Pekerjaan Persiapan
No Uraian Pekerjaan Vol Sat.
I PEKERJAAN PERSIAPAN :
1 Pembersihan lapangan 1 ls 11286800 1128.68
2 Pengukuran dan bouwplank 1 ls 13680 136.8
3 Penyediaan listrik & air kerja 1 ls
17.84
660.625
20.39
Kelvin
27
27
53
4
3510 27
27
Kelvin
2047.948
706.38
90.72
HARGA TOTAL HARGA
84,269,144
3,248,441,643.04
3057103518.61535
95486358.20475
6,485,300,664
648530066.38586
7,133,830,730
93,995.00 132,479,842.83
15583.333333 7,321,237.00
257,812.50 27214687.5
896,917.59 25750504.0089
106763871.012
5796978.9656 204401478.326
208991378.233
296807398.702
364942643.153
133011470.854
505646475.3356
26296375.4
2177534.923
57708216.618
310407.79
211411797.66
22546972.1
26128420.413
1029165.06
568,480.00 674717542.4
138935 151247836.505
112618 271409.38
35475 212850
58384.33 3970134.44
149380 39854584
64570.5 17227409.4
3,248,441,643.04
892,171.50 156661746.714
533,346.00 50662536.54
237,050.00 4169709.5
15583.333333 11919754
235,028.75 1480681.125
113,177.35 62949242.07
109,308.10 145819191.562
60,840.78 67679283.672
58,345.98 155669408.4792
60,840.78 6059741.688
200,414.50 4243576.623
176,203.51 143782064.16
286,262.58 78607704.468
110,542.30 102649579.78
127,710.00 9475060.32
134,420.00 1345544.2
175,835.00 34111990
1,374,835.00 5499340
178,035.00 356070
26,152.50 4079790
755,287.50 67522702.5
225,940.00 36602280
110,542.30 221084.6
458,320.00 81305968
109,230.55 100492106
17,435.00 1499410
33,880.00 3692920
26,422.00 9089168
810,590.00 1621180
492,726.30 111173835.069
36,107.50 1480407.5
33,013.75 4478315.1875
28,997.00 17811117.28
15,994.00 14538546
237,050.00 18888144
957,528.00
17072724.24
205,584.50
16115768.955
232,754.50
43981290.32
210,619.51 139140513.79375
210,619.51 6276461.398
12,828.20 7167115.34
261,208.75 5326046.4125
87,208.00 2998211.04
54252 5750712
156552 10488984
1273052 2546104
259100 6995700
46420 2599520
43120 1207360
46970 2489410
602,745.00 16274115
40,535.00 1094445
75,524.63 4002805.39
341,605.00 1366420
1,161,600.00 31363200
351,560.00 9492120
19,423.80 39778932.3624
19,423.80 13720583.844
54,562.20 4949882.784
113,177.35 23617849.398
109,308.10 147424927.551
60,840.78 25392507.9408
58,345.98 157383613.3716
60,840.78 13725679.968
176,203.51 60614007.44
286,262.58 74227886.994
110,542.30 78485033
109230.55 56494040.46
127710 13011350.22
134420 524238
175835 9143420
26152.5 2719860
755287.5 65981916
225940 5874440
458320 11677993.6
17435 6695040
33880 3252480
26422 475596
28,997.00 19299533.29
15,994.00 13865998.3
205584.5 12014358.18
232754.5 58095523.2
210619.51 107807702.3886
12828.2 4040883
26,180.00 6534528
54252 5750712
156552 10488984
1273052 0
259100 6995700
46420 2599520
43120 1293600
46970 2489410
602745 15671370
40535 1053910
75524.63 3927280.76
351560 9140560
1161600 30201600
19,423.80 58026660.12
19,423.80 13720583.844
54,562.20 4766553.792
40,766.00 2759042.88
3057103518.61535
108,832.20 18659280.69
103,907.10 215399.4183
628,781.47 20749788.51
93,995.00 3447924.59
15,583.33 158015
237,050.00 523406.4
533,346.00 8034324.144
1,077,191.70 13615703.088
113177.35 13286455.00325
60840.78 14284806.7362
22,121.00 176968
61,336.00 797368
60,225.00 77991.375
606,650.00 221427.25
257,812.50 1237500
95486358.20475
A Pekerjaan Persiapan Perhitungan
Pembersihan Lapangan
L = PxL
L= 406 x 278
1128.68
1
Pengukuran Bouwplank
K = 2 x (406 + 278)
1368
1128.68 m2
1368 m'
1 Ls
1 Ls
1 Ls
B Pekerjaan Struktur Dan Atap Perhitungan
I Pekerjaan Tanah
1 Galian Tanah
Galian Footplate P1-P2 Luas Galian
= (1.5+2.5)/2 x 2.5
= 5 m2
Volume Galian
= 5 x 120,4
= 602 m3
Volume Galian
= 5.63 x 108.8
= 635.06 m3
Volume Galian P7
= (1+2)/2 x 2x 2.5 x 8
= 60 m3
Volume Galian
= 0.5625 x 6
= 3,375m3
Luas Galian
= ((0.6+0.9)/2 x 0.75) = 0.5625m2
Volume Galian
= 0.5625 x 6
= 3,375m3
Volume Galian
= 2.25 x 409,2
= 920,7m3
Galian Batu Kali Pot. 4 Luas Galian
= ((1+1,5)/2 x 1,5) = 1,875 m2
Volume Galian
= 1,875 x 193,4 = 734.85 m3
TOTAL
2 Urugan Kembali
Volume Pengurugan Kembali Volume Urugan Kembali
= 1/3 * Volume Total Galian
TOTAL
Volume
= 0.41 x 58.2 x 2
= 47.29 m3
= ((1.5+1.75)x0.5) / 2
=0.41 m2
Volume
= 0.41 x 58.2 x 2
= 47.29 m3
Sirtu P3 dan P4
Luas Sirtu P3 dan P4
= ((1.75+2)x0.5) / 2
=0.47 m2
Volume
= 0.47 x 54.4 x 2
= 51.14 m3
Luas Sirtu P7
= ((1+1.25)x0.5) / 2
=0.28 m2
Volume
= 0.28 x 8
= 2.25 m3
TOTAL
Volume P5 dan P6
= 1.5 x 2.5 x 0.07 x 6
= 1.58 m3
Volume P7
= 1 x 2.5 x 0.07 x 8
= 1.4 m3
TOTAL
Tulangan 10D19
= 76.8 x 10 x 192/162
= 1711.41 kg
Tulangan Ø12-10
Keliling Sengkang
= ((0.6-(0.02x2))x2) + ((0.25-
(0.02x2))x2) = 1.54 m
Jumlah Tulangan
= (7680/10) + 1 = 769
Volume
= 1.54 x 769 x 122/162
= 1052.68 kg
= 1.54 x 769 x 122/162
= 1052.68 kg
Tulangan 6D19
= 41.6 x 6 x 192/162
= 556.21 kg
Tulangan Ø10-15
Keliling Sengkang
= ((0.6-(0.02x2))x2) + ((0.25-
(0.02x2))x2) = 1.54 m
Jumlah Tulangan
= (4160/15) + 1 = 279
Volume
= 1.54 x 279 x 102/162
= 265.22 kg
Tulangan 10D19
= 64 x 10 x 192/162
= 1426.17 kg
Tulangan Ø12-10
Keliling Sengkang
= ((0.6-(0.02x2))x2) + ((0.25-
(0.02x2))x2) = 1.54 m
Jumlah Tulangan
= (6400/10) + 1 = 641
Volume
= 1.54 x 641 x 122/162
= 877.46 kg
Tulangan 6D19
= 44.8 x 6 x 192/162
= 598.99 kg
Tulangan Ø10-15
Keliling Sengkang
= ((0.6-(0.02x2))x2) + ((0.25-
(0.02x2))x2) = 1.54 m
Jumlah Tulangan
= (4480/15) + 1 = 300
Volume
= 44.8 x 6 x 19 /162
= 598.99 kg
Tulangan Ø10-15
Keliling Sengkang
= ((0.6-(0.02x2))x2) + ((0.25-
(0.02x2))x2) = 1.54 m
Jumlah Tulangan
= (4480/15) + 1 = 300
Volume
= 1.54 x 300 x 102/162
= 285.19 kg
TOTAL
Bang. Sayap
Volume Tulangan 6D16
= (115.50x6x162/162) x 2
= 2190.22 kg
Keliling Sengkang
= ((0.4-0.02)+(0,2-0,02)x2)
= 1,12 m
Lapangan Ø10-15
= (1/2x115.50) = 57.75 m
Jumlah sengkang
= 385 + 1 = 386
Tumpuan Ø10-10
= (1/4x115.50) = 28.875 m
Jumlah sengkang
= 288.75 + 1 = 290 x 2 = 580
Keliling Sengkang
= ((0.4-0.02)+(0,2-0,02)x2)
= 1,12 m
Lapangan Ø10-15
= (1/2x115.50) = 57.75 m
Jumlah sengkang
= 385 + 1 = 386
Tumpuan Ø10-10
= (1/4x115.50) = 28.875 m
Jumlah sengkang
= 288.75 + 1 = 290 x 2 = 580
Volume Ø10-10, Ø10-15
= 1.12 x 966 x 102/162
= 667.85 x 2 = 1335.70 kg
Bang. Utama
Volume Tulangan 6D16
= (39.8x6x162/162) = 377.36 kg
Keliling Sengkang
= ((0.4-0.02)+(0,2-0,02)x2)
= 1,12 m
Lapangan Ø10-15
= (1/2x39.8) = 19.9 m
Jumlah sengkang
= 132.67 + 1 = 134
Tumpuan Ø10-10
= (1/4x39.8) = 9.95 m
Jumlah sengkang
= 99.5 + 1 = 101 x 2 = 202
Volume Ø10-10, Ø10-15
= 1.12 x 336 x 102/162
= 232.30 kg
Bekisting
Volume Bekisting
= (103.4x0.4x2x2) + (36.85x0.4x2)
= 194.92 m2
Bang. Sayap
Volume Tulangan 12D16
= (59.45x12x162/162) x 2
= 2254.70 kg
Keliling Sengkang
= ((0.6-0.02)+(0,2-0,02)x2)
= 1,56 m
Lapangan Ø10-15
= (1/2x59.45) = 29.74 m
Jumlah sengkang
= 198.17 + 1 = 199
Tumpuan Ø10-10
= (1/4x59.45) = 14.86 m
Jumlah sengkang
= 148.63 + 1 = 150 x 2 = 300
Volume Ø10-10, Ø10-15
= 1.56 x 499 x 102/162
= 480.52 x 2 = 961.04 kg
Bang. Utama
Volume Tulangan 12D16
= (19x12x162/162) x 2
= 360.3 kg
Keliling Sengkang
= ((0.6-0.02)+(0,2-0,02)x2)
= 1,56 m
Lapangan Ø10-15
= (1/2x19) = 9.5 m
Jumlah sengkang
= 63.3 + 1 = 64
Tumpuan Ø10-10
= (1/4x19) = 4.75 m
Jumlah sengkang
= 47.5 + 1 = 49 x 2 = 98
Volume Ø10-10, Ø10-15
= 1.56 x 162 x 102/162
= 156 kg
Bekisting
Volume Bekisting
= (57.15x0.6x2x2) + (17.2x0.6x2)
= 157.8 m2
TOTAL
TOTAL
Bekisting
= (((0.2x2) + (0.65x2)) x 32) +
(8x((0.2+0.35)/2)x62.5))
= 191.9 m2
Pondasi P2 Volume P2
= ((0.2+0.35)/2)x0.625)x1.6x13x2
= 7.15 m3
Bekisting
= ((0.2x1.6) + (0.65x1.6)) x 26
= 35.36 m2
Jumlah Tulangan Ø10-15
= (255/15) + 1 = 18
Volume Ø12-15
= 1.6 x 18 x 102/162 x 26
= 462.22 kg
Bekisting
= ((0.2x1.6) + (0.65x1.6)) x 26
= 35.36 m2
Pondasi P3 Volume P3
= ((0.2+0.35)/2)x0.75)x2x16x2
= 13.20 m3
Bekisting
= ((0.2x2) + (0.75x2)) x 32
= 60.80 m2
Pondasi P4 Volume P4
= ((0.2+0.35)/2)x0.75)x1.6x14x2
= 9.24 m3
Bekisting
= ((0.2x1.6) + (0.75x2)) x 28
= 50.96 m2
Jumlah Tulangan Ø10-15
= (300/15) + 1 = 21
Volume Ø12-15
= 1.6 x 21 x 102/162 x 28
= 580.74 kg
Bekisting
= ((0.2x1.6) + (0.75x2)) x 28
= 50.96 m2
Bekisting
= ((0.15x4.5) + (0.75x1.5))x8 +
((1.5x1x4)x8)
= 62.4 m2
= ((0.15x4.5) + (0.75x1.5))x8 +
((1.5x1x4)x8)
= 62.4 m2
TOTAL
Volume 12D19
= 4 x 12 x (192/162) x 20 x 2
= 4278.52 kg
Keliling Sengkang
= ((0.35-(0.02x2))x4) = 1.24 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 1.24 x 37 x 102/162 x 20 x 2
= 1132.8 kg
Bekisting
= 0.35 x (4-0.25) x 4 x 20 x 2
= 210 m2
Volume 8D19
= 4 x 8 x (192/162) x 12 x 2
= 1711.41 kg
Keliling Sengkang
= ((0.35-(0.02x2))x4) = 1.24 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume 8D19
= 4 x 8 x (192/162) x 12 x 2
= 1711.41 kg
Keliling Sengkang
= ((0.35-(0.02x2))x4) = 1.24 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 1.24 x 37 x 102/162 x 12 x 2
= 679.68 kg
Bekisting
= 0.35 x (4-0.25) x 4 x 12 x 2
= 126 m2
Kolom K2 Volume K2
= (0.32x(4-0.25)) x 10
= 3.38 m3
Volume 8D16
= 4 x 8 x (162/162) x 10
= 505.68 kg
Keliling Sengkang
= ((0.3-(0.02x2))x4) = 1.04 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 1.04 x 37 x 102/162 x 10
= 237.53 kg
Bekisting
= 0.3 x (4-0.25) x 4 x 10
= 45 m2
Kolom K3 Volume K3
= (0.4x0.25x(4-0.25)) x 2 x 2
= 1.5 m3
Volume 8D16
= 4 x 8 x (162/162) x 2 x 2
= 202.27 kg
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.14 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 1.14 x 37 x 102/162 x 2 x 2
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.14 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 1.14 x 37 x 102/162 x 2 x 2
= 104.15 kg
Bekisting
= (0.4+0.25) x 2 x (4-0.25) x 2 x 2
= 19.5 m2
Kolom K4 Volume K4
= (0.4x0.2x(4-0.25)) x 2
= 0.6 m3
Volume 8D16
= 4 x 8 x (162/162) x 2
= 101.14 kg
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.04 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 1.04 x 37 x 102/162 x 2
= 47.51 kg
Bekisting
= (0.4+0.2) x 2 x (4-0.25) x 2
= 9 m2
Volume 4D16
= 4 x 4 x (162/162) x 2
= 50.57 kg
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.04 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 1.04 x 37 x 102/162 x 2
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.04 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 1.04 x 37 x 102/162 x 2
= 47.51 kg
Bekisting
= (0.4+0.2) x 2 x (4-0.25) x 2
= 9 m2
Kolom K5 Volume K5
= (0.5x0.2x(4-0.25)) x 2
= 0.75 m3
Volume 8D16
= 4 x 8 x (162/162) x 2
= 101.14 kg
Keliling Sengkang
= ((0.5-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.24 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 1.24 x 37 x 102/162 x 2
= 56.65 kg
Bekisting
= (0.5+0.2) x 2 x (4-0.25) x 2
= 10.5 m2
Kolom K6 Volume K5
= (0.4x0.15x(4-0.25)) x 2
= 0.45 m3
Volume 4D16
= 4 x 4 x (162/162) x 2
= 50.57 kg
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.15-(0.02x2))x2) = 0.94 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 0.94 x 37 x 102/162 x 2
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.15-(0.02x2))x2) = 0.94 m
Jumlah Ø10-10
= (((1/4x400)/10)+1) x 2 = 22
Jumlah Ø10-15
= ((1/2x400)/15) + 1 = 15
Volume Ø10-10 dan Ø10-15
= 0.94 x 37 x 102/162 x 2
= 42.94 kg
Bekisting
= (0.4+0.15) x 2 x (4-0.25) x 2
= 8.25 m2
TOTAL
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.14 m
Jumlah Ø10-10
= ((((1/4x450)/10)+1) x 2) +
((((1/4x180)/10)+1) x 2) = 36
Jumlah Ø10-15
= (((1/2x450)/15) + 1) +
(((1/2x180)/15) + 1) = 23
Volume Ø10-10 dan Ø10-15
= 1.14 x 59 x 102/162 x 2
= 83.04 kg
Bekisting
= (0.4 + (0.25x2)) x 6.3 x 2
= 11.34 m2
Volume As.9
Balok As.9 = 0.25 x 0.6 x 13.8 x 2
= 4.14 m3
Keliling Sengkang
= ((0.6-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.54 m
Jumlah Ø10-10
= ((((1/4x600)/10)+1) x 4) +
((((1/4x180)/10)+1) x 2) = 75
Jumlah Ø10-15
= ((((1/2x600)/15)+1)x2) +
(((1/2x180)/15) + 1) = 49
Volume Ø10-10 dan Ø10-15
= 1.54 x 124 x 102/162 x 2
= 235.75 kg
Bekisting
= (0.6 + (0.25x2)) x 13.8 x 2
= 30.36 m2
Keliling Sengkang
= ((0.6-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.54 m
Jumlah Ø10-10
= ((((1/4x600)/10)+1) x 4) +
((((1/4x180)/10)+1) x 2) = 75
Jumlah Ø10-15
= ((((1/2x600)/15)+1)x2) +
(((1/2x180)/15) + 1) = 49
Volume Ø10-10 dan Ø10-15
= 1.54 x 124 x 102/162 x 10
= 1178.77 kg
Bekisting
= (0.6 + (0.25x2)) x 13.8 x 10
((((1/4x180)/10)+1) x 2) = 75
Jumlah Ø10-15
= ((((1/2x600)/15)+1)x2) +
(((1/2x180)/15) + 1) = 49
Volume Ø10-10 dan Ø10-15
= 1.54 x 124 x 102/162 x 10
= 1178.77 kg
Bekisting
= (0.6 + (0.25x2)) x 13.8 x 10
= 151.8 m2
Keliling Sengkang
= ((0.6-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.54 m
Jumlah Ø10-10
= ((((1/4x600)/10)+1) x 4) +
((((1/4x180)/10)+1) x 2) = 75
Jumlah Ø10-15
= ((((1/2x600)/15)+1)x2) +
(((1/2x180)/15) + 1) = 49
Volume Ø10-10 dan Ø10-15
= 1.54 x 124 x 102/162 x 2
= 235.75 kg
Bekisting
= (0.6 + (0.25x2)) x 13.8 x 2
= 30.36 m2
Bekisting
= ((0.6+(0.25x2))x6) + ((0.7+
((0.25x2))x7.8) x 2
= 31.99 m2
Volume 5D16
= 5 x 25.2 x (162/162) x 2
= 398.22 kg
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.14 m
Jumlah Ø10-10
= (((1/4x360)/10)+1) x 2 = 20
Jumlah Ø10-15
= ((1/2x360)/15) + 1 = 13
Volume Ø10-10 dan Ø10-15
= 1.14 x 33 x 102/162 x 2 x 25.2
= 1170.4 kg
Bekisting
= (0.4 + (0.25x2)) x 25.2 x 2
Jumlah Ø10-10
= (((1/4x360)/10)+1) x 2 = 20
Jumlah Ø10-15
= ((1/2x360)/15) + 1 = 13
Volume Ø10-10 dan Ø10-15
= 1.14 x 33 x 102/162 x 2 x 25.2
= 1170.4 kg
Bekisting
= (0.4 + (0.25x2)) x 25.2 x 2
= 45.36 m2
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.14 m
Jumlah Ø10-10
= (1420/10) + 1 = 143
Jumlah Ø10-15
= (1420/15) + 1 = 96
Volume Ø10-10 dan Ø10-15
= 1.14 x 239 x 102/162 x 2
= 336.37 kg
Bekisting
= (0.4 + (0.25x2)) x 28.4 x 2
= 51.12 m2
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.14 m
Jumlah Ø10-10
= (1620/10) + 1 = 163
Jumlah Ø10-15
= (1580/15) + 1 = 107
Volume Ø10-10 dan Ø10-15
= 1.14 x 270 x 102/162 x 2
= 380 kg
Bekisting
= (0.4 + (0.25x2)) x 28.4 x 2
= 51.12 m2
