satuan

Jumlah Harga

60,000.00

Rp

45,000.00

65,000.00

Rp

1,625.00

Rp

46,625.00

Rp

46,625.00

60,000.00

Rp

54,000.00

65,000.00

Rp

2,925.00

Rp

56,925.00

Rp

56,925.00

60,000.00

Rp

63,000.00

65,000.00

Rp

4,355.00

Rp

67,355.00

Rp

67,355.00

60,000.00

Rp

15,000.00

65,000.00

Rp

541.67

Rp

15,541.67

Rp

15,542.00

95,000.00

Rp

114,000.00

60,000.00

Rp

18,000.00

65,000.00

Rp

650.00

Rp

132,650.00

Rp

132,650.00

45,000.00

Rp

54,000.00

60,000.00

Rp

30,000.00

65,000.00

Rp

3,250.00

Rp

87,250.00

Rp

87,250.00

130,000.00

Rp

156,000.00

1,200.00

Rp

195,600.00

122,000.00

Rp

63,440.00

60,000.00

Rp

90,000.00

70,000.00

Rp

52,500.00

80,000.00

Rp

6,000.00

65,000.00

Rp

4,875.00

Rp

568,415.00

Rp

568,415.00

15,000.00

Rp

90,000.00

60,000.00

Rp

9,000.00

65,000.00

Rp

975.00

Rp

99,975.00

Rp

99,975.00

550.00

Rp

38,500.00

1,200.00

Rp

22,740.00

122,000.00

Rp

4,636.00

60,000.00

Rp

18,000.00

75,000.00

Rp

7,500.00

80,000.00

Rp

800.00

65,000.00

Rp

975.00

Rp

93,151.00

Rp

93,151.00

550.00

Rp

38,500.00

1,200.00

Rp

13,800.00

122,000.00

Rp

5,246.00

60,000.00

Rp

18,000.00

75,000.00

Rp

7,500.00

80,000.00

Rp

800.00

65,000.00

Rp

975.00

Rp

84,821.00

Rp

84,821.00

1,200.00

Rp

12,268.80

122,000.00

Rp

2,440.00

60,000.00

Rp

18,000.00

75,000.00

Rp

11,250.00

80,000.00

Rp

1,200.00

65,000.00

Rp

975.00

Rp

46,133.80

Rp

46,134.00

1,200.00

Rp

9,331.20

122,000.00

Rp

2,806.00

60,000.00

Rp

18,000.00

75,000.00

Rp

11,250.00

80,000.00

Rp

1,200.00

65,000.00

Rp

975.00

Rp

43,562.20

Rp

43,562.00

1,200.00

Rp

7,488.00

122,000.00

Rp

2,928.00

60,000.00

Rp

18,000.00

75,000.00

Rp

11,250.00

80,000.00

Rp

1,200.00

65,000.00

Rp

975.00

Rp

41,841.00

Rp

41,841.00

1,200.00

Rp

276,000.00

123,000.00

Rp

78,474.00

125,000.00

Rp

95,125.00

60,000.00

Rp

72,000.00

75,000.00

Rp

15,000.00

80,000.00

Rp

1,600.00

65,000.00

Rp

3,900.00

Rp

542,099.00

Rp

542,099.00

Rp

27,104.95

Rp

27,104.95

Rp

27,105.00

1,200.00

Rp

391,200.00

123,000.00

Rp

66,789.00

125,000.00

Rp

95,250.00

60,000.00

Rp

99,000.00

75,000.00

Rp

20,625.00

80,000.00

Rp

2,240.00

65,000.00

Rp

5,395.00

Rp

680,499.00

Rp

680,499.00

1,200.00

Rp

445,200.00

123,000.00

Rp

61,377.00

125,000.00

Rp

97,000.00

60,000.00

Rp

99,000.00

75,000.00

Rp

20,625.00

80,000.00

Rp

2,240.00

65,000.00

Rp

5,395.00

Rp

730,837.00

Rp

730,837.00

1,200.00

Rp

460,800.00

123,000.00

Rp

60,797.14

125,000.00

Rp

96,203.70

60,000.00

Rp

99,000.00

75,000.00

Rp

20,625.00

80,000.00

Rp

2,240.00

542,099.00

65,000.00

