PEKERJAAN PEKERJAAN
KONTRAK AWAL ADDENDUM - I
TAMBAH ( + ) KURANG ( - )
NO. URAIAN PEKERJAAN SAT
JUMLAH JUMLAH JUMLAH
HARGA HARGA
VOLUME VOLUME VOLUME VOLUME
SATUAN SATUAN
HARGA HARGA HARGA
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Lantai Keramik WC/KM 4 Unit M 50.11 41,759 2,092,543 39.94 1,667,938 10.17 41,759
2 Pek. Bongkar Lantai Beton Bertulang WC/KM 4 Unit M 5.58 6,443,335 5.58 1,153,807
3 Pek. Bongkar Dinding Bata WC/KM 4 Unit M 2.13 1,229,958 2.13 576,903
4 Pek. Bongkar Paving Block Area Septicktank Ls 1.00 2,500,000 1.00 2,500,000
II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai WC/KM Uk. 30x30 cm M 4.44 305,920 1,358,285 5.73 1,752,922 10.17 305,920
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 45.67 261,181 11,928,136 0.86 225,869 46.53 261,181
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 12.00 3,900,000 24.00 325,000
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 8.93 583,611
5 Pek. Urugan Tanah Kembali M 22.31 1,032,693 22.31 46,288
6 Pek. Cor Lantai Beton Adk. 1 2 : 3 M 5.58 5,802,045 5.58 1,038,971
7 Pek. Penulangan Plat Lantai Kg 424.23 7,264,318 424.23 17,124
8 Pek. Pasang Dinding 1/2 Bata Adk. 1 : 3 M 16.40 3,562,126 16.40 217,203
9 Pek. Plesteran dinding Bata Adk. 1 : 2 M 10.40 632,141 10.40 60,783
10 Pek. Pasang Dinding Keramik Uk. 20x25 cm M 18.40 5,406,524 18.40 293,833
IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 24.00 42,000
V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 8.93 47,873 427,506 8.93 427,506
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 31.27 451,133 206.79 14,425
VI PEKERJAAN PENGECATAN
1 Pek. Pembersihan Seluruh Lokasi Ls 1.00 3,000,000 1.00 3,000,000
SUB TOTAL A 28,619,464 ### 3,929,055
B PEKERJAAN LANTAI - 2
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Lantai Keramik Uk. 30x30 cm Eksisting M 78.88 41,759 3,293,950 42.25 1,764,234 36.63 41,759
II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai Ruangan Uk. 30x30 cm M 78.88 305,920 24,130,970 42.25 12,924,508 36.63 305,920
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 8.00 261,181 2,089,448 8.00 2,089,448
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 12.00 3,900,000 24.00 325,000
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 8.93 583,611
5 Pek. Rehab Nut Keramik Lantai dan Dinding WC/KM Ls 1.00 500,000 500,000 1.00 500,000
IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 24.00 42,000
PEKERJAAN PEKERJAAN
KONTRAK AWAL ADDENDUM - I
TAMBAH ( + ) KURANG ( - )
NO. URAIAN PEKERJAAN SAT
JUMLAH JUMLAH JUMLAH
HARGA HARGA
VOLUME VOLUME VOLUME VOLUME
SATUAN SATUAN
HARGA HARGA HARGA
V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 8.93 47,873 427,506 8.93 427,506
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 27.02 389,827 202.54 14,425
3 Pek. Cat Minyak Railing Tangga dan Pagar M 39.83 89,576 3,567,812 39.83 89,576
SUB TOTAL B 46,822,679 4,289,827 19,539,308
C PEKERJAAN LANTAI - 3
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Lantai Keramik Uk. 30x30 cm Eksisting M 58.75 41,759 2,453,341 37.60 1,570,222 21.15 41,759
II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai Ruangan Uk. 30x30 cm M 58.75 305,920 17,972,800 37.60 11,503,204 21.15 305,920