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.14 m
Jumlah Ø10-10
= ((180/10)+1) x 7 = 133
Jumlah Ø10-15
= ((180/15)+1) x 7 = 91
Volume Ø10-10 dan Ø10-15
= 1.14 x 224 x 102/162 x 2
= 315.26 kg
Bekisting
((0.25-(0.02x2))x2) = 1.14 m
Jumlah Ø10-10
= ((180/10)+1) x 7 = 133
Jumlah Ø10-15
= ((180/15)+1) x 7 = 91
Volume Ø10-10 dan Ø10-15
= 1.14 x 224 x 102/162 x 2
= 315.26 kg
Bekisting
= (0.4 + (0.25x2)) x 25.2 x 2
= 45.36 m2
Volume 5D16
= 5 x 5.8 x (162/162) x 2
= 91.65 kg
Keliling Sengkang
= ((0.6-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.44 m
Jumlah Ø10-10
= (300/10) + 1 = 31
Jumlah Ø10-15
= (280/15) + 1 = 20
Volume Ø10-10 dan Ø10-15
= 1.44 x 51 x 102/162 x 2
= 90.67 kg
Bekisting
= (0.6 + (0.2x2)) x 5.8 x 2
= 11.6 m2
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.25-(0.02x2))x2) = 1.14 m
Jumlah Ø10-10
= (230/10) + 1 = 24
Jumlah Ø10-15
= (220/15) + 1 = 16
Volume Ø10-10 dan Ø10-15
= 1.14 x 40 x 102/162 x 2
= 56.3 kg
Bekisting
= (0.4 + (0.25x2)) x 4.5 x 2
= 8.1 m2
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.04 m
Jumlah Ø10-10
= (620/10) + 1 = 63
Jumlah Ø10-15
= (490/15) + 1 = 34
Volume Ø10-10 dan Ø10-15
= 1.04 x 97 x 102/162 x 2
= 124.54 kg
Bekisting
= (0.4 + (0.2x2)) x 11.1 x 2
= 17.76 m2
Balok Typikal As.D', F' Volume As.D', F'
= 0.15 x 0.4 x 4.4 x 2
= 0.53 m3
Volume 5D12
= 5 x 4.4 x (122/162) x 2
= 39.11 kg
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.15-(0.02x2))x2) = 0.94 m
Jumlah Ø10-10
= (260/10) + 1 = 27
Jumlah Ø10-15
= (180/15) + 1 = 13
Volume Ø10-10 dan Ø10-15
= 0.94 x 40 x 102/162 x 2
= 46.42 kg
Bekisting
= (0.4 + (0.15x2)) x 4.4 x 2
= 6.16 m2
Keliling Sengkang
= ((0.5-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.24 m
Jumlah Ø10-10
= (300/10) + 1 = 31
Jumlah Ø10-15
= (300/15) + 1 = 21
Volume Ø10-10 dan Ø10-15
= 1.24 x 52 x 102/162
= 39.8 kg
Bekisting
= (0.5 + (0.2x2)) x 6
= 5.4 m2
Jumlah Ø10-15
= (300/15) + 1 = 21
Volume Ø10-10 dan Ø10-15
= 1.24 x 52 x 102/162
= 39.8 kg
Bekisting
= (0.5 + (0.2x2)) x 6
= 5.4 m2
Keliling Sengkang
= ((0.5-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.24 m
Jumlah Ø10-10
= (460/10) + 1 = 47
Jumlah Ø10-15
= (300/15) + 1 = 21
Volume Ø10-10 dan Ø10-15
= 1.24 x 68 x 102/162
= 52.05 kg
Bekisting
= (0.5 + (0.2x2)) x 7.6
= 6.84 m2
Volume 5D16
= 5 x 6 x (162/162) x 2
= 94.82 kg
Volume 5Ø12
= 5 x 6.4 x (122/162) x 2
= 56.88 kg
Keliling Sengkang
= ((0.5-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.24 m
Jumlah Ø10-10
= (300/10) + 1 = 31
Jumlah Ø10-15
= (300/15) + 1 = 21
Volume Ø10-10 dan Ø10-15
= 1.24 x 52 x 102/162 x 2
= 79.6 kg
= ((0.5-(0.02x2))x2) +
((0.2-(0.02x2))x2) = 1.24 m
Jumlah Ø10-10
= (300/10) + 1 = 31
Jumlah Ø10-15
= (300/15) + 1 = 21
Volume Ø10-10 dan Ø10-15
= 1.24 x 52 x 102/162 x 2
= 79.6 kg
Keliling Sengkang
= ((0.4-(0.02x2))x2) +
((0.15-(0.02x2))x2) = 0.94 m
Jumlah Ø10-10
= (360/10) + 1 = 37
Jumlah Ø10-15
= (280/15) + 1 = 20
Volume Ø10-10 dan Ø10-15
= 0.94 x 57 x 102/162 x 2
= 66.15 kg
Bekisting
= (((0.4+(0.15x2))x6.4) +
((0.5+(0.2x2))x6)) x 2
= 19.86 m2
TOTAL
Bekisting BA1
= ((2x0.4x3.35) + (0.25x3.35) x 26
= 91.46 m2
Bekisting BA2
= ((2x0.4x3.35) + (0.2x3.35)) x 26
= 87.1 m2
Bekisting BA3
= ((2x0.2x1.25) + (0.15x1.25) x 26
= 17.88 m2
BA4
Luas Penampang BA4
= 0.25 x 0.4 = 0.1 m2
Volume BA4 (2 balok)
= (0.1 x 1.2) x 2 = 0.24 m3
Bekisting BA4
= ((2 x 0.4 x 0.7) + (0.25 x 0.7) x 2
= 1.47 m2
Bekisting BA1'
= ((2 x 0.4 x 3) + (0.25 x 3) x 2
= 6.3 m2
Bekisting Plat
= 325.35 m2
Bekisting Plat
= 82.4 m2
= (6x4.2) + (3.6x13) + (2x3.5x0.6)
+ (0.6x13) + (2.5x8) - (6x3.6)
= 82.4 m2
Volume Plat (2 plat)
= ((78.2 x 0.1) + (4.2 x 0.15)) x 2
= 16.90 m3
Bekisting Plat
= 82.4 m2
TOTAL
TOTAL
11 Beton Listplank
Volume Beton Listplank
= ((0.08x0.6) + (0.18x0.65) +
((10x10)/2)) x 3 = 0.51 m3
Bekisting Listplank
= ((45x300)x2) + (33x300) +
((14x300)x2) + (15x300) +
(10x300) = 52800 cm2
= 5.28 m2
12 Tangga Beton
Tangga Depan Volume Beton Tangga
- Anak Tangga
= ((18,18x30)/2) x 80 x 20
= 0.44 m3
- Bordes
= 147.5 x 200 x 18
= 0.53 m3
- Plat Tangga
= 18 x 360.56 x 80 x 2
= 1.04 m3
- Balok Bordes
= 40 x 20 x 200
= 0.16 m3
- Bordes Lantai 2
= (58.33x10x80) + (10x10x80/2)
= 0.05 m3
Bekisting
- Plat Tangga
= (360.55x80x2) +
((18+15.55)x360.55x2x2)
= 10.61 m2
- Anak Tangga
= 18.18 x 80 x 22
= 3.20 m2
- Bordes
= ((147.5x18)+(80x18)) +
(147.5x200)
= 3.36 m2
- Balok Bordes
= (200x40)x2 + (20x200)
= 2 m2
- Bordes Lantai 2
= (58.33x80x2) + (10x80) +
(58.33x10x2) + (10x10x2/2)
= 1.14 m2
Tulangan
- Anak Tangga Melintang 1Ø10
= (0.25xπx0.12x0.8) x 7850 x 22
= 10.85 kg
- Anak Tangga Memanjang Ø8-20
= (0.25xπx0.082x0.64) x 7850 x 110
= 27.84 kg
- Plat Melintang Ø8-15
= (0.25xπx0.082x0.8) x 7850 x 100
= 31.55 kg
- Plat Memanjang Bawah I
D16-12.5
= (0.25xπx0.162x4.81) x 7850 x 7
= 53.19 kg
- Plat Memanjang Atas I D16-12.5
- Anak Tangga Memanjang Ø8-20
= (0.25xπx0.082x0.64) x 7850 x 110
= 27.84 kg
- Plat Melintang Ø8-15
= (0.25xπx0.082x0.8) x 7850 x 100
= 31.55 kg
- Plat Memanjang Bawah I
D16-12.5
= (0.25xπx0.162x4.81) x 7850 x 7
= 53.19 kg
- Plat Memanjang Atas I D16-12.5
= (0.25xπx0.162x5.17) x 7850 x 7
= 56.83 kg
- Plat Memanjang Bawah II
D16-12.5
= (0.25xπx0.162x6.05) x 7850 x 7
= 66.86 kg
- Plat Memanjang Atas II D16-12.5
= (0.25xπx0.162x6.18) x 7850 x 7
= 68.32 kg
- Tulangan Bordes Memanjang ke
Bawah D16-12.5
= (0.25xπx0.162x2.17) x 7850 x 7
= 24.07 kg
- Tulangan Bordes Memanjang ke
Atas D16-12.5
= (0.25xπx0.162x3.11) x 7850 x 7
= 34.35 kg
- Tulangan Bordes Memanjang
Lantai 2 D16-12.5
= (0.25xπx0.162x1.84) x 7850 x 7
= 20.37 kg
- Tulangan Bordes Melintang
Ø8-15
= (0.25xπx0.082x2) x 7850 x 20
= 15.78 kg
- Tulangan Bordes Lantai 2
Melintang Ø8-10
= (0.25xπx0.082x0.8) x 7850 x 7
= 2.21 kg
- Tulangan Bordes Lantai 2
Memanjang Ø8-10
= (0.25xπx0.082x0.76) x 7850 x 9
= 2.7 kg
- Balok Bordes Memanjang 6D16
= (0.25xπx0.162x2) x 7850 x 6
= 18.93 kg
- Balok Bordes Ø8-15
= (0.25xπx0.082x1.2) x 7850 x 14
= 6.63 kg
Bekisting
- Plat Tangga
= (360.55x76.25x2) +
((18+15.55)x360.55x2x2)
= 10.28 m2
- Anak Tangga
= 18.18 x 76.25 x 22
= 3.05 m2
- Bordes
= ((122.5x18)+(76.25x18)) +
(122.5x172.5)
= 2.47 m2
- Balok Bordes
= (172.5x40)x2 + (20x172.5)
= 1.73 m2
- Bordes Lantai 2
= (58.33x76.25x2) + (10x76.25) +
(58.33x10x2) + (10x10x2/2)
= 1.09 m2
Tulangan
- Anak Tangga Melintang 1Ø10
= (0.25xπx0.12x0.76) x 7850 x 22
= 10.34 kg
- Anak Tangga Memanjang Ø8-20
= (0.25xπx0.082x0.64) x 7850 x 88
= 22.41 kg
- Plat Melintang Ø8-15
= (0.25xπx0.082x0.76) x 7850 x 100
= 30.07 kg
- Plat Memanjang Bawah I
D16-12.5
= (0.25xπx0.162x4.72) x 7850 x 7
= 52.15 kg
- Plat Memanjang Atas I D16-12.5
= (0.25xπx0.162x4.96) x 7850 x 7
= 54.77 kg
- Plat Memanjang Bawah II
D16-12.5
= (0.25xπx0.162x5.85) x 7850 x 7
= 64.55 kg
- Plat Memanjang Atas II D16-12.5
= (0.25xπx0.162x5.8) x 7850 x 7
= 64.09 kg
- Tulangan Bordes Memanjang ke
Bawah D16-12.5
= 54.77 kg
- Plat Memanjang Bawah II
D16-12.5
= (0.25xπx0.162x5.85) x 7850 x 7
= 64.55 kg
- Plat Memanjang Atas II D16-12.5
= (0.25xπx0.162x5.8) x 7850 x 7
= 64.09 kg
- Tulangan Bordes Memanjang ke
Bawah D16-12.5
= (0.25xπx0.162x1.98) x 7850 x 7
= 21.83 kg
- Tulangan Bordes Memanjang ke
Atas D16-12.5
= (0.25xπx0.162x2.81) x 7850 x 7
= 31.04 kg
- Tulangan Bordes Memanjang
Lantai 2 D16-12.5
= (0.25xπx0.162x1.74) x 7850 x 7
= 19.2 kg
- Tulangan Bordes Melintang
Ø8-15
= (0.25xπx0.082x1.73) x 7850 x 18
= 12.25 kg
- Tulangan Bordes Lantai 2
Melintang Ø8-10
= (0.25xπx0.082x0.76) x 7850 x 7
= 2.11 kg
- Tulangan Bordes Lantai 2
Memanjang Ø8-10
= (0.25xπx0.082x0.76) x 7850 x 8
= 2.4 kg
- Balok Bordes Memanjang 6D16
= (0.25xπx0.162x1.73) x 7850 x 6
= 16.33 kg
- Balok Bordes Ø8-15
= (0.25xπx0.082x1.2) x 7850 x 12
= 5.68 kg
TOTAL
TOTAL
TOTAL
Kolom K4
Kolom K4A
Kolom K5
TOTAL
= 1.088,623
5 Corong Talang
VOLUME = 8,5 x 8 m
= 68 m
Galian
5
602 m3
Galian
2.5
635.06 m3
dan P6 Galian
x 2,5 x 8
169 m3
x8
Galian
= 0.5625m 2
= 0.5625m2
3.375 m3
Galian
36 m3
0 m3
Galian
5 m2
0 m3
Galian
1,875 m2
0 m3
.85 m3
Galian
m3
1409.435
Urugan
469.812 m3
Urugan
m3
469.812
Sirtu
47.29 m3
Sirtu
51.14 m3
Sirtu
7.13 m3
Sirtu
105.56 m3
Lantai K.
12.4 m3
Lantai K.
13.33 m3
Lantai K.
2.98 m3
Lantai K.
28.71 m3
1
Beton
11.52 m3
10D19
1711.41 kg
+ ((0.25-
Ø12-10
1052.68 kg
2
2
2 Beton
6.24 m3
6D19
556.21 kg
+ ((0.25-
Ø10-15
265.22 kg
2
3 Beton
9.6 m3
10D19
1426.17 kg
+ ((0.25-
Ø12-10
877.46 kg
4 Beton
6.72 m3
6D19
598.99 kg
+ ((0.25-
+ ((0.25-
Ø10-15
285.19 kg
2
Beton
34.08 m3
Tul. Ulir
3292.78 kg
Tul. Polos
2080.55 kg
16
x2
02)x2)
5m
75 m
2 = 580
02)x2)
5m
75 m
2 = 580
-15
2
70 kg
16
377.36 kg
02)x2)
= 202
-15
2
(36.85x0.4x2)
D16
x2 Ø10-10 dan Ø10-15
1117.04 kg
02)x2)
2 = 300
-15
2
4 kg
D16
2
2)x2)
98
-15
2
17.2x0.6x2)
Beton
35.26 m3
Bekisting
352.72 m2
Tul. Ulir
5182.58 kg
Tul. Polos
2685.04 kg
Beton
5) x 2 x 16 x 2
11 m3
-15
Bekisting
65 + 0.65 191.9 m2
32
) x 32) +
5))
Beton
5)x1.6x13x2
7.15 m3
-20
Bekisting
65 + 0.65 35.36 m2
26
1.6)) x 26
-15
26
1.6)) x 26
Beton
)x2x16x2
13.2 m3
-12.5
Bekisting
.75 + 0.75 60.8 m2
x 32
x 32
Beton
)x1.6x14x2
9.24 m3
-17.5
Bekisting
.75 + 0.75 50.96 m2
x 28
2)) x 28
-15
x 28
2)) x 28
7 Beton
.52 x 4) +
x 4) + 7.7 m3
x 8)
-12.5 Bekisting
62.4 m2
5+0.75) +
+0.65)
Tulangan Polos
x4
715.05 kg
-12.5
5+0.75) +
+0.65)
x4
-10
2.3 m
x8
-20
2.3 m
x1.5))x8 +
x1.5))x8 +
Beton
48.29 m3
Bekisting
401.42 m2
Tul. Polos
6805.6 kg
Beton
0x2
18.38 m3
20 x 2 Bekisting
210 m2
= 1.24 m
x 2 = 22 12D19
= 15 4278.52 kg
Ø10-15
x 20 x 2
Beton
2x2
11.03 m3
12 x 2 Bekisting
126 m2
= 1.24 m
x 2 = 22
= 15
12 x 2
= 1.24 m
x 2 = 22 8D19
= 15
1711.41 kg
Ø10-15
x 12 x 2
Beton
3.38 m3
10
Bekisting
45 m2
= 1.04 m
x 2 = 22 8D16
= 15 505.68 kg
Ø10-15
x 10
Beton
x2x2
1.5 m3
2x2 Bekisting
19.5 m2
+
1.14 m
8D16
x 2 = 22
= 15
Ø10-15
x2x2
+
1.14 m
x 2 = 22
202.27 kg
= 15
Ø10-15
x2x2
Ø10-10 dan Ø10-15
0.25) x 2 x 2 104.15 kg
Beton
x2
0.6 m3
2
Bekisting
9 m2
+
.04 m
8D16
x 2 = 22
101.14 kg
= 15
Ø10-15
x2
Ø10-10 dan Ø10-15
.25) x 2 47.51 kg
Beton
x2
0.6 m3
2 Bekisting
9 m2
+
1.04 m
4D16
x 2 = 22
= 15
Ø10-15
x2
+
1.04 m
x 2 = 22 50.57 kg
= 15
Ø10-15
x2
Ø10-10 dan Ø10-15
.25) x 2 47.51 kg
Beton
x2
0.75 m3
2
Bekisting
10.5 m2
+
.24 m
8D16
x 2 = 22
101.14 kg
= 15
Ø10-15
x2
Ø10-10 dan Ø10-15
.25) x 2 56.65 kg
Beton
x2
0.45 m3
2
Bekisting
8.25 m2
+
0.94 m
8D16
x 2 = 22
= 15
Ø10-15
x2
+
0.94 m
x 2 = 22
50.57 kg
= 15
Ø10-15
x2
Ø10-10 dan Ø10-15
0.25) x 2 42.94 kg
Beton
36.69 m3
Bekisting
437.25 m2
Tul. Ulir
5001.3 kg
Tul. Polos
2348.77 kg
Beton
1.26 m3
16
x (162/162) x 2 Bekisting
11.34 m2
+
= 1.14 m
.3 x 2 83.04 kg
2
Beton
4.14 m3
dan 7D19
4x7)) x
Bekisting
30.36 m2
+
= 1.54 m
5D19, 6D19, dan
x 4) + 7D19
x 2) = 75
356.54 kg
x2) +
= 49
Ø10-15
2x2 Ø10-10 dan Ø10-15
235.75 kg
3.8 x 2
Beton
10
20.7 m3
dan 8D19
10x8)) x Bekisting
151.8 m2
+
= 1.54 m 6D19, 7D19, dan
8D19
x 4) +
x 2) = 75 2308.62 kg
x2) +
= 49
Ø10-15
2 x 10 Ø10-10 dan Ø10-15
3.8 x 10
x 2) = 75
x2) +
= 49
Ø10-15
2 x 10 Ø10-10 dan Ø10-15
1178.77 kg
3.8 x 10
Beton
2
4.14 m3
8D19, 10D19
Bekisting
(7x8) +
192/162) x 2 30.36 m2
+
= 1.54 m 6D19, 7D19, 8D19,
10D19 dan 12D19
x 4) +
x 2) = 75
528.58 kg
x2) +
= 49
Ø10-15
2x2 Ø10-10 dan Ø10-15
235.75 kg
3.8 x 2
Beton
5x0.7x7.8)) x 2
dan 7D19
(3.5x7)) x
5x0.7x7.8)) x 2
4.53 m3
dan 7D19
(3.5x7)) x Bekisting
31.99 m2
x60
+
1.54 m 5D19, 6D19, dan
7D19
x 2 = 32
354.31 kg
= 21
Ø10-15
x2
x 2 = 41
= 27
Ø10-15
x2
+ ((0.7+
Beton
2
5.04 m3
x2
Bekisting
45.36 m2
+
= 1.14 m
5D16
x 2 = 20
398.22 kg
= 13
Ø10-15
x 2 x 25.2
5.2 x 2
x 2 = 20
= 13
Ø10-15
x 2 x 25.2
Ø10-10 dan Ø10-15
5.2 x 2 1170.4 kg
Beton
2
5.68 m3
dan 7D16
+ (0.5x7)) x Bekisting
51.12 m2
+
= 1.14 m 4D16, 5D16, dan
7D16
443.42 kg
Ø10-15
2x2
Ø10-10 dan Ø10-15
8.4 x 2
336.37 kg
Beton
2
5.68 m3
dan 7D16
+ (1.5x7)) x
2
dan 7D16
+ (1.5x7)) x Bekisting
51.12 m2
+
= 1.14 m 4D16, 5D16, dan
7D16
485.77 kg
7
Ø10-15
2x2
Ø10-10 dan Ø10-15
8.4 x 2
380 kg
Beton
2
5.04 m3
16
x (162/162) x 2 Bekisting
45.36 m2
+
1.14 m
133
5D16, dan 6D16
91 403.91 kg
Ø10-15
2x2
1.14 m
133
91
Ø10-15
2x2
Beton
1.39 m3
x2 Bekisting
11.6 m2
+
.44 m
5D16
91.65 kg
Ø10-15
x2
Ø10-10 dan Ø10-15
8x2 90.67 kg
Beton
16
)) x (162/162)
0.9 m3
16
)) x (162/162) Bekisting
8.1 m2
+
1.14 m 4D16, dan 5D16
30.26 kg
Ø10-15
x2
Ø10-10 dan Ø10-15
.5 x 2
56.3 kg
Beton
1.78 m3
12
x (122/162) x 2
Bekisting
17.76 m2
+
.04 m
Ø10-15 128.89 kg
x2
124.54 kg
Beton
0.53 m3
2
Bekisting
6.16 m2
.94 m
5D12
39.11 kg
10-15
2
Ø10-10 dan Ø10-15
x2 46.42 kg
Beton
0.6 m3
16
62/162)
Bekisting
5.4 m2
+
.24 m
Ø10-15 56.89 kg
Ø10-15
39.8 kg
Beton
0.76 m3
16
62/162)
Bekisting
6.84 m2
+
.24 m
Ø10-15 56.89 kg
52.05 kg
Beton
.2x0.5x6) x 2
1.96 m3
2
Bekisting
19.86 m2
x2
5D16
+ 94.82 kg
1.24 m
5Ø12,Ø10-10 dan
Ø10-15 Ø10-15
x2
+
1.24 m
5Ø12,Ø10-10 dan
Ø10-15 Ø10-15
x2
202.63 kg
+
0.94 m
Ø10-15
x2
4) +
2
Beton
64.13 m3
Bekisting
524.53 m2
Tul. Ulir
3871.75 kg
Tul Polos
3294.59 kg
Beton
k)
9.36 m3
36 m3
Bekisting
5x3.35) x 26
91.46 m2
5D16
6 737.9 kg
6 = 0.094 m3
9 kg
dan Ø8-15
5.03 x 10-5 m2
6
6 = 0.094 m3
9 kg
.98 m 321.95 kg
puan
buah
ngan
uah
-15
2 x 26
5
321.95 kg
2 Beton
7.49 m3
k)
7.49 m3
Bekisting
2x3.35)) x 26
87.1 m2
2
7D12
12 581.93 kg
26
= 581.93 kg
Ø8-10 dan Ø8-15
dan Ø8-15
5.03x10-5 m2
289.10 kg
0.88 m
mpuan
uah
angan
uah
8-15
32 x 26
15
289.1 kg
289.1 kg
Beton
k) 1.17 m3
.17 m3
Bekisting
5x1.25) x 26
17.88 m2
2
4D12
2
6
138.56 kg
38.56 kg Ø8-10
114.98 kg
5.03x10-5 m2
7m
uah
6 x 26
14.98 kg
Beton
4
0.24 m3
)
4 m3
Bekisting
.25 x 0.7) x 2 1.47 m2
1.37 kg
2
16
2
18.95 kg
1.37 kg
16 9.29 kg
2
7.58 kg
dan Ø8-15
5.03x10-5 m2
0.98 m
10
h
15
h
8-15
12 x 2
1' Beton
15
9.29 kg
k) 0.72 m3
2 m3
Bekisting
5 x 3) x 2
6.30 m2
16
7D16 dan 5D16
2
73.9 kg
59.69 kg
16
2
25.54 kg
14.21 kg
dan Ø8-15
5.03x10-5 m2
0.98 m
mpuan
buah
angan
buah
8-15
33 xE'2(a)
As. Beton
15
25.54
m3 kg
a)
buah
angan
buah
8-15
33 xE'2(a)
As.