Rp

5,395.00

Rp

745,060.85

Rp

745,061.00

Rp

500,000.00

10,500.00

Rp

11,025.00

17,000.00

Rp

255.00

60,000.00

Rp

420.00

75,000.00

Rp

525.00

80,000.00

Rp

56.00

65,000.00

Rp

26.00

Rp

12,307.00

Rp

12,307.00

13,000.00

Rp

13,650.00

17,000.00

Rp

255.00

60,000.00

Rp

420.00

75,000.00

Rp

525.00

80,000.00

Rp

56.00

65,000.00

Rp

26.00

Rp

14,932.00

Rp

14,932.00

2,800,000.00

Rp

112,000.00

17,000.00

Rp

5,100.00

4,500.00

Rp

450.00

60,000.00

Rp

31,200.00

75,000.00

Rp

19,500.00

80,000.00

Rp

2,080.00

65,000.00

Rp

1,690.00

Rp

172,020.00

Rp

172,020.00

2,800,000.00

Rp

126,000.00

17,000.00

Rp

5,100.00

4,500.00

Rp

450.00

60,000.00

Rp

31,200.00

75,000.00

Rp

19,500.00

80,000.00

Rp

2,080.00

65,000.00

Rp

1,690.00

Rp

186,020.00

Rp

186,020.00

2,800,000.00

Rp

112,000.00

17,000.00

Rp

6,800.00

4,500.00

Rp

900.00

3,200,000.00

Rp

48,000.00

110,000.00

Rp

38,500.00

12,000.00

Rp

24,000.00

60,000.00

Rp

39,600.00

75,000.00

Rp

24,750.00

80,000.00

Rp

2,640.00

65,000.00

Rp

2,145.00

Rp

299,335.00

Rp

299,335.00

2,800,000.00

Rp

112,000.00

17,000.00

Rp

6,800.00

4,500.00

Rp

900.00

3,200,000.00

Rp

57,600.00

110,000.00

Rp

38,500.00

12,000.00

Rp

24,000.00

60,000.00

Rp

39,600.00

75,000.00

Rp

24,750.00

80,000.00

Rp

2,640.00

65,000.00

Rp

2,145.00

Rp

308,935.00

Rp

308,935.00

2,800,000.00

Rp

112,000.00

17,000.00

Rp

6,800.00

4,500.00

Rp

900.00

3,200,000.00

Rp

48,000.00

110,000.00

Rp

38,500.00

12,000.00

Rp

72,000.00

60,000.00

Rp

39,600.00

75,000.00

Rp

24,750.00

80,000.00

Rp

2,640.00

65,000.00

Rp

2,145.00

Rp

347,335.00

Rp

347,335.00

745,061.00

Rp

745,061.00

12,307.00

Rp

3,550,815.64

172,020.00

Rp

688,080.00

25,000.00

Rp

25,000.00

Rp

5,008,956.64

Rp

5,008,957.00

745,061.00

Rp

745,061.00

14,932.00

Rp

5,123,484.91

172,020.00

Rp

688,080.00

25,000.00

Rp

25,000.00

Rp

6,581,625.91

Rp

6,581,626.00

745,061.00

Rp

745,061.00

12,307.00

Rp

3,165,601.07

186,020.00

Rp

744,080.00

25,000.00

Rp

25,000.00

Rp

4,679,742.07

Rp

4,679,742.00

745,061.00

Rp

745,061.00

12,307.00

Rp

3,788,258.69

186,020.00

Rp

744,080.00

25,000.00

Rp

25,000.00

Rp

5,302,399.69

Rp

5,302,400.00

745,061.00

Rp

745,061.00

12,307.00

Rp

2,655,324.13

299,335.00

Rp

1,197,340.00

25,000.00

Rp

25,000.00

Rp

4,622,725.13

Rp

4,622,725.00

745,061.00

Rp

745,061.00

12,307.00

Rp

3,302,903.43

299,335.00

Rp

1,197,340.00

25,000.00

Rp

25,000.00

Rp

5,270,304.43

Rp

5,270,304.00

745,061.00

Rp

745,061.00

12,307.00

Rp

1,897,283.59

299,335.00

Rp

1,197,340.00

25,000.00

Rp

