Anda di halaman 1dari 37

TABEL XI.

ANALISA HARGA SATUAN (AHS) PEKERJAAN INSTALASI LISTRIK

Harga Sat. Jumlah Harga


No. Uraian Jenis pekerjaan Sat. Koeff. Bahan / Upah / Alat Bahan
Rp. Rp.
1 2 3 4 5 6
XI PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 20 S/D 100 WATT
Lampu pijar 25 s/d 100 watt bh 1.000 Rp6,000.00 Rp6,000.00
Pekerja Oh 2.237 Rp38,000.00
Mandor Oh 0.5 Rp60,000.00
Jumlah Rp6,000.00
XI.2 LAMPU SL PHILIP 20 WATT
Lampu Sl philip 25 watt bh 1.000 Rp32,000.00 Rp32,000.00
Pekerja Oh 2.237 Rp38,000.00
Mandor Oh 0.5 Rp60,000.00
Jumlah Rp32,000.00
XI.3 LAMPU DOWNLIGHT
Downlight + SL 25 watt philip bh 1.000 Rp33,500.00 Rp33,500.00
Pekerja Oh 2.237 Rp38,000.00
Mandor Oh 0.5 Rp60,000.00
Jumlah Rp33,500.00
XI.4 LAMPU TAMAN
Lampu taman + tiang + lampu 1 buah bh 1.000 Rp146,500.00 Rp146,500.00
Pekerja Oh 2.237 Rp38,000.00
Mandor Oh 0.5 Rp60,000.00
Jumlah Rp146,500.00
XI.5 STOP KONTAK
Stop kontak broko standard (1 phase) bh 1.000 Rp13,500.00 Rp13,500.00
Pekerja Oh 2.237 Rp38,000.00
Mandor Oh 0.5 Rp60,000.00
Jumlah Rp13,500.00
XI.6 SAKLAR
Saklar broko tunggal standard bh 1.000 Rp10,000.00 Rp10,000.00
Pekerja Oh 2.237 Rp38,000.00
Mandor Oh 0.5 Rp60,000.00
Jumlah Rp10,000.00
XI.7 KABEL NYM SUPREME 2 X 10
Saklar broko tunggal standard m' 1.000 Rp20,800.00 Rp20,800.00
Pekerja Oh 2.237 Rp38,000.00
Mandor Oh 0.5 Rp60,000.00
Jumlah Rp20,800.00
TABEL XI.1

SATUAN (AHS) PEKERJAAN INSTALASI LISTRIK

Jumlah Harga Jumlah Harga


Upah Alat Bahan + Upah
Rp. Rp. Rp.
7 8 9

- -
Rp85,000.00
Rp30,000.00
Rp115,000.00 121,000.00

- -
Rp85,000.00
Rp30,000.00
Rp115,000.00 147,000.00

- -
Rp85,000.00
Rp30,000.00
Rp115,000.00 148,500.00

- -
Rp85,000.00
Rp30,000.00
Rp115,000.00 261,500.00

- -
Rp85,000.00
Rp30,000.00
Rp115,000.00 128,500.00

- -
Rp85,000.00
Rp30,000.00
Rp115,000.00 125,000.00

- -
Rp85,000.00
Rp30,000.00
Rp115,000.00 135,800.00
TABEL XI.2

RAB BAHAN PEKERJAAN INSTALASI LISTRIK

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
BAHAN Biaya Bahan Bid Price
1 2 3 4 5 6
XI. PEKERJAAN INSTALASI LISTRIK
K.1 Lampu Pijar 25 Watt 2 bh Rp6,000 Rp12,000.00
K.2 Lampu SL Philip 25 Watt 6 bh Rp32,000 Rp192,000.00
K.3 Lampu Downlight 6 bh Rp33,500 Rp201,000.00
K.4 Lampu Taman 2 bh Rp146,500 Rp293,000.00
K.5 Stop Kontak 11 bh Rp13,500 Rp148,500.00
K.6 Stop Kontak Dobel 4 bh Rp13,500 Rp54,000.00
K.7 Saklar 8 bh Rp10,000 Rp80,000.00
K.8 Kabel NYM supreme 2 x 10 100 m' Rp20,800 Rp2,080,000.00
Jumlah Rp3,060,500

