NAMA PEKERJAAN : PEKERJAAN SERVICE GEDUNG PT.

UNITED TRACTOR,TBK
END USER : PT. UNITED TRACTOR,TBK CAB. MEDAN
KONTRAKTOR : PT. ARDEKO INDONESIA
LOKASI : JALAN SISINGAMANGARAJA, MEDAN

KLARIFIKASI DAN NEGOSIASI


NO URAIAN
VOL. SATUAN
A. PEKERJAAN PENDAHULUAN
1 Pek. Mobilisasi dan Demobilisasi Man Power dan Equipment 1 Ls
SUB TOTAL
B PEKERJAAN SERVICE GEDUNG OFFICE
I PEK. PEMBONGKARAN DAN PEMBERSIHAN
Pek. Pembongkaran Talang 121 m1
Pek. Pembongkaran gypsum area looby 137.5 m2
Pek. Pengupasan wallpaper 166.2 m2
Pek. Pengupasan dak yang bocor 176 m2
PEK. PENGECATAN
Pek. Pengecatan dinding / indoor 166.2 m2
Pek. Pengecatan dinding fasade/outdoor (kanopi beton,dinding bata dan 86.88 m2
kolom teras)
PEK. PLAFOND
Pek. Plafond gyptile ex. Jayaboard 55 m2
Pek. Perbaikan plafond bekas yang bocor ex. Jayaboard 137.50 m2
PEK. ATAP DAN TALANG
Pekerjaan Talang Atap ex. Alumunium 85 m1
Pek. Perbaikan clading atap Zincalume tbl.0,35 286.00 m2
Pek. Waterproofing dak atap 210.00 m2
Pek. Instalasi Pipa 4" + Aksesories ex.wavin 30 m1
Pek. Screeding lantai + floor hardener 210 m2
SUB TOTAL
C PEKERJAAN SERVICE WARE HOUSE
PEK. ATAP DAN VENTILASI UDARA
Pek. Pembongkaran 1 Ls
Pek. Pembuatan talang baru (pembesaran dimensi dan jenis material) 89.1 m1
40x40x40 cm ex. Alu,unium
Pengecatan longspan 100 m2
Pek. Louver ventilation area jack roof 52.8 m2
SUB TOTAL
D PEKERJAAN SERVICE WORKSHOP
II PEK. MAIN HOLE DAN SUMUR RESAPAN
Pek. Cutting beton bertulang 30 m2
Pek. Pembuatan main hole beton bertulang 200x200x150 4 m2
Pek. Pembuatan main hole beton bertulang 150x150x150 3 m2
Pek. Pembuatan sumur resapan 5 bh
Pek. Cor lantai Beton bertulang tbl 30cm double 5.28 m3
Pek. Floor hardener include epoxy lantai 33 m2
PEK. INSTALASI PLUMBING
Pek. Instalasi pipa PVC 8" + aksesoreis 30 m1
Pek. Instalasi pipa 4" + aksesoreis 60 m1
Perbaikan elevasi drainase 1 Ls
SUB TOTAL
E PEKERJAAN SERVICE POS JAGA
PEK. JENDELA DAN PEMBERSIHAN
Pek. Pembongkaran terakota 140 m2
Pek. Pembongkaran dinding untuk jendela kaca mati
Pek. Perbaikan dinding bata yang rusak 1 Ls
Pek. Pembuatan kaca mati
Pek. Pembersihan 1 Ls
PEK. PLESTERAN DAN PENGECATAN
Pek. Pengupasan cat existing (luar)
Pek. Plesteran dan comprotan 140 m2
Pek. Pengecatan ulang dinding pos jaga (luar+dalam) 280 m2
SUB TOTAL
F PEK.ERJAAN SERVICE PAGAR
PEKERJAAN PENGECATAN DINDING
I PAGAR DEPAN
Pek. Pengupasan cat exisiting (dinding teracota) 93.50 m2
Pek. Pengupasan cat exisiting (dinding bata) 330.00 m2
Pek. Perbaikan dinding bata yang rusak 1.00 Ls
Pengecatan ulang dinding bata 423.50 m2
Pengecatan minyak pagar besi 90.00 m1
II PAGAR SAMPING KIRI DAN KANAN
Pek. Pengupasan cat exisiting 2,574.00 m2
Pek. Perbaikan dinding bata 1.00 Ls
2,574.00 m2
Pengecatan ulang dinding bata ex. Jotun weathershield
III PAGAR BELAKANG
Pek. Pengupasan cat exisiting 550 m2
Pek. Perbaikan dinding bata 1 Ls
Pengecatan ulang dinding bata 550 m2
Pek. Kawat duri
SUB TOTAL
G PEKERJAAN PEMASANGAN ATAP PARKIRAN dan KANOPI BM
I PEK. PARKIRAN MOTOR
Pek. Pembongkaran atap parkir motor 99 m2
Pek. Pemasangan penutup atap parkiran motor 99 m2
Pek. Pemasangan rabung, ex longspan tbl. 0,45 17 m1
Pek. Pemasangan talang sisi belakang 17 m1
Pek. Lisplank GRC 44 m1
Pek. Pengecatan parkiran (kolom dan rangka) 1 Ls
II PEK. PARKIRAN MOBIL
Pek. Pemasangan atap parkiran mobil
Pipa besi dia, 3"
Pengecatan Pipa
Penutup Atap
Pek. Bongkar pasang paving dan perbaikan base 297 m2
Scope Pekerjaan :
Bongkar paving
Urugan pasir
Pasang paving kembali
Pembongkaran kolom atap mobil
III PEK. STOPER MOBIL 30 Bh
Scope Pekerjaan ex. Kerb beton
IV PEK. KANOPI KENDARAAN BRANCH MANAGER
Cor lantai beton tbl. 0,25 cm
Kanopi

