BETON BESI
JENIS PEKERJAAN Vol. Sat. Hrg. Sat. Vol. Sat. Hrg. Sat.
SLOOF
Balok Sloof 30/50 = 0,15, 1 M3
- Bahan 1.00 M3
- Upah (Cor Manual) 1.00 M3 72,000.00 124.43 Kg 480.00
72,000.00 59,724.80
72,000.00 77,264.64
42,000.00 77,264.64
42,000.00 63,955.20
KOLOM
KOLOM 50 x 50 = 0,25 M3, 1 M3
- Bahan 1.00 M3
- Upah Ready Mixed Tanpa Pump 1.00 M3 48,000.00 191.81 Kg 480.00
- Sepatu Kolom (40 x 40) 1.00 Bh 4,800.00
52,800.00 92,067.84
52,800.00 66,768.60
BALOK
Balok utama 40/60 = 0,24 M3, 1M3
- Bahan 1.00 M3
- Upah Ready Mixed Dengan Pump 1.00 M3 24,000.00
- Sewa Pompa (per - 8 Jam @ Rp. 1.800.000,00) 0.01 Jam 18,000.00 176.30 Kg 480.00
42,000.00 84,623.98
PLAT
Grid Plat Dag = 300 x 300 x 12 = 0.12, 1 M3 =
- Bahan 1.00 M3
- Upah Ready Mixed Dengan Pump 1.00 M3 24,000.00
- Sewa Pompa (per - 8 Jam @ Rp. 1.800.000,00) 0.01 Jam 18,000.00 148.76 Kg 480.00
42,000.00 71,403.73
1077600
BEGISTING Beton Deking Bongkaran Begisting JUMLAH
Vol. Sat. Hrg. Sat. Vol. Sat. Hrg. Sat. Vol. Sat. Hrg. Sat.
-
2.67 M2 7,800.00 4.92 M2 240.00 M2 1,800.00
20,800.00 1,180.00 - 173,544.80
SLOOF
Balok Sloof 30/50 = 0,15, 1 M3
- Bahan 1.00 M3
- Upah (Cor Manual) 1.00 M3 66,000.00 124.43 Kg 440.00
66,000.00 54,747.73
66,000.00 70,825.92
38,500.00 70,825.92
38,500.00 58,625.60
KOLOM
KOLOM 50 x 50 = 0,25 M3, 1 M3
- Bahan 1.00 M3
- Upah Ready Mixed Tanpa Pump 1.00 M3 44,000.00 191.81 Kg 440.00
- Sepatu Kolom (40 x 40) 1.00 Bh 4,400.00
48,400.00 84,395.52
48,400.00 61,204.55
BALOK
Balok utama 40/60 = 0,24 M3, 1M3
- Bahan 1.00 M3
- Upah Ready Mixed Dengan Pump 1.00 M3 22,000.00
- Sewa Pompa (per - 8 Jam @ Rp. 1.800.000,00) 0.01 Jam 16,500.00 176.30 Kg 440.00
38,500.00 77,571.98
PLAT
Grid Plat Dag = 300 x 300 x 12 = 0.12, 1 M3 =
- Bahan 1.00 M3
- Upah Ready Mixed Dengan Pump 1.00 M3 22,000.00
- Sewa Pompa (per - 8 Jam @ Rp. 1.800.000,00) 0.01 Jam 16,500.00 148.76 Kg 440.00
38,500.00 65,453.42
-
2.67 M2 7,150.00 4.92 M2 220.00 M2 1,650.00
19,066.67 1,081.67 - 159,082.73
SLOOF
Balok Sloof 30/50 = 0,15, 1 M3
- Bahan 1.00 M3
- Upah (Cor Manual) 1.00 M3 60,000.00 124.43 Kg 400.00
60,000.00 49,770.67
60,000.00 64,387.20
35,000.00 64,387.20
35,000.00 53,296.00
KOLOM
KOLOM 50 x 50 = 0,25 M3, 1 M3
- Bahan 1.00 M3
- Upah Ready Mixed Tanpa Pump 1.00 M3 40,000.00 191.81 Kg 400.00
- Sepatu Kolom (40 x 40) 1.00 Bh 4,000.00
44,000.00 76,723.20
44,000.00 55,640.50
BALOK
Balok utama 40/60 = 0,24 M3, 1M3
- Bahan 1.00 M3
- Upah Ready Mixed Dengan Pump 1.00 M3 20,000.00
- Sewa Pompa (per - 8 Jam @ Rp. 1.800.000,00) 0.01 Jam 15,000.00 176.30 Kg 400.00
35,000.00 70,519.98
PLAT
Grid Plat Dag = 300 x 300 x 12 = 0.12, 1 M3 =
- Bahan 1.00 M3
- Upah Ready Mixed Dengan Pump 1.00 M3 20,000.00
- Sewa Pompa (per - 8 Jam @ Rp. 1.800.000,00) 0.01 Jam 15,000.00 148.76 Kg 400.00
35,000.00 59,503.11
898000
BEGISTING Beton Deking Bongkaran Begisting JUMLAH
Vol. Sat. Hrg. Sat. Vol. Sat. Hrg. Sat. Vol. Sat. Hrg. Sat.
-
2.67 M2 6,500.00 4.92 M2 200.00 M2 1,500.00
17,333.33 983.33 - 144,620.67
HARGA BAHAN
NO NAMA BAHAN SAT
Rp.
1 Box Sekering
Bahan
MCB 16 A 1 Ph 1.000 Unit 50,000.00 50,000.00
Box Sekring 1.000 Bh 75,000.00 75,000.00
Jumlah 125,000.00
Tenaga
Tukang Listik 0.200 Oh 40,000.00 8,000.00
Pekerja 0.400 Oh 25,000.00 10,000.00
Kepala Tukang 0.020 Oh 50,000.00 1,000.00
Mandor 0.020 Oh 60,000.00 1,200.00
Jumlah 20,200.00
Total 145,200.00
2 Stop Kontak
Bahan
Stop Kontak 1.000 Bh 15,000.00 15,000.00
Kabel NYM 3 x 2.5 mm 10.000 M 8,000.00 80,000.00
Dos 1.000 Bh 1,000.00 1,000.00
Jumlah 96,000.00
Tenaga
Tukang Listik 0.200 Oh 40,000.00 8,000.00
Pekerja 0.300 Oh 25,000.00 7,500.00
Kepala Tukang 0.020 Oh 50,000.00 1,000.00
Mandor 0.020 Oh 60,000.00 1,200.00
Jumlah 17,700.00
Total 113,700.00
3 Instalasi Lampu
Bahan
Kabel 2 x 2.5 mm 20.000 m 6,500.00 130,000.00
Jumlah 130,000.00
Tenaga
Tukang Listik 2.000 Oh 40,000.00 80,000.00
Pekerja 1.000 Oh 25,000.00 25,000.00
Kepala Tukang 0.200 Oh 50,000.00 10,000.00
Mandor 0.050 Oh 60,000.00 3,000.00
Jumlah 118,000.00
Total 248,000.00
4 Saklar Cam
Bahan
Saklar Cam 1.000 Unit 75,000.00 75,000.00
Jumlah 75,000.00
Tenaga
Tukang Listik 1.500 Oh 40,000.00 60,000.00
Pekerja 1.000 Oh 25,000.00 25,000.00
Kepala Tukang 0.150 Oh 50,000.00 7,500.00
Mandor 0.050 Oh 60,000.00 3,000.00
Jumlah 95,500.00
Total 170,500.00
Lampu Sorot
Bahan
Lampu Sorot 400 W 1.000 Unit 950,000.00 950,000.00
Jumlah 950,000.00
Tenaga
Tukang Listik 1.500 Oh 40,000.00 60,000.00
Pekerja 1.000 Oh 25,000.00 25,000.00
Kepala Tukang 0.150 Oh 50,000.00 7,500.00
Mandor 0.050 Oh 60,000.00 3,000.00
Jumlah 95,500.00
Total 1,045,500.00
HARGA BAHAN
NO NAMA BAHAN SAT
Rp.