RAB UPAH PEKERJAAN INSTALASI LISTRIK

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
UPAH Biaya Upah Bid Price
1 2 3 4 5 6
XI. PEKERJAAN INSTALASI LISTRIK
K.1 Lampu Pijar 25 Watt 2 bh Rp115,000 Rp230,000.00
K.2 Lampu SL Philip 25 Watt 6 bh Rp115,000 Rp690,000.00
K.3 Lampu Downlight 6 bh Rp115,000 Rp690,000.00
K.4 Lampu Taman 2 bh Rp115,000 Rp230,000.00
K.5 Stop Kontak 11 bh Rp115,000 Rp1,265,000.00
K.6 Stop Kontak Dobel 4 bh Rp115,000 Rp460,000.00
K.7 Saklar 8 bh Rp115,000 Rp920,000.00
K.8 Kabel NYM supreme 2 x 10 100 m' Rp115,000 Rp11,500,000.00
Jumlah Rp15,985,000
TABEL XI.2

AN PEKERJAAN INSTALASI LISTRIK

JUMLAH HARGA
Biaya Bahan Pelaksanaan
7

Rp12,000.00
Rp192,000.00
Rp201,000.00
Rp293,000.00
Rp148,500.00
Rp54,000.00
Rp80,000.00
Rp2,080,000.00
Rp3,060,500

H PEKERJAAN INSTALASI LISTRIK

JUMLAH HARGA
Biaya Upah Pelaksanaan
7
Rp207,000.00
Rp621,000.00
Rp621,000.00
Rp207,000.00
Rp1,138,500.00
Rp414,000.00
Rp828,000.00
Rp10,350,000.00
Rp14,386,500
TABEL XI.3

KEBUTUHAN TENAGA KERJA

No. Uraian Jenis pekerjaan Sat. Koeff. (Awal) Koeff. (Akhir) Volume Sat

1 2 3 4 5 6 7
XI PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Pekerja Oh 2.237 2.013 2.000 bh
Mandor Oh 0.500 0.450 2.000 bh
Jumlah
XI.2 LAMPU SL PHILIP 25 WATT
Pekerja Oh 2.237 2.013 6.000 bh
Mandor Oh 0.500 0.450 6.000 bh
Jumlah
XI.3 LAMPU DOWNLIGHT
Pekerja Oh 2.237 2.013 6.000 bh
Mandor Oh 0.500 0.450 6.000 bh
Jumlah
XI.4 LAMPU TAMAN
Pekerja Oh 2.237 2.013 2.000 bh
Mandor Oh 0.500 0.450 2.000 bh
Jumlah
XI.5 STOP KONTAK
Pekerja Oh 2.237 2.013 11.000 bh
Mandor Oh 0.500 0.450 11.000 bh
Jumlah
XI.6 STOP KONTAK DOBEL
Pekerja Oh 2.237 2.013 4.000 bh
Mandor Oh 0.500 0.450 4.000 bh
Jumlah
XI.7 SAKLAR
Pekerja Oh 2.237 2.013 8.000 bh
Mandor Oh 0.500 0.450 8.000 bh
Jumlah
XI.8 KABEL NYM SUPREME 2 X 10
Pekerja Oh 2.237 2.013 100.000 m'
Mandor Oh 0.500 0.450 100.000 m'
Jumlah
TABEL XI.3