V PEK. PERBAIKAIN JPU 2 Unit


Scope Pekerjaan :
Pelapisan plat tiang JPU
Pengecatan anti karat
SUB TOTAL
H PEKERJAAN SERVICE GEDUNG MESS
PEK.PERBAIKAN DINDING RETAK AREA LUAR
Pek. Pembobokan dinding bata 22 m2
Pek. Pemasangan dinding bata 22 m2
Pek. Plesteran + Aci dinding Bata 44 m3
PEK. PENGECATAN
Pek. Pengecatan Fasade dinding depan 361.46 m2
Pek. Pengecatan kusen dan daun pintu sisi timur 1 Unit
Pek. Pengecatan kusen pintu dan jendela arah depan 10 Unit
PEK. LAINNYA
Pek. Pemasangan kanopi untuk pintu sisi timur 4.84 m2
Pek. Perbaikan bocor lantai dak kanopi 1 Ls
Pek. Water proofing dak kanopi yang bocor 23.32 m2
Pek. Bongkar pasang paving dan perbaikan base 99 m2
Pek. Perbaikan plafond bekas bocor 27.5 m2
SUB TOTAL
I PEKERJAAN SERVICE GEDUNG KANTIN (10X21)
I PEK. PEMBONGKARAN, TALANG DAN PLAFOND
Pek. Pembongkaran talang 48.4 m2
Pek. Pembongkaran plafond 72.6 m2
Pek. Pembongkaran lisplank ACP 81.4 m2
Pek. Perbaikan/penggantian talang 48.4 m1
Pek. Pemasangan plafond spandrel
Pek. Pemasangan plafond GRC 72.6 m2
Pek. Pengecatan plafond 72.6 m2
SUB TOTAL
J PEKERJAAN SERVICE GEDUNG UT SCHOOL (31X10)
PEK. PEMBONGKARAN, TALANG DAN PLAFOND
Pek. Pembongkaran talang 68.2 m1
Pek. Pembongkaran plafond 102.3 m2
Pek. Perbaikan/penggantian talang 68.2 m1
Pek. Pemasangan plafond spandrel
Pek. Pemasangan plafond GRC 102.3 m2
PEK. PAVING BLOCK
Pek. Bongkar pasang paving dan perbaikan base 99 m2
SUB TOTAL
K PEKERJAAN SERVICE POWER HOUSE
PEK. PENGECATAN DINDING
Pek. Pengupasan cat lama sisi luar 168.3 M2
Pek. Service dinding bata yang rusak 1 Ls
Pek. Pengecatan dinding bata sisi luar 168.3 m2
SUB TOTAL
L PEKERJAAN SERVICE GEDUNG ARSIP (13,5 x 7)
PEK. PEMBONGKARAN DAN ATAP
Pek. Pembongkaran Penutup Atap 199.485 m2
Pek. Pemasangan penutup Atap ex. Zincalum tbl.0,35 199.485 m2
Pek. Rabung seng 15.5 m1
Pek. Lisplank GRC 55 m1
Pek. Pengupasan cat dinding existing area luar 180.4 m2
PEK. PENGECATAN
Pek. Pengecatan dinding bata luar 422.4 m2
Pek. Pengecatan plafond GRC 51.7 m2
Pek. Pengecatan Kusen + Daun Pintu dan Jendela 1 Ls
PEK. ELEKTRIKAL DAN PLAFOND
Pek. Instalasi Penerangan 10 Ttk
Pek. Instalasi Stop Kontak 5 Ttk
Pek, Armateur Stop Kontak 5 Bh
Pek. Armateur Saklar 5 Bh
