NO Uraian Satuan Harga Upah Upah Orang/Jam Upah Orang/Hari
NO Uraian Satuan Harga Upah Upah Orang/Jam Upah Orang/Hari
HARGA UPAH
NO URAIAN SATUAN UPAH UPAH
ORANG/JAM ORANG/HARI
I BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m2 83,000.00
2 Kaca Polos 3 mm ( ASAHI ) m2 105,000.00
3 Kaca Polos 5 mm ( ASAHI ) m2 134,000.00
4 Kaca Polos 8 mm ( ASAHI ) m2 221,000.00
5 Kaca Rayband 5 mm ( ASAHI ) m2 179,000.00
6 Kaca Rayband 8 mm ( ASAHI ) m2 391,000.00
7 Kaca Rayband 12 mm ( ASAHI ) m2 758,000.00
8 Kaca cermin 5 mm m2 182,000.00
9 Kaca cermin 6 mm m2 225,000.00
10 Kaca cermin 8 mm m2 283,000.00
11 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,961,000.00
12 Kaca Patri Ex Luar Negeri Terpasang m2 4,145,000.00
13 Kaca 6 mm Gravver m2 1,529,000.00
14 Glass Block DN 20 x 20 ( Kedawung ) bh 26,000.00
15 Glass Block DN 20 x 20 Ex LN bh 152,000.00
16 Sealant kg 256,000.00
17 Jendela Nako bh 132,000.00
K BAHAN PERPIPAAN
1 Besi Pipa Untuk Hydrant BSP 1" bt 183,500.00
2 Besi Pipa Untuk Hydrant BSP 1.25" bt 231,300.00
3 Besi Pipa Untuk Hydrant BSP 1.5" bt 327,800.00
4 Besi Pipa Untuk Hydrant BSP 2" bt 387,000.00
5 Besi Pipa Untuk Hydrant BSP 2.5" bt 483,500.00
6 Besi Pipa Untuk Hydrant BSP 3" bt 654,500.00
7 Besi Pipa Untuk Hydrant BSP 4" bt 956,600.00
8 Besi Pipa Untuk Hydrant BSP 6" bt 1,565,800.00
9 Besi Pipa Hitam 1" t = 2 mm bt 189,600.00
10 Besi Pipa Hitam 2" t = 2 mm bt 250,700.00
11 Besi Pipa Hitam 3" t = 2mm bt 402,500.00
12 Besi Pipa Hitam 4" t = 2 mm bt 630,500.00
13 Besi Pipa Hitam 6" t = 2 mm bt 850,000.00
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 120,500.00
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 175,500.00
16 Pipa GIP Medium A 1" ( 6 m1 ) bt 199,700.00
17 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt 285,500.00
18 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt 308,600.00
19 Pipa GIP Medium A 1 3/4" ( 6 m1 ) bt 359,100.00
20 Pipa GIP Medium A 2" ( 6 m1 ) bt 514,200.00
21 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt 739,500.00
22 Pipa GIP Medium A 3" ( 6 m1 ) bt 934,900.00
23 Pipa GIP Medium A 4" ( 6 m1 ) bt 950,000.00
24 Macam2 Sambungan GIP 1/2" bh 7,000.00
25 Macam2 Sambungan GIP 3/4" bh 9,500.00
26 Macam2 Sambungan GIP 1" bh 18,500.00
27 Macam2 Sambungan GIP 1 1/4" bh 21,800.00
28 Macam2 Sambungan GIP 1 1/2" bh 23,000.00
29 Macam2 Sambungan GIP 1 3/4" bh 25,000.00
30 Macam2 Sambungan GIP 2" bh 56,500.00
31 Macam2 Sambungan GIP 2 1/2" bh 66,500.00
32 Macam2 Sambungan GIP 3" bh 83,500.00
33 Macam2 Sambungan GIP 4" bh 130,500.00
34 Pipa PVC RUCIKA type AW 1/2" bt 42,500.00
35 Pipa PVC RUCIKA type AW 3/4" bt 55,500.00
36 Pipa PVC RUCIKA type AW 1" bt 65,000.00
37 Pipa PVC RUCIKA type AW 1 1/4" bt 82,500.00
38 Pipa PVC RUCIKA type AW 1 1/2" bt 110,000.00
39 Pipa PVC RUCIKA type AW 2" bt 120,000.00
40 Pipa PVC RUCIKA type AW 2 1/2" bt 170,000.00
41 Pipa PVC RUCIKA type AW 3" bt 215,000.00
42 Pipa PVC RUCIKA type AW 4" bt 360,000.00
NO URAIAN SAT. HARGA
L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh 115,000.00
2 Stop Kran 1" KIT bh 137,500.00
3 Stop Kran 1 1/2" KIT bh 230,000.00
4 Stop Kran 2" KIT bh 295,000.00
5 Stop Kran 2 1/2" KIT bh 785,000.00
6 Stop Kran 3" KIT bh 915,000.00
7 Check Valve 1/2" bh 95,500.00
8 Double Neple 1/2" bh 36,000.00
9 Water Mur 1/2" bh 44,500.00
10 Gate walve 1/2" bh 61,500.00
11 Saringan Air Lt. KM Stainless Steel/Floor Drain bh 73,500.00
12 Apooer Bath Tube bh 295,000.00
13 Kran Stainless Lokal Kait bh 51,500.00
14 Shower Dengan Tiang bh 245,000.00
15 Shower Tanpa Tiang bh 150,000.00
16 Kran Tembok Sun Eui dia. 1/2" bh 55,000.00
17 Kran Tembok ITAP dia. 1/2" bh 45,000.00
18 Kran Bebek Sun Eui 1/2" bh 160,000.00
19 Kran Bebek ITAP 1/2" bh 57,500.00
20 Kran Panas Dingin San Eui Standard bh 252,000.00
21 Bath Cape Washteren unit 2,310,000.00
22 Tempat Sabun Poslin bh 51,500.00
23 Wastafel Lengkap TOTO LW 230 unit 1,115,000.00
24 Wastafel Lengkap INA unit 800,000.00
NO URAIAN SAT. HARGA
N BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW ) unit 78,536,500.00
2 Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW ) unit 237,995,000.00
3 Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW ) unit 650,812,000.00
4 Presure Tank kap. 500 liter lengkap unit 40,698,000.00
5 Hydran Box dlm Gedung ( Lengkap ) unit 7,540,000.00
6 Fire House 1.5 x 30 m + nose unit 5,353,000.00
7 Exhose Fan H 360 W 60 x 60 cm unit 7,550,000.00
8 Exhose Fan H 380 W CFM 55 x 55 cm unit 6,040,500.00
9 Exhose Fan H 100 W 40 x 40 cm unit 1,212,500.00
10 AC Split 3 PK Setara TOSHIBA unit 33,871,500.00
11 AC Split 2 PK Setara TOSHIBA unit 24,119,500.00
12 AC Split 1 PK Setara TOSHIBA unit 5,692,000.00
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU 5,000,000.00
O BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) ROLL 115,000.00
2 Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' ) ROLL 170,000.00
3 Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' ) m' 7,000.00
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) m' 8,000.00
5 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' ) m' 5,000.00
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) m' 12,000.00
7 Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' ) m' 8,000.00
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m' 7,000.00
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m' 17,000.00
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m' 23,000.00
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m' 13,000.00
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m' 15,000.00
13 Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' ) m' 22,000.00
14 Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' ) m' 21,000.00
15 Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' ) m' 145,000.00
16 Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' ) m' 30,000.00
17 Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' ) m' 34,000.00
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m' 14,000.00
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m' 23,000.00
20 Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' ) m' 29,000.00
NO URAIAN SAT. HARGA
T ALAT TUKANG
1 Palu 0.5 kg bh 47,000.00
2 Cangkul bh 66,000.00
3 Singkup bh 50,000.00
4 Sekrop bh 61,000.00
5 Pengki bh 15,000.00
6 Linggis bh 50,000.00
7 Rool Meter 30 meter ( Bahan Plastik ) bh 122,000.00
8 Rool Meter 5 meter ( Bahan Besi ) bh 44,000.00
9 Selang Plastik untuk Water Pas dia. 0.5 cm m 1,700.00
10 Water Pas Alumunium 60 cm bh 101,000.00
V BAHAN PAGAR
1 Panel Beton Pracetak lbr 220,000.00
2 Kolom Beton Pracetak btg 319,000.00
B BIDANG PERTAMANAN
1 Aglomena batang 60,000.00
2 Bambu krisik/jepang batang 60,000.00
3 Furadan kg 29,000.00
4 Kompos/pupuk kandang batang 30,000.00
5 Matoa (2 m) batang 46,000.00
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang 121,000.00
7 Philo batang 91,000.00
8 Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2 m batang 30,000.00
9 Pohon perdu (kaca piring, puring, mawar, melati, dll) batang 11,000.00
10 Rumput gajah mini m2 18,000.00
Keterangan :
Harga material diatas sudah termasuk profit / keuntungan
ANALISA HARGA SATUAN PEKERJAAN
HARGA SAT. JUMLAH
NO URAIAN SAT VOLUME
Rp. Rp.
1 2 3 4 5 6=4x5
A PEKERJAAN PERSIAPAN SNI 03-2835-2002
A-01 1 M Pagar Sementara dari Kayu Setinggi 2 Meter
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 33,000.00 41,250.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral Beton 2/3 M3 0.0090 240,000.00 2,160.00
Kayu balok terentang M3 0.0720 2,975,000.00 214,200.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Residu Lt 0.4000 9,000.00 3,600.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Pekerja Oh 0.4000 80,000.00 32,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0200 125,000.00 2,500.00
Jumlah 323,550.00
Dibulatkan 323,550.00
A-02 1 M Pagar Sementara dari Seng Gelombang Tinggi 2 Meter
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 33,000.00 41,250.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Seng Gelombang BJLS-30 Lbr 1.2000 69,500.00 83,400.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral Beton 2/3 M3 0.0090 240,000.00 2,160.00
Kayu balok terentang M3 0.0720 2,975,000.00 214,200.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Meni besi Kg 0.4500 36,000.00 16,200.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Pekerja Oh 0.4000 80,000.00 32,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0200 125,000.00 2,500.00
Jumlah 419,550.00
Dibulatkan 419,550.00
A-03 1 M Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter
Dolken Kayu Ø 8-10/400 Cm Btg 1.0000 33,000.00 33,000.00
Semen Portland Kg 2.0000 1,540.00 3,080.00
Kawat Duri Kg 2.5000 77,000.00 192,500.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral Beton M3 0.0090 240,000.00 2,160.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0200 125,000.00 2,500.00
Jumlah 281,230.00
Dibulatkan 281,230.00
A-04 1 M¹ Pengukuran dan Pasang Bouwplank
Kayu kaso 5/7 Albasia M3 0.0120 2,506,000.00 30,072.00
Paku Biasa 2" - 5 " Kg 0.0200 24,000.00 480.00
Kayu Papan 3/20 Albasia M3 0.0070 2,506,000.00 17,542.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 67,269.00
Dibulatkan 67,260.00
1 M¹ Pengukuran
Kayu kaso 5/7 Albasia M3 0.0040 2,263,000.00 9,052.00
1 2 3 4 5 6=4x5
Paku Biasa 2" - 5 " Kg 0.0080 24,000.00 192.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 28,419.00
Dibulatkan 28,410.00
A-05 1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 33,000.00 41,250.00
Kayu terentang M3 0.1800 2,975,000.00 535,500.00
Paku Biasa Kg 0.8500 24,000.00 20,400.00
Besi Strip Kg 1.1000 32,000.00 35,200.00
Semen Portland Kg 35.0000 1,540.00 53,900.00
Pasir Pasang M3 0.1500 265,000.00 39,750.00
Pasir Beton M3 0.1000 290,000.00 29,000.00
Koral Beton 2/3 M3 0.1500 240,000.00 36,000.00
Bata Merah Bh 30.0000 850.00 25,500.00
Seng Plat Lbr 0.2500 19,140.00 4,785.00
Kawat harmonika 4 cm Bh 2.0000 40,000.00 80,000.00
Kaca Polos M2 0.0800 105,000.00 8,400.00
Kunci Tanam Bh 0.1500 104,000.00 15,600.00
Plywood 120 x 240 x 0,4 cm Lbr 0.0600 145,000.00 8,700.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Tukang Batu Oh 1.0000 95,000.00 95,000.00
Pekerja Oh 2.0000 80,000.00 160,000.00
Kepala Tukang Oh 0.3000 105,000.00 31,500.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 1,416,735.00
Dibulatkan 1,416,730.00
A-06 1 M2 Pembuatan Gudang Semen dan alat - alat
Dolken Kayu Ø 8-10/400 Cm Btg 1.7000 33,000.00 56,100.00
Kayu balok terentang M3 0.2100 2,975,000.00 624,750.00
Paku Biasa Kg 0.3000 24,000.00 7,200.00
Semen Portland Kg 10.5000 1,540.00 16,170.00
Pasir Beton M3 0.0300 290,000.00 8,700.00
Koral Beton 2/3 M3 0.0500 240,000.00 12,000.00
Seng Gelombang Bjls 30 Lbr 1.5000 69,500.00 104,250.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 1,126,420.00
Dibulatkan 1,126,420.00
A-07 1 M2 Pembuatan Bedeng Buruh
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 33,000.00 41,250.00
Kayu balok terentang M3 0.1860 2,975,000.00 553,350.00
Paku Biasa Kg 0.3000 24,000.00 7,200.00
Semen Portland Kg 18.0000 1,540.00 27,720.00
Pasir Beton M3 0.0300 290,000.00 8,700.00
Koral Beton 2/3 M3 0.0500 240,000.00 12,000.00
Seng Gelombang Bjls 32 Lbr 1.5000 69,500.00 104,250.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 1,051,720.00
Dibulatkan 1,051,720.00
A-08 1 M2 Membersihkan Lapangan dan Perataan
Pekerja Oh 0.1000 80,000.00 8,000.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 14,250.00
Dibulatkan 14,250.00
A-09 1 M2 Pembuatan Jalan Sementara
Batu Belah 15/20 M3 0.1500 233,000.00 34,950.00
Batu Pecah 5/7 M3 0.0900 222,000.00 19,980.00
Pasir Pasang M3 0.0100 265,000.00 2,650.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 143,830.00
Dibulatkan 143,830.00
A-10 1 M3 Bongkaran Beton Bertulang
Pekerja Oh 6.6670 80,000.00 533,360.00
Mandor Oh 0.3330 125,000.00 41,625.00
Jumlah 574,985.00
Dibulatkan 574,980.00
A-11 1 M3 Bongkaran Dinding Tembok Bata Merah
Pekerja Oh 6.6670 80,000.00 533,360.00
Mandor Oh 0.0330 125,000.00 4,125.00
Jumlah 537,485.00
Dibulatkan 537,480.00
A-12 1 M Pagar Beton Pracetak (5x50x213) Cm
Panel Beton Pracetak Lbr 0.9860 220,000.00 216,920.00
Kolom Beton Pracetak Btg 0.5250 319,000.00 167,475.00
Pasir Beton M3 0.0740 290,000.00 21,460.00
Koral 2/3 M3 0.1460 240,000.00 35,040.00
Semen Portland Kg 45.0000 1,540.00 69,300.00
Tukang Batu Oh 0.1250 95,000.00 11,875.00
Pekerja Oh 0.3750 80,000.00 30,000.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0190 125,000.00 2,375.00
Jumlah 555,705.00
Dibulatkan 555,700.00
A-13 1 M¹ Pagar kawat ayam tiang besi L 50.50.5, tinggi 1 m¹
Kawat ram ayam Lbr 0.4340 17,000.00 7,378.00
Besi siku L 50.50.5 Kg 6.7860 12,500.00 84,825.00
Besi pelat (1,2 x 3) mm Kg 0.0424 12,500.00 530.00
Baut Kg 4.0000 700.00 2,800.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral 2/3 M3 0.0090 240,000.00 2,160.00
Pekerja Oh 0.3750 80,000.00 30,000.00
Tukang Batu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0190 125,000.00 2,375.00
Jumlah 148,503.00
Dibulatkan 148,500.00
A-14 1 M2 Pagar BRC lengkap dengan tiang
BRC lengkap dengan tiang Lbr 0.4340 207,000.00 89,838.00
Semen Portland Kg 2.0000 1,540.00 3,080.00
Kawat Duri Kg 2.5000 77,000.00 192,500.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral Beton 2/3 M3 0.0090 240,000.00 2,160.00
