Anda di halaman 1dari 401

DAFTAR HARGA

No TYPE Harga Jual Volume Jumlah Harga


1 Rumah Type GADE T36 231,000,000.00 98.00 231,000,000.00

1 Rumah Type RUBY T42 252,000,000.00 140.00 252,000,000.00

1 Rumah Type SAPHIRE 283,500,000.00 96.00 283,500,000.00

1 RUKO 420,000,000.00 34.00 420,000,000.00


SUMMARY
De SEKAR VALLEY
No Uraian Pekerjaan satuan Volume
A PENDAPATAN
1 PENJUALAN RUMAH
1.1 Kontruksi Rumah Type 70/60 unit 17

17
TOTAL PENDAPATAN

B BIAYA & BEBAN


1 HARGA POKOK TANAH (HPT)
1.1 Beli tanah m2 1,500.00

2 SARANA DAN PRASARANA


2.1 Pemetaan dan Pematangan Lahan m2 1,500.00
2.2 Urugan Sirtu dan Pemadatan m2 300.00
2.3 Drainase Lingkungan m1 150.00
2.4 Pavingstone ut Main Road m2 300.00
2.5 Kansteen m1 150.00
2.6 Instalasi PAM unit 18.00
2.7 Penyambungan Jaringan Listrik unit 18.00
2.8 Ippt,IMB,dan site plan unit 18.00
2.11 Landscape m2 300.00
2.12 Kompensasi Makam m2 67.99

3 HARGA POKOK BANGUNAN ( HPB)


3.1 BIAYA KONTRUKSI
3.1.1 Gate Utama Unit 1
3.1.2 Kontruksi Rumah Type 70/60 m2 1,189.88
3.1.6 Paving Garasi m2 254.98

3.2 BPHTB / Pembeli


3.2.1 Kontruksi Rumah Type 70/60 unit 2.5%

TOTAL ( HPT + HPB )


3.2.5 Biaya Perencanaan dan Pengawasan 1.00%

4 OVER HEAD COST ( OHC )


4.1 BEBAN MARKETING
4.1.1 Iklan & Promotions Unit 17
4.1.2 Adminitrasi Marketing & fee 4.00%
4.1.3 Oprasional Kantor Ls 1

4.2 BEBAN UMUM & PERSONALIA


4.2.1 Gaji Pelaksana & Pegawai bulan 12
4.2.2 ATK bulan 12
4.2.3 Materai,perangko & surat menyurat bulan 12

PERHITUNGAN RUGI LABA


A. PENDAPATAN
B. BIAYA & BEBAN

TOTAL R/L
SUMMARY
SEKAR VALLEY
Harga satuan
Jumlah Harga
hrg jual/unit

375,000,000.00 6,374,375,000.00

-
TOTAL PENDAPATAN 6,374,375,000.00

550,000.00 825,000,000.00
825,000,000.00

15,000.00 22,500,000.00
95,000.00 28,500,000.00
75,000.00 11,250,000.00
125,000.00 37,500,000.00
75,000.00 11,250,000.00
1,800,000.00 32,400,000.00
1,750,000.00 31,500,000.00
2,500,000.00 45,000,000.00
125,000.00 37,500,000.00
200,000.00 13,598,666.67
270,998,666.67
TOTAL (HPT) 1,095,998,666.67

100,000,000.00 100,000,000.00
2,560,000.00 3,046,101,333.33
125,000.00 31,871,875.00
3,177,973,208.33

### 159,359,375.00
159,359,375.00
TOTAL(HPB) 3,337,332,583.33
4,433,331,250.00
### 44,333,312.50

750,000.00 12,748,750.00
### 254,975,000.00
15,000,000.00 15,000,000.00
282,723,750.00

40,000,000.00 480,000,000.00
1,000,000.00 12,000,000.00
1,500,000.00 18,000,000.00
510,000,000.00
Total OHC 792,723,750.00

6,374,375,000.00
5,270,388,312.50

###
21%
harga tanah 550,000.00 /m2 INDEKS AWAL TARGET PENERIMAAN PENJUALAN 6,374,375,000.00 100%
luas tanah 1,457.00 m2 3
BUDGET BIAYA HPP YANG DIKELUARKAN 4,565,630,916.67 71.62%
jumlah kavling 17.00 unit 1 Lahan 1,457.00 550,000.00 801,350,000.00 12.57%
tanah efektif 70% 1,019.90 m2 2 Fasum 437.10 750,000.00 327,825,000.00 5.14%
3 Konstruksi rumah 1,189.88 2,560,000.00 3,046,101,333.33 47.79%
rencana 4 Perijinan 1,457.00 20,000.00 29,140,000.00 0.46%
luas bangunan 70 m2 5 Sertifikasi 17.00 2,500,000.00 42,495,833.33 0.67%
luas kapling 60 m2 6 Pajak Transaksi 5.0% 318,718,750.00 5.00%
rencana anggaran konstruksi 2,560,000 /m2

harga jual harga standar brosur TARGET LABA KOTOR YANG DIHARAPKAN 1,808,744,083.33 28.38%
bangunan 3,942,400.00 m2
kapling/m2 1,650,000.00 m2
375,000,000.00 BUDGET BIAYA ADUM KANTOR 12 bulan 299,975,000.00 4.71%
7 Inventaris kantor 1 15,000,000.00 15,000,000.00 0.24%
bunga 9.00% 8 Marketing dan Promosi 4.00% 254,975,000.00 4.00%
bulan 180 9 Biaya Umum dan Administrasi 2,500,000.00 12 30,000,000.00 0.47%
Analisa TARGET MARKET cicilan kpr Rp2,662,449.78
target market by penghasilan 8,652,961.80
TARGET LABA BERSIH YANG DIHARAPKAN 1,508,769,083.33 23.67%
MODAL
Lahan 100% 801,350,000.00

Fasum 100% 327,825,000.00

Konstruksi rumah 100% 3,046,101,333.33


Return On Investment 0.31 kali
Perijinan 100% 29,140,000.00
Profit Margin 23.67%
Sertifikasi 100% 42,495,833.33

Pajak Transaksi 100% 318,718,750.00


Net Present Value 7% Rp1,410,064,563.86
Inventaris kantor 100% 15,000,000.00

Marketing dan Promosi 100% 254,975,000.00


Break Even Point 13 unit
Biaya Umum dan Administrasi 100% 30,000,000.00

KEBUTUHAN MODAL 4,865,605,916.67

*Harga belum termasuk sambung daya dan PDAM/Sumur bor


harga tanah - /m2 INDEKS AWAL TARGET PENERIMAAN PENJUALAN #DIV/0! 100%
luas tanah - m2 3
BUDGET BIAYA HPP YANG DIKELUARKAN #DIV/0! #DIV/0!
jumlah kavling #DIV/0! unit 1 Lahan - - - #DIV/0!
tanah efektif - m2 2 Fasum - 750,000.00 - #DIV/0!
3 Konstruksi rumah #DIV/0! 2,560,000.00 #DIV/0! #DIV/0!
rencana 4 Perijinan - 20,000.00 - #DIV/0!
luas bangunan 0 m2 5 Sertifikasi #DIV/0! 2,500,000.00 #DIV/0! #DIV/0!
luas kapling 0 m2 6 Pajak Transaksi 2.5% #DIV/0! #DIV/0!
rencana anggaran konstruksi - /m2

harga jual harga standar brosur TARGET LABA KOTOR YANG DIHARAPKAN #DIV/0! #DIV/0!
bangunan 3,942,400.00 m2
kapling/m2 - m2
- BUDGET BIAYA ADUM KANTOR 24 bulan #DIV/0! #DIV/0!
7 Inventaris kantor 1 15,000,000.00 15,000,000.00 #DIV/0!
bunga 9.00% 8 Marketing dan Promosi 4.00% #DIV/0! #DIV/0!
bulan 180.00 9 Biaya Umum dan Administrasi 2,500,000.00 24 60,000,000.00 #DIV/0!
Analisa TARGET MARKET cicilan kpr Rp0.00
target market by penghasilan -
TARGET LABA BERSIH YANG DIHARAPKAN #DIV/0! #DIV/0!
MODAL
Lahan 100% -

Fasum 100% -
Return On Investment #DIV/0! kali
Konstruksi rumah 100% #DIV/0!

Perijinan 100% -
Profit Margin #DIV/0!
Sertifikasi 100% #DIV/0!

Pajak Transaksi 100% #DIV/0!


Net Present Value 7% #DIV/0!
Inventaris kantor 100% 15,000,000.00

Marketing dan Promosi 100% #DIV/0!


Break Even Point #DIV/0! unit
Biaya Umum dan Administrasi 100% 60,000,000.00

KEBUTUHAN MODAL #DIV/0!


Komunitas Properti TERBESAR di INDONESIA 13.45 9.00 121.05
QUICK COUNT

harga tanah 300,000.00 /m2 INDEKS AWAL TARGET PENERIMAAN PENJUALAN


luas tanah 32,000.00 m2 3.75
BUDGET BIAYA HPP YANG DIKELUARKAN
jumlah kavling 200.00 unit 1 Lahan 32,000.00
tanah efektif 60% 19,200.00 m2 2 Fasum 12,800.00
3 Konstruksi rumah 12,000.00
rencana 4 Perijinan 32,000.00
luas bangunan 60 m2 5 Sertifikasi 200.00
luas kapling 96 m2 6 Pajak Transaksi
rencana anggaran konstruksi 2,540,000 /m2

harga jual harga standar brosur TARGET LABA KOTOR YANG DIHARAPKAN
bangunan 3,556,000.00 m2 321,500,000.00
kapling/m2 1,125,000.00 m2 BUDGET BIAYA ADUM KANTOR 24
7 Inventaris kantor
bunga 9.00% 8 Marketing dan Promosi
bulan 180.00 9 Biaya Umum dan Administrasi 5,000,000.00
Analisa TARGET MARKET cicilan kpr Rp2,608,693.65
target market by penghasilan 8,478,254.38
TARGET LABA BERSIH YANG DIHARAPKAN
MODAL
Lahan 100% 9,600,000,000.00

Fasum 100% 15,360,000,000.00


Return On Investment
Konstruksi rumah 100% 30,480,000,000.00

Perijinan 100% 640,000,000.00


Profit Margin
Sertifikasi 100% 500,000,000.00

Pajak Transaksi 100% 3,215,000,000.00


Net Present Value
Net Present Value
Inventaris kantor 100% 500,000,000.00

Marketing dan Promosi 100% 1,607,500,000.00


Break Even Point
Biaya Umum dan Administrasi 100% 120,000,000.00

KEBUTUHAN MODAL 62,022,500,000.00


35,310.00

64,300,000,000.00 100%

59,795,000,000.00 92.99%
300,000.00 9,600,000,000.00 14.93%
1,200,000.00 15,360,000,000.00 23.89%
2,540,000.00 30,480,000,000.00 47.40%
20,000.00 640,000,000.00 1.00%
2,500,000.00 500,000,000.00 0.78%
5.0% 3,215,000,000.00 5.00%

4,505,000,000.00 7.01%

bulan 2,227,500,000.00 3.46%


250,000,000.00 500,000,000.00 0.78%
2.50% 1,607,500,000.00 2.50%
24 120,000,000.00 0.19%

TARGET LABA BERSIH YANG DIHARAPKAN 2,277,500,000.00 3.54%

Return On Investment 0.04 kali

Profit Margin 3.54%

7% Rp1,997,807,017.54
7% Rp1,997,807,017.54

Break Even Point 193 unit


PROGRES MINGGUAN BULAN ……….,…………………..,. 2019 S/d …..,……………………

RUMAH TYPE - 70/60 KONTRAKTOR :

NO JENIS PEKERJAAN VOL SAT HARGA SATUAN TOTAL HARGA

I PEKERJAAN PERSIAPAN
1 Uitset dan bowplank 23.000 m' Rp 56,400.00 Rp 1,297,200.00
2 Mobilisasi & demobilisasi 1.000 ls Rp 1,000,000.00 Rp 1,000,000.00
Rp 2,297,200.00
II PEKERJAAN TANAH & PONDASI
1 Galian tanah pondasi 19.980 m3 Rp 2,533.25 Rp 50,614.34
2 Urugan tanah kembali 4.995 m3 Rp 28,050.00 Rp 140,109.75
3 Urug tanah ex. galian dibawah lantai 12.600 m3 #REF! #REF!
4 Pondasi batu kali 1:6, bangunan 15.601 m3 #REF! #REF!
5 Pondasi batu kali 1:6, pagar 9.750 m3 #REF! #REF!
6 Rollag bata 3.000 m' #REF! #REF!
#REF!
III PEKERJAAN BETON
1 Sloof 12/15 ( 4ø8 /ø6 - 20 ) 1.050 m3 #REF! #REF!
2 Kolom Praktis 12/12 ( 4ø8 /ø6 - 20 ) 1.210 m3 #REF! #REF!
3 Ring balk 12/12 (4Ø8 /Ø6-20 ) 0.780 m3 #REF! #REF!
4 Ring Gewel 12/12 (4Ø8 /Ø6-20 ) 0.360 m3 #REF! #REF!
5 Balok latai 12/12 (4Ø8 /Ø6-20 ) 0.290 m3 #REF! #REF!
6 Balok gantung 12/25 (6Ø10 /Ø6-15 ) 0.230 m3 #REF! #REF!
7 Plat atap teras t. 8cm ( besi Ø8-20 ) 0.440 m3 #REF! #REF!
8 Meja Dapur (Ø6-20 ) 0.050 m3 #REF! #REF!
9 Talang datar t.10cm, (Ø8-20 ) 0.530 m3 #REF! #REF!
10 Balok gantung 10/12 (4Ø10 /Ø6-15 ), dibawah tralis teras 0.040 m3 #REF! #REF!
11 Beton Rabat lantai 33.990 m2 #REF! #REF!
#REF!
IV PEKERJAAN PASANGAN
1 Dinding bata 1 : 6 37.553 m3 #REF! #REF!
2 Plesteran 1 : 6 dan acian 289.800 m2 #REF! #REF!
3 Profil benangan lisplank GRC, lebar 30 cm 21.850 m' #REF! #REF!
4 Penebalan plesteran, tebal 5cm lebar 9cm 15.400 m' #REF! #REF!
5 Penebalan plesteran, tebal 5cm lebar 14cm 18.240 m' #REF! #REF!
6 Penebalan plesteran, tebal 5cm lebar 7cm 17.960 m' #REF! #REF!
#REF!
V PEKERJAAN PLAFOND & ATAP
1 Rangka atap Galvalum, C 0.65mm dan 0.75mm 40.520 m2 #REF! #REF!
2 Penutup atap genteng beton flat, ex. lokal, finish cat black 49.260 m2 #REF! #REF!
3 Penutup nok genteng beton bubung ex Lokal, finish cat black 5.700 m' #REF! #REF!
4 Plafond Gypsum + Rangka hollow 4x4 & 2x4 + shadow line 41.780 m2 #REF! #REF!
5 Lisplank lebar 20 cm, Kalsiplank atau setara 13.100 m' #REF! #REF!
6 Flashing pasangan bata 17.720 m' #REF! #REF!
#REF!
VI PEKERJAAN KUSEN, PINTU & JENDELA
1 Kusen dan Pintu PVC + aksesories pintu P2 (KM/WC ) ex. Maspion 1.000 unit #REF! #REF!
2 Kusen alumunium 4" powder coating u/ jendela 39.420 m #REF! #REF!
3 Daun Pintu P1, PJ1 dan PJ2 4.000 bh #REF! #REF!
4 Daun Jendela Sliding Aluminium J1 (64 x 231) + aksesoris 2.000 bh #REF! #REF!
5 Daun Jendela Kupu-kupu Aluminium PJ1 & PJ2 + aksesoris 4.000 bh #REF! #REF!
6 Daun Jendela Sliding Aluminium J2 (64 x 159) + aksesoris 2.000 bh #REF! #REF!
7 Handle pintu utama ex. Bossini 1.000 set #REF! #REF!
8 Engsel pintu 4x3x3mm, 2BB, ex. GERBER 12.000 bh #REF! #REF!
9 Lock set pintu komplit set, ex. Mego 4.000 set #REF! #REF!
10 Teralis Ornamen, uk. 185x100cm, besi tuang fin cat 1.000 unit Rp 650,000.00 Rp 650,000.00
#REF!
VII PEKERJAAN KERAMIK
1 Lantai Keramik Lantai (49 x 49), PLATINUM (LEXUS CREAM) 29.000 m2 #REF! #REF!
2 Lantai Keramik teras (40 x 40), PLATINUM (CLARIN BONE) 2.430 m2 #REF! #REF!
3 lantai keramik KM/WC (30 X 30), ASIA TILE (OSCAR CREAM) 2.560 m2 #REF! #REF!
4 Keramik dinding KM/WC 20/25, ASIA TILE (METRO DARK GREEN) 10.160 m2 #REF! #REF!
5 Keramik Meja Dapur (20 X 33), ex. ASIA TILE (MOSAIC BASIC) 1.610 m2 #REF! #REF!
6 Keramik dinding Dapur (20 X 33),ASIA TILE (MOSAIC GREY) 1.260 m2 #REF! #REF!
#REF!
VIII PEKERJAAN PENGECATAN
1 Cat tembok dalam, ex. CATYLAC GARDENA 45006 104.290 m2 #REF! #REF!
2 Cat tembok luar warna putih ex. CATYLAC MARIGOLD 44505 17.220 m2 #REF! #REF!
3 Cat tembok luar warna cream ex. CATYLAC GARDENA 45006 85.510 m2 #REF! #REF!
4 Cat plafond ex. CATYLAC GARDENA 45006 41.780 m2 #REF! #REF!
5 Cat Lisplank Atap warna putih ex. CATYLAC PUTIH 101 2.620 m2 #REF! #REF!
#REF!
IX PEKERJAAN SANITAIR
1 Instalasi Air Bersih, PVC AW Ø 3/4" 28.000 m' #REF! #REF!
2 Instalasi Air Hujan, PVC D Ø 2 1/2" (vertikal) 24.000 m' #REF! #REF!
3 Instalasi Air Kotor, PVC D Ø 4" (horisontal) 30.000 m' #REF! #REF!
5 Instalasi Sparing Pipa air kotor, PVC D Ø 1 1/2" 1.000 unit #REF! #REF!
6 Instalasi Pipa hawa, PVC D Ø 1 1/2" 1.000 unit #REF! #REF!
7 Kran dinding, Ø1/2" ex. Dupon BG13NC atau setara 1.000 bh #REF! #REF!
8 Kran kitchen sink dia 1/2" ex. Lokal 1.000 bh #REF! #REF!
9 Kran taman, Ø1/2" ex. Lokal 1.000 bh #REF! #REF!
10 Floor drain cover, ex Lokal Venus 9921 atau setara 1.000 bh #REF! #REF!
11 Tempat sabun ex. lokal Teresia Ivory atau setara 1.000 bh #REF! #REF!
12 Closet Duduk ex. Duty type C-09/T-09 1.000 bh #REF! #REF!
13 Shower spray closet ex.Dupon CO500G NC (pastel Ivory) 1.000 bh #REF! #REF!
14 Kitchen sink ex. ROYAL, PAULINA 89 cm, SB 21 E 1.000 bh #REF! #REF!
15 Bak mandi Fiber finish keramik 1.000 unit #REF! #REF!
16 Bak kontrol 40x40 + tutup, pas bata 6.000 unit #REF! #REF!
18 Septitank BIO FILTER caps 1 - 3 org, ex. Bio seven 1.000 unit Rp 1,500,000.00 Rp 1,500,000.00
#REF!
X PEKERJAAN INSTALASI LISTRIK
1 Instalasi listrik Lampu + Fitting 10.000 ttk Rp 85,000.00 Rp 850,000.00
2 Instalasi Saklar Tunggal 2.000 ttk Rp 85,000.00 Rp 170,000.00
3 Instalasi Saklar Ganda 1.000 ttk Rp 85,000.00 Rp 85,000.00
4 Instalasi Saklar Triple 2.000 ttk Rp 85,000.00 Rp 170,000.00
5 Instalasi Stop kontak 5.000 ttk Rp 85,000.00 Rp 425,000.00
6 Line Telpon -Berker 1.000 ttk Rp 90,000.00 Rp 90,000.00
7 Line Antena TV 1.000 ttk Rp 90,000.00 Rp 90,000.00
8 MCB ( Dua Group ) + kabel power 1.000 unit Rp 90,000.00 Rp 90,000.00
9 Grounding BC 10 1.000 unit Rp 100,000.00 Rp 100,000.00
Rp 2,070,000.00
XI PEKERJAAN LAIN - LAIN
Perkerasan carport, lantai rabat t. 5cm finish keramik (40x40), PLATINUM
1 16.500 m2 #REF! #REF!
(AZTECA DARK BROWN)
3 Pembersihan akhir 1.000 ls #REF! #REF!
#REF!
Grand Total #REF!
hrg/m2 #REF!
J
U
N
I

……….,…………………..,. 2019 S/d …..,……………………, JULI 201 S


/
MINGGU
D II
P
1
R
4
O
BOBOT G
JR
U
E
### S
#REF!
N
I
###
#REF!
#REF!
### 2
0
### 1
#REF!
### 4
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
#REF!
###

###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
#REF!
###

###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
#REF!
###

###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
#REF!
###
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
#REF!
###

###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
#REF!
###

###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
#REF!
###

###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
#REF!
###

###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
###
#REF!
#REF!
###

#REF! ###

###
#REF!
#REF!
###
#REF!
###
UMAH TYPE 70/ 60

JENIS PEKERJAAN SAT BOBOT VOLUME HARGA SATUAN


PEKERJAAN PERSIAPAN
Pembersihan lokasi m2 10,000.00
Uitset dan Bouplank m' 0.725 54.00 13,366.07
Listrik Kerja ls 0.107 1.00 106,928.53
Air Kerja ls 0.215 1.00 213,857.07
Gudang ls 0.161 1.00 160,392.80
1.208
PEKERJAAN TANAH & PONDASI
Galian tanah pondasi m3 0.195 13.20 14,727.89
Urug pasir m3 0.220 3.77 58,003.69
Urug kembali tanah pondasi m3 0.024 3.30 7,363.95
Urugan tanah Pedel Ex lokal Bojonegoro m3 1.126 20.10 55,784.41
Urugan tanah Halaman depan/belakang ex lokal Bojonegoro m3 0.401 12.00 33,289.07
Aanstamping m3 1.226 7.54 161,905.94
Pas. Pondasi batu kali 1:6 m3 4.011 14.14 282,452.73
Pas. Pondasi rolag 1:5 m3 0.333 1.64 202,155.46
7.536

PEKERJAAN BETON
Pond.Strouse dia 25 cm -3 M (11 ttk ) K175 m1 2.481 33.00 74,849.97
Sloof 15/20 (campuran 1:2:3) Bangunan induk K175 m3 2.489 1.26 1,967,081.54
Sloof 15/20 (campuran 1:2:3) Pagar K175 m3 1.245 0.63 1,967,081.54
Kolom praktis 12/12 (campuran 1:2:3) Bangunan Induk K175 m3 1.719 0.87 1,967,081.54
Kolom praktis 12/12 (campuran 1:2:3) Pagar K175 m3 0.316 0.16 1,967,081.54
Ring balk 12/35 (campuran 1:2:3) Bangunan induk K175 m3 1.289 0.60 2,138,570.70
Ring balk 12/15 (campuran 1:2:3) Pagar K175 m3 0.644 0.30 2,138,570.70
Ring Gewel 12/15 (campuran 1:2:3) K175 m3 1.911 0.89 2,138,570.70
Plat dag Teras & Plat level jendela T.10 cm (campuran 1:2:3) K175 m3 2.276 1.06 2,138,570.70
Kolom Teras 15/15 M3 0.126 0.06 1,967,081.54
Lantai Rabat t 5 cm (campuran 1:3:5) Mutu B0 m2 1.417 52.77 26,732.13
Waterprofing coating m2 0.154 5.73 26,732.13
16.066
PEKERJAAN PASANGAN
Dinding Trasram 1:3 m2 0.947 14.16 66,578.14
Dinding batu bata 1:6 m2 12.564 215.70 58,003.69
Plesteran + acian 1:6 m2 4.095 205.18 19,872.57
Benangan m' 0.691 128.70 5,346.43
Benangan Tali Air Kusen Jendela m' 0.446 83.00 5,346.43
18.742
PEKERJAAN PLAFOND DAN ATAP
Atap Geteng beton Flat ex Jawa Beton doff Dark Brown m2 6.361 73.87 85,744.58
Geteng Bubung ex Jawa Beton m' 0.605 6.00 100,371.60
Geteng Bubung Lisplank ex Jawa Beton m' 0.355 7.45 47,512.58
Rangka Atap Baja Ringan (68,59) m2 8.596 65.27 131,138.77
Talang datar BJLS 30 + papan m' 0.296 3.00 98,354.08
Rangka plafond Hollow Galvalum +Gypsump board 9 mm m2 4.707 65.44 71,621.94
Lisplank / Woodplank m' 0.921 20.20 45,394.19
21.841
PEKERJAAN KUSEN, PINTU DAN ALUMINIUM
Upah Pasang Pintu KM/WC WPC + Kunci Silinder dan Engsel( Material Supply by LN ) bh 0.152 1.00 151,313.96
Kusen Pintu Kayu Nyatoh Finish Melamin Imfra Cocoa Browm m3 2.291 0.29 7,868,326.16
Kusen Jendela Kayu Nyatoh Finish Melamin Imfra Cocoa Brown m3 1.659 0.21 7,868,326.16
Daun Pintu Kaca Kayu Nyatoh Finish Melamin Imfra Cocoa Browm bh 0.591 1.00 588,106.94
Upah Pasang Daun Pintu Solid Kayu Nyatoh Finish Melamin Imfra ( Material Supply by LN ) bh 0.304 3.00 100,875.98
Daun Jendela Kayu Nyatoh Finish Melamin Imfra Cocoa Browm bh 2.019 4.00 502,564.11
kaca 5 mm Bening m2 0.845 12.11 69,503.55
Engsel Pintu ex Dekson 4x3x3 mm 2BB SSS ( 3 Bh ) set 0.345 4.00 85,946.33
Engsel Jendela ex Dekson 4x3x2 mm SSS ( 2 Bh ) set 0.144 4.00 35,810.97
Window stay ex Dekson set 0.159 4.00 39,543.38
Spring knip ex Dekson set 0.154 4.00 38,433.75
Handel Pintu Utama,mortise ,cylinder dan escutheon-PH 0611 (di Toko NIKO) set 0.479 1.00 476,901.27
Selot Pintu P1 ex Dekson R. Keluarga,KT 1,KT2 dan dapur LHSR0058 set 1.184 3.00 392,911.93
Selot KM/WC Kunci bulat cylinder P2 set 0.148 1.00 147,278.93
10.474
PEKERJAAN CAT
Cat tembok catylax putih 1501 m2 2.813 198.34 14,122.64
Cat tembok catylax Light stone 46158 m2 0.111 7.85 14,122.64
Cat Plafond Catylax putih m2 0.928 65.44 14,122.64
3.852
PEKERJAAN SANITAIR
Instalasi air bersih PVC "AW" WAVIN dia 1/2" m' 1.102 53.33 20,578.70
Instalasi air kotor PVC "D" WAVIN dia 3" m' 0.086 3.00 28,436.94
Instalasi air kotor PVC "D" WAVIN dia 4" m' 1.198 36.00 33,147.85
Talang tegak PVC "D" WAVIN dia2.1/2" m' 0.243 9.00 26,833.01
Kran air untuk Taman dia 1/2"Lokal bh 0.075 2.00 37,324.11
Kran air untuk Bak mandi dia 1/2"ex Lokal bh 0.048 1.00 48,117.84
Floor drain Ina bh 0.081 1.00 80,196.40
Tempat sabun keramik bh 0.081 1.00 80,196.40
Closet Duduk ex TOTO CW660/SW660 JP WHITE bh 1.672 1.00 1,664,453.61
Jet Sprey bh 0.152 1.00 151,313.96
Bak mandi bata merah finish. Keramik bh 0.152 1.00 151,313.96
Septitank BIO FILTER caps 1 - 3 org unit 1.672 1.00 1,664,453.61
Kitchen Zink Ex VIVESS bh 0.456 1.00 453,941.89
Kran Kitchen Zink dia 1/2" EX Wasser bh 0.070 1.00 69,503.55
Bak kontrol bh 0.322 6.00 53,464.27
7.408
PEKERJAAN KERAMIK / BATU ALAM
Pasang Krmk Lt.Utama 60/60 Luxury Granito (Mat.Supply by LN ) m2 2.721 44.77 60,525.59
Krmk lt.KM 40/40 PLATINUM CYRCA GREY A m2 0.280 2.60 107,180.72
Krmk Dinding.KM20/40 ROMAN W40208 TWINKLE BROWN m2 0.689 5.30 129,474.32
Krmk Dinding.KM20/40 ROMAN W40206 TWINKLE WHITE m2 1.386 10.90 126,599.35
Pasang Krmk Meja Dapur 60/60 Luxury Granito (Mat.Supply by LN ) m2 0.091 1.50 60,525.59
Krmk Dinding Dapur 20/50 PLATINUM GRO0VE DECOR m2 0.164 1.20 136,485.20
Krmk Dinding Dapur 20/50 PLATINUM GRO0VE-GOMES GREY EMBOSSED m2 0.164 1.20 136,485.20
Krmk Terras Depan 40/40 PATINUM CLARIN GREY m2 0.314 3.10 100,875.98
Krmk Terras belakang 40/40 PALTINUM CLARIN GREY m2 0.334 3.30 100,875.98
Batu Andesit Lantai carport m2 0.307 1.90 160,897.18
Keramik carport 40/40 CENTRO ALSAGE ROSSO m2 1.452 14.00 103,297.00
Batu Amanjiwo kasar 30/60 m2 1.586 8.60 183,594.28
9.489
TOTAL HARGA

-
721,767.61
106,928.53
213,857.07
160,392.80
1,202,946.02

194,408.18
218,673.90
24,301.02
1,121,266.74
399,468.87
1,220,770.80
3,993,881.66
331,534.95
7,504,306.12

2,470,049.16
2,478,522.74
1,239,261.37
1,711,360.94
314,733.05
1,283,142.42
641,571.21
1,903,327.92
2,266,884.94
125,893.22
1,410,654.70
153,175.13
15,998,576.79

942,546.79
12,511,395.16
4,077,453.37
688,085.12
443,753.42
18,663,233.87

6,333,952.12
602,229.58
353,968.76
8,559,427.47
295,062.23
4,686,939.97
916,962.63
21,748,542.75

151,313.96
2,281,814.59
1,652,348.49
588,106.94
302,627.93
2,010,256.46
841,687.96
343,785.33
143,243.89
158,173.53
153,734.99
476,901.27
1,178,735.78
147,278.93
10,430,010.05

2,801,083.76
110,862.70
924,185.35
3,836,131.81

1,097,462.03
85,310.81
1,193,322.45
241,497.09
74,648.22
48,117.84
80,196.40
80,196.40
1,664,453.61
151,313.96
151,313.96
1,664,453.61
453,941.89
69,503.55
320,785.60
7,376,517.44

2,709,730.48
278,669.88
686,213.87
1,379,932.92
90,788.38
163,782.24
163,782.24
312,715.53
332,890.72
305,704.65
1,446,158.00
1,578,910.78
9,449,279.68
DAFTAR ANALISA HARGA SATUAN BAHAN DAN UPAH TENAGA KERJA
NAMA PROYEK :
PEKERJAAN :
LOKASI PROYEK :

PERSIAPAN & PASANGAN


1 1 m2 Pembersihan Lahan
0.525 pekerja a Rp. 80,000.00 = Rp.
0.003 mandor a Rp. 100,000.00 = Rp.

2 1 m' Uiset Bowplank


Bahan : 0.002 m3 Kayu 3/5 meranti a Rp. 3,125,000.00 = Rp.
0.002 m3 Kayu 5/7 meranti a Rp. 3,125,000.00 = Rp.
0.055 kg Paku usuk a Rp. 20,000.00 = Rp.

Upah : 0.008 pekerja a Rp. 80,000.00 = Rp.


0.021 tukang kayu a Rp. 95,000.00 = Rp.
0.150 mandor a Rp. 100,000.00 = Rp.

3 1 m3 Galian tanah
0.750 pekerja a Rp. 80,000.00 = Rp.
0.003 mandor a Rp. 100,000.00 = Rp.

6 1 m3 Urugan Tanah Kembali


0.335 pekerja a Rp. 80,000.00 = Rp.
0.013 mandor a Rp. 100,000.00 = Rp.

7 1 m3 urugan pasir bawah lantai dan pondasi


Upah : 0.600 pekerja a Rp. 80,000.00 = Rp.
0.030 mandor a Rp. 100,000.00 = Rp.

Bahan : 1.200 m3 pasir a Rp. 114,000.00 = Rp.

8 1 m3 Aanstamping batu kali


Upah : 1.200 pekerja a Rp. 80,000.00 = Rp.
0.060 mandor a Rp. 100,000.00 = Rp.

Bahan : 1.200 m3 batu kali a Rp. 208,000.00 = Rp.


0.110 m3 pasir urug a Rp. 114,000.00 = Rp.

11 1 m3 Pasang batu kali 1:7


Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.090 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.200 m3 batu kali a Rp. 208,000.00 = Rp.


2.277 zak semen portland a Rp. 60,000.00 = Rp.
0.555 m3 pasir a Rp. 195,000.00 = Rp.

12 1 m3 Pasang batu kali 1:8 :


Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.090 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.200 m3 batu belah a Rp. 208,000.00 = Rp.


1.920 zak semen portland a Rp. 60,000.00 = Rp.
0.560 m3 pasir a Rp. 195,000.00 = Rp.

13 1 m3 Pasang bata kosong


Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.085 Mandor a Rp. 100,000.00 = Rp.

Bahan : 550.000 bh batu bata a Rp. 500.00 = Rp.

17 1 m3 Pasang batu bata 1:3


Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.090 Mandor a Rp. 100,000.00 = Rp.

Bahan : 525 bh batu bata a Rp. 500.00 = Rp.


4.600 3.600 zak semen portland a Rp. 60,000.00 = Rp.
0.378 m3 pasir a Rp. 195,000.00 = Rp.

18 1 m3 Pasang batu bata 1:4 :


Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.090 Mandor a Rp. 100,000.00 = Rp.

Bahan : 525 bh batu bata a Rp. 500.00 = Rp.


3.160 zak semen portland a Rp. 60,000.00 = Rp.
0.406 m3 pasir a Rp. 195,000.00 = Rp.

19 1 m3 Pasang batu bata 1:5 :


Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.090 Mandor a Rp. 100,000.00 = Rp.

Bahan : 525 bh batu bata a Rp. 500.00 = Rp.


2.330 zak semen portland a Rp. 60,000.00 = Rp.
0.423 m3 pasir a Rp. 195,000.00 = Rp.

20 1 m3 Pasang batu bata 1:7


Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.090 Mandor a Rp. 100,000.00 = Rp.

Bahan : 525 bh batu bata a Rp. 500.00 = Rp.


2.210 zak semen portland a Rp. 60,000.00 = Rp.
0.428 m3 pasir pasang a Rp. 195,000.00 = Rp.

21 1 m3 Pasang batu bata 1:8


Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.090 Mandor a Rp. 100,000.00 = Rp.

Bahan : 525 bh batu bata a Rp. 500.00 = Rp.


2.150 zak semen portland a Rp. 60,000.00 = Rp.
0.430 m3 pasir pasang a Rp. 195,000.00 = Rp.
22 1 m3 Pasang rollag bata merah 1:5
Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.090 Mandor a Rp. 100,000.00 = Rp.

Bahan : 525 bh batu bata a Rp. 500.00 = Rp.


2.330 zak semen portland a Rp. 60,000.00 = Rp.
0.423 m3 pasir pasang a Rp. 195,000.00 = Rp.

23 1 m3 Pasang rollag bata merah 1:7


Upah : 0.600 Tukang batu a Rp. 95,000.00 = Rp.
1.800 Pekerja a Rp. 80,000.00 = Rp.
0.090 Mandor a Rp. 100,000.00 = Rp.

Bahan : 525 bh batu bata a Rp. 500.00 = Rp.


2.210 zak semen portland a Rp. 60,000.00 = Rp.
0.428 m3 pasir a Rp. 195,000.00 = Rp.

1
1 m3 Pasang batu bata 1:1:3 :
Upah : 1.500 Tukang batu a Rp. 95,000.00 = Rp.
4.500 Pekerja a Rp. 80,000.00 = Rp.
0.225 Mandor a Rp. 100,000.00 = Rp.

Bahan : 500.000 buah batu bata a Rp. 500.00 = Rp.


0.105 m3 a Rp. = Rp.
0.105 m3 a Rp. 93,000.00 = Rp.
0.315 m3 a Rp. 195,000.00 = Rp.

1 m2 Pasangan Dinding Bataco 1pc : 2ps :


Upah : 1.500 Tukang batu a Rp. 95,000.00 = Rp.
4.500 Pekerja a Rp. 80,000.00 = Rp.
0.225 Mandor a Rp. 100,000.00 = Rp.

Bahan : 13.000 Bataco a Rp. 6,400.00 = Rp.


0.033 m3 kapur batu a Rp. 195,000.00 = Rp.
0.425 zak a Rp. 60,000.00 = Rp.
1 m2 Plesteran d = 15 mm 1 : 2 :
Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
0.140 Pekerja a Rp. 80,000.00 = Rp.
0.007 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.215 zak semen a Rp. 60,000.00 = Rp.


0.017 m3 pasir a Rp. 195,000.00 = Rp.

24 1 m2 Plesteran d = 15 mm 1 : 3
Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
0.140 Pekerja a Rp. 80,000.00 = Rp.
0.007 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.183 zak semen a Rp. 60,000.00 = Rp.


0.019 m3 pasir a Rp. 195,000.00 = Rp.

25 1 m2 Plesteran d = 15 mm 1 : 4 :
Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
0.140 Pekerja a Rp. 80,000.00 = Rp.
0.007 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.152 zak semen a Rp. 60,000.00 = Rp.


0.020 m3 pasir a Rp. 195,000.00 = Rp.

26 1 m2 Plesteran d = 15 mm 1 : 5 :
Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
0.140 Pekerja a Rp. 80,000.00 = Rp.
0.007 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.120 zak semen a Rp. 60,000.00 = Rp.


0.022 m3 pasir a Rp. 195,000.00 = Rp.

27 1 m2 Plesteran d = 15 mm 1 : 7
Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
0.140 Pekerja a Rp. 80,000.00 = Rp.
0.007 Mandor a Rp. 100,000.00 = Rp.
Bahan : 0.087 zak semen a Rp. 60,000.00 = Rp.
0.022 m3 pasir a Rp. 195,000.00 = Rp.

29 1 m1 Benangan sudut
Upah : 0.105 Tukang batu a Rp. 95,000.00 = Rp.
0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.003 zak semen a Rp. 60,000.00 = Rp.


0.017 m3 pasir a Rp. 195,000.00 = Rp.

30 1 m1 Ban-banan profil :
Upah : 0.105 Tukang batu a Rp. 95,000.00 = Rp.
0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.180 zak semen a Rp. 60,000.00 = Rp.


0.003 m3 pasir a Rp. 195,000.00 = Rp.

31 1 m2 Plesteran Tekstur
Upah : 0.085 Tukang batu a Rp. 95,000.00 = Rp.
0.250 Pekerja a Rp. 80,000.00 = Rp.
0.013 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.120 m2 semen a Rp. 60,000.00 = Rp.


0.022 m3 pasir a Rp. 195,000.00 = Rp.

BATU ALAM
32 1 m2 Pasang Batu Palimanan 1 : 4 :
Upah : 0.140 Tukang batu a Rp. 95,000.00 = Rp.
0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.147 zak semen a Rp. 60,000.00 = Rp.


0.014 m3 pasir a Rp. 195,000.00 = Rp.
1.100 m2 Palimanan 15 x 14 a Rp. 127,500.00 = Rp.
33 1 m2 Pasang Batu Lempengan 1 : 4 :
Upah : 0.140 Tukang batu a Rp. 95,000.00 = Rp.
0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.152 zak semen a Rp. 60,000.00 = Rp.


0.020 m3 pasir a Rp. 195,000.00 = Rp.
1.200 m2 Lempengan a Rp. 120,000.00 = Rp.

34 1 m2 Pasang Batu Candi 1 : 4 :


Upah : 0.140 Tukang batu a Rp. 95,000.00 = Rp.
0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.147 zak semen a Rp. 60,000.00 = Rp.


0.014 m3 pasir a Rp. 195,000.00 = Rp.
1.100 m2 Batu Candi a Rp. 120,000.00 = Rp.

35 1 m2 Pasang Batu Palimanan 1 : 5 :


Upah : 0.140 Tukang batu a Rp. 95,000.00 = Rp.
0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.120 zak semen a Rp. 60,000.00 = Rp.


0.022 m3 pasir a Rp. 195,000.00 = Rp.
1.100 m2 Palimanan 15 x 14 a Rp. 127,500.00 = Rp.

36 1 m2 Pasang Batu Lempengan 1 : 5 :


Upah : 0.140 Tukang batu a Rp. 95,000.00 = Rp.
0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.120 zak semen a Rp. 60,000.00 = Rp.


0.022 m3 pasir a Rp. 195,000.00 = Rp.
1.200 m2 Lempengan a Rp. 120,000.00 = Rp.
KERAMIK / TEGEL
37 1 m2 Pasang keramik Mulia/Milan
Upah : 0.031 Kepala tukang a Rp. 95,000.00 = Rp.
0.313 Tukang batu a Rp. 95,000.00 = Rp.
0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.

Diambil 2/3 = Rp.


Bahan : 1.000 m2 Keramik KW 1 40x40 polos a Rp. 60,000.00 = Rp.
1.000 m2 Keramik KW 1 30x30 motif 60,000.00 = Rp.
0.020 zak semen a Rp. 60,000.00 = Rp.
0.025 m3 perekat G. 6 a Rp. 204,750.00 = Rp.

Upah + bahan :
1.000 m2 keramik 30x30 polos a Rp. 121,530.42 = Rp.

Upah + bahan :
1.000 m2 keramik 40x40 motif a Rp. 66,318.75 = Rp.

41 1 m2 Pas. keramik lantai 30/30 ( ROMAN KW 1) :


Bahan : 1.000 m2 keramik 30/30 a Rp. 60,000.00 = Rp.
0.130 zak PC a Rp. 60,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 195,000.00 = Rp.
0.002 zak semen warna a Rp. 60,000.00 = Rp.

Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.


0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.

42 1 m2 Pas. keramik lantai 30/30 ( CLASSIC ) :


Bahan : 1.000 m2 keramik 30/30 a Rp. 60,000.00 = Rp.
0.130 zak PC a Rp. 60,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 195,000.00 = Rp.
0.002 zak semen warna a Rp. 60,000.00 = Rp.

Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.


0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.
43 1 m2 Pas. keramik lantai 20/20 ( ROMAN Kw 1 ) :
Bahan : 1.000 m2 keramik 20/20 a Rp. 75,000.00 = Rp.
0.130 zak PC a Rp. 60,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 195,000.00 = Rp.
0.002 zak semen warna a Rp. 48,000.00 = Rp.

Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.


0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.

44 1 m2 Pas. keramik lantai 40/40 ( ROMAN Kw 1 ) :


Bahan : 1.000 m2 keramik 40/40 a Rp. 60,000.00 = Rp.
0.130 zak PC a Rp. 60,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 195,000.00 = Rp.
0.002 zak semen warna a Rp. 48,000.00 = Rp.

Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.


0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.

45 1 m2 Pas. keramik lantai 20/20 ( MULIA ) :


Bahan : 1.000 m2 keramik 20/20 a Rp. - = Rp.
0.130 zak PC a Rp. 60,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 195,000.00 = Rp.
0.002 zak semen warna a Rp. 48,000.00 = Rp.

Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.


0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.

46 1 m2 Pas. keramik dinding 20/25 ( ROMAN Kw 1) :


Bahan : 1.000 m2 keramik 20 x 25 a Rp. 68,181.82 = Rp.
0.133 zak PC a Rp. 60,000.00 = Rp.
0.002 zak Semen warna a Rp. 48,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 195,000.00 = Rp.

Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.


0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.
47 1 m2 Pas. keramik dinding 10/20 ( ROMAN KW2) :
Bahan : 1.000 m2 keramik dinding 10/20 a Rp. 83,333.33 = Rp.
0.133 zak PC a Rp. 60,000.00 = Rp.
0.002 zak Semen warna a Rp. 48,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 195,000.00 = Rp.

Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.


0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.

48 1 m2 Pas. keramik lantai 10/20 ( ROMAN ) :


Bahan : 1.000 m2 Patlah 6cm 1pc:8ps a Rp. 25,224.50 = Rp.
1.000 m2 keramik 10/20 a Rp. - = Rp.
0.130 zak PC a Rp. 60,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 195,000.00 = Rp.
0.002 zak semen warna a Rp. 48,000.00 = Rp.

Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.


0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.

49 1 m2 Pas. keramik lantai 30/30 Kw 1 ( ROMAN ) :


Bahan : 1.000 m2 Patlah 6cm 1pc:8ps a Rp. 25,224.50 = Rp.
1.000 m2 keramik 30/30 a Rp. 31,313.13 = Rp.
0.130 zak PC a Rp. 60,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 195,000.00 = Rp.
0.002 zak semen warna a Rp. 48,000.00 = Rp.

Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.


0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.

Bahan + Upah :

50 1 m2 Pas. keramik dinding 20/20 ( ROMAN ) :


Bahan : 1.000 m2 keramik dinding 20/20 a Rp. 87,500.00 = Rp.
0.133 zak PC a Rp. 60,000.00 = Rp.
0.002 zak Semen warna a Rp. 195,000.00 = Rp.
0.021 m3 Pasir pasang a Rp. 48,000.00 = Rp.
Upah : 0.313 Tukang batu a Rp. 95,000.00 = Rp.
0.625 Pekerja a Rp. 80,000.00 = Rp.
0.031 Mandor a Rp. 100,000.00 = Rp.

PEKERJAAN BETON UMUM:


54 1 m3 Stamp beton 1:2:5 Work floor :
Upah : 6.000 Pekerja a Rp. 80,000.00 = Rp.
0.300 Mandor a Rp. 100,000.00 = Rp.
0.500 Tukang batu a Rp. 95,000.00 = Rp.

Bahan : 1.000 m3 batu pecah 2/3 a Rp. 486,956.52 = Rp.


0.500 m3 pasir a Rp. 195,000.00 = Rp.
5.885 zak semen a Rp. 60,000.00 = Rp.

55 1 m2 Begesting /10 m2 :
Upah : 0.500 Tukang kayu a Rp. 95,000.00 = Rp.
0.050 Kepala tukang a Rp. 95,000.00 = Rp.
0.200 Pekerja a Rp. 80,000.00 = Rp.
0.010 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.400 m3 papan begesting a Rp. 1,600,000.00 = Rp.


4.000 kg paku a Rp. 20,000.00 = Rp.

56 1 m3 Beton bertulang 1:2:3 :


Mengecor :
6.000 Pekerja a Rp. 80,000.00 = Rp.
0.300 Mandor a Rp. 100,000.00 = Rp.
1.000 Tukang batu a Rp. 95,000.00 = Rp.
0.100 Kepala tukang a Rp. 95,000.00 = Rp.
0.820 m3 batu pecah 2/3 a Rp. 486,956.52 = Rp.
0.540 m3 pasir cor a Rp. 175,000.00 = Rp.
6.800 zak semen 50 kg a Rp. 60,000.00 = Rp.

Pembesian :
6.750 Pekerja a Rp. 80,000.00 = Rp.
6.750 Tukang besi a Rp. 95,000.00 = Rp.
2.250 Kepala tukang besi a Rp. 95,000.00 = Rp.
110 kg besi beton a Rp. 8,250.00 = Rp.
2.000 kg kawat beton/bendrat a Rp. 27,500.00 = Rp.

Cetakan beton/begesting :
0.500 Tukang kayu a Rp. 95,000.00 = Rp.
0.050 Kepala tukang a Rp. 95,000.00 = Rp.
0.200 Pekerja a Rp. 80,000.00 = Rp.
0.010 Mandor a Rp. 100,000.00 = Rp.
0.400 m3 papan begesting a Rp. 1,600,000.00 = Rp.
4.000 kg paku a Rp. 20,000.00 = Rp.

Upah + bahan 1 m3 beton bertulang tanpa begesting


Upah + bahan 1 m3 beton bertulang dengan pembesian praktis

57 1m3 Beton bertulang 1pc:2Ps:3kr pek. kolom 12/12 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.
153 kg Besi beton dia. (6mm+8mm) a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

58 1m3 Beton bertulang 1pc:2Ps:3kr pek. Sloof 15/20 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.
80 kg Besi beton dia. (6mm+8mm) a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.500 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

59 1m3 Beton bertulang 1pc:2Ps:3kr pek. Ring balk 12/15 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.
126 kg Besi beton dia. (6mm+8mm) a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

60 1m3 Beton bertulang 1pc:2Ps:3kr pek. Plat meja dapur t = 7 cm :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.
96.78 kg Besi beton dia. (8mm) a Rp. 8,250.00 = Rp.
1.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.144 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
2.500 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Cor beton = Rp.
Pembesian = Rp.
Begesting = Rp.

61 1 m3 Rabat beton 1pc :3ps : 6kr :


Bahan : 4.240 zak Semen PC a Rp. 60,000.00 = Rp.
0.500 m3 Pasir cor a Rp. 175,000.00 = Rp.
1.000 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.

Upah : 0.700 Tukang batu a Rp. 95,000.00 = Rp.


4.200 Pekerja a Rp. 80,000.00 = Rp.
0.210 Mandor a Rp. 100,000.00 = Rp.

62 1 m2 Patlah 1pc : 5ps - 7 cm :


Bahan : 31 bh Bata merah a Rp. 500.00 = Rp.
0.027 m3 Pasir pasang a Rp. 75,000.00 = Rp.
0.128 zak Semen pc a Rp. 60,000.00 = Rp.
Upah : 0.105 Tukang batu a Rp. 95,000.00 = Rp.
0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

63 1 m2 Patlah 1pc : 8ps - 7 cm :


Bahan : 31 bh Bata merah a Rp. 500.00 = Rp.
m3 Pasir pasang a Rp. 75,000.00 = Rp.
zak Semen pc a Rp. 60,000.00 = Rp.

Upah : 0.105 Tukang batu a Rp. 95,000.00 = Rp.


0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

64 1 m3 Beton tanpa tulang 1pc:2Ps:3kr :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.
0.144 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
2.500 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Begesting = Rp.
Cor beton = Rp.

65 1 m3 Beton bertulang 1pc:2Ps:3kr pek. Plat jembatan masuk rumah t = 10 cm :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.
66.360 kg Besi beton dia. (8mm) a Rp. 8,250.00 = Rp.
1.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.144 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
2.500 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.
66 1 m3 Beton bertulang 1pc:2Ps:3kr pek. kolom 10/10 :
Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.
208.27 kg Besi beton dia. (6mm+8mm) a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Cor beton = Rp.
Pembesian = Rp.
Begesting = Rp.

67 1 m3 Beton bertulang 1pc:2Ps:3kr pek. sloof 12/20 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.
89.340 kg Besi beton dia. (6mm+8mm) a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.500 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Cor beton = Rp.
Pembesian = Rp.
Begesting = Rp.

