E N G I N E E R E STI MATE

PEKERJAAN : REHABILITAS MASJID NURUL IKRAM


LOKASI : JL. ARIFIN AHMAD - PEKANBARU

HARGA SATUAN JUMLAH HARGA KETERANGAN


NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Bangunan Masjid Lama Ls 50.11 41,759 2,092,543 Err:504
2 Pek. Galian Tanah Biasa M Item Baru
3 Pek. Timbunan Tanah Dari Hasil Galian M Item Baru

II PEKERJAAN STRUKTUR
1 Pek. Pasir Urug, T = 5 Cm M 4.44 305,920 1,358,285 Err:504
2 Pek. Cor Lantai Kerja, T = 10 Cm M 45.67 261,181 11,928,136 Err:504
3 Pek. Pondasi K1 40 x 40 Cm Bh 12.00 325,000 3,900,000 Err:504
Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 Err:504
- Pembesian M Item Baru
- Pek. Cor Beton K - 175 M Item Baru
Pek. Penulangan Plat Lantai Kg Item Baru
Pek. Pasang Dinding 1/2 Bata Adk. 1 : 3 M Item Baru
Pek. Plesteran dinding Bata Adk. 1 : 2 M Item Baru
Pek. Pasang Dinding Keramik Uk. 20x25 cm M Item Baru

III PEKERJAAN SANITAIR


1 Pek. Perbaikan Instalasi Pipa Air Bekas & Air Kotor Ls 1.00 1,250,000 1,250,000 Err:504
2 Pek. Pasang Kran Air Bh 24.00 41,457 994,968 Err:504
3 Pek. Pasang Floor Drain Bh 24.00 29,526 708,624 Err:504
4 Pek. Pasang Kran Cuci Piring Bh 2.00 167,957 335,914 Err:504
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

5 Pek. Perbaikan Meja Pantry Bh 2.00 750,000 1,500,000 Err:504


6 Pek. Pasang Closet jongkok Bh Item Baru
7 Pek. Pengecekan Pipa Air Kotor Ls Item Baru
8 Pek. Instalasi Pipa PVC 2" Air Bekas M' Item Baru
9 Pek. Instalasi Pipa PVC 2,5" Air Bekas M' Item Baru
10 Pek. Instalasi Pipa PVC 3" Air Bekas M' Item Baru
11 Pek. Instalasi Pipa PVC 4" Air Kotor (Closed) M' Item Baru
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 Err:504

V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 8.93 47,873 427,506 Err:504
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 Err:504

VI PEKERJAAN PENGECATAN
1 Pek. Pembersihan Seluruh Lokasi Ls Item Baru
SUB TOTAL A 28,619,464
B PEKERJAAN LANTAI - 2
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Lantai Keramik Uk. 30x30 cm Eksisting M 78.88 41,759 3,293,950 Err:504

II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai Ruangan Uk. 30x30 cm M 78.88 305,920 24,130,970 Err:504
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 8.00 261,181 2,089,448 Err:504
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 Err:504
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 Err:504
5 Pek. Rehab Nut Keramik Lantai dan Dinding WC/KM Ls 1.00 500,000 500,000 Err:504

III PEKERJAAN SANITAIR


1 Pek. Perbaikan Instalasi Pipa Air Bekas & Air Kotor Ls 1.00 1,250,000 1,250,000 Err:504
2 Pek. Pasang Kran Air Bh 24.00 41,457 994,968 Err:504
3 Pek. Pasang Floor Drain Bh 24.00 29,526 708,624 Err:504
4 Pek. Pasang Kran Cuci Piring Bh 2.00 167,957 335,914 Err:504
5 Pek. Perbaikan Meja Pantry Bh 2.00 750,000 1,500,000 Err:504

IV PEKERJAAN ELEKTRIKAL
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 Err:504

V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 8.93 47,873 427,506 Err:504
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 Err:504
3 Pek. Cat Minyak Railing Tangga dan Pagar M 39.83 89,576 3,567,812 Err:504
SUB TOTAL B 46,822,679
C PEKERJAAN LANTAI - 3
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Lantai Keramik Uk. 30x30 cm Eksisting M 58.75 41,759 2,453,341 Err:504

