Anda di halaman 1dari 110

DAFTAR HARGA SATUAN UPAH

HARGA UPAH
NO URAIAN SATUAN UPAH UPAH
ORANG/JAM ORANG/HARI

1 Mandor org/Hari/8 jam Rp 15,625.00 Rp 125,000.00


2 Kepala Tukang Batu org/Hari/8 jam Rp 13,125.00 Rp 105,000.00
3 Kepala Tukang Kayu org/Hari/8 jam Rp 13,125.00 Rp 105,000.00
4 KepalaTukang Besi/Alumunium org/Hari/8 jam Rp 13,125.00 Rp 105,000.00
5 Kepala Tukang Cat/Pelitur org/Hari/8 jam Rp 13,125.00 Rp 105,000.00
6 Kepala Tukang Listrik org/Hari/8 jam Rp 13,125.00 Rp 105,000.00
7 Tukang Batu org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
8 Tukang Kayu org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
9 Tukang Besi/Baja org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
10 Tukang Alumunium org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
11 Tukang Cat org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
12 Tukang Listrik org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
13 Tukang Pipa org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
14 Tukang Plitur org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
15 Tukang Taman org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
16 Tukang org/Hari/8 jam Rp 11,875.00 Rp 95,000.00
17 Pembantu Tukang org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
18 Pekerja Biasa org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
19 Penjaga Malam org/Hari/8 jam Rp 11,250.00 Rp 90,000.00
20 Supir org/Hari/8 jam Rp 11,250.00 Rp 90,000.00
21 Operator org/Hari/8 jam Rp 31,250.00 Rp 250,000.00
22 Mekanik org/Hari/8 jam Rp 12,500.00 Rp 100,000.00
23 Pembantu Supir org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
24 Pembantu Operator org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
25 Pembantu Mekanik org/Hari/8 jam Rp 10,000.00 Rp 80,000.00

Harga Sudah Termasuk Profit / Keuntungan


DAFTAR HARGA SATUAN BAHAN / MATERIAL

NO URAIAN SAT. HARGA

A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m3 199,000.00
2 Tanah Urug Pilihan m3 101,000.00
3 Sirtu m3 232,000.00
4 Pasir Teras m3 198,000.00
5 Pasir Pasang Kali m3 265,000.00
6 Pasir Beton m3 290,000.00
7 Abu Batu m3 294,000.00
8 Batu Gosok ( Apung ) kg 33,000.00
9 Batu Pecah Mesin 1/2 m3 254,000.00
10 Batu Pecah Mesin 2/3 m3 240,000.00
11 Batu Pecah Mesin 3/5 m3 233,000.00
12 Batu Pecah Mesin 5/7 m3 222,000.00
13 Batu Belah Pondasi m3 233,000.00
14 Batu Bronjol ( Untuk Bronjong ) m3 205,000.00
15 Batu Koral Beton Kali m3 196,000.00
16 Batu Tempel Hitam m3 110,000.00
17 Batu Pinggir Beton 10 x 20 x 35 bh 16,000.00
18 Batu Pinggir Beton 15 x 35 x 50 ( K-225 ) bh 83,000.00
19 Batu Telor m3 111,000.00
20 Batako Kecil 8 x 10 x 20 bh 2,500.00
21 Batako Besar 8 x 20 x 30 bh 2,700.00
22 Con Blok 8 x 20 x 40 bh 6,000.00
23 Bata Merah Bakar kelas I bh 850.00
24 Bata Merah Bakar kelas II bh 750.00
25 Bata Merah Oven ( Klingker ) bh 2,000.00
26 Roster Beton 20 x 20 bh 17,000.00
27 Roster Beton 30 x 30 bh 18,000.00
28 Grass Blok 20 x 20 bh 11,000.00
29 Grass Blok 30 x 30 m3 16,000.00
30 Paving Blok Natural 8 cm m3 98,000.00
31 Paving Blok Warna 8 cm m3 131,000.00
32 Paving Blok Natural 6 cm m3 91,000.00
33 Paving Blok Warna 6 cm m3 104,000.00
34 Canstin Paving Blok m1 42,000.00
35 Semen PC /50 kg zak 85,000.00
Semen PC kg 1,540.00
36 Semen Putih zak 102,000.00
37 Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm bh 71,000.00
38 Readymix Beton K500, Tanpa Pompa ( Selang ) m3 1,386,000.00
39 Readymix Beton K400, Tanpa Pompa ( Selang ) m3 1,248,000.00
40 Readymix Beton K350, Tanpa Pompa ( Selang ) m3 1,220,000.00
41 Readymix Beton K300, Tanpa Pompa ( Selang ) m3 1,219,000.00
42 Readymix Beton K225, Tanpa Pompa ( Selang ) m3 1,165,000.00
43 Readymix Beton K175, Tanpa Pompa ( Selang ) m3 1,062,000.00
44 Kapur Pasang / Kapur Tembok m3 427,000.00
45 Kapur Sirih kg 22,000.00
46 Semen Warna kg 16,000.00
47 Tanah liat m3 37,000.00
48 Air ltr 350.00
49 Formite/spacer bh 2,800.00
50 Hollow/Con Blok 8 x 20 x 40 bh 5,700.00
51 Hollow/Con Blok 8 x 15 x 40 bh 6,500.00
52 Hollow/Con Blok 8 x 10 x 40 bh 3,500.00
NO URAIAN SAT. HARGA

B LABURAN,PENGISI DAN ALATNYA


1 Plamir Tembok kg 30,000.00
2 Cat Tembok ICI Eksterior ( Beton ) lt 148,000.00
3 Cat Tembok ICI Interior ( Plafon Dan Dinding ) lt 90,000.00
4 Cat Tembok Vinilex kg 30,000.00
5 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt 101,000.00
6 Cat Tembok Sanlek kg 24,000.00
7 Cat Dasar kg 38,000.00
8 Cat Tahan Asam lt 49,000.00
9 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) kg 110,000.00
10 Cat Marka / Spotlight kg 225,000.00
11 Water Profing Emulsion ml 88,000.00
12 Water Profing Membrance bh 74,000.00
13 Rool Cat Tembok bh 38,000.00
14 Kape Tembok bh 10,000.00
15 Kape Kayu 5 lt 11,000.00
16 Soligneum 1 Blek kg 28,000.00
17 Plincote kg 35,000.00
18 Penawetan Kayu m3 434,000.00
19 Pegopenan Kayu bh 429,000.00
20 Kwas 3" kg 18,000.00
21 Oker bks 25,000.00
22 Oyan bks 6,000.00
23 Oten ( Pewarna Plitur ) lt 6,000.00
24 Spirtus kg 19,000.00
25 Bahan Pelitur Kripik ( Sirlak India ) kg 126,000.00
26 Dempul Lilin kg 38,000.00
27 Dempul Plitur kg 44,000.00
28 Dempul Halus / Imfra ( Wood Filler ) lt 46,000.00
29 Dempul Jadi kg 44,000.00
30 Politur lt 60,000.00
31 Politur Jadi lt 137,000.00
32 Terpentin kg 23,000.00
33 Tiner A kg 28,000.00
34 Tiner B kg 26,000.00
35 Kumpon zak 37,000.00
36 Melamik kg 63,000.00
37 Dempul Plastik kg 47,000.00
38 Dempul Duco kg 44,000.00
39 Ampelas kg 6,000.00
40 Dempul Kayu Cap Kucing kg 29,000.00
41 Meni Kayu / Besi kg 36,000.00
42 Sincromat kg 49,000.00
43 Cat Kayu Glotex kg 50,000.00
43 Cat Kayu Pinotex kg 57,000.00
44 Cat Besi lt 53,000.00
45 Cat Besi Duco Danaglos / ICI kg 92,000.00
46 Cat Bron kg 81,000.00
47 Karet lis bh 4,000.00
48 Minyak cat kg 46,000.00
Steger werk Ls 1,000.00
49 Glass beet kg 61,000.00
50 Residu lt 9,000.00

C BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu 5 s.d 7 bt 21,000.00
2 Bambu 7 s.d 10 bt 30,000.00
NO URAIAN SAT. HARGA

3 Bambu Gombong bt 46,000.00


4 Kayu Kamper Singkil / Kapur ( Kayu Samarinda kls II ) m3 8,585,000.00
5 Kayu Balok Borneo Super m3 6,391,000.00
6 Kayu Papan Borneo Super m3 6,771,000.00
7 Kayu Balok Kamper Medan (Kruing ) m3 6,888,000.00
8 Kayu Papan Kamper Medan (Kruing ) m3 7,046,000.00
9 Kayu Balok Kamper Banjar m3 7,700,000.00
10 Kayu Papan Kamper Banjar m3 8,041,000.00
11 Kayu Balok Kamper Samarinda m3 10,450,000.00
12 Kayu Papan Kamper Samarinda m3 10,556,000.00
13 Kayu Balok Rasamala m3 3,216,000.00
14 Kayu Jati Jatim Tua dia. 40 cm m3 25,135,000.00
15 Kayu Jati Jateng Tua dia. 40 cm m3 26,851,000.00
16 Kayu Jati Jabar Tua dia. 40 cm m3 16,500,000.00
17 Kayu Jati Jabar Tua dia. 40 cm kebawah m3 15,411,000.00
18 Kayu Hutan Kelas I ( Segeng,Mahoni, Laban ) m3 2,504,000.00
19 Kayu Balok Albasia m3 2,263,000.00
20 Kayu Papan Albasia m3 2,506,000.00
21 Dolken 5 s/d 7 bt 27,000.00
22 Dolken 7 s/d 10 bt 33,000.00
23 List Profil Kamper 1 cm m1 10,000.00
24 List Profil Kamper 2 cm m1 11,000.00
25 List Profil Kamper 4 cm m1 16,000.00
26 List Profil Kamper 5 cm m1 20,000.00
27 List Profil Kamper 10 cm m1 35,000.00
28 Pegangan Tangga Profil Jati m1 194,000.00
29 Pegangan Tangga Profil Kamper m1 148,000.00
30 Kayu Kaso 4/6 m3 3,354,000.00
31 Kayu Kaso 5/7 m3 4,061,000.00
32 Kayu Reng 2/3 Borneo Super m1 2,000.00
33 Kayu Reng 2/3 Kamper Banjar m1 3,000.00
34 Kayu Reng 3/4 Kamper Banjar m3 4,000.00
35 Kayu Papan Terentang m3 3,245,000.00
36 Kayu Balok Terentang m3 2,975,000.00
37 Batang Kelapa bt 323,000.00
38 Tali Ijuk kg 28,000.00
39 Lapisan Ijuk tebal 10 cm m2 26,000.00
40 Venetion Blind m2 651,000.00
41 Vertikal Blind m2 425,000.00
42 List Kayu 1/4 kayu Borneo m1 3,000.00

D BAHAN PENUTUP RANGKA PLAFOND


1 Plafond Enternit 4 mm m2 18,500.00
2 Plafond hardpleks 5 mm 120 x 240 lbr 68,700.00
3 Plafond Asbes Semen 5 mm m2 25,000.00
4 Plafond Asbes Semen 3,5 mm m2 21,500.00
5 Gypsum 120 x 240 t= 9 mm ex DN lbr 87,800.00
6 Gypsum 120 x 240 t= 9 mm ex Luar lbr 92,200.00
7 Tepung Gypsum kg 13,800.00
8 Acustik Amstrong 60 x 120 lbr 146,500.00
9 Cotton Plester bh 16,500.00
10 GRC board ( 120 x 240 x 4 ) mm lbr 74,500.00
11 Cornice Coumpound zak 83,000.00
12 List gypsum m1 9,000.00
Kalsiplank uk. 3000x300x9 mm lbr 65,800.00

E BAHAN KAYU LAPIS


NO URAIAN SAT. HARGA

1 Triplek 3 mm 120 x 240 lbr 65,000.00


2 Triplek 4 mm 120 x 240 lbr 68,500.00
3 Triplek 4 mm ukuran Pintu lbr 60,500.00
4 Triplek 6 mm 120 x 240 lbr 98,500.00
5 Triplek 9 mm 120 x 240 lbr 183,500.00
6 Jabar Wood 4 mm lbr 132,500.00
7 Bilik Bambu ( tanpa kulit ) m2 22,500.00
8 Bilik Bambu ( dengan kulit ) m2 25,000.00
9 Bilik Bambu Hitam Variasi m2 37,700.00
10 Wall paper m2 61,500.00
11 Multiplek 9 mm 120 x 240 lbr 166,500.00
12 Multiplek 12 mm 120 x 240 lbr 215,000.00
13 Multiplek 18 mm 120 x 240 lbr 282,500.00
14 Playwood 18 mm 120 x 240 m3 357,500.00
15 Playwood 9 mm 120 x 240 lbr 260,000.00
16 Playwood 4 mm 120 x 240 lbr 145,000.00
17 Teakwood 3 mm 120 x 240 lbr 142,500.00
18 Teakwood 4 mm 120 x 240 lbr 145,000.00
19 Teakwood 3 mm 120 x 240 ukuran Pintu lbr 140,000.00
20 Teakwood ukuran Pintu 4 mm lbr 127,500.00
21 Tacon ( Tahan Bakar ) m2 142,500.00
22 Supercon m2 61,500.00
23 Melamin 4 mm 120 x 240 lbr 98,500.00
24 Melamin TOK 4 mm lbr 147,000.00
25 Formika 120 x 240 lbr 175,000.00
26 Formika ukuran Pintu lbr 147,500.00
27 Formika Warna 4" x 8" lbr 262,500.00
27 HPL lbr 175,000.00

F BAHAN LANTAI DAN PELAPIS DINDING


1 Tegel PC 20 x 20 bh 4,000.00
2 Plin Tegel PC 10 x 20 bh 2,000.00
3 Tegel PC 30 x 30 bh 4,000.00
4 Plin Tegel PC 15 x 30 bh 3,000.00
5 Tegel Warna 20 x 20 bh 4,000.00
6 Plin Tegel Warna 10 x 20 bh 3,000.00
7 Tegel Warna 30 x 30 bh 6,000.00
8 Plin Tegel Warna 15 x 30 bh 7,000.00
9 Tegel Wafel PC 20 x 20 bh 3,000.00
10 Tegel Wafel Warna 20 x 20 bh 2,000.00
11 Tegel Badak PC 30 x 30 bh 4,000.00
12 Poslin 11 x 11 Warna Standar DN m2 77,000.00
13 Poslin 11 x 11 Warna khusus DN m2 82,000.00
14 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia m2 66,000.00
15 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia m2 68,000.00
16 Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia m2 71,000.00
17 Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia m2 66,000.00
18 Keramik 20 x 25 Dinding KM KW I DN Corak Mulia m2 71,000.00
19 Keramik 30 x 30 KWI DN Putih Polos Mulia m2 61,000.00
20 Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 66,000.00
21 Keramik 40 x 40 KWI DN Putih Polos Mulia m2 74,000.00
22 Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 72,000.00
23 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman m2 72,000.00
24 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman m2 88,000.00
25 Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman m2 91,000.00
26 Keramik 20 x 20 (KM) KW I DN Putih Polos Roman m2 89,000.00
27 Keramik 20 x 25 Dinding KM KW I DN Corak Roman m2 89,000.00
NO URAIAN SAT. HARGA

27 Keramik 20 x 40 Dinding KM KW I DN Corak Roman m2 91,000.00


28 Keramik 20 x 25 KW I DN Putih Polos Roman m2 83,000.00
28 Keramik 30 x 30 KW I DN Polos Roman m2 83,000.00
29 Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman m2 88,000.00
30 Keramik 40 x 40 KW I DN Polos Roman m2 88,000.00
31 Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman m2 93,000.00
32 Vinyl Lantai Standar m2 72,000.00
33 Karpet Kelas Baik LN m2 1,241,000.00
34 Karpet Kelas Sedang LN m2 427,000.00
35 Parquet Jati m2 454,000.00
36 Stairnosing Keramik 10/20 bh 17,000.00
37 Stairnosing Fiber m 27,000.00
38 Taraso Kerang 30 x 30 m2 38,000.00
39 Plin Taraso 10 x 30 bh 16,000.00
40 Granit Alam LN Ukuran Besar m2 2,236,000.00
41 Granit Alam LN Ukuran Kecil m2 1,951,000.00
42 Granit Alam DN Ukuran Besar m2 1,610,000.00
43 Granit Alam DN Ukuran Kecil m2 1,572,000.00
44 Granito Tile Essenza Ukuran 40 x 40 Polis m2 418,000.00
45 Granito Tile Essenza Ukuran 30 x 30 m3 391,000.00
46 Granito Tile Essenza Ukuran 40 x 40 UnPolis m2 248,000.00
47 Marmer m2 665,000.00
48 Marmer Alam Lampung Ukuran Besar m2 666,000.00
49 Marmer Alam Lampung Ukuran kecil m2 418,000.00
50 Marmer Alam Citatah Ukuran Besar m2 412,000.00
51 Marmer Alam Citatah Ukuran Kecil m2 288,000.00
52 Marmer Sintetis m2 192,000.00
53 Granito Tile Essenza 60 x 60 Polis M2 434,000.00
54 Granito Tile Essenza 60 x 60 UnPolis M2 280,000.00
55 Batu Tempel Hitam m2 117,000.00
56 Bata Karawang bh 650.00
57 Campuran untuk Kedap Air ( AM ) ltr 41,500.00
58 Plint keramik 10 x 20 bh 3,500.00
59 Plint keramik 10 x 25 bh 4,000.00
60 Plint keramik 10 x 30 bh 4,000.00
61 Plint keramik 10 x 40 bh 4,500.00
62 Plint keramik 15 x 30 bh 5,000.00
63 Plint keramik 15 x 40 bh 5,500.00
64 Plint granito 10 x 30 bh 2,000.00
65 Plint granito 10 x 40 bh 2,200.00
66 Plint granito 15 x 30 bh 2,500.00
67 Plint granito 15 x 40 bh 3,000.00
Puzzdith - 100 XR ltr 0.00

G BAHAN SALURAN AIR KOTOR / BERSIH


1 Grafel U 20 cm' m1 52,000.00
2 Grafel U 30 cm' m1 66,000.00
3 Grafel U 40 cm' m1 86,000.00
4 Buis Beton 20 cm ( 1 M' ) m1 58,000.00
5 Buis Beton 30 cm ( 1 M' ) m1 74,000.00
6 Buis Beton 40 cm ( 1 M' ) m1 93,000.00
7 Buis Beton 50 cm ( 1 M' ) stk 107,000.00
8 Buis Beton 60 cm ( 1 M' ) stk 148,000.00
9 Buis Beton 100 cm ( 0.50 M' ) stk 341,000.00
10 Buis Beton 80 cm ( 0.50 M' ) stk 335,000.00
11 BuisTanah 10 cm ( 0.50 M' ) stk 11,000.00
12 BuisTanah 15 cm ( 0.50 M' ) stk 14,000.00
NO URAIAN SAT. HARGA

13 BuisTanah 20 cm ( 0.50 M' ) stk 18,000.00


14 BuisTanah 25 cm ( 0.50 M' ) stk 25,000.00
15 Injuk kg 19,000.00

H BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata-rata kg 18,000.00
2 Besi Beton U-39 / U-32 Rata-rata kg 25,000.00
3 Pagar BRC lengkap tiang ( Tanpa Pondasi ) m2 207,000.00
4 Bondek m2 223,000.00
5 Besi WF Ex DN SII kg 12,500.00
6 Besi WF Ex Jepang kg 12,500.00
7 Besi Profil DN SII kg 12,500.00
8 Besi Profil Ex LN kg 12,500.00
9 Besi C Lip Chanel kg 23,000.00
10 Ongkos Galfanis Besi kg 12,000.00
11 Kawat Beton kg 33,000.00
12 Kawat Duri kg 77,000.00
13 Kawat Pengikat m1 1,000.00
14 Kawat Bronjong 4 mm kg 34,000.00
15 Kawat Tembaga kg 50,000.00
16 Ram Nyamuk Hijau m2 16,000.00
17 Ram Kawat 1 x 1 cm m2 17,000.00
18 Ram Ayam m2 17,000.00
19 Kawat Kasa 1 x 1 ( Putih ) m2 39,000.00
Kawat Harmonika 4 cm Lapis Plastik m2 88,000.00
20 Kawat Harmonika 4 cm m2 40,000.00
21 Kawat Harmonika 2 cm m2 34,000.00
22 Kawat Las Listrik kg 28,000.00
23 Wiremesh M8 m2 63,000.00
24 Wiremesh M6 m2 46,000.00
25 Timah kg 56,000.00
26 Timah Hitam kg 52,000.00
27 Ram nyamuk Alumunium m2 39,000.00
28 Plat Srip Ø 2 x 30 mm ( 6 m1 ) bt 39,000.00
29 Plat Srip Ø 3 x 30 mm ( 6 m1 ) bt 40,000.00
30 Plat Strip bt 22,000.00
31 Besi Strip kg 32,000.00
32 Plat Alumunium 0.2 mm m2 108,000.00
33 Plat Alumunium 0.3 mm m2 134,000.00
34 Plat Alumunium 0.4 mm m2 171,000.00
35 Plat Alumunium 0.5 mm m2 173,000.00
36 Plat Alumunium 0.6 mm m2 207,000.00
37 Plat Alumunium 0.1 mm m2 68,000.00
38 Kusen Alumunium Natural 1.3 mm t= 103 mm ( 4 " ) m1 183,000.00
39 Kusen Alumunium Warna 1.3 mm t= 103 mm ( 4 " ) m1 197,000.00
40 Kusen Alumunium Natural 1.3 mm t= 103 mm ( 3 " ) m1 98,000.00
41 Kusen Alumunium Warna 1.3 mm t= 103 mm ( 3 " ) m1 123,000.00
42 Daun Jendela Alumunium Natural ( tanpa kaca dan accessories ) m2 119,000.00
43 Daun Jendela Alumunium Warna ( tanpa kaca dan accessories ) m2 108,000.00
44 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m2 256,000.00
45 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m2 232,000.00
46 Handle Alumunium ( Tarikan Pintu Alumunium ) bh 417,000.00
47 Kait Angin Alumunium ps 126,000.00
48 Karet Asisoris Kusen / Pintu Alumunium m1 9,000.00
49 Jalusi Alumunium m1 42,000.00
50 Sunscreen Almunium m2 460,000.00
51 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) roll 1,914,000.00
NO URAIAN SAT. HARGA

52 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) roll 251,000.00


53 Plat Besi Tipis 1 mm kg 20,000.00
54 Plat Besi Tipis 0.5 mm kg 21,000.00
55 Plat Besi 2 mm s/d 5 mm kg 17,000.00
56 Plat Besi 6 mms/d 10 mm kg 17,000.00
57 Plat Besi 10 mm keatas kg 17,000.00
58 Kabel presstressed polos kg 32,000.00
59 Jaring Kawat Baja kg 34,000.00
60 Lem Kuning ( Aibond ) kg 43,000.00
61 Lem Fox kg 28,000.00
62 Lem Vinyl kg 53,000.00
63 Besi Strip Kaca Nako kg 13,000.00
64 Profil alumunium "T" m1 14,000.00
65 Besi Hallow ( 2 x 4 x 4 cm ) btg 27,000.00
66 Besi Hallow ( 4 x 4 cm ) btg 35,000.00
67 Besi Rail Pengamanan kg 555,000.00
68 Jendela Besi m2 472,000.00
69 Jendela Besi tahan api m2 607,000.00
70 Pintu gulung besi m2 607,000.00
71 Pintu Roliing Door m2 371,000.00
72 Jendela nako kaca ryben + tralis 6 klip set 205,000.00
73 Jendela nako kaca ryben + tralis 7 klip set 242,000.00
74 Jendela nako kaca ryben + tralis 8 klip set 278,000.00
75 Jendela nako kaca ryben + tralis 10 klip set 350,000.00
76 Jendela nako kaca bening + tralis 4 klip set 145,000.00
77 Jendela nako kaca bening + tralis 5 klip set 169,000.00
78 Jendela nako kaca bening + tralis 6 klip set 205,000.00
79 Jendela nako kaca bening + tralis 7 klip set 254,000.00
80 Jendela nako kaca bening + tralis 8 klip set 278,000.00
81 Jendela nako kaca bening + tralis 10 klip set 363,000.00

I BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m2 83,000.00
2 Kaca Polos 3 mm ( ASAHI ) m2 105,000.00
3 Kaca Polos 5 mm ( ASAHI ) m2 134,000.00
4 Kaca Polos 8 mm ( ASAHI ) m2 221,000.00
5 Kaca Rayband 5 mm ( ASAHI ) m2 179,000.00
6 Kaca Rayband 8 mm ( ASAHI ) m2 391,000.00
7 Kaca Rayband 12 mm ( ASAHI ) m2 758,000.00
8 Kaca cermin 5 mm m2 182,000.00
9 Kaca cermin 6 mm m2 225,000.00
10 Kaca cermin 8 mm m2 283,000.00
11 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,961,000.00
12 Kaca Patri Ex Luar Negeri Terpasang m2 4,145,000.00
13 Kaca 6 mm Gravver m2 1,529,000.00
14 Glass Block DN 20 x 20 ( Kedawung ) bh 26,000.00
15 Glass Block DN 20 x 20 Ex LN bh 152,000.00
16 Sealant kg 256,000.00
17 Jendela Nako bh 132,000.00

J BAHAN PAKU DAN MUR BAUT


1 Paku ½ s/d 2 cm kg 24,000.00
2 Paku 2 cm s/d 5 cm kg 24,000.00
3 Paku 8 cm s/d 15 cm kg 18,400.00
4 Paku Beton 2 cm s/d 5 cm bh 1,700.00
5 Paku Kait Lengkap bh 1,000.00
6 Paku Cacing kg 63,000.00
NO URAIAN SAT. HARGA

7 Besi Beugel Kuda - Kuda kg 24,000.00


8 Duk Angker bh 8,300.00
9 Angker Mur Baut dia. 19 / Panjang 60 cm bh 79,000.00
10 Mur Baut HTB dia. 19 s/d 16 ( 5 cm ) bh 17,500.00
11 Mur Baut Biasa dia. 19 s/d 16 ( 5 cm ) bh 10,300.00
12 Piser dia.12 s/d 20 cm bh 5,500.00
13 Paku skrup 3" bh 850.00
14 Ramset / Dinabolt bh 8,000.00
15 Baut Besar bh 700.00
16 Baut Kecil bh 300.00
17 Paku GRC kg 38,500.00
18 Paku Gypsum kg 18,500.00
19 Sekrup fixer bh 300.00

K BAHAN PERPIPAAN
1 Besi Pipa Untuk Hydrant BSP 1" bt 183,500.00
2 Besi Pipa Untuk Hydrant BSP 1.25" bt 231,300.00
3 Besi Pipa Untuk Hydrant BSP 1.5" bt 327,800.00
4 Besi Pipa Untuk Hydrant BSP 2" bt 387,000.00
5 Besi Pipa Untuk Hydrant BSP 2.5" bt 483,500.00
6 Besi Pipa Untuk Hydrant BSP 3" bt 654,500.00
7 Besi Pipa Untuk Hydrant BSP 4" bt 956,600.00
8 Besi Pipa Untuk Hydrant BSP 6" bt 1,565,800.00
9 Besi Pipa Hitam 1" t = 2 mm bt 189,600.00
10 Besi Pipa Hitam 2" t = 2 mm bt 250,700.00
11 Besi Pipa Hitam 3" t = 2mm bt 402,500.00
12 Besi Pipa Hitam 4" t = 2 mm bt 630,500.00
13 Besi Pipa Hitam 6" t = 2 mm bt 850,000.00
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 120,500.00
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 175,500.00
16 Pipa GIP Medium A 1" ( 6 m1 ) bt 199,700.00
17 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt 285,500.00
18 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt 308,600.00
19 Pipa GIP Medium A 1 3/4" ( 6 m1 ) bt 359,100.00
20 Pipa GIP Medium A 2" ( 6 m1 ) bt 514,200.00
21 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt 739,500.00
22 Pipa GIP Medium A 3" ( 6 m1 ) bt 934,900.00
23 Pipa GIP Medium A 4" ( 6 m1 ) bt 950,000.00
24 Macam2 Sambungan GIP 1/2" bh 7,000.00
25 Macam2 Sambungan GIP 3/4" bh 9,500.00
26 Macam2 Sambungan GIP 1" bh 18,500.00
27 Macam2 Sambungan GIP 1 1/4" bh 21,800.00
28 Macam2 Sambungan GIP 1 1/2" bh 23,000.00
29 Macam2 Sambungan GIP 1 3/4" bh 25,000.00
30 Macam2 Sambungan GIP 2" bh 56,500.00
31 Macam2 Sambungan GIP 2 1/2" bh 66,500.00
32 Macam2 Sambungan GIP 3" bh 83,500.00
33 Macam2 Sambungan GIP 4" bh 130,500.00
34 Pipa PVC RUCIKA type AW 1/2" bt 42,500.00
35 Pipa PVC RUCIKA type AW 3/4" bt 55,500.00
36 Pipa PVC RUCIKA type AW 1" bt 65,000.00
37 Pipa PVC RUCIKA type AW 1 1/4" bt 82,500.00
38 Pipa PVC RUCIKA type AW 1 1/2" bt 110,000.00
39 Pipa PVC RUCIKA type AW 2" bt 120,000.00
40 Pipa PVC RUCIKA type AW 2 1/2" bt 170,000.00
41 Pipa PVC RUCIKA type AW 3" bt 215,000.00
42 Pipa PVC RUCIKA type AW 4" bt 360,000.00
NO URAIAN SAT. HARGA

43 Pipa PVC RUCIKA type AW 6" bt 675,000.00


44 Pipa PVC RUCIKA type AW 8" bt 850,000.00
45 Pipa PVC MASPION ABU ( AW ) 1/2" bt 25,000.00
46 Pipa PVC MASPION ABU ( AW ) 3/4" bt 28,500.00
47 Pipa PVC MASPION ABU ( AW ) 1" bt 42,500.00
48 Pipa PVC MASPION ABU ( AW ) 1 1/4" bt 60,500.00
49 Pipa PVC MASPION ABU ( AW ) 1 1/2" bt 61,500.00
50 Pipa PVC MASPION ABU ( AW ) 2" bt 80,000.00
51 Pipa PVC MASPION ABU ( AW ) 2 1/2" bt 130,500.00
52 Pipa PVC MASPION ABU ( AW ) 3" bt 155,000.00
53 Pipa PVC MASPION ABU ( AW ) 4" bt 265,000.00
54 Macam2 Sambungan Paralon 1/2" bh 4,700.00
55 Macam2 Sambungan Paralon 3/4" bh 5,000.00
56 Macam2 Sambungan Paralon 1" bh 5,500.00
57 Macam2 Sambungan Paralon 1 1/4" bh 8,000.00
58 Macam2 Sambungan Paralon 1 1/2" bh 10,500.00
59 Macam2 Sambungan Paralon 1 3/4" bh 15,000.00
60 Macam2 Sambungan Paralon 2" bh 17,500.00
61 Macam2 Sambungan Paralon 2 1/2" bh 29,500.00
62 Macam2 Sambungan Paralon 3" bh 33,000.00
63 Macam2 Sambungan Paralon 4" bh 38,000.00
64 Sambungan Pipa PVC Jenis AW 4" TY bh 99,000.00
65 Lem Paralon tb 10,500.00
66 Solatip Ledeng gl 4,500.00
67 Pipa PVC 4" Berlobang Jenis AW m1 40,500.00
68 PVC Waterstop lebar 150 m1 55,000.00
69 PVC Waterstop lebar 200 m1 60,000.00
70 PVC Waterstop lebar 230 m1 70,000.00
71 PVC Waterstop lebar 250 m1 76,000.00
72 PVC Waterstop lebar 300 m1 87,500.00
73 PVC Waterstop lebar 320 m1 95,000.00