Pek. Armateur TL 10 Bh
Pek. Lampu TL 1x18 Watt ex. Philipps 10 Bh
Pek. Plafond Gypsum 115.5 m2
Pek. Plafond GRC 51.7 m2
SUB TOTAL
M PEKERJAAN SERVICE GEDUNG MUSHALLA 1 Ls
PEKERJAAN SERVICE
Pek. Pembongkaran Penutup Atap
Pek. Pemasangan penutup Atap ex. Genteng metal
Pek. Rabung seng
Pek. Penggantian plafond yang bocor
Pek. Pengupasan cat dinding existing area luar
Pek. Pengecatan dinding bata luar
Pek. Pengecatan kusen jendela
Pek. Pengecatan kusen + daun pintu
SUB TOTAL
N PEKERJAAN SERVICE GEDUNG EMPLOYE CENTRE
PEKERJAAN ATAP DAN TALANG
Pek. Pembongkaran Penutup Atap 280.28 m2
Pek. Pemasangan penutup Atap ex. Zincalume 280.28 m2
Pek. Rabung seng 14 m1
PEKERJAAN PENGECATAN
Pek. Pengupasan cat dinding existing sisi luar 1,936 m2
Pek. Pengecatan dinding bata 1302.4 m2
Dinding bata keliling m2
Gewel/tembok layar m2
Pek. Pengecatan plafond kalsiboard sisi luar 61.6 m2
PEKERJAAN ELEKTRIKAL
Pek. Instalasi Penerangan 15 Ttk
Pek. Instalasi Stop Kontak 10 Ttk
Pek. Armatuer TL 15 Bh
Pek. Lampu TL 18 Watt ex. Philipps 15 Bh
PEKERJAAN LAINNYA
Pek. Plafond ex. Jayaboard atau setara tbl. 9mm 158.4 m2
Pek. Plafond Kalsiboard sisi luar 61.6 m2
Perbaikan karet dan aksesories jendela 1 Ls
SUB TOTAL
O PEKERJAAN SERVICE /PENGECATAN INSTALASI HYDRANT
PEK. PENGECATAN
Pek. Pengupasan cat existing 666.4 m1
Pek. Pengupasan Box Hydrant 5 Unit
Pek. Pengupasan Pompa Hydrant 5 Unit
Pek. Pengecatan Box Hydrant 5 Unit
Pek. Pengecatan Pompa Hydrant 5 Unit
Pek. Pengecatan instalasi hydrant 666.4 m1
SUB TOTAL
P PEKERJAAN SERVICE AREA LOADING + UNLOADING
PEK. REPAIR
Pek. Plesteran + Acian 11 m2
Pek. Plat tbl. 2,2mm + rangka 117.00 kg
Pek. UNP 150x75 75 Kg
Pek. Bantalan plat 4 Bh
Pek. Perapian dinding 1 Ls
PEK. PENGECATAN
Pek. Pengecatan dinding bata 11 m2
Pek. Pengecatan dinding plat 11 m2
SUB TOTAL
Q PEKERJAAN SERVICE AREA B3 DAN OIL TRAP
PEK. BETON
Pek. Pembuatan penampungan air 150x150x100 cm 2.475 m2
Pek. Pengecoran lantai tbl.15 cm K.250 16.17 m3
Pek. Drainase Pjg. 8m 30x40 (beton bertulang) 8 m1
Pek. Pembongkaran tempat bakar sampah 1 Ls
PEK. PENGECATAN (14x7)
Pek. Pengecatan gudang 211.2 m2
Pek. Pengecatan plat penutup oil trap 1 Ls
Pek. Service pintu gudang 1 Ls
SUB TOTAL
TOTAL
NITED TRACTOR,TBK