68 1 m3 Beton bertulang 1pc:2Ps:3kr pek. ring balk 10/15 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 175,000.00 = Rp.
146.76 kg Besi beton dia. (6mm+8mm) a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Cor beton = Rp.
Pembesian = Rp.
Begesting = Rp.

KAYU :
69 1 m3 Kuda-kuda bentang 7 m :
Upah : 18.000 Tukang kayu a Rp. 95,000.00 = Rp.
6.000 Pekerja a Rp. 80,000.00 = Rp.
0.300 Mandor a Rp. 100,000.00 = Rp.

Upah + Bahan : 1.100 m3 kayu meranti a Rp. 3,125,000.00 = Rp.

70 1 m3 Kusen pintu/ jendela kamper :


Upah : 20.000 Tukang kayu a Rp. 95,000.00 = Rp.
6.660 Pekerja a Rp. 80,000.00 = Rp.
0.333 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.100 m3 kayu kamper a Rp. 12,500,000.00 = Rp.


1.000 kg lem kayu a Rp. 13,500.00 = Rp.
1.000 kg paku a Rp. 20,000.00 = Rp.

71 1 m3 Kusen pintu/ jendela meranti :


Upah : 20.000 Tukang kayu a Rp. 95,000.00 = Rp.
2.000 Kepala tukang a Rp. 95,000.00 = Rp.
6.667 Pekerja a Rp. 80,000.00 = Rp.
0.333 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.100 m3 kayu meranti a Rp. 3,125,000.00 = Rp.


1.000 kg lem kayu a Rp. 35,000.00 = Rp.
1.000 kg paku a Rp. 20,000.00 = Rp.

72 1 m2 Rangka atap genting/sirap :


Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.
0.010 Kepala tukang a Rp. 95,000.00 = Rp.
0.100 Pekerja a Rp. 80,000.00 = Rp.
0.025 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.100 kg paku reng a Rp. 20,000.00 = Rp.


0.150 kg paku kasau a Rp. 20,000.00 = Rp.

Upah + Bahan : 0.017 m3 kayu kruwing a Rp. 35,000.00 = Rp.


Upah + Bahan : 0.017 m3 kayu meranti a Rp. 3,125,000.00 = Rp.

73 1 m2 Rangka plafond + eternit datar :


Upah : 0.267 Tukang kayu a Rp. 95,000.00 = Rp.
0.080 Kepala tukang a Rp. 95,000.00 = Rp.
0.093 Pekerja a Rp. 80,000.00 = Rp.
0.005 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.010 m3 Kayu meranti 5/7 Kwalitas A a Rp. 3,125,000.00 = Rp.


0.002 m3 Kayu meranti 5/10 Kwalitas A a Rp. 3,125,000.00 = Rp.
1.000 lb Asbes 1.00 x 1.00 mecco a Rp. 22,000.00 = Rp.
0.250 kg Paku eternit a Rp. 25,000.00 = Rp.

74 1 m2 Rangka plafond + eternit miring :


Upah : 0.267 Tukang kayu a Rp. 95,000.00 = Rp.
0.080 Kepala tukang a Rp. 95,000.00 = Rp.
0.093 Pekerja a Rp. 80,000.00 = Rp.
0.005 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.010 m3 Kayu meranti 5/7 Kwalitas A a Rp. 3,125,000.00 = Rp.


1.000 lb Asbes 1.00 x 1.00 a Rp. 22,000.00 = Rp.
0.250 kg Paku eternit a Rp. 25,000.00 = Rp.

75 1 m' List Pinggir Plafond dalam :


Upah : 0.200 Tukang kayu a Rp. 95,000.00 = Rp.
0.030 Pekerja a Rp. 80,000.00 = Rp.
0.005 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.100 m' List gypsum 5/4 a Rp. Err:509 = Rp.


0.005 kg Paku a Rp. 25,000.00 = Rp.

76 1 m3 Pek. gording, nok Meranti (A) :


Bahan : 1.100 m3 Balok meranti Kwalitas A a Rp. 3,125,000.00 = Rp.
3.000 kg Paku a Rp. 20,000.00 = Rp.

Upah : 36.000 Tukang kayu a Rp. 95,000.00 = Rp.


3.600 Kepala Tukang kayu a Rp. 95,000.00 = Rp.
12.000 Pekerja a Rp. 80,000.00 = Rp.
0.600 Mandor a Rp. 100,000.00 = Rp.

77 1 m3 Pek. kuda-kuda meranti :


Bahan : 1.100 m3 Balok meranti Kwalitas A a Rp. 3,125,000.00 = Rp.
22.000 bh Begel a Rp. 11,400.00 = Rp.
70.000 bh Baut a Rp. 15,500.00 = Rp.
2.500 kg Paku a Rp. 20,000.00 = Rp.

Upah : 36.000 Tukang kayu a Rp. 95,000.00 = Rp.


3.600 Kepala Tukang kayu a Rp. 95,000.00 = Rp.
12.000 Pekerja a Rp. 80,000.00 = Rp.
0.600 Mandor a Rp. 100,000.00 = Rp.

78 1 m3 Pek. gording, nok Meranti (C) :


Bahan : 1.100 m3 Balok meranti Kwalitas C a Rp. 4,800,000.00 = Rp.
3.000 kg Paku a Rp. 20,000.00 = Rp.

Upah : 36.000 Tukang kayu a Rp. 95,000.00 = Rp.


3.600 Kepala Tukang kayu a Rp. 95,000.00 = Rp.
12.000 Pekerja a Rp. 80,000.00 = Rp.
0.600 Mandor a Rp. 100,000.00 = Rp.

79 1 m3 Pek. kuda-kuda meranti :


Bahan : 1.100 m3 Balok meranti Kwalitas C a Rp. 4,800,000.00 = Rp.
22.000 bh Begel a Rp. 11,400.00 = Rp.
70.000 bh Baut a Rp. 15,500.00 = Rp.
2.500 kg Paku a Rp. 20,000.00 = Rp.

Upah : 36.000 Tukang kayu a Rp. 95,000.00 = Rp.


3.600 Kepala Tukang kayu a Rp. 95,000.00 = Rp.
12.000 Pekerja a Rp. 80,000.00 = Rp.
0.600 Mandor a Rp. 100,000.00 = Rp.

80 1 m2 Pas. usuk, reng meranti kw. A:


Bahan : 0.012 m3 Kayu mrnti 3/5 dan 5/7 kw. A a Rp. 4,800,000.00 = Rp.
0.060 kg Paku a Rp. 20,000.00 = Rp.

Upah : 0.020 Tukang kayu a Rp. 95,000.00 = Rp.


0.200 Pekerja a Rp. 80,000.00 = Rp.
0.100 Mandor a Rp. 100,000.00 = Rp.

81 1 m2 Pas. usuk, reng meranti kw. C:


Bahan : 0.012 m3 Kayu mrnti 3/5 dan 5/7 kw. C a Rp. 4,800,000.00 = Rp.
0.060 kg Paku a Rp. 20,000.00 = Rp.

Upah : 0.020 Tukang kayu a Rp. 95,000.00 = Rp.


0.200 Pekerja a Rp. 80,000.00 = Rp.
0.100 Mandor a Rp. 100,000.00 = Rp.

82 1 m' Pas. reuter Meranti 2/20 :


Bahan : 0.004 m3 Meranti papan 2/20 Kwalitas C a Rp. 2,273,400.00 = Rp.
0.086 kg Paku a Rp. 20,000.00 = Rp.

Upah : 0.300 Tukang kayu a Rp. 95,000.00 = Rp.


0.030 Pekerja a Rp. 80,000.00 = Rp.
0.300 Mandor a Rp. 100,000.00 = Rp.

83 1 m' Pas. lisplank Kamper 2/20 :


Bahan : 0.004 m3 Kamper papan 2/19 a Rp. 5,683,400.00 = Rp.
0.086 kg Paku a Rp. 20,000.00 = Rp.

Upah : 0.800 Tukang kayu a Rp. 95,000.00 = Rp.


0.280 Pekerja a Rp. 80,000.00 = Rp.
0.014 Mandor a Rp. 100,000.00 = Rp.

ATAP :
84 1 m2 Pas. genteng beton ( type Garuda ) :
Bahan : 9.000 bj Genteng beton polos a Rp. 2,900.00 = Rp.
1.000 m2 Cat genteng a Rp. 73,500.00 = Rp.

Upah : 0.200 Tukang kayu a Rp. 95,000.00 = Rp.


0.100 Pekerja a Rp. 80,000.00 = Rp.
0.005 Mandor a Rp. 100,000.00 = Rp.
85 1 m1 Pas. bubungn btn polos :
Bahan : 3.500 bj Bubungan beton polos a Rp. 8,300.00 = Rp.
0.050 m3 Mortal a Rp. = Rp.
1.000 m' Cat genteng a Rp. 73,500.00 = Rp.

Upah : 0.025 Tukang kayu a Rp. 95,000.00 = Rp.


0.025 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

86 1 m2 Pas. atap asbes gelombang kecil :


Bahan : 0.530 lb Asbes belombang kecil a Rp. 57,000.00 = Rp.
0.050 kg Paku payung a Rp. 20,000.00 = Rp.

Upah : 0.025 Tukang kayu a Rp. 95,000.00 = Rp.


0.025 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

87 1 m' Pasang bubungan asbes :


Bahan : 1.000 bj Bubungan asbes a Rp. 30,000.00 = Rp.
0.050 kg Paku payung a Rp. 20,000.00 = Rp.

Upah : 0.025 Tukang kayu a Rp. 95,000.00 = Rp.


0.025 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

88 1 m2 Pas. atap zeng gelombang kecil :


0.620 lb Zeng gelombang kecil BJLS 30 a Rp. 66,200.00 = Rp.
0.050 kg Paku payung a Rp. 20,000.00 = Rp.

Upah : 0.025 Tukang kayu a Rp. 95,000.00 = Rp.


0.025 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

89 1 m' Pasang bubungan Zeng :


Bahan : 1.000 m' Plat zeng BJLS 30 L=60cm a Rp. 25,900.00 = Rp.
0.050 kg Paku payung a Rp. 20,000.00 = Rp.

Upah : 0.025 Tukang kayu a Rp. 95,000.00 = Rp.


0.025 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

90 1 m2 Lisplank :
Upah : 0.800 Tukang kayu a Rp. 95,000.00 = Rp.
0.080 Kepala tukang a Rp. 95,000.00 = Rp.
0.280 Pekerja a Rp. 80,000.00 = Rp.
0.140 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.100 kg paku a Rp. 20,000.00 = Rp.


0.022 m3 papan kamper a Rp. 5,683,400.00 = Rp.

91 1 m' Lisplank 2/20 :


Upah : 0.160 Tukang kayu a Rp. 95,000.00 = Rp.
0.056 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.086 kg paku a Rp. 20,000.00 = Rp.


0.004 m3 papan meranti a Rp. 3,125,000.00 = Rp.

92 1 m' Lisplank 3/20 :


Upah : 0.160 Tukang kayu a Rp. 95,000.00 = Rp.
0.056 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.086 kg paku a Rp. 20,000.00 = Rp.


0.007 m3 papan meranti a Rp. 3,125,000.00 = Rp.

93 1 m' Pasang Talang datar :


Upah : 0.160 Tukang kayu a Rp. 95,000.00 = Rp.
0.056 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.300 kg paku a Rp. 20,000.00 = Rp.


1.000 m' platseng BJLS 30 l=60cm a Rp. 25,900.00 = Rp.
0.004 m3 meranti papan 2/20 a Rp. 3,125,000.00 = Rp.
94 1 m' Pasang Talang Jurai :
Upah : 0.025 Tukang kayu a Rp. 95,000.00 = Rp.
0.025 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.300 kg paku a Rp. 20,000.00 = Rp.


1.000 m' platseng BJLS 30 =60cm a Rp. 25,900.00 = Rp.
0.004 m3 meranti papan 2/20 a Rp. 3,125,000.00 = Rp.

95 1 m' Pasang Talang Tegak :


Upah : 0.025 Tukang kayu a Rp. 95,000.00 = Rp.
0.025 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.250 ljr Pipa PVC D 3" Maspion a Rp. 42,200.00 = Rp.
1.250 klem Pengikat a Rp. 7,000.00 = Rp.

96 1 m2 Genting karang pilang model :


Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.
0.010 Kepala tukang a Rp. 95,000.00 = Rp.
0.200 Pekerja a Rp. 80,000.00 = Rp.
0.010 Mandor a Rp. 100,000.00 = Rp.

Bahan : 23.000 bh Genteng a Rp. 2,750.00 = Rp.

97 1 m' Nok genting / bubungan polos:


Upah : 0.200 Tukang kayu a Rp. 95,000.00 = Rp.
0.020 Kepala tukang a Rp. 95,000.00 = Rp.
0.400 Pekerja a Rp. 80,000.00 = Rp.
0.020 Mandor a Rp. 100,000.00 = Rp.

Bahan : 5.000 bh Genteng a Rp. 2,900.00 = Rp.


0.036 zak PC a Rp. 48,000.00 = Rp.

98 1 m2 Asbes Gelombang kecil :


Upah : 0.200 Tukang kayu a Rp. 95,000.00 = Rp.
0.020 Kepala tukang a Rp. 95,000.00 = Rp.
0.100 Pekerja a Rp. 80,000.00 = Rp.
0.005 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.100 m2 atap asbes gelombang a Rp. 57,000.00 = Rp.


4.000 sekerup a Rp. 2,100.00 = Rp.
= Rp.

99 1 m' Bubungan Asbes Gelombang kecil :


Upah : 0.025 Tukang kayu a Rp. 95,000.00 = Rp.
0.003 Kepala tukang a Rp. 95,000.00 = Rp.
0.025 Pekerja a Rp. 80,000.00 = Rp.

Bahan : 1.000 m' bubungan asbes a Rp. 57,000.00 = Rp.


4.000 sekerup a Rp. 2,100.00 = Rp.

1 m' Talang seng BJLS 30 :


Upah : 0.300 Tukang kayu a Rp. 95,000.00 = Rp.
0.030 Kepala tukang a Rp. 95,000.00 = Rp.

Bahan : 1.000 m' seng a Rp. 25,900.00 = Rp.


0.025 kg paku a Rp. 20,000.00 = Rp.
0.008 m3 kayu meranti a Rp. 3,125,000.00 = Rp.

100 1 m2 Eternit polos :


Upah : 0.500 Pekerja a Rp. 80,000.00 = Rp.
0.030 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.000 Lbr. Eternit a Rp. 8,500.00 = Rp.


0.020 kg paku a Rp. 14,000.00 = Rp.

101 1 m' List Pinggir plafond :


Upah : 0.200 Pekerja a Rp. 80,000.00 = Rp.
0.030 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.100 m' list plafond a Rp. 13,100.00 = Rp.


0.005 kg paku a Rp. 14,000.00 = Rp.
PAVING STONE
103 Pengalaman 1 m' Pasang Paving stone landasan :
Upah : 0.125 Tukang batu a Rp. 95,000.00 = Rp.
0.025 Kepala tukang a Rp. 95,000.00 = Rp.
0.250 Pekerja a Rp. 80,000.00 = Rp.
0.013 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.100 m3 pasir a Rp. 60,000.00 = Rp.


1.000 m2 paving a Rp. 175,000.00 = Rp.

104 Pengalaman 1 m' Pasang Paving stone biasa warna :


Upah : 0.125 Tukang batu a Rp. 95,000.00 = Rp.
0.025 Kepala tukang a Rp. 95,000.00 = Rp.
0.250 Pekerja a Rp. 80,000.00 = Rp.
0.013 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.100 m3 pasir a Rp. 60,000.00 = Rp.


1.000 m2 paving a Rp. 175,000.00 = Rp.

FINISHING / CAT :
105 1 m2 Pek. plamur dinding :
Bahan : 0.210 kg Plamur a Rp. 22,000.00 = Rp.
0.200 lb Kertas gosok a Rp. 6,000.00 = Rp.

Upah : 0.300 Tukang cat a Rp. 95,000.00 = Rp.


0.150 Pekerja a Rp. 80,000.00 = Rp.
0.008 Mandor a Rp. 100,000.00 = Rp.

106 1 m2 Pek. plamur dinding ( 1 lem : 1 pc : 5 Calsium ) :


Bahan : 0.012 kg Lem rajawali a Rp. 13,000.00 = Rp.
0.012 kg PC a Rp. Err:509 = Rp.
0.060 kg Calsium a Rp. 70,000.00 = Rp.
0.200 lb Kertas gosok a Rp. 6,000.00 = Rp.

Upah : 0.300 Tukang cat a Rp. 95,000.00 = Rp.


0.150 Pekerja a Rp. 80,000.00 = Rp.
0.008 Mandor a Rp. 100,000.00 = Rp.
107 1 m2 Mengecat kayu ( Menggunakan cat merk :AVIAN ) :
Bahan : 0.105 kg Menie a Rp. 55,000.00 = Rp.
0.175 kg Plamur a Rp. 32,500.00 = Rp.
0.056 ltr Thiner a Rp. 28,000.00 = Rp.
0.140 kg Cat kayu a Rp. 55,000.00 = Rp.
0.075 bh Kuas 2,5 " a Rp. 10,000.00 = Rp.
1.000 lb Kertas gosok a Rp. 6,000.00 = Rp.

Upah : 0.225 Tukang cat a Rp. 95,000.00 = Rp.


0.150 Pekerja a Rp. 80,000.00 = Rp.
0.008 Mandor a Rp. 100,000.00 = Rp.

108 1 m2 Mengecat kayu ( Menggunakan cat merk :EMCO ) :


Bahan : 0.105 kg Menie a Rp. 55,000.00 = Rp.
0.175 kg Plamur a Rp. 32,500.00 = Rp.
0.056 ltr Thiner a Rp. 28,000.00 = Rp.
0.140 kg Cat kayu a Rp. 55,000.00 = Rp.
0.075 bh Kuas 2,5 " a Rp. 10,000.00 = Rp.
1.000 lb Kertas gosok a Rp. 6,000.00 = Rp.

Upah : 0.225 Tukang cat a Rp. 95,000.00 = Rp.


0.150 Pekerja a Rp. 80,000.00 = Rp.
0.008 Mandor a Rp. 100,000.00 = Rp.

109 1 m2 Mengecat dinding ( Menggunakan cat merk : MOWILEX ) :


Bahan : 1.000 m2 Plamur a Rp. 32,500.00 = Rp.
0.150 kg Cat tembok a Rp. 55,000.00 = Rp.
0.030 bh Kuas 4" a Rp. 7,500.00 = Rp.
0.500 lb Kertas gosok a Rp. 6,000.00 = Rp.

Upah : 0.010 Tukang cat a Rp. 95,000.00 = Rp.


0.060 Pekerja a Rp. 80,000.00 = Rp.
0.001 Mandor a Rp. 100,000.00 = Rp.

110 1 m2 Mengecat dinding ( Menggunakan cat merk : MAXILITE ) :


Bahan : 1.000 m2 Plamur a Rp. 32,500.00 = Rp.
0.150 kg Cat tembok a Rp. 55,000.00 = Rp.
0.030 bh Kuas 4" a Rp. 7,500.00 = Rp.
0.500 lb Kertas gosok a Rp. 6,000.00 = Rp.
Upah : 0.010 Tukang cat a Rp. 95,000.00 = Rp.
0.060 Pekerja a Rp. 80,000.00 = Rp.
0.001 Mandor a Rp. 100,000.00 = Rp.

111 1 m2 Mengecat dinding ( Menggunakan cat merk : AVITEX ) :


Bahan : 1.000 m2 Plamur a Rp. 32,500.00 = Rp.
0.150 kg Cat tembok a Rp. 46,000.00 = Rp.
0.030 bh Kuas 4" a Rp. 7,500.00 = Rp.
0.500 lb Kertas gosok a Rp. 6,000.00 = Rp.

Upah : 0.010 Tukang cat a Rp. 95,000.00 = Rp.


0.060 Pekerja a Rp. 80,000.00 = Rp.
0.001 Mandor a Rp. 100,000.00 = Rp.

112 1 m2 Mengecat dinding ( Menggunakan cat merk : DULUX ) :


Bahan : 1.000 m2 Plamur a Rp. 32,500.00 = Rp.
0.150 kg Cat tembok a Rp. 48,000.00 = Rp.
0.030 bh Kuas 4" a Rp. 7,500.00 = Rp.
0.500 lb Kertas gosok a Rp. 6,000.00 = Rp.

Upah : 0.010 Tukang cat a Rp. 95,000.00 = Rp.


0.060 Pekerja a Rp. 80,000.00 = Rp.
0.001 Mandor a Rp. 100,000.00 = Rp.

113 1 m2 Mengecat genteng ( Menggunakan cat merk : DJARUM ) :


Bahan : 0.130 kg Cat genting a Rp. 73,500.00 = Rp.

Upah : 0.020 Tukang cat a Rp. 95,000.00 = Rp.


0.075 Pekerja a Rp. 80,000.00 = Rp.
0.015 Mandor a Rp. 100,000.00 = Rp.

114 1 m2 Mengecat plafond ( Menggunakan cat merk : AVITEK ) :


Bahan : 0.080 kg Plamur a Rp. 32,500.00 = Rp.
0.425 kg Cat tembok a Rp. 46,000.00 = Rp.
0.500 lb Kertas gosok a Rp. 6,000.00 = Rp.

Upah : 0.150 Tukang cat a Rp. 95,000.00 = Rp.


0.015 Kepala tukang a Rp. 95,000.00 = Rp.
0.100 Pekerja a Rp. 80,000.00 = Rp.
0.005 Mandor a Rp. 100,000.00 = Rp.

115 1 m2 Cat tembok 3x (Paragon) :


Upah : 0.225 Tukang cat a Rp. 95,000.00 = Rp.
0.023 Kepala tukang a Rp. 95,000.00 = Rp.
0.150 Pekerja a Rp. 80,000.00 = Rp.
0.008 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.425 kg cat a Rp. 46,000.00 = Rp.


0.080 plamir a Rp. 32,500.00 = Rp.

116 1 m2 Cat plafond 2x (Paragon) :


Upah : 0.150 Tukang cat a Rp. 95,000.00 = Rp.
0.015 Kepala tukang a Rp. 95,000.00 = Rp.
0.100 Pekerja a Rp. 80,000.00 = Rp.
0.005 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.283 kg cat a Rp. 46,000.00 = Rp.


0.080 plamir a Rp. 32,500.00 = Rp.

117 1 m2 Mengecat kayu 3x dan menggosok (EMCO) :


Bahan : 0.500 Lbr kertas Ampelas a Rp. 6,000.00 = Rp.
4.250 Kg Plamur Kayu a Rp. 32,500.00 = Rp.
0.800 Kg Cat Kayu a Rp. 55,000.00 = Rp.
2.000 Ltr Thiner a Rp. 28,000.00 = Rp.
1.200 Kg Cat Dasar/meni a Rp. 30,000.00 = Rp.

Upah : 1.500 Tukang a Rp. 95,000.00 = Rp.


0.030 Kepala Tukang a Rp. 95,000.00 = Rp.
0.100 Mandor a Rp. 100,000.00 = Rp.

118 1 m2 Mengecat kayu lama :


Upah : 0.075 Tukang cat a Rp. 95,000.00 = Rp.
0.008 Kepala tukang a Rp. 95,000.00 = Rp.
0.050 Pekerja a Rp. 80,000.00 = Rp.
0.003 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.120 kg cat a Rp. 55,000.00 = Rp.


0.022 L thiner a Rp. 28,000.00 = Rp.
= Rp.

119 1 m2 Kapuran 3x (hingga baik) :


Upah : 0.010 Tukang a Rp. 95,000.00 = Rp.
0.001 Kepala tukang a Rp. 95,000.00 = Rp.
0.060 Pekerja a Rp. 80,000.00 = Rp.

Bahan : 0.001 m3 kapur batu a Rp. - = Rp.

120 1 m2 Menie rangka atap :


Upah : 0.001 Mandor a Rp. 100,000.00 = Rp.
0.038 Tukang cat a Rp. 95,000.00 = Rp.
0.025 Pekerja a Rp. 80,000.00 = Rp.

Bahan : 0.120 kg menie kayu a Rp. 55,000.00 = Rp.

PINTU / JENDELA :
121 1 m2 Pintu/jendela kayu jati kaca 3 mm :
Upah : 4.000 Tukang kayu a Rp. 95,000.00 = Rp.
0.400 Kepala tukang a Rp. 95,000.00 = Rp.
1.000 Pekerja a Rp. 80,000.00 = Rp.
0.100 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.021 m3 kayu jati a Rp. - = Rp.


1.000 m2 kaca mati a Rp. 103,400.00 = Rp.

122 1 Buah Daun Pintu Teakwood + Aluminium :


Upah : 1.500 Tukang kayu a Rp. 95,000.00 = Rp.
0.150 Kepala tukang a Rp. 95,000.00 = Rp.
0.500 Pekerja a Rp. 80,000.00 = Rp.
0.025 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.021 m3 kayu kamper a Rp. 6,398,000.00 = Rp.


1.000 Lbr. Teakwood a Rp. 120,000.00 = Rp.
1.000 Lbr. Teakwood aluminium a Rp. 162,000.00 = Rp.
0.020 kg paku a Rp. 25,000.00 = Rp.
123 1 buah daun pintu panil jati :
Upah : 1.500 Tukang kayu a Rp. 95,000.00 = Rp.
0.150 Kepala tukang a Rp. 95,000.00 = Rp.
0.500 Pekerja a Rp. 80,000.00 = Rp.
0.025 Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.092 m3 kayu jati a Rp. - = Rp.


0.020 kg paku a Rp. 14,000.00 = Rp.
a Rp.

124 1 bh Pasang kunci tanam (ROYAL besar) :


Bahan : 1.000 Set Kunci a Rp. 225,000.00 = Rp.

Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.


0.025 Mandor a Rp. 100,000.00 = Rp.

125 1 set Pasang engsel pintu :


Bahan : 3.000 bh Engsel Pintu a Rp. 199,000.00 = Rp.

Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.


0.025 Mandor a Rp. 100,000.00 = Rp.

126 1 bh Pasang Engsel Jendela :


Bahan : 2.000 Bh Engsel Jendela a Rp. 65,000.00 = Rp.

Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.


0.025 Mandor a Rp. 100,000.00 = Rp.

127 1 bh Pasang Hak angin Jendela :


Bahan : 1.000 Bh Hak angin a Rp. 15,500.00 = Rp.

Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.


0.025 Mandor a Rp. 100,000.00 = Rp.

128 1 bh Pasang Grendel Biasa :


Bahan : 1.000 Bh Grendel Biasa a Rp. 15,500 = Rp.
Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.
0.020 Mandor a Rp. 100,000.00 = Rp.

129 Pasang Kaca Mati dop :


Bahan : 1.000 m2 kaca a Rp. 141,600.00 = Rp.

Upah : 0.600 Pekerja a Rp. 80,000.00 = Rp.


1.800 Tukang kayu a Rp. 95,000.00 = Rp.

130 1 bh Pasang Glass Block km/wc :


Bahan : 1.000 bh Glass Block a Rp. 17,000.00 = Rp.

Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.


0.020 Mandor a Rp. 100,000.00 = Rp.

131 1 bh Pasang Loster Kamper :


Bahan : 1.000 bh Loster kamper a Rp. 26,500.00 = Rp.

Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.


0.020 Mandor a Rp. 100,000.00 = Rp.

132 1 m2 Pasang Kaca gelap :


Bahan : 1.000 m2 Kaca gelap 5 mm a Rp. 109,800.00 = Rp.

Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.


0.020 Mandor a Rp. 100,000.00 = Rp.

133 1 m2 Pasang Kaca es :


Bahan : 1.000 m2 Kaca es 3 mm a Rp. 141,600.00 = Rp.

Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.


0.020 Mandor a Rp. 100,000.00 = Rp.
134 1 m2 Pasang Kaca sunblusting :
Bahan : 1.000 m2 Kaca sunblusting 5 mm a Rp. 230,000.00 = Rp.

Upah : 0.100 Tukang kayu a Rp. 95,000.00 = Rp.


0.020 Mandor a Rp. 100,000.00 = Rp.

INSTALASI AIR :
135 1 unit Pasang Kloset Jongkok :
Upah : 0.280 Tukang batu a Rp. 95,000.00 = Rp.
Pekerja a Rp. 80,000.00 = Rp.
0.034 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.000 Bh Closet Jongkok a Rp. 900,000.00 = Rp.


1.000 Bh knie PVC 4" maspion a Rp. 14,500.00 = Rp.

136 1 Bh Pasang tempat sabun :


Upah : 0.140 Tukang batu a Rp. 95,000.00 = Rp.
Pekerja a Rp. 80,000.00 = Rp.
Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.000 Bh tempat sabun porselin a Rp. 75,000.00 = Rp.

137 1 Bh Kitchen Zink :


Upah : 0.210 Tukang batu a Rp. 95,000.00 = Rp.
0.140 Pekerja a Rp. 80,000.00 = Rp.
0.028 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.000 Bh Kitchen zink a Rp. 446,500.00 = Rp.

138 1 Bh Pasang Avour Bak mandi :


Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
Pekerja a Rp. 80,000.00 = Rp.
Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.000 Bh Avour stainless a Rp. 120,000.00 = Rp.


139 1 Unit Pasang Wastafel :
Upah : 0.210 Tukang batu a Rp. 95,000.00 = Rp.
0.140 Pekerja a Rp. 80,000.00 = Rp.
0.028 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.000 Bh Wastafel INA a Rp. 1,200,000.00 = Rp.

140 1 unit Pasang Monoblock :


Upah : 0.210 Tukang batu a Rp. 95,000.00 = Rp.
0.140 Pekerja a Rp. 80,000.00 = Rp.
0.028 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.000 bh Monoblock INA a Rp. 2,900,000.00 = Rp.

141 1 m' Saluran air bersih :


Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
0.014 Pekerja a Rp. 80,000.00 = Rp.
Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.250 lj Pipa PVC AW 1/2 " M a Rp. 8,100.00 = Rp.


0.125 bh Knie PVC 1/2" M a Rp. 2,500.00 = Rp.
0.250 bh Soket PVC 1/2" M a Rp. 2,100.00 = Rp.
0.125 tb Lem PVC a Rp. 7,500.00 = Rp.

142 1 m' Saluran air limbah :


Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
0.014 Pekerja a Rp. 80,000.00 = Rp.
Mandor a Rp. 100,000.00 = Rp.

Bahan : 0.250 lj Pipa PVC D 3 " Naga a Rp. 69,700.00 = Rp.


0.125 bh Knie PVC 3" maspion a Rp. 88,000.00 = Rp.
0.250 bh Soket PVC 3" Maspion a Rp. 6,200.00 = Rp.
0.125 tb Lem PVC a Rp. 7,500.00 = Rp.

143 1 m' Saluran limbah padat :


Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
0.014 Pekerja a Rp. 80,000.00 = Rp.
Mandor a Rp. 100,000.00 = Rp.
Bahan : 0.250 lj Pipa PVC D 4 " Naga a Rp. 101,300.00 = Rp.
0.125 bh Knie PVC 4" Maspion a Rp. 14,500.00 = Rp.
0.250 bh Soket PVC 4" Maspion a Rp. 8,300.00 = Rp.
0.125 tb Lem PVC a Rp. 7,500.00 = Rp.

144 1 Bh Pasang Avour lantai :


Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.
Pekerja a Rp. 80,000.00 = Rp.
0.088 Mandor a Rp. 100,000.00 = Rp.

Bahan : 1.000 Bh Avour a Rp. 20,000.00 = Rp.


1.000 Bh Knie PVC D 2.5 a Rp. 7,300.00 = Rp.

145 1 bh Pas. kran kuningan 1/2'':


Bahan : 1.000 bh Kran air kuningan a Rp. 30,000.00 = Rp.
1.000 bh soket PVC 1/2 " a Rp. 2,100.00 = Rp.

Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.


Pekerja a Rp. 80,000.00 = Rp.
Mandor a Rp. 100,000.00 = Rp.

146 1 bh Pas. kran SAN- EI :


Bahan : 1.000 bh Kran botol SAN-EI a Rp. = Rp.
1.000 bh soket PVC 1/2 " a Rp. 2,100.00 = Rp.

Upah : 0.070 Tukang batu a Rp. 95,000.00 = Rp.


Pekerja a Rp. 80,000.00 = Rp.
Mandor a Rp. 100,000.00 = Rp.

PEKERJAAN BETON KHUSUS


147 Beton bertulang /m3 1pc:2Ps:3kr -> kolom 15/40 :
Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
54.600 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
118.667 kg Besi beton dia. 12mm a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

148 Beton bertulang /m3 1pc:2Ps:3kr -> kolom 15/25 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
65.520 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
142.400 kg Besi beton dia. 12mm a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

149 Beton bertulang /m3 1pc:2Ps:3kr -> Balok 25/35 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
40.560 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
61.028 kg Besi beton dia. 12mm a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

150 Beton bertulang /m3 1pc:2Ps:3kr -> Balok Struktur 15/20 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
72.800 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
148.330 kg Besi beton dia. 12mm a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

151 Beton bertulang /m3 1pc:2Ps:3kr -> kolom Struktur 20/20 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
54.600 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
178.000 kg Besi beton dia. 12mm a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

152 Beton bertulang /m3 1pc:2Ps:3kr -> kolom Struktur 20/25 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
49.140 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
89.000 kg Besi beton dia. 12mm a Rp. 8,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

153 Beton bertulang /m3 1pc:2Ps:3kr -> balok 15/20 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
52.000 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
29.767 kg Besi beton dia. 6mm a Rp. 6,324.11 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

154 Beton bertulang /m3 1pc:2Ps:3kr -> balok 20/25 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
15.600 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
21.560 kg Besi beton dia. 6mm a Rp. 6,324.11 = Rp.
62.000 kg Besi beton dia. 10mm a Rp. 4,488.08 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

155 Beton bertulang /m3 1pc:2Ps:3kr -> kolom 20/20 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
78.000 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
23.100 kg Besi beton dia. 6mm a Rp. 6,324.11 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

156 Beton bertulang /m3 1pc:2Ps:3kr -> balok struktur 20/20 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
49.725 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
111.250 kg Besi beton dia. 12mm a Rp. 9,965.80 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

157 Beton bertulang /m3 1pc:2Ps:3kr -> Strauss Dia. 30 cm :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
33.125 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
16.500 kg Besi beton dia. 6mm a Rp. 6,324.11 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian a Rp. = Rp.
14.200 m' Bor Strauss Dia. 30 cm a Rp. 22,500.00 = Rp.
Cor beton a Rp. = Rp.

158 Beton bertulang /m3 1pc:2Ps:3kr -> Ring Balok 15/15 :


7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
66.670 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
41.067 kg Besi beton dia. 6mm a Rp. 6,324.11 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

159 Beton bertulang /m3 1pc:2Ps:3kr -> Plat lantai t 12cm :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
45.500 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
25.667 kg Besi beton dia. 6mm a Rp. 6,324.11 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

160 Beton bertulang /m3 1pc:2Ps:3kr -> Plat lantai t 10 cm :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
54.600 kg Besi beton dia. 8mm a Rp. 8,250.00 = Rp.
30.800 kg Besi beton dia. 6mm a Rp. 6,324.11 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.
161 Beton bertulang /m3 1pc:2Ps:3kr -> Plat meja dapur t = 8 cm :
Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
96.775 kg Besi beton dia. (8mm) a Rp. 8,250.00 = Rp.
1.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.144 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
2.500 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

162 Rbt. btn. 1pc :2ps : 5kr /m3 :


Bahan : 6.863 zak Semen PC a Rp. 60,000.00 = Rp.
0.490 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.980 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.

Upah :
Cor beton = Rp.

163 Beton bertulang /m3 1pc:2Ps:3kr -> balok struktur 15/25 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
63.632 kg Besi beton dia. 10mm a Rp. 8,250.00 = Rp.
191.054 kg Besi beton dia. 14mm a Rp. 9,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.
164 Beton bertulang /m3 1pc:2Ps:3kr -> KOLOM STRUKTUR 15/35 :
Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
59.664 kg Besi beton dia. 10mm a Rp. 8,250.00 = Rp.
136.982 kg Besi beton dia. 14mm a Rp. 9,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

165 Beton bertulang /m3 1pc:2Ps:3kr -> balok anak 12/15 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
72.334 kg Besi beton dia. 10mm a Rp. 8,250.00 = Rp.
296.670 kg Besi beton dia. 12mm a Rp. 9,965.80 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

166 Beton bertulang /m3 1pc:2Ps:3kr -> balok STRUKTUR 15/40 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
58.901 kg Besi beton dia. 10mm a Rp. 8,250.00 = Rp.
121.002 kg Besi beton dia. 14mm a Rp. 9,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

167 Beton bertulang /m3 1pc:2Ps:3kr -> kolom praktis 15/15 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
72.782 kg Besi beton dia. 10mm a Rp. 8,250.00 = Rp.
154.782 kg Besi beton dia. 12mm a Rp. 9,965.80 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

168 Beton bertulang /m3 1pc:2Ps:3kr -> kolom struktur 15/20 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
68.199 kg Besi beton dia. 10mm a Rp. 8,250.00 = Rp.
177.998 kg Besi beton dia. 12mm a Rp. 9,965.80 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

169 Beton bertulang /m3 1pc:2Ps:3kr -> Konsol beton :


Bahan : 8.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
110.000 kg Besi beton dia. (12mm) a Rp. 9,965.80 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.400 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
0.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.

170 Upah /m3 Beton bertulang 1:2:3 :


Mengecor :
4.200 Pekerja a Rp. 80,000.00 = Rp.
0.210 Mandor a Rp. 100,000.00 = Rp.
0.700 Tukang batu a Rp. 95,000.00 = Rp.

Pembesian :
4.725 Pekerja a Rp. 80,000.00 = Rp.
4.725 Tukang besi a Rp. 95,000.00 = Rp.

Cetakan beton/begesting :
0.350 Tukang kayu a Rp. 95,000.00 = Rp.
0.140 Pekerja a Rp. 80,000.00 = Rp.
0.007 Mandor a Rp. 100,000.00 = Rp.

171 Beton bertulang /m3 1pc:2Ps:3kr -> kolom struktur 30/30 :


Bahan : 7.500 zak Semen PC a Rp. 60,000.00 = Rp.
0.540 m3 Pasir cor a Rp. 175,000.00 = Rp.
0.820 m3 Krikil 2/2 a Rp. 560,000.00 = Rp.
53.733 kg Besi beton dia. 10mm a Rp. 8,250.00 = Rp.
80.667 kg Besi beton dia. 14mm a Rp. 9,250.00 = Rp.
2.000 kg Kawat bendrat a Rp. 27,500.00 = Rp.
0.140 m3 Kayu begesting a Rp. 1,600,000.00 = Rp.
1.400 kg Paku a Rp. 20,000.00 = Rp.

Upah :
Pembesian = Rp.
Begesting = Rp.
Cor beton = Rp.
ENAGA KERJA

Pake !!
42,000.00
250.00
Sub Total = Rp. 5,281.25 a1 5,300

5,312.50
6,250.00
1,100.00
Sub Total = Rp. 12,662.50
600.00
1,995.00
15,000.00
Sub Total = Rp. 17,595.00
Upah + Bahan = Rp. 30,257.50 a2 30,300

60,000.00
300.00
Sub Total = Rp. 60,300.00 a3 60,300

26,800.00
1,250.00
Sub Total = Rp. 28,050.00 a6 28,100

48,000.00
3,000.00
Sub Total = Rp. 51,000.00
136,800.00
Sub Total = Rp. 136,800.00
Upah + Bahan = Rp. 187,800.00 a7 187,800

96,000.00
6,000.00
Sub Total = Rp. 102,000.00
249,600.00
12,540.00
Sub Total = Rp. 262,140.00
Upah + Bahan = Rp. 364,140.00 a8 364,200

57,000.00
144,000.00
9,000.00
Sub Total = Rp. 210,000.00
249,600.00
136,620.00
108,225.00
Sub Total = Rp. 494,445.00
Upah + Bahan = Rp. 704,445.00 a9 704,500

57,000.00
144,000.00
9,000.00
Sub Total = Rp. 210,000.00
249,600.00
115,200.00
109,200.00
Sub Total = Rp. 474,000.00
Upah + Bahan = Rp. 684,000.00 684,000

57,000.00
144,000.00
8,500.00
Sub Total = Rp. 209,500.00
275,000.00
Sub Total = Rp. 275,000.00
Upah + Bahan = Rp. 484,500.00 a10 484,500

57,000.00
144,000.00
9,000.00
Sub Total = Rp. 210,000.00
262,500.00
216,000.00
73,710.00
Sub Total = Rp. 552,210.00
Upah + Bahan = Rp. 762,210.00 a11 762,300

57,000.00
144,000.00
9,000.00
Sub Total = Rp. 210,000.00
262,500.00
189,600.00
79,170.00
Sub Total = Rp. 531,270.00 m3
Upah + Bahan = Rp. 741,270.00 741,300

57,000.00
144,000.00
9,000.00
Sub Total = Rp. 210,000.00
262,500.00
139,800.00
82,485.00
Sub Total = Rp. 484,785.00 m3
Upah + Bahan = Rp. 694,785.00 694,800

57,000.00
144,000.00
9,000.00
Sub Total = Rp. 210,000.00
262,500.00
132,600.00
83,460.00
Sub Total = Rp. 478,560.00 m3
Upah + Bahan = Rp. 688,560.00 a12 688,600

57,000.00
144,000.00
9,000.00
Sub Total = Rp. 210,000.00
262,500.00
129,000.00
83,850.00
Sub Total = Rp. 475,350.00 m3
Upah + Bahan = Rp. 685,350.00 a13 685,400

57,000.00
144,000.00
9,000.00
Sub Total = Rp. 210,000.00
262,500.00
139,800.00
82,485.00
Sub Total = Rp. 484,785.00 m3
Upah + Bahan = Rp. 694,785.00 a14 694,800

57,000.00
144,000.00
9,000.00
Sub Total = Rp. 210,000.00
262,500.00
132,600.00
83,460.00
Sub Total = Rp. 478,560.00 m3
Upah + Bahan = Rp. 688,560.00 a15 688,600
(Upah + Bahan)/m1 86,070.00

142,500.00
360,000.00
22,500.00
Sub Total = Rp. 525,000.00
250,000.00
-
9,765.00
61,425.00
Sub Total = Rp. 321,190.00 m3
Upah + Bahan = Rp. 846,190.00 846,200

142,500.00
360,000.00
22,500.00
Sub Total = Rp. 525,000.00
83,200.00
6,493.50
25,500.00
Sub Total = Rp. 115,193.50 m3
Upah + Bahan = Rp. 640,193.50 640,200

6,650.00
11,200.00
700.00
Sub Total = Rp. 18,550.00
12,900.00
3,334.50
Sub Total = Rp. 16,234.50 m2
Upah + Bahan = Rp. 34,784.50 34,800

6,650.00
11,200.00
700.00
Sub Total = Rp. 18,550.00
10,980.00
3,705.00
Sub Total = Rp. 14,685.00 m2
Upah + Bahan = Rp. 33,235.00 a16 33,300

6,650.00
11,200.00
700.00
Sub Total = Rp. 18,550.00
9,120.00
3,900.00
Sub Total = Rp. 13,020.00 m2
Upah + Bahan = Rp. 31,570.00

6,650.00
11,200.00
700.00
Sub Total = Rp. 18,550.00
7,200.00
4,290.00
Sub Total = Rp. 11,490.00 m2
Upah + Bahan = Rp. 30,040.00

6,650.00
11,200.00
700.00
Sub Total = Rp. 18,550.00
5,220.00
4,290.00
Sub Total = Rp. 9,510.00 m2
Upah + Bahan = Rp. 28,060.00 a17 28,100

9,975.00
22,400.00
1,400.00
Sub Total = Rp. 33,775.00
150.00
3,315.00
Sub Total = Rp. 3,465.00 m2
Upah + Bahan = Rp. 37,240.00 a18 37,300

9,975.00
22,400.00
1,400.00
Sub Total = Rp. 33,775.00
10,800.00
643.50
Sub Total = Rp. 11,443.50 m2
Upah + Bahan = Rp. 45,218.50 a22 45,300

8,075.00
20,000.00
1,250.00
Sub Total = Rp. 29,325.00
7,200.00
4,290.00
= Rp. 11,490.00 m2
Upah + Bahan = Rp. 40,815.00 a23 40,900

13,300.00
22,400.00
1,400.00
Sub Total = Rp. 37,100.00
8,820.00
2,716.35
140,250.00
Sub Total = Rp. 151,786.35
Upah + Bahan = Rp. 188,886.35 b1 188,900

13,300.00
22,400.00
1,400.00
Sub Total = Rp. 37,100.00
9,120.00
3,900.00
144,000.00
Sub Total = Rp. 157,020.00
Upah + Bahan = Rp. 194,120.00 b2 194,200

13,300.00
22,400.00
1,400.00
Sub Total = Rp. 37,100.00
8,820.00
2,710.50
132,000.00
Sub Total = Rp. 143,530.50
Upah + Bahan = Rp. 180,630.50 180,700

13,300.00
22,400.00
1,400.00
Sub Total = Rp. 37,100.00
7,200.00
4,290.00
140,250.00
Sub Total = Rp. 151,740.00
Upah + Bahan = Rp. 188,840.00 b3 188,900

13,300.00
22,400.00
1,400.00
Sub Total = Rp. 37,100.00
7,200.00
4,290.00
144,000.00
Sub Total = Rp. 155,490.00
Upah + Bahan = Rp. 192,590.00 b4 192,600
2,973.50
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
55,211.67
60,000.00
60,000.00
1,200.00
5,118.75 66,318.75
66,318.75

121,530.42
Sub Total = Rp. 204,347.92 c1 204,400

66,318.75
Sub Total = Rp. 149,136.25 c2 149,200

60,000.00
7,814.40
4,075.50
90.00
Sub Total = Rp. 71,979.90
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 154,797.40 c3 154,800

60,000.00
7,814.40
4,075.50
90.00
Sub Total = Rp. 71,979.90
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 154,797.40 c4 154,800
75,000.00
7,814.40
4,075.50
72.00
Sub Total = Rp. 86,961.90
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 169,779.40 c5 169,800

60,000.00
7,814.40
4,075.50
72.00
Sub Total = Rp. 71,961.90
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 154,779.40 c6 154,800

-
7,814.40
4,075.50
72.00
Sub Total = Rp. 11,961.90
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 94,779.40 c7 94,800

68,181.82
7,958.40
72.00
4,075.50
Sub Total = Rp. 80,287.72
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 163,105.22 c8 163,200

83,333.33
7,958.40
72.00
4,075.50
Sub Total = Rp. 95,439.23
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 178,256.73 c9 178,300

25,224.50
-
7,814.40
4,075.50
72.00
Sub Total = Rp. 37,186.40
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 120,003.90 c10 120,100

25,224.50
31,313.13
7,814.40
4,075.50
72.00
Sub Total = Rp. 68,499.53
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 151,317.03 151,400

87,500.00
7,958.40
292.50
1,003.20
Sub Total = Rp. 96,754.10
29,687.50
50,000.00
3,130.00
Sub Total = Rp. 82,817.50
Upah + Bahan = Rp. 179,571.60 c11 179,600

480,000.00
30,000.00
47,500.00
Sub Total = Rp. 557,500.00
486,956.52
97,500.00
353,100.00
Sub Total = Rp. 937,556.52
Upah + Bahan = Rp. 1,495,056.52 d1 1,495,100

47,500.00
4,750.00
16,000.00
1,000.00
Sub Total = Rp. 69,250.00
640,000.00
80,000.00
Sub Total = Rp. 720,000.00
Upah + Bahan = Rp. 789,250.00 d2 789,300

480,000.00
30,000.00
95,000.00
9,500.00 614,500.00
399,304.35
94,500.00
408,000.00 901,804.35
Sub Total = Rp. 1,516,304.35

540,000.00
641,250.00
213,750.00 1,395,000.00
907,500.00
55,000.00 962,500.00
Sub Total = Rp. 2,357,500.00

47,500.00
4,750.00
16,000.00
1,000.00 69,250.00
640,000.00
80,000.00 720,000.00
Sub Total = Rp. 789,250.00
= Rp. 3,873,804.35 d3 3,873,900
embesian praktis = Rp. 4,663,054.35 d4 4,663,100

450,000.00
94,500.00
143,500.00
1,262,167.50
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,257,167.50

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,959,042.50 d5 3,959,100

450,000.00
94,500.00
143,500.00
663,465.00
55,000.00
224,000.00
30,000.00
Sub Total = Rp. 1,660,465.00

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,362,340.00 d6 3,362,400
450,000.00
94,500.00
143,500.00
1,036,860.00
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,031,860.00

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,733,735.00 d7 3,733,800

450,000.00
94,500.00
143,500.00
798,393.75
27,500.00
230,400.00
50,000.00
Sub Total = Rp. 1,794,293.75

423,500.00
826,875.00
451,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,496,168.75 d8 3,496,200

254,400.00
87,500.00
175,000.00
Sub Total = Rp. 516,900.00
66,500.00
336,000.00
21,000.00
Sub Total = Rp. 423,500.00
Upah + Bahan = Rp. 940,400.00 d9 940,400

15,500.00
2,032.50
7,692.00
Sub Total = Rp. 25,224.50
9,975.00
22,400.00
1,400.00
Sub Total = Rp. 33,775.00
Upah + Bahan = Rp. 58,999.50 d10 59,000

15,500.00
-
-
Sub Total = Rp. 15,500.00
9,975.00
22,400.00
1,400.00
Sub Total = Rp. 33,775.00
Upah + Bahan = Rp. 49,275.00 d11 49,300

450,000.00
94,500.00
143,500.00
230,400.00
50,000.00
Sub Total = Rp. 968,400.00

451,500.00
423,500.00
Sub Total = Rp. 875,000.00
Upah + Bahan = Rp. 1,843,400.00 d12 1,843,400

450,000.00
94,500.00
143,500.00
547,470.00
27,500.00
230,400.00
50,000.00
Sub Total = Rp. 1,543,370.00

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,245,245.00 d13 3,245,300
450,000.00
94,500.00
143,500.00
1,718,227.50
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,713,227.50

423,500.00
826,875.00
451,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,415,102.50 d14 4,415,200

450,000.00
94,500.00
143,500.00
737,055.00
55,000.00
224,000.00
30,000.00
Sub Total = Rp. 1,734,055.00

423,500.00
826,875.00
451,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,435,930.00 d15 3,436,000

450,000.00
94,500.00
143,500.00
1,210,770.00
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,205,770.00

423,500.00
826,875.00
451,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,907,645.00 d16 3,907,700

1,710,000.00
480,000.00
30,000.00
= Rp. 2,220,000.00
3,437,500.00 3,437,500.00
Sub Total = Rp. 5,657,500.00 e1 5,657,500

1,900,000.00
532,800.00
33,330.00
Sub Total = Rp. 2,466,130.00
13,750,000.00
13,500.00
20,000.00
Sub Total = Rp. 13,783,500.00
Upah + Bahan = Rp. 16,249,630.00 e2 16,249,700