L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh 115,000.00
2 Stop Kran 1" KIT bh 137,500.00
3 Stop Kran 1 1/2" KIT bh 230,000.00
4 Stop Kran 2" KIT bh 295,000.00
5 Stop Kran 2 1/2" KIT bh 785,000.00
6 Stop Kran 3" KIT bh 915,000.00
7 Check Valve 1/2" bh 95,500.00
8 Double Neple 1/2" bh 36,000.00
9 Water Mur 1/2" bh 44,500.00
10 Gate walve 1/2" bh 61,500.00
11 Saringan Air Lt. KM Stainless Steel/Floor Drain bh 73,500.00
12 Apooer Bath Tube bh 295,000.00
13 Kran Stainless Lokal Kait bh 51,500.00
14 Shower Dengan Tiang bh 245,000.00
15 Shower Tanpa Tiang bh 150,000.00
16 Kran Tembok Sun Eui dia. 1/2" bh 55,000.00
17 Kran Tembok ITAP dia. 1/2" bh 45,000.00
18 Kran Bebek Sun Eui 1/2" bh 160,000.00
19 Kran Bebek ITAP 1/2" bh 57,500.00
20 Kran Panas Dingin San Eui Standard bh 252,000.00
21 Bath Cape Washteren unit 2,310,000.00
22 Tempat Sabun Poslin bh 51,500.00
23 Wastafel Lengkap TOTO LW 230 unit 1,115,000.00
24 Wastafel Lengkap INA unit 800,000.00
NO URAIAN SAT. HARGA

25 Closet Jongkok Poslin Warna TOTO unit 227,500.00


26 Closet Jongkok Standard Putih Poslin TOTO unit 207,500.00
27 Closet Jongkok Lengkap Sistem Jet TOTO unit 2,236,500.00
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 1,897,500.00
29 Wastafel Bulat Warna Standard Lengkap unit 1,002,000.00
30 Closet Duduk Warna Standard INA Lengkap bh 1,399,500.00
31 Urinoir Lengkap TOTO Warna Standard Lengkap unit 1,952,500.00
32 Penyekat Poslin Urinoar TOTO lbr 545,500.00
33 Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) bh 438,500.00
34 Kitchen Zink Stainless Non Standard Franke ( 1 Lubang ) bh 1,400,000.00
35 Kitchen Zink Stainless Non Standard Franke ( 2 Lubang ) bh 1,815,500.00
36 Talang PVC U - 15 cm btg 66,000.00

M BAHAN PENUTUP ATAP


1 Atap Plastik Gelombang 80 x 180 lbr 36,500.00
2 Atap Fiber Glass Tipis 80 x 180 ( Gelombang ) lbr 52,000.00
3 Atap Fiber Glass Tebal 80 x 180 ( Gelombang ) lbr 110,000.00
4 Atap Alumunium Natural USR 26 ( JAINDO ) m2 155,000.00
5 Atap Alumunium Warna USR 26 ( JAINDO ) m2 182,500.00
6 Atap Asbes Gel. Kecil 80 x 180 x 4 mm lbr 85,000.00
7 Atap Asbes Gel. Besar 80 x 180 x 5 mm lbr 122,500.00
8 Atap Seng Gelombang 80 cm x 180 cm x 3 mm lbr 69,500.00
9 Atap Seng Gelombang 80 cm x 180 cm x 5 mm lbr 91,500.00
10 Atap Seng Gelombang 270 cm x 105 cm x 4mm lbr 81,000.00
11 Atap Seng Gelombang 240 cm x 105 cm x 4mm lbr 72,500.00
12 Atap Seng Gelombang 210 cm x 105 cm x 4mm lbr 65,500.00
13 Atap Seng Gelombang 150 cm x 105 cm x 4mm lbr 47,000.00
14 Atap Seng Gelombang 150 cm x 102 cm x 5mm lbr 86,500.00
15 Atap Seng Gelombang 180 cm x 102 cm x 5mm lbr 107,500.00
16 Atap Gelombang 300 cm x 105 cm x 4 mm lbr 88,000.00
17 Atap Tegola Kubota, lengkap m2 536,000.00
18 Atap Tegola Kwalitas Sedang m2 312,000.00
19 Alumunium Foile m2 20,000.00
20 Atap Genteng Plentong pres Bakar KW I bh 2,000.00
21 Atap Genteng Plentong pres Molen Oven KW I bh 3,000.00
22 Atap Genteng Flam pres Molen Oven Jatiwangi bh 2,500.00
23 Bubung Genteng pres Bulat Ex Jatiwangi bh 8,500.00
24 Genteng Bubungan Ex Jatiwangi Segi Tiga bh 5,000.00
25 Genteng Bubungan Beton bh 11,000.00
26 Genteng Metal ( Rainbow Roof ) m2 225,000.00
27 Genteng Metal Hana m2 190,000.00
28 Nok Atas Metal ( Rainbow Roof ) m2 152,500.00
29 Nok Atas Metal Hana lbr 89,000.00
30 Nok Pingir Metal ( Rainbow Roof ) lbr 115,900.00
31 Nok Pingir Metal Hana lbr 110,900.00
32 Wall Flasing ( Rainbow Roof ) lbr 92,300.00
33 Wall Flasing Hana lbr 97,600.00
34 Atap Genteng Beton Warna 14.5/m2 m2 106,500.00
35 Genteng Beton Natural m2 9,000.00
36 Sirap Kelas I ( 80 / m2 ) bh 27,500.00
37 Genteng Keramik Natural Intan 14.5 / m2 m2 115,000.00
38 Genteng Keramik Glasur Standard 14.5 /m2 m2 145,500.00
39 Genteng Keramik Glasur Special 14.5 /m2 m2 147,000.00
40 Genteng Keramik Glasur Premium 14.5 /m2 m2 150,000.00
41 Genteng Murando Natural 1m2 = 20 bh bh 3,000.00
42 Genteng Murando Glasur 1m2 = 20 bh bh 4,500.00
43 Bubung Murando Natural bh 8,500.00
NO URAIAN SAT. HARGA

44 Bubung Murando Glasur bh 12,000.00


45 Bubungan Genteng Keramik bh 11,000.00
46 Atap Genteng Kodok bh 3,500.00
47 Bubungan Genteng Kodok bh 5,000.00
48 Bubungan Genteng Plentong bh 6,500.00
49 Bubungan Stel Gelombang bh 8,000.00
50 Nok Stel Gelombang lbr 39,000.00
51 Nok Atap Seng lbr 41,500.00
52 Nok Standar 40 cm 18, SWG 22 m2 78,500.00
53 Pelat Asbes tebal 4 mm lbr 22,500.00
54 Pelat Asbes tebal 3.5 mm lbr 17,500.00
55 Trusses ZAM-75 t=0.8 Rangka Utama m1 38,500.00
56 Trusses ZAM-75 t=0.5 Rangka Utama m1 23,000.00
57 Reng 16-DB Roof Battens t=0.48 mm m1 11,500.00
58 Foot Plate t= 1.22 mm m1 8,000.00
59 PLD - Diafragma Plate bh 2,500.00
60 WIND Bracing m1 2,000.00
61 Tensioner ( Pengaku Tali angin ) bh 8,000.00
62 Nok Pinggir Morando Natural bh 4,000.00
62 Waterproofing membrance tb. 3 mm m2 125,000.00

N BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW ) unit 78,536,500.00
2 Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW ) unit 237,995,000.00
3 Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW ) unit 650,812,000.00
4 Presure Tank kap. 500 liter lengkap unit 40,698,000.00
5 Hydran Box dlm Gedung ( Lengkap ) unit 7,540,000.00
6 Fire House 1.5 x 30 m + nose unit 5,353,000.00
7 Exhose Fan H 360 W 60 x 60 cm unit 7,550,000.00
8 Exhose Fan H 380 W CFM 55 x 55 cm unit 6,040,500.00
9 Exhose Fan H 100 W 40 x 40 cm unit 1,212,500.00
10 AC Split 3 PK Setara TOSHIBA unit 33,871,500.00
11 AC Split 2 PK Setara TOSHIBA unit 24,119,500.00
12 AC Split 1 PK Setara TOSHIBA unit 5,692,000.00
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU 5,000,000.00

O BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) ROLL 115,000.00
2 Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' ) ROLL 170,000.00
3 Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' ) m' 7,000.00
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) m' 8,000.00
5 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' ) m' 5,000.00
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) m' 12,000.00
7 Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' ) m' 8,000.00
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m' 7,000.00
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m' 17,000.00
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m' 23,000.00
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m' 13,000.00
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m' 15,000.00
13 Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' ) m' 22,000.00
14 Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' ) m' 21,000.00
15 Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' ) m' 145,000.00
16 Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' ) m' 30,000.00
17 Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' ) m' 34,000.00
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m' 14,000.00
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m' 23,000.00
20 Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' ) m' 29,000.00
NO URAIAN SAT. HARGA

21 Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' ) m' 16,000.00


22 Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' ) m' 23,000.00
23 Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' ) m' 22,000.00
24 Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' ) m' 24,000.00
25 Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' ) m' 31,000.00
26 Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' ) m' 43,000.00
27 Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' ) m' 51,000.00
28 NSFB FUJI EA - 100 A bh 1,019,000.00
29 NSFB FUJI EA - 150 A bh 2,421,000.00
30 Rumah Panel 30 x 60 cm ( Kosong ) unt 186,000.00
31 Skring Kas 2 grop Biasa unt 248,000.00
32 Skring Kas 3 grop Biasa unt 269,000.00
33 Skring Kas 5 grop Biasa unt 567,000.00
34 MCB 1 PAS bh 67,000.00
35 MCB 3 PAS bh 129,000.00
36 Tahanan 50 A Merk Fuji bh 630,000.00
37 Saklar Broko Tunggal Standard ( 1 Phase ) bh 29,000.00
38 Saklar Broko Seri Standard ( 1 Phase ) bh 31,000.00
39 Stop Kontak Broko Standard ( 1 Phase ) bh 29,000.00
40 Stop Kontak Broko 3 Phase (Out Bow) bh 106,000.00
41 Stop Kontak Broko 3 Phase ( In Bow) bh 176,000.00
42 Stop Kontak Handle 3 Phase bh 107,000.00
43 Instalas Titik Lampu / Stop Kontak (Upah dan Alat) ttk 217,000.00
44 Lampu pijar 25 Watt s/d 100 Watt bh 74,000.00
45 Lampu Neon Phillips 20 Watt bh 36,000.00
46 Lampu Neon Phillips 40 Watt bh 42,000.00
47 Trapo TL 20 W (Phillips) bh 50,000.00
48 Trapo TL 40 W (Phillips) bh 46,000.00
49 Trapo TL 20 W (Sinar) bh 49,000.00
50 Trapo TL 40 W (Sinar) bh 50,000.00
51 Stater Neon Phillips bh 10,000.00
52 Stater Neon Biasa bh 8,000.00
53 Rumah TL In Bow / Out Bow 2 x 20 W (kosongan) bh 174,000.00
54 Down Light + SL 25 W bh 137,000.00
55 Lampu SL Philip 25 W bh 55,000.00
56 Lampu Sirkel TL 20 W Lengkap bh 82,000.00
57 Lampu Mercuri 80 W bh 179,000.00
58 Lampu Taman + Tiang + Lampu 1 Buah bh 372,000.00
59 Lampu Baret 30 cm + Neon bh 269,000.00
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh 893,000.00
61 Jarum Penangkal Petir 16 bh 123,000.00
62 Kawat BC ( Tembaga ) kg 79,000.00
63 Pentanahan Penangkal Petir ttk 513,000.00
64 Pentanahan Panel ttk 358,000.00

P BAHAN ALAT PENGANTUNG DAN KUNCI


1 Kunci Silinder ALFA untuk Pintu Alumunium bh 452,500.00
2 Tarikan Pintu Alumunium bh 450,000.00
3 Kunci 2 Slaag ROYAL bh 139,500.00
4 Rel Henderson Lengkap bh 951,000.00
5 Rel maraton I Pintu unt 212,500.00
6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh 369,500.00
7 Kunci 2 Slaag Ancor Asli bh 182,500.00
8 Kunci 2 Slaag ISO bh 228,500.00
9 Kunci KM Bulat Kualitas Biasa bh 59,900.00
10 Kunci kM Bulat ALFA bh 113,100.00
11 Kunci 2 Slaag Silinder Utama Standard bh 645,300.00
NO URAIAN SAT. HARGA

12 Kunci Gembok Besar bh 93,800.00


13 Kunci 2 Slaag Kuda Terbang bh 104,000.00
14 Kunci Lemari bh 51,500.00
15 Espangolet ps 56,800.00
16 Grendel 15 cm bh 54,800.00
17 Grendel 5 cm bh 6,000.00
18 Hak Angin Kait Jendela Biasa ps 8,000.00
19 Hak Angin Jendela Antik ps 31,900.00
20 Hak Angin Sendok Stainless / Kuningan bh 35,500.00
21 Sloot Pintu Berikut Rantai bh 35,000.00
22 Sloot Jendela Tunggal bh 36,300.00
23 Engsel Pintu Unilon Standard ps 23,100.00
24 Engsel Jendela Unilon ps 16,500.00
25 Engsel Patrun ps 15,100.00
26 Engsel Harmonika m1 10,100.00
27 Door Closer Kelas Standard ( Kelas Sedang ) unt 462,000.00
28 Door Closer Kelas Standard ( Kelas Baik ) unt 657,300.00
29 Door Closer Kelas Rendah unt 220,000.00
30 Door Holder unt 226,000.00
31 Door Stoper unt 281,500.00
32 Tarikan Almari Rata-rata bh 21,500.00
33 Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' ) m1 48,000.00
34 Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' ) m1 59,000.00
35 Seng BJLS 30 / 3 x 0.3 mm lbr 96,500.00
36 Seng Plat 3' x 6' BJLS 30 lbr 55,500.00
37 Waterstop Lebar 200 mm m1 64,500.00
38 Waterstop Lebar 150 mm m1 57,000.00

Q BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


1 Hotmix jadi berikut alat dan bahan bakar ( T=5 cm => 9 m2 ) ton 1,631,000.00
2 Aspal (ESO) 1 Drum 155 kg kg 15,000.00
3 Aspal Curah kg 13,000.00
4 Aspal RC 70 ( Cilacap ) kg 13,000.00
5 Aspal Concrete / Laston ( AC - WC ) ton 1,631,000.00
6 Aspal Threated Base ( ATB ) ton 1,452,000.00
7 Lataston / Hot Rols Sheet ( HRS ) ton 2,016,000.00

R BAHAN PENGISAP AIR SUMUR DALAM


1 Pompa Kodok unit 208,000.00
2 Pompa Dragon Tegal unit 295,000.00
3 Pompa Dragon Asli unit 869,000.00
4 Mesin Pompa Air 100 W - Sanyo unit 1,331,000.00
5 Mesin Pompa Air 150 W - Sanyo unit 2,288,000.00
6 Pompa Zet Pump 250 W - Sanyo unit 6,003,000.00
7 Pompa Zet Pump 450 W - Sanyo unit 9,532,000.00
8 Pompa Submersible kap. 150 liter / menit 3 KW unit 32,852,000.00
9 Gear Pump Kap. 60 liter / menit unit 19,000,000.00
10 Deep Well dengan kelengkapannya kap. 150 liter / menit unit 189,258,000.00
11 Hand Oil Pump unit 5,715,000.00

S BAHAN PENAMPUNG AIR


1 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh 1,419,000.00
2 Tangki Air Fiber Glass 1 m3 ( Excel ) bh 1,593,000.00
3 Tangki Air Fiber Glass 2 m3 ( Excel ) bh 2,365,000.00
4 Bak KM Fiber 60 x 60 bh 309,000.00
5 Bak Taraso WC 40 x 40 bh 143,000.00
6 Bak KM Taraso 60 x 60 bh 195,000.00
NO URAIAN SAT. HARGA

T ALAT TUKANG
1 Palu 0.5 kg bh 47,000.00
2 Cangkul bh 66,000.00
3 Singkup bh 50,000.00
4 Sekrop bh 61,000.00
5 Pengki bh 15,000.00
6 Linggis bh 50,000.00
7 Rool Meter 30 meter ( Bahan Plastik ) bh 122,000.00
8 Rool Meter 5 meter ( Bahan Besi ) bh 44,000.00
9 Selang Plastik untuk Water Pas dia. 0.5 cm m 1,700.00
10 Water Pas Alumunium 60 cm bh 101,000.00

U BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah lt 19,000.00
2 Kayu Bakar dari Kayu Karet m3 164,500.00
3 Bahan Bakar Residu lt 30,500.00
4 Minyak Solar lt 10,000.00
5 Bensin Premium lt 8,000.00
6 Plus Oil lt 3,500.00
7 Oil Mesran 40 SAE lt 57,500.00
8 Elpiji / botol 15 kg 112,500.00
9 Asitilin / Botol 15.1 kg btl 98,000.00
10 Angin ( O2 ) / botol btl 73,500.00
11 Karbit kg 21,500.00
12 Minyak Bekisting ltr 45,000.00
13 Rapidrant Gln 17,500.00
14 Soda Api kg 39,500.00
15 Sabun kg 2,500.00
16 Arang Kayu kg 11,500.00
17 Kawat Las bh 1,500.00

V BAHAN PAGAR
1 Panel Beton Pracetak lbr 220,000.00
2 Kolom Beton Pracetak btg 319,000.00

B BIDANG PERTAMANAN
1 Aglomena batang 60,000.00
2 Bambu krisik/jepang batang 60,000.00
3 Furadan kg 29,000.00
4 Kompos/pupuk kandang batang 30,000.00
5 Matoa (2 m) batang 46,000.00
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang 121,000.00
7 Philo batang 91,000.00
8 Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2 m batang 30,000.00
9 Pohon perdu (kaca piring, puring, mawar, melati, dll) batang 11,000.00
10 Rumput gajah mini m2 18,000.00

Keterangan :
Harga material diatas sudah termasuk profit / keuntungan
ANALISA HARGA SATUAN PEKERJAAN
HARGA SAT. JUMLAH
NO URAIAN SAT VOLUME
Rp. Rp.
1 2 3 4 5 6=4x5
A PEKERJAAN PERSIAPAN SNI 03-2835-2002
A-01 1 M Pagar Sementara dari Kayu Setinggi 2 Meter
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 33,000.00 41,250.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral Beton 2/3 M3 0.0090 240,000.00 2,160.00
Kayu balok terentang M3 0.0720 2,975,000.00 214,200.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Residu Lt 0.4000 9,000.00 3,600.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Pekerja Oh 0.4000 80,000.00 32,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0200 125,000.00 2,500.00
Jumlah 323,550.00
Dibulatkan 323,550.00
A-02 1 M Pagar Sementara dari Seng Gelombang Tinggi 2 Meter
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 33,000.00 41,250.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Seng Gelombang BJLS-30 Lbr 1.2000 69,500.00 83,400.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral Beton 2/3 M3 0.0090 240,000.00 2,160.00
Kayu balok terentang M3 0.0720 2,975,000.00 214,200.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Meni besi Kg 0.4500 36,000.00 16,200.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Pekerja Oh 0.4000 80,000.00 32,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0200 125,000.00 2,500.00
Jumlah 419,550.00
Dibulatkan 419,550.00
A-03 1 M Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter
Dolken Kayu Ø 8-10/400 Cm Btg 1.0000 33,000.00 33,000.00
Semen Portland Kg 2.0000 1,540.00 3,080.00
Kawat Duri Kg 2.5000 77,000.00 192,500.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral Beton M3 0.0090 240,000.00 2,160.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0200 125,000.00 2,500.00
Jumlah 281,230.00
Dibulatkan 281,230.00
A-04 1 M¹ Pengukuran dan Pasang Bouwplank
Kayu kaso 5/7 Albasia M3 0.0120 2,506,000.00 30,072.00
Paku Biasa 2" - 5 " Kg 0.0200 24,000.00 480.00
Kayu Papan 3/20 Albasia M3 0.0070 2,506,000.00 17,542.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 67,269.00
Dibulatkan 67,260.00
1 M¹ Pengukuran
Kayu kaso 5/7 Albasia M3 0.0040 2,263,000.00 9,052.00
1 2 3 4 5 6=4x5
Paku Biasa 2" - 5 " Kg 0.0080 24,000.00 192.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 28,419.00
Dibulatkan 28,410.00
A-05 1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 33,000.00 41,250.00
Kayu terentang M3 0.1800 2,975,000.00 535,500.00
Paku Biasa Kg 0.8500 24,000.00 20,400.00
Besi Strip Kg 1.1000 32,000.00 35,200.00
Semen Portland Kg 35.0000 1,540.00 53,900.00
Pasir Pasang M3 0.1500 265,000.00 39,750.00
Pasir Beton M3 0.1000 290,000.00 29,000.00
Koral Beton 2/3 M3 0.1500 240,000.00 36,000.00
Bata Merah Bh 30.0000 850.00 25,500.00
Seng Plat Lbr 0.2500 19,140.00 4,785.00
Kawat harmonika 4 cm Bh 2.0000 40,000.00 80,000.00
Kaca Polos M2 0.0800 105,000.00 8,400.00
Kunci Tanam Bh 0.1500 104,000.00 15,600.00
Plywood 120 x 240 x 0,4 cm Lbr 0.0600 145,000.00 8,700.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Tukang Batu Oh 1.0000 95,000.00 95,000.00
Pekerja Oh 2.0000 80,000.00 160,000.00
Kepala Tukang Oh 0.3000 105,000.00 31,500.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 1,416,735.00
Dibulatkan 1,416,730.00
A-06 1 M2 Pembuatan Gudang Semen dan alat - alat
Dolken Kayu Ø 8-10/400 Cm Btg 1.7000 33,000.00 56,100.00
Kayu balok terentang M3 0.2100 2,975,000.00 624,750.00
Paku Biasa Kg 0.3000 24,000.00 7,200.00
Semen Portland Kg 10.5000 1,540.00 16,170.00
Pasir Beton M3 0.0300 290,000.00 8,700.00
Koral Beton 2/3 M3 0.0500 240,000.00 12,000.00
Seng Gelombang Bjls 30 Lbr 1.5000 69,500.00 104,250.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 1,126,420.00
Dibulatkan 1,126,420.00
A-07 1 M2 Pembuatan Bedeng Buruh
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 33,000.00 41,250.00
Kayu balok terentang M3 0.1860 2,975,000.00 553,350.00
Paku Biasa Kg 0.3000 24,000.00 7,200.00
Semen Portland Kg 18.0000 1,540.00 27,720.00
Pasir Beton M3 0.0300 290,000.00 8,700.00
Koral Beton 2/3 M3 0.0500 240,000.00 12,000.00
Seng Gelombang Bjls 32 Lbr 1.5000 69,500.00 104,250.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 1,051,720.00
Dibulatkan 1,051,720.00
A-08 1 M2 Membersihkan Lapangan dan Perataan
Pekerja Oh 0.1000 80,000.00 8,000.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 14,250.00
Dibulatkan 14,250.00
A-09 1 M2 Pembuatan Jalan Sementara
Batu Belah 15/20 M3 0.1500 233,000.00 34,950.00
Batu Pecah 5/7 M3 0.0900 222,000.00 19,980.00
Pasir Pasang M3 0.0100 265,000.00 2,650.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 143,830.00
Dibulatkan 143,830.00
A-10 1 M3 Bongkaran Beton Bertulang
Pekerja Oh 6.6670 80,000.00 533,360.00
Mandor Oh 0.3330 125,000.00 41,625.00
Jumlah 574,985.00
Dibulatkan 574,980.00
A-11 1 M3 Bongkaran Dinding Tembok Bata Merah
Pekerja Oh 6.6670 80,000.00 533,360.00
Mandor Oh 0.0330 125,000.00 4,125.00
Jumlah 537,485.00
Dibulatkan 537,480.00
A-12 1 M Pagar Beton Pracetak (5x50x213) Cm
Panel Beton Pracetak Lbr 0.9860 220,000.00 216,920.00
Kolom Beton Pracetak Btg 0.5250 319,000.00 167,475.00
Pasir Beton M3 0.0740 290,000.00 21,460.00
Koral 2/3 M3 0.1460 240,000.00 35,040.00
Semen Portland Kg 45.0000 1,540.00 69,300.00
Tukang Batu Oh 0.1250 95,000.00 11,875.00
Pekerja Oh 0.3750 80,000.00 30,000.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0190 125,000.00 2,375.00
Jumlah 555,705.00
Dibulatkan 555,700.00
A-13 1 M¹ Pagar kawat ayam tiang besi L 50.50.5, tinggi 1 m¹
Kawat ram ayam Lbr 0.4340 17,000.00 7,378.00
Besi siku L 50.50.5 Kg 6.7860 12,500.00 84,825.00
Besi pelat (1,2 x 3) mm Kg 0.0424 12,500.00 530.00
Baut Kg 4.0000 700.00 2,800.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral 2/3 M3 0.0090 240,000.00 2,160.00
Pekerja Oh 0.3750 80,000.00 30,000.00
Tukang Batu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0190 125,000.00 2,375.00
Jumlah 148,503.00
Dibulatkan 148,500.00
A-14 1 M2 Pagar BRC lengkap dengan tiang
BRC lengkap dengan tiang Lbr 0.4340 207,000.00 89,838.00
Semen Portland Kg 2.0000 1,540.00 3,080.00
Kawat Duri Kg 2.5000 77,000.00 192,500.00
Pasir Beton M3 0.0050 290,000.00 1,450.00
Koral Beton 2/3 M3 0.0090 240,000.00 2,160.00
Pekerja Oh 0.3750 80,000.00 30,000.00
Tukang Batu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0190 125,000.00 2,375.00
Jumlah 334,538.00
Dibulatkan 334,530.00
1 2 3 4 5 6=4x5
A-15 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40x50x20) Cm
Bambu Ø 6 -10/600 Cm Btg 1.0000 30,000.00 30,000.00
Tali Ijuk Kg 0.2500 28,000.00 7,000.00
Tukang Kayu Oh 0.0170 95,000.00 1,615.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Kepala Tukang Oh 0.0020 105,000.00 210.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 56,450.00
Dibulatkan 56,450.00
A-16 1 M¹ Cerucuk Bambu
Bambu Ø 7 -10 ( 400 ) Cm Btg 1.2500 30,000.00 37,500.00
Pekerja Oh 0.5000 80,000.00 40,000.00
Mandor Oh 0.0250 125,000.00 3,125.00
Jumlah 80,625.00
Dibulatkan 80,620.00
17 1 M3 Bongkaran Kuda-kuda, Gording Balok
Pekerja Oh 2.5000 80,000.00 200,000.00
Tukang Kayu Oh 1.2000 95,000.00 114,000.00
Mandor Oh 0.1200 125,000.00 15,000.00
Jumlah 329,000.00
Dibulatkan 329,000.00
18 1 M3 Bongkaran Rangka Atap, Reng dan Kaso
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Kayu Oh 0.0200 95,000.00 1,900.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 8,125.00
Dibulatkan 8,120.00
19 1 M3 Bongkaran Genteng Lama
Pekerja Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 2,850.00
Dibulatkan 2,850.00

B PEKERJAAN TANAH SNI 03-2835-2002


B-01 Galian Tanah Biasa sedalam 1 Meter
Pekerja Oh 0.4000 80,000.00 32,000.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 37,000.00
Dibulatkan 37,000.00
B-02 Galian Tanah Biasa sedalam 2 Meter
Pekerja Oh 0.5260 80,000.00 42,080.00
Mandor Oh 0.0526 125,000.00 6,575.00
Jumlah 48,655.00
Dibulatkan 48,650.00
B-03 Galian Tanah Biasa sedalam 3 Meter
Pekerja Oh 0.7350 80,000.00 58,800.00
Mandor Oh 0.0735 125,000.00 9,187.50
Jumlah 67,987.50
Dibulatkan 67,980.00
B-04 Galian Tanah Keras sedalam 1 Meter
Pekerja Oh 0.6250 80,000.00 50,000.00
Mandor Oh 0.0625 125,000.00 7,812.50
Jumlah 57,812.50
Dibulatkan 57,810.00
B-05 Galian Tanah Lumpur sedalam 1 Meter
Pekerja Oh 0.8230 80,000.00 65,840.00
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 76,215.00
Dibulatkan 76,210.00
1 2 3 4 5 6=4x5
B-06 Pekerjaan Srtipping Setinggi 10 CM
Pekerja Oh 0.0500 80,000.00 4,000.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 4,625.00
Dibulatkan 4,620.00
B-07 1 M3 Pembuangan Tanah Sejauh 150 Meter
Pekerja Oh 0.0516 80,000.00 4,128.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 10,378.00
Dibulatkan 10,370.00
B-08 1 M3 Urugan Kembali
Pekerja Oh 0.1920 80,000.00 15,360.00
Mandor Oh 0.0190 125,000.00 2,375.00
Jumlah 17,735.00
Dibulatkan 17,730.00
B-09 1 M3 Pemadatan Tanah
Pekerja Oh 0.5000 80,000.00 40,000.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 46,250.00
Dibulatkan 46,250.00
B-10 1 M3 Urugan Pasir
Pasir Urug m3 1.2000 199,000.00 238,800.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 264,050.00
Dibulatkan 264,050.00
B-11 1 M² Pemasangan Lapisan Ijuk tebal 10 cm
Ijuk m2 1.2000 26,000.00 31,200.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 45,075.00
Dibulatkan 45,070.00
B-12 1 M3 Pemasangan Urugan Sirtu
Sirtu m3 1.2000 232,000.00 278,400.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Mandor Oh 0.0250 125,000.00 3,125.00
Jumlah 301,525.00
Dibulatkan 301,520.00
B-13 1 M3 Urugan Tanah Pilihan
Tanah Urug Pilihan m3 1.2000 101,000.00 121,200.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Mandor Oh 0.0250 125,000.00 3,125.00
Jumlah 144,325.00
Dibulatkan 144,320.00
B-14 1 M2 Pembuatan Jalan Sementara, Tebal 25 Cm
Batu Belah m3 0.2750 233,000.00 64,075.00
Kerikil m3 0.0300 196,000.00 5,880.00
Pasir Urug m3 0.0500 199,000.00 9,950.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Mandor Oh 0.1000 125,000.00 12,500.00
Jumlah 172,405.00
Dibulatkan 172,400.00
1 M3 Lapisan Pudel Camp. 1 Kp : 3 Ps : 7 TL
Pasir Urug m3 0.3300 199,000.00 65,670.00
Kapur Padam m3 0.1090 427,000.00 46,543.00
Tanah Liat m3 0.7630 37,000.00 28,231.00
Pekerja Oh 0.8330 80,000.00 66,640.00
Tukang Gali Oh 0.4160 95,000.00 39,520.00
Kepala Tukang Oh 0.0400 105,000.00 4,200.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 261,179.00
Dibulatkan 261,170.00
1 M3 Lapisan Pudel Camp. 1 Kp : 5 TL
Kapur Padam m3 0.2000 427,000.00 85,400.00
Tanah Liat m3 1.0000 37,000.00 37,000.00
Pekerja Oh 0.8330 80,000.00 66,640.00
Tukang Gali Oh 0.4160 95,000.00 39,520.00
Kepala Tukang Oh 0.0410 105,000.00 4,305.00
Mandor Oh 0.0810 125,000.00 10,125.00
Jumlah 242,990.00
Dibulatkan 242,990.00