KEBUTUHAN TENAGA KERJA

Kebutuhan Tenaga Kerja

8=5x6

4.026
0.900
4.926

12.079
2.700
14.779

12.079
2.700
14.779

4.026
0.900
4.926

22.145
4.950
27.095

8.053
1.800
9.853

16.105
3.600
19.705

201.316
45.000
246.316
TABEL XI.4

ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Harga Satuan


No. Uraian Pekerja Sat Biaya Upah
Tenaga Kerja Upah
1 2 3 4 5 6=4x5
XI. PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Pekerja Oh 4.026 Rp38,000 Rp153,000
Mandor Oh 0.900 Rp60,000 Rp54,000
Jumlah Rp207,000
XI. 2 LAMPU SL PHILIP 25 WATT
Pekerja Oh 12.079 Rp38,000 Rp459,000
Mandor Oh 2.700 Rp60,000 Rp162,000
Jumlah Rp621,000
XI.3 LAMPU DOWNLIGHT
Pekerja Oh 12.079 Rp38,000 Rp459,000
Mandor Oh 2.700 Rp60,000 Rp162,000
Jumlah Rp621,000
XI.4 LAMPU TAMAN
Pekerja Oh 4.026 Rp38,000 Rp153,000
Mandor Oh 0.900 Rp60,000 Rp54,000
Jumlah Rp207,000
XI.5 STOP KONTAK
Pekerja Oh 22.145 Rp38,000 Rp841,500
Mandor Oh 4.950 Rp60,000 Rp297,000
Jumlah Rp1,138,500
XI.6 STOP KONTAK DOBEL
Pekerja Oh 8.053 Rp38,000 Rp306,000
Mandor Oh 1.800 Rp60,000 Rp108,000
Jumlah Rp414,000
XI.7 SAKLAR
Pekerja Oh 16.105 Rp38,000 Rp612,000
Mandor Oh 3.600 Rp60,000 Rp216,000
Jumlah Rp828,000
XI.8 KABEL NYM SUPREME 2 X 10
Pekerja Oh 201.316 Rp38,000 Rp7,650,000
Mandor Oh 45.000 Rp60,000 Rp2,700,000
Jumlah Rp10,350,000
TABEL XI.4

S PRODUKTIVITAS KERJA

Durasi Volume Kebutuhan Tenaga Kerja Produktivitas Kerja


Sat Sat
(Hari) Pekerjaan (Per Hari) (Per Hari)
7 8 9 10 = 4 7 11 = 8 10 12

4.026
1 2.000 bh 0.900 2.000 bh

12.079
1 6 bh 2.700 6.000 bh

12.079
1 6.000 bh 2.700 6.000 bh

4.026
2 2.000 bh 0.900 2.000 bh

22.145
2 11.000 bh 4.950 11.000 bh
2 11.000 bh 11.000 bh

8.053
2 4.000 bh 1.800 4.000 bh

16.105
2 8.000 bh 3.600 8.000 bh

201.316
2 100.000 m' 45.000 100.000 m'
TABEL XI.5

ANALISIS BAHAN DAN KEBUTUHAN BAHAN

No. Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan Sat

1 2 3 4 5 6 7=5x4 7
XI PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Lampu pijar 25 s/d 100 watt bh 1.000 2.00 bh 2.000 bh
Jumlah
XI.2 LAMPU SL PHILIP 25 WATT
Lampu Sl philip 25 watt bh 1.0000 6.00 bh 6.000 bh
Jumlah
XI.3 LAMPU DOWNLIGHT
Downlight + SL 25 watt philip bh 1.0000 6.00 bh 6.000 bh
Jumlah
XI.4 LAMPU TAMAN
Lampu taman + tiang + lampu 1 buah bh 1.0000 2.00 bh 2.000 bh
Jumlah
XI.5 STOP KONTAK
Stop kontak broko standard (1 phase) bh 1.0000 11.00 bh 11.000 bh
Jumlah
XI.6 STOP KONTAK DOBEL
Stop kontak broko standard (1 phase) bh 1.0000 4.00 bh 4.000 bh
Jumlah
XI.7 SAKLAR
Saklar broko tunggal standard bh 1.0000 8.00 bh 8.000 bh
Jumlah
XI.8 KABEL NYM SUPREME 2 X 10
Saklar broko tunggal standard m' 1.0000 100.00 m' 100.000 m'
Jumlah
TABEL XI.5

HAN DAN KEBUTUHAN BAHAN

Harga
Durasi Kebutuhan Produktivitas/
Satuan RAB Bahan Sat Sat
(Hari) Bahan/Hari Hari
Bahan
8 9 10 11 12 13 14

