DAFTAR CEKLIST MONITORING DAN EVALUASI KONSULTAN SUPERVISI

Kelengkapan di Basecamp
No Nama Paket Progres Fisik Gambar DMF
Schedule Spek Desain
Renc. Urpil AC BC Beton fc……. Urpil
PRESERVASI JALAN MATAOMPANA - DALAM KOTA Real. LPB AC WC Beton fc……. LPB
1 BAUBAU - BANABUNGI Deviasi LPA Beton fc……. LPA

Renc. Urpil AC BC Beton fc……. Urpil


Real. LPB AC WC Beton fc……. LPB
2 PRESERVASI JALAN SP3. WAKOKO - LASALIMU - KAMARU
Deviasi LPA Beton fc……. LPA

Renc. Urpil AC BC Beton fc……. Urpil


PRESERVASI JALAN WANCI - TOPANUANDA - JALAN Real. LPB AC WC Beton fc……. LPB
3 MASUK BANDARA Deviasi LPA Beton fc……. LPA

No. Nama Paket Kendala

PRESERVASI JALAN
1 MATAOMPANA - DALAM KOTA
BAUBAU - BANABUNGI
No. Nama Paket Kendala

PRESERVASI JALAN SP3.


2 WAKOKO - LASALIMU -
KAMARU

PRESERVASI JALAN WANCI -


3 TOPANUANDA - JALAN MASUK
BANDARA
Daftar Cat.
JMF Request Ket
Simak Harian

AC BC Beton fc…….
AC WC Beton fc…….
Beton fc…….

AC BC Beton fc…….
AC WC Beton fc…….
Beton fc…….

AC BC Beton fc…….
AC WC Beton fc…….
Beton fc…….

Saran
Saran
DAFTAR CEKLIST MONITORING DAN EVALUASI KONSULTAN SUPERVISI
Kelengkapan di Basecamp
Progres
No Nama Paket Gambar
Fisik Schedule Spek Desain
1
2
3
4
5
6
7
8
9
10
11
12

No. Nama Paket Kendala


1 0

2 0

3 0
No. Nama Paket Kendala
4

10
No. Nama Paket Kendala
11

12
Daftar
DMF JMF Request Keterangan
Simak

Saran
Saran
Saran
DAFTAR HADIR MONITORING DAN EVALUASI KONSULTAN
PAKET 03 - PENGAWASAN TEKNIS PRESERVASI REKON JALAN BTS. SULSEL - TOLALA - L

Personil
No PPK
Nomor
Jabatan/Posisi Nama APD Tanda Tanga
Kendaraan

1 Site Engineer Ir. Syafaruddin 1

2 Quality Engineer Patahuddin, ST

3 Quantity Engineer Ir. Baharuddin K 3

4 Inspector - 1 Muh. Adam, ST

5 Inspector - 2 Zulfadly, ST 5
PPK 1.1 Ir. PENIL DICKY, MM)

6 Inspector - 3 Makmur, ST

7 Inspector - 4 Sahir, ST 7

8 Surveyor -1 Isidorus Mboade, ST


PPK 1.1 Ir. PENI
Personil
No PPK
Nomor
Jabatan/Posisi Nama APD Tanda Tanga
Kendaraan

9 Surveyor -2 Suparman 9

10 Material Technician Rivai M, A.Md

11 Operator Computer/Draftman Suardin 11

12 Office Boy Bimo


LTAN SUPERVISI
LA - LELEWAWO PROV. SULTRA

Peralatan
Alamat Kantor / Mess Kantor
Tangan

8
Peralatan
Alamat Kantor / Mess Kantor
Tangan

10

12
TABEL MONITORING DAN EVALUASI SUPERVISI
Kontrak Fasilitas
Konsult
No Paket Nilai PPK
an No. TGL Lokasi Barang Jumlah Satuan Cek
(Rp)

2 Mobil 1 Unit

3 Motor 6 Unit

4 Komputer + Printer 1 Unit


PRESERVASI JALAN
MATAOMPANA -
5 DALAM KOTA BAUBAU - Kantor, Telp/Fax, Listrik, Air, dll 1 Unit
7 - PENGAWASAN JALAN DAN JEMBATAN PJN WIL III B (KEPULAUAN) PROV. SULTRA

BANABUNGI
6 Peralatan/Perlengkapan kantor 1 Set

8
HK 01 02-Bb21/P2JN SULTRA-PPKPW/P-07/226

9
PT. Arista Cipta - PT. Wira Marga (KSO)

PPK 3.1 Ir. PENIL DICKY, MM)

2 Mobil 1 Unit
13 Maret 2019
1,935,940,000

3 Motor 4 Unit
PRESERVASI JALAN SP3.
4 WAKOKO - LASALIMU - Komputer + Printer 1 Unit
KAMARU
5 Kantor, Telp/Fax, Listrik, Air, dll 1 Unit

6 Peralatan/Perlengkapan kantor 1 Set

1
HK
PAKET 07 - PENGAWASA
Kontrak Fasilitas
Konsult
No Paket Nilai PPK
an No. TGL Lokasi Barang Jumlah Satuan Cek
(Rp)

2 Mobil 1 Unit

3 Motor 4 Unit
PRESERVASI JALAN
WANCI - TOPANUANDA Komputer + Printer
4 1 Unit
- JALAN MASUK
BANDARA
5 Kantor, Telp/Fax, Listrik, Air, dll 1 Unit

6 Peralatan/Perlengkapan kantor 1 Set

7
UPERVISI
Personil
Waktu Tanggal
Jabatan/Posisi Nama Cek
(Bulan) Mobilisasi

Site Engineer Abd. Rachman ST 22-Mar-19

Quality/Quantity Engineer -01 Asdar, ST 22-Mar-19

Inspektor -01 Edy Sugiarto, A.Md 22-Mar-19

Inspektor -02 Ahmad, ST 22-Mar-19

Surveyor -01 Erwin, ST 22-Mar-19

Surveyor -02 Hariono, A.Md 22-Mar-19

Material Technician -01 Sutrisno, A.Md 22-Mar-19

Operator Computer/ Draftman -01 Rita Tri Yani, S.Pd.I 22-Mar-19

Office Boy -01 Mustalib 22-Mar-19

Site Engineer Abd. Rachman ST 22-Mar-19

Quality/Quantity Engineer-01 Jhoni Arung Sulle, ST 22-Mar-19

Inspektor PPK-14 Peningkatan AkseMuhammad Nasir, A.Md 22-Mar-19

Surveyor PPK-14 Hasnita Devi Eka Putri, ST 22-Mar-19

Material Technician PPK-14 Nurliana, ST 22-Mar-19

Operator Komputer -01 Rita Tri Yani, S.Pd.I 22-Mar-19

Office Boy Mustalib 22-Mar-19

Site Engineer Abd. Rachman ST 22-Mar-19


Personil
Waktu Tanggal
Jabatan/Posisi Nama Cek
(Bulan) Mobilisasi

Quality/Quantity Engineer -02 Jhoni Arung Sulle, ST 22-Mar-19

Inspektor -04 Muardin, A.Md 22-Mar-19

Surveyor -04 La Ode Rohani Buton, ST 22-Mar-19

Material Technician -02 Nurliana, ST 22-Mar-19

Operator Computer/ Draftman -02 Rahmawati, A.Md 22-Mar-19

Office Boy -02 Muh. Rahyuddin 22-Mar-19

Anda mungkin juga menyukai