ANALISA HARGA SATUAN (AHS) PEKERJAAN INSTALASI LISTRIK
Harga Sat.
No.

Uraian Jenis pekerjaan

XI

PEKERJAAN INSTALASI LISTRIK

XI.1

LAMPU PIJAR 20 S/D 100 WATT


Lampu pijar 25 s/d 100 watt
Pekerja
Mandor

Sat.
3

bh
Oh
Oh

Koeff.
4

1.000
2.237
0.5

Bahan / Upah / Alat

Bahan

Rp.

Rp.

Rp6,000.00
Rp38,000.00
Rp60,000.00

Jumlah
XI.2

LAMPU SL PHILIP 20 WATT


Lampu Sl philip 25 watt
Pekerja
Mandor
LAMPU DOWNLIGHT
Downlight + SL 25 watt philip
Pekerja
Mandor

bh
Oh
Oh

1.000
2.237
0.5

Rp32,000.00
Rp38,000.00
Rp60,000.00

LAMPU TAMAN
Lampu taman + tiang + lampu 1 buah
Pekerja
Mandor

Rp32,000.00

Rp32,000.00
bh
Oh
Oh

1.000
2.237
0.5

Rp33,500.00
Rp38,000.00
Rp60,000.00

Jumlah
XI.4

Rp6,000.00

Rp6,000.00

Jumlah
XI.3

Jumlah Harga

Rp33,500.00

Rp33,500.00
bh
Oh
Oh

1.000
2.237
0.5

Rp146,500.00
Rp38,000.00
Rp60,000.00

Rp146,500.00

Jumlah
XI.5

STOP KONTAK
Stop kontak broko standard (1 phase)
Pekerja
Mandor

Rp146,500.00
bh
Oh
Oh

1.000
2.237
0.5

Rp13,500.00
Rp38,000.00
Rp60,000.00

Jumlah
XI.6

SAKLAR
Saklar broko tunggal standard
Pekerja
Mandor

Rp13,500.00
bh
Oh
Oh

1.000
2.237
0.5

Rp10,000.00
Rp38,000.00
Rp60,000.00

Jumlah
XI.7

KABEL NYM SUPREME 2 X 10


Saklar broko tunggal standard
Pekerja
Mandor
Jumlah

Rp13,500.00

Rp10,000.00

Rp10,000.00
m'
Oh
Oh

1.000
2.237
0.5

Rp20,800.00
Rp38,000.00
Rp60,000.00

Rp20,800.00

Rp20,800.00

TABEL XI.1

SATUAN (AHS) PEKERJAAN INSTALASI LISTRIK

Jumlah Harga
Upah

Alat

Jumlah Harga
Bahan + Upah

Rp.

Rp.

Rp.

Rp85,000.00
Rp30,000.00

Rp115,000.00
Rp85,000.00
Rp30,000.00

121,000.00
-

Rp115,000.00
Rp85,000.00
Rp30,000.00

147,000.00
-

Rp115,000.00
Rp85,000.00
Rp30,000.00

148,500.00
-

Rp115,000.00
Rp85,000.00
Rp30,000.00

261,500.00
-

Rp115,000.00
Rp85,000.00
Rp30,000.00

128,500.00
-

Rp115,000.00
Rp85,000.00
Rp30,000.00
Rp115,000.00

125,000.00
-

135,800.00

TABEL XI.2
RAB BAHAN PEKERJAAN INSTALASI LISTRIK

NO

URAIAN PEKERJAAN

1
XI. PEKERJAAN INSTALASI LISTRIK
K.1

Lampu Pijar 25 Watt

K.2

Lampu SL Philip 25 Watt

K.3

Lampu Downlight

K.4

Lampu Taman

K.5

Stop Kontak

K.6

Stop Kontak Dobel

K.7

Saklar

K.8

Kabel NYM supreme 2 x 10

VOL

SAT

2
6
6
2
11
4
8
100

bh
bh
bh
bh
bh
bh
bh
m'