25,000.00

Rp

3,864,684.59

Rp

3,864,685.00

745,061.00

Rp

745,061.00

12,307.00

Rp

3,833,192.92

308,935.00

Rp

2,618,224.13

25,000.00

Rp

25,000.00

Rp

7,221,478.04

Rp

7,221,478.00

745,061.00

Rp

745,061.00

12,307.00

Rp

3,291,876.36

308,935.00

Rp

2,618,224.13

25,000.00

Rp

25,000.00

Rp

6,680,161.49

Rp

6,680,161.00

745,061.00

Rp

745,061.00

12,307.00

Rp

4,292,435.46

347,335.00

Rp

1,389,340.00

25,000.00

Rp

25,000.00

Rp

6,451,836.46

Rp

6,451,836.00

745,061.00

Rp

745,061.00

14,932.00

Rp

1,314,445.17

172,020.00

Rp

688,080.00

25,000.00

Rp

25,000.00

Rp

2,772,586.17

Rp

2,772,586.00

745,061.00

Rp

745,061.00

14,932.00

Rp

3,670,476.73

347,335.00

Rp

1,389,340.00

25,000.00

Rp

25,000.00

Rp

5,829,877.73

Rp

5,829,878.00

745,061.00

Rp

745,061.00

14,932.00

Rp

3,278,235.63

347,335.00

Rp

1,389,340.00

25,000.00

Rp

25,000.00

Rp

5,437,636.63

Rp

5,437,637.00

745,061.00

Rp

745,061.00

12,307.00

Rp

2,655,324.13

299,335.00

Rp

1,197,340.00

25,000.00

Rp

25,000.00

Rp

4,622,725.13

Rp

4,622,725.00

745,061.00

Rp

745,061.00

12,307.00

Rp

4,137,419.41

308,935.00

Rp

2,618,224.13

25,000.00

Rp

25,000.00

Rp

7,525,704.53

Rp

7,525,705.00

3,600,000.00

Rp

39,600.00

17,000.00

Rp

4,250.00

50,000.00

Rp

10,000.00

60,000.00

Rp

18,000.00

80,000.00

Rp

2,400.00

65,000.00

Rp

650.00

Rp

74,900.00

Rp

74,900.00

3,600,000.00

Rp

4,320,000.00

17,000.00

Rp

21,250.00

35,000.00

Rp

35,000.00

60,000.00

Rp

360,000.00

75,000.00

Rp

1,350,000.00

80,000.00

Rp

144,000.00

65,000.00

Rp

19,500.00

Rp

6,249,750.00

Rp

6,249,750.00

160,000.00

Rp

168,000.00

17,000.00

Rp

1,700.00

60,000.00

Rp

6,000.00

75,000.00

Rp

15,000.00

80,000.00

Rp

1,600.00

65,000.00

Rp

325.00

Rp

192,625.00

Rp

192,625.00

53,000.00

Rp

56,180.00

1,200.00

Rp

9,828.00

122,000.00

Rp

5,490.00

2,300.00

Rp

3,726.00

60,000.00

Rp

42,000.00

75,000.00

Rp

26,250.00

80,000.00

Rp

2,800.00

65,000.00

Rp

2,275.00

Rp

148,549.00

Rp

148,549.00

54,000.00

Rp

57,240.00

1,200.00

Rp

9,828.00

122,000.00

Rp

5,490.00

2,300.00

Rp

3,726.00

60,000.00

Rp

42,000.00

75,000.00

Rp

26,250.00

80,000.00

Rp

2,800.00

65,000.00

Rp

2,275.00

Rp

149,609.00

Rp

149,609.00

52,000.00

Rp

55,120.00

1,200.00

Rp

12,000.00

122,000.00

Rp

5,490.00

2,300.00

Rp

3,450.00

60,000.00

Rp

42,000.00

75,000.00

Rp

26,250.00

80,000.00

Rp

2,800.00

65,000.00

Rp

2,275.00

Rp

149,385.00

Rp

149,385.00

50,000.00

Rp

53,000.00

1,200.00

Rp

12,480.00

122,000.00

Rp

5,490.00

2,300.00

Rp

3,726.00

60,000.00

Rp

42,000.00

75,000.00

Rp

26,250.00