C PEKERJAAN PONDASI SNI 03-2836-2002


C-01 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 3 Ps
Batu Belah 15 / 20 M3 1.1000 233,000.00 256,300.00
Semen Portland Kg 202.0000 1,540.00 311,080.00
Pasir Pasang M3 0.4850 265,000.00 128,525.00
Pekerja Oh 1.5000 80,000.00 120,000.00
Tukang Gali Oh 0.6000 95,000.00 57,000.00
Kepala Tukang Oh 0.0600 105,000.00 6,300.00
Mandor Oh 0.0750 125,000.00 9,375.00
Jumlah 888,580.00
Dibulatkan 888,580.00
C-02 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 4 Ps
Batu Belah 15 / 20 M3 1.1000 233,000.00 256,300.00
Semen Portland Kg 163.0000 1,540.00 251,020.00
Pasir Pasang M3 0.5200 265,000.00 137,800.00
Pekerja Oh 1.5000 80,000.00 120,000.00
Tukang Gali Oh 0.6000 95,000.00 57,000.00
Kepala Tukang Oh 0.0600 105,000.00 6,300.00
Mandor Oh 0.0750 125,000.00 9,375.00
Jumlah 837,795.00
Dibulatkan 837,790.00
C-03 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 5 Ps
Batu Belah 15 / 20 M3 1.1000 233,000.00 256,300.00
Semen Portland Kg 136.0000 1,540.00 209,440.00
Pasir Pasang M3 0.5440 265,000.00 144,160.00
Pekerja Oh 1.5000 80,000.00 120,000.00
Tukang Gali Oh 0.6000 95,000.00 57,000.00
Kepala Tukang Oh 0.0600 105,000.00 6,300.00
Mandor Oh 0.0750 125,000.00 9,375.00
Jumlah 802,575.00
Dibulatkan 802,570.00
C-04 1 M3 Pasangan Pondasi Batu Kosong (Aanstamping)
Batu Belah 15 / 20 M3 1.2000 233,000.00 279,600.00
Pasir Urug M3 0.3000 199,000.00 59,700.00
Pekerja Oh 0.7800 80,000.00 62,400.00
Tukang Batu Oh 0.3900 95,000.00 37,050.00
Kepala Tukang Oh 0.0390 105,000.00 4,095.00
Mandor Oh 0.0390 125,000.00 4,875.00
Jumlah 447,720.00
Dibulatkan 447,720.00
C-05 1 M3 Beton Siklop 1pc : 2 ps : 3 kr + 40 % Batu Belah dgn besi tulangan
Besi Beton Kg 75.0000 18,000.00 1,350,000.00
Semen Portland Kg 202.0000 1,540.00 311,080.00
Pasir Beton M3 0.3200 290,000.00 92,800.00
Koral Beton 2/3 M3 0.4900 240,000.00 117,600.00
Kawat Beton Kg 0.8000 33,000.00 26,400.00
1 2 3 4 5 6=4x5
Batu Belah M3 0.4500 233,000.00 104,850.00
Pekerja Oh 3.0000 80,000.00 240,000.00
Tukang Batu Oh 0.8500 95,000.00 80,750.00
Kepala Tukang Oh 0.0850 105,000.00 8,925.00
Mandor Oh 0.1500 125,000.00 18,750.00
Jumlah 2,351,155.00
Dibulatkan 2,351,150.00
C-06 1 M3 Pasang Pondasi Sumuran 1pc : 2 ps : 3 kr + 40 % Batu Belah (D= 1m)
Batu Belah Kg 0.4500 233,000.00 104,850.00
Semen Portland Kg 280.0000 1,540.00 431,200.00
Pasir Beton M3 0.4500 290,000.00 130,500.00
Koral Beton 2/3 M3 0.6700 240,000.00 160,800.00
Pekerja Oh 2.3800 80,000.00 190,400.00
Tukang Batu Oh 0.3000 95,000.00 28,500.00
Kepala Tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0800 125,000.00 10,000.00
Jumlah 1,059,400.00
Dibulatkan 1,059,400.00
C-07 1 M3 Pondasi Siklop 1pc : 2 ps : 3 kr + 40 % Batu Belah
Batu Belah Kg 0.4500 233,000.00 104,850.00
Semen Portland Kg 202.0000 1,540.00 311,080.00
Pasir Beton M3 0.3200 290,000.00 92,800.00
Koral Beton 2/3 M3 0.4900 240,000.00 117,600.00
Pekerja Oh 3.0000 80,000.00 240,000.00
Tukang Batu Oh 0.8500 95,000.00 80,750.00
Kepala Tukang Oh 0.0850 105,000.00 8,925.00
Mandor Oh 0.1500 125,000.00 18,750.00
Jumlah 974,755.00
Dibulatkan 974,750.00
C-08 1 M¹ Pembuatan Tiang Pancang (40x40) Cm, Beton Bertulang
Pasir Urug Darat M3 0.0190 199,000.00 3,781.00
Pasir Beton M3 0.0940 290,000.00 27,260.00
Koral Beton M3 0.1500 240,000.00 36,000.00
Semen Portland Kg 60.5000 1,540.00 93,170.00
Besi Beton Kg 45.0000 18,000.00 810,000.00
Kawat Beton Kg 0.9000 33,000.00 29,700.00
Kayu balok terentang M3 0.0320 2,975,000.00 95,200.00
Paku Kg 0.1200 24,000.00 2,880.00
Minyak Bekisting Lt 0.0900 45,000.00 4,050.00
Plamuur Tembok Kg 0.2400 30,000.00 7,200.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Batu Oh 0.6700 95,000.00 63,650.00
Kepala Tukang Oh 0.0670 105,000.00 7,035.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 1,266,176.00
Dibulatkan 1,266,170.00
C-09 1 M¹ Pembuatan Tiang Pancang (35x35) Cm, Beton Bertulang
Pasir Urug Darat M3 0.0160 199,000.00 3,184.00
Pasir Beton M3 0.0800 290,000.00 23,200.00
Koral Beton M3 0.1250 240,000.00 30,000.00
Semen Portland Kg 49.0000 1,540.00 75,460.00
Besi Beton Kg 34.5000 18,000.00 621,000.00
Kawat Beton Kg 0.7000 33,000.00 23,100.00
Kayu balok terentang M3 0.0270 2,975,000.00 80,325.00
Paku Kg 0.1200 24,000.00 2,880.00
Minyak Bekisting Lt 0.0900 45,000.00 4,050.00
Plamuur Tembok Kg 0.2000 30,000.00 6,000.00
Pekerja Oh 0.8000 80,000.00 64,000.00
Tukang Batu Oh 0.5000 95,000.00 47,500.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0500 105,000.00 5,250.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 990,949.00
Dibulatkan 990,940.00
C-10 1 M¹ Pembuatan Tiang Pancang Ø 40 Cm, Beton Bertulang
Pasir Urug Darat M3 0.0149 199,000.00 2,965.10
Pasir Beton M3 0.0738 290,000.00 21,402.00
Koral Beton M3 0.1178 240,000.00 28,272.00
Semen Portland Kg 47.4925 1,540.00 73,138.45
Besi Beton Kg 45.0000 18,000.00 810,000.00
Kawat Beton Kg 0.9000 33,000.00 29,700.00
Kayu balok terentang M3 0.0320 2,975,000.00 95,200.00
Paku Kg 0.1200 24,000.00 2,880.00
Minyak Bekisting Lt 0.0900 45,000.00 4,050.00
Plamuur Tembok Kg 0.2400 30,000.00 7,200.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Batu Oh 0.6700 95,000.00 63,650.00
Kepala Tukang Oh 0.0670 105,000.00 7,035.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 1,231,742.55
Dibulatkan 1,231,740.00
C-11 1 M¹ Memancang Tiang Pancang Beton Bertulang
Crawler crane lengkap jam 0.1170 1,078,750.00 126,213.75
Pekerja Oh 0.0400 80,000.00 3,200.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 129,663.75
Dibulatkan 129,660.00
C-12 1 Buah Memotong Tiang Pancang (40 x 40) Cm Beton Bertulang
Pekerja Oh 3.3200 80,000.00 265,600.00
Kepala Tukang Oh 0.0700 105,000.00 7,350.00
Mandor Oh 0.2000 125,000.00 25,000.00
Alat bantu lot 0.3500 297,950.00 104,282.50
Jumlah 402,232.50
Dibulatkan 402,230.00
C-13 1 M¹ Menyambung Tiang Pancang Beton Bertulang
Besi pelat Kg 18.3700 17,000.00 312,290.00
Besi Beton Kg 6.0600 18,000.00 109,080.00
Kawat las Kg 2.2000 28,000.00 61,600.00
Tukang las Oh 1.0000 95,000.00 95,000.00
Pembantu tukang las Oh 2.0000 80,000.00 160,000.00
Mandor Oh 0.2000 125,000.00 25,000.00
Mesin Las jam 2.0000 26,325.00 52,650.00
Jumlah 815,620.00
Dibulatkan 815,620.00

D PEKERJAAN BETON
1 M2 Lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr. tebal 5 cm
Semen Portland Kg 10.0000 1,540.00 15,400.00
Pasir Beton M3 0.0260 290,000.00 7,540.00
Koral Beton M3 0.0440 240,000.00 10,560.00
Pekerja Oh 1.1500 80,000.00 92,000.00
Tukang Batu Oh 0.0200 95,000.00 1,900.00
Kepala Tukang Oh 0.0020 105,000.00 210.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 128,360.00
Dibulatkan 128,360.00
D-01 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr
Semen Portland Kg 218.0000 1,540.00 335,720.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.8700 240,000.00 208,800.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0800 125,000.00 10,000.00
Jumlah 863,695.00
Dibulatkan 863,690.00
D-02 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr
Semen Portland Kg 197.0000 1,540.00 303,380.00
Pasir Beton M3 0.4700 290,000.00 136,300.00
Koral Beton M3 0.9400 240,000.00 225,600.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0800 125,000.00 10,000.00
Jumlah 833,655.00
Dibulatkan 833,650.00
D-03 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr
Semen Portland Kg 336.0000 1,540.00 517,440.00
Pasir Beton M3 0.5400 290,000.00 156,600.00
Koral Beton M3 0.8100 240,000.00 194,400.00
Pekerja Oh 2.0000 80,000.00 160,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 1.0000 125,000.00 125,000.00
Jumlah 1,190,365.00
Dibulatkan 1,190,360.00
D-04 1 M3 Tiang Pancang Prestressed Beton
Semen Portland Kg 440.0000 1,540.00 677,600.00
Pasir Beton M3 0.5000 290,000.00 145,000.00
Koral Beton M3 0.8000 240,000.00 192,000.00
Rapidrant Gln 2.4600 17,500.00 43,050.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0800 125,000.00 10,000.00
Jumlah 1,226,025.00
Dibulatkan 1,226,020.00
D-05 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 4 Kr
Semen Portland Kg 291.0000 1,540.00 448,140.00
Pasir Beton M3 0.4700 290,000.00 136,300.00
Koral Beton M3 0.9300 240,000.00 223,200.00
Pekerja Oh 2.0000 80,000.00 160,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 1.0000 125,000.00 125,000.00
Jumlah 1,129,565.00
Dibulatkan 1,129,560.00
D-06 1 M' Memasang PVC Waterstop Lebar 200 mm
Waterstop Lebar 200 mm M1 1.0500 64,500.00 67,725.00
Pekerja Oh 0.0500 80,000.00 4,000.00
Tukang Batu Oh 0.0350 95,000.00 3,325.00
Kepala Tukang Oh 0.0035 105,000.00 367.50
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 75,667.50
Dibulatkan 75,660.00
1 M' Memasang PVC Waterstop Lebar 150 mm
Waterstop Lebar 150 mm M1 1.0500 57,000.00 59,850.00
Pekerja Oh 0.0500 80,000.00 4,000.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.0300 95,000.00 2,850.00
Kepala Tukang Oh 0.0030 105,000.00 315.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 67,265.00
Dibulatkan 67,260.00
D-07 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir
Besi Beton ( Polos/ Ulir ) Kg 1.0500 18,000.00 18,900.00
Kawat Beton Kg 0.0150 33,000.00 495.00
Pekerja Oh 0.0070 80,000.00 560.00
Tukang Besi Oh 0.0070 95,000.00 665.00
Kepala Tukang Oh 0.0007 105,000.00 73.50
Mandor Oh 0.0003 125,000.00 37.50
Jumlah 20,731.00
Dibulatkan 20,730.00
D-08 1 M2 Pasangan Bekisting untuk Pondasi
Kayu terentang M3 0.0400 3,245,000.00 129,800.00
Paku Biasa 2" - 5" Kg 0.3000 24,000.00 7,200.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 0.2600 95,000.00 24,700.00
Kepala Tukang Oh 0.0260 105,000.00 2,730.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 189,055.00
Dibulatkan 189,050.00
D-09 1 M2 Pasangan Bekisting untuk Sloof
Kayu Terentang M3 0.0450 3,245,000.00 146,025.00
Paku Biasa 2" - 5" Kg 0.3000 24,000.00 7,200.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 0.2600 95,000.00 24,700.00
Kepala Tukang Oh 0.0260 105,000.00 2,730.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 205,280.00
Dibulatkan 205,280.00
D-10 1 M2 Pasangan Bekisting untuk Kolom
Kayu Terentang M3 0.0400 3,245,000.00 129,800.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Kayu balok terentang M3 0.0150 2,975,000.00 44,625.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 2.0000 33,000.00 66,000.00
Pekerja Oh 0.3300 80,000.00 26,400.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 370,265.00
Dibulatkan 370,260.00
D-11 1 M2 Pasangan Bekisting untuk Balok
Kayu Terentang M3 0.0400 3,245,000.00 129,800.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Kayu balok terentang M3 0.0180 2,975,000.00 53,550.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 2.0000 33,000.00 66,000.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 376,790.00
Dibulatkan 376,790.00
D-12 1 M2 Pasangan Bekisting untuk Lantai
Kayu Terentang M3 0.0400 3,245,000.00 129,800.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
1 2 3 4 5 6=4x5
Minyak Bekisting Ltr 0.2000 45,000.00 9,000.00
Kayu balok terentang M3 0.0150 2,975,000.00 44,625.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 6.0000 33,000.00 198,000.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 508,865.00
Dibulatkan 508,860.00
D-13 1 M2 Pasang Bekisting untuk Tangga
Kayu Terentang M3 0.0300 3,245,000.00 97,350.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Minyak Bekisting Ltr 0.1500 45,000.00 6,750.00
Kayu balok terentang M3 0.0150 2,975,000.00 44,625.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 2.0000 33,000.00 66,000.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 343,765.00
Dibulatkan 343,760.00
D-14 1 M3 Membuat Beton Cor Mutu K225
Semen Portland Kg 388.0000 1,540.00 597,520.00
Pasir Beton M3 0.6500 290,000.00 188,500.00
Koral Beton M3 0.6500 240,000.00 156,000.00
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Batu Oh 1.0000 95,000.00 95,000.00
Kepala Tukang Oh 0.1000 105,000.00 10,500.00
Mandor Oh 0.3000 125,000.00 37,500.00
Jumlah 1,640,270.00
Dibulatkan 1,640,270.00
D-15 1 M3 Membuat Beton Cor Mutu K275
Semen Portland Kg 400.0000 1,540.00 616,000.00
Pasir Beton M3 0.4000 290,000.00 116,000.00
Koral Beton M3 0.8200 240,000.00 196,800.00
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Batu Oh 1.0000 95,000.00 95,000.00
Kepala Tukang Oh 0.1000 105,000.00 10,500.00
Mandor Oh 0.3000 125,000.00 37,500.00
Jumlah 1,627,050.00
Dibulatkan 1,627,050.00
D-16 1 KG Besi Beton Polos
Besi Beton Polos U 24 Kg 1.1000 18,000.00 19,800.00
Kawat Beton Kg 0.0188 33,000.00 620.40
Pekerja Oh 0.0080 80,000.00 640.00
Tukang Besi Oh 0.0100 95,000.00 950.00
Kepala Tukang Oh 0.0029 105,000.00 304.50
Mandor Oh 0.0010 125,000.00 125.00
Jumlah 22,439.90
Dibulatkan 22,430.00
D-16 1 KG Besi Beton Ulir
Besi Beton Ulir 32 / 39 Kg 1.1000 25,000.00 27,500.00
Kawat Beton Kg 0.0188 33,000.00 620.40
Pekerja Oh 0.0080 80,000.00 640.00
Tukang Besi Oh 0.0100 95,000.00 950.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0029 105,000.00 304.50
Mandor Oh 0.0010 125,000.00 125.00
Jumlah 30,139.90
Dibulatkan 30,130.00
D-16 1 M3 Pondasi Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.2000 3,245,000.00 649,000.00
Paku Biasa 2" - 5" Kg 1.5000 24,000.00 36,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 3.9000 80,000.00 312,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.0400 95,000.00 98,800.00
Tukang Besi Oh 1.0500 95,000.00 99,750.00
Kepala Tukang Oh 0.2450 105,000.00 25,725.00
Mandor Oh 0.1650 125,000.00 20,625.00
Jumlah 4,884,820.00
Dibulatkan 4,884,820.00
D-17 1 M3 Sloof Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 6,217,025.00
Dibulatkan 6,217,020.00
1 M3 Sloof Beton Tulang 15/20 cm (150 kg besi+bekisting)
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Minyak Bekisting Ltr 0.6000 45,000.00 27,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 5,344,025.00
Dibulatkan 5,344,020.00
1 M3 Sloof Beton Tulang 15/20 cm (180 kg besi+bekisting) 4 dia. 12 ring 8-15
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
1 2 3 4 5 6=4x5
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 5,857,025.00
Dibulatkan 5,857,020.00
1 M3 Sloof Beton Tulang 20/30 cm (150 kg besi+bekisting) 4 dia. 16 ring 8-15
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 5,317,025.00
Dibulatkan 5,317,020.00
1 M3 Sloof Beton Tulang 20/30 cm (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 6,217,025.00
Dibulatkan 6,217,020.00
1 M3 Sloof Beton Bertulang 20/40 cm (240 kg besi+bekisting) Struktur bertingkat
Kayu Terentang M3 0.2700 3,245,000.00 876,150.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Minyak Bekisting Ltr 0.6000 45,000.00 27,000.00
Besi Beton Polos Kg 240.0000 18,000.00 4,320,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Pekerja Oh 4.8500 80,000.00 388,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3310 105,000.00 34,755.00
Mandor Oh 0.1700 125,000.00 21,250.00
Jumlah 6,964,025.00
Dibulatkan 6,964,020.00
1 2 3 4 5 6=4x5
D-18 1 M3 Kolom Beton Tulang (120 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 120.0000 18,000.00 2,160,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,449,170.00
Dibulatkan 7,449,170.00
D-19 1 M3 Kolom Beton Tulang (140 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 140.0000 18,000.00 2,520,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,809,170.00
Dibulatkan 7,809,170.00
D-20 1 M3 Kolom Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,989,170.00
1 2 3 4 5 6=4x5
Dibulatkan 7,989,170.00
D-21 1 M3 Kolom Beton Tulang (180 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,529,170.00
Dibulatkan 8,529,170.00
D-22 1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,889,170.00
Dibulatkan 8,889,170.00
D-23 1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 250.0000 18,000.00 4,500,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
1 2 3 4 5 6=4x5
Jumlah 9,789,170.00
Dibulatkan 9,789,170.00
D-24 1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 300.0000 18,000.00 5,400,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 10,689,170.00
Dibulatkan 10,689,170.00
1 M3 Kolom Beton Tulang 20/20 cm (140 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 140.0000 18,000.00 2,520,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,719,170.00
Dibulatkan 7,719,170.00
1 M3 Kolom Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,439,170.00
1 2 3 4 5 6=4x5
Dibulatkan 8,439,170.00
1 M3 Kolom Beton Tulang 20/20 cm (210 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 210.0000 18,000.00 3,780,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,979,170.00
Dibulatkan 8,979,170.00
1 M3 Kolom Beton Tulang 20/30cm (230 kg besi+bekisting) Struktur bertingkat 6 dia.16+2 dia.12, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 230.0000 18,000.00 4,140,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 9,339,170.00
Dibulatkan 9,339,170.00
1 M3 Kolom Beton Tulang 20/40 cm (250 kg besi+bekisting) Struktur bertingkat
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 250.0000 18,000.00 4,500,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 9,789,170.00
Dibulatkan 9,789,170.00
1 2 3 4 5 6=4x5
1 M3 Kolom Beton Tulang 30/30 cm (175 kg besi+bekisting) Struktur bertingkat 8 dia. 16, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 175.0000 18,000.00 3,150,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,349,170.00
Dibulatkan 8,349,170.00
1 M3 Kolom Beton Tulang 30/30 cm (210 kg besi bekisting) Struktur bertingkat 10 dia. 16, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 210.0000 18,000.00 3,780,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,979,170.00
Dibulatkan 8,979,170.00
1 M3 Kolom Beton Tulang 30/40 cm (200 kg besi bekisting) Struktur bertingkat
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,889,170.00
Dibulatkan 8,889,170.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (175 kg besi+bekisting)
1 2 3 4 5 6=4x5
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 175.0000 18,000.00 3,150,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 7,320,170.00
Dibulatkan 7,320,170.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (260 kg besi+bekisting) 4 dia. 10, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 260.0000 18,000.00 4,680,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,850,170.00
Dibulatkan 8,850,170.00
1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 4.5000 33,000.00 148,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 8,888,270.00
Dibulatkan 8,888,270.00
1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 250.0000 18,000.00 4,500,000.00
Kawat Beton Kg 4.5000 33,000.00 148,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 9,788,270.00
Dibulatkan 9,788,270.00
1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 300.0000 18,000.00 5,400,000.00
Kawat Beton Kg 4.5000 33,000.00 148,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1500 2,975,000.00 446,250.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 10,688,270.00
Dibulatkan 10,688,270.00
D-25 1 M3 Balok Beton Tulang (120 kg besi+bekisting)
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 120.0000 18,000.00 2,160,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 6,635,545.00
Dibulatkan 6,635,540.00
D-26 1 M3 Balok Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.3500 3,245,000.00 1,135,750.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,287,745.00
Dibulatkan 7,287,740.00
D-27 1 M3 Balok Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.3000 3,245,000.00 973,500.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 200.0000 1,540.00 308,000.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 1.5000 166,500.00 249,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 12.0000 33,000.00 396,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,512,375.00
Dibulatkan 7,512,370.00
D-28 1 M3 Balok Beton Tulang (230 kg besi+bekisting)
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 230.0000 18,000.00 4,140,000.00
Kawat Beton Kg 3.4500 33,000.00 113,850.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 8,669,995.00
Dibulatkan 8,669,990.00
1 M3 Balok Beton Tulang 15/20 cm (150 kg besi+bekisting)
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
1 2 3 4 5 6=4x5
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,190,395.00
Dibulatkan 7,190,390.00
1 M3 Balok Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,658,395.00
Dibulatkan 7,658,390.00
1 M3 Balok Beton Lintel 11/11 (300 kg besi+bekisting) 4 dia. 10, 8-15
Kayu Terentang M3 0.4000 3,245,000.00 1,298,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 300.0000 18,000.00 5,400,000.00
Kawat Beton Kg 1.8000 33,000.00 59,400.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 33,000.00 660,000.00
Pekerja Oh 7.3000 80,000.00 584,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 3.3000 95,000.00 313,500.00
Tukang Besi Oh 2.1000 95,000.00 199,500.00
Kepala Tukang Oh 0.5700 105,000.00 59,850.00
Mandor Oh 0.2500 125,000.00 31,250.00
Jumlah 9,570,170.00
Dibulatkan 9,570,170.00
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk+balok portal (180 kg besi+bekisting) 4 dia.12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 180.0000 18,000.00 3,240,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
1 2 3 4 5 6=4x5
Dolken o - 8 Cm/ 4 m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,658,395.00
Dibulatkan 7,658,390.00
1 M3 Balok Beton Tulang 15/30 (190 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 190.0000 18,000.00 3,420,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,838,395.00
Dibulatkan 7,838,390.00
1 M3 Balok Beton Tulang 20/40 (200 kg besi+bekisting) Struktur bertingkat 7 dia. 16+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 8,043,145.00
Dibulatkan 8,043,140.00
1 M3 Balok Beton Tulang 20/30 (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 8,043,145.00
Dibulatkan 8,043,140.00
1 M3 Balok Beton Tulang 20/30 (175 kg besi+bekisting) Struktur bertingkat 5 dia. 16, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 175.0000 18,000.00 3,150,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 7,593,145.00
Dibulatkan 7,593,140.00
1 M3 Balok Beton Tulang 25/55 (140 kg besi+bekisting) Struktur bertingkat 8 dia. 16+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 140.0000 18,000.00 2,520,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 6,963,145.00
Dibulatkan 6,963,140.00
1 M3 Balok Beton Tulang 30/60 (110 kg besi+ bekisting) Struktur bertingkat 9 dia. 19+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 110.0000 18,000.00 1,980,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1400 2,975,000.00 416,500.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 33,000.00 528,000.00
Pekerja Oh 5.9600 80,000.00 476,800.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.8000 95,000.00 266,000.00
1 2 3 4 5 6=4x5
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4550 105,000.00 47,775.00
Mandor Oh 0.2080 125,000.00 26,000.00
Jumlah 6,423,145.00
Dibulatkan 6,423,140.00
D-29 1 M3 Tangga Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2500 3,245,000.00 811,250.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Minyak Bekisting Ltr 1.2000 45,000.00 54,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1050 2,975,000.00 312,375.00
Multiplek 9 mm 120 x 240 Lbr 2.5000 166,500.00 416,250.00
Dolken o - 8 Cm/ 4 m Btg 14.0000 33,000.00 462,000.00
Pekerja Oh 5.6000 80,000.00 448,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.3000 95,000.00 218,500.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.4050 105,000.00 42,525.00
Mandor Oh 0.2020 125,000.00 25,250.00
Jumlah 7,562,820.00
Dibulatkan 7,562,820.00
D-30 1 M3 Plat Lantai Tb. 10 Cm Beton Bertulang (90 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 10.0000 508,860.00 5,088,600.00
Besi Beton Polos Kg 90.0000 20,730.00 1,865,700.00
Jumlah 8,144,660.00
Dibulatkan 8,144,660.00
D-30.1 1 M3 Plat Lantai 1 lapis Tb. 10 Cm Beton Bertulang (50 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Besi Beton Polos Kg 50.0000 20,730.00 1,036,500.00
Jumlah 2,226,860.00
Dibulatkan 2,226,860.00
D-31 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (110 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 8.3300 508,860.00 4,238,803.80
Besi Beton Polos Kg 110.0000 20,730.00 2,280,300.00
Jumlah 7,709,463.80
Dibulatkan 7,709,460.00
D-32 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (130 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 8.3300 508,860.00 4,238,803.80
Besi Beton Polos Kg 130.0000 20,730.00 2,694,900.00
Jumlah 8,124,063.80
Dibulatkan 8,124,060.00
D-33 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (90 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 6.6700 508,860.00 3,394,096.20
Besi Beton Polos Kg 90.0000 20,730.00 1,865,700.00
Jumlah 6,450,156.20
Dibulatkan 6,450,150.00
D-34 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (115 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 6.6700 508,860.00 3,394,096.20
Besi Beton Polos Kg 115.0000 20,730.00 2,383,950.00
Jumlah 6,968,406.20
1 2 3 4 5 6=4x5
Dibulatkan 6,968,400.00
1 M3 Listplang Beton Tulang T= 8 cm (77.5 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 8.3300 508,860.00 4,238,803.80
Besi Beton Polos Kg 77.5000 20,730.00 1,606,575.00
Jumlah 7,035,738.80
Dibulatkan 7,035,730.00
D-35 1 M' Kolom Praktis Beton Tulang ( 11 x 11 ) Cm
Kayu Terentang M3 0.0020 3,245,000.00 6,490.00
Paku Biasa 2" - 5" Kg 0.0100 24,000.00 240.00
Besi Beton Polos Kg 3.0000 18,000.00 54,000.00
Kawat Beton Kg 0.0450 33,000.00 1,485.00
Semen Portland Kg 4.0000 1,540.00 6,160.00
Pasir Beton M3 0.0060 290,000.00 1,740.00
Koral Beton M3 0.0090 240,000.00 2,160.00
Pekerja Oh 0.0600 80,000.00 4,800.00
Tukang Batu Oh 0.0200 95,000.00 1,900.00
Tukang Kayu Oh 0.0200 95,000.00 1,900.00
Tukang Besi Oh 0.0200 95,000.00 1,900.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0030 125,000.00 375.00
Jumlah 83,780.00
Dibulatkan 83,780.00
D-36 1 M' Ring Balok Beton Tulang ( 10 x 15 ) Cm
Kayu Terentang M3 0.0030 3,245,000.00 9,735.00
Paku Biasa 2" - 5" Kg 0.0200 24,000.00 480.00
Besi Beton Polos Kg 3.6000 18,000.00 64,800.00
Kawat Beton Kg 0.0500 33,000.00 1,650.00
Semen Portland Kg 5.5000 1,540.00 8,470.00
Pasir Beton M3 0.0090 290,000.00 2,610.00
Koral Beton M3 0.0150 240,000.00 3,600.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Batu Oh 0.0330 95,000.00 3,135.00
Tukang Kayu Oh 0.0330 95,000.00 3,135.00
Tukang Besi Oh 0.0330 95,000.00 3,135.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 110,425.00
Dibulatkan 110,420.00
D-37 1 M2 Pasang Bekisting untuk Dinding
Kayu Terentang M3 0.0300 3,245,000.00 97,350.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Minyak Bekisting Ltr 0.2000 45,000.00 9,000.00
Kayu balok terentang M3 0.0200 2,975,000.00 59,500.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 3.0000 33,000.00 99,000.00
Formtie/ Penjaga jarak Bekisting/ Spacer Bh 4.0000 2,800.00 11,200.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Kayu Oh 0.3300 95,000.00 31,350.00
Kepala Tukang Oh 0.0330 105,000.00 3,465.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 405,090.00
Dibulatkan 405,090.00
D-38 1 M3 Pelat Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.3200 3,245,000.00 1,038,400.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
1 2 3 4 5 6=4x5
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1200 2,975,000.00 357,000.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 32.0000 33,000.00 1,056,000.00
Pekerja Oh 5.3000 80,000.00 424,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.3000 95,000.00 123,500.00
Tukang Besi Oh 1.0500 95,000.00 99,750.00
Kepala Tukang Oh 0.2650 105,000.00 27,825.00
Mandor Oh 0.2650 125,000.00 33,125.00
Jumlah 7,417,520.00
Dibulatkan 7,417,520.00
D-39 1 M3 Dinding Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.2400 3,245,000.00 778,800.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 18,000.00 2,700,000.00
Kawat Beton Kg 2.2500 33,000.00 74,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1600 2,975,000.00 476,000.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken o - 8 Cm/ 4 m Btg 24.0000 33,000.00 792,000.00
Pekerja Oh 5.6000 80,000.00 448,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 2.6400 95,000.00 250,800.00
Tukang Besi Oh 1.0500 95,000.00 99,750.00
Kepala Tukang Oh 0.4000 105,000.00 42,000.00
Mandor Oh 0.1930 125,000.00 24,125.00
Jumlah 7,169,395.00
Dibulatkan 7,169,390.00
D-40 1 M3 Dinding Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2500 3,245,000.00 811,250.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Minyak Bekisting Ltr 1.2000 45,000.00 54,000.00
Besi Beton Polos Kg 200.0000 18,000.00 3,600,000.00
Kawat Beton Kg 3.0000 33,000.00 99,000.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 290,000.00 150,800.00
Koral Beton M3 0.7800 240,000.00 187,200.00
Kayu Balok Terentang M3 0.1050 2,975,000.00 312,375.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken o - 8 Cm/ 4 m Btg 14.0000 33,000.00 462,000.00
Pekerja Oh 5.6000 80,000.00 448,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Tukang Kayu Oh 1.5600 95,000.00 148,200.00
Tukang Besi Oh 1.4000 95,000.00 133,000.00
Kepala Tukang Oh 0.3230 105,000.00 33,915.00
Mandor Oh 0.2830 125,000.00 35,375.00
Jumlah 7,543,985.00
Dibulatkan 7,543,980.00
D-41 1 M3 Membuat Beton Cor Mutu K300
Semen Portland Kg 413.0000 1,540.00 636,020.00
Pasir Beton M3 0.4256 290,000.00 123,424.00
Koral Beton M3 0.6807 240,000.00 163,368.00
Pekerja Oh 1.6500 80,000.00 132,000.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.2750 95,000.00 26,125.00
Kepala Tukang Oh 0.0280 105,000.00 2,940.00
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 1,094,252.00
Dibulatkan 1,094,250.00
D-42 1 M3 Membuat Beton Cor Mutu K200
Semen Portland Kg 352.0000 1,540.00 542,080.00
Pasir Beton M3 0.4569 290,000.00 132,501.00
Koral Beton M3 0.6873 240,000.00 164,952.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2750 95,000.00 26,125.00
Kepala Tukang Oh 0.0280 105,000.00 2,940.00
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 1,010,973.00
Dibulatkan 1,010,970.00
D-43 1 M3 Membuat Beton Cor Mutu K250
Semen Portland Kg 384.0000 1,540.00 591,360.00
Pasir Beton M3 0.4325 290,000.00 125,425.00
Koral Beton M3 0.6927 240,000.00 166,248.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2750 95,000.00 26,125.00
Kepala Tukang Oh 0.0280 105,000.00 2,940.00
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 1,054,473.00
Dibulatkan 1,054,470.00
1 M3 Membuat Beton dengan Puzzdith - 100 XR
Semen Portland Kg 336.0000 1,540.00 517,440.00
Pasir Beton M3 0.5400 290,000.00 156,600.00
Koral Beton M3 0.8100 240,000.00 194,400.00
Puzzdith - 100 XR Ltr 1.0000 0.00 0.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0800 125,000.00 10,000.00
Jumlah 1,036,815.00
Dibulatkan 1,036,810.00
1 M3 Membuat Beton Kedap Air dengan AM - 100
Semen Portland Kg 400.0000 1,540.00 616,000.00
Pasir Beton M3 0.4800 290,000.00 139,200.00
Koral Beton M3 0.8000 240,000.00 192,000.00
AM - 100 Ltr 1.2000 41,500.00 49,800.00
Pekerja Oh 2.0000 80,000.00 160,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 1.0000 125,000.00 125,000.00
Jumlah 1,318,925.00
Dibulatkan 1,318,920.00
1 Kg Kabel Presstressed Polos / Strands
Besi Presstressed Polos Kg 1.0500 18,000.00 18,900.00
Kawat Beton Kg 0.0100 33,000.00 330.00
Pekerja Oh 0.0050 80,000.00 400.00
Tukang Besi Oh 0.0050 95,000.00 475.00
Kepala Tukang Oh 0.0005 105,000.00 52.50
Mandor Oh 0.0003 125,000.00 37.50
Jumlah 20,195.00
Dibulatkan 20,190.00
1 Kg Jaring Kawat Baja
Besi Jaring Kawat Baja Kg 1.0200 34,000.00 34,680.00
Kawat Beton Kg 0.8050 33,000.00 26,565.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.0250 80,000.00 2,000.00
Tukang Besi Oh 0.0250 95,000.00 2,375.00
Kepala Tukang Oh 0.0025 105,000.00 262.50
Mandor Oh 0.0015 125,000.00 187.50
Jumlah 66,070.00
Dibulatkan 66,070.00
1 M3 Membuat Beton Cor Mutu K175
Semen Portland Kg 326.0000 1,540.00 502,040.00
Pasir Beton M3 0.5429 290,000.00 157,441.00
Koral Beton M3 0.7622 240,000.00 182,928.00
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 1.6500 80,000.00 132,000.00
Tukang Batu Oh 0.2750 95,000.00 26,125.00
Kepala Tukang Oh 0.0280 105,000.00 2,940.00
Mandor Oh 0.0830 125,000.00 10,375.00
Jumlah 1,089,099.00
Dibulatkan 1,089,090.00
1 M2 Pasangan Jembatan Cor
Kayu Albasia M3 0.0264 2,506,000.00 66,158.40
Paku Biasa 2" - 5" Kg 0.6000 24,000.00 14,400.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 0.5000 33,000.00 16,500.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 115,208.40
Dibulatkan 115,200.00
1 M3 Listplank Beton Tulang T=8 cm ( 77,50 kg besi + bekisting )
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,190,360.00 1,190,360.00
Pasang Bekisting untuk lantai M2 8.3300 508,860.00 4,238,803.80
Besi Beton Polos Kg 77.5000 20,730.00 1,606,575.00
Jumlah 7,035,738.80
Dibulatkan 7,035,730.00