15 0.336 m3
25.54
m3 kg
a) Bekisting
.2 x 3.6)
4.08 m2
2
Ø8-10 dan Ø8-15
12
00181 m3 13.20 kg
4.21 kg
dan Ø8-15
5.03x10-5 m2
0.88 m
mpuan
buah
angan
uah
8-15
38 E' (b)
As. Beton
2
15 0.15 m3
3.2
m 3 kg
b) Bekisting
5 x 2)
1.90 m2
2
Ø8-10 dan Ø8-15
12
0.00102 m3 7.39 kg
.99 kg
dan Ø8-15
5.03x10-5 m2
0.78 m
mpuan
uah
angan
ah
.99 kg
dan Ø8-15
5.03x10-5 m2
0.78 m
mpuan
uah
angan
ah
8-15
24 Beton
19.46 m3
15
7.39 kg Bekisting
210.19 m2
Tul. Ulir
1591 kg
Tul. Polos
781.45 kg
Sayap Beton
3.8-0.25)) + 78.08 m3
((352x32) +
.4x2) +
5) +
m2 Bekisting
= 78.08 m3 325.35 m2
Ø10-30
0 kg
24403.24
.86 x 10-5 m2
-30 (arah x)
uah
30 (arah y)
buah
47) +
3)) x 2
403.24 kg
x 0.15)) x 2 Bekisting
+ (2x3.5x0.6)
(6x3.6)
x 0.15)) x 2
82.40 m2
Ø8-30
5.03x10 m
-5 2
207.31 kg
-30 (arah x)
.2) +
= 255.37 m
30 (arah y)
+ (((420/30)
+ 1) x 8)
+269.67)
07.31 kg
Beton
84.98 m3
Bekisting
407.75 m2
Tul. Polos
17610.55 kg
Bekisting
py
+ 56.75 m2
+
+
5 m2 Ø8-30
55.70 kg
2.5x(55/30))
82/162
162
162
Beton
2.05 m3
Bekisting
56.75 m2
Tul. Polos
55.70 kg
nk Beton
x0.65) + 0.51 m3
1 m3
x300) + Bekisting
00) +
2 5.28 m2
njang Ø8-15
86 3.01 kg
56
22
328
= 338
= 290
36
52
58
48
26
x(4x0.8 +
55) x 3 x 7850
njang
Beton
0.51 m3
Bekisting
5.28 m2
x 7850 = 1.18 Tul. Polos
3.01 kg
a Beton
4.44 m3
x 20
Bekisting
40.62 m2
2
Polos
194.58 kg
0x10x80/2)
Ulir
684.76 kg
2x2)
8)) +
200)
x80) +
0x2/2)
ang 1Ø10
7850 x 22
njang Ø8-20
) x 7850 x 110
5
x 7850 x 100
wah I
) x 7850 x 7
s I D16-12.5
njang Ø8-20
) x 7850 x 110
5
x 7850 x 100
wah I
) x 7850 x 7
s I D16-12.5
) x 7850 x 7
wah II
) x 7850 x 7
s II D16-12.5
) x 7850 x 7
emanjang ke
) x 7850 x 7
emanjang ke
) x 7850 x 7
emanjang
) x 7850 x 7
elintang
7850 x 20
ntai 2
x 7850 x 7
ntai 2
) x 7850 x 9
anjang 6D16
7850 x 6
5
x 7850 x 14
pan
m3
= 40.62 m2
94.58 kg
84.76 kg
a Beton
.25 x 20 3.52 m3
Bekisting
37.24 m2
x2
Polos
170.52 kg
Ulir
647.92 kg
2x2)
x18)) +
x172.5)
(10x76.25) +
0x2/2)
ang 1Ø10
x 7850 x 22
njang Ø8-20
) x 7850 x 88
5
) x 7850 x 100
wah I
) x 7850 x 7
s I D16-12.5
) x 7850 x 7
wah II
) x 7850 x 7
s II D16-12.5
x 7850 x 7
emanjang ke
wah II
) x 7850 x 7
s II D16-12.5
x 7850 x 7
emanjang ke
) x 7850 x 7
emanjang ke
) x 7850 x 7
emanjang
) x 7850 x 7
elintang
) x 7850 x 18
ntai 2
) x 7850 x 7
ntai 2
) x 7850 x 8
anjang 6D16
) x 7850 x 6
5
x 7850 x 12
akang
m3
= 37.24 m2
70.52 kg
47.92 kg
Beton
7.96 m3
Bekisting
77.86 m2
Tul. Ulir
365.10 kg
Tul. Polos
1332.68 kg
Waterproof
11.98 m2
ng Sayap
0.55) +
Waterproof
11.98 m2
Beton
11.15 m3
Bekisting
437.25 m2
Tulangan
2910.15 kg
Beton
9.7 m3
Bekisting
125.35 m2
Tulangan
778.5 kg
Beton
3.97 m3
Bekisting
39.72 m2
Tulangan
421.92 kg
1186.88 m2
1088.623 m2
2.41 m
6 bh
68 m
268.8 m'
268.8 m'
268.8 m'
C Pekerjaan Finishing Arsitektur
a. Pekerjaan Finishing Arsitektur Lantai 1
I. Pekerjaan Pondasi
1 Pemasangan Pondasi Batu Belah 1SP: 6 PP
2 Aanstamping
5 Plesteran 1:6
6 Plesteran Beton
7 Beton Praktis Sloof
8 Beton Praktis Kolom
TYPE J3 (2 bh)
TYPE J4 (4 bh)
TYPE J5 (2 bh)
TYPE J6 (2 bh)
TYPE J1 (2)
TYPE PJ1 (1 bh)
TYPE P1 (4 bh)
TYPE P2 (1 bh)
TYPE J3 (2 bh)
TYPE J4 (4 bh)
TYPE J5 (2 bh)
TYPE J6 (2 bh)
TYPE PJ2 (26 bh)
TYPE J1 ( 2 bh)
TYPE P1 ( 4bh)
TYPE J3 (2 bh)
TYPE J4 (4 bh)
TYPE J5 (2 bh)
TYPE J6 (2 bh)
TYPE P1 ( 4bh)
4 Kunci Tanam
5 floor hinges
6 Kunci raam alluminium
7 Engsel pintu
a. Type P1 (4bh)
TYPE PJ3
TYPE P2 (1 bh)
kecil
TYPE J5 (2 bh)
TYPE P1 (4bh)
TYPE P2 ( 1bh)
TYPE P3 ( 27 bh )
13 Engsel Jendela
a. Type J1 (6 bh)
d. Type J4 (4 bh)
f. Type j6 (2 bh)
14 Grendel
15 Raam Skor
16 Pintu Shaft Besi 40/60
17 railing tangga pipa hitam fin. Cat lt 1 ke lt.2
tangga depan
IV PEKERJAAN PLAFOND
1 Plafond Exose Aci
2 Plafond Asbess Plat
3 List Tepi Kayu Profil
V Pekerjaan Pasang Lantai dan Dinding
5
5
9 Nosing Tangga
VI PEK. PENERANGAN :
1 Lampu SL 18 W
2 Down light SL 18 W
3 Lampu baret 40 W
4 Ceiling fan
6 Saklar tunggal
7 Saklar ganda
VIII PEK.SANITAIR :
1 Closet jongkok warna tua
3 Kran air
IX Pekerjaan Cat-catan
Cat Tembok
1
Cat Plafon
3
3
Gambar Rooftank
Tipe Kusen
Tipe Kolom
3 Plesteran 1 : 3
Plesteran depan
Plesteran belakang
4 Plesteran 1 : 6
5 Plesteran Beton
Keyplan Lantai Kolom Lantai 2
(K1, K3, K4, K4A, dan K5)
TYPE J3 (2 bh)
TYPE J4 (4 bh)
TYPE J5 (2 bh)
TYPE J6 (2 bh)
TYPE J4 (4 bh)
TYPE J5 (2 bh)
3 Kaca Bening 5 mm
TYPE J2 (2 bh)
TYPE J3 (2 bh)
TYPE J4 (4 bh)
TYPE J5 (2 bh)
TYPE J6 (2 bh)
4 Kunci Tanam
Type PJ2
Type PJ3
5 Engsel Pintu
Type PJ2
Type PJ3
6 Daun Pintu Double Teakwood
TYPE PJ2 (26 bh)
TYPE PJ3 (26 bh)
1
1
1
Dinding Keramik 20x25 Lavatory
4
Plint Lantai Jeglok Finish Cat Minyak
Volume = 26 x (( 2x 3,45)+(2x 4,35)) + (26x3,60)+ 2 x ((2x1,05) + 5,8 )
5
= 205,6 + 93,6 + 15,8
= 315 m '
V PEK. PENERANGAN :
1 Lampu SL 18 W
2 Down light SL 18 W
3 Lampu Baret 40 w
4 Ceiling fan
6 Saklar tunggal
7 Saklar ganda
VI PEK.SANITAIR :
3 Kran air
IX PEK. CAT-CATAN :
Cat tembok
1
Cat Plafond
4
Perhitungan Volume Satuan
175.596 m3
L = 1/2(30+80)x80=4400 cm2
volume=4400x360x52=82.368.000 cm3
volume=4400x600x32=79.200.000 cm3
volume=4400x780x2=6.864.000 cm3
volume=4400x200x5=1.760.000 cm3
volume=4400x180x2=1.584.000 cm3
volume=4400x350x2=2.200.000 cm3
total=173.976.000 cm3
LUAS=1/2(135+111,6)x20=2466 cm2
volume=2466x600x33=48.826.800 cm3
volume=2466x360x52=46.163.520 cm3
764.904 m³
6.3 m2
556.2 m2
1334.02 m2
Dinding Tanpa Trasram = 3,7 x 228,1
=843,97 m2
Keliling = (1,8 + 1,5) x 2 = 6,6 m
Tinggi Dinding = 4 – 1,25 = 2,75 m
Luas Dinding Kamar Mandi = 6,6 x 2,75 x
27 = 490,05 m2
843,97 + 490,05= 1334,02 m2
1112.4 m2
2668.04 m2
99.6 m2
1. Kolom K1
Volume = (35 x 39) = 1400 cm
2. Kolom K1A
Volume = (35 x 12) = 420 cm
3. Kolom K2
Volume = (30 x 14) = 420 cm
4. Kolom K3
Volume = (25 x 4) = 100 cm
5. Kolom K4
Volume = (20 x 2) = 40 cm
6. Kolom K4A
Volume = (20 x 2) = 40 cm
7. Kolom K5
Volume = (20 x 2) = 40 cm
8. Kolom K6
Volume = (15 x 2) = 30 cm
21.174 m'
= 13500 cm
Sloof S1 = 1980+13500=15480 cm
274,6 m'
Kusen Ruangan (PJ2, PJ3, P3, J5, BV1)
[(1,55+1,65+0,8+0,8)x50] + [(1,55+1,65+1,5+0,8+0,8)x2]
252.6
0,9+0,8+2,4
4.1
(0,9+4,8+1,4+5,4+1,6+5,6)
19.7
928.6 m'
VOLUME = (570 x 2)+(60 x 5) = 1440 cm
= 14,4 m x 2
= 28,8 m
10.01 m2
VOLUME = ((160 x 5)x2)+((113 x 5)x2))
= 2730 cm2
= 0,2730 m2 x 2
= 0,546 m2
59 bh
4 unit
2 unit
156 bh
Pintu = 3, Ventilasi = 2
89.04 m2
VOLUME = (210 x 80) = 16800 cm2
= 1,68 m2 x 26
= 43,68 m2
27 unit
2 unit
177.4 m2
volume = (200*1650)*26
= 85,8 m2
volum3=(200*82,5)*56
= 92,4
920 m'
VOLUME = (160 x 4)+(40 x 4) = 800 cm
= 8,0 m x 2
= 16 m
VOLUME = (160 x 2)+(50 x 2) = 420 cm
= 4,2 m x 4
= 16,8 m
12 bh
24 bh
16 bh
109 bh
109 bh
2 bh
225.63 m'
41 m'
135.65 m2
614.24 m2
909 m'
Volume = t. urug pasir x Luas Lantai 79.68 m3
Tebal urug pasir = 10 cm
Tipe B = 180*130*1
= 23400 cm²
660.625 m²
660.625 m²
29.8 m²
35100 558.7 m
Tipe B = 270*26 = 7020 cm
Tipe C = 227.5*2 = 455 cm
Tipe D = 1390*2 = 2780 cm
Tipe E = 835*2 = 1670 cm
Tipe F = 1530*1 = 1530 cm
Tipe G = 690*1 = 690 cm
Tipe H = 4285*1 = 4285 cm
Volume = 55870 cm
20.39 m²
106 bh
67 bh
2 bh
27 bh
56 bh
28 bh
53 bh
27 bh
27 bh
53 bh
4 bh
27 bh
27 bh
a. Dinding Luar
Keliling = 18230 cm
= 18230 x 400
= 7292000 cm2
b. Dinding Dalam
Keliling = 100685 cm
= 32722625 cm2
= 216617 cm2
(29 buah)
4. pintu P3 = (80x205) x 27
= 60 x 90 x 4 = 21600
= 2550 cm2
8. jendela J1 = (60x160)
(6 buah) = 9600 x 6
= 57600 cm2
9. jendela J2 = (70x570)
(4 buah) = 22950 x 4
= 91800 cm2
(2 buah) = 13600 x 2
= 27200 cm2
(6 buah) = 8500 x 6
= 51000 cm2
(lt 1) = 30030 x 2
= 60060 cm2
= 991250 cm2
= 8336520 cm2
= 20479480 cm2
= 2047.948 m2
= 4890600 cm2
2. Koridor = (180x360x7) + (600x360-
450x200)+(600x120)
(kanan kiri) = 651600 x 2
= 618000 cm2
TOTAL CAT PLAFOND = 4890600 + 1303200 + 252000
+ 618000
= 7063800 cm2
= 706.38 m2
208.68 m²
Luas Bruto = (Panjang kotor (pas. batu bata 1:3)*tinggi ruangan
= ([1,35*1,7]+[1,65*2,6]+[0,7*2,26]+[1,35*
0,7]+[0,8*1,7]+[0,5*1,7]+[1,1*2,26]) +
([0,175*4*34]+[0,3*4*2]+[0,3*4*2]+
[0,35*4*2])
= 237,0908 m²
Jadi, Luas Pas. Batu Bata 1 : 6 = 1585,8- 237,0908
= 1348,71 m²
417.36 m²
2697.42 m²
225.6 m
Luas Bruto Selimut Kolom (K1, K3, K4, K4A, dan K5)
= Luas( K1+ K3 + K4 + K4A + K5)
= (0,35*4*4)*32 + (0,4*4+0,25*4)*2 + (0,4*4+0,2*4)*2
+ (0,4*4+0,2*4)*2 + (0,5*4+0,2*4)*2
= 264 m²
344 m
259,3 m
710.00 m'
VOLUME = (570 x 2)+(60 x 5) = 1440 cm
= 14,40 m x 2
= 28,80 m
101.882 m2
VOLUME = ((160 x 60)x2)+((113 x 60)x2)) = 32760 cm2
= 3,276 m2 x 2
= 6,552 m2
52 bh
(1 X 26) = 26
(1 X 26) = 26
104 bh
(2 X 26) = 52
(2 X 26) = 52
27.84 m2
26 unit
25.48 m2
384 bh
(2 x 3) x 26 = 156
(2 x 3) x 26 = 156
(2 x 2) x 2 = 8
(2 x 1) x 4 = 8
(2 x 1) x 2 = 4
(2 x 1) x 26 = 52
18 bh
665.57 m2
665.57 m2
866.95 m'
+( 2 x 1,6 x1,55)) m²
= 26 x( 4,640 + 4,96) m²
= 249,6 m²
249.6 m2
= ( 26 x ( 3,60 x 4,45 ))
+ (14 x 1,65 x 3,60)
+ (2 x 1,05 x 5,8 ) m²
511.86 m2
= 359,125,195+75,075+12,18m²
= 511,86 m²
+ (2 x1,6m x 1,45m))
= 249,6 m²
249.6 m2
26x3,60)+ 2 x ((2x1,05) + 5,8 )
315 m
104 bh
54 bh
0 bh
26 bh
54 bh
24 bh
52 bh
26 bh
26 bh
52 bh
26 bh
26 bh
a. Dinding Luar
Keliling = 16480 cm
Luas = 16480 x tinggi gedung
= 16480 x 400
= 6592000 cm2
b. Dinding Dalam
Keliling = 71360 cm
Luas = 71360 x 325
= 23192000 cm2
Total Cat luar dalam
6592000 + 23192000 = 29784000 cm2
2978.4 m2
c. Bagian tidak terkena cat (luar & dalam)
4. pintu P3 = (80x205) x 27
= 4890600 cm2
2. Koridor = (180x360x7) + (600x360)+(200x180)+((200-
15)x(450-30)
(kanan kiri) = 783300 x 2
= 1566600 cm2
706.38 m2
3. Gedung Tengah = (350x360) x 2 = 252000 cm2
= 618000 cm2
= 7063800 cm2
= 706.38 m2
A. = (3.6x1.95) + (2.58x0.65) +
(2.52x0.38)
B.
=(1.8x(2.06+0.08+0.2+0.1))
Resapan
C.
= 4x1,2
1 D.
= 0.9x1.2
> Volume
= (9.655x1.8) + (4.392x2.1) +
(4.8x1.2) + (1.08x4)
(2.4x1.8)+(1.35x3.6)+(0.4x1.2)+(0.1
2x4)
Urugan Pasir > Luas Urugan
= 2.5x0.08
= 1.8x0.1
Resapan
= 4x0.15
3
= 0.8x0.15
> Volume
(0.2x1.8)+(0.18x3.6)+(0.6x1.2)+(0.1
2x4)
Volume Aanstamping
Potongan A
> Luas anstamping
A. = 2x(0.75𝑥0.3/2)
= 0.95x0.15
= 1.3x0.15
= 1.8x0.3
> Volume
(2.25x30)+(1.425x90)+
(1.95x0.9)+(5.4x1.8)
4
Potongan B
>Luas anstamping
= 0.2x1.8
>Volume
= 0.36x1.5
>Total 1 unit
= 1.343+0.54
>Total 8 unit
= 1.883x8
Volume Beton
Potongan A
Pelat Penutup
> Luas Beton
= 2x(0.075+0.6+0.3+
0.4)x0.1 + (2x0.75x0.1)
+ (0.4x0.1)
>Volume
= 0.465x1.8
Pelat Dasar
> Luas Beton
= 0.08x2.1
> Volume
= (0.168x1.8)
Potongan B
5 Pelat Penutup
>Luas Beton
= 1.5x0.1
>Volume
= 0.15x1.5
Pelat Dasar
>Luas Beton
= 0.08x1.8
>Volume
=0.144x1.5
>Total 1 unit
= 0.837+0.302+0.225
+0.216
>Total 8 unit
= 1.58x8
Dinding Bata 1:3
1. 2 x 60 x 30
2. 2 x 70 x 15
6
3. 2 x 94,87 x 21,21
6
4. 100 x 30
5. 65 x 30
Total
Total 8 unit
Plasteran 1:3
V = 2 x V.Dinding Bata
7
V = 2 x 117395,08
8
Jumlah = 1x8
8 unit = 8 x 650 cm
9
Ukuran dipasaran 4m
Ijuk
>Panjang Pipa
= √(4²+0,5²)
10 >Lp Ijuk
= π x 0,1016*4,031
10
+ ¹/₄π x 0,1016²
= ¹/₂(0,45+0,775)x0,65
- ¹/₄π x0,1016²x4,031
11
0.365
12 Sirtu
Volume Satuan
171.45 m'
2.073 m'
33 bh
9655
4,392
m2
4800
1080
36,682 m3
2.4
1.35
m2
0.4
0.12
10.14 m3
= 0.200 m2
= 0.18 m2
= 0.6 m2
m3
= 0.12 m2
2.208
= 2.25
= 1.425
m2
= 1.95
= 5.4
= 1.343 m3
= 0.36 m2
= 0.54 m3
= 1.883
m3
= 15.064
= 0.465 m2
0.837 m3
= 0.168 m2
0.302 m3
= 0.15 m2
0.225 m3
0.144 m2
0.216 m3
1.58 m3
12.64 m3
3600
2100
m2
4024.39
3000 m2
1950
14674.3854
117395.08
234790.1664 m2
8 bh
650
cm
5200
5200/400
13 Bh
4,031 m
1.295 m2
0.365 m3
4.8 m3
HARGA BAHAN/UPAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN
Rp
A HARGA SATUAN PEKERJAAN PERSIAPAN
1 A.2.2.1.9 1 m2 Pembersihan Lapangan
A TENAGA
L.01 0.1 OH Pekerja 75000
L.04 0.05 OH Mandor 100000
B BAHAN
C PERALATAN
D Jumlah A+B+C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
2 A.2.2.1.4 1 m’ Pengukuran dan Bouwplank
A TENAGA
L.01 0.1 OH Pekerja 75000
L.02 0.1 OH Tukang Kayu 95000
L.03 0.01 OH Kepala Tukang 110000
L.04 0.005 OH Mandor 100000
B BAHAN
Kayu 5/7x 4m Kayu
0.012 m3 5051000
Kruing
0.02 kg Paku Biasa 2”-5” 15000
0.007 m3 Kayu Papan 3/20 Kruing 6250000
C PERALATAN
D Jumlah A + B + C
A TENAGA
L.01 0.5 OH Pekerja 75000
L.04 0.05 OH Mandor 100000
B BAHAN
C PERALATAN
D Jumlah A + B + C
Pembesian dg Besi
3 A.4.1.1.17 10 kg
Polos
A TENAGA
L.01 0.07 OH Pekerja 75000
L.02 0.07 OH Tukang Besi 95000
L.03 0.007 OH Kepala Tukang 110000
L.04 0.004 OH Mandor 100000
B BAHAN
10.5 Kg Besi Beton polos 9800
0.15 Kg Kawat Beton 17000
C PERALATAN
D Jumlah A + B + C
A TENAGA
L.01 0.007 OH Pekerja 75000
L.02 0.07 OH Tukang Besi 95000
L.03 0.007 OH Kepala Tukang 110000
L.04 0.004 OH Mandor 100000
B BAHAN
1.5 Kg Besi Beton ulir 9800
0.15 Kg Kawat Beton 17000
C PERALATAN
D Jumlah A + B + C
Memasang Bekisting
4 A.4.1.1.20 1 m2
untuk Pondasi
A TENAGA
L.01 0.52 OH Pekerja 75000
L.02 0.26 OH Tukang Kayu 95000
L.03 0.026 OH Kepala Tukang 110000
L.04 0.026 OH Mandor 100000
B BAHAN
0.04 m3 Kayu Klas III (Terentang) 2000000
0.3 Kg Paku Biasa 2" - 5" 15000
0.1 Ltr Minyak Bekisting 9000
C PERALATAN
D Jumlah A + B + C
Memasang Bekisting
6 A.4.1.1.22 1 m2
untuk Kolom
A TENAGA
L.01 0.66 OH Pekerja 75000
L.02 0.33 OH Tukang Kayu 95000
L.03 0.033 OH Kepala Tukang 110000
L.04 0.033 OH Mandor 100000
B BAHAN
0.04 m3 Kayu Klas III (Terentang) 2000000
0.4 Kg Paku Biasa 2" - 5" 15000
0.2 Ltr Minyak Bekisting 9000
0.015 m3 Balok Kayu Klas II 5051000
0.35 Lbr Plywood tebal 9mm 121000
Dolken Kayu Galam
2 Btg 21000
diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
Memasang Bekisting
7 A.4.1.1.23 1 m2
