Anda di halaman 1dari 4

BILL OF QUANTITY

NAMA PROYEK PERBAIKAN TOILET PB 4 LT 2


LOKASI / SEKSI PB 4 / GENERAL AFFAIR
REFERENSI GAMBAR S1900679

NO ITEM UNIT QTY UNIT PRICE


I JASA
A PEKERJAAN PERSIAPAN
1. Mod Demob ls Rp 200,000
2. Safety protection ( Terpal , APD , Helmet , dll ) ls Rp 200,000
Sub Total - A

B PEKERJAAN BONGKARAN
1. Bongkar closet existing bh 1.00 Rp 300,000
2. Bongkar pipa existing Ø3"' m1 1.00 Rp 300,000
Sub Total - B

C PEKERJAAN LAIN - LAIN


1. Transport cost ls Rp 250,000
2. Tool charge ls Rp 250,000
3. Cleaning & buang puing ls Rp 250,000
Sub Total - C

TOTAL JASA ( Sub Total A ~ C )


Over Head 10%
TOTAL JASA

II MATERIAL
A PEKERJAAN PERBAIKAN TOILET PB 4 LT 2
1. Pasang pipa baru Ø3 ± 1m ls Rp 400,000
2. Pasang sealent / aqua proof ls Rp 250,000
3. Pasang closet CE-7 (supply by STI) bh Rp 350,000
Sub Total - A

B PEKERJAAN LAIN - LAIN


1. Miscellaneous material ls Rp 500,000
2. Consumable material ls Rp 500,000
Sub Total - B

TOTAL MATERIAL ( Sub Total A + B )


Over Head 10%
TOTAL MATERIAL

GRAND TOTAL ( MATERIAL + JASA )

ROUNDED
L OF QUANTITY

TOTAL PRICE

Rp 200,000
Rp 200,000
Rp 400,000

Rp 300,000
Rp 300,000
Rp 600,000

Rp 250,000
Rp 250,000
Rp 250,000
Rp 750,000

Rp 1,750,000
Rp 175,000
Rp 1,925,000

Rp 400,000
Rp 250,000
Rp 350,000
Rp 1,000,000

Rp 500,000
Rp 500,000
Rp 1,000,000

Rp 2,000,000
Rp 200,000
Rp 2,200,000

Rp 4,125,000

Rp 4,125,000