E PEKERJAAN DINDING
E-01 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 32.9500 1,540.00 50,743.00
Pasir Pasang M3 0.0910 265,000.00 24,115.00
Pekerja Oh 0.6500 80,000.00 52,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 270,708.00
Dibulatkan 270,700.00
E-02 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 26.5500 1,540.00 40,887.00
Pasir Pasang M3 0.0930 265,000.00 24,645.00
Pekerja Oh 0.6500 80,000.00 52,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 261,382.00
Dibulatkan 261,380.00
E-03 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 22.2000 1,540.00 34,188.00
Pasir Pasang M3 0.1020 265,000.00 27,030.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.6500 80,000.00 52,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 257,068.00
Dibulatkan 257,060.00
E-04 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 14.3700 1,540.00 22,129.80
Pasir Pasang M3 0.0400 265,000.00 10,600.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 130,254.80
Dibulatkan 130,250.00
E-05 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 11.5000 1,540.00 17,710.00
Pasir Pasang M3 0.0430 265,000.00 11,395.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 126,630.00
Dibulatkan 126,630.00
E-06 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 9.6800 1,540.00 14,907.20
Pasir Pasang M3 0.0450 265,000.00 11,925.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 124,357.20
Dibulatkan 124,350.00
E-07 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 3 ps
Roster Terawang Bh 36.0000 17,000.00 612,000.00
Semen Portland Kg 12.8000 1,540.00 19,712.00
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 677,412.00
Dibulatkan 677,410.00
E-08 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 4 ps
Roster Terawang Bh 36.0000 17,000.00 612,000.00
Semen Portland Kg 11.0000 1,540.00 16,940.00
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 674,640.00
Dibulatkan 674,640.00
E-09 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm
Roster Terawang Bh 36.0000 17,000.00 612,000.00
Semen Portland Kg 12.8000 1,540.00 19,712.00
1 2 3 4 5 6=4x5
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 677,412.00
Dibulatkan 677,410.00
E-10 1 M2 Pasang Dinding Batako Besar Pres uk. 8 x 20 x 30 ad. 1pc : 4ps
Batako Bh 13.0000 2,700.00 35,100.00
Semen Portland Kg 12.0000 1,540.00 18,480.00
Pasir Pasang M3 0.0380 265,000.00 10,070.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 100,075.00
Dibulatkan 100,070.00
E-11 1 M2 Pasang Dinding Hollowblock (HB-20)
HB-20 Bh 12.5000 5,700.00 71,250.00
Semen Portland Kg 13.5000 1,540.00 20,790.00
Pasir Pasang M3 0.0480 265,000.00 12,720.00
Besi angkur Ø 8 mm Kg 1.9500 18,000.00 35,100.00
Pekerja Oh 0.3500 80,000.00 28,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0170 125,000.00 2,125.00
Jumlah 185,810.00
Dibulatkan 185,810.00
E-12 1 M2 Pasang Dinding Hollowblock (HB-15)
HB-15 Bh 12.5000 6,500.00 81,250.00
Semen Portland Kg 10.4500 1,540.00 16,093.00
Pasir Pasang M3 0.0380 265,000.00 10,070.00
Besi angkur Ø 8 mm Kg 1.9500 18,000.00 35,100.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 182,648.00
Dibulatkan 182,640.00
E-13 1 M2 Pasang Dinding Hollowblock (HB-10)
HB-10 Bh 12.5000 3,500.00 43,750.00
Semen Portland Kg 7.5000 1,540.00 11,550.00
Pasir Pasang M3 0.0270 265,000.00 7,155.00
Besi angkur Ø 8 mm Kg 1.9500 18,000.00 35,100.00
Pekerja Oh 0.3200 80,000.00 25,600.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 137,690.00
Dibulatkan 137,690.00
E-14 1 M2 Pasang Dinding Conblock (CB-20)
CB-20 Bh 12.5000 5,700.00 71,250.00
Semen Portland Kg 14.0500 1,540.00 21,637.00
Pasir Beton M3 0.0040 290,000.00 1,160.00
Pasir Pasang M3 0.0420 265,000.00 11,130.00
Besi angkur Ø 8 mm Kg 3.8700 18,000.00 69,660.00
Paku Biasa 2" - 5" Kg 0.0060 24,000.00 144.00
Kayu Terentang M3 0.0010 3,245,000.00 3,245.00
Kawat Beton Kg 0.0300 33,000.00 990.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.0050 240,000.00 1,200.00
Pekerja Oh 0.3700 80,000.00 29,600.00
Tukang Batu Oh 0.1570 95,000.00 14,915.00
Tukang Besi Oh 0.0070 95,000.00 665.00
Kepala Tukang Oh 0.0164 105,000.00 1,722.00
Mandor Oh 0.0185 125,000.00 2,312.50
Jumlah 229,630.50
Dibulatkan 229,630.00
E-15 1 M2 Pasang Dinding Conblock (CB-15)
CB-15 Bh 12.5000 6,500.00 81,250.00
Semen Portland Kg 10.4600 1,540.00 16,108.40
Pasir Beton M3 0.0030 290,000.00 870.00
Pasir Pasang M3 0.0320 265,000.00 8,480.00
Besi angkur Ø 8 mm Kg 0.8700 18,000.00 15,660.00
Paku Biasa 2" - 5" Kg 0.0040 24,000.00 96.00
Kayu Terentang M3 0.0010 3,245,000.00 3,245.00
Kawat Beton Kg 0.0200 33,000.00 660.00
Koral Beton M3 0.0040 240,000.00 960.00
Pekerja Oh 0.3400 80,000.00 27,200.00
Tukang Batu Oh 0.1300 95,000.00 12,350.00
Tukang Besi Oh 0.0070 95,000.00 665.00
Kepala Tukang Oh 0.0137 105,000.00 1,438.50
Mandor Oh 0.0170 125,000.00 2,125.00
Jumlah 171,107.90
Dibulatkan 171,100.00
E-16 1 M2 Pasang Dinding Conblock (CB-10)
CB-10 Bh 12.5000 3,500.00 43,750.00
Semen Portland Kg 10.4600 1,540.00 16,108.40
Pasir Beton M3 0.0030 290,000.00 870.00
Pasir Pasang M3 0.0320 265,000.00 8,480.00
Besi angkur Ø 8 mm Kg 0.8700 18,000.00 15,660.00
Paku Biasa 2" - 5" Kg 0.0040 24,000.00 96.00
Kayu Terentang M3 0.0010 3,245,000.00 3,245.00
Kawat Beton Kg 0.0200 33,000.00 660.00
Koral Beton M3 0.0040 240,000.00 960.00
Pekerja Oh 0.3400 80,000.00 27,200.00
Tukang Batu Oh 0.1300 95,000.00 12,350.00
Tukang Besi Oh 0.0070 95,000.00 665.00
Kepala Tukang Oh 0.0137 105,000.00 1,438.50
Mandor Oh 0.0170 125,000.00 2,125.00
Jumlah 133,607.90
Dibulatkan 133,600.00
E-17 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Mulia
Keramik 10x20 Cm Corak m2 1.0000 68,000.00 68,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 142,998.00
Dibulatkan 142,990.00
E-18 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Mulia
Keramik 10x20 Cm Polos m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 140,998.00
Dibulatkan 140,990.00
E-19 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Mulia
Keramik 20x20 Cm Corak m2 1.0000 71,000.00 71,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 145,998.00
Dibulatkan 145,990.00
E-20 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Mulia
Keramik 20x20 Cm polos m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 140,998.00
Dibulatkan 140,990.00
E-21 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Mulia
Keramik 20x25 Cm Corak m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 140,998.00
Dibulatkan 140,990.00
E-22 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Mulia
Keramik 20x25 Cm Corak m2 1.0000 71,000.00 71,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 145,998.00
Dibulatkan 145,990.00
E-23 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Mulia
Keramik 30x30 Cm polos m2 1.0000 61,000.00 61,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 135,998.00
1 2 3 4 5 6=4x5
Dibulatkan 135,990.00
E-24 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia
Keramik 30x30 Cm corak m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 140,998.00
Dibulatkan 140,990.00
E-25 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Mulia
Keramik 40x40 Cm polos m2 1.0000 74,000.00 74,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 148,998.00
Dibulatkan 148,990.00
E-26 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Mulia
Keramik 40x40 Cm corak m2 1.0000 72,000.00 72,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 146,998.00
Dibulatkan 146,990.00
1 M2 Pasang Dinding Granito uk. 60 x 60 set. Essenza polis
Granito 60 x 60 essenza polis M2 1.0500 434,000.00 455,700.00
Paku Pancing 60x230 Bh 2.0000 1,000.00 2,000.00
Semen Abu - Abu Kg 10.4400 1,540.00 16,077.60
Pasir Pasang M3 0.0200 265,000.00 5,300.00
Semen Warna Kg 1.5000 16,000.00 24,000.00
Pekerja Oh 0.5000 80,000.00 40,000.00
Tukang Batu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0250 125,000.00 3,125.00
Jumlah 572,577.60
Dibulatkan 572,570.00
E-27 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Roman
Keramik 10x20 Cm Corak m2 1.0000 88,000.00 88,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 162,998.00
Dibulatkan 162,990.00
E-28 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Roman
Keramik 10x20 Cm Polos m2 1.0000 72,000.00 72,000.00
1 2 3 4 5 6=4x5
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 146,998.00
Dibulatkan 146,990.00
E-29 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Roman
Keramik 20x20 Cm Corak m2 1.0000 91,000.00 91,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 165,998.00
Dibulatkan 165,990.00
E-30 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Roman
Keramik 20x20 Cm polos m2 1.0000 72,000.00 72,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 146,998.00
Dibulatkan 146,990.00
E-31 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Roman
Keramik 20x25 Cm m2 1.0000 83,000.00 83,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 157,998.00
Dibulatkan 157,990.00
E-32 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Roman
Keramik 20x25 Cm Corak m2 1.0000 89,000.00 89,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 163,998.00
Dibulatkan 163,990.00
E-33 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Roman
Keramik 30x30 Cm polos m2 1.0000 83,000.00 83,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 157,998.00
Dibulatkan 157,990.00
E-34 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Roman
Keramik 30x30 Cm corak m2 1.0000 88,000.00 88,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 162,998.00
Dibulatkan 162,990.00
E-35 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Roman
Keramik 40x40 Cm polos m2 1.0000 88,000.00 88,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 162,998.00
Dibulatkan 162,990.00
E-36 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Roman
Keramik 40x40 Cm corak m2 1.0000 93,000.00 93,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 167,998.00
Dibulatkan 167,990.00
E-36 1 M2 Pasang Dinding Keramik 20 x 40 Cm corak setara Roman
Keramik 20x40 Cm corak m2 1.0000 91,000.00 91,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 165,998.00
Dibulatkan 165,990.00
E-37 1 M2 Pasang Dinding Marmer
Marmer M2 1.0500 665,000.00 698,250.00
Paku Pancing 60x230 Bh 2.0000 1,000.00 2,000.00
Semen Abu - Abu Kg 12.4400 1,540.00 19,157.60
Pasir Pasang M3 0.0250 265,000.00 6,625.00
Semen Warna Kg 1.5000 16,000.00 24,000.00
Pekerja Oh 0.9000 80,000.00 72,000.00
Tukang Batu Oh 0.6500 95,000.00 61,750.00
Kepala Tukang Oh 0.0650 105,000.00 6,825.00
Mandor Oh 0.0350 125,000.00 4,375.00
1 2 3 4 5 6=4x5
Jumlah 894,982.60
Dibulatkan 894,980.00
E-38 1 M2 Pasang Dinding Batu Tempel Hitam
Batu Tempel Hitam M2 0.0500 110,000.00 5,500.00
Semen Abu - Abu Kg 11.7500 1,540.00 18,095.00
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.6200 80,000.00 49,600.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 123,145.00
Dibulatkan 123,140.00
E-39 1 M2 Pasang Dinding Poslin 11 x 11 Cm
Poslin m2 1.0000 77,000.00 77,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.1875 80,000.00 15,000.00
Tukang Batu Oh 0.3750 95,000.00 35,625.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0188 125,000.00 2,350.00
Jumlah 151,998.00
Dibulatkan 151,990.00
E-40 1 M2 Wall paper
Wall paper m2 1.0500 61,500.00 64,575.00
Lem Kg 0.2500 43,000.00 10,750.00
Pekerja Oh 0.3500 80,000.00 28,000.00
Tukang Batu Oh 0.1750 95,000.00 16,625.00
Kepala Tukang Oh 0.0170 105,000.00 1,785.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 121,985.00
Dibulatkan 121,980.00
E-41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,888,000.00 192,864.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 28,000.00 15,680.00
Teak Wood 4 mm 120 x 240 Lbr 0.8600 145,000.00 124,700.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.4500 95,000.00 42,750.00
Kepala Tukang Oh 0.0450 105,000.00 4,725.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 397,319.00
Dibulatkan 397,310.00
E-42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,888,000.00 192,864.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 28,000.00 15,680.00
Plywood 120 x 240 x 9 mm Lbr 0.8600 260,000.00 223,600.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Kayu Oh 0.6000 95,000.00 57,000.00
Kepala Tukang Oh 0.0600 105,000.00 6,300.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 516,294.00
Dibulatkan 516,290.00
E-43 1 M2 Dinding Pemisah Triplek Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,888,000.00 192,864.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 28,000.00 15,680.00
Triplek 120 x 240 x 4 mm Lbr 0.8600 68,500.00 58,910.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Kayu Oh 0.6000 95,000.00 57,000.00
Kepala Tukang Oh 0.0600 105,000.00 6,300.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 351,604.00
Dibulatkan 351,600.00
E-44 1 M2 Dinding Pemisah GRC tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 35,000.00 14,525.00
Hollow 2/4 Zincromate Btg 0.1500 27,000.00 4,050.00
GRC ( 120 x 240 x 4 ) mm Lbr 0.3640 74,500.00 27,118.00
Paku GRC kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 107,391.00
Dibulatkan 107,390.00
E-45 1 M2 Dinding Pemisah Gypsum dobel tb. 9 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.8300 35,000.00 29,050.00
Hollow 2/4 Zincromate Btg 0.3000 27,000.00 8,100.00
Gypsum Lbr 0.7280 87,800.00 63,918.40
Paku Gypsum kg 0.2200 38,500.00 8,470.00
Ramset / dina bolt Bh 8.0000 8,000.00 64,000.00
Cotton plaster Bh 0.1440 16,500.00 2,376.00
Compoun Zak 0.2500 83,000.00 20,750.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang besi Oh 0.1000 95,000.00 9,500.00
Kepala tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 224,464.40
Dibulatkan 224,460.00
E-46 1 M2 Dinding Plywood tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 35,000.00 14,525.00
Hollow 2/4 Zincromate Btg 0.1500 27,000.00 4,050.00
Plywood 120 x 240 x 9 mm Lbr 0.3640 260,000.00 94,640.00
Paku kg 0.1100 24,000.00 2,640.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 161,755.00
Dibulatkan 161,750.00
E-47 1 M2 Dinding Teakwood tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 35,000.00 14,525.00
Hollow 2/4 Zincromate Btg 0.1500 27,000.00 4,050.00
Teakwood (120 x 240 x 4) mm Lbr 0.3640 145,000.00 52,780.00
Paku kg 0.1100 24,000.00 2,640.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 119,895.00
Dibulatkan 119,890.00
E-48 1 M2 Pasang Dinding Glass Block 20 x 20 ad. 1pc : 4 ps
1 2 3 4 5 6=4x5
Glass block 20 x 20 bh 36.0000 26,000.00 936,000.00
Semen Abu - Abu Kg 11.0000 1,540.00 16,940.00
Pasir Pasang M3 0.0350 265,000.00 9,275.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 998,640.00
Dibulatkan 998,640.00
E-49 1 M2 Pasang Dinding Anyaman Bambu, rangka kayu
Bilik bambu M2 1.5000 25,000.00 37,500.00
Kayu kaso 5/7 M3 0.0140 4,061,000.00 56,854.00
Paku Kg 0.0112 24,000.00 268.80
List kayu 2/4 M3 0.0030 6,391,000.00 19,173.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 127,320.80
Dibulatkan 127,320.00

F PEKERJAAN PLESTERAN
F-01 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm
Semen Portland Kg 8.5200 1,540.00 13,120.80
Pasir Pasang M3 0.0170 265,000.00 4,505.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 50,700.80
Dibulatkan 50,700.00
F-02 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm
Semen Portland Kg 6.4800 1,540.00 9,979.20
Pasir Pasang M3 0.0190 265,000.00 5,035.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 48,089.20
Dibulatkan 48,080.00
F-03 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm
Semen Portland Kg 5.2000 1,540.00 8,008.00
Pasir Pasang M3 0.0200 265,000.00 5,300.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 46,383.00
Dibulatkan 46,380.00
1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm + Acian
Semen Portland Kg 4.3200 1,540.00 6,652.80
Pasir Pasang M3 0.0220 265,000.00 5,830.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 45,557.80
Dibulatkan 45,550.00
F-04 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm
1 2 3 4 5 6=4x5
Semen Portland Kg 10.8000 1,540.00 16,632.00
Pasir Pasang M3 0.0260 265,000.00 6,890.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 66,184.50
Dibulatkan 66,180.00
F-05 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm
Semen Portland Kg 8.6800 1,540.00 13,367.20
Pasir Pasang M3 0.0280 265,000.00 7,420.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 63,449.70
Dibulatkan 63,440.00
F-06 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm
Semen Portland Kg 7.2900 1,540.00 11,226.60
Pasir Pasang M3 0.0260 265,000.00 6,890.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 60,779.10
Dibulatkan 60,770.00
F-07 1 M2 Barapen 1 Pc : 5 Ps, Tebal 15 mm
Semen Portland Kg 5.6700 1,540.00 8,731.80
Pasir Pasang M3 0.0230 265,000.00 6,095.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Batu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 35,211.80
Dibulatkan 35,210.00
F-08 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm
Semen Portland Kg 9.3000 1,540.00 14,322.00
Pasir Pasang M3 0.0180 265,000.00 4,770.00
Pekerja Oh 0.2600 80,000.00 20,800.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 62,617.00
Dibulatkan 62,610.00
F-09 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm
Semen Portland Kg 7.0700 1,540.00 10,887.80
Pasir Pasang M3 0.0210 265,000.00 5,565.00
Pekerja Oh 0.2600 80,000.00 20,800.00
Tukang Batu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 59,977.80
Dibulatkan 59,970.00
F-10 1 M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm
Semen Portland Kg 0.5000 1,540.00 770.00
Pasir Pasang M3 0.0130 265,000.00 3,445.00
Pekerja Oh 0.0800 80,000.00 6,400.00
Tukang Batu Oh 0.4000 95,000.00 38,000.00
Kepala Tukang Oh 0.0400 105,000.00 4,200.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0040 125,000.00 500.00
Jumlah 53,315.00
Dibulatkan 53,310.00
F-11 1 M2 Acian Plesteran
Semen Portland Kg 4.0000 1,540.00 6,160.00
Pekerja Oh 0.1430 80,000.00 11,440.00
Tukang Batu Oh 0.1070 95,000.00 10,165.00
Kepala Tukang Oh 0.0105 105,000.00 1,102.50
Mandor Oh 0.0105 125,000.00 1,312.50
Jumlah 30,180.00
Dibulatkan 30,180.00
F-12 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps batu belah
Semen Portland Kg 6.3400 1,540.00 9,763.60
Pasir Pasang M3 0.0120 265,000.00 3,180.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 54,643.60
Dibulatkan 54,640.00
F-13 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps dinding bata merah
Semen Portland Kg 4.3200 1,540.00 6,652.80
Pasir Pasang M3 0.0160 265,000.00 4,240.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Batu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 31,277.80
Dibulatkan 31,270.00

G PEKERJAAN PENUTUP ATAP


G-01 1 M2 Pasang Atap Genteng Pelentong
Genteng Pelentong Bh 25.0000 2,000.00 50,000.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.0750 95,000.00 7,125.00
Kepala Tukang Oh 0.0080 105,000.00 840.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 70,965.00
Dibulatkan 70,960.00
1 M2 Pasang Atap Genteng Pelentong Existing (Lama)
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.0750 95,000.00 7,125.00
Kepala Tukang Oh 0.0080 105,000.00 840.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 20,965.00
Dibulatkan 20,960.00
G-02 1 M2 Pasang Genteng Bubungan Palentong
Genteng Bubungan Pelentong Bh 5.0000 6,500.00 32,500.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0320 265,000.00 8,480.00
Pekerja Oh 0.4000 80,000.00 32,000.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 106,650.00
Dibulatkan 106,650.00
G-03 1 M2 Pasang Roof Ligt Fiberglass ( 180 x 90 ) Cm
Roof Light Fiberglass Lbr 0.6000 110,000.00 66,000.00
Paku Biasa 1/2" - 1" Kg 0.0500 24,000.00 1,200.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.1400 80,000.00 11,200.00
Tukang Kayu Oh 0.0670 95,000.00 6,365.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 86,375.00
Dibulatkan 86,370.00
G-04 1 M2 Pasang Atap Asbes Gelombang ( 3.00 x 1.05 m ) x 4 mm
Asbes Gelombang Lbr 0.3500 88,000.00 30,800.00
Paku seng Kg 0.1200 24,000.00 2,880.00
Pekerja Oh 0.1400 80,000.00 11,200.00
Tukang Kayu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 53,140.00
Dibulatkan 53,140.00
G-05 1 M2 Pasang Atap Asbes Gelombang ( 2.70 x 1.05 m ) x 4 mm
Asbes Gelombang Lbr 0.4200 81,000.00 34,020.00
Paku seng Kg 0.1200 24,000.00 2,880.00
Pekerja Oh 0.1400 80,000.00 11,200.00
Tukang Kayu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 56,360.00
Dibulatkan 56,360.00
G-06 1 M2 Pasang Atap Asbes Gelombang ( 2.40 x 1.05 m ) x 4 mm
Asbes Gelombang Lbr 0.4400 72,500.00 31,900.00
Paku seng Kg 0.1200 24,000.00 2,880.00
Pekerja Oh 0.1400 80,000.00 11,200.00
Tukang Kayu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 54,240.00
Dibulatkan 54,240.00
G-07 1 M2 Pasang Atap Asbes Gelombang ( 2.10 x 1.05 m ) x 4 mm
Asbes Gelombang Lbr 0.5100 65,500.00 33,405.00
Paku seng Kg 0.1200 24,000.00 2,880.00
Pekerja Oh 0.1400 80,000.00 11,200.00
Tukang Kayu Oh 0.0670 95,000.00 6,365.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 55,460.00
Dibulatkan 55,460.00
G-08 1 M2 Pasang Atap Asbes Gelombang besar 80 x 180 x 5 mm
Asbes Gelombang Lbr 0.6900 122,500.00 84,525.00
Paku kait bh 4.0000 1,000.00 4,000.00
Pekerja Oh 0.1400 80,000.00 11,200.00
Tukang Kayu Oh 0.0670 95,000.00 6,365.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 107,700.00
Dibulatkan 107,700.00
G-09 1 M' Pasang Nok Stel Gelombang 1.05 m
Nok Stel Gelombang Lbr 2.1000 39,000.00 81,900.00
Paku Sekrup 3,5" Bh 6.0000 850.00 5,100.00
Pekerja Oh 0.0840 80,000.00 6,720.00
Tukang Kayu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0130 105,000.00 1,365.00
Mandor Oh 0.0040 125,000.00 500.00
Jumlah 107,460.00
1 2 3 4 5 6=4x5
Dibulatkan 107,460.00
G-10 1 M2 Pasang Atap Genteng Beton
Genteng Beton Bh 11.0000 9,000.00 99,000.00
Paku 2" - 5" Kg 0.0300 24,000.00 720.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0200 125,000.00 2,500.00
Jumlah 129,820.00
Dibulatkan 129,820.00
G-11 1 M2 Pasang Atap Genteng Morando Natural
Genteng Morando Bh 18.0000 3,000.00 54,000.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.0750 95,000.00 7,125.00
Kepala Tukang Oh 0.0080 105,000.00 840.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 74,965.00
Dibulatkan 74,960.00
G-12 1 M2 Pasang Atap Genteng Morando Glasur
Genteng Morando Glasur Bh 18.0000 4,500.00 81,000.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.0750 95,000.00 7,125.00
Kepala Tukang Oh 0.0080 105,000.00 840.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 101,965.00
Dibulatkan 101,960.00
G-13 1 M2 Pasang Atap Genteng Metal
Genteng Metal m2 1.0200 225,000.00 229,500.00
Paku 2" - 5" Kg 0.2000 24,000.00 4,800.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0010 125,000.00 125.00
Jumlah 260,975.00
Dibulatkan 260,970.00
G-14 1 M' Pasang Nok Genteng Beton
Nok Genteng Beton Bh 3.5000 11,000.00 38,500.00
Paku 2" x 5" Kg 0.0500 24,000.00 1,200.00
Semen Abu - abu Kg 10.8000 1,540.00 16,632.00
Pasir Pasang M3 0.0320 265,000.00 8,480.00
Semen warna Kg 1.0000 16,000.00 16,000.00
Pekerja Oh 0.4000 80,000.00 32,000.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0200 125,000.00 2,500.00
Jumlah 136,412.00
Dibulatkan 136,410.00
G-15 1 M' Pasang Nok Genteng Metal
Nok genteng metal m1 1.1000 152,500.00 167,750.00
Paku Biasa 1/2" - 1" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Kayu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 206,400.00
Dibulatkan 206,400.00
G-16 1 M2 Pasang Atap Seng Gelombang
Seng Gelombang 180X80, 5mm Lbr 0.7000 91,500.00 64,050.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.1200 80,000.00 9,600.00
Tukang Kayu Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 81,210.00
Dibulatkan 81,210.00
G-17 1 M2 Pasang Atap Nok Seng
Seng Plat 3"x 6" Bjls 30 Lbr 0.3000 55,500.00 16,650.00
Paku Biasa 1/2" - 1" Kg 0.0400 24,000.00 960.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0080 105,000.00 840.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 37,850.00
Dibulatkan 37,850.00
G-18 1 M2 Pasang Alluminium Foil / Sisalation
Sisalation / Alluminium Foil M2 1.0500 20,000.00 21,000.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 39,275.00
Dibulatkan 39,270.00
G-19 1 M2 Pasang Atap Alluminium Natural
Atap Alluminium Natural USR 26 M2 1.0500 155,000.00 162,750.00
Paku Hak Panjang 15 Cm Kg 0.0200 18,400.00 368.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.7500 95,000.00 71,250.00
Kepala Tukang Oh 0.0080 105,000.00 840.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 247,958.00
Dibulatkan 247,950.00
G-20 1 M2 Pasang Atap Alluminium Warna
Atap Alluminium Natural USR 26 M2 1.0500 182,500.00 191,625.00
Paku Hak Panjang 15 Cm Kg 0.0200 18,400.00 368.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.7500 95,000.00 71,250.00
Kepala Tukang Oh 0.0080 105,000.00 840.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 276,833.00
Dibulatkan 276,830.00
G-21 1 M2 Pasang Nol Alluminium
Nok standar M2 1.2000 78,500.00 94,200.00
Paku Hak Panjang 15 Cm Kg 0.0400 18,400.00 736.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 1.0000 95,000.00 95,000.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 200,236.00
Dibulatkan 200,230.00
G-22 1 M' Pasang Listplang GRC lebar 30 Cm
GRC lbr 0.3300 74,500.00 24,585.00
Paku GRC Kg 0.0500 38,500.00 1,925.00
Pekerja Setengah Terampil Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Terampil Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Kayu Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 56,235.00
Dibulatkan 56,230.00
1 2 3 4 5 6=4x5
1 M' Pasang Listplang GRC lebar 30 Cm , tebal 9 mm
Kalsiplank uk. 3000x300x9 mm lbr 0.3400 65,800.00 22,372.00
Kaso 4/6 ky. Borneo m3 0.0030 3,354,000.00 10,062.00
Paku Biasa ½" - 1" Kg 0.3000 24,000.00 7,200.00
Paku Skrup bh 4.0000 850.00 3,400.00
Pekerja Setengah Terampil Oh 0.1100 80,000.00 8,800.00
Tukang Kayu Terampil Oh 0.2200 95,000.00 20,900.00
Kepala Tukang Kayu Oh 0.0220 105,000.00 2,310.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 75,669.00
Dibulatkan 75,660.00
G-23 1 M' Pasang Nok Pinggir Morando Natural
Nok pinggir genteng morando natural Bh 4.0000 4,000.00 16,000.00
Paku Biasa 8" - 15" cm Kg 0.0526 18,400.00 967.84
Pekerja Oh 0.0840 80,000.00 6,720.00
Tukang Kayu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0130 105,000.00 1,365.00
Mandor Oh 0.0040 125,000.00 500.00
Jumlah 37,427.84
Dibulatkan 37,420.00
1 M' Pasang Bubungan Stel Gelombang 0.92 m
Bubungan Stel Gelombang Lbr 2.4000 8,000.00 19,200.00
Paku Sekrup 3,5" Bh 6.0000 850.00 5,100.00
Pekerja Oh 0.0840 80,000.00 6,720.00
Tukang Kayu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0130 105,000.00 1,365.00
Mandor Oh 0.0040 125,000.00 500.00
Jumlah 44,760.00
Dibulatkan 44,760.00
1 M' Pasang Nok Sirap
Seng Plat 3"x 6" Bjls 28 Lbr 0.4000 55,500.00 22,200.00
Paku Biasa 1/2" - 1" Kg 0.0600 24,000.00 1,440.00
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Kayu Borneo, Papan Tebal 3 Cm M3 0.0040 6,771,000.00 27,084.00
Pekerja Oh 0.1250 80,000.00 10,000.00
Tukang Kayu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0500 105,000.00 5,250.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 91,674.00
Dibulatkan 91,670.00
1 M' Pasang Genteng Bubungan Morando Naatural
Genteng Bubungan Morando Bh 4.0000 8,500.00 34,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0320 265,000.00 8,480.00
Pekerja Oh 0.4000 80,000.00 32,000.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 108,150.00
Dibulatkan 108,150.00
1 M' Pasang Genteng Bubungan Morando Glazur
Genteng Bubungan Morando Bh 4.0000 12,000.00 48,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0320 265,000.00 8,480.00
Pekerja Oh 0.4000 80,000.00 32,000.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 122,150.00
1 2 3 4 5 6=4x5
Dibulatkan 122,150.00
1 M2 Pasang Water Proofing Membrance tb. 3 mm
Water proofing membrance tb. 3 mm M2 1.0000 125,000.00 125,000.00
Alat bantu dan alat pembakaran Ls 0.1500 150,700.00 22,605.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Batu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0150 125,000.00 1,875.00
Jumlah 173,305.00
Dibulatkan 173,300.00