Pekerja Oh 0.3750 80,000.00 30,000.00
Tukang Batu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0190 125,000.00 2,375.00
Jumlah 334,538.00
Dibulatkan 334,530.00
1 2 3 4 5 6=4x5
A-15 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40x50x20) Cm
Bambu Ø 6 -10/600 Cm Btg 1.0000 30,000.00 30,000.00
Tali Ijuk Kg 0.2500 28,000.00 7,000.00
Tukang Kayu Oh 0.0170 95,000.00 1,615.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Kepala Tukang Oh 0.0020 105,000.00 210.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 56,450.00
Dibulatkan 56,450.00
A-16 1 M¹ Cerucuk Bambu
Bambu Ø 7 -10 ( 400 ) Cm Btg 1.2500 30,000.00 37,500.00
Pekerja Oh 0.5000 80,000.00 40,000.00
Mandor Oh 0.0250 125,000.00 3,125.00
Jumlah 80,625.00
Dibulatkan 80,620.00
17 1 M3 Bongkaran Kuda-kuda, Gording Balok
Pekerja Oh 2.5000 80,000.00 200,000.00
Tukang Kayu Oh 1.2000 95,000.00 114,000.00
Mandor Oh 0.1200 125,000.00 15,000.00
Jumlah 329,000.00
Dibulatkan 329,000.00
18 1 M3 Bongkaran Rangka Atap, Reng dan Kaso
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Kayu Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 8,125.00
Dibulatkan 8,120.00
19 1 M3 Bongkaran Genteng Lama
Pekerja Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 2,850.00
Dibulatkan 2,850.00
D PEKERJAAN BETON
1 M2 Lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr. tebal 5 cm
Semen Portland Kg 10.0000 1,540.00 15,400.00
Pasir Beton M3 0.0260 290,000.00 7,540.00
Koral Beton M3 0.0440 240,000.00 10,560.00
Pekerja Oh 1.1500 80,000.00 92,000.00
Tukang Batu Oh 0.0200 95,000.00 1,900.00
Kepala Tukang Oh 0.0020 105,000.00 210.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 128,360.00
Dibulatkan 128,360.00
D-01 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr
Semen Portland Kg 218.0000 1,540.00 335,720.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.8700 240,000.00 208,800.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0800 125,000.00 10,000.00
Jumlah 863,695.00
Dibulatkan 863,690.00
D-02 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr
Semen Portland Kg 197.0000 1,540.00 303,380.00
Pasir Beton M3 0.4700 290,000.00 136,300.00
Koral Beton M3 0.9400 240,000.00 225,600.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0800 125,000.00 10,000.00
Jumlah 833,655.00
Dibulatkan 833,650.00
D-03 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr
Semen Portland Kg 336.0000 1,540.00 517,440.00
Pasir Beton M3 0.5400 290,000.00 156,600.00
Koral Beton M3 0.8100 240,000.00 194,400.00
Pekerja Oh 2.0000 80,000.00 160,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 1.0000 125,000.00 125,000.00
Jumlah 1,190,365.00
Dibulatkan 1,190,360.00
D-04 1 M3 Tiang Pancang Prestressed Beton
Semen Portland Kg 440.0000 1,540.00 677,600.00
Pasir Beton M3 0.5000 290,000.00 145,000.00
Koral Beton M3 0.8000 240,000.00 192,000.00
Rapidrant Gln 2.4600 17,500.00 43,050.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0800 125,000.00 10,000.00
Jumlah 1,226,025.00
Dibulatkan 1,226,020.00
D-05 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 4 Kr
Semen Portland Kg 291.0000 1,540.00 448,140.00
Pasir Beton M3 0.4700 290,000.00 136,300.00
Koral Beton M3 0.9300 240,000.00 223,200.00
Pekerja Oh 2.0000 80,000.00 160,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 1.0000 125,000.00 125,000.00
Jumlah 1,129,565.00
Dibulatkan 1,129,560.00
D-06 1 M' Memasang PVC Waterstop Lebar 200 mm
Waterstop Lebar 200 mm M1 1.0500 64,500.00 67,725.00
Pekerja Oh 0.0500 80,000.00 4,000.00
Tukang Batu Oh 0.0350 95,000.00 3,325.00
Kepala Tukang Oh 0.0035 105,000.00 367.50
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 75,667.50
Dibulatkan 75,660.00
1 M' Memasang PVC Waterstop Lebar 150 mm
Waterstop Lebar 150 mm M1 1.0500 57,000.00 59,850.00
Pekerja Oh 0.0500 80,000.00 4,000.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.0300 95,000.00 2,850.00
Kepala Tukang Oh 0.0030 105,000.00 315.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 67,265.00
Dibulatkan 67,260.00
D-07 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir
Besi Beton ( Polos/ Ulir ) Kg 1.0500 18,000.00 18,900.00
Kawat Beton Kg 0.0150 33,000.00 495.00
Pekerja Oh 0.0070 80,000.00 560.00
Tukang Besi Oh 0.0070 95,000.00 665.00
Kepala Tukang Oh 0.0007 105,000.00 73.50
Mandor Oh 0.0003 125,000.00 37.50
Jumlah 20,731.00
Dibulatkan 20,730.00
D-08 1 M2 Pasangan Bekisting untuk Pondasi
Kayu terentang M3 0.0400 3,245,000.00 129,800.00
Paku Biasa 2" - 5" Kg 0.3000 24,000.00 7,200.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 0.2600 95,000.00 24,700.00
Kepala Tukang Oh 0.0260 105,000.00 2,730.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 189,055.00
Dibulatkan 189,050.00
D-09 1 M2 Pasangan Bekisting untuk Sloof
Kayu Terentang M3 0.0450 3,245,000.00 146,025.00
Paku Biasa 2" - 5" Kg 0.3000 24,000.00 7,200.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 0.2600 95,000.00 24,700.00
Kepala Tukang Oh 0.0260 105,000.00 2,730.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 205,280.00
Dibulatkan 205,280.00
D-10 1 M2 Pasangan Bekisting untuk Kolom
Kayu Terentang M3 0.0400 3,245,000.00 129,800.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Kayu balok terentang M3 0.0150 2,975,000.00 44,625.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 2.0000 33,000.00 66,000.00
Pekerja Oh 0.3300 80,000.00 26,400.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 370,265.00
Dibulatkan 370,260.00
D-11 1 M2 Pasangan Bekisting untuk Balok
Kayu Terentang M3 0.0400 3,245,000.00 129,800.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Kayu balok terentang M3 0.0180 2,975,000.00 53,550.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 2.0000 33,000.00 66,000.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 376,790.00
Dibulatkan 376,790.00
D-12 1 M2 Pasangan Bekisting untuk Lantai
Kayu Terentang M3 0.0400 3,245,000.00 129,800.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
1 2 3 4 5 6=4x5
Minyak Bekisting Ltr 0.2000 45,000.00 9,000.00
Kayu balok terentang M3 0.0150 2,975,000.00 44,625.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 6.0000 33,000.00 198,000.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 508,865.00
Dibulatkan 508,860.00
D-13 1 M2 Pasang Bekisting untuk Tangga
Kayu Terentang M3 0.0300 3,245,000.00 97,350.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Minyak Bekisting Ltr 0.1500 45,000.00 6,750.00
Kayu balok terentang M3 0.0150 2,975,000.00 44,625.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 2.0000 33,000.00 66,000.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 343,765.00
Dibulatkan 343,760.00
D-14 1 M3 Membuat Beton Cor Mutu K225
Semen Portland Kg 388.0000 1,540.00 597,520.00
Pasir Beton M3 0.6500 290,000.00 188,500.00
Koral Beton M3 0.6500 240,000.00 156,000.00
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Batu Oh 1.0000 95,000.00 95,000.00
Kepala Tukang Oh 0.1000 105,000.00 10,500.00
Mandor Oh 0.3000 125,000.00 37,500.00
Jumlah 1,640,270.00
Dibulatkan 1,640,270.00
D-15 1 M3 Membuat Beton Cor Mutu K275
Semen Portland Kg 400.0000 1,540.00 616,000.00
Pasir Beton M3 0.4000 290,000.00 116,000.00
Koral Beton M3 0.8200 240,000.00 196,800.00
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Batu Oh 1.0000 95,000.00 95,000.00
Kepala Tukang Oh 0.1000 105,000.00 10,500.00
Mandor Oh 0.3000 125,000.00 37,500.00
Jumlah 1,627,050.00
Dibulatkan 1,627,050.00
D-16 1 KG Besi Beton Polos
Besi Beton Polos U 24 Kg 1.1000 18,000.00 19,800.00
Kawat Beton Kg 0.0188 33,000.00 620.40
Pekerja Oh 0.0080 80,000.00 640.00
Tukang Besi Oh 0.0100 95,000.00 950.00
Kepala Tukang Oh 0.0029 105,000.00 304.50
Mandor Oh 0.0010 125,000.00 125.00
Jumlah 22,439.90
Dibulatkan 22,430.00
D-16 1 KG Besi Beton Ulir
Besi Beton Ulir 32 / 39 Kg 1.1000 25,000.00 27,500.00
Kawat Beton Kg 0.0188 33,000.00 620.40
Pekerja Oh 0.0080 80,000.00 640.00
Tukang Besi Oh 0.0100 95,000.00 950.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0029 105,000.00 304.50
Mandor Oh 0.0010 125,000.00 125.00
Jumlah 30,139.90
Dibulatkan 30,130.00
D-16 1 M3 Pondasi Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.2000 3,245,000.00 649,000.00
Paku Biasa 2" - 5" Kg 1.5000 24,000.00 36,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 3.9000 80,000.00 312,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.0400 95,000.00 98,800.00
Tukang Besi Oh 1.0500 95,000.00 99,750.00
Kepala Tukang Oh 0.2450 105,000.00 25,725.00
Mandor Oh 0.1650 125,000.00 20,625.00
Jumlah 4,884,820.00
Dibulatkan 4,884,820.00
D-17 1 M3 Sloof Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 6,217,025.00
Dibulatkan 6,217,020.00
1 M3 Sloof Beton Tulang 15/20 cm (150 kg besi+bekisting)
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Minyak Bekisting Ltr 0.6000 45,000.00 27,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 5,344,025.00
Dibulatkan 5,344,020.00
1 M3 Sloof Beton Tulang 15/20 cm (180 kg besi+bekisting) 4 dia. 12 ring 8-15
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
1 2 3 4 5 6=4x5
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 5,857,025.00
Dibulatkan 5,857,020.00
1 M3 Sloof Beton Tulang 20/30 cm (150 kg besi+bekisting) 4 dia. 16 ring 8-15
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 5,317,025.00
Dibulatkan 5,317,020.00
1 M3 Sloof Beton Tulang 20/30 cm (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 6,217,025.00
Dibulatkan 6,217,020.00
1 M3 Sloof Beton Bertulang 20/40 cm (240 kg besi+bekisting) Struktur bertingkat
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Minyak Bekisting Ltr 0.6000 45,000.00 27,000.00
Besi Beton Polos Kg 240.0000 18,000.00 4,320,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 6,964,025.00
Dibulatkan 6,964,020.00
1 2 3 4 5 6=4x5
D-18 1 M3 Kolom Beton Tulang (120 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 120.0000 18,000.00 2,160,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,449,170.00
Dibulatkan 7,449,170.00
D-19 1 M3 Kolom Beton Tulang (140 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 140.0000 18,000.00 2,520,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,809,170.00
Dibulatkan 7,809,170.00
D-20 1 M3 Kolom Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,989,170.00
1 2 3 4 5 6=4x5
Dibulatkan 7,989,170.00
D-21 1 M3 Kolom Beton Tulang (180 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,529,170.00
Dibulatkan 8,529,170.00
D-22 1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,889,170.00
Dibulatkan 8,889,170.00
D-23 1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 250.0000 18,000.00 4,500,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
1 2 3 4 5 6=4x5
Jumlah 9,789,170.00
Dibulatkan 9,789,170.00
D-24 1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 300.0000 18,000.00 5,400,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 10,689,170.00
Dibulatkan 10,689,170.00
1 M3 Kolom Beton Tulang 20/20 cm (140 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 140.0000 18,000.00 2,520,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,719,170.00
Dibulatkan 7,719,170.00
1 M3 Kolom Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,439,170.00
1 2 3 4 5 6=4x5
Dibulatkan 8,439,170.00
1 M3 Kolom Beton Tulang 20/20 cm (210 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 210.0000 18,000.00 3,780,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,979,170.00
Dibulatkan 8,979,170.00
1 M3 Kolom Beton Tulang 20/30cm (230 kg besi+bekisting) Struktur bertingkat 6 dia.16+2 dia.12, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 230.0000 18,000.00 4,140,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 9,339,170.00
Dibulatkan 9,339,170.00
1 M3 Kolom Beton Tulang 20/40 cm (250 kg besi+bekisting) Struktur bertingkat
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 250.0000 18,000.00 4,500,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 9,789,170.00
Dibulatkan 9,789,170.00
1 2 3 4 5 6=4x5
1 M3 Kolom Beton Tulang 30/30 cm (175 kg besi+bekisting) Struktur bertingkat 8 dia. 16, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 175.0000 18,000.00 3,150,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,349,170.00
Dibulatkan 8,349,170.00
1 M3 Kolom Beton Tulang 30/30 cm (210 kg besi bekisting) Struktur bertingkat 10 dia. 16, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 210.0000 18,000.00 3,780,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,979,170.00
Dibulatkan 8,979,170.00
1 M3 Kolom Beton Tulang 30/40 cm (200 kg besi bekisting) Struktur bertingkat
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,889,170.00
Dibulatkan 8,889,170.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (175 kg besi+bekisting)
1 2 3 4 5 6=4x5
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 175.0000 18,000.00 3,150,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,320,170.00
Dibulatkan 7,320,170.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (260 kg besi+bekisting) 4 dia. 10, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 260.0000 18,000.00 4,680,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,850,170.00
Dibulatkan 8,850,170.00
1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 4.5000 33,000.00 148,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,888,270.00
Dibulatkan 8,888,270.00
