B PEKERJAAN BONGKARAN
1. Bongkar closet existing bh 1.00 Rp 300,000
2. Bongkar pipa existing Ø3"' m1 1.00 Rp 300,000
Sub Total - B
II MATERIAL
A PEKERJAAN PERBAIKAN TOILET PB 4 LT 2
1. Pasang pipa baru Ø3 ± 1m ls Rp 400,000
2. Pasang sealent / aqua proof ls Rp 250,000
3. Pasang closet CE-7 (supply by STI) bh Rp 350,000
Sub Total - A
ROUNDED
L OF QUANTITY
TOTAL PRICE
Rp 200,000
Rp 200,000
Rp 400,000
Rp 300,000
Rp 300,000
Rp 600,000
Rp 250,000
Rp 250,000
Rp 250,000
Rp 750,000
Rp 1,750,000
Rp 175,000
Rp 1,925,000
Rp 400,000
Rp 250,000
Rp 350,000
Rp 1,000,000
Rp 500,000
Rp 500,000
Rp 1,000,000
Rp 2,000,000
Rp 200,000
Rp 2,200,000
Rp 4,125,000
Rp 4,125,000