Ruang Ruang
Radiologi
Poli Anak Poli Gigi Perawata Bersalin IGD Laborat.
& USG
n II II
6,250 1,250 2,100 1,200 2,000 600 9,000
A. BIAYA INVESTASI
4. AIC alat non medis 5,000,000 1,000,000 1,000,000 1,000,000 0 1,000,000 4,000,000
B. BIAYA OPERASIONAL
3. Biaya bahan habis pakai (non medis) 4,000,000 2,000,000 10,000,000 12,000,000 25,000,000 1,000,000 1,000,000
C. BIAYA PEMELIHARAAN
1. Biaya pemeliharaan gedung 250,000 150,000 200,000 200,000 50,000 200,000 250,000
Jumlah Biaya Variabel (B2+B3+B4+B5+C) 71,040,000 21,690,000 45,300,000 28,440,000 35,670,000 22,470,000 76,050,000
JUMLAH TOTAL BIAYA ASLI (A+B+C) 118,400,000 36,150,000 75,500,000 47,400,000 59,450,000 37,450,000 126,750,000
PUSAT BIAYA PRODUKSI
0 0 0 2,000,000 0
0 0 0 0 0
0 0 0 100,000 0
0 0 0 0 0
Jumlah Karcis 0 0 0 0 0
PB. Penunjang
PB. Penunjang
Sekretariat Direktur 909,639
Loket 3,270,623
Instalasi gizi/dapur 80,306,087
Loundry 6,177,391
Ambulance 157,523,478
HASIL DISTRIBUSI II
TOTAL COST
OUTPUT ACTUAL
0 0 50 20 0 400 0
50 36
20,200 20,200
12,550 12,200
4,350 4,100
470 470
580,590,000
71,040,000
31,195,826,087
18,918,988,580
6,486,624,725
725,843,478
57,398,322,871
1,819,277
513,678,923
388,572,486
109,775,116
169,399,315
1,183,245,117
58,581,567,987