1,900,000.00
190,000.00
533,336.00
33,330.00
Sub Total = Rp. 2,656,666.00
3,437,500.00
35,000.00
20,000.00
Sub Total = Rp. 3,492,500.00
Upah + Bahan = Rp. 6,149,166.00 e3 6,149,200

9,500.00
950.00
8,000.00
2,500.00
Sub Total = Rp. 20,950.00
2,000.00
3,000.00
Sub Total = Rp. 5,000.00
581.00
Sub Total = Rp. 26,531.00 e4 26,600
51,875.00
Sub Total = Rp. 77,825.00 e5 77,900

25,333.33
7,600.00
7,466.67
466.67
Sub Total = Rp. 40,866.67
32,343.75
5,312.50
22,000.00
6,250.00
Sub Total = Rp. 65,906.25
Upah + Bahan = Rp. 106,772.92 e6 106,800

25,333.33
7,600.00
7,466.67
466.67
Sub Total = Rp. 40,866.67
32,343.75
22,000.00
6,250.00
Sub Total = Rp. 60,593.75
Upah + Bahan = Rp. 101,460.42 e7 101,500

19,000.00
2,400.00
500.00
Sub Total = Rp. 21,900.00
Err:509
125.00
Sub Total = Rp. Err:509
Upah + Bahan = Rp. Err:509 e8 Err:509

3,437,500.00
60,000.00
= Rp. 3,497,500.00
3,420,000.00
342,000.00
960,000.00
60,000.00
Sub Total = Rp. 4,782,000.00
Upah + Bahan = Rp. 8,279,500.00 e9 8,279,500

3,437,500.00
250,800.00
1,085,000.00
50,000.00
Sub Total = Rp. 4,823,300.00
3,420,000.00
342,000.00
960,000.00
60,000.00
Sub Total = Rp. 4,782,000.00
Upah + Bahan = Rp. 9,605,300.00 e10 9,605,300

5,280,000.00
60,000.00
Sub Total = Rp. 5,340,000.00
3,420,000.00
342,000.00
960,000.00
60,000.00
Sub Total = Rp. 4,782,000.00
Upah + Bahan = Rp. 10,122,000.00 10,122,000

5,280,000.00
250,800.00
1,085,000.00
50,000.00
Sub Total = Rp. 6,665,800.00
3,420,000.00
342,000.00
960,000.00
60,000.00
Sub Total = Rp. 4,782,000.00
Upah + Bahan = Rp. 11,447,800.00 11,447,800

57,600.00
1,200.00
Sub Total = Rp. 58,800.00
1,900.00
16,000.00
10,000.00
Sub Total = Rp. 27,900.00
Upah + Bahan = Rp. 86,700.00 e11 86,700

57,600.00
1,200.00
Sub Total = Rp. 58,800.00
1,900.00
16,000.00
10,000.00
Sub Total = Rp. 27,900.00
Upah + Bahan = Rp. 86,700.00 e12 86,700

10,002.96
1,720.00
Sub Total = Rp. 11,722.96
28,500.00
2,400.00
30,000.00
Sub Total = Rp. 60,900.00
Upah + Bahan = Rp. 72,622.96 e13 72,700

25,006.96
1,720.00
Sub Total = Rp. 26,726.96
76,000.00
22,400.00
1,400.00
Sub Total = Rp. 99,800.00
Upah + Bahan = Rp. 126,526.96 e14 126,600

26,100.00
73,500.00
Sub Total = Rp. 99,600.00
19,000.00
8,000.00
500.00
Sub Total = Rp. 27,500.00
Upah + Bahan = Rp. 127,100.00 f1 127,100
29,050.00
-
73,500.00
Sub Total = Rp. 102,550.00
2,375.00
2,000.00
250.00
Sub Total = Rp. 4,625.00
Upah + Bahan = Rp. 107,175.00 f2 107,200

30,210.00
1,000.00
Sub Total = Rp. 31,210.00
2,375.00
2,000.00
250.00
Sub Total = Rp. 4,625.00
Upah + Bahan = Rp. 35,835.00 f3 35,900

30,000.00
1,000.00
Sub Total = Rp. 31,000.00
2,375.00
2,000.00
250.00
Sub Total = Rp. 4,625.00
Upah + Bahan = Rp. 35,625.00 f4 35,700

41,044.00
1,000.00
Sub Total = Rp. 42,044.00
2,375.00
2,000.00
250.00
Sub Total = Rp. 4,625.00
Upah + Bahan = Rp. 46,669.00 f5 46,700

25,900.00
1,000.00
Sub Total = Rp. 26,900.00
2,375.00
2,000.00
250.00
Sub Total = Rp. 4,625.00
Upah + Bahan = Rp. 31,525.00 f6 31,600

76,000.00
26,600.00
1,120.00
-
Sub Total = Rp. 103,720.00
2,000.00
125,034.80
Sub Total = Rp. 127,034.80
Upah + Bahan = Rp. 230,754.80 230,800

15,200.00
4,480.00
280.00
Sub Total = Rp. 19,960.00
1,720.00
13,750.00
Sub Total = Rp. 15,470.00
Upah + Bahan = Rp. 35,430.00 e15 35,500

15,200.00
4,480.00
280.00
Sub Total = Rp. 19,960.00
1,720.00
20,625.00
Sub Total = Rp. 22,345.00
Upah + Bahan = Rp. 42,305.00 e16 42,400

15,200.00
4,480.00
280.00
Sub Total = Rp. 19,960.00
6,000.00
25,900.00
13,750.00
Sub Total = Rp. 45,650.00
Upah + Bahan = Rp. 65,610.00 f7 65,700
2,375.00
2,000.00
250.00
Sub Total = Rp. 4,625.00
6,000.00
25,900.00
13,750.00
Sub Total = Rp. 45,650.00
Upah + Bahan = Rp. 50,275.00 f8 50,300

2,375.00
2,000.00
250.00
Sub Total = Rp. 4,625.00
10,550.00
8,750.00
Sub Total = Rp. 19,300.00
Upah + Bahan = Rp. 23,925.00 f9 24,000

9,500.00
950.00
16,000.00
1,000.00
Sub Total = Rp. 27,450.00
63,250.00
Sub Total = Rp. 63,250.00
Upah + Bahan = Rp. 90,700.00 f10 90,700

19,000.00
1,900.00
32,000.00
2,000.00
Sub Total = Rp. 54,900.00
14,500.00
1,728.00
Sub Total = Rp. 16,228.00
Upah + Bahan = Rp. 71,128.00 f11 71,200

19,000.00
1,900.00
8,000.00
500.00 = Rp.
Sub Total = Rp. 29,400.00
62,700.00
8,400.00
100,500.00 = Rp. 71,100.00
Upah + Bahan = Rp. 100,500.00 f12 100,500

2,375.00
237.50
2,000.00
Sub Total = Rp. 4,612.50
57,000.00
8,400.00
Sub Total = Rp. 65,400.00
Upah + Bahan = Rp. 70,012.50 f13 70,100

28,500.00
2,850.00
Sub Total = Rp. 31,350.00
25,900.00
500.00
25,937.50
Sub Total = Rp. 52,337.50
Upah + Bahan = Rp. 83,687.50 f14 83,700

40,000.00
3,000.00
Sub Total = Rp. 43,000.00
8,500.00
280.00
Sub Total = Rp. 8,780.00
Upah + Bahan = Rp. 51,780.00 f15 51,800

16,000.00
3,000.00
Sub Total = Rp. 19,000.00
14,410.00
70.00
Sub Total = Rp. 14,480.00
Upah + Bahan = Rp. 33,480.00 33,500
11,875.00
2,375.00
20,000.00
1,250.00 = Rp.
Sub Total = Rp. 35,500.00
6,000.00
175,000.00
Sub Total = Rp. 181,000.00
Upah + Bahan = Rp. 216,500.00 216,500

11,875.00
2,375.00
20,000.00
1,250.00
Sub Total = Rp. 35,500.00
6,000.00
175,000.00
Sub Total = Rp. 181,000.00
Upah + Bahan = Rp. 216,500.00 216,500

4,620.00
1,200.00
Sub Total = Rp. 5,820.00
28,500.00
12,000.00
750.00
Sub Total = Rp. 41,250.00
Upah + Bahan = Rp. 47,070.00 g1 47,100

154.76
Err:509
4,166.67
1,200.00
Sub Total = Rp. Err:509
28,500.00
12,000.00
750.00
Sub Total = Rp. 41,250.00
Upah + Bahan = Rp. Err:509 g2 Err:509
5,775.00
5,687.50
1,568.00
7,700.00
750.00
6,000.00
Sub Total = Rp. 27,480.50
21,375.00
12,000.00
750.00
Sub Total = Rp. 34,125.00
Upah + Bahan = Rp. 61,605.50 g3 61,700

5,775.00
5,687.50
1,568.00
7,700.00
750.00
6,000.00
Sub Total = Rp. 27,480.50
21,375.00
12,000.00
750.00
Sub Total = Rp. 34,125.00
Upah + Bahan = Rp. 61,605.50 g4 61,700

32,500.00
8,250.00
225.00
3,000.00
Sub Total = Rp. 43,975.00
950.00
4,800.00
100.00
Sub Total = Rp. 5,850.00
Upah + Bahan = Rp. 49,825.00 g5 49,900

32,500.00
8,250.00
225.00
3,000.00
Sub Total = Rp. 43,975.00
950.00
4,800.00
100.00
Sub Total = Rp. 5,850.00
Upah + Bahan = Rp. 49,825.00 g6 49,900

32,500.00
6,900.00
225.00
3,000.00
Sub Total = Rp. 42,625.00
950.00
4,800.00
100.00
Sub Total = Rp. 5,850.00
Upah + Bahan = Rp. 48,475.00 g7 48,500

32,500.00
7,200.00
225.00
3,000.00
Sub Total = Rp. 42,925.00
950.00
4,800.00
100.00
Sub Total = Rp. 5,850.00
Upah + Bahan = Rp. 48,775.00 g8 48,800

9,555.00
= Rp. 9,555.00
1,900.00
6,000.00
1,500.00
Sub Total = Rp. 9,400.00
Upah + Bahan = Rp. 18,955.00 g9 19,000

2,600.00
19,550.00
3,000.00
Sub Total = Rp. 25,150.00
14,250.00
1,425.00
8,000.00
500.00
Sub Total = Rp. 24,175.00
Upah + Bahan = Rp. 49,325.00 g10 49,400

21,375.00
2,137.50
12,000.00
750.00
Sub Total = Rp. 36,262.50
19,550.00
2,600.00
Sub Total = Rp. 22,150.00
Upah + Bahan = Rp. 58,412.50 g11 58,500

14,250.00
1,425.00
8,000.00
500.00
Sub Total = Rp. 24,175.00
13,031.80
2,600.00
Sub Total = Rp. 15,631.80
Upah + Bahan = Rp. 39,806.80 g12 39,900

3,000.00
138,125.00
44,000.00
56,000.00
36,000.00
Sub Total = Rp. 277,125.00
142,500.00
2,850.00
10,000.00
Sub Total = Rp. 155,350.00
Upah + Bahan = Rp. 432,475.00 g13 432,500

7,125.00
712.50
4,000.00
250.00
Sub Total = Rp. 12,087.50
6,600.00
616.00
19,303.50 = Rp. 7,216.00
Upah + Bahan = Rp. 19,303.50 g14 19,400

950.00
95.00
4,800.00
Sub Total = Rp. 5,845.00
-
Sub Total = Rp. -
Upah + Bahan = Rp. 5,845.00 g15 5,900

125.00
3,562.50
2,000.00
Sub Total = Rp. 5,687.50
6,600.00
Sub Total = Rp. 6,600.00
Upah + Bahan = Rp. 12,287.50 g16 12,300

380,000.00
38,000.00
80,000.00
10,000.00
Sub Total = Rp. 508,000.00
-
103,400.00
Sub Total = Rp. 103,400.00
Upah + Bahan = Rp. 611,400.00 h1 611,400

142,500.00
14,250.00
40,000.00
2,500.00
Sub Total = Rp. 199,250.00
134,358.00
120,000.00
162,000.00
500.00
Sub Total = Rp. 416,858.00
Upah + Bahan = Rp. 616,108.00 h2 616,200
142,500.00
14,250.00
40,000.00
2,500.00
Sub Total = Rp. 199,250.00
-
280.00
Sub Total = Rp. 280.00
Upah + Bahan = Rp. 199,530.00 h3 199,600

225,000.00
Sub Total = Rp. 225,000.00
9,500.00
2,500.00
Sub Total = Rp. 12,000.00
Upah + Bahan = Rp. 237,000.00 h4 237,000

597,000.00
Sub Total = Rp. 597,000.00
9,500.00
2,500.00
Sub Total = Rp. 12,000.00
Upah + Bahan = Rp. 609,000.00 h5 609,000

130,000.00
Sub Total = Rp. 130,000.00
9,500.00
2,500.00
Sub Total = Rp. 24,000.00
Upah + Bahan = Rp. 154,000.00 h6 154,000

15,500.00
Sub Total (1 stel) = Rp. 31,000.00
9,500.00
2,500.00
Sub Total (1 stel) = Rp. 12,000.00
Upah + Bahan = Rp. 43,000.00 h7 43,000

15,500.00
Sub Total = Rp. 15,500.00
9,500.00
2,000.00
Sub Total = Rp. 11,500.00
Upah + Bahan = Rp. 27,000.00 h8 27,000

141,600.00
Sub Total = Rp. 141,600.00
48,000.00
171,000.00
Sub Total = Rp. 219,000.00
Upah + Bahan = Rp. 360,600.00 h9 360,600

17,000.00
Sub Total = Rp. 17,000.00
9,500.00
2,000.00
Sub Total = Rp. 11,500.00
Upah + Bahan = Rp. 28,500.00 h10 28,500

26,500.00
Sub Total = Rp. 26,500.00
9,500.00
2,000.00
Sub Total = Rp. 11,500.00
Upah + Bahan = Rp. 38,000.00 h11 38,000

109,800.00
Sub Total = Rp. 109,800.00
9,500.00
2,000.00
Sub Total = Rp. 11,500.00
Upah + Bahan = Rp. 121,300.00 h12 121,300

141,600.00
Sub Total = Rp. 141,600.00
9,500.00
2,000.00
Sub Total = Rp. 11,500.00
Upah + Bahan = Rp. 153,100.00 h13 153,100
230,000.00
Sub Total = Rp. 230,000.00
9,500.00
2,000.00
Sub Total = Rp. 11,500.00
Upah + Bahan = Rp. 241,500.00 h14 241,500

26,600.00
-
3,400.00
Sub Total = Rp. 30,000.00
900,000.00
14,500.00
Sub Total = Rp. 914,500.00
Upah + Bahan = Rp. 944,500.00 i1 944,500

13,300.00
-
-
Sub Total = Rp. 13,300.00
75,000.00
Sub Total = Rp. 75,000.00
Upah + Bahan = Rp. 88,300.00 i2 88,300

19,950.00
11,200.00
2,800.00
Sub Total = Rp. 33,950.00
446,500.00
Sub Total = Rp. 446,500.00
Upah + Bahan = Rp. 480,450.00 i3 480,500

6,650.00
-
-
Sub Total = Rp. 6,650.00
120,000.00
Sub Total = Rp. 120,000.00
Upah + Bahan = Rp. 126,650.00 i4 126,700
19,950.00
11,200.00
2,800.00
Sub Total = Rp. 33,950.00
1,200,000.00
Sub Total = Rp. 1,200,000.00
Upah + Bahan = Rp. 1,233,950.00 i5 1,234,000

19,950.00
11,200.00
2,800.00
Sub Total = Rp. 33,950.00
2,900,000.00
Sub Total = Rp. 2,900,000.00
Upah + Bahan = Rp. 2,933,950.00 i6 2,934,000

6,650.00
1,120.00
-
Sub Total = Rp. 7,770.00
2,025.00
312.50
525.00
937.50
Sub Total = Rp. 3,800.00
Upah + Bahan = Rp. 11,570.00 i7 11,600

6,650.00
1,120.00
-
Sub Total = Rp. 7,770.00
17,425.00
11,000.00
1,550.00
937.50
Sub Total = Rp. 30,912.50
Upah + Bahan = Rp. 38,682.50 i8 38,700

6,650.00
1,120.00
-
Sub Total = Rp. 7,770.00
25,325.00
1,812.50
2,075.00
937.50
Sub Total = Rp. 30,150.00
Upah + Bahan = Rp. 37,920.00 i9 38,000

6,650.00
-
8,750.00
Sub Total = Rp. 15,400.00
20,000.00
7,300.00
Sub Total = Rp. 27,300.00
Upah + Bahan = Rp. 42,700.00 i10 42,700

30,000.00
2,100.00
Sub Total = Rp. 32,100.00
6,650.00
-
-
Sub Total = Rp. 6,650.00
Upah + Bahan = Rp. 38,750.00 i11 38,800

-
2,100.00
Sub Total = Rp. 2,100.00
6,650.00
-
-
Sub Total = Rp. 6,650.00
Upah + Bahan = Rp. 8,750.00 i12 8,800

450,000.00
94,500.00
459,200.00
450,450.00
979,002.75
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,740,152.75

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,442,027.75 d17 4,442,100

450,000.00
94,500.00
459,200.00
540,540.00
1,174,800.00
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 3,026,040.00

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,727,915.00 d18 4,728,000

450,000.00
94,500.00
459,200.00
334,620.00
503,481.00
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,148,801.00

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,850,676.00 d19 3,850,700
450,000.00
94,500.00
459,200.00
600,600.00
1,223,722.50
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 3,135,022.50

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,836,897.50 d20 4,836,900

450,000.00
94,500.00
459,200.00
450,450.00
1,468,500.00
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 3,229,650.00

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,931,525.00 d21 4,931,600

450,000.00
94,500.00
459,200.00
405,405.00
734,250.00
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,450,355.00

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,152,230.00 d22 4,152,300

450,000.00
94,500.00
459,200.00
429,000.00
188,249.80
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 1,927,949.80

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,629,824.80 d23 3,629,900

450,000.00
94,500.00
459,200.00
128,700.00
136,347.83
278,260.87
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 1,854,008.70

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,555,883.70 d24 3,555,900

450,000.00
94,500.00
459,200.00
643,500.00
146,086.96
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,100,286.96

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,802,161.96 d25 3,802,200

450,000.00
94,500.00
459,200.00
410,231.25
1,108,695.65
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,829,626.90

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,531,501.90 d26 4,531,600

450,000.00
94,500.00
459,200.00
273,281.25
104,347.83
55,000.00
28,000.00
Sub Total = Rp. 1,464,329.08

826,875.00
319,500.00
423,500.00
Sub Total = Rp. 1,569,875.00
Upah + Bahan = Rp. 3,034,204.08 d27 3,034,300

450,000.00
94,500.00
459,200.00
550,027.50
259,712.25
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,120,439.75

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,822,314.75 d28 3,822,400

450,000.00
94,500.00
459,200.00
375,375.00
162,320.95
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 1,848,395.95

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,550,270.95 d29 3,550,300

450,000.00
94,500.00
459,200.00
450,450.00
194,782.61
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 1,955,932.61

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,657,807.61 d30 3,657,900

450,000.00
94,500.00
459,200.00
798,393.75
27,500.00
230,400.00
50,000.00
Sub Total = Rp. 2,109,993.75

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 3,811,868.75 d31 3,811,900

411,780.00
85,750.00
548,800.00
Sub Total = Rp. 1,046,330.00

423,500.00
Sub Total = Rp. 423,500.00
Upah + Bahan = Rp. 1,469,830.00 d32 1,469,900

450,000.00
94,500.00
459,200.00
524,964.00
1,767,249.50
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 3,602,913.50

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 5,304,788.50 d33 5,304,800
450,000.00
94,500.00
459,200.00
492,228.00
1,267,083.50
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 3,070,011.50

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,771,886.50 d34 4,771,900

450,000.00
94,500.00
459,200.00
596,755.50
2,956,554.96
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 4,864,010.46

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 6,565,885.46 d35 6,565,900

450,000.00
94,500.00
459,200.00
485,933.25
1,119,268.50
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,915,901.75

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,617,776.75 d36 4,617,800

450,000.00
94,500.00
459,200.00
600,451.50
1,542,527.02
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 3,453,678.52

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 5,155,553.52 d37 5,155,600

450,000.00
94,500.00
459,200.00
562,641.75
1,773,893.11
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 3,647,234.86

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 5,349,109.86 d38 5,349,200

510,000.00
94,500.00
459,200.00
1,096,238.40
55,000.00
640,000.00
8,000.00
Sub Total = Rp. 2,862,938.40

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,564,813.40 d39 4,564,900

336,000.00
21,000.00
66,500.00
Sub Total = Rp. 423,500.00

378,000.00
448,875.00
Sub Total = Rp. 826,875.00

33,250.00
11,200.00
700.00
Sub Total = Rp. 451,500.00
Upah TotaL = Rp. 1,701,875.00 d41 1,701,900

450,000.00
94,500.00
459,200.00
443,297.25
746,169.75
55,000.00
224,000.00
28,000.00
Sub Total = Rp. 2,500,167.00

826,875.00
451,500.00
423,500.00
Sub Total = Rp. 1,701,875.00
Upah + Bahan = Rp. 4,202,042.00 d40 4,202,100
ANALISA HARGA SATUAN PEKERJAAN
Untuk Daerah Malang & Sekitarnya
(Periode April 2017)

Harga Satuan Harga Satuan


No Uraian Pekerjaan Koefisien Satuan Bahan Pekerjaan
(Rp.) (Rp.)
GALIAN & URUGAN
1 Uitset Bouwplank m'
Papan Meranti 2/20 0.004 m3 3,125,000.00 12,500.00
Usuk Meranti 5/7 0.004 m3 3,125,000.00 12,500.00
Paku 0.055 kg 20,000.00 1,100.00
Benang 2.000 rol
Upah Kerja 30,300.00
56,400.00

2 Urugan Pasir m3
Pasir 1.200 m3 114,000.00 136,800.00
Upah Kerja 51,000.00
187,800.00

3 Urugan Sirtu m3
Sirtu 12.000 m3 90,000.00 1,080,000.00
Upah Kerja 9,500.00
Upah Pemadatan 7,500.00
1,097,000.00

4 Galian Tanah Biasa ( < 1m' ) m3


Tukang Gali 0.350 95.00 33.25
Mandor 0.025 100,000.00 2,500.00
2,533.25

5 Galian Tanah Biasa ( > 1 m' ) m3


Pekerja 0.625 95.00 59.38
Mandor 0.025 100,000.00 2,500.00
2,559.38

6 Urugan Tanah Kembali


Pekerja 0.225 95.00 21.38
Mandor 0.025 100,000.00 2,500.00
2,521.38

PONDASI
1 Pasangan Aanstamping m3
Batu Belah 1.200 m3 208,000.00 249,600.00
Pasir 0.110 m3 114,000.00 12,540.00
Upah Kerja 35,000.00
297,140.00

2 Pasangan Pondasi Batu Belah 1:4 m3


Batu Belah 1.200 m3 208,000.00 249,600.00
Pasir 0.110 m3 195,000.00 21,450.00
PC 4.000 zak 60,000.00 240,000.00
Upah Kerja 60,000.00
571,050.00
3 Pasangan Pondasi Batu Belah 1:8 m3
Batu Belah 1.200 m3 208,000.00 249,600.00
Pasir 0.110 m3 195,000.00 21,450.00
PC 3.000 zak 60,000.00 180,000.00
Upah Kerja 60,000.00
511,050.00

4 Pasangan Pondasi Batu Belah 1:10 m3


Batu belah 1.200 m3 208,000.00 249,600.00
Pasir 0.110 m3 195,000.00 21,450.00
PC 2.000 zak 60,000.00 120,000.00
Upah Kerja 60,000.00
451,050.00

PASANGAN BATA DINDING


1 Rollag Bata m3
Batu Bata 525.000 bh 500.00 262,500.00
PC 2.330 zak 60,000.00 139,800.00
Pasir Pasang 0.423 m3 195,000.00 82,485.00
Upah Kerja 65,000.00
549,785.00

2 Pasangan Bata Kosong m3


Bata merah 550.000 bh 500.00 275,000.00
Upah Kerja 45,000.00
320,000.00

3 Pasangan Bata Merah 1:4 m3


Bata Merah 525.000 bh 500.00 262,500.00
Pasir 0.340 m3 195,000.00 66,300.00
PC 2.000 zak 60,000.00 120,000.00
Upah Kerja 65,000.00
513,800.00

4 Pasangan Bata Merah 1:8 m3


Bata Merah 525.000 bh 500.00 262,500.00
Pasir 0.350 m3 195,000.00 68,250.00
PC 1.500 zak 60,000.00 90,000.00
Upah Kerja 65,000.00
485,750.00

5 Pasangan Bata Merah 1:10 m3


Bata Merah 525.000 bh 500.00 262,500.00
Pasir 0.375 m3 195,000.00 73,125.00
PC 1.000 zak 60,000.00 60,000.00
Upah Kerja 65,000.00
460,625.00

6 Pasangan Bata Merah 1:3:10 m3


Bata Merah 525.000 bh 500.00 262,500.00
Pasir 0.250 m3 195,000.00 48,750.00
PC 0.075 zak 60,000.00 4,500.00
Delocid 3.000 zak 7,300.00 21,900.00
Upah Kerja 65,000.00
402,650.00

PLESTERAN
1 Plesteran 1:4 m2
Pasir 0.026 m3 195,000.00 5,070.00
PC 0.200 zak 60,000.00 12,000.00
Upah Kerja 8,000.00
25,070.00

2 Plesteran 1:8 m2
Pasir 0.026 m3 195,000.00 5,070.00
PC 0.150 zak 60,000.00 9,000.00
Upah Kerja 8,000.00
22,070.00

3 Plesteran 1:10 m2
Pasir 0.026 m3 195,000.00 5,070.00
PC 0.100 zak 60,000.00 6,000.00
Upah Kerja 8,000.00
19,070.00

4 Benangan Sudut m'


Calsium 0.014 m3 27,500.00 385.00
PC 0.028 zak 60,000.00 1,680.00
Upah Kerja 7,000.00
9,065.00

5 Benangan Tali Air m'


PC 0.003 zak 60,000.00 180.00
Pasir 0.017 m3 195,000.00 3,315.00
Upah Kerja 7,000.00
10,495.00

6 Benangan Timbul m'


Calsium 0.014 zak 27,500.00 385.00
PC 0.028 zak 60,000.00 1,680.00
Upah Kerja 7,000.00
9,065.00

7 Border Dinding/Ban-banan m'


Border Fabrikasi 1.000 m' 18,000.00 18,000.00
Upah Kerja 7,000.00
25,000.00

8 Border Teras (kanopi) m'


Border Fabrikasi 1.000 m' 50,000.00 50,000.00
Upah Kerja 7,000.00
57,000.00

9 Tekstur Alur Fabrikasi m2


Tekstur Alur 1.000 m2 40,000.00 40,000.00
Upah Kerja 8,000.00
48,000.00

10 Plesteran Tekstur m2
PC 0.120 zak 60,000.00 7,200.00
Pasir 0.022 m3 195,000.00 4,290.00
Upah Kerja 8,000.00
19,490.00

PASANGAN DINDING KHUSUS


1 Pasangan Dinding Bataco 1:3 m2
Bataco/Holow break 20/40 13.000 bh 6,400.00 83,200.00
Pasir 0.050 m3 195,000.00 9,750.00
PC 0.263 zak 60,000.00 15,780.00
Upah Kerja 8,000.00
116,730.00

2 Pasangan Dinding Bataco 1:2 m2


Bataco Holow Break 20/40 13.000 bh 6,400.00 83,200.00
Pasir 0.045 m3 195,000.00 8,775.00
PC 0.388 zak 60,000.00 23,280.00
Upah Kerja 8,000.00
123,255.00

3 Pasangan Rooster Semen 1:3 m2


Bataco/Holow Break 25.500 bh 6,400.00 163,200.00
Pasir 0.050 m3 195,000.00 9,750.00
PC 0.263 zak 60,000.00 15,780.00
Upah Kerja 9,000.00
197,730.00

4 Pasangan Rooster Merah 1:3 m2


Bataco/Holow Break 25.500 bh 6,400.00 163,200.00
Pasir 0.050 m 3
195,000.00 9,750.00
PC 0.263 zak 60,000.00 15,780.00
Upah Kerja 9,000.00
197,730.00

BETON PRAKTIS
A Beton Ringan 1:2:3 m3
PC 6.500 zak 60,000.00 390,000.00
Pasir Cor 0.500 m3 175,000.00 87,500.00
Krikil Cor 0.820 m3 486,956.52 399,304.35
876,804.35

B Beton Rabat 1:3:5 m3


PC 5.000 zak 60,000.00 300,000.00
Pasir Cor 0.540 m3 175,000.00 94,500.00
Krikil Cor 0.820 m3 486,956.52 399,304.35
793,804.35

1 Sloof 15/20 m3
Beton 1:2:3 1.000 m3 876,804.35 876,804.35
Pembesian
- Besi beton dia. 6 mm 27.720 kg 8,250.00 228,690.00
- Besi beton dia. 8 mm 53.580 kg 8,250.00 442,035.00
- Kawat Bendrat 2.000 kg 20,000.00 40,000.00
Begesting
- Papan Randu 2/20 0.133 m3 475,000.00 63,175.00
- reng Meranti 2/3 0.001 m3 3,125,000.00 3,125.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 81.300 kg 800.00 65,040.00
- Upah Begesting + Cor 1.000 m3 110,005.00 110,005.00
1,848,874.35

2 Kolom 12/12 m3
Beton 1:2:3 1.000 m3 876,804.35 876,804.35
Pembesian
- Besi beton dia. 6 mm 43.170 kg 8,250.00 356,152.50
- Besi beton dia. 8 mm 109.530 kg 8,250.00 903,622.50
- Kawat Bendrat 2.000 kg 20,000.00 40,000.00
Begesting
- Papan Randu 2/20 0.280 m3 475,000.00 133,000.00
- reng Meranti 2/3 m3 3,125,000.00 -
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 152.700 kg 800.00 122,160.00
- Upah Begesting + Cor 1.000 m 3
129,990.00 129,990.00
2,581,729.35

3 Ring Balk 12/15 m3


Beton 1:2:3 1.000 m3 876,804.35 876,804.35
Pembesian
- Besi beton dia. 6 mm 37.840 kg 8,250.00 312,180.00
- Besi beton dia. 8 mm 87.630 kg 8,250.00 722,947.50
- Kawat Bendrat 2.000 kg 20,000.00 40,000.00
Begesting
- Papan Randu 2/20 0.220 m3 475,000.00 104,500.00
- reng Meranti 2/3 0.002 m 3
3,125,000.00 6,250.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 125.470 kg 800.00 100,376.00
- Upah Begesting + Cor 1.000 m3 115,550.00 115,550.00
2,298,607.85

4 Beton Plat, t = 7 cm m3
Beton 1:2:3 1.000 m3 876,804.35 876,804.35
Pembesian
- Besi beton dia. 8 mm 112.600 kg 8,250.00 928,950.00
- Kawat Bendrat 2.000 kg 8,250.00 16,500.00
Begesting
- Papan Randu 2/20 0.143 m3 475,000.00
- reng Meranti 2/3 0.223 m3 3,125,000.00 696,875.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 112.600 kg 800.00 90,080.00
- Upah Begesting + Cor 1.000 m3 167,175.00 167,175.00
2,796,384.35

C Beton Semi Berat 1:2:3 m3


PC 7.500 zak 60,000.00 450,000.00
Pasir Cor 0.540 m3 175,000.00 94,500.00
Krikil Cor 0.820 m 3
486,956.52 399,304.35
943,804.35

5 Balok 15/25 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 65.520 kg 8,250.00 540,540.00
- Besi beton dia 12 mm 142.400 kg 8,250.00 1,174,800.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.214 m3 475,000.00 101,650.00
- reng Meranti 2/3 0.007 m 3
3,125,000.00 21,875.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 168.970 kg 800.00 135,176.00
- Upah Begesting + Cor 1.000 m3 110,005.00 110,005.00
3,097,850.35

6 Sloof 15/25 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 26.870 kg 8,250.00 221,677.50
- Besi beton dia 12 mm 142.100 kg 8,250.00 1,172,325.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.214 m3 475,000.00 101,650.00
- reng Meranti 2/3 0.007 m3 3,125,000.00 21,875.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 168.970 kg 800.00 135,176.00
- Upah Begesting + Cor 1.000 m3 110,005.00 110,005.00
2,776,512.85

7 Sloof 20/30 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 21.880 kg 8,250.00 180,510.00
- Besi beton dia 12 mm 103.620 kg 8,250.00 854,865.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.135 m3 475,000.00 64,125.00
- reng Meranti 2/3 0.014 m3 3,125,000.00 43,750.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 125.500 kg 800.00 100,400.00
- Upah Begesting + Cor 1.000 m3 161,685.00 161,685.00
2,419,139.35

8 Sloof 20/40 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 36.410 kg 8,250.00 300,382.50
- Besi beton dia 12 mm 103.900 kg 8,250.00 857,175.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.050 m3 475,000.00 23,750.00
- reng Meranti 2/3 0.005 m3 3,125,000.00 15,625.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 140.310 kg 800.00 112,248.00
- Upah Begesting + Cor 1.000 m3 107,500.00 107,500.00
2,430,484.85

9 Kolom 12/30 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 6 mm 30.390 kg 8,250.00 250,717.50
- Besi beton dia 12 mm 148.000 kg 8,250.00 1,221,000.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.222 m3 475,000.00 105,450.00
- reng Meranti 2/3 0.210 m3
3,125,000.00 656,250.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 178.390 kg 800.00 142,712.00
- Upah Begesting + Cor 1.000 m3
145,560.00 145,560.00
3,535,493.85

10 Kolom 25/30 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 6 mm 23.050 kg 8,250.00 190,162.50
- Besi beton dia 12 mm 118.370 kg 8,250.00 976,552.50
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.107 m3 475,000.00 50,825.00
- reng Meranti 2/3 0.020 m3 3,125,000.00 62,500.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 141.420 kg 800.00 113,136.00
- Upah Begesting + Cor 1.000 m3 129,990.00 129,990.00
2,536,970.35

11 Kolom 30/30 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 6 mm 21.000 kg 8,250.00 173,250.00
- Besi beton dia 12 mm 108.520 kg 8,250.00 895,290.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.089 m3 475,000.00 42,275.00
- reng Meranti 2/3 0.017 m3 3,125,000.00 53,125.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 129.520 kg 800.00 103,616.00
- Upah Begesting + Cor 1.000 m3 128,885.00 128,885.00
2,410,245.35

12 Kolom 40/40 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 28.130 kg 8,250.00 232,072.50
- Besi beton dia 12 mm 90.220 kg 8,250.00 744,315.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.200 m3 475,000.00 95,000.00
- reng Meranti 2/3 0.009 m3 3,125,000.00 28,125.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 118.350 kg 800.00 94,680.00
- Upah Begesting + Cor 1.000 m3 118,125.00 118,125.00
2,326,121.85

13 Balok 12/30 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 6 mm 30.800 kg 8,250.00 254,100.00
- Besi beton dia 12 mm 172.680 kg 8,250.00 1,424,610.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.222 m3 475,000.00 105,450.00
- reng Meranti 2/3 0.026 m3
3,125,000.00 81,250.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 203.480 kg 800.00 162,784.00
- Upah Begesting + Cor 1.000 m3
169,450.00 169,450.00
3,211,448.35

14 Balok 20/40 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 36.410 kg 8,250.00 300,382.50
- Besi beton dia 12 mm 111.000 kg 8,250.00 915,750.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.063 m3 475,000.00 29,925.00
- reng Meranti 2/3 0.013 m3 3,125,000.00 40,625.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 147.410 kg 800.00 117,928.00
- Upah Begesting + Cor 1.000 m3 150,000.00 150,000.00
2,568,414.85

15 Balok 25/40 m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 29.800 kg 8,250.00 245,850.00
- Besi beton dia 12 mm 99.460 kg 8,250.00 820,545.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.096 m3 475,000.00 45,600.00
- reng Meranti 2/3 0.011 m3 3,125,000.00 34,375.00
- Paku 1.000 kg 20,000.00 20,000.00
Upah Kerja
- Upah Pembesian 129.260 kg 800.00 103,408.00
- Upah Begesting + Cor 1.000 m3 136,000.00 136,000.00
2,399,582.35

16 Beton Pond. Strouss 20 cm m3


Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 22.220 kg 8,250.00 183,315.00
- Besi beton dia 12 mm 169.600 kg 8,250.00 1,399,200.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Upah Kerja
- Upah Bor Strouss 31.830 m' 20,000.00 636,600.00
- Upah Pembesian 191.820 kg 800.00 153,456.00
- Upah Cor 1.000 m3 70,000.00 70,000.00
3,436,375.35

17 Beton Pond. Strouss 25 cm m3


Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 19.000 kg 8,250.00 156,750.00
- Besi beton dia 12 mm 144.710 kg 8,250.00 1,193,857.50
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Upah Kerja
- Upah Bor Strouss 20.370 m' 20,000.00 407,400.00
- Upah Pembesian 163.710 kg 800.00 130,968.00
- Upah Cor 1.000 m3 70,000.00 70,000.00
2,952,779.85

18 Beton Plat 1 x 1, t = 15 cm m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 18.900 kg 8,250.00 155,925.00
- Besi beton dia 12 mm 83.302 kg 8,250.00 687,241.50
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Upah Kerja
- Upah Pembesian 102.202 kg 800.00 81,761.60
- Upah Cor 1.000 m3 75,330.00 75,330.00
1,994,062.45
19 Beton Plat 1,2 x 1,2 t = 25 cm m3
Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 13.144 kg 8,250.00 108,438.00
- Besi beton dia 12 mm 103.194 kg 8,250.00 851,350.50
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Upah Kerja
- Upah Pembesian 116.337 kg 800.00 93,069.60
- Upah Cor 1.000 m3 72,780.00 72,780.00
2,119,442.45

20 Beton Plat Lantai, t = 10 cm m3


Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 86.600 kg 8,250.00 714,450.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Meranti 2/20 0.100 m3 2,273,400.00 227,340.00
- reng Meranti 2/3 0.315 m3
3,125,000.00 984,375.00
- Paku 3.000 kg 20,000.00 60,000.00
Upah Kerja
- Upah Pembesian 86.680 kg 800.00 69,344.00
- Upah Begesting + Cor 1.000 m3
155,000.00 155,000.00
1.000 3,204,313.35

21 Beton Plat Lantai, t = 12 cm m3


Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 8 mm 72.700 kg 8,250.00 599,775.00
- Kawat Bendrat 3.000 kg 20,000.00 60,000.00
Begesting
- Papan Meranti 2/20 0.084 m3 2,273,400.00 190,965.60
- reng Meranti 2/3 0.260 m3 3,125,000.00 812,500.00
- Paku 3.000 kg 20,000.00 60,000.00
Upah Kerja
- Upah Pembesian 72.700 kg 800.00 58,160.00
- Upah Begesting + Cor 1.000 m3 119,980.00 119,980.00
2,845,184.95

22 Beton Lisplank 7/60 m3


Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 6 mm 24.710 kg 8,250.00 203,857.50
- Besi beton dia. 8 mm 46.910 kg 8,250.00 387,007.50
- Kawat Bendrat 2.500 kg 20,000.00
Begesting
- Papan Randu 2/20 0.285 m3 475,000.00 135,375.00
- Usuk 5/7, Reng 2/3 Meranti 0.046 m3 2,395,600.00 110,197.60
- Paku 3.000 kg 20,000.00 60,000.00
Upah Kerja
- Upah Pembesian 71.620 kg 800.00 57,296.00
- Upah Begesting + Cor 1.000 m3 202,900.00 202,900.00
2,100,437.95

23 Beton Lisplank 7/75 m3


Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 6 mm 24.200 kg 8,250.00 199,650.00
- Besi beton dia. 8 mm 52.680 kg 8,250.00 434,610.00
- Kawat Bendrat 2.500 kg 20,000.00 50,000.00
Begesting
- Papan Randu 2/20 0.305 m3 475,000.00 144,875.00
- Usuk 5/7, Reng 2/3 Meranti 0.031 m3 2,395,600.00 74,263.60
- Paku 3.000 kg 20,000.00 60,000.00
Upah Kerja
- Upah Pembesian 76.880 kg 800.00 61,504.00
- Upah Begesting + Cor 1.000 m3 202,900.00 202,900.00
2,171,606.95

24 Beton Lisplank 5/30 m3


Beton 1:2:3 1.000 m3 943,804.35 943,804.35
Pembesian
- Besi beton dia. 6 mm 34.540 kg 8,250.00 284,955.00
- Besi beton dia. 8 mm 78.800 kg 8,250.00 650,100.00
- Kawat Bendrat 2.500 kg 20,000.00
Begesting
- Papan Randu 2/20 0.535 m3 475,000.00 254,125.00
- Usuk 5/7, Reng 2/3 Meranti 0.035 m3 2,395,600.00 83,846.00
- Paku 3.000 kg 20,000.00 60,000.00
Upah Kerja
- Upah Pembesian 113.340 kg 800.00 90,672.00
- Upah Begesting + Cor 1.000 m3 202,900.00 202,900.00
2,570,402.35

D Patlah Bata m3
Bata Merah 31.000 bh 500.00 15,500.00
PC 0.128 zak 60,000.00 7,680.00
Pasir Pasang 0.027 m3 195,000.00 5,265.00
Upah Kerja 10,000.00
38,445.00

PEKERJAAN LANTAI
A Beton Rabat 1:3:5 m3
PC 5.000 zak 60,000.00 300,000.00
Pasir Cor 0.540 m3 195,000.00 105,300.00
Krikil Cor 0.820 m3 486,956.52 399,304.35
Upah Kerja 85,740.00
890,344.35

B Speci Pas. Keramik 1:4, t=2cm m2


PC 0.200 zak 60,000.00 12,000.00
Pasir Pasang 0.020 m3 195,000.00 3,900.00
15,900.00

C PASANG KERAMIK LANTAI


KERAMIK ROMAN
1 Keramik 40/40 m2
Keramik 40/40 1.000 m2 60,000.00 60,000.00
Speci 1:4 1.000 m 2
15,900.00 15,900.00
Lantai Kerja Rabat Beton 1.000 m2 62,261.84 62,261.84
Upah Kerja 82,817.50
220,979.34

2 Keramik 30/30 m2
Keramik 30/30 1.000 m2 60,000.00 60,000.00
Speci 1:4 1.000 m 2
15,900.00 15,900.00
Lantai Kerja Rabat Beton 1.000 m2 62,261.84 62,261.84
Upah Kerja 82,817.50
220,979.34

3 Keramik 20/20 m2
Keramik 20/20 1.000 m2 65,000.00 65,000.00
Speci 1:4 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 1.000 m2 62,261.84 62,261.84
Upah Kerja 82,817.50
225,979.34

4 Keramik 25/25 m2
Keramik 25/25 1.000 m2 65,000.00 65,000.00
Speci 1:4 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 1.000 m2 62,261.84 62,261.84
Upah Kerja 82,817.50
225,979.34

D PASANG KERAMIK DINDING


KERAMIK ROMAN
1 Keramik 30/30 m2
Keramik 30/30 1.000 m2 60,000.00 60,000.00
Speci 1:4 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 7 cm 1.000 m2
62,261.84 62,261.84
Upah Kerja 82,817.50
220,979.34

2 Keramik 20/20 m2
Keramik 20/20 1.000 m2 65,000.00 65,000.00
Speci 1:4 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 7 cm 1.000 m2
62,261.84 62,261.84
Upah Kerja 82,817.50
225,979.34

6 Pas. Dinding Keramik 20/25 Gambar m2 156,323.69


Keramik 20/25 1.000 m2 65,000.00 65,000.00
Speci 1:4 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 7 cm 1.000 m2
62,261.84 62,261.84
Upah Kerja 82,817.50
225,979.34

E PASANG KERAMIK LANTAI & DINDING


KERAMIK ASIA / SETARA
1 Keramik Lantai 40/40 m2
Keramik 40/40 1.000 m2 60,000.00 60,000.00
Speci 1:4 1.000 m2
15,900.00 15,900.00
Lantai Kerja Rabat Beton 7 cm 1.000 m2 62,261.84 62,261.84
Upah Kerja 82,817.50
220,979.34

2 Keramik Lantai 30/30 m2


Keramik 30/30 1.000 m2 60,000.00 60,000.00
Speci 1:4 1.000 m2
15,900.00 15,900.00
Lantai Kerja Rabat Beton 7 cm 1.000 m2 62,261.84 62,261.84
Upah Kerja 82,817.50
220,979.34
3 Keramik Lantai 20/20 m2
Keramik 20/20 1.000 m2 65,000.00 65,000.00
Speci 1:4 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 7 cm 1.000 m2 62,261.84 62,261.84
Upah Kerja 82,817.50
225,979.34

4 Keramik Dinding 20/20 m2


Keramik 20/20 1.000 m2 53,000.00 53,000.00
Speci 1:4 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 7 cm 1.000 m2 62,261.84 62,261.84
Upah Kerja 82,817.50
213,979.34

5 Keramik Dinding 20/25 m2


Keramik 20/25 1.000 m2 -
Speci 1:4 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 7 cm 1.000 m2 62,261.84 62,261.84
Upah Kerja 82,817.50
160,979.34

6 Lantai Rabat Beton Berpola m2


Lantai Kerja Rabat Beton 7 cm 1.000 m2 62,261.84 62,261.84
Speci 1:4 1.000 m2 15,900.00 15,900.00
Urugan Pasir 7 cm 1.000 m2 62,261.84 62,261.84
Upah Kerja
140,423.69

7 Lantai Paving Berpola m2


Paving 8 cm 1.000 m2 -
Speci 1:4 1.000 m2 15,900.00 15,900.00
Urugan Pasir 7 cm 1.000 m2 62,261.84 62,261.84
Upah Kerja 5,000.00
83,161.84

E SOME
Speci KeramikHIDDEN
1:3, t = 2 !!
cm
PC 0.300 48,000.00 14,400.00
Pasir Pasang 0.020 75,000.00 1,500.00
15,900.00

G PASANG BATU ALAM LANTAI


1 Batu Cirebon Persegi (B) m2
Batu Persegi 1.000 m2 -
Speci 1:3 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 1:3 1.000 m2 62,261.84 62,261.84
Upah Kerja 12,500.00
90,661.84

2 Batu Jember Persegi (B) m2


Batu Persegi 1.000 m2 -
Speci 1:3 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 1:3 1.000 m2 62,261.84 62,261.84
Upah Kerja 12,500.00
90,661.84

3 Batu Cirebon Natural (B) m2


Batu Natural 1.000 m2 -
Speci 1:3 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 1:3 1.000 m2 62,261.84 62,261.84
Upah Kerja 10,000.00
88,161.84

4 Batu Jember Natural (B) m2


Batu Natural 1.000 m2 -
Speci 1:3 1.000 m2 15,900.00 15,900.00
Lantai Kerja Rabat Beton 1:3 1.000 m2 62,261.84 62,261.84
Upah Kerja 10,000.00
88,161.84

ATAP & PLAFOND


1 Gording, Nok Kayu Meranti m3
Balok Kayu Meranti 1.100 m3 3,125,000.00 3,437,500.00
Paku 2.000 kg 14,000.00 28,000.00
Angkur Baut 10.000 kg 15,500.00 155,000.00
Menie 2.000 kg 18,600.00 37,200.00
Upah Kerja 250,000.00
3,907,700.00

2 Gording, Nok Kayu Kamper m3


Balok Kayu Kamper 1.100 m3 6,398,000.00 7,037,800.00
Paku 2.000 kg 14,000.00 28,000.00
Angkur Baut 10.000 kg 15,500.00 155,000.00
Menie 2.000 kg 18,600.00 37,200.00
Upah Kerja 250,000.00
7,508,000.00

3 Gording, Nok Kayu Kruwing m3


Balok Kayu Kruwing 1.100 m3 - -
Paku 2.000 kg 14,000.00 28,000.00
Angkur Baut 10.000 kg 15,500.00 155,000.00
Menie 2.000 kg 18,600.00 37,200.00
Upah Kerja 250,000.00
470,200.00

4 Usuk 5/7, Reng 3/5 Meranti m2


Balok Usuk 5/7 Meranti 0.010 m3 2,395,600.00 23,956.00
Balok Usuk 3/5 Meranti 0.005 m3 2,395,600.00 11,978.00
Paku 0.025 kg 14,000.00 350.00
Menie 0.100 kg 18,600.00 1,860.00
Upah Kerja 7,500.00
45,644.00

5 Usuk 5/7, Reng 3/5 Kamper m2


Balok Usuk 5/7 Kamper 0.010 m3 4,650,000.00 46,500.00
Balok Usuk 3/5 Kamper 0.005 m3 4,650,000.00 23,250.00
Paku 0.025 kg 14,000.00 350.00
Menie 0.100 kg 18,600.00 1,860.00
Upah Kerja 7,500.00
79,460.00

6 Usuk 5/7, Reng 3/5 Kruwing m2


Balok Usuk 5/7 Kruwing 0.010 m3 -
Balok Usuk 3/5 Kruwing 0.005 m3 -
Paku 0.025 kg 14,000.00 350.00
Menie 0.100 kg 18,600.00 1,860.00
Upah Kerja 7,500.00
9,710.00
7 Kuda-kuda Meranti m3
Balok Meranti 1.100 m3 4,800,000.00 5,280,000.00
Paku 3.000 kg 14,000.00 42,000.00
Begel Plat 20.000 kg 11,400.00 228,000.00
Menie 2.000 kg 18,600.00 37,200.00
Upah Kerja 300,000.00
5,887,200.00

8 Kuda-kuda Kamper m3
Balok Kamper 1.100 m3 6,398,000.00 7,037,800.00
Paku 3.000 kg 14,000.00 42,000.00
Begel Plat 20.000 kg 11,400.00 228,000.00
Menie 2.000 kg 18,600.00 37,200.00
Upah Kerja 300,000.00
7,645,000.00

9 Kuda-kuda Kruwing m3
Balok Kruwing 1.100 m3 - -
Paku 3.000 kg 14,000.00 42,000.00
Begel Plat 20.000 kg 11,400.00 228,000.00
Menie 2.000 kg 18,600.00 37,200.00
Upah Kerja 300,000.00
607,200.00

10 Papan Reuter Meranti m'


Papan Meranti 0.004 m3 2,273,400.00 9,093.60
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 5,000.00
15,373.60

11 Papan Reuter Kruwing m'


Papan Kruwing 0.004 m3 - -
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 5,000.00
6,280.00

12 Talang Horizontal Kruwing m'


Papan Kayu Kruwing 0.009 m3 - -
Plat BJLS 1.000 kg 25,900.00 25,900.00
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 10,000.00
37,180.00

13 Talang Jurai Kruwing m'


Papan Kayu Kruwing 0.005 m3 - -
Plat BJLS 1.000 kg 25,900.00 25,900.00
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 10,000.00
37,180.00

14 Talang Horizontal Meranti m'


Papan Kayu Meranti 0.009 m3 2,273,400.00 20,460.60
Plat BJLS 1.000 kg 25,900.00 25,900.00
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 10,000.00
57,640.60
15 Talang Jurai Meranti m'
Papan Kayu Meranti 0.005 m3 2,273,400.00 11,367.00
Plat BJLS 1.000 kg 25,900.00 25,900.00
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 10,000.00
48,547.00