H PEKERJAAN LANGIT - LANGIT


H-01 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 5 mm
Plafond Asbes Tebal 5 mm M2 1.1000 25,000.00 27,500.00
Paku Kg 0.0100 24,000.00 240.00
Pekerja Oh 0.0300 80,000.00 2,400.00
Tukang Kayu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0015 125,000.00 187.50
Jumlah 37,712.50
Dibulatkan 37,710.00
H-02 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 3.5 mm
Plafond Asbes Tebal 3.5 mm M2 1.1000 21,500.00 23,650.00
Paku Kg 0.0100 24,000.00 240.00
Pekerja Oh 0.0300 80,000.00 2,400.00
Tukang Kayu Oh 0.0700 95,000.00 6,650.00
Kepala Tukang Oh 0.0070 105,000.00 735.00
Mandor Oh 0.0015 125,000.00 187.50
Jumlah 33,862.50
Dibulatkan 33,860.00
H-03 1 M2 Langit - langit Akustik (60x120) Cm
Akustik Arm Strong ukuran 60x120 Cm Lbr 1.5000 146,500.00 219,750.00
Paku Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.0600 80,000.00 4,800.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0030 125,000.00 375.00
Jumlah 236,675.00
Dibulatkan 236,670.00
H-04 1 M2 Langit - langit Akustik 60x120 Cm dan Rangka alluminium
Profi Alluminium "T" M' 3.6000 14,000.00 50,400.00
Kawat Seng Polos Kg 0.1500 33,000.00 4,950.00
Ramset/ Dina Bolt Bh 1.0000 8,000.00 8,000.00
Akustik Arm Strong 60x120 Cm Lbr 1.5000 146,500.00 219,750.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0500 105,000.00 5,250.00
Mandor Oh 0.0075 125,000.00 937.50
Jumlah 348,787.50
Dibulatkan 348,780.00
H-05 1 M2 Langit - Langit Teakwood (60 x 120) cm, t = 4 mm + Rangka kayu Borneo Super
Kayu Balok Borneo Super M3 0.2300 6,391,000.00 1,469,930.00
Paku biasa 2" - 5" Kg 0.0600 24,000.00 1,440.00
Teakwood 120 cm x 240 cm x 0,4 cm Lbr 0.3900 145,000.00 56,550.00
Pekerja Oh 0.2700 80,000.00 21,600.00
Tukang kayu Oh 0.4000 95,000.00 38,000.00
Kepala tukang Oh 0.0400 105,000.00 4,200.00
Mandor Oh 0.0135 125,000.00 1,687.50
Jumlah 1,593,407.50
1 2 3 4 5 6=4x5
Dibulatkan 1,593,400.00
H-06 1 M2 Langit - Langit Teakwood 3 mm + Rangka kayu Borneo Super
Kayu Balok Borneo Super M3 0.2300 6,391,000.00 1,469,930.00
Paku biasa 2" - 5" Kg 0.0600 24,000.00 1,440.00
Teakwood 120 cm x 240 cm x 0,3 cm Lbr 0.3900 142,500.00 55,575.00
Pekerja Oh 0.2700 80,000.00 21,600.00
Tukang kayu Oh 0.4000 95,000.00 38,000.00
Kepala tukang Oh 0.0400 105,000.00 4,200.00
Mandor Oh 0.0135 125,000.00 1,687.50
Jumlah 1,592,432.50
Dibulatkan 1,592,430.00
H-07 1 M2 Langit - Langit Triplek 4 mm + Rangka kayu Borneo Super
Kayu Balok Borneo Super M3 0.2300 6,391,000.00 1,469,930.00
Paku biasa 2" - 5" Kg 0.0600 24,000.00 1,440.00
Triplek 120 cm x 240 cm x 0,4 cm Lbr 0.3900 68,500.00 26,715.00
Pekerja Oh 0.2700 80,000.00 21,600.00
Tukang kayu Oh 0.4000 95,000.00 38,000.00
Kepala tukang Oh 0.0400 105,000.00 4,200.00
Mandor Oh 0.0135 125,000.00 1,687.50
Jumlah 1,563,572.50
Dibulatkan 1,563,570.00
H-07 1 M2 Langit - Langit Triplek 4 mm
Paku biasa 2" - 5" Kg 0.0100 24,000.00 240.00
Triplek 120 cm x 240 cm x 0,4 cm Lbr 0.3750 68,500.00 25,687.50
Pekerja Oh 0.0800 80,000.00 6,400.00
Tukang kayu Oh 0.0800 95,000.00 7,600.00
Kepala tukang Oh 0.0800 105,000.00 8,400.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 53,327.50
Dibulatkan 53,320.00
H-08 1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 2/4
Hollow 4/4 Zincromate Btg 0.4150 35,000.00 14,525.00
Hollow 2/4 Zincromate Btg 0.1500 27,000.00 4,050.00
Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.3640 87,800.00 31,959.20
Paku gypsum Kg 0.1100 18,500.00 2,035.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 110,032.20
Dibulatkan 110,030.00
H-08 1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 4/4
Hollow 4/4 Zincromate Btg 0.5650 35,000.00 19,775.00
Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.3640 87,800.00 31,959.20
Paku gypsum Kg 0.1100 18,500.00 2,035.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 111,232.20
Dibulatkan 111,230.00
H-09 1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 2/4
Hollow 4/4 Zincromate Btg 0.4150 35,000.00 14,525.00
1 2 3 4 5 6=4x5
Hollow 2/4 Zincromate Btg 0.1500 27,000.00 4,050.00
GRC ( 120 x 240 x 4 ) mm Lbr 0.3640 74,500.00 27,118.00
Paku GRC Kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 107,391.00
Dibulatkan 107,390.00
H-09 1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 4/4
Hollow 4/4 Zincromate Btg 0.5650 35,000.00 19,775.00
GRC ( 120 x 240 x 4 ) mm Lbr 0.3640 74,500.00 27,118.00
Paku GRC Kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang besi Oh 0.0500 95,000.00 4,750.00
Kepala tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 108,591.00
Dibulatkan 108,590.00
H-10 1 M2 Langit - Langit Gypsum Board, tb. 9 mm
Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.3900 87,800.00 34,242.00
Paku sekrup Kg 0.1100 18,500.00 2,035.00
Pekerja Oh 0.1350 80,000.00 10,800.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 69,052.00
Dibulatkan 69,050.00
H-11 1 M2 Langit - Langit GRC, tb. 4 mm
GRC ( 120 x 240 x 4 ) mm Lbr 0.3900 74,500.00 29,055.00
Paku GRC Kg 0.1100 38,500.00 4,235.00
Pekerja Oh 0.1350 80,000.00 10,800.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0070 125,000.00 875.00
Jumlah 66,065.00
Dibulatkan 66,060.00
H-12 1 M1 List Langit - langit Kayu Profil 10 cm
List Kayu Profil M' 1.0500 35,000.00 36,750.00
Paku Kg 0.0100 24,000.00 240.00
Pekerja Oh 0.0500 80,000.00 4,000.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0030 125,000.00 375.00
Jumlah 46,640.00
Dibulatkan 46,640.00
H-13 1 M1 List Langit - langit Gypsum 10 cm
List Gypsum M' 1.0500 9,000.00 9,450.00
Tepung gypsum Kg 0.1500 13,800.00 2,070.00
Pekerja Oh 0.0500 80,000.00 4,000.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0030 125,000.00 375.00
1 2 3 4 5 6=4x5
Jumlah 21,170.00
Dibulatkan 21,170.00
H-14 1 M1 List Langit - langit kayu borneo 1/4 cm
List kayu 1/4 M' 1.0500 3,000.00 3,150.00
Paku Kg 0.0100 24,000.00 240.00
Pekerja Oh 0.0434 80,000.00 3,472.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0030 125,000.00 375.00
Jumlah 12,512.00
Dibulatkan 12,510.00

I PEKERJAAN PENUTUP LANTAI


1 M2 Pasang Lantai Granito Tile Essenza Ukuran 60 x 60 Cm Polis
Granito Tile Essenza 60 x 60 Cm M2 1.0500 434,000.00 455,700.00
Semen Portland Kg 10.0000 1,540.00 15,400.00
Pasir Pasang M3 0.0450 265,000.00 11,925.00
Semen Warna Kg 1.0000 16,000.00 16,000.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0125 105,000.00 1,312.50
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 533,775.00
Dibulatkan 533,770.00
1 M2 Pasang Lantai Granito Tile Essenza Ukuran 60 x 60 Cm Un Polis
Granito Tile Essenza 60 x 60 Cm M2 1.0500 280,000.00 294,000.00
Semen Portland Kg 10.0000 1,540.00 15,400.00
Pasir Pasang M3 0.0450 265,000.00 11,925.00
Semen Warna Kg 1.0000 16,000.00 16,000.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0125 105,000.00 1,312.50
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 372,075.00
Dibulatkan 372,070.00
I-0 1 M2 Pasang Lantai Ubin Granito Ukuran 40x40 cm setara Essenza
Ubin Granito 40 x 40 Cm M2 1.0500 418,000.00 438,900.00
Semen Portland Kg 9.8000 1,540.00 15,092.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 1.3000 16,000.00 20,800.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 514,712.00
Dibulatkan 514,710.00
I-02 1 M2 Pasang Lantai Ubin Granito Ukuran 30x30 cm setara Essenza
Ubin Granito 30 x 30 Cm M2 1.0500 391,000.00 410,550.00
Semen Portland Kg 10.0000 1,540.00 15,400.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 1.5000 16,000.00 24,000.00
Pekerja Oh 0.2600 80,000.00 20,800.00
Tukang Batu Oh 0.1250 95,000.00 11,875.00
Kepala Tukang Oh 0.0125 105,000.00 1,312.50
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 491,260.00
Dibulatkan 491,260.00
I-03 1 M' Pasang Plin Ubin Granito Ukuran 10x40 cm setara Essenza
Plin Ubin Granito 10 x 40 Cm Bh 2.6500 2,200.00 5,830.00
1 2 3 4 5 6=4x5
Semen Portland Kg 1.2000 1,540.00 1,848.00
Pasir Pasang M3 0.0030 265,000.00 795.00
Semen Warna Kg 0.1000 16,000.00 1,600.00
Pekerja Oh 0.0600 80,000.00 4,800.00
Tukang Batu Oh 0.0300 95,000.00 2,850.00
Kepala Tukang Oh 0.0030 105,000.00 315.00
Mandor Oh 0.0030 125,000.00 375.00
Jumlah 18,413.00
Dibulatkan 18,410.00
I-04 1 M' Pasang Plin Ubin Granito Ukuran 10x30 cm setara Essenza
Plin Ubin Granito 10 x 30 cm Bh 3.3300 2,000.00 6,660.00
Semen Portland Kg 1.6500 1,540.00 2,541.00
Pasir Pasang M3 0.0032 265,000.00 848.00
Semen Warna Kg 0.1000 16,000.00 1,600.00
Pekerja Oh 0.0900 80,000.00 7,200.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0045 125,000.00 562.50
Jumlah 28,906.50
Dibulatkan 28,900.00
I-05 1 M2 Pasang Lantai Keramik 10x20 cm Corak setara Mulia
Ubin Keramik 10x20 cm Corak m2 1.0000 68,000.00 68,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 120,448.00
Dibulatkan 120,440.00
I-06 1 M2 Pasang Lantai Keramik 20x20 cm Corak setara Mulia
Ubin Keramik 20x20 cm Corak m2 1.0000 71,000.00 71,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 123,448.00
Dibulatkan 123,440.00
I-07 1 M2 Pasang Lantai Keramik 30 x 30 cm Polos setara Mulia
Keramik 30x30 cm Polos m2 1.0000 61,000.00 61,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 113,448.00
Dibulatkan 113,440.00
I-08 1 M2 Pasang Lantai Keramik 30 x 30 cm Corak setara Mulia
Keramik 30x30 cm corak setara Mulia m2 1.0000 66,000.00 66,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 118,448.00
Dibulatkan 118,440.00
I-09 1 M2 Pasang Lantai Keramik 40x40 cm polos setara Mulia
Keramik 40x40 cm polos set. Mulia m2 1.0000 74,000.00 74,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 126,448.00
Dibulatkan 126,440.00
I-10 1 M2 Pasang Lantai Keramik 40x40 cm Corak/Warna setara Mulia
Keramik 40x40 cm Corak/Warna set. Mulia m2 1.0000 72,000.00 72,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 124,448.00
Dibulatkan 124,440.00

I-11 1 M2 Pasang Lantai Keramik 10x20 cm Corak setara Roman


Ubin Keramik 10x20 cm Corak m2 1.0000 88,000.00 88,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 140,448.00
Dibulatkan 140,440.00
I-12 1 M2 Pasang Lantai Keramik 20x20 cm Corak setara Roman
Ubin Keramik 20x20 cm Corak m2 1.0000 91,000.00 91,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 143,448.00
Dibulatkan 143,440.00
I-13 1 M2 Pasang Lantai Keramik 30 x 30 cm Polos setara Roman
Keramik 30x30 cm Polos m2 1.0000 83,000.00 83,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
1 2 3 4 5 6=4x5
Jumlah 135,448.00
Dibulatkan 135,440.00
I-14 1 M2 Pasang Lantai Keramik 30 x 30 cm corak setara Roman
Keramik 30x30 cm corak m2 1.0000 88,000.00 88,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 140,448.00
Dibulatkan 140,440.00
I-15 1 M2 Pasang Lantai Keramik 40x40 cm polos setara Roman
Keramik 40x40 cm m2 1.0000 88,000.00 88,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 140,448.00
Dibulatkan 140,440.00
I-16 1 M2 Pasang Lantai Keramik 40x40 cm Corak/Warna setara Roman
Keramik 40x40 cm Corak/Warna m2 1.0000 93,000.00 93,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 265,000.00 5,697.50
Semen Warna Kg 0.0130 16,000.00 208.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0125 125,000.00 1,562.50
Jumlah 145,448.00
Dibulatkan 145,440.00

I-17 1 M2 Lantai Marmer


Marmer m2 1.0600 665,000.00 704,900.00
Semen Portland Kg 8.1900 1,540.00 12,612.60
Pasir Pasang M3 0.0450 265,000.00 11,925.00
Semen Warna Kg 0.6500 16,000.00 10,400.00
Pekerja Oh 0.7000 80,000.00 56,000.00
Tukang Batu Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 0.0350 125,000.00 4,375.00
Jumlah 837,137.60
Dibulatkan 837,130.00
I-18 1 M2 Pasang Lantai Parguet Jati
Parguet Jati M2 1.0500 454,000.00 476,700.00
Lem Vinyil Kg 0.6000 53,000.00 31,800.00
Pekerja Oh 0.6500 80,000.00 52,000.00
Tukang Oh 0.3500 95,000.00 33,250.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 0.0325 125,000.00 4,062.50
Jumlah 601,487.50
Dibulatkan 601,480.00
I-19 1 M¹ Plint Keramik ukuran 10 x 40 cm
Plint keramik 10 x 40 cm Bh 2.6500 4,500.00 11,925.00
Semen Portland Kg 1.2000 1,540.00 1,848.00
1 2 3 4 5 6=4x5
Pasir Pasang M3 0.0030 265,000.00 795.00
Semen Warna Kg 0.1000 16,000.00 1,600.00
Pekerja Oh 0.0600 80,000.00 4,800.00
Tukang Batu Oh 0.0300 95,000.00 2,850.00
Kepala Tukang Oh 0.0030 105,000.00 315.00
Mandor Oh 0.0030 125,000.00 375.00
Jumlah 24,508.00
Dibulatkan 24,500.00
I-20 1 M¹ Plint Keramik ukuran 10 x 30 cm
Plint keramik 10 x 30 cm Bh 3.5000 4,000.00 14,000.00
Semen Portland Kg 1.6500 1,540.00 2,541.00
Pasir Pasang M3 0.0032 265,000.00 848.00
Semen Warna Kg 0.1000 16,000.00 1,600.00
Pekerja Oh 0.0900 80,000.00 7,200.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0045 125,000.00 562.50
Jumlah 36,246.50
Dibulatkan 36,240.00
I-21 1 M¹ Plint kayu kamper Samarinda 2 x 10 cm
Papan kayu kamper samarinda m3 0.0024 ### 25,334.40
Paku Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1200 80,000.00 9,600.00
Tukang Kayu Oh 0.1200 95,000.00 11,400.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 49,544.40
Dibulatkan 49,540.00
I-22 1 M¹ Plint Keramik ukuran 10 x 20 cm
Plint keramik 10 x 20 cm Bh 5.3000 3,500.00 18,550.00
Semen Portland Kg 1.1400 1,540.00 1,755.60
Pasir Pasang M3 0.0032 265,000.00 848.00
Semen Warna Kg 0.0250 16,000.00 400.00
Pekerja Oh 0.0900 80,000.00 7,200.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 38,873.60
Dibulatkan 38,870.00
I-23 1 M2 Lantai karpet
Karpet m2 1.0500 427,000.00 448,350.00
Lem Kg 0.3500 43,000.00 15,050.00
Pekerja Oh 0.1700 80,000.00 13,600.00
Tukang Kayu Oh 0.1700 95,000.00 16,150.00
Kepala Tukang Oh 0.0170 105,000.00 1,785.00
Mandor Oh 0.0085 125,000.00 1,062.50
Jumlah 495,997.50
Dibulatkan 495,990.00
I-24 1 M2 Paving Block Natural 8 cm
Paving Block natural M2 1.0500 98,000.00 102,900.00
Pasir Pasang M3 0.1000 265,000.00 26,500.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 199,837.50
Dibulatkan 199,830.00
I-25 1 M2 Paving Block Warna 8 cm
Paving Block warna M2 1.0500 131,000.00 137,550.00
1 2 3 4 5 6=4x5
Pasir Pasang M3 0.1000 265,000.00 26,500.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 234,487.50
Dibulatkan 234,480.00
I-26 1 M2 Paving Block Natural 6 cm
Paving Block natural M2 1.0500 91,000.00 95,550.00
Pasir Pasang M3 0.1000 265,000.00 26,500.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 192,487.50
Dibulatkan 192,480.00
I-27 1 M2 Paving Block Warna 6 cm
Paving Block warna M2 1.0500 104,000.00 109,200.00
Pasir Pasang M3 0.1000 265,000.00 26,500.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 206,137.50
Dibulatkan 206,130.00
I-28 1 M2 Grass Block 20 x 20
Grass Block Bh 26.2500 11,000.00 288,750.00
Pasir Pasang M3 0.1000 265,000.00 26,500.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 385,687.50
Dibulatkan 385,680.00
I-29 1 M2 Grass Block 30 x 30
Grass Block Bh 11.6700 16,000.00 186,720.00
Pasir Pasang M3 0.1000 265,000.00 26,500.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Batu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 283,657.50
Dibulatkan 283,650.00

J PEKERJAAN KAYU
J-01 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Samarinda
Kayu Balok Kamper Samarinda M3 1.2000 ### 12,540,000.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Kayu Oh 18.0000 95,000.00 1,710,000.00
Kepala Tukang Oh 2.0000 105,000.00 210,000.00
Mandor Oh 0.3000 125,000.00 37,500.00
Jumlah 14,977,500.00
Dibulatkan 14,977,500.00
J-02 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Medan/Kruing
Kayu Balok Kamper Medan M3 1.2000 6,888,000.00 8,265,600.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Kayu Oh 18.0000 95,000.00 1,710,000.00
Kepala Tukang Oh 2.0000 105,000.00 210,000.00
Mandor Oh 0.3000 125,000.00 37,500.00
1 2 3 4 5 6=4x5
Jumlah 10,703,100.00
Dibulatkan 10,703,100.00
J-03 1 M3 Pasang Kusen Pintu dan Jendela Kayu Borneo Super
Kayu Balok Borneo Super M3 1.2000 6,391,000.00 7,669,200.00
Pekerja Oh 6.0000 80,000.00 480,000.00
Tukang Kayu Oh 18.0000 95,000.00 1,710,000.00
Kepala Tukang Oh 2.0000 105,000.00 210,000.00
Mandor Oh 0.3000 125,000.00 37,500.00
Jumlah 10,106,700.00
Dibulatkan 10,106,700.00
J-04 1 M2 Pasang Pintu Panel Kayu Kamper Samarinda
Kayu Papan Kamper Samarinda M3 0.0400 ### 422,240.00
Paku biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 773,440.00
Dibulatkan 773,440.00
J-05 1 M2 Pasang Pintu Panel Kayu Kamper Medan/Kruing
Kayu Papan Kamper Medan M3 0.0400 7,046,000.00 281,840.00
Paku biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 633,040.00
Dibulatkan 633,040.00
J-06 1 M2 Pasang Daun Jendela Kaca Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0150 7,046,000.00 105,690.00
Pekerja Oh 0.8000 80,000.00 64,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 385,690.00
Dibulatkan 385,690.00
J-07 1 M2 Pasang Pintu dan Jendela Kaca Kayu Borneo
Kayu Papan Borneo Super M3 0.0350 6,771,000.00 236,985.00
Pekerja Oh 0.8000 80,000.00 64,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 516,985.00
Dibulatkan 516,980.00
J-08 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0640 7,046,000.00 450,944.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Kayu Oh 3.0000 95,000.00 285,000.00
Kepala Tukang Oh 0.3000 105,000.00 31,500.00
Mandor Oh 0.5000 125,000.00 62,500.00
Jumlah 909,944.00
Dibulatkan 909,940.00
J-09 1 M2 Pasang Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan/Kruing
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.0300 24,000.00 720.00
Lem Kayu Lt 0.3000 28,000.00 8,400.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
Pekerja Oh 0.6000 80,000.00 48,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 478,471.60
Dibulatkan 478,470.00
J-10 1 M2 Pasang Jalusi Mati Kusen kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0600 7,046,000.00 422,760.00
Paku Biasa 1/2" - 1" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.5000 80,000.00 40,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.3000 105,000.00 31,500.00
Mandor Oh 0.0250 125,000.00 3,125.00
Jumlah 690,985.00
Dibulatkan 690,980.00
J-11 1 M2 Pasang Daun Pintu Triplek Rangkap, Rangka Kayu Kamper
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.0300 24,000.00 720.00
Lem Kayu Lt 0.3000 28,000.00 8,400.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
Pekerja Oh 0.6000 80,000.00 48,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 478,471.60
Dibulatkan 478,470.00
J-12 1 M2 Pasang Daun Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Lt 0.3000 28,000.00 8,400.00
Teak Wood 4 mm 120 x 240 Lbr 1.0000 145,000.00 145,000.00
Pekerja Oh 0.6000 80,000.00 48,000.00
Tukang Kayu Oh 2.0000 95,000.00 190,000.00
Kepala Tukang Oh 0.2000 105,000.00 21,000.00
Mandor Oh 0.0300 125,000.00 3,750.00
Jumlah 561,451.60
Dibulatkan 561,450.00
J-13 1 M2 Pasang Pintu dobel Plywood lapis HPL, Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Ltr 0.8000 28,000.00 22,400.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
HPL Lbr 0.5000 175,000.00 87,500.00
Pekerja Oh 0.8000 80,000.00 64,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 656,451.60
Dibulatkan 656,450.00
J-14 1 M2 Pasang Pintu Teakwood lapis HPL , Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 7,046,000.00 138,101.60
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Ltr 0.8000 28,000.00 22,400.00
Teak Wood 4 mm 120 x 240 Lbr 1.0000 145,000.00 145,000.00
Politur Ltr 0.5000 60,000.00 30,000.00
Formika Warna 4" x 8" Lbr 0.5000 262,500.00 131,250.00
Pekerja Oh 0.8000 80,000.00 64,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0400 125,000.00 5,000.00
Jumlah 806,701.60
1 2 3 4 5 6=4x5
Dibulatkan 806,700.00
J-15 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kamper Medan
Kayu Balok Kamper Medan M3 1.1000 6,888,000.00 7,576,800.00
Besi Strip Kg 15.0000 32,000.00 480,000.00
Paku Biasa 2" - 5" Kg 0.8000 24,000.00 19,200.00
Pekerja Oh 4.0000 80,000.00 320,000.00
Tukang Kayu Oh 12.0000 95,000.00 1,140,000.00
Kepala Tukang Oh 1.2000 105,000.00 126,000.00
Mandor Oh 0.2000 125,000.00 25,000.00
Jumlah 9,687,000.00
Dibulatkan 9,687,000.00
J-16 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Borneo
Kayu Balok Borneo Super M3 1.1000 6,391,000.00 7,030,100.00
Besi Strip Kg 15.0000 32,000.00 480,000.00
Paku Biasa 2" - 5" Kg 0.8000 24,000.00 19,200.00
Pekerja Oh 4.0000 80,000.00 320,000.00
Tukang Kayu Oh 12.0000 95,000.00 1,140,000.00
Kepala Tukang Oh 1.2000 105,000.00 126,000.00
Mandor Oh 0.2000 125,000.00 25,000.00
Jumlah 9,140,300.00
Dibulatkan 9,140,300.00
J-17 1 M2 Pasang Kaso dan Reng Genteng Plentong kayu Kamper Medan
Kayu Balok Kamper medan M3 0.0120 6,888,000.00 82,656.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 105,431.00
Dibulatkan 105,430.00
J-18 1 M2 Pasang Kaso dan Reng Genteng Beton kayu Kamper
Kayu Balok Kamper Medan M3 0.0140 6,888,000.00 96,432.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 119,207.00
Dibulatkan 119,200.00
J-19 1 M' Pasang Lisplang (3x20) Cm, Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0072 7,046,000.00 50,731.20
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 81,656.20
Dibulatkan 81,650.00
J-20 1 M' Pasang Lisplang (3x30) Cm, Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0110 7,046,000.00 77,506.00
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1100 80,000.00 8,800.00
Tukang Kayu Oh 0.2200 95,000.00 20,900.00
Kepala Tukang Oh 0.0220 105,000.00 2,310.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 111,341.00
Dibulatkan 111,340.00
J-21 1 M' Pasang List Plafon - Kayu Profil 10 cm
Kayu Profil M' 1.0500 35,000.00 36,750.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.0210 80,000.00 1,680.00
Tukang Kayu Oh 0.0210 95,000.00 1,995.00
Kepala Tukang Oh 0.0020 105,000.00 210.00
Mandor Oh 0.0010 125,000.00 125.00
Jumlah 40,760.00
Dibulatkan 40,760.00
J-22 7,26 M2 Kusen Partisi Dobel Triplek
Kayu Balok Borneo Super M3 0.1050 6,391,000.00 671,055.00
Triplek 4 mm 120 x 240 Lbr 5.0000 68,500.00 342,500.00
Paku Biasa 1 s/d 3 cm Kg 2.0000 24,000.00 48,000.00
Ampelas Lbr 2.0000 6,000.00 12,000.00
Engsel Bh 4.0000 23,100.00 92,400.00
Slot Bh 4.0000 35,000.00 140,000.00
Pekerja Oh 0.3000 80,000.00 24,000.00
Tukang Kayu Oh 1.3000 95,000.00 123,500.00
Kepala Tukang Oh 0.1300 105,000.00 13,650.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 1,468,730.00
1 M2 Pekerjaan partisi 202,304.41
Dibulatkan 202,300.00
J-23 1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu Kamper
Kayu Balok Kamper M3 0.0120 6,888,000.00 82,656.00
Paku Biasa 5" - 7" Kg 0.1000 24,000.00 2,400.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0750 125,000.00 9,375.00
Jumlah 132,806.00
Dibulatkan 132,800.00
J-24 1 M2 Pasang Rangka Langit - langit (0.50 x 1.00) m, Kayu Borneo
Kayu Balok Borneo Super M3 0.0154 6,391,000.00 98,421.40
Paku Biasa 5" - 7" Kg 0.2000 24,000.00 4,800.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.3000 95,000.00 28,500.00
Kepala Tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0750 125,000.00 9,375.00
Jumlah 156,246.40
Dibulatkan 156,240.00
J-25 1 M1 Reuter Kayu Kamper Medan
Kayu Kamper Medan M3 0.0040 6,888,000.00 27,552.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 57,277.00
Dibulatkan 57,270.00
J-26 1 M3 Gording kayu kelas II
Balok kayu M3 1.1000 6,888,000.00 7,576,800.00
Besi Strip Kg 15.0000 32,000.00 480,000.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Pekerja Oh 2.4000 80,000.00 192,000.00
Tukang Kayu Oh 7.2000 95,000.00 684,000.00
Kepala Tukang Oh 0.7200 105,000.00 75,600.00
Mandor Oh 0.1200 125,000.00 15,000.00
Jumlah 9,095,400.00
Dibulatkan 9,095,400.00
J-27 1 M2 Dinding bilik, rangka kayu borneo
Bilik bambu m2 1.1000 25,000.00 27,500.00
Kaso 5/7 m3 0.0140 2,975,000.00 41,650.00
1 2 3 4 5 6=4x5
Paku Biasa 2" - 5" Kg 0.0120 24,000.00 288.00
List kayu 2/4 m3 0.0030 11,000.00 33.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.0500 95,000.00 4,750.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 83,371.00
Dibulatkan 83,370.00
1 M2 Pasang Pintu Panel Multiplek 9 mm rangka kayu Kamper Medan / Kruing
Kayu Papan Kamper Medan/Kruing M3 0.0230 7,046,000.00 162,058.00
Multiplek 9 mm lbr 0.2300 166,500.00 38,295.00
List kayu profil 1 cm m' 3.6000 10,000.00 36,000.00
Paku biasa ½" - 1" kg 0.3000 24,000.00 7,200.00
Lem putih FOX kg 0.1500 28,000.00 4,200.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Kayu Oh 2.5000 95,000.00 237,500.00
Kepala Tukang Oh 0.2500 105,000.00 26,250.00
Mandor Oh 0.0500 125,000.00 6,250.00
Jumlah 597,753.00
Dibulatkan 597,750.00