LARIFIKASI DAN NEGOSIASI KETERANGAN


HARGA TOTAL

56,000,000 56,000,000 1 1
56,000,000 56,000,000 #REF!

60,000 7,260,000 7,260,000 #REF!


36,000 4,950,000 4,950,000 #REF!
12,000 1,994,400 1,994,400 #REF!
80,400 14,150,400 14,150,400 #REF!
-
37,800 6,282,360 6,282,360 #REF!
37,800 3,284,064 3,284,064 #REF!
-
-
180,000 9,900,000 9,900,000 #REF!
135,000 18,562,500 18,562,500 #REF!
-
240,000 20,400,000 20,400,000 #REF!
172,800 49,420,800 49,420,800 #REF!
78,000 16,380,000 16,380,000 #REF!
168,000 5,040,000 5,040,000 #REF!
123,500 25,935,000 25,935,000 #REF!
183,559,524
-
-
10,000,000 10,000,000 10,000,000 #REF!
240,000 21,384,000

54,000 5,400,000 5,400,000 #REF!


450,000 23,760,000 23,760,000 #REF!
36,784,000
-
-
260,000 7,800,000 7,800,000 #REF!
2,500,000 10,000,000 10,000,000 #REF!
2,500,000 7,500,000 7,500,000 #REF!
5,000,000 25,000,000 25,000,000 #REF!
2,500,000 13,200,000 13,200,000 #REF!
300,000 9,900,000 9,900,000 #REF!
-
562,500 16,875,000 16,875,000 #REF!
165,000 9,900,000 9,900,000 #REF!
7,500,000 7,500,000 7,500,000 #REF!
107,675,000
-
-
30,000 4,200,000 4,200,000 #REF!

4,500,000 - -

1,500,000 1,500,000 1,500,000 #REF!


-

85,000 11,900,000 11,900,000 #REF!


37,800 10,584,000 10,584,000 #REF!
28,184,000
-
-
-
15,000 1,402,500 1,402,500 #REF!
15,000 4,950,000 4,950,000 #REF!
12,000,000 - -
37,800 - -
120,000 10,800,000 10,800,000 #REF!
-
15,000 38,610,000 1,287 38,610,000 #REF!
18,000,000 18,000,000 18,000,000 #REF!
35,910 92,432,340 92,432,340 #REF!
-
-
15,000 8,250,000 550 8,250,000 #REF!
6,600,000 6,600,000 6,600,000 #REF!
35,910 19,750,500 19,750,500 #REF!
200,795,340
-
-
36,000 3,564,000 3,564,000 #REF!
180,000 17,820,000 17,820,000 #REF!
150,000 2,550,000 2,550,000 #REF!
240,000 4,080,000 4,080,000 #REF!
180,000 7,920,000 7,920,000 #REF!
4,500,000 4,500,000 4,500,000 #REF!
-

80,000 23,760,000 23,760,000 #REF!


-
-
-
-
-
150,000 4,500,000 4,500,000 #REF!
-

3,000,000 6,000,000 6,000,000 #REF!