HARGA SAT
BAHAN
5
Rp6,000
Rp32,000
Rp33,500
Rp146,500
Rp13,500
Rp13,500
Rp10,000
Rp20,800

Jumlah

JUMLAH HARGA
Biaya Bahan Bid Price
6
Rp12,000.00
Rp192,000.00
Rp201,000.00
Rp293,000.00
Rp148,500.00
Rp54,000.00
Rp80,000.00
Rp2,080,000.00
Rp3,060,500

RAB UPAH PEKERJAAN INSTALASI LISTRIK

NO

URAIAN PEKERJAAN

VOL

SAT

HARGA SAT
UPAH
5

JUMLAH HARGA
Biaya Upah Bid Price
6

XI. PEKERJAAN INSTALASI LISTRIK


K.1

Lampu Pijar 25 Watt

K.2

Lampu SL Philip 25 Watt

K.3

Lampu Downlight

K.4

Lampu Taman

K.5

Stop Kontak

K.6

Stop Kontak Dobel

K.7

Saklar

K.8

Kabel NYM supreme 2 x 10

2
6
6
2
11
4
8
100
Jumlah

bh
bh
bh
bh
bh
bh
bh
m'

Rp115,000
Rp115,000
Rp115,000
Rp115,000
Rp115,000
Rp115,000
Rp115,000
Rp115,000

Rp230,000.00
Rp690,000.00
Rp690,000.00
Rp230,000.00
Rp1,265,000.00
Rp460,000.00
Rp920,000.00
Rp11,500,000.00
Rp15,985,000

TABEL XI.2

AN PEKERJAAN INSTALASI LISTRIK

JUMLAH HARGA
Biaya Bahan Pelaksanaan
7
Rp12,000.00
Rp192,000.00
Rp201,000.00
Rp293,000.00
Rp148,500.00
Rp54,000.00
Rp80,000.00
Rp2,080,000.00
Rp3,060,500

H PEKERJAAN INSTALASI LISTRIK

JUMLAH HARGA
Biaya Upah Pelaksanaan
7

Rp207,000.00
Rp621,000.00
Rp621,000.00
Rp207,000.00
Rp1,138,500.00
Rp414,000.00
Rp828,000.00
Rp10,350,000.00
Rp14,386,500

TABEL XI.3
KEBUTUHAN TENAGA KERJA

No.

Uraian Jenis pekerjaan

Sat.

Pekerja

Oh

Mandor

Oh

XI
XI.1

Koeff. (Awal) Koeff. (Akhir)

Volume

Sat

2.237

2.013

2.000

bh

0.500

0.450

2.000

bh

PEKERJAAN INSTALASI LISTRIK


LAMPU PIJAR 25 WATT

Jumlah
XI.2

LAMPU SL PHILIP 25 WATT


Pekerja

Oh

2.237

2.013

6.000

bh

Mandor

Oh

0.500

0.450

6.000

bh

Jumlah
XI.3

LAMPU DOWNLIGHT
Pekerja

Oh

2.237

2.013

6.000

bh

Mandor

Oh

0.500

0.450

6.000

bh

Jumlah
XI.4

LAMPU TAMAN
Pekerja

Oh

2.237

2.013

2.000

bh

Mandor

Oh

0.500

0.450

2.000

bh

Jumlah
XI.5

STOP KONTAK
Pekerja

Oh

2.237

2.013

11.000

bh

Mandor

Oh

0.500

0.450

11.000

bh

Jumlah
XI.6

STOP KONTAK DOBEL


Pekerja

Oh

2.237

2.013

4.000

bh

Mandor

Oh

0.500

0.450

4.000

bh

Jumlah
XI.7

SAKLAR
Pekerja

Oh

2.237

2.013

8.000

bh

Mandor

Oh

0.500

0.450

8.000

bh

Jumlah
XI.8

KABEL NYM SUPREME 2 X 10


Pekerja

Oh

2.237

2.013

100.000

m'

Mandor

Oh

0.500

0.450

100.000

m'

Jumlah

TABEL XI.3
KEBUTUHAN TENAGA KERJA

Kebutuhan Tenaga Kerja


8=5x6

4.026
0.900
4.926
12.079
2.700
14.779
12.079
2.700
14.779
4.026
0.900

4.926
22.145
4.950
27.095
8.053
1.800
9.853
16.105
3.600
19.705
201.316
45.000
246.316

TABEL XI.4
ANALISIS PRODUKTIVITAS KERJA

No.

