I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Bangunan Masjid Lama Ls 50.11 41,759 2,092,543 Err:504
2 Pek. Galian Tanah Biasa M Item Baru
3 Pek. Timbunan Tanah Dari Hasil Galian M Item Baru
II PEKERJAAN STRUKTUR
1 Pek. Pasir Urug, T = 5 Cm M 4.44 305,920 1,358,285 Err:504
2 Pek. Cor Lantai Kerja, T = 10 Cm M 45.67 261,181 11,928,136 Err:504
3 Pek. Pondasi K1 40 x 40 Cm Bh 12.00 325,000 3,900,000 Err:504
Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 Err:504
- Pembesian M Item Baru
- Pek. Cor Beton K - 175 M Item Baru
Pek. Penulangan Plat Lantai Kg Item Baru
Pek. Pasang Dinding 1/2 Bata Adk. 1 : 3 M Item Baru
Pek. Plesteran dinding Bata Adk. 1 : 2 M Item Baru
Pek. Pasang Dinding Keramik Uk. 20x25 cm M Item Baru
IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 Err:504
V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 8.93 47,873 427,506 Err:504
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 Err:504
VI PEKERJAAN PENGECATAN
1 Pek. Pembersihan Seluruh Lokasi Ls Item Baru
SUB TOTAL A 28,619,464
B PEKERJAAN LANTAI - 2
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Lantai Keramik Uk. 30x30 cm Eksisting M 78.88 41,759 3,293,950 Err:504
II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai Ruangan Uk. 30x30 cm M 78.88 305,920 24,130,970 Err:504
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 8.00 261,181 2,089,448 Err:504
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 Err:504
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 Err:504
5 Pek. Rehab Nut Keramik Lantai dan Dinding WC/KM Ls 1.00 500,000 500,000 Err:504
IV PEKERJAAN ELEKTRIKAL
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)
V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 8.93 47,873 427,506 Err:504
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 Err:504
3 Pek. Cat Minyak Railing Tangga dan Pagar M 39.83 89,576 3,567,812 Err:504
SUB TOTAL B 46,822,679
C PEKERJAAN LANTAI - 3
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Lantai Keramik Uk. 30x30 cm Eksisting M 58.75 41,759 2,453,341 Err:504
II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai Ruangan Uk. 30x30 cm M 58.75 305,920 17,972,800 Err:504
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 8.00 261,181 2,089,448 Err:504
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 Err:504
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 Err:504
5 Pek. Rehab Nut Keramik Lantai dan Dinding WC/KM Ls 1.00 500,000 500,000 Err:504
IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 Err:504
V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 5.95 47,873 284,844 Err:504
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 Err:504
3 Pek. Cat Minyak Railing Tangga dan Pagar M 39.83 89,576 3,567,812 Err:504
SUB TOTAL C 39,681,239
D PEKERJAAN LANTAI - 4
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Lantai Keramik Uk. 30x30 cm Eksisting M 134.21 41,759 5,604,475 Err:504
II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai Ruangan Uk. 30x30 cm M 134.21 305,920 41,057,523 Err:504
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 8.00 261,181 2,089,448 Err:504
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 Err:504
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 Err:504
5 Pek. Rehab Nut Keramik Lantai dan Dinding WC/KM Ls 1.00 500,000 500,000 Err:504
IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 Err:504
V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 5.95 47,873 284,844 Err:504
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 Err:504
3 Pek. Cat Minyak Railing Tangga dan Pagar M 39.83 89,576 3,567,812 Err:504
SUB TOTAL D 65,917,096
E PEKERJAAN LANTAI DAK
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Atap Polycarbonate M 80.88 21,965 1,776,529 Err:504
II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Atap Plastik Transparan M 8.83 105,719 933,499 Err:504
2 Pek. Pasang Atap Longspan M 72.05 114,614 8,257,939 Err:504
3 Pek. Pasang Perabung Atap Longspan M 16.85 72,266 1,217,682 Err:504
4 Pek. Water Proofing Plat Dag M 214.58 59,989 12,872,440 Err:504
SUB TOTAL E 25,058,088
F PEKERJAAN LUAR BANGUNAN
I PEKERJAAN SANITAIR
1 Pek. Instalasi Pipa PVC 2" Air Bekas M' 103.20 33,260 3,432,432 Err:504
2 Pek. Instalasi Pipa PVC 4" Air Kotor (Closed) M' 108.00 529,687 57,206,196 Err:504
3 Pek. Pembuatan Septicktank Uk. 2 x 3 x 1.5 m Unit 4.00 3,750,000 15,000,000 Err:504
4 Pek. Pembuatan Sumur Resapan = 1,5 m x 1,5 m Unit 4.00 2,500,000 10,000,000 Err:504
5 Pek. Instalasi Pipa PVC 4" Dari Sumur resapan Ke Saluran Terbuka M' Item Baru
6 Pek. Instalasi Pipa PVC 4" Air Hujan M' Item Baru
7 Pek. Cor Beton Selasar Adk. 1 : 2 : 3 M Item Baru
SUB TOTAL F 85,638,628
ASRAMA STIKES BANGKINANG
A PEKERJAAN LANTAI - 1
I PEKERJAAN PENDAHULUAN
1 Pek. Pembongkaran Lantai Keramik M 7.44 41,759 310,687 Err:504
II PEKERJAAN ARSITEKTUR
1 Pek. Rehab Pintu Plywood 6 mm M 4.92 259,911 1,278,762 Err:504
2 Pek. Rehab Kusen Alluminium Ls 1.00 2,500,000 2,500,000 Err:504
3 Pek. Pasang Kunci Tanam 2 Slag Bh 23.00 200,876 4,620,148 Err:504
4 Pek. Rehab Nut Keramik WC/KM Ls 1.00 500,000 500,000 Err:504
5 Pek. Pasang Kunci Tanam 2 Slag Pintu Entrance Bh Item Baru
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)
IV PEKERJAAN PENGECATAN
1 Pek. Cat Vernis Pintu M 75.44 40,865 3,082,856 Err:504
SUB TOTAL A 17,887,285
B PEKERJAAN LANTAI - 2
I PEKERJAAN PENDAHULUAN
1 Pek. Pembongkaran Lantai Keramik M 7.44 41,759 310,687 Err:504
II PEKERJAAN ARSITEKTUR
1 Pek. Rehab Pintu Plywood 6 mm M 9.84 259,911 2,557,524 Err:504
2 Pek. Rehab Kusen Alluminium Ls 1.00 2,500,000 2,500,000 Err:504
3 Pek. Pasang Kunci Tanam 2 Slag Bh 24.00 200,876 4,821,024 Err:504
4 Pek. Rehab Nut Keramik WC/KM Ls 1.00 500,000 500,000 Err:504
IV PEKERJAAN PENGECATAN
1 Pek. Cat Vernis Pintu M 78.72 40,865 3,216,893 Err:504
SUB TOTAL B 20,839,914
363,510,000
Diperiksa oleh:
Diajukan oleh:
Konsultan Supervisi
Kontraktor Pelaksana
CV. BARAU KONSULTAN
CV. BUANA MANDIRI
SAID KHAIRIANSYAH,
PUJI ASTUTI.
ST.
Direktur
Direktur