untuk Balok
A TENAGA
L.01 0.66 OH Pekerja 75000
L.02 0.33 OH Tukang Kayu 95000
L.03 0.033 OH Kepala Tukang 110000
L.04 0.033 OH Mandor 100000
B BAHAN
0.04 m3 Kayu Klas III (Terentang) 2000000
0.4 Kg Paku Biasa 2" - 5" 15000
0.2 Ltr Minyak Bekisting 9000
0.018 m3 Balok Kayu Klas II 5051000
0.35 Lbr Plywood tebal 9mm 121000
Dolken Kayu Galam
2 Btg 21000
diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
Memasang Bekisting
8 A.4.1.1.24 1 m2
untuk Lantai
A TENAGA
L.01 0.66 OH Pekerja 75000
L.02 0.33 OH Tukang Kayu 95000
L.03 0.033 OH Kepala Tukang 110000
L.04 0.033 OH Mandor 100000
B BAHAN
0.04 m3 Kayu Klas III (Terentang) 2000000
0.4 Kg Paku Biasa 2" - 5" 15000
0.2 Ltr Minyak Bekisting 9000
Balok Kayu Klas II
0.015 m3 5051000
(Borneo)
0.35 Lbr Plywood tebal 9mm 121000
Dolken Kayu Galam
6 Btg 21000
diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
Memasang Bekisting
9 A.4.1.1.26 1 m2
untuk Tangga
A TENAGA
L.01 0.66 OH Pekerja 75000
L.02 0.33 OH Tukang Kayu 95000
L.03 0.033 OH Kepala Tukang 110000
L.04 0.033 OH Mandor 100000
B BAHAN
0.03 m3 Kayu Klas III (Terentang) 2000000
0.4 Kg Paku Biasa 2" - 5" 15000
0.15 Ltr Minyak Bekisting 9000
0.015 m3 Balok Kayu Klas II 5051000
0.35 Lbr Plywood tebal 9mm 121000
Dolken Kayu Galam
2 Btg 21000
diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
A TENAGA
L.01 1.65 OH Pekerja 75000
L.02 0.275 OH Tukang Batu 95000
L.03 0.028 OH Kepala Tukang 110000
L.04 0.083 OH Mandor 100000
B BAHAN
384 Kg Portland Semen 1050
692 Kg Pasir Beton 250
Kerikil (maksimum 30
1039 Kg 229,63
mm)
215 ltr Air 15.00
C PERALATAN
D Jumlah A + B + C
(Bikinan) A TENAGA
L.01 0.2 OH Pekerja 75000
L.02 0.45 OH Tukang Besi 95000
L.03 0.01 OH Kepala Tukang 110000
L.04 0.05 OH Mandor 100000
B BAHAN
Pemasangan Atap
2 A.4.5.2.2 1 m2
Genteng Glasur
A TENAGA
L.01 0.15 OH Pekerja 75000
L.02 0.075 OH Tukang Kayu 95000
L.03 0.008 OH Kepala Tukang 110000
L.04 0.008 OH Mandor 100000
B BAHAN
25 Buah Genteng Glasur 4250
C PERALATAN
D Jumlah A + B + C
Pemasangan Genteng
3 A.4.5.2.5 1 m2
Bubung Glasur
A TENAGA
L.01 0.4 OH Pekerja 75000
L.02 0.2 OH Tukang Kayu 95000
L.03 0.02 OH Kepala Tukang 110000
L.04 0.002 OH Mandor 100000
B BAHAN
5 Buah Genteng Bubung Glasur 6500
8 kg Portland Semen 1050
0.032 m3 Pasir Pasang 315000
C PERALATAN
D Jumlah A + B + C
Pemasangan Nok
6 A.4.5.2.37 1 m'
Genteng Metal
A TENAGA
L.01 0.25 OH Pekerja 75000
L.02 0.15 OH Tukang Kayu 95000
L.03 0.015 OH Kepala Tukang 110000
L.04 0.013 OH Mandor 100000
B BAHAN
1.1 Buah Nok Genteng 20000
0.05 Kg Paku Biasa 1/2" - 1" 15000
C PERALATAN
D Jumlah A + B + C
Pemasangan Listplank
7 A.4.6.1.21 1 m'
Kayu Bengkirai 2x2/20
A TENAGA
L.01 0.1 OH Pekerja 75000
L.02 0.2 OH Tukang Kayu 95000
L.03 0.02 OH Kepala Tukang 110000
L.04 0.005 OH Mandor 100000
B BAHAN
0.0108 m3 Kayu bengkirai 9750000
0.10 Kg Paku Biasa 2" - 5" 13000
C PERALATAN
D Jumlah A + B + C
Pemasangan Batu
2 A.3.2.1.9 1 m3
Kosong/Anstamping
A TENAGA
L.01 0.78 OH Pekerja 75000
L.02 0.39 OH Tukang Batu 95000
L.03 0.039 OH Kepala Tukang 110000
L.04 0.039 OH Mandor 100000
B BAHAN
1.2 m3 Batu Belah 15/20 260000
0.432 m3 Pasir Urug 160000
C PERALATAN
D Jumlah A + B + C
Pemasangan Dinding
Bata Merah Ukuran
2 A.4.4.1.8 1 m2
(5x11x22)cm Tebal 1/2
Bata Camp. 1SP : 3PP
A TENAGA
L.01 0.3 OH Pekerja 75000
L.02 0.1 OH Tukang Batu 95000
L.03 0.01 OH Kepala Tukang 110000
L.04 0.015 OH Mandor 100000
B BAHAN
70 Buah Bata Merah 5 x 11 x 22 580
14.37 Kg Portland Semen 1050
0.04 m3 Pasir Pasang 315000
C PERALATAN
D Jumlah A + B + C
Pemasangan Dinding
Bata Merah Ukuran
3 A.4.4.1.11 1 m2
(5x11x22)cm Tebal 1/2
Bata Camp. 1SP : 6PP
A TENAGA
L.01 0.3 OH Pekerja 75000
L.02 0.1 OH Tukang Batu 95000
L.03 0.01 OH Kepala Tukang 110000
L.04 0.015 OH Mandor 100000
B BAHAN
70 Buah Bata Merah 5 x 11 x 22 580
8.32 Kg Portland Semen 1050
0.049 m3 Pasir Pasang 315000
C PERALATAN
D Jumlah A + B + C
A TENAGA
L.01 0.3 OH Pekerja 75000
L.02 0.15 OH Tukang Batu 95000
L.03 0.015 OH Kepala Tukang 110000
L.04 0.015 OH Mandor 100000
B BAHAN
7,776 Kg Portland Semen 1050
0.023 m3 Pasir Pasang 315000
C PERALATAN
D Jumlah A + B + C
A TENAGA
L.01 0.3 OH Pekerja 75000
L.02 0.15 OH Tukang Batu 95000
L.03 0.015 OH Kepala Tukang 110000
L.04 0.015 OH Mandor 100000
B BAHAN
4,416 Kg Portland Semen 1050
0.027 m3 Pasir Pasang 315000
C PERALATAN
D Jumlah A + B + C
Pemasangan Kaca
2 A.4.6.2.17 1 m2
Tebal 5 mm
A TENAGA
L.01 0.015 OH Pekerja 75000
L.02 0.15 OH Tukang Kayu 95000
L.03 0.015 OH Kepala Tukang 110000
L.04 0.00075 OH Mandor 100000
B BAHAN
1.1 m2 Kaca Tebal 5 mm 90000
C PERALATAN
D Jumlah A + B + C
Pemasangan Kunci
4 A.4.6.2.2 1 Buah
Tanam
A TENAGA
L.01 0.01 OH Pekerja 75000
L.02 0.5 OH Tukang Kayu 95000
L.03 0.01 OH Kepala Tukang 110000
L.04 0.005 OH Mandor 100000
B BAHAN
1 Buah Kunci Tanam 110000
C PERALATAN
D Jumlah A + B + C
Pemasangan Floor
5 A.4.6.2.2a 1 Unit
Hinges
(bikinan) A TENAGA
L.01 0.01 OH Pekerja 75000
L.02 0.5 OH Tukang Besi 95000
L.03 0.01 OH Kepala Tukang 110000
L.04 0.005 OH Mandor 100000
B BAHAN
1 Buah Floor Hinges 1200000
C PERALATAN
D Jumlah A + B + C
Pemasangan Engsel
7 A.4.6.2.5 1 Buah
Pintu
A TENAGA
L.01 0.015 OH Pekerja 75000
L.02 0.15 OH Tukang Kayu 95000
L.03 0.015 OH Kepala Tukang 110000
L.04 0.0075 OH Mandor 100000
B BAHAN
1 Buah Engsel Pintu 6000
C PERALATAN
D Jumlah A + B + C
Pemasangan Daun
8 A.4.6.1.5 1 m'
Pintu Double Teakwood
A TENAGA
L.01 1 OH Pekerja 75000
L.02 3 OH Tukang Kayu 95000
L.03 0.3 OH Kepala Tukang 110000
L.04 0.05 OH Mandor 100000
B BAHAN
0.04 m3 Kayu Klas II (Kamfer), pap 7200000
0.05 kg Lem Kayu 12500
C PERALATAN
D Jumlah A + B + C
(Bikinan) A TENAGA
L.01 1 OH Pekerja 75000
L.04 0.05 OH Mandor 100000
B BAHAN
0.04 m3 Pintu PVC 185000
1 Buah Kunci Tanam 95000
1 Buah Engsel Pintu 23000
C PERALATAN
D Jumlah A + B + C
Pemasangan
11 A.4.2.1.9 1 m2
Sunscreen Allumunium
A TENAGA
L.01 0.08 OH Pekerja 75000
L.02 0.8 OH Tukang Besi 95000
L.03 0.08 OH Kepala Tukang 110000
L.04 0.004 OH Mandor 100000
B BAHAN
1 m2 Sunscreen Allumunium 350000
C PERALATAN
D Jumlah A + B + C
Pemasangan Engsel
13 A.4.6.2.6 1 Buah
Jendela Kupu-Kupu
A TENAGA
L.01 0.01 OH Pekerja 75000
L.02 0.1 OH Tukang Besi 95000
L.03 0.01 OH Kepala Tukang 110000
L.04 0.005 OH Mandor 100.000.00
B BAHAN
1 Buah Engsel Jendela 4000
C PERALATAN
D Jumlah A + B + C
Pemasangan Kunci
14 A.4.6.2.11 1 Buah
Selot
A TENAGA
L.01 0.02 OH Pekerja 75000
L.02 0.2 OH Tukang Besi 95000
L.03 0.02 OH Kepala Tukang 110000
L.04 0.001 OH Mandor 100000
B BAHAN
1 Buah Kunci Selot 8000
C PERALATAN
D Jumlah A + B + C
Pemasangan Pintu
16 A.4.2.1.4 1 Buah
Shaft Besi
A TENAGA
L.01 1.05 OH Pekerja 75000
L.02 1.05 OH Tukang Besi 95000
L.03 0.105 OH Kepala Tukang 110000
L.04 0.052 OH Mandor 100000
B BAHAN
15 Kg Besi Siku L.30.30.3 7500
32.8 Kg Besi Plat Baja 13000
0.05 Kg Kawat Las 55000
C PERALATAN
D Jumlah A + B + C
Pengecatan Permukaan
17 A.4.7.1.16 1 m2
Baja dengan Meni Besi
A TENAGA
L.01 0.02 OH Pekerja 75000
L.02 0.2 OH Tukang Cat 95000
L.03 0.002 OH Kepala Tukang 110000
L.04 0.0025 OH Mandor 100000
B BAHAN
0.1 kg Meni Besi 25000
0.01 kg Perekat/Lem 55000
C PERALATAN
D Jumlah A + B + C
Pemasangan Kaca
18 A.4.6.2.17a 1 m2
Boven Tebal 5 mm
(Bikinan) A TENAGA
L.01 0.015 OH Pekerja 75000
L.04 0.00075 OH Mandor 100000
B BAHAN
1.1 m2 Kaca Boven Tebal 5 mm 110000
C PERALATAN
D Jumlah A + B + C
C PERALATAN
A Tenaga
L.01 0.043 OH Pekerja 75000
L.02 0.043 OH Tukang Besi 95000
L.03 0.0043 OH Kepala Tukang 110000
L.04 0.0021 OH Mandor 100000
B Bahan
1.1 m' Profil Allumu 80000
2 buah Skrup Fixer 750
0.06 Tube Sealant 50000
C PERALATAN
D Jumlah A + B + C
IV PEKERJAAN PLAFOND
1 A.4.4.2.27 1 m2 Plafond Expose Aci
A TENAGA
L.01 0.2 OH Pekerja 75000
L.02 0.1 OH Tukang batu 95000
L.03 0.01 OH Kepala Tukang 110000
L.04 0.01 OH Mandor 100000
B BAHAN
3.25 Kg Portland Semen 1050
C PERALATAN
D Jumlah A + B + C
Pemasangan Plafond
2 A.4.5.1.1 1 m2
Asbes Plat
A TENAGA
L.01 0.03 OH Pekerja 75000
L.02 0.07 OH Tukang Kayu 95000
L.03 0.007 OH Kepala Tukang 110000
L.04 0.004 OH Mandor 100000
B BAHAN
1.1 lbr Plat Asbes 15500
0.01 kg Paku 15000
C PERALATAN
D Jumlah A + B + C
Pembuatan Lantai
3 A.4.1.1.1 1 m2
Rabat Beton Tritisan
A TENAGA
L.01 1.65 OH Pekerja 75000
L.02 0.275 OH Tukang Batu 95000
L.03 0.028 OH Kepala Tukang 110000
L.04 0.083 OH Mandor 100000
B BAHAN
247 Kg Portland Semen 1050
869 Kg Pasir Beton 250
999 Kg Kerikil (maksimum 30 mm) 229,63
215 ltr Air 15
C PERALATAN
D Jumlah A + B + C
Pemasangan Dinding
4 A.4.4.3.54 1 m2
Keramik 20 x 20 cm
A TENAGA
L.01 0.9 OH Pekerja 75000
L.02 0.45 OH Tukang Batu 95000
L.03 0.045 OH Kepala Tukang 110000
L.04 0.045 OH Mandor 100000
B BAHAN
26.5 Buah Keramik 2080
9.3 Kg Portland Semen 1050
1.94 Kg Semen Warna 11000
0.018 m3 Pasir Pasang 315000
C PERALATAN
D Jumlah A + B + C
Pemasangan Lantai
5 A.4.4.3.34 1 m2
Keramik 40 x 40 cm
A TENAGA
L.01 0.7 OH Pekerja 75000
L.02 0.35 OH Tukang Batu 95000
L.03 0.035 OH Kepala Tukang 110000
L.04 0.035 OH Mandor 100000
B BAHAN
10 Buah Ubin Keramik 33x33 cm 5777,78
8.19 Kg Portland Semen 1050
1.62 Kg Semen Warna 11000
0.045 m3 Pasir Pasang 315000
C PERALATAN
D Jumlah A + B + C
Pemasangan Plint
7 A.4.4.3.39 1 m' Keramik Ukuran 10x20
cm
A TENAGA
L.01 0.09 OH Pekerja 75000
L.02 0.09 OH Tukang Batu 95000
L.03 0.009 OH Kepala Tukang 110000
L.04 0.005 OH Mandor 100000
B BAHAN
5.3 Buah Ubin Keramik 2500
1.14 Kg Portland Semen 1050
0.003 m3 Pasir Pasang 315000
0.025 Kg Semen Warna 11000
C PERALATAN
D Jumlah A + B + C
Pemasangan Batu
8 A.4.4.3.58 1 m2
Tempel Dinding Canopy
A TENAGA
L.01 0.7 OH Pekerja 75000
L.02 0.35 OH Tukang Batu 95000
L.03 0.035 OH Kepala Tukang 110000
L.04 0.035 OH Mandor 100000
B BAHAN
1.1 m2 Batu Tempel 110000
11.75 Kg Portland Semen 1050
0.035 m3 Pasir Pasang 370000
C PERALATAN
D Jumlah A + B + C
C PERALATAN
D Jumlah A + B + C
Water Proofing
11 A.4.7.1.10 1 m2
R.Lavatory
A TENAGA
L.01 0.02 OH Pekerja 75000
L.04 0.003 OH Mandor 100000
B BAHAN
0.2 kg Cat pelapis anti bocor 110000
C PERALATAN
D Jumlah A + B + C
VI PEKERJAAN PENERANGAN
Pemasangan Lampu SL
1 A.4.5.2.1 1 Buah
18 W
(Bikinan) A TENAGA
L.01 0.12 OH Pekerja 75000
L.02 0.12 OH Tukang Listrik 95000
L.03 0.012 OH Kepala Tukang 110000
L.04 0.006 OH Mandor 100000
B BAHAN
1 Buah Lampu SL 18 W 27000
C PERALATAN
D Jumlah A + B + C
Pemasangan Down
2 A.4.5.2.2 1 Buah
Light SL 18 W
(Bikinan) A TENAGA
L.01 0.12 OH Pekerja 75000
L.02 0.12 OH Tukang Listrik 95000
L.03 0.012 OH Kepala Tukang 110000
L.04 0.006 OH Mandor 100000
B BAHAN
1 Buah Down Light SL 18 W 120000
C PERALATAN
D Jumlah A + B + C
Pemasangan Lampu
3 A.4.5.2.3 1 Buah
Baret 40 W
(Bikinan) A TENAGA
L.01 0.12 OH Pekerja 75000
L.02 0.12 OH Tukang Listrik 95000
L.03 0.012 OH Kepala Tukang 110000
L.04 0.006 OH Mandor 100000
B BAHAN
1 Buah Lampu Baret 40 W 1135000
C PERALATAN
D Jumlah A + B + C
Pemasangan Ceiling
4 A.4.5.2.4 1 Buah
Fan
(Bikinan) A TENAGA
L.01 0.15 OH Pekerja 75000
L.02 0.3 OH Tukang Listrik 95000
L.03 0.03 OH Kepala Tukang 110000
L.04 0.075 OH Mandor 100000
B BAHAN
1 Buah Ceiling Fan 185000
C PERALATAN
D Jumlah A + B + C
Pemasangan Stop
5 A.4.5.2.5 1 Buah
Kontak 200 W
(Bikinan) A TENAGA
L.01 0.1 OH Pekerja 75000
L.02 0.2 OH Tukang Listrik 95000
L.03 0.02 OH Kepala Tukang 110000
L.04 0.005 OH Mandor 100000
B BAHAN
1 Buah Stop Kontak 200 W 13000
C PERALATAN
D Jumlah A + B + C
Pemasangan Saklar
6 A.4.5.2.6 1 Buah
Tunggal
(Bikinan) A TENAGA
L.01 0.1 OH Pekerja 75000
L.02 0.2 OH Tukang Listrik 95000
L.03 0.02 OH Kepala Tukang 110000
L.04 0.005 OH Mandor 100000
B BAHAN
1 Buah Saklar Tunggal 10000
C PERALATAN
D Jumlah A + B + C
Pemasangan Saklar
7 A.4.5.2.7 1 Buah
Ganda
(Bikinan) A TENAGA
L.01 0.1 OH Pekerja 75000
L.02 0.2 OH Tukang Listrik 95000
L.03 0.02 OH Kepala Tukang 110000
L.04 0.005 OH Mandor 100000
B BAHAN
1 Buah Saklar Ganda 13500
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
A TENAGA
L.01 3 OH Pekerja 75000
L.02 4.5 OH Tukang Batu 95000
L.03 0.05 OH Kepala Tukang 110000
L.04 0.9 OH Mandor 100000
B BAHAN
1 Buah Bak Fiberglass 275000
0.12 - Perlengkapan 12% Bak Fiberglass 275000
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A TENAGA
L.01 0.015 OH Pekerja 75000
L.02 0.15 OH Tukang Kayu 95000
L.03 0.015 OH Kepala Tukang 110000
L.04 0.00075 OH Mandor 100000
B BAHAN
1.1 m2 Kaca Cermin 40x60 cm 275000
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
IX PEKERJAAN CAT-CATAN
1 A.4.7.1.10 1 m2 Pengecatan Tembok
A TENAGA
L.01 0.02 OH Pekerja 75000
L.02 0.063 OH Tukang Cat 95000
L.03 0.0063 OH Kepala Tukang 110000
L.04 0.003 OH Mandor 100000
B BAHAN
0.1 kg Plamir 20000
0.1 kg Cat Dasar 12000
0.26 kg Cat Penutup 2 Kali 23000
C PERALATAN
D Jumlah A + B + C
Pengecatan Listplank
3 A.4.7.1.4 1 m2
Kayu
A TENAGA
L.01 0.07 OH Pekerja 75000
L.02 0.009 OH Tukang Cat 95000
L.03 0.006 OH Kepala Tukang 110000
L.04 0.003 OH Mandor 100000
B BAHAN
0.2 kg Cat Menie 23000
0.15 kg Plamuur 25000
0.17 kg Cat Dasar 36500
0.26 kg Cat Penutup 55000
0.01 buah Kuas 14000
0.03 kg Pengencer 10000
0.2 lbr Ampelas 3500
C PERALATAN
D Jumlah A + B + C
Pemasangan Saluran
2 A.5.1.1.35 1 m'
Buis Beton ø 20
A TENAGA
L.01 0.14 OH Pekerja 75000
L.02 0.07 OH Tukang Batu 95000
L.03 0.007 OH Kepala Tukang 110000
L.04 0.007 OH Mandor 100000
B BAHAN
1.1 bh pipa beton 35000
0.027 m3 Batu Bata 435000
3.92 kg Semen Portlan 1050
0.056 m3 Pasir Pasang 315000
0.024 m3 Pasir Urug 160000
C PERALATAN
D Jumlah A + B + C
Pemasangan Bak