1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 250.0000 18,000.00 4,500,000.00
Kawat Beton Kg 4.5000 33,000.00 148,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 9,788,270.00
Dibulatkan 9,788,270.00
1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 300.0000 18,000.00 5,400,000.00
Kawat Beton Kg 4.5000 33,000.00 148,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 10,688,270.00
Dibulatkan 10,688,270.00
D-25 1 M3 Balok Beton Tulang (120 kg besi+bekisting)
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 120.0000 18,000.00 2,160,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 6,635,545.00
Dibulatkan 6,635,540.00
D-26 1 M3 Balok Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.3500 3,245,000.00 1,135,750.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,287,745.00
Dibulatkan 7,287,740.00
D-27 1 M3 Balok Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.3000 3,245,000.00 973,500.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 200.0000 1,540.00 308,000.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 1.5000 166,500.00 249,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 12.0000 33,000.00 396,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,512,375.00
Dibulatkan 7,512,370.00
D-28 1 M3 Balok Beton Tulang (230 kg besi+bekisting)
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 230.0000 18,000.00 4,140,000.00
Kawat Beton Kg 3.4500 33,000.00 113,850.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 8,669,995.00
Dibulatkan 8,669,990.00
1 M3 Balok Beton Tulang 15/20 cm (150 kg besi+bekisting)
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
1 2 3 4 5 6=4x5
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,190,395.00
Dibulatkan 7,190,390.00
1 M3 Balok Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,658,395.00
Dibulatkan 7,658,390.00
1 M3 Balok Beton Lintel 11/11 (300 kg besi+bekisting) 4 dia. 10, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 300.0000 18,000.00 5,400,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 9,570,170.00
Dibulatkan 9,570,170.00
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk+balok portal (180 kg besi+bekisting) 4 dia.12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
1 2 3 4 5 6=4x5
Dolken o - 8 Cm/ 4 m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,658,395.00
Dibulatkan 7,658,390.00
1 M3 Balok Beton Tulang 15/30 (190 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 190.0000 18,000.00 3,420,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,838,395.00
Dibulatkan 7,838,390.00
1 M3 Balok Beton Tulang 20/40 (200 kg besi+bekisting) Struktur bertingkat 7 dia. 16+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 8,043,145.00
Dibulatkan 8,043,140.00
1 M3 Balok Beton Tulang 20/30 (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 8,043,145.00
Dibulatkan 8,043,140.00
1 M3 Balok Beton Tulang 20/30 (175 kg besi+bekisting) Struktur bertingkat 5 dia. 16, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 175.0000 18,000.00 3,150,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,593,145.00
Dibulatkan 7,593,140.00
1 M3 Balok Beton Tulang 25/55 (140 kg besi+bekisting) Struktur bertingkat 8 dia. 16+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 140.0000 18,000.00 2,520,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 6,963,145.00
Dibulatkan 6,963,140.00
1 M3 Balok Beton Tulang 30/60 (110 kg besi+ bekisting) Struktur bertingkat 9 dia. 19+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 110.0000 18,000.00 1,980,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
1 2 3 4 5 6=4x5
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 6,423,145.00
Dibulatkan 6,423,140.00
D-29 1 M3 Tangga Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2500 3,245,000.00 811,250.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Minyak Bekisting Ltr 1.2000 45,000.00 54,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1050 2,975,000.00 312,375.00
Multiplek 9 mm 120 x 240 Lbr 2.5000 166,500.00 416,250.00
Dolken o - 8 Cm/ 4 m Btg 14.0000 33,000.00 462,000.00
Pekerja Oh 5.6000 80,000.00 448,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.3000 95,000.00 218,500.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4050 105,000.00 42,525.00
Mandor Oh 0.2020 125,000.00 25,250.00
Jumlah 7,562,820.00
Dibulatkan 7,562,820.00
D-30 1 M3 Plat Lantai Tb. 10 Cm Beton Bertulang (90 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 10.0000 508,860.00 5,088,600.00
Besi Beton Polos Kg 90.0000 20,730.00 1,865,700.00
Jumlah 8,144,660.00
Dibulatkan 8,144,660.00
D-30.1 1 M3 Plat Lantai 1 lapis Tb. 10 Cm Beton Bertulang (50 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Besi Beton Polos Kg 50.0000 20,730.00 1,036,500.00
Jumlah 2,226,860.00
Dibulatkan 2,226,860.00
D-31 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (110 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 8.3300 508,860.00 4,238,803.80
Besi Beton Polos Kg 110.0000 20,730.00 2,280,300.00
Jumlah 7,709,463.80
Dibulatkan 7,709,460.00
D-32 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (130 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 8.3300 508,860.00 4,238,803.80
Besi Beton Polos Kg 130.0000 20,730.00 2,694,900.00
Jumlah 8,124,063.80
Dibulatkan 8,124,060.00
D-33 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (90 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 6.6700 508,860.00 3,394,096.20
Besi Beton Polos Kg 90.0000 20,730.00 1,865,700.00
Jumlah 6,450,156.20
Dibulatkan 6,450,150.00
D-34 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (115 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 6.6700 508,860.00 3,394,096.20
Besi Beton Polos Kg 115.0000 20,730.00 2,383,950.00
Jumlah 6,968,406.20
1 2 3 4 5 6=4x5
Dibulatkan 6,968,400.00
1 M3 Listplang Beton Tulang T= 8 cm (77.5 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 8.3300 508,860.00 4,238,803.80
Besi Beton Polos Kg 77.5000 20,730.00 1,606,575.00
Jumlah 7,035,738.80
Dibulatkan 7,035,730.00
D-35 1 M' Kolom Praktis Beton Tulang ( 11 x 11 ) Cm
Kayu Terentang M3 0.0020 3,245,000.00 6,490.00
Paku Biasa 2" - 5" Kg 0.0100 24,000.00 240.00
Besi Beton Polos Kg 3.0000 18,000.00 54,000.00
Kawat Beton Kg 0.0450 33,000.00 1,485.00
Semen Portland Kg 4.0000 1,540.00 6,160.00
Pasir Beton M3 0.0060 290,000.00 1,740.00
Koral Beton M3 0.0090 240,000.00 2,160.00
Pekerja Oh 0.0600 80,000.00 4,800.00
Tukang Batu Oh 0.0200 95,000.00 1,900.00
Tukang Kayu Oh 0.0200 95,000.00 1,900.00
Tukang Besi Oh 0.0200 95,000.00 1,900.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0030 125,000.00 375.00
Jumlah 83,780.00
Dibulatkan 83,780.00
D-36 1 M' Ring Balok Beton Tulang ( 10 x 15 ) Cm
Kayu Terentang M3 0.0030 3,245,000.00 9,735.00
Paku Biasa 2" - 5" Kg 0.0200 24,000.00 480.00
Besi Beton Polos Kg 3.6000 18,000.00 64,800.00
Kawat Beton Kg 0.0500 33,000.00 1,650.00
Semen Portland Kg 5.5000 1,540.00 8,470.00
Pasir Beton M3 0.0090 290,000.00 2,610.00
Koral Beton M3 0.0150 240,000.00 3,600.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Batu Oh 0.0330 95,000.00 3,135.00
Tukang Kayu Oh 0.0330 95,000.00 3,135.00
Tukang Besi Oh 0.0330 95,000.00 3,135.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 110,425.00
Dibulatkan 110,420.00
D-37 1 M2 Pasang Bekisting untuk Dinding
Kayu Terentang M3 0.0300 3,245,000.00 97,350.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Minyak Bekisting Ltr 0.2000 45,000.00 9,000.00
Kayu balok terentang M3 0.0200 2,975,000.00 59,500.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 3.0000 33,000.00 99,000.00
Formtie/ Penjaga jarak Bekisting/ Spacer Bh 4.0000 2,800.00 11,200.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 405,090.00
Dibulatkan 405,090.00
D-38 1 M3 Pelat Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
1 2 3 4 5 6=4x5
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1200 2,975,000.00 357,000.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 32.0000 33,000.00 1,056,000.00
Pekerja Oh 5.3000 80,000.00 424,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.3000 95,000.00 123,500.00
Tukang Besi Oh 1.0500 95,000.00 99,750.00
Kepala Tukang Oh 0.2650 105,000.00 27,825.00
Mandor Oh 0.2650 125,000.00 33,125.00
Jumlah 7,417,520.00
Dibulatkan 7,417,520.00
D-39 1 M3 Dinding Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.2400 3,245,000.00 778,800.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1600 2,975,000.00 476,000.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken o - 8 Cm/ 4 m Btg 24.0000 33,000.00 792,000.00
Pekerja Oh 5.6000 80,000.00 448,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.6400 95,000.00 250,800.00
Tukang Besi Oh 1.0500 95,000.00 99,750.00
Kepala Tukang Oh 0.4000 105,000.00 42,000.00
Mandor Oh 0.1930 125,000.00 24,125.00
Jumlah 7,169,395.00
Dibulatkan 7,169,390.00
D-40 1 M3 Dinding Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2500 3,245,000.00 811,250.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Minyak Bekisting Ltr 1.2000 45,000.00 54,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1050 2,975,000.00 312,375.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken o - 8 Cm/ 4 m Btg 14.0000 33,000.00 462,000.00
Pekerja Oh 5.6000 80,000.00 448,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3230 105,000.00 33,915.00
Mandor Oh 0.2830 125,000.00 35,375.00
Jumlah 7,543,985.00
Dibulatkan 7,543,980.00
D-41 1 M3 Membuat Beton Cor Mutu K300
Semen Portland Kg 413.0000 1,540.00 636,020.00
Pasir Beton M3 0.4256 290,000.00 123,424.00
Koral Beton M3 0.6807 240,000.00 163,368.00
Pekerja Oh 1.6500 80,000.00 132,000.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.2750 95,000.00 26,125.00
Kepala Tukang Oh 0.0280 105,000.00 2,940.00
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 1,094,252.00
Dibulatkan 1,094,250.00
D-42 1 M3 Membuat Beton Cor Mutu K200
Semen Portland Kg 352.0000 1,540.00 542,080.00
Pasir Beton M3 0.4569 290,000.00 132,501.00
Koral Beton M3 0.6873 240,000.00 164,952.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2750 95,000.00 26,125.00
Kepala Tukang Oh 0.0280 105,000.00 2,940.00
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 1,010,973.00
Dibulatkan 1,010,970.00
D-43 1 M3 Membuat Beton Cor Mutu K250
Semen Portland Kg 384.0000 1,540.00 591,360.00
Pasir Beton M3 0.4325 290,000.00 125,425.00
Koral Beton M3 0.6927 240,000.00 166,248.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2750 95,000.00 26,125.00
Kepala Tukang Oh 0.0280 105,000.00 2,940.00
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 1,054,473.00
Dibulatkan 1,054,470.00
1 M3 Membuat Beton dengan Puzzdith - 100 XR
Semen Portland Kg 336.0000 1,540.00 517,440.00
Pasir Beton M3 0.5400 290,000.00 156,600.00
Koral Beton M3 0.8100 240,000.00 194,400.00
Puzzdith - 100 XR Ltr 1.0000 0.00 0.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0800 125,000.00 10,000.00
Jumlah 1,036,815.00
Dibulatkan 1,036,810.00
1 M3 Membuat Beton Kedap Air dengan AM - 100
Semen Portland Kg 400.0000 1,540.00 616,000.00
Pasir Beton M3 0.4800 290,000.00 139,200.00
Koral Beton M3 0.8000 240,000.00 192,000.00
AM - 100 Ltr 1.2000 41,500.00 49,800.00
Pekerja Oh 2.0000 80,000.00 160,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 1.0000 125,000.00 125,000.00
Jumlah 1,318,925.00
Dibulatkan 1,318,920.00
1 Kg Kabel Presstressed Polos / Strands
Besi Presstressed Polos Kg 1.0500 18,000.00 18,900.00
Kawat Beton Kg 0.0100 33,000.00 330.00
Pekerja Oh 0.0050 80,000.00 400.00
Tukang Besi Oh 0.0050 95,000.00 475.00
Kepala Tukang Oh 0.0005 105,000.00 52.50
Mandor Oh 0.0003 125,000.00 37.50
Jumlah 20,195.00
Dibulatkan 20,190.00
1 Kg Jaring Kawat Baja
Besi Jaring Kawat Baja Kg 1.0200 34,000.00 34,680.00
Kawat Beton Kg 0.8050 33,000.00 26,565.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.0250 80,000.00 2,000.00
Tukang Besi Oh 0.0250 95,000.00 2,375.00
Kepala Tukang Oh 0.0025 105,000.00 262.50
Mandor Oh 0.0015 125,000.00 187.50
Jumlah 66,070.00
Dibulatkan 66,070.00
1 M3 Membuat Beton Cor Mutu K175
Semen Portland Kg 326.0000 1,540.00 502,040.00
Pasir Beton M3 0.5429 290,000.00 157,441.00
Koral Beton M3 0.7622 240,000.00 182,928.00
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2750 95,000.00 26,125.00
Kepala Tukang Oh 0.0280 105,000.00 2,940.00
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 1,089,099.00
Dibulatkan 1,089,090.00
1 M2 Pasangan Jembatan Cor
Kayu Albasia M3 0.0264 2,506,000.00 66,158.40
Paku Biasa 2" - 5" Kg 0.6000 24,000.00 14,400.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 0.5000 33,000.00 16,500.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 115,208.40
Dibulatkan 115,200.00
1 M3 Listplank Beton Tulang T=8 cm ( 77,50 kg besi + bekisting )
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 8.3300 508,860.00 4,238,803.80
Besi Beton Polos Kg 77.5000 20,730.00 1,606,575.00
Jumlah 7,035,738.80
Dibulatkan 7,035,730.00
E PEKERJAAN DINDING
E-01 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 32.9500 1,540.00 50,743.00
Pasir Pasang M3 0.0910 265,000.00 24,115.00
Pekerja Oh 0.6500 80,000.00 52,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 270,708.00
Dibulatkan 270,700.00
E-02 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 26.5500 1,540.00 40,887.00
Pasir Pasang M3 0.0930 265,000.00 24,645.00