BATU
1 Agregat Halus M3 -
2 Agregat Kasar M3 -
3 Batu Bulat Sungai M3 -
4 Batu Belah 10 - 15 / 15 - 20 Cm M3 112,700.00
5 Batu Pecah 5 - 7 Cm M3 112,700.00
6 Batu Pecah 3 - 5 Cm M3 112,700.00
7 Batu Pecah 2 - 3 Cm M3 122,950.00
8 Batu Pecah 1 - 2 Cm M3 122,950.00
9 Batu Pecah 4 - 6 Cm M3 112,700.00
10 Batu Koral Pecah 2 - 3 Cm M3 122,950.00
1 Batu Koral Pecah 1 - 2 Cm M3 122,950.00
2 Batu Koral Pecah 0,5 - 1 Cm M3 128,050.00
3 Batu Palimanan M2 -
4 Batu Ampyang Kg -
5 Batu Teraso Kg -
6 Batu Tempel Hitam (Batu Candi) M2 -
7 Batu Paras M2 -
8 Krikil Sungai tidak tersaring M3 -
9 Batu Granito Kg -
PASIR
1 Pasir Urug / Timbunan M3 66,600.00
2 Pasir Pasang M3 79,400.00
3 Pasir Beton M3 92,200.00
4 Pasir Silika Kg -
5 Sirtu M3 61,500.00
6 Grosok M3 -
7 Tanah Urug M3 46,100.00
8 Timbunan Pilihan M3 -
9 Pitrun M3 -
KAPUR
1 Kapur Zak -
2 Kapur M3 -
3 Gamping M3 -
4 Gamping Kg -
KAYU
1 Kayu Jati Balok 8/12,6/12 X 4 M' M3 -
2 Kayu Jati Papan 2/20 X 4 M' M3 -
3 Kayu Kamper Balok 8/12, 8/15, 6/12 X 4 M' M3 -
4 Kayu Kamper Papan 2/20, 3/30, 3/30 X 4 M' M3 -
5 Kayu Kamper Usuk 5/7, 4/6 X 4 M' M3 -
6 Kayu Kamper Reng 2/3, 3/5 X 4 M' M3 -
7 Kayu Kruing Balok 8/12, 8/15, 6/12 X 4 M' M3 -
8 Kayu Kruing Papan 2/20, 3/30, 3/30 X 4 M' M3 -
9 Kayu Kruing Usuk 5/7, 4/6 X 4 M' M3 -
10 Kayu Kruing Reng 2/3, 3/5 X 4 M' M3 -
1 Kayu Meranti Balok 8/12, 8/15, 6/12 X 4 M' M3 1,895,150.00
2 Kayu Meranti Papan 2/20, 3/30, 3/30 X 4 M' M3 1,690,300.00
3 Kayu Meranti Usuk 5/7, 4/6 X 4 M' M3 1,434,200.00
4 Kayu Meranti Reng 2/3, 3/5 X 4 M' M3 -
4 Kayu Begisting M3 717,100.00
5 Formitie/penjaga jarak bekisting/spacer Btg -
6 List Kayu 2/4 M' -
5 Dolken 4 m btg 8,750.00
6 Perancah Kayu M3 -
7 Kayu Bakar M3
GORONG-GORONG
1 Gorong-2 Ø 40 cm M' -
2 Gorong-2 Ø 50 cm M' -
3 Gorong-2 Ø 60 cm M' -
4 Gorong-2 Ø 80 cm M' -
5 Buis Beton U 20 cm Bh -
6 Buis Beton U 30 cm Bh -
7 Buis Beton D 100 cm M' -
8 Buis Beton D 80 cm M' -
9 Buis Beton D 60 cm M' -
10 Buis Beton D 40 cm M' -
11 Buis Beton D 30 cm M' -
12 Buis Beton D 20 cm M' -
PORTLAND CEMENT ( PC )
1 Semen 50 Kg Zak 41,000.00
2 Semen 40 Kg Zak 32,800.00
3 Semen PC Kg 820.00
4 Semen Putih Kg 2,050.00
5 Semen Merah M3 8,750.00
6 Semen Warna Kg -
7 Semen Tahan Asam Kg -
8 Betagum ex Holland 4 mm M2 -
PAKU
1 Paku Reng / Papan Kg 8,750.00
2 Paku Usuk Kg 10,250.00
3 Paku Eternit Kg -
4 Baut Kail / Kait Stel -
5 Angker Kusen / paku dook Kg -
3 Paku Seng / Sumbat Kg 13,850.00
4 Paku Skrup Bh 350.00
5 Paku Kalsiboard Kg -
6 Paku Hak pig Kg -
7 Paku Pancing Kg -
Paku Asbes Kg
MUR BAUT
1 Angker 5/8 -30 cm Bh -
2 Angker 3/4 -50 cm Bh -
1 Mur Baut & Set Ankur 1/2 " Bh 1,250.00
2 Mur Baut 3/8 " Bh 750.00
3 Mur Baut 5/8 " Bh 1,550.00
4 Mur Baut 3/4 " Bh -
5 Dynabolt (terpasang) Bh -
4 Jarum keras Bh 4,350.00
5 Ankur Ø 19 Bh 32,000.00
KAWAT
1 Bendrat / Kawat Beton Kg 9,250.00
2 Kawat Bronjong / duri Ø 4 mm Kg -
3 Kawat Harmonika M2 -
4 Kawat Jaring M2 -
5 Kawat Kasa M2 -
6 Kawat Seng Polos Kg -
7 Kawat Duri Kg
BESI
1 Besi Beton Kg 5,000.00
2 Besi Beugel Klem Stell -
SENG
1 Seng BWG 30 ( 80 X 300 Cm ) gelombang Lbr -
2 Seng BJLS 30 ( 80 X 180 Cm ) gelombang Lbr -
1 Seng Plat 3"× 6" BJLS Lbr 37,800.00
2 Seng Gelombang 3"×6" BJLS 28 Lbr -
3 Seng Plat Alumunium Lbr -
4 Seng Talang BWG 30 Lbr. 60 cm M' -
5 Seng Talang BWG 30 Lbr. 90 cm M' -
6 Seng Plat Datar Lbr -
7 Lapis Aluminium 4 x 8 x 4 mm Lbr -
TRIPLEK
1 Triplek 120 X 240 X 4 mm Lbr -
2 Triplek 90 X 210 X 4 mm Lbr -
3 Triplek 120 x 240 x 3 mm Lbr -
4 Multiplek t = 9 mm Lbr -
5 Teaxwood 90 x 210 x 4 mm Lbr -
6 Teaxwood 120 x 240 x 4 mm Lbr -
7 Teaxwood 120 X 240 x 3 mm Lbr -
8 Playwood 4' X 8' x 4 mm Lbr -
9 Playwood 4' X 8' x 6 mm Lbr -
10 Playwood 4 Lbr -
1 Playwood 9 mm Lbr 82,000.00
2 Formika Lbr -
3 Akustik ukuran 30×30 cm Lbr -
4 Akustik ukuran 30×60 cm Lbr -
5 Akustik arm strong ukuran 60×120 cm Lbr -
GYPSUM
1 Gypsum board M2 -
2 List Gypsum M' -
3 Kalsiboard M2 -
PENUTUP ATAP
1 Polycarbonat M2 -
2 Multiroof M2 -
3 Fiberglass M2 -
4 Roof light fibreglass Lbr -