16 Talang Vertical/Saluran Talang 3" m'


PVD dia. 3" 1.000 m3 88,000.00 88,000.00
Klem Pengikat 1.000 m' 7,000.00 7,000.00
Upah Kerja 10,000.00
105,000.00

17 Talang Vertical/Saluran Talang 4" m'


PVD dia. 4" 1.000 m3 145,000.00 145,000.00
Klem Pengikat 1.000 m' 7,000.00 7,000.00
Upah Kerja 10,000.00
162,000.00

18 Lisplank Meranti 3/30 m'


Papan Meranti 3/30 0.009 m3 2,273,400.00 20,460.60
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 7,500.00
29,240.60

19 Lisplank Meranti 3/20 m'


Papan Meranti 3/20 0.006 m3 2,273,400.00 13,640.40
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 7,500.00
22,420.40

20 Lisplank Kamper 3/30 m'


Papan Kamper 3/30 0.009 m3 5,683,400.00 51,150.60
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 7,500.00
59,930.60

21 Lisplank Kamper 3/20 m'


Papan Kamper 3/20 0.006 m3 5,683,400.00 34,100.40
Paku 0.025 kg 14,000.00 350.00
Menie 0.050 kg 18,600.00 930.00
Upah Kerja 7,500.00
42,880.40

22 Pas. Genteng Beton Model GARUDA m2


Genteng Beton GARUDA 9.500 bh 2,900.00 27,550.00
Upah Kerja 2,500.00
30,050.00

23 Pas. Genteng Beton Model KIA m2


Genteng Beton KIA 12.500 bh - -
Upah Kerja 2,500.00
2,500.00

24 Pas. Bubungan m'


Bubungan 3.500 bh 8,300.00 29,050.00
Upah Kerja 7,500.00
36,550.00
25 Pas. Vergel m'
Vergel 4.000 bh - -
Upah Kerja 5,000.00
5,000.00

26 Pas. Atap Zeng Gelombang m2


BJLS 30 0.850 lb 66,200.00 56,270.00
Paku Payung 0.001 kg 20,000.00 20.00
Upah Kerja 2,000.00
58,290.00

27 Pas. Asbest Gelombang m2


Asbest Gelombang 0.850 lb -
Paku Payung 0.001 kg 20,000.00 20.00
Upah Kerja 2,000.00
2,020.00

28 Pas. Plafond Eternit m2


Eternit 1,00 x 1,00 1.000 lb 8,500.00 8,500.00
Balok Usuk 5/7 Meranti 0.006 m3 2,395,600.00 14,373.60
Paku 0.020 kg 14,000.00 280.00
Upah Kerja 7,500.00
SOME HIDDEN !! 30,653.60

SANITASI
1 Septictank 1 x 2,5 m, t = 1,50 m Unit
Galian Tanah 7.200 m3 2,559.38 18,427.50
Urugan Pasir, t = 5 cm 0.225 m3 187,800.00 42,255.00
Lantai dasar beton tanpa tulang 7 cm 0.315 m3 943,804.35 297,298.37
Tutup Beton Bertulang 10 cm 0.364 m3 3,204,313.35 1,166,370.06
Pas. Bata 1:4 1.935 m3 513,800.00 994,203.00
Plesteran Bata 1:4 14.400 m2 25,070.00 361,008.00
2,879,561.93

2 Septictank 1 x 2 m, t = 1,50 m Unit


Galian Tanah 6.000 m3 2,559.38 15,356.25
Urugan Pasir, t = 5 cm 0.188 m3 187,800.00 35,306.40
Lantai dasar beton tanpa tulang 7 cm 0.263 m3 943,804.35 248,220.54
Tutup Beton Bertulang 10 cm 0.229 m3 3,204,313.35 733,787.76
Pas. Bata 1:4 1.710 m3 513,800.00 878,598.00
Plesteran Bata 1:4 12.900 m2 25,070.00 323,403.00
2,234,671.95

3 Resapan 1,00 m, t = 2,50 m Unit


Galian Tanah 5.426 m3 2,559.38 13,887.17
Tutup Beton Bertulang 10 cm 0.201 m3 3,204,313.35 644,066.98
Pas. Bata Kosong 2.763 m3 320,000.00 884,160.00
Pas. Bata 1:4 0.628 m3 513,800.00 322,666.40
1,864,780.55

4 Bak Kontrol 30 x 30 tertutup Unit


Galian Tanah 0.216 m3 2,559.38 552.83
Urugan Pasir, t = 5 cm 0.018 m3 187,800.00 3,380.40
Lantai dasar beton tanpa tulang 7 cm 0.025 m3 943,804.35 23,595.11
Tutup Beton Bertulang 10 cm 0.036 m3 3,204,313.35 115,355.28
Pas. Bata 1:4 0.360 m3 513,800.00 184,968.00
Plesteran Bata 1:4 0.600 m2 25,070.00 15,042.00
342,893.61

5 Bak Kontrol 30 x 30 terbuka Unit


Galian Tanah 0.216 m3 2,559.38 552.83
Urugan Pasir, t = 5 cm 0.018 m3 187,800.00 3,380.40
Lantai dasar beton tanpa tulang 7 cm 0.025 m3 943,804.35 23,595.11
Pas. Bata 1:4 0.360 m3 513,800.00 184,968.00
Plesteran Bata 1:4 0.600 m2 25,070.00 15,042.00
227,538.33

6 Pasang Kloset Jongkok INA Unit


Closet Jongkok merk INA 1.000 set 175,000.00 175,000.00
Knie PVC D 4" 1.000 bh 14,500.00 14,500.00
Upah Kerja 40,000.00
229,500.00

7 Pasang Monoblok Unit


Kloset Duduk Monoblok 1.000 set 850,000.00 850,000.00
Knie PVC D 4" 1.000 bh 14,500.00 14,500.00
Upah Kerja 75,000.00
939,500.00

8 Pasang Bath-Up Fiber Unit


Bath-up Fiber 1.000 set -
Knie PVC D 2,5" 1.000 bh 7,300.00 7,300.00
Upah Kerja 100,000.00
107,300.00

9 Pasang Bath-Up Fiber Segitiga Unit


Bath-up Fiber Segitiga 1.000 set -
Knie PVC D 2,5" 1.000 bh 7,300.00 7,300.00
Upah Kerja 100,000.00
107,300.00

10 Pasang Washtafel Unit


Washtafel 1.000 set 750,000.00 750,000.00
Knie PVC D 2,5" 1.000 bh 7,300.00 7,300.00
Upah Kerja 75,000.00
832,300.00

11 Pasang Tempat Sabun Unit


Terpat Sabun Porselen 1.000 set 50,000.00 50,000.00
Upah Kerja 25,000.00
75,000.00

12 Pasang Kitchen Zink Unit


Kitchen Zink 1.000 set 160,000.00 160,000.00
Knie PVC D 2,5" 1.000 bh 7,300.00 7,300.00
Upah Kerja 75,000.00
242,300.00

13 Pasang Avour Lantai Unit


Avour Lantai 1.000 set 20,000.00 20,000.00
Knie PVC D 2,5" 1.000 bh 7,300.00 7,300.00
Upah Kerja 5,000.00
32,300.00

14 Pasang Avour Bak/Tap-tapan bak mandi Unit


Avour Bak Mandi 1.000 set 7,500.00 7,500.00
Upah Kerja 5,000.00
12,500.00

15 Pasang Kran (stainless steel) Unit


Kran 1/2 DUPONT 1.000 set -
Sock Stainless Steel 1/2" 1.000 bh -
Upah Kerja 75,000.00
75,000.00
16 Pasang Kran DUPONT Unit
Kran 1.000 set 15,500.00 15,500.00
Sock PVC 1/2" 1.000 bh 5,200.00 5,200.00
Upah Kerja 75,000.00
95,700.00

17 Pasang Saluran Air Bersih Unit


Pipa PVC AW 1/2" 0.250 bt 32,400.00 8,100.00
Lem PVC & Bahan Join 1.000 ls 3,240.00 3,240.00
Upah Kerja 4,000.00
15,340.00

18 Pasang Saluran Air Bersih Unit


Pipa PVC AW 3/4" 0.250 bt 42,000.00 10,500.00
Lem PVC & Bahan Join 1.000 ls 4,200.00 4,200.00
Upah Kerja 4,500.00
19,200.00

19 Saluran Air Bersih Galvanis Unit


Pipa Galvanis 1/2" Spindo 0.167 bt 144,700.00 24,164.90
TBA & Bahan Join ls -
Upah Kerja 5,000.00
29,164.90

20 Saluran Air Bersih Galvanis Unit


Pipa Galvanis 3/4" Spindo 0.167 bt 175,700.00 29,341.90
TBA & Bahan Join ls -
Upah Kerja 6,000.00
35,341.90

21 Saluran Air Limbah 4" Unit


Pipa PVC 4" 0.250 bt 338,000.00 84,500.00
Lem PVC & Bahan Join 1.000 ls 16,880.00 16,880.00
Upah Kerja 3,500.00
104,880.00

22 Saluran Air Limbah 3" Unit


Pipa PVC 3" 0.250 bt 88,000.00 22,000.00
Lem PVC & Bahan Join ls -
Upah Kerja 3,500.00
25,500.00

23 Saluran Air Limbah 2,5" Unit


Pipa PVC 2,5" 0.250 bt 168,800.00 42,200.00
Lem PVC & Bahan Join 1.000 ls 16,880.00 16,880.00
Upah Kerja 3,500.00
62,580.00

24 Saluran Air Limbah 2" Unit


Pipa PVC 2" 0.250 bt 121,200.00 30,300.00
Lem PVC & Bahan Join ls 12,120.00 -
Upah Kerja 3,500.00
33,800.00

KOZEN, DAUN PINTU, DAUN JENDELA


1 Kozen Kayu Kamper m3
Balok Kayu Kamper 1.100 m3 6,398,000.00 7,037,800.00
Paku 1.000 kg 14,000.00 14,000.00
Upah Kerja 555,000.00
7,606,800.00
2 Kozen Kayu Jati m3
Balok Jati 1.100 m3 - -
Paku 1.000 kg 14,000.00 14,000.00
Upah Kerja 555,000.00
569,000.00

3 Daun Pintu Panil Kamper bh


Papan Kayu Kamper 0.094 m3 5,683,400.00 534,239.60
Paku 0.250 kg 14,000.00 3,500.00
Lem Rajawali Kuning 0.500 kg 13,500.00 6,750.00
Upah Kerja 175,000.00
719,489.60

4 Daun Pintu Panil Jati bh


Papan Kayu Jati Lokal 0.094 m3 - -
Paku 0.025 kg 14,000.00 350.00
Lem Rajawali Kuning 0.500 kg 13,500.00 6,750.00
Upah Kerja 175,000.00
182,100.00

5 Daun Pintu Vlam Teakwood bh


Papan Kayu Kamper 0.024 m3 5,683,400.00 136,401.60
Teakwood 4 mm 2.000 lb 91,000.00 182,000.00
Lis Profil 7.000 bt -
Paku 0.025 kg 14,000.00 350.00
Lem Rajawali Kuning 0.500 kg 13,500.00 6,750.00
Upah Kerja 60,000.00
385,501.60

6 Daun Pintu Vlam Triplek bh


Papan Kayu Kamper 0.024 m3 5,683,400.00 136,401.60
Teakwood 4 mm 2.000 lb 91,000.00 182,000.00
Lis Profil 7.000 bt - -
Paku 0.025 kg 14,000.00 350.00
Lem Rajawali Kuning 0.500 kg 13,500.00 6,750.00
Upah Kerja 60,000.00
385,501.60

7 Daun Pintu Vlam Triplek KM/WC bh


Papan Kayu Kamper 0.024 m3 5,683,400.00 136,401.60
Triplek 4 mm 1.000 lb 60,000.00 60,000.00
Triplek Aluminium 4 mm 1.000 lb - -
Lis Profil 3.500 bt 14,000.00 49,000.00
Paku 0.025 kg 14,000.00 350.00
Lem Rajawali Kuning 0.500 kg 13,500.00 6,750.00
Upah Kerja 50,000.00
302,501.60

8 Daun Jendela Slimar Kamper ( 82 x 166 ) bh


Papan Kayu Kamper 0.016 m3 5,683,400.00 90,934.40
Paku 0.015 kg 14,000.00 210.00
Lem Rajawali Kuning 0.025 kg 13,500.00 337.50
Upah Kerja 50,000.00
141,481.90

9 Daun Jendela Slimar Kamper ( 82 x 136 ) bh


Papan Kayu Kamper 0.014 m3 5,683,400.00 79,567.60
Paku 0.015 kg 14,000.00 210.00
Lem Rajawali Kuning 0.025 kg 13,500.00 337.50
Upah Kerja 45,000.00
125,115.10

10 Daun Jendela Slimar Kamper ( 82 x 50 ) bh


Papan Kayu Kamper 0.009 m3 5,683,400.00 51,150.60
Paku 0.015 kg 14,000.00 210.00
Lem Rajawali kuning 0.025 kg 13,500.00 337.50
Upah Kerja 30,000.00
81,698.10

11 Daun Jendela Slimar Jati ( 82 x 166 ) bh


Papan Kayu Jati Lokal 0.016 m3 - -
Paku 0.015 kg 14,000.00 210.00
Lem Rajawali Kuning 0.025 kg 13,500.00 337.50
Upah Kerja 50,000.00
50,547.50

12 Daun Jendela Slimar Jati ( 82 x 136 ) bh


Papan Kayu Jati Lokal 0.014 m3 - -
Paku 0.015 kg 14,000.00 210.00
Lem Rajawali Kuning 0.025 kg 13,500.00 337.50
Upah Kerja 45,000.00
45,547.50

13 Daun Jendela Slimar Jati ( 82 x 50 ) bh


Papan Kayu Jati Lokal 0.009 m3 - -
Paku 0.015 kg 14,000.00 210.00
Lem Rajawali Kuning 0.025 kg 13,500.00 337.50
Upah Kerja 30,000.00
30,547.50

PLAMUR / CAT & SENDING


A Plamur Tembok 1:3:5 m2
PC Putih 0.015 kg 98,200.00 1,473.00
Calsium 0.025 kg 27,500.00 687.50
Lem Tembok Rajawali 0.125 kg 13,000.00 1,625.00
3,785.50

B Plamur Tembok 1:3:5 m2


PC Putih 0.015 kg 98,200.00 1,473.00
Calsium 0.025 kg 27,500.00 687.50
Lem Tembok Rajawali 0.125 kg 13,000.00 1,625.00
Upah Kerja 2,000.00
5,785.50

C Plamur Tembok Ex Pabrik m2


Plamur Tembok Paragon 0.300 kg 4,600.00 1,380.00
Upah Kerja 2,000.00
3,380.00

1 Plamur & Cat Tembok AVITEX m2


Plamur Tembok 0.300 kg 4,600.00 1,380.00
Cat Tembok 0.300 kg 46,000.00 13,800.00
Ampelas 0.100 lb 3,100.00 310.00
Kuas 5" 0.100 bh 7,500.00 750.00
Upah Kerja 4,500.00
20,740.00

2 Plamur & Cat Tembok PARAGON m2


Plamur Tembok 0.300 kg 4,600.00 1,380.00
Cat Tembok 0.300 kg - -
Ampelas 0.100 lb 3,100.00 310.00
Kuas 5" 0.100 bh 7,500.00 750.00
Upah Kerja 4,500.00
6,940.00
3 Plamur & Cat Tembok DULUX m2
Plamur Tembok 0.300 kg 4,600.00 1,380.00
Cat Tembok 0.300 kg 48,000.00 14,400.00
Ampelas 0.100 lb 3,100.00 310.00
Kuas 5" 0.100 bh 7,500.00 750.00
Upah Kerja 4,500.00
21,340.00

4 Plamur & Cat Kayu AVIAN m2


Plamur Kayu PEDANG 0.250 kg 18,600.00 4,650.00
Cat Kayu 0.300 kg 55,000.00 16,500.00
Menie Kayu 0.150 kg 18,600.00 2,790.00
Tinner 0.050 lt 6,200.00 310.00
Ampelas 0.100 lb 3,100.00 310.00
Kuas 5" 0.100 bh 7,500.00 750.00
Upah Kerja 6,500.00
31,810.00

5 Plamur & Cat Kayu EMCO m2


Plamur Kayu PEDANG 0.250 kg 18,600.00 4,650.00
Cat Kayu 0.300 kg 35,000.00 10,500.00
Menie Kayu 0.150 kg 18,600.00 2,790.00
Tinner 0.050 lt 6,200.00 310.00
Ampelas 0.100 lb 3,100.00 310.00
Kuas 5" 0.100 bh 7,500.00 750.00
Upah Kerja 6,500.00
25,810.00

6 Cat Genteng JARUM m2


Cat Genteng 0.250 kg 73,500.00 18,375.00
Kuas 5" 0.100 bh 7,500.00 750.00
Upah Kerja 2,500.00
21,625.00

PASANG KUNCI & ENGSEL


A RUMAH MENENGAH ATAS
1 Pasang Kunci Pintu
Kunci Pintu JIL 1.000 set 15,000.00
Kunci Pintu SES (pintu double utama) 1.000 set 20,000.00
Kunci Pintu SES (Pintu double belang) 1.000 set 20,000.00
Kunci Pintu SES (pintu double dalam) 1.000 set 20,000.00
Kunci Pintu SES (pintu depan utama) 1.000 set 17,500.00
Kunci Pintu SES (pintu depan) 1.000 set 12,500.00
Kunci Pintu SES (pintu dalam) 1.000 set 12,500.00
Handel Pintu Utama 1.000 set 98,000.00 118,000.00
Handel Pintu dalam/belakang 1.000 set 90,000.00 105,000.00
2 Pasang Engsel Pintu & Jendela
Engsel Pintu 5" Kuningan 1.000 bh 15,000.00
Engsel Pintu 4" Kuningan 1.000 bh 15,000.00
Engsel Pintu 3" Kuningan 1.000 bh 15,000.00
Rel Pintu Tunggal HANDERSEN 1.000 unit 25,000.00
Rel Pintu Lipat HANDERSEN daun 25,000.00
Rel Pintu Dorong HANDERSEN daun 25,000.00
3 Pasang Grendel/Hak Angin Pintu & Jendela
Grendel Pintu Tanam Kuningan 1.000 bh 15,000.00
Grendel Pintu Kuningan 1.000 bh 15,000.00
Grendel Jendela Kuningan 1.000 bh 10,000.00
Hak Angin Kuningan 1.000 bh 10,000.00
4 Pasang Kaca
Kaca Rayband 5 mm Coklat/Biru 1.000 m2 2,000.00
Kaca Rayband 5 mm 1.000 m2 2,000.00
Kaca Bening 5 mm 1.000 m2 103,400.00 105,400.00
Kaca Flora 3 mm 1.000 m2 2,000.00
Kaca Painting 5 mm 1.000 m2 2,000.00
Kaca Grafier 5 mm 1.000 m2 2,000.00
Kaca Staine/Timah 5 mm 1.000 m2 2,000.00

RUMAH MENENGAH
ATAS
B RUMAH MENENGAH
HIDDEN
1 Pasang !!
Kunci Pintu
Kunci Pintu (pintu double utama) 1.000 set 15,000.00
Kunci Pintu (pintu double belakang) 1.000 set 20,000.00
Kunci Pintu (pintu double dalam) 1.000 set 20,000.00
Kunci Pintu (pintu double dalam) 1.000 set 20,000.00
Kunci Pintu (pintu depan utama) 1.000 set 17,500.00
Kunci Pintu (pintu depan) 1.000 set 12,500.00
Kunci Pintu (pintu dalam) 1.000 set 12,500.00
Handel Pintu Utama 1.000 set 98,000.00 118,000.00
Handel Pintu Dalam/Belakang 1.000 set 90,000.00 105,000.00
2 Pasang Engsel Pintu & Jendela
Engsel Pintu 5" Kuningan 1.000 bh 13,500.00 28,500.00
Engsel Pintu 4" Kuningan 1.000 bh 15,000.00
Engsel Pintu 3" Kuningan 1.000 bh 15,000.00
3 Pasang Grendel/Hak Angin Pintu & Jendela
Grendel Pintu Dalam Kuningan 1.000 bh 15,000.00
Grendel Pintu Kuningan 1.000 bh 15,000.00
Grendel Jendela Kuningan 1.000 bh 4,200.00 14,200.00
Hak Angin Kuningan 1.000 bh 15,500.00 25,500.00
Keterangan

26,100.00

17,000.00

262,140.00

511,050.00
451,050.00

391,050.00

484,785.00

275,500.00

448,800.00

420,750.00

395,625.00

337,650.00

17,070.00
14,070.00

11,070.00

2,065.00

3,495.00

2,065.00

11,490.00

108,730.00
115,255.00

188,730.00

188,730.00

1,673,829.35

175,045.00
2,329,579.35

252,150.00

2,082,681.85

215,926.00

2,539,129.35

257,255.00

2,852,669.35

245,181.00
2,531,331.85

245,181.00

2,157,054.35

262,085.00

2,210,736.85

219,748.00

3,247,221.85

288,272.00
2,293,844.35

243,126.00

2,177,744.35

232,501.00

2,113,316.85

212,805.00

2,879,214.35

332,234.00
2,300,486.85

267,928.00

2,160,174.35

239,408.00

2,576,319.35

860,056.00

2,344,411.85

608,368.00

1,836,970.85

157,091.60
1,953,592.85

165,849.60

2,979,969.35

224,344.00

2,667,044.95

178,140.00

1,840,241.95

260,196.00
1,907,202.95

264,404.00

2,276,830.35

293,572.00

28,445.00

1 m3 = 14,30 m2

804,604.35
62,261.84

138,161.84
138,161.84

143,161.84

78,161.84

138,161.84

143,161.84

299,485.53

138,161.84

138,161.84
143,161.84

131,161.84

78,161.84

140,423.69

78,161.84

78,161.84

78,161.84
78,161.84

78,161.84

3,657,700.00

7,258,000.00

220,200.00

38,144.00

71,960.00

2,210.00
5,587,200.00

7,345,000.00

307,200.00

10,373.60

1,280.00

27,180.00

27,180.00

47,640.60
38,547.00

95,000.00

152,000.00

21,740.60

14,920.40

52,430.60

35,380.40
56,290.00

20.00

23,153.60
189,500.00

864,500.00

7,300.00

7,300.00

757,300.00

167,300.00

27,300.00

untuk Bath-up, Shower,


Washtafel, kitchen zink

-
untuk bak mandi
20,700.00

11,340.00

14,700.00

24,164.90

29,341.90

101,380.00

22,000.00

59,080.00

30,300.00

7,051,800.00
14,000.00

544,489.60

7,100.00

325,501.60

325,501.60

252,501.60

91,481.90

80,115.10
51,698.10

547.50

547.50

547.50

3,785.50

16,240.00

2,440.00
16,840.00

25,310.00

19,310.00

19,125.00

Upah
15,000.00
20,000.00
20,000.00
20,000.00
17,500.00
12,500.00
12,500.00
20,000.00
15,000.00

15,000.00
15,000.00
15,000.00
25,000.00
25,000.00
25,000.00

15,000.00
15,000.00
10,000.00
10,000.00

2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00

Upah
15,000.00
20,000.00
20,000.00
20,000.00
17,500.00
12,500.00
12,500.00
20,000.00
15,000.00

15,000.00
15,000.00
15,000.00

15,000.00
15,000.00
10,000.00
10,000.00
HARGA SATUAN UPAH BORONGAN
Untuk Daerah Malang & Sekitarnya
(Periode April 2017)

Harga Satuan
No. Uraian Pekerjaan Satuan Keterangan
(Rp.)
I Pekerjaan Persiapan
1 Pembuatan Direksi Keet & Gudang m2 20,000.00 20,000.00 faktor reduce
2 Pembersihan Lahan m2 1,000.00 1,000.00
3 Uitset Bouwplank m' 30,300.00 30,300.00

II Pekerjaan Galian & Timbunan


1 Galian Tanah Biasa m3 60,300.00 60,300.00
2 Urugan Kembali m3 28,100.00 28,100.00
3 Urugan Pasir Bawah Pondasi & Lantai m3 51,000.00 51,000.00
4 Timbunan Tanah/Sirtu m3 9,500.00 9,500.00
5 Pemadatan dengan Stamper m2 7,500.00 7,500.00

III Pekerjaan Pasangan Batu Belah


1 Pasangan Aanstamping m3 102,000.00 102,000.00
2 Pondasi Batu Belah m3 210,000.00 210,000.00
3 Beraben m2 6,500.00 6,500.00
4 Beraben Timbul m2

IV Pekerjaan Pasangan Bata Merah


1 Pasangan Bata Kosong m3 209,500.00 209,500.00
2 Pasangan Dinding Bata Merah m3 210,000.00 210,000.00
3 Pasangan Dinding Batako m2 525,000.00 525,000.00
4 Pasangan Dinding Rooster m2 9,000.00 9,000.00
5 Plesteran & Acian m2 18,550.00 18,550.00
6 Benangan m' 33,775.00 33,775.00
7 benangan Tali Air m' 33,775.00 33,775.00
8 Ban-banan Lantai m' 33,775.00 33,775.00
9 Benangan Timbul m' 33,775.00 33,775.00

V Pekerjaan Beton
Beton Praktis
1 Beton Rabat, t =7 cm m3 557,500.00 557,500.00 1 m3 =
2 Sloof 15/20 m3 1,701,875.00 1,701,875.00 1 m3 =
3 Kolom Praktis 12/12 m3 1,701,875.00 1,701,875.00 1 m3 =
4 Ring Balk 12/15, Balok Latei 12/15 m3 1,701,875.00 1,701,875.00 1 m3 =
5 Balok Gantung 12/20, Konsol 12/20 m3 1,701,875.00 1,701,875.00 1 m3 =
6 Plat Level, t = 7 cm m3 1,701,875.00 1,701,875.00 1 m3 =
7 Lisplank Beton 7/60 m3 1,701,875.00 1,701,875.00 1 m3 =
Beton Konstruksi
1 Bor Strouss m' 20,000.00 20,000.00
2 Pondasi Strouss dia. 20 cm m3 70,000.00 70,000.00 1 m3 =
3 Pondasi Strouss dia. 25 cm m3 70,000.00 70,000.00 1 m3 =
4 Pondasi Plat Kaki 1,00 x 1,00 t= 15 cm m3 75,330.00 75,330.00 1 m3 =
5 Pondasi Plat Kaki 1,20 x 1,20 t = 20 cm m3 72,780.00 72,780.00 1 m3 =
6 Sloof 15/25 m3 110,005.00 110,005.00 1 m3 =
7 Sloof 20/30 m3 161,685.00 161,685.00 1 m3 =
8 Sloof 20/40 m3 107,500.00 107,500.00 1 m3 =
9 Kolom 12/30 m3 145,560.00 145,560.00 1 m3 =
10 Kolom 25/30 m3 129,990.00 129,990.00 1 m3 =
11 kolom 30/30 m3 128,885.00 128,885.00 1 m3 =
12 Kolom 40/40 m3 118,125.00 118,125.00 1 m3 =
13 Balok 12/30 m3 169,450.00 169,450.00 1 m3 =
14 Balok 20/40 m3 150,000.00 150,000.00 1 m3 =
15 Balok 25/40 m3 136,000.00 136,000.00 1 m3 =
16 Plat Deck Lantai & Tangga, t = 10 cm m3 155,000.00 155,000.00 1 m3 =
17 Plat Deck Lantai & Tangga, t = 12 cm m3 119,980.00 119,980.00 1 m3 =
18 Pembesian kg 800.00 800.00

VI Pekerjaan Atap
1 Kuda-kuda m3 300,000.00 300,000.00
2 Nok, Gording m3 250,000.00 250,000.00
3 Usuk, Reng m2 7,500.00 7,500.00
4 Lisplank m' 7,500.00 7,500.00
5 Papan Reuter m' 5,000.00 5,000.00
6 Talang Jurai m' 10,000.00 10,000.00
7 Talang Datar m' 10,000.00 10,000.00
8 Kuda-kuda Expost m3 350,000.00 350,000.00
9 Pas. Genteng beton m2 2,500.00 2,500.00
10 Pas. Bubungan Beton m' 7,500.00 7,500.00
11 Pas. Vergel Beton m' 5,000.00 5,000.00
12 Pas. Asbest & Zeng Gelombang m' 2,000.00 2,000.00

VII Pekerjaan Plafond


1 Plafond Eternit 1,00 x 1,00 m2 7,500.00 7,500.00
2 Plafond Triplex 0,6 x 0,6 m m2 10,000.00 10,000.00
3 Plafond Plaster Board 0,6 x 0,6 m2 10,000.00 10,000.00

VIII Pekerjaan Kozen, Pintu & Jendela + Accessories


1 Kozen m3 555,000.00 555,000.00
2 Daun pintu panil bh 175,000.00 175,000.00
3 Daun Pintu Vlam profil Rangka Kamper bh 60,000.00 60,000.00
4 Daun Pintu Vlam rangka Kamper bh 50,000.00 50,000.00
5 Daun Jendela Slimar Besar bh 50,000.00 50,000.00
6 Daun Jendela Slimar Sedang bh 45,000.00 45,000.00
7 Daun Jendela Slimar Kecil bh 30,000.00 30,000.00
8 Accessories daun pintu panil tunggal unit 15,000.00 15,000.00
9 Accessories daun pintu Panil Double unit 20,000.00 20,000.00
10 Accessories daun Pintu Vlam Tunggal unit 12,500.00 12,500.00
11 Accessories daun pintu Vlam Double unit 17,500.00 17,500.00
12 Accessories daun pintu dengan rel atas unit 25,000.00 25,000.00
13 Accessories daun pintu KM/WC unit 10,000.00 10,000.00
14 Accessories daun jendela slimar unit 10,000.00 10,000.00
15 kaca unit 2,000.00 2,000.00

IX Pekerjaan Lantai
1 Pas. Keramik Lantai m2 82,817.50 82,817.50
2 Pas. Keramik Dinding m2 99,381.00 99,381.00
3 Pas. Batu Alam Persegi (lantai) m2 12,500.00 12,500.00
4 Pas. Batu Alam Natural (lantai) m2 10,000.00 10,000.00
5 Pas. Batu Alam Persegi (dinding) m2 15,000.00 15,000.00
6 Pas. Batu Alam Natural (dinding) m2 12,500.00 12,500.00

X Pekerjaan Instalasi Listrik Bahan


1 Titik Lampu ttk 50,000.00 50,000.00 37,500
2 Stop Kontak ttk 50,000.00 50,000.00 37,500
3 Box Sekering ttk 50,000.00 50,000.00 37,500
4 Arde ttk 52,500.00 52,500.00 37,500
5 MCB grup 65,000.00 65,000.00 50,000

XI Pekerjaan Instalasi Air


1 Saluran Air Bersih PVC 1/2 m' 4,000.00 4,000.00
2 Saluran Air Bersih PVC 3/4 m' 4,500.00 4,500.00
3 Saluran Air Bersih Galvanis 1/2 m' 5,000.00 5,000.00
4 Saluran Air Bersih Galvanis 3/4 m' 6,000.00 6,000.00
5 Saluran Air Limbah PVC m' 3,500.00 3,500.00
6 Pasang Bath-Up Lengkap unit 100,000.00 100,000.00
7 Pasang Wastafel Lengkap unit 75,000.00 75,000.00
8 Pasang Monoblock Lengkap unit 75,000.00 75,000.00
9 Pasang Kloset Jongkok unit 40,000.00 40,000.00
10 Pasang Bak Mandi unit 100,000.00 100,000.00
11 Pasang Kran bh 75,000.00 75,000.00
12 Pasang Kran Double bh 25,000.00 25,000.00
13 Pasang Avour, Tap-tapan bak mandi bh 5,000.00 5,000.00
14 Pasang Bak Kontrol 50 x 50 x 50 cm unit 20,000.00 20,000.00
15 Septictank 1 x 2 m, t = 2 m unit 300,000.00 300,000.00
16 Resapan dia. 1 m, t = 3 m unit 200,000.00 200,000.00

XII Pekerjaan Finishing


1 Plamur Tembok m2 2,000.00 2,000.00
2 Plamur + Cat Kayu m2 6,500.00 6,500.00
3 Plamur + Dinding/plafond m2 4,500.00 4,500.00
4 Cat Genteng m2 2,500.00 2,500.00
5 Sending
a. Daun pintu panil bh 100,000.00 100,000.00
b. Daun pintu Teakwood/triplex bh 75,000.00 75,000.00
c. Kozen m' 10,000.00 10,000.00
d. Daun Jendela Slimar m' 10,000.00 10,000.00

XIII Pekerjaan Jalan & Saluran


1 Pasang Paving Jalan m2 7,500.00 7,500.00
2 Pasang Paving Halaman m2 5,000.00 5,000.00
3 Riool Pas. Bata & Buis Beton u/ 20 m2
4 Riool Pas. Bataco & Buis Beton u/20 m2
Keterangan

: 100%

14.29 m'
33.33 m'
69.44 m'
55.55 m'
41.67 m'
14.29 m2
23.81 m2

31.83 m'
20.37 m'
5.33 m2
2.78 m2
26.67 m'
16.67 m'
12.50 m'
27.78 m'
13.33 m'
11.11 m'
6.25 m'
27.78 m'
12.50 m'
8.00 m'
10.00 m2
8.33 m2

99,381.00 12500 7.95048

Upah
12,500
12,500
12,500
15,000
15,000
DAFTAR HARGA UPAH

UPAH PEKERJA

No. Upah Pekerja Harga Satuan

1 Pekerja Rp. 80,000.00 per hari


2 Tukang batu Rp. 95,000.00 per hari
3 Kepala Tukang Batu Rp. 95,000.00 per hari
4 Tukang kayu Rp. 95,000.00 per hari
5 Kepala Tukang kayu Rp. 95,000.00 per hari
6 Tukang besi Rp. 95,000.00 per hari
7 Kepala tukang besi Rp. 95,000.00 per hari
8 Tukang cat Rp. 95,000.00 per hari
9 Kepala tukang cat Rp. 95,000.00 per hari
10 Tukang Las Rp. 95,000.00 per hari
11 Tukang Pipa Rp. 95,000.00 per hari
12 Mandor Rp. 100,000.00 per hari
13 Tukang gali Rp. 95.00 per hari
14 Operator Alat Berat Rp. 200,000.00 per hari
15 Pembantu Operator Rp. 80,000.00 per hari
16 Penjaga malam Rp. 100,000.00 per hari
Daftar Harga Material / bahan Bangunan di malang
DAFTAR HARGA TERBARU MATERIAL BANGUNAN

Tahun 2017
SEMEN
Satuan
1. Semen Tiga Roda(Indocement) sak
2. Semen Gresik sak
Pengurangan Harga Tergantung Quantity
SEMEN PUTIH
1. Plamur Kingkong sak

BATU BATA PRESS


KW 1 Rp. 500/bh bh
KW 1 Rp. 480/5000bh bh

BESI BEUGLE
Uk. 6
1. Kawat 6 TM tbl 4,2mm btg
2. Kawat 6 TM tbl 5.8mm btg
Uk.8
1. Besi 8 JI btg
2. Besi 8 KS btg
3. Besi 8 TI btg
Uk.10
1. Besi 10 KS btg
2. Besi 10 TI btg
3. Besi 10 JI btg
Uk. 12
1. Besi 12 KS btg
2. Besi 12 TI btg
3. Besi 12 KSJI btg
Uk. 13 Ulir
1. Besi 13 Ulir TI btg
2. Besi 13 Ulir TW btg
Uk. 16 Ulir
1. Besi 16 TI btg
Uk. 16 Polos
1. Besi 16mm KS btg
2. Besi 16mm JI btg
Uk. 19 Ulir
1. Besi 19 Ulir TI btg
Kawat Bendrat kg
Kawat Bendrat roll

WIREMESH
Wiremesh M5 : uk. 2,10m x 5,4m .-
Wiremesh M6 : uk.5,4m x 2,1m
Wiremesh M7 : uk.5,4m x 2,1m
Wiremesh M8 : uk.5,4m x 2,1m
Wiremesh M10 : uk.5,4m x 2,1m

Gunting Besi Duduk Merk Muller uk. 32"

PASIR
Pasir Urug
Pasir hitam
Pasir hitam
Pasir putih
Pasir putih
Pasir Putih TR
Pasir Putih TR
Harga tergantung jarak tempuh

KORAL
Per Pickup 1.2 m3
Koral Jagung uk. 1.2m3
Koral Ayak uk. 1.2m3
Split 1x2 uk. 1,2m3
Per truk
Split 1x2, 2x3, 5x7
Koral jagung
Batu Kali

PAKU
Paku cap keris 1-5"
Paku cap keris 1-5"
Paku Seng
Paku Kalsiboard
Paku Genteng Metal
Paku Gypsum
Paku triplek uk.3/4
Karet Asbes

PLYWOOD
Ukuran 3mm (1220mm x 2440mm)(super)
Ukuran 4mm (1220 x 2440mm) (Kalimantan)
Ukuran 6mm (1220 x 2440mm) (Kalimantan)
Ukuran 9mm (1220 x 2440mm) (Lokal)
Ukuran 9mm (1220 x 2440mm)

Ukuran 8mm (1220 x 2440mm)


Ukuran 8mm banci (1220 x 2440mm)
Ukuran 12mm (1220 x 2440mm)
Ukuran 15mm (1220x2440mm)
Ukuran 18mm (1220 x 2440mm)

JABARWOOD
Ukuran 3mm (1220mm x 2440mm) (Bintang Lotus)
GRC BOARD
ukuran 4mm (1220mm x 2440) (Fiber Flat)
ukuran 5mm (1220mm x 2440) (GRC)
ukuran 6mm (1220mm x 2440)
ukuran 8mm (1220mm x 2440)
ukuran 9mm (1220 x 2440)
ukuran 12mm (1220mm x 2440)
SIMPLEPLANK
8mmx100mmx2.440mm
8mmx200mmx2.440mm
8mmx200mmx2.440mm
SUPERPLANK
9mmx100mmx2.440mm
9mmx200mmx2.440mm
9mmx200mmx2.440mm
LISTPLANK
List Plank Urat bahan GRC panjang 2440
List Plank Urat bahan GRC panjang 3660
List Plank Urat Kayu Panjang 3m Harga
CORNICE
Cornice Jaya Board 20kg
Cornice A plus 20kg
Paku
GYPSUM
Gypsum Jaya Board
Gysum Knauf
PEMASANGAN GYPSUM
~ Bahan Galvanis (Pemasangan Rata) :
~ Pemasangan Bertingkat :
~ List Gypsum :
Pemasangan dengan bahan Gypsum atau GRC harga tetap sama.
BESI HOLLOW
Bahan Galvanis
~ ukuran 2x4 (Tebal 0,25mm)
~ Ukuran 4x4 (Tebal 0,25mm)
~Ukuran 2x4 (Tebal 0,5mm) Harga
~Ukuran 4x4 (Tebal 0,5mm) Harga
~Ukuran 2x4 (Tebal 0,7mm) Harga
~Ukuran 4x4 (Tebal 0,7mm) Harga
Bahan Meni
~ ukuran 2x4
~ Ukuran 4x4
PLAMUR
1. Plamur Kingkong
2. Plamur Eco Emulsion
3. Plamur RJ

4. Plamur RJ
BATA RINGAN
CITICON
Harga per m3

ASBES GELOMBANG
Merk Djabesmen uk. 1.05
Merk Djabesmen uk. 80
Asbes gelombang besar uk. 2.5m Lebar 1.05
Paku Asbes uk 4"
Karet Asbes
SENG GELOMBANG
Tersedia seng gelombang KW 1 Harga

SENG GELOMBANG TRANSFARAN


Seng Fiber Gelombang Excel 0,8mm Harga

``
Rp. 10,000.-/ft
Seng Fiber Polos Econolite Rp. 30,000.-/m
Seng Fiber Polos Ozone Rp. 20,000.-/m
Seng Polos Motif Rp. 25,000.-/m

GENTENG METAL

Spesifikasi Sakura Roof

Sakura Roof Merpati / Jazz dengan ketebalan 0.25mm -


Sakura Roof Crystal dengan ketebalan (0.25mm &0.30mm)

1 Meter Persegi = 1,62 Lembar


Lebar Efektif = 800mm
Panjang Efektif = 770mm
Tebal = 0,30mm
Jarak Reng = 385mm
Jarak Kaso = 500mm

Sakura Roof uk. 80x70 1,62/m2 (Type Kristal)


(Type Merpati)
Sakura Roof

Surya Roof Pasir

Surya Roof Pasir


Spesifikasi Surya Roof
Type Classic = 2x4 (8 Daun)
1 Meter Persegi = 1,62 Lembar
Lebar Efektif = 800mm
Panjang Efektif = 770mm
Tebal = 0,30mm
Jarak Reng = 385mm
Jarak Kaso = 500mm

Multiroof Pasir
Multiroof Pasir
Spesifikasi Multi Roof
Spesifikasi Multi Roof
Type Classic = 2x5 (10 Daun)
1 Meter Persegi = 1,3 Lembar
Lebar Efektif = 1000mm
Panjang Efektif = 770mm
Tebal = 0,40mm
Jarak Reng = 385mm
Jarak Kaso = 500mm

Genteng Minimalis Harga Rp. 52,000.-/kpg

Pelangi Roof Rp. 28,000.-/kpg


Pengurangan harga tergantung quantity

Soka Roof
Ocean Roof Pasir
Prima Roof Pasir
Global Roof

GENTENG KERAMIK

Tersedia : Genteng Morando, KANMURI, M-CLASS.


Pengurangan harga tergantung Quantity

Morando Glasur
Harga

Genteng Morando Quantity 19 pcs/m2


Genteng Morando Quantity 19 pcs/m2

Genteng Morando Quantity 19 pcs/m2

Noc Atas Genteng Non Glasur Rp. 4,000.-/pcs


Morando Non Glasur ukuran jumbo Rp. 2,700.-/pcs

Noc Atas Rp. 9,500.-/pcs


Noc Samping Rp. 9,000.-/pcs

Pengurangan harga tergantung Quantity

M-CLASS

M-CLASS Warna Natural Rp. 11,400.-/pcs

Genteng M-Class Warna Mahogany Rp. 11,800.-pcs

Genteng M-Class Warna Maroon Rp. 16,800.-/pcs


Genteng M-Class Warna Green

Specification :

Panjang Genteng 32,4cm


Lebar Genteng 31,1cm
Panjang Efektif 27,0cm
Lebar Efektif 26,8cm
Berat per keping Max 2,85kg
Quantity 13,6 pcs/m2
Jarak Reng 27,0cm

ACCESSORIES

Noc Arah Kanan

Noc Arah Kiri

Penangkal Anti Petir


List Pank Kanan

List Pank Kiri

KANMURI

Harga Kanmuri Natural Rp. 11,600.'/kpg

Espanica Natural 14,5pcs/m2


Natural Milineo 14 pcs/m2

KARPET TALANG

Karpet talang ukuran 53 x 50 Pink Rp. 330,000.-/roll


Karpet talang ukuran 53 x 50 Pink Rp. 13,000.-/m
Karpet talang ukuran 53 x 50 Pink+hitam Rp. 8000,-/m
Karpet talang ukuran 53 x 50 Hitam Rp. 8,000.-/m

SENG ALKAN
~ Tebal 0.35mm
~ Tebal 0.45mm

Seng Talang Alkan Tebal 0,45mm


Seng talang Alkan Tebal 0,45mm

Seng Talang Alkan

Baut 12-24x55 (khusus alkan) Rp. 600.-/pcs

RANGKA BAJA

BAJA RINGAN
Spesifikasi
TS C.75.65 tebal 0,65mm Harga
TS C.75.75 tebal 0,75mm Harga
TS C.75.100 tebal 1mm Harga

Spesifikasi
TASO (TR) 32.45 Tebal 0,45mm Harga btg
TASO (TR) 40.60 Tebal 0,60mm Harga btg

ALUMINIUM FOIL
Aluminium Foil Double karung uk. 1,20m x 50m roll
Aluminium Foil Single karung uk. 1,20m x 50m roll
Baut Drilling pcs

Sedia Bondeks, Atap Zincalume.

GLASS BLOCK / ROSTER

Glass Block uk. 20x20 Rp. 22,000,-/bh bh


Glass Block uk. 20x20 Rp. 120,000/dus dus

Contoh Gbr.
Kode Barang : 21

Kode Barang : 32

Kode Barang : 05

ROSTER EKONOMIS

Roster uk. 20x20 polos Rp. 33,000,-/bh


Roster uk. 30x30 polos Rp. 44,000,-/bh

Royal 30x30/20x20

ROSTER MINIMALIS
Roster Minimalis RO-56 Harga Rp. 47,000.-/pcs

Roster Minimalis RO-73 20x40 Harga Rp. 47,000.-/pcs


Tersedia : Warna putih, dan Abu-abu (Grey)

ROSTER LUKIS

Roster uk. 20x20 warna Rp. 36,000,-/bh


Roster uk. 30x30 warna Rp. 47,000,-/bh

Roster Anggrek 30x30 (RO48)

Roster Matahari 30x30 (RO37)


Roster Mawar 30x30 (RO45)

Roster Tanah uk. 10x20 Rp. 3,000,-/bh


Roster Tanah uk. 20x20 Rp. 8,000,-/bh

TEMPAT SABUN

TS-1 Harga Rp. 30,000.-

TS-71 Harga Rp.42,000.-

TS-75 Harga Rp.42,000.-

KAYU
Kayu Racuk Rp 1,350,000.00/m3
Kayu Racuk uk 2/20 Rp 27,000,-/kpg
Kayu Racuk uk 2/25 Rp 30,000,-/kpg
Kayu Racuk sento 5/5 (isi 100 btg = 1m3) Rp. 2,000,000.-/m3

Kayu Duren
Rp 2,600,000,-/m3
5/5 Rp 30,000,-/btg
5/7 Rp 40,000,-/btg

Kayu Meranti

Kayu Sento Rp. 3,300,000,-/kbk


Papan Rp. 3,500,000,-/kbk
5/5 Rp. 40,000,-/btg
5/7 Rp. 50,000,-/btg
Balok 8/12 Rp. 135,000.-/btg ( Meranti)
Reng 3/4 Rp. 22,000.-/btg

Kayu Gelam
6-8 Rp. 7,000,-/btg
8-10 Rp. 10,000,-/btg
10-12 Rp 13,000.00/btg

Hek
Racuk Rp. 70,000.'/ikat (1 ikat isi 10 keping)

Sento 5/5 dan sento 5/7 Racuk kelas 3 (Rp. 2, 200,000/kubik)


Sento 5/5 Gelam Rp. 15,000,-/btg (Rp. 1,400,000,-/m3)
Sento 5/7 Gelam Rp. 21,000,-/btg

TEDMOND TANGKI AIR

Ukuran 250 Fiber liter Rp 440,000.00/bh


Ukuran 550 Fiber liter Rp 690,000.00/bh
Ukuran 900 Fiber liter Rp 1,080,000.00/bh
Ukuran 1100 Fiber liter Rp 1,150,000.00/bh
Ukuran 1500 Fiber liter Rp 1,770,000.00/bh
Ukuran 2200 Fiber Liter Rp. 2,320,000.00/bh
Tedmond Grand Kapasitas 900L Harga 1,080,000.-/pcs

Tedmond Luxe Harga Sementara sama dengan Harga Tedmond


Grand Garansi Produk 15 Tahun

Ukuran 500L Stainless (TD550) Rp. 1,776,000.-/bh


Ukuran 1000L Stainless (TD1500) Rp. 3,744,000.-/bh
Ukuran 1500L Stainless (TD2000) Rp. 4,670,000.-/bh
Ukuran 2000L Stainless (TD2500) Rp. 6,367,000.-/bh
Ukuran 2300L Stainless Rp. 7,320,000.-/bh
Bak Mandi Fiber Tedmond uk.210 Rp 310,000.00/bh
Bak Mandi Fiber Tedmond uk.310 Rp 440,000.00/bh

PELAMPUNG

Pelampung 1/2" (Soligen) Rp. 60,000.'/pcs


Pelampung 3/4" (Soligen) Rp. 65,000.'/pcs

Pelampung 1/2" (ONDA) Rp. 96,000.'/pcs


Pelampung 3/4" (ONDA) Rp. 145,000,'/pcs

NAT (PENGISI KERAMIK)


~ Supergrout Rp. 10,000,-
~ AM 50 Rp. 16,000.-

PRODUK AM

~ AM 50 Rp. 16,000.-/kg
~ Fungsi : Pengisi nat premium yang mengandung bahan anti microba untuk mencegah pertumbuhan jam

~ AM 76 Rp. 36,000.-/liter
~ Fungsi menyatukan beton lama dengan beton baru, menambah daya rekat plester pada permukaan beto

~ AM 70 Rp. 79,000.-/liter
~ Fungsi Memperkuat mortar dengan meningkatkan daya rekat, fleksibilitas dan tahan air.

~ AM 54 Rp. 57,000,-/Liter
~ Fungsi sebagai cairan penguat pengisi nat sehingga pengisi nat lebih tahan terhadap jamur dan lumut.

~ AM 37 Rp. 108,000.-/set
Powder : ~ Kantong 3kg, Liquid : ~ Jerigen 1 kg

AM37 Perekat Ubin Ekstra Flexible


Fungsi : Perekat ubin yang terdiri dua komponen sangat flexible dan tahan air, dapat digunakan untuk merekat

PENGERAS BETON

~ Beton Mix Rp. 25,000.-/liter


PEMBERSIH KERAMIK

Porstex /ltr ltr


Porstex ltr
Pembersih Closet ltr
Pembersih Closet & kamar mandi hanya memakai kuas ltr

LEM

Lem Fox (kayu) 400gr Rp. 9,000.-/bks


Lem Fox (kayu) 800gr Rp. 15,000.-/bks

Lem Impra (kayu) 400gr Rp. 8,000.-/bks


Lem Impra (kayu) 800gr Rp. 14,000.-/bks

Lem Kayu Aibon Rp. 6,000.-/klg


Lem Kayu Aibon 0.95 Rp. 33,000.-/klg
Lem Kayu Aibon 3,78 Rp. 110,000.-/gln

Lem korea Rp. 8,000.'/btl

PINTU

~ Pintu Fiber Rp. 185,000,-/set


~ Pintu Fiber Rp. 195,000,-/set
Pintu Fiber Oval + Sticker kaca+ Jalusi Rp. 300,000.-/set

Pintu Fiber Oval + Sticker kaca + Jalusi Rp. 300,000.-/set

Pintu Fiber Oval + Sticker kaca + Jalusi Rp. 300,000.-/set


~ KW 1 Polos Rp. 300,000,-/set
~ KW 1 kaca + gambar Rp. 550,000,-/set
~ Kunci Kaca Patri Sebagian Rp. 550,000,-/set

KERAMIK

Keramik putih polos 30x30 Accura kw 1 Rp. 47,000.-


Keramik putih polos 40x40 Rp. 50,000.- ~ Rp. 52,000.-
Keramik 20x20 kasar Rp. 53,000,- ~ Rp. 55,000.-
Keramik 20x25 Licin (dinding) Rp.53,000.-/dus ~ Rp. 58,000.-
Keramik Platinum 40x40 Rp. 67,000,-/dus

"Harga keramik tergantung Motif & Merk,"

CLOSET

CLOSET TOTO
~ Closet Jongkok TOTO

CE7 IDR 280,000 (Squatting Toilet)

C50
IDR 670,000

CW421J/SW420JP

IDR 2,460,000 ( Harga Belum termasuk discount)


CLOSET AMERICAN STANDARD

~ Closet Jongkok AS warna muda Rp. 205,000,-


~ Closet Jongkok AS warna tua Rp. 235,000.-/pcs
~ Closet duduk AS type Winplus Dual Flush Rp. 1, 250,000.-/set
~ Closet duduk AS tanpa Tanki warna muda Rp. 896,000.-/pcs
~ Closet Duduk Donato Rp. 390,000.-/pcs
~ Tutup Closet Rp. 38,000.-/pcs
Tersedia Closet duduk, wastafel, dll.