3 A.5.1.1.16 1 Buah
Kontrol 45x45
A TENAGA
L.01 3.2 OH Pekerja 75000
L.02 1.15 OH Tukang Batu 95000
L.03 0.011 OH Kepala Tukang 110000
L.04 0.016 OH Mandor 100000
B BAHAN
70 buah Batu Bata 580
77 kg Portland Semen 1050
0.13 m3 Pasir Pasang 315000
0.09 m3 Pasir Beton 350000
0.02 m3 Kerikil 240000
1.6 kg Baja Tulangan 13037,20
C PERALATAN
D Jumlah A + B + C
II SEPTICTANK+PERESAPAN
Pemasangan Pipa PVC
1 A.5.1.1.25 1 m'
tipe AW Ø ½"
A TENAGA
L.01 0.036 OH Pekerja 75000
L.02 0.06 OH Tukang Batu 95000
L.03 0.006 OH Kepala Tukang 110000
L.04 0.002 OH Mandor 100000
B BAHAN
1.2 m' Pipa PVC Ø ½" 7,000.00
0.35 Ls Perlengkapan 35% x pipa 7,000.00
C PERALATAN
D Jumlah A + B + C
Pemasangan Lapisan
3 A.2.3.1.13 1 m2
Ijuk
A TENAGA
L.01 0.15 OH Pekerja 75000
L.04 0.015 OH Mandor 100000
B BAHAN
6 kg Ijuk 7000
C PERALATAN
D Jumlah A + B + C
Urugan Kerikil+Batu
4 A.2.3.1.11a 1 m3
Pecah
(Bikinan) A TENAGA
L.01 0.3 OH Pekerja 75000
L.04 0.01 OH Mandor 100000
B BAHAN
1.2 m3 Kerikil 180000
1.2 m3 Batu Pecah 260000
C PERALATAN
D Jumlah A + B + C
12,000,000.000
12,500.000
7,500.000
5,000.000
12,500.000
1,250.000
13,750.000
135,588.200
7,500.000
9,500.000
1,100.000
500.000
104,662.000
60,612.000
300.000
43,750.000
123,262.000
12,326.200
135,588.200
13,750,000
1,000,000
2,200,000
AP
93995
85450
78750
6700
85450
8545
93995
15583
42500
37500
5000
42500
4250
46750
257812.5
21250
18750
2500
216000
237250
23725
260975
896917.59
111800
90000
19000
2200
600
703579.63
241500
223250
235829.63
3000
815379.63
81537.96
896917.59
130372
13070
5250
6650
770
400
105450
102900
2550
118520
118520
130372
130372
13070
5250
6650
770
400
105450
102900
2550
118520
11852
130372
170016
69160
39000
24700
2860
2600
85400
80000
4500
900
154560
15456
170016
181016
69160
39000
24700
2860
2600
95400
90000
4500
900
164560
16456
181016
369264,5
87780
49500
31350
3630
3300
24915
80000
6000
1800
75765
42350
42000
335695
33569,50
369264,50
385932,80
87,780.00
49,500.00
31,350.00
3,630.00
3,300.00
263,068.00
80000
60000
1800
90918
42350
42000
350848
35084,80
385932,80
461664,50
87780
49500
31,350.00
3,630.00
3,300.00
331915
80000
6000
1800
75765
42350
126000
419695
41969,50
461664,50
346769,50
87780
49500
31350
3630
3300
227465
60000
6000
1350
75765
42350
42000
315245
31524,50
346769,50
1077191,70
161255
123750
26125
3080
8300
818010,19
403200
173000
238585,19
3225
979625,19
97962,52
1077191,70
103900,50
34280
22275
3135
3135
3135
1100
1500
60175
9870
300
35280
850
5775
3150
4950
94455
9445,50
103900,50
25910,50
1800
1500
300
22000
22000
23800
2380
26180
189725,80
63850
15000
42750
1100
5000
108628
21576
27900
9800
5600
37800
5952
172478
17247,80
189725,80
138935
20055
11250
7125
880
800
106250
106250
126305
12630
138935
112618
51400
30000
19000
2200
200
50980
32500
8400
10080
102380
10238
112618
35475
24000
22500
1500
8250
8250
32250
3225
35475
58384,33
20785
6075
12825
1485
400
32291,67
25000
7291,67
53076,67
5307,67
58384,33
64570,50
35950
18750
14250
1650
1300
22750
22000
750
58700
5870,50
64570,50
149380
29200
7500
19000
2200
500
106600
105300
1300
135800
13580
149380
TUR
892171,50
199500
112500
71250
8250
7500
511565
312000
122850
176715
811065
81106
892171,50
533346
103740
58500
37050
4290
3900
381210
312000
69120
484860
48486,50
533346
237050
23500
22500
1000
192000
192000
215500
21550
237050
235028,75
69200
45000
19000
2200
3000
144462,50
81200
34597,50
28665
213662,50
21366,25
235028,75
113177,35
34600
22500
9500
1100
1500
68288,50
40600
15088,50
12600
102888,50
10288,85
113177,35
109308,10
34600
22500
9500
1100
1500
64771
40600
8736
15435
99371
9937
109308,10
60840,78
39900
22500
14250
1650
1500
15409,80
8164,80
7245
55309,80
5530,98
60840,78
58345,98
39900
22500
14250
1650
1500
13141,80
4636,80
8505
53041,80
5304,18
58345,98
110542,30
7993
3225
4085
473
210
92500
88000
1500
3000
100493
10049,30
110542,30
127710
17100
1125
14250
1650
75
99000
99000
116100
11610
127710
175835
49850
750
47500
1100
500
110000
110000
159850
15985
175835
1374835
49850
750
47500
1100
500
1200000
1200000
1249850
124985
1374835
26152,50
17775
1125
14250
1650
750
6000
6000
23775
2377,50
26152,50
755287,50
398000
75000
285000
33000
5000
288625
288000
625
686625
68662,50
755287,50
225940
80000
75000
5000
125400
7400
95000
23000
205400
20540
225940
458320
91200
6000
76000
8800
400
350000
350000
441200
44120
456320
17435
11850
750
9500
1100
500
4000
4000
15850
1585
17435
33880
22800
1500
19000
2200
100
8000
8000
30800
3080
33880
810590
195250
78750
99750
11550
5200
541650
112500
426400
2750
736900
73690
810590
26422
20970
1500
19000
220
250,50
3050
2500
550
24020
2402
26422
134420
1200
1125
75
121000
121000
12220
12220
134420
178035
11850
750
9500
1100
500
150000
150000
161850
16185
178035
110542,30
7993
3225
4085
473
210
92500
88000
1500
3000
100493
10049,30
110542,30
109230,55
7993
3225
4085
473
210
92500
88000
1500
3000
100492
10049,20
110542,20
36107,50
17825
1125
14250
1650
800
15000
15000
32825
3282,50
36107,50
492726,3
7933
3250
4085
473
210
440000
440000
447933
44793,30
492726,30
33013,75
26600
15000
9500
1100
1000
3412,50
3412,50
30012,50
2001,25
33013,75
28997
10070
2250
6650
770
400
17200
17050
150
27270
2727
28997
15994
9350
3750
4750
550
300
5190
5040
150
14540
1454
15994
205584,50
93100
52500
33250
3850
3500
93795
50880
10920
17820
14175
186895
18689,50
205584,50
957528
161255
123750
26125
3080
8300
709225
253175
217250
229400
3225
870480
87048,50
957528
232754,50
119700
67500
42750
4950
4500
91895
55120
9765
21340
5670
211595
21159,50
232754,50
210619,51
93100
52500
32250
3850
3500
86423,06
57777,78
8599,50
17820
14175
191472,28
19147,23
210619,51
35702,70
16790
6750
8550
990
500
15667
13250
1197
945
275
32457
3245,70
35702,70
261208,75
93100
52500
33250
3850
3500
144362,50
121000
12337,50
11025
237462,50
23746,25
261208,75
87208
4150
3750
300
75130
75000
130
79280
7928
87208
12828,20
8478
1500
5985
963
300
4500
4500
11662
1166,20
12828,20
26,180.00
1800
1500
300
22000
22000
23800
2380
26180
54252
22320
9000
11400
1320
600
27000
27000
49320
4932
54252
156552
22320
9000
11400
1320
600
120000
120000
142320
14232
156552
1273052
22320
9000
11400
1320
600
1135000
1135000
1157320
115732
1273052
259100
50550
11250
28500
3300
7500
185000
185000
235550
23550
259100
46420
29200
7500
19000
2200
500
13000
13000
42200
4220
46420
43120
29200
7500
19000
2200
500
10000
10000
39200
3920
43120
46970
29200
7500
19000
2200
500
13500
13500
42700
4270
46970
602745
398500
75000
142500
165000
16000
149450
140000
6300
3150
547950
54795
602745
40535
11850
750
9500
1100
500
25000
25000
36850
3685
40535
75524,63
43650
750
38000
4400
500
25008,75
25000
8,75
68658,75
6865,88
75524,63
341605
35550
2250
28500
3300
1500
275000
225000
50000
310550
31055
341605
1161600
748000
225000
427500
5500
90000
308000
275000
33000
1056000
105600
1161600
351560
17100
1125
14250
1650
75
302500
302500
319600
31960
351560
19423,80
8478
1500
5985
693
300
9180
2000
1200
5980
17658
1765,80
19423,80
54562,20
10760
3000
5700
1760
300
38842
9150
22692
7000
49602
4960,20
54562,20
40766
7065
5250
855
660
300
29995
4600
3750
6205
14300
140
300
700
37060
3706
40766
19423,80
8478
1500
5985
693
300
9180
2000
1200
5980
17658
1765,80
19423,80
PENUNJANG
108832,20
18620
10500
6650
770
700
80541
43200
11745,50
4116
17640
3840
99161
9161
108832,20
103907,10
18620
10500
6650
770
700
75841
38500
11745
4116
17640
3840
94461
9446,10
103907,10
628781,47
352060
240000
109250
1210
1600
219559,52
40600
80850
40950
31500
4800
20859,52
571619,52
57161,95
628781,47
22121
9260
2700
5700
660
200
10850
8400
2450
20110
2011
22121
61336
9260
2700
5700
660
200
46500
36000
10500
55760
5576
61336
60225
12750
11250
1500
42000
42000
54750
5475
60225
606650
23500
22500
1000
528000
216000
312000
551500
55150
606650
A. Pekerjaan Persiapan
No Uraian Pekerjaan Vol Sat.
I PEKERJAAN PERSIAPAN :
1 Pembersihan lapangan 1128.68 m2
2 Pengukuran dan bouwplank 136.8 m
3 Penyediaan listrik & air kerja 1 ls
4 Papan nama proyek 1 ls
5 Administrasi proyek 1 ls
1 Sirtu 105.56 m3
2 Lantai kerja 1:3:5 bwh poor/sloof t = 5 cm 28.71 m3
3 Beton balok RIB 34.08 m3
4 Beton balok sloof 35.26 m3
5 Beton plat pondasi 48.29 m3
6 Beton kolom struktur 36.69 m3
7 Beton balok induk 64.13 m3
8 Beton balok anak 19.46 m3
9 Beton plat lantai 81.518 m3
10 Beton plat daak canopy 2.05 m3
11 Beton listplank 0.51 m3
12 Tangga beton 7.96 m3
13 Water proofing daak canopy 11.98 m2
II PEK.BETON BERTULANG LANTAI 2 :
1 Beton kolom struktur 11.15 m3
2 Beton balok ring atas 9.70 m3
3 Beton plat daak 3.97 m3
4 Water proofing daak 39.72 m2
VIII PEK.SANITAIR :
1 Closet jongkok warna tua 27 bh
2 Saringan air ( floor drain ) 27 bh
3 Kran air 53 bh
4 Meja pantry + wash bak 4 bh
5 Bak mandi Fiber 27 bh
6 Kaca cermin 40x60 tepi dibevel 27 bh
IX PEK. CAT-CATAN :
1 Cat tembok 2047.948 m2
2 Cat plafond 706.38 m2
3 Pelituran Daun Pintu 90.72 m2
1 Sirtu m3 257,812.50
2 Lantai kerja 1:3:5 bwh poor/sloof t = 5 cm m3 896,917.59
3 Beton balok RIB m3 3,132,742.69
4 Beton balok sloof m3 5,796,978.97
5 Beton plat pondasi m3 4,327,839.68
6 Beton kolom struktur m 3
8,089,599.31
7 Beton balok induk m 3
5,690,669.63
8 Beton balok anak m 3
6,835,121.83
9 Beton plat lantai m 3
6,202,881.27
10 Beton plat daak canopy m 3
12,827,500.20
11 Beton listplank m 3
4,269,676.32
12 Tangga beton m 3
7,249,775.96
13 Water proofing daak canopy m 2
25,910.50
II PEK.BETON BERTULANG LANTAI 2 :
1 Beton kolom struktur m3 18,960,699.34
2 Beton balok ring atas m3 2,324,430.11
3 Beton plat daak m3 6,581,466.10
4 Water proofing daak m2 25,910.50
I PEKERJAAN PERSIAPAN :
1 A.2.2.1.9 Pembersihan lapangan 1128.68 m2
2 A.2.2.1.4 Pengukuran dan bouwplank 136.8 m'
3 LS Penyediaan listrik & air kerja 1 ls
4 LS Papan nama proyek 1 ls
5 LS Administrasi proyek 1 ls
A. Pekerjaan Persiapan
a. PEK. TANAH :
1 A.2.3.1.3 Galian Tanah 1409.435 m3
2 A.2.3.1.9 Urugan kembali 469.81 m3
IV PEK. PLAFOND :
1 A.4.4.2.27 Plafond exspose aci 135.65 m2
2 A.4.5.1.1 Plafond asbes plat 614.24 m2
3 A.4.5.1.9 List tepi kayu profil 909 m'
VI PEK. PENERANGAN :
1 A.4.5.2.1 Lampu SL 18 W 106 bh
2 A.4.5.2.2 Down light SL 18 W 67 bh
3 A.4.5.2.3 Lampu baret 40 W 2 bh
4 A.4.5.2.4 Ceiling fan 27 bh
5 A.4.5.2.5 Stop kontak 200 W 56 bh
6 A.4.5.2.6 Saklar tunggal 28 bh
7 A.4.5.2.7 Saklar ganda 53 bh
VIII PEK.SANITAIR :
1 A.5.1.1.2 Closet jongkok warna tua 27 bh
2 A.5.1.1.14 Saringan air ( floor drain ) 27 bh
3 A.5.1.1.19 Kran air 53 bh
4 A.5.1.1.12 Meja pantry + wash bak 4 bh
5 A.5.1.1.7 Bak mandi Fiber 27 bh
6 A.4.6.2.18 Kaca cermin 40x60 tepi dibevel 27 bh
IX PEK. CAT-CATAN :
V PEK. PENERANGAN :
1 A.4.5.2.1 Lampu SL 18 W 104 bh
2 A.4.5.2.2 Down light SL 18 W 54 bh
3 A.4.5.2.3 Lampu baret 40 W 0 bh
4 A.4.5.2.4 Ceiling fan 26 bh
5 A.4.5.2.5 Stop kontak 200 W 54 bh
6 A.4.5.2.6 Saklar tunggal 24 bh
7 A.4.5.2.7 Saklar ganda 52 bh
VI PEK.SANITAIR :
1 A.5.1.1.2 Closet jongkok warna tua 26 bh
2 A.5.1.1.14 Saringan air ( floor drain ) 26 bh
3 A.5.1.1.19 Kran air 52 bh
4 A.5.1.1.12 Meja pantry + wash bak 0 bh
5 A.4.6.2.18 Kaca cermin 40x60 tepi dibevel 26 bh
6 A.5.1.1.7 Bak mandi Fiber 26 bh
IX PEK. CAT-CATAN :
a. PEK. SALURAN
1 A.5.1.1.35a Saluran terbuka U 20 171.45 m'
2 A.5.1.1.35 Saluran buis beton ø 20 2.073 m'
3 A.5.1.1.16 Bak kontrol 45x45 33 bh
8 Septictank =
D. Pekerjaan Halaman dan Bangunan Penunjang
A. Pekerjaan Persiapan
B. Pekerjaan Struktur dan Atap
C. Pekerjaan Finishing Arsitektur
D. Pekerjaan Halaman dan Bangunan Penunjang
Jumlah
Dibulatkan
PPn 10%
Total
Harga Satuan (Rp) Jumlah Harga (Rp) Jumlah (Rp) Bobot
C
KOEFISIEN
No URAIAN PEKERJAAN VOLUME
Pekerja Mandor Tk. Kayu Tk. Besi
I PEKERJAAN SALURAN
1 Saluran terbuka U 20 171.45 0.14 0.007 0 0
2 Saluran buis beton ø 20 2.073 0.14 0.007 0 0
3 Bak kontrol 45x45 33 3.2 0.016 0 0
II PEKERJAAN SALURAN
1 Galian tanah 36.682 1.05 0.067 0 0
2 Urugan tanah kembali 10.14 0.5 0.05 0 0
3 Pasir urug 2.208 0.3 0.01 0 0
4 Aanstamping 15.064 0.78 0.039 0 0
5 Beton bertulang (plat dasar,tutup) 12.64 1.65 0.083 0 0
6 Dinding bata 1:3 117.395 0.3 0.015 0 0
7 Plesteran 1:3 234.79 0.3 0.015 0 0
8 Pipa hawa ø 1½" GIP 8 0.036 0.002 0 0
9 Pipa PVC dia.4" 13 0.036 0.002 0 0
10 Ijuk 1.295 0.15 0.015 0 0
11 Kerikil+batu pecah 0.365 0.3 0.01 0 0
12 Sirtu 4.8 0.25 0.025 0 0
kolom
1.650 0.083
0.660 0.033
0.000 0.000
0.007 0.004
2.317 0.120
1.650
0.007
0.070
1.727
KOEFISIEN KOEFISIEN
Tk. Batu Tk. Cat Tk. Las Tk. Listrik K. Tukang Pekerja Mandor Tk. Kayu Tk. Besi
0 0 0 0 0 112.868 56.434 0 0
0 0 0 0 0.01 13.68 6.84 13.68 0
0 0 0 0 0 1479.907 94.432
0 0 0 0 0 234.906 23.491
KOEFISIEN KOEFISIEN
Tk. Batu Tk. Cat Tk. Las Tk. Listrik K. Tukang Pekerja Mandor Tk. Kayu Tk. Besi
0.275 0.028
0.330 0.033
0.000 0.000
0.070 0.007
0.330 0.070 0.275 0.000 0.000 0.000 0.068
KOEFISIEN KINERJA SDM
DURASI
Tk. Batu Tk. Cat Tk. Las Tk. Listrik K. Tukang Total SDM Pembulatan SDM/Hari
23030 18000
127.94444
0.070 0.007
22946.426
127.48014
RJA SDM
Pembulatan
22
18
79
37
8
30
18
10
7
24
16
8
49
11
31
20
15
58
15
7
17
70
12
10
5
56
5
3
21
44
52
1
20
1
1
6
1
6
17
2
6
1
3
77
9
3
14
3
9
1
2
1
26
33
1
2
8
10
23
RJA SDM
Pembulatan
25
30
2
48
2
22
48
32
76
16
9
52
44
43
14
2
31
3
1
15
21
10
1
35
43
6
14
21
1
11
46
44
14
13
22
37
30
39
57
34
18
8
2
14
9
1
8
10
10
9
29
4
25
2
58
2
13
10
6
6
29
12
47
19
39
32
17
24
19
1
4
3
43
14
7
24
4
2
11
32
17
36
48
10
6
11
7
0
16
13
25
17
13
4
8
#DIV/0!