5 Plastic aerator Bh -
6 Atap Aluminium Lbr
KACA
1 Kaca Bening 3 mm M2 -
2 Kaca Bening 5 mm M2 -
3 Kaca Bening 8 mm M2 -
4 Kaca Bening 10 mm M2 -
5 Kaca Bening 12 mm M2 -
6 Kaca Rayband 3 mm M2 -
7 Kaca Rayband 5 mm M2 -
8 Kaca Rayband 10 mm M2 -
9 Kaca Rayband 12 mm M2 -
10 Kaca Painting 5 mm M2 -
11 Kaca Sun glass 5 mm berwarna M2 -
12 Glass blok polos Bh -
13 Glass blok motif Bh -
14 Kaca Cermin tebal 5 mm M2 -
15 Kaca Cermin tebal 6 mm M2 -
16 Kaca Cermin tebal 8 mm M2 -
17 Kaca wireglass tebal 5 mm M2 -
18 Kaca Es T = 5 mm M2 -
PINTU
1 Pintu Rolling door aluminium M2 -
2 Pintu Gulung Besi M2 -
3 Pintu Lipat M2 -
4 Pintu Sun Sreem Alumunium M2 -
5 Pintu Alumunium M2 -
6 Rel Pintu Dorong Bh -
ALUMINIUM KUSEN
1 Aluminium 4" Putih M' -
2 Aluminium 4" Coklat M' -
3 Aluminium 3" Putih M' -
4 Aluminium 3" Coklat M' -
5 Karet kaca M' -
6 Metal Furing M2 -
LEM.
1 Lem Kayu Kg -
2 Lem PVC Kg -
3 Sealent Kg -
4 Lem vinyl Kg -
POLITURAN
1 Spirtus Ltr -
2 Serlak Ltr -
3 Plitur Ltr -
4 Plitur Jadi Ltr -
5 Vernis Jadi Ltr -
6 Kertas gosok air Lbr -
7 Kertas gosok biasa Lbr -
8 Oker Kg -
KUAS
1 Alang - Alang / Saput Ikat -
1 Kuas Bh 4,000.00
ALUMUNIUM
1 Asbes gelombang 300 x 80 cm Lbr -
2 Asbes gelombang 300 x 1.05 cm Lbr -
3 Asbes gelombang 240 x 80 cm Lbr -
4 Asbes gelombang 180 x 80 cm Lbr -
5 Asbes gelombang 150 x 80 cm Lbr -
6 Bubung Asbes Gelombang Lbr -
7 Eternit Asbes Bh -
8 Atap Alumunium Gelombang t.0.55 M2 -
9 Nok Standart 40 cm 18 SWG 22 M2 -
1 Alumunium Foil M2 4,950.00
2 Screening Alumunium M2 600,000.00
2 Plat Asbes tb.6 mm Lbr -
3 Plat Asbes tb.5 mm Lbr -
4 Plat Asbes tb.4 mm Lbr -
5 Plat Asbes tb.3.5 mm Lbr -
SANITAIR
1 Kloset Monoblok Bh -
2 Kloset Duduk Bh -
3 Kloset Jongkok Bh -
4 Kran Air D 1/2" Bh -
5 Kran Air D 3/4" Bh -
6 Kran shower Bh -
7 Stop Kran Bh -
8 Pipa / Slang Spiral Saluran Kran Set -
9 Pipa Stainless M' -
10 Rol TBA / Seal Tape Bh -
11 Septictank Asbes Kotak ( 10 Pemakai ) 1000 1 Bh -
12 Septictank Asbes Kotak ( 5 Pemakai ) 500 1 Bh -
13 Sifon Wasser Set -
14 Sumur Peresapan Bh -
15 Watermur Bh -
16 Water Drain + Aksesoris Set -
17 Wastafel Bh -
18 Urinoir Bh -
19 Bak Fibreglass Bh -
20 Bak Teraso Bh -
21 Bak Cuci Teraso Bh -
22 Bak Dip Bh -
23 Floor Drain Bh -
24 Tempat Sabun Bh -
25 Kichen Zink 1 lubang Bh -
26 Hand Shower Bh -
27 Tempat Tissue Bh -
28 Tangki Air Fiberglass 1000 Ltr Unit -
29 Tangki Air Fiberglass 2000 Ltr Unit -
30 Tangki Air Fiberglass 3000 Ltr Unit -
AKSESORIS
1 Venetions Blinds M2 -
2 Vertikal Blinds M2 -
3 Wall paper M3 -
PIPA
1 Pipa Besi 4" biasa Lj -
2 Pipa Besi 3" biasa Lj -
3 Pipa Besi 2 1/2" biasa Lj -
4 Pipa Besi 2" biasa Lj -
5 Pipa Besi 1" biasa Lj -
6 Pipa Besi 3/4" biasa Lj -
7 Pipa Besi 1/2" biasa Lj -
8 Pipa Besi 4" ( Medium) Lj -
9 Pipa Besi 3" (Medium) Lj -
10 Pipa Besi 2 1/2" (Medium) Lj -
11 Pipa Besi 2" (Medium) Lj -
12 Pipa Besi 1" (Medium) Lj -
13 Pipa Besi 3/4" (Medium) Lj -
14 Pipa Besi 1/2" (Medium) Lj -
15 Pipa PVC AW 4" ( 4 M' ) Lj -
16 Pipa PVC AW 3" ( 4 M' ) Lj -
17 Pipa PVC AW 2 1/2" ( 4 M' ) Lj -
18 Pipa PVC AW 2" ( 4 M' ) Lj -
19 Pipa PVC AW 1 1/2" ( 4 M' ) Lj -
PAVING STONE
1 Pavingstone warna abu-abu 8 Cm (K 125) M2 -
2 Pavingstone warna abu-abu 6 Cm (K 125) M2 -
3 Pavingstone warna abu-abu 8 Cm (K 225) M2 -
4 Pavingstone warna abu-abu 6 Cm (K 225) M2 -
5 Pavingstone warna abu-abu 8 Cm (K 400) M2 -
6 Pavingstone warna abu-abu 8 Cm (K 300) M2 -
7 Pavingstone warna abu-abu 6 Cm (K 300) M2 -
8 Pavingstone warna 8 Cm (K 125) M2 -
9 Pavingstone warna 6 Cm (K 125) M2 -
10 Pavingstone warna 8 Cm (K 225) M2 -
11 Pavingstone warna 6 Cm (K 225) M2 -
12 Pavingstone warna 8 Cm (K 400) M2 -
13 Pavingstone warna 8 Cm (K 300) M2 -
14 Pavingstone warna 6 Cm (K 300) M2 -
15 Kansteen besar M' -
16 Kansteen kecil M' -
ASPAL
1 Aspal Bitumen Kg -
2 Aspal Curah Kg -
3 Aspal Beton Ton -
4 Kerosina Ltr -
5 Solar Ltr -
6 Bensin Ltr -
7 Olie (minyak pelumas) Ltr -
8 Minyak Bekisting Ltr -
TANAMAN
1 Cemara Bh -
2 Beringin Bh -
LAIN - LAIN.