BAK MANDI

Bak Mandi Uk. 53x53x60 (Petak) Harga Rp. 230,000.-/pcs


Bak Mandi Uk. 63x63x70 (Petak) Harga Rp. 400,000.-/pcs
Bak Mandi Uk. 53x53x60 (Sudut) Harga Rp. 380,000.-/pcs
Bak Mandi Uk. 63x63x70 (Sudut) Harga Rp. 570,000.-/pcs

Tersedia warna : Pink, Biru

Tersedia Bioseptic tank

PIPA

Pipa Wavin

Kualitas AW
~ Pipa 1/2" Rp. 19,000.-
~ Pipa 3/4" Rp. 26,000.-
~ Pipa 1" Rp. 35,000.-
~ Pipa 1 1/4" Rp. 53,000.-
~ Pipa 1 1/2" Rp. 61,000.-
~ Pipa 2" Rp.78,000.-
~ Pipa 2 1/2" Rp. 114,000.-
~ pipa 3" Rp. 154,000.-
~ Pipa 4" Rp. 256,000.-
~ Pipa 5" Rp. 424,000.-
~ Pipa 6" Rp. 595,000.-
~ Pipa 8" Rp. 998,000.-
~ Pipa 10" Rp. 1,544,000.-
~ Pipa 12" Rp. 2,177,000.-

Kualitas D
~ Pipa 1 1/4" Rp. 33,000.-
~ Pipa 1 1/2" Rp. 37,000.-
~ Pipa 2" Rp. 48,000,-
~ Pipa 2 1/2" Rp. 65,000,-
~ Pipa 3" Rp. 83,000,-
~ Pipa 4" Rp. 131,000,-
~ Pipa 5" Rp. 211,000,-
~ Pipa 6" Rp. 279,000.-
~ Pipa 8" Rp. 491,000.-
~ Pipa 10" Rp. 809,000.-
~ Pipa 12" Rp. 1,136,000.-

TALANG AIR
~ Maspion, Langgeng Rp. 98,000.-
~ Bahana Rp. 60,000.-

PITTING TALANG
~ Sambungan talang Rp. 8,000.-/pcs
~ Corong Talang Rp. 23,000.-/pcs
~ Tutup Talang Rp. 8,000.-/pcs
PITTING PIPA
Merk Rucika
~ Socket AW
1/2" Rp. 1,500.-/pcs
3/4" Rp. 2,000.-
1" Rp. 3,000.-
1 1/4" Rp. 5,000.-
1 1/2" Rp. 7,000.-
2" Rp. 10,000.-
2 1/2" Rp. 16,000,-
3" Rp. 23,000.-
4" Rp. 46,000.-
6" Rp. 98,000.-
8" Rp. 194,000.-
10" Rp. 308,000.-
~ Socket D
1 1/4" Rp. 2,000.-/pcs
1 1/2" Rp. 3,000.-/pcs
2" Rp. 4,000.-/pcs
2 1/2" Rp. 5,000.-/pcs
3" Rp. 7,000.-/pcs
4" Rp. 12,000.-/pcs
5" Rp. 23,000.-/pcs
6" Rp. 30,000.-/pcs
8" Rp. 81,000.-/pcs
10" Rp. 122,000.-/pcs
~ L-Bow AW
1/2" Rp. 1,500.-/pcs
3/4" Rp. 2,000.-/pcs
1" Rp. 3,000.-/pcs
1 1/4" Rp. 5,000.-/pcs
1 1/2" Rp. 7,000.-/pcs
2" Rp. 10,000.-/pcs
2 1/2" Rp. 11,000.-/pcs
3" Rp. 28,000.-/pcs
4" Rp. 54,000.-/pcs
5" Rp. 78,000.-/pcs
6" Rp. 132,000.-/pcs
8" Rp. 299,000.-/pcs
10" rp. 399,000.-/pcs
~ L-Bow D
1 1/4 Rp. 2,000.-/pcs
1 1/2" Rp. 2,500.-/pcs
2" Rp. 5,000.-/pcs
2 1/2" Rp. 7,000.-/pcs
3" Rp. 10,000.-/pcs
4" Rp. 21,000.-/pcs
5" Rp. 50,000.-/pcs
6" Rp. 131,000.-/pcs
8" Rp. 262,000.-/pcs
10" Rp. 397,000.-/pcs
~ Clean Out

uk. 2" Rp. 5,000.-, uk. 3" Rp. 7,000.-, uk. 4" Rp. 18,000.-

~ Check Valve Yuta Rp. 59,000.-/pcs

Double Nipple Harga Rp. 14,000.-/pcs

Lem Pipa Wavin


~ Lem Botol 60gr Rp.8,000.-/btl
~ Lem Kaleng 400gr Rp. 35,000.-/klg

Tersedia fitting Rucika Standar

KRAN
San-E 1/2" Rp. 165,000.-/pcs
San-E 1/2" Ekonomi Rp. 90,000,-/pcs
San-E Shower tanam Rp. 348,000,-/pcs
San-E kran cabang Rp. 348,000,-/pcs
Onda 1/2" Stainless Rp. 35,000/pcs

Kran Cuci Piring SAN_EI type EA 15 R

Onda 1/2" Rp. 16,000,-/pcs


Onda 3/4" Rp. 33,000.'/pcs

STOP KRAN

Stop kran 1/2" (Jiarong/sejenis) Rp. 12,000.-/pcs


Stop kran 3/4" (Jiarong/sejenis) Rp. 15,000.-/pcs
Stop kran 1" (Onda) Rp. 20,000.-/pcs
Stop kran 2" (Jiarong) Rp. 65,000.'/pcs
Garden Spray Gun Harga Rp. 36,000.-

Klep Sumur 3/4" Rp. 13,000.'/pcs

KRAN CUCI PIRING


Kran Cuci Piring Flexible Rp. 220,000.-/pcs
Kran Cuci Piring std Rp. 36,000.-/pcs
Kran Cuci Piring Rp. 105,000.-/pcs

KRAN SHOWER
Shower bidet ONDA Rp. 65,000.-/pcs

Shower mandi ONDA Rp. 79,000.-/pcs

Tempat sabun ( Soap Dish Holder) (Germany Brilliant) Rp.


378,000.-/pcs

Tempat sabun Cair (Soap Dispenser) (Germany Brilliant) Rp.


330,000.-/pcs
330,000.-/pcs

Floor Drain YT Rp. 40,000.-/pcs

CAT TEMBOK, KUSEN, DAN BESI

PRODUK KANSAI PAINT

Cat Kusen dan Besi


~ Cat Ftalit Rp. 55,000, -/1kg
~ Cat Ftalit Doff Rp. 59,000,-/kg
~ Zink Chromate Rp. 53,000,- /kg Rp. 255,000.-/5kg
~ Kansai Red Oxide Primer Rp. 34,000,- Rp. 163,000.-/5kg
~ Wood Putty Rp. 27,000,-

Cat Tembok
~ Property Rp. 510,000.-/25kg
~ Property Rp. 110,000.-/5kg

NIPPON PAINT

PLATONE
Cat Kusen dan Besi
~ Cat Platone Rp. 47,000,-/klg Rp 195,000,-/gln
~ Cat Meni Kayu Nippon Rp. 49,000,-/klg
~ Meni Kayu Nippon (5kg) Rp. 230,000,-
~ Bodelac Metal Primer Rp. 34,000,-
~ Bodelac Undercoat White (1kg) Rp. 33,000.-/kg
~ Bodelac Undercoat White Rp. 145,000/gln
~ Wood Filler Rp. 30,000,-/kg
~ Wood Filler Rp. 135,000/gln

CAT Q-LUC
~ Harga Rp. 225,000.-/20kg
~ Harga Rp. 58,000.-/5kg

SEIV KHUSUS BESI


Cat Besi
~ Cat SEIV khusus Tembaga Rp. 85,000,-/kg
~ Cat SEIV khusus tembaga Rp. 30,000.-/klg
~ Cat SEIV Emas Rp. 110,000,-/kg
~ Cat SEIV Emas Rp. 33,000,-/klg
~ Cat ABC Rp. 33,000.-/klg
~ Eha Bond Rp. 112,000.-/gln

THINNER (PENGENCER CAT MINYAK)

~ Thinner Cobra Rp. 27,000.-/liter


~ Thinner Cobra Rp. 110,000.-/ 5 Liter
~ Thinner Cobra Merah Rp. 22,000.-/lt
~ Thinner Cobra Merah Rp. 90,000.-/gln
~ Thinner Akebono Rp. 15,000.-/klg
~ Thinner Biasa Rp. 12,000,-
~ Thinner ND Rp 65,000.-/galon
~ Thinner Botol Rp. 8,000,-
THINNER ND 200 LITER HARGA Rp. 2,915,000.-/200Lt
THINNER ND SUPER HARGA Rp. 3,080,000.-/200Lt
Cat Putih Columbus 250kg Harga 1,320,000.-/250Lt

CAT TEMBOK, KAYU, & BESI

BALILUX
~ Cat Balilux Rp. 45,000.-/gln
~ Cat Balilux Rp. 180,000.-/pail
~ Cat Merk Columbus Rp. 110,000,-/20kg

ARIES GOLD
~ Cat Aries Gold Rp. 242,000,-/peil
~ Cat Aries Gold Rp. 64,000,-/gln

YOKO
Cat Kusen dan Besi
~ Cat Yoko Rp. 40,000,-/0.9Lt
~ Cat Yoko Rp. 197,000.-/3.78Lt
~ Yoko Meni, Plamir, Cat Dasar Rp. 18,000.-/0,9Lt
~ Yoko Meni, Plamir, Cat Dasar Rp. 81,000.-/3,5kg

AVIAN
~ High Gloss Enamel Rp. 58,000.-/0,9Lt
~ High Gloss Enamel Rp. 228,000.-/3,6 Lt

NO DROP (Pelapis Anti Bocor)


~ Harga Rp. 50,000.-/1kg
~ Harga Rp. 193,000.-/4kg
~ Harga Rp. 887,000.-/20kg

~ Cat Vinotex Standar Rp. 18,000/kg


~ Cat Vinotex Standar Rp. 46,000,-/gln
~ Cat Vinotex Special Rp. 56,000,-/gln
~ Cat Vinotex Standar Rp. 197,000/peil
~ Cat Vinotex Special Rp. 240,000.-/peil

~Metrolite Rp. 22,000,-/kg


~ Metrolite Rp. 420,000,-/peil

CAT DANABRITE

~ Cat Danabrite Rp. 98,000,-/5kg


~ Cat Danabrite Rp. 475,000,-/25kg

CAT PROPERTY
CAT PROPERTY

~ Property Rp. 510,000.-/25kg


~ Property Rp. 110,000.-/5kg

CAT DULUX

~ Dulux Weathershield BW Rp. 244,000.-/2,5L dan Rp. 1,800,000.'/20L


~ Dulux Weathershield Warna Standar Rp. 252,000.-/2,5L dan 1,840,000.'/20L
~ Dulux Weathershield Warna Khusus Rp. 282,000.'/2,5L
~ Cat Catylac Interior Rp. 109,000.-/5kg
~ Cat Catylac Interior Rp. 530,000.-/25kg
~ Cat Catylac Exterior Rp. 153,000.-/5kg
~ Cat Catylac Exterior Rp. 748,000.-/25kg

CAT GENTENG
~ Sanlex Standar Rp. 148,000.-/gln
~ Sanlex Spc Rp. 195,000.-/gln

PROPAN
CAT TEMBOK

~ Alkali Resisting Primer (Water Base) Rp. 126,000/2.5L


~ Alkali Resisting Primer (Solvent Base) Rp. 215,000.-/2.5 L
~ Alkali Resisting Primer Eco Emulsion Rp. 113,000,-/4kg
~ Plamur Eco Emulsion Rp. 52,000/4kg
~ Plamur Eco Emulsion Rp. 250,000/25kg
~ Cat Eco Emulsion Standar Rp. 108,000,-/5kg
~ Cat Eco Emulsion Spesial Rp. 138,000,-/5kg
~ Cat Eco Emulsion Standar Rp. 530,000,-/25kg
~ Cat Eco Emulsion Spesial Rp. 680,000,-/25kg

~ Cat Decorshield Standar Rp. 232,000/2.5L


~ Cat Decorshield Special Rp. 247,000/2.5L
~ Cat Decorshiel Standar Rp. 1,760,000/20L
~ Cat Decorshield Special Rp. 1,880,000/20L
~ Cat Decorcryl standar Rp. 142,000/2,5L
~ Cat Decorcryl standar Rp. 1,040,000/20L
~ Cat Decorcryl Special Rp. 157,000/2,5L
~ Cat Decorcryl Special Rp.1,160,000/20L
~ Cat Decorcryl S Special Rp. 187,000/2,5L
~ Cat Decorcryl S Special Rp.1,400,000/20L

~ Propan Stone Care (Vernis Batu Alam) Rp. 69,000,-/lt


~ Propan Batu Candi Rp. 78,000,-/lt

CAT SPESIALIS KAYU IMPRA


WOOD FILLER
~ Borneo, Jati, Kamper, Sungkai Rp. 33,000.-/kg
~ Red Mahony Rp. 42,000.-/kg

WOOD STAIN WS-162 B


~ Warna Muda
(Candy Brown CA (CB), Cocoa Brown, Red Mahony, Yellow BB)
Rp. 60,000.-/lt

~ Warna Tua
(Brown KJ, Coffee Brown, Dark Brown,Light Brown, Salak Brown, SHP Brown)
Rp. 66,000.-/lt

IMPRA MELAMINE SYSTEM


~ Sending Sealer + obat Rp. 56,000.'/klg
~ Melamine Clear Gloss/Clear Dof Rp. 56,000.-/klg
~ Sending Sealer Tanpa obat Rp. 56,000,-/lt
~ Efoxy Rp. 110,000.-/set
~ Lem Kayu Impra Rp. 8,000.-/400gr
~ Lem Kayu Impra Rp. 15,000.-/800gr
~ Melamine Hardener Clear Gloss/Clear Doff/Sending Sealer
Ukuran sedang Rp. 43,000/btl
Ukuran Kecil Rp. 15,000.-/btl
~ Remover Cat Besi Rp. 38,000.-/ltr
~ Remover Cat Tembok Rp. 30,000.-/ltr

Ultran Vernis
~ Propan ultran Vernis Rp. 33,000,-/klg

Politur
~ Politur P01 khusus interior Rp. 57,000.-/klg -
Warna : Brown AR, Brown KJ, Dark Brown, Mahony, SHP Brown, Solar Red, Sollar Yellow, Teak, Clear Gloss,
~ Politur P03 khusus exterior Rp. 62,000.-/klg
Warna : Natural Doff & Natural Gloss Rp. 74,000.'/klg

KHUSUS PERAWATAN MEUBEL


~ Furniture Polish Pledge Rp. 17,000.-

CAT KHUSUS LAPANGAN OLAHRAGA


~ Tennokote Rp. 198,000/5kg (0,5kg pasir)
Rp. 835,000.-/22,5kg (2,5 kg pasir)
~ Tennokote Warna Special Rp. 225,000/5kg
Rp. 970,000/22,5kg

Pilihan Warna Tennokote

CAT SPESIALIS CEMENT FIBER BOARD


~ Fibercote Rp. 83,000.-/Ltr
~ Fibercote Rp. 182,500,-/Ltr

PROSEAL (SEALANT & GAP FILLER)


Produk dari Propan untuk menutup celah dan retakan pada dinding Harga Rp. 24,000.-/pcs

Kegunaan :
~ Mengisi dan merapatkan retak-retak pada plester
~ Mengisi dan merapatkan celah-celah di sekeliling kusen dan jendela
~ Mengisi dan merapatkan celah-celah sambungan keramik dengan dinding
~ Mengisi dan merapatkan sambungan dari bagian bangunan yg pergerakannya rendah
~ Mengisi dan merapatkan sambungan papan kayu pada meubel

Keunggulan :
~ Fleksibel
~ Elastis
~ Dapat dicat
~ Daya rekat kuat

#Produk Impra akan mengalami kenaikan pada bulan Maret 2015

CAT MOWILEX

KHUSUS TAMAN

~ Cat Mowilex Standar Rp. 70,000,-/kg


~ Cat Mowilex Special Rp. 90,000,-/kg

KHUSUS KAYU
~ Woodstain Water Base Rp. 70,000.-/klg

Tabel Warna Wood Stain Mowilex

GLOBE

~ Cat Globe Rp. 45,000.-/gln

KEMTONE

INTERIOR
~ Cat Tembok Satin Putih Rp. 1,172,000/18,9L
~ Cat Tembok Satin Putih Rp. 245,000/3,78L
~ Cat Tembok Satin Muda Rp. 1,199,000.-/18,9L
~ Cat Tembok Satin Muda Rp. 252,000.-/3,78L
~ Cat Tembok Satin Tua Rp. 1,408,000/18,9L
~ Cat Tembok Satin Tua Rp. 305,000/3,78L
~ Alkali Resisiting Primer Rp. 849,000/18,9L
~ Alkali Resisiting Primer Rp.183,000/3,78L

EXTERIOR
~ Cat Tembok Satin Putih Rp. 1,764,000.-/18,9L
~ Cat Tembok Satin Putih Rp. 363,000.-/3,78L
~ Cat Tembok Satin Muda Rp. 1,804,000/18,9L
~ Cat Tembok Satin Muda Rp. 370,000/3,78L
~ Cat Tembok Satin Tua Rp. 1,907,000/18,9L
~ Cat Tembok Satin Tua Rp. 394,000/3,78L
~ Alkali Resisiting Primer (Luar) Rp. 1,260,000.-/18,9L
Alkali Resisiting Primer (Luar) Rp. 274,000.-/3,78L
~ Alkali Resisiting Primer (Solvent) Rp. 1,331,000.-/18,9L
Alkali Resisiting Primer (Solvent) Rp. 281,000.-/3,78L

SPECTRUM

~ Cat Tembok Flat Putih Rp. 602,000.-/18,9L


~ Cat Tembok Flat Putih Rp. 125,000.-/3,78L
~ Cat Tembok Flat Muda Rp. 657,000.-/18,9L
~ Cat Tembok Flat Muda Rp. 136,000.-/3,78L
~ Cat Tembok Flat Tua Rp. 778,000.-/18,9L
~ Cat Tembok Flat Tua Rp. 162,000.-/3,78L
~ Alkali Resisting Primer Rp. 564,000.-/18,9L
~ Alkali Resisting Primer Rp. 117,000.-/3,78L

PRODUK SIKA

Waterproofing
~ SikaTop 107 Seal (2 komponen Semen Pelapis Kedap Air) Rp. 457,000.-/25kg set
Fungsi : Sebagai pelapis anti bocor untuk internal dan eksternal pada beton, mortar, bata, kolam renang, atap

PELAPIS ANTI BOCOR

Aquaproof Rp. 50,000,-/kg


Aquaproof 4kg Rp. 182,000,-
Aquaproof 20kg Rp. 820,000,
AquaGard (Pelapis Anti Bocor untuk air menggenang seperti Bak, Kolam renang) Rp. 65,000,-/set

AquaGard (Pelapis Anti Bocor untuk air menggenang seperti Bak, Kolam renang) Rp. 65,000,-/set
Membran pelapis Rp. 4,000.-/lbr

CAT KOLAM

Cat Kolam Harga Rp. 50,000.-/lt

ALAT - ALAT LISTRIK


KABEL

NYA Praba 1 X 2.5mm Rp. 305,000-/Roll


Praba 2 X 1,5mm Rp. 305,000.-/Roll
Praba 2 X 2,5mm Rp. 450,000.-/Roll
Praba 3 X 2,5mm Rp. 550,000,-/Roll

Pipa Listrik Clipsal Rp. 11,000.-/btg


L-bow Clipsal Rp. 3,000.-/bh
Tee dus Clipsal Rp. 5,500.-/bh
Cross Clipsal Rp. 6,500.-/bh
Klem Pipa Clipsal Rp. 1,000.-/pcs

PANASONIC

Stop Kontak Single Rp. 20,000.-/pcs


Stop Kontak Seri Rp. 40,000.-/pcs
Stop Kontak + plate 2 gang Rp. 26,000.-/pcs
Inbow dus Rp. 4,000.-/pcs
Plate 1 gang 1 device Rp. 6,000.-/pcs
Plate 1 gang 2 device Rp. 6,000.-/pcs
Saklar Rp. 10,000.-/pcs
Stop Kontak Universal Rp. 10,000.-/pcs
Isolasi Listrik Unibel Rp. 8,000.-/pcs

Instalasi Listrik Biaya Rp. 90,000.-/titik

Pengurangan tergantung banyak titik

MCB

1P C10, 1P C6, 1P C4, 1P C2 Schneider Electric Rp. 55,000.-/pcs


1P C10, 1P C6, Schneider Electric Rp. 55,000.-/pcs
1P C32, Schneider Electric Rp. 65,000.-/pcs
MCB Scheneider Electric 1P 16 Rp. 55,000.-/pcs

Stick Lamp Rp. 70,000.-/pcs

Box MCB uk. 60x40x20 Rp. 430,000.-/pcs

Fuse Box Presto 4 Group Rp. 35,000.-/pcs


GANTUNGAN BAJU

Bahan
Plastik Rp. 11,000.-/pcs
Crom Rp. 35,000.-/pcs

SELANG & REGULATOR GAS

Selang + Regulator Merk Quantum Rp. 75,000.-


Regulator tekanan rendah Merk Winn Gas Rp. 45,000.-
Regulator tekanan tinggi Merk Winn Gas Rp. 74,000.-

MESIN

Pompa Air Otomatis Sanyo 550V ~ 50 Hz Rp. 550,000.-


Pompa Air Manual Sanyo Rp. 400,000.-
Pompa Air Manual Shimizu Rp. 370,000.-
Mesin Molen Rp. 12,000,000.-/set

Gerinda Maktec Rp. 280,000.-/pcs


Mesin Bor Maktec Rp. 320,00.-/pcs
Mesin Bor Mactec 13MM (1/2") Rp. 610,000.-/pcs
Mesin Gerinda Makita Rp. 576,000.-/pcs
Mesi Sugu Modern Rp. 310,000.-/pcs

PAKU BETON

ANTI RAYAP

~ Harga Rp. 25,000.-/8ml


Penggunaan : ~ Kayu gergajian
Hama : Rayap kayu kering & Rayap tanah Dosis 5 - 10ml perliter air
~ Pondasi Bangunan
Hama : Rayap tanah Dosis 15ml per liter air disiramkan pada tanah semua sisi lobang p

KUNCI

Kunci Bulat SES Rp. 85


,000.-/pcs
Kunci SES Rp. 220,000.-/set
Kunci F&F (SES) Rp. 230,000.-/set
Kenzzo Rp. 180,000.-/set
Engsel SES 4" Rp. 180,000.-/psg
Full Handle Gerber Rp. 180,000.-/psg
SES Silinder Rp. 90,000.'-/pcs

Grendel Tanam SES Rp. 250,000.'/set


Plat Tanam Rp. 20,000.'/pcs

Engsel BLC 3" Rp. 25,000.-/psg


Engsel BLC 4" Rp. 35,000.-/psg
Engsel Gerber 3" Rp. 38,000.-/psg
Engsel Gerber 4" Rp. 48,000.-/psg
Engsel Morechi 4" Rp. 30,000.'/psg
Engsel Ferza 3" Rp. 9,000.'/psg
Engsel Ferza 4" Rp. 10,000.'/psg

GEMBOK

Soligen 50mm leher pendek Rp. 75,000/pcs


Soligen 40mm Leher Pendek Rp. 60,000.-/pcs
Sherlock Brass Freelancer panjang (40mm) Rp. 80,000.'/pcs
Sherlock Brass Freelancer pendek (40mm) Rp. 75,000.'/pcs
Sherlock Gembok 40mm (Jaket) Rp. 65,000.'/pcs

TANGGA
~ Tangga Aluminium Indalex 2m Rp. 600,000/pcs
~ Tangga Aluminium Indalex 1,43m Rp. 440,000/pcs

DOWN LIGHT
Philips MAX 15W-E27 4 inch Rp. 38,000.-/pcs
Philips MAX 12W-E27 3,5 inch Rp. 45,000.-/pcs
Tersedia Lampu Philips Tornado & Essential

KITCHEN SINK

Kitchen Sink SB 1 Ekon Royal + Afur Rp. 238,000.-/pcs


Kitchen Sink 1 Lubang 52 x 44 x 21 Harga Rp. 378,000.-/pcs

Kitchen Sink Aldolf 100 x 46 x 20 Harga Rp. 450,000.-/pcs

Kitchen Sink Aldolf 86 x 50 x 20A Harga Rp. 475,000.-/pcs

* BCP Silver Star Single Rp. 165,000.'/pcs


BCP Halcon satu Lubang Sayap Rp. 150,000.'/pcs

SELANG
Selang Benang 1/2" Rp. 550,000.-/Roll (Lebih kurang 100 meter)
Selang Benang 5/8" Rp. 650,000.-/Roll ( Lebih kurang 100 meter)
Selang Benang 3/4" Rp. 750,000.-/Roll (Lebih kurang 100 meter)
Selang Benang 1" Rp. 600,000.-/Roll (Lebih kurang 50meter)

PERALATAN TUKANG

Helm Proyek Rp. 20,000.-/pcs


Sepatu Boot AP Originil Rp. 95,000.-/pcs
Tang Rivet Rp. 70,000.-/pcs
Meteran Tancap 30 Meter (Besi) Rp. 60,000.-/pcs
Meteran Tancap 50 Meter (Besi) Rp. 70,000.-/pcs
Cutting Wheel 14" Rp. 30,000.-/pcs
Cut off Wheel 4" Rp. 8,000.-/pcs
Kereta Dorong Rp. 350,000.-/pcs
Ban Komplit Rp. 90,000.-/pcs
Gunting Hollow Rp. 75,000.-/pcs
Senter Kepala Rp. 45,000.-/pcs
Gunting Besi uk. 48" Harga Rp. 305,000.-/pcs
Gunting Besi uk. 32" Harga Rp. 280,000.-/pcs

Tool Box uk. 5" Harga Rp. 165,000.-/bh

Saringan WC (Germany Brilliant) Rp. 302,000.-/pcs


Posted by MegaTruss Depo genteng at 6:59 AM
Email ThisBlogThis!Share to TwitterShare to FacebookShare to Pinterest

Labels: material bangunan


Location: Kota Malang, Kota Malang, Jawa Timur, Indonesia
2 comments:

travel wisataMarch 9, 2016 at 12:55 AM


Jasa Pembuatan Pagar di Malang
Jasa Pembuatan Kanopi di Malang
Reply

Risky
apakahAndikaMarch 13,dan
ada spandek 2016seng
at 11:16 PM
gelombang ukuran
tebal 0.4 panjang antara 1.8 sampai 2 m berapa
harganya Reply Submit
Older PostHome

Subscribe to: Post Comments (Atom)


Megatrussglobal

Head Office : Jl. Mayjend Sungkono, Citra Garden City Malang (Puncak Buring Indah) Blok P1. No.4 - Kota Ma

Workshop di Kediri : Badas, Pare – Kediri

Workshop di Surabaya : Tenggilis Utara 7, Tenggilis Mejoyo – Kota Surabaya

Workshop di Ponorogo : Jl. Sukarno-hatta, Ponorogo

Untuk Wilayah Malang,Pasuruan,lumajang, sidoarjo, Surabaya, jember, Blitar, Jombang, mojokerto, kediri, Nga

Hubungi kami di No :

Telkomsel 0853 3443 9900 (Call, SMS, WhatsApp, Line),

Indosat 0856 5540 0004 (Call, SMS, WhatsApp),

XL 087 888 48 5050 (Call, SMS)

Phone&Fax : 0341 - 754253


Email : megatrussglobal@yahoo.com
www.megatrussglobal.com

Blog Archive

▼ 2015 (3)
▼ May (3)
Daftar Harga Material / bahan Bangunan di malang
HARGA PEMASANGAN RANGKA BAJA RINGAN & ATAP di MALA...
Rangka Atap Baja ringan di Malang | Megatrussgloba...
► 2014 (58)
► 2011 (1)
Total Pageviews

26261
Follow by Email
Google+ Followers
Daftar Harga Material / bahan Bangun
DAFTAR HARGA TERBARU MATERIA

Tahun 2017
SEMEN
Harga
Rp. 60,000,-/sak 1. Semen Tiga Roda(Indocement)
Rp. 62,000,-/sak 2. Semen Gresik
Pengurangan Harga Tergantung Quantity

Rp. 120,000,-/sak

BATU BATA PRESS

BESI BEUGLE
Uk. 6
Rp. 14,000,-/btg
Rp. 24,000,-/btg
Uk.8
Rp. 31,000,-/btg
Rp. 43,000,-/btg
Rp. 40,000,-/btg
Uk.10
Rp. 62,000,-/btg
Rp. 60,000,-/btg
Rp. 50,000.-/btg
Uk. 12
Rp. 93,000,-/btg
Rp. 90,000,-/btg
Rp. 68,000.-/btg
Uk. 13 Ulir
Rp. 117,000.-/btg
Rp. 108,000.-/btg
Uk. 16 Ulir
Rp. 176,000.-/btg
Uk. 16 Polos
Rp. 180,000.-/btg
Rp. 147,000.-/btg
Uk. 19 Ulir
Rp. 248,000.-/btg
Rp. 16,000,-/kg Kawat Bendrat
Rp. 335,000,-/roll Kawat Bendrat

WIREMESH
Rp. 252,000 Wiremesh M5 : uk. 2,10m x 5,4m .-
Rp. 357,000.- Wiremesh M6 : uk.5,4m x 2,1m
Rp. 494,000.- Wiremesh M7 : uk.5,4m x 2,1m
Rp. 640,500.- Wiremesh M8 : uk.5,4m x 2,1m
Rp. 1,008,000.- Wiremesh M10 : uk.5,4m x 2,1m
Bondeks (Floordeks), Spandeks, Atap Zincalume
~ Pengurangan harga tergantung Quantity
Rp. 4,800,000.-/pcs Gunting Besi Duduk Merk Muller uk. 32"

PASIR
Rp. 380,000.-/truk Pasir Urug
Rp. 390,000,-/truk Pasir hitam
Rp. 110,000,-/1.2m3 Pasir hitam
Rp. 450,000,-/truk isi lebih kurang 5m3 Pasir putih
Rp. 130,000,-/1.2m3 Pasir putih
Rp. 130,000.-/m3 (Truk) Pasir Putih TR
Rp. 195,000.-/1,2m3 Pasir Putih TR
Harga tergantung jarak tempuh

KORAL
Per Pickup 1.2 m3
Rp. 450,000,- Koral Jagung uk. 1.2m3
Rp. 550,000,- Koral Ayak uk. 1.2m3
Rp. 560,000,- Split 1x2 uk. 1,2m3
Per truk
Rp. 430,000,-/m3 Split 1x2, 2x3, 5x7
Rp. 380,000.-/m3 Koral jagung
Rp. 430,000.-/m3 Batu Kali
Pengiriman pasir dan koral dengan truk harga tergantung
PAKU
Rp. 16,000/kg Paku cap keris 1-5"
Rp. 335,000/dus Paku cap keris 1-5"
Rp 28,000.00/kg Paku Seng
Rp. 25,000.-/kg Paku Kalsiboard
Rp. 27,000.-/kg Paku Genteng Metal
Rp. 25,000.-/kg Paku Gypsum
Rp. 10,000.-/ktk Paku triplek uk.3/4
Rp. 70.-/pcs Karet Asbes

PLYWOOD
Rp 44,000.00/kpg Ukuran 3mm (1220mm x 2440mm)(super)
Rp 63,000.00/kpg Ukuran 4mm (1220 x 2440mm) (Kalimantan)
Rp 80,000.00/kpg Ukuran 6mm (1220 x 2440mm) (Kalimantan)
Rp 128,000.00/kpg Ukuran 9mm (1220 x 2440mm) (Lokal)
Rp 133,000.00/kpg Ukuran 9mm (1220 x 2440mm)

Rp 124,000.00/kpg Ukuran 8mm (1220 x 2440mm)


Rp. 118,000.00/kpg Ukuran 8mm banci (1220 x 2440mm)
Rp. 165,000.00/kpg Ukuran 12mm (1220 x 2440mm)
Rp. 210,000,-/kpg Ukuran 15mm (1220x2440mm)
Rp. 248,000.00/kpg Ukuran 18mm (1220 x 2440mm)

JABARWOOD
Rp 87,000.00/kpg Ukuran 3mm (1220mm x 2440mm) (Bintang Lotus)
GRC BOARD
Rp. 65,000,-/kpg ukuran 4mm (1220mm x 2440) (Fiber Flat)
Rp. 90,000,-/kpg ukuran 5mm (1220mm x 2440) (GRC)
Rp. 128,000,-/kpg ukuran 6mm (1220mm x 2440)
Rp. 183,000,-/kpg ukuran 8mm (1220mm x 2440)
Rp. 264,000,-/kpg ukuran 9mm (1220 x 2440)
Rp. 420,000,-/kpg ukuran 12mm (1220mm x 2440)
SIMPLEPLANK
Rp. 27,000.- 8mmx100mmx2.440mm
Rp. 45,000.- 8mmx200mmx2.440mm
Rp. 60,000.- 8mmx200mmx2.440mm
SUPERPLANK
Rp. 35,000.- 9mmx100mmx2.440mm
Rp. 55,000.- 9mmx200mmx2.440mm
Rp. 75,000.- 9mmx200mmx2.440mm
LISTPLANK
Rp. 45,000/kpg List Plank Urat bahan GRC panjang 2440
Rp. 55,000/kpg List Plank Urat bahan GRC panjang 3660
Rp. 48,000.-/kpg List Plank Urat Kayu Panjang 3m Harga
CORNICE
Rp 68,000,-/sak Cornice Jaya Board 20kg
Rp. 70,000,-/sak Cornice A plus 20kg
Rp 25,000.00/kg Paku
GYPSUM
Rp. 73,000.-/kpg Gypsum Jaya Board
Rp. 71,000.-/kpg Gysum Knauf
PEMASANGAN GYPSUM
Rp. 135,000,-/m, ~ Bahan Galvanis (Pemasangan Rata) :
Rp. 145,000.-/m ~ Pemasangan Bertingkat :
Rp. 25,000,-/m ~ List Gypsum :
Pemasangan dengan bahan Gypsum atau GRC harga tetap s
BESI HOLLOW
Bahan Galvanis
Rp. 20,000,- ~ ukuran 2x4 (Tebal 0,25mm)
Rp. 27,000,- ~ Ukuran 4x4 (Tebal 0,25mm)
Rp. 40,000.'/btg ~Ukuran 2x4 (Tebal 0,5mm) Harga
Rp. 34,000.'/btg ~Ukuran 4x4 (Tebal 0,5mm) Harga
Rp. 52,000.'/btg ~Ukuran 2x4 (Tebal 0,7mm) Harga
Rp. 42,000.'/btg ~Ukuran 4x4 (Tebal 0,7mm) Harga
Bahan Meni
Rp. 15,000,- ~ ukuran 2x4
Rp. 18,000,- ~ Ukuran 4x4
PLAMUR
Rp. 120,000,-/sak 1. Plamur Kingkong
Rp. 52,000,-/gln 2. Plamur Eco Emulsion
Rp. 15,000,-/kg 3. Plamur RJ
Rp. 48,000,-/5kg
Rp. 195,000,-/peil 4. Plamur RJ
BATA RINGAN
CITICON
Rp. 750.000,00 Harga per m3

ASBES GELOMBANG
Rp. 10,500,-/ft Merk Djabesmen uk. 1.05
Rp. 6,500.-/ft Merk Djabesmen uk. 80
Rp. 115,000.-/kpg Asbes gelombang besar uk. 2.5m Lebar 1.05
Rp. 45,000.-/kg Paku Asbes uk 4"
Rp. 70,-/pcs Karet Asbes
SENG GELOMBANG
Rp. 6,400.-/ft Tersedia seng gelombang KW 1 Harga

SENG GELOMBANG TRANSFARAN


Rp. 10,000.-/feet Seng Fiber Gelombang Excel 0,8mm
Seng Fiber Polos Econolite
Seng Fiber Polos Ozone
Seng Polos Motif

GENTENG METAL
Spesifikasi Sakura Roof
Sakura Roof Merpati / Jazz dengan ketebalan 0.25mm -
Sakura Roof Crystal dengan ketebalan (0.25mm &0.30mm)

1 Meter Persegi
Lebar Efektif
Panjang Efektif
Tebal
Jarak Reng
Jarak Kaso

Sakura Roof uk. 80x70 1,62/m2

Surya Roof Pasir


Spesifikasi Surya Roof
Type Classic
1 Meter Persegi
Lebar Efektif =
Panjang Efektif =
Tebal =
Jarak Reng =
Jarak Kaso =

Multi Roof Pasir


Spesifikasi Multi Roof
Type Classic = 2x5 (10 Daun)
1 Meter Persegi = 1,3 Lembar
Rp. 33,000.-/kpg Lebar Efektif = 1000mm
Rp. 34,000.-/kpg Panjang Efektif = 770mm
Tebal = 0,40mm
Jarak Reng = 385mm
Soka Roof
Ocean Roof Pasir
Prima Roof Pasir
Global Roof

Rp.68,000.-/kpg GENTENG KERAMIK

Tersedia : Genteng Morando, KANMURI, M-CLASS.


Pengurangan harga tergantung Quantity
Morando Glasur ( 9 pcs/m2 )
Noc Atas Glasur Rp. 9,500.-/pcs
Noc Samping Glasur Rp. 9,500.-/pcs
Rp.98,000.-/kpg

Rp. 63,000.-/kpg
Rp. 45,000.-/kpg
Rp. 54,000.-/kpg
Rp. 30,000.-/kpg

Rp. 3,500.-/pcs
SENG ALKAN
Rp. 62,000.-/meter ~ Tebal 0.35mm
Rp. 72,000.-/meter ~ Tebal 0.45mm

Rp. 80,000.-/meter Seng Talang Alkan Tebal 0,45mm


Rp. 3,750,000.-/Roll Seng talang Alkan Tebal 0,45mm

BAJA RINGAN
Rp. 73,000.-/btg Spesifikasi
Rp. 79,000.-/btg TS C.75.65 tebal 0,65mm Harga
Rp. 128,000.-/btg TS C.75.75 tebal 0,75mm Harga
TS C.75.100 tebal 1mm Harga

Spesifikasi
Rp. 37,000.-/btg TASO (TR) 32.45 Tebal 0,45mm
Rp. 78,000.-/btg TASO (TR) 40.60 Tebal 0,60mm

ALUMINIUM FOIL
Rp. 620,000.- Aluminium Foil Double karung uk. 1,20m x 50m
Rp. 380,000.- Aluminium Foil Single karung uk. 1,20m x 50m
Rp. 140/pcs Baut Drilling

Sedia Bondeks, Atap Zincalume.

GLASS BLOCK / ROSTER

Glass Block uk. 20x20 Rp. 22,000,-/bh


Glass Block uk. 20x20 Rp. 120,000/dus

Contoh Gbr.
ROSTER LUKIS

Roster uk. 20x20 warna Rp. 36,000,-/bh


Roster uk. 30x30 warna Rp. 47,000,-/bh
KAYU
Kayu Racuk
Kayu Racuk uk 2/20
Kayu Racuk uk 2/25
Kayu Racuk sento 5/5 (isi 100 btg = 1m3)

Kayu Duren
Rp 2,600,000,-/m3
5/5 /btg
5/7 /btg

Kayu Meranti

Kayu Sento
Papan
5/5 /btg
5/7 /btg
Balok 8/12 /btg ( Meranti)
Reng 3/4 /btg
ntuk mencegah pertumbuhan jamur pada permukaan nat secara permanen.

kat plester pada permukaan beton atau bata di area kering.

s dan tahan air.

han terhadap jamur dan lumut.

dapat digunakan untuk merekatkan ubin atau batu alam di atas kayu dan besi.
Rp. 15,000,-
Rp. 20,000,-
Rp. 15,000,-
Rp. 45,000,-
Sollar Yellow, Teak, Clear Gloss, Clear Doff
p. 24,000.-/pcs
00.-/25kg set
mortar, bata, kolam renang, atap dak, balkon, teras, dinding, dll.

g) Rp. 65,000,-/set

g) Rp. 65,000,-/set
ml perliter air

pada tanah semua sisi lobang pondasi dan tanah bawah lantai
Indah) Blok P1. No.4 - Kota Malang

Jombang, mojokerto, kediri, Nganjuk, Tulung agung, trenggalek, Ponorogo, madiun dan SEKITARNYA
al / bahan Bangunan di malang
ERBARU MATERIAL BANGUNAN

Sat harga 1.25


sak 60,000.00 75,000.00
sak 62,000.00 77,500.00
ng Quantity -
-
sak 120,000.00 150,000.00
-
-
KW 1 Rp. 500/bh 500.00 625.00
KW 1 Rp. 480/5000bh 480.00 600.00
-
-
-
1. Kawat 6 TM tbl 4,2mm btg 14,000.00 17,500.00
2. Kawat 6 TM tbl 5.8mm btg 24,000.00 30,000.00
1.25
1. Besi 8 JI btg 31,000.00 38,750.00
2. Besi 8 KS btg 43,000.00 53,750.00
3. Besi 8 TI btg 40,000.00 50,000.00
- -
1. Besi 10 KS btg 62,000.00 77,500.00
2. Besi 10 TI btg 60,000.00 75,000.00
3. Besi 10 JI btg 50,000.00 62,500.00
-
1. Besi 12 KS btg 93,000.00 116,250.00
2. Besi 12 TI btg 90,000.00 112,500.00
3. Besi 12 KSJI btg 68,000.00 85,000.00
-
1. Besi 13 Ulir TI btg 117,000.00 146,250.00
2. Besi 13 Ulir TW btg 108,000.00 135,000.00
-
1. Besi 16 TI btg 175,000.00 218,750.00
-
1. Besi 16mm KS btg 180,000.00 225,000.00
2. Besi 16mm JI btg 147,000.00 183,750.00
- -
1. Besi 19 Ulir TI btg 248,000.00 310,000.00
kg 16,000.00 20,000.00
roll 335,000.00 418,750.00
-
-
lbr 252,000.00 315,000.00
lbr 357,000.00 446,250.00
lbr 494,000.00 617,500.00
lbr 640,500.00 800,625.00
m lbr 1,008,000.00 1,260,000.00
ks, Atap Zincalume -
ng Quantity -
er uk. 32" pcs 4,800,000.00 6,000,000.00
-
-
Truk 380,000.00 475,000.00
Truk 390,000.00 487,500.00
m3 110,000.00 137,500.00
Truk 450,000.00 562,500.00
m3 130,000.00 162,500.00
Truk 130,000.00 162,500.00
m3 195,000.00 243,750.00
-
-
-

pkup 450,000.00 562,500.00 360,000.00 540,000.00


pkup 550,000.00 687,500.00
pkup 560,000.00 700,000.00
-
m3 430,000.00 537,500.00
m3 380,000.00 475,000.00
m3 430,000.00 537,500.00
ngan truk harga tergantung jarak tempuh pengiriman. -
-
kg 16,000.00 20,000.00
dus 335,000.00 418,750.00
kg 28,000.00 35,000.00
kg 25,000.00 31,250.00
kg 27,000.00 33,750.00
kg 25,000.00 31,250.00
dos 10,000.00 12,500.00
pcs 70.00 87.50
-
-
lbr 44,000.00 55,000.00
(Kalimantan) lbr 63,000.00 78,750.00
(Kalimantan) lbr 80,000.00 100,000.00
lbr 128,000.00 160,000.00
lbr 133,000.00 166,250.00
-
lbr 124,000.00 155,000.00
lbr 118,000.00 147,500.00
lbr 165,000.00 206,250.00
lbr 210,000.00 262,500.00
lbr 248,000.00 310,000.00
-
-
m) (Bintang Lotus) lbr 87,000.00 108,750.00
-
(Fiber Flat) lbr 65,000.00 81,250.00
lbr 90,000.00 112,500.00
lbr 128,000.00 160,000.00
lbr 183,000.00 228,750.00
lbr 264,000.00 330,000.00
lbr 420,000.00 525,000.00
-
lbr 27,000.00 33,750.00
lbr 45,000.00 56,250.00
lbr 60,000.00 75,000.00
-
lbr 35,000.00 43,750.00
lbr 55,000.00 68,750.00
lbr 75,000.00 93,750.00
-
njang 2440 lbr 45,000.00 56,250.00
njang 3660 lbr 55,000.00 68,750.00
m Harga lbr 48,000.00 60,000.00
-
sak 68,000.00 85,000.00
sak 70,000.00 87,500.00
kg 25,000.00 31,250.00
-
lbr 73,000.00 91,250.00
lbr 71,000.00 88,750.00
-
m 135,000.00 168,750.00
m 145,000.00 181,250.00
m 25,000.00 31,250.00
psum atau GRC harga tetap sama. -
-
-
btg 20,000.00 25,000.00
btg 27,000.00 33,750.00
btg 40,000.00 50,000.00
btg 34,000.00 42,500.00
btg 52,000.00 65,000.00
btg 42,000.00 52,500.00
-
btg 15,000.00 18,750.00
btg 18,000.00 22,500.00
-
sak 120,000.00 150,000.00
gln 52,000.00 65,000.00
kg 15,000.00 18,750.00
kg 48,000.00 60,000.00
peil 195,000.00 243,750.00
-
-
m3 750,000.00 937,500.00

-
ft 10,500.00 13,125.00
ft 6,500.00 8,125.00
m Lebar 1.05 lbr 115,000.00 143,750.00
kg 45,000.00 56,250.00
pcs 70.00 87.50
-
ft 6,400.00 8,000.00
-
-
ft 10,000.00 12,500.00
m 30,000.00 37,500.00
m 20,000.00 25,000.00
m 25,000.00 31,250.00
-
-
-
gan ketebalan 0.25mm - -
ebalan (0.25mm &0.30mm) -
-
; 1,62 Lembar -
; 800mm -
; 770mm -
; 0,30mm -
; 385mm -
; 500mm -
-
(Type Kristal) lbr 33,000.00 41,250.00
(Type Merpati) lbr 34,000.00 42,500.00
lbr 68,000.00 85,000.00
-
2x4 (8 Daun) -
1,62 Lembar -
800mm -
770mm -
0,30mm -
385mm -
500mm -
-
-
lbr 98,000.00 122,500.00
-
-

lbr 63,000.00 78,750.00 Soka Roof


lbr 45,000.00 56,250.00
lbr 54,000.00 67,500.00
lbr 30,000.00 37,500.00
-
-
-
-
ANMURI, M-CLASS. -
g Quantity -
pcs 3,500.00 4,375.00
pcs 9,500.00 11,875.00
pcs -
-
-
-
-
-
-
-
-
-
Multiroof Pasir lbr 98,000.00 122,500.00

Soka Roof lbr 63,000.00 78,750.00


Ocean Roof Pasir lbr 45,000.00 56,250.00
Prima Roof Pasir lbr 54,000.00 67,500.00
Global Roof lbr 30,000.00 37,500.00
-
GENTENG KERAMIK -
-
Tersedia : Genteng Morando, KANMURI, M-CLASS. -
Pengurangan harga tergantung Quantity -
-
-
Morando Glasur pcs 3,500.00 4,375.00
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-

-
-

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-

-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
m 62,000.00 77,500.00
m 72,000.00 90,000.00
-
m 80,000.00 100,000.00
roll 3,750,000.00 4,687,500.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
btg 73,000.00 91,250.00
btg 79,000.00 98,750.00
btg 128,000.00 160,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
btg 37,000.00 46,250.00
btg 78,000.00 97,500.00
-
-
uk. 1,20m x 50m roll 620,000.00 775,000.00
uk. 1,20m x 50m roll 380,000.00 475,000.00
pcs 140.00 175.00
-
-
-
-
-
22,000,-/bh bh 22,000.00 27,500.00
120,000/dus dps 120,000.00 150,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
Rp. 36,000,-/bh bh 36,000.00 45,000.00
Rp. 47,000,-/bh bh 47,000.00 58,750.00
-
-

Roster
Anggrek
30x30 -
(RO48)

-
-
-
-
-
-
-
-
-
-
-

-
-

-
-

-
-
-
-
-

-
-
-
m3 1,350,000.00 1,687,500.00
lbr 27,000.00 33,750.00
lbr 30,000.00 37,500.00
g = 1m3) m3 2,000,000.00 2,500,000.00
-
-
m3 2,600,000.00 3,250,000.00
btg 30,000.00 37,500.00
btg 40,000.00 50,000.00
-
-
-
m3 3,300,000.00 4,125,000.00
m3 3,500,000.00 4,375,000.00
btg 40,000.00 50,000.00
btg 50,000.00 62,500.00
btg 135,000.00 168,750.00
btg 22,000.00 27,500.00
-
-
btg 7,000.00 8,750.00
btg 10,000.00 12,500.00
btg 13,000.00 16,250.00
-
-
ikt 70,000.00 87,500.00
-
-
m3 2,200,000.00 2,750,000.00
m3 1,400,000.00 1,750,000.00
btg 21,000.00 26,250.00
-
-
-
-
-
bh 440,000.00 550,000.00
bh 690,000.00 862,500.00
bh 1,080,000.00 1,350,000.00
bh 1,150,000.00 1,437,500.00
bh 1,770,000.00 2,212,500.00
bh 2,320,000.00 2,900,000.00
-
-
-
-