Pekerja Oh 0.6500 80,000.00 52,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 261,382.00
Dibulatkan 261,380.00
E-03 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 22.2000 1,540.00 34,188.00
Pasir Pasang M3 0.1020 265,000.00 27,030.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.6500 80,000.00 52,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 257,068.00
Dibulatkan 257,060.00
E-04 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 14.3700 1,540.00 22,129.80
Pasir Pasang M3 0.0400 265,000.00 10,600.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 130,254.80
Dibulatkan 130,250.00
E-05 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 11.5000 1,540.00 17,710.00
Pasir Pasang M3 0.0430 265,000.00 11,395.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 126,630.00
Dibulatkan 126,630.00
E-06 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 9.6800 1,540.00 14,907.20
Pasir Pasang M3 0.0450 265,000.00 11,925.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 124,357.20
Dibulatkan 124,350.00
E-07 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 3 ps
Roster Terawang Bh 36.0000 17,000.00 612,000.00
Semen Portland Kg 12.8000 1,540.00 19,712.00
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 677,412.00
Dibulatkan 677,410.00
E-08 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 4 ps
Roster Terawang Bh 36.0000 17,000.00 612,000.00
Semen Portland Kg 11.0000 1,540.00 16,940.00
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 674,640.00
Dibulatkan 674,640.00
E-09 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm
Roster Terawang Bh 36.0000 17,000.00 612,000.00
Semen Portland Kg 12.8000 1,540.00 19,712.00
1 2 3 4 5 6=4x5
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 677,412.00
Dibulatkan 677,410.00
E-10 1 M2 Pasang Dinding Batako Besar Pres uk. 8 x 20 x 30 ad. 1pc : 4ps
Batako Bh 13.0000 2,700.00 35,100.00
Semen Portland Kg 12.0000 1,540.00 18,480.00
Pasir Pasang M3 0.0380 265,000.00 10,070.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 100,075.00
Dibulatkan 100,070.00
E-11 1 M2 Pasang Dinding Hollowblock (HB-20)
HB-20 Bh 12.5000 5,700.00 71,250.00
Semen Portland Kg 13.5000 1,540.00 20,790.00
Pasir Pasang M3 0.0480 265,000.00 12,720.00
Besi angkur Ø 8 mm Kg 1.9500 18,000.00 35,100.00
Pekerja Oh 0.3500 80,000.00 28,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0170 125,000.00 2,125.00
Jumlah 185,810.00
Dibulatkan 185,810.00
E-12 1 M2 Pasang Dinding Hollowblock (HB-15)
HB-15 Bh 12.5000 6,500.00 81,250.00
Semen Portland Kg 10.4500 1,540.00 16,093.00
Pasir Pasang M3 0.0380 265,000.00 10,070.00
Besi angkur Ø 8 mm Kg 1.9500 18,000.00 35,100.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 182,648.00
Dibulatkan 182,640.00
E-13 1 M2 Pasang Dinding Hollowblock (HB-10)
HB-10 Bh 12.5000 3,500.00 43,750.00
Semen Portland Kg 7.5000 1,540.00 11,550.00
Pasir Pasang M3 0.0270 265,000.00 7,155.00
Besi angkur Ø 8 mm Kg 1.9500 18,000.00 35,100.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 137,690.00
Dibulatkan 137,690.00
E-14 1 M2 Pasang Dinding Conblock (CB-20)
CB-20 Bh 12.5000 5,700.00 71,250.00
Semen Portland Kg 14.0500 1,540.00 21,637.00
Pasir Beton M3 0.0040 290,000.00 1,160.00
Pasir Pasang M3 0.0420 265,000.00 11,130.00
Besi angkur Ø 8 mm Kg 3.8700 18,000.00 69,660.00
Paku Biasa 2" - 5" Kg 0.0060 24,000.00 144.00
Kayu Terentang M3 0.0010 3,245,000.00 3,245.00
Kawat Beton Kg 0.0300 33,000.00 990.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.0050 240,000.00 1,200.00
Pekerja Oh 0.3700 80,000.00 29,600.00
Tukang Batu Oh 0.1570 95,000.00 14,915.00
Tukang Besi Oh 0.0070 95,000.00 665.00
Kepala Tukang Oh 0.0164 105,000.00 1,722.00
Mandor Oh 0.0185 125,000.00 2,312.50
Jumlah 229,630.50
Dibulatkan 229,630.00
E-15 1 M2 Pasang Dinding Conblock (CB-15)
CB-15 Bh 12.5000 6,500.00 81,250.00
Semen Portland Kg 10.4600 1,540.00 16,108.40
Pasir Beton M3 0.0030 290,000.00 870.00
Pasir Pasang M3 0.0320 265,000.00 8,480.00
Besi angkur Ø 8 mm Kg 0.8700 18,000.00 15,660.00
Paku Biasa 2" - 5" Kg 0.0040 24,000.00 96.00
Kayu Terentang M3 0.0010 3,245,000.00 3,245.00
Kawat Beton Kg 0.0200 33,000.00 660.00
Koral Beton M3 0.0040 240,000.00 960.00
Pekerja Oh 0.3400 80,000.00 27,200.00
Tukang Batu Oh 0.1300 95,000.00 12,350.00
Tukang Besi Oh 0.0070 95,000.00 665.00
Kepala Tukang Oh 0.0137 105,000.00 1,438.50
Mandor Oh 0.0170 125,000.00 2,125.00
Jumlah 171,107.90
Dibulatkan 171,100.00
E-16 1 M2 Pasang Dinding Conblock (CB-10)
CB-10 Bh 12.5000 3,500.00 43,750.00
Semen Portland Kg 10.4600 1,540.00 16,108.40
Pasir Beton M3 0.0030 290,000.00 870.00
Pasir Pasang M3 0.0320 265,000.00 8,480.00
Besi angkur Ø 8 mm Kg 0.8700 18,000.00 15,660.00
Paku Biasa 2" - 5" Kg 0.0040 24,000.00 96.00
Kayu Terentang M3 0.0010 3,245,000.00 3,245.00
Kawat Beton Kg 0.0200 33,000.00 660.00
Koral Beton M3 0.0040 240,000.00 960.00
Pekerja Oh 0.3400 80,000.00 27,200.00
Tukang Batu Oh 0.1300 95,000.00 12,350.00
Tukang Besi Oh 0.0070 95,000.00 665.00
Kepala Tukang Oh 0.0137 105,000.00 1,438.50
Mandor Oh 0.0170 125,000.00 2,125.00
Jumlah 133,607.90
Dibulatkan 133,600.00
E-17 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Mulia
Keramik 10x20 Cm Corak m2 1.0000 68,000.00 68,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 142,998.00
Dibulatkan 142,990.00
E-18 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Mulia
Keramik 10x20 Cm Polos m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 140,998.00
Dibulatkan 140,990.00
E-19 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Mulia
Keramik 20x20 Cm Corak m2 1.0000 71,000.00 71,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 145,998.00
Dibulatkan 145,990.00
E-20 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Mulia
Keramik 20x20 Cm polos m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 140,998.00
Dibulatkan 140,990.00
E-21 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Mulia
Keramik 20x25 Cm Corak m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 140,998.00
Dibulatkan 140,990.00
E-22 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Mulia
Keramik 20x25 Cm Corak m2 1.0000 71,000.00 71,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 145,998.00
Dibulatkan 145,990.00
E-23 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Mulia
Keramik 30x30 Cm polos m2 1.0000 61,000.00 61,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 135,998.00
1 2 3 4 5 6=4x5
Dibulatkan 135,990.00
E-24 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia
Keramik 30x30 Cm corak m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 140,998.00
Dibulatkan 140,990.00
E-25 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Mulia
Keramik 40x40 Cm polos m2 1.0000 74,000.00 74,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 148,998.00
Dibulatkan 148,990.00
E-26 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Mulia
Keramik 40x40 Cm corak m2 1.0000 72,000.00 72,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 146,998.00
Dibulatkan 146,990.00
1 M2 Pasang Dinding Granito uk. 60 x 60 set. Essenza polis
Granito 60 x 60 essenza polis M2 1.0500 434,000.00 455,700.00
Paku Pancing 60x230 Bh 2.0000 1,000.00 2,000.00
Semen Abu - Abu Kg 10.4400 1,540.00 16,077.60
Pasir Pasang M3 0.0200 265,000.00 5,300.00
Semen Warna Kg 1.5000 16,000.00 24,000.00
Pekerja Oh 0.5000 80,000.00 40,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0250 125,000.00 3,125.00
Jumlah 572,577.60
Dibulatkan 572,570.00
E-27 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Roman
Keramik 10x20 Cm Corak m2 1.0000 88,000.00 88,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 162,998.00
Dibulatkan 162,990.00
E-28 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Roman
Keramik 10x20 Cm Polos m2 1.0000 72,000.00 72,000.00
1 2 3 4 5 6=4x5
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 146,998.00
Dibulatkan 146,990.00
E-29 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Roman
Keramik 20x20 Cm Corak m2 1.0000 91,000.00 91,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 165,998.00
Dibulatkan 165,990.00
E-30 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Roman
Keramik 20x20 Cm polos m2 1.0000 72,000.00 72,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 146,998.00
Dibulatkan 146,990.00
E-31 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Roman
Keramik 20x25 Cm m2 1.0000 83,000.00 83,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 157,998.00
Dibulatkan 157,990.00
E-32 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Roman
Keramik 20x25 Cm Corak m2 1.0000 89,000.00 89,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 163,998.00
Dibulatkan 163,990.00
E-33 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Roman
Keramik 30x30 Cm polos m2 1.0000 83,000.00 83,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 157,998.00
Dibulatkan 157,990.00
E-34 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Roman
Keramik 30x30 Cm corak m2 1.0000 88,000.00 88,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 162,998.00
Dibulatkan 162,990.00
E-35 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Roman
Keramik 40x40 Cm polos m2 1.0000 88,000.00 88,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 162,998.00
Dibulatkan 162,990.00
E-36 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Roman
Keramik 40x40 Cm corak m2 1.0000 93,000.00 93,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 167,998.00
Dibulatkan 167,990.00
E-36 1 M2 Pasang Dinding Keramik 20 x 40 Cm corak setara Roman
Keramik 20x40 Cm corak m2 1.0000 91,000.00 91,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 165,998.00
Dibulatkan 165,990.00
E-37 1 M2 Pasang Dinding Marmer
Marmer M2 1.0500 665,000.00 698,250.00
Paku Pancing 60x230 Bh 2.0000 1,000.00 2,000.00
Semen Abu - Abu Kg 12.4400 1,540.00 19,157.60
Pasir Pasang M3 0.0250 265,000.00 6,625.00
Semen Warna Kg 1.5000 16,000.00 24,000.00
Pekerja Oh 0.9000 80,000.00 72,000.00
Tukang Batu Oh 0.6500 95,000.00 61,750.00
Kepala Tukang Oh 0.0650 105,000.00 6,825.00
Mandor Oh 0.0350 125,000.00 4,375.00
1 2 3 4 5 6=4x5
Jumlah 894,982.60
Dibulatkan 894,980.00
E-38 1 M2 Pasang Dinding Batu Tempel Hitam
Batu Tempel Hitam M2 0.0500 110,000.00 5,500.00
Semen Abu - Abu Kg 11.7500 1,540.00 18,095.00
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.6200 80,000.00 49,600.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 123,145.00
Dibulatkan 123,140.00
E-39 1 M2 Pasang Dinding Poslin 11 x 11 Cm
Poslin m2 1.0000 77,000.00 77,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 151,998.00
Dibulatkan 151,990.00
E-40 1 M2 Wall paper
Wall paper m2 1.0500 61,500.00 64,575.00
Lem Kg 0.2500 43,000.00 10,750.00
Pekerja Oh 0.3500 80,000.00 28,000.00
Tukang Batu Oh 0.1750 95,000.00 16,625.00
Kepala Tukang Oh 0.0170 105,000.00 1,785.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 121,985.00
Dibulatkan 121,980.00
E-41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,888,000.00 192,864.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 28,000.00 15,680.00
Teak Wood 4 mm 120 x 240 Lbr 0.8600 145,000.00 124,700.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.4500 95,000.00 42,750.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 397,319.00
Dibulatkan 397,310.00
E-42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,888,000.00 192,864.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 28,000.00 15,680.00
Plywood 120 x 240 x 9 mm Lbr 0.8600 260,000.00 223,600.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Kayu Oh 0.6000 95,000.00 57,000.00
Kepala Tukang Oh 0.0600 105,000.00 6,300.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 516,294.00
Dibulatkan 516,290.00
E-43 1 M2 Dinding Pemisah Triplek Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,888,000.00 192,864.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 28,000.00 15,680.00
Triplek 120 x 240 x 4 mm Lbr 0.8600 68,500.00 58,910.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Kayu Oh 0.6000 95,000.00 57,000.00
Kepala Tukang Oh 0.0600 105,000.00 6,300.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 351,604.00
Dibulatkan 351,600.00
E-44 1 M2 Dinding Pemisah GRC tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 35,000.00 14,525.00
Hollow 2/4 Zincromate Btg 0.1500 27,000.00 4,050.00
GRC ( 120 x 240 x 4 ) mm Lbr 0.3640 74,500.00 27,118.00
Paku GRC kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 107,391.00
Dibulatkan 107,390.00
E-45 1 M2 Dinding Pemisah Gypsum dobel tb. 9 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.8300 35,000.00 29,050.00
Hollow 2/4 Zincromate Btg 0.3000 27,000.00 8,100.00
Gypsum Lbr 0.7280 87,800.00 63,918.40
Paku Gypsum kg 0.2200 38,500.00 8,470.00
Ramset / dina bolt Bh 8.0000 8,000.00 64,000.00
Cotton plaster Bh 0.1440 16,500.00 2,376.00
Compoun Zak 0.2500 83,000.00 20,750.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang besi Oh 0.1000 95,000.00 9,500.00
Kepala tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 224,464.40
Dibulatkan 224,460.00
E-46 1 M2 Dinding Plywood tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 35,000.00 14,525.00
Hollow 2/4 Zincromate Btg 0.1500 27,000.00 4,050.00
Plywood 120 x 240 x 9 mm Lbr 0.3640 260,000.00 94,640.00
Paku kg 0.1100 24,000.00 2,640.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 161,755.00