80,000.00

Rp

2,800.00

65,000.00

Rp

2,275.00

Rp

148,021.00

Rp

148,021.00

51,000.00

Rp

54,060.00

1,200.00

Rp

11,160.00

122,000.00

Rp

2,196.00

2,300.00

Rp

4,462.00

60,000.00

Rp

36,000.00

75,000.00

Rp

33,750.00

80,000.00

Rp

3,600.00

65,000.00

Rp

2,925.00

Rp

148,153.00

Rp

148,153.00

70,000.00

Rp

26,250.00

18,000.00

Rp

540.00

60,000.00

Rp

6,000.00

75,000.00

Rp

7,500.00

80,000.00

Rp

800.00

65,000.00

Rp

325.00

Rp

41,415.00

Rp

41,415.00

70,000.00

Rp

25,480.00

400.00

Rp

44.00

60,000.00

Rp

6,000.00

75,000.00

Rp

3,750.00

80,000.00

Rp

400.00

65,000.00

Rp

325.00

Rp

35,999.00

Rp

35,999.00

10,000.00

Rp

9,200.00

5,000.00

Rp

1,000.00

3,500.00

Rp

6,475.00

5,000.00

Rp

1,000.00

4,000.00

Rp

5,200.00

5,000.00

Rp

3,250.00

6,000.00

Rp

3,900.00

1,000.00

Rp

650.00

400.00

Rp

260.00

60,000.00

Rp

6,000.00

75,000.00

Rp

3,750.00

80,000.00

Rp

400.00

65,000.00

Rp

325.00

60,000.00

Rp

3,000.00

75,000.00

Rp

3,750.00

80,000.00

Rp

400.00

65,000.00

Rp

195.00

Rp

12,765.00

Rp

12,765.00

120,000.00

Rp

132,000.00

400.00

Rp

3,200.00

60,000.00

Rp

12,000.00

75,000.00

Rp

7,500.00

80,000.00

Rp

800.00

65,000.00

Rp

650.00

Rp

156,150.00

Rp

156,150.00

45,000.00

Rp

49,500.00

400.00

Rp

2,400.00

60,000.00

Rp

15,000.00

75,000.00

Rp

11,250.00

80,000.00

Rp

1,200.00

65,000.00

Rp

845.00

Rp

80,195.00

Rp

80,195.00

22,000.00

Rp

4,400.00

16,000.00

Rp

2,400.00

27,000.00

Rp

4,590.00

43,000.00

Rp

8,600.00

60,000.00

Rp

4,200.00

75,000.00

Rp

675.00

80,000.00

Rp

480.00

65,000.00

Rp

162.50

Rp

25,507.50

Rp

25,508.00

14,000.00

Rp

1,400.00

26,000.00

Rp

2,600.00

27,500.00

Rp

7,150.00

60,000.00

Rp

1,200.00

75,000.00

Rp

4,725.00

80,000.00

Rp

504.00

65,000.00

Rp

162.50

Rp

17,741.50

Rp

17,742.00

16,000.00

Rp

1,280.00

27,500.00

Rp

6,875.00

60,000.00

Rp

1,200.00

75,000.00

Rp

4,725.00

80,000.00

Rp

504.00

65,000.00

Rp

162.50

Rp

14,746.50

Rp

14,747.00

DAFTAR HARGA UPAH DAN BAHAN


No.

Komponen

A.

UPAH KERJA

Pekerja

Tukang

Kepala Tukang

Mandor

B.

BAHAN

Genteng Metal

Batu Bata

Batu Kali / Batu Belah

Besi Beton Polos

Besi Beton Ulir

Bubungan Genteng Metal

Cat Kayu Dasar

Cat Kayu Penutup

Cat Menie

10

Cat Tembok Dasar

11

Cat Tembok Penutup

12

Dempul

13

Dolken Kayu 8 - 10 cm Pjg 4 m

14

Engsel Pintu 4 Inchi

15

Engsel Jendela 3 Inchi

16

Grendel Jendela

17

Hak Angin Jendela

18

Tarikan/Pegangan Jendela

19

Kunci Tanam 2 Slaag

20

Kawat Beton

21

Kayu Klas I

22

Kayu Klas II

23

Kayu setara Klas III

24

Kayu Rangka Plafond (setara klas II)