1 Gedek M2 -
2 Bambu Ljr -
3 Tali Ijuk Kg -
4 Ijuk M3 -
5 Panel Beton pracetak M' -
6 Kolom Beton pracetak M' -
7 Holoowblok ( HB 10 ) Bh -
8 Holoowblok ( HB 15 ) Bh -
9 Holoowblok ( HB 20 ) Bh -
10 Concrete blok Bh -
11 Bondeam Bh -
12 Pintu Besi Baja M2 -
13 Jendela Besi M2 -
14 Jendela Besi Tahan Api M2 -
15 Bahan Teralux Cor M2 -
16 Carpet M2 -
17 Carpet 100 % wool M2 -
18 Carpet 80 % wool, 20 % nylon M2 -
19 Gymfloor M2 -
A.3 1 M' Pagar sementara dari kawat duri tinggi 1,80 meter
A.3.1 Bahan
Dolken kayu D 8-10 / 400 cm 1.000 Btg 8,750.00 8,750.00
Semen Portland 2.000 Kg 820.00 1,640.00
Kawat duri 25.000 Kg - -
Pasir beton 0.005 M3 92,200.00 461.00
Koral beton 0.009 M3 122,950.00 1,106.55
Paku 2"- 5" 0.060 Kg 10,250.00 615.00
Jumlah 12,572.55
A.3.2 Tenaga
Tukang kayu 0.200 Oh 40,000.00 8,000.00
Pekerja 0.300 Oh 25,000.00 7,500.00
Kepala Tukang 0.020 Oh 50,000.00 1,000.00
Mandor 0.020 Oh 60,000.00 1,200.00
Jumlah 17,700.00
Total 30,272.55
Jumlah 186,655.00
Total 186,655.00
Total 397,119.00
C.17 1 M' Pembuatan tiang pancang (40 X40 ) Cm, beton bertulang
C.17.1 Bahan
Pasir urug darat 0.019 M3 66,600.00 1,265.40
Pasir beton 0.094 M3 92,200.00 8,666.80
Koral beton 0.150 M3 122,950.00 18,442.50
Semen portland 60.500 Kg 820.00 49,610.00
Besi beton 45.000 Kg 5,000.00 225,000.00
Kawat beton 0.900 Kg 9,250.00 8,325.00
Kayu kaso 5/7 0.032 M3 1,434,200.00 45,894.40
Paku 0.120 Kg 10,250.00 1,230.00
Minyak bekisting 0.090 Lt 2,600.00 234.00
Plamir tembok 0.240 Kg 10,250.00 2,460.00
Jumlah 361,128.10
C.17.2 Tenaga
Pekerja 1.000 Oh 25,000.00 25,000.00
Tukang batu 0.670 Oh 40,000.00 26,800.00
Kepala Tukang 0.067 Oh 50,000.00 3,350.00
Mandor 0.050 Oh 60,000.00 3,000.00
Jumlah 58,150.00
Total 419,278.10
Jumlah 14,300.00
Total 35,636.20
D.25.2 Tenaga
Pekerja 0.300 Oh 25,000.00 7,500.00
Tukang batu 0.100 Oh 40,000.00 4,000.00
Kepala Tukang 0.010 Oh 50,000.00 500.00
Mandor 0.015 Oh 60,000.00 900.00
Jumlah 12,900.00
Total 26,175.00
E.27.1 Bahan
Semen Portland 7.070 Kg 820.00 5,797.40
Pasir pasang 0.021 M3 79,400.00 1,667.40
Jumlah 7,464.80
E.27.2 Tenaga
Pekerja 0.150 Oh 25,000.00 3,750.00
Tukang batu 0.070 Oh 40,000.00 2,800.00
Kepala Tukang 0.007 Oh 50,000.00 350.00
Mandor 0.008 Oh 60,000.00 480.00
Jumlah 7,380.00
Total 14,844.80
F.21.1 Bahan
Kayu jati papan 0.020 M3 - -
Paku biasa 1/2 " - 1 " 0.300 Kg 10,250.00 3,075.00
Lem kayu 0.800 Ltr - -
Playwood 4' x 8' x 4 mm 1.000 Lbr - -
Formika 0.500 Lbr - -
Jumlah 3,075.00
F.21.2 Tenaga
Pekerja 0.800 Oh 25,000.00 20,000.00
Tukang kayu 2.500 Oh 40,000.00 100,000.00
Kepala Tukang 0.250 Oh 50,000.00 12,500.00
Mandor 0.040 Oh 60,000.00 2,400.00
Jumlah 134,900.00
Total 137,975.00
F.24 1 M2 Pasang pintu teakwood & formika, rangka kayu kamper (Divernis)
F.24.1 Bahan
Kayu kamper papan 0.020 M3 - -
Paku biasa 1/2 " - 1 " 0.300 Kg 10,250.00 3,075.00
Lem kayu 0.800 Ltr - -
Teakwood 4' x '8' x 4' mm 0.500 Lbr - -
Vernis 0.500 Ltr - -
formika 4' x 8' 0.500 Lbr - -
Jumlah 3,075.00
F.24.2 Tenaga
Pekerja 0.800 Oh 25,000.00 20,000.00
Tukang kayu 2.500 Oh 40,000.00 100,000.00
Kepala Tukang 0.250 Oh 50,000.00 12,500.00
Mandor 0.040 Oh 60,000.00 2,400.00
Jumlah 134,900.00
Total 137,975.00
F.34.2 Tenaga
Pekerja 0.100 Oh 25,000.00 2,500.00
Tukang kayu 0.100 Oh 40,000.00 4,000.00
Kepala Tukang 0.010 Oh 50,000.00 500.00
Mandor 0.005 Oh 60,000.00 300.00
Jumlah 7,300.00
Total 8,837.50
Jumlah 28,500.00
Total 29,525.00
G.4 1M3 Membuat lantai kerja beton tumbuk, 1Pc : 3 Ps : 5 Kr, tbl 5 cm
G.4.1 Bahan
Semen portland 10.000 Kg 820.00 8,200.00
Pasir beton 0.026 M3 92,200.00 2,397.20
Koral beton 0.040 M3 122,950.00 4,918.00
Jumlah 15,515.20
G.4.2 Tenaga
Pekerja 1.150 Oh 25,000.00 28,750.00
Tukang Batu 0.020 Oh 40,000.00 800.00
Kepala Tukang 0.002 Oh 50,000.00 100.00
Mandor 0.006 Oh 60,000.00 360.00
Jumlah 30,010.00
Total 45,525.20
Total 95,140.25
Jumlah 2,182,967.50
G.49.2 Tenaga
Pekerja 5.800 Oh 25,000.00 145,000.00
Tukang Batu 0.350 Oh 40,000.00 14,000.00
Tukang kayu 2.800 Oh 40,000.00 112,000.00
Tukang besi 1.050 Oh 35,000.00 36,750.00
Kepala Tukang 0.420 Oh 50,000.00 21,000.00
Mandor 0.185 Oh 60,000.00 11,100.00
Jumlah 339,850.00
Total 2,522,817.50
H.8.2 Tenaga
Pekerja 0.140 Oh 25,000.00 3,500.00
Tukang Kayu 0.075 Oh 40,000.00 3,000.00
Kepala Tukang 0.008 Oh 50,000.00 400.00
Mandor 0.008 Oh 60,000.00 480.00
Jumlah 7,380.00
Total 7,380.00
Jumlah 6,230.00
Total 15,980.00
Total 6,180.00
Jumlah 17.50