Uraian Pekerja

Sat

Kebutuhan
Tenaga Kerja

Harga Satuan
Upah
5

Biaya Upah

1
2
XI. PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Pekerja
Mandor

6=4x5

Oh
Oh

4.026
0.900

Rp38,000
Rp60,000
Jumlah

Rp153,000
Rp54,000
Rp207,000

XI. 2 LAMPU SL PHILIP 25 WATT


Pekerja
Mandor

Oh
Oh

12.079
2.700

Rp38,000
Rp60,000
Jumlah

Rp459,000
Rp162,000
Rp621,000

XI.3 LAMPU DOWNLIGHT


Pekerja
Mandor

Oh
Oh

12.079
2.700

Rp38,000
Rp60,000
Jumlah

Rp459,000
Rp162,000
Rp621,000

XI.4 LAMPU TAMAN


Pekerja
Mandor

Oh
Oh

4.026
0.900

Rp38,000
Rp60,000
Jumlah

Rp153,000
Rp54,000
Rp207,000

XI.5 STOP KONTAK


Pekerja
Mandor

Oh
Oh

22.145
4.950

Rp38,000
Rp60,000

Rp841,500
Rp297,000

Jumlah

Rp1,138,500

XI.6 STOP KONTAK DOBEL


Pekerja
Mandor

Oh
Oh

8.053
1.800

Rp38,000
Rp60,000
Jumlah

Rp306,000
Rp108,000
Rp414,000

XI.7 SAKLAR
Pekerja
Mandor

Oh
Oh

16.105
3.600

Rp38,000
Rp60,000
Jumlah

Rp612,000
Rp216,000
Rp828,000

XI.8 KABEL NYM SUPREME 2 X 10


Pekerja
Mandor

Oh
Oh

201.316
45.000

Rp38,000
Rp60,000
Jumlah

Rp7,650,000
Rp2,700,000
Rp10,350,000

TABEL XI.4

S PRODUKTIVITAS KERJA
Durasi
(Hari)

Volume
Pekerjaan

Sat

2.000

Produktivitas Kerja
(Per Hari)
11 = 8 10

Sat

Kebutuhan Tenaga Kerja


(Per Hari)
10 = 4 7

bh

4.026
0.900

2.000

bh

bh

12.079
2.700

6.000

bh

6.000

bh

12

6.000

bh

12.079
2.700

2.000

bh

4.026
0.900

2.000

bh

bh

22.145
4.950

11.000

bh

11.000

11.000

4.000

8.000

100.000

bh

11.000

bh

bh

8.053
1.800

4.000

bh

bh

16.105
3.600

8.000

bh

m'

201.316
45.000

100.000

m'

TABEL XI.5
ANALISIS BAHAN DAN KEBUTUHAN BAHAN

No.

Uraian Jenis pekerjaan

Sat.

Koeff.

Volume

Sat

Kebutuhan Bahan

Sat

7=5x4

bh

1.000

2.00

bh

2.000

bh

XI
XI.1

PEKERJAAN INSTALASI LISTRIK


LAMPU PIJAR 25 WATT
Lampu pijar 25 s/d 100 watt

Jumlah
XI.2

LAMPU SL PHILIP 25 WATT


Lampu Sl philip 25 watt

bh

1.0000

6.00

bh

6.000

bh
Jumlah

XI.3

LAMPU DOWNLIGHT
Downlight + SL 25 watt philip

bh

1.0000

6.00

bh

6.000

bh
Jumlah

XI.4

LAMPU TAMAN
Lampu taman + tiang + lampu 1 buah

bh

1.0000

2.00

bh

2.000

bh
Jumlah

XI.5

STOP KONTAK

Stop kontak broko standard (1 phase)

bh

1.0000

11.00

bh

11.000

bh
Jumlah

XI.6

STOP KONTAK DOBEL


Stop kontak broko standard (1 phase)

bh

1.0000

4.00

bh

4.000

bh
Jumlah

XI.7

SAKLAR
Saklar broko tunggal standard

bh

1.0000

8.00

bh

8.000

bh
Jumlah

XI.8

KABEL NYM SUPREME 2 X 10


Saklar broko tunggal standard

m'