-
-

-
-
-
bh 1,776,000.00 2,220,000.00
bh 3,744,000.00 4,680,000.00
bh 4,670,000.00 5,837,500.00
bh 6,367,000.00 7,958,750.00
bh 7,320,000.00 9,150,000.00
-
-
b 310,000.00 387,500.00
b 440,000.00 550,000.00
-
-
-
pcs 60,000.00 75,000.00
pcs 65,000.00 81,250.00
-
pcs 96,000.00 120,000.00
pcs 145,000.00 181,250.00
-
-
-
kg 10,000.00 12,500.00
kg 16,000.00 20,000.00
-
-
-
-
kg 16,000.00 20,000.00
-
36,000.00 45,000.00
-
-
79,000.00 98,750.00
-
-
57,000.00 71,250.00
-
-
set 108,000.00 135,000.00
-
-
-
-
-
-
-
-
-
-
-
ltr 25,000.00 31,250.00
-
-
-
-
ltr 15,000.00 18,750.00
ltr 20,000.00 25,000.00
ltr 15,000.00 18,750.00
ltr 45,000.00 56,250.00
-
-
-
bks 9,000.00 11,250.00
bks 15,000.00 18,750.00
-
bks 8,000.00 10,000.00
bks 14,000.00 17,500.00
-
klg 6,000.00 7,500.00
klg 33,000.00 41,250.00
gln 110,000.00 137,500.00
-
btl 8,000.00 10,000.00
-
-
-
-
set 185,000.00 231,250.00
set 195,000.00 243,750.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
set 300,000.00 375,000.00
set 550,000.00 687,500.00
set 550,000.00 687,500.00
-
-
-
m2 47,000.00 58,750.00
m2 52,000.00 65,000.00
m2 55,000.00 68,750.00
m2 58,000.00 72,500.00
m2 67,000.00 83,750.00
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
bh 205,000.00 256,250.00
pcs 235,000.00 293,750.00
set 1,250,000.00 1,562,500.00
pcs 896,000.00 1,120,000.00
pcs 390,000.00 487,500.00
pcs 38,000.00 47,500.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
pcs 230,000.00 287,500.00
pcs 400,000.00 500,000.00
pcs 380,000.00 475,000.00
pcs 570,000.00 712,500.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
ljr 19,000.00 23,750.00
ljr 26,000.00 32,500.00
ljr 35,000.00 43,750.00
ljr 53,000.00 66,250.00
ljr 61,000.00 76,250.00
ljr 78,000.00 97,500.00
ljr 114,000.00 142,500.00
ljr 154,000.00 192,500.00
ljr 256,000.00 320,000.00
ljr 424,000.00 530,000.00
ljr 595,000.00 743,750.00
ljr 998,000.00 1,247,500.00
ljr 1,544,000.00 1,930,000.00
ljr 2,177,000.00 2,721,250.00
-
-
ljr 33,000.00 41,250.00
ljr 37,000.00 46,250.00
ljr 48,000.00 60,000.00
ljr 65,000.00 81,250.00
ljr 83,000.00 103,750.00
ljr 131,000.00 163,750.00
ljr 211,000.00 263,750.00
ljr 279,000.00 348,750.00
ljr 491,000.00 613,750.00
ljr 809,000.00 1,011,250.00
ljr 1,136,000.00 1,420,000.00
-
-
ljr 98,000.00 122,500.00
ljr 60,000.00 75,000.00
-
-
pcs 8,000.00 10,000.00
pcs 23,000.00 28,750.00
pcs 8,000.00 10,000.00
-
-
-
pcs 15,000.00 18,750.00
pcs 2,000.00 2,500.00
pcs 3,000.00 3,750.00
pcs 5,000.00 6,250.00
pcs 7,000.00 8,750.00
pcs 10,000.00 12,500.00
pcs 16,000.00 20,000.00
pcs 23,000.00 28,750.00
pcs 46,000.00 57,500.00
pcs 98,000.00 122,500.00
pcs 194,000.00 242,500.00
pcs 308,000.00 385,000.00
-
pcs 2,000.00 2,500.00
pcs 3,000.00 3,750.00
pcs 4,000.00 5,000.00
pcs 5,000.00 6,250.00
pcs 7,000.00 8,750.00
pcs 12,000.00 15,000.00
pcs 23,000.00 28,750.00
pcs 30,000.00 37,500.00
pcs 81,000.00 101,250.00
pcs 122,000.00 152,500.00
-
pcs 1,500.00 1,875.00
pcs 2,000.00 2,500.00
pcs 3,000.00 3,750.00
pcs 5,000.00 6,250.00
pcs 7,000.00 8,750.00
pcs 10,000.00 12,500.00
pcs 11,000.00 13,750.00
pcs 28,000.00 35,000.00
pcs 54,000.00 67,500.00
pcs 78,000.00 97,500.00
pcs 132,000.00 165,000.00
pcs 299,000.00 373,750.00
pcs 399,000.00 498,750.00
-
pcs 2,000.00 2,500.00
pcs 25,000.00 31,250.00
pcs 5,000.00 6,250.00
pcs 7,000.00 8,750.00
pcs 10,000.00 12,500.00
pcs 21,000.00 26,250.00
pcs 50,000.00 62,500.00
pcs 131,000.00 163,750.00
pcs 262,000.00 327,500.00
pcs 397,000.00 496,250.00
-
-
-
-
-
-
-
-
-
-
-
pcs 59,000.00 73,750.00
-
-
-
-
-
-
-
-
-
-
-
-
-
pcs 165,000.00 206,250.00
pcs 90,000.00 112,500.00
pcs 348,000.00 435,000.00
pcs 348,000.00 435,000.00
pcs 35,000.00 43,750.00
-
-
-
-
-
-
-
-
-
-
pcs 12,000.00 15,000.00
pcs 15,000.00 18,750.00
pcs 20,000.00 25,000.00
pcs 65,000.00 81,250.00
-
-
-
-
-
-
-
-
-
-
-
-
-
pcs 13,000.00 16,250.00
-
-
pcs 220,000.00 275,000.00
pcs 36,000.00 45,000.00
pcs 105,000.00 131,250.00
-
-
pcs 65,000.00 81,250.00

pcs 79,000.00 98,750.00


-

pcs 378,000.00 472,500.00


-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
pcs 40,000.00 50,000.00
-
-
-
-
-
-
kg 55,000.00 68,750.00
kg 59,000.00 73,750.00
kg 55,100.00 68,875.00
kg 32,000.00 40,000.00
kg 27,000.00 33,750.00
-
-
kg 20,400.00 25,500.00
kg 20,200.00 25,250.00
-
-
-
-
-
-
klg 47,000.00 58,750.00
klg 49,000.00 61,250.00
kg 46,000.00 57,500.00
kg 34,000.00 42,500.00
kg 33,000.00 41,250.00
kg 29,000.00 36,250.00
kg 30,000.00 37,500.00
kg 27,000.00 33,750.00
-
-
kg 1,250.00 1,562.50
kg 11,600.00 14,500.00
-
-
-
kg 85,000.00 106,250.00
klg 30,000.00 37,500.00
kg 110,000.00 137,500.00
klg 33,000.00 41,250.00
klg 33,000.00 41,250.00
kg 22,400.00 28,000.00
-
-
-
-
-
ltr 27,000.00 33,750.00
ltr 22,000.00 27,500.00
ltr 22,000.00 27,500.00
ltr 18,000.00 22,500.00
klg 15,000.00 18,750.00
klg 12,000.00 15,000.00
klg 13,000.00 16,250.00
btl 8,000.00 10,000.00
ltr 14,575.00 18,218.75
ltr 15,400.00 19,250.00
ltr 5,280.00 6,600.00
-
-
-
-
kg 9,000.00 11,250.00
kg 7,200.00 9,000.00
kg 5,500.00 6,875.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
kg 12,100.00 15,125.00
kg 12,800.00 16,000.00
-
-
-
ltr 44,444.44 55,555.56
ltr 52,116.40 65,145.50
ltr 20,000.00 25,000.00
kg 23,142.86 28,928.57
-
-
lt 64,444.44 80,555.56
lt 63,333.33 79,166.67
-
-
kg 50,000.00 62,500.00
kg 48,250.00 60,312.50
kg 44,350.00 55,437.50
-
kg 18,000.00 22,500.00
kg 18,400.00 23,000.00
kg 22,400.00 28,000.00
kg 13,133.33 16,416.67
kg 16,000.00 20,000.00
-
-
kg 22,000.00 27,500.00
kg 28,000.00 35,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
kg 20,400.00 25,500.00
kg 22,000.00 27,500.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
lt 97,600.00 122,000.00
lt 100,800.00 126,000.00
lt 112,800.00 141,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
kg 21,800.00 27,250.00
kg 21,200.00 26,500.00
kg 30,600.00 38,250.00
kg 29,920.00 37,400.00
-
-
kg 29,600.00 37,000.00
kg 39,000.00 48,750.00
-
-
-
-
ltr 504,000.00 630,000.00
ltr 86,000.00 107,500.00
kg 28,250.00 35,312.50
kg 13,000.00 16,250.00
kg 10,000.00 12,500.00
kg 21,600.00 27,000.00
kg 27,600.00 34,500.00
kg 21,200.00 26,500.00
kg 27,200.00 34,000.00
-
ltr 92,800.00 116,000.00
ltr 98,800.00 123,500.00
ltr 88,000.00 110,000.00
ltr 94,000.00 117,500.00
ltr 56,800.00 71,000.00
ltr 52,000.00 65,000.00
ltr 62,800.00 78,500.00
ltr 58,000.00 72,500.00
ltr 74,800.00 93,500.00
ltr 70,000.00 87,500.00
-
ltr 69,000.00 86,250.00
ltr 78,000.00 97,500.00
-
-
-
kg 33,000.00 41,250.00
kg 42,000.00 52,500.00
-
-
-
-
ltr 60,000.00 75,000.00
-
-
-
ltr 66,000.00 82,500.00
-
-
klg 56,000.00 70,000.00
klg 56,000.00 70,000.00
ltr 56,000.00 70,000.00
set 110,000.00 137,500.00
grm 20.00 25.00
grm 18.75 23.44
-
btl 43,000.00 53,750.00
btl 18,000.00 22,500.00
ltr 38,000.00 47,500.00
ltr 30,000.00 37,500.00
-
-
klg 33,000.00 41,250.00
-
-
klg 57,000.00 71,250.00
-
klg 62,000.00 77,500.00
klg 74,000.00 92,500.00
-
-
ls 17,000.00 21,250.00
-
-
kg 39,600.00 49,500.00
kg 37,111.11 46,388.89
kg 45,000.00 56,250.00
kg 43,111.11 53,888.89
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
pcs 24,000.00 30,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
kg 70,000.00 87,500.00
kg 90,000.00 112,500.00
-
-
-
klg 70,000.00 87,500.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ltr 62,010.58 77,513.23
ltr 64,814.81 81,018.52
ltr 63,439.15 79,298.94
ltr 66,666.67 83,333.33
ltr 74,497.35 93,121.69
ltr 80,687.83 100,859.79
ltr 44,920.63 56,150.79
ltr 48,412.70 60,515.87
-
-
ltr 93,333.33 116,666.67
ltr 96,031.75 120,039.68
ltr 95,449.74 119,312.17
ltr 477,248.68 596,560.85
ltr 100,899.47 126,124.34
ltr 104,232.80 130,291.01
ltr 66,666.67 83,333.33
ltr 72,486.77 90,608.47
ltr 735.77 919.71
ltr 74,338.62 92,923.28
-
-
-
ltr 332.78 415.98
ltr 33,068.78 41,335.98
ltr 34,761.90 43,452.38
ltr 35,978.84 44,973.54
ltr 41,164.02 51,455.03
ltr 42,857.14 53,571.43
ltr 29,841.27 37,301.59
ltr 30,952.38 38,690.48
-
-
-
-
kg 18,280.00 22,850.00
-
-
-
-
kg -
kg -
kg -
set 65,000.00

-
-
-

set 65,000.00 81,250.00


-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
lbr 4,000.00 5,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
roll 3,050.00 3,812.50
roll 3,050.00 3,812.50
roll 4,500.00 5,625.00
roll 5,500.00 6,875.00
-
btg 11,000.00 13,750.00
bh 3,000.00 3,750.00
bh 5,500.00 6,875.00
bh 6,500.00 8,125.00
pcs 1,000.00 1,250.00
-
-
-
pcs 20,000.00 25,000.00
pcs 40,000.00 50,000.00
pcs 26,000.00 32,500.00
pcs 4,000.00 5,000.00
pcs 6,000.00 7,500.00
pcs 6,000.00 7,500.00
pcs 10,000.00 12,500.00
pcs 10,000.00 12,500.00
pcs 8,000.00 10,000.00
-
ttk 90,000.00 112,500.00
-
-
-
-
-
-
pcs 55,000.00 68,750.00
pcs 55,000.00 68,750.00
pcs 65,000.00 81,250.00
pcs 55,000.00 68,750.00
-
pcs 70,000.00 87,500.00
-
pcs 430,000.00 537,500.00
-
pcs 35,000.00 43,750.00
-
-
-
-
pcs -
pcs -
-
-
-
pcs -
pcs -
pcs -
-
-
-
pcs -
pcs -
pcs -
set -
-
pcs -
pcs -
pcs -
pcs -
pcs -
-
-
-
-
-
-
ml 25,000.00 31,250.00
-
-
-
-
-
-
-
-
-
pcs 85,000.00 106,250.00
-
set 220,000.00 275,000.00
set 230,000.00 287,500.00
set 180,000.00 225,000.00
psg 180,000.00 225,000.00
psg 180,000.00 225,000.00
pcs 90,000.00 112,500.00
-
set 250,000.00 312,500.00
pcs 20,000.00 25,000.00
-
psg 25,000.00 31,250.00
psg 35,000.00 43,750.00
psg 38,000.00 47,500.00
psg 48,000.00 60,000.00
psg 30,000.00 37,500.00
psg 9,000.00 11,250.00
psg 10,000.00 12,500.00
-
-
-
pcs 75,000.00 93,750.00
pcs 60,000.00 75,000.00
pcs 80,000.00 100,000.00
pcs 75,000.00 93,750.00
pcs 65,000.00 81,250.00
-
-
pcs 600,000.00 750,000.00
pcs 440,000.00 550,000.00
-
-
pcs 38,000.00 47,500.00
pcs 45,000.00 56,250.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-

-
-
-
-
-
-
-
-
pcs 165,000.00 206,250.00
pcs 150,000.00 187,500.00
-
-
roll 550,000.00 687,500.00
roll 650,000.00 812,500.00
roll 750,000.00 937,500.00
roll 600,000.00 750,000.00
-
-
-
pcs 20,000.00 25,000.00
pcs 95,000.00 118,750.00
pcs 70,000.00 87,500.00
pcs 60,000.00 75,000.00
pcs 70,000.00 87,500.00
pcs 30,000.00 37,500.00
pcs 8,000.00 10,000.00
pcs 350,000.00 437,500.00
pcs 90,000.00 112,500.00
pcs 75,000.00 93,750.00
pcs 45,000.00 56,250.00
pcs 305,000.00 381,250.00
pcs 280,000.00 350,000.00
BESI TABEL BESI
BETON
POLOS &
ULIR ULIR POLOS
Ø BERAT Ø BERAT
(mm) (Kg) (mm) (Kg)
6 0.222 6p 0.22
8 0.395 8p 0.4
9 0.5 9p 0.5
10 0.617 10p 0.62
12 0.888 12p 0.89
13 1.04 13p 1.04
16 1.578 16p 1.57
16 1.578 16p 1.58
19 2.223 19p 2.23
22 2.985 22p 2.98
25 3.853 25p 3.85
28 4.83 28p 4.83
29 5.185 29p 5.19
32 6.313 32p 6.31
36 7.99 36p 7.99
16 30000
Sakura Roof

Surya Roof Pasir

ka Roof
CE7 IDR
280,000
(Squatting
Toilet)
IDR 670,000

IDR 2,460,000
( Harga Belum
termasuk
discount)
511
32600

20400

6.28
DAFTAR HARGA BAHAN DAN UPAH

No. Uraian Bahan

MATERIAL KASAR
1 Tanah urug
2 Tanah Biasa
3 Tanah Liat
4 Tanah Padas
5 Tras
6 Pasir Urug
7 Pasir hitam
8 Pasir hitam
9 Pasir putih
10 Pasir putih
11 Pasir Putih TR
12 Pasir Putih TR
Harga tergantung jarak tempuh
13 Pasir pasang Lumajang
14 Pasir pasang Kediri
15 Pasir pasang Pasuruan
16 Pasir Pasang cepu
17 Pasir Kwarsa
18 Kapur Pasang (padam)
19 Kapur sirih
20 Pasir Beton (Cepu) cepu
21 Pasir Beton ( Muntilan) Muntilan
22 Pasir Beton / cor
23 Abu batu
24 Sirtu kerikil kotor/urug
25 Sirtu kerikil ayak
26 Sirtu (tak ayak)
27 Sirtu Royalty
Tali Ijuk
KORAL
28 Koral Jagung uk. 1.2m3
29 Koral Ayak uk. 1.2m3
30 Split 1x2 uk. 1,2m3
31 Per truk
32 Split 1x2, 2x3, 5x7
33 Koral jagung
34 Batu Kali
35 Abu batu
36 Abu batu (Tayu)
37 Air bersih
Pengiriman pasir dan koral dengan truk harga tergantung jarak tempuh pengiriman.
38 Semen PC @ 50 kg gersik
39 Semen Putih @ 40 Kg gersik
40 PC warna
41 Semen PC @ 50 kg gersik
42 Semen PC @ 50 kg tiga roda
43 Semen PC 50 kg@ Holcim
44 Portland Cement / PC
45 Portland Cement / PC (40 kg)
46 Portland Cement / PC (50 kg)
47 Portland Cement / PC Curah
48 Semen portland
49 Portland Pozzolan Cement / PPC - Warna
50 Portland Pozzolan Cement / PPC (40 kg)
52 Portland Pozzolan Cement / PPC (50 kg)
53 Portland Pozzolan Cement / PPC (50 kg) - warna
54 Minyak Tanah Kerosene
55 Residu
56 Aspal Minyak
57 Material Laston AC-WC
58 Pemeliharaan Alat (Walls)
59 Pertamina Dex
60 Bensin / Premium
61 Aspal bitumen
62 Aspal AC 60/70
63 Hotmix jadi, Upah + Alat berat
64 Batu Bata Merah
65 Bata putih (9/12/27)
66 Batako besar (10x19x39) HB.20
67 Bataco Kecil (7/11/25) HB.10
68 Bataco Sedang (10/15/40) HB.15
69 Batu belah Pondasi
70 Batu Belah 15/20
71 Batu Bolder
72 Batu Grosok (pudel)
73 Batu Gunung/quarry
74 Batu Kali Bulat
75 Batu Pecah 0.5/1
76 Batu Pecah 1/1
77 Batu Pecah 1 - 2 cm
78 Batu Pecah 2 - 3 cm
79 Batu Pecah 3 - 5 cm
80 Batu Pecah 5 - 7 cm
81 Kerikil Ayak tanpa pasir
82 Kerikil Biasa
83 Kerikil Sawur / Koral
84 Kesrikil Sungai - royalty
Batu Andesit
85 Batu Andesit Polos uk.10x10x1,5 cm
86 Batu Andesit bintik bakar Cipanauk.10x10x1,5 cm
87 Batu Andesit bintik bakar gh uk.10x10x1,5 cm
88 Batu Andesit susun sirih
Batu Candi
89 Batu Candi uk.10x20x1.5 cm
90 Batu Candi Alur lurus uk.15x30x1.5 cm
91 Batu candi alur matahari/diagonal,napoli& rel 3D uk.15x30x1.5 cm
92 Batu Candi RTM / polos
93 Batu Alam - Palimanan (RTM/Polos)
94 Batu Alam (Lempeng) - Acak
95 Batu Alam (Lempeng) - Berdimensi
96 Batu Alam (Marmo) - Bakar
97.98 Batu Alam (Marmo) - Krem
99 Batu Pearl Sone
100 Grevel U dia 20 cm
101 Grevel U dia 30 cm
102 Buis Beton ø 100 cm - 100 cm
103 Buis Beton ø 25 cm - 100 cm
104 Buis Beton ø 20 cm - 100 cm
105 Buis Beton ø 25 cm - 100 cm
106 Buis Beton ø 30 cm - 100 cm
107 Buis Beton ø 40 cm - 100 cm
108 Buis Beton ø 50 cm - 100 cm
109 Buis Beton ø 60 cm - 100 cm
110 Buis Beton ø 80 cm - 100 cm
111 Buis Beton U 15 cm - 100 cm
112 Buis Beton U 20 cm - 100 cm
113 Buis Beton U 30 cm - 100 cm
114 Kansteen UK. 15 X 30 X 60 CM
115 Paving Block t = 8 cm, Natural
116 Paving Block Hexagonal Kecil tb. 6 cm, K.300
117 (ALDAS)
Paving Block Hexagonal Kecil tb. 6 cm, K.400
118 (ALDAS)
Paving Block Hexagonal Kecil tb. 8 cm, K.300
119 (ALDAS)
Paving Block Hexagonal Kecil tb. 8 cm, K.400
120 (ALDAS)
Paving Block Holland tb. 10 cm K.500 (ALDAS)
121 Paving Block Holland tb. 6 cm K.175 (Lokal)
122 Paving Block Natural tb. 6 cm K.200
123 Paving Block Holland tb. 6 cm K.225
124 Paving Block Natural tb. 6 cm K.250
125 Paving Block Holland tb. 6 cm K.300
126 Paving Block Holland tb. 6 cm K.400 (ALDAS)
127 Paving Block Holland tb. 8 cm K.300 (ALDAS)
128 Paving Block Holland tb. 8 cm K.400 (ALDAS)
129 Paving Block Holland tb. 8 cm K.500 (ALDAS)
130 Kerb Lubang 10/12,5 x 30 x 50 K.200 (ALDAS)
131 Kerb Lubang 10/12,5 x 30 x 50 K.300 (ALDAS)
132 Kerb Lubang 15/20 x 30 x 50 K.200 (ALDAS)
133 Kerb Lubang 15/20 x 30 x 50 K.300 (ALDAS)
134 Kerb Standard 10/12,5 x 30 x 50 K.200 (ALDAS)
135 Kerb Standard 10/12,5 x 30 x 50 K.300 (ALDAS)
136 Kerb Standard 15/20 x 30 x 50 K.200 (ALDAS)
137 Kerb Standard 15/20 x 30 x 50 K.300 (ALDAS)
138 Beton Ready Mix K-175
139 Beton Ready Mix K-300
140 Tiang Pancang Segi Empat 20 x 20 cm, tul. 4 D 16 mm mutu beton k- 450 kg/cm2
141 Biaya Pancang menggunalan Sistim Drop Hammer
142 Mobillisasi Drop Hammer ( luar Kota / Jawa Barat )
143 Pembobokan Kepala Tiang Pancang utk Pile Cap
144 HCS 150.07.12, terpasang
145 Dinding Fasade, t = 10 cm, terpasang
BAHAN2 KAYU
146 Kayu Jati 5 / 7
147 Usuk Kayu Jati (5x7x400)
148 Usuk Kayu Jati (4x6x400)
149 Usuk Kayu Jati (3x5x400)
150 Reng Kayu Jati (2x3x300)
151 Reng Kayu Jati (2x3x400)
152 Kayu Jati (balok/pesagen)
153 Kayu Jati (papan)
154 Kayu Dolken Dia 8-10/400 cm
155 Kayu Hutan (Rimba Campur)
156 Kayu Perancah
157 Kayu Randu (papan 1,5 x 20 x 200)
Balok kayu Kamper Oven
158 4x6 50,000.00
159 5x7 85,000.00
160 5 x 7 x 400 usuk
161 3 x 20 x 400 papan
162 4 x 10 cm papan
Balok kayu Borneo
163 8 x 12 x 400
164 6 x 12 x 400
165 5 x 7 x 400 usuk
166 2 x 20 x 400 papan
167 3 x 30 x 400 papan
168 Kayu Bakar
169 Kayu Bengkirai (balok/pesagen)
170 Kayu Bengkirai (papan)
171 Reng Kayu Bengkirai (2x3x300)
172 Reng Kayu Bengkirai (2x3x400)
173 Usuk Kayu Bengkirai (3x5x400)
174 Usuk Kayu Bengkirai (4x6x400)
175 Usuk Kayu Bengkirai (5x7x400)
176 Kayu Kruing (balok/pesagen)
177 Kayu Kruing (papan)
178 Reng Kayu Kruing (2x3x300)
179 Reng Kayu Kruing (2x3x400)
180 Usuk Kayu Kruing (3x5x400)
181 Usuk Kayu Kruing (4x6x400)
182 Usuk Kayu Kruing (5x7x400)
183 Glugu
Kayu lokal
184 8 x 12 x 400
185 6 x 12 x 400
186 5 x 7 x 400 usuk
187 3 x 30 x 400 papan
Kayu Meranti/Borneo
188 2x3 7,000.00
189 3x4 15,000.00
190 4x6 27,500.00
191 5x7 42,500.00
192 5x10
193 Bambu Apus
194 Bambu diameter 6-8 / 600 cm

PLYWOOD
195 triplex tebal 3 mm
196 Triplek # 4 mm uk. 120 x 240
197 Megatiek # 4 mm uk. 120 x 240
198 Melaminto # 4 mm uk. 120 x 240
199 Triplek # 6 mm uk. 120 x 240
200 Ukuran 8mm (1220 x 2440mm)
201 Ukuran 8mm banci (1220 x 2440mm)
203 Ukuran 9mm (1220 x 2440mm) (Lokal)
204 Ukuran 9mm (1220 x 2440mm)
205 Multiplek # 12 mm uk. 120 x 240
206 Multiplek # 15 mm uk. 120 x 240
207 Playwood # 18 mm uk. 120 x 240
208 Multiplek # 18 mm uk. 120 x 240
TEXWOOD
209 Teakwood # 4 mm uk. 120 x 240
210 Sungkai Playwood Super
JABARWOOD
211 Ukuran 3mm (1220mm x 2440mm) (Bintang Lotus)
212 HPL ex. DeCo
213 HPL ex. LAMINAR
214 Edging 2.2 CM
215 Edging 2.9 CM
216 Edging 3.3 CM
217 Papan solid nyatoh
GRC BOARD
218 ukuran 4mm (1220mm x 2440) (Fiber Flat)
219 ukuran 5mm (1220mm x 2440) (GRC)
220 ukuran 6mm (1220mm x 2440)
221 ukuran 8mm (1220mm x 2440)
222 ukuran 9mm (1220 x 2440)
223 ukuran 12mm (1220mm x 2440)
SIMPLEPLANK
224 8mmx100mmx2.440mm
225 8mmx200mmx2.440mm
226 8mmx200mmx2.440mm
SUPERPLANK
227 9mmx100mmx2.440mm
228 9mmx200mmx2.440mm
229 9mmx200mmx2.440mm
LISTPLANK
300 List Plank Urat bahan GRC panjang 2440
301 List Plank Urat bahan GRC panjang 3660
302 List Plank Urat Kayu Panjang 3m Harga
3 CORNICE/COMPON
303 Cornice Jaya Board 20kg
304 Cornice A plus 20kg
305 Paku
GYPSUM
306 Gypsum Jaya Board
307 Gypsum 9 mm (Elepant, Jaya board)
308 Gysum Knauf
PEMASANGAN GYPSUM
309 ~ Bahan Galvanis (Pemasangan Rata) :
302 ~ Pemasangan Bertingkat :
304 ~ List Gypsum :
Pemasangan dengan bahan Gypsum atau GRC harga tetap sama.
305 Eternit 4 mm (100 x 100)
306 Lis Gypsum
307 Lis Kayu 2/3
308 Lis Kayu Profil
309 Harplek 30 x 200
310 Harplek 40 x 200
311 Harplek 50 x 200
312 Harplek 60 x 200

BAHAN2 BESI DAN BAJA


PAKU
313 Paku - payung
314 Paku - sekrup
315 Paku cap keris 1-5" ( 1s/d 2" )
316 Paku cap keris 1-5" ( 1s/d 2" )
317 Paku 1 s/d 2"
318 Paku 2 s/d 4"
319 Paku Seng
320 Paku Kalsiboard
321 Paku Genteng Metal
321 Pasang Kuda-Kuda baja ringan komplit (Kencana
. Truss)
Paku Gypsum
322 Paku triplek uk.3/4
323 Karet Asbes
324 Paku Genteng
325 Besi Plat t = 2 mm
326 Besi Siku 50.50.5
327 Mur Baud dia. 20 mm p = 7 cm
328 Mur Baud dia. 20 mm p = 50 cm
329 Baja WF
330 Baja profil " IWF "
331 Besi Profil
332 Baja profil " L " atau " C "
333 Baja ringan (reng tb. 0,75 mm)
334 Baja ringan (Tipe C tb. 0,75 mm)
335 Baja tralis
336 Kawat berduri
337 Kawat Bronjong
338 Kawat Ikat Beton/bendrat
339 Kawat Las Listrik
400 Besi BJTD-39
401 Besi BJTP-24
402 Wire Mesh M8
403 Shear Connector
BESI BEUGLE
404 Ø6 1. Kawat 6 TM tbl 4,2mm
405 2. Kawat 6 TM tbl 5.8mm
406 Ø8 1. Besi 8 JI
407 2. Besi 8 KS
408 3. Besi 8 TI
409 Ø 10 1. Besi 10 KS
410 2. Besi 10 TI
411 3. Besi 10 JI
412 Ø 12 1. Besi 12 KS
413 2. Besi 12 TI
414 3. Besi 12 KSJI
415 D 13 1. Besi 13 Ulir TI
416 2. Besi 13 Ulir TW
417 D 16 Ulir 1. Besi 16 TI
418 D. 16 Polos 1. Besi 16mm KS
419 2. Besi 16mm JI
420 D. 19 Ulir 1. Besi 19 Ulir TI
421 Kawat Bendrat
422 Kawat Bendrat
423 Besi Plat Baja
Besi Strip
WIREMESH
424 Wiremesh M5 : uk. 2,10m x 5,4m .-
425 Wiremesh M6 : uk.5,4m x 2,1m
426 Wiremesh M7 : uk.5,4m x 2,1m
427 Wiremesh M8 : uk.5,4m x 2,1m
428 Wiremesh M10 : uk.5,4m x 2,1m
429 Wiremesh / jaring kawat baja dilas
Bondeks (Floordeks), Spandeks, Atap Zincalume
~ Pengurangan harga tergantung Quantity
Gunting Besi Duduk Merk Muller uk. 32"
430 Plat Bondex Hokayu, 1.00 mm
431 Kawat Beton
432 Kawat Las
433 Kawat Duri
434 Sekrup fisher
435 Sekrup Gypsum
436 Seng Gel. BJLS 30 lebar 60 cm ( 1 roll 50 m )
437 Seng Gel. BJLS 30 lebar 90 cm ( 1 roll 50 m )
438 Mur Baut 3-8"
439 Mur Baut 9"
440 Nok Asbes
441 Nok Galfalum
442 Nok Seng Gelombang
443 Hollo Galvanis 4 X 4 CM
444 Besi 5 x 40 mm
445 Metal stud ( Bluescope ) 0.75 x 100 mm
446 Stell Stud
447 Hollo Alumunium Truss 40 x 40 mm untuk rangka ACP
448 Ramset
449 Paku sekrup
450 Baja Profil Hollow 20 x 40 mm
451 BSP 2"
452 BSP 1.5"
453 BSP 1.0"
454 Pagar BRC 90
455 Pagar BRC 120
456 Rangka Metal (Hollow 40.20.0,4 mm)
457 Rangka Metal (Hollow 40.20.0,6 mm)
458 Rangka Metal (Hollow 40.40.0,4 mm)
459 Rangka Metal (Hollow 40.40.0,6 mm)
460 Roll Cat
461 Rolling Door (Allumunium); tb. 0,5 mm
462 Rolling Door (Allumunium); tb. 0,8 mm
463 Rolling Door (Galfalum); tb. 0,8 mm
464 Sabun
465 Sealant (Dokorning)
466 Sealtape
467 Sekrup Asbes
468 Sekrup Baja ringan
469 Sekrup Fixer (Allumunium)
470 Engsel H
471 Engsel Kupu-kupu
472 Engsel Pintu
473 Floordrain (Plastik)
474 Floordrain (Stainlessteel)
475 Folding gate; tb. 0,4 mm
476 Folding gate; tb. 0,5 mm
477 Folding gate; tb. 0,8 mm
478 Formika
479 Galfalum (lebar 0,7 m)
480 Gebalan Rumput
481 Grendel
482 Hak Angin

BAHAN-BAHAN CAT DAN FINISHING


483 Amplas
484 Ampelas / Ambril
485 Ampelas besi
486 Ampelas Dico no. 120
487 Ampelas Dico no. 280
488 Ampelas Norton No. 3
489 Thinner Super Daimaru
490 Thinner A
491 Thinner B
492 Spirtus
493 Minyak bekisting
494 Minyak solar
495 Minyak pelumas
496 Dempul
497 Dempul plitur ( dempul kasar )
498 Wood Filer ( Imfra )
499 Oker Putih
500 Oker Warna
501 Batu Apung ( Gosok )
502 Sirlak Ex India
503 Plamur Tembok
504 Plamur Kayu
505 Plinkut
506 Sirlax
507 Soda Api
508 cat tembk vinlex sper 5 kg 130,000.00
509 cat tembk vinlex sper 25 kg 750,000.00
510 Cat Besi (baik)
511 Cat Besi (cukup)
512 Cat Foxi
513 Cat Kayu (baik)
514 Cat Kayu (cukup)
515 Cat Tembok Dalam (baik)
516 Cat Tembok Dalam (cukup)
517 Cat Tembok Dalam dulux, mowilex/setara
518 Cat Tembok Luar (baik)
519 Cat Tembok Luar (cukup)
520 Cat Tembok Luar dulux mowilex/setara
521 Aqua Prof 5 kg 170,000.00
522 Aqua Prof 20 kg 670,000.00
523 Cat Tembok DULUX ( Interior )
524 Cat Menie Besi
525 Cat Vernis
526 Cat Kayu / Cat besi AVIAN
527 Cat tembok Epoxy (1 kg) Danapaint + Minyak Cat
528 Cat tembok Weather shield Dulux ICI (exterior)
529 Cat Dasar
530 Kuas 3"
531 Roll Cat
532 Lem FOX Putih
533 Lem FOX kuning
534 Lem Kuning (aica aibon)
535 Floor Hardner sek. SIKA / FOSROC
536 Wood filer (INFRA)
537 Lapisan Kedap Air
BAHAN2 KUSEN & PINTU ALUMINIUM
538 Allumunium strip lebar 8 cm
539 Aluminium kusen 4", sek. YKK Silver Anodize
540 Aluminium daun pintu, sek. YKK Silver Anodize
541 Aluminium daun jendela, sek. YKK Silver Anodize
542 Kusen Alumunium MULLION 6010 powder coating sek. ALEXINDO
543 Kusen Alumunium MULLION 6008 powder coating sek. ALEXINDO
544 Kusen Alumunium TRANSOM 6008 powder coating sek. ALEXINDO
545 Accessories karet Transom
546 Accessories karet Mullion
547 Sealent Alumunium Ke Kaca
548 Sealent Alumunium Ke Tembok
549 Gasket / karet kaca
550 Formika 4 mm 120 x 240
551 Plat Stainles L 2 cm
552 LIST KACA U Stainles L 2 cm
553 Sealant
554 Profil Kaca
555 Profil Alumunium t = 0.5 mm
556 Alumunium Strip /. Apandrel

BAHAN2 KUNCI DAN PENGGANTUNG


557 Kunci Lemari
558 Kunci Silinder
559 Kunci Tanam Besar
560 Kunci Tanam Kecil
561 Path Fitting Deckson US 10 PSS Sek Deckson
562 Handle Pintu Alumunium PH 802 32 x 457 x 300 PSS + SSS Sek. Deckson
563 Floor Hinge FH 84 SSS Sek. Deckson
564 Pull Handle DH DL 801 32 X 600 PSS
565 Pull Handle DH DL 802 32 X 800 X 600 SSS + PSS
566 Pull Handle DH DL 802 32 X 1000 SSS
567 PADLOCK DEKKSON PL 811 46 MM
568 Platfitting PT 10, PT 20 sek Deckson
567 Platfitting PT 40 sek Deckson
568 Selot Pintu DB D02 3" SSS
569 Engsel Pintu ESS DL 5 X 3 X 3 mm 4BB SSS
570 Kunci Pintu MTSL IL DL 84030 SSS
571 Cylinder DEKKSON CYL HC DL 60 MM SN
572 Estucheon ESCN 855 SSS
573 Lever Handle LHTR 0003 SSS
574 Lockset Series KC BL HD 8000 ET SSS CYLINDERICAL
575 Door Closer DCL 300 NHO NA
576 Pull Plate DEKKSON PP 004 AB
577 Panic bar sek. Dorma
578 Engsel pintu SH 7701 CP ( GW )
579 Pull Handle DEKKSON PH DL809 32 X 200 PSS
580 PT 21
581 Engsel jendela ESS DL 3X2.5X2MM 2BB SSS
582 Sliding Rail DEKKSON SR 8901 D4 2M
583 Hinge Dekkson ESS DL 4X3X3MM 2BB SSS
584 SELOT BESI
585 MORTISE LOCK DEKKSON NTS IL DL8672 SSS
586 Cylinder DEKKSON CYL DC DL 70 mm SN
587 ESCUTCHEON DEKKSON ESCN 855 SSS
588 Handle dekkson LHTR 0016 22MM SSS

BAHAN-BAHAN PENUTUP LANTAI


589 Keramik Dinding 20 x 25 cm, Setara ROMAN POLISH
590 Keramik lantai 20 x 20 cm Setara ROMAN Unpolished
591 Keramik 20 x 20 cm Setara ROMAN polished
592 Keramik lantai 30 x 30 cm, Setara ROMAN POLISH
593 Keramik 40 X 40 cm setara ARWANA
594 Keramik 10 x 25 cm (Lis)
595 Keramik 20 x 20 cm
596 Keramik 20 x 25 cm
597 Keramik 7,5 x 20 cm (Lis)
598 Keramik Putih 30 x 30 cm
599 Keramik Warna 40 x 40 cm
600 Keramik Warna 45 x 45 cm
601 Keramik Warna 50 x 50 cm
602 Granit Tile 20 x 20 Sek. Indogres Polish
603 Granit Tile 30 x 30 Sek. Indogres Polish
604 Granit Tile 50 x 50 Sek. Indogress Un Polish
605 Granit Tile 60 x 60 Sek. NIRO GRANITE polished
606 Granit Alam , t = 2 cm
607 Plint Granit Lantai 10/60, Sek. Indogres
608 Granito 60 x 60 (lokal)
609 Granit Lokal
610 Marmer Lampung
611 Marmer Tulungagung
612 Material Pilihan (tras)
613 Plint Keramik Lantai Setara Roman 10/40
614 Floor Hardener Terpasang
615 Stepnoishing tangga Granit 10 x 60
616 Border Keramik 8 x 20
617 Keramik 25 x 25cm sek. Roman
618 Keramik 25 x 50 cm sek. Roman

BAHAN-BAHAN KACA, DAN PANEL


619 GRC 6 mm
620 Accoustic Tile 60x120
621 Gypsum Board 9 mm, Sek. Jayaboard
622 Gysum Knauf
623 Cornice Jaya Board 20kg
624 Cornice A plus 20kg
625 Paku
626 PEMASANGAN GYPSUM
627 ~ Bahan Galvanis (Pemasangan Rata) :
628 ~ Pemasangan Bertingkat :
629 ~ List Gypsum C.7 :
630 Dempul Gypsum
631 Pemasangan dengan bahan Gypsum atau GRC harga tetap sama.
632 Wallpaper
633 Karpet Import
634 Vertikals Blinds
635 Jendela nako lengkap
636 Kaca bening 5 mm
637 Kaca buram 12 mm
638 Kaca Rayband 3 mm
639 Kaca Rayband 5 mm
640 Kaca bening # 3 mm
641 Kaca bening # 5 mm
642 Kaca bening 8 mm ex. Asahi mas
643 Kaca bening 10 mm ex. Asahi mas
644 Kaca tempered 8 mm ex. Asahi mas
645 Kaca Temperate 10 mm sek. Asahi Mas
646 Kaca Temperate 12 mm sek. Asahi Mas
647 Kaca Stopsol 8 MM Dark Grey
648 Kaca 8 MM One Way
649 Kaca Glass Block
650 Kaca cermin 5 mm
651 Sanblast
652 Alumunium Composit panel 4 mm PVDF 0.3 mm sek.SEVEN
653 Rel pintu sorong
654 Profil Allumunium (kaca mati + tutup)
655 Profil Allumunium (Moher / Ram pintu)
656 Profil Allumunium (Motoran+ tutup)
657 Profil Allumunium (Open back + tutup)
658 Profil Allumunium (Ram jendela jungkit)
BAHAN-BAHAN RANGKA DAN PENUTUP ATAP
659 Rangka Atap Baja Ringan sek. 1.2 Truss
660 Atap Bitumen Sek. IKO lengkap accssories underlayer membran bakar
661 Atap Bitumen Sek. IKO lengkap accssories underlayer
662 Pekerjaan Starter, Coveraqqe
662 Pekerjaan Pasangan Flasing 12 mm
663 Lisplank GRC
664 Sunscreen Allumunium
665 Glass Wool
666 Roof mess
667 Aluminium Foil Doble Side
668 Aluminium Tape
669 Asbes Gel. 0.8 x 1.8 m
670 Atap asbes Kecil (150x105)
671 Atap asbes Kecil (180x105}
672 Atap asbes Kecil (210x105)
673 Atap asbes Kecil (240x105)
674 Atap asbes Kecil (270x105)
675 Atap asbes Kecil (300x105)
676 Atap datar zyncalum t = 0.75 mm
677 Asbes plat 100 cm x 100 cm x 5 mm
678 Asbes plat 100 cm x 200 cm x 5 mm
679 Asbes plat 100 cm x 240 cm x 5 mm
ASBES GELOMBANG
680 Merk Djabesmen uk. 1.05
681 Merk Djabesmen uk. 80
682 Asbes gelombang besar uk. 2.5m Lebar 1.05
683 Paku Asbes uk 4"
684 Karet Asbes
SENG GELOMBANG
Tersedia seng gelombang KW 1 Harga

SENG GELOMBANG TRANSFARAN


685 Seng Fiber Gelombang Excel 0,8mm
686 Seng Fiber Polos Econolite
687 Seng Fiber Polos Ozone
688 Seng Polos Motif
689 Seng Gelb. Kecil 0,70 x 1,80 m
690 Seng Gelb. Kecil 0,70 x 2,10 m
691 Seng Gelb. Kecil 0,70 x 2,40 m
692 Seng Gelb. Kecil 0,70 x 3,00 m
693 Seng Talang BJLS 26 lebar 0,60
694 Seng Talang BJLS 26 lebar 0,90
695 Seng Talang BJLS 26 lebar 1,20
696 Genteng Beton Plat
697 Genteng Biasa
698 Genteng Jatiwangi (Glazour)
699 Genteng Jatiwangi (Natural)
700 Genteng Keramik (KIA, M-CLASS, KANMURI)
701 Genteng Kerpus Beton
702 Genteng Kerpus Jatiwangi
703 Genteng Kerpus Keramik
704 Genteng Kerpus Lokal
705 Genteng Kerpus Mantili
706 Genteng Mantili Besar
707 Genteng Mantili Kecil
708 Genteng Pres Kodok

GENTENG METAL
Spesifikasi Sakura Roof
Sakura Roof Merpati / Jazz dengan ketebalan 0.25mm -
Sakura Roof Crystal dengan ketebalan (0.25mm &0.30mm)

1 Meter Persegi ;
Lebar Efektif ;
Panjang Efektif ;
Tebal ;
Jarak Reng ;
Jarak Kaso ;

709 Sakura Roof uk. 80x70 1,62/m2 (Type Kristal)


710 (Type Merpati)
711 Surya Roof Pasir
Spesifikasi Surya Roof
Type Classic
1 Meter Persegi
Lebar Efektif =
Panjang Efektif =
Tebal =
Jarak Reng =
Jarak Kaso =

712 Multi Roof Pasir


Spesifikasi Multi Roof
Type Classic = 2x5 (10 Daun)
1 Meter Persegi = 1,3 Lembar
Lebar Efektif = 1000mm
Panjang Efektif = 770mm
Tebal = 0,40mm
713 Jarak Reng = 385mm
714 Soka Roof
715 Ocean Roof Pasir Soka Roof
716 Prima Roof Pasir
717 Global Roof

GENTENG KERAMIK

Tersedia : Genteng Morando, KANMURI, M-CLASS.