Dibulatkan 161,750.00
E-47 1 M2 Dinding Teakwood tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 35,000.00 14,525.00
Hollow 2/4 Zincromate Btg 0.1500 27,000.00 4,050.00
Teakwood (120 x 240 x 4) mm Lbr 0.3640 145,000.00 52,780.00
Paku kg 0.1100 24,000.00 2,640.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 119,895.00
Dibulatkan 119,890.00
E-48 1 M2 Pasang Dinding Glass Block 20 x 20 ad. 1pc : 4 ps
1 2 3 4 5 6=4x5
Glass block 20 x 20 bh 36.0000 26,000.00 936,000.00
Semen Abu - Abu Kg 11.0000 1,540.00 16,940.00
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 998,640.00
Dibulatkan 998,640.00
E-49 1 M2 Pasang Dinding Anyaman Bambu, rangka kayu
Bilik bambu M2 1.5000 25,000.00 37,500.00
Kayu kaso 5/7 M3 0.0140 4,061,000.00 56,854.00
Paku Kg 0.0112 24,000.00 268.80
List kayu 2/4 M3 0.0030 6,391,000.00 19,173.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 127,320.80
Dibulatkan 127,320.00
F PEKERJAAN PLESTERAN
F-01 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm
Semen Portland Kg 8.5200 1,540.00 13,120.80
Pasir Pasang M3 0.0170 265,000.00 4,505.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 50,700.80
Dibulatkan 50,700.00
F-02 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm
Semen Portland Kg 6.4800 1,540.00 9,979.20
Pasir Pasang M3 0.0190 265,000.00 5,035.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 48,089.20
Dibulatkan 48,080.00
F-03 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm
Semen Portland Kg 5.2000 1,540.00 8,008.00
Pasir Pasang M3 0.0200 265,000.00 5,300.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 46,383.00
Dibulatkan 46,380.00
1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm + Acian
Semen Portland Kg 4.3200 1,540.00 6,652.80
Pasir Pasang M3 0.0220 265,000.00 5,830.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 45,557.80
Dibulatkan 45,550.00
F-04 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm
1 2 3 4 5 6=4x5
Semen Portland Kg 10.8000 1,540.00 16,632.00
Pasir Pasang M3 0.0260 265,000.00 6,890.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 66,184.50
Dibulatkan 66,180.00
F-05 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm
Semen Portland Kg 8.6800 1,540.00 13,367.20
Pasir Pasang M3 0.0280 265,000.00 7,420.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 63,449.70
Dibulatkan 63,440.00
F-06 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm
Semen Portland Kg 7.2900 1,540.00 11,226.60
Pasir Pasang M3 0.0260 265,000.00 6,890.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 60,779.10
Dibulatkan 60,770.00
F-07 1 M2 Barapen 1 Pc : 5 Ps, Tebal 15 mm
Semen Portland Kg 5.6700 1,540.00 8,731.80
Pasir Pasang M3 0.0230 265,000.00 6,095.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Batu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 35,211.80
Dibulatkan 35,210.00
F-08 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm
Semen Portland Kg 9.3000 1,540.00 14,322.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Pekerja Oh 0.2600 80,000.00 20,800.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 62,617.00
Dibulatkan 62,610.00
F-09 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm
Semen Portland Kg 7.0700 1,540.00 10,887.80
Pasir Pasang M3 0.0210 265,000.00 5,565.00
Pekerja Oh 0.2600 80,000.00 20,800.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 59,977.80
Dibulatkan 59,970.00
F-10 1 M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm
Semen Portland Kg 0.5000 1,540.00 770.00
Pasir Pasang M3 0.0130 265,000.00 3,445.00
Pekerja Oh 0.0800 80,000.00 6,400.00
Tukang Batu Oh 0.4000 95,000.00 38,000.00
Kepala Tukang Oh 0.0400 105,000.00 4,200.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0040 125,000.00 500.00
Jumlah 53,315.00
Dibulatkan 53,310.00
F-11 1 M2 Acian Plesteran
Semen Portland Kg 4.0000 1,540.00 6,160.00
Pekerja Oh 0.1430 80,000.00 11,440.00
Tukang Batu Oh 0.1070 95,000.00 10,165.00
Kepala Tukang Oh 0.0105 105,000.00 1,102.50
Mandor Oh 0.0105 125,000.00 1,312.50
Jumlah 30,180.00
Dibulatkan 30,180.00
F-12 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps batu belah
Semen Portland Kg 6.3400 1,540.00 9,763.60
Pasir Pasang M3 0.0120 265,000.00 3,180.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 54,643.60
Dibulatkan 54,640.00
F-13 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps dinding bata merah
Semen Portland Kg 4.3200 1,540.00 6,652.80
Pasir Pasang M3 0.0160 265,000.00 4,240.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Batu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 31,277.80
Dibulatkan 31,270.00
J PEKERJAAN KAYU
J-01 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Samarinda
Kayu Balok Kamper Samarinda M3 1.2000 ### 12,540,000.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Kayu Oh 18.0000 95,000.00 1,710,000.00
Kepala Tukang Oh 2.0000 105,000.00 210,000.00
Mandor Oh 0.3000 125,000.00 37,500.00
Jumlah 14,977,500.00
Dibulatkan 14,977,500.00
J-02 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Medan/Kruing
Kayu Balok Kamper Medan M3 1.2000 6,888,000.00 8,265,600.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Kayu Oh 18.0000 95,000.00 1,710,000.00
Kepala Tukang Oh 2.0000 105,000.00 210,000.00
Mandor Oh 0.3000 125,000.00 37,500.00
1 2 3 4 5 6=4x5
Jumlah 10,703,100.00
Dibulatkan 10,703,100.00
J-03 1 M3 Pasang Kusen Pintu dan Jendela Kayu Borneo Super
Kayu Balok Borneo Super M3 1.2000 6,391,000.00 7,669,200.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Kayu Oh 18.0000 95,000.00 1,710,000.00
Kepala Tukang Oh 2.0000 105,000.00 210,000.00
Mandor Oh 0.3000 125,000.00 37,500.00
Jumlah 10,106,700.00
Dibulatkan 10,106,700.00
J-04 1 M2 Pasang Pintu Panel Kayu Kamper Samarinda
Kayu Papan Kamper Samarinda M3 0.0400 ### 422,240.00
Paku biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 773,440.00
Dibulatkan 773,440.00
J-05 1 M2 Pasang Pintu Panel Kayu Kamper Medan/Kruing
Kayu Papan Kamper Medan M3 0.0400 7,046,000.00 281,840.00
Paku biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 633,040.00
Dibulatkan 633,040.00
J-06 1 M2 Pasang Daun Jendela Kaca Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0150 7,046,000.00 105,690.00
Pekerja Oh 0.8000 80,000.00 64,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 385,690.00
Dibulatkan 385,690.00
J-07 1 M2 Pasang Pintu dan Jendela Kaca Kayu Borneo
Kayu Papan Borneo Super M3 0.0350 6,771,000.00 236,985.00
Pekerja Oh 0.8000 80,000.00 64,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 516,985.00
Dibulatkan 516,980.00
J-08 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0640 7,046,000.00 450,944.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Kayu Oh 3.0000 95,000.00 285,000.00
Kepala Tukang Oh 0.3000 105,000.00 31,500.00
Mandor Oh 0.5000 125,000.00 62,500.00
Jumlah 909,944.00
Dibulatkan 909,940.00
J-09 1 M2 Pasang Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan/Kruing
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.0300 24,000.00 720.00
Lem Kayu Lt 0.3000 28,000.00 8,400.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
Pekerja Oh 0.6000 80,000.00 48,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 478,471.60
Dibulatkan 478,470.00
J-10 1 M2 Pasang Jalusi Mati Kusen kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0600 7,046,000.00 422,760.00
Paku Biasa 1/2" - 1" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.5000 80,000.00 40,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.3000 105,000.00 31,500.00
Mandor Oh 0.0250 125,000.00 3,125.00
Jumlah 690,985.00
Dibulatkan 690,980.00
J-11 1 M2 Pasang Daun Pintu Triplek Rangkap, Rangka Kayu Kamper
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.0300 24,000.00 720.00
Lem Kayu Lt 0.3000 28,000.00 8,400.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
Pekerja Oh 0.6000 80,000.00 48,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 478,471.60
Dibulatkan 478,470.00
J-12 1 M2 Pasang Daun Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Lt 0.3000 28,000.00 8,400.00
Teak Wood 4 mm 120 x 240 Lbr 1.0000 145,000.00 145,000.00
Pekerja Oh 0.6000 80,000.00 48,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 561,451.60
Dibulatkan 561,450.00
J-13 1 M2 Pasang Pintu dobel Plywood lapis HPL, Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Ltr 0.8000 28,000.00 22,400.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
HPL Lbr 0.5000 175,000.00 87,500.00
Pekerja Oh 0.8000 80,000.00 64,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 656,451.60
Dibulatkan 656,450.00
J-14 1 M2 Pasang Pintu Teakwood lapis HPL , Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Ltr 0.8000 28,000.00 22,400.00
Teak Wood 4 mm 120 x 240 Lbr 1.0000 145,000.00 145,000.00
Politur Ltr 0.5000 60,000.00 30,000.00
Formika Warna 4" x 8" Lbr 0.5000 262,500.00 131,250.00
Pekerja Oh 0.8000 80,000.00 64,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 806,701.60
1 2 3 4 5 6=4x5
Dibulatkan 806,700.00
J-15 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kamper Medan
Kayu Balok Kamper Medan M3 1.1000 6,888,000.00 7,576,800.00
Besi Strip Kg 15.0000 32,000.00 480,000.00
Paku Biasa 2" - 5" Kg 0.8000 24,000.00 19,200.00
Pekerja Oh 4.0000 80,000.00 320,000.00
Tukang Kayu Oh 12.0000 95,000.00 1,140,000.00
Kepala Tukang Oh 1.2000 105,000.00 126,000.00
Mandor Oh 0.2000 125,000.00 25,000.00
Jumlah 9,687,000.00
Dibulatkan 9,687,000.00
J-16 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Borneo
Kayu Balok Borneo Super M3 1.1000 6,391,000.00 7,030,100.00
Besi Strip Kg 15.0000 32,000.00 480,000.00
Paku Biasa 2" - 5" Kg 0.8000 24,000.00 19,200.00
Pekerja Oh 4.0000 80,000.00 320,000.00
Tukang Kayu Oh 12.0000 95,000.00 1,140,000.00
Kepala Tukang Oh 1.2000 105,000.00 126,000.00
Mandor Oh 0.2000 125,000.00 25,000.00
Jumlah 9,140,300.00
Dibulatkan 9,140,300.00
J-17 1 M2 Pasang Kaso dan Reng Genteng Plentong kayu Kamper Medan
Kayu Balok Kamper medan M3 0.0120 6,888,000.00 82,656.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 105,431.00
Dibulatkan 105,430.00
J-18 1 M2 Pasang Kaso dan Reng Genteng Beton kayu Kamper
Kayu Balok Kamper Medan M3 0.0140 6,888,000.00 96,432.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 119,207.00
Dibulatkan 119,200.00
J-19 1 M' Pasang Lisplang (3x20) Cm, Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0072 7,046,000.00 50,731.20
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 81,656.20
Dibulatkan 81,650.00
J-20 1 M' Pasang Lisplang (3x30) Cm, Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0110 7,046,000.00 77,506.00
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1100 80,000.00 8,800.00
Tukang Kayu Oh 0.2200 95,000.00 20,900.00
Kepala Tukang Oh 0.0220 105,000.00 2,310.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 111,341.00
Dibulatkan 111,340.00
J-21 1 M' Pasang List Plafon - Kayu Profil 10 cm
Kayu Profil M' 1.0500 35,000.00 36,750.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.0210 80,000.00 1,680.00
Tukang Kayu Oh 0.0210 95,000.00 1,995.00
Kepala Tukang Oh 0.0020 105,000.00 210.00
Mandor Oh 0.0010 125,000.00 125.00
Jumlah 40,760.00
Dibulatkan 40,760.00
J-22 7,26 M2 Kusen Partisi Dobel Triplek
Kayu Balok Borneo Super M3 0.1050 6,391,000.00 671,055.00
Triplek 4 mm 120 x 240 Lbr 5.0000 68,500.00 342,500.00
Paku Biasa 1 s/d 3 cm Kg 2.0000 24,000.00 48,000.00
Ampelas Lbr 2.0000 6,000.00 12,000.00
Engsel Bh 4.0000 23,100.00 92,400.00
Slot Bh 4.0000 35,000.00 140,000.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 1.3000 95,000.00 123,500.00
Kepala Tukang Oh 0.1300 105,000.00 13,650.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 1,468,730.00
1 M2 Pekerjaan partisi 202,304.41
Dibulatkan 202,300.00
J-23 1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu Kamper
Kayu Balok Kamper M3 0.0120 6,888,000.00 82,656.00
Paku Biasa 5" - 7" Kg 0.1000 24,000.00 2,400.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0750 125,000.00 9,375.00
Jumlah 132,806.00
Dibulatkan 132,800.00
J-24 1 M2 Pasang Rangka Langit - langit (0.50 x 1.00) m, Kayu Borneo
Kayu Balok Borneo Super M3 0.0154 6,391,000.00 98,421.40
Paku Biasa 5" - 7" Kg 0.2000 24,000.00 4,800.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.3000 95,000.00 28,500.00
Kepala Tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0750 125,000.00 9,375.00
Jumlah 156,246.40
Dibulatkan 156,240.00
J-25 1 M1 Reuter Kayu Kamper Medan
Kayu Kamper Medan M3 0.0040 6,888,000.00 27,552.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 57,277.00
Dibulatkan 57,270.00
J-26 1 M3 Gording kayu kelas II
Balok kayu M3 1.1000 6,888,000.00 7,576,800.00
Besi Strip Kg 15.0000 32,000.00 480,000.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Pekerja Oh 2.4000 80,000.00 192,000.00
Tukang Kayu Oh 7.2000 95,000.00 684,000.00
Kepala Tukang Oh 0.7200 105,000.00 75,600.00
Mandor Oh 0.1200 125,000.00 15,000.00
Jumlah 9,095,400.00
Dibulatkan 9,095,400.00
J-27 1 M2 Dinding bilik, rangka kayu borneo
Bilik bambu m2 1.1000 25,000.00 27,500.00
Kaso 5/7 m3 0.0140 2,975,000.00 41,650.00
1 2 3 4 5 6=4x5
Paku Biasa 2" - 5" Kg 0.0120 24,000.00 288.00
List kayu 2/4 m3 0.0030 11,000.00 33.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 83,371.00
Dibulatkan 83,370.00
1 M2 Pasang Pintu Panel Multiplek 9 mm rangka kayu Kamper Medan / Kruing
Kayu Papan Kamper Medan/Kruing M3 0.0230 7,046,000.00 162,058.00