5
28
31
22
4
6
RJA SDM
Pembulatan
39
1
37
14
3
1
19
13
13
13
1
1
1
1
2
5030
No Jenis Pekerjaan Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15 Minggu 16 Minggu 17 Minggu 18 Minggu 19 Minggu 20 Minggu 21 Minggu 22 Minggu 23 Minggu 24 Minggu 25 Minggu 26
Durasi
I PEKERJAAN PERSIAPAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153
1 Pembersihan lapangan 8
2 Pengukuran dan Bouwplank 2
3 Penyediaan listrik & air kerja 180
4 Papan nama proyek 1
5 Administrasi proyek 180
II PEKERJAAN TANAH
1 Galian Tanah 20
2 Urugan Kembali 7
III PEKERJAAN BETON BERTULANG
a STRUKTUR LANTAI 1
1 Sirtu 2
2 Lantai Kerja 2
3 Beton Balok RIB 4
Penulangan Ulir 3
Penulangan Polos 3
4 Beton Balok Sloof 3
Penulangan Ulir 3
Penulangan Polos 3
Bekisting 6
5 Beton Plat Pondasi 9
Bekisting 11
Penulangan Polos 3
6 Beton Kolom Struktur 5
Bekisting 8
Penulangan Ulir 3
Penulangan Polos 3
7 Beton Balok Induk 8
Bekisting 8
Penulangan Ulir 3
Penulangan Polos 3
8 Beton Balok Anak 8
Bekisting 4
Penulangan Ulir 3
Penulangan Polos 3
9 Beton Plat Lantai 8
Bekisting 10
Penulangan Polos 3
10 Beton Plat Daak Canopy 5
Bekisting 3
Penulangan Polos 1
11 Beton Listplank 2
Bekisting 1
Penulangan Polos 1
12 Tangga Beton 3
Bekisting 5
Penulangan Ulir 3
Penulangan Polos 2
13 Water Proofing Daak Canopy 1
b STRUKTUR LANTAI 2
1 Beton Kolom Struktur 8
Bekisting 6
Penulangan Ulir 3
2 Beton Balok Ring Atas 8
Bekisting 4
Penulangan Ulir 3
3 Beton Plat Daak 1
Bekisting 4
Penulangan Ulir 3
4 Water Proofing Daak 1
IV PEKERJAAN RANGKA DAN ATAP
1 Kuda - kuda Baja Ringan (lengkap) 33
2 Atap Genteng Keramik Glasur 8
3 Bubungan Genteng Keramik Glasur 2
4 Ornamen Puncak Atap 1
5 Corong Ta lang ø3" PVC 2
6 Listplank Kayu Bengkirai 2x2/20 4
7 Flashing Atap 5
I PEKERJAAN FINISHING ARSITEKTUR LANTAI 1
a Pekerjan Pondasi Batu Belah
1 Pondasi Batu Belah 1:6 17
2 Aanstamping 4
3 Urug Pasir Bawah Pondasi + Urug Pasir Bawah Rolag 3
4 Urugan Tanah Peninggian Bangunan 5
b Pekerjaan Pas. Bata / Plesteran
1 Pas. Rollag 1:3 3
2 Pas. Batu Bata 1:3 11
3 Pas. Batu Bata 1:6 12
4 Plesteran 1:3 17
5 Plesteran 1:6 17
6 Plesteran Beton 3
7 Beton Praktis Sloof 5
8 Beton Praktis Kolom 32
9 Beton Praktis Balok Latei 13
c Pekerjaan Pas. Kosen
1 Kosen Aluminium 4" 2
2 Kaca Bening 5mm 1
3 Kaca Raam Jendela 1
4 Kunci Tanam 1
5 Floor Hinges 1
6 Kunci Raam Aluminium 1
7 Engsel Pintu 2
8 Daun Pintu Double Teakwood 6
9 Pintu PVC lengkap, engsel, kunci, kusen 3
10 Pintu Raam Aluminium 1
11 Sun Screen Hollow Finish Cat 5
12 Raam Jendela Aluminium 2
13 Engsel Jendela 2
14 Gerendel 2
15 Raam Skor 1
16 Pintu Shaft Besi 40/60 (lengkap) 5
17 Ralling Tangga Pipa Hitam Finish Cat 2
18 Ralling Depan Tralis Besi Finish Cat 1
d Pekerjaan Plafond
1 Plafond Expose Aci 1
2 Plafond Asbes Plat 5
3 List Tepi Kayu Profil 8
e Pek. Pasang Lantai Dan Dinding
1 Urug Pasir Bawah Lantai 1
2 Lantai Rabat Beton Tritisan 1
3 Lantai Keramik 20x20 cm Lavatory 3
4 Dinding Keramik 20x25 cm Lavatory 7
5 Lt. Keramik Warna 40/40 cm 13
6 Lt. Keramik Warna U. Tangga 40/40cm 1
7 Plint Lantai Jeglok Finish Cat Minyak 3
8 Batu Tempel Dinding Canopy 3
9 Nosing Tangga 1
f Pekerjan Penerangan
1 Lampu SL 18W 2
2 Down Light SL 18W 2
3 Lampu Baret 40W 1
4 Ceiling Fan 2
5 Stop Kontak 200W 2
6 Saklar Tunggal 1
7 Saklar Ganda 2
g Pekerjaan Sanitair
1 Closet Jongkok Warna Tua 4
2 Saringan air (floor drain) 1
3 Kran air 1
4 Meja pantry + wash bak 1
5 Bak Mandi Fiber + Keramik 20/25 4
6 Kaca Cermin 40x60 Tepi Dibevel 3
h Pekerjaan Cat - Catan
1 Cat Tembok 15
2 Cat Plafond 7
3 Pelituran Daun Pintu 2
II PEKERJAAN FINISHING ARSITEKTUR LANTAI 2
a Pek. Pas. Bata/Plesteran, Kolom Prakris
1 Pas. Batu Bata 1:3 15
2 Pas, Batu Bata 1:6 20
3 Plesteran 1:3 17
4 Plesteran 1:6 28
5 Plesteran beton 6
6 Beton Praktis Kolom 18
7 Beton Praktis Balok Latei 17
b Pekerjaan Pasangan Kusen
1 Kusen Aluminium 4' 4
2 Raam Jendela Aluminium 2
3 Kaca Bening 5mm 1
4 Kaca Boven 5mm 1
5 Kunci Tanam 9
6 Engsel Pintu 9
7 Daun Pintu Double Teakwood 9
8 Pintu PVC lengkap kunci engsel, kusen 2
9 Sun Screen Hollow Finish Cat 4
10 Engsel Jendela 2
11 Gerendel 6
12 Raam Skor 3
c Pekerjaan Plafond
1 Plafond Asbes Plat 7
2 List Tepi Kayu Profil 3
d Pek. Pas. Lantai dan Dinding
1 Lt. Keramik 20x20cm Lavatory 4
2 Dinding Keramik 20cmx25cm Lavatory 10
3 Lantai Keramik Warna 40/40cm 12
4 Plint Lantai Jeglok Finish Cat Minyak 3
5 Waterproofing R Lavatory 1
e Pekerjaan Peneragan
1 Lampu SL 18W 4
2 Down Light SL 18W 2
3 Lampu Baret 40W 2
4 Ceiling Fan 2
5 Stop Kontak 200W 2
6 Saklar Tunggal 1
7 Saklar Ganda 1
f Pekeraan Sanitasi
1 Closet Jongkok Warna Tua 9
2 Saringan air (floor drain) 1
3 Kran air 3
4 Meja pantry + wash bak 0
5 Kaca Cermin 40x60 Tepi Dibevel 1
6 Bak Mandi Fiber + Keramik 20/25 8
g Pekerjaan Cat-Catan
1 Cat Tembok 9
2 Cat Plafond 3
3 Pelituran Daun Pintu 3
4 Cat Listplank Kayu 1
I PEKERJAAN SALURAN
1 Saluran terbuka U 20 1
2 Saluran buis beton ø 20 1
3 Bak kontrol 45x45 4
II PEKERJAAN SALURAN
1 Galian tanah 3
2 Urugan tanah kembali 2
3 Pasir urug 1
4 Aanstamping 1
5 Beton bertulang (plat dasar,t utup) 2
6 Dinding bata 1:3 4
7 Plesteran 1:3 9
8 Pipa hawa ø 1½" GIP 1
9 Pipa PVC dia.4" 1
10 Ijuk 1
11 Kerikil+batu pecah 1
12 Sirtu 1
Minggu 26 Minggu 27 Minggu 28 Minggu 29 Minggu 30
154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180
No Jenis Pekerjaan Minggu 1
Volume Durasi Total SDM SDM/hari
I PEKERJAAN PERSIAPAN 1
1 Pembersihan lapangan 8 170 21 21
2 Pengukuran dan Bouwplank 2 36 18
3 Penyediaan listrik & air kerja 180 180 1 1
4 Papan nama proyek 1 1 1
5 Administrasi proyek 180 180 1 1
II PEKERJAAN TANAH
1 Galian Tanah 20 1575 79
2 Urugan Kembali 7 259 37
III PEKERJAAN BETON BERTULANG
a STRUKTUR LANTAI 1
1 Sirtu 2 30 15
2 Lantai Kerja 2 59 30
3 Beton Balok RIB 4 70 18
Penulangan Ulir 3 29 10
Penulangan Polos 3 19 6
4 Beton Balok Sloof 3 72 24
Penulangan Ulir 3 46 15
Penulangan Polos 3 24 8
Bekisting 6 294 49
5 Beton Plat Pondasi 9 99 11
Bekisting 11 334 30
Penulangan Polos 3 60 20
6 Beton Kolom Struktur 5 75 15
Bekisting 8 462 58
Penulangan Ulir 3 45 15
Penulangan Polos 3 21 7
7 Beton Balok Induk 8 131 16
Bekisting 8 554 69
Penulangan Ulir 3 35 12
Penulangan Polos 3 29 10
8 Beton Balok Anak 8 40 5
Bekisting 4 222 56
Penulangan Ulir 3 15 5
Penulangan Polos 3 7 2
9 Beton Plat Lantai 8 166 21
Bekisting 10 431 43
Penulangan Polos 3 155 52
10 Beton Plat Daak Canopy 5 5 1
Bekisting 3 60 20
Penulangan Polos 1 1 1
11 Beton Listplank 2 2 1
Bekisting 1 6 6
Penulangan Polos 1 1 1
12 Tangga Beton 3 17 6
Bekisting 5 83 17
Penulangan Ulir 3 4 1
Penulangan Polos 2 12 6
13 Water Proofing Daak Canopy 1 1 1
b STRUKTUR LANTAI 2
1 Beton Kolom Struktur 8 23 3
Bekisting 6 462 77
Penulangan Ulir 3 26 9
2 Beton Balok Ring Atas 8 20 3
Bekisting 4 53 13
Penulangan Ulir 3 7 2
3 Beton Plat Daak 1 9 9
Bekisting 4 4 1
Penulangan Ulir 3 4 1
4 Water Proofing Daak 1 1 1
IV PEKERJAAN RANGKA DAN ATAP
1 Kuda - kuda Baja Ringan (lengkap) 33 843 26
2 Atap Genteng Keramik Glasur 8 263 33
3 Bubungan Genteng Keramik Glasur 2 2 1
4 Ornamen Puncak Atap 1 2 2
5 Corong Talang ø3" PVC 2 16 8
6 Listplank Kayu Bengkirai 2x2/20 4 39 10
7 Flashing Atap 5 115 23
I PEKERJAAN FINISHING ARSITEKTUR LANTAI 1
a Pekerjan Pondasi Batu Belah
1 Pondasi Batu Belah 1:6 17 422 25
2 Aanstamping 4 119 30
3 Urug Pasir Bawah Pondasi + Urug Pasir Bawah Rolag 3 6 2
4 Urugan Tanah Peninggian Bangunan 5 238 48
b Pekerjaan Pas. Bata / Plesteran
1 Pas. Rollag 1:3 3 6 2
2 Pas. Batu Bata 1:3 11 237 22
3 Pas. Batu Bata 1:6 12 567 47
4 Plesteran 1:3 17 534 31
5 Plesteran 1:6 17 1281 75
6 Plesteran Beton 3 48 16
7 Beton Praktis Sloof 5 44 9
8 Beton Praktis Kolom 32 1662 52
9 Beton Praktis Balok Latei 13 560 43
c Pekerjaan Pas. Kosen
1 Kosen Aluminium 4" 2 86 43
2 Kaca Bening 5mm 1 14 14
3 Kaca Raam Jendela 1 2 2
4 Kunci Tanam 1 31 31
5 Floor Hinges 1 3 3
6 Kunci Raam Aluminium 1 1 1
7 Engsel Pintu 2 30 15
8 Daun Pintu Double Teakwood 6 122 20
9 Pintu PVC lengkap, engsel, kunci, kusen 3 29 10
10 Pintu Raam Aluminium 1 1 1
11 Sun Screen Hollow Finish Cat 5 172 34
12 Raam Jendela Aluminium 2 86 43
13 Engsel Jendela 2 11 6
14 Gerendel 2 27 14
15 Raam Skor 1 21 21
16 Pintu Shaft Besi 40/60 (lengkap) 5 5 1
17 Ralling Tangga Pipa Hitam Finish Cat 2 21 11
18 Ralling Depan Tralis Besi Finish Cat 1 46 46
d Pekerjaan Plafond
1 Plafond Expose Aci 1 44 44
2 Plafond Asbes Plat 5 69 14
3 List Tepi Kayu Profil 8 99 12
e Pek. Pasang Lantai Dan Dinding
1 Urug Pasir Bawah Lantai 1 22 22
2 Lantai Rabat Beton Tritisan 1 37 37
3 Lantai Keramik 20x20 cm Lavatory 3 88 29
4 Dinding Keramik 20x25 cm Lavatory 7 273 39
5 Lt. Keramik Warna 40/40 cm 13 740 57
6 Lt. Keramik Warna U. Tangga 40/40cm 1 34 34
7 Plint Lantai Jeglok Finish Cat Minyak 3 52 17
8 Batu Tempel Dinding Canopy 3 23 8
9 Nosing Tangga 1 2 2
f Pekerjan Penerangan
1 Lampu SL 18W 2 28 14
2 Down Light SL 18W 2 18 9
3 Lampu Baret 40W 1 1 1
4 Ceiling Fan 2 15 8
5 Stop Kontak 200W 2 19 10
6 Saklar Tunggal 1 10 10
7 Saklar Ganda 2 18 9
g Pekerjaan Sanitair
1 Closet Jongkok Warna Tua 4 113 28
2 Saringan air (floor drain) 1 4 4
3 Kran air 1 25 25
4 Meja pantry + wash bak 1 2 2
5 Bak Mandi Fiber + Keramik 20/25 4 229 57
6 Kaca Cermin 40x60 Tepi Dibevel 3 5 2
h Pekerjaan Cat - Catan
1 Cat Tembok 15 190 13
2 Cat Plafond 7 66 9
3 Pelituran Daun Pintu 2 11 6
II PEKERJAAN FINISHING ARSITEKTUR LANTAI 2
a Pek. Pas. Bata/Plesteran, Kolom Prakris
1 Pas. Batu Bata 1:3 15 89 6
2 Pas, Batu Bata 1:6 20 574 29
3 Plesteran 1:3 17 201 12
4 Plesteran 1:6 28 1295 46
5 Plesteran beton 6 109 18
6 Beton Praktis Kolom 18 701 39
7 Beton Praktis Balok Latei 17 528 31
b Pekerjaan Pasangan Kusen
1 Kusen Aluminium 4' 4 66 17
2 Raam Jendela Aluminium 2 48 24
3 Kaca Bening 5mm 1 19 19
4 Kaca Boven 5mm 1 1 1
5 Kunci Tanam 9 28 3
6 Engsel Pintu 9 20 2
7 Daun Pintu Double Teakwood 9 122 14
8 Pintu PVC lengkap kunci engsel, kusen 2 28 14
9 Sun Screen Hollow Finish Cat 4 25 6
10 Engsel Jendela 2 48 24
11 Gerendel 6 24 4
12 Raam Skor 3 4 1
c Pekerjaan Plafond
1 Plafond Asbes Plat 7 74 11
2 List Tepi Kayu Profil 3 94 31
d Pek. Pas. Lantai dan Dinding
1 Lt. Keramik 20x20cm Lavatory 4 66 17
2 Dinding Keramik 20cmx25cm Lavatory 10 360 36
3 Lantai Keramik Warna 40/40cm 12 574 48
4 Plint Lantai Jeglok Finish Cat Minyak 3 30 10
5 Waterproofing R Lavatory 1 6 6
e Pekerjaan Peneragan
1 Lampu SL 18W 4 41 10
2 Down Light SL 18W 2 14 7
3 Lampu Baret 40W 2 15 8
4 Ceiling Fan 2 32 16
5 Stop Kontak 200W 2 26 13
6 Saklar Tunggal 1 25 25
7 Saklar Ganda 1 17 17
f Pekeraan Sanitasi
1 Closet Jongkok Warna Tua 9 109 12
2 Saringan air (floor drain) 1 4 4
3 Kran air 3 24 8
4 Meja pantry + wash bak 0 0 0
5 Kaca Cermin 40x60 Tepi Dibevel 1 5 5
6 Bak Mandi Fiber + Keramik 20/25 8 220 28
g Pekerjaan Cat-Catan
1 Cat Tembok 9 276 31
2 Cat Plafond 3 66 22
3 Pelituran Daun Pintu 3 11 4
4 Cat Listplank Kayu 1 6 6
I PEKERJAAN SALURAN
1 Saluran terbuka U 20 1 39 39
2 Saluran buis beton ø 20 1 1 1
3 Bak kontrol 45x45 4 145 36
II PEKERJAAN SALURAN
1 Galian tanah 3 41 14
2 Urugan tanah kembali 2 6 3
3 Pasir urug 1 1 1
4 Aanstamping 1 19 19
5 Beton bertulang (plat dasar,tutup) 2 26 13
6 Dinding bata 1:3 4 50 13
7 Plesteran 1:3 9 113 13
8 Pipa hawa ø 1½" GIP 1 1 1
9 Pipa PVC dia.4" 1 1 1
10 Ijuk 1 1 1
11 Kerikil+batu pecah 1 1 1
12 Sirtu 1 2 2
23
140
Minggu 1 Minggu 2 Minggu 3 Minggu 4
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
21 21 21 22 22 21 21
18 18
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
55 55 60 70 70 70 70 70 70 75 75 75
23 23 23 24 24 42 41 57 57 62 72 72 72 72 72 72 77 77 77
140 259 432 462
350
300
250
200
150
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1
2000
1800
1600
1400
1200
2000
1800
1600
1400
1200
1000
800
600
400
200
0
1 2 3 4 5 6 7 8 9 10 11 12 13
Minggu 4 Minggu 5 Minggu 6 Minggu 7
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
75 75 75 77 77 77 76 76 76 76
15 15
30 29
11 11
31 31 31 31 30
20 20 20
24 24
33 28 29 29
2 2 2
77 77 77 79 79 79 78 78 78 78 19 19 34 64 81 82 82 68 67
462 471 295 433
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Minggu 7 Minggu 8 Minggu 9 Minggu 10
40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
58 63 21 31 32
18 18 17 17
10 10 9
6 6 7
24 24 24
15 15 16
8 8 8
40 40 63 57 49 45
11 11 11 11 11 11 11
30 30 30 30 30 30
48 68 68
15 15 15
7 7 7
24 24 24 24 24 24 44 34 14 14 24 20 20 20 40
48 50 48 40
8 9 9 9
67 67 67 67 67 67 57 75 95 96 107 121 112 108 122 143 152 158 151
433 400 639 884
1 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
9 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 5
Minggu 10 Minggu 11 Minggu 12 Minggu 13
59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
32 22
15 15 15 15 15
48 57 57 58 58
24 15 10 10 10 26 26 10
69 69 69 69 69 69 60 80
12 12 11
10 10 9
5 5 5 5 5 5 5 5
50 74 73 25
5 5 5
2 2 3
52
2 2 2
21 21 21 21 21 22 22 22 22 22 22
37 52 52 37 47 47 47 47 47 37 47 70
25 25
85 60
9
59 85 72 50 79 63 40 40 40 53 70 90 100 79 110 16 19
50 60 67 40 53 40 31 30 40 30 49 40 30
43 43
17 25
10 10
38 36
48 38
1 1
44
14 14 14 14
39
1
30 36 36 43
14 14 13
1
19
13 13
8 30 6 6
47
158 246 252 252 259 279 290 292 296 294 296 292 289 294 296 276 293 292
884 1578 1759 1746
1 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74
Minggu 13 Minggu 14 Minggu 15 Minggu 16
77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
9 15 15 20 20 29 29 29
43 43 43 44 43 43 43 43 43 43
62 52 41
1 1 1 1 1
20 20 20
1
1 1
6
1
6 6
17 17 17 16 16
1 1 2
6 6
1
3 3 3
77 77 77 77 77 77
9 9 8
25 25 36 36 47 30 30 45 45 27 26 26 26 30 30
56 42 51 85 115 85 110 110 105 70 46 70 70 60 61
16 16 16
15 25 35 50 39 39 46 50 48 40 40 65 65 20 20
14
2
31
3
1
15 15
15 16 24 25
9
1
28 45 25
6 5
14 13
21
1 1 1
11 10
46
13
5 10 10 10 15 10 16 23
22
37
20 53 15
30 20 50 52 51 40
14 14
9 9
1
8 7
10 9
10
9 9
17 11 27 68 31 17 57 47 31 35
19 14 14 14 19 24 39 39 39 39
3 3
10 5 10 10 3 8 10 10
1
1
1
1
2
295 299 299 293 298 299 298 297 290 295 294 290 283 292 287 270 269 251 228
1746 1786 1749 1597
MAN POWER
1 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95
71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95
gu 16 Minggu 17 Minggu 18 Minggu 19
96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5
3 3 3 3 2
3 3 3 3 2 2 2 2
13 13 13 14
2 2 3
1 1
1 1 2
25 25 25
30
57 35 35 59 59 52 52 52 52 67 67 67 86
34
18 17 17
13 5 5
2
28 28 27 30
4
25
2
65 60 60 44
2 2 1
10 19 21 18 5 5 7 7 7 7 12 12 20 20 20
9
6 5
6 6 6 6 6 6 6 6 6 6 6
57 31 21 36 35 11 40 25 20 25 30
31 27 51 42 52 55 47 55
39 39 39 39 39 34 39
234 237 228 210 175 173 173 130 138 115 106 121 119 119 96 75 91 97 75
97 1257 783 597
91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 1
Mingguan
Mingguan
91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115
Minggu 20 Minggu 21 Minggu 22 Minggu
115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
9
1 1
25 25 25 25 25 25 25 25 25 25 25 25 26 26 26 26 26 26 26
9 9 9 10 10 10
6 6 6 5
30 29 29 30 20 20 20 20 45
10 10 13 13 12 12 20 6 6 6 10 25 18 10 10
47 47 52 52 36 55 52 52 56 52 52 32 52 52 52
1
73 72 80 73 115 114 112 112 120 94 99 85 90 86 90 85 98 90 90
488 651 534 526
111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134
111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135
Minggu 23 Minggu 24 Minggu 25 Minggu 26
134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
26 26 26 26 26 26 26 26 26 24 28
38 38 38 37 20 25 33 34
10 10
52 65 49 48 43 42 58 60 48 35 22 22 10
20 15 15 15 20 24
16 16 17 17
24 24
19
1
3 3 3 2 3 3 3
2 2 2 2 2 2 2
15 15 15 10 11 10 11
14 14
7 7 6 5
24 24
4 4 4 4
1 2 1
7 14 15 14 8 8 8
28 32 34
9 10 10 12
7 7
8 7
16 16
13 13
90 103 77 76 71 70 86 88 99 91 84 93 124 133 131 153 136 132 110
526 505 718 590
30 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 15
131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155
Minggu 26 Minggu 27 Minggu 28 Minggu 29
153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1
2
10 6
9 10 10 10
23 23 23 23 23
4 4
3 3
10 25
4 4
5 30 26
25 35 38 37 37 37 37 38 38 38
46 46 52 46 46 48
25
17
24 14 9 9 7 9 9 15
5
19 19 27 35 36 28 28 28
27 32 32 31
7 2 2
6
71 69 72 90 89 100 97 75 67 67 68 71 56 59 63 88 89 89 96
590 585 405 554
150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 1
1 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 17
Minggu 29 Minggu 30
172 173 174 175 176 177 178 179 180
170 0
36 0
1 1 1 1 1 1 1 1 1 180 0
1 0
1 1 1 1 1 1 1 1 1 180 0
0 0
1575 0
259 0
0 0
0 0
30 0
59 0
70 0
29 0
19 0
72 0
46 0
24 0
294 0
99 0
334 0
60 0
75 0
462 0
45 0
21 0
131 0
554 0
35 0
29 0
40 0
222 0
15 0
7 0
166 0
431 0
155 0
5 0
60 0
1 0
2 0
6 0
1 0
17 0
83 0
4 0
12 0
1 0
0 0
23 0
462 0
26 0
20 0
53 0
7 0
9 0
4 0
4 0
1 0
0 0
843 0
263 0
2 0
2 0
16 0
39 0
115 0
0 0
0 0
422 0
119 0
6 0
238 0
0 0
6 0
237 0
567 0
534 0
1281 0
48 0
44 0
1662 0
560 0
0 0
86 0
14 0
2 0
31 0
3 0
1 0
30 0
122 0
29 0
1 0
172 0
86 0
11 0
27 0
21 0
5 0
21 0
46 0
0 0
44 0
69 0
99 0
0 0
22 0
37 0
88 0
273 0
740 0
34 0
52 0
23 0
2 0
0 0
28 0
18 0
1 0
15 0
19 0
10 0
18 0
0 0
113 0
4 0
25 0
2 0
229 0
5 0
0 0
190 0
66 0
11 0
0 0
0 0