I.14.2 Tenaga
Pekerja 0.200 Oh 25,000.00 5,000.00
Tukang kayu 0.600 Oh 40,000.00 24,000.00
Kepala tukang 0.060 Oh 50,000.00 3,000.00
Mandor 0.010 Oh 60,000.00 600.00
Jumlah 32,600.00
Total 32,617.50
I.21.2 Tenaga
Pekerja 0.270 Oh 25,000.00 6,750.00
Tukang kayu 0.400 Oh 40,000.00 16,000.00
Kepala tukang 0.040 Oh 50,000.00 2,000.00
Mandor 0.014 Oh 60,000.00 810.00
Jumlah 25,560.00
Total 42,578.30
Tenaga
Pekerja 1.000 Oh 25,000.00 25,000.00
Tukang batu 1.500 Oh 40,000.00 60,000.00
Kepala tukang 0.300 Oh 50,000.00 15,000.00
Mandor 0.110 Oh 60,000.00 6,600.00
Jumlah 106,600.00
Total 114,414.00
J.10.1 Bahan
Pipa Beton 1.100 Bh - 0.00
Batu Bata 0.027 M3 300.00 8.10
Semen Portland 3.920 Kg 820.00 3,214.40
Pasir Pasang 0.056 M3 79,400.00 4,446.40
Pasir Urug 0.024 M3 66,600.00 1,598.40
Jumlah 9,267.30
J.10.2 Tenaga
Pekerja 0.140 Oh 25,000.00 3,500.00
Tukang batu 0.070 Oh 40,000.00 2,800.00
Kepala tukang 0.007 Oh 50,000.00 350.00
Mandor 0.070 Oh 60,000.00 4,200.00
Jumlah 10,850.00
Total 20,117.30
J.12 Memasang 1 buah bak kontrol pasangan batu bata uk. (30 x 30)cm tinggi 35 cm
J.12.1 Bahan
Batu bata 0.145 M3 300.00 43.50
Semen portland 44.000 Kg 820.00 36,080.00
Pasir pasang 0.070 M3 79,400.00 5,558.00
Batu kerikil 0.070 M3 - 0.00
Besi beton 1.600 Kg 5,000.00 8,000.00
Pasir beton 0.060 M3 92,200.00 5,532.00
Jumlah 55,213.50
J.12.2 Tenaga
Pekerja 3.200 Oh 25,000.00 80,000.00
Tukang batu 1.015 Oh 40,000.00 40,600.00
Kepala tukang 0.002 Oh 50,000.00 75.00
Mandor 0.016 Oh 60,000.00 960.00
Jumlah 121,635.00
Total 176,848.50
J.13 Memasang 1 buah bak kontrol pasangan batu bata uk. (45 x 45 )cm tinggi 50 cm
J.13.1 Bahan
Batu bata 0.250 M3 300.00 75.00
Semen portland 77.000 Kg 820.00 63,140.00
Pasir pasang 0.130 M3 79,400.00 10,322.00
Batu kerikil 0.020 M3 - 0.00
Besi beton 2.600 Kg 5,000.00 13,000.00
Pasir beton 0.090 M3 92,200.00 8,298.00
Jumlah 94,835.00
J.13.2 Tenaga
Pekerja 1.420 Oh 25,000.00 35,500.00
Tukang batu 0.473 Oh 40,000.00 18,920.00
Kepala tukang 0.047 Oh 50,000.00 2,350.00
Mandor 0.071 Oh 60,000.00 4,260.00
Jumlah 61,030.00
Total 155,865.00
J.14 Memasang 1 buah bak kontrol pasangan batu bata uk. (60 x 60)cm tinggi 65 cm
J.14.1 Bahan
Batu bata 0.371 M3 300.00 111.30
Semen portland 114.000 Kg 820.00 93,480.00
Pasir pasang 0.184 M3 1,588.00 292.19
Batu koral 0.033 M3 122,950.00 4,057.35
Besi beton 4.850 Kg 5,000.00 24,250.00
Pasir beton 0.120 M3 92,200.00 11,064.00
Jumlah 133,254.84
J.14.2 Tenaga
Pekerja 2.160 Oh 25,000.00 54,000.00
Tukang batu 0.720 Oh 40,000.00 28,800.00
Kepala tukang 0.072 Oh 50,000.00 3,600.00
Mandor 0.108 Oh 60,000.00 6,480.00
Tukang gali 0.100 Oh 30,000.00 3,000.00
Jumlah 95,880.00
Total 229,134.84
J.31.2 Tenaga
Pekerja 0.010 Oh 25,000.00 250.00
Tukang batu 0.100 Oh 40,000.00 4,000.00
Kepala tukang 0.010 Oh 50,000.00 500.00
Mandor 0.005 Oh 60,000.00 300.00
Jumlah 5,050.00
Total 5,050.00
Total 78,360.00
Total 7,205.00
K.24 1 M' Pasang Talang 1/2 lingkaran D-10 cm, Seng BJLS 28
K.24.1 Bahan
Seng plat 3' x 6' bjls 28 0.300 Lbr 37,800.00 11,340.00
Paku biasa 1/2" - 1" 0.100 Kg 8,750.00 875.00
Kayu borneo, papan 0.019 M3 717,100.00 13,624.90
Besi Strip 0.500 Kg - -
Jumlah 25,839.90
K.24.2 Tenaga
Pekerja 0.150 Oh 25,000.00 3,750.00
Tukang kayu 0.250 Oh 40,000.00 10,000.00
K.25 1 M' Pasang Talang 1/2 lingkaran D-10 cm, Seng BJLS 24
K.25.1 Bahan
Seng plat 3' x 6' bjls 28 0.300 Lbr 37,800.00 11,340.00
Paku biasa 1/2" - 1" 0.100 Kg 8,750.00 875.00
Kayu borneo, papan 0.019 M3 717,100.00 13,624.90
Besi Strip 0.500 Kg - -
Jumlah 25,839.90
K.25.2 Tenaga
Pekerja 0.150 Oh 25,000.00 3,750.00
Tukang kayu 0.250 Oh 40,000.00 10,000.00
Kepala tukang 0.025 Oh 50,000.00 1,250.00
Mandor 0.001 Oh 60,000.00 75.00
Jumlah 15,075.00
Total 40,914.90
L.7.2 Tenaga
Pekerja 0.020 Oh 25,000.00 500.00
Tukang Kayu 0.200 Oh 40,000.00 8,000.00
Kepala tukang 0.020 Oh 50,000.00 1,000.00
Mandor 0.010 Oh 60,000.00 600.00
Jumlah 10,100.00
Total 10,100.00
Jumlah 9,009.40
M.6.2 Tenaga
Pekerja 0.270 Oh 25,000.00 6,750.00
Tukang Batu 0.130 Oh 40,000.00 5,200.00
Kepala tukang 0.013 Oh 50,000.00 650.00
Mandor 0.014 Oh 60,000.00 810.00
Jumlah 13,410.00
Total 22,419.40
M46.2 Tenaga
Pekerja 0.620 Oh 25,000.00 15,500.00
Tukang Batu 0.350 Oh 40,000.00 14,000.00
Kepala tukang 0.035 Oh 50,000.00 1,750.00
Mandor 0.030 Oh 60,000.00 1,800.00
Jumlah 33,050.00
Total 45,716.40
Jumlah 9,055.20
M.60.2 Tenaga
Pekerja 0.600 Oh 25,000.00 15,000.00