-
-
-
74,694,000
-
-
60,000 1,320,000 22 1,320,000 #REF!
216,000 4,752,000 4,752,000 #REF!
102,000 4,488,000 4,488,000 #REF!
-
37,800 13,663,188 13,663,188 #REF!
2,500,000 2,500,000 2,500,000 #REF!
1,450,000 14,500,000 14,500,000 #REF!
-
540,000 2,613,600 2,613,600 #REF!
3,000,000 3,000,000 3,000,000 #REF!
250,000 5,830,000 5,830,000 #REF!
80,000 7,920,000 7,920,000 #REF!
120,000 3,300,000 3,300,000 #REF!
63,886,788
-
-
60,000 2,904,000 2,904,000 #REF!
60,000 4,356,000 4,356,000 #REF!
60,000 4,884,000 4,884,000 #REF!
240,000 11,616,000 11,616,000 #REF!

130,000 9,438,000 9,438,000 #REF!


25,000 1,815,000 1,815,000 #REF!
35,013,000
-
-
60,000 4,092,000 4,092,000 #REF!
60,000 6,138,000 6,138,000 #REF!
240,000 16,368,000 16,368,000 #REF!

130,000 13,299,000 13,299,000 #REF!


-
80,000 7,920,000 7,920,000 #REF!
47,817,000
-
-
15,000 2,524,500 168 2,524,500 #REF!
3,000,000 3,000,000 1 3,000,000 #REF!
37,800 6,361,740 6,361,740 #REF!
11,886,240

66,000 13,166,010
165,000 32,915,025 Provisional
162,000 2,511,000 Provisional
150,000 8,250,000
15,000 2,706,000

35,910 15,168,384
30,000 1,551,000
4,500,000 4,500,000

300,000 3,000,000
300,000 1,500,000
90,000 450,000
90,000 450,000
60,000 600,000
60,000 600,000
144,000 16,632,000
150,000 7,755,000
- -
100,000,000 100,000,000 #REF!
-
-
-
-
-
-
-
-
-
100,000,000

66,000 18,498,480
180,000 50,450,400
150,000 2,100,000

300,000 4,500,000
300,000 3,000,000
60,000 900,000
60,000 900,000

144,000 22,809,600
162,000 9,979,200
6,500,000 6,500,000
- -
-
-
24,000 15,993,600 15,993,600 #REF!
250,000 1,250,000 1,250,000 #REF!
250,000 1,250,000 1,250,000 #REF!
1,100,000 5,500,000 5,500,000 #REF!
900,000 4,500,000 4,500,000 #REF!
44,650 29,754,760 29,754,760 #REF!
58,248,360
-
-
102,000 1,122,000 1,122,000 #REF!
18,000 2,106,000 2,106,000 #REF!
18,000 1,350,000 1,350,000 #REF!
450,000 1,800,000 1,800,000 #REF!
3,700,000 3,700,000 3,700,000 #REF!
-
37,800 415,800 415,800 #REF!
44,650 491,150 491,150 #REF!
10,984,950
-
-
3,300,000 8,167,500 8,167,500 #REF!
2,500,000 40,425,000 #REF!
1,200,000 9,600,000 9,600,000 #REF!
1,200,000 1,200,000 1,200,000 #REF!
-
37,800 7,983,360 7,983,360 #REF!
1,200,000 1,200,000 1,200,000 #REF!
7,000,000 7,000,000 7,000,000 #REF!
75,575,860
### #REF! #REF!
TIME SCHEDULLE
JOB TITLE : PEKERJAAN SERVICE GEDUNG PT. UNITED TRACTOR,TBK
END USER : PT. UNITED TRACTOR,TBK CAB. MEDAN
LOCATION : JALAN SISINGAMANGARAJA, MEDAN