Pengurangan harga tergantung Quantity
Morando Glasur ( 9 pcs/m2 )
718 Noc Atas Glasur
719 Noc Samping Glasur

BAHAN-BAHAN SANITARI
720 Kran Air lokal
721 Kran Sink
722 Kran Bak Air
723 Bak Cuci piring 1 lobang stainless steel komplit standard ( Sink )
724 Bak Cuci Stainlessteel lokal
725 Bak Fiberglass (1 m3)
726 Bak Air Lapis Keramik
727 Tissue Holder (AW 360)
728 Waterproofing Coating
729 Waterproofing sheet terpasang
730 Closet duduk lengkap Setara TOTO
731 Closet Jongkok Setara TOTO
732 Closet Duduk Porselin (manual)
733 Closet Jongkok Porselin
734 Wastafel , Sek TOTO
735 Wastafel Besar
736 Wastafel Kecil
737 Roof drain dia. 4" + Saringan
738 Roof drain dia. 3"+ Saringan
739 Tempat Sabun
740 Jet Washer
740 Cove Lampu Di atas Wastafel ( tidak termasuk lampu )
741 Shower Tray
741 Shower Curtain
742 Shower Hand
742 Kran Shower Tray
743 Kran Wastafel
743 Floor Drain
744 Urinoar mono block
744 Urinoir
745 Sekat Urinoar sek. TOTO
745 Soaltipe
746 Tangki Air fiber glass 2.000 lt (Pinguin)

BAHAN PANEL, RAK & KABEL ( ELEKTRIKAL )


746 Panel LP-B1-1/B1-2
747 Panel PP-B1-1/B1-2
748 Panel PP-B1-AC1/B1-AC2
749 Panel SDP-B-1/B-2
750 Kabel NYFGbY 4x25 mm2
751 Kabel NFGbYY 4x240 mm2
752 Kabel NFGbYY 4x50 mm2
753 Kabel NFGbYY 4x95 mm2
754 Kabel NYY 2x4 mm2
755 Kabel NYY 3x4 mm2
756 Kabel NYY 4x4 mm2
757 Kabel NYY 4x6 mm2
758 Kabel NYY 4x10 mm2
759 Kabel NYY 4x16 mm2
760 Kabel NYY 4x25 mm2
761 Kabel NYY 4x70 mm2
762 Kabel NYM 3x4 mm2
763 Kabel NYM 3x2.5 mm2
764 kabel tray ukuran 300x100 mm
765 elbow ukuran 300x100 mm
766 tee ukuran 300x100 mm
767 Ladder
768 TL 2x 36 watt RMO 300 ( M2 TYPE )
769 TL 2x 18 watt RMO 300 ( M2 TYPE )
770 Lampu wastafel 1x 8 watt
771 Downlight LED 10 watt RD 100 ( DL)
772 Downlight LED 10 watt RD 150 ( warm light)
773 Lampu exit
774 Down light ekpose LED 10 watt
775 Stop kontak tunggal
776 Stop klontak ganda
777 Stop kontak ganda lantai type
778 Instalasi Penerangan dalam konduit
779 Instalasi Stop kontak dalam konduit
780 Saklar Tunggal
781 saklar ganda
782 Saklar grid 8 module
783 Lp. sorot HPI-T 400 w ke dinding lengkap dudukan ,pengaman serta instalasinya
784 PJU LED 50 WATT + tiang galvanized type Octagonal 7 meter single lengkap pondasi
785 GL TOP ACR TRP E27 8 LED 10 W ( Warm light) + tiang galvanized type bulat single 7 m lengkap dud
786 pondasi
Saklar ganda 10A
787 Saklar Triple 10A
788 Saklar hotel 10A
789 Outlet Telepon
790 Box Panel
791 MCCB 100-225A 3Ph 220/380V 50HZ 143KA + motor mechanism
792 MCCB 100-225 A 3P 220/380V 50HZ 65 KA
793 MCB 20 A 3P 220/380V 50HZ 25 KA
794 MCB 16 A 3P 220/380V 50HZ 25 KA
795 MCB 32 A 3P 220/380V 50HZ 25 KA
796 MCB 40 A 3P 220/380V 50HZ 25 KA
797 MCB 63 A 3P 220/380V 50HZ 25 KA
798 Indicator Lamp + Fuse
799 Amper Meter
800 Volt Meter
801 Selector Switch
802 KWH Meter,Lengkap dengan CT dan PT
803 KWH Meter,Lengkap dengan CT dan PT
804 Chosphi meter
805 Arester
806 Busbar CU (20 x3 mm)
807 Instalasi telepon dalam pipa PVC dia 5/8"
808 Instalasi penerangan & Stop Kontak dalam pipa PVC dia.3/4"
809 Instalasi stop kontak AC dalam pipa PVC dia.3/4"
810 Pesawat telepon
811 TBT-1
812 TBT-2
813 Rate of rise temperature heat detector
814 Luminous Fire Alarm
815 Break Glass
816 Fire alarm bell
817 TBF-1, 2, 3
818 Kabel NYY 5x2,5mm2
819 Fixed temperature heat detector

BAHAN2 PIPA-PIPA/ MEKANIKAL


820 Pipa GIP Med A 50 mm (2")
821 Pipa GIP Med A 65 mm (2 1/2")
822 Pipa GIP Med A 100 mm (4")
823 Pipa GIP Med A 1 1/2"
824 Pipa BSP dia 1 1/2"
825 Pipa BSP dia 2 1/2"
826 Pipa BSP dia 3"
827 Pipa BSP dia 4"
828 Pipa Galvanis ø 1/2"
829 Pipa Galvanis ø 3/4"
830 Pipa Galvanis ø 1"
831 Pipa Galvanis ø 1 1/2"
832 Pipa Galvanis ø 2"
833 Pipa Stainless Steel Ø 2"
834 Pipa Stainless Steel Ø 1 1/2"
835 Pipa Stainless Steel Ø 1"
836 Pipa PP Dia 3/4"
837 Pipa PP Dia 2"
838 Pipa PP Dia 1/2"
839 Pipa PP Dia 1"
840 Pipa PP Dia 1 1/2"
841 Gate Valve Dia 2" (screw type)
842 Gate Valve Dia 2 1/2" 10 K (screw type)
843 Gate Valve Dia 2 1/2" 20 K (flange type)
844 Gate Valve Dia 3 " 10 K (flange type)
845 Gate Valve Dia 4 " 10 K (flange type)
846 Gate Valve Dia 6 " 10 K (flange type)
847 Gate Valve Dia 1/2" (screw type)
848 Gate Valve Dia 3/4" (screw type)
849 Gate Valve Dia 1" (screw type)
850 Gate Valve Dia 1 1/2" (screw type)
851 Gate Valve Dia 1 1/4" (screw type)
852 Pipa PVC AW 10 K Dia 150/ 6"
853 Pipa PVC AW 10 K Dia 125/ 5"
854 Pipa PVC AW 10 K Dia 100/ 4"
855 Pipa PVC AW 10 K Dia 50/ 2"
856 Pipa PVC AW 10 K Dia 25/ 1"
857 Pipa PVC AW 10 K Dia 1 1/2"
858 Pipa PVC AW 10 K Dia 75/ 3"
859 Pipa PVC AW 10 K Dia 1 1/4"
860 Pipa PVC AW 10 K Dia 3/4"
861 Pipa PVC AW 10 K Dia 1/2"
862 Pipa PVC Maspion tipe AW ø 1/2"
863 Pipa PVC Maspion tipe AW ø 3/4"
864 Pipa PVC Maspion tipe AW ø 1"
865 Pipa PVC Maspion tipe AW ø 1 1/4"
866 Pipa PVC Maspion tipe AW ø 1 1/2"
867 Pipa PVC Maspion tipe AW ø 2"
868 Pipa PVC Maspion tipe AW ø 2 1/2"
869 Pipa PVC Maspion tipe AW ø 3"
870 Pipa PVC Maspion tipe AW ø 4"
871 Pipa PVC Maspion tipe AW ø 5"
872 Pipa PVC Maspion tipe AW ø 6"
873 Pipa PVC Wavin tipe AW ø 1/2"
874 Pipa PVC Wavin tipe AW ø 3/4"
875 Pipa PVC Wavin tipe AW ø 1"
876 Pipa PVC Wavin tipe AW ø 1 1/4"
877 Pipa PVC Wavin tipe AW ø 1 1/2"
878 Pipa PVC Wavin tipe AW ø 2"
879 Pipa PVC Wavin tipe AW ø 2 1/2"
880 Pipa PVC Wavin tipe AW ø 3"
881 Pipa PVC Wavin tipe AW ø 4"
882 Pipa Tiang BRC 90 - 2"
883 Pipa Tiang BRC 120 - 2"
884 Tee PVC AW Dia 6"x4" (900)
885 Tee PVC AW 10 K Dia 4" (900)
886 Tee PVC AW 10 K Dia 3" (450)
887 Tee PVC AW Dia 2 1/2" (900)
888 Tee PVC AW 10 K Dia 2" (900)
889 Tee PVC D Dia 1 1/4 (900)
890 Socket PVC AW Dia 6"
891 Socket PVC AW 10 K Dia 4"
892 Socket PVC AW 10 K Dia 3" (450)
893 Socket PVC AW Dia 2 1/2" (900)
894 Socket PVC D Dia 2"
895 Pipa Tembaga Dia 1/4" + Isolasi ( Armaflex )
896 Pipa Tembaga Dia 1" + Isolasi ( Armaflex )
897 Pipa Tembaga Dia 3/4" + Isolasi ( Armaflex )
898 Elbow PVC AW Dia 6" (900)
899 Elbow PVC AW 10 K Dia 4" (900)

BAHAN/PERLATAN PENUNJANG
900 Tie Rod Dia 16 lengkap ring & mur
901 Wall stud 64 mm
902 Wall track mead 64
903 Cross Tee
904 Wall track bottom
905 Pipe Support (sewa)
906 Sewa Kontainer 20 feet
907 Sewa Pagar pengaman sementara
908 Sewa Unit Drop Hammer
909 unit rangka scapmoulding t = 90 cm
910 Sewa Alat (Crane)
911 Cat walk
912 Jack base
913 Sewa Exavator 0.90 m3+ opertor
914 Sewa Buldozer
915 Sewa Water tank Truck
916 Sewa Roller Vibro
917 Sewa Dump Truck
918 Sewa Katrol baja
919 Tandem Roller
920 Aspalt Sprayer
921 Compressor
922 Aspalt Finisher
923 P. Tyre Roller
924 Sewa Walls
HARGA BAHAN DAN UPAH
Harga Satuan Bahan
han
Termasuk Keuntungan

Rp. 120,000.00 per M3


Rp. 31,200.00 per m
3
Rp. 70,000.00 per m
3
Rp. 60,000.00 per m
3
Rp. 200,000.00 per m
3
Rp. 114,000.00 per M3
Rp. 117,000.00 per M3
Rp. 110,000.00 per M3
Rp. 135,000.00 per M3
Rp. 130,000.00 per M3
Rp. 39,000.00 per M3
Rp. 195,000.00 per M3

Rp. 195,000.00 per M3


Rp. 180,000.00 per M3
Rp. 140,000.00 per M3
Rp. 326,000.00 per M3
Rp. 170,000.00 per M3
Rp. 360,000.00 per m
3
Rp. 1,000.00 per kg
Rp. 341,200.00 per M3
Rp. 420,000.00 per M3
Rp. 175,000.00 per M3
Rp. 202,600.00 per M3
Rp. 90,000.00 per M3
Rp. 135,000.00 per M3
Rp. 154,000.00 per m
3
Rp. 65,000.00 per m
3
Rp. 7,500.00 per kg

Rp. 450,000.00 per M3


Rp. 550,000.00 per M3
Rp. 560,000.00 per M3

Rp. 129,000.00 per M3


Rp. 114,000.00 per M3
Rp. 185,000.00 per M3
Rp. 156,200.00 per m
3
Rp. 200,000.00 per m
3
Rp. 25.00 per ltr
ng jarak tempuh pengiriman.
60,000.00 Rp. 1,200.00 per kg
78,000.00 Rp. 1,950.00 per kg
48,000.00 Rp. 1,200.00 per kg
Rp. 1,950.00 per kg
Rp. 60,000.00 per zak
Rp. 75,000.00 per zak
Rp. 1,500.00 per kg
Rp. 53,300.00 per zak
Rp. 56,000.00 per zak
Rp. 1,150.00 per kg
Rp. 1,060.00 per kg
Rp. 3,000.00 per kg
Rp. 42,300.00 per zak
Rp. 52,900.00 per zak
Rp. 150,000.00 per zak
Rp. 8,500.00 per ltr
Rp. 5,000.00 per ltr
Rp. 15,000.00 per kg
Rp. 1,500,000.00 per ton
Rp. 60,000.00 per hr
Rp. 9,500.00 per hr
Rp. 6,750.00 per ltr
Rp. 14,000.00 per Kg
Rp. 14,000.00 per Kg
Rp. 1,200,000.00 per Ton
Rp. 500.00 per Bh
Rp. 1,200.00 per Bh
Rp. 6,400.00 per Bh
Rp. 2,500.00 per Bh
Rp. 5,700.00 per Bh
Rp. 208,000.00 per M3
Rp. 200,000.00 per M3
Rp. 200,000.00 per M3
Rp. 147,500.00 per M3
Rp. 70,000.00 per M3
Rp. 181,250.00 per M3
Rp. 198,300.00 per m3
Rp. 242,500.00 per m3
Rp. 560,000.00 per M3
Rp. 486,956.52 per M3
Rp. 486,956.52 per M3
Rp. 210,000.00 per M3
Rp. 100,000.00 per m
3
Rp. 35,000.00 per m
3
Rp. 30,000.00 per m
3
Rp. 60,000.00 per m
3
Rp. 250,000.00 per m2
Rp. 77,000.00 per m2
Rp. 150,000.00 per m2
Rp. 140,000.00 per m2
Rp. 132,000.00 per m2

Rp 78,000.00 per m2
Rp 117,000.00 per m2
Rp 120,000.00 per m2
Rp 100,000.00 per m2
Rp 127,500.00 per m2
Rp 56,000.00 per m2
Rp 120,000.00 per m2
Rp 130,000.00 per m2
Rp 107,500.00 per m2
Rp. 75,000.00 per m2
Rp. 42,000.00 per m1
Rp. 46,500.00 per m1
Rp 400,000.00 per bh
Rp 51,200.00 per bh
Rp 50,000.00 per bh
Rp 83,000.00 per bh
Rp 85,000.00 per bh
Rp 110,000.00 per bh
Rp 143,300.00 per bh
Rp 151,600.00 per bh
Rp 223,300.00 per bh
Rp 25,000.00 per bh
Rp 35,000.00 per bh
Rp 50,000.00 per bh
Rp. 45,000.00 per Bh
Rp. 175,000.00 per m2
Rp. per m
2
Rp. 84,000.00 per m
2
Rp. per m
2
Rp. 115,000.00 per m
2
Rp. 163,000.00 per m
2
Rp. 50,000.00 per m
2
Rp. 62,000.00 per m
2
Rp. 66,850.00 per m
2
Rp. 71,700.00 per m
2
Rp. 78,000.00 per m
2
Rp. 84,000.00 per m
2
Rp. 107,000.00 per m
2
Rp. 115,000.00 per m
2
Rp. 127,000.00 per m
2
Rp. 33,000.00 per m'
Rp. 36,000.00 per m'
Rp. 46,500.00 per m'
Rp. 50,500.00 per m'
Rp. 27,500.00 per m'
Rp. 30,000.00 per m'
Rp. 46,500.00 per m'
Rp. 47,500.00 per m'
Rp. 650,000.00 per M3
Rp. 750,000.00 per M3
Rp. 315,000.00 per m1
Rp. 16,500.00 per m1
Rp. 6,050,000.00 per unit
Rp. 50,000.00 per ttk
Rp. 562,500.00 per m2
Rp. 795,000.00 per m2

Rp. 12,500,000.00 per m3


Rp. 168,000.00 per btg
Rp. 115,000.00 per btg
Rp. 72,000.00 per btg
Rp. 450,000.00 per pak
Rp. 600,000.00 per pak
Rp. 21,000,000.00 per m
3
Rp. 2,100,000.00 per m
3
Rp. 50,000.00 per btg
Rp. 7,000,000.00 per m
3
Rp. 2,750,000.00 per m
3
Rp. 8,300.00 per lbr

bt Rp. 5,700,000.00 per m3


bt Rp. 5,700,000.00 per m3
Rp. 5,700,000.00 per m3
Rp. 5,700,000.00 per m3
Rp. 48,048.00 per m'

Rp. 3,125,000.00 per m3


Rp. 3,125,000.00 per m3
Rp. 3,125,000.00 per m3
Rp. 5,700,000.00 per m3
Rp. 5,700,000.00 per m3
Rp. 140,000.00 per m
3
Rp. 8,875,000.00 per m
3
Rp. 9,400,000.00 per m
3
Rp. 240,000.00 per pak
Rp. 343,700.00 per pak
Rp. 40,000.00 per btg
Rp. 59,300.00 per btg
Rp. 100,000.00 per btg
Rp. 6,333,300.00 per m
3
Rp. 6,766,600.00 per m
3
Rp. 210,000.00 per pak
Rp. 280,000.00 per pak
Rp. 30,700.00 per btg
Rp. 49,500.00 per btg
Rp. 82,500.00 per btg
Rp. 275,000.00 per m'
Rp. 1,600,000.00 per m3
Rp. 1,600,000.00 per m3
Rp. 1,600,000.00 per m3
Rp. 1,600,000.00 per m3

btg Rp. 3,125,000.00 per m3


btg Rp. 3,125,000.00 per m3
btg Rp. 3,125,000.00 per m3
btg Rp. 3,125,000.00 per m3
Rp. 3,125,000.00 per m3
Rp. 10,000.00 per btg
Rp. 25,000.00 per btg

Rp. 48,500.00 per Lbr


Rp. 81,000.00 per Lbr
Rp. 200,000.00 per Lbr
Rp. 103,000.00 per Lbr
Rp. 80,000.00 per Lbr
Rp. 124,000.00 per Lbr
Rp. 118,000.00 per Lbr
Rp. 128,000.00 per Lbr
Rp. 133,000.00 per Lbr
Rp. 165,000.00 per Lbr
Rp. 210,000.00 per Lbr
Rp. 250,000.00 per Lbr
Rp. 216,000.00 per Lbr

Rp. 120,000.00 per Lbr


Rp. 162,000.00 per Lbr

Rp 87,000.00 per Lbr


Rp. 150,000.00 per Lbr
Rp. 168,000.00 per Lbr
Rp. 9,500.00 per m1
Rp. 10,500.00 per m1
Rp. 12,000.00 per m1
Rp. 12,000,000.00 per m4

Rp 65,000.00 Per lbr


Rp 90,000.00 Per lbr
Rp 128,000.00 Per lbr
Rp 183,000.00 Per lbr
Rp 264,000.00 Per lbr
Rp 420,000.00 Per lbr

Rp 27,000.00 Per lbr


Rp 45,000.00 Per lbr
Rp 60,000.00 Per lbr
Rp 35,000.00 Per lbr
Rp 55,000.00 Per lbr
Rp 75,000.00 Per lbr

Rp 45,000.00 Per lbr


Rp 55,000.00 Per lbr
Rp 48,000.00 Per lbr

Rp 68,000.00 Per sak


Rp 70,000.00 Per sak
Rp 25,000.00 Per kg

Rp 73,000.00 Per lbr


Rp 76,000.00 Per lbr
Rp 71,000.00 Per lbr

Rp 135,000.00 Per m
Rp 145,000.00 Per m
Rp 25,000.00 Per m

Rp 17,200.00 Per m
2
Rp 4,000.00 Per m'
Rp 3,200.00 Per m'
Rp 3,700.00 Per m'
Rp 17,500.00 Per lbr
Rp 20,000.00 Per lbr
Rp 22,500.00 Per lbr
Rp 25,000.00 Per lbr

Rp. 26,400.00 per kg


Rp. 38,300.00 per kg
Rp. 19,200.00 per Kg
Rp. 402,000.00 per dos
Rp. 25,000.00 per Kg
Rp. 20,000.00 per Kg
Rp. 33,600.00 per Kg
Rp. 30,000.00 per Kg
Rp. 32,400.00 per Kg
150,000.00 m
2
Rp. 30,000.00 per Kg
Rp. 12,000.00 per dos
Rp. 84.00 per pcs
Rp. 60,000.00 per Kg
Rp. 16,500.00 per Kg
Rp. 16,000.00 per Kg
Rp. 14,000.00 per bh
Rp. 47,200.00 per bh
Rp. 15,000.00 per Kg
Rp. 13,500.00 per
Rp. 13,000.00 per Kg
Rp. 13,500.00 per kg
Rp. 14,200.00 per m'
Rp. 6,000.00 per m'
Rp. 12,000.00 per kg
Rp. 11,000.00 per m'
Rp. 35,000.00 per kg
Rp. 20,000.00 per kg
Rp. 30,000.00 per kg
Rp. 9,250.00 per Kg
Rp. 8,250.00 per Kg
Rp. 11,000.00 per Kg
Rp. 12,500.00 per kg

Rp. 17,500.00 per btg


Rp. 30,000.00 per btg
Rp. 38,750.00 per btg
Rp. 53,750.00 per btg
Rp. 50,000.00 per btg
Rp. 77,500.00 per btg
Rp. 75,000.00 per btg
Rp. 62,500.00 per btg
Rp. 116,250.00 per btg
Rp. 112,500.00 per btg
Rp. 85,000.00 per btg
Rp. 146,250.00 per btg
Rp. 135,000.00 per btg
Rp. 218,750.00 per btg
Rp. 225,000.00 per btg
Rp. 183,750.00 per btg
Rp. 310,000.00 per btg
Rp. 20,000.00 per kg
Rp. 418,750.00 per roll
Rp. 15,000.00 per kg
Rp. 15,000.00 per kg
Rp 315,000.00 per lbr
Rp 446,250.00 per lbr
Rp 617,500.00 per lbr
Rp 800,625.00 per lbr
Rp 1,260,000.00 per lbr
Rp 90,000.00 per m
2

6,000,000.00 per pcs


Rp. 110,000.00 per m2
Rp. 27,500.00 per Kg
Rp. 32,500.00 per Kg
Rp. 6,000.00 per m1
Rp. 2,100.00 per Bh
Rp. 200.00 per bh.
Rp. 37,000.00 per Lbr
Rp. 52,000.00 per M1
Rp. 3,000.00 per bh
Rp. 6,000.00 per bh
Rp. 31,200.00 per bh
Rp. 32,000.00 per m'
Rp. 30,000.00 per m'
Rp. 9,000.00 per M1
Rp. 15,666.67 per M1
Rp. 15,000.00 per M1
Rp. 15,000.00 per M1
Rp. 21,000.00 per M1
Rp. 15,000.00 per ls
Rp. 25,000.00 per kg
Rp. 20,000.00 per M1
Rp. 28,000.00 per M1
Rp. 11,500.00 per M1
Rp. 9,400.00 per M1
Rp. 164,500.00 per lbr
Rp. 163,900.00 per lbr
Rp. 4,600.00 per m'
Rp. 5,000.00 per m'
Rp. 7,000.00 per m'
Rp. 9,100.00 per m'
Rp. 24,500.00 per bh
Rp. 450,000.00 per m
2
Rp. 650,000.00 per m
2
Rp. 300,000.00 per m
2
Rp. 13,500.00 per kg
Rp. 35,000.00 per tube
Rp. 2,700.00 per bh
Rp. 1,200.00 per bh
Rp. 500.00 per bh
Rp. 400.00 per bh
Rp. 7,500.00 per bh
Rp. 7,500.00 per bh
Rp. 10,000.00 per bh
Rp. 20,000.00 per bh
Rp. 50,000.00 per bh
Rp. 500,000.00 per m
2
Rp. 575,000.00 per m
2
Rp. 650,000.00 per m
2
Rp. 90,000.00 per lbr
Rp. 34,000.00 per m'
Rp. 15,000.00 per m
2
Rp. 8,000.00 per bh
Rp. 9,800.00 per bh

Rp. 6,000.00 per Lbr


Rp. 4,000.00 per lbr
Rp. 4,000.00 per lbr
Rp. 4,000.00 per lbr
Rp. 4,000.00 per lbr
Rp. 4,000.00 per lbr
Rp. 29,000.00 per ltr
Rp. 28,000.00 per Ltr
Rp. 23,000.00 per Ltr
Rp. 17,000.00 per Ltr
Rp. 10,000.00 per Ltr
Rp. 8,500.00 per Ltr
Rp. 28,500.00 per Ltr
Rp. 10,300.00 per kg
Rp. 42,500.00 per Kg
Rp. 29,000.00 per Kg
Rp. 29,000.00 per Kg
Rp. 31,000.00 per Kg
Rp. 25,000.00 per Kg
Rp. 92,500.00 per Kg
Rp. 22,000.00 per Kg
Rp. 32,500.00 per Kg
Rp. 27,500.00 per kg
150,000.00 kg
15,000.00 kg
Rp. 26,000.00 per Kg
Rp. 30,000.00 per Kg
Rp. 64,700.00 per kg
Rp. 50,000.00 per kg
Rp. 51,000.00 per kg
Rp. 59,000.00 per kg
Rp. 39,100.00 per kg
Rp. 22,000.00 per kg
Rp. 18,000.00 per kg
Rp. 70,000.00 per kg
Rp. 35,500.00 per kg
Rp. 25,000.00 per kg
Rp. 100,000.00 per kg
Rp. 34,000.00 per Kg
Rp. 33,500.00 per Kg
Rp. 70,000.00 per Kg
Rp. 55,000.00 per Kg
Rp. 48,500.00 per Kg
Rp. 55,000.00 per Kg
Rp. 95,000.00 per Kg
Rp. 90,000.00 per Kg
Rp. 30,000.00 per Ltr
Rp. 10,000.00 per bh
Rp. 25,000.00 per bh
Rp. 35,000.00 per kg
Rp. 50,000.00 per kg
Rp. 65,000.00 per kg
Rp. 10,000.00 per kg
Rp. 33,000.00 per kg
Rp. 47,600.00 per kg

16,000.00 m'
Rp. 160,000.00 per m'
Rp. 180,000.00 per m'
Rp. 160,000.00 per m'
Rp. 85,000.00 per m'
Rp. 35,000.00 per m'
Rp. 65,000.00 per m'
Rp. 5,000.00 per m'
Rp. 15,000.00 per m'
Rp. 4,000.00 per M'
Rp. 4,000.00 per M'
Rp. 4,000.00 per M'
Rp. 120,000.00 per lbr
Rp. 45,000.00 per M'
Rp. 75,000.00 per M'
Rp. 45,000.00 per tube
Rp. 50,000.00 per m1
Rp. 68,000.00 per m2
Rp. 270,000.00 per m2

Rp. 10,800.00 per bh


Rp. 150,000.00 per bh
Rp. 112,500.00 per bh
Rp. 84,000.00 per bh
Rp. 1,200,000.00 per Bh
Rp. 762,500.00 per set
Rp. 1,800,000.00 per Bh
Rp. 868,400.00 per Bh
Rp. 1,280,900.00 per Bh
Rp. 1,576,300.00 per Bh
Rp. 569,250.00 per Bh
Rp. 631,500.00 per Bh
Rp. 1,050,000.00 per Bh
Rp. 54,500.00 per Set
Rp. 199,000.00 per Bh
Rp. 225,000.00 per Bh
Rp. 130,000.00 per Set
Rp. 46,450.00 per Bh
Rp. 254,000.00 per Bh
Rp. 239,000.00 per Bh
Rp. 412,500.00 per Bh
Rp. 167,500.00 per Bh
Rp. 3,450,000.00 per Bh
Rp. 781,500.00 per Bh
Rp. 937,500.00 per Bh
Rp. 86,500.00 per Bh
Rp. 65,000.00 per Bh
Rp. 625,000.00 per Bh
Rp. 180,000.00 per Bh
Rp. 116,500.00 per Bh
Rp. 380,000.00 per Bh
Rp. 167,500.00 per Bh
Rp. 46,500.00 per Bh
Rp. 266,500.00 per Bh

Rp. 65,000.00 per m2


Rp. 75,000.00 per m2
Rp. 65,000.00 per m2
Rp. 60,000.00 per m2
Rp. 60,000.00 per m2
Rp. 4,500.00 per bh
Rp. 53,000.00 per doos
Rp. 2,600.00 per bh
Rp. 7,800.00 per bh
Rp. 39,100.00 per doos
Rp. 8,100.00 per bh
Rp. 13,000.00 per bh
Rp. 17,300.00 per bh
Rp. 165,000.00 per M2
Rp. 195,000.00 per M2
Rp. 285,000.00 per M2
Rp. 185,000.00 per M2
Rp. 1,680,000.00 per M2
Rp. 10,333.33 per Bh
Rp. 125,000.00 per m
2
Rp. 125,000.00 per m
2
Rp. 1,300,000.00 per bh
Rp. 850,000.00 per bh
Rp. 200,000.00 per m
3
Rp. 15,000.00 per Bh
Rp. 60,000.00 per Kg
Rp. 25,500.00 per Bh
Rp. 10,000.00 per Bh
Rp. 90,000.00 per m2
Rp. 122,500.00 per m2

Rp. 75,000.00 per lbr


Rp. 94,500.00 per lbr
Rp. 76,000.00 per lbr
Rp. 71,000.00 per lbr
Rp. 68,000.00 per zak
Rp. 70,000.00 per zak
Rp. 25,000.00 per kg

Rp 135,000.00 per m
Rp 145,000.00 per m
Rp 25,000.00 per m
Rp 3,250.00 per kg

Rp. 73,000.00 per m2


Rp. 403,000.00 per m2
Rp. 377,000.00 per m2
Rp. 75,000.00 per daun
Rp. 90,000.00 per M2
Rp. 125,000.00 per M2
Rp. 85,000.00 per M2
Rp. 100,000.00 per M2
Rp. 70,000.00 per M2
Rp. 75,000.00 per M2
Rp. 230,000.00 per M2
Rp. 290,000.00 per M2
Rp. 435,000.00 per M2
Rp. 510,000.00 per M2
Rp. 585,000.00 per M2
Rp. 875,000.00 per M2
Rp. 550,000.00 per M3
Rp. 26,500.00 per bh
Rp. 125,000.00 per m2
Rp. 130,000.00 per M2
Rp. 363,000.00 per M2
Rp. 200,000.00 per set
Rp. 66,700.00 per m'
Rp. 68,650.91 per m'
Rp. 71,441.82 per m'
Rp. 74,232.73 per m'
Rp. 77,023.64 per m'

Rp. 185,000.00 per M2


Rp. 450,000.00 per m2
Rp. 315,000.00 per m2
Rp. 30,000.00 per m1
Rp. 35,000.00 per M4
Rp. 22,000.00 per m'
Rp. 10,000.00 per m
2
Rp. 350,000.00 per rol
Rp. 400,000.00 per rol
Rp. 3,000,000.00 per rol
Rp. 375,000.00 per rol
Rp. 57,000.00 per lbr
Rp. 45,000.00 per lbr
Rp. 50,200.00 per lbr
Rp. 60,000.00 per lbr
Rp. 65,000.00 per lbr
Rp. 75,000.00 per lbr
Rp. 85,000.00 per lbr
Rp. 125,000.00 per m2
Rp. 17,600.00 per bh
Rp. 47,000.00 per bh
Rp. 49,500.00 per bh

Rp 13,125.00 Per lbr


Rp 8,125.00 Per lbr
Rp 143,750.00 Per lbr
Rp 56,250.00 Per lbr
Rp 87.50 lbr
-
Rp 8,000.00 Per lbr

Rp 12,500.00 per lbr


Rp 37,500.00 per lbr
Rp 25,000.00 per lbr
Rp 31,250.00 per lbr
Rp 46,500.00 per lbr
Rp 55,500.00 per lbr
Rp 63,200.00 per lbr
Rp 75,000.00 per lbr
Rp 36,000.00 per m'
Rp 26,500.00 per m'
Rp 35,000.00 per m'
Rp 6,000.00 per bh
Rp 800.00 per bh
Rp 4,200.00 per bh
Rp 3,200.00 per bh
Rp 10,500.00 per bh
Rp 20,000.00 per bh
Rp 10,000.00 per bh
Rp 25,000.00 per bh
Rp 4,000.00 per bh
Rp 4,300.00 per bh
Rp 1,800.00 per bh
Rp 1,400.00 per bh
Rp 1,300.00 per bh
Sakura Roof

Rp 41,250.00 Per lbr


Rp 42,500.00 Per lbr
Rp 85,000.00 Per lbr

Surya Roof Pasir

Rp 122,500.00 per lbr

Rp 78,750.00 per lbr


Soka Roof Rp 56,250.00 per lbr
Rp 67,500.00 per lbr
Rp 37,500.00 per lbr

Rp 9,500.00 per pcs


Rp 9,500.00 per pcs

Rp. 15,300.00 per bh


Rp. 262,500.00 per Bh
Rp. 225,000.00 per Bh
Rp. 446,500.00 per unit
Rp. 168,700.00 per bh
Rp. 175,000.00 per bh
Rp. 475,000.00 per Bh
Rp. 312,000.00 per Bh
Rp. 65,000.00 per M2
Rp. 125,000.00 per M2
Rp. 2,900,000.00 per Bh
Rp. 900,000.00 per Bh
Rp. 450,000.00 per bh
Rp. 133,700.00 per bh
Rp. 1,200,000.00 per Bh
Rp. 396,600.00 per Bh
Rp. 350,000.00 per Bh
Rp. 125,000.00 per Bh
Rp. 110,000.00 per Bh
Rp. 110,000.00 per Bh
Rp. 240,000.00 per Bh
Rp. 230,500.00 per Bh
Rp. 415,000.00 per Bh
Rp. 420,000.00 per Bh
Rp. 525,000.00 per Bh
Rp. 225,000.00 per Bh
Rp. 95,000.00 per Bh
Rp. 342,000.00 per Bh
Rp. 2,250,000.00 per Bh
Rp. 550,000.00 per bh
Rp. 900,000.00 per Bh
Rp. 5,000.00 per Bh
Rp. 3,100,000.00 per bh

Rp. 4,750,000.00 per Unit


Rp. 7,750,000.00 per Unit
Rp. 3,750,000.00 per Unit
Rp. 13,500,000.00 per Unit
Rp. 145,500.00 per m
Rp. 1,155,500.00 per m
Rp. 252,500.00 per m
Rp. 275,000.00 per m
Rp. 13,750.00 per m
Rp. 18,500.00 per m
Rp. 22,650.00 per m
Rp. 110,000.00 per m
Rp. 160,000.00 per m
Rp. 180,000.00 per m
Rp. 195,000.00 per m
Rp. 235,000.00 per m
Rp. 45,300.00 per m
Rp. 32,700.00 per m
Rp. 149,000.00 per m
Rp. 230,400.00 per bh
Rp. 230,400.00 per bh
Rp. 172,000.00 per m
Rp. 895,000.00 per bh
Rp. 532,000.00 per bh
Rp. 450,000.00 per bh
Rp. 306,000.00 per bh
Rp. 326,000.00 per bh
Rp. 1,293,000.00 per bh
Rp. 437,000.00 per bh
Rp. 75,000.00 per bh
Rp. 125,000.00 per bh
Rp. 350,000.00 per bh
Rp. 250,000.00 per bh
Rp. 260,000.00 per bh
Rp. 75,000.00 per bh
Rp. 125,000.00 per bh
Rp. 450,000.00 per bh
Rp. 2,500,000.00 per bh
eter single lengkap pondasi Rp. 10,439,000.00 per bh
alvanized type bulat single 7 m lengkap dudukan Rp. 6,831,000.00 per bh
Rp. 260,000.00 per bh
Rp. 42,500.00 per bh
Rp. 55,500.00 per bh
Rp. 150,000.00 per bh
Rp. 1,800,000.00 per bh
Rp. 4,250,000.00 per bh
Rp. 3,750,000.00 per bh
Rp. 370,500.00 per bh
Rp. 360,200.00 per bh
Rp. 385,500.00 per bh
Rp. 397,300.00 per bh
Rp. 410,000.00 per bh
Rp. 59,000.00 per set
Rp. 49,500.00 per set
Rp. 48,500.00 per set
Rp. 115,000.00 per Bh
Rp. 1,215,500.00 per set
Rp. 1,453,000.00 per unit
Rp. 1,660,000.00 per Bh
Rp. 3,385,000.00 per Bh
Rp. 200,000.00 per Bh
Rp. 175,000.00 per titik
Rp. 150,000.00 per titik
Rp. 145,000.00 per titik
Rp. 485,000.00 per Bh
Rp. 275,000.00 per unit
Rp. 295,000.00 per unit
Rp. 385,000.00 per Bh
Rp. 525,000.00 per Bh
Rp. 350,000.00 per Bh
Rp. 475,000.00 per Bh
Rp. 345,000.00 per unit
Rp. 15,000.00 per m
Rp. 585,000.00 per Bh

Rp. 76,800.00 per m'


Rp. 82,100.00 per m'
Rp. 186,700.00 per m'
Rp. 62,600.00 per m'
Rp. 23,200.00 per m'
Rp. 33,800.00 per m'
Rp. 62,500.00 per m'
Rp. 72,500.00 per m'
Rp. 15,000.00 per m'
Rp. 20,400.00 per m'
Rp. 25,000.00 per m'
Rp. 33,900.00 per m'
Rp. 41,800.00 per m'
Rp. 147,500.00 per m'
Rp. 105,000.00 per m'
Rp. 92,500.00 per m'
Rp. 16,250.00 per m
Rp. 55,200.00 per m
Rp. 12,600.00 per m
Rp. 27,900.00 per m
Rp. 40,500.00 per m
Rp. 747,500.00 per bh
Rp. 923,000.00 per bh
Rp. 2,210,000.00 per bh
Rp. 1,462,500.00 per bh
Rp. 2,240,500.00 per bh
Rp. 6,110,000.00 per bh
Rp. 111,800.00 per bh
Rp. 156,000.00 per bh
Rp. 526,500.00 per bh
Rp. 1,225,500.00 per bh
Rp. 645,500.00 per bh
Rp. 144,000.00 per m
Rp. 114,000.00 per m
Rp. 84,500.00 per m
Rp. 30,300.00 per m
Rp. 11,800.00 per m
Rp. 15,300.00 per m
Rp. 42,200.00 per m
Rp. 13,500.00 per m
Rp. 10,500.00 per m
Rp. 8,100.00 per m
Rp. 6,100.00 per m'
Rp. 7,300.00 per m'
Rp. 9,100.00 per m'
Rp. 13,500.00 per m'
Rp. 17,000.00 per m'
Rp. 27,000.00 per m'
Rp. 32,200.00 per m'
Rp. 46,000.00 per m'
Rp. 65,800.00 per m'
Rp. 113,700.00 per m'
Rp. 151,200.00 per m'
Rp. 6,000.00 per m'
Rp. 7,500.00 per m'
Rp. 9,500.00 per m'
Rp. 13,100.00 per m'
Rp. 18,100.00 per m'
Rp. 23,100.00 per m'
Rp. 33,100.00 per m'
Rp. 45,000.00 per m'
Rp. 66,200.00 per m'
Rp. 185,000.00 per unit
Rp. 224,600.00 per unit
Rp. 141,000.00 per Bh
Rp. 87,500.00 per Bh
Rp. 44,400.00 per Bh
Rp. 28,800.00 per Bh
Rp. 26,800.00 per Bh
Rp. 24,600.00 per Bh
Rp. 29,400.00 per Bh
Rp. 22,800.00 per Bh
Rp. 20,400.00 per Bh
Rp. 18,500.00 per Bh
Rp. 11,700.00 per Bh
Rp. 35,400.00 per m
Rp. 55,800.00 per m
Rp. 41,400.00 per m
Rp. 134,400.00 per Bh
Rp. 64,200.00 per Bh

Rp. 8,450.00 per set


Rp. 11,200.00 per M'
Rp. 11,200.00 per M'
Rp. 7,800.00 per M'
Rp. 11,200.00 per M'
Rp. 6,850.00 per set
Rp. 1,500,000.00 per unit
Rp. 45,000.00 per m1
Rp. 44,000,000.00 per unit
Rp. 40,000.00 per set
Rp. 770,000.00 per ls
Rp. 30,000.00 per set
Rp. 7,500.00 per set
Rp. 393,000.00 per jam
Rp. 389,000.00 per jam
Rp. 234,000.00 per jam
Rp. 277,000.00 per jam
Rp. 600,000.00 per jam
Rp. 500,000.00 per set
Rp. 190,000.00 per liter
Rp. 70,000.00 per jam
Rp. 177,000.00 per jam
Rp. 178,000.00 per jam
Rp. 202,000.00 per jam
Rp. 165,000.00 per hr
ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2017

No. URAIAN SATUAN INDEKS

1 1 M3 COR BETON READY MIX K-300 BERIKUT SLANG MIN 6 M3


Beton Ready Mix K-300 m3 1.0000
Pekerja OH 1.6500
Tukang Batu OH 0.2750
Kepala Tukang OH 0.0280
Mandor OH 0.0830

Overhead & Profit 10%


Jumlah

2 1 M3 COR BETON SITE MIX K-175


Bahan Semen PC 50kg Kg 326.0000
Besi Beton Kg 10.5000
Pasir Beton m3 0.5400
Split 1/2 Pecah Mesin m3 0.8300
Upah Pekerja OH 1.6500
Tukang Batu OH 0.2750
Kepala Tukang OH 0.0280
Mandor OH 0.0830
Bekisting Papan 3 x pakai M2 0.2667

Overhead & Profit 10%


Jumlah

3 1 M2 BEKISTING PAPAN UTK SLOOF, BALOK LINTEL, RING BALOK & KOLOM PRAKTIS
Bahan kayu Lokal kls III M3 0.0400
Paku biasa 2" - 5" kg 0.3000
Minyak bekisting Lt 0.1000
Upah Pekerja OH 0.5200
Tukang kayu OH 0.2600
Kepala Tukang kayu OH 0.0260
Mandor OH 0.0260

Overhead & Profit 10%


Jumlah

4 1 M2 BEKISTING MULTIPLEK UNTUK KOLOM


Bahan Multiplek, t = 12 mm lembar 0.3500
Kayu lokal (balok / usuk) m3 0.0150
Paku 5 cm - 12 cm kg 0.4000
Minyak Bekisting Liter 0.2000
Dolken O (8-10) cm x 4 m Btg 2.0000
Upah Pekerja OH 0.6600
Kepala Tukang OH 0.3300
Kepala Tukang Kayu OH 0.0330
Mandor OH 0.0330

Overhead & Profit 10%


Jumlah

5 1 M2 BEKISTING MULTIPLEK UNTUK BALOK


Bahan Multiplek, t = 12 mm lembar 0.3500
Kayu lokal (balok / usuk) m3 0.0180
Paku 5 cm - 12 cm kg 0.4000
Minyak Bekisting Liter 0.2000
Dolken O (8-10) cm x 4 m Btg 2.0000
Upah Pekerja OH 0.6600
Kepala Tukang OH 0.3300
Kepala Tukang Kayu OH 0.0330
Mandor OH 0.0330

Overhead & Profit 10%


Jumlah

6 1 M2 BEKISTING MULTIPLEK UNTUK PLAT LANTAI


Bahan Multiplek, t = 12 mm lembar 0.3500
Kayu lokal (balok / usuk) m3 0.0150
Paku 5 cm - 12 cm kg 0.4000
Minyak Bekisting Liter 0.2000
Dolken O (8-10) cm x 4 m Btg 6.0000
Upah Pekerja OH 0.6600
Kepala Tukang OH 0.3300
Kepala Tukang Kayu OH 0.0330
Mandor OH 0.0330

Overhead & Profit 10%


Jumlah

7 1 M2 PENYANGGA PELAT BONDEX TANPA MULTIPLEK UNTUK PLAT LANTAI


Bahan
Kayu lokal (balok / usuk) m3 0.0075
Paku 5 cm - 12 cm kg 0.1000
Dolken O (8-10) cm x 4 m Btg 3.0000
Upah Pekerja OH 0.3300
Kepala Tukang OH 0.1650
Kepala Tukang Kayu OH 0.0165
Mandor OH 0.0165

Overhead & Profit 10%


Jumlah

8 1 M2 BEKISTING MULTIPLEK UNTUK TANGGA


Bahan Multiplek, t = 12 mm lembar 0.3500
Kayu lokal (balok / usuk) m3 0.0150
Paku 5 cm - 12 cm kg 0.4000
Minyak Bekisting Liter 0.1500
Dolken O (8-10) cm x 4 m Btg 2.0000
Upah Pekerja OH 0.6600
Kepala Tukang OH 0.3300
Kepala Tukang Kayu OH 0.0330
Mandor OH 0.0330

Overhead & Profit 10%


Jumlah

9 10 KG MENGERJAKAN BESI BETON U 39


Bahan Besi Kg 10.5000
Kawat Beton / Bendrat Kg 0.1500
Upah Tukang Besi OH 0.0700
Kepala Tukang Besi OH 0.0700
Pekerja OH 0.0070
Mandor OH 0.0040

Overhead & Profit 10%


1 KG MENGERJAKAN BESI BETON U 39
Jumlah

10 10 KG MENGERJAKAN BESI BETON U 24


Bahan Besi Beton Kg 10.5000
Kawat Beton Kg 0.1500
Upah Tukang Besi OH 0.0700
Kepala Tukang Besi OH 0.0700
Pekerja OH 0.0070
Mandor OH 0.0040

Overhead & Profit 10%


1 KG MENGERJAKAN BESI BETON U 24
Jumlah

10 1M1 Tiang Pancang dia 35 cmmutu beton k 450 kg/cm2 M1 1.00


Overhead & Profit 10%
Jumlah
11 1M1 Biaya Pemancangan menggunakan Mesin Pancang Hidrolik M1 1.00
Overhead & Profit 10%
Jumlah
12 1 Unit Mobdemob alat Pancang hidrolis M1 1.00
Overhead & Profit 10%
Jumlah
GEDUNG MESS
13 1 M3 KOLOM K1 60 X 60
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-24 Kg 32.0850
Besi Beton U-39 Kg 123.8889
Bekisting Multiplek 12 mm 3 X pakai M2 26.6667

14 1 M3 SLOOF 60 X 30 S1
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-24 Kg 25.1600
Besi Beton U-39 Kg 70.2222
Bekisting Multiplek 12 mm 3 X pakai M2 6.6667

`
15 1 M3 SLOOF 25 X 50 - S2
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-24 Kg 30.2400
Besi Beton U-39 Kg 101.1200
Bekisting Multiplek 12 mm 3 X pakai M2 8.0000

16 1 M3 SLOOF 20 X 15 - S3
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-24 Kg 53.5200
Besi Beton U-39 Kg 172.1867
Bekisting Papan 3 x pakai M2 13.3333

17 1 M3 KOLOM K4 40 X 40
Bahan Beton Redy Mix k - 175 M3 1.0000
Besi Beton U-24 Kg 51.1500
Besi Beton U-39 Kg 218.4490
Bekisting Multiplek 12 mm 3 X pakai M2 11.4286

18 1 M3 KOLOM K2 DIA 60 CM
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-24 Kg 35.1455
Besi Beton U-39 Kg 126.2562
Bekisting Multiplek 12 mm 3 X pakai M2 6.6667

19 1 M3 KOLOM K3 40 X 40
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-24 Kg 44.9500
Besi Beton U-39 Kg 167.2500
Bekisting Multiplek 12 mm 3 X pakai M2 10.0000

20 1 M3 KOLOM K5 15 X 45
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-24 Kg 77.4690
Besi Beton U-39 Kg 330.3704
Bekisting Multiplek 12 mm 3 X pakai M2 17.7778

21 1 M3 KOLOM K6 15 X 30
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-24 Kg 137.9500
Besi Beton U-39 Kg 118.6667
Bekisting Multiplek 12 mm 3 X pakai M2 31.1111

22 1 M3 KOLOM K7 15 X 15
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-24 Kg 64.0800
Besi Beton U-39 Kg 158.2222
Bekisting Papan 3 x pakai M2 13.3333
23 1 M3 BALK LINTEL / LATAI BL 12 X 12
Bahan Beton Site Mix k - 175 M3 1.0000
Besi Beton U-24 Kg 73.3920
Besi Beton U-39 Kg 247.2222
Bekisting Papan 3 x pakai M2 16.6667

31 1 M3 PLAT DAK T = 12 CM 2 LAPIS WIRRE MESS M8


Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Wire Mess M-8 dengan 2 lapis Kg 90.7670
Bekisting Multiplek 12 mm 3 X pakai M2 8.3290

32 1 M3 PLAT DAK T = 10 CM 1 LAPIS WIRRE MESS M8


Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Wire Mess M-8 dengan 1 lapis Kg 54.4790
Bekisting Multiplek 12 mm 3 X pakai M2 9.9982

32 1 M3 PLAT LANTAI T = 20 CM 2 LAPIS WIRRE MESS M8


Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Wire Mess M-8 dengan 1 lapis Kg 54.4852

33 1 M3 PLAT LANTAI T = 12 CM
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Wire mess M 8 uk. 15 x 15 cm Kg 45.4149
Pelat bondex T - 1mm Kg 79.1803
Kayu Perancah M2 8.3348

34 10 kg MENGERJAKAN WIREMESH M 8
Bahan Wiremesh M 8 Kg 10.2000
Kawat Las Kg 0.0500
Upah
Tukang Besi OH 0.0250
Kepala Tukang Besi OH 0.0250
Pekerja OH 0.0250
Mandor OH 0.0010

1 kg MENGERJAKAN WIREMESH M 8
Overhead & Profit 10%
Jumlah

35 10 kg PELAT BONDEX
Bahan Bondex Kg 10.2000
Kawat Las Kg 0.0500
Upah
Tukang Besi OH 0.0250
Kepala Tukang Besi OH 0.0250
Pekerja OH 0.0010
Mandor OH 0.0010

1 kg PELAT BONDEX
Overhead & Profit 10%
Jumlah
36 1 M3 DINDING BETON 20 CM
Bahan Beton Redy Mix k - 300 M3 1.0000
Besi Beton U-39 Kg 165.2463
Bekisting Multiplek 12 mm 3 X pakai M2 10.0352
PEKERJAAN
2017

HARGA SATUAN JUMLAH (RP) TOTAL (RP)

1,158,800.00
895,000.00 895,000.00
75,000.00 123,750.00
85,000.00 23,375.00
95,000.00 2,660.00
105,000.00 8,715.00
Jumlah 1,053,500.00
105,350.00
1,158,850.00

1,096,000.00
1,200.00 391,200.00
11,400.00 119,700.00
210,000.00 113,400.00
230,000.00 190,900.00
75,000.00 123,750.00
85,000.00 23,375.00
95,000.00 2,660.00
105,000.00 8,715.00
85,030.00 22,674.67
Jumlah 996,374.67
99,637.47
1,096,012.13

OM PRAKTIS 152,600.00
1,600,000.00 64,000.00
25,000.00 7,500.00
10,000.00 1,000.00
75,000.00 39,000.00
85,000.00 22,100.00
95,000.00 2,470.00
105,000.00 2,730.00
Jumlah 138,800.00
13,880.00
152,680.00

255,000.00
165,000.00 57,750.00
1,600,000.00 24,000.00
20,000.00 8,000.00
10,000.00 2,000.00
28,000.00 56,000.00
75,000.00 49,500.00
85,000.00 28,050.00
95,000.00 3,135.00
105,000.00 3,465.00
Jumlah 231,900.00
23,190.00
255,090.00

260,300.00
165,000.00 57,750.00
1,600,000.00 28,800.00
20,000.00 8,000.00
10,000.00 2,000.00
28,000.00 56,000.00
75,000.00 49,500.00
85,000.00 28,050.00
95,000.00 3,135.00
105,000.00 3,465.00
Jumlah 236,700.00
23,670.00
260,370.00

378,200.00
165,000.00 57,750.00
1,600,000.00 24,000.00
20,000.00 8,000.00
10,000.00 2,000.00
28,000.00 168,000.00
75,000.00 49,500.00
85,000.00 28,050.00
95,000.00 3,135.00
105,000.00 3,465.00
Jumlah 343,900.00
34,390.00
378,290.00

154,000.00
1,600,000.00 12,000.00
20,000.00 2,000.00
28,000.00 84,000.00
75,000.00 24,750.00
85,000.00 14,025.00
95,000.00 1,567.50
105,000.00 1,732.50
Jumlah 140,075.00
14,007.50
154,082.50

254,500.00
165,000.00 57,750.00
1,600,000.00 24,000.00
20,000.00 8,000.00
10,000.00 1,500.00
28,000.00 56,000.00
75,000.00 49,500.00
85,000.00 28,050.00
95,000.00 3,135.00
105,000.00 3,465.00
Jumlah 231,400.00
23,140.00
254,540.00

12,600.00
9,250.00 97,125.00
27,500.00 4,125.00
85,000.00 5,950.00
95,000.00 6,650.00
75,000.00 525.00
105,000.00 420.00
Jumlah 114,795.00
11,479.50

12,627.45

11,400.00 740000
8,250.00 86,625.00 85000
27,500.00 4,125.00 836,400.00
85,000.00 5,950.00 1,003,680.00
95,000.00 6,650.00
75,000.00 525.00
105,000.00 420.00
Jumlah 104,295.00
10,429.50

11,472.45

500,000.00 500,000.00
50,000.00
550,000.00
66,000.00 66,000.00
6,600.00
72,600.00
44,000,000.00 44,000,000.00
4,400,000.00
48,400,000.00

5,353,000.00
1,158,800.00 1,158,800.00
11,400.00 365,769.00
12,600.00 1,561,000.00
85,030.00 2,267,466.67
Jumlah 5,353,035.67

2,897,200.00
1,158,800.00 1,158,800.00
11,400.00 286,824.00
12,600.00 884,800.00
85,030.00 566,866.67
Jumlah 2,897,290.67

3,457,800.00
1,158,800.00 1,158,800.00
11,400.00 344,736.00
12,600.00 1,274,112.00
85,030.00 680,240.00
Jumlah 3,457,888.00

4,616,700.00
1,158,800.00 1,158,800.00
11,400.00 610,128.00
12,600.00 2,169,552.00
50,866.67 678,222.22
Jumlah 4,616,702.22

5,403,300.00
1,096,000.00 1,096,000.00
11,400.00 583,110.00
12,600.00 2,752,457.14
85,030.00 971,771.43
Jumlah 5,403,338.57

3,716,900.00
1,158,800.00 1,158,800.00
11,400.00 400,658.77
12,600.00 1,590,828.03
85,000.00 566,666.67
Jumlah 3,716,953.46

4,628,500.00
1,158,800.00 1,158,800.00
11,400.00 512,430.00
12,600.00 2,107,350.00
85,000.00 850,000.00
Jumlah 4,628,580.00

7,715,700.00
1,158,800.00 1,158,800.00
11,400.00 883,146.60
12,600.00 4,162,666.67
85,000.00 1,511,111.11
Jumlah 7,715,724.38
6,871,000.00
1,158,800.00 1,158,800.00
11,400.00 1,572,630.00
12,600.00 1,495,200.00
85,000.00 2,644,444.44
Jumlah 6,871,074.44
5,016,200.00
1,158,800.00 1,158,800.00
11,400.00 730,512.00
12,600.00 1,993,600.00
85,000.00 1,133,333.33
Jumlah 5,016,245.33
5,895,400.00
1,096,000.00 1,096,000.00
11,400.00 836,668.80
12,600.00 3,115,000.00
50,866.67 847,777.78
Jumlah 5,895,446.58
3,406,900.00
1,158,800.00 1,158,800.00
13,200.00 1,198,123.87
126,066.67 1,050,008.76
Jumlah 3,406,932.63

1,877,900.00
1,158,800.00 1,158,800.00
13,200.00 719,122.38
126,066.67 1,260,445.29
Jumlah 1,877,922.38

1,878,000.00
1,158,800.00 1,158,800.00
13,200.00 719,204.95
Jumlah 1,878,004.95

3,262,900.00
1,158,800.00 1,158,800.00
13,200.00 599,477.16
13,600.00 1,076,852.15
51,333.33 427,851.48
Jumlah 3,262,980.79

13,200.00
11,000.00 112,200.00
32,500.00 1,625.00

85,000.00 2,125.00
95,000.00 2,375.00
75,000.00 1,875.00
105,000.00 105.00
Jumlah 120,305.00
12,030.50
1,203.05
13,233.55

13,600.00
11,578.95 118,105.26
32,500.00 1,625.00

85,000.00 2,125.00
95,000.00 2,375.00
75,000.00 75.00
105,000.00 105.00
Jumlah 124,410.26
12,441.03
1,244.10
13,685.13
4,506,000.00
1,158,800.00 1,158,800.00
12,600.00 2,082,103.30
126,066.67 1,265,104.21
Jumlah 4,506,007.51
ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2017

No. URAIAN SATUAN INDEKS

1 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK


Kayu Lokal klas II 5/7 m3 0.0120
Paku 2" - 5" Kg 0.0200
Kayu Papan lokal kls. II 3/20 m3 0.0070
Pekerja OH 0.0280
Tukang Kayu OH 0.0800
Kepala Tukang Kayu OH 0.0080
Mandor OH 0.0014

Overhead & Profit 10%


Jumlah
2 1 Unit Sewa Kontainer 20 feet untuk direksi keet
Sewa Kontainer 20 feet Bulan 7.0000

Overhead & Profit 10%


Jumlah
3 1 M1 Sewa Pagar pengaman sementara
Bahan Seng Gelombang BJLS 28 ( 80 x 180 ) m1 64.0000
Kayu Lokal 5/7 kls. II
Jumlah
4 1 Unit mobilisasi Alat pancang
Unit Mesimn Hidrolis unit 1.0000

Jumlah
5 1 Set Pemasangan scapmoulding per 30 HK (t =10 m 30 modul )
unit rangka scapmoulding t = 90 cm set 480.00
Cat walk set 38.00
Jack base set 152.00
Dibulatkan
6 1 M2 LOS KERJA/DIREKSI KEET
Kayu Dolken batang 1.2500
Paku Kg 0.8500
Triplek 4 mm Lembar 0.3500
Pasir Pasang m3 0.1500
Bata Merah buah 30.0000
Semen (PC) Kg 35.0000
Kunci Tanam buah 0.1500
Seng Gelombang BJLS Lembar 0.9600
Pekerja OH 1.7600
Tukang Kayu OH 2.0000
Tukang Batu OH 1.0000
Kepala Tukang OH 0.3000

Overhead & Profit 10%


Jumlah

7 1 M' PAGAR PENGAMAN KEGIATAN


Seng Gelombang BJLS 28 ( 80 x 180 ) Lembar 1.4300
Kayu Lokal 5/7 kls. II m3 0.0250
Paku 5 - 7 Kg 0.2000
Pengecatan 2 x bagian luar m2 0.1200
Ongkos pasang ls 0.2000