1.0000

100.00

m'

100.000

m'
Jumlah

TABEL XI.5

HAN DAN KEBUTUHAN BAHAN


Harga
Satuan
Bahan

RAB Bahan

Durasi
(Hari)

Kebutuhan
Bahan/Hari

Sat

Produktivitas/
Hari

Sat

10

11

12

13

14

2.000

bh

2.00

m2

6.000

bh

6.00

m2

6.000

bh

6.00

m2

2.000

bh

1.00

m2

Rp6,000
Jumlah
Rp32,000
Jumlah
Rp33,500
Jumlah
Rp146,500
Jumlah

Rp12,000
Rp12,000
Rp192,000
Rp192,000
Rp201,000
Rp201,000
Rp293,000
Rp293,000

Rp13,500
Jumlah
Rp13,500
Jumlah
Rp10,000
Jumlah
Rp20,800
Jumlah

Rp148,500
Rp148,500
Rp54,000
Rp54,000
Rp80,000
Rp80,000
Rp2,080,000
Rp2,080,000

11.000

bh

5.50

m2

4.000

bh

2.00

m2

8.000

bh

4.00

m2

100.000

m'

50.00

m2

TABEL XI.6
REKAPITULASI
REKAPITULASI UPAH TENAGA KERJA PEKERJAAN LISTRIK

No.

Jenis Pekerja

Sat

Jumlah Pekerja

Sat

Harga Satuan
Upah

279.829

Oh

Rp38,000

62.550

Oh

Rp60,000

Pekerja

Oh

Mandor

Oh
Jumlah

REKAPITULASI BAHAN PEKERJAAN LISTRIK

No.

Jenis Bahan

Sat

Jumlah Bahan

Sat

Harga Satuan
Bahan

Lampu Pijar 25 Watt

bh

2.000

bh

Rp6,000

Lampu SL Philip 25 Watt

bh

6.000

bh

Rp32,000

Lampu Downlight

bh

6.000

bh

Rp33,500

Lampu Taman

bh

2.000

bh

Rp146,500

Stop Kontak

bh

11.000

bh

Rp13,500

Stop Kontak Dobel

bh

4.000

bh

Rp13,500

Saklar

bh

8.000

bh

Rp10,000

Kabel NYM supreme 2 x 10

100.000

m'

Rp20,800

m'
Jumlah

RIK

RAB Upah

Jumlah
Pekerja/Hari

Biaya
Upah/Hari

Rp10,633,500

39.976

Rp1,519,071

Rp3,753,000
Rp14,386,500

8.936
Jumlah

Rp536,143
Rp2,055,214

RAB Bahan

Jumlah
Bahan/Hari

Biaya
Bahan/Hari

Rp12,000

0.286

Rp1,714

Rp192,000

0.857

Rp27,429

Rp201,000

0.857

Rp28,714

Rp293,000

0.286

Rp41,857

Rp148,500

1.571

Rp21,214

Rp54,000

0.571

Rp7,714

Rp80,000

1.143

Rp11,429

Rp2,080,000
Rp3,060,500

14.286
Jumlah

Rp297,143
Rp437,214

RAB BAHAN PEKERJAAN INSTALASI LISTRIK

NO

URAIAN PEKERJAAN

1
2
XI. PEKERJAAN INSTALASI LISTRIK
K.1

Lampu Pijar 25 Watt

K.2

Lampu SL Philip 25 Watt

K.3

Lampu Downlight

K.4

Lampu Taman

K.5

Stop Kontak

K.6

Stop Kontak Dobel

K.7

Saklar

K.8

Kabel NYM supreme 2 x 10

VOL

SAT

13
10
7
5
6
9
10
100
Jumlah

bh
bh
bh
bh
bh
bh
bh
m'