NO DESCRIPTION QTY UNIT

I PEKERJAAN PENDAHULUAN 1
II PEKERJAAN SERVICE GEDUNG OFFICE
Pek. Pembongkaran Talang 121.00 m1
Pek. Pembongkaran gypsum area looby 137.50 m2
Pek. Pengupasan wallpaper 166.20 m2
Pek. Pengupasan dak yang bocor 176.00 m2
PEK. PENGECATAN
Pek. Pengecatan dinding / indoor 166.20 m2
86.88 m2
Pek. Pengecatan dinding fasade/outdoor (kanopi
beton,dinding bata dan kolom teras)
PEK. PLAFOND
Pek. Plafond gyptile ex. Jayaboard 55.00 m2
137.50 m2
Pek. Perbaikan plafond bekas yang bocor ex. Jayaboard
PEK. ATAP DAN TALANG
Pekerjaan Talang Atap ex. Alumunium 85.00 m1
Pek. Perbaikan clading atap Zincalume tbl.0,35 286.00 m2
Pek. Waterproofing dak atap 210.00 m2
Pek. Instalasi Pipa 4" + Aksesories ex.wavin 30.00 m1
Pek. Screeding lantai + floor hardener 210.00 m2
III PEKERJAAN SERVICE WARE HOUSE
PEK. ATAP DAN VENTILASI UDARA
Pek. Pembongkaran 1.00 Ls
89.10 m1
Pek. Pembuatan talang baru (pembesaran dimensi dan
jenis material) 40x40x40 cm ex. Alu,unium
Pengecatan longspan 100.00 m2
Pek. Louver ventilation area jack roof 52.80 m2
IV PEKERJAAN SERVICE WORKSHOP
Pek. Cutting beton bertulang 30.00 m2
4.00 m2
Pek. Pembuatan main hole beton bertulang
200x200x150
3.00 m2
Pek. Pembuatan main hole beton bertulang
150x150x150
Pek. Pembuatan sumur resapan 5.00 bh
Pek. Cor lantai Beton bertulang tbl 30cm double 5.28 m3
Pek. Floor hardener include epoxy lantai 33.00 m2
PEK. INSTALASI PLUMBING
Pek. Instalasi pipa PVC 8" + aksesoreis 30.00 m1
Pek. Instalasi pipa 4" + aksesoreis 60.00 m1
Perbaikan elevasi drainase 1.00 Ls
V PEKERJAAN SERVICE POS JAGA
PEK. JENDELA DAN PEMBERSIHAN
Pek. Pembongkaran terakota 140.00 m2
Pek. Pembersihan 1.00 Ls
PEK. PLESTERAN DAN PENGECATAN
Pek. Plesteran dan comprotan 140.00 m2
280.00 m2
Pek. Pengecatan ulang dinding pos jaga (luar+dalam)
VI PEK.ERJAAN SERVICE PAGAR
PAGAR DEPAN
Pek. Pengupasan cat exisiting (dinding teracota) 93.50 m2
Pek. Pengupasan cat exisiting (dinding bata) 330.00 m2
Pengecatan minyak pagar besi 90.00 m1
PAGAR SAMPING KIRI DAN KANAN
Pek. Pengupasan cat exisiting 2574.00 m2 1287
Pek. Perbaikan dinding bata 1.00 Ls 1
2574.00 m2
Pengecatan ulang dinding bata ex. Jotun weathershield
PAGAR BELAKANG
Pek. Pengupasan cat exisiting 550.00 m2 550.00
Pek. Perbaikan dinding bata 1.00 Ls 1
Pengecatan ulang dinding bata 550.00 m2
VII PEKERJAAN PEMASANGAN ATAP PARKIRAN dan KANOPI BM
PEK. PARKIRAN MOTOR
Pek. Pembongkaran atap parkir motor 99.00 m2
Pek. Pemasangan penutup atap parkiran motor 99.00 m2
Pek. Pemasangan rabung, ex longspan tbl. 0,45 17.00 m1
Pek. Pemasangan talang sisi belakang 17.00 m1
Pek. Lisplank GRC 44.00 m1
Pek. Pengecatan parkiran (kolom dan rangka) 1.00 Ls
PEK. PARKIRAN MOBIL
Pek. Bongkar pasang paving dan perbaikan base 297.00 m2