II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai Ruangan Uk. 30x30 cm M 58.75 305,920 17,972,800 Err:504
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 8.00 261,181 2,089,448 Err:504
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 Err:504
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 Err:504
5 Pek. Rehab Nut Keramik Lantai dan Dinding WC/KM Ls 1.00 500,000 500,000 Err:504

III PEKERJAAN SANITAIR


1 Pek. Perbaikan Instalasi Pipa Air Bekas & Air Kotor Ls 1.00 1,250,000 1,250,000 Err:504
2 Pek. Pasang Kran Air Bh 24.00 41,457 994,968 Err:504
3 Pek. Pasang Floor Drain Bh 24.00 29,526 708,624 Err:504
4 Pek. Pasang Kran Cuci Piring Bh 2.00 167,957 335,914 Err:504
5 Pek. Perbaikan Meja Pantry Bh 2.00 750,000 1,500,000 Err:504

IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 Err:504

V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 5.95 47,873 284,844 Err:504
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 Err:504
3 Pek. Cat Minyak Railing Tangga dan Pagar M 39.83 89,576 3,567,812 Err:504
SUB TOTAL C 39,681,239
D PEKERJAAN LANTAI - 4
I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Lantai Keramik Uk. 30x30 cm Eksisting M 134.21 41,759 5,604,475 Err:504

II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Keramik Lantai Ruangan Uk. 30x30 cm M 134.21 305,920 41,057,523 Err:504
2 Pek. Pasang Keramik Lantai WC/KM Uk. 20x20 cm M 8.00 261,181 2,089,448 Err:504
3 Pek. Pasang Pintu PVC WC/KM Uk. 60/180 cm Bh 12.00 325,000 3,900,000 Err:504
4 Pek. Rehab Plafond Gypsum 9 mm M 8.93 65,354 583,611 Err:504
5 Pek. Rehab Nut Keramik Lantai dan Dinding WC/KM Ls 1.00 500,000 500,000 Err:504

III PEKERJAAN SANITAIR


1 Pek. Perbaikan Instalasi Pipa Air Bekas & Air Kotor Ls 1.00 1,250,000 1,250,000 Err:504
2 Pek. Pasang Kran Air Bh 24.00 41,457 994,968 Err:504
3 Pek. Pasang Floor Drain Bh 24.00 29,526 708,624 Err:504
4 Pek. Pasang Kran Cuci Piring Bh 2.00 167,957 335,914 Err:504
5 Pek. Perbaikan Meja Pantry Bh 2.00 750,000 1,500,000 Err:504

IV PEKERJAAN ELEKTRIKAL
1 Pas. Lampu Hemat Energy 18 Watt Bh 24.00 42,000 1,008,000 Err:504

V PEKERJAAN PENGECATAN
1 Pek. Cat Plafond M 5.95 47,873 284,844 Err:504
2 Pek. Cat Tembok Ruang WC/KM 4 Unit M 175.52 14,425 2,531,876 Err:504
3 Pek. Cat Minyak Railing Tangga dan Pagar M 39.83 89,576 3,567,812 Err:504
SUB TOTAL D 65,917,096
E PEKERJAAN LANTAI DAK
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

I PEKERJAAN PEMBONGKARAN
1 Pek. Bongkar Atap Polycarbonate M 80.88 21,965 1,776,529 Err:504