HARGA SAT
BAHAN
5
Rp6,000
Rp32,000
Rp33,500
Rp146,500
Rp13,500
Rp13,500
Rp10,000
Rp20,800

RAB UPAH PEKERJAAN INSTALASI LISTRIK

NO

URAIAN PEKERJAAN

1
2
XI. PEKERJAAN INSTALASI LISTRIK
K.1

Lampu Pijar 25 Watt

K.2

Lampu SL Philip 25 Watt

K.3

Lampu Downlight

K.4

Lampu Taman

VOL

SAT

13
10
7
5

bh
bh
bh
bh

HARGA SAT
UPAH
5
Rp115,000
Rp115,000
Rp115,000
Rp115,000

K.5

Stop Kontak

K.6

Stop Kontak Dobel

K.7

Saklar

K.8

Kabel NYM supreme 2 x 10

6
9
10
100
Jumlah

Rp115,000
Rp115,000
Rp115,000
Rp115,000

bh
bh
bh
m'

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN


No.

Jenis Pekerja

Sat

Jumlah Pekerja

Sat

Lampu Pijar 25 Watt

bh

11.700

ttk

Lampu SL Philip 25 Watt

bh

9.000

ttk

Lampu Downlight

bh

6.300

ttk

Lampu Taman

bh

4.500

ttk

Stop Kontak

bh

5.400

ttk

Stop Kontak Dobel

bh

8.100

ttk

Saklar

bh

9.000

ttk

Kabel NYM supreme 2 x 10

m'

90.000

ttk

REKAPITULASI BAHAN PEKERJAAN LANT


No.

Jenis Bahan

Sat

Jumlah Bahan

Sat

Lampu Pijar 25 Watt

bh

13.000

bh

Lampu SL Philip 25 Watt

bh

10.000

bh

Lampu Downlight

bh

7.000

bh

Lampu Taman

bh

5.000

bh

Stop Kontak

bh

6.000

bh

Stop Kontak Dobel

bh

9.000

bh

Saklar

bh

10.000

bh

Kabel NYM supreme 2 x 10

m'

100.000

m'

AHAN PEKERJAAN INSTALASI LISTRIK

JUMLAH HARGA
Biaya Bahan Bid Price
Biaya Bahan Pelaksanaan
6
7
Rp78,000.00
Rp320,000.00
Rp234,500.00
Rp732,500.00
Rp81,000.00
Rp121,500.00
Rp100,000.00
Rp2,080,000.00
Rp3,747,500

Rp78,000.00
Rp320,000.00
Rp234,500.00
Rp732,500.00
Rp81,000.00
Rp121,500.00
Rp100,000.00
Rp2,080,000.00
Rp3,747,500

UPAH PEKERJAAN INSTALASI LISTRIK

JUMLAH HARGA
Biaya Upah Bid Price
Biaya Upah Pelaksanaan
6
7
Rp1,495,000.00
Rp1,150,000.00
Rp805,000.00
Rp575,000.00