Rp6,000 Rp12,000 2.000 bh


1 2.00 m2
Jumlah Rp12,000

Rp32,000 Rp192,000 6.000 bh 6.00 m2


1
Jumlah Rp192,000

Rp33,500 Rp201,000 6.000 bh 6.00 m2


1
Jumlah Rp201,000

Rp146,500 Rp293,000 2.000 bh 1.00 m2


2
Jumlah Rp293,000
Rp13,500 Rp148,500 11.000 bh 5.50 m2
2
Jumlah Rp148,500

Rp13,500 Rp54,000 4.000 bh 2.00 m2


2
Jumlah Rp54,000

Rp10,000 Rp80,000 8.000 bh 4.00 m2


2
Jumlah Rp80,000

Rp20,800 Rp2,080,000 100.000 m' 50.00 m2


2
Jumlah Rp2,080,000
TABEL XI.6
REKAPITULASI

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN LISTRIK

No. Jenis Pekerja Sat Jumlah Pekerja Sat Harga Satuan


Upah
1 Pekerja Oh 279.829 Oh Rp38,000
2 Mandor Oh 62.550 Oh Rp60,000
Jumlah

REKAPITULASI BAHAN PEKERJAAN LISTRIK

No. Jenis Bahan Sat Jumlah Bahan Sat Harga Satuan


Bahan
1 Lampu Pijar 25 Watt bh 2.000 bh Rp6,000
2 Lampu SL Philip 25 Watt bh 6.000 bh Rp32,000
3 Lampu Downlight bh 6.000 bh Rp33,500
4 Lampu Taman bh 2.000 bh Rp146,500
5 Stop Kontak bh 11.000 bh Rp13,500
6 Stop Kontak Dobel bh 4.000 bh Rp13,500
7 Saklar bh 8.000 bh Rp10,000
8 Kabel NYM supreme 2 x 10 m' 100.000 m' Rp20,800
Jumlah
RIK

Jumlah Biaya
RAB Upah
Pekerja/Hari Upah/Hari
Rp10,633,500 39.976 Rp1,519,071
Rp3,753,000 8.936 Rp536,143
Rp14,386,500 Jumlah Rp2,055,214

RAB Bahan Jumlah Biaya


Bahan/Hari Bahan/Hari
Rp12,000 0.286 Rp1,714
Rp192,000 0.857 Rp27,429
Rp201,000 0.857 Rp28,714
Rp293,000 0.286 Rp41,857
Rp148,500 1.571 Rp21,214
Rp54,000 0.571 Rp7,714
Rp80,000 1.143 Rp11,429
Rp2,080,000 14.286 Rp297,143
Rp3,060,500 Jumlah Rp437,214
RAB BAHAN PEKERJAAN INSTALASI LISTRIK

HARGA SAT
NO URAIAN PEKERJAAN VOL SAT
BAHAN
1 2 3 4 5
XI. PEKERJAAN INSTALASI LISTRIK
K.1 Lampu Pijar 25 Watt 13 bh Rp6,000
K.2 Lampu SL Philip 25 Watt 10 bh Rp32,000
K.3 Lampu Downlight 7 bh Rp33,500
K.4 Lampu Taman 5 bh Rp146,500
K.5 Stop Kontak 6 bh Rp13,500
K.6 Stop Kontak Dobel 9 bh Rp13,500
K.7 Saklar 10 bh Rp10,000
K.8 Kabel NYM supreme 2 x 10 100 m' Rp20,800
Jumlah
RAB UPAH PEKERJAAN INSTALASI LISTRIK

HARGA SAT
NO URAIAN PEKERJAAN VOL SAT
UPAH
1 2 3 4 5
XI. PEKERJAAN INSTALASI LISTRIK
K.1 Lampu Pijar 25 Watt 13 bh Rp115,000
K.2 Lampu SL Philip 25 Watt 10 bh Rp115,000
K.3 Lampu Downlight 7 bh Rp115,000
K.4 Lampu Taman 5 bh Rp115,000
K.5 Stop Kontak 6 bh Rp115,000
K.6 Stop Kontak Dobel 9 bh Rp115,000
K.7 Saklar 10 bh Rp115,000
K.8 Kabel NYM supreme 2 x 10 100 m' Rp115,000
Jumlah

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN

No. Jenis Pekerja Sat Jumlah Pekerja Sat

1 Lampu Pijar 25 Watt bh 11.700 ttk


2 Lampu SL Philip 25 Watt bh 9.000 ttk
3 Lampu Downlight bh 6.300 ttk
4 Lampu Taman bh 4.500 ttk
5 Stop Kontak bh 5.400 ttk
6 Stop Kontak Dobel bh 8.100 ttk
7 Saklar bh 9.000 ttk
8 Kabel NYM supreme 2 x 10 m' 90.000 ttk

REKAPITULASI BAHAN PEKERJAAN LANT

No. Jenis Bahan Sat Jumlah Bahan Sat

1 Lampu Pijar 25 Watt bh 13.000 bh


2 Lampu SL Philip 25 Watt bh 10.000 bh
3 Lampu Downlight bh 7.000 bh
4 Lampu Taman bh 5.000 bh
5 Stop Kontak bh 6.000 bh
6 Stop Kontak Dobel bh 9.000 bh
7 Saklar bh 10.000 bh
8 Kabel NYM supreme 2 x 10 m' 100.000 m'
AHAN PEKERJAAN INSTALASI LISTRIK