K PEKERJAAN PENUTUP BESI & ALLUMUNIUM


K-01 1 Kg Besi profil
Besi Profil WF Kg 1.1000 12,500.00 13,750.00
Meni Besi Kg 0.0800 36,000.00 2,880.00
Tukang Besi Oh 0.0060 95,000.00 570.00
Pekerja Oh 0.0600 80,000.00 4,800.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0003 125,000.00 37.50
Jumlah 22,667.50
Dibulatkan 22,660.00
K-02 1 Kg pekerjaan perakitan
Solar Ltr 0.0100 10,000.00 100.00
Minyak pelumas Ltr 0.0010 57,500.00 57.50
Sewa Alat Jam 0.0080 100,000.00 800.00
Pekerja Oh 0.0010 80,000.00 80.00
Tukang Besi Oh 0.00001 95,000.00 0.95
Kepala Tukang Oh 0.00001 105,000.00 1.05
Mandor Oh 0.00005 125,000.00 6.25
Jumlah 1,045.75
Dibulatkan 1,040.00
K-03 1 Cm Pengelasan dengan las listrik
Kawat las listrik Kg 0.0400 28,000.00 1,120.00
Solar Ltr 0.0300 10,000.00 300.00
Minyak pelumas Ltr 0.0040 57,500.00 230.00
Sewa Alat Jam 0.0170 100,000.00 1,700.00
Pekerja Oh 0.0040 80,000.00 320.00
Tukang Las Oh 0.0020 95,000.00 190.00
Kepala Tukang Oh 0.0002 105,000.00 21.00
Mandor Oh 0.0002 125,000.00 25.00
Jumlah 3,906.00
Dibulatkan 3,900.00
K-04 1 M2 Pasang Pintu Rolling Door
Rolling Door M2 1.0000 371,000.00 371,000.00
Tukang Besi Oh 1.0500 95,000.00 99,750.00
Pekerja Oh 1.5000 80,000.00 120,000.00
Kepala Tukang Oh 0.1050 105,000.00 11,025.00
Mandor Oh 0.0052 125,000.00 650.00
Jumlah 602,425.00
1 2 3 4 5 6=4x5
Dibulatkan 602,420.00
K-05 1 M2 Pasang Pintu Alluminium Natural
Pintu Alluminium Natural M2 1.0000 256,000.00 256,000.00
Tukang Besi Konstruksi Oh 1.0500 95,000.00 99,750.00
Pekerja Oh 1.0500 80,000.00 84,000.00
Kepala Tukang Oh 0.1050 105,000.00 11,025.00
Mandor Oh 0.0052 125,000.00 650.00
Jumlah 451,425.00
Dibulatkan 451,420.00
K-06 1 M2 Pasang Terali Besi
Besi Strip 2x3 M' 11.5000 6,500.00 74,750.00
Tukang Las Oh 1.2000 95,000.00 114,000.00
Pekerja Oh 1.2000 80,000.00 96,000.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0006 125,000.00 75.00
Jumlah 286,085.00
Dibulatkan 286,080.00
K-07 1 M2 Pasang Kawat Harmonika
Kawat Harmonika M2 1.0000 40,000.00 40,000.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
Papan Kayu Kamper M3 0.0018 7,046,000.00 12,682.80
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0005 125,000.00 62.50
Jumlah 71,775.30
Dibulatkan 71,770.00
K-08 1 M' Pasang Talang Datar, Seng Bjls 28 lebar 90 cm
Seng Plat 3'x6' Bjls 30 m1 1.0500 22,885.00 24,029.25
Paku Biasa 1/2" - 1" Kg 0.0150 24,000.00 360.00
Kayu Borneo, Papan M3 0.0096 6,771,000.00 65,001.60
Flincote Kg 0.2500 35,000.00 8,750.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.4000 95,000.00 38,000.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0013 125,000.00 156.25
Jumlah 150,922.10
Dibulatkan 150,920.00
K-09 1 M' Pasang Talang Miring, Seng Bjls 28 lebar 90 cm
Seng Plat 3'x6' Bjls 30 m1 1.0500 22,885.00 24,029.25
Paku Biasa 1/2" - 1" Kg 0.0150 24,000.00 360.00
Kayu papan borneo M3 0.0190 6,771,000.00 128,649.00
Flincote / Meni Besi Kg 0.3000 35,000.00 10,500.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Kayu Oh 0.4000 95,000.00 38,000.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0013 125,000.00 156.25
Jumlah 220,319.50
Dibulatkan 220,310.00
K-10 1 M' Pasang Talang 1/2 Lingkaran D -15 cm, seng pelat BJLS 28 lebar 90 cm
Seng Plat 3'x6' Bjls 30 m1 1.0500 22,885.00 24,029.25
Paku Biasa 1/2" - 1" Kg 0.1000 24,000.00 2,400.00
Kayu Borneo, Papan M3 0.0190 6,771,000.00 128,649.00
Besi Strip Kg 0.5000 32,000.00 16,000.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.3000 95,000.00 28,500.00
Kepala Tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0080 125,000.00 1,000.00
Jumlah 215,728.25
1 2 3 4 5 6=4x5
Dibulatkan 215,720.00
K-11 1 M1 Pasang Kusen pintu/jendela allumunium natural 4"
Alumunium profil natural 4" m1 1.1000 183,000.00 201,300.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant m1 1.0000 9,000.00 9,000.00
Pekerja Oh 0.0430 80,000.00 3,440.00
Tukang Kayu Oh 0.0430 95,000.00 4,085.00
Kepala Tukang Oh 0.0043 105,000.00 451.50
Mandor Oh 0.0021 125,000.00 262.50
Jumlah 219,139.00
Dibulatkan 219,130.00
K-12 1 M1 Pasang Kusen pintu/jendela allumunium warna 4"
Alumunium profil warna 4" m1 1.1000 197,000.00 216,700.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant m1 1.0000 9,000.00 9,000.00
Pekerja Oh 0.0430 80,000.00 3,440.00
Tukang Kayu Oh 0.0430 95,000.00 4,085.00
Kepala Tukang Oh 0.0043 105,000.00 451.50
Mandor Oh 0.0021 125,000.00 262.50
Jumlah 234,539.00
Dibulatkan 234,530.00
K-13 1 M1 Pasang Kusen pintu/jendela allumunium natural 3"
Alumunium profil natural 3" m1 1.1000 98,000.00 107,800.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant m1 1.0000 9,000.00 9,000.00
Pekerja Oh 0.0430 80,000.00 3,440.00
Tukang Kayu Oh 0.0430 95,000.00 4,085.00
Kepala Tukang Oh 0.0043 105,000.00 451.50
Mandor Oh 0.0021 125,000.00 262.50
Jumlah 125,639.00
Dibulatkan 125,630.00
K-14 1 M1 Pasang Kusen pintu/jendela allumunium warna 3"
Alumunium profil warna 3" m1 1.1000 123,000.00 135,300.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant m1 1.0000 9,000.00 9,000.00
Pekerja Oh 0.0430 80,000.00 3,440.00
Tukang Kayu Oh 0.0430 95,000.00 4,085.00
Kepala Tukang Oh 0.0043 105,000.00 451.50
Mandor Oh 0.0021 125,000.00 262.50
Jumlah 153,139.00
Dibulatkan 153,130.00
K-15 1 M1 Pintu Allumunium strip lebar 8 cm
Alumunium profil 4" natural m1 4.4000 183,000.00 805,200.00
Alumunium strip 6 mm m2 1.0500 207,000.00 217,350.00
Pekerja Oh 0.0850 80,000.00 6,800.00
Tukang Kayu Oh 0.0850 95,000.00 8,075.00
Kepala Tukang Oh 0.0085 105,000.00 892.50
Mandor Oh 0.0042 125,000.00 525.00
Jumlah 1,038,842.50
Dibulatkan 1,038,840.00
K-16 1 M1 Pintu/jendela kaca rangka allumunium natural 4"
Alumunium profil natural 4" m1 4.4000 183,000.00 805,200.00
Profil allumunium T m1 4.5000 14,000.00 63,000.00
Sealant tube 0.2700 9,000.00 2,430.00
Pekerja Oh 0.0850 80,000.00 6,800.00
Tukang Kayu Oh 0.0850 95,000.00 8,075.00
Kepala Tukang Oh 0.0085 105,000.00 892.50
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 887,022.50
1 2 3 4 5 6=4x5
Dibulatkan 887,020.00
K-17 1 M1 Pintu/jendela kaca rangka allumunium warna 4"
Alumunium profil warna 4" m1 4.4000 197,000.00 866,800.00
Profil allumunium T m1 4.5000 14,000.00 63,000.00
Sealant tube 0.2700 9,000.00 2,430.00
Pekerja Oh 0.0850 80,000.00 6,800.00
Tukang Kayu Oh 0.0850 95,000.00 8,075.00
Kepala Tukang Oh 0.0085 105,000.00 892.50
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 948,622.50
Dibulatkan 948,620.00
K-18 1 M2 Jendela Nako & Teralis (10 klips)
Jendela Nako (rangka + kaca 5 mm) M2 1.1000 363,000.00 399,300.00
Paku Biasa 1/2" - 1" atau Skrup bh 10.0000 300.00 3,000.00
Besi Strip m1 7.0000 6,500.00 45,500.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Kayu Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0010 125,000.00 125.00
Jumlah 485,025.00
Dibulatkan 485,020.00
K-19 1 M2 Pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Besi siku L 30.30.3 Kg 15.0000 12,500.00 187,500.00
Besi plat baja Kg 32.8000 12,500.00 410,000.00
Kawat las Kg 0.0500 28,000.00 1,400.00
Pekerja Oh 0.2000 80,000.00 16,000.00
Tukang Las Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0010 125,000.00 125.00
Jumlah 636,125.00
Dibulatkan 636,120.00
K-20 1 m2 Rangka jendela besi scuare tube ( 5 x 5 ) cm
Besi scuare tube M 4.7600 0.00 0.00
Besi lis kaca 1 x 1 cm M 4.5220 12,500.00 56,525.00
Pengelasan Cm 20.0000 3,900.00 78,000.00
Pekerja Oh 0.6500 80,000.00 52,000.00
Tukang Las Oh 0.6500 95,000.00 61,750.00
Kepala Tukang Oh 0.0650 105,000.00 6,825.00
Mandor Oh 0.0320 125,000.00 4,000.00
Jumlah 259,100.00
Dibulatkan 259,100.00
K-21 1 M2 Pasang Pintu Lipat
Pintu Lipat M2 1.0000 607,000.00 607,000.00
Tukang Besi Oh 1.0500 95,000.00 99,750.00
Pekerja Oh 1.0500 80,000.00 84,000.00
Kepala Tukang Oh 0.1050 105,000.00 11,025.00
Mandor Oh 0.0052 125,000.00 650.00
Jumlah 802,425.00
Dibulatkan 802,420.00
K-22 1 M2 Tirai ( Venetions Blinds and vertical blinds)
Venetion Blinds M2 1.0000 651,000.00 651,000.00
Tukang Kayu Oh 0.3500 95,000.00 33,250.00
Pekerja Oh 0.3500 80,000.00 28,000.00
Kepala Tukang Oh 0.0350 105,000.00 3,675.00
Mandor Oh 0.0018 125,000.00 218.75
Jumlah 716,143.75
Dibulatkan 716,140.00
1 M2 Pasang Jendela Besi
Jendela Besi M2 1.0000 472,000.00 472,000.00
1 2 3 4 5 6=4x5
Tukang Besi Oh 1.0500 95,000.00 99,750.00
Pekerja Oh 1.0500 80,000.00 84,000.00
Kepala Tukang Oh 0.1050 105,000.00 11,025.00
Mandor Oh 0.0053 125,000.00 656.25
Jumlah 667,431.25
Dibulatkan 667,430.00
1 M2 Pasang Jendela Besi Tahan Api
Jendela Besi Tahan Api M2 1.0000 607,000.00 607,000.00
Tukang Besi Oh 1.2000 95,000.00 114,000.00
Pekerja Oh 1.0220 80,000.00 81,760.00
Kepala Tukang Oh 0.1200 105,000.00 12,600.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 816,110.00
Dibulatkan 816,110.00
1 M2 Pasang Pintu Gulung Besi
Pintu Gulung Besi M2 1.0000 607,000.00 607,000.00
Tukang Besi Oh 1.2000 95,000.00 114,000.00
Pekerja Oh 1.2000 80,000.00 96,000.00
Kepala Tukang Oh 0.1200 105,000.00 12,600.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 830,350.00
Dibulatkan 830,350.00
1 M2 Pasang Pintu Sunscreen Alluminium
Sunscreen Alluminium M2 1.0000 460,000.00 460,000.00
Tukang Besi Oh 0.8000 95,000.00 76,000.00
Pekerja Oh 0.0800 80,000.00 6,400.00
Kepala Tukang Oh 0.0800 105,000.00 8,400.00
Mandor Oh 0.0040 125,000.00 500.00
Jumlah 551,300.00
Dibulatkan 551,300.00
1 M2 Pasang Kawat Nyamuk
Kawat Nyamuk M2 1.1000 16,000.00 17,600.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0005 125,000.00 62.50
Jumlah 36,692.50
Dibulatkan 36,690.00
1 M2 Pasang Kawat Kassa
Kawat Kassa M2 1.1000 39,000.00 42,900.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
Kayu Kamper, Papan M3 0.0018 ### 19,000.80
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0005 125,000.00 62.50
Jumlah 80,993.30
Dibulatkan 80,990.00
1 M2 Pasang Kawat Burung
Kawat Burung M2 1.1000 17,000.00 18,700.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
Kayu Kamper, Papan M3 0.0018 ### 19,000.80
Pekerja Oh 0.1000 80,000.00 8,000.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0005 125,000.00 62.50
Jumlah 56,793.30
Dibulatkan 56,790.00
1 2 3 4 5 6=4x5
1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 24
Seng Plat 3'x6' Bjls 24 Lbr 0.3000 55,500.00 16,650.00
Paku Biasa 1/2" - 1" Kg 0.1000 24,000.00 2,400.00
Kayu Borneo, Papan M3 0.0190 6,771,000.00 128,649.00
Besi Strip Kg 0.5000 3,666.67 1,833.33
Pekerja Oh 0.1500 80,000.00 12,000.00
Tukang Kayu Oh 0.2500 95,000.00 23,750.00
Kepala Tukang Oh 0.0250 105,000.00 2,625.00
Mandor Oh 0.0013 125,000.00 156.25
Jumlah 188,063.58
Dibulatkan 188,060.00
1 1 UNIT Pasang Partisi Alumunium, Daun Partisi Multiplek rangka kayu Kamper
Kusen Alumunium Natural Uk 4" + upah 20% m' 7.6200 219,600.00 1,673,352.00
Multiplek 9 mm lbr 1.3500 166,500.00 224,775.00
Kayu papan kamper medan m3 0.0300 7,046,000.00 211,380.00
List kayu profil 1 cm m' 11.7000 10,000.00 117,000.00
Paku biasa ½" - 1" kg 0.1000 24,000.00 2,400.00
Lem putih FOX kg 0.2500 28,000.00 7,000.00
Grendel jendela 2" bh 4.0000 6,000.00 24,000.00
Handle partisi bh 2.0000 36,300.00 72,600.00
Cat kayu m2 1.5400 50,000.00 77,000.00
Cat tembok m2 4.8600 38,000.00 184,680.00
Pekerja Terampil Oh 0.3000 80,000.00 24,000.00
Tukang kayu Terampil Oh 1.3000 95,000.00 123,500.00
Kepla Tukang Kayu Oh 0.1300 105,000.00 13,650.00
Mandor Oh 0.0130 125,000.00 1,625.00
Jumlah 2,756,962.00
Dibulatkan 2,756,960.00
2 1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
Profil aluminium 4" natural + upah 20% m' 12.0000 219,600.00 2,635,200.00
Profil daun jendela alm. + upah 20% m' 5.4000 142,800.00 771,120.00
Kaca polos 5 mm m2 1.8100 134,000.00 242,540.00
Engsel jendela 3" ps 2.0000 16,500.00 33,000.00
Slot Handle jendela bh 2.0000 36,300.00 72,600.00
Hak Kait angin jendela biasa bh 2.0000 8,000.00 16,000.00
Acesories ( 5 % ) ls 0.0000 182,443.00 182,443.00
Jumlah 3,952,903.00
Dibulatkan 3,952,900.00
3 1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
Profil aluminium 4" natural + upah 20% m' 14.1000 219,600.00 3,096,360.00
Profil daun jendela alm. + upah 20% m' 2.7000 142,800.00 385,560.00
Kaca polos 5 mm m2 1.6500 134,000.00 221,100.00
Daun pintu panel Multiplek 9 mm m2 1.6800 597,750.00 1,004,220.00
rangka ky. Kamper Medan/Kruing
Engsel jendela 3" ps 1.0000 16,500.00 16,500.00
Slot Handle jendela bh 1.0000 36,300.00 36,300.00
Hak Kait angin jendela biasa bh 2.0000 8,000.00 16,000.00
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 185,151.00 185,151.00
Jumlah 5,141,341.00
Dibulatkan 5,141,340.00
4 1 UNIT Pek. Kusen Pintu Alumunium uk. 0,8 X 2,70 M'
Profil aluminium 4" natural + upah 20% m' 7.0000 219,600.00 1,537,200.00
Kaca polos 5 mm m2 0.3700 134,000.00 49,580.00
Daun pintu panel Multiplek 9 mm m2 1.6800 597,750.00 1,004,220.00
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
1 2 3 4 5 6=4x5
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 79,339.00 79,339.00
Jumlah 2,850,489.00
Dibulatkan 2,850,480.00
5 1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
Profil aluminium 4" natural + upah 20% m' 15.4500 219,600.00 3,392,820.00
Profil daun jendela alm. + upah 20% m' 5.4000 142,800.00 771,120.00
Kaca polos 5 mm m2 2.5500 134,000.00 341,700.00
Engsel jendela 3" ps 2.0000 16,500.00 33,000.00
Slot Handle jendela bh 2.0000 36,300.00 72,600.00
Hak Kait angin jendela biasa bh 2.0000 8,000.00 16,000.00
Acesories ( 5 % ) ls 0.0000 225,282.00 225,282.00
Jumlah 4,852,522.00
Dibulatkan 4,852,520.00
6 1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
Profil aluminium 4" natural + upah 20% m' 17.5500 219,600.00 3,853,980.00
Profil daun jendela alm. + upah 20% m' 5.4000 142,800.00 771,120.00
Kaca polos 5 mm m2 2.4000 134,000.00 321,600.00
Daun pintu panel Multiplek 9 mm m2 1.6800 597,750.00 1,004,220.00
rangka ky. Kamper Medan/Kruing
Engsel jendela 3" ps 2.0000 16,500.00 33,000.00
Slot Handle jendela bh 2.0000 36,300.00 72,600.00
Hak Kait angin jendela biasa bh 2.0000 8,000.00 16,000.00
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 247,335.00 247,335.00
Jumlah 6,500,005.00
Dibulatkan 6,500,000.00
7 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
Profil aluminium 4" natural + upah 20% m' 8.9000 219,600.00 1,954,440.00
Kaca polos 5 mm m2 0.6500 134,000.00 87,100.00
Daun pintu panel Multiplek 9 mm m2 2.7300 597,750.00 1,631,857.50
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
spagnolet tanam ps 1.0000 56,800.00 56,800.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 102,077.00 102,077.00
Jumlah 4,006,424.50
Dibulatkan 4,006,420.00
8 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
Profil aluminium 4" natural + upah 20% m' 8.8000 219,600.00 1,932,480.00
Kaca polos 5 mm m2 0.7000 134,000.00 93,800.00
Daun pintu panel Multiplek 9 mm m2 2.9400 597,750.00 1,757,385.00
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
spagnolet tanam ps 1.0000 56,800.00 56,800.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 101,314.00 101,314.00
Jumlah 4,115,929.00
Dibulatkan 4,115,920.00
9 1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
Profil aluminium 4" natural + upah 20% m' 10.7500 219,600.00 2,360,700.00
Kaca polos 5 mm m2 1.0700 134,000.00 143,380.00
Daun pintu panel Multiplek 9 mm m2 1.6800 597,750.00 1,004,220.00
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
spagnolet tanam ps 1.0000 56,800.00 56,800.00
1 2 3 4 5 6=4x5
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 125,204.00 125,204.00
Jumlah 3,864,454.00
Dibulatkan 3,864,450.00
10 1 UNIT Pek. Jalusi Alumunium Sofi-sofi
Profil aluminium 4" natural + upah 20% m' 5.1000 219,600.00 1,119,960.00
Jalusi Alm m2 8.0000 42,000.00 336,000.00
Acesories ( 5 % ) ls 0.0000 72,798.00 72,798.00
Jumlah 1,528,758.00
Dibulatkan 1,528,750.00
11 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
Profil aluminium 4" natural + upah 20% m' 4.0000 219,600.00 878,400.00
Kaca polos 5 mm m2 0.2400 134,000.00 32,160.00
Acesories ( 5 % ) ls 0.0000 45,528.00 45,528.00
Jumlah 956,088.00
Dibulatkan 956,080.00
12 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m
Profil aluminium 4" natural + upah 20% m' 4.5000 219,600.00 988,200.00
Kaca polos 5 mm m2 0.4800 134,000.00 64,320.00
Acesories ( 5 % ) ls 0.0000 52,626.00 52,626.00
Jumlah 1,105,146.00
Dibulatkan 1,105,140.00
13 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
Profil aluminium 4" natural + upah 20% m' 6.4000 219,600.00 1,405,440.00
Kaca polos 5 mm m2 0.7200 134,000.00 96,480.00
Acesories ( 5 % ) ls 0.0000 75,096.00 75,096.00
Jumlah 1,577,016.00
Dibulatkan 1,577,010.00
14 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m
Profil aluminium 4" natural + upah 20% m' 8.3000 219,600.00 1,822,680.00
Kaca polos 5 mm m2 0.9600 134,000.00 128,640.00
Acesories ( 5 % ) ls 0.0000 97,566.00 97,566.00
Jumlah 2,048,886.00
Dibulatkan 2,048,880.00
15 1 UNIT Pek. Kusen Jendela Alumunium uk. 1,35 X 1,60 M' ( 2 lubang ) dgn 1 Daun Jendela
Profil aluminium 4" natural + upah 20% m' 8.8500 219,600.00 1,943,460.00
Profil daun jendela alm. + upah 20% m' 2.9000 142,800.00 414,120.00
Kaca polos 5 mm m2 1.5500 134,000.00 207,700.00
Engsel jendela 3" ps 1.0000 16,500.00 16,500.00
Slot Handle jendela bh 1.0000 36,300.00 36,300.00
Hak Kait angin jendela biasa bh 1.0000 8,000.00 8,000.00
Acesories ( 5 % ) ls 0.0000 128,264.00 128,264.00
Jumlah 2,754,344.00
Dibulatkan 2,754,340.00
16 1 UNIT Pek. Kusen Jendela Alumunium uk. 0,70 X 1,60 M' ( 1 lubang ) dgn 1 Daun Jendela
Profil aluminium 4" natural + upah 20% m' 5.3000 219,600.00 1,163,880.00
Profil daun jendela alm. + upah 20% m' 2.9000 142,800.00 414,120.00
Kaca polos 5 mm m2 0.3300 134,000.00 44,220.00
Engsel jendela 3" ps 1.0000 16,500.00 16,500.00
Slot Handle jendela bh 1.0000 36,300.00 36,300.00
Hak Kait angin jendela biasa bh 1.0000 8,000.00 8,000.00
Acesories ( 5 % ) ls 0.0000 81,111.00 81,111.00
Jumlah 1,764,131.00
Dibulatkan 1,764,130.00
17 1 UNIT Pek. Kusen Pintu Alumunium uk. 0,90 X 2,80 M' (KM/WC)
Profil aluminium 4" natural + upah 20% m' 7.0000 219,600.00 1,537,200.00
Kaca polos 5 mm m2 0.3700 134,000.00 49,580.00
Daun pintu Triplel lapis formika m2 1.6800 656,450.00 1,102,836.00
rangka ky. Kamper Medan/Kruing
1 2 3 4 5 6=4x5
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 79,339.00 79,339.00
Jumlah 2,949,105.00
Dibulatkan 2,949,100.00
18 1 UNIT Pek. Kusen Pintu Alumunium uk. 0,90 X 2,15 M' (KM/WC)
Profil aluminium 4" natural + upah 20% m' 5.2000 219,600.00 1,141,920.00
Daun pintu Triplel lapis formika m2 1.6800 656,450.00 1,102,836.00
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 57,096.00 57,096.00
Jumlah 2,482,002.00
Dibulatkan 2,482,000.00
19 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 2,40 X 2,80 M' ( 2 Daun Pintu ) Kantor
Profil aluminium 4" natural + upah 20% m' 16.1000 219,600.00 3,535,560.00
Daun Pintu Alumunium Natural + upah 20 % m2 2.9840 307,200.00 916,684.80
Tarikan Pintu Alumunium bh 2.0000 417,000.00 834,000.00
Kaca polos 5 mm m2 4.4900 134,000.00 601,660.00
Engsel pintu 4" ps 3.0000 23,100.00 69,300.00
Door Holder bh 2.0000 226,000.00 452,000.00
Kunci Silinder ALFA untuk pintu alumunium bh 1.0000 452,500.00 452,500.00
Acesories ( 5 % ) ls 0.0000 294,395.24 294,395.24
Jumlah 7,156,100.04
Dibulatkan 7,156,100.00
20 1 UNIT Pek. Kusen Pintu Alm. Doble Triplek Lapis Formika uk. 0,8 X 2,80 M'
Profil aluminium 4" natural + upah 20% m' 7.0000 219,600.00 1,537,200.00
Kaca polos 5 mm m2 0.3700 134,000.00 49,580.00
Daun pintu Duble Triplek Lapis Formika m2 1.6800 806,700.00 1,355,256.00
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 79,339.00 79,339.00
Jumlah 3,201,525.00
Dibulatkan 3,201,520.00

L PEKERJAAN KUNCI DAN KACA


L-01 1 Buah Pasang Kunci Tanam 2 slaag
Kunci Tanam Bh 1.0000 182,500.00 182,500.00
Pekerja Oh 0.0600 80,000.00 4,800.00
Tukang Kayu Oh 0.6000 95,000.00 57,000.00
Kepala Tukang Oh 0.0600 105,000.00 6,300.00
Mandor Oh 0.0030 125,000.00 375.00
Jumlah 250,975.00
Dibulatkan 250,970.00
L-02 1 Buah Pasang Kunci Tanam Biasa
Kunci Tanam Biasa Bh 1.0000 139,500.00 139,500.00
Pekerja Oh 0.0100 80,000.00 800.00
Tukang Kayu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 189,475.00
Dibulatkan 189,470.00
L-03 1 Buah Pasang Kunci Tanam Kamar Mandi
Kunci Tanam Kamar Mandi Bh 1.0000 104,000.00 104,000.00
Pekerja Oh 0.0050 80,000.00 400.00
1 2 3 4 5 6=4x5
Tukang Kayu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0050 105,000.00 525.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 152,737.50
Dibulatkan 152,730.00
L-04 1 Buah Pasang Engsel Pintu
Engsel Pintu Bh 1.0000 23,100.00 23,100.00
Pekerja Oh 0.0150 80,000.00 1,200.00
Tukang Kayu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0008 125,000.00 93.75
Jumlah 40,218.75
Dibulatkan 40,210.00
L-05 1 Buah Pasang Engsel Jendela Kupu - Kupu
Engsel Jendela Bh 1.0000 16,500.00 16,500.00
Pekerja Oh 0.0100 80,000.00 800.00
Tukang Kayu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0005 125,000.00 62.50
Jumlah 27,912.50
Dibulatkan 27,910.00
L-06 1 Buah Pasang Kait Angin
Kait Angin Bh 1.0000 8,000.00 8,000.00
Pekerja Oh 0.0150 80,000.00 1,200.00
Tukang Kayu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0008 125,000.00 93.75
Jumlah 25,118.75
Dibulatkan 25,110.00
L-07 1 Buah Pasang Door Closer
Door Closer Bh 1.0000 462,000.00 462,000.00
Pekerja Oh 0.0500 80,000.00 4,000.00
Tukang Kayu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0500 105,000.00 5,250.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 519,062.50
Dibulatkan 519,060.00
L-08 1 Buah Pasang Pegangan Pintu / Door Holder
Door Holder Bh 1.0000 226,000.00 226,000.00
Pekerja Oh 0.0500 80,000.00 4,000.00
Tukang Kayu Oh 0.5000 95,000.00 47,500.00
Kepala Tukang Oh 0.0500 105,000.00 5,250.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 283,062.50
Dibulatkan 283,060.00
L-09 1 M2 Pasang Kaca, Tebal 3 mm
Kaca 3 mm M2 1.1000 105,000.00 115,500.00
Pekerja Oh 0.0150 80,000.00 1,200.00
Tukang Kayu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0008 125,000.00 93.75
Jumlah 132,618.75
Dibulatkan 132,610.00
L-10 1 M2 Pasang Kaca, Tebal 5 mm
Kaca 5 mm M2 1.1000 134,000.00 147,400.00
Pekerja Oh 0.0150 80,000.00 1,200.00
Tukang Kayu Oh 0.1500 95,000.00 14,250.00
Kepala Tukang Oh 0.0150 105,000.00 1,575.00
Mandor Oh 0.0008 125,000.00 93.75
1 2 3 4 5 6=4x5
Jumlah 164,518.75
Dibulatkan 164,510.00