Multiplek 9 mm lbr 0.2300 166,500.00 38,295.00
List kayu profil 1 cm m' 3.6000 10,000.00 36,000.00
Paku biasa ½" - 1" kg 0.3000 24,000.00 7,200.00
Lem putih FOX kg 0.1500 28,000.00 4,200.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 597,753.00
Dibulatkan 597,750.00
M PEKERJAAN SANITASI
M-01 1 Buah Closet Jongkok Proselen Standar
Kloset jongkok porselen Bh 1.0000 207,500.00 207,500.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 265,000.00 2,650.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Batu Oh 1.5000 95,000.00 142,500.00
Kepala Tukang Oh 0.1500 105,000.00 15,750.00
Mandor Oh 0.1600 125,000.00 20,000.00
Jumlah 477,640.00
Dibulatkan 477,640.00
M-02 1 Buah Urinoir
Urinoir Bh 1.0000 1,952,500.00 1,952,500.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 265,000.00 2,650.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Batu Oh 1.0000 95,000.00 95,000.00
Kepala Tukang Oh 0.1000 105,000.00 10,500.00
Mandor Oh 0.0010 125,000.00 125.00
Perlengkapan 30 % Ls 0.3000 1,952,500.00 585,750.00
Jumlah 2,735,765.00
Dibulatkan 2,735,760.00
M-03 1 Buah Wastafel
Wastafel Bh 1.0000 800,000.00 800,000.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 265,000.00 2,650.00
Pekerja Oh 1.2000 80,000.00 96,000.00
Tukang Batu Oh 1.4500 95,000.00 137,750.00
Kepala Tukang Oh 0.1500 105,000.00 15,750.00
Mandor Oh 0.1000 125,000.00 12,500.00
Perlengkapan 12 % Ls 0.1200 800,000.00 96,000.00
Jumlah 1,169,890.00
Dibulatkan 1,169,890.00
M-04 1 Buah Bak Mandi Fibreflass volume 0,30 M3
Bak Fibreglass Bh 1.0000 309,000.00 309,000.00
Pekerja Oh 1.8000 80,000.00 144,000.00
Tukang Batu Oh 2.7000 95,000.00 256,500.00
Kepala Tukang Oh 0.5400 105,000.00 56,700.00
Mandor Oh 0.1100 125,000.00 13,750.00
Perlengkapan 18 % Ls 0.1800 309,000.00 55,620.00
Jumlah 835,570.00
Dibulatkan 835,570.00
M-05 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
Buis beton Ø 30 cm bh 1.1000 74,000.00 81,400.00
Bata merah bh 25.0000 850.00 21,250.00
P.C (50 gk) Kg 10.3000 1,540.00 15,862.00
Pasir pasang m3 0.0610 265,000.00 16,165.00
Pasir urug m3 0.0690 199,000.00 13,731.00
Pekerja org 0.3800 80,000.00 30,400.00
Tukang batu org 0.1900 95,000.00 18,050.00
Kepala Tukang org 0.0190 105,000.00 1,995.00
Mandor org 0.0190 125,000.00 2,375.00
Jumlah 201,228.00
Dibulatkan 201,220.00
M-06 1 Buah Bak kontrol Pas. Bata Merah Uk (60 x 60) cm
Bata Merah bh 186.0000 850.00 158,100.00
1 2 3 4 5 6=4x5
Semen PC Kg 114.0000 1,540.00 175,560.00
Pasir Pasang M3 0.1840 265,000.00 48,760.00
Batu pecah 2/3 M3 0.0330 240,000.00 7,920.00
Besi Beton Kg 4.8500 18,000.00 87,300.00
Pasir Beton M3 0.1200 290,000.00 34,800.00
Pekerja Oh 2.1600 80,000.00 172,800.00
Tukang Batu Oh 0.7200 95,000.00 68,400.00
Kepala Tukang Oh 0.0720 105,000.00 7,560.00
Tukang Gali Oh 0.1000 80,000.00 8,000.00
Mandor Oh 0.1080 125,000.00 13,500.00
Jumlah 782,700.00
Dibulatkan 782,700.00
M-07 1 Buah Bak kontrol Pas. Bata Merah Uk (30 x 30) cm
Bata Merah bh 53.0000 850.00 45,050.00
Semen PC Kg 44.0000 1,540.00 67,760.00
Pasir Pasang M3 0.0700 265,000.00 18,550.00
Batu pecah 2/3 M3 0.0700 240,000.00 16,800.00
Besi Beton Kg 1.6000 18,000.00 28,800.00
Pasir Beton M3 0.0600 290,000.00 17,400.00
Pekerja Oh 3.2000 80,000.00 256,000.00
Tukang Batu Oh 1.0150 95,000.00 96,425.00
Kepala Tukang Oh 0.0015 105,000.00 157.50
Mandor Oh 0.0160 125,000.00 2,000.00
Jumlah 548,942.50
Dibulatkan 548,940.00
M-08 1 M¹ Pipa PVC Type AW Ø ½"
Pipa PVC M1 1.2000 10,625.00 12,750.00
Pekerja Oh 0.0360 80,000.00 2,880.00
Tukang Batu Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0018 125,000.00 225.00
Perlengkapan 35% Ls 0.3500 12,750.00 4,462.50
Jumlah 26,647.50
Dibulatkan 26,640.00
M-09 1 M¹ Pipa PVC Type AW Ø 1"
Pipa PVC M1 1.2000 16,250.00 19,500.00
Pekerja Oh 0.0360 80,000.00 2,880.00
Tukang Batu Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0018 125,000.00 225.00
Perlengkapan 35% Ls 0.3500 19,500.00 6,825.00
Jumlah 35,760.00
Dibulatkan 35,760.00
M-10 1 M¹ Pipa PVC Type AW Ø 1½"
Pipa PVC M1 1.2000 27,500.00 33,000.00
Pekerja Oh 0.0360 80,000.00 2,880.00
Tukang Batu Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0018 125,000.00 225.00
Perlengkapan 35% Ls 0.3500 33,000.00 11,550.00
Jumlah 53,985.00
Dibulatkan 53,980.00
M-11 1 M¹ Pipa PVC Type AW Ø 2"
Pipa PVC M1 1.2000 30,000.00 36,000.00
Pekerja Oh 0.0360 80,000.00 2,880.00
Tukang Batu Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0018 125,000.00 225.00
Perlengkapan 35% Ls 0.3500 36,000.00 12,600.00
1 2 3 4 5 6=4x5
Jumlah 58,035.00
Dibulatkan 58,030.00
1 M¹ Pipa PVC Type AW Ø 2½"
Pipa PVC M1 1.2000 42,500.00 51,000.00
Perlengkapan 35% Ls 1.0000 17,850.00 17,850.00
Pekerja Oh 0.0540 80,000.00 4,320.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0027 125,000.00 337.50
Jumlah 83,002.50
Dibulatkan 83,000.00
1 M¹ Pipa PVC Type AW Ø 3"
Pipa PVC M1 1.2000 53,750.00 64,500.00
Perlengkapan 35% Ls 1.0000 22,575.00 22,575.00
Pekerja Oh 0.0810 80,000.00 6,480.00
Tukang Batu Oh 0.1350 95,000.00 12,825.00
Kepala Tukang Oh 0.0135 105,000.00 1,417.50
Mandor Oh 0.0041 125,000.00 512.50
Jumlah 108,310.00
Dibulatkan 108,310.00
M-12 1 M¹ Pipa PVC Type AW Ø 4"
Pipa PVC M1 1.2000 90,000.00 108,000.00
Pekerja Oh 0.0810 80,000.00 6,480.00
Tukang Batu Oh 0.1350 95,000.00 12,825.00
Kepala Tukang Oh 0.0135 105,000.00 1,417.50
Mandor Oh 0.0041 125,000.00 512.50
Perlengkapan 35% Ls 0.3500 108,000.00 37,800.00
Jumlah 167,035.00
Dibulatkan 167,030.00
M-13 1 M¹ Pipa PVC Type AW Ø ¾"
Pipa PVC M1 1.2000 13,875.00 16,650.00
Pekerja Oh 0.0810 80,000.00 6,480.00
Tukang Batu Oh 0.1350 95,000.00 12,825.00
Kepala Tukang Oh 0.0135 105,000.00 1,417.50
Mandor Oh 0.0041 125,000.00 512.50
Perlengkapan 35% Ls 0.3500 16,650.00 5,827.50
Jumlah 43,712.50
Dibulatkan 43,710.00
M-14 1 Buah Bak Cuci Piring Stainles Steel
Bak cuci stainles steel Bh 1.0000 438,500.00 438,500.00
Pekerja Oh 0.0300 80,000.00 2,400.00
Tukang Batu Oh 0.3000 95,000.00 28,500.00
Kepala Tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0015 125,000.00 187.50
Jumlah 472,737.50
Dibulatkan 472,730.00
M-15 1 Buah Kran Ø ½" atau ¾"
Kran Air Bh 1.0000 45,000.00 45,000.00
Seal Tape Bh 0.0250 4,500.00 112.50
Pekerja Oh 0.0100 80,000.00 800.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 57,087.50
Dibulatkan 57,080.00
M-16 1 Buah Floor Drain
Floor Drain Bh 1.0000 73,500.00 73,500.00
Pekerja Oh 0.0100 80,000.00 800.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 85,475.00
Dibulatkan 85,470.00
M-17 1 M' Grafel beton U 20 cm -60 cm
Pipa beton U bh 1.1000 52,000.00 57,200.00
Bata merah bh 12.0000 850.00 10,200.00
P.C (50 gk) zak 0.1030 1,540.00 158.62
Pasir pasang m3 0.0305 265,000.00 8,082.50
Pasir urug m3 0.0345 199,000.00 6,865.50
Pekerja org 0.0100 80,000.00 800.00
Tukang batu org 0.1000 95,000.00 9,500.00
Kepala Tukang org 0.0100 105,000.00 1,050.00
Mandor org 0.0050 125,000.00 625.00
Jumlah 94,481.62
Dibulatkan 94,480.00
M-18 1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC m' 1.0500 66,000.00 69,300.00
Perlengkapan 35 % harga talang lot 0.3500 69,300.00 24,255.00
Pekerja org 0.1500 80,000.00 12,000.00
Tukang batu org 0.4000 95,000.00 38,000.00
Kepala Tukang org 0.0250 105,000.00 2,625.00
Mandor org 0.0013 125,000.00 156.25
Jumlah 146,336.25
Dibulatkan 146,330.00
M-19 1 M' Saluran Air Limbah Buis beton Ø 60 cm
Buis beton Ø 60 cm bh 1.1000 148,000.00 162,800.00
Bata merah bh 25.0000 850.00 21,250.00
P.C (50 gk) Kg 0.2060 1,540.00 317.24
Pasir pasang m3 0.0610 265,000.00 16,165.00
Pasir urug m3 0.0690 199,000.00 13,731.00
Pekerja org 0.3800 80,000.00 30,400.00
Tukang batu org 0.1900 95,000.00 18,050.00
Kepala Tukang org 0.0190 105,000.00 1,995.00
Mandor org 0.0190 125,000.00 2,375.00
Jumlah 267,083.24
Dibulatkan 267,080.00
M-20 1 M' Pasang Talang Seng Datar
Seng pelat 3" x 6" lbr 0.5000 19,140.00 9,570.00
Paku kg 0.0150 24,000.00 360.00
Kayu kelas II m3 0.0096 3,245,000.00 31,152.00
Meni besi kg 0.2500 36,000.00 9,000.00
Pekerja org 0.1500 80,000.00 12,000.00
Tukang batu org 0.4000 95,000.00 38,000.00
Kepala Tukang org 0.0250 105,000.00 2,625.00
Mandor org 0.0013 125,000.00 156.25
Jumlah 102,863.25
Dibulatkan 102,860.00
M-21 1 Buah Closet Duduk
Closet duduk Bh 1.0000 1,399,500.00 1,399,500.00
Pekerja Oh 3.3000 80,000.00 264,000.00
Tukang Batu Oh 1.1000 95,000.00 104,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.1600 125,000.00 20,000.00
Perlengkapan 6 % Ls 0.0600 1,399,500.00 83,970.00
Jumlah 1,873,020.00
Dibulatkan 1,873,020.00
M-22 1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass kapasitas 1 m3 bh 1.0000 1,593,000.00 1,593,000.00
1 2 3 4 5 6=4x5
Pekerja org 3.3000 80,000.00 264,000.00
Tukang batu org 1.1000 95,000.00 104,500.00
Kepala Tukang org 0.0010 105,000.00 105.00
Mandor org 0.1600 125,000.00 20,000.00
Perlengkapan 6 % harga bak lot 0.0600 1,593,000.00 95,580.00
Jumlah 2,077,185.00
Dibulatkan 2,077,180.00
M-23 1 Unit Septictank 2 x 1,50 x 1,50 M + Rembesannya
Galian tanah M3 4.5000 48,655.00 218,947.50
Pasir urug M3 0.2142 199,000.00 42,625.80
Lantai kerja M3 2.2500 863,690.00 1,943,302.50
Pas bata 1pc : 3ps M2 15.0000 270,700.00 4,060,500.00
Plesteran M2 15.0000 50,700.00 760,500.00
Plat beton penutup & balok M3 0.3000 8,144,660.00 2,443,398.00
Pipa PVC 4" jenis AW + sambungan M1 5.4000 66,250.00 357,750.00
Pipa GIP 1 1/2" M1 5.0000 51,433.33 257,166.67
Galian tanah untuk rembesan M3 3.3750 48,655.00 164,210.63
Pas. Injuk KG 5.4000 28,000.00 151,200.00
Urugan kerikil 3.5 cm M3 1.0500 233,000.00 244,650.00
Pipa PVC 4" berlobang jenis AW M1 9.0000 40,500.00 364,500.00
Urugan kembali perataan tanah M3 1.1250 63,985.00 71,983.13
Jumlah 11,080,734.22
Dibulatkan 11,080,730.00
M-24 1 Unit Septictank 1 x 1,50 x 1,50 M + Rembesannya
Galian tanah M3 2.2500 37,000.00 83,250.00
Pasir urug M3 0.1070 199,000.00 21,293.00
Lantai kerja M3 1.1250 863,690.00 971,651.25
Pas bata 1pc : 3ps M2 7.5000 270,700.00 2,030,250.00
Plesteran M2 7.5000 50,700.00 380,250.00
Plat beton penutup & balok M3 0.1500 8,144,660.00 1,221,699.00
Pipa PVC 4" jenis AW + sambungan M1 9.0000 66,250.00 596,250.00
Pipa GIP 1 1/2" M1 2.5000 9,250.00 23,125.00
Galian tanah untuk rembesan M3 1.6880 37,000.00 62,456.00
Pas. Injuk KG 2.7000 28,000.00 75,600.00
Urugan kerikil 3.5 cm M3 0.5250 233,000.00 122,325.00
Pipa PVC 4" berlobang jenis AW M1 9.0000 40,500.00 364,500.00
Urugan kembali perataan tanah M3 0.5630 63,985.00 36,023.56
Jumlah 5,988,672.81
Dibulatkan 5,988,670.00
1 M¹ Pipa Galvanis Ø ½"
Pipa Galvanis M1 1.2000 20,083.33 24,100.00
Perlengkapan 35% Ls 1.0000 8,435.00 8,435.00
Pekerja Oh 0.0540 80,000.00 4,320.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0270 125,000.00 3,375.00
Jumlah 49,725.00
Dibulatkan 49,720.00
1 M¹ Pipa Galvanis Ø ¾"
Pipa Galvanis M1 1.2000 29,250.00 35,100.00
Perlengkapan 35% Ls 1.0000 12,285.00 12,285.00
Pekerja Oh 0.0540 80,000.00 4,320.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0270 125,000.00 3,375.00
Jumlah 64,575.00
Dibulatkan 64,570.00
1 M¹ Pipa Galvanis Ø 1"
Pipa Galvanis M1 1.2000 33,283.33 39,940.00
1 2 3 4 5 6=4x5
Perlengkapan 35% Ls 1.0000 13,979.00 13,979.00
Pekerja Oh 0.0540 80,000.00 4,320.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0270 125,000.00 3,375.00
Jumlah 71,109.00
Dibulatkan 71,100.00
1 M¹ Pipa Galvanis Ø 1½"
Pipa Galvanis M1 1.2000 51,433.33 61,720.00
Perlengkapan 35% Ls 1.0000 21,602.00 21,602.00
Pekerja Oh 0.1080 80,000.00 8,640.00
Tukang Batu Oh 0.1800 95,000.00 17,100.00
Kepala Tukang Oh 0.0180 105,000.00 1,890.00
Mandor Oh 0.0054 125,000.00 675.00
Jumlah 111,627.00
Dibulatkan 111,620.00
1 M¹ Pipa Galvanis Ø 3"
Pipa Galvanis M1 1.2000 155,816.67 186,980.00
Perlengkapan 35% Ls 1.0000 65,443.00 65,443.00
Pekerja Oh 0.1080 80,000.00 8,640.00
Tukang Batu Oh 0.1800 95,000.00 17,100.00
Kepala Tukang Oh 0.0180 105,000.00 1,890.00
Mandor Oh 0.0054 125,000.00 675.00
Jumlah 280,728.00
Dibulatkan 280,720.00
1 M¹ Pipa Galvanis Ø 4"
Pipa Galvanis M1 1.2000 158,333.33 190,000.00
Perlengkapan 35% Ls 1.0000 66,500.00 66,500.00
Pekerja Oh 0.1350 80,000.00 10,800.00
Tukang Batu Oh 0.2250 95,000.00 21,375.00
Kepala Tukang Oh 0.0225 105,000.00 2,362.50
Mandor Oh 0.0068 125,000.00 850.00
Jumlah 291,887.50
Dibulatkan 291,880.00
1 Buah Bak kontrol Pas. Batu Bata (45 x 45) cm, Tinggi 50 cm
Batu Bata M2 0.2500 59,500.00 14,875.00
Semen PC Kg 77.0000 1,540.00 118,580.00
Pasir Pasang M3 0.1300 265,000.00 34,450.00
Batu Kerikil M3 0.0200 196,000.00 3,920.00
Besi Beton Kg 2.6000 18,000.00 46,800.00
Pasir Beton M3 0.0900 290,000.00 26,100.00
Pekerja Oh 1.4200 80,000.00 113,600.00
Tukang Batu Oh 0.4730 95,000.00 44,935.00
Kepala Tukang Oh 0.0470 105,000.00 4,935.00
Mandor Oh 0.0710 125,000.00 8,875.00
Jumlah 417,070.00
Dibulatkan 417,070.00
1 M' Saluran Air Hujan Lbr. 20 cm
Galian tanah M3 0.1000 37,000.00 3,700.00
Urugan pasir M3 0.0100 264,050.00 2,640.50
Pas. Bata merah ad. 1 : 5 M2 0.3500 124,350.00 43,522.50
Pas. Plesteran ad. 1 : 5 M2 0.4000 66,180.00 26,472.00
Pas. Beton tumbuk ad. 1 : 3 : 5 M3 0.0150 863,690.00 12,955.35
Perapihan 5% - 4,464.52 4,464.52
Jumlah 93,754.87
Dibulatkan 93,750.00
1 M' Perbaikan Saluran Air Hujan Lbr. 20 cm
Pas. Plesteran ad. 1 : 5 M2 0.4000 66,180.00 26,472.00
Pas. Beton tumbuk ad. 1 : 3 : 5 M3 0.0150 863,690.00 12,955.35
1 2 3 4 5 6=4x5
Perapihan 5% - 1,971.37 1,971.37
Jumlah 41,398.72