JUMLAH HARGA
Biaya Bahan Bid Price Biaya Bahan Pelaksanaan
6 7

Rp78,000.00 Rp78,000.00
Rp320,000.00 Rp320,000.00
Rp234,500.00 Rp234,500.00
Rp732,500.00 Rp732,500.00
Rp81,000.00 Rp81,000.00
Rp121,500.00 Rp121,500.00
Rp100,000.00 Rp100,000.00
Rp2,080,000.00 Rp2,080,000.00
Rp3,747,500 Rp3,747,500
UPAH PEKERJAAN INSTALASI LISTRIK

JUMLAH HARGA
Biaya Upah Bid Price Biaya Upah Pelaksanaan
6 7

Rp1,495,000.00 Rp1,345,500.00
Rp1,150,000.00 Rp1,035,000.00
Rp805,000.00 Rp724,500.00
Rp575,000.00 Rp517,500.00
Rp690,000.00 Rp621,000.00
Rp1,035,000.00 Rp931,500.00
Rp1,150,000.00 Rp1,035,000.00
Rp11,500,000.00 Rp10,350,000.00
Rp18,400,000 Rp16,560,000

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN LANTAI

Jumlah Biaya
Harga Satuan Upah RAB Upah
Pekerja/Hari Upah/Hari
Rp115,000 Rp1,345,500 1.671 Rp192,214
Rp115,000 Rp1,035,000 1.286 Rp147,857
Rp115,000 Rp724,500 0.900 Rp103,500
Rp115,000 Rp517,500 0.643 Rp73,929
Rp115,000 Rp621,000 0.771 Rp88,714
Rp115,000 Rp931,500 1.157 Rp133,071
Rp115,000 Rp1,035,000 1.286 Rp147,857
Rp115,000 Rp10,350,000 12.857 Rp1,478,571
Jumlah Rp16,560,000 Jumlah Rp2,365,714

REKAPITULASI BAHAN PEKERJAAN LANTAI

Harga Satuan Bahan RAB Bahan Jumlah Biaya


Bahan/Hari Bahan/Hari
Rp6,000 Rp6,000 1.857 Rp11,143
Rp32,000 Rp320,000 1.429 Rp45,714
Rp33,500 Rp234,500 1.000 Rp33,500
Rp146,500 Rp732,500 0.714 Rp104,643
Rp13,500 Rp81,000 0.857 Rp11,571
Rp13,500 Rp121,500 1.286 Rp17,357
Rp10,000 Rp100,000 1.429 Rp14,286
Rp20,800 Rp2,080,000 14.286 Rp297,143
Jumlah Rp3,675,500 Jumlah Rp535,357
KEBUTUHAN TENAGA KERJA

Kebutuhan Tenaga
No. Uraian Jenis pekerjaan Sat. Koeff. (Awal) Koeff. (Akhir) Volume Sat
Kerja

1 2 3 4 5 6 7 8=5x6
XI PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000 13.000 bh 11.700
Jumlah 11.700
XI.2 LAMPU SL PHILIP 25 WATT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000 10.000 bh 9.000
Jumlah 9.000
XI.3 LAMPU DOWNLIGHT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000 7.000 bh 6.300
Jumlah 6.300
XI.4 LAMPU TAMAN
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000 5.000 bh 4.500
Jumlah 4.500
XI.5 STOP KONTAK
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000 6.000 bh 5.400
Jumlah 5.400
XI.6 STOP KONTAK DOBEL
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000 9.000 bh 8.100
Jumlah 8.100
XI.7 SAKLAR
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000 10.000 bh 9.000
Jumlah 9.000
XI.8 KABEL NYM SUPREME 2 X 10
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000 100.000 m' 90.000
Jumlah 90.000