M PEKERJAAN SANITASI
M-01 1 Buah Closet Jongkok Proselen Standar
Kloset jongkok porselen Bh 1.0000 207,500.00 207,500.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 265,000.00 2,650.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Batu Oh 1.5000 95,000.00 142,500.00
Kepala Tukang Oh 0.1500 105,000.00 15,750.00
Mandor Oh 0.1600 125,000.00 20,000.00
Jumlah 477,640.00
Dibulatkan 477,640.00
M-02 1 Buah Urinoir
Urinoir Bh 1.0000 1,952,500.00 1,952,500.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 265,000.00 2,650.00
Pekerja Oh 1.0000 80,000.00 80,000.00
Tukang Batu Oh 1.0000 95,000.00 95,000.00
Kepala Tukang Oh 0.1000 105,000.00 10,500.00
Mandor Oh 0.0010 125,000.00 125.00
Perlengkapan 30 % Ls 0.3000 1,952,500.00 585,750.00
Jumlah 2,735,765.00
Dibulatkan 2,735,760.00
M-03 1 Buah Wastafel
Wastafel Bh 1.0000 800,000.00 800,000.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 265,000.00 2,650.00
Pekerja Oh 1.2000 80,000.00 96,000.00
Tukang Batu Oh 1.4500 95,000.00 137,750.00
Kepala Tukang Oh 0.1500 105,000.00 15,750.00
Mandor Oh 0.1000 125,000.00 12,500.00
Perlengkapan 12 % Ls 0.1200 800,000.00 96,000.00
Jumlah 1,169,890.00
Dibulatkan 1,169,890.00
M-04 1 Buah Bak Mandi Fibreflass volume 0,30 M3
Bak Fibreglass Bh 1.0000 309,000.00 309,000.00
Pekerja Oh 1.8000 80,000.00 144,000.00
Tukang Batu Oh 2.7000 95,000.00 256,500.00
Kepala Tukang Oh 0.5400 105,000.00 56,700.00
Mandor Oh 0.1100 125,000.00 13,750.00
Perlengkapan 18 % Ls 0.1800 309,000.00 55,620.00
Jumlah 835,570.00
Dibulatkan 835,570.00
M-05 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
Buis beton Ø 30 cm bh 1.1000 74,000.00 81,400.00
Bata merah bh 25.0000 850.00 21,250.00
P.C (50 gk) Kg 10.3000 1,540.00 15,862.00
Pasir pasang m3 0.0610 265,000.00 16,165.00
Pasir urug m3 0.0690 199,000.00 13,731.00
Pekerja org 0.3800 80,000.00 30,400.00
Tukang batu org 0.1900 95,000.00 18,050.00
Kepala Tukang org 0.0190 105,000.00 1,995.00
Mandor org 0.0190 125,000.00 2,375.00
Jumlah 201,228.00
Dibulatkan 201,220.00
M-06 1 Buah Bak kontrol Pas. Bata Merah Uk (60 x 60) cm
Bata Merah bh 186.0000 850.00 158,100.00
1 2 3 4 5 6=4x5
Semen PC Kg 114.0000 1,540.00 175,560.00
Pasir Pasang M3 0.1840 265,000.00 48,760.00
Batu pecah 2/3 M3 0.0330 240,000.00 7,920.00
Besi Beton Kg 4.8500 18,000.00 87,300.00
Pasir Beton M3 0.1200 290,000.00 34,800.00
Pekerja Oh 2.1600 80,000.00 172,800.00
Tukang Batu Oh 0.7200 95,000.00 68,400.00
Kepala Tukang Oh 0.0720 105,000.00 7,560.00
Tukang Gali Oh 0.1000 80,000.00 8,000.00
Mandor Oh 0.1080 125,000.00 13,500.00
Jumlah 782,700.00
Dibulatkan 782,700.00
M-07 1 Buah Bak kontrol Pas. Bata Merah Uk (30 x 30) cm
Bata Merah bh 53.0000 850.00 45,050.00
Semen PC Kg 44.0000 1,540.00 67,760.00
Pasir Pasang M3 0.0700 265,000.00 18,550.00
Batu pecah 2/3 M3 0.0700 240,000.00 16,800.00
Besi Beton Kg 1.6000 18,000.00 28,800.00
Pasir Beton M3 0.0600 290,000.00 17,400.00
Pekerja Oh 3.2000 80,000.00 256,000.00
Tukang Batu Oh 1.0150 95,000.00 96,425.00
Kepala Tukang Oh 0.0015 105,000.00 157.50
Mandor Oh 0.0160 125,000.00 2,000.00
Jumlah 548,942.50
Dibulatkan 548,940.00
M-08 1 M¹ Pipa PVC Type AW Ø ½"
Pipa PVC M1 1.2000 10,625.00 12,750.00
Pekerja Oh 0.0360 80,000.00 2,880.00
Tukang Batu Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0018 125,000.00 225.00
Perlengkapan 35% Ls 0.3500 12,750.00 4,462.50
Jumlah 26,647.50
Dibulatkan 26,640.00
M-09 1 M¹ Pipa PVC Type AW Ø 1"
Pipa PVC M1 1.2000 16,250.00 19,500.00
Pekerja Oh 0.0360 80,000.00 2,880.00
Tukang Batu Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0018 125,000.00 225.00
Perlengkapan 35% Ls 0.3500 19,500.00 6,825.00
Jumlah 35,760.00
Dibulatkan 35,760.00
M-10 1 M¹ Pipa PVC Type AW Ø 1½"
Pipa PVC M1 1.2000 27,500.00 33,000.00
Pekerja Oh 0.0360 80,000.00 2,880.00
Tukang Batu Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0018 125,000.00 225.00
Perlengkapan 35% Ls 0.3500 33,000.00 11,550.00
Jumlah 53,985.00
Dibulatkan 53,980.00
M-11 1 M¹ Pipa PVC Type AW Ø 2"
Pipa PVC M1 1.2000 30,000.00 36,000.00
Pekerja Oh 0.0360 80,000.00 2,880.00
Tukang Batu Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0018 125,000.00 225.00
Perlengkapan 35% Ls 0.3500 36,000.00 12,600.00
1 2 3 4 5 6=4x5
Jumlah 58,035.00
Dibulatkan 58,030.00
1 M¹ Pipa PVC Type AW Ø 2½"
Pipa PVC M1 1.2000 42,500.00 51,000.00
Perlengkapan 35% Ls 1.0000 17,850.00 17,850.00
Pekerja Oh 0.0540 80,000.00 4,320.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0027 125,000.00 337.50
Jumlah 83,002.50
Dibulatkan 83,000.00
1 M¹ Pipa PVC Type AW Ø 3"
Pipa PVC M1 1.2000 53,750.00 64,500.00
Perlengkapan 35% Ls 1.0000 22,575.00 22,575.00
Pekerja Oh 0.0810 80,000.00 6,480.00
Tukang Batu Oh 0.1350 95,000.00 12,825.00
Kepala Tukang Oh 0.0135 105,000.00 1,417.50
Mandor Oh 0.0041 125,000.00 512.50
Jumlah 108,310.00
Dibulatkan 108,310.00
M-12 1 M¹ Pipa PVC Type AW Ø 4"
Pipa PVC M1 1.2000 90,000.00 108,000.00
Pekerja Oh 0.0810 80,000.00 6,480.00
Tukang Batu Oh 0.1350 95,000.00 12,825.00
Kepala Tukang Oh 0.0135 105,000.00 1,417.50
Mandor Oh 0.0041 125,000.00 512.50
Perlengkapan 35% Ls 0.3500 108,000.00 37,800.00
Jumlah 167,035.00
Dibulatkan 167,030.00
M-13 1 M¹ Pipa PVC Type AW Ø ¾"
Pipa PVC M1 1.2000 13,875.00 16,650.00
Pekerja Oh 0.0810 80,000.00 6,480.00
Tukang Batu Oh 0.1350 95,000.00 12,825.00
Kepala Tukang Oh 0.0135 105,000.00 1,417.50
Mandor Oh 0.0041 125,000.00 512.50
Perlengkapan 35% Ls 0.3500 16,650.00 5,827.50
Jumlah 43,712.50
Dibulatkan 43,710.00
M-14 1 Buah Bak Cuci Piring Stainles Steel
Bak cuci stainles steel Bh 1.0000 438,500.00 438,500.00
Pekerja Oh 0.0300 80,000.00 2,400.00
Tukang Batu Oh 0.3000 95,000.00 28,500.00
Kepala Tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0015 125,000.00 187.50
Jumlah 472,737.50
Dibulatkan 472,730.00
M-15 1 Buah Kran Ø ½" atau ¾"
Kran Air Bh 1.0000 45,000.00 45,000.00
Seal Tape Bh 0.0250 4,500.00 112.50
Pekerja Oh 0.0100 80,000.00 800.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 57,087.50
Dibulatkan 57,080.00
M-16 1 Buah Floor Drain
Floor Drain Bh 1.0000 73,500.00 73,500.00
Pekerja Oh 0.0100 80,000.00 800.00
Tukang Batu Oh 0.1000 95,000.00 9,500.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.0050 125,000.00 625.00
Jumlah 85,475.00
Dibulatkan 85,470.00
M-17 1 M' Grafel beton U 20 cm -60 cm
Pipa beton U bh 1.1000 52,000.00 57,200.00
Bata merah bh 12.0000 850.00 10,200.00
P.C (50 gk) zak 0.1030 1,540.00 158.62
Pasir pasang m3 0.0305 265,000.00 8,082.50
Pasir urug m3 0.0345 199,000.00 6,865.50
Pekerja org 0.0100 80,000.00 800.00
Tukang batu org 0.1000 95,000.00 9,500.00
Kepala Tukang org 0.0100 105,000.00 1,050.00
Mandor org 0.0050 125,000.00 625.00
Jumlah 94,481.62
Dibulatkan 94,480.00
M-18 1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC m' 1.0500 66,000.00 69,300.00
Perlengkapan 35 % harga talang lot 0.3500 69,300.00 24,255.00
Pekerja org 0.1500 80,000.00 12,000.00
Tukang batu org 0.4000 95,000.00 38,000.00
Kepala Tukang org 0.0250 105,000.00 2,625.00
Mandor org 0.0013 125,000.00 156.25
Jumlah 146,336.25
Dibulatkan 146,330.00
M-19 1 M' Saluran Air Limbah Buis beton Ø 60 cm
Buis beton Ø 60 cm bh 1.1000 148,000.00 162,800.00
Bata merah bh 25.0000 850.00 21,250.00
P.C (50 gk) Kg 0.2060 1,540.00 317.24
Pasir pasang m3 0.0610 265,000.00 16,165.00
Pasir urug m3 0.0690 199,000.00 13,731.00
Pekerja org 0.3800 80,000.00 30,400.00
Tukang batu org 0.1900 95,000.00 18,050.00
Kepala Tukang org 0.0190 105,000.00 1,995.00
Mandor org 0.0190 125,000.00 2,375.00
Jumlah 267,083.24
Dibulatkan 267,080.00
M-20 1 M' Pasang Talang Seng Datar
Seng pelat 3" x 6" lbr 0.5000 19,140.00 9,570.00
Paku kg 0.0150 24,000.00 360.00
Kayu kelas II m3 0.0096 3,245,000.00 31,152.00
Meni besi kg 0.2500 36,000.00 9,000.00
Pekerja org 0.1500 80,000.00 12,000.00
Tukang batu org 0.4000 95,000.00 38,000.00
Kepala Tukang org 0.0250 105,000.00 2,625.00
Mandor org 0.0013 125,000.00 156.25
Jumlah 102,863.25
Dibulatkan 102,860.00
M-21 1 Buah Closet Duduk
Closet duduk Bh 1.0000 1,399,500.00 1,399,500.00
Pekerja Oh 3.3000 80,000.00 264,000.00
Tukang Batu Oh 1.1000 95,000.00 104,500.00
Kepala Tukang Oh 0.0100 105,000.00 1,050.00
Mandor Oh 0.1600 125,000.00 20,000.00
Perlengkapan 6 % Ls 0.0600 1,399,500.00 83,970.00
Jumlah 1,873,020.00
Dibulatkan 1,873,020.00
M-22 1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass kapasitas 1 m3 bh 1.0000 1,593,000.00 1,593,000.00
1 2 3 4 5 6=4x5
Pekerja org 3.3000 80,000.00 264,000.00
Tukang batu org 1.1000 95,000.00 104,500.00
Kepala Tukang org 0.0010 105,000.00 105.00
Mandor org 0.1600 125,000.00 20,000.00
Perlengkapan 6 % harga bak lot 0.0600 1,593,000.00 95,580.00
Jumlah 2,077,185.00
Dibulatkan 2,077,180.00
M-23 1 Unit Septictank 2 x 1,50 x 1,50 M + Rembesannya
Galian tanah M3 4.5000 48,655.00 218,947.50
Pasir urug M3 0.2142 199,000.00 42,625.80
Lantai kerja M3 2.2500 863,690.00 1,943,302.50
Pas bata 1pc : 3ps M2 15.0000 270,700.00 4,060,500.00
Plesteran M2 15.0000 50,700.00 760,500.00
Plat beton penutup & balok M3 0.3000 8,144,660.00 2,443,398.00
Pipa PVC 4" jenis AW + sambungan M1 5.4000 66,250.00 357,750.00
Pipa GIP 1 1/2" M1 5.0000 51,433.33 257,166.67
Galian tanah untuk rembesan M3 3.3750 48,655.00 164,210.63
Pas. Injuk KG 5.4000 28,000.00 151,200.00
Urugan kerikil 3.5 cm M3 1.0500 233,000.00 244,650.00
Pipa PVC 4" berlobang jenis AW M1 9.0000 40,500.00 364,500.00
Urugan kembali perataan tanah M3 1.1250 63,985.00 71,983.13
Jumlah 11,080,734.22
Dibulatkan 11,080,730.00
M-24 1 Unit Septictank 1 x 1,50 x 1,50 M + Rembesannya
Galian tanah M3 2.2500 37,000.00 83,250.00
Pasir urug M3 0.1070 199,000.00 21,293.00
Lantai kerja M3 1.1250 863,690.00 971,651.25
Pas bata 1pc : 3ps M2 7.5000 270,700.00 2,030,250.00
Plesteran M2 7.5000 50,700.00 380,250.00
Plat beton penutup & balok M3 0.1500 8,144,660.00 1,221,699.00
Pipa PVC 4" jenis AW + sambungan M1 9.0000 66,250.00 596,250.00
Pipa GIP 1 1/2" M1 2.5000 9,250.00 23,125.00
Galian tanah untuk rembesan M3 1.6880 37,000.00 62,456.00
Pas. Injuk KG 2.7000 28,000.00 75,600.00
Urugan kerikil 3.5 cm M3 0.5250 233,000.00 122,325.00
Pipa PVC 4" berlobang jenis AW M1 9.0000 40,500.00 364,500.00
Urugan kembali perataan tanah M3 0.5630 63,985.00 36,023.56
Jumlah 5,988,672.81
Dibulatkan 5,988,670.00
1 M¹ Pipa Galvanis Ø ½"
Pipa Galvanis M1 1.2000 20,083.33 24,100.00
Perlengkapan 35% Ls 1.0000 8,435.00 8,435.00
Pekerja Oh 0.0540 80,000.00 4,320.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0270 125,000.00 3,375.00
Jumlah 49,725.00
Dibulatkan 49,720.00
1 M¹ Pipa Galvanis Ø ¾"
Pipa Galvanis M1 1.2000 29,250.00 35,100.00
Perlengkapan 35% Ls 1.0000 12,285.00 12,285.00
Pekerja Oh 0.0540 80,000.00 4,320.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0270 125,000.00 3,375.00
Jumlah 64,575.00
Dibulatkan 64,570.00
1 M¹ Pipa Galvanis Ø 1"
Pipa Galvanis M1 1.2000 33,283.33 39,940.00
1 2 3 4 5 6=4x5
Perlengkapan 35% Ls 1.0000 13,979.00 13,979.00
Pekerja Oh 0.0540 80,000.00 4,320.00
Tukang Batu Oh 0.0900 95,000.00 8,550.00
Kepala Tukang Oh 0.0090 105,000.00 945.00
Mandor Oh 0.0270 125,000.00 3,375.00
Jumlah 71,109.00
Dibulatkan 71,100.00
1 M¹ Pipa Galvanis Ø 1½"
Pipa Galvanis M1 1.2000 51,433.33 61,720.00
Perlengkapan 35% Ls 1.0000 21,602.00 21,602.00
Pekerja Oh 0.1080 80,000.00 8,640.00
Tukang Batu Oh 0.1800 95,000.00 17,100.00
Kepala Tukang Oh 0.0180 105,000.00 1,890.00
Mandor Oh 0.0054 125,000.00 675.00
Jumlah 111,627.00
Dibulatkan 111,620.00
1 M¹ Pipa Galvanis Ø 3"
Pipa Galvanis M1 1.2000 155,816.67 186,980.00
Perlengkapan 35% Ls 1.0000 65,443.00 65,443.00
Pekerja Oh 0.1080 80,000.00 8,640.00
Tukang Batu Oh 0.1800 95,000.00 17,100.00
Kepala Tukang Oh 0.0180 105,000.00 1,890.00
Mandor Oh 0.0054 125,000.00 675.00
Jumlah 280,728.00
Dibulatkan 280,720.00
1 M¹ Pipa Galvanis Ø 4"
Pipa Galvanis M1 1.2000 158,333.33 190,000.00
Perlengkapan 35% Ls 1.0000 66,500.00 66,500.00
Pekerja Oh 0.1350 80,000.00 10,800.00
Tukang Batu Oh 0.2250 95,000.00 21,375.00
Kepala Tukang Oh 0.0225 105,000.00 2,362.50
Mandor Oh 0.0068 125,000.00 850.00
Jumlah 291,887.50
Dibulatkan 291,880.00
1 Buah Bak kontrol Pas. Batu Bata (45 x 45) cm, Tinggi 50 cm
Batu Bata M2 0.2500 59,500.00 14,875.00
Semen PC Kg 77.0000 1,540.00 118,580.00
Pasir Pasang M3 0.1300 265,000.00 34,450.00
Batu Kerikil M3 0.0200 196,000.00 3,920.00
Besi Beton Kg 2.6000 18,000.00 46,800.00
Pasir Beton M3 0.0900 290,000.00 26,100.00
Pekerja Oh 1.4200 80,000.00 113,600.00
Tukang Batu Oh 0.4730 95,000.00 44,935.00
Kepala Tukang Oh 0.0470 105,000.00 4,935.00
Mandor Oh 0.0710 125,000.00 8,875.00
Jumlah 417,070.00
Dibulatkan 417,070.00
1 M' Saluran Air Hujan Lbr. 20 cm
Galian tanah M3 0.1000 37,000.00 3,700.00
Urugan pasir M3 0.0100 264,050.00 2,640.50
Pas. Bata merah ad. 1 : 5 M2 0.3500 124,350.00 43,522.50
Pas. Plesteran ad. 1 : 5 M2 0.4000 66,180.00 26,472.00
Pas. Beton tumbuk ad. 1 : 3 : 5 M3 0.0150 863,690.00 12,955.35
Perapihan 5% - 4,464.52 4,464.52
Jumlah 93,754.87
Dibulatkan 93,750.00
1 M' Perbaikan Saluran Air Hujan Lbr. 20 cm
Pas. Plesteran ad. 1 : 5 M2 0.4000 66,180.00 26,472.00
Pas. Beton tumbuk ad. 1 : 3 : 5 M3 0.0150 863,690.00 12,955.35
1 2 3 4 5 6=4x5
Perapihan 5% - 1,971.37 1,971.37
Jumlah 41,398.72
Dibulatkan 41,390.00

N PEKERJAAN PENGECATAN
N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama
Soda Api Kg 0.0500 39,500.00 1,975.00
Pekerja Oh 0.1500 80,000.00 12,000.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 14,287.50
Dibulatkan 14,280.00
N-02 1 M2 Mendempul dan Menggosok Kayu
Dempul Jadi Kg 0.0800 44,000.00 3,520.00
Minyak Cat Kg 0.0200 46,000.00 920.00
Batu Apung Kg 0.0100 33,000.00 330.00
Pekerja Oh 0.0400 80,000.00 3,200.00
Tukang Cat Oh 0.0400 95,000.00 3,800.00
Kepala Tukang Oh 0.0040 105,000.00 420.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 12,502.50
Dibulatkan 12,500.00
N-03 1 M2 Pengecatan Bidang Kayu dan Besi lama Setara Glotex
Plamir Kg 0.1500 30,000.00 4,500.00
Cat Dasar Kg 0.1700 38,000.00 6,460.00
Cat Penutup setara Glotex 2X Kg 0.1700 50,000.00 8,500.00
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Cat Oh 0.0750 95,000.00 7,125.00
Kepala Tukang Oh 0.0075 105,000.00 787.50
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 33,285.00
Dibulatkan 33,280.00
N-03 1 M2 Pengecatan Bidang Kayu lama Setara Pinotex
Plamir Kg 0.1500 30,000.00 4,500.00
Cat Dasar Kg 0.1700 38,000.00 6,460.00
Cat Penutup setara Pinotex 2X Kg 0.1700 57,000.00 9,690.00
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Cat Oh 0.0750 95,000.00 7,125.00
Kepala Tukang Oh 0.0075 105,000.00 787.50
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 34,475.00
Dibulatkan 34,470.00
N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Glotex 3 X laburan
Cat Meni Kg 0.2000 36,000.00 7,200.00
Plamir Kg 0.1500 30,000.00 4,500.00
Cat Dasar Kg 0.1700 38,000.00 6,460.00
Cat Penutup setara Glotex 3X Kg 0.3500 50,000.00 17,500.00
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Cat Oh 0.1050 95,000.00 9,975.00
Kepala Tukang Oh 0.0040 105,000.00 420.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 51,967.50
Dibulatkan 51,960.00
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve 2 X laburan
Cat Meni Kg 0.2000 36,000.00 7,200.00
Plamir Kg 0.1500 30,000.00 4,500.00
Cat Dasar Kg 0.1700 38,000.00 6,460.00
Cat Penutup setara Sieve 2X Kg 0.2600 50,000.00 13,000.00
Pekerja Oh 0.0700 80,000.00 5,600.00
Tukang Cat Oh 0.0090 95,000.00 855.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0060 105,000.00 630.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 38,557.50
Dibulatkan 38,550.00
N-05 1 M2 Pelaburan Bidang Kayu dengan Politur
Politur Ltr 0.1500 60,000.00 9,000.00
Politur Jadi Ltr 0.3720 137,000.00 50,964.00
Ampelas Lbr 2.0000 6,000.00 12,000.00
Tukang Cat Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0160 105,000.00 1,680.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 79,656.50
Dibulatkan 79,650.00
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
Residu atau Ter Ltr 0.3500 9,000.00 3,150.00
Pekerja Oh 0.1000 80,000.00 8,000.00
Mandor Oh 0.0060 125,000.00 750.00
Jumlah 11,900.00
Dibulatkan 11,900.00
N-07 1 M2 Pengecatan Tembok Setara ICI Exterior (weather shield)
Plamir Kg 0.1000 30,000.00 3,000.00
Cat Dasar Kg 0.1000 38,000.00 3,800.00
Cat Penutup setara ICI Exterior 2X Kg 0.2600 148,000.00 38,480.00
Pekerja Oh 0.0200 80,000.00 1,600.00
Tukang Cat Oh 0.0630 95,000.00 5,985.00
Kepala Tukang Oh 0.0063 105,000.00 661.50
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 53,839.00
Dibulatkan 53,830.00
N-07 1 M2 Pengecatan Tembok Setara ICI Interior
Plamir Kg 0.1000 30,000.00 3,000.00
Cat Dasar Kg 0.1000 38,000.00 3,800.00
Cat Penutup setara ICI Interior 2X Kg 0.2600 101,000.00 26,260.00
Pekerja Oh 0.0200 80,000.00 1,600.00
Tukang Cat Oh 0.0630 95,000.00 5,985.00
Kepala Tukang Oh 0.0063 105,000.00 661.50
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 41,619.00
Dibulatkan 41,610.00
N-08 1 M2 Pengecatan Tembok Lama Setara ICI Weather Shield
Cat Dasar Kg 0.1200 38,000.00 4,560.00
Cat Penutup setara ICI 2X Kg 0.1800 148,000.00 26,640.00
Pekerja Oh 0.0280 80,000.00 2,240.00
Tukang Cat Oh 0.0420 95,000.00 3,990.00
Kepala Tukang Oh 0.0042 105,000.00 441.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 38,183.50
Dibulatkan 38,180.00
N-09 1 M2 Pengecatan Plafond ( 3x ) setara ICI
Cat tembok setara ICI Kg 0.2000 101,000.00 20,200.00
Plamir tembok Kg 0.1600 30,000.00 4,800.00
Rol cat Bh 0.0100 38,000.00 380.00
Steger werk Ls 1.0000 1,000.00 1,000.00
Ampelas Lbr 0.5000 6,000.00 3,000.00
Pekerja setengah trampil Oh 0.2000 80,000.00 16,000.00
Tukang cat Oh 0.3000 95,000.00 28,500.00
Kepala tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 78,280.00
1 2 3 4 5 6=4x5
Dibulatkan 78,280.00
N-10 1 M2 Pengecatan Plafond ( 3x ) setara Vinilex
Cat tembok setara Vinilex Kg 0.2000 30,000.00 6,000.00
Plamir tembok Kg 0.1600 30,000.00 4,800.00
Rol cat Bh 0.0100 38,000.00 380.00
Steger werk Ls 1.0000 1,000.00 1,000.00
Ampelas Lbr 0.5000 6,000.00 3,000.00
Pekerja setengah trampil Oh 0.2000 80,000.00 16,000.00
Tukang cat Oh 0.3000 95,000.00 28,500.00
Kepala tukang Oh 0.0300 105,000.00 3,150.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 64,080.00
Dibulatkan 64,080.00
N-10r 1 M2 Pengecatan Plafond ( 2x ) setara Vinilex
Cat tembok setara Vinilex Kg 0.1300 30,000.00 3,900.00
Plamir tembok Kg 0.1100 30,000.00 3,300.00
Rol cat Bh 0.0100 38,000.00 380.00
Steger werk Ls 0.6700 1,000.00 670.00
Ampelas Lbr 0.3300 6,000.00 1,980.00
Pekerja setengah trampil Oh 0.1300 80,000.00 10,400.00
Tukang cat Oh 0.2000 95,000.00 19,000.00
Kepala tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 42,980.00
Dibulatkan 42,980.00
N-11 1 M2 Pemasangan Wall Paper
Wall Paper M3 1.2000 61,500.00 73,800.00
Perekat Kg 0.2500 43,000.00 10,750.00
Pekerja Oh 0.3500 80,000.00 28,000.00
Tukang Cat Oh 0.1750 95,000.00 16,625.00
Kepala Tukang Oh 0.0170 105,000.00 1,785.00
Mandor Oh 0.0017 125,000.00 212.50
Jumlah 131,172.50
Dibulatkan 131,170.00
N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi
Meni Besi Kg 0.1000 36,000.00 3,600.00
Kuas Bh 0.0100 18,000.00 180.00
Pekerja Oh 0.0200 80,000.00 1,600.00
Tukang Cat Oh 0.2000 95,000.00 19,000.00
Kepala Tukang Oh 0.0200 105,000.00 2,100.00
Mandor Oh 0.0100 125,000.00 1,250.00
Jumlah 27,730.00
Dibulatkan 27,730.00
N-13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
Meni Besi Kg 0.1000 36,000.00 3,600.00
Kuas Bh 0.0100 18,000.00 180.00
Perancah Kayu M3 0.0020 2,504,000.00 5,008.00
Pekerja Oh 0.2500 80,000.00 20,000.00
Tukang Cat Oh 0.2250 95,000.00 21,375.00
Kepala Tukang Oh 0.0225 105,000.00 2,362.50
Mandor Oh 0.0075 125,000.00 937.50
Jumlah 53,463.00
Dibulatkan 53,460.00
N-14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
Cat besi setara ICI Kg 0.3000 81,000.00 24,300.00
Pekerja Oh 0.0060 80,000.00 480.00
Tukang Cat Oh 0.0600 95,000.00 5,700.00
Kepala Tukang Oh 0.0120 105,000.00 1,260.00
Mandor Oh 0.0060 125,000.00 750.00
1 2 3 4 5 6=4x5
Jumlah 32,490.00
Dibulatkan 32,490.00
N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
Plamir Kg 0.1600 30,000.00 4,800.00
Cat Dasar Kg 0.1000 38,000.00 3,800.00
Cat Penutup setara Vinilex 3X Kg 0.3900 30,000.00 11,700.00
Pekerja Oh 0.0300 80,000.00 2,400.00
Tukang Cat Oh 0.1890 95,000.00 17,955.00
Kepala Tukang Oh 0.0189 105,000.00 1,984.50
Mandor Oh 0.0019 125,000.00 236.25
Jumlah 42,875.75
Dibulatkan 42,870.00
N-15r 1 M2 Pengecatan Tembok Setara Vinilex (2 x laburan)
Plamir Kg 0.1000 30,000.00 3,000.00
Cat Dasar Kg 0.1000 38,000.00 3,800.00
Cat Penutup setara Vinilex 2X Kg 0.3900 30,000.00 11,700.00
Pekerja Oh 0.0300 80,000.00 2,400.00
Tukang Cat Oh 0.0945 95,000.00 8,977.50
Kepala Tukang Oh 0.0095 105,000.00 997.50
Mandor Oh 0.0038 125,000.00 475.00
Jumlah 31,350.00
Dibulatkan 31,350.00
N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex
Cat Dasar Kg 0.1200 38,000.00 4,560.00
Cat Penutup setara Vinilex 2X Kg 0.1800 30,000.00 5,400.00
Pekerja Oh 0.0280 80,000.00 2,240.00
Tukang Cat Oh 0.0420 95,000.00 3,990.00
Kepala Tukang Oh 0.0042 105,000.00 441.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 16,943.50
Dibulatkan 16,940.00

O PEKERJAAN PENANAMAN POHON


O-01 1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2 m
Pupuk kandang Krg 0.0800 30,000.00 2,400.00
Furadan Kg 0.0010 29,000.00 29.00
Pohon pelindung btg 1.0000 30,000.00 30,000.00
Pekerja Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 34,741.50
Dibulatkan 34,740.00
O-02 1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
Pupuk kandang Krg 0.0800 30,000.00 2,400.00
Furadan Kg 0.0010 29,000.00 29.00
Bambu krisik/jepang btg 1.0000 60,000.00 60,000.00
Pekerja Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0025 125,000.00 312.50
Jumlah 64,741.50
Dibulatkan 64,740.00
O-03 1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
Pupuk kandang Krg 0.0400 30,000.00 1,200.00
Furadan Kg 0.0010 29,000.00 29.00
Pohon perdu btg 1.0000 11,000.00 11,000.00
Pekerja Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0020 125,000.00 250.00
Jumlah 14,079.00
Dibulatkan 14,070.00
O-04 1 M2 Tanam rumput gajah (silang papan catur)
Pupuk kandang Krg 0.0400 30,000.00 1,200.00
1 2 3 4 5 6=4x5
Rumput gajah mini m2 0.5000 18,000.00 9,000.00
Pekerja Oh 0.0400 80,000.00 3,200.00
Mandor Oh 0.0040 125,000.00 500.00
Jumlah 13,900.00
Dibulatkan 13,900.00
DAFTAR HARGA SATUAN PEKERJAAN
KODE
No. URAIAN SATUAN
ANAL
A PEKERJAAN PERSIAPAN SNI 03-2835-2002
1 1 M Pagar Sementara dari Kayu Setinggi 2 Meter A-01
2 1 M Pagar Sementara dari Seng Gelombang Tinggi 2 Meter A-02
3 1 M Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter A-03
4 1 M¹ Pengukuran dan Pasang Bouwplank A-04
1 M¹ Pengukuran
5 1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran A-05
6 1 M2 Pembuatan Gudang Semen dan alat - alat A-06
7 1 M2 Pembuatan Bedeng Buruh A-07
8 1 M2 Membersihkan Lapangan dan Perataan A-08
9 1 M2 Pembuatan Jalan Sementara A-09
10 1 M3 Bongkaran Beton Bertulang A-10
11 1 M3 Bongkaran Dinding Tembok Bata Merah A-11
12 1 M Pagar Beton Pracetak (5x50x213) Cm A-12
13 1 M¹ Pagar kawat ayam tiang besi L 50.50.5, tinggi 1 m¹ A-13
14 1 M2 Pagar BRC lengkap dengan tiang A-14
15 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40x50x20) Cm A-15
16 1 M¹ Cerucuk Bambu A-16
1 M3 Bongkaran Kuda-kuda, Gording Balok
1 M3 Bongkaran Rangka Atap, Reng dan Kaso
1 M3 Bongkaran Genteng Lama

B PEKERJAAN TANAH SNI 03-2835-2002


1 Galian Tanah Biasa sedalam 1 Meter B-01
2 Galian Tanah Biasa sedalam 2 Meter B-02
3 Galian Tanah Biasa sedalam 3 Meter B-03
4 Galian Tanah Keras sedalam 1 Meter B-04
5 Galian Tanah Lumpur sedalam 1 Meter B-05
6 Pekerjaan Srtipping Setinggi 10 CM B-06
7 1 M3 Pembuangan Tanah Sejauh 150 Meter B-07
8 1 M3 Urugan Kembali B-08
9 1 M3 Pemadatan Tanah B-09
10 1 M3 Urugan Pasir B-10
11 1 M² Pemasangan Lapisan Ijuk tebal 10 cm B-11
12 1 M3 Pemasangan Urugan Sirtu B-12
13 1 M3 Urugan Tanah Pilihan B-13
14 1 M2 Pembuatan Jalan Sementara, Tebal 25 Cm B-14
1 M3 Lapisan Pudel Camp. 1 Kp : 3 Ps : 7 TL
1 M3 Lapisan Pudel Camp. 1 Kp : 5 TL

C PEKERJAAN PONDASI SNI 03-2836-2002


1 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 3 Ps C-01
2 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 4 Ps C-02
3 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 5 Ps C-03
4 1 M3 Pasangan Pondasi Batu Kosong (Aanstamping) C-04
5 1 M3 Beton Siklop 1pc : 2 ps : 3 kr + 40 % Batu Belah dgn besi tulangan C-05
6 1 M3 Pasang Pondasi Sumuran 1pc : 2 ps : 3 kr + 40 % Batu Belah (D= 1m) C-06
7 1 M3 Pondasi Siklop 1pc : 2 ps : 3 kr + 40 % Batu Belah C-07
8 1 M¹ Pembuatan Tiang Pancang (40x40) Cm, Beton Bertulang C-08
9 1 M¹ Pembuatan Tiang Pancang (35x35) Cm, Beton Bertulang C-09
10 1 M¹ Pembuatan Tiang Pancang Ø 40 Cm, Beton Bertulang C-10
11 1 M¹ Memancang Tiang Pancang Beton Bertulang C-11
12 1 Buah Memotong Tiang Pancang (40 x 40) Cm Beton Bertulang C-12
13 1 M¹ Menyambung Tiang Pancang Beton Bertulang C-13