PEK. STOPER MOBIL 30.00 Bh
Scope Pekerjaan ex. Kerb beton
PEK. PERBAIKAIN JPU 2.00 Unit
VIII PEKERJAAN SERVICE GEDUNG MESS
PEK.PERBAIKAN DINDING RETAK AREA LUAR
Pek. Pembobokan dinding bata 22.00 m2 22
Pek. Pemasangan dinding bata 22.00 m2
Pek. Plesteran + Aci dinding Bata 44.00 m3
PEK. PENGECATAN
Pek. Pengecatan Fasade dinding depan 361.46 m2
1.00 Unit
Pek. Pengecatan kusen dan daun pintu sisi timur
10.00 Unit
Pek. Pengecatan kusen pintu dan jendela arah depan
PEK. LAINNYA
Pek. Pemasangan kanopi untuk pintu sisi timur 4.84 m2
Pek. Perbaikan bocor lantai dak kanopi 1.00 Ls
Pek. Water proofing dak kanopi yang bocor 23.32 m2
99.00 m2
Pek. Bongkar pasang paving dan perbaikan base
Pek. Perbaikan plafond bekas bocor 27.50 m2
IX PEKERJAAN SERVICE GEDUNG KANTIN (10X21)
PEK. PEMBONGKARAN, TALANG DAN PLAFOND
Pek. Pembongkaran talang 48.40 m2
Pek. Pembongkaran plafond 72.60 m2
Pek. Pembongkaran lisplank ACP 81.40 m2
Pek. Perbaikan/penggantian talang 48.40 m1
Pek. Pemasangan plafond GRC 72.60 m2
Pek. Pengecatan plafond 72.60 m2
IX PEKERJAAN SERVICE GEDUNG UT SCHOOL (31X10)
PEK. PEMBONGKARAN, TALANG DAN PLAFOND
Pek. Pembongkaran talang 68.20 m1
Pek. Pembongkaran plafond 102.30 m2
Pek. Perbaikan/penggantian talang 68.20 m1
Pek. Pemasangan plafond GRC 102.30 m2
PEK. PAVING BLOCK
99.00 m2
Pek. Bongkar pasang paving dan perbaikan base
Pek. Bongkar pasang paving dan perbaikan base
XI PEKERJAAN SERVICE POWER HOUSE
PEK. PENGECATAN DINDING
Pek. Pengupasan cat lama sisi luar 168.30 M2 168.30
Pek. Service dinding bata yang rusak 1.00 Ls 1
Pek. Pengecatan dinding bata sisi luar 168.30 m2
XII PEKERJAAN SERVICE GEDUNG MUSHALLA 1.00 Ls
PEKERJAAN SERVICE /PENGECATAN INSTALASI HYDRANT
PEK. PENGECATAN
Pek. Pengupasan cat existing 666.40 m1
Pek. Pengupasan Box Hydrant 5.00 Unit
Pek. Pengupasan Pompa Hydrant 5.00 Unit
Pek. Pengecatan Box Hydrant 5.00 Unit
Pek. Pengecatan Pompa Hydrant 5.00 Unit
Pek. Pengecatan instalasi hydrant 666.40 m1
XIII PEKERJAAN SERVICE AREA LOADING + UNLOADING
PEK. REPAIR
Pek. Plesteran + Acian 11.00 m2
Pek. Plat tbl. 2,2mm + rangka 117.00 kg
Pek. UNP 150x75 75.00 Kg
Pek. Bantalan plat 4.00 Bh
Pek. Perapian dinding 1.00 Ls
PEK. PENGECATAN
Pek. Pengecatan dinding bata 11.00 m2
Pek. Pengecatan dinding plat 11.00 m2
XIV PEKERJAAN SERVICE AREA B3 DAN OIL TRAP
PEK. BETON
2.48 m2
Pek. Pembuatan penampungan air 150x150x100 cm
Pek. Pengecoran lantai tbl.15 cm K.250 16.17 m3
Pek. Drainase Pjg. 8m 30x40 (beton bertulang) 8.00 m1
Pek. Pembongkaran tempat bakar sampah 1.00 Ls
PEK. PENGECATAN (14x7)
Pek. Pengecatan gudang 211.20 m2
Pek. Pengecatan plat penutup oil trap 1.00 Ls
Pek. Service pintu gudang 1.00 Ls
TOTAL
KOMULATIF
PEKANBARU, 3 JULI 2017
DIBUAT OLEH
PT. ARDEKO INDONESIA