25

Kayu Perancah/Papan bekisting

26

Keramik Dinding 20 x 25 cm

27

Keramik 20 x 20 cm

28

Keramik 30 x 30 cm

29

Keramik 40 x 40 cm (Polished)

30

Keramik 40 x 40 cm (Unpolished)

31

Kerikil Beton

32

Kertas Amplas

33

Kuda-kuda Rangka Baja Ringan terpasang

34

List Kayu Profil

35

Minyak Bekisting

36

Minyak Cat

37

Paku Kayu

38

Paku Seng

39

Paku Ulir

40

Paku Tripleks

41

Papan Listplang (Kayu Klas II)

42

Plamur Tembok

43

Plywood 9 mm

44

Plywood 4 mm

45

Pasir Beton

46

Pasir Pasang

47

Pasir Urug

48

Pipa PVC dia 4"

49

Pipa PVC dia 3"

50

Pipa Hawa

51

Semen Portland @ 40 Kg

52

Semen Portland

53

Semen Putih (Warna) @ 50 Kg

54

Semen Putih (Warna)

55

Stop Kontak + Instalasi

56

Saklar Tunggal

57

Saklar Ganda

58

Saklar Triple

59

Lampu HE 18 Watt Setara Philips (Komplit)

60

Lampu HE 23 Watt Setara Philips (Komplit)

61

Lampu TL 2x40 W Setara Philips (komplit)

62

Tanah Timbun

63

Titik Lampu + Instalasi

64

Residu Kap Atap

65
66

Lem Kayu
Ijuk

TAR HARGA UPAH DAN BAHAN


Satuan

Harga Satuan

OH

Rp.

60,000.00

OH

Rp.

75,000.00

OH

Rp.

80,000.00

OH

Rp.

65,000.00

M2

Rp.

120,000.00

Buah

Rp.

550.00

M3

Rp.

130,000.00

Kg

Rp.

10,500.00

Kg

Rp.

13,000.00

Rp.

45,000.00

Kg

Rp.

27,000.00

Kg

Rp.

43,000.00

Kg

Rp.

22,000.00

Kg

Rp.

26,000.00

Kg

Rp.

27,500.00

Kg

Rp.

16,000.00

Btg

Rp.

12,000.00

Bh

Rp.

16,000.00

Bh

Rp.

12,000.00

Bh

Rp.

11,000.00

Bh

Rp.

12,000.00

Bh

Rp.

14,000.00

Bh

Rp.

120,000.00

Kg

Rp.

17,000.00

M3

Rp.

4,800,000.00

M3

Rp.

3,600,000.00

M3

Rp.

3,200,000.00

M3

Rp.

3,600,000.00

M3

Rp.

2,800,000.00

M2

Rp.

51,000.00

M2

Rp.

50,000.00

M2

Rp.

52,000.00

M2

Rp.

53,000.00

M2

Rp.

54,000.00

M3

Rp.

125,000.00

Lembar

Rp.

2,500.00

M2

Rp.

160,000.00

Rp.

5,000.00

Ltr

Rp.

4,500.00

Ltr

Rp.

17,000.00

Kg

Rp.

17,000.00

Kg

Rp.

25,000.00

Bh

Rp.

400.00

Kg

Rp.

18,000.00

M2

Rp.

160,000.00

kg

Rp.

14,000.00

Lembar

Rp.

110,000.00

Lembar

Rp.

70,000.00

M3

Rp.

123,000.00

M3

Rp.

122,000.00

M3

Rp.

95,000.00

M'

Rp.

32,000.00

M'

Rp.

28,000.00

Bh

Rp.

15,000.00

Zak

Rp.

48,000.00

Kg

Rp.

1,200.00

Zak

Rp.

115,000.00

Kg

Rp.

2,300.00

Titik

Rp.

120,000.00

Bh

Rp.

18,000.00

Bh

Rp.

20,000.00

Bh

Rp.

22,000.00

Bh

Rp.

40,000.00

Bh

Rp.

45,000.00

Bh

Rp.

70,000.00

M3

Rp.

45,000.00

Titik

Rp.

120,000.00

Pkt

Rp.

500,000.00

Kg
KG

Rp.
Rp.

35,000.00
15,000.00