89 0
574 0
201 0
1295 0
110 -1
701 0
528 0
0 0
66 0
48 0
19 0
1 0
28 0
20 0
122 0
28 0
25 0
48 0
24 0
4 0
0 0
74 0
94 0
0 0
66 0
360 0
50 50 48 48 47 47 574 0
10 10 10 30 0
6 6 0
0 0
41 0
14 0
15 0
32 0
26 0
25 0
17 0
0 0
13 109 0
4 4 0
8 8 8 24 0
0 0
5 0
220 0
0 0
31 31 31 31 30 276 0
22 22 22 66 0
11 0
6 0
0 0
39 0
1 0
145 0
0 0
41 0
6 0
1 0
19 0
26 0
50 0
113 0
1 0
1 0
1 0
1 0
2 0
96 95 89 89 79 71 40 34 12 23148 129
554 325
170 171 172 173 174 175 176 177 178 179 180
172 173 174 175 176 177 178 179 180
NO Jenis Pekerjaan
volume Harga Satuan Harga Total Pek. Bobot
I PEKERJAAN PERSIAPAN
1 Pembersihan lapangan 1128.68 13750 15519350 0.26620
2 Pengukuran dan Bouwplank 136.8 135588.2 18548465.76 0.31816
3 Penyediaan listrik & air kerja 1 13750000 13750000 0.23585
4 Papan nama proyek 1 1000000 1000000 0.01715
5 Administrasi proyek 1 2200000 2200000 0.03774
II PEKERJAAN TANAH
1 Galian Tanah 1409.435 93995 132479842.825 2.27242
2 Urugan Kembali 469.812 15583.3333333 7321237 0.12558
III PEKERJAAN BETON BERTULANG
a STRUKTUR LANTAI 1
1 Sirtu 105.56 257812.5 27214687.5 0.46681
2 Lantai Kerja 28.71 896917.59 25750504.0089 0.44170
3 Beton Balok RIB 34.08 1,077,191.70 36710693.136 0.62970
Penulangan Ulir 3292.78 13,037.20 42928631.416 0.73635
Penulangan Polos 2080.55 13,037.20 27124546.46 0.46527
4 Beton Balok Sloof 35.26 1,077,191.70 37981779.342 0.65150
Penulangan Ulir 5182.58 13,037.20 67566331.976 1.15896
Penulangan Polos 2685.04 13,037.20 35005403.488 0.60045
Bekisting 352.72 181,016.00 63847963.52 1.09518
5 Beton Plat Pondasi 48.29 1,077,191.70 52017587.193 0.89226
Bekisting 401.42 170,016.00 68247822.72 1.17065
Penulangan Polos 6805.6 13,037.20 88725968.32 1.52191
6 Beton Kolom Struktur 36.69 1,077,191.70 39522163.473 0.67792
Bekisting 437.25 369,264.50 161460902.625 2.76953
Penulangan Ulir 5001.3 13,037.20 65202948.36 1.11842
Penulangan Polos 2348.77 13,037.20 30621384.244 0.52525
7 Beton Balok Induk 64.13 1,077,191.70 69080303.721 1.18493
Bekisting 524.53 385,932.80 202433331.584 3.47233
Penulangan Ulir 3871.75 13,037.20 50476779.1 0.86583
Penulangan Polos 3294.59 13,037.20 42952228.748 0.73676
8 Beton Balok Anak 19.46 1,077,191.70 20962150.482 0.35956
Bekisting 210.19 385,932.80 81119215.232 1.39144
Penulangan Ulir 1591 13,037.20 20742185.2 0.35579
Penulangan Polos 781.45 13,037.20 10187919.94 0.17475
9 Beton Plat Lantai 81.518 1,077,191.70 87810513.0006 1.50621
Bekisting 407.75 461,664.50 188243699.875 3.22894
Penulangan Polos 17610.55 13,037.20 229592262.46 3.93819
10 Beton Plat Daak Canopy 2.05 1,077,191.70 2208242.985 0.03788
Bekisting 56.75 411,664.50 23361960.375 0.40073
Penulangan Polos 55.7 13,037.20 726172.04 0.01246
11 Beton Listplank 0.51 1,077,191.70 549367.767 0.00942
Bekisting 5.28 300,932.80 1588925.184 0.02725
Penulangan Polos 3.01 13,037.20 39241.972 0.00067
12 Tangga Beton 7.96 1,077,191.70 8574445.932 0.14708
Bekisting 77.86 346,769.50 26999473.27 0.46312
Penulangan Ulir 365.1 13,037.20 4759881.72 0.08165
Penulangan Polos 1332.68 13,037.20 17374415.696 0.29802
13 Water Proofing Daak Canopy 11.98 25,910.50 310407.79 0.00532
b STRUKTUR LANTAI 2
1 Beton Kolom Struktur 11.15 1,077,191.70 12010687.455 0.20602
Bekisting 437.25 369,264.50 161460902.625 2.76953
Penulangan Ulir 2910.15 13,037.20 37940207.58 0.65079
2 Beton Balok Ring Atas 9.7 103,900.50 1007834.85 0.01729
Bekisting 125.35 90,863.00 11389677.05 0.19537
Penulangan Ulir 778.5 13,037.20 10149460.2 0.17409
3 Beton Plat Daak 3.97 1,077,191.70 4276451.049 0.07335
Bekisting 39.72 411,664.50 16351313.94 0.28047
Penulangan Ulir 421.92 13,037.20 5500655.424 0.09435
4 Water Proofing Daak 39.72 25,910.50 1029165.06 0.01765
IV PEKERJAAN RANGKA DAN ATAP
1 Kuda - kuda Baja Ringan (lengkap) 1186.88 149941 177961974.08 3.05258
2 Atap Genteng Keramik Glasur 1088.623 138935 151247836.505 2.59435
3 Bubungan Genteng Keramik Glasur 2.41 112618 271409.38 0.00466
4 Ornamen Puncak Atap 6 35475 212850 0.00365
5 Corong Talang ø3" PVC 68 58384.33 3970134.44 0.06810
6 Listplank Kayu Bengkirai 2x2/20 266.8 149380 39854584 0.68362
7 Flashing Atap 266.8 64570.5 17227409.4 0.29550
I PEKERJAAN FINISHING ARSITEKTUR LAN
a Pekerjan Pondasi Batu Belah
1 Pondasi Batu Belah 1:6 175.596 892171.5 156661746.714 2.68721
2 Aanstamping 94.99 533346 50662536.54 0.86901
Urug Pasir Bawah Pondasi + Urug Pasir
3 17.59 237050 4169709.5 0.07152
Bawah Rolag
4 Urugan Tanah Peninggian Bangunan 764.904 15583.3333333 11919754 0.20446
b Pekerjaan Pas. Bata / Plesteran
1 Pas. Rollag 1:3 6.3 235028.75 1480681.125 0.02540
2 Pas. Batu Bata 1:3 556.2 113177.35 62949242.07 1.07977
3 Pas. Batu Bata 1:6 1334.02 109308.1 145819191.562 2.50123
4 Plesteran 1:3 1112.4 60840.78 67679283.672 1.16090
5 Plesteran 1:6 2668.04 58345.98 155669408.4792 2.67019
6 Plesteran Beton 99.6 60840.78 6059741.688 0.10394
7 Beton Praktis Sloof 21.174 200414.5 4243576.623 0.07279
8 Beton Praktis Kolom 816 176203.51 143782064.16 2.46629
9 Beton Praktis Balok Latei 274.6 286262.58 78607704.468 1.34836
c Pekerjaan Pas. Kosen
1 Kosen Aluminium 4" 928.6 110542.3 102649579.78 1.76075
2 Kaca Bening 5mm 74.192 127710 9475060.32 0.16253
3 Kaca Raam Jendela 10.01 134420 1345544.2 0.02308
4 Kunci Tanam 59 175835 10374265 0.17795
5 Floor Hinges 4 1374835 5499340 0.09433
6 Kunci Raam Aluminium 2 178035 356070 0.00611
7 Engsel Pintu 156 26152.5 4079790 0.06998
8 Daun Pintu Double Teakwood 27.84 755287.5 21027204 0.36068
9 Pintu PVC lengkap, engsel, kunci, kusen 27 225940 6100380 0.10464
10 Pintu Raam Aluminium 2 110542.3 221084.6 0.00379
11 Sun Screen Hollow Finish Cat 177.4 458320 81305968 1.39464
12 Raam Jendela Aluminium 920 109230.55 100492106 1.72374
13 Engsel Jendela 86 17435 1499410 0.02572
14 Gerendel 109 33880 3692920 0.06334
15 Raam Skor 109 26422 2879998 0.04940
16 Pintu Shaft Besi 40/60 (lengkap) 2 810590 1621180 0.02781
17 Ralling Tangga Pipa Hitam Finish Cat 225.63 492726.3 111173835.069 1.90696
18 Ralling Depan Tralis Besi Finish Cat 41 36107.5 1480407.5 0.02539
d Pekerjaan Plafond
1 Plafond Expose Aci 135.65 33013.75 4478315.1875 0.07682
2 Plafond Asbes Plat 614.24 28997 17811117.28 0.30551
3 List Tepi Kayu Profil 909 15994 14538546 0.24938
e Pek. Pasang Lantai Dan Dinding
1 Urug Pasir Bawah Lantai 79.68 237050 18888144 0.32399
2 Lantai Rabat Beton Tritisan 17.83 957528 17072724.24 0.29285
3 Lantai Keramik 20x20 cm Lavatory 78.39 205584.5 16115768.955 0.27643
4 Dinding Keramik 20x25 cm Lavatory 188.96 232754.5 43981290.32 0.75441
5 Lt. Keramik Warna 40/40 cm 660.625 210619.51 139140513.7938 2.38667
6 Lt. Keramik Warna U. Tangga 40/40cm 29.8 210619.51 6276461.398 0.10766
7 Plint Lantai Jeglok Finish Cat Minyak 558.7 12828.2 7167115.34 0.12294
8 Batu Tempel Dinding Canopy 20.39 261208.75 5326046.4125 0.09136
9 Nosing Tangga 34.38 87208 2998211.04 0.05143
f Pekerjan Penerangan
1 Lampu SL 18W 106 54252 5750712 0.09864
2 Down Light SL 18W 67 156552 10488984 0.17992
3 Lampu Baret 40W 2 1273052 2546104 0.04367
4 Ceiling Fan 27 259100 6995700 0.12000
5 Stop Kontak 200W 56 46420 2599520 0.04459
6 Saklar Tunggal 28 43120 1207360 0.02071
7 Saklar Ganda 53 46970 2489410 0.04270
g Pekerjaan Sanitair
1 Closet Jongkok Warna Tua 27 602745 16274115 0.27915
2 Saringan air (floor drain) 27 40535 1094445 0.01877
3 Kran air 53 75524.63 4002805.39 0.06866
4 Meja pantry + wash bak 4 341605 1366420 0.02344
5 Bak Mandi Fiber + Keramik 20/25 27 1161600 31363200 0.53797
6 Kaca Cermin 40x60 Tepi Dibevel 27 351560 9492120 0.16282
h Pekerjaan Cat - Catan
1 Cat Tembok 2047.948 19423.8 39778932.3624 0.68233
2 Cat Plafond 706.38 19423.8 13720583.844 0.23535
3 Pelituran Daun Pintu 90.72 54562.2 4949882.784 0.08491
II PEKERJAAN FINISHING ARSITEKTUR LAN
a Pek. Pas. Bata/Plesteran, Kolom Prakris
1 Pas. Batu Bata 1:3 208.68 113177.35 23617849.398 0.40512
2 Pas, Batu Bata 1:6 1348.71 109308.1 147424927.551 2.52878
3 Plesteran 1:3 417.36 60840.78 25392507.9408 0.43556
4 Plesteran 1:6 2697.42 58345.98 157383613.3716 2.69960
5 Plesteran beton 225.6 60840.78 13725679.968 0.23544
6 Beton Praktis Kolom 344 176203.51 60614007.44 1.03971
7 Beton Praktis Balok Latei 259.3 286262.58 74227886.994 1.27323
b Pekerjaan Pasangan Kusen
1 Kusen Aluminium 4' 710 110542.3 78485033 1.34625
2 Raam Jendela Aluminium 517.2 109230.55 56494040.46 0.96904
3 Kaca Bening 5mm 101.882 127710 13011350.22 0.22318
4 Kaca Boven 5mm 3.9 134420 524238 0.00899
5 Kunci Tanam 52 175835 9143420 0.15684
6 Engsel Pintu 104 26152.5 2719860 0.04665
7 Daun Pintu Double Teakwood 87.36 755287.5 65981916 1.13179
8 Pintu PVC lengkap kunci engsel, kusen 26 225940 5874440 0.10076
9 Sun Screen Hollow Finish Cat 25.48 458320 11677993.6 0.20031
10 Engsel Jendela 384 17435 6695040 0.11484
11 Gerendel 96 33880 3252480 0.05579
12 Raam Skor 18 26422 475596 0.00816
c Pekerjaan Plafond
1 Plafond Asbes Plat 665.57 28997 19299533.29 0.33104
2 List Tepi Kayu Profil 866.95 15994 13865998.3 0.23784
d Pek. Pas. Lantai dan Dinding
1 Lt. Keramik 20x20cm Lavatory 58.44 205584.5 12014358.18 0.20608
2 Dinding Keramik 20cmx25cm Lavatory 249.6 232754.5 58095523.2 0.99651
3 Lantai Keramik Warna 40/40cm 511.86 210619.51 107807702.3886 1.84922
4 Plint Lantai Jeglok Finish Cat Minyak 315 12828.2 4040883 0.06931
5 Waterproofing R Lavatory 249.6 26180 6534528 0.11209
e Pekerjaan Peneragan
1 Lampu SL 18W 104 54252 5642208 0.09678
2 Down Light SL 18W 54 156552 8453808 0.14501
3 Lampu Baret 40W 0 1273052 0 0.00000
4 Ceiling Fan 26 259100 6736600 0.11555
5 Stop Kontak 200W 54 46420 2506680 0.04300
6 Saklar Tunggal 24 43120 1034880 0.01775
7 Saklar Ganda 52 46970 2442440 0.04190
f Pekeraan Sanitasi
1 Closet Jongkok Warna Tua 26 602745 15671370 0.26881
2 Saringan air (floor drain) 26 40535 1053910 0.01808
3 Kran air 52 75524.63 3927280.76 0.06736
4 Meja pantry + wash bak 0 341605 0 0.00000
5 Kaca Cermin 40x60 Tepi Dibevel 26 351560 9140560 0.15679
6 Bak Mandi Fiber + Keramik 20/25 26 1161600 30201600 0.51805
g Pekerjaan Cat-Catan
1 Cat Tembok 2987.4 19423.8 58026660.12 0.99533
2 Cat Plafond 706.38 19423.8 13720583.844 0.23535
3 Pelituran Daun Pintu 87.36 54562.2 4766553.792 0.08176
4 Cat Listplank Kayu 67.68 40766 2759042.88 0.04733
I PEKERJAAN SALURAN
1 Saluran terbuka U 20 171.45 93995 16115442.75 0.27643
2 Saluran buis beton ø 20 2.073 15583.3333333 32304.25 0.00055
3 Bak kontrol 45x45 33 237050 7822650 0.13418
II PEKERJAAN SALURAN
1 Galian tanah 36.682 93995 3447924.59 0.05914
2 Urugan tanah kembali 10.14 15583.3333333 158015 0.00271
3 Pasir urug 2.208 237050 523406.4 0.00898
4 Aanstamping 15.064 533346 8034324.144 0.13781
5 Beton bertulang (plat dasar,tutup) 12.64 1077191.7 13615703.088 0.23355
6 Dinding bata 1:3 117.395 113177.35 13286455.00325 0.22790
7 Plesteran 1:3 234.79 60840.78 14284806.7362 0.24503
8 Pipa hawa ø 1½" GIP 8 22121 176968 0.00304
9 Pipa PVC dia.4" 13 61336 797368 0.01368
10 Ijuk 1.295 60225 77991.375 0.00134
11 Kerikil+batu pecah 0.365 606650 221427.25 0.00380
12 Sirtu 4.8 257812.5 1237500 0.02123
5829894092.18 100.00000
Minggu 1
Durasi B/hari Total SDM
1 2 3 4 5 6
100
8 0.03328 170 Chart Title
0.0328839 0.0328839 0.0328839 0.0328839 0.0344498 0.0344498
2 0.15908 36 100
180 0.00131 180 0.0013103
90 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103
1 0.01715 1 80
180 0.00021 180 0.0002096
70 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096
60
20 0.11362 1575
50
7 0.01794 259
40
30
20
2 0.23341 30
2 0.22085 59 10
4 0.15742 70 0
0 20 40 60 80 100 120 140 160 180 20
3 0.24545 29
3 0.15509 19
3 0.21717 72
3 0.38632 46
3 0.20015 24
6 0.18253 294
9 0.09914 99
11 0.10642 33490
3 0.50730 60
5 0.13558 75
8 0.34619 462
3 0.37281 45
3 0.17508 21
8 0.14812 131
8 0.43404 554
3 0.28861 35
3 0.24559 29
8 0.04495 40
4 0.34786 222
3 0.11860 15
3 0.05825 7
8 0.18828 166
10 0.32289 431
3 1.31273 155
5 0.00758 5
3 0.13358 60
1 0.01246 1
2 0.00471 280
1 0.02725 6
1 0.00067 1
3 0.04903 17
5 0.09262 83
3 0.02722 4
2 0.14901 12
1 0.00532 1
8 0.02575 23
6 0.46159 462
3 0.21693 26
8 0.00216 20
4 0.04884 53
3 0.05803 7
1 0.07335 9
4 0.07012 4
3 0.03145 4
1 0.01765 1
33 0.09250 843
70
8 0.32429 263
2 0.00233 2
1 0.00365 2
2 0.03405 16
4 0.17091 39
5 0.05910 115
17 0.15807 422
4 0.21725 119
3 0.02384 6
5 0.04089 238
3 0.00847 6
11 0.09816 237
12 0.20844 567
17 0.06829 534
17 0.15707 1281
3 0.03465 48
5 0.01456 44
60
32 0.07707 1662
13 0.10372 560
2 0.88037 86
1 0.16253 14
1 0.02308 2
1 0.17795 31
1 0.09433 3
1 0.00611 1
2 0.03499 30
6 0.06011 122
3 0.03488 29
1 0.00379 1
5 0.27893 172
2 0.86187 86
2 0.01286 11
2 0.03167 27
1 0.04940 21
5 0.00556 5
2 0.95348 21
1 0.02539 50
46
1 0.07682 44
5 0.06110 69
8 0.03117 99
1 0.32399 22
1 0.29285 37
3 0.09214 88
7 0.10777 273
13 0.18359 740
1 0.10766 34
3 0.04098 52
3 0.03045 23
1 0.05143 2
2 0.04932 28
2 0.08996 18
1 0.04367 1
2 0.06000 15
2 0.02229 19
40
1 0.02071 10
2 0.02135 18
4 0.06979 113
1 0.01877 4
1 0.06866 25
1 0.02344 2
4 0.13449 229
3 0.05427 5
15 0.04549 190
7 0.03362 66
2 0.04245 11
15 0.02701 89
20 0.12644 574
17 0.02562 201
28 0.09641 1295
6 0.03924 109
30
30
18 0.05776 701
17 0.07490 528
4 0.33656 66
2 0.48452 48
1 0.22318 19
1 0.00899 1
9 0.01743 28
9 0.00518 20
9 0.12575 122
2 0.05038 28
4 0.05008 25
2 0.05742 48
6 0.00930 24
3 0.00272 4
7 0.04729 74
3 0.07928 94
4 0.05152 66
20
10 0.09965 360
12 0.15410 574
3 0.02310 30
1 0.11209 6
4 0.02420 41
2 0.07250 14
2 0.00000 15
2 0.05778 32
2 0.02150 26
1 0.01775 25
1 0.04190 17
9 0.02987 109
1 0.01808 4
3 0.02245 24
0 0
1 0.15679 5
8 0.06476 220
9 0.11059 10
276
3 0.07845 66
3 0.02725 11
1 0.04733 6
1 0.27643 39
1 0.00055 1
4 0.03355 145
3 0.01971 41
2 0.00136 6
1 0.00898 1
1 0.13781 19
2 0.11677 26
4 0.05698 50
9 0.02723 113
1 0.00304 1
1 0.01368 1
1 0.00134 1
1 0.00380 1
1 0.02123 20
0
0.0344038 0.0344038 0.0344038 0.0344038 0.0359697 0.0359697
0.0344038 0.0688077 0.1032115 0.1376153 0.1735851 0.2095548
1
0.2095548242
0.2095548242
KU
120
100
80
60
40
20
0
0 5 10
Minggu 2 Minggu 3
7 8 9 10 11 12 13 14 15
0.0328839 0.0328839
0.1590806 0.1590806
0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103
0.017153
0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096
KURVA S MINGGUAN
10 15 20 25 30 35
Minggu 3 Minggu 4
16 17 18 19 20 21 22 23 24
0.2334064 0.2334064
0.224592
0.023841 0.023841 0.023841
0.1126162 0.1126162 0.1111734 0.1111734 0.1111734 0.1111734 0.2587673 0.2587673 0.2499529
2.3622287 2.4748449 2.5860182 2.6971916 2.808365 2.9195383 3.1783056 3.4370729 3.6870258
5 6
0.669925786 2.8783057151
2.919538318 5.7978440331
Minggu 6 Minggu 7
34 35 36 37 38 39 40 41 42
0.2171056
0.1619222 0.1619222
0.253915 0.253915 0.2285235
0.1469263 0.1469263 0.171414
0.2171668
0.3779228 0.3779228 0.4031177
0.2001489 0.2001489 0.2001489
0.1490044 0.1490044 0.2346819 0.2123312
0.0991396 0.0991396 0.0991396 0.0991396
0.1051485 0.1051485 0.1051485
0.1528274 0.1528274 0.1528274 0.2801835 0.2165054 0.0891493 0.0891493 0.1528274 0.1273561
0.3586353 0.3586353 0.3586353 0.380843 1.1969383 1.2185866 1.2428777 0.5509514 0.7202963
8.7824152 9.1410505 9.4996859 9.8805289 11.077467 12.296054 13.538931 14.089883 14.810179
8 9
3.8722739122 4.6663472229
12.2960537914 16.9624010142
Minggu 9 Minggu 10
52 53 54 55 56 57 58 59 60
0.1529265 0.1529265
0.2171668 0.2171668
0.1825304 0.1676299
0.1355845 0.1355845
0.2877438 0.40763705 0.407637 0.2877438 0.3416958
0.3728081 0.3728081 0.3728081
0.1750826 0.1750826 0.1750826
0.1273561 0.1273561 0.2547123
0.008466
0.0106671
0.2170869
0.4324747 0.4324747 0.4324747 0.4324747 0.4324747
0.2968549 0.2968549 0.272117
0.2540546 0.2540546 0.2286491
0.0449454
0.3133864 0.4638118 0.4575441 0.1566932
0.1185967 0.1185967 0.1185967
0.0499295 0.0499295 0.0748942
0.008466 0.008466
0.0956755 0.0956755 0.0956755 0.0956755 0.0956755 0.1002315 0.1002315
0.1632197 0.2293899 0.2293899 0.1632197 0.2073332 0.2073332 0.2073332
0.008978
0.1378125
60
0.7968498 0.7947389 0.9475117 1.3306554 1.6884891 1.8547264 1.351158 1.3637496 1.4489788
21.752776 22.547515 23.495026 24.825682 26.514171 28.368897 29.720055 31.083805 32.532784
11 12
7.4129713403 7.7507686828
28.3688971588 36.1196658416
Minggu 12 Minggu 13
70 71 72 73 74 75 76 77 78
0.3221447
1.5752757 1.321199
0.1335757
0.012456 0
0.1002315 0.1002315 0.1002315 0.1002315
0.2073332 0.2073332 0.1632197 0.2073332 0.3087941
0.0543493 0.0543493 0.0543493 0.0543493
0.1771791 0.1250676 0.1167297 0.0875473
0.8803726 0.8803726
0.1625254
0.0230801
0.0061077
0.0768164
0.0619883 0.0619883 0.0619883 0.0619883 0.0575605
0.0125949
0.1167749 0.1167749
0.0364643 0.1367413 0.0273483 0.0273483
0.1019138 0.0216838 0.0108419
80
1.260815 1.1671874 1.1588799 1.7176318 1.7233781 1.9883576 1.6775385 2.4592377 2.4408009
33.793599 34.960786 36.119666 37.837298 39.560676 41.549033 43.226572 45.68581 48.12661
12 13
7.7507686828 12.0069446057
36.1196658416 48.1266104473
Minggu 14 Minggu 15
79 80 81 82 83 84 85 86 87
0.1779495
0.09433
0.0349903 0.03499026
0.0709532 0.0739096
0.0037923
0.2027091
0.0055616
0.9988846 0.9080769
0.02539339
0.3239878
0.2928479
0.0628258
0.0493209 0.0493209
0.0899586 0.0899586