Tukang Batu 0.450 Oh 40,000.00 18,000.00
Kepala tukang 0.045 Oh 50,000.00 2,250.00
Mandor 0.030 Oh 60,000.00 1,800.00
Jumlah 37,050.00
Total 46,105.20
N.3 1 M2 Mengerok Karat Cat Lama Permukaan Baja dgn Cara Manual
N.3.1 Bahan
Sabun 0.050 Kg - -
Jumlah -
N.3.2 Tenaga
Pekerja 0.150 Oh 25,000.00 3,750.00
Tukang cat 0.000 Oh 35,000.00 -
Kepala tukang 0.000 Oh 50,000.00 -
Mandor 0.003 Oh 60,000.00 150.00
Jumlah 3,900.00
Total 3,900.00
N.8 1 M2 Pengecatan Bid. Kayu Baru (1 lapis plamir), 1 lapis cat dasar,
2 lapis cat penutup
N.8.1 Bahan
Cat Meni 0.200 Kg - -
Plamir 0.150 Kg - -
Cat dasar 0.170 Kg - -
Cat penutup 2 kali 0.260 Kg - -
Jumlah -
N.8.2 Tenaga
Pekerja 0.070 Oh 25,000.00 1,750.00
Tukang cat 0.009 Oh 35,000.00 315.00
Kepala tukang 0.006 Oh 50,000.00 300.00
Mandor 0.003 Oh 60,000.00 150.00
Jumlah 2,515.00
Total 2,515.00
N.10 1 M2 Pengecatan Bid. Kayu Baru (1 lapis plamir), 1 lapis cat dasar,
3 lapis cat penutup
N.10.1 Bahan
Cat Meni 0.200 Kg - -
Plamir 0.150 Kg - -
Cat dasar 0.170 Kg - -
Cat penutup 3 kali 0.350 Kg - -
Jumlah -
N1.10.2 Tenaga
Pekerja 0.070 Oh 25,000.00 1,750.00
Tukang cat 0.105 Oh 35,000.00 3,675.00
Kepala tukang 0.004 Oh 50,000.00 200.00
Mandor 0.003 Oh 60,000.00 150.00
Jumlah 5,775.00
Total 5,775.00
N.13.2 Tenaga
Pekerja 0.100 Oh 25,000.00 2,500.00
Tukang cat - Oh 35,000.00
Kepala tukang - Oh 50,000.00
Mandor 0.006 Oh 60,000.00 360.00
Jumlah 2,860.00
Total 3,770.00
N.16 1 M2 pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
N.16.1 Bahan
Cat dasar 0.120 Kg - -
Cat penutup 2 kali 0.180 Kg - -
Jumlah -
N.16.2 Tenaga
Pekerja 0.028 Oh 25,000.00 700.00
Tukang cat 0.042 Oh 35,000.00 1,470.00
Kepala tukang 0.004 Oh 50,000.00 210.00
Mandor 0.003 Oh 60,000.00 150.00
Jumlah 2,530.00
Total 2,530.00
Aluminium C 0.040 Kg -
Aluminium B 0.040 Kg -
Pengencer 0.010 Ltr - -
Perancah kayu 0.002 M3 - -
Jumlah 2,460.00
N.23.2 Tenaga
Pekerja 0.006 Oh 25,000.00 150.00
Tukang cat 0.006 Oh 35,000.00 210.00
Kepala tukang 0.023 Oh 50,000.00 1,125.00
Mandor 0.008 Oh 60,000.00 450.00
Jumlah 1,935.00
Total 4,395.00
HSPK
NO NAMA BAHAN SAT
Rp.
BATU
1 1 M' Pagar sementara dari kayu tinggi 2 meter M3 139,672.45
2 1 M' Pagar sementara dari sebng gelombang tinggi 2 mete M3 144,167.45
3 1 M' Pagar sementara dari kawat duri tinggi 1,80 meter M3 30,272.55
4 1 M' Pengukuran dan pemasangan bouwplank M3 36,547.50
5 1 M2 Pembuatan kantor sementara , dengan lantai pleste M3 626,049.50
6 1 M2 Pembuatan gudang semen dan alat alat M3 551,455.00
7 1 M2 Pembuatan rumah jaga / konstruksi kayu M3 651,986.40
8 1 M2 Membersihkan lapangan dan perataan M3 5,500.00
9 1 M2 Pembuatan bedeng buruh M3 508,183.90
10 1 M2 Pembuatan bak adukan ukuran 40 x 50 x 20 cm M3 1,472,925.60
11 1 M2 Pembuatan Stegger dari bambu M3 7,810.00
12 1 M2 Pembuatan jalan sementara M3 55,842.00
13 1 M3 Bongkaran beton bertulang M2 186,655.00
14 1 M3 Bongkaran dinding tembok bata merah Kg 168,655.00
15 1 M2 Pasang pagar kawat jaring galvanis panjang 240 cm Kg 2,840.00
16 1 M ' Pasang pagar beton pracetak ( 5 x 50 x 213 cm ) M2 77,788.50
1 M2 Bongkaran Atap Zincalum M2 13,100.00
1 M2 Bongkaran Screning Alumunium M2 15,500.00
B PEKERJAAN TANAH
1 M3 Galian tanah biasa sedalam 1 meter M3 16,270.00
1 M3 Galian tanah biasa sedalam 2 meter M3 16,270.00
1 M3 Galian tanah biasa sedalam 1.5 meter M3 29,017.50
1 M3 Galian tanah biasa sedalam 3 meter M3 22,755.00
1 M3 Galian tanah keras sedalam 1 meter M3 19,345.00
1 M3 galian tanah cadas sedalam 1 meter M3 38,750.00
1 M3 Galian tanah lumpur sedalam 1 meter M3 25,555.00
1 M2 Pekerjaan stripping setinggi 1 meter M3 1,550.00
1 M3 Pembuangan tanah sejauh 150 meter M3 15,900.00
1 Ttk Bor Strouss 2 m Ttk 38,000.00
1 M3 Urugan kembali M3 5,940.00
1 M3 Pemadatan tanah M3 15,500.00
1 M3 Urugan pasir M3 88,020.00
1 M3 Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL M3 101,597.30
1 M3 Lapisan pudel campuran 1 Kp : 5 TL M3 90,475.00
1 M3 Pemasangan lapisan ijuk M3 4,650.00
1 M3 Urugan sirtu M3 81,550.00
1 M2 Pembuatan jalan sementara tebal 25 cm M2 69,343.50
C PEKERJAAN PONDASI
1 M3 Pasang pondasi batu kali,1 PC : 1 Ps M3 539,341.60
1 M3 Pasang pondasi batu kali,1 PC : 2 Ps M3 411,910.00
1 M3 Pasang pondasi batu kali,1 PC : 2,5 Ps M3 539,341.60
1 M3 Pasang pondasi batu kali,1 PC : 3 Ps M3 397,119.00
1 M3 Pasang pondasi batu kali,1 PC : 4 Ps M3 367,918.00
1 M3 Pasang pondasi batu kali,1 PC : 5 Ps M3 347,683.60