ANALISIS BAHAN DAN K

No. Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan Sat

1 2 3 4 5 6 7=5x4 7
XI PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Lampu pijar 25 s/d 100 watt bh 1.000 13.00 bh 13.000 bh
Jumlah
XI.2 LAMPU SL PHILIP 25 WATT
Lampu Sl philip 25 watt bh 1.0000 10.00 bh 10.000 bh
Jumlah
XI.3 LAMPU DOWNLIGHT
Downlight + SL 25 watt philip bh 1.0000 7.00 bh 7.000 bh
Jumlah
XI.4 LAMPU TAMAN
Lampu taman + tiang + lampu 1 buah bh 1.0000 5.00 bh 5.000 bh
Jumlah
XI.5 STOP KONTAK
Stop kontak broko standard (1 phase) bh 1.0000 6.00 bh 6.000 bh
Jumlah
XI.6 STOP KONTAK DOBEL
Stop kontak broko standard (1 phase) bh 1.0000 9.00 bh 9.000 bh
Jumlah
XI.7 SAKLAR
Saklar broko tunggal standard bh 1.0000 10.00 bh 10.000 bh
Jumlah
XI.8 KABEL NYM SUPREME 2 X 10
Saklar broko tunggal standard m' 1.0000 100.00 m' 100.000 m'
Jumlah
ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Harga Satuan


No. Uraian Pekerja Sat
Tenaga Kerja Upah
1 2 3 4 5
XI. PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 11.700 Rp115,000
Jumlah
XI. 2 LAMPU SL PHILIP 25 WATT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 9.000 Rp115,000
Jumlah
XI.3 LAMPU DOWNLIGHT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 6.300 Rp115,000
Jumlah
XI.4 LAMPU TAMAN
Instalasi titik lampu/stop kontak (upah dan alat) ttk 4.500 Rp115,000
Jumlah
XI.5 STOP KONTAK
Instalasi titik lampu/stop kontak (upah dan alat) ttk 5.400 Rp115,000
Jumlah
XI.6 STOP KONTAK DOBEL
Instalasi titik lampu/stop kontak (upah dan alat) ttk 8.100 Rp115,000
Jumlah
XI.7 SAKLAR
Instalasi titik lampu/stop kontak (upah dan alat) ttk 9.000 Rp115,000
Jumlah
XI.8 KABEL NYM SUPREME 2 X 10
Instalasi titik lampu/stop kontak (upah dan alat) ttk 90.000 Rp115,000
Jumlah

ALISIS BAHAN DAN KEBUTUHAN BAHAN

Harga
Kebutuhan Produktivitas/
Satuan RAB Bahan Durasi (Hari) Sat
Bahan/Hari Hari
Bahan

8 9 10 11 12 13

Rp6,000 Rp78,000 6.500 bh


2 6.50
Jumlah Rp78,000

Rp32,000 Rp320,000 5.000 bh 5.00


2
Jumlah Rp320,000

Rp33,500 Rp234,500 3.500 bh 3.50


2
Jumlah Rp234,500

Rp146,500 Rp732,500 2.500 bh 2.50


2
Jumlah Rp732,500

Rp13,500 Rp81,000 3.000 bh 3.00


2
2
Jumlah Rp81,000

Rp13,500 Rp121,500 4.500 bh 4.50


2
Jumlah Rp121,500

Rp10,000 Rp100,000 5.000 bh 5.00


2
Jumlah Rp100,000

Rp20,800 Rp2,080,000 50.000 m' 50.00


2
Jumlah Rp2,080,000
NALISIS PRODUKTIVITAS KERJA

Kebutuhan
Durasi Volume Tenaga Kerja Produktivitas
Biaya Upah Sat Sat
(Hari) Pekerjaan (Per Hari) Kerja (Per Hari)
6=4x5 7 8 9 10 = 4 7 11 = 8 10 12

Rp1,345,500 5.850
2 13.000 bh 6.500 bh
Rp1,345,500

Rp1,035,000 4.500
2 10 bh 5.000 bh
Rp1,035,000

Rp724,500 3.150 3.500 bh


2 7.000 bh
Rp724,500

Rp517,500 2.250 2.500 bh


2 5.000 bh
Rp517,500

Rp621,000 2.700 3.000 bh


2 6.000 bh
Rp621,000

Rp931,500 4.050 4.500 bh


2 9.000 bh
Rp931,500
Rp1,035,000 4.500 5.000 bh
2 10.000 bh
Rp1,035,000

Rp10,350,000 45.000 50.000 m'


2 100.000 m'
Rp10,350,000

Sat

14

m2

m2

m2

m2

m2
m2

m2

m2

Anda mungkin juga menyukai