D PEKERJAAN BETON
KODE
No. URAIAN SATUAN
ANAL
1 M2 Lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr. tebal 5 cm
1 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr D-01
2 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr D-02
3 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr D-03
4 1 M3 Tiang Pancang Prestressed Beton D-04
5 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 4 Kr D-05
6 1 M' Memasang PVC Waterstop Lebar 200 mm D-06
1 M' Memasang PVC Waterstop Lebar 150 mm
7 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir D-07
8 1 M2 Pasangan Bekisting untuk Pondasi D-08
9 1 M2 Pasangan Bekisting untuk Sloof D-09
10 1 M2 Pasangan Bekisting untuk Kolom D-10
11 1 M2 Pasangan Bekisting untuk Balok D-11
12 1 M2 Pasangan Bekisting untuk Lantai D-12
13 1 M2 Pasang Bekisting untuk Tangga D-13
14 1 M3 Membuat Beton Cor Mutu K225 D-14
15 1 M3 Membuat Beton Cor Mutu K275 D-15
16 1 M3 Pondasi Beton Tulang (150 kg besi+bekisting) D-16
17 1 M3 Sloof Beton Tulang (200 kg besi+bekisting) D-17
1 M3 Sloof Beton Tulang 15/20 cm (150 kg besi+bekisting)
1 M3 Sloof Beton Tulang 15/20 cm (180 kg besi+bekisting) 4 dia. 12 ring 8-15
1 M3 Sloof Beton Tulang 20/30 cm (150 kg besi+bekisting) 4 dia. 16 ring 8-15
1 M3 Sloof Beton Tulang 20/30 cm (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
1 M3 Sloof Beton Bertulang 20/40 cm (240 kg besi+bekisting) Struktur bertingkat
18 1 M3 Kolom Beton Tulang (120 kg besi+bekisting) D-18
19 1 M3 Kolom Beton Tulang (140 kg besi+bekisting) D-19
20 1 M3 Kolom Beton Tulang (150 kg besi+bekisting) D-20
21 1 M3 Kolom Beton Tulang (180 kg besi+bekisting) D-21
22 1 M3 Kolom Beton Tulang (200 kg besi+bekisting) D-22
23 1 M3 Kolom Beton Tulang (250 kg besi+bekisting) D-23
24 1 M3 Kolom Beton Tulang (300 kg besi+bekisting) D-24
1 M3 Kolom Beton Tulang 20/20 cm (140 kg besi+bekisting) 4 dia. 12, 8-15
1 M3 Kolom Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
1 M3 Kolom Beton Tulang 20/20 cm (210 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
1 M3 Kolom Beton Tulang 20/30cm (230 kg besi+bekisting) Struktur bertingkat 6 dia.16+2 dia.12, 8-15
1 M3 Kolom Beton Tulang 20/40 cm (250 kg besi+bekisting) Struktur bertingkat
1 M3 Kolom Beton Tulang 30/30 cm (175 kg besi+bekisting) Struktur bertingkat 8 dia. 16, 8-15
1 M3 Kolom Beton Tulang 30/30 cm (210 kg besi bekisting) Struktur bertingkat 10 dia. 16, 8-15
1 M3 Kolom Beton Tulang 30/40 cm (200 kg besi bekisting) Struktur bertingkat
1 M3 Kolom Beton Tulang Praktis 12/12 cm (175 kg besi+bekisting)
1 M3 Kolom Beton Tulang Praktis 12/12 cm (260 kg besi+bekisting) 4 dia. 10, 8-15
1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
25 1 M3 Balok Beton Tulang (120 kg besi+bekisting) D-25
26 1 M3 Balok Beton Tulang (150 kg besi+bekisting) D-26
27 1 M3 Balok Beton Tulang (200 kg besi+bekisting) D-27
28 1 M3 Balok Beton Tulang (230 kg besi+bekisting) D-28
1 M3 Balok Beton Tulang 15/20 cm (150 kg besi+bekisting)
1 M3 Balok Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
1 M3 Balok Beton Lintel 11/11 (300 kg besi+bekisting) 4 dia. 10, 8-15
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk+balok portal (180 kg besi+bekisting) 4 dia.12, 8-15
1 M3 Balok Beton Tulang 15/30 (190 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
1 M3 Balok Beton Tulang 20/40 (200 kg besi+bekisting) Struktur bertingkat 7 dia. 16+2 dia. 12, 8-15
1 M3 Balok Beton Tulang 20/30 (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
1 M3 Balok Beton Tulang 20/30 (175 kg besi+bekisting) Struktur bertingkat 5 dia. 16, 8-15
1 M3 Balok Beton Tulang 25/55 (140 kg besi+bekisting) Struktur bertingkat 8 dia. 16+2 dia. 12, 8-15
1 M3 Balok Beton Tulang 30/60 (110 kg besi+ bekisting) Struktur bertingkat 9 dia. 19+2 dia. 12, 8-15
KODE
No. URAIAN SATUAN
ANAL
29 1 M3 Tangga Beton Tulang (200 kg besi+bekisting) D-29
30 1 M3 Plat Lantai Tb. 10 Cm Beton Bertulang (90 kg besi+bekisting) D-30
31 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (110 kg besi+bekisting) D-31
32 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (130 kg besi+bekisting) D-32
33 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (90 kg besi+bekisting) D-33
34 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (115 kg besi+bekisting) D-34
35 1 M' Kolom Praktis Beton Tulang ( 11 x 11 ) Cm D-35
36 1 M' Ring Balok Beton Tulang ( 10 x 15 ) Cm D-36
37 1 M2 Pasang Bekisting untuk Dinding D-37
38 1 M3 Pelat Beton Tulang (150 kg besi+bekisting) D-38
39 1 M3 Dinding Beton Tulang (150 kg besi+bekisting) D-39
40 1 M3 Dinding Beton Tulang (200 kg besi+bekisting) D-40
41 1 M3 Membuat Beton Cor Mutu K300 D-41
42 1 M3 Membuat Beton Cor Mutu K200 D-42
43 1 M3 Membuat Beton Cor Mutu K250 D-43
1 M3 Membuat Beton dengan Puzzdith - 100 XR
1 M3 Membuat Beton Kedap Air dengan AM - 100
1 Kg Kabel Presstressed Polos / Strands
1 Kg Jaring Kawat Baja
1 M3 Membuat Beton Cor Mutu K175
1 M2 Pasangan Jembatan Cor
1 M3 Listplank Beton Tulang T=8 cm ( 77,50 kg besi + bekisting )

E PEKERJAAN DINDING
1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps E-01
2 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps E-02
3 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps E-03
4 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps E-04
5 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps E-05
6 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps E-06
7 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 3 ps E-07
8 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 4 ps E-08
9 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm E-09
10 1 M2 Pasang Dinding Batako Besar Pres uk. 8 x 20 x 30 ad. 1pc : 4ps E-10
11 1 M2 Pasang Dinding Hollowblock (HB-20) E-11
12 1 M2 Pasang Dinding Hollowblock (HB-15) E-12
13 1 M2 Pasang Dinding Hollowblock (HB-10) E-13
14 1 M2 Pasang Dinding Conblock (CB-20) E-14
15 1 M2 Pasang Dinding Conblock (CB-15) E-15
16 1 M2 Pasang Dinding Conblock (CB-10) E-16
17 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Mulia E-17
18 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Mulia E-18
19 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Mulia E-19
20 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Mulia E-20
21 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Mulia E-21
22 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Mulia E-22
23 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia E-23
24 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia E-24
25 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Mulia E-25
26 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Mulia E-26
27 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Roman E-27
28 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Roman E-28
29 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Roman E-29
30 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Roman E-30
31 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Roman E-31
32 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Roman E-32
33 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Roman E-33
34 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Roman E-34
KODE
No. URAIAN SATUAN
ANAL
35 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Roman E-35
36 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Roman E-36
36 1 M2 Pasang Dinding Keramik 20 x 40 Cm corak setara Roman E-36
37 1 M2 Pasang Dinding Marmer E-37
38 1 M2 Pasang Dinding Batu Tempel Hitam E-38
39 1 M2 Pasang Dinding Poslin 11 x 11 Cm E-39
40 1 M2 Wall paper E-40
41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan E-41
42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan E-42
43 1 M2 Dinding Pemisah Triplek Rangkap, Rangka Kayu Kamper Medan E-43
44 1 M2 Dinding Pemisah GRC tb. 4 mm + rangka besi hollow E-44
45 1 M2 Dinding Pemisah Gypsum dobel tb. 9 mm + rangka besi hollow E-45
46 1 M2 Dinding Plywood tb. 4 mm + rangka besi hollow E-46
47 1 M2 Dinding Teakwood tb. 4 mm + rangka besi hollow E-47
48 1 M2 Pasang Dinding Glass Block 20 x 20 ad. 1pc : 4 ps E-48
49 1 M2 Pasang Dinding Anyaman Bambu, rangka kayu E-49

F PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm F-01
2 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm F-02
3 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm F-03
1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm + Acian
4 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm F-04
5 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm F-05
6 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm F-06
7 1 M2 Barapen 1 Pc : 5 Ps, Tebal 15 mm F-07
8 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm F-08
9 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm F-09
10 1 M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm F-10
11 1 M2 Acian Plesteran F-11
12 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps batu belah F-12
13 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps dinding bata merah F-13
1M2 Waterprofing Layer UV
G PEKERJAAN PENUTUP ATAP
1 1 M2 Pasang Atap Genteng Pelentong G-01
1 M2 Pasang Atap Genteng Pelentong Existing (Lama)
2 1 M2 Pasang Genteng Bubungan Palentong G-02
3 1 M2 Pasang Roof Ligt Fiberglass ( 180 x 90 ) Cm G-03
4 1 M2 Pasang Atap Asbes Gelombang ( 3.00 x 1.05 m ) x 4 mm G-04
5 1 M2 Pasang Atap Asbes Gelombang ( 2.70 x 1.05 m ) x 4 mm G-05
6 1 M2 Pasang Atap Asbes Gelombang ( 2.40 x 1.05 m ) x 4 mm G-06
7 1 M2 Pasang Atap Asbes Gelombang ( 2.10 x 1.05 m ) x 4 mm G-07
8 1 M2 Pasang Atap Asbes Gelombang besar 80 x 180 x 5 mm G-08
9 1 M' Pasang Nok Stel Gelombang 1.05 m G-09
10 1 M2 Pasang Atap Genteng Beton G-10
11 1 M2 Pasang Atap Genteng Morando Natural G-11
12 1 M2 Pasang Atap Genteng Morando Glasur G-12
13 1 M2 Pasang Atap Genteng Metal G-13
14 1 M' Pasang Nok Genteng Beton G-14
15 1 M' Pasang Nok Genteng Metal G-15
16 1 M2 Pasang Atap Seng Gelombang G-16
17 1 M2 Pasang Atap Nok Seng G-17
18 1 M2 Pasang Alluminium Foil / Sisalation G-18
19 1 M2 Pasang Atap Alluminium Natural G-19
20 1 M2 Pasang Atap Alluminium Warna G-20
21 1 M2 Pasang Nol Alluminium G-21
22 1 M' Pasang Listplang GRC lebar 30 Cm G-22
1 M' Pasang Listplang GRC lebar 30 Cm , tebal 9 mm
KODE
No. URAIAN SATUAN
ANAL
23 1 M' Pasang Nok Pinggir Morando Natural G-23
1 M' Pasang Bubungan Stel Gelombang 0.92 m
1 M' Pasang Nok Sirap
1 M' Pasang Genteng Bubungan Morando Naatural
1 M' Pasang Genteng Bubungan Morando Glazur
1 M2 Pasang Water Proofing Membrance tb. 3 mm
1M2 Waterprofing Mortar
H PEKERJAAN LANGIT - LANGIT
1 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 5 mm H-01
2 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 3.5 mm H-02
3 1 M2 Langit - langit Akustik (60x120) Cm H-03
4 1 M2 Langit - langit Akustik 60x120 Cm dan Rangka alluminium H-04
5 1 M2 Langit - Langit Teakwood (60 x 120) cm, t = 4 mm + Rangka kayu Borneo Super H-05
6 1 M2 Langit - Langit Teakwood 3 mm + Rangka kayu Borneo Super H-06
7 1 M2 Langit - Langit Triplek 4 mm + Rangka kayu Borneo Super H-07
8 1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 2/4 H-08
1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 4/4 H-08
9 1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 2/4 H-09
1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 4/4 H-09
1 M2 Langit - Langit Triplek 4 mm
10 1 M2 Langit - Langit Gypsum Board, tb. 9 mm H-10
11 1 M2 Langit - Langit GRC, tb. 4 mm H-11
12 1 M1 List Langit - langit Kayu Profil 10 cm H-12
13 1 M1 List Langit - langit Gypsum 10 cm H-13
14 1 M1 List Langit - langit kayu borneo 1/4 cm H-14

I PEKERJAAN PENUTUP LANTAI


1 M2 Pasang Lantai Granito Tile Essenza Ukuran 60 x 60 Cm Polis
1 1 M2 Pasang Lantai Ubin Granito Ukuran 40x40 cm setara Essenza I-01
2 1 M2 Pasang Lantai Ubin Granito Ukuran 30x30 cm setara Essenza I-02
3 1 M' Pasang Plin Ubin Granito Ukuran 10x40 cm setara Essenza I-03
4 1 M' Pasang Plin Ubin Granito Ukuran 10x30 cm setara Essenza I-04
5 1 M2 Pasang Lantai Keramik 10x20 cm Corak setara Mulia I-05
6 1 M2 Pasang Lantai Keramik 20x20 cm Corak setara Mulia I-06
7 1 M2 Pasang Lantai Keramik 30 x 30 cm Polos setara Mulia I-07
8 1 M2 Pasang Lantai Keramik 30 x 30 cm Corak setara Mulia I-08
9 1 M2 Pasang Lantai Keramik 40x40 cm polos setara Mulia I-09
10 1 M2 Pasang Lantai Keramik 40x40 cm Corak/Warna setara Mulia I-10
11 1 M2 Pasang Lantai Keramik 10x20 cm Corak setara Roman I-11
12 1 M2 Pasang Lantai Keramik 20x20 cm Corak setara Roman I-12
13 1 M2 Pasang Lantai Keramik 30 x 30 cm Polos setara Roman I-13
14 1 M2 Pasang Lantai Keramik 30 x 30 cm corak setara Roman I-14
15 1 M2 Pasang Lantai Keramik 40x40 cm polos setara Roman I-15
16 1 M2 Pasang Lantai Keramik 40x40 cm Corak/Warna setara Roman I-16
17 1 M2 Lantai Marmer I-17
18 1 M2 Pasang Lantai Parguet Jati I-18
19 1 M¹ Plint Keramik ukuran 10 x 40 cm I-19
20 1 M¹ Plint Keramik ukuran 10 x 30 cm I-20
21 1 M¹ Plint kayu kamper Samarinda 2 x 10 cm I-21
22 1 M¹ Plint Keramik ukuran 10 x 20 cm I-22
23 1 M2 Lantai karpet I-23
24 1 M2 Paving Block Natural 8 cm I-24
25 1 M2 Paving Block Warna 8 cm I-25
26 1 M2 Paving Block Natural 6 cm I-26
27 1 M2 Paving Block Warna 6 cm I-27
28 1 M2 Grass Block 20 x 20 I-28
29 1 M2 Grass Block 30 x 30 I-29
KODE
No. URAIAN SATUAN
ANAL
J PEKERJAAN KAYU
1 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Samarinda J-01
2 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Medan/Kruing J-02
3 1 M3 Pasang Kusen Pintu dan Jendela Kayu Borneo Super J-03
4 1 M2 Pasang Pintu Panel Kayu Kamper Samarinda J-04
5 1 M2 Pasang Pintu Panel Kayu Kamper Medan/Kruing J-05
6 1 M2 Pasang Daun Jendela Kaca Kayu Kamper Medan J-06
7 1 M2 Pasang Pintu dan Jendela Kaca Kayu Borneo J-07
8 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kamper Medan J-08
9 1 M2 Pasang Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan/Kruing J-09
10 1 M2 Pasang Jalusi Mati Kusen kayu Kamper Medan J-10
11 1 M2 Pasang Daun Pintu Triplek Rangkap, Rangka Kayu Kamper J-11
12 1 M2 Pasang Daun Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan J-12
13 1 M2 Pasang Pintu dobel Plywood lapis HPL, Rangka Kayu Kamper Medan J-13
14 1 M2 Pasang Pintu Teakwood lapis HPL , Rangka Kayu Kamper Medan J-14
15 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kamper Medan J-15
16 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Borneo J-16
17 1 M2 Pasang Kaso dan Reng Genteng Plentong kayu Kamper Medan J-17
18 1 M2 Pasang Kaso dan Reng Genteng Beton kayu Kamper J-18
19 1 M' Pasang Lisplang (3x20) Cm, Kayu Kamper Medan J-19
20 1 M' Pasang Lisplang (3x30) Cm, Kayu Kamper Medan J-20
21 1 M' Pasang List Plafon - Kayu Profil 10 cm J-21
22 7,26 M2 Kusen Partisi Dobel Triplek J-22
23 1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu Kamper J-23
24 1 M2 Pasang Rangka Langit - langit (0.50 x 1.00) m, Kayu Borneo J-24
25 1 M1 Reuter Kayu Kamper Medan J-25
26 1 M3 Gording kayu kelas II J-26
27 1 M2 Dinding bilik, rangka kayu borneo J-27
1 M2 Pasang Pintu Panel Multiplek 9 mm rangka kayu Kamper Medan / Kruing

K PEKERJAAN PENUTUP BESI & ALLUMUNIUM


1 1 Kg Besi profil K-01
2 1 Kg pekerjaan perakitan K-02
3 1 Cm Pengelasan dengan las listrik K-03
4 1 M2 Pasang Pintu Rolling Door K-04
5 1 M2 Pasang Pintu Alluminium Natural K-05
6 1 M2 Pasang Terali Besi K-06
7 1 M2 Pasang Kawat Harmonika K-07
8 1 M' Pasang Talang Datar, Seng Bjls 28 lebar 90 cm K-08
9 1 M' Pasang Talang Miring, Seng Bjls 28 lebar 90 cm K-09
10 1 M' Pasang Talang 1/2 Lingkaran D -15 cm, seng pelat BJLS 28 lebar 90 cm K-10
11 1 M1 Pasang Kusen pintu/jendela allumunium natural 4" K-11
12 1 M1 Pasang Kusen pintu/jendela allumunium warna 4" K-12
13 1 M1 Pasang Kusen pintu/jendela allumunium natural 3" K-13
14 1 M1 Pasang Kusen pintu/jendela allumunium warna 3" K-14
15 1 M1 Pintu Allumunium strip lebar 8 cm K-15
16 1 M1 Pintu/jendela kaca rangka allumunium natural 4" K-16
17 1 M1 Pintu/jendela kaca rangka allumunium warna 4" K-17
18 1 M2 Jendela Nako & Teralis (10 klips) K-18
19 1 M2 Pintu besi plat baja tebal 2 mm rangkap, rangka baja siku K-19
20 1 m2 Rangka jendela besi scuare tube ( 5 x 5 ) cm K-20
21 1 M2 Pasang Pintu Lipat K-21
22 1 M2 Tirai ( Venetions Blinds and vertical blinds) K-22
1 M2 Rangka atap baja ringan
1 M2 Pasang Jendela Besi
1 M2 Pasang Jendela Besi Tahan Api
1 M2 Pasang Pintu Gulung Besi
KODE
No. URAIAN SATUAN
ANAL
1 M2 Pasang Pintu Sunscreen Alluminium
1 M2 Pasang Kawat Nyamuk
1 M2 Pasang Kawat Kassa
1 M2 Pasang Kawat Burung
1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 24
1 UNIT Pasang Partisi Alumunium, Daun Partisi Multiplek rangka kayu Kamper
1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
1 UNIT Pek. Kusen Pintu Alumunium uk. 0,8 X 2,70 M'
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
1 UNIT Pek. Jalusi Alumunium Sofi-sofi
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m
1 UNIT Pek. Kusen Jendela Alumunium uk. 1,35 X 1,60 M' ( 2 lubang ) dgn 1 Daun Jendela
1 UNIT Pek. Kusen Jendela Alumunium uk. 0,70 X 1,60 M' ( 1 lubang ) dgn 1 Daun Jendela
1 UNIT Pek. Kusen Pintu Alumunium uk. 0,90 X 2,80 M' (KM/WC)
1 UNIT Pek. Kusen Pintu Alumunium uk. 0,90 X 2,15 M' (KM/WC)
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 2,40 X 2,80 M' ( 2 Daun Pintu ) Kantor
1 UNIT Pek. Kusen Pintu Alm. Doble Triplek Lapis Formika uk. 0,8 X 2,80 M'

L PEKERJAAN KUNCI DAN KACA


1 1 Buah Pasang Kunci Tanam 2 slaag L-01
2 1 Buah Pasang Kunci Tanam Biasa L-02
3 1 Buah Pasang Kunci Tanam Kamar Mandi L-03
4 1 Buah Pasang Engsel Pintu L-04
5 1 Buah Pasang Engsel Jendela Kupu - Kupu L-05
6 1 Buah Pasang Engsel Jendela Kupu - Kupu L-06
7 1 Buah Pasang Door Closer L-07
8 1 Buah Pasang Pegangan Pintu / Door Holder L-08
9 1 M2 Pasang Kaca, Tebal 3 mm L-09
10 1 M2 Pasang Kaca, Tebal 5 mm L-10

M PEKERJAAN SANITASI
1 1 Buah Closet Jongkok Proselen Standar M-01
2 1 Buah Urinoir M-02
3 1 Buah Wastafel M-03
4 1 Buah Bak Mandi Fibreflass volume 0,30 M3 M-04
5 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm M-05
6 1 Buah Bak kontrol Pas. Bata Merah Uk (60 x 60) cm M-06
7 1 Buah Bak kontrol Pas. Bata Merah Uk (30 x 30) cm M-07
8 1 M¹ Pipa PVC Type AW Ø ½" M-08
9 1 M¹ Pipa PVC Type AW Ø 1" M-09
10 1 M¹ Pipa PVC Type AW Ø 1½" M-10
11 1 M¹ Pipa PVC Type AW Ø 2" M-11
1 M¹ Pipa PVC Type AW Ø 2½"
1 M¹ Pipa PVC Type AW Ø 3"
12 1 M¹ Pipa PVC Type AW Ø 4" M-12
13 1 M¹ Pipa PVC Type AW Ø ¾" M-13
14 1 Buah Bak Cuci Piring Stainles Steel M-14
15 1 Buah Kran Ø ½" atau ¾" M-15
16 1 Buah Floor Drain M-16
17 1 M' Grafel beton U 20 cm -60 cm M-17
KODE
No. URAIAN SATUAN
ANAL
18 1 M' Pasang Talang Plastik PVC U 15 cm (AW) M-18
19 1 M' Saluran Air Limbah Buis beton Ø 60 cm M-19
20 1 M' Pasang Talang Seng Datar M-20
21 1 Buah Closet Duduk M-21
22 1 Buah Tangki Air fibreglass Volume 1 m3 M-22
23 1 Unit Septictank 2 x 1,50 x 1,50 M + Rembesannya M-23
24 1 Unit Septictank 1 x 1,50 x 1,50 M + Rembesannya M-24
1 M¹ Pipa Galvanis Ø ½"
1 M¹ Pipa Galvanis Ø ¾"
1 M¹ Pipa Galvanis Ø 1"
1 M¹ Pipa Galvanis Ø 1½"
1 M¹ Pipa Galvanis Ø 3"
1 M¹ Pipa Galvanis Ø 4"
1 Buah Bak kontrol Pas. Batu Bata (45 x 45) cm, Tinggi 50 cm
1 M' Saluran Air Hujan Lbr. 20 cm
1 M' Perbaikan Saluran Air Hujan Lbr. 20 cm

N PEKERJAAN PENGECATAN
1 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama N-01
2 1 M2 Mendempul dan Menggosok Kayu N-02
3 1 M2 Pengecatan Bidang Kayu dan Besi lama Setara Glotex N-03
1 M2 Pengecatan Bidang Kayu lama Setara Pinotex
4 1 M2 Pengecatan Bidang Kayu Baru Setara Glotex 3 X laburan N-04
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve 2 X laburan
5 1 M2 Pelaburan Bidang Kayu dengan Politur N-05
6 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter N-06
7 1 M2 Pengecatan Tembok Setara ICI Exterior (weather shield) N-07
8 1 M2 Pengecatan Tembok Lama Setara ICI Weather Shield N-08
9 1 M2 Pengecatan Plafond ( 3x ) setara ICI N-09
10 1 M2 Pengecatan Plafond ( 3x ) setara Vinilex N-10
1 M2 Pengecatan Plafond ( 2x ) setara Vinilex N-10r
11 1 M2 Pemasangan Wall Paper N-11
12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi N-12
13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah N-13
14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um N-14
15 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan) N-15
1 M2 Pengecatan Tembok Setara Vinilex (2 x laburan) N-15r
16 1 M2 Pengecatan Tembok Lama Setara Vinilex 16

O PEKERJAAN PENANAMAN POHON


1 1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2 m O-01
2 1 Lubang (70x70x70) cm, tanam bambu krisik/jepang O-02
3 1 Lubang (40x40x40) cm, tanam pohon perdu (polibag) O-03
4 1 M2 Tanam rumput gajah (silang papan catur) O-04
HARGA
SATUAN

323,550.00
419,550.00
281,230.00
67,260.00
28,410.00
1,416,730.00
1,126,420.00
1,051,720.00
14,250.00
143,830.00
574,980.00
537,480.00
555,700.00
148,500.00
334,530.00
56,450.00
80,620.00
329,000.00
8,120.00
2,850.00

37,000.00
48,650.00
67,980.00
57,810.00
76,210.00
4,620.00
10,370.00
17,730.00
46,250.00
264,050.00
45,070.00
301,520.00
144,320.00
172,400.00
261,170.00
242,990.00

888,580.00
837,790.00
802,570.00
447,720.00
2,351,150.00
1,059,400.00
974,750.00
1,266,170.00
990,940.00
1,231,740.00
129,660.00
402,230.00
815,620.00
HARGA
SATUAN
128,360.00
863,690.00
833,650.00
1,190,360.00
1,226,020.00
1,129,560.00
75,660.00
67,260.00
20,730.00
189,050.00
205,280.00
370,260.00
376,790.00
508,860.00
343,760.00
1,640,270.00
1,627,050.00
4,884,820.00
6,217,020.00
5,344,020.00
5,857,020.00
5,317,020.00
6,217,020.00
6,964,020.00
7,449,170.00
7,809,170.00
7,989,170.00
8,529,170.00
8,889,170.00
9,789,170.00
10,689,170.00
7,719,170.00
8,439,170.00
8,979,170.00
9,339,170.00
9,789,170.00
8,349,170.00
8,979,170.00
8,889,170.00
7,320,170.00
8,850,170.00
8,888,270.00
9,788,270.00
10,688,270.00
6,635,540.00
7,287,740.00
7,512,370.00
8,669,990.00
7,190,390.00
7,658,390.00
9,570,170.00
7,658,390.00
7,838,390.00
8,043,140.00
8,043,140.00
7,593,140.00
6,963,140.00
6,423,140.00
HARGA
SATUAN
7,562,820.00
8,144,660.00
7,709,460.00
8,124,060.00
6,450,150.00
6,968,400.00
83,780.00
110,420.00
405,090.00
7,417,520.00
7,169,390.00
7,543,980.00
1,094,250.00
1,010,970.00
1,054,470.00
1,036,810.00
1,318,920.00
20,190.00
66,070.00
1,089,090.00
115,200.00
7,035,730.00

270,700.00
261,380.00
257,060.00
130,250.00
126,630.00
124,350.00
677,410.00
674,640.00
677,410.00
100,070.00
185,810.00
182,640.00
137,690.00
229,630.00
171,100.00
133,600.00
142,990.00
140,990.00
145,990.00
140,990.00
140,990.00
145,990.00
135,990.00
140,990.00
148,990.00
146,990.00
162,990.00
146,990.00
165,990.00
146,990.00
157,990.00
163,990.00
157,990.00
162,990.00
HARGA
SATUAN
162,990.00
167,990.00
165,990.00
894,980.00
123,140.00
151,990.00
121,980.00
397,310.00
516,290.00
351,600.00
107,390.00
224,460.00
161,750.00
119,890.00
998,640.00
127,320.00

50,700.00
48,080.00
46,380.00
45,550.00
66,180.00
63,440.00
60,770.00
35,210.00
62,610.00
59,970.00
53,310.00
30,180.00
54,640.00
31,270.00
105,000.00

70,960.00
20,960.00
106,650.00
86,370.00
53,140.00
56,360.00
54,240.00
55,460.00
107,700.00
107,460.00
129,820.00
74,960.00
101,960.00
260,970.00
136,410.00
206,400.00
81,210.00
37,850.00
39,270.00
247,950.00
276,830.00
200,230.00
56,230.00
75,660.00
HARGA
SATUAN
37,420.00
44,760.00
91,670.00
108,150.00
122,150.00
173,300.00
58,500.00

37,710.00
33,860.00
236,670.00
348,780.00
1,593,400.00
1,592,430.00
1,563,570.00
110,030.00
111,230.00
107,390.00
108,590.00
53,320.00
69,050.00
66,060.00
46,640.00
21,170.00
12,510.00

533,770.00
514,710.00
491,260.00
18,410.00
28,900.00
120,440.00
123,440.00
113,440.00
118,440.00
126,440.00
124,440.00
140,440.00
143,440.00
135,440.00
140,440.00
140,440.00
145,440.00
837,130.00
601,480.00
24,500.00
36,240.00
49,540.00
38,870.00
495,990.00
199,830.00
234,480.00
192,480.00
206,130.00
385,680.00
283,650.00
421,591.50
HARGA
SATUAN

14,977,500.00
10,703,100.00
10,106,700.00
773,440.00
633,040.00
385,690.00
516,980.00
909,940.00
478,470.00
690,980.00
478,470.00
561,450.00
656,450.00
806,700.00
9,687,000.00
9,140,300.00
105,430.00
119,200.00
81,650.00
111,340.00
40,760.00
202,300.00
132,800.00
156,240.00
57,270.00
9,095,400.00
83,370.00
597,750.00
51,750.00

22,660.00
1,040.00
3,900.00
602,420.00
451,420.00
286,080.00
71,770.00
150,920.00
220,310.00
215,720.00
219,130.00
234,530.00
125,630.00
153,130.00
1,038,840.00
887,020.00
948,620.00
485,020.00
636,120.00
259,100.00
802,420.00
716,140.00
196,000.00
667,430.00
816,110.00
830,350.00
HARGA
SATUAN
551,300.00
36,690.00
80,990.00
56,790.00
188,060.00
2,756,960.00
3,952,900.00
5,141,340.00
2,850,480.00
4,852,520.00
6,500,000.00
4,006,420.00
4,115,920.00
3,864,450.00
1,528,750.00
956,080.00
1,105,140.00
1,577,010.00
2,048,880.00
2,754,340.00
1,764,130.00
2,949,100.00
2,482,000.00
7,156,100.00
3,201,520.00

250,970.00
189,470.00
152,730.00
40,210.00
27,910.00
25,110.00
519,060.00
283,060.00
132,610.00
164,510.00

477,640.00
2,735,760.00
1,169,890.00
835,570.00
201,220.00
782,700.00
548,940.00
26,640.00
35,760.00
53,980.00
58,030.00
83,000.00
108,310.00
167,030.00
43,710.00
472,730.00
57,080.00
85,470.00
94,480.00
HARGA
SATUAN
146,330.00
267,080.00
102,860.00
1,873,020.00
2,077,180.00
11,080,730.00
5,988,670.00
49,720.00
64,570.00
71,100.00
111,620.00
280,720.00
291,880.00
417,070.00
93,750.00
41,390.00

14,280.00
12,500.00
33,280.00
34,470.00
51,960.00
38,550.00
79,650.00
11,900.00
53,830.00
38,180.00
78,280.00
64,080.00
42,980.00
131,170.00
27,730.00
53,460.00
32,490.00
42,870.00
31,350.00
16,940.00

34,740.00
64,740.00
14,070.00
13,900.00