Overhead & Profit 10%


Jumlah

8 1 UNIT PAPAN NAMA KEGIATAN 80 X 120 CM


Bahan Kayu Lokal m3 0.0500
Seng Plat m2 1.6200
Paku kg 0.6000
Cat Kayu kg 0.6000
Upah Tukang Kayu OH 0.0500
Tukang Cat OH 0.0500
Pekerja OH 1.0000
Mandor OH 1.0000

Overhead & Profit 10%


Jumlah

9 1 M3 GALIAN TANAH BERBATU SEDALAM SD 2 METER


Pekerja OH 1.5000
Mandor OH 0.1500

Biaya Peralatan Jack Hammer Jam 0.1500

Overhead & Profit 10%


Jumlah

10 1 M3 GALIAN TANAH BIASA


Pekerja OH 0.2500
Mandor OH 0.0250

Overhead & Profit 10%


Jumlah

11 1 M3 MEMADATKAN TANAH ( PER 20 CM ) DENGAN MANUAL


Pekerja jam 0.5000
Mandor jam 0.0500

Overhead & Profit 10%


Jumlah

12 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


Pekerja OH 0.1000
Mandor OH 0.0500

Overhead & Profit 10%


Jumlah

13 1 M2 PEK STRIPING TANAH TEBAL = 20 CM


Tukang Gali OH 0.0500
Mandor OH 0.0050
Alat Bantu LS 0.3500

Overhead & Profit 10%


Jumlah

14 1 M3 URUGAN KEMBALI TANAH BEKAS GALIAN


Pekerja OH 0.1920
Mandor OH 0.0190

Overhead & Profit 10%


Jumlah

15 1 M3 BUANGAN TANAH KELUAR LOKASI SEJAUH 1 KM


Pekerja Jam 1.6500
Mandor Jam 0.0500
Biaya Peralatan Dump Truck Jam 0.0872

Overhead & Profit 10%


Jumlah

16 1 M3 MENGURUG PASIR URUG


Pasir Urug m3 1.2000
Pekerja OH 0.3000
Mandor OH 0.0100

Overhead & Profit 10%


Jumlah

17 1 M3 MENGURUG SIRTU
SIRTU m3 1.2000
Pekerja OH 0.3000
Mandor OH 0.0100

Overhead & Profit 10%


Jumlah

18 1 M3 MENGURUG TANAH DARI LUAR


Abu Batu m3 1.2000
Pekerja OH 0.3000
Mandor OH 0.0100

Overhead & Profit 10%


Jumlah

19 1 M2 URUGAN TANAH DENGAN BULDOZER


Pekerja jam 0.0590
Mandor jam 0.0059
Peralatan Buldozer jam 0.0191
Overhead & Profit 10%
Jumlah

20 1 M3 URUGAN TANAH ( TANAH YANG ADA )


Pekerja OH 0.3000
Mandor OH 0.0100

Overhead & Profit 10%


Jumlah

21 1 M' KANSTEEN BETON


Kansteen 15x30x60 Buah 1.6667
Pekerja OH 0.2500
Tukang Batu OH 0.0075
Kepala Tukang OH 0.0005
Mandor OH 0.0045

Overhead & Profit 10%


Jumlah

22 1 M2 PASANGAN PAVING BLOCK NATURAL T = 8 CM


Paving block natural t = 8 cm m2 1.0100
Pekerja Orang 0.1500
Tukang batu Orang 0.2500
Kepala tukang batu Orang 0.0250
Mandor Orang 0.0030

Overhead & Profit 10%


Jumlah

23 1 M3 PASANGAN PONDASI BATU BELAH, CAMPURAN 1 : 6


Batu Belah m3 1.2000
Semen 50 kg Kg 117.0000
Pasir Pasang m3 0.5610
Pekerja OH 1.5000
Tukang Batu OH 0.7500
Kepala Tukang OH 0.0750
Mandor OH 0.0750

Overhead & Profit 10%


Jumlah

24 1 M3 PASANGAN BATU BELAH 1 : 3


Batu Belah m3 1.2000
Semen 50 kg Kg 202.0000
Pasir Pasang m3 0.4850
Pekerja OH 1.5000
Tukang Batu OH 0.7500
Kepala Tukang OH 0.0750
Mandor OH 0.0750

Overhead & Profit 10%


Jumlah

25 1 M2 Finishing siar pasangan batu kali 1 Pc : 2 Ps


Bahan
Semen Portland Kg 6.34
Pasir Pasang M3 0.0120
Tenaga
Pekerja Oh 0.3000
Tukang Batu Oh 0.1400
Kepala Tukang Oh 0.0140
Mandor Oh 0.0150
Jumlah
Overhead & Profit 10%
Jumlah

26 1 M3 PONDASI SIKLOP, 60% BETON CAMPURAN 1 PC: 2 PB : 3 KR DAN 40% BATU BELAH
Batu Belah 15 cm / 20 cm m3 0.4800
Semen 50 kg Kg 194.0000
Pasir Beton m3 0.3120
Kerikil m3 0.4680
Pekerja OH 3.0000
Tukang Batu OH 0.8500
Kepala Tukang OH 0.0850
Mandor OH 0.1500

Overhead & Profit 10%


Jumlah

27 1 M3 PASANG BATU KOSONG / AANSTAMPING


Batu Belah m3 1.2000
Pasir Urug m3 0.1000
Pekerja OH 0.5000
Tukang Batu OH 0.5625
Kepala Tukang Batu OH 0.0750
Mandor OH 0.0750

Overhead & Profit 10%


Jumlah

28 1 M3 LANTAI KERJA (1PC : 3PS : 5KR)


Semen PC 50kg Kg 230.0000
Split 1/2 Pecah Mesin m3 0.8558
Pasir Beton m3 0.7442
Pekerja OH 1.2000
Tukang batu OH 0.2000
Kepala Tukang OH 0.0200
Mandor OH 0.0600

Overhead & Profit 10%


Jumlah

29 1 M2 PASANG DINDING BATA MERAH 1/2 BT (1PC : 3PS)


Semen PC 50kg kg 14.3700
Bata Merah Buah 70.0000
Pasir Pasang m3 0.0400
Pekerja OH 0.3000
Tukang Batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0150

Overhead & Profit 10%


Jumlah

30 1 M2 PASANG DINDING BATA MERAH 1 BT (1PC : 3PS)


Semen PC 50kg kg 32.9500
Bata Merah Buah 140.0000
Pasir Pasang m3 0.0910
Pekerja OH 0.6000
Tukang Batu OH 0.2000
Kepala Tukang OH 0.0200
Mandor OH 0.0300

Overhead & Profit 10%


Jumlah

31 1 M2 PASANG DINDING BATA MERAH 1/2 BT (1PC : 5PS)


Semen PC 50kg kg 9.6800
Bata Merah Buah 70.0000
Pasir Pasang m3 0.0450
Pekerja OH 0.3000
Tukang Batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0016

Overhead & Profit 10%


Jumlah

1 m3 Pasang rollag bata merah 1:5


batu bata bh 525.0000
semen portland zak 2.3300
pasir pasang m3 0.4230
Tukang batu OH 0.6000
Pekerja OH 1.8000
Mandor OH 0.0900

Overhead & Profit 10%


Jumlah

32 1 M2 PLESTERAN DINDING 1 : 3
Semen PC 50kg kg 7.7760
Pasir Pasang m3 0.0230
Pekerja OH 0.2500
Tukang Batu OH 0.1500
Kepala Tukang OH 0.0150
Mandor OH 0.0150

Overhead & Profit 10%


Jumlah
33 1 M2 PLESTERAN DINDING 1 : 5
Semen PC 50kg kg 6.9000
Pasir Pasang m3 0.0200
Pekerja OH 0.2500
Tukang Batu OH 0.1500
Kepala Tukang OH 0.0150
Mandor OH 0.0150

Overhead & Profit 10%


Jumlah

34 1 M2 PLESTERAN CIPRAT (1PC : 2PS)


Semen Kg 0.0864
Pasir Pasang m3 0.0060
Pekerja OH 0.2500
Tukang Batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0130

Overhead & Profit 10%


Jumlah

35 1 M2 PEKERJAAN SCREDING T = 3 CM, 1 PC : 3 PS


Semen PC 50kg kg 14.1500
Pasir Pasang m3 0.0390
Pekerja OH 0.3000
Tukang Batu OH 0.2000
Kepala Tukang OH 0.0200
Mandor OH 0.0130

Overhead & Profit 10%


Jumlah

36 1 M2 PEKERJAAN ACIAN
Semen PC 50kg kg 3.2500
Pekerja OH 0.1500
Tukang Batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0075

Overhead & Profit 10%


Jumlah

37 1 M1 PLESTERAN BAN + ACIAN


PC (50 Kg) kg 1.0360
Pasir pasang m3 0.0050
Pekerja OH 0.2500
Tukang batu OH 0.1000
Kepala tukang batu OH 0.0100
Mandor OH 0.0130

Overhead & Profit 10%


Jumlah

38 1 M2 FLOOR HARDENER
Floor Hardener Kg 7.0000
Pekerja OH 0.1200
Tukang Batu OH 0.1200
Kepala Tukang OH 0.0120
Mandor OH 0.0060

Overhead & Profit 10%


Jumlah

39 1 M2 PASANG BATU ANDESIT


Batu Andesit m2 1.1000
PC ( 50 kg ) kg 6.0000
Pasir pasang m3 0.0310
Pekerja OH 0.8175
Tukang Batu OH 0.2250
Kepala Tukang OH 0.0375
Mandor OH 0.0338

Overhead & Profit 10%


Jumlah

40 1 M2 Pasang Batu Pearl Stone


Bahan
Batu Pearlstone M2 1.00
Semen Portland Kg 11.75
Tenaga
Pekerja Oh 0.6200
Tukang Batu Oh 0.3500
Kepala Tukang Oh 0.0350
Mandor Oh 0.0300
Jumlah
Keuntungan Max. 10%
Jumlah

41 1 M2 PASANG LT. KERAMIK KM/WC 20 X 20 (1PC : 4PS) SETARA ROMAN UNPOLISHED


Keramik 20 x 20 m2 1.0100
Semen PC 50 kg kg 8.0000
Pasir Pasang m3 0.0300
Semen Warna Kg 0.0130
Pekerja OH 0.1875
Tukang Batu OH 0.3750
Kepala Tukang OH 0.0700
Mandor OH 0.0188

Overhead & Profit 10%


Jumlah
42 1 M2 PASANG DINDING KERAMIK 20 X 40 CT-8 (1PC : 4PS) SETARA ROMAN
Keramik m2 1.0100
Semen PC 50 kg kg 8.0000
Pasir Pasang m3 0.0300
Semen Warna Kg 0.0130
Pekerja OH 0.1875
Tukang Batu OH 0.3750
Kepala Tukang OH 0.0700
Mandor OH 0.0188

Overhead & Profit 10%


Jumlah

43 1 M2 PASANG LANTAI KERAMIK 30 X 30 CT-8 (1PC : 4PS) SETARA ROMAN


Keramik 30 x 30 setara ARWANA m2 1.0100
Semen PC 50 kg kg 8.0000
Pasir Pasang m3 0.0300
Semen Warna Kg 0.0130
Pekerja OH 0.1875
Tukang Batu OH 0.3750
Kepala Tukang OH 0.0750
Mandor OH 0.0188

Overhead & Profit 10%


Jumlah

44 1 M2 PASANG LANTAI GRANIT TILE 60 X 60 (1PC : 4PS) SEK. Niro granito Un Polished
Granit Tile m2 1.0100
Semen PC 50 kg Kg 8.0000
Pasir Pasang m3 0.0300
Semen Warna Kg 0.0130
Pekerja OH 0.1875
Tukang Batu OH 0.3750
Kepala Tukang OH 0.0700
Mandor OH 0.0188

Overhead & Profit 10%


Jumlah

45 1 M2 PASANG LANTAI GRANIT TILE 60 X 60 (1PC : 4PS) SEK. Niro granito Polished
Granit Tile m2 1.0100
Semen PC 50 kg Kg 8.0000
Pasir Pasang m3 0.0300
Semen Warna Kg 0.0130
Pekerja OH 0.1875
Tukang Batu OH 0.3750
Kepala Tukang OH 0.0750
Mandor OH 0.0188

Overhead & Profit 10%


Jumlah

46 1 M' PASANG STAIR NOSHING TANGGA KERAMIK 10 X 60


Granit Tile 10 X 60 CM Buah 2.5000
Semen PC 50kg kg 1.5000
Pasir Pasang m3 0.0050
Semen Warna Kg 0.0500
Pekerja OH 0.0500
Tukang Batu OH 0.0500
Kepala Tukang OH 0.0100
Mandor OH 0.0500

Overhead & Profit 10%


Jumlah

47 1 M' PASANG PLIN ALUMUNIUM T = 10 CM


Alumunium t = 0.5 mm M2 0.1000
Paku Kg 0.2000
Tenaga
Pekerja OH 0.0600
Tukang Kayu OH 0.0300
Kepala Tukang OH 0.0030
Mandor OH 0.0030

Overhead & Profit 10%


Jumlah

48 1 M' PASANG PLIN KERAMIK LANTAI 10 X 30 cm


Plint Keramik 10 x 30 cm Bh 2.5000
Semen PC kg 2.5000
Pasir Pasang m3 0.0070
Pekerja OH 0.0600
Tukang OH 0.0030
Kepala Tukang OH 0.0030
Mandor OH 0.0300

Overhead & Profit 10%


Jumlah
49 1 M' PASANG PLIN GRANIT LANTAI 10 X 60 cm Unpolish
Plint Granit 10 x 60 cm Bh 1.6700
Semen PC kg 2.5000
Pasir Pasang m3 0.0070
Pekerja OH 0.0600
Tukang OH 0.0030
Kepala Tukang OH 0.0030
Mandor OH 0.0300

Overhead & Profit 10%


Jumlah
50 1 M' PASANG PLIN GRANIT LANTAI 10 X 60 cm polished
Plint Granit 10 x 60 cm Bh 1.6700
Semen PC kg 2.5000
Pasir Pasang m3 0.0070
Pekerja OH 0.0600
Tukang OH 0.0030
Kepala Tukang OH 0.0030
Mandor OH 0.0300

Overhead & Profit 10%


Jumlah
51 1 M2 PENGECATAN TEMBOK DINDING CAT DULUX ( Interior)
Cat Tembok sek. Dulux Kg 0.2600
Cat Dasar Kg 0.1000
Plamuur Kg 0.1000

Pekerja OH 0.0200
Tukang Cat OH 0.0630
Kepala Tukang OH 0.0063
Mandor OH 0.0030

Overhead & Profit 10%


Jumlah

52 1 M2 PENGECATAN TEMBOK DINDING CAT DULUX ( Eksterior )


Cat Tembok DULUX Kg 0.2600
Cat Dasar Kg 0.1000
Plamuur Buah 0.1000

Pekerja OH 0.0200
Tukang Cat OH 0.0630
Kepala Tukang OH 0.0063
Mandor OH 0.0030

Overhead & Profit 10%


Jumlah

53 1 M2 PENGECATAN KAYU (3X) BERIKUT MENI


Meni kayu kg 0.1670
Plamir kayu kg 0.0830
Cat kayu Avian kg 0.2000
Amplas lembar 0.4000
Minyak cat liter 0.1500
Kwas 3" buah 0.0500
Pekerja OH 0.1500
Tukang Cat OH 0.2000
Kepala Tukang OH 0.0300
Mandor OH 0.0100

Overhead & Profit 10%


Jumlah

54 1 M2 PENGECATAN BESI
Meni besi kg 0.1670
Cat besi kg 0.2000
Amplas lembar 0.4000
Minyak cat liter 0.1500
Kuas buah 0.0500
Pekerja OH 0.1000
Tukang Cat OH 0.2500
Kepala Tukang OH 0.0300
Mandor OH 0.0100
Overhead & Profit 10%
Jumlah

55 1 M2 PENGECATAN cat DUCO


Cat dasar kg 0.1670
Meni besi kg 0.1670
Cat besi kg 0.2000
Amplas lembar 0.4000
thinner liter 0.1500
Dempul Sun Polac kg 0.0830
Peralatan ls 0.0500
Pekerja OH 0.1000
Tukang Cat OH 0.2500
Kepala Tukang OH 0.0300
Mandor OH 0.0100

Overhead & Profit 10%


Jumlah

56 1 M2 PLITURAN
Dempul plitur ( dempul kasar ) Kg 0.0300
Wood Filer ( Imfra ) kg 0.2000
Oker Putih kg 0.0200
Oker Warna kg 0.0100
Batu Apung ( Gosok ) kg 0.1000
Sirlak Ex India kg 0.2000
Kwas 3" buah 0.0100
Spirtus liter 0.2000
Hamplas Lembar 0.1000
Pekerja OH 0.2500
Tukang Cat OH 0.4000
Kepala Tukang OH 0.0400
Mandor OH 0.0200

Overhead & Profit 10%


Jumlah

57 1 M2 CAT VERNIS ( 3 X )
Vernis kg 0.4250
Amplas lembar 0.4000
Minyak cat liter 0.1500
Kuas buah 0.0500
Pekerja OH 0.1000
Tukang Cat OH 0.2500
Kepala Tukang OH 0.0300
Mandor OH 0.0100

Overhead & Profit 10%


Jumlah

58 1 KG PEK. ERECTION KONST. BAJA WF


Pekerja OH 0.0010
Tukang besi OH 0.0010
Kepala tukang besi OH 0.0002
Mandor OH 0.0001
Operator alat besar OH 0.0002
Pembantu Operator OH 0.0200
Sewa alat ls 0.0002
Bahan bakar solar lt 0.0100
Pelumas lt 0.0010
Alat bantu lot 0.0002

Overhead & Profit 10%


Jumlah

59 1 CM PENGELASAN DENGAN LAS LISTRIK TEBAL = 4 MM


Kawat las listrik kg 0.0400
Bahan bakar solar lt 0.0300
Pelumas lt 0.0040
Pekerja OH 0.0040
Tukang besi OH 0.0020
Kepala tukang besi OH 0.0020
Mandor OH 0.0010
Alat bantu ( mesin las listrik ) Lot 0.2500

Overhead & Profit 10%


Jumlah

60 1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR


Pekerja OH 0.0500
Tukang besi profil / Tukang Las OH 0.0200
Kepala tukang besi profil / Tukang Las OH 0.0030
Mandor OH 0.0010
Alat bantu ( Mesin Bor ) lot 0.2500

Overhead & Profit 10%


Jumlah

61 1 KG PEK. KONST. BAJA WF


Baja WF Kg 1.1000
Pekerja OH 0.0600
Tukang besi OH 0.0060
Kepala tukang besi OH 0.0060
Mandor OH 0.0003

Overhead & Profit 10%


Jumlah

62 1 KG PEK. KONST. Besi Profil


Besi Profil Kg 1.1000
Pekerja OH 0.0600
Tukang besi OH 0.0060
Kepala tukang besi OH 0.0060
Mandor OH 0.0003

Overhead & Profit 10%


Jumlah

63 1 M1 PEKERJAAN LISTPLANK 4 MM/20 CM GRC


Bahan
GRC LISPLANK m1 1.05
Sekrup Kg 0.0200
Tenaga
Pekerja Oh 0.2000
Tukang Oh 0.3000
Kepala Tukang Oh 0.0300
Mandor Oh 0.0100

Overhead & Profit 10%


Jumlah

64 1 M2 Pemasangan Atap Alumunium pelat datar


Bahan
alumunium t = 0.75 mm galvalum m2 1.050
sekkrup Kg 0.020
Tenaga
Pekerja Oh 0.150
Tukang Besi Oh 0.750
Kepala Tukang Besi Beton Oh 0.080
Mandor Oh 0.006

Overhead & Profit 10%


Jumlah

65 1 M2 PEMASANGAN HOLLO 4 X 4 CM GALVANIZED . RANGKA PLAPON


Bahan :
Metal furing M' 5.0000
Gantungan Besi dia 6 Kg 0.2750
Tenaga Kerja :
Pekerja Oh 0.3500
Tukang Oh 0.3500
Kepala Tukang Oh 0.0350
Mandor Oh 0.0180
Jumlah
Overhead + Profit 10%
Jumlah

66 1 M2 PEMASANGAN C BAJA RINGAN 75 X 37,5 X 0.75 MM


Bahan :
Rangka C . Baja ringan 75 x 37.5 x 0.75 mm M' 5.0000
Peralatan ls 0.5000
Tenaga Kerja :
Pekerja Oh 0.3500
Tukang Oh 0.3500
Kepala Tukang Oh 0.0350
Mandor Oh 0.0180
Jumlah
Overhead + Profit 10%
Jumlah

67 1 M2 PEMASANGAN ALUMUNIUM TRUSS HOLLO 40.40.2 RANGKA ACP


Bahan :
Hollo 4 x 4 Alumunium Truss M' 5.0000
Accessories ls 1.0000
Tenaga Kerja :
Pekerja Oh 0.3500
Tukang Oh 0.3500
Kepala Tukang Oh 0.0350
Mandor Oh 0.0180
Jumlah
Overhead + Profit 10%
Jumlah

68 1 M2 PASANGAN PLAFOND ACCOUSTICS UK 60 X 60 CM RANGKA CONCEALED GRID


Bahan
PAPAN ACCOUSTICS uk. 60 x 120 cm di potong 2 lembar 1.5000
T = 15 MM SEK. AMSTRONG
Profil Alumunium T m1 5.4000
Kawat dia 4 mm kg 0.2000
Ramset bh 1.5500

Tenaga
Pekerja Oh 0.5000
Tukang Gypsum Oh 0.5000
Kepala Tukang Gypsum Oh 0.0050
Mandor Oh 0.0050

Overhead & Profit 10%


Jumlah
69 1 M2 PASANGAN GYPSUM IBOARD 9 MM
Bahan
gypsum board 9 mm lembar 0.3640
Paku Cacing Kg 0.1100
Tenaga
Pekerja Oh 0.1000
Tukang Gypsum Oh 0.0500
Kepala Tukang Gypsum Oh 0.0050
Mandor Oh 0.0050

Overhead & Profit 10%


Jumlah
70 1 M2 PASANGAN KALSIBOARD 6 MM
Bahan
KALSIBOARD lembar 0.3640
Paku Cacing Kg 0.1100
Tenaga
Pekerja Oh 0.1000
Tukang Gypsum Oh 0.0500
Kepala Tukang Gypsum Oh 0.0050
Mandor Oh 0.0050

Overhead & Profit 10%


Jumlah
71 1 M2 PARTISI DINDING, RANGKA C BAJA RINGAN BLUESCOPE
Bahan :
C Baja Ringan Blue Scope l = 100 t = 0.75 mm m1 5.0000
Peralatan LS 0.5000
Tenaga Kerja :
Pekerja Oh 0.35
Tukang Oh 0.35
Kepala Tukang Oh 0.04
Mandor Oh 0.0180

Overhead & Profit 10%


Jumlah

72 1 M2 PEMASANGAN WALLPAPER
Walpaper M2 1.2000
Lem fox kg 0.2000
Pekerja OH 0.0200
Tukang Cat OH 0.2000
Kepala Tukang Cat OH 0.0020
Mandor OH 0.0025

Overhead & Profit 10%


Jumlah

73 1 M2 PEMASANGAN VERTIKALS BLINDS


Vertikals Blinds M2 1.0000
Pekerja OH 0.3500
Tukang Kayu OH 0.3500
Kepala Tukang Kayu OH 0.0350
Mandor OH 0.0018

Overhead & Profit 10%


Jumlah

74 1 M' PASANG LIST PROFIL PLAFOND GYPSUM


List Profil Gypsum m 1.0000
Cornise Compound zak 0.0150
Pekerja OH 0.0250
Tukang Kayu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0020

Overhead & Profit 10%


Jumlah

75 1 UNIT BAK KONTROL 50 X 50 X 50


Lantai Kerja t. 10 cm m3 0.0360
Pasir Urug t. 10 cm m3 0.0640
Pasangan 1/2 bata 1:3 m2 1.2000
Plesteren + acian 1:3 m2 1.5000
Galian m3 0.4219
Urugan kembali m3 0.1473

Overhead & Profit 10%


Jumlah

76 1 BH. PASANG BAK KONTROL 40 X 40 CM


Galian Tanah m3 0.1260
Urugan pasir m3 0.0360
Pas. Bata 1 : 3 m3 0.2180
Plesteran 1 : 3 m2 0.6400
Alat bantu Ls 1.0000

Overhead & Profit 10%


Jumlah

77 1.5 M' PASANG SALURAN UDITH 300 X 300


Galian Tanah m3 0.3000
Urugan pasir m3 0.0300
Udith Uk. 30 x 30 x 30 cm bh 1.0000
Plesteran + Acian 1 : 3 m2 0.0900
Alat bantu Ls 1.0000

Overhead & Profit 10%


Jumlah

78 Memasang I buah kran diameter 1/2 atau 3/4 "


Bahan
Kran air ex. Sun Ei M1 1.0000
Solatipe Bh 0.0250
Tenaga
Pekerja Oh 0.0100
Tukang batu Oh 0.4000
Kepala tukang batu Oh 0.0400
Mandor Oh 0.0050

Overhead & Profit 10%


Jumlah
79 Memasang I buah kloset Duduk sek. TOTO - White

Bahan
Kloset duduk monoblok Bh 1.0000
Tenaga
Pekerja Oh 0.0100
Tukang batu Oh 0.4000
Kepala tukang batu Oh 0.0400
Mandor Oh 0.0050

Overhead & Profit 10%


Jumlah
80 Memasang I buah sekat Urinoir sek. TOTO - White
Bahan
sekat urinoir Bh 1.0000
Tenaga
Pekerja Oh 1.0000
Tukang batu Oh 1.5000
Kepala tukang batu Oh 0.1500
Mandor Oh 0.1500

Overhead & Profit 10%


Jumlah
81 Memasang I buah Urinoir sek. TOTO - White
Bahan Bahan
Urinoir monoblok Bh 1.0000
Tenaga
Pekerja Oh 1.0000
Tukang batu Oh 1.5000
Kepala tukang batu Oh 0.1500
Mandor Oh 0.1500

Overhead & Profit 10%


Jumlah
82 Memasang 1 buah Wastafel
Bahan
Wastafel Unit 1.0000
Semen Portland Cement Kg 6.0000
Pasir Pasang M3 0.0100
Perlengkapan % 12.0000
Tenaga
Pekerja Oh 1.2000
Tukang batu Oh 1.4500
Kepala tukang batu Oh 0.1500
Mandor Oh 0.0600

Overhead & Profit 10%


Jumlah
83 1 M1 PEK. PELAT BESI 5 X 40 MM
Besi 5 x 40 mm m1 1.1000
pengelasan cm 2.0000
Pekerja OH 0.0600
Tukang besi OH 0.0060
Kepala tukang besi OH 0.0060
Mandor OH 0.0003
Overhead & Profit 10%
Jumlah

84 1 M1 PEK. KONST.BESI HOLLOW 20 x 40 mm


Baja Profil Hollow 20 x 40 mm m1 1.1000
Pengelasan ls 1.2000
Pekerja OH 0.3500
Tukang besi OH 0.3500
Kepala tukang besi OH 0.0350
Mandor OH 0.0180

Overhead & Profit 10%


Jumlah

85 1 M1 PEK. KONST.BESI 2"


BSP 2" M1 1.1000
Pengelasan ls 0.4000
Pekerja OH 0.2500
Tukang besi OH 0.2500
Kepala tukang besi OH 0.0300
Mandor OH 0.0180

Overhead & Profit 10%


Jumlah

86 1 M' PASANG RAILING KAYU T = 10 CM FINISH FLITUR


Kayu papan Solid Nyatoh m3 0.0035
Paku Kg 0.2000
Tenaga
Pekerja OH 0.0600
Tukang Kayu OH 0.0300
Kepala Tukang OH 0.0030
Mandor OH 0.0030

Overhead & Profit 10%


Jumlah

87 1 M1 PEK. KONST.BESI 1.5"


BSP 1.5" M1 1.1000
Pengelasan ls 0.4000
Pekerja OH 0.2500
Tukang besi OH 0.2500
Kepala tukang besi OH 0.0300
Mandor OH 0.0180

Overhead & Profit 10%


Jumlah

88 1 M1 PEK. KONST.BESI 1.0"


BSP 1.0" M1 1.1000
Pengelasan ls 0.4000
Pekerja OH 0.2500
Tukang besi OH 0.2500
Kepala tukang besi OH 0.0300
Mandor OH 0.0180

Overhead & Profit 10%


Jumlah
N PEKERJAAN
N 2017

HARGA JUMLAH TOTAL


SATUAN (Rp.) (Rp.)

37,300.00
1,200,000.00 14,400.00
20,000.00 400.00
1,200,000.00 8,400.00
80,000.00 2,240.00
95,000.00 7,600.00
95,000.00 760.00
100,000.00 140.00
Jumlah 33,940.00
3,394.00
37,334.00
11,550,000.00
1,500,000.00 10,500,000.00
Jumlah 10,500,000.00
1,050,000.00
11,550,000.00
20,160,000.00
315,000.00 20,160,000.00
Jumlah 20,160,000.00
20,160,000.00
44,000,000.00
44,000,000.00 44,000,000.00
Jumlah 44,000,000.00
44,000,000.00
21,252,000.00
40,000.00 19,200,000.00
30,000.00 1,140,000.00
6,000.00 912,000.00
21,252,000.00
746,800.00
28,000.00 35,000.00 74,680.00
20,000.00 17,000.00
81,000.00 28,350.00
195,000.00 29,250.00
500.00 15,000.00
1,200.00 42,000.00
54,500.00 8,175.00
52,000.00 49,920.00
80,000.00 140,800.00
95,000.00 190,000.00
95,000.00 95,000.00
95,000.00 28,500.00
Jumlah 678,995.00
67,899.50
746,894.50

154,200.00
52,000.00 74,360.00
1,200,000.00 30,000.00
20,000.00 4,000.00
71,000.00 8,520.00
116,880.00 23,376.00
Jumlah 140,256.00
14,025.60
154,281.60

427,100.00
1,200,000.00 60,000.00
52,000.00 84,240.00
20,000.00 12,000.00
71,000.00 42,600.00
95,000.00 4,750.00
95,000.00 4,750.00
80,000.00 80,000.00
100,000.00 100,000.00
Jumlah 388,340.00
38,834.00
427,174.00

170,700.00
80,000.00 120,000.00
100,000.00 15,000.00

135,000.00 20,250.00
Jumlah 155,250.00
15,525.00 -
170,775.00 -

24,700.00
80,000.00 20,000.00
100,000.00 2,500.00
Jumlah 22,500.00
2,250.00
24,750.00

7,000.00
11,428.57 5,714.29
14,285.71 714.29
Jumlah 6,428.57
642.86
7,071.43

14,300.00
80,000.00 8,000.00
100,000.00 5,000.00
Jumlah 13,000.00
1,300.00
14,300.00

6,600.00
80,000.00 4,000.00
100,000.00 500.00
4,500.00 1,575.00
Jumlah 6,075.00
607.50
6,682.50

18,900.00
80,000.00 15,360.00
100,000.00 1,900.00
Jumlah 17,260.00
1,726.00
18,986.00

79,000.00
11,428.57 18,857.14 52,320.00
14,285.71 714.29
600,000.00 52,320.00
Jumlah 71,891.43
7,189.14
79,080.57

Err:509
Err:509 Err:509
80,000.00 24,000.00
100,000.00 1,000.00
Jumlah Err:509
Err:509
Err:509

198,000.00
141,500.00 169,800.00
14,285.71 4,285.71
600,000.00 6,000.00
Jumlah 180,085.71
18,008.57
198,094.29

100,100.00
55,000.00 66,000.00
80,000.00 24,000.00
100,000.00 1,000.00
Jumlah 91,000.00
9,100.00
100,100.00

9,800.00
11,428.57 674.29
14,285.71 84.29
429,000.00 8,193.90
Jumlah 8,952.47
895.25
9,847.72

27,500.00
80,000.00 24,000.00
100,000.00 1,000.00
Jumlah 25,000.00
2,500.00
27,500.00

105,800.00
45,000.00 75,000.00
80,000.00 20,000.00
95,000.00 712.50
95,000.00 47.50
100,000.00 450.00
Jumlah 96,210.00
9,621.00
105,831.00

236,600.00
175,000.00 176,750.00
80,000.00 12,000.00
95,000.00 23,750.00
95,000.00 2,375.00
100,000.00 300.00
Jumlah 215,175.00
21,517.50
236,692.50

738,800.00
180,000.00 216,000.00
1,200.00 140,400.00
195,000.00 109,395.00
80,000.00 120,000.00
95,000.00 71,250.00
95,000.00 7,125.00
100,000.00 7,500.00
Jumlah 671,670.00
67,167.00
738,837.00

834,700.00
180,000.00 216,000.00
1,200.00 242,400.00
195,000.00 94,575.00
80,000.00 120,000.00
95,000.00 71,250.00
95,000.00 7,125.00
100,000.00 7,500.00
Jumlah 758,850.00
75,885.00
834,735.00

55,000.00

1,200.00 7,608.00
195,000.00 2,340.00

80,000.00 24,000.00
95,000.00 13,300.00
95,000.00 1,330.00
100,000.00 1,500.00
Jumlah 50,078.00
5,007.80
55,085.80

40% BATU BELAH 869,000.00


180,000.00 86,400.00
1,200.00 232,800.00
195,000.00 60,840.00
141,500.00 66,222.00
80,000.00 240,000.00
95,000.00 80,750.00
95,000.00 8,075.00
100,000.00 15,000.00
Jumlah 790,087.00
79,008.70
869,095.70

Err:509
180,000.00 216,000.00
Err:509 Err:509
80,000.00 40,000.00
95,000.00 53,437.50
95,000.00 7,125.00
100,000.00 7,500.00
Jumlah Err:509
Err:509
Err:509

Err:509
1,200.00 276,000.00
Err:509 Err:509
175,000.00 130,229.17
80,000.00 96,000.00
95,000.00 19,000.00
95,000.00 1,900.00
100,000.00 6,000.00
Jumlah Err:509
Err:509
Err:509

115,200.00
1,200.00 17,244.00
625.00 43,750.00
195,000.00 7,800.00
80,000.00 24,000.00
95,000.00 9,500.00
95,000.00 950.00
100,000.00 1,500.00
Jumlah 104,744.00
10,474.40
115,218.40

Err:509
1,200.00 39,540.00 Err:509
Err:509 Err:509
195,000.00 17,745.00
80,000.00 48,000.00
95,000.00 19,000.00
95,000.00 1,900.00
100,000.00 3,000.00
Jumlah Err:509
Err:509
Err:509

108,600.00 22 1 m3 Pasang rollag bata mera


1,200.00 11,616.00 Upah :
625.00 43,750.00
195,000.00 8,775.00
80,000.00 24,000.00
95,000.00 9,500.00 Bahan :
95,000.00 950.00
100,000.00 160.00
Jumlah 98,751.00
9,875.10
108,626.10

849,200.00
625.00 328,125.00
65,000.00 151,450.00
195,000.00 82,485.00
95,000.00 57,000.00
80,000.00 144,000.00
100,000.00 9,000.00
Jumlah 772,060.00
77,206.00
849,266.00

56,000.00
1,200.00 9,331.20
195,000.00 4,485.00
80,000.00 20,000.00
95,000.00 14,250.00
95,000.00 1,425.00
100,000.00 1,500.00
Jumlah 50,991.20
5,099.12
56,090.32
54,200.00
1,200.00 8,280.00
195,000.00 3,900.00
80,000.00 20,000.00
95,000.00 14,250.00
95,000.00 1,425.00
100,000.00 1,500.00
Jumlah 49,355.00
4,935.50
54,290.50

36,300.00
1,200.00 103.68
195,000.00 1,170.00
80,000.00 20,000.00
95,000.00 9,500.00
95,000.00 950.00
100,000.00 1,300.00
Jumlah 33,023.68
3,302.37
36,326.05

77,800.00
1,200.00 16,980.00
195,000.00 7,605.00
80,000.00 24,000.00
95,000.00 19,000.00
95,000.00 1,900.00
100,000.00 1,300.00
Jumlah 70,785.00
7,078.50
77,863.50

29,800.00
1,200.00 3,900.00
80,000.00 12,000.00
95,000.00 9,500.00
95,000.00 950.00
100,000.00 750.00
Jumlah 27,100.00
2,710.00
29,810.00

37,300.00
1,200.00 1,243.20
195,000.00 975.00
80,000.00 20,000.00
95,000.00 9,500.00
95,000.00 950.00
100,000.00 1,300.00
Jumlah 33,968.20
3,396.82
37,365.02

102,000.00
10,000.00 70,000.00
80,000.00 9,600.00
95,000.00 11,400.00
95,000.00 1,140.00
100,000.00 600.00
Jumlah 92,740.00
9,274.00
102,014.00

420,100.00
250,000.00 275,000.00
1,200.00 7,200.00
195,000.00 6,045.00
80,000.00 65,400.00
95,000.00 21,375.00
95,000.00 3,562.50
100,000.00 3,380.00
Jumlah 381,962.50
38,196.25
420,158.75

196,100.00

75,000.00 75,000.00
1,200.00 14,100.00

80,000.00 49,600.00
95,000.00 33,250.00
95,000.00 3,325.00
100,000.00 3,000.00
Jumlah 178,275.00
17,827.50
196,102.50

N UNPOLISHED 154,400.00
65,000.00 65,650.00
1,200.00 9,600.00
195,000.00 5,850.00
11,000.00 143.00
80,000.00 15,000.00
95,000.00 35,625.00
95,000.00 6,650.00
100,000.00 1,880.00
Jumlah 140,398.00
14,039.80
154,437.80
154,400.00
65,000.00 65,650.00
1,200.00 9,600.00
195,000.00 5,850.00
11,000.00 143.00
80,000.00 15,000.00
95,000.00 35,625.00
95,000.00 6,650.00
100,000.00 1,880.00
Jumlah 140,398.00
14,039.80
154,437.80

149,400.00
60,000.00 60,600.00
1,200.00 9,600.00
195,000.00 5,850.00
11,000.00 143.00
80,000.00 15,000.00
95,000.00 35,625.00
95,000.00 7,125.00
100,000.00 1,880.00
Jumlah 135,823.00
13,582.30
149,405.30

o Un Polished 276,600.00
175,000.00 176,750.00
1,200.00 9,600.00
195,000.00 5,850.00
11,000.00 143.00
80,000.00 15,000.00
95,000.00 35,625.00
95,000.00 6,650.00
100,000.00 1,880.00
Jumlah 251,498.00
25,149.80
276,647.80

288,200.00 ###
185,000.00 186,850.00
1,200.00 9,600.00
195,000.00 5,850.00
11,000.00 143.00
80,000.00 15,000.00
95,000.00 35,625.00
95,000.00 7,125.00
100,000.00 1,880.00
Jumlah 262,073.00
26,207.30
288,280.30

61,000.00
15,000.00 37,500.00
1,200.00 1,800.00
195,000.00 975.00
11,000.00 550.00
80,000.00 4,000.00
95,000.00 4,750.00
95,000.00 950.00
100,000.00 5,000.00
Jumlah 55,525.00
5,552.50
61,077.50

22,000.00
68,000.00 6,800.00
25,000.00 5,000.00

80,000.00 4,800.00
95,000.00 2,850.00
95,000.00 285.00
100,000.00 300.00
Jumlah 20,035.00
2,003.50
22,038.50

55,200.00
15,000.00 37,500.00
1,200.00 3,000.00
195,000.00 1,365.00
80,000.00 4,800.00
95,000.00 285.00
95,000.00 285.00
100,000.00 3,000.00
Jumlah 50,235.00
5,023.50
55,258.50
32,300.00
10,000.00 16,700.00
1,200.00 3,000.00
195,000.00 1,365.00
80,000.00 4,800.00
95,000.00 285.00
95,000.00 285.00
100,000.00 3,000.00
Jumlah 29,435.00
2,943.50
32,378.50

10,333.33 17,256.67
1,200.00 3,000.00
195,000.00 1,365.00
80,000.00 4,800.00
95,000.00 285.00
95,000.00 285.00
100,000.00 3,000.00
Jumlah 29,991.67
2,999.17
32,990.83
34,300.00
70,000.00 18,200.00
30,000.00 3,000.00
22,000.00 2,200.00

80,000.00 1,600.00
85,000.00 5,355.00
95,000.00 598.50
100,000.00 300.00
-
Jumlah 31,253.50
3,125.35
34,378.85

40,000.00
90,000.00 23,400.00
30,000.00 3,000.00
22,000.00 2,200.00

80,000.00 1,600.00
85,000.00 5,355.00
95,000.00 598.50
100,000.00 300.00
-
Jumlah 36,453.50
3,645.35
40,098.85

68,200.00
55,000.00 9,185.00
32,500.00 2,697.50
55,000.00 11,000.00
5,000.00 2,000.00
26,000.00 3,900.00
7,500.00 375.00
80,000.00 12,000.00
85,000.00 17,000.00
95,000.00 2,850.00
100,000.00 1,000.00
Jumlah 62,007.50
6,200.75
68,208.25

71,000.00
55,000.00 9,185.00
80,000.00 16,000.00
5,000.00 2,000.00
26,000.00 3,900.00
7,500.00 375.00
80,000.00 8,000.00
85,000.00 21,250.00
95,000.00 2,850.00
100,000.00 1,000.00
Jumlah 64,560.00
6,456.00
71,016.00

90,500.00
80,000.00 13,360.00
55,000.00 9,185.00
80,000.00 16,000.00
5,000.00 2,000.00
26,000.00 3,900.00
37,000.00 3,071.00
34,156.00 1,707.80
80,000.00 8,000.00
85,000.00 21,250.00
95,000.00 2,850.00
100,000.00 1,000.00
Jumlah 82,323.80
8,232.38
90,556.18

102,000.00
42,500.00 1,275.00
29,000.00 5,800.00
29,000.00 580.00
31,000.00 310.00
25,000.00 2,500.00
92,500.00 18,500.00
7,500.00 75.00
17,000.00 3,400.00
5,000.00 500.00
80,000.00 20,000.00
85,000.00 34,000.00
95,000.00 3,800.00
100,000.00 2,000.00
Jumlah 92,740.00
9,274.00
102,014.00

65,900.00
48,500.00 20,612.50
5,000.00 2,000.00
26,000.00 3,900.00
7,500.00 375.00
80,000.00 8,000.00
85,000.00 21,250.00
95,000.00 2,850.00
100,000.00 1,000.00
Jumlah 59,987.50
5,998.75
65,986.25

2,100.00
80,000.00 80.00
85,000.00 85.00
95,000.00 19.00
100,000.00 10.00
125,000.00 25.00
75,000.00 1,500.00
500,000.00 100.00
8,500.00 85.00
28,500.00 28.50
1,932.50 0.39
Jumlah 1,932.89
193.29
2,126.18

3,300.00
32,500.00 1,300.00
8,500.00 255.00
28,500.00 114.00
80,000.00 320.00
85,000.00 170.00
95,000.00 190.00
100,000.00 100.00
2,449.00 612.25
Jumlah 3,061.25
306.13
3,367.38

8,300.00
80,000.00 4,000.00
85,000.00 1,700.00
95,000.00 285.00
100,000.00 100.00
6,085.00 1,521.25
Jumlah 7,606.25
760.63
8,366.88

24,600.00
15,000.00 16,500.00
80,000.00 4,800.00
85,000.00 510.00
95,000.00 570.00
100,000.00 30.00
Jumlah 22,410.00
2,241.00
24,651.00

22,200.00
13,000.00 14,300.00
80,000.00 4,800.00
85,000.00 510.00
95,000.00 570.00
100,000.00 30.00
Jumlah 20,210.00
2,021.00
22,231.00

75,800.00

22,000.00 23,100.00
25,000.00 500.00

80,000.00 16,000.00
85,000.00 25,500.00
95,000.00 2,850.00
100,000.00 1,000.00
Jumlah 68,950.00
6,895.00
75,845.00

237,200.00

125,000.00 131,250.00
25,000.00 500.00

80,000.00 12,000.00
85,000.00 63,750.00
95,000.00 7,600.00
100,000.00 600.00
Jumlah 215,700.00
21,570.00
237,270.00

121,100.00

9,000.00 45,000.00
8,250.00 2,268.75

80,000.00 28,000.00
85,000.00 29,750.00
95,000.00 3,325.00
100,000.00 1,800.00
Jumlah 110,143.75
11,014.38
121,158.13

126,900.00

9,000.00 45,000.00
15,000.00 7,500.00

80,000.00 28,000.00
85,000.00 29,750.00
95,000.00 3,325.00
100,000.00 1,800.00
Jumlah 115,375.00
11,537.50
126,912.50

207,700.00

21,000.00 105,000.00
21,000.00 21,000.00

80,000.00 28,000.00
85,000.00 29,750.00
95,000.00 3,325.00
100,000.00 1,800.00
Jumlah 188,875.00
18,887.50
207,762.50

CEALED GRID

54,000.00 81,000.00

21,500.00 116,100.00
11,400.00 2,280.00
15,000.00 23,250.00

80,000.00 40,000.00
85,000.00 42,500.00
95,000.00 475.00
100,000.00
Jumlah 305,605.00
30,560.50
336,165.50
48,000.00

76,000.00 27,664.00
25,000.00 2,750.00

80,000.00 8,000.00
85,000.00 4,250.00
95,000.00 475.00
100,000.00 500.00
Jumlah 43,639.00
4,363.90
48,002.90
79,100.00

128,000.00 46,592.00
110,000.00 12,100.00

80,000.00 8,000.00
85,000.00 4,250.00
95,000.00 475.00
100,000.00 500.00
Jumlah 71,917.00
7,191.70
79,108.70
159,900.00

15,000.00 75,000.00
15,000.00 7,500.00

80,000.00 28,000.00
85,000.00 29,750.00
95,000.00 3,325.00
100,000.00 1,800.00
Jumlah 145,375.00
14,537.50
159,912.50

124,900.00
73,000.00 87,600.00
35,000.00 7,000.00
75,000.00 1,500.00
85,000.00 17,000.00
95,000.00 190.00
105,000.00 262.50
Jumlah 113,552.50
11,355.25
124,907.75

480,100.00
377,000.00 377,000.00
75,000.00 26,250.00
85,000.00 29,750.00
95,000.00 3,325.00
100,000.00 175.00
Jumlah 436,500.00
43,650.00
480,150.00

30,900.00
15,500.00 15,500.00
65,000.00 975.00
80,000.00 2,000.00
85,000.00 8,500.00
95,000.00 950.00
100,000.00 200.00
Jumlah 28,125.00
2,812.50
30,937.50

Err:509
Err:509 Err:509
120,000.00 7,680.00
104,744.00 125,692.80
50,991.20 76,486.80
- -
17,260.00 2,541.54
Jumlah Err:509
Err:509
Err:509

Err:509
- -
Err:509 Err:509
104,744.00 22,834.19
50,991.20 32,634.37
5,000.00 5,000.00
Jumlah Err:509
Err:509
Err:509

Err:509
24,700.00 7,410.00
Err:509 Err:509
360,800.00 360,800.00
85,800.00 7,722.00
10,000.00 10,000.00
Jumlah Err:509
Err:509
Err:509

264,200.00

Rp 225,000.00 Rp 225,000.00
Rp 5,000.00 Rp 125.00

Rp 80,000.00 Rp 800.00
Rp 85,000.00 Rp 34,000.00
Rp 95,000.00 Rp 3,800.00
Rp 100,000.00 Rp 500.00
Jumlah 264,225.00 Rp 264,225.00
Rp 26,422.50
Rp 290,647.50
3,233,000.00

Rp 2,900,000.00 Rp 2,900,000.00
Rp 80,000.00 Rp 800.00
Rp 85,000.00 Rp 34,000.00
Rp 95,000.00 Rp 3,800.00
Rp 100,000.00 Rp 500.00
Jumlah 2,939,100.00 Rp 2,939,100.00
Rp 293,910.00
Rp 3,233,010.00
1,250,400.00

Rp 900,000.00 Rp 900,000.00

Rp 80,000.00 Rp 80,000.00
Rp 85,000.00 Rp 127,500.00
Rp 95,000.00 Rp 14,250.00
Rp 100,000.00 Rp 15,000.00
Jumlah 1,136,750.00 Rp 1,136,750.00
Rp 113,675.00
Rp 1,250,425.00
2,735,400.00

Rp 2,250,000.00 Rp 2,250,000.00

Rp 80,000.00 Rp 80,000.00
Rp 85,000.00 Rp 127,500.00
Rp 95,000.00 Rp 14,250.00
Rp 100,000.00 Rp 15,000.00
Jumlah 2,486,750.00 Rp 2,486,750.00
Rp 248,675.00
Rp 2,735,425.00
1,752,800.00

1,200,000.00 Rp 1,200,000.00
1,200.00 Rp 7,200.00
170,000.00 Rp 1,700.00
Rp 145,068.00

80,000.00 Rp 96,000.00
85,000.00 Rp 123,250.00
95,000.00 Rp 14,250.00
100,000.00 Rp 6,000.00
Jumlah 1,593,468.00 Rp 1,593,468.00
Rp 159,346.80
Rp 1,752,814.80
32,100.00
15,666.67 17,233.33
3,061.25 6,122.50
80,000.00 4,800.00
85,000.00 510.00
95,000.00 570.00
100,000.00 30.00
Jumlah 29,265.83
2,926.58
32,192.42

97,400.00
20,000.00 22,000.00
3,061.25 3,673.50
80,000.00 28,000.00
85,000.00 29,750.00
95,000.00 3,325.00
100,000.00 1,800.00
Jumlah 88,548.50
8,854.85
97,403.35

85,700.00
28,000.00 30,800.00
3,061.25 1,224.50
80,000.00 20,000.00
85,000.00 21,250.00
95,000.00 2,850.00
100,000.00 1,800.00
Jumlah 77,924.50
7,792.45
85,716.95

60,400.00
12,000,000.00 42,000.00
25,000.00 5,000.00

80,000.00 4,800.00
85,000.00 2,550.00
95,000.00 285.00
100,000.00 300.00
Jumlah 54,935.00
5,493.50
60,428.50

65,700.00
11,500.00 12,650.00
3,061.25 1,224.50
80,000.00 20,000.00
85,000.00 21,250.00
95,000.00 2,850.00
100,000.00 1,800.00
Jumlah 59,774.50
5,977.45
65,751.95

63,200.00
9,400.00 10,340.00
3,061.25 1,224.50
80,000.00 20,000.00
85,000.00 21,250.00
95,000.00 2,850.00
100,000.00 1,800.00
Jumlah 57,464.50
5,746.45
63,210.95
1 m3 Pasang rollag bata merah 1:5
0.6 Tukang batu a Rp. 75000 = Rp.
1.8 Pekerja a Rp. 65000 = Rp.
0.09 Mandor a Rp. 95000 = Rp.

525 bh batu bata a Rp. 500 = Rp.


2.33 zak semen portland a Rp. 65000 = Rp.
0.423 m3 pasir pasang a Rp. 195000 = Rp.
45000
117000
8550
Sub Total = Rp. 170550
262500
151450
82485
Sub Total = Rp. 496435
Upah + Ba = Rp. 666985 80038.2 /m2 a14 667000

Anda mungkin juga menyukai