Dibulatkan 41,390.00
N PEKERJAAN PENGECATAN
N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama
Soda Api Kg 0.0500 39,500.00 1,975.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 14,287.50
Dibulatkan 14,280.00
N-02 1 M2 Mendempul dan Menggosok Kayu
Dempul Jadi Kg 0.0800 44,000.00 3,520.00
Minyak Cat Kg 0.0200 46,000.00 920.00
Batu Apung Kg 0.0100 33,000.00 330.00
Pekerja Oh 0.0400 80,000.00 3,200.00
Tukang Cat Oh 0.0400 95,000.00 3,800.00
Kepala Tukang Oh 0.0040 105,000.00 420.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 12,502.50
Dibulatkan 12,500.00
N-03 1 M2 Pengecatan Bidang Kayu dan Besi lama Setara Glotex
Plamir Kg 0.1500 30,000.00 4,500.00
Cat Dasar Kg 0.1700 38,000.00 6,460.00
Cat Penutup setara Glotex 2X Kg 0.1700 50,000.00 8,500.00
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Cat Oh 0.0750 95,000.00 7,125.00
Kepala Tukang Oh 0.0075 105,000.00 787.50
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 33,285.00
Dibulatkan 33,280.00
N-03 1 M2 Pengecatan Bidang Kayu lama Setara Pinotex
Plamir Kg 0.1500 30,000.00 4,500.00
Cat Dasar Kg 0.1700 38,000.00 6,460.00
Cat Penutup setara Pinotex 2X Kg 0.1700 57,000.00 9,690.00
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Cat Oh 0.0750 95,000.00 7,125.00
Kepala Tukang Oh 0.0075 105,000.00 787.50
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 34,475.00
Dibulatkan 34,470.00
N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Glotex 3 X laburan
Cat Meni Kg 0.2000 36,000.00 7,200.00
Plamir Kg 0.1500 30,000.00 4,500.00
Cat Dasar Kg 0.1700 38,000.00 6,460.00
Cat Penutup setara Glotex 3X Kg 0.3500 50,000.00 17,500.00
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Cat Oh 0.1050 95,000.00 9,975.00
Kepala Tukang Oh 0.0040 105,000.00 420.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 51,967.50
Dibulatkan 51,960.00
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve 2 X laburan
Cat Meni Kg 0.2000 36,000.00 7,200.00
Plamir Kg 0.1500 30,000.00 4,500.00
Cat Dasar Kg 0.1700 38,000.00 6,460.00
Cat Penutup setara Sieve 2X Kg 0.2600 50,000.00 13,000.00
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Cat Oh 0.0090 95,000.00 855.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 38,557.50
Dibulatkan 38,550.00
N-05 1 M2 Pelaburan Bidang Kayu dengan Politur
Politur Ltr 0.1500 60,000.00 9,000.00
Politur Jadi Ltr 0.3720 137,000.00 50,964.00
Ampelas Lbr 2.0000 6,000.00 12,000.00
Tukang Cat Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0160 105,000.00 1,680.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 79,656.50
Dibulatkan 79,650.00
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
Residu atau Ter Ltr 0.3500 9,000.00 3,150.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 11,900.00
Dibulatkan 11,900.00
N-07 1 M2 Pengecatan Tembok Setara ICI Exterior (weather shield)
Plamir Kg 0.1000 30,000.00 3,000.00
Cat Dasar Kg 0.1000 38,000.00 3,800.00
Cat Penutup setara ICI Exterior 2X Kg 0.2600 148,000.00 38,480.00
Pekerja Oh 0.0200 80,000.00 1,600.00
Tukang Cat Oh 0.0630 95,000.00 5,985.00
Kepala Tukang Oh 0.0063 105,000.00 661.50
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 53,839.00
Dibulatkan 53,830.00
N-07 1 M2 Pengecatan Tembok Setara ICI Interior
Plamir Kg 0.1000 30,000.00 3,000.00
Cat Dasar Kg 0.1000 38,000.00 3,800.00
Cat Penutup setara ICI Interior 2X Kg 0.2600 101,000.00 26,260.00
Pekerja Oh 0.0200 80,000.00 1,600.00
Tukang Cat Oh 0.0630 95,000.00 5,985.00
Kepala Tukang Oh 0.0063 105,000.00 661.50
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 41,619.00
Dibulatkan 41,610.00
N-08 1 M2 Pengecatan Tembok Lama Setara ICI Weather Shield
Cat Dasar Kg 0.1200 38,000.00 4,560.00
Cat Penutup setara ICI 2X Kg 0.1800 148,000.00 26,640.00
Pekerja Oh 0.0280 80,000.00 2,240.00
Tukang Cat Oh 0.0420 95,000.00 3,990.00
Kepala Tukang Oh 0.0042 105,000.00 441.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 38,183.50
Dibulatkan 38,180.00
N-09 1 M2 Pengecatan Plafond ( 3x ) setara ICI
Cat tembok setara ICI Kg 0.2000 101,000.00 20,200.00
Plamir tembok Kg 0.1600 30,000.00 4,800.00
Rol cat Bh 0.0100 38,000.00 380.00
Steger werk Ls 1.0000 1,000.00 1,000.00
Ampelas Lbr 0.5000 6,000.00 3,000.00
Pekerja setengah trampil Oh 0.2000 80,000.00 16,000.00
Tukang cat Oh 0.3000 95,000.00 28,500.00
Kepala tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 78,280.00
1 2 3 4 5 6=4x5
Dibulatkan 78,280.00
N-10 1 M2 Pengecatan Plafond ( 3x ) setara Vinilex
Cat tembok setara Vinilex Kg 0.2000 30,000.00 6,000.00
Plamir tembok Kg 0.1600 30,000.00 4,800.00
Rol cat Bh 0.0100 38,000.00 380.00
Steger werk Ls 1.0000 1,000.00 1,000.00
Ampelas Lbr 0.5000 6,000.00 3,000.00
Pekerja setengah trampil Oh 0.2000 80,000.00 16,000.00
Tukang cat Oh 0.3000 95,000.00 28,500.00
Kepala tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 64,080.00
Dibulatkan 64,080.00
N-10r 1 M2 Pengecatan Plafond ( 2x ) setara Vinilex
Cat tembok setara Vinilex Kg 0.1300 30,000.00 3,900.00
Plamir tembok Kg 0.1100 30,000.00 3,300.00
Rol cat Bh 0.0100 38,000.00 380.00
Steger werk Ls 0.6700 1,000.00 670.00
Ampelas Lbr 0.3300 6,000.00 1,980.00
Pekerja setengah trampil Oh 0.1300 80,000.00 10,400.00
Tukang cat Oh 0.2000 95,000.00 19,000.00
Kepala tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 42,980.00
Dibulatkan 42,980.00
N-11 1 M2 Pemasangan Wall Paper
Wall Paper M3 1.2000 61,500.00 73,800.00
Perekat Kg 0.2500 43,000.00 10,750.00
Pekerja Oh 0.3500 80,000.00 28,000.00
Tukang Cat Oh 0.1750 95,000.00 16,625.00
Kepala Tukang Oh 0.0170 105,000.00 1,785.00
Mandor Oh 0.0017 125,000.00 212.50
Jumlah 131,172.50
Dibulatkan 131,170.00
N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi
Meni Besi Kg 0.1000 36,000.00 3,600.00
Kuas Bh 0.0100 18,000.00 180.00
Pekerja Oh 0.0200 80,000.00 1,600.00
Tukang Cat Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 27,730.00
Dibulatkan 27,730.00
N-13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
Meni Besi Kg 0.1000 36,000.00 3,600.00
Kuas Bh 0.0100 18,000.00 180.00
Perancah Kayu M3 0.0020 2,504,000.00 5,008.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Cat Oh 0.2250 95,000.00 21,375.00
Kepala Tukang Oh 0.0225 105,000.00 2,362.50
Mandor Oh 0.0075 125,000.00 937.50
Jumlah 53,463.00
Dibulatkan 53,460.00
N-14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
Cat besi setara ICI Kg 0.3000 81,000.00 24,300.00
Pekerja Oh 0.0060 80,000.00 480.00
Tukang Cat Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0060 125,000.00 750.00
1 2 3 4 5 6=4x5
Jumlah 32,490.00
Dibulatkan 32,490.00
N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
Plamir Kg 0.1600 30,000.00 4,800.00
Cat Dasar Kg 0.1000 38,000.00 3,800.00
Cat Penutup setara Vinilex 3X Kg 0.3900 30,000.00 11,700.00
Pekerja Oh 0.0300 80,000.00 2,400.00
Tukang Cat Oh 0.1890 95,000.00 17,955.00
Kepala Tukang Oh 0.0189 105,000.00 1,984.50
Mandor Oh 0.0019 125,000.00 236.25
Jumlah 42,875.75
Dibulatkan 42,870.00
N-15r 1 M2 Pengecatan Tembok Setara Vinilex (2 x laburan)
Plamir Kg 0.1000 30,000.00 3,000.00
Cat Dasar Kg 0.1000 38,000.00 3,800.00
Cat Penutup setara Vinilex 2X Kg 0.3900 30,000.00 11,700.00
Pekerja Oh 0.0300 80,000.00 2,400.00
Tukang Cat Oh 0.0945 95,000.00 8,977.50
Kepala Tukang Oh 0.0095 105,000.00 997.50
Mandor Oh 0.0038 125,000.00 475.00
Jumlah 31,350.00
Dibulatkan 31,350.00
N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex
Cat Dasar Kg 0.1200 38,000.00 4,560.00
Cat Penutup setara Vinilex 2X Kg 0.1800 30,000.00 5,400.00
Pekerja Oh 0.0280 80,000.00 2,240.00
Tukang Cat Oh 0.0420 95,000.00 3,990.00
Kepala Tukang Oh 0.0042 105,000.00 441.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 16,943.50
Dibulatkan 16,940.00
D PEKERJAAN BETON
KODE
No. URAIAN SATUAN
ANAL
1 M2 Lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr. tebal 5 cm
1 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr D-01
2 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr D-02
3 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr D-03
4 1 M3 Tiang Pancang Prestressed Beton D-04
5 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 4 Kr D-05
6 1 M' Memasang PVC Waterstop Lebar 200 mm D-06
1 M' Memasang PVC Waterstop Lebar 150 mm
7 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir D-07
8 1 M2 Pasangan Bekisting untuk Pondasi D-08
9 1 M2 Pasangan Bekisting untuk Sloof D-09
10 1 M2 Pasangan Bekisting untuk Kolom D-10
11 1 M2 Pasangan Bekisting untuk Balok D-11
12 1 M2 Pasangan Bekisting untuk Lantai D-12
13 1 M2 Pasang Bekisting untuk Tangga D-13
14 1 M3 Membuat Beton Cor Mutu K225 D-14
15 1 M3 Membuat Beton Cor Mutu K275 D-15
16 1 M3 Pondasi Beton Tulang (150 kg besi+bekisting) D-16
17 1 M3 Sloof Beton Tulang (200 kg besi+bekisting) D-17
1 M3 Sloof Beton Tulang 15/20 cm (150 kg besi+bekisting)
1 M3 Sloof Beton Tulang 15/20 cm (180 kg besi+bekisting) 4 dia. 12 ring 8-15
1 M3 Sloof Beton Tulang 20/30 cm (150 kg besi+bekisting) 4 dia. 16 ring 8-15
1 M3 Sloof Beton Tulang 20/30 cm (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
1 M3 Sloof Beton Bertulang 20/40 cm (240 kg besi+bekisting) Struktur bertingkat
18 1 M3 Kolom Beton Tulang (120 kg besi+bekisting) D-18
19 1 M3 Kolom Beton Tulang (140 kg besi+bekisting) D-19
20 1 M3 Kolom Beton Tulang (150 kg besi+bekisting) D-20
21 1 M3 Kolom Beton Tulang (180 kg besi+bekisting) D-21
22 1 M3 Kolom Beton Tulang (200 kg besi+bekisting) D-22
23 1 M3 Kolom Beton Tulang (250 kg besi+bekisting) D-23
24 1 M3 Kolom Beton Tulang (300 kg besi+bekisting) D-24
1 M3 Kolom Beton Tulang 20/20 cm (140 kg besi+bekisting) 4 dia. 12, 8-15
1 M3 Kolom Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
1 M3 Kolom Beton Tulang 20/20 cm (210 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
1 M3 Kolom Beton Tulang 20/30cm (230 kg besi+bekisting) Struktur bertingkat 6 dia.16+2 dia.12, 8-15
1 M3 Kolom Beton Tulang 20/40 cm (250 kg besi+bekisting) Struktur bertingkat
1 M3 Kolom Beton Tulang 30/30 cm (175 kg besi+bekisting) Struktur bertingkat 8 dia. 16, 8-15
1 M3 Kolom Beton Tulang 30/30 cm (210 kg besi bekisting) Struktur bertingkat 10 dia. 16, 8-15
1 M3 Kolom Beton Tulang 30/40 cm (200 kg besi bekisting) Struktur bertingkat
1 M3 Kolom Beton Tulang Praktis 12/12 cm (175 kg besi+bekisting)
1 M3 Kolom Beton Tulang Praktis 12/12 cm (260 kg besi+bekisting) 4 dia. 10, 8-15
1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
25 1 M3 Balok Beton Tulang (120 kg besi+bekisting) D-25
26 1 M3 Balok Beton Tulang (150 kg besi+bekisting) D-26
27 1 M3 Balok Beton Tulang (200 kg besi+bekisting) D-27
28 1 M3 Balok Beton Tulang (230 kg besi+bekisting) D-28
1 M3 Balok Beton Tulang 15/20 cm (150 kg besi+bekisting)
1 M3 Balok Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
1 M3 Balok Beton Lintel 11/11 (300 kg besi+bekisting) 4 dia. 10, 8-15
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk+balok portal (180 kg besi+bekisting) 4 dia.12, 8-15
1 M3 Balok Beton Tulang 15/30 (190 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
1 M3 Balok Beton Tulang 20/40 (200 kg besi+bekisting) Struktur bertingkat 7 dia. 16+2 dia. 12, 8-15
1 M3 Balok Beton Tulang 20/30 (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
1 M3 Balok Beton Tulang 20/30 (175 kg besi+bekisting) Struktur bertingkat 5 dia. 16, 8-15
1 M3 Balok Beton Tulang 25/55 (140 kg besi+bekisting) Struktur bertingkat 8 dia. 16+2 dia. 12, 8-15
1 M3 Balok Beton Tulang 30/60 (110 kg besi+ bekisting) Struktur bertingkat 9 dia. 19+2 dia. 12, 8-15
KODE
No. URAIAN SATUAN
ANAL
29 1 M3 Tangga Beton Tulang (200 kg besi+bekisting) D-29
30 1 M3 Plat Lantai Tb. 10 Cm Beton Bertulang (90 kg besi+bekisting) D-30
31 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (110 kg besi+bekisting) D-31
32 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (130 kg besi+bekisting) D-32
33 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (90 kg besi+bekisting) D-33
34 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (115 kg besi+bekisting) D-34
35 1 M' Kolom Praktis Beton Tulang ( 11 x 11 ) Cm D-35
36 1 M' Ring Balok Beton Tulang ( 10 x 15 ) Cm D-36
37 1 M2 Pasang Bekisting untuk Dinding D-37
38 1 M3 Pelat Beton Tulang (150 kg besi+bekisting) D-38
39 1 M3 Dinding Beton Tulang (150 kg besi+bekisting) D-39
40 1 M3 Dinding Beton Tulang (200 kg besi+bekisting) D-40
41 1 M3 Membuat Beton Cor Mutu K300 D-41
42 1 M3 Membuat Beton Cor Mutu K200 D-42
43 1 M3 Membuat Beton Cor Mutu K250 D-43
1 M3 Membuat Beton dengan Puzzdith - 100 XR
1 M3 Membuat Beton Kedap Air dengan AM - 100
1 Kg Kabel Presstressed Polos / Strands
1 Kg Jaring Kawat Baja
1 M3 Membuat Beton Cor Mutu K175
1 M2 Pasangan Jembatan Cor
1 M3 Listplank Beton Tulang T=8 cm ( 77,50 kg besi + bekisting )
E PEKERJAAN DINDING
1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps E-01
2 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps E-02
3 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps E-03
4 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps E-04
5 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps E-05
6 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps E-06
7 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 3 ps E-07
8 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 4 ps E-08
9 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm E-09
10 1 M2 Pasang Dinding Batako Besar Pres uk. 8 x 20 x 30 ad. 1pc : 4ps E-10