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 8.00 261,181 2,089,448 8.00 2,089,448
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 16.00 325,000
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 8.93 583,611
5 Pek. Rehab Nut Keramik Lantai dan Dinding WC/KM Ls 1.00 500,000 500,000 1.00 500,000
IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 24.00 42,000
V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 5.95 47,873 284,844 5.95 284,844
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 27.02 389,827 202.54 14,425
3 Pek. Cat Minyak Railing Tangga dan Pagar M 39.83 89,576 3,567,812 39.83 89,576
SUB TOTAL C 39,681,239 389,827 17,781,329
D PEKERJAAN LANTAI - 4
PEKERJAAN PEKERJAAN
KONTRAK AWAL ADDENDUM - I
TAMBAH ( + ) KURANG ( - )
NO. URAIAN PEKERJAAN SAT
JUMLAH JUMLAH JUMLAH
HARGA HARGA
VOLUME VOLUME VOLUME VOLUME
SATUAN SATUAN
HARGA HARGA HARGA
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Lantai Keramik Uk. 30x30 cm Eksisting M 134.21 41,759 5,604,475 100.46 4,194,942 33.75 41,759
II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai Ruangan Uk. 30x30 cm M 134.21 305,920 41,057,523 100.46 30,731,500 33.75 305,920
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 8.00 261,181 2,089,448 8.00 2,089,448
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 16.00 325,000
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 157.77 10,311,097 166.70 65,354
5 Pek. Rehab Nut Keramik Lantai dan Dinding WC/KM Ls 1.00 500,000 500,000 1.00 500,000
IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 24.00 42,000
V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 5.95 47,873 284,844 160.75 7,695,728 166.70 47,873
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 27.02 389,827 202.54 14,425
3 Pek. Cat Minyak Railing Tangga dan Pagar M 39.83 89,576 3,567,812 39.83 89,576
SUB TOTAL D 65,917,096 18,396,652 38,765,890
E PEKERJAAN LANTAI DAK
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Atap Polycarbonate M 80.88 21,965 1,776,529 1.12 24,601 82.00 21,965
II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Atap Plastik Transparan M 8.83 105,719 933,499 4.60 485,990 13.43 105,719
2 Pek. Pasang Atap Longspan M 72.05 114,614 8,257,939 1.95 223,268 74.00 114,614
PEKERJAAN PEKERJAAN
KONTRAK AWAL ADDENDUM - I
TAMBAH ( + ) KURANG ( - )
NO. URAIAN PEKERJAAN SAT
JUMLAH JUMLAH JUMLAH
HARGA HARGA
VOLUME VOLUME VOLUME VOLUME
SATUAN SATUAN
HARGA HARGA HARGA
3 Pek. Pasang Perabung Atap Longspan M 16.85 72,266 1,217,682 16.85 72,266
4 Pek. Water Proofing Plat Dag M 214.58 59,989 12,872,440 214.58 59,989
SUB TOTAL E 25,058,088 733,859 -
F PEKERJAAN LUAR BANGUNAN
I PEKERJAAN SANITAIR
1 Pek. Instalasi Pipa PVC 2" Air Bekas M' 103.20 33,260 3,432,432 103.20 3,432,432
2 Pek. Instalasi Pipa PVC 4" Air Kotor (Closed) M' 108.00 529,687 57,206,196 108.00 57,206,196
3 Pek. Pembuatan Septicktank Uk. 2 x 3 x 1.5 m Unit 4.00 3,750,000 15,000,000 4.00 3,750,000
4 Pek. Pembuatan Sumur Resapan = 1,5 m x 1,5 m Unit 4.00 2,500,000 10,000,000 4.00 2,500,000
5 Pek. Instalasi Pipa PVC 4" Dari Sumur resapan Ke Saluran Terbuka M' 27.00 14,301,549 27.00 529,687
6 Pek. Instalasi Pipa PVC 4" Air Hujan M' 45.90 24,312,633 45.90 529,687