II PEKERJAAN ARSITEKTUR
1 Pek. Pasang Atap Plastik Transparan M 8.83 105,719 933,499 Err:504
2 Pek. Pasang Atap Longspan M 72.05 114,614 8,257,939 Err:504
3 Pek. Pasang Perabung Atap Longspan M 16.85 72,266 1,217,682 Err:504
4 Pek. Water Proofing Plat Dag M 214.58 59,989 12,872,440 Err:504
SUB TOTAL E 25,058,088
F PEKERJAAN LUAR BANGUNAN
I PEKERJAAN SANITAIR
1 Pek. Instalasi Pipa PVC 2" Air Bekas M' 103.20 33,260 3,432,432 Err:504
2 Pek. Instalasi Pipa PVC 4" Air Kotor (Closed) M' 108.00 529,687 57,206,196 Err:504
3 Pek. Pembuatan Septicktank Uk. 2 x 3 x 1.5 m Unit 4.00 3,750,000 15,000,000 Err:504
4 Pek. Pembuatan Sumur Resapan = 1,5 m x 1,5 m Unit 4.00 2,500,000 10,000,000 Err:504
5 Pek. Instalasi Pipa PVC 4" Dari Sumur resapan Ke Saluran Terbuka M' Item Baru
6 Pek. Instalasi Pipa PVC 4" Air Hujan M' Item Baru
7 Pek. Cor Beton Selasar Adk. 1 : 2 : 3 M Item Baru
SUB TOTAL F 85,638,628
ASRAMA STIKES BANGKINANG
A PEKERJAAN LANTAI - 1
I PEKERJAAN PENDAHULUAN
1 Pek. Pembongkaran Lantai Keramik M 7.44 41,759 310,687 Err:504

II PEKERJAAN ARSITEKTUR
1 Pek. Rehab Pintu Plywood 6 mm M 4.92 259,911 1,278,762 Err:504
2 Pek. Rehab Kusen Alluminium Ls 1.00 2,500,000 2,500,000 Err:504
3 Pek. Pasang Kunci Tanam 2 Slag Bh 23.00 200,876 4,620,148 Err:504
4 Pek. Rehab Nut Keramik WC/KM Ls 1.00 500,000 500,000 Err:504
5 Pek. Pasang Kunci Tanam 2 Slag Pintu Entrance Bh Item Baru
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

III PEKERJAAN SANITAIR


1 Pek. Pasang Floor Drain Bh 32.00 29,526 944,832 Err:504
2 Pek. Saluran Air Kotor + Besi Grill Saluran WC/KM M' 37.20 125,000 4,650,000 Err:504

IV PEKERJAAN PENGECATAN
1 Pek. Cat Vernis Pintu M 75.44 40,865 3,082,856 Err:504
SUB TOTAL A 17,887,285
B PEKERJAAN LANTAI - 2
I PEKERJAAN PENDAHULUAN
1 Pek. Pembongkaran Lantai Keramik M 7.44 41,759 310,687 Err:504

II PEKERJAAN ARSITEKTUR
1 Pek. Rehab Pintu Plywood 6 mm M 9.84 259,911 2,557,524 Err:504
2 Pek. Rehab Kusen Alluminium Ls 1.00 2,500,000 2,500,000 Err:504
3 Pek. Pasang Kunci Tanam 2 Slag Bh 24.00 200,876 4,821,024 Err:504
4 Pek. Rehab Nut Keramik WC/KM Ls 1.00 500,000 500,000 Err:504

III PEKERJAAN SANITAIR


1 Pek. Pasang Floor Drain Bh 32.00 29,526 944,832 Err:504
2 Pek. Saluran Air Kotor + Besi Grill Saluran WC/KM M' 37.20 125,000 4,650,000 Err:504
3 Pek. Water Proofing Plat Dag Teras M 22.32 59,989 1,338,954 Err:504

IV PEKERJAAN PENGECATAN
1 Pek. Cat Vernis Pintu M 78.72 40,865 3,216,893 Err:504
SUB TOTAL B 20,839,914

JUMLAH HARGA 330,464,393


PPN ( 10 % ) 33,046,439
TOTAL HARGA 363,510,832
HARGA SATUAN JUMLAH HARGA KETERANGAN
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

363,510,000

Diperiksa oleh:
Diajukan oleh:
Konsultan Supervisi
Kontraktor Pelaksana
CV. BARAU KONSULTAN
CV. BUANA MANDIRI

SAID KHAIRIANSYAH,
PUJI ASTUTI.
ST.
Direktur
Direktur