1 M3 Pasang pondasi batu kali,1 PC : 6 Ps M3 333,453.40
1 M3 Pasang pondasi batu kali,1 PC : 8 Ps M3 312,133.40
1 M3 Pasang pondasi batu kali,1Kp : 1 Sm, : 1 Ps M3 238,167.35
1 M3 Pasang pondasi batu kali,1Kp : 1 Sm, : 2 Ps M3 221,453.50
1 M3 Pasang pondasi batu kali,1 PC : 1/4 Kp : 4 Ps M3 367,259.60
1 M3 Pasang pondasi batu kali,1 PC : 3 Kp : 10 Ps M3 282,054.80
1 M3 Pasang pondasi batu kali,1/4 PC : 1 Kp : 4 Ps M3 268,116.20
1 M3 Pasang pondasi batu kosong M3 194,610.00
1 M3 Pasang pondasi siklop , 40 % batu kali M3 755,017.00
1 M3 Pasang pondasi sumuran , diameter 100 cm M3 481,981.50
1 M' Pembuatan tiang pancang (40 X40 ) Cm, beton bertu M' 419,278.10
1 M' Pembuatan tiang pancang ( 35 x 35 ) cm, beton bert M' 330,102.75
D PEKERJAAN DINDING
1 M2 Pasangan bata merah tebal 1 bata ,1 PC : 1 Ps M2 126,239.20
1 M2 Pasangan bata merah tebal 1 bata ,1 PC : 2 Ps M2 111,072.00
1 M2 Pasangan bata merah tebal 1 bata ,1 PC : 3 Ps M2 103,294.40
1 M2 Pasangan bata merah tebal 1 bata ,1 PC : 4 Ps M2 98,205.20
1 M2 Pasangan bata merah tebal 1 bata ,1 PC : 5 Ps M2 95,352.80
1 M2 Pasangan bata merah tebal 1 bata ,1 PC : 6 Ps M2 95,352.80
1 M2 Pasangan bata merah tebal 1 bata, 1 PC : 3 Kp : 10 M2 84,660.10
1 M2 Pasangan bata merah tebal 1/2 bata ,1 PC : 1 Ps M2 59,419.20
Harga Bahan Proyek ....... 04/13/2019 HAL : 107
HSPK
NO NAMA BAHAN SAT
Rp.
1 M2 Pasangan bata merah tebal 1/2 bata ,1 PC : 2 Ps M2 52,956.20
1 M2 Pasangan bata merah tebal 1/2 bata ,1 PC : 3 Ps M2 49,359.40
1 M2 Pasangan bata merah tebal 1/2 bata ,1 PC : 4 Ps M2 47,244.20
1 M2 Pasangan batu merah tebal 1/2 bata , 1 PC : 5 Ps M2 45,910.60
1 M2 Pasangan bata merah tebal 1/2 bata ,1 PC : 6 Ps M2 45,113.00
1 M2 Pasangan bata merah tebal 1/2 bata ,1 PC : 8 Ps M2 43,700.00
1 M2 Pasangan bata merah tebal 1/2 bata, 1 PC : 3 Kp : M2 42,060.00
1 M2 Pasangan Bata Merah tebal 1/2 Bata - 1 Kp : 1 Sm : M2 35,843.96
1 M2 Pasangan Bata Merah tebal 1/2 Bata - 1 Kp : 1 Sm : M2 36,634.68
1 M2 Pasangan Dinding Hollowblock ( HB 20 ) M2 41,151.20
1 M2 Pasangan Dinding Hollowblock ( HB 15 ) M2 35,636.20
1 M2 Pasangan Dinding Hollowblock ( HB 10 ) M2 31,443.80
1 M2 Pasangan Dinding conblock ( CB 20 ) M2 53,950.45
1 M2 Pasangan Dinding conblock ( CB 15 ) M2 32,829.50
1 M2 Pasangan Dinding conblock ( CB 10 ) M2 36,326.25
1 M2 Pasang Dinding Latei M2 42,850.50
1 M2 Pasang dinding roster / terawang ( 12 x 11 x 24 ) c M2 26,175.00
1 M2 Pasang bata berongga ukuran ( 5 x 11 x 24 ) cm M2 244,301.00
1 M2 Pasang Dinding Anyaman Bambu, Rangka Kayu M2 4,993.00
E PEKERJAAN PLESTERAN
1 M2 Plesteran 1 PC : 1 Ps , tebal 15 mm M2 23,976.60
1 M2 Plesteran 1 PC : 2 Ps , tebal 15 mm M2 20,686.20
1 M2 Plesteran 1 PC : 3 Ps , tebal 15 mm M2 19,172.20
1 M2 Plesteran 1 PC : 4 Ps , tebal 15 mm M2 18,202.00
1 M2 Plesteran 1 PC : 5 Ps , tebal 15 mm M2 17,639.20
1 M2 Plesteran 1 PC : 6 Ps , tebal 15 mm M2 17,193.80
1 M2 Plesteran 1 PC : 8 Ps , tebal 15 mm M2 16,617.20
1 M2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, tb.15 mm M2 18,105.40
1 M2 Plesteran 1 Pc : 3 Kp : 10 Ps, tbl 15 mm M2 14,970.40
1 M2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, tbl 15 mm M2 16,318.60
1 M2 Plesteran 1 Kp : 1 Sm : 1 Ps, tbl 15 mm M2 13,143.35
1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, tbl 15 mm M2 13,546.74
1 M2 Plesteran 1 PC : 3 Ps,tebal 20 mm M2 26,920.40
1 M2 Plesteran 1 PC : 4 Ps,tebal 20 mm M2 25,340.80
1 M2 Plesteran 1 PC : 5 Ps,tebal 20 mm M2 24,201.00
1 M2 Plesteran 1 PC : 6 Ps,tebal 20 mm M2 23,498.80
1 M2 Plesteran 1Kp:1Sm:2Ps - tb.20 mm M2 17,429.20
1 M2 Plesteran 1 PC : 2 Ps,tebal 25 mm M2 31,022.20
1 M2 Plesteran 1 PC : 3 Ps,tebal 25 mm M2 29,694.00
1 M2 Plesteran 1 PC : 4 Ps,tebal 25 mm M2 28,070.80
1 M2 Plesteran 1 PC : 5 Ps,tebal 25 mm M2 26,887.40
1 M2 Plesteran 1 PC : 2 Ps,tebal 30 mm M2 38,222.00
1 M2 Plesteran 1 PC : 3 Ps,tebal 30 mm M2 34,849.60
1 M2 Plesteran 1 PC : 4 Ps,tebal 30 mm M2 32,816.40
1 M2 Plesteran 1 PC : 5 Ps,tebal 30 mm M2 30,438.80
1 M2 Berapen 1 PC : 3 Ps,tebal 30 mm M2 14,844.80
1 M2 Berapen 1 PC : 5 Ps,tebal 15 mm M2 13,855.60
1 M2 Plesteran Beton 1 PC : 2 Ps,tebal 15 mm M2 25,335.20
1 M2 Plesteran Beton 1 PC : 3 Ps,tebal 15 mm M2 23,744.80
1 M2 Plesteran Skoning 1 PC : 2 Ps M2 5,533.80
1 M2 Plesteran Granito 1 PC warna : 2 Granito, tebal 10 M2 2,450.00
1 M2 Plesteran Teraso 1 PC warna : 2 batu teraso, tebal M2 21,750.00
1 M2 Plesteran Ciprat, 1 PC : 2 Ps M2 16,462.80