7 Pek. Cor Beton Selasar Adk. 1 : 2 : 3 M 2.79 2,898,728 2.79 1,038,971
SUB TOTAL F 85,638,628 38,614,182 60,638,628
II PEKERJAAN ARSITEKTUR
1 Pek. Rehab Pintu Plywood 6 mm M 4.92 259,911 1,278,762 4.92 259,911
2 Pek. Rehab Kusen Alluminium Ls 1.00 2,500,000 2,500,000 1.00 2,500,000
3 Pek. Pasang Kunci Tanam 2 Slag Bh 23.00 200,876 4,620,148 23.00 200,876
4 Pek. Rehab Nut Keramik WC/KM Ls 1.00 500,000 500,000 1.00 500,000
5 Pek. Pasang Kunci Tanam 2 Slag Pintu Entrance Bh 1.00 500,000 1.00 500,000
IV PEKERJAAN PENGECATAN
1 Pek. Cat Vernis Pintu M 75.44 40,865 3,082,856 75.44 40,865
PEKERJAAN PEKERJAAN
KONTRAK AWAL ADDENDUM - I
TAMBAH ( + ) KURANG ( - )
NO. URAIAN PEKERJAAN SAT
JUMLAH JUMLAH JUMLAH
HARGA HARGA
VOLUME VOLUME VOLUME VOLUME
SATUAN SATUAN
HARGA HARGA HARGA
SUB TOTAL A 17,887,285 500,000 851,890
B PEKERJAAN LANTAI - 2
I PEKERJAAN PENDAHULUAN
1 Pek. Pembongkaran Lantai Keramik M 7.44 41,759 310,687 0.23 9,688 7.21 41,759
II PEKERJAAN ARSITEKTUR
1 Pek. Rehab Pintu Plywood 6 mm M 9.84 259,911 2,557,524 1.64 426,254 11.48 259,911
2 Pek. Rehab Kusen Alluminium Ls 1.00 2,500,000 2,500,000 1.00 2,500,000
3 Pek. Pasang Kunci Tanam 2 Slag Bh 24.00 200,876 4,821,024 24.00 200,876
4 Pek. Rehab Nut Keramik WC/KM Ls 1.00 500,000 500,000 1.00 500,000
IV PEKERJAAN PENGECATAN
1 Pek. Cat Vernis Pintu M 78.72 40,865 3,216,893 78.72 40,865
SUB TOTAL B 20,839,914 426,254 833,786
Diperiksa oleh:
Diajukan ole
Konsultan Supervisi
Kontraktor Pelak
CV. BARAU KONSULTAN
CV. BUANA MAN
PEKERJAAN PEKERJAAN
Diperiksa oleh: KONTRAK AWAL ADDENDUM - I
TAMBAH ( + ) KURANG ( - ) Diajukan ole
NO. Konsultan Supervisi
URAIAN PEKERJAAN SAT
JUMLAH JUMLAH JUMLAH Kontraktor Pelak
CV. BARAU KONSULTAN HARGA HARGA
VOLUME VOLUME VOLUME VOLUME CV. BUANA MAN
SATUAN SATUAN
HARGA HARGA HARGA
SAID KHAIRIANSYAH,
PUJI ASTUT
ST.
Direktur
Direktur
EER ESTIMATE
ADDENDUM - I KETERANGAN
(THD. VOLUME
JUMLAH
KONTRAK AWAL)
HARGA
Volume Berkurang
994,968 Volume Tetap
708,624 Volume Tetap
335,914 Volume Tetap
1,500,000 Volume Tetap
ADDENDUM - I KETERANGAN
(THD. VOLUME
JUMLAH
KONTRAK AWAL)
HARGA
14,153,556 Item Baru
3,000,000 Item Baru
931,280 Item Baru
2,237,063 Item Baru
1,184,519 Item Baru
38,137,464 Item Baru
ADDENDUM - I KETERANGAN
(THD. VOLUME
JUMLAH
KONTRAK AWAL)
HARGA
Volume Berkurang
2,983,009 Volume Bertambah
Volume Berkurang
994,968 Volume Tetap
708,624 Volume Tetap
335,914 Volume Tetap
1,500,000 Volume Tetap
Volume Berkurang
2,921,703 Volume Bertambah
3,567,812 Volume Tetap
31,573,198
Volume Berkurang
994,968 Volume Tetap
708,624 Volume Tetap
335,914 Volume Tetap
1,500,000 Volume Tetap
Volume Berkurang
2,921,703 Volume Bertambah
3,567,812 Volume Tetap
23,589,737
ADDENDUM - I KETERANGAN
(THD. VOLUME
JUMLAH
KONTRAK AWAL)
HARGA
Volume Berkurang
994,968 Volume Tetap
708,624 Volume Tetap
335,914 Volume Tetap
1,500,000 Volume Tetap
Volume Berkurang
Volume Berkurang
15,000,000 Volume Tetap
10,000,000 Volume Tetap
14,301,549 Item Baru
24,312,633 Item Baru
2,898,728 Item Baru
63,614,182
###
35,837,142
###
###
Diajukan oleh:
Kontraktor Pelaksana
CV. BUANA MANDIRI
ADDENDUM - I
Diajukan oleh: KETERANGAN
Kontraktor Pelaksana (THD. VOLUME
JUMLAH
KONTRAK AWAL)
CV. BUANA MANDIRI
HARGA
PUJI ASTUTI.
Direktur