PUTI RAHATAMI
DIREKTUR
UNIT RATE AMOUNT BOBOT MONTH I
(%) WEEK I WEEK II WEEK III
5.02% 5.02% 2.51%

1,100,000 133,100,000 0.65% 0.65%


150,000 20,625,000 0.44% 0.44%
0.18% 0.18%
1.27% 1.27%

0.56% 0.56%
0.29% 0.29%

0.89%
1.67%

1.83% 1.83%
4.43% 2.22%
1.47%
0.45%
2.33% 2.33%

0.90%
#REF! #REF! 1.92%

0.48%
2.13%
0.70% 0.70%
0.90%

#REF! #REF! 0.67%

950,000 4,750,000 2.24%


150,000 792,000 1.18%
3,200,000 105,600,000 0.89%
55,000 -
17,000 510,000 1.51%
1,500,000 90,000,000 0.89%
0.67%

0.38%
0.13%

1.07%
0.95%

0.13% 0.13%
0.44% 0.44%
0.97%

1.73% 3.46%
1.61% 1.61%
8.29%

0.74% 0.74%
0.59% 0.59%
1.77%

0.32%
1.60%
0.23%
0.37%
0.71%
0.40%

2.13%
0.40%

0.54%

0.12% 0.12%
0.43%
0.40%

1.23%
0.22%

1.30%

0.23%
0.27%
0.52%
0.71%

0.30%

0.26%
0.39%
0.44%
1.04%
0.85%
0.16%

0.37%
0.55%
1.47%
1.19%

0.71%
0.23% 0.23%
0.27% 0.27%
0.57%
8.97%

1.43% 0.72%
0.11%
0.11%
0.49%
0.40%
2.67%
10.32%

0.10%
0.19%
0.12%
0.16%
0.33%

0.04%
0.04%

0.73%

3.63%
0.86%
0.11%

0.72%
0.11%
0.63%
#REF! 100.0% 2.51% 1.27% 10.49%
#REF! 2.51% 3.79% 14.27%

10.32%
6.53%
I MONTH II MONTH III
WEEK IV WEEK V WEEK VI WEEK VII WEEK VIII WEEK VIX WEEK X

0.89%
1.67%

2.22%
1.47%
0.45%

0.90%
0.96% 0.96%

0.48%
0.71% 0.71% 0.71%
0.90%

0.67%

1.12% 1.12%
1.18%
0.89%

1.51%
0.89%
0.67%

0.38%
0.13%

1.07%
0.95%

0.97%

1.15% 1.15% 1.15%


0.81% 0.81%
2.76% 2.76% 2.76%

0.25% 0.25% 0.25%


0.59%
0.89% 0.89%

0.32%
1.60%
0.23%
0.37%
0.71%
0.40%

1.07% 1.07%
0.20% 0.20%

0.54%

0.12%
0.43%
0.40%

0.61% 0.61%
0.22%

0.65% 0.65%

0.23%
0.27%
0.52%
0.71%

0.30%

0.26%
0.39%
0.44%
0.52% 0.52%
0.85%
0.16%

0.37%
0.55%
1.47%
1.19%
0.23%
0.27%
0.57%
2.24% 2.24% 2.24% 2.24%

0.72%
0.11%
0.11%
0.49%
0.40%
0.89% 0.89% 0.89%

0.10%
0.19%
0.12%
0.16%

0.37% 0.37%

1.81%

14.81% 12.23% 15.95% 11.34% 9.14% 7.66% 6.72%


29.09% 41.32% 57.26% 68.61% 77.75% 85.41% 92.13%
MONTH III
KETERANGAN
WEEK XI WEEK XII
2.51%
0.71%
0.33%

0.04%
0.04%

1.81%
0.86%
0.11%

0.72%
0.11%
0.31% 0.31%
4.11% 3.76%
96.24% 100.00%