Rp1,345,500.00
Rp1,035,000.00
Rp724,500.00
Rp517,500.00

Rp690,000.00
Rp1,035,000.00
Rp1,150,000.00
Rp11,500,000.00
Rp18,400,000

Rp621,000.00
Rp931,500.00
Rp1,035,000.00
Rp10,350,000.00
Rp16,560,000

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN LANTAI


Harga Satuan Upah

RAB Upah

Jumlah
Pekerja/Hari

Biaya
Upah/Hari

Rp115,000

Rp1,345,500

1.671

Rp192,214

Rp115,000

Rp1,035,000

1.286

Rp147,857

Rp115,000

Rp724,500

0.900

Rp103,500

Rp115,000

Rp517,500

0.643

Rp73,929

Rp115,000

Rp621,000

0.771

Rp88,714

Rp115,000

Rp931,500

1.157

Rp133,071

Rp115,000

Rp1,035,000

1.286

Rp147,857

Rp115,000

Rp10,350,000

12.857

Rp1,478,571

Jumlah

Rp16,560,000

Jumlah

Rp2,365,714

Harga Satuan Bahan

RAB Bahan

Jumlah
Bahan/Hari

Biaya
Bahan/Hari

Rp6,000

Rp6,000

1.857

Rp11,143

Rp32,000

Rp320,000

1.429

Rp45,714

Rp33,500

Rp234,500

1.000

Rp33,500

Rp146,500

Rp732,500

0.714

Rp104,643

Rp13,500

Rp81,000

0.857

Rp11,571

Rp13,500

Rp121,500

1.286

Rp17,357

REKAPITULASI BAHAN PEKERJAAN LANTAI

Rp10,000

Rp100,000

1.429

Rp14,286

Rp20,800

Rp2,080,000

14.286

Rp297,143

Jumlah

Rp3,675,500

Jumlah

Rp535,357

KEBUTUHAN TENAGA KERJA

No.

Uraian Jenis pekerjaan

Sat.

ttk

1.0000

XI
XI.1

Volume

Sat

Kebutuhan Tenaga
Kerja

8=5x6

0.9000

13.000

bh

11.700

Koeff. (Awal) Koeff. (Akhir)

PEKERJAAN INSTALASI LISTRIK


LAMPU PIJAR 25 WATT
Instalasi titik lampu/stop kontak (upah dan alat)

Jumlah
XI.2

11.700

LAMPU SL PHILIP 25 WATT


Instalasi titik lampu/stop kontak (upah dan alat)

ttk

1.0000

0.9000

10.000

bh

Jumlah
XI.3

XI.4

LAMPU DOWNLIGHT
Instalasi titik lampu/stop kontak (upah dan alat)

9.000

ttk
Jumlah

1.0000

0.9000

7.000

bh

6.300
6.300

ttk

1.0000

0.9000

5.000

bh

4.500

LAMPU TAMAN
Instalasi titik lampu/stop kontak (upah dan alat)

Jumlah
XI.5

4.500

STOP KONTAK
Instalasi titik lampu/stop kontak (upah dan alat)

ttk

1.0000

0.9000

6.000

bh

Jumlah
XI.6

9.000

5.400
5.400

STOP KONTAK DOBEL


Instalasi titik lampu/stop kontak (upah dan alat)

ttk

1.0000

0.9000

9.000

bh

8.100

Jumlah
XI.7

8.100

SAKLAR
Instalasi titik lampu/stop kontak (upah dan alat)

ttk

1.0000

0.9000

10.000

bh

Jumlah
XI.8

9.000
9.000

KABEL NYM SUPREME 2 X 10


Instalasi titik lampu/stop kontak (upah dan alat)

ttk

1.0000

0.9000

100.000

m'

Jumlah

90.000
90.000

ANALISIS BAHAN DAN K

No.

Uraian Jenis pekerjaan

Sat.

Koeff.

Volume

Sat

Kebutuhan Bahan

Sat

7=5x4

bh

1.000

13.00

bh

13.000

bh

XI
XI.1

PEKERJAAN INSTALASI LISTRIK


LAMPU PIJAR 25 WATT
Lampu pijar 25 s/d 100 watt

Jumlah
XI.2

LAMPU SL PHILIP 25 WATT


Lampu Sl philip 25 watt

bh

1.0000

10.00

bh

10.000

bh
Jumlah

XI.3

LAMPU DOWNLIGHT
Downlight + SL 25 watt philip

bh

1.0000

7.00

bh

7.000

bh
Jumlah

XI.4

LAMPU TAMAN
Lampu taman + tiang + lampu 1 buah

bh

1.0000

5.00

bh

5.000

bh
Jumlah

XI.5

STOP KONTAK
Stop kontak broko standard (1 phase)

bh

1.0000

6.00

bh

6.000

bh

Jumlah
XI.6

STOP KONTAK DOBEL


Stop kontak broko standard (1 phase)

bh

1.0000

9.00

bh

9.000

bh
Jumlah

XI.7

SAKLAR
Saklar broko tunggal standard

bh

1.0000

10.00

bh

10.000

bh
Jumlah

XI.8

KABEL NYM SUPREME 2 X 10


Saklar broko tunggal standard

m'

1.0000

100.00

m'

100.000

m'
Jumlah

ANALISIS PRODUKTIVITAS KERJA

No.