0.0252141 0.016315
0.0458169 0.0337599
0.0013552
0.2631333
0.00471164 0.0047116
0.0272548
0.0006731
0.05190961 0.0519096 0.043258
0.0948561 0.0948561 0.0948561 0.08927637 0.0892764
0.0204115 0.0204115 0.0408231
0.1490114 0.1490114
0.0436732
0.0639984 0.0559986
0.0234682 0.0211213
0.0207098
0.02135039 0.0213504
0.0691698
0.018773
0.06866
0.1526995
0.0651272
0.0400459 0.1008563 0.0459786 0.0252141 0.0845413 0.0697095 0.04597863 0.0519114 0.0459786
0.0337599 0.0337599 0.0458169 0.057874 0.0940453 0.0940453 0.0940453 0.0940453 0.0940453
0.0013552
0.002593 0.0025931
0.0479202 0.0479202 0.04792 0.0516063
0.049741 0.049741 0.0746115
0.1838383 0.1128832 0.1128832 0.1902888 0.1902888 0.1677122 0.1677122 0.167712 0.1677122
0.0234382
0.1409534 0.1409534 0.1033658
0.0651272 0.0325636
0.0463119 0.0385933
0 0 0.027311 0.0273112
0 0 0.251115 0.1365715
0.0400459 0.0756423 0.0622936 0.0771254 0.081575 0.0697095 0.081575
0.0940453 0.0940453 0.0940453 0.0940453 0.0819882 0.0940453
100
0.7195207 0.6096327 0.5308626 0.472565 0.480528 0.4952896 0.3912947 0.516128 0.4124526
70.101048 70.710681 71.241544 71.714109 72.194637 72.689926 73.081221 73.59735 74.009801
17 18
3.3083986014 2.5422795791
72.6899262752 75.2322058543
Minggu 18 Minggu 19
106 107 108 109 110 111 112 113 114
0.0701184 0.0701184
0.0235881 0.0235881 0.0471763
0.0514282
0.0176532
0.0212445 0.023605
0.072504 0.072504
0 0
0.0577763 0.0577763
0.5534095 0.5503821 0.5626376 0.8316226 1.1936092 1.2069699 0.923994 0.6710375 0.6522766
85.027228 85.57761 86.140248 86.97187 88.165479 89.372449 90.296443 90.967481 91.619757
24 25
2.2869746171 5.4795097306
86.1402477545 91.6197574852
Minggu 26 Minggu 27
151 152 153 154 155 156 157 158 159
0.0860283 0
0.023605 0.028326
0.0214985 0.0214985
0.0177513
0.0418951
0.1567878
0.0447404 0.0447404 0.0635785 0.0824166
160
0.6269543 0.587001 0.2105772 0.3681462 0.34577674 0.5321762 0.2022436 0.1702857 0.1863557
92.246712 92.833713 93.04429 93.412436 93.7582129 94.290389 94.492633 94.662918 94.849274
26 27
2.6706316386 1.0873402455
94.2903891237 95.3777293692
Minggu 27 Minggu 28
160 161 162 163 164 165 166 167 168
0.0973692
0.0784496 0.0784496
180
0.2151605 0.1030739 0.0246243
99.403525 99.506599 99.531223
30
1.12577836
99.5312228398
Jenis Pekerjaan No. Uraian Pekerjaan Ket
1 Pembersihan Lapangan A1
2 Pengukuran dan Pemasangan Bouwplank A2
Pekerjaan Persiapan 3 Penyediaan Listrik dan Air Kerja A3
4 Pemasangan Papan Nama Proyek A4
5 Administrasi Proyek A5
6 Galian Tanah B1
Pekerjaan Tanah
7 Urugan Kembali B2
8 Pemasangan pondasi batu belah 1:6 F1
9 Pemasangan Aanstamping F2
Pekerjaan Pondasi Batu
10 Urugan pasir bawah pondasi F3
Belah
11 Urugan pasir bawah rolag F4
Urugan tanah peninggian bangunan t = 60
12 F5
cm
13 Sirtu C1
Pekerjaan lantai kerja 1:3:5 bwh poor/sloof
14 C2
t=5 cm
15 Pekerjaan beton balok RIB C3
16 Pekerjaan beton balok sloof C4
17 Pekerjaan beton plat pondasi C5
18 Pekerjaan beton kolom struktur C6
Pekerjaan Struktur
19 Pekerjaan beton balok induk C7
Lantai 1
20 Pekerjaan beton balok anak C8
21 Pekerjaan beton plat lantai C9
22 Pekerjaan beton plat daak canopy C10
23 Pekerjaan beton listplank C11
24 Pekerjaan tangga beton C12
25 Pekerjaan water proofing daak canopy C13
26 Pekerjaan beton kolom struktur D1
Pekerjaan Beton 27 Pekerjaan beton balok ring atas D2
Bertulang Lantai 2 28 Pekerjaan beton plat daak D3
29 Pekerjaan water proofing daak D4
30 Pemasangan kuda-kuda baja ringan E1
31 Pemasangan atap genteng keramik glasur E2
Pemasangan bubungan genteng keramik
32 E3
Pekerjaan Rangka Atap glasur
33 Pemasangan ornament puncak atap E4
dan Atap
34 Pemasangan corong talang Ø3” PVC E5
35 Pemasangan Listplank ky bengkirai 2x2/20 E6
36 Pemasangan flashing atap E7
42 Pekerjaan pasangan rollag 1:3 G1
43 Pekerjaan pasangan batu bata 1:3 G2
44 Pekerjaan pasangan batu bata 1:6 G3
45 Pekerjaan plesteran 1:3 G4
Pekerjaan Batu Bata /
46 Pekerjaan plesteran 1:6 G5
Plesteran Lantai 1
47 Pekerjaan plesteran beton G6
48 Pekerjaan beton praktis sloof G7
49 Pekerjaan beton praktis kolom G8
50 Pekerjaan beton praktis balok latei G9
51 Pekerjaan kusen aluminium 4” H1
52 Pemasangan kaca bening 5 mm H2
53 Pemasangan kaca raam jendela 5mm H3
54 Pemasangan kunci tanam H4
55 Pemasangan floor hinges H5
Pekerjaan Pasangan
Kusen Lantai 1
56 Pemasangan kunci raam alluminium H6
57 Pemasangan engsel pintu H7
58 Pemasangan daun pintu double teakwood H8
Pemasangan pintu PVC lengkap kunci,
Pekerjaan Pasangan 59 H9
engsel, kusen
Kusen Lantai 1 60 Pemasangan pintu raam alluminium H10
61 Pemasangan sun screen hollow finish cat H11
62 Pemasangan raam jendela alluminium H12
63 Pemasangan engsel jendela H13
64 Pemasangan Grendel H14
65 Pemasangan raam skor H15
66 Pemasangan pintu shaft besi 40/60 H16
Pekerjaan railing tangga pipa hitam finish
67 H17
cat lantai 1railing
Pekerjaan ke lantai 2 besi finish cat lantai
tralis
68 H18
canopy
69 Pekerjaan plafond exspose aci I1
Pekerjaan Plafond
70 Pekerjaan plafond asbes plat I2
Lantai 1
71 Pekerjaan list tepi kayu profil I3
72 Urugan pasir bawah lantai J1
73 Pekerjaan lantai rabat beton tritisan J2
74 Pekerjaan lantai keramik 20x20 cm lavatory J3
Pekerjaan dinding keramik 20x25 cm
75 J4
Pekerjaan Lantai dan lavatory
76 Pekerjaan lantai keramik warna 40/40 cm J5
Dinding Lantai 1 Pekerjaan lantai keramik warna untuk
77 J6
tangga 40/40
Pekerjaan cmlantai jeglok finish cat
plint
78 J7
minyak
79 Pekerjaan batu tempel dinding canopy J8
80 Pekerjaan nosing tangga J9
Pemasangan lampu dan down light SL 18
81 K1
W
82 Pemasangan lampu baret 40 W K2
Pekerjaan Penerangan 83 Pemasangan ceiling fan K3
Lantai 1 84 Pemasangan stop kontak 200 W K4
85 Pemasangan saklar tunggal K5
86 Pemasangan saklar ganda K6
87 Pemasangan closet jongkok L1
88 Pemasangan saringan air L2
Pekerjaan Sanitair 89 Pemasangan kran air L3
Lantai 1 90 Pemasangan meja pantry + wash bak L4
Pemasangan bak mandi fiber + keramik
91 L5
20/25
Pemasangan kaca cermin 40x60 tepi
92 L6
dibevel
93 Pekerjaan cat tembok M1
Pekerjaan Cat-catan
94 Pekerjaan cat plafond M2
Lantai 1
95 Pekerjaan pelituran daun pintu M3
96 Pekerjaan pasangan batu bata 1:3 N1
97 Pekerjaan pasangan batu bata 1:6 N2
98 Pekerjaan plesteran 1:3 N3
Pekerjaan Batu Bata /
99 Pekerjaan plesteran 1:6 N4
Plesteran Lantai 2
100 Pekerjaan plesteran beton N5
101 Pekerjaan beton praktis kolom N6
102 Pekerjaan beton praktis balok latei N7
103 Pekerjaan kusen aluminium 4” O1
104 Pemasangan kaca raam jendela 5 mm O2
105 Pemasangan kaca bening 5 mm O3
106 Pemasangan kaca boven 5 mm O4
107 Pemasangan kunci tanam O5
Pekerjaan Pasangan
Kusen Lantai 2
Pekerjaan Pasangan 108 Pemasangan engsel pintu O6
Kusen Lantai 2 109 Pemasangan daun pintu double teakwood O7
Pemasangan pintu PVC lengkap kunci,
110 O8
engsel, kusen
111 Pemasangan sun screen hollow finish cat O9
112 Pemasangan engsel jendela O10
113 Pemasangan grendel O11
114 Pemasangan raam skor O12
Pekerjaan Plafond 115 Pekerjaan plafond asbes plat P1
Lantai 2 116 Pekerjaan list tepi kayu profil P2
117 Pekerjaan lantai keramik 20x20 cm lavatory Q1
Pekerjaan dinding keramik 20x25 cm
118 Q2
Pekerjaan Lantai dan lavatory
119 Pekerjaan lantai keramik warna 40/40 cm Q3
Dinding Lantai 2 Pekerjaan plint lantai jeglok finish cat
120 Q4
minyak
121 Pekerjaan water proofing R lavatory Q5
Pemasangan lampu dan down light SL 18
122 R1
W
123 Pemasangan lampu baret R2
Pekerjaan Penerangan 124 Pemasangan ceiling fan R3
Lantai 2 125 Pemasangan stop kontak 200 W R4
126 Pemasangan saklar tunggal R5
127 Pemasangan saklar ganda R6
128 Pemasangan closet jongkok S1
129 Pemasangan saringan air S2
Pekerjaan Sanitair
130 Pemasangan kran air S3
Lantai 2 Pemasangan kaca cermin 40x60 tepi
131 S4
dibevel
Pemasangan bak mandi fiber + keramik
132 S5
20/25
133 Pekerjaan cat tembok T1
Pekerjaan Cat-catan 134 Pekerjaan cat plafond T2
Lantai 2 135 Pekerjaan pelituran daun pintu T3
136 Pekerjaan cat listplank kayu T4
137 Pemasangan saluran terbuka U 20 U1
Pekerjaan Saluran 138 Pemasangan saluran buis beton Ø20 U2
139 Pemasangan bak control 45x45 U3
140 Galian tanah (Septictank+Peresapan) V1
Urugan tanah kembali
141 V2
(Septictank+Peresapan)
142 Urugan pasir (Septictank+Peresapan) V3
Pemasangan Aanstamping
143 V4
(Septictank+Peresapan)
Pemasangan beton bertulang (plat
144 V5
dasar,tutup) (Septictank+Peresapan)
Pemasangan dinding bata 1:3
Pekerjaan Septictank 145 V6
(Septictank+Peresapan)
Pemasangan plesteran 1:3
dan Peresapan 146 V7
(Septictank+Peresapan)
Pemasangan pipa hawa Ø11/2 “ GIP
147 V8
(Septictank+Peresapan)
Pemasangan pipa PVC dia.4”
148 V9
(Septictank+Peresapan)
149 Pemasangan ijuk (Septictank+Peresapan) V10
Pemasangan kerikil dan batu pecah
150 V11
(Septictank+Peresapan)
151 Pemasangan sirtu (Septictank+Peresapan) V12
Durasi (hari) P. Sebelum P.Sesudah
8 - B1
2 A1 B1
180 - -
1 A1 -
180 - -
20 A1;A2 C1
7 F1 -
17 F2 B2;G7
4 F4 F1
2 B1 -
2 B1 F2
5 F1 G1
2 B1 C2
2 C1 C5
7 C5 C6
7 C5 C6
12 C2 C3;C4
10 C3; C4 C7;C8
13 C6 C9
13 C6 C9
12 C7;C8 D1
8 C7;C8 C13
4 G3 -
8 C9 -
1 C10 -
12 C9 D2
11 D1 D3;E1
6 D2 D4
1 D3 -
33 D2 E2
8 E1 E3
E4;E5;
2 E2
E6;E7
1 E2 -
2 E2 -
4 E2 -
5 E2 -
3 F5 G2
11 G1 G4;G5
12 G1 G4;G5
17 G3 -
17 G3 G6
3 G5 -
5 F1 U1
32 F5 G2
13 F5 G2
2 G9 H8
1 H12 -
1 H12 -
1 H7 -
1 H9 H10
1 H12 -
2 H8 H4
6 H1 H7
3 H1 H5
1 H5 -
5 H1 -
2 H1 H2;H13
2 H12 -
2 H12 -
1 H12 -
5 H1 H17
2 H16 -
1 H16 -
1 G9 -
5 G9 I3;K1
8 I2 J1
1 I3 J2
1 J1 J4
3 J1 L1
7 J3 J8
13 J4 J6
1 J5 J9
3 J6 -
3 J4 -
1 J6 -
4 I2 K3
1 K1 K3
2 K2 K4
2 K3 K5
1 K4 K6
2 K5 -
4 K6 L4
1 K6 L4
1 K6 L4
1 J3 -
4 K6 -
3 K6 -
15 M3 M2
7 M3 -
2 G5 M1
15 N6;N7 N3
20 N6;N7 N4
17 N1 P1
28 N2 O1;P1
6 R6 -
18 I2 N2
17 I2 N2
4 N4 O2
2 O1 O3
1 O2 -
1 O1 -
9 O1 T3
9 O1 T3
9 O1 T3
2 O1 -
4 O1 -
2 O2 O11
6 O10 -
3 O10 -
7 N4 P2
3 P1 Q1
4 P2 Q2
10 Q1 Q3
12 Q2 Q4
3 Q3 -
1 Q3 -
4 P1 R4
0 P1 R4
2 P1 R4
2 R3 R5
1 R4 N5
1 R5 N5
9 S5 S1
1 S1 -
3 S1 -
1 S1 -
8 Q1 S1
9 T4 T2
3 T1 -
3 O7 T4
1 T3 T1
1 G7 U2
1 U1 -
4 U1 V1
3 U3 V3
2 V12 -
1 V1 V4
1 V3 V5
2 V4 V6
4 V5 V7
9 V6 V8
1 V7 V11
1 V7 V11
1 V7 V11
1 V10 V2
1 V10 V2
17
Durasi Paling Awal Paling Akhir Float
No Uraian Pekerjaan
(Hari) Mulai (Es) Akhir (Ef) Mulai (Ls) Akhir (Lf) Free Float
1 Pembersihan Lapangan 8 0 8 0 8 0
2 Pengukuran dan Pemasangan Bo 2 0 2 0 8 0
3 Papan Nama Proyek 1 0 1 0 8 0
4 Galian Tanah 20 8 28 8 28 0
5 Sirtu 2 28 30 28 53 0
6 Lantai Kerja 2 30 32 53 55 0
7 Beton Plat Pondasi 12 32 44 55 67 0
8 Balok RIB 7 44 51 67 173 0
9 Urugan Kembali 7 51 58 173 180 0
10 Beton Balok Sloof 7 44 51 67 74 0
11 Beton Kolom Struktur 10 51 61 74 84 0
12 Beton Balok Anak 13 61 74 84 97 0
13 Beton Balok Induk 13 61 74 84 97 0
14 Beton Plat Lantai 12 74 86 97 109 0
15 Beton Plat Dask Canopy 8 74 82 97 120 0
16 Beton Kolom Struktur 12 86 98 109 121 0
17 Tangga Beton 8 86 94 209 121 0
18 Water Proofing Daak Canopy 1 82 83 120 121 0
19 Balok Ring Atas 11 98 109 121 132 0
20 Beton Plat Daak 6 109 115 132 179 0
21 Water Proofing Daak Canopy 1 115 116 179 180 0
22 Pekerjaan Rangka Atap 48 109 157 132 180 0
23 Urugan Pasir Bawah Pondasi + Pa 3 28 31 28 31 0
24 Anstamping 4 31 35 31 35 0
25 Pondasi Batu Belah 1:6 17 35 52 35 52 0
26 Beton Praktis Sloof 5 52 57 52 57 0
27 Beton Praktis Kolom 32 57 89 57 180 0
28 Saluran Terbuka U20 1 57 58 57 155 0
29 Bak Kontrol 45x45 4 58 62 155 156 0
30 Saluran Buis Beton 1 58 59 155 156 0
31 Galian Tanah 3 62 65 156 159 0
32 Pasir Urug 1 65 66 159 160 0
33 Anstamping 1 66 67 160 161 0
34 Beton Bertulang 2 67 69 161 163 0
35 Dinding Bata 1:3 4 69 73 163 167 0
36 Plesteran 1:3 9 73 82 167 176 0
37 Pem. Pipa PVC, Pipa Hawa, Ijuk 1 82 83 176 177 0
38 Pem. Batu Pecah+Kerikil, Dan Sir 1 83 84 177 178 0
39 Urugan Tanah Kembali 2 84 86 178 180 0
40 Beton Praktis Balok Latei 13 57 70 57 70 0
41 Plafond Expose Aci 1 70 71 70 118 0
42 Pekerjaan Kusen 11 70 81 70 118 0
43 Plafond Asbes Plat 5 70 75 70 75 0
44 List Tepi Kayu Profil 8 75 83 75 83 0
45 Urug Pasir Bawah Lantai 1 83 84 83 153 0
46 Lantai Rabat Beton Tritisan 1 84 85 153 156 0
47 Lantai Keramik 20x20cm Lavator 3 84 87 153 156 0
48 Dinding keramik 20x25 Lavatory 7 87 94 156 163 0
49 Batu Tempel Dinding canopy 3 94 97 163 176 0
50 Lantai Keramik Warna 40x40cm 13 94 107 163 176 0
51 Lantai keramik Warna Untuk Tan 1 107 108 176 177 0
52 Nosing Tangga 1 108 109 177 180 0
53 Plint Lantai Jeglok Finish Cat M 3 108 111 177 180 0
54 Pekerjaan Penerangan 10 83 93 83 117 0
55 Pekerjaan Sanit Air 5 93 98 117 122 0
56 Pekerjaan Cat-Cat an 24 98 122 122 146 0
57 Beton Praktis Kolom Lt 2 18 83 101 83 101 0
58 Pasangan Batu 1:6 20 101 121 101 146 0
59 Beton Praktis Balok Latei Lt 2 17 83 100 83 101 0
60 Pasangan Bata 1:3 17 101 118 101 118 0
61 Plesteran 1:3 17 118 135 118 146 0
62 Plasteran 1:6 28 118 146 118 146 0
63 Pekerjaan Kusen 8 146 154 146 180 0
64 Plesteran Beton 6 146 152 146 180 0
65 Plafond Asbes Plat 2 146 148 146 148 0
66 List Tepi Kayu Profil 3 148 151 148 151 0
67 Pekerjaan Penerangan 5 148 153 148 156 0
68 Pekerjaan Sanitasi 20 153 173 156 176 0
69 Pekerjaan Cat-Cat an 4 173 177 176 180 0
70 Pekerjaan Pasangan dan Dinding 29 151 180 151 180 0
71 Urugan Tanah Peninggian 5 52 57 52 145 0
72 Pasangan Rollag 1:3 3 57 60 145 148 0
73 Pasagan Batu Bata 1:3 11 60 71 148 180 0
74 Pasangan Batu Bata 1:6 12 60 72 148 160 0
75 Plesteran 1:3 17 72 89 160 180 0
76 Plestera 1:6 17 72 89 160 177 0
77 Plesteran Beton 3 89 92 177 180 0
Float
Total Float
0
2
1
0
23
23
23
122
122
23
23
23
23
23
38
23
27
38
23
64
64
23
0
0
0
0
91
97
94
97
94
94
94
94
94
94
94
94
94
0
47
37
0
0
69
71
69
69
79
69
69
71
69
24
24
24
0
25
101
0
11
0
26
28
0
0
3
3
3
0
88
88
109
88
91
88
88
Durasi Paling Awal Paling Akhir
No Uraian Pekerjaan
(Hari) Mulai (Es) Akhir (Ef) Mulai (Ls) Akhir (Lf)
1 Pembersihan Lapangan 8 0 8 0 8
2 Pengukuran dan Pemasang 2 0 2 0 8
3 Papan Nama Proyek 1 0 1 0 8
4 Galian Tanah 20 8 28 8 28
5 Sirtu 2 28 30 28 53
6 Lantai Kerja 2 30 32 53 55
7 Beton Plat Pondasi 12 32 44 55 67
8 Balok RIB 7 44 51 67 173
9 Urugan Kembali 7 51 58 173 180
10 Beton Balok Sloof 7 44 51 67 74
11 Beton Kolom Struktur 10 51 61 74 84
12 Beton Balok Anak 13 61 74 84 97
13 Beton Balok Induk 13 61 74 84 97
14 Beton Plat Lantai 12 74 86 97 109
15 Beton Plat Dask Canopy 8 74 82 97 120
16 Beton Kolom Struktur 12 86 98 109 121
17 Tangga Beton 8 86 94 209 121
18 Water Proofing Daak Cano 1 82 83 120 121
19 Balok Ring Atas 11 98 109 121 132
20 Beton Plat Daak 6 109 115 132 179
21 Water Proofing Daak Cano 1 115 116 179 180
22 Pekerjaan Rangka Atap 48 109 157 132 180
23 Urugan Pasir Bawah Ponda 3 28 31 28 31
24 Anstamping 4 31 35 31 35
25 Pondasi Batu Belah 1:6 17 35 52 35 52
26 Beton Praktis Sloof 5 52 57 52 57
27 Beton Praktis Kolom 32 57 89 57 180
28 Saluran Terbuka U20 1 57 58 57 155
29 Bak Kontrol 45x45 4 58 62 155 156
30 Saluran Buis Beton 1 58 59 155 156
31 Galian Tanah 3 62 65 156 159
32 Pasir Urug 1 65 66 159 160
33 Anstamping 1 66 67 160 161
34 Beton Bertulang 2 67 69 161 163
35 Dinding Bata 1:3 4 69 73 163 167
36 Plesteran 1:3 9 73 82 167 176
37 Pem. Pipa PVC, Pipa Hawa, 1 82 83 176 177
38 Pem. Batu Pecah+Kerikil, 1 83 84 177 178
39 Urugan Tanah Kembali 2 84 86 178 180
40 Beton Praktis Balok Latei 13 57 70 57 70
41 Plafond Expose Aci 1 70 71 70 118
42 Pekerjaan Kusen 11 70 81 70 118
43 Plafond Asbes Plat 5 70 75 70 75
44 List Tepi Kayu Profil 8 75 83 75 83
45 Urug Pasir Bawah Lantai 1 83 84 83 153
46 Lantai Rabat Beton Tritisa 1 84 85 153 156
47 Lantai Keramik 20x20cm L 3 84 87 153 156
48 Dinding keramik 20x25 La 7 87 94 156 163
49 Batu Tempel Dinding cano 3 94 97 163 176
50 Lantai Keramik Warna 40 13 94 107 163 176
51 Lantai keramik Warna Unt 1 107 108 176 177
52 Nosing Tangga 1 108 109 177 180
53 Plint Lantai Jeglok Finish 3 108 111 177 180
54 Pekerjaan Penerangan 10 83 93 83 117
55 Pekerjaan Sanit Air 5 93 98 117 122
56 Pekerjaan Cat-Cat an 24 98 122 122 146
57 Beton Praktis Kolom Lt 2 18 83 101 83 101
58 Pasangan Batu 1:6 20 101 121 101 146
59 Beton Praktis Balok Latei 17 83 100 83 101
60 Pasangan Bata 1:3 17 101 118 101 118
61 Plesteran 1:3 17 118 135 118 146
62 Plasteran 1:6 28 118 146 118 146
63 Pekerjaan Kusen 8 146 154 146 180
64 Plesteran Beton 6 146 152 146 180
65 Plafond Asbes Plat 2 146 148 146 148
66 List Tepi Kayu Profil 3 148 151 148 151
67 Pekerjaan Penerangan 5 148 153 148 156
68 Pekerjaan Sanitasi 20 153 173 156 176
69 Pekerjaan Cat-Cat an 4 173 177 176 180
70 Pekerjaan Pasangan dan Di 29 151 180 151 180
71 Urugan Tanah Peninggian 5 52 57 52 145
72 Pasangan Rollag 1:3 3 57 60 145 148
73 Pasagan Batu Bata 1:3 11 60 71 148 180
74 Pasangan Batu Bata 1:6 12 60 72 148 160
75 Plesteran 1:3 17 72 89 160 180
76 Plestera 1:6 17 72 89 160 177
77 Plesteran Beton 3 89 92 177 180
Float
Free Float Total Float
0 0
0 2
0 1
0 0
0 23
0 23
0 23
0 122
0 122
0 23
0 23
0 23
0 23
0 23
0 38
0 23
0 27
0 38
0 23
0 64
0 64
0 23
0 0
0 0
0 0
0 0
0 91
0 97
0 94
0 97
0 94
0 94
0 94
0 94
0 94
0 94
0 94
0 94
0 94
0 0
0 47
0 37
0 0
0 0
0 69
0 71
0 69
0 69
0 79
0 69
0 69
0 71
0 69
0 24
0 24
0 24
0 0
0 25
0 101
0 0
0 11
0 0
0 26
0 28
0 0
0 0
0 3
0 3
0 3
0 0
0 88
0 88
0 109
0 88
0 91
0 88
0 88