11 1 M2 Pasang Dinding Hollowblock (HB-20) E-11
12 1 M2 Pasang Dinding Hollowblock (HB-15) E-12
13 1 M2 Pasang Dinding Hollowblock (HB-10) E-13
14 1 M2 Pasang Dinding Conblock (CB-20) E-14
15 1 M2 Pasang Dinding Conblock (CB-15) E-15
16 1 M2 Pasang Dinding Conblock (CB-10) E-16
17 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Mulia E-17
18 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Mulia E-18
19 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Mulia E-19
20 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Mulia E-20
21 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Mulia E-21
22 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Mulia E-22
23 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia E-23
24 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia E-24
25 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Mulia E-25
26 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Mulia E-26
27 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Roman E-27
28 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Roman E-28
29 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Roman E-29
30 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Roman E-30
31 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Roman E-31
32 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Roman E-32
33 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Roman E-33
34 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Roman E-34
KODE
No. URAIAN SATUAN
ANAL
35 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Roman E-35
36 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Roman E-36
36 1 M2 Pasang Dinding Keramik 20 x 40 Cm corak setara Roman E-36
37 1 M2 Pasang Dinding Marmer E-37
38 1 M2 Pasang Dinding Batu Tempel Hitam E-38
39 1 M2 Pasang Dinding Poslin 11 x 11 Cm E-39
40 1 M2 Wall paper E-40
41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan E-41
42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan E-42
43 1 M2 Dinding Pemisah Triplek Rangkap, Rangka Kayu Kamper Medan E-43
44 1 M2 Dinding Pemisah GRC tb. 4 mm + rangka besi hollow E-44
45 1 M2 Dinding Pemisah Gypsum dobel tb. 9 mm + rangka besi hollow E-45
46 1 M2 Dinding Plywood tb. 4 mm + rangka besi hollow E-46
47 1 M2 Dinding Teakwood tb. 4 mm + rangka besi hollow E-47
48 1 M2 Pasang Dinding Glass Block 20 x 20 ad. 1pc : 4 ps E-48
49 1 M2 Pasang Dinding Anyaman Bambu, rangka kayu E-49
F PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm F-01
2 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm F-02
3 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm F-03
1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm + Acian
4 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm F-04
5 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm F-05
6 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm F-06
7 1 M2 Barapen 1 Pc : 5 Ps, Tebal 15 mm F-07
8 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm F-08
9 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm F-09
10 1 M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm F-10
11 1 M2 Acian Plesteran F-11
12 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps batu belah F-12
13 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps dinding bata merah F-13
1M2 Waterprofing Layer UV
G PEKERJAAN PENUTUP ATAP
1 1 M2 Pasang Atap Genteng Pelentong G-01
1 M2 Pasang Atap Genteng Pelentong Existing (Lama)
2 1 M2 Pasang Genteng Bubungan Palentong G-02
3 1 M2 Pasang Roof Ligt Fiberglass ( 180 x 90 ) Cm G-03
4 1 M2 Pasang Atap Asbes Gelombang ( 3.00 x 1.05 m ) x 4 mm G-04
5 1 M2 Pasang Atap Asbes Gelombang ( 2.70 x 1.05 m ) x 4 mm G-05
6 1 M2 Pasang Atap Asbes Gelombang ( 2.40 x 1.05 m ) x 4 mm G-06
7 1 M2 Pasang Atap Asbes Gelombang ( 2.10 x 1.05 m ) x 4 mm G-07
8 1 M2 Pasang Atap Asbes Gelombang besar 80 x 180 x 5 mm G-08
9 1 M' Pasang Nok Stel Gelombang 1.05 m G-09
10 1 M2 Pasang Atap Genteng Beton G-10
11 1 M2 Pasang Atap Genteng Morando Natural G-11
12 1 M2 Pasang Atap Genteng Morando Glasur G-12
13 1 M2 Pasang Atap Genteng Metal G-13
14 1 M' Pasang Nok Genteng Beton G-14
15 1 M' Pasang Nok Genteng Metal G-15
16 1 M2 Pasang Atap Seng Gelombang G-16
17 1 M2 Pasang Atap Nok Seng G-17
18 1 M2 Pasang Alluminium Foil / Sisalation G-18
19 1 M2 Pasang Atap Alluminium Natural G-19
20 1 M2 Pasang Atap Alluminium Warna G-20
21 1 M2 Pasang Nol Alluminium G-21
22 1 M' Pasang Listplang GRC lebar 30 Cm G-22
1 M' Pasang Listplang GRC lebar 30 Cm , tebal 9 mm
KODE
No. URAIAN SATUAN
ANAL
23 1 M' Pasang Nok Pinggir Morando Natural G-23
1 M' Pasang Bubungan Stel Gelombang 0.92 m
1 M' Pasang Nok Sirap
1 M' Pasang Genteng Bubungan Morando Naatural
1 M' Pasang Genteng Bubungan Morando Glazur
1 M2 Pasang Water Proofing Membrance tb. 3 mm
1M2 Waterprofing Mortar
H PEKERJAAN LANGIT - LANGIT
1 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 5 mm H-01
2 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 3.5 mm H-02
3 1 M2 Langit - langit Akustik (60x120) Cm H-03
4 1 M2 Langit - langit Akustik 60x120 Cm dan Rangka alluminium H-04
5 1 M2 Langit - Langit Teakwood (60 x 120) cm, t = 4 mm + Rangka kayu Borneo Super H-05
6 1 M2 Langit - Langit Teakwood 3 mm + Rangka kayu Borneo Super H-06
7 1 M2 Langit - Langit Triplek 4 mm + Rangka kayu Borneo Super H-07
8 1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 2/4 H-08
1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 4/4 H-08
9 1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 2/4 H-09
1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 4/4 H-09
1 M2 Langit - Langit Triplek 4 mm
10 1 M2 Langit - Langit Gypsum Board, tb. 9 mm H-10
11 1 M2 Langit - Langit GRC, tb. 4 mm H-11
12 1 M1 List Langit - langit Kayu Profil 10 cm H-12
13 1 M1 List Langit - langit Gypsum 10 cm H-13
14 1 M1 List Langit - langit kayu borneo 1/4 cm H-14
M PEKERJAAN SANITASI
1 1 Buah Closet Jongkok Proselen Standar M-01
2 1 Buah Urinoir M-02
3 1 Buah Wastafel M-03
4 1 Buah Bak Mandi Fibreflass volume 0,30 M3 M-04
5 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm M-05
6 1 Buah Bak kontrol Pas. Bata Merah Uk (60 x 60) cm M-06
7 1 Buah Bak kontrol Pas. Bata Merah Uk (30 x 30) cm M-07
8 1 M¹ Pipa PVC Type AW Ø ½" M-08
9 1 M¹ Pipa PVC Type AW Ø 1" M-09
10 1 M¹ Pipa PVC Type AW Ø 1½" M-10
11 1 M¹ Pipa PVC Type AW Ø 2" M-11
1 M¹ Pipa PVC Type AW Ø 2½"
1 M¹ Pipa PVC Type AW Ø 3"
12 1 M¹ Pipa PVC Type AW Ø 4" M-12
13 1 M¹ Pipa PVC Type AW Ø ¾" M-13
14 1 Buah Bak Cuci Piring Stainles Steel M-14
15 1 Buah Kran Ø ½" atau ¾" M-15
16 1 Buah Floor Drain M-16
17 1 M' Grafel beton U 20 cm -60 cm M-17
KODE
No. URAIAN SATUAN
ANAL
18 1 M' Pasang Talang Plastik PVC U 15 cm (AW) M-18
19 1 M' Saluran Air Limbah Buis beton Ø 60 cm M-19
20 1 M' Pasang Talang Seng Datar M-20
21 1 Buah Closet Duduk M-21
22 1 Buah Tangki Air fibreglass Volume 1 m3 M-22
23 1 Unit Septictank 2 x 1,50 x 1,50 M + Rembesannya M-23
24 1 Unit Septictank 1 x 1,50 x 1,50 M + Rembesannya M-24
1 M¹ Pipa Galvanis Ø ½"
1 M¹ Pipa Galvanis Ø ¾"
1 M¹ Pipa Galvanis Ø 1"
1 M¹ Pipa Galvanis Ø 1½"
1 M¹ Pipa Galvanis Ø 3"
1 M¹ Pipa Galvanis Ø 4"
1 Buah Bak kontrol Pas. Batu Bata (45 x 45) cm, Tinggi 50 cm
1 M' Saluran Air Hujan Lbr. 20 cm
1 M' Perbaikan Saluran Air Hujan Lbr. 20 cm
N PEKERJAAN PENGECATAN
1 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama N-01
2 1 M2 Mendempul dan Menggosok Kayu N-02
3 1 M2 Pengecatan Bidang Kayu dan Besi lama Setara Glotex N-03
1 M2 Pengecatan Bidang Kayu lama Setara Pinotex
4 1 M2 Pengecatan Bidang Kayu Baru Setara Glotex 3 X laburan N-04
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve 2 X laburan
5 1 M2 Pelaburan Bidang Kayu dengan Politur N-05
6 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter N-06
7 1 M2 Pengecatan Tembok Setara ICI Exterior (weather shield) N-07
8 1 M2 Pengecatan Tembok Lama Setara ICI Weather Shield N-08
9 1 M2 Pengecatan Plafond ( 3x ) setara ICI N-09
10 1 M2 Pengecatan Plafond ( 3x ) setara Vinilex N-10
1 M2 Pengecatan Plafond ( 2x ) setara Vinilex N-10r
11 1 M2 Pemasangan Wall Paper N-11
12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi N-12
13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah N-13
14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um N-14
15 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan) N-15
1 M2 Pengecatan Tembok Setara Vinilex (2 x laburan) N-15r
16 1 M2 Pengecatan Tembok Lama Setara Vinilex 16
323,550.00
419,550.00
281,230.00
67,260.00
28,410.00
1,416,730.00
1,126,420.00
1,051,720.00
14,250.00
143,830.00
574,980.00
537,480.00
555,700.00
148,500.00
334,530.00
56,450.00
80,620.00
329,000.00
8,120.00
2,850.00
37,000.00
48,650.00
67,980.00
57,810.00
76,210.00
4,620.00
10,370.00
17,730.00
46,250.00
264,050.00
45,070.00
301,520.00
144,320.00
172,400.00
261,170.00
242,990.00
888,580.00
837,790.00
802,570.00
447,720.00
2,351,150.00
1,059,400.00
974,750.00
1,266,170.00
990,940.00
1,231,740.00
129,660.00
402,230.00
815,620.00
HARGA
SATUAN
128,360.00
863,690.00
833,650.00
1,190,360.00
1,226,020.00
1,129,560.00
75,660.00
67,260.00
20,730.00
189,050.00
205,280.00
370,260.00
376,790.00
508,860.00
343,760.00
1,640,270.00
1,627,050.00
4,884,820.00
6,217,020.00
5,344,020.00
5,857,020.00
5,317,020.00
6,217,020.00
6,964,020.00
7,449,170.00
7,809,170.00
7,989,170.00
8,529,170.00
8,889,170.00
9,789,170.00
10,689,170.00
7,719,170.00
8,439,170.00
8,979,170.00
9,339,170.00
9,789,170.00
8,349,170.00
8,979,170.00
8,889,170.00
7,320,170.00
8,850,170.00
8,888,270.00
9,788,270.00
10,688,270.00
6,635,540.00
7,287,740.00
7,512,370.00
8,669,990.00
7,190,390.00
7,658,390.00
9,570,170.00
7,658,390.00
7,838,390.00
8,043,140.00
8,043,140.00
7,593,140.00
6,963,140.00
6,423,140.00
HARGA
SATUAN
7,562,820.00
8,144,660.00
7,709,460.00
8,124,060.00
6,450,150.00
6,968,400.00
83,780.00
110,420.00
405,090.00
7,417,520.00
7,169,390.00
7,543,980.00
1,094,250.00
1,010,970.00
1,054,470.00
1,036,810.00
1,318,920.00
20,190.00
66,070.00
1,089,090.00
115,200.00
7,035,730.00
270,700.00
261,380.00
257,060.00
130,250.00
126,630.00
124,350.00
677,410.00
674,640.00
677,410.00
100,070.00
185,810.00
182,640.00
137,690.00
229,630.00
171,100.00
133,600.00
142,990.00
140,990.00
145,990.00
140,990.00
140,990.00
145,990.00
135,990.00
140,990.00
148,990.00
146,990.00
162,990.00
146,990.00
165,990.00
146,990.00
157,990.00
163,990.00
157,990.00
162,990.00
HARGA
SATUAN
162,990.00
167,990.00
165,990.00
894,980.00
123,140.00
151,990.00
121,980.00
397,310.00
516,290.00
351,600.00
107,390.00
224,460.00
161,750.00
119,890.00
998,640.00
127,320.00
50,700.00
48,080.00
46,380.00
45,550.00
66,180.00
63,440.00
60,770.00
35,210.00
62,610.00
59,970.00
53,310.00
30,180.00
54,640.00
31,270.00
105,000.00
70,960.00
20,960.00
106,650.00
86,370.00
53,140.00
56,360.00
54,240.00
55,460.00
107,700.00
107,460.00
129,820.00
74,960.00
101,960.00
260,970.00
136,410.00
206,400.00
81,210.00
37,850.00
39,270.00
247,950.00
276,830.00
200,230.00
56,230.00
75,660.00
HARGA
SATUAN
37,420.00
44,760.00
91,670.00
108,150.00
122,150.00
173,300.00
58,500.00
37,710.00
33,860.00
236,670.00
348,780.00
1,593,400.00
1,592,430.00
1,563,570.00
110,030.00
111,230.00
107,390.00
108,590.00
53,320.00
69,050.00
66,060.00
46,640.00
21,170.00
12,510.00
533,770.00
514,710.00
491,260.00
18,410.00
28,900.00
120,440.00
123,440.00
113,440.00
118,440.00
126,440.00
124,440.00
140,440.00
143,440.00
135,440.00
140,440.00
140,440.00
145,440.00
837,130.00
601,480.00
24,500.00
36,240.00
49,540.00
38,870.00
495,990.00
199,830.00
234,480.00
192,480.00
206,130.00
385,680.00
283,650.00
421,591.50
HARGA
SATUAN
14,977,500.00
10,703,100.00
10,106,700.00
773,440.00
633,040.00
385,690.00
516,980.00
909,940.00
478,470.00
690,980.00
478,470.00
561,450.00
656,450.00
806,700.00
9,687,000.00
9,140,300.00
105,430.00
119,200.00
81,650.00
111,340.00
40,760.00
202,300.00
132,800.00
156,240.00
57,270.00
9,095,400.00
83,370.00
597,750.00
51,750.00
22,660.00
1,040.00
3,900.00
602,420.00
451,420.00
286,080.00
71,770.00
150,920.00
220,310.00
215,720.00
219,130.00
234,530.00
125,630.00
153,130.00
1,038,840.00
887,020.00
948,620.00
485,020.00
636,120.00
259,100.00
802,420.00
716,140.00
196,000.00
667,430.00
816,110.00
830,350.00
HARGA
SATUAN
551,300.00
36,690.00
80,990.00
56,790.00
188,060.00
2,756,960.00
3,952,900.00
5,141,340.00
2,850,480.00
4,852,520.00
6,500,000.00
4,006,420.00
4,115,920.00
3,864,450.00
1,528,750.00
956,080.00
1,105,140.00
1,577,010.00
2,048,880.00
2,754,340.00
1,764,130.00
2,949,100.00
2,482,000.00
7,156,100.00
3,201,520.00
250,970.00
189,470.00
152,730.00
40,210.00
27,910.00
25,110.00
519,060.00
283,060.00
132,610.00
164,510.00
477,640.00
2,735,760.00
1,169,890.00
835,570.00
201,220.00
782,700.00
548,940.00
26,640.00
35,760.00
53,980.00
58,030.00
83,000.00
108,310.00
167,030.00
43,710.00
472,730.00
57,080.00
85,470.00
94,480.00
HARGA
SATUAN
146,330.00
267,080.00
102,860.00
1,873,020.00
2,077,180.00
11,080,730.00
5,988,670.00
49,720.00
64,570.00
71,100.00
111,620.00
280,720.00
291,880.00
417,070.00
93,750.00
41,390.00
14,280.00
12,500.00
33,280.00
34,470.00
51,960.00
38,550.00
79,650.00
11,900.00
53,830.00
38,180.00
78,280.00
64,080.00
42,980.00
131,170.00
27,730.00
53,460.00
32,490.00
42,870.00
31,350.00
16,940.00
34,740.00
64,740.00
14,070.00
13,900.00