Uraian Pekerja

Sat

Kebutuhan Harga Satuan


Tenaga Kerja
Upah
4
5

XI. PEKERJAAN INSTALASI LISTRIK


XI.1 LAMPU PIJAR 25 WATT
Instalasi titik lampu/stop kontak (upah dan alat)

ttk

11.700

Rp115,000
Jumlah

XI. 2 LAMPU SL PHILIP 25 WATT


Instalasi titik lampu/stop kontak (upah dan alat)

ttk

9.000

Rp115,000
Jumlah

XI.3 LAMPU DOWNLIGHT


Instalasi titik lampu/stop kontak (upah dan alat)

ttk

6.300

Rp115,000
Jumlah

ttk

4.500

Rp115,000

XI.4 LAMPU TAMAN


Instalasi titik lampu/stop kontak (upah dan alat)

Jumlah
XI.5 STOP KONTAK
Instalasi titik lampu/stop kontak (upah dan alat)

ttk

5.400

Rp115,000
Jumlah

XI.6 STOP KONTAK DOBEL


Instalasi titik lampu/stop kontak (upah dan alat)

ttk

8.100

Rp115,000
Jumlah

XI.7 SAKLAR
Instalasi titik lampu/stop kontak (upah dan alat)

ttk

9.000

Rp115,000
Jumlah

XI.8 KABEL NYM SUPREME 2 X 10


Instalasi titik lampu/stop kontak (upah dan alat)

ttk

90.000

Rp115,000
Jumlah

ALISIS BAHAN DAN KEBUTUHAN BAHAN


Harga
Satuan
Bahan

RAB Bahan

Durasi (Hari)

Kebutuhan
Bahan/Hari

Sat

Produktivitas/
Hari

10

11

12

13

6.500

bh

5.000

bh

5.00

3.500

bh

3.50

2.500

bh

2.50

3.000

bh

3.00

Rp6,000

Rp78,000
Rp78,000

Jumlah
Rp32,000

Rp320,000
Rp320,000

Jumlah
Rp33,500

Rp234,500
Rp234,500

Jumlah
Rp146,500

Rp732,500
Rp732,500

Jumlah
Rp13,500

Rp81,000

6.50

Rp81,000

Jumlah
Rp13,500

Rp121,500

Jumlah
Rp10,000

Rp100,000
Rp100,000

Jumlah
Rp20,800
Jumlah

Rp121,500

Rp2,080,000
Rp2,080,000

4.500

bh

4.50

5.000

bh

5.00

50.000

m'

50.00

NALISIS PRODUKTIVITAS KERJA

Biaya Upah

Durasi
(Hari)

Volume
Pekerjaan

Sat

6=4x5

13.000

bh

10

bh

7.000

bh

5.000

bh

6.000

bh

9.000

bh

Rp1,345,500
Rp1,345,500
Rp1,035,000
Rp1,035,000
Rp724,500
Rp724,500
Rp517,500
Rp517,500
Rp621,000
Rp621,000
Rp931,500
Rp931,500

Kebutuhan
Tenaga Kerja Produktivitas
(Per Hari)
Kerja (Per Hari)
10 = 4 7
11 = 8 10

5.850

Sat
12

6.500

bh

5.000

bh

3.150

3.500

bh

2.250

2.500

bh

2.700

3.000

bh

4.050

4.500

bh

4.500

Rp1,035,000
Rp1,035,000
Rp10,350,000
Rp10,350,000

Sat
14

m2

m2

m2

m2

m2

10.000

bh

100.000

m'

4.500

5.000

bh

45.000

50.000

m'

m2

m2

m2