1 M2 Plesteran Siar Adukan 1 PC : 2 Ps M2 12,192.80
1 M2 Plesteran Waterproof Batacote 3 lapis M2 18,286.40
F PEKERJAAN KAYU
1 M3 Pasang kusen pintu dan jendela kayu jati M3 1,068,000.00
1 M3 Pasang kusen pintu dan jendela kayu kamper M3 988,000.00
1 M3 Pasang kusen pintu dan jendela kayu borneo M3 3,262,180.00
1 M3 Pasang kusen pintu dan jendela kayu damar laut M3 3,262,180.00
1 M2 Pasang pintu klamp kayu kamper M3 57,592.50
1 M2 Pasang pintu klamp kayu borneo M3 118,443.30
1 M2 Pasang pintu Panel kayu jati M3 140,500.00
1 M2 Pasang pintu panel kayu kamper M3 140,500.00
1 M2 Pasang pintu dan jendela kaca kayu jati M3 112,400.00
1 M2 Pasang pintu dan jendela kaca kayu kamper M3 112,400.00
1 M2 Pasang pintu dan jendela kaca kayu borneo M3 171,560.50
1 M2 Pasang pintu dan jendela jalusi kayu jati M3 178,000.00
1 M2 Pasang pintu dan jendela jalusi kayu kamper M3 190,000.00
1 M2 Pasang pintu Playwood rangkap,rangka kayu jati M3 107,107.50
1 M2 Pasang pintu Playwood rangkap,rangka kayu kamper M3 107,107.50
1 M2 Pasang jalusi mati kusen kayu jati M3 105,537.50
1 M2 Pasang jalusi mati kusen kayu kamper M3 105,537.50
1 M2 Pasang pintu plywood rangkap, rangka kayu borne M3 140,237.38
G PEKERJAAN BETON
1M3 Membuat beton tumbuk, 1Pc : 3 Ps : 5 Kr M3 390,970.50
1M3 Membuat beton tumbuk, 1Pc : 3 Ps : 6 Kr M3 377,747.00
1M3 Membuat beton tumbuk, 1Pc : 4 Ps : 6 Kr M3 358,680.50
1M3 Membuat lantai kerja beton tumbuk, 1Pc : 3 Ps : 5 K M3 45,525.20
1M3 Membuat beton bertulang , 1Pc : 2 Ps : 3 Kr M3 391,385.00
1M3 Membuat beton bertulang , 1Pc : 2 Ps : 4 Kr M3 439,045.00
1M3 Membuat beton bertulang , 1Pc : 2 Ps : 2,5 Kr M3 483,637.00
1M3 Membuat beton bertulang, 1Pc : 1,5 Ps : 3 Kr M3 455,157.00
1M3 Membuat beton bertulang , 1Pc : 1,5 Ps : 2,5 Kr M3 513,055.00
1M3 Membuat beton bertulang 1 Pc : 1 Ps : 2 Kr M3 575,177.00
1M3 Membuat tiang pancang prestressed beton M3 562,560.00
1M3 Membuat beton dengan puzzdith - 100 XR M3 482,197.50
1m3 Membuat beton bertulang , 1Pc : 2 Ps : 3 Kr M3 550,647.50
1m3 Membuat beton bertulang , 1Pc : 2 Ps : 4 Kr M3 522,047.50
1M3 Membuat beton bertulang, 1Pc : 1,5 Ps : 3 Kr M3 575,454.00
1M3 Membuat beton bertulang , 1Pc : 1,5 Ps : 2,5 Kr M3 596,366.00
1M3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr M3 741,928.00
1M3 Membuat beton kedap air dengan strorox - 100 M3 596,366.00
1M' Memasang PVC Waterstop lebar 150 mm M 2,720.00
1M' Memasang PVC Waterstop lebar 200 mm M 2,945.00
1M' Memasang PVC Waterstop lebar 230 mm M 15,330.00
1M' Memasang PVC Waterstop lebar 250 mm M 15,330.00
1M' Memasang PVC Waterstop lebar 300 mm M 15,330.00
1M' Memasang PVC Waterstop lebar 320 mm M 15,330.00
1 Kg Pembesian dengan besi polos atau besi ulir KG 5,861.75
1 Kg Kabel presstressed polos / strands KG 435.50
1 Kg Jaring kawat baja KG 14,261.25
1 M2 Pasang bekisting untuk pondasi M2 51,519.00
1 M2 Pasang bekisting untuk sloof M2 55,104.50
1 M2 Pasang bekisting untuk kolom M2 130,641.25
1 M2 Pasang bekisting untuk balok M2 136,826.70
1 M2 Pasang bekisting untuk lantai M2 137,441.25
1 M2 Pasang bekisting untuk dinding M2 113,496.00
Harga Bahan Proyek ....... 04/13/2019 HAL : 109
HSPK
NO NAMA BAHAN SAT
Rp.
1 M2 Pasang bekisting untuk tangga M2 95,140.25
1 M3 Membuat beton dengan mutu K 175 M3 649,377.50
1 M3 Membuat beton dengan mutu K 225 M3 671,007.50
1 M3 Membuat beton dengan mutu K 275 M3 678,699.00
1 M2 Pasang jembatan cor M2 35,876.44
1 M3 membuat beton Pondasi Strouss Ø 30 M3 1,497,050.79
1 M3 membuat beton Pile Cap 120 x 120 x 40 M3 1,926,330.02
1 M3 membuat beton Sloof 20/30 M3 2,274,723.30
1 M3 membuat beton Kolom 15/15 (praktis) M3 4,906,273.08
1 M3 membuat beton Kolom 30/50 komposit (WF bahan l M3 2,190,509.77
1 M3 membuat beton Balok 15/15 (ring balk) M3 3,246,862.41
1 M3 Membuat pondasi beton bertulang ( 150 kg besi + be M3 1,551,352.50
1 M3 Membuat sloof beton bertulang ( 200 kg besi + bekisting ) M3 1,925,532.00
1 M3 Membuat kolom beton bertulang ( 300 kg besi + beki M3 3,475,142.50
1 M3 Membuat balok beton bertulang ( 200 kg besi + beki M3 2,697,038.00
1 M3 Membuat balok beton bertulang ( 150 kg besi + beki M3 2,522,817.50
1 M3 Membuat dinding beton bertulang ( 150 kg besi + be M3 2,459,335.50
1 M3 Membuat tangga beton bertulang ( 200 kg + bekisti M3 2,503,460.75
1 M' Membuat kolom penguat beton bertulang ( 11 X 11 M 54,526.45
1 M' Membuat ring balok beton bertulang ( 10 X 